27.10.2014 Views

Escala M6-715

Escala M6-715

Escala M6-715

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Technical specifications<br />

ARCHITECTURE<br />

Bulding block packaging<br />

19” rack drawer (4U) / 1-4 nodes per system<br />

Max building blocks per system / max U’s 4 /16U<br />

Number of cores (processors) per system 12 – 48 (12 cores per processor card) 16 – 64 (16 cores per processor card)<br />

CPU core clock rate 12, 24, 36, 48 at 4.22 GHz 16, 32, 48, 64 at 3.8GHz<br />

Processor (Four Single Chip Module)<br />

System Memory per building block (min-max)<br />

L2 cache<br />

L3 cache<br />

64-bit POWER7+<br />

64 GB – 1 TB (1066 MHz DDR3) / 128 GB – 4 TB (1066 MHz DDR3)<br />

256 KB<br />

10 MB<br />

AIX 6.1/7.1<br />

Standard<br />

Media bays Slimline bays per building block 1<br />

DVD RAM<br />

RDX USB External docking station<br />

Expandability<br />

CEC Slots for hot swap PCI-E adapters 6 x PCIe Gen2<br />

CEC Slots for hot-swap SAS disk drive bays 6<br />

System Internal disk capacity ( 24 disk x 900GB)<br />

Expansion drawers (4 per CEC) 16x 10 PCIe/18 disks<br />

Additional expandability through drawers 160 PCIe/ 288 disks<br />

Bull StoreWay disk subsystems Optional<br />

EMC2 disk subsystems Optional<br />

Netapp disk subsystem Optional<br />

Integrated multifuncition card<br />

2 Ports USB / 1 Serial / 4 Ethernet<br />

Choice of Integrated Multifunction Card options (maximum of<br />

one per enclosure)<br />

Dual 10 Gb Optical + Dual 1 Gb Ethernet Optional<br />

Dual 10 Gb Copper + Dual 1 Gb Ethernet Optional<br />

Consoles<br />

HMC (optional)<br />

Specifications<br />

Warranty<br />

Operating temperature 5 to 35 degrees C<br />

Relative humidity 8% to 80%<br />

Operating voltage 200 to 240 V, 80+ compliant<br />

1 year Customer Replacement Unit (CRU)<br />

Warranty extension (Optional)<br />

VIRTUALIZATION<br />

Maximum Logical Partitions<br />

Power on Demand (PoD) support<br />

Advanced Virtualisation Features (PowerVM)<br />

Live Partition migration<br />

Up to 1000 per system<br />

Yes<br />

Optional<br />

Optional with PowerVM Enterprise<br />

↳ The features<br />

Chipkill ECC, bit-steering memory<br />

Service processor<br />

Hot-node add<br />

Cold-node repair<br />

Dynamic processor deactivation<br />

Redundant hot-plug fans<br />

Redundant hot-plug power supply<br />

Active Memory Mirroring (optional)<br />

High Availability: ARF V8, PowerHA 7.1 (optional)<br />

Max rPerfs with AIX 6.1: 3.8 GHz (4): 219.3(16), 410.8(32), 570.1(48), 729.3(64)<br />

4.2 GHz (3): 184.2(12), 345.1(24), 478.9(36), 612.7(48)<br />

S-<strong>Escala</strong><strong>M6</strong>-<strong>715</strong>-en2<br />

Contact us: info.servers@bull.net<br />

©Bull SAS - 2012 - RCS Versailles B 642 058 739 - RCS Versailles B 642 058 739 – All trademarks mentioned herein are the property of their respective owners. Bull reserves the right to modify this document at any<br />

time without prior notice. Some offers or parts of offers described in this document may not be available locally. Please contact your local Bull correspondent to know which offers are available in your country. This<br />

document has no contractual significance.<br />

UK: Bull Maxted Road, Hemel Hempstead, Hertfordshire HP2 7DZ / USA: Bull 300 Concord Road, Billerica, MA 01821<br />

Bull - Rue Jean Jaurès - 78340 Les Clayes sous Bois - France<br />

This flyer is printed on paper containing 40% eco-certifed fibers originating from sustainably managed forests and 60% recycled fibers, in conformity with environmental regulations (ISO 14001).<br />

Design: T2BH / Photos:…..

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!