<strong>IT</strong> <strong>Infrastructure</strong><br />

&<br />

<strong>Physical</strong> <strong>Layer</strong><br />

<strong>Commissioning</strong> (Cx)<br />

Rick Foster, RCDD TLT<br />

Innovative Engineering Services<br />

November 12, <strong>2012</strong><br />

IES <strong>2012</strong>


Today’s Topics<br />

Introduction to <strong>the</strong> <strong>Commissioning</strong> “Process”<br />

Market Drivers<br />

Case Study & Economic Considerations<br />

What is <strong>IT</strong> <strong>Commissioning</strong> ?<br />

Manufacturer Warranty Programs & <strong>Commissioning</strong>


<strong>Commissioning</strong> ?<br />

How much money did I get from that SALE!!!!<br />

Ano<strong>the</strong>r 15%<br />

“U.S. Navy Ships: Launching and<br />

<strong>Commissioning</strong><br />

Launching and commissioning are two milestones in<br />

<strong>the</strong> construction of a Navy ship.<br />

A ship is launched when it is first put into <strong>the</strong> water.<br />

At this time <strong>the</strong> ship is incomplete, and still requires<br />

considerable work to complete it and make it ready<br />

for service. When <strong>the</strong> ship is fully ready for use by<br />

<strong>the</strong> Navy, it runs acceptance trials to see if it will<br />

perform according to specifications. When this has<br />

been done to <strong>the</strong> Navy's satisfaction, and any<br />

discrepancies have been set right, <strong>the</strong> Navy's<br />

representative signs a paper officially accepting it<br />

from <strong>the</strong> builder. “<br />

Source – Naval Historical Center


“building commissioning” is <strong>the</strong><br />

process for achieving, verifying and<br />

documenting that <strong>the</strong> performance of <strong>the</strong><br />

building and its systems meet <strong>the</strong> design<br />

intent and <strong>the</strong> owner and occupant<br />

needs.”<br />

Building <strong>Commissioning</strong> Guide:<br />

U.S. General Services Administration<br />

U.S. Department of Energy<br />

July 1998


The <strong>IT</strong> <strong>Infrastructure</strong> is<br />

not just cable and<br />

connectors !<br />

…all <strong>the</strong> necessary<br />

physical layer<br />

components that will<br />

effect <strong>the</strong> operational<br />

efficiency, network<br />

performance and<br />

reliability of <strong>the</strong><br />

information system.


<strong>IT</strong> <strong>Infrastructure</strong> & <strong>Commissioning</strong> (Cx)<br />

Application of established commissioning<br />

procedures <strong>IT</strong> <strong>Commissioning</strong> to <strong>IT</strong> <strong>Infrastructure</strong> (Cx)<br />

requirements<br />

Combination<br />

A quality<br />

of<br />

control<br />

<strong>IT</strong> expertise<br />

process<br />

and<br />

construction experience<br />

Bridges <strong>the</strong> gap between <strong>IT</strong> needs and<br />

architectural specifications


<strong>IT</strong> <strong>Commissioning</strong> & Quality Control<br />

Question – To produce a 1,000 feet of<br />

Cat-6 4pr –UTP cable how many quality control<br />

checks take place from raw materials to finished<br />

product?<br />

Answer * – Over 750 or more plus real time<br />

information ga<strong>the</strong>ring during manufacturing…….<br />

* Berk-Tek


<strong>IT</strong> <strong>Commissioning</strong> & Quality Control<br />

Question – To produce a kilometer of fiber optic<br />

cable how many quality control checks take place<br />

from raw materials to finished product?<br />

Answer * – Multiple inspection and verification<br />

points that assesses hundreds of process and<br />

performance attributes ……<br />

* OFS


<strong>IT</strong> <strong>Commissioning</strong> & Quality Control<br />

Question – How many quality control<br />

checks take place from when <strong>the</strong> cable<br />

reaches <strong>the</strong> job site to final installation and<br />

testing?<br />

Answer – ???


