2012 - IT Infrastructure & Physical Layer Commissioning - the IWCS ...
2012 - IT Infrastructure & Physical Layer Commissioning - the IWCS ...
2012 - IT Infrastructure & Physical Layer Commissioning - the IWCS ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>IT</strong> <strong>Infrastructure</strong><br />
&<br />
<strong>Physical</strong> <strong>Layer</strong><br />
<strong>Commissioning</strong> (Cx)<br />
Rick Foster, RCDD TLT<br />
Innovative Engineering Services<br />
November 12, <strong>2012</strong><br />
IES <strong>2012</strong>
Today’s Topics<br />
Introduction to <strong>the</strong> <strong>Commissioning</strong> “Process”<br />
Market Drivers<br />
Case Study & Economic Considerations<br />
What is <strong>IT</strong> <strong>Commissioning</strong> ?<br />
Manufacturer Warranty Programs & <strong>Commissioning</strong>
<strong>Commissioning</strong> ?<br />
How much money did I get from that SALE!!!!<br />
Ano<strong>the</strong>r 15%<br />
“U.S. Navy Ships: Launching and<br />
<strong>Commissioning</strong><br />
Launching and commissioning are two milestones in<br />
<strong>the</strong> construction of a Navy ship.<br />
A ship is launched when it is first put into <strong>the</strong> water.<br />
At this time <strong>the</strong> ship is incomplete, and still requires<br />
considerable work to complete it and make it ready<br />
for service. When <strong>the</strong> ship is fully ready for use by<br />
<strong>the</strong> Navy, it runs acceptance trials to see if it will<br />
perform according to specifications. When this has<br />
been done to <strong>the</strong> Navy's satisfaction, and any<br />
discrepancies have been set right, <strong>the</strong> Navy's<br />
representative signs a paper officially accepting it<br />
from <strong>the</strong> builder. “<br />
Source – Naval Historical Center
“building commissioning” is <strong>the</strong><br />
process for achieving, verifying and<br />
documenting that <strong>the</strong> performance of <strong>the</strong><br />
building and its systems meet <strong>the</strong> design<br />
intent and <strong>the</strong> owner and occupant<br />
needs.”<br />
Building <strong>Commissioning</strong> Guide:<br />
U.S. General Services Administration<br />
U.S. Department of Energy<br />
July 1998
The <strong>IT</strong> <strong>Infrastructure</strong> is<br />
not just cable and<br />
connectors !<br />
…all <strong>the</strong> necessary<br />
physical layer<br />
components that will<br />
effect <strong>the</strong> operational<br />
efficiency, network<br />
performance and<br />
reliability of <strong>the</strong><br />
information system.
<strong>IT</strong> <strong>Infrastructure</strong> & <strong>Commissioning</strong> (Cx)<br />
Application of established commissioning<br />
procedures <strong>IT</strong> <strong>Commissioning</strong> to <strong>IT</strong> <strong>Infrastructure</strong> (Cx)<br />
requirements<br />
Combination<br />
A quality<br />
of<br />
control<br />
<strong>IT</strong> expertise<br />
process<br />
and<br />
construction experience<br />
Bridges <strong>the</strong> gap between <strong>IT</strong> needs and<br />
architectural specifications
<strong>IT</strong> <strong>Commissioning</strong> & Quality Control<br />
Question – To produce a 1,000 feet of<br />
Cat-6 4pr –UTP cable how many quality control<br />
checks take place from raw materials to finished<br />
product?<br />
Answer * – Over 750 or more plus real time<br />
information ga<strong>the</strong>ring during manufacturing…….<br />
* Berk-Tek
<strong>IT</strong> <strong>Commissioning</strong> & Quality Control<br />
Question – To produce a kilometer of fiber optic<br />
cable how many quality control checks take place<br />
from raw materials to finished product?<br />
Answer * – Multiple inspection and verification<br />
points that assesses hundreds of process and<br />
performance attributes ……<br />
* OFS
<strong>IT</strong> <strong>Commissioning</strong> & Quality Control<br />
Question – How many quality control<br />
checks take place from when <strong>the</strong> cable<br />
reaches <strong>the</strong> job site to final installation and<br />
testing?<br />
Answer – ???
