26.10.2014 Views

Procurement and Supply Chain - Oakdene Hollins

Procurement and Supply Chain - Oakdene Hollins

Procurement and Supply Chain - Oakdene Hollins

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

WR1403: Business Waste Prevention Evidence Review<br />

L2m4-3: <strong>Procurement</strong> & <strong>Supply</strong> <strong>Chain</strong><br />

Table 1: Summary of waste minimisation evidence<br />

Category Supported Description Outcomes Ref<br />

ID<br />

Supplier<br />

packaging<br />

reduction<br />

Waste<br />

minimisation<br />

clauses<br />

Envirowise<br />

Oregon<br />

Department of<br />

Environmental<br />

Quality<br />

No<br />

No<br />

No<br />

No<br />

No<br />

No<br />

WRAP<br />

Potential waste savings found at Danwood<br />

Group, a supplier of office solutions to<br />

Manchester United Football Club, after visit<br />

from Envirowise advisor<br />

Norm Thompson Outfitters, USA engaged<br />

suppliers to reduce underpacking of “Save<br />

Your Back” bags<br />

US retailer Wal-Mart worked with toy<br />

supplier to reduce packaging on 255<br />

products<br />

New Zeal<strong>and</strong> retailer The Warehouse<br />

reduced packaging associated with men’s<br />

shirts<br />

Osborne Civil Engineering worked with<br />

suppliers to deliver materials without<br />

packaging during Peterborough<br />

redevelopment<br />

Kier Nuttall introduced waste minimisation<br />

clauses in supplier contracts during Channel<br />

Tunnel Rail Link construction. Waste<br />

aggregate reused on site.<br />

Wessex Water required trade contractors to<br />

pay for any excess materials – preventing<br />

over-ordering<br />

Wilmott Dixon required subcontractors to<br />

price their work to include material costs<br />

incentivising waste minimisation during<br />

construction of Jubilee Gardens Primary Care<br />

Centre in Ealing<br />

Graham Construction incorporated WRAP’s<br />

model wording into contract to reduce waste<br />

<strong>and</strong> report arisings per £100k project spend<br />

prior to construction of health centre in<br />

Scotl<strong>and</strong><br />

EMS No ISO14001 is widespread in the German<br />

automotive industry because suppliers need<br />

to demonstrate their accreditation<br />

Reuse of surplus<br />

food by<br />

charities<br />

FareShare<br />

scheme<br />

Source: Collated by <strong>Oakdene</strong> <strong>Hollins</strong>/Brook Lyndhurst<br />

Food manufacturers encouraged by retailer<br />

customers to participate in the FareShare<br />

scheme donating surplus food to charity.<br />

£9,300/yr savings<br />

(projected only)<br />

(16)<br />

$2,900/yr savings (17)<br />

$2.4m/yr in shipping costs<br />

saved; “3,800 trees <strong>and</strong><br />

1,000 barrels of oil”<br />

saved/yr<br />

(18)<br />

4 t/yr plastic saved (19)<br />

n/a (10)<br />

130 kt/yr material saved;<br />

savings of £260,000 in<br />

l<strong>and</strong>fill taxes; 8,000 vehicle<br />

movements avoided<br />

(9)<br />

n/a (12)<br />

On-site wastage was 28.8<br />

m 3 per £100k of project<br />

spend, (under target of<br />

45m 3 per £100k)<br />

total saving of £77.8k<br />

(Projected)<br />

(11)<br />

(14)<br />

n/a (21)<br />

3kt of food waste saved in<br />

2009-10<br />

a<br />

a Fare Share’s Marketing & Communications Manager, personal communication, January 2011<br />

10 For Defra

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!