01.11.2014 Views

iH BYAM PROPELLER SERVICE INC. - Controller

iH BYAM PROPELLER SERVICE INC. - Controller

iH BYAM PROPELLER SERVICE INC. - Controller

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

i H<br />

<strong>BYAM</strong> <strong>PROPELLER</strong> <strong>SERVICE</strong> <strong>INC</strong>. <br />

<strong>BYAM</strong> <strong>PROPELLER</strong> <strong>SERVICE</strong> <strong>INC</strong>. <br />

4001 N. MAIN ST., HANGER 7 SOUTH <br />

MEACHAM INTERNATIONAL AIRPORT <br />

FORT WORTH, TEXAS 76106 <br />

FAA. RE PAIR STATION WN 1 R590K <br />

BUS:(817) 625-0 161 FAX:(817) 626-0009 <br />

Propeller Logbook


<strong>PROPELLER</strong> MAINTE NANCE RECORD <br />

LEFT ENGINE<br />

RIGHT ENGINE<br />

Hub Model { ( ,_ h ._) '


1. Approving N ati onal Aviation 2. i ~. Fo:'"m Trac king Nemher: I<br />

Authoritv/Coun try:<br />

FAAlUnited States<br />

AUTHORIZED RELEASE CERTIFICATE<br />

BPS 06-29211<br />

FAA Form 8130-3, AIRWORTHINESS APPROVAL TAG<br />

4. Organiz.ation Name and Address: By am Propc:.U~r Se rvo In c . S. Work Order/Contract/Invoice<br />

(tol) 817 -625 -01 6 1 (fax) 81 7 -626 -0009<br />

4001 N. Main Hanger 7 South<br />

Nwnber:<br />

(ul) 8 17 -625-0006<br />

Ft.. Worth . fe xa s 7 6106<br />

29211<br />

6. Item: 7. Description: 8. Part Number: 9. Eligibihty:' 10. Quan ti ty: I\. Serialffiatch Number: 12. StatusfWork:<br />

1 Hartzell<br />

Propeller HC-B31N-3B n/a 1 BUA21469 overhaul<br />

13. Remarks:<br />

Propeller disassembled, inspected and overhauled. Reassembled, polane painted and<br />

balanced. C/W AD: 2005-14-12, 72-08-04, 83-08-OlR2, 96-15-04; C/W SB: 61-279R4,<br />

l37A, 61-136R1, 61-256, 61-261R1, 6l-280.-------END-------------­<br />

blade model: TlOl73B-10 Serial number: D53359, D53381, D54577<br />

14. Certifies the it ems identified above were manufactured in confonnity to: 19. ¥i


DESCRIPTION OF ALL OPERATIONS <br />

PERTAINING TO AIRWORTHINESS llIRECTIVES. <br />

<strong>SERVICE</strong> BULLETINS. <strong>SERVICE</strong> LETTERS. <br />

&MINOR ADJUSTMENTS <br />

TACH<br />

DATE TIME DESCRIPTION OF WORK SIGNATURE<br />

April 13,2006<br />

HARTZELL HC-B3TN-3B HUB SIN BUA-21469 TT: 7567.1 TSO: 0.0<br />

Installed overhauled propeller in left position on KING AIR C90 N240RE SIN LJ-570 <br />

HM 64815 TTAF 9081.5 LANDINGS 8553, in conjunction with Phase II inspection. <br />

Installation in accordance with C90 Maintenance Manual Chapter 61 and in compliance <br />

with '\D 200.'i-14-12. (See B YAM Propeller work order # 29211). <br />

I certify that this propeller has been inspected in accordance with Raytheon (phase II) <br />

inspection program per FAR 91409(F) and found to be in airworthy condition <br />

Michael Hornstrom A&P2306859


TACH<br />

TIME<br />

CJ/~~<br />

DESCRIPTION OF ALL OPERATIONS<br />

PERTAINING TO AIRWORTHINESS DIRECTIVES.<br />

<strong>SERVICE</strong> BULLETINS. <strong>SERVICE</strong> LETTERS.<br />

& MINOR ADJUSTMENTS


j<br />

1<br />

~<br />

OAT<br />

Gray Enterprises<br />

Open at date : 2/18/2008<br />

Close date : 4/4/2008<br />

W/O#: 1582<br />

Tel: (706) 937-6615<br />

Page: 1 Of 1<br />

For Aircraft : N73MH , Propeller HC-B3TN-3 , BUA21469<br />

Total: Hours 7871.60 Cycles Landings Other<br />

Propeller TSO 304.50 CSO LSO OSO<br />

Hourmeter: 6786.0 Conducted Phase 1 & 2 Inspection<br />

Performed Inspection - Scheduled,Phase Inspection. 200 Hour Phase Inspection.<br />

Conducted Phase 1 & 2 of the Hawker Beechcraft Scheduled Inspection Program in<br />

accordance with Chapter 5-21-01, 5-21-02 & 5-21-05 of the 90 Series Maintenance<br />

Manual.<br />

2 Performed Lubrication,Propelier Blade Bearings (2 zerks per blade) .. Lubricated propeller<br />

blade bearings with Aeroshell #6 Grease.<br />

3 Performed Lubrication,Low Pitch Stop Rods . . Lubricated propeller low pitch stop rods<br />

with Marvel Mystery Oil.<br />

Certificate of return to serv :-,-,-"e_--: icc:.<br />

This AircraftfAircraft Engine/Propeller has been inspected in accordance with FAR 91.409(f)3<br />

and Raytheon/Beech Phase Inspection Program , discrepancies were repaired & inspected in<br />

accordance with current regulations of the FAA and is Approved for Return to Service.<br />

Signed off by :<br />

James E. Gray<br />

Certificate Number : A&P 2989218<br />

/"\<br />

Signature :


Gray Enterprises<br />

Open at date : 2/10/2009<br />

Close date: 4/4/2009<br />

W/O#: 1608<br />

Tel: (706) 937-6615<br />

118 Spring Hill Drive Ringgold GA U.S.A. 30736 Page: 1 Of 1<br />

For Aircraft . N73MH , Propeller HC-B3TN-3 , BUA21469<br />

DATE Total: Hours 7951.40 Cycles Landings Other<br />

Propeller TSO 384 .30 CSO LSO OSO<br />

Hourmeter: 6865.8 - Phase 3 & 4 Inspections<br />

Performed Inspection - Scheduled,Phase Inspection. 200 Hour Phase Inspection.<br />

Conducted Phase 3 & 4 Inspections of the Hawker Beechcraft Scheduled Inspection<br />

Program in accordance with Chapter 5-21-01 , 5-21-03,5-21-04 & 8-21-05 of the 90<br />

Series Maintenance Manual.<br />

2 Performed Lubrication,Propelier Blade Bearings (2 zerks per blade) .. Lubricated propeller<br />

blade bearings with Aeroshell #6 Grease, in accordance with Beech 90 Series<br />

Maintenance Manual.<br />

3 Performed Lubrication,Propelier Low Pitch Stop Rods (Reversing Propeller). Lubrication<br />

Schedule - Propeller Lubricated low pitch stop rods with Marvel Mystery Oil, n<br />

accordance with Beech90 Series Maintenance Manual.<br />

CertifiCate of reiurn to service<br />

This Aircraft/Aircraft Engine/Propeller has been inspected in accordance with FAR 91.409(f)3<br />

and Raytheon/Beech Phase Inspection Program, discrepancies were repaired & inspected in<br />

accordance with current regulations of the FAA and is Approved for Return to Service.<br />

Signed off by :<br />

James E. Gray<br />

Certificate Number: A&P /}2989218<br />

Signature:

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!