Ferrous Solutions - Outotec
Ferrous Solutions - Outotec
Ferrous Solutions - Outotec
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Samarco 3 – project overview<br />
• <strong>Outotec</strong>’s scope<br />
• Design, engineering, delivery and construction of the core plant<br />
(induration furnace) on a lump-sum-turnkey basis<br />
• Contract value<br />
• > EUR 160 million (200 USD)<br />
• Project implementation time<br />
• 30 months<br />
• Erection quantities<br />
• 5,623 tonnes of steel structure and 11,265 tonnes of equipment<br />
• Origin of supplies and services<br />
• Approximately 80% from Brazil<br />
• Approximately 20% from abroad<br />
8<br />
Nov 15, 2011<br />
<strong>Outotec</strong> CMD/<strong>Ferrous</strong> <strong>Solutions</strong><br />
© <strong>Outotec</strong> - All rights reserved