05.11.2014 Views

Swimming Pools - Forsyth County Government

Swimming Pools - Forsyth County Government

Swimming Pools - Forsyth County Government

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Commercial<br />

SWIMMING<br />

POOL<br />

PERMIT<br />

PACKET


CHECKLIST<br />

Please complete the entire application package, including:<br />

□ Permit Details Form<br />

□ Property Owner Authorization Form or signed copy of Sales Contract<br />

□ Affidavits<br />

1. Georgia State Energy Code affidavit.<br />

2. Contractor Affidavits – Required. ( must be signed and submitted prior to applying for<br />

building permit)<br />

• Electrical affidavit/ Temp to Perm.<br />

• Plumbing affidavit.<br />

3. Pool Drain Discharge Location Affidavit.<br />

□ Georgia Erosion & Sediment Control Certification Card – attach copy of card<br />

□ Temporary Toilet / Exemption Form – Required by <strong>Forsyth</strong> <strong>County</strong> Health Department (will<br />

be signed at building permit submittal)<br />

□ Septic Tank Permit – Required if on septic. Obtain at <strong>Forsyth</strong> <strong>County</strong> Health Department<br />

(770-781-6909) prior to applying for building permit.<br />

□ Site Plan – Scale drawing 2 copies 8 ½ x 11 see page 3 for additional requirements<br />

□ Individual lot permit – if applicable<br />

□ Fees – See <strong>Forsyth</strong> <strong>County</strong> Department of Planning and Community Development Fee<br />

Schedule. Impact fees are required for all new finished space.<br />

FORSYTH COUNTY, GA – COMMERCIAL<br />

SWIMMING POOL PERMIT APPLICATION -Page 1 -


GENERAL INFORMATION<br />

**All site plans and permit cards are to remain onsite<br />

until a Certificate of Occupancy has been obtained **<br />

COMMERCIAL SITE PLAN REQUIREMENTS<br />

A site plan is required for any proposed Commercial building or structures, any proposed addition to<br />

an existing Commercial building or structure, any proposed Commercial accessory building or<br />

structure, including swimming pools and retaining walls. The following information is required to be<br />

on site plan.<br />

a. Property lines with dimensions<br />

b. Location and names of all abutting streets and rights of way<br />

c. Minimum required front, side and rear building setback lines with dimensions<br />

d. The approximate outline of all proposed and existing buildings and structures including<br />

projections such as fireplaces, bay windows, porches, patio’s and deck’s.<br />

e. The approximated outline of all driveways, walkways, swimming pools, retaining walls, and<br />

other improvements proposed or existing.<br />

f. Outline of roof overhangs need not be shown however dimensions of overhangs must be<br />

listed.<br />

g. Dimensions of building and distances between all structures and the nearest property lines.<br />

Dimensions of all projections including bay windows, fireplaces, porches, decks, and eaves.<br />

h. Location and dimension of all floodplain limits, buffer requirements, and all drainage or any<br />

other easements.<br />

i. Subdivision name, lot number, street address and zoning.<br />

j. Required zoning conditions for separation between buildings on adjacent lots specifying where<br />

measurement is taken from wall to wall, foundation to foundation, eave to eave, and roof<br />

overhang to roof overhang.<br />

k. Any and all other zoning requirements of the zoning approval square footage requirements,<br />

garage single double etc.<br />

l. As built drawings will be required at the completion of the job.<br />

**The issuance of a building permit does not assure that the building setbacks<br />

have been met or that the structure does not encroach on any easement, or<br />

buffer. The owner and/or permit holder have the sole responsibility of<br />

determining compliance with setbacks and non-encroachment of easements and<br />

buffers. **<br />

FORSYTH COUNTY, GA – COMMERCIAL<br />

SWIMMING POOL PERMIT APPLICATION -Page 2 -


Building Permit # ___________________________<br />

PERMIT DETAILS FORM<br />

Address: __________________________________________<br />

City/State/Zip: _______________________<br />

Directions to job site:<br />

________________________________________________________________________________________<br />

________________________________________________________________________________________<br />

Subdivision Name: _______________________________________________________<br />

Lot # _______<br />

CONTRACTOR INFORMATION<br />

<strong>Forsyth</strong> <strong>County</strong> Business License / Registration # _________________GA State License # _______________<br />

Business Name: ______________________________________________ Phone # ____________________<br />

Address: _____________________________________________City/State/Zip: _______________________<br />

Onsite Contact Person: Names: ________________________________________ Phone#: ______________<br />

Email: __________________________________________________________________________________<br />

OWNER INFORMATION<br />

Last Name: _______________________ First Name: _________________________ Phone #_____________<br />

Address: _________________________________________City/State/Zip: ___________________________<br />

PROJECT INFORMATION<br />

Description of work: _______________________________________________________________________<br />

Class Work: New Repermit (if repermit old permit number)__________________________<br />