<strong>IT</strong> <strong>Commissioning</strong> & Quality Control


Process of <strong>Commissioning</strong><br />

Program Phase & Project Formulation<br />

Design Phase - “Design Intent”<br />

Construction Phase<br />

Acceptance Phase & Construction Close Out<br />

Post – Acceptance Phase


Process of <strong>Commissioning</strong><br />

Program Phase & Project Formulation<br />

Identifying <strong>the</strong> TEAM<br />

Owner<br />

A/E Firm (Architect / Engineer)<br />

Establish “Design Intent”<br />

<strong>IT</strong> representative<br />

<strong>Commissioning</strong> Authority<br />

GC or Construction Manager<br />

Approvals<br />

Funding & Budgets<br />

Crucial decisions must be made early


“Design Intent”<br />

Determines <strong>the</strong> clients<br />

goals and objectives are<br />

met in <strong>the</strong> design phase<br />

Establishes benchmark<br />

and specifications<br />

Becomes <strong>the</strong> baseline for<br />

project scope<br />

Mandates acceptance<br />

criteria at <strong>the</strong> project<br />

inception


The design said conduits for cable !<br />

The furniture was designed with a communication raceway!<br />

“Design Intent ” – Gone Bad


Structural · Mechanical · Electrical · Plumbing · Fire Protection · Technology


Market Drivers<br />

Increased regulatory mandates<br />

Codes & Standards<br />

Service Level Agreements (SLA)<br />

Utility Discounts – reduced kWh $$$<br />

Technology – Power over E<strong>the</strong>rnet (PoE)


Market Drivers<br />

LEED® initiative & Green Buildings<br />

Leadership in Energy & Environmental Design (LEED)<br />

Included in MasterFormat (Division 27)


Market Drivers<br />

MasterFormat is a standard for<br />

organizing specifications and<br />

o<strong>the</strong>r written information for<br />

commercial and institutional<br />

building projects. It is a product of<br />

<strong>the</strong> Construction Specification<br />

Institute (CSI). It provides a<br />

master list of divisions and<br />

section numbers and titles within<br />

<strong>the</strong> division to organize<br />

information about construction a<br />

facility.<br />

In 2004 it was expanded to 50<br />

Divisions and Division 27 is <strong>the</strong><br />

communications section.


Market Drivers<br />

14 08 00 <strong>Commissioning</strong> of Conveying Equipment<br />

14 08 10 <strong>Commissioning</strong> of Dumbwaiters<br />

14 08 20 <strong>Commissioning</strong> of Elevators<br />

14 08 30 <strong>Commissioning</strong> of Escalators and Moving Walks<br />

22 08 00 <strong>Commissioning</strong> of Plumbing<br />

26 08 00 <strong>Commissioning</strong> of Electrical Systems<br />

27 08 00 <strong>Commissioning</strong> of Communications<br />

<strong>Commissioning</strong> is in multiple Divisions


Economics of <strong>Commissioning</strong><br />

Change Orders and Request for Information (RFI)<br />

A study documented that a simple RFI could require up<br />

to four staff hours to resolve. This project had 92 RFIs<br />

and consumed 10 weeks (400 hrs.) of staff time.<br />

This same (non-commissioned) project had over 90<br />

change orders totaling almost $95,000.00 which was<br />

equal to about 1% of <strong>the</strong> construction costs¹<br />

High School Project<br />

¹ Kristen Heinemeier,et al “<strong>Commissioning</strong> of New Schools: A State Funded Study of Costs and Benefits


Economics of <strong>Commissioning</strong><br />

Existing Building Systems 1<br />

Building Type<br />

<strong>Commissioning</strong><br />

Costs<br />

Annual<br />

Savings<br />

Simple<br />

Payback<br />

(Years)<br />

Computer<br />

Facilities/Office<br />

High Rise<br />

Office<br />

Medical<br />

Institution<br />

$24,000 $89,758 .03<br />

$12,745 $8,145 1.6<br />

$24,768 $65,534 .04<br />

1 Gregerson,Joan, “Cost Effectiveness of <strong>Commissioning</strong> 44 Existing Buildings”, in Proceedings of <strong>the</strong> National Conference of<br />

Building <strong>Commissioning</strong>


Economics of <strong>Commissioning</strong><br />

Cost Saving range from 5-10% by<br />

eliminating design related change orders<br />

Deficiencies are identified and remedied<br />

before completion when it is more<br />

economical<br />

Funding commissioning as part of <strong>the</strong><br />

project represents a 2-5% of project cost.


