GOVERNMENT OF MAHARASHTRA<br />

PUBLIC WORKS DEPARTMENT<br />

PUBLIC WORKS REGION, NASHIK<br />

PUBLIC WORKS CIRCLE, NASHIK<br />

B-1<br />

TENDER PAPERS<br />

NAME OF WORK: - Constructing Karanji to Tarukhedale Road ODR-<br />

182 Km. 0/00 to 3/00, Tal. Niphad, Dist. Nashik<br />

TENDER COST : RS. 45,24,972.00<br />

RECALL E-TENDER NOTICE NO. 2 WORK NO. 1<br />

SYSTEM TENDER NO. _____NIT NO. _____ dated _______ (IInd call)<br />

Executive Engineer<br />

Public Works Division<br />

Nashik


NAME OF WORK: - Constructing Karanji to Tarukhedale Road ODR-<br />

182 Km. 0/00 to 3/00, Tal. Niphad, Dist. Nashik<br />

INDEX<br />

1<br />

Sr.<br />

No.<br />

1 General In<strong>for</strong>mation of Contract<br />

2 Brief Tender Notice<br />

3 Detailed Tender Notice<br />

4 Scope of Work<br />

DESCRIPTION<br />

5 Agreement Form B-1 & Conditions of Contract.<br />

6 Schedule “A”<br />

7 Additional Conditions <strong>for</strong> Material brought by Contractor<br />

8 Additional General Conditions.<br />

9 Additional Specifications.<br />

10 Quality Assurance and Maintenance.<br />

11 Price Variation Clause.<br />

12 Schedule “B” (Civil & Electrical Work)<br />

13 Schedule “C” - Itemise Specifications.<br />

14 Electrical Work - Specifications & Special Conditions<br />

15 Specifications of CPCC & Water proofing Treatment<br />

16 Bond of Security Deposit<br />

17 Forms of Store<br />

18 Declaration of Contractor<br />

19 Bar Chart<br />

20 Drawings<br />

PAGES<br />

From<br />

To<br />

Issued to _________________________________________________________<br />

AS PER D.R. /T.R. NO. ____________________ Dated: ____________________<br />

Divisional Accounts Officer to<br />

Executive Engineer<br />

Public Works Division, Nashik<br />

Contractor No. of Corrections Executive Engineer


¨É½þÉ®úɹ]Åõ ÉɺÉxÉ<br />

ºÉÉ´ÉÇVÉÊxÉEò ¤ÉÉÆvÉEòÉ¨É Ê´É¦ÉÉMÉ xÉÉÊÉEòú<br />

±êú¸ü


3<br />

ÊxÉÊ´ÉnäùSÉä ´Éä³ýÉ{ÉjÉEò<br />

†.ÎÓú. ÃÖÖ ²ÖÖÓ ÖÖŸµÖÖ“Öß<br />

úÖµÖÔ¾ÖÖÆüß<br />

×−Ö×¾Ö¤üÖúÖ¸üÖÓ“Öß úÖµÖÔ¾ÖÖÆüß ¯ÖÖÃÖæ−Ö<br />

פü−ÖÖÓú ¾Ö ¾Öêôû<br />

1 ´Öãôû ×−Ö×¾Ö¤üÖ ¯ÖÏ×ÃÖ¬¤ü ú¸üÖê - 14/06/2013<br />

10:00 ¯ÖÖÃÖæ−Ö<br />

2 - ´Öãôû ×−Ö×¾Ö¤üÖ ÃÖÓ“Ö Ