Employment period : December 2001 to November 2002

Employer

: Det Norske Veritas AS Shanghai Station, China.

Position

: Surveyor.

Project

: CNOOC DF1-1 Oil & Gas Field Development Project

Location

: China.

Brief description:

Work as a surveyor in DNV Shanghai, PR China, providing inspection and 3 rd party certification

services to DF1-1 Gas Field Development Project. The field is located in Beibu Bay, 110KM off

Hainan Island. It consisted of a Central Processing Platform and 3 Well Head Platforms and an

Onshore Collecting Terminal DFTS. The gas produced was collected by the DF1-1 CEP collecting

platform and transferred to the Hainan Island via 110KM 22” API 5LX56 sub-sea gas line. There

was also a parallel sub-sea cable from the mainland to provide power to offshore consumers.

Responsibility & Job involved:

• Involved in topside fabrication surveillance.

• Involved in 103KM of offshore Sub-sea pipeline surveillance.

• Pipe manufacturing inspection and pipe coating inspection.

• Interpretation of radiographic films

• Interpretation & evaluating of RD-Tech automated UT systems on Serimer Dasa Saturnax-5

pipeline welding.

• Reviewed and approval of quality control and assurance procedures.

• Reviewed and approval of Pre-commissioning and Commissioning procedures.

• Conducting material receiving/verification inspection.

• Welding inspection for dimension, fit-up, visual for structures and piping.

• Witnessing WQT & WPQT for CS/SS/Duplex material.

• Perform process and system audits.

• Establishing NDE requirements and interpretation of codes and project specifications.

• Reviewed of NDE reports and NDE cross checking.

• Perform facility safety surveys.

• Perform coating inspection, adhesion testing and holiday testing.

• Conducting fabrication safety survey.

• 3 rd party inspection and verification of sacrificial anode to DNV RP B401 & BS 7361.

Applicable codes & standards.

Undersign is familiar with following standards and codes requirements, among others:

• API RP2A WSD, API2B, API2H, AWS D1.1-96, NACE RP001, NACE MR01-75, API RP14E,

API 1104, ANSI B31.2/31.4/31.8, ASME section II/V/VII/IX, SSPC specs, NFPA 70, API RP

500B, DNV RP B401 , BS 7361 and DNV-OS-F101 (2000), NACE TPC,DNV RP B401 and BS

7361, DNV B101, DNV C401, DNV E101, DNV RP-F103, DNV RP-B403.

Curriculum Vitae of Charlie Chong updated on 2022 October / Page 20 of 40