23.10.2014 Views

Ferrous Solutions - Outotec

Ferrous Solutions - Outotec

Ferrous Solutions - Outotec

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Samarco 3 – project overview<br />

• <strong>Outotec</strong>’s scope<br />

• Design, engineering, delivery and construction of the core plant<br />

(induration furnace) on a lump-sum-turnkey basis<br />

• Contract value<br />

• > EUR 160 million (200 USD)<br />

• Project implementation time<br />

• 30 months<br />

• Erection quantities<br />

• 5,623 tonnes of steel structure and 11,265 tonnes of equipment<br />

• Origin of supplies and services<br />

• Approximately 80% from Brazil<br />

• Approximately 20% from abroad<br />

8<br />

Nov 15, 2011<br />

<strong>Outotec</strong> CMD/<strong>Ferrous</strong> <strong>Solutions</strong><br />

© <strong>Outotec</strong> - All rights reserved

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!