Construction Type:<br />

Sewer System:<br />

On- Site<br />

Septic: (<strong>Forsyth</strong> <strong>County</strong> Health Dept. Permit #___________)<br />

Sewer: <strong>County</strong> City Private<br />

Pool Type: Gunite Liner Fiberglass Above ground<br />

Square footage of <strong>Swimming</strong> Pool: ________________<br />

FORSYTH COUNTY, GA – COMMERCIAL<br />

SWIMMING POOL PERMIT APPLICATION -Page 3 -


Total disturbed acreage associated with this permit and the disturbed acreage for any adjacent permits<br />

that will be disturbed at the same time:<br />

Total Acreage: ___________________<br />

Disturbed Acreage: _______________________<br />

Current use of Property: Vacant Residential Agricultural Other ________________<br />

Other buildings on property: Home Storage Buildings Other ____________________________<br />

Will pool be heated? Yes No<br />

Will electric underground be needed? Yes No<br />

Will underground gas line inspection be needed? Yes No<br />

Pool Heater Size: __________BTU<br />

NO STURCTURES OF ANY TYPE SHALL BE INSTALLED OR CONSTRUCTED WITHIN ANY EASEMENT<br />

I, ______________________________________________, hereby certify that the above information<br />

is true and correct.<br />

________________________________________________<br />

Property Owner Signature<br />

________________________________________________<br />

________________<br />

Notary Public Signature and Stamp<br />

Date<br />

GSWCC CERTIFICATION<br />

I am aware that a Georgia Soil & Water Conservation Commission Card Holder must be on site during any<br />

land disturbance activity. (Copy of Card must be presented with permit application)<br />

__________________________________________________<br />

GSWCC Certification Card Holder Signature<br />

Certification # ______________________________________<br />

________________________________________________<br />

Notary Public Signature and Stamp<br />

________________<br />

Date<br />

FORSYTH COUNTY, GA – COMMERCIAL<br />

SWIMMING POOL PERMIT APPLICATION -Page 4 -


PROPERTY OWNER AUTHORIZATION FORM<br />

Property Location: _________________________________________________________________<br />

Contractor: I hereby authorize the person named in the Authorized Agent section to both obtain a<br />

building permit for my property and complete construction.<br />

Combination: I will seek to obtain a permit for contractor as authorized in the Contractor Authorization<br />

section. Construction will be completed by the contractor.<br />

AUTHORIZED AGENT<br />

Name: ___________________________________________________________________________<br />

Address: _________________________________________________________________________<br />

City/State/Zip: _____________________________________________________________________<br />

Phone # ______________________Email Address: _______________________________________<br />

NOTARIZATION<br />

I, ______________________________________________, hereby certify that the above information<br />

is true and correct.<br />

________________________________________________<br />

Property Owner Signature<br />

________________________________________________<br />

Notary Public Signature and Stamp<br />

________________<br />

Date<br />

CONTRACTOR AUTHORIZATION<br />

I, the contractor, authorize the property owner to pursue a building permit under my business license<br />

name and number.<br />

_______________________________________________<br />

Contractor Signature<br />

________________<br />

Date<br />

_______________________________________________<br />

<strong>Forsyth</strong> <strong>County</strong> Business License / Registration #<br />

FORSYTH COUNTY, GA – COMMERCIAL<br />

SWIMMING POOL PERMIT APPLICATION -Page 5 -


SWIMMING POOL DRAIN DISCHARGE<br />

LOCATION AFFIDAVIT<br />

Article III, Section 82-63<br />

No person shall discharge or cause to be discharged any storm water, surface water, groundwater,<br />

roof runoff, swimming pool backwash or drain, subsurface drainage, uncontaminated cooling water,<br />

or unpolluted industrial process waters to any sanitary sewer, and wastewaters shall not be<br />

discharged to a sanitary sewer, except in accordance with all applicable laws, regulations and permits<br />

(including without limitation, NPDES permits requiring treatment prior to discharge.<br />

The penalty for violation:<br />

Section: 82-98 civil penalties.<br />

(a) Any user or person who has violated, or continues to violate, any provision of this ordinance, a<br />

wastewater discharge permit, or order issued hereunder, or any other pretreatment standard or<br />

requirement shall be liable to the county for a maximum civil penalty of $1,000.00 per violation<br />

per day. In the case of monthly or other long-term average discharge limit violations, penalties<br />

shall accrue for each day during the period of the violation. Notwithstanding the foregoing, civil<br />

penalties may be in addition to, but shall not be duplicative of, administrative fines assessed<br />

under section 82-91, and the county is authorized to bring an action for civil penalties<br />

regardless of whether such administrative fines have been assessed.<br />

By signing this affidavit I state that my swimming pool is not connected in any way to the <strong>County</strong><br />

sanitary sewer system<br />

Signature<br />

Date<br />

Address<br />

Subdivision<br />

Notary Public<br />

FORSYTH COUNTY, GA – COMMERCIAL<br />

SWIMMING POOL PERMIT APPLICATION -Page 7 -

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!