<strong>MSN</strong> 5 TYP <strong>Construction</strong> Elements<br />

NATIONAL CEMETERY ADMINISTRATION - <strong>MSN</strong> COST GUIDE<br />

<strong>MSN</strong> 5: Oakl<strong>and</strong> Memorial Service Network<br />

CURRENT CONSTRUCTION UNIT COSTS AS NOTED IN CHART - VALID THROUGH OCTOBER 2014<br />

USE FOR PLANNING PURPOSES ONLY - NOT FOR BUDGETING<br />

PREPARED BY: <strong>Office</strong> <strong>of</strong> <strong>Construction</strong> & <strong>Facilities</strong> Management, <strong>Cost</strong> Estimating Service (003C2C).<br />

Updated: JUNE, 2014<br />

Location<br />

P.I.C.<br />

BUILDING<br />

ADMIN.<br />

BUILDING<br />

REST<br />

ROOM<br />

MAINT.<br />

BUILDING<br />

STORAGE<br />

BUILDING<br />

COMMITTAL<br />

SHELTER<br />

PRE-<br />

PLACED<br />

CRYPTS<br />

COLUM-<br />

BARIUM<br />

MEMORIAL<br />

WALL<br />

24' ROAD<br />

W/CURB<br />

METAL<br />

FENCE IRRIGATION<br />

$/SF $/SF $/SF $/SF $/SF EA. EA. EA. $/SPACE $/LF $/LF $/ACRE<br />

Kent, WA (TACOMA, WA) $412 $335 $353 $235 $118 $470,739 $530 $588 $294 $118 $206 $47,074<br />

Portl<strong>and</strong>, OR $389 $317 $333 $222 $111 $444,487 $500 $556 $278 $111 $194 $44,449<br />

Eagle Point, OR (EUGENE, OR) $406 $331 $348 $232 $116 $464,447 $523 $581 $290 $116 $203 $46,445<br />

Dixon, CA (SACRAMENTO, CA) $451 $368 $387 $258 $129 $515,905 $580 $645 $322 $129 $226 $51,590<br />

Santa Nella, CA (SAN FRANCISCO, CA) $463 $377 $397 $264 $132 $528,990 $595 $661 $331 $132 $231 $52,899<br />

Bakersfield, CA $398 $324 $341 $227 $114 $454,528 $511 $568 $284 $114 $199 $45,453<br />

Los Angeles, CA $414 $337 $354 $236 $118 $472,600 $532 $591 $295 $118 $207 $47,260<br />

San Diego, CA $408 $333 $350 $233 $117 $466,716 $525 $583 $292 $117 $204 $46,672<br />

Phoenix, AZ $317 $258 $272 $181 $91 $362,158 $407 $453 $226 $91 $158 $36,216<br />

Ft. Richardson, AK (ANCHORAGE, AK) $518 $422 $444 $296 $148 $592,119 $666 $740 $370 $148 $259 $59,212<br />

Honolulu, HI $482 $392 $413 $275 $138 $550,635 $619 $688 $344 $138 $241 $55,064<br />

NOTES:<br />

Unit costs have been updated using the most current project data available.<br />

<strong>Cost</strong> shown are averages to be used for establishing an order <strong>of</strong> magnitude. Actual costs will vary depending on complexity <strong>and</strong> unique conditions <strong>of</strong> each project.<br />

<strong>Cost</strong>s shown are for typical <strong>NCA</strong> construction only. Additional costs to be considered include: Pre-Design allowance; escalation to contract award date; construction contingencies;<br />

technical services; impact costs; utility agreements; site improvements; site utilities; CM fees; <strong>and</strong> current local market conditions.<br />

Allow additional funds for known adverse sub-surface conditions.<br />

Allow additional funds for special construction requirements such as: phasing; unusual site constraints, tie into existing structures.<br />

Funds for Federally required Physical Security <strong>and</strong> Energy construction m<strong>and</strong>ates are NOT INCLUDED in the unit costs.<br />

Allow additional funds for compliance with VA Physical Security St<strong>and</strong>ards <strong>and</strong> Sustainability <strong>Guide</strong>lines for 5' outside <strong>of</strong> Building Envelope.<br />

Sitework <strong>and</strong> site utility costs will vary greatly for each project. Early identification <strong>of</strong> requirements is critical.<br />

For conceptual estimates on projects up to $25M, 15% added building cost is a reasonable rule <strong>of</strong> thumb for sitework <strong>and</strong> site utilities . Factor may decrease to 10% for larger projects.<br />

For additional assistance contact:<br />

estimating@va.gov<br />

Page 1 <strong>of</strong> 2


<strong>MSN</strong> 5 - Escalation Rates<br />

NATIONAL CEMETERY ADMINISTRATION - <strong>MSN</strong> COST GUIDE<br />

<strong>MSN</strong> 5: Oakl<strong>and</strong> Memorial Service Network<br />

CURRENT CONSTRUCTION UNIT COSTS AS NOTED IN CHART - VALID THROUGH OCTOBER 2014<br />

USE FOR PLANNING PURPOSES ONLY - NOT FOR BUDGETING<br />

PREPARED BY: <strong>Office</strong> <strong>of</strong> <strong>Construction</strong> & <strong>Facilities</strong> Management, <strong>Cost</strong> Estimating Service (003C2C).<br />

Updated: JUNE, 2014<br />

YEAR<br />

2014 2015 2016 2017 2018<br />

ESCALATION RATE 3.00% 4.00% 5.00% 5.00% 5.00%<br />

NOTES:<br />

When using the above Escalation Rates over a number <strong>of</strong> years. These will need to be compounded to show true escalation.<br />

For additional assistance contact:<br />

estimating@va.gov<br />

Page 2 <strong>of</strong> 2