Balance of <strong>Medford</strong> <strong>Street</strong> <strong>Bridge</strong> Work as<br />
Planned:<br />
2013 Closures<br />
• 07/01/13 to 07/03/13 Continued Sidewalk Closure<br />
• 07/04/13 No Work/Open for Holiday Access<br />
• 07/05/13 to 07/21/13: Full Road Closure<br />
• October to December 2013: Single Lane Closures<br />
2014 Closures<br />
• May 2014: Two Weekends of Full Road Closures<br />
• May to July 2014: Single Lane Closures<br />