ENERGY AND GREENHOUSE GAS MANAGEMENT<br />

PCP Milestone 4 <strong>and</strong> 5 Report<br />

Initiative 3: Build All New Municipal Buildings to High Energy Efficient St<strong>and</strong>ards<br />

Action 5:<br />

Status:<br />

Green building policy – Require all new buildings greater than 500 m 2 (approx.<br />

5382 square feet) to meet the BC Energy Efficient Buildings Plan Target <strong>for</strong> new<br />

construction.<br />

Not <strong>for</strong>mally implemented<br />

The City identifies opportunities <strong>for</strong> energy efficiency <strong>and</strong> alternative energy in new buildings on a<br />

case-by-case basis. Currently the City is in the process of building a new RCMP building that is<br />

expected to attain LEED Gold. Design features may include: exhaust heat recovery, increased<br />

insulation, daylight harvesting, groundwater cooling, <strong>and</strong> innovative lighting controls. The facility is<br />

expected to connect to the District Energy System as part of Phase 2. The City is identifying higher<br />

energy efficiency measures <strong>for</strong> the upcoming building at the 18 th Avenue Yard.<br />

Source: http://www.pgcitycentre.ca/Documents/CityCentreProspectus(Oct2011).pdf<br />

Future initiatives: The City has not defined a <strong>for</strong>mal policy to ensure all buildings meet a minimum<br />

energy st<strong>and</strong>ard that exceeds the building code. Defining such a policy may assist in communicating<br />

the ongoing ef<strong>for</strong>ts to build energy efficient buildings.<br />

Initiative 4: Implement a Consolidated Fleet Energy Management Strategy<br />

Action 6:<br />

Status:<br />

Action 7:<br />

Status:<br />

Evaluate fleet management system – Evaluate an appropriate system <strong>for</strong> fleet<br />

management <strong>and</strong> evaluate the potential benefits of joining the Fleet E3 program.<br />

Completed<br />

Implement fleet management systems <strong>and</strong> training – Implement (or revise<br />

existing) fleet management systems <strong>and</strong> training with the objective of reducing<br />

energy consumption.<br />

Completed; ongoing implementation<br />