Why <strong>IT</strong> <strong>Commissioning</strong>?<br />

Cost savings realized from problem resolution<br />

during construction not after <strong>the</strong> walls are up<br />

Acts as a “check & balance” for low bid projects<br />

Quality Control Process<br />

Facility/Network is operational - “<strong>the</strong> first time”


The <strong>IT</strong> <strong>Infrastructure</strong> is<br />

not just cable and<br />

connectors !<br />

…all <strong>the</strong> necessary<br />

physical layer<br />

components that will<br />

effect <strong>the</strong> operational<br />

efficiency, network<br />

performance and<br />

reliability of <strong>the</strong><br />

information system.


Sample Report Page


Fill ratio<br />

Cable jacket scored and deformed<br />

HVAC pipe in cable bundle<br />

Hard left turn?


<strong>IT</strong> <strong>Commissioning</strong> - What’s Included<br />

Conveyance & pathways<br />

Installation methods verification<br />

Testing requirements<br />

Documentation and “As-Builts”<br />

Network Operability - <strong>Layer</strong> 2+<br />

Convergence validation - Systems<br />

Level


<strong>IT</strong> <strong>Commissioning</strong> - What’s Included<br />

Network Connectivity<br />

Power requirements<br />

Code compliance<br />

Standards verification<br />

Fire & Security requirements<br />

A/V integration<br />

Building Automation and Control<br />

integration


Quick Recap<br />

Introduction to <strong>the</strong> <strong>Commissioning</strong> “Process”<br />

<strong>IT</strong> <strong>Commissioning</strong> – A quality control process<br />

Market Drivers<br />

Case Study & Economic Considerations<br />

Manufacturer Warranty Programs & <strong>Commissioning</strong><br />

Warranty Programs Friend or Foe?<br />

Spiderman is trademark of Marvel Characters Inc


Recommendation<br />

Challenge<br />

How can Consider you influence adopting how many <strong>the</strong> quality<br />

control checks take place from when <strong>the</strong><br />

commissioning process as part of<br />

cable reaches <strong>the</strong> job site to final installation<br />

your cabling and testing? and connectivity<br />

warranty solutions.


Case Study-<br />

College Science Building<br />

120,000 sq. ft’<br />

Combination Classroom/Lab/Office<br />

1,800 Work Area Outlets – 6,000 cables<br />

27 Telecommunications Rooms<br />

SMF/MMF Backbone for Data<br />

– 972 fiber connections<br />

Copper Voice Backbone<br />

– 8,100 pairs


Case Study<br />

Cable Plant Design – <strong>IT</strong> Dept<br />

Building Specifications – Facility Dept<br />

Manufacturer's Warranty included<br />

Low Bid Award<br />

Job was “Value Engineered”<br />

General Contractor responsible for<br />

implementation – compressed schedules


Case Study Conclusions<br />

Specifications were minimally enforced<br />

Marginal workmanship issues were<br />

resolved by <strong>the</strong> warranty and<br />

commissioning<br />

Commission Report identified additional<br />

deficiencies and subsequent corrective<br />

action.<br />

<strong>Commissioning</strong> ROI was Five to One


Summary<br />

<strong>Commissioning</strong> (Cx) is an accepted<br />

practice in <strong>the</strong> construction process<br />

that is being mandated by owners<br />

and regulatory bodies.<br />

<strong>IT</strong> <strong>Commissioning</strong> (Cx) during<br />

construction and renovation will<br />

become increasingly important as<br />

both a quality control process and<br />

validation of buildings converged<br />

systems.


Thank You & Questions<br />