07.11.2014 Views

Issue of Consent to Establish / NOC

Issue of Consent to Establish / NOC

Issue of Consent to Establish / NOC

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Size<br />

Category<br />

&<br />

Medium Scale ;<br />

Orange Category<br />

Medium Scale ;<br />

Orange Category<br />

Power<br />

Requirement<br />

1970 HP<br />

2856 HP<br />

[Additional <strong>of</strong> 886 HP]<br />

Solid waste<br />

Aluminum scraps is reused in<br />

the process.<br />

Aluminum scraps is reused in<br />

the process.<br />

Process details:<br />

Aluminum Ingot + Scraps -> Rerolling –Wire -> Winding -> Inspection<br />

-> Finished product<br />

Remarks:<br />

The requirement for power enhancement is for installation <strong>of</strong> additional<br />

machineries for quality improvement and increasing <strong>of</strong> conduc<strong>to</strong>r<br />

size.<br />

There will be no enhancement in the sanctioned production capacity.<br />

Waste Water: There will be no effluent generation from the process.<br />

Air Pollution Control Systems Attached: Wet Scrubber and Dust<br />

Collec<strong>to</strong>r<br />

Solid Waste Generation: Aluminium Scrap generated from process is<br />

recycled back as raw material.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!