<strong>IT</strong> <strong>Commissioning</strong> & Quality Control
Process of <strong>Commissioning</strong><br />
Program Phase & Project Formulation<br />
Design Phase - “Design Intent”<br />
Construction Phase<br />
Acceptance Phase & Construction Close Out<br />
Post – Acceptance Phase
Process of <strong>Commissioning</strong><br />
Program Phase & Project Formulation<br />
Identifying <strong>the</strong> TEAM<br />
Owner<br />
A/E Firm (Architect / Engineer)<br />
Establish “Design Intent”<br />
<strong>IT</strong> representative<br />
<strong>Commissioning</strong> Authority<br />
GC or Construction Manager<br />
Approvals<br />
Funding & Budgets<br />
Crucial decisions must be made early
“Design Intent”<br />
Determines <strong>the</strong> clients<br />
goals and objectives are<br />
met in <strong>the</strong> design phase<br />
Establishes benchmark<br />
and specifications<br />
Becomes <strong>the</strong> baseline for<br />
project scope<br />
Mandates acceptance<br />
criteria at <strong>the</strong> project<br />
inception
The design said conduits for cable !<br />
The furniture was designed with a communication raceway!<br />
“Design Intent ” – Gone Bad
Structural · Mechanical · Electrical · Plumbing · Fire Protection · Technology
Market Drivers<br />
Increased regulatory mandates<br />
Codes & Standards<br />
Service Level Agreements (SLA)<br />
Utility Discounts – reduced kWh $$$<br />
Technology – Power over E<strong>the</strong>rnet (PoE)
Market Drivers<br />
LEED® initiative & Green Buildings<br />
Leadership in Energy & Environmental Design (LEED)<br />
Included in MasterFormat (Division 27)
Market Drivers<br />
MasterFormat is a standard for<br />
organizing specifications and<br />
o<strong>the</strong>r written information for<br />
commercial and institutional<br />
building projects. It is a product of<br />
<strong>the</strong> Construction Specification<br />
Institute (CSI). It provides a<br />
master list of divisions and<br />
section numbers and titles within<br />
<strong>the</strong> division to organize<br />
information about construction a<br />
facility.<br />
In 2004 it was expanded to 50<br />
Divisions and Division 27 is <strong>the</strong><br />
communications section.
Market Drivers<br />
14 08 00 <strong>Commissioning</strong> of Conveying Equipment<br />
14 08 10 <strong>Commissioning</strong> of Dumbwaiters<br />
14 08 20 <strong>Commissioning</strong> of Elevators<br />
14 08 30 <strong>Commissioning</strong> of Escalators and Moving Walks<br />
22 08 00 <strong>Commissioning</strong> of Plumbing<br />
26 08 00 <strong>Commissioning</strong> of Electrical Systems<br />
27 08 00 <strong>Commissioning</strong> of Communications<br />
<strong>Commissioning</strong> is in multiple Divisions
Economics of <strong>Commissioning</strong><br />
Change Orders and Request for Information (RFI)<br />
A study documented that a simple RFI could require up<br />
to four staff hours to resolve. This project had 92 RFIs<br />
and consumed 10 weeks (400 hrs.) of staff time.<br />
This same (non-commissioned) project had over 90<br />
change orders totaling almost $95,000.00 which was<br />
equal to about 1% of <strong>the</strong> construction costs¹<br />
High School Project<br />
¹ Kristen Heinemeier,et al “<strong>Commissioning</strong> of New Schools: A State Funded Study of Costs and Benefits
Economics of <strong>Commissioning</strong><br />
Existing Building Systems 1<br />
Building Type<br />
<strong>Commissioning</strong><br />
Costs<br />
Annual<br />
Savings<br />
Simple<br />
Payback<br />
(Years)<br />
Computer<br />
Facilities/Office<br />
High Rise<br />
Office<br />
Medical<br />
Institution<br />
$24,000 $89,758 .03<br />
$12,745 $8,145 1.6<br />
$24,768 $65,534 .04<br />
1 Gregerson,Joan, “Cost Effectiveness of <strong>Commissioning</strong> 44 Existing Buildings”, in Proceedings of <strong>the</strong> National Conference of<br />
Building <strong>Commissioning</strong>
Economics of <strong>Commissioning</strong><br />
Cost Saving range from 5-10% by<br />
eliminating design related change orders<br />
Deficiencies are identified and remedied<br />
before completion when it is more<br />
economical<br />
Funding commissioning as part of <strong>the</strong><br />
project represents a 2-5% of project cost.
