04.11.2014 Views

schematic layouts

schematic layouts

schematic layouts

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

S a n P a b l o A v e n u e<br />

5<br />

1<br />

1<br />

5 5<br />

3<br />

R . O .W.<br />

6<br />

4<br />

2<br />

B a n k o f A m e r i c a<br />

Stormwater Improvement Concept Plan<br />

Scale: 1”=20’<br />

January 2013<br />

N<br />

1<br />

Stormwater curb extensions capture runoff from San Pablo<br />

Avenue.<br />

4<br />

Existing ADA accessible parking spaces to remain at current<br />

location.<br />

2<br />

3<br />

Sidewalk rain garden captures stormwater from private<br />

parking lot. This will require acceptance and coordination of<br />

improvements with private owner.<br />

A boardwalk allows stormwater to be connected between the curb<br />

extension and rain garden.<br />

5<br />

6<br />

Existing large canopy street trees to remain. Stormwater facility is<br />

graded to allow existing street trees to remain.<br />

Sidewalk rain garden captures stormwater from private parking<br />

lot. Existing signs and utilities will need to be protected.<br />

San Pablo Avenue Green Stormwater Spine Project<br />

City of El Cerrito, California<br />

[ nev-ū-non ]<br />

Nevue Ngan Associates

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!