22.10.2014 Views

Rapport - November 2009 - Unipart Rail

Rapport - November 2009 - Unipart Rail

Rapport - November 2009 - Unipart Rail

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

2 Traction and Rolling Stock Traction and Rolling Stock 3<br />

Inside this<br />

Issue…<br />

Traction and Rolling Stock<br />

<strong>Unipart</strong> <strong>Rail</strong> becomes OEM<br />

supplier to Siemens 2<br />

A move from spare parts<br />

provider to OEM supplier<br />

Improved Lighting sticks 3<br />

Dependable light when you need it most<br />

Value Added Service – Kitting 4<br />

East Midlands Trains improves<br />

productivity with kitting<br />

A Partnership for the Supply of<br />

150 Bogies 5<br />

<strong>Unipart</strong> <strong>Rail</strong> and LH Group enter<br />

a new relationship for Class 150<br />

C4 bogie overhaul work<br />

<strong>Unipart</strong> Expert Practices in Australia 6<br />

<strong>Unipart</strong> <strong>Rail</strong> Expert Practices supports<br />

<strong>Rail</strong>Corp’s CI programme<br />

<strong>Unipart</strong> <strong>Rail</strong> and 3M 6<br />

A new partnership offering the<br />

full range of 3M rail products<br />

Product & Service Solutions 8 & 9<br />

CCTV bespoke design DVR<br />

replacement and Vehicle Movers<br />

New Directors for <strong>Unipart</strong> <strong>Rail</strong> 10<br />

Welcome to our new T&RS<br />

Engineering Director and Business<br />

Development Director (DACH)<br />

Infrastructure<br />

Kitting Services for Balfour Beatty 11<br />

A remote warehouse kitting service<br />

to support electrification work<br />

New Framework Contracts with<br />

Network <strong>Rail</strong> 12<br />

New contracts for the supply of<br />

Cables, Relay’s, LED Signal Heads<br />

and Banner Heads<br />

Consultants to the Crossrail Project 13<br />

<strong>Unipart</strong> <strong>Rail</strong> provides logistics consultancy<br />

Let building Commence 13<br />

New 4-REB control centre<br />

for London Underground<br />

More New Products 14<br />

New innovations for the railway system,<br />

latest developments in Point Heating<br />

Electrification Improvements 15<br />

Expanding the range of products &<br />

services for Overhead Line Equipment<br />

& Third <strong>Rail</strong> Electrification<br />

<strong>Unipart</strong> Group<br />

Ambassador Role for<br />

Chief Executive 16<br />

John Neill is appointed as HRH The Prince<br />

of Wales’Ambassador for the South East<br />

Hat Trick of Gold Awards 16<br />

<strong>Unipart</strong> awarded ‘Gold Status’ in BITC’s<br />

Corporate Responsibility Index<br />

<strong>Unipart</strong> <strong>Rail</strong> becomes OEM to Siemens<br />

For many years, <strong>Unipart</strong> <strong>Rail</strong> has been one of Britain’s most important logistic<br />

service providers for the rail aftermarket, and has more recently been actively<br />

establishing itself within the world-wide rail aftermarket as both a spare<br />

parts provider and an OEM supplier.<br />

This move towards becoming an OEM The success of these projects led to both<br />

supplier was started by <strong>Unipart</strong> <strong>Rail</strong> companies discussing more long-term<br />

manufacturing ‘niche’ products to provide partnerships, which has culminated in<br />

the rail industry with reliable, high quality <strong>Unipart</strong> <strong>Rail</strong> and Siemens jointly entering<br />

products at competitive prices. Against a framework agreement to provide ‘niche’<br />

fierce competition, <strong>Unipart</strong> <strong>Rail</strong> won products such as E-APC Receivers AWS/<br />

orders from Siemens Germany to provide TPWS and DRA units to Siemens’ entire<br />

E-APC Receivers to Siemens’ West UK fleet. The <strong>Unipart</strong> <strong>Rail</strong> team was led by<br />

Midlands Franchise and Mumbai projects. Sven Busche, Paul Jolly and Tom Monk.<br />

The first 350/2 comes off the production line. Photo courtesy of London Midland ©<strong>2009</strong>.<br />

To check product quality and safety<br />

standards, Siemens audited <strong>Unipart</strong> <strong>Rail</strong>’s<br />

site in Crewe twice. The first audit in<br />

2008 focused on general manufacturing<br />

skills, project management capabilities and<br />

logistical expertise. In June <strong>2009</strong> Siemens<br />

returned to Crewe for the first article<br />

inspection concentrating on the quality<br />

of the first batch of ‘niche’ products.<br />

Siemens was delighted to see such a good<br />

combination of technical rail know-how,<br />

logistical capabilities, project management<br />

skills and product quality. <strong>Unipart</strong> <strong>Rail</strong><br />

started delivering its first ‘niche’ products<br />

in July <strong>2009</strong> for Siemens’ Scot<strong>Rail</strong> project.<br />

This framework agreement represents<br />

a major step change, from spare parts<br />

provider to OEM supplier demonstrating<br />

<strong>Unipart</strong> <strong>Rail</strong>’s commitment to improved<br />

safety and enhanced quality in the rail<br />

industry over many years.<br />

...a major step<br />

change, from<br />

spare parts<br />

provider<br />

to OEM<br />

supplier...<br />

Emergency<br />

Lighting<br />

Sticks<br />

POWERFUL, PORTABLE,<br />

RELIABLE light that<br />

produces no heat,<br />

flames or sparks.<br />

Working in partnership with Cyalume<br />

Technologies, <strong>Unipart</strong> <strong>Rail</strong> is now<br />

distributing a range of evacuation lighting<br />

products.<br />

Order the New 10” system which<br />

replaces the 6” one NOW!<br />

4 Provides safety and reassurance<br />

4 360º light for four hours<br />

4 Easy to install and maintain<br />

4 GM/RT2130<br />

4 Reach compliant EC N° 1907/2006<br />

4 EN ISO 9001: 2000<br />

EvacLight and EvacStations provide<br />

passengers with a feeling of safety and<br />

comfort as a visible aid in the event of<br />

lighting failure. Typically situated near the<br />

train exit, when the housing is opened, all<br />

the EvacLights within will be illuminated.<br />

Evacuees can remove the EvacLight and<br />

proceed with the evacuation process.<br />

Contact: trsenquiries@unipartrail.com<br />

to PLACE YOUR ORDER NOW or<br />

request an onsite demonstration, or view<br />

a video at www.unipartrail.com/cyalume<br />

Dependable<br />

light when<br />

you need it<br />

the most.<br />

...for Infrastructure and T&RS News from

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!