circumstances?<br />

(2) Did the London insurers, by reason of the terms of the Builders' Risks Policy,<br />

waive disclosure of the said circumstances?<br />

Issue 8: Did Sembawang suffer no loss as a result of any alleged breach of duty on<br />

the part of NHM on any of the grounds set out in paragraph 9(1) of the Amended<br />

Defence and Counterclaim [i.e. because it was not liable to make good the damage to<br />

the vessel]?<br />

Issue 9: Did CPL suffer no loss (by way of a liability to Sembawang for breach of<br />

clause 15.12 of the Completion Contract) as a result of any alleged breach of duty on<br />

the part of NHM on the grounds set out in paragraph 16C of the Amended Defence<br />

and Counterclaim [i.e. because CPL was itself entitled to recover the full amount of<br />

the loss under the policy]?<br />

[I have added the words in brackets to assist in understanding the nature of the<br />

issues.]<br />

The policy<br />

7.<br />

It is convenient at this point to refer to the salient terms of the London market policy. As is<br />

commonly the case, the contract is to be found in a market slip to which each of the<br />

claimants subscribed. The slip describes the type of cover as 'Marine Hull' and the<br />

form of policy as 'MAR 91 / Slip Policy'. It does not appear to have been envisaged,<br />

therefore, that a formal policy wording would be produced and none was.<br />

8.<br />

The following clauses are of particular importance:<br />

“ASSURED: SEA TRUCKS (NIGERIA) LIMITED and/or DIESEL POWER<br />

(NIGERIA) LIMITED and/or DOLPHIN OFFSHORE (NIGERIA)<br />

LIMITED and/or WALVIS (NIGERIA) LIMITED and/or WEST<br />

AFRICAN DRYDOCK LIMITED and/or Subsidiary, Affiliates,<br />

Associated and Interrelated Companies and/or Joint Ventures as may<br />

be required as their respective rights and interest may appear.<br />

PROJECT/<br />

PERIOD:<br />

INTEREST:<br />

Attachment hereon with effect from 21 st May 2003 whilst at<br />

Sembawang Shipyard, Singapore, undergoing completion, outfitting,<br />

commissioning and testing during period of approx. 6½ months,<br />

expected final delivery date after sea trials, mid January 2004.<br />

HULL AND MATERIALS etc., MACHINERY OUTFIT etc., and<br />

everything connected therewith nothing excluded. Sum Insured:-