Issue of Consent to Establish / NOC
Issue of Consent to Establish / NOC
Issue of Consent to Establish / NOC
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Size<br />
Category<br />
&<br />
Medium Scale ;<br />
Orange Category<br />
Medium Scale ;<br />
Orange Category<br />
Power<br />
Requirement<br />
1970 HP<br />
2856 HP<br />
[Additional <strong>of</strong> 886 HP]<br />
Solid waste<br />
Aluminum scraps is reused in<br />
the process.<br />
Aluminum scraps is reused in<br />
the process.<br />
Process details:<br />
Aluminum Ingot + Scraps -> Rerolling –Wire -> Winding -> Inspection<br />
-> Finished product<br />
Remarks:<br />
The requirement for power enhancement is for installation <strong>of</strong> additional<br />
machineries for quality improvement and increasing <strong>of</strong> conduc<strong>to</strong>r<br />
size.<br />
There will be no enhancement in the sanctioned production capacity.<br />
Waste Water: There will be no effluent generation from the process.<br />
Air Pollution Control Systems Attached: Wet Scrubber and Dust<br />
Collec<strong>to</strong>r<br />
Solid Waste Generation: Aluminium Scrap generated from process is<br />
recycled back as raw material.