Why <strong>IT</strong> <strong>Commissioning</strong>?<br />
Cost savings realized from problem resolution<br />
during construction not after <strong>the</strong> walls are up<br />
Acts as a “check & balance” for low bid projects<br />
Quality Control Process<br />
Facility/Network is operational - “<strong>the</strong> first time”
The <strong>IT</strong> <strong>Infrastructure</strong> is<br />
not just cable and<br />
connectors !<br />
…all <strong>the</strong> necessary<br />
physical layer<br />
components that will<br />
effect <strong>the</strong> operational<br />
efficiency, network<br />
performance and<br />
reliability of <strong>the</strong><br />
information system.
Sample Report Page
Fill ratio<br />
Cable jacket scored and deformed<br />
HVAC pipe in cable bundle<br />
Hard left turn?
<strong>IT</strong> <strong>Commissioning</strong> - What’s Included<br />
Conveyance & pathways<br />
Installation methods verification<br />
Testing requirements<br />
Documentation and “As-Builts”<br />
Network Operability - <strong>Layer</strong> 2+<br />
Convergence validation - Systems<br />
Level
<strong>IT</strong> <strong>Commissioning</strong> - What’s Included<br />
Network Connectivity<br />
Power requirements<br />
Code compliance<br />
Standards verification<br />
Fire & Security requirements<br />
A/V integration<br />
Building Automation and Control<br />
integration
Quick Recap<br />
Introduction to <strong>the</strong> <strong>Commissioning</strong> “Process”<br />
<strong>IT</strong> <strong>Commissioning</strong> – A quality control process<br />
Market Drivers<br />
Case Study & Economic Considerations<br />
Manufacturer Warranty Programs & <strong>Commissioning</strong><br />
Warranty Programs Friend or Foe?<br />
Spiderman is trademark of Marvel Characters Inc
Recommendation<br />
Challenge<br />
How can Consider you influence adopting how many <strong>the</strong> quality<br />
control checks take place from when <strong>the</strong><br />
commissioning process as part of<br />
cable reaches <strong>the</strong> job site to final installation<br />
your cabling and testing? and connectivity<br />
warranty solutions.
Case Study-<br />
College Science Building<br />
120,000 sq. ft’<br />
Combination Classroom/Lab/Office<br />
1,800 Work Area Outlets – 6,000 cables<br />
27 Telecommunications Rooms<br />
SMF/MMF Backbone for Data<br />
– 972 fiber connections<br />
Copper Voice Backbone<br />
– 8,100 pairs
Case Study<br />
Cable Plant Design – <strong>IT</strong> Dept<br />
Building Specifications – Facility Dept<br />
Manufacturer's Warranty included<br />
Low Bid Award<br />
Job was “Value Engineered”<br />
General Contractor responsible for<br />
implementation – compressed schedules
Case Study Conclusions<br />
Specifications were minimally enforced<br />
Marginal workmanship issues were<br />
resolved by <strong>the</strong> warranty and<br />
commissioning<br />
Commission Report identified additional<br />
deficiencies and subsequent corrective<br />
action.<br />
<strong>Commissioning</strong> ROI was Five to One
Summary<br />
<strong>Commissioning</strong> (Cx) is an accepted<br />
practice in <strong>the</strong> construction process<br />
that is being mandated by owners<br />
and regulatory bodies.<br />
<strong>IT</strong> <strong>Commissioning</strong> (Cx) during<br />
construction and renovation will<br />
become increasingly important as<br />
both a quality control process and<br />
validation of buildings converged<br />
systems.
Thank You & Questions<br />
Rick Foster RCDD, TLT<br />
rfoster@iesllc.biz