Dubai Electricity & Water Authority<br />

1 Introduction<br />

1 Introduction<br />

To ensure the availability of power, it is essential that the load<br />

projections, the time of power requirements and other factors<br />

from all the potential developers are available with DEWA well<br />

in advance.<br />

The purpose of this document is as follows:<br />

<br />

To provide guidelines to all the major developers and the<br />

consultants in regard to the DEWA’s power supply<br />

requirements.<br />

To assist the developers and the consultants in<br />

understanding the requirements for submissions of project<br />

/ development Master Plan documents and to facilitate the<br />

project / development power supply on time.<br />

Power Supply Guidelines for Major Projects 1 of 14 August 2009