mobile county bicentennial bicycle & pedestrian ... - Mobile MPO
mobile county bicentennial bicycle & pedestrian ... - Mobile MPO
mobile county bicentennial bicycle & pedestrian ... - Mobile MPO
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Roadway Characteristics Continued – City of <strong>Mobile</strong> & Surrounding Metro Area<br />
(Includes Chickasaw, Dawes, Eight Mile, Prichard, & Saraland)<br />
Street Lanes Pavement<br />
Edge<br />
Shoulder<br />
On<br />
Street<br />
Parking<br />
Applicable Bikeway<br />
Design Guideline<br />
Figure<br />
University Blvd. (North) 4, 5, 6 Curb None No Figure 1<br />
University Blvd. (South) 4, 5 Curb None No Figure 1<br />
Virginia Street 2 None None No Figure 2<br />
Virginia Street 3 Curb None No Figures 1 & 3<br />
Water Street (North) 4, 6 Curb None No Figure 1<br />
Water Street (North) 2 None None No Figure 2<br />
Zeigler Blvd. 2, 4, 5 Curb None No Figure 1<br />
Zeigler Blvd. 2 None None No Figure 2<br />
Roadway Characteristics – <strong>Mobile</strong> County Roads Outside the City of <strong>Mobile</strong> Metro Area<br />
Street Lanes Pavement<br />
Edge<br />
County Road 41:<br />
From Citronelle Walk & Bike Trail to Cedar Creek<br />
State Park<br />
US Hwy 45:<br />
From Industrial Pkwy (Hwy 158) to Citronelle Walk<br />
& Bike Trail (at Celeste Road)<br />
US Hwy 90:<br />
From Theodore Dawes Road (Cty 30) to MS State<br />
Line<br />
Hwy 188:<br />
From US Hwy 193 (Grand Bay) to Hwy 193 (Heron<br />
Bay)<br />
Shoulder<br />
On<br />
Street<br />
Parking<br />
Applicable Bikeway<br />
Design Guideline<br />
Figure<br />
3 None None No Figure 2<br />
2, 3 None None No Figure 2<br />
2, 3, 5 None<br />
2, 3 None<br />
Yes (Has min. 3’ striped /<br />
paved shoulder both sides -<br />
areas with warning stripes)<br />
Yes (Has min. 3’ striped /<br />
paved shoulder 1 side, from<br />
Bayou La Batre to Coden)<br />
No Figure 2<br />
Yes Figure 2