08.11.2014 Views

Maharashtra State Power Generation Company Limited - Mahagenco

Maharashtra State Power Generation Company Limited - Mahagenco

Maharashtra State Power Generation Company Limited - Mahagenco

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Maharashtra</strong> <strong>State</strong> <strong>Power</strong> <strong>Generation</strong> <strong>Company</strong> <strong>Limited</strong><br />

-------------------------------------------------------------------------------------------<br />

Tel.: 26476698(P), 26474211 Ext.2300 Human Resources Development Cell.<br />

Fax: 022-26473392 / 022-26475454 Plot No. G-9, 2 nd Floor, Prakashgad<br />

E-mail: cgmhr@mahagenco.in Bandra (E), Mumbai 400051<br />

----------------------------------------------------------------------------------------------------------<br />

No.MSPGCL/HRD/ CGM HR/3805 DATE: -24.03.2009<br />

OFFICE ORDER NO.: K-49<br />

In pursuance of the approval accorded by the competent Authority, All<br />

newly appointed Junior Engineer (Gen) shall undergo one year Induction Level Training<br />

Programme, covering Mandatory Modules on Theoretical as well as In-Plant Training as per<br />

IE Rules 1956. The following newly appointed Junior Engineers, MSPGCL, are deputed in<br />

Batch No.- K-49 at Koradi Training Center, Koradi, commencing from 13 th April 2009.<br />

BATCH NO: K-49, KORADI TRAINING CENTER<br />

TOTAL TRAINEES –30<br />

SR. NAME OF THE ENGINEER POWER STATION/OFFICE<br />

NO. SARVASHRI<br />

1. Ku. Nagpure Urmila S. Chandrapur TPS<br />

2. Meshram Pradip S. Chandrapur TPS<br />

3. Chaure Onkar C. Chandrapur TPS<br />

4. Kale Shrikant Shriram Chandrapur TPS<br />

5. Sawlani Ashok G. Chandrapur TPS<br />

6. Kulkarni Avinash V. Chandrapur TPS<br />

7. Thawari Sushil W. Chandrapur TPS<br />

8. Gabhane Sachin G. Chandrapur TPS<br />

9. Kamble Paras D. Chandrapur TPS<br />

10 Rathod Ravi Ganesh Chandrapur TPS<br />

11 Gimekar Rajkumar J. Chandrapur TPS<br />

12 Dumore Pravin B. Chandrapur TPS<br />

13 Gobade Bhupendra Ramdas Chandrapur TPS<br />

14. Umare S.G. AE Chandrapur TPS<br />

15. Jaipal F. Jamdal Khaperkheda TPS<br />

16. Nitesh D. Padole Khaperkheda TPS<br />

17. Mrs. Ghurde P.R. Koradi TPS<br />

18. Bhave V.V. Koradi TPS<br />

19. Ikhankar A.L. Koradi TPS<br />

20. Ambagade V. N. Koradi TPS<br />

21. Gour Poonam C. Koradi TPS<br />

22. Ukey V. T. Koradi TPS<br />

23. Sul B. B. Koradi TPS<br />

24. Ramteke M. U. Koradi TPS<br />

25. Ku. Belsare Meeta B. Koradi TPS<br />

26. Ms. Dahibhate J.V. Koradi TPS


27. Waghmare S.V. Paithan HPS<br />

28. Bhedurkar S.S. Chandrapur Project<br />

29. Ms. Chilwant V.R. Bhusawal TPS<br />

30. Ghate J.V. Ghatghar HPS<br />

Terms and conditions for deputation to the above training batch No. K-49 are :<br />

1. The trainees are directed to report at training center latest on 13 th April’ 2009<br />

for training by 9.30 A.M. along with their safety shoes and helmet. Bachelor<br />

accommodation is arranged at the training center for the participants.<br />

2. Dress code for class room will be<br />

a. For all days – Formal dress (Jeans not permitted)<br />

b. For special occasion – Grey Trousers/Light Pista Shirt for Gents<br />

/Same combination Salwar Suit or Light<br />

Pista Colour for Ladies/ Light Blue Blazer<br />

for all<br />

c. For Yoga classes – shall be intimated to trainees after joining.<br />

3. As the training at Koradi training center is fully residential, they are entitled for DA<br />

as per General Order No. 56 dtd 12.09.1969.<br />

4. They will be entitled for TA/DA for reporting to the training center and also during<br />

study tour as per <strong>Company</strong>’s Rules provided the study tour is undertaken to places<br />

other than Koradi. All the TA/DA advances will be given by the training center.<br />

The TA bills for the same should be submitted by the participants to the training<br />

center itself before relieving from the training center<br />

5. After completion of the theoretical training, the trainee shall report back to the<br />

respective power station where they were working prior to attending this training<br />

programme and shall undergo in-plant Training.<br />

6. The above training is statutory as per IE rules and hence all the Trainee<br />

Engineers are to be trained compulsorily.<br />

7. Training format is as given below:<br />

Phase I – Training at KTC (Classroom Training)<br />

Phase II – Training at KTC (Classroom Training)<br />

Phase III – Training at their respective place of work (In-Plant Training)<br />

No. Of Days<br />

180 days<br />

180 days<br />

Change of batch shall not be allowed on any ground.<br />

To,<br />

All the above Engineers (through their controlling officers)<br />

Copy s.w.r. to:<br />

Sd/-<br />

Chief General Manager (HR)<br />

MSPGCL, Mumbai


1. The Executive Director HR / (Gen. O&M), MSPGCL, Mumbai / (Gen.<br />

Proj.-II) Koradi.<br />

Copy f.w.cs. to:<br />

1. The Chief General Manager, KTPS, Koradi / Khaperkheda TPS / Koradi<br />

training center / Chandrapur TPS / Chandrapur Project / Bhusawal TPS<br />

Copy to:<br />

1. The Supdt.Engineer, Nasik <strong>Generation</strong> Training Center MSPGCL, Eklahare,<br />

Nasik / HPC Nasik<br />

2. The Executive Engr.,Yeldari HPS / Ghatghar HPS<br />

Note:<br />

(If any one of the above Engineers has resigned, the in charge of the <strong>Power</strong> Station will identify<br />

& depute the substitute to KTC from his power station only under intimation to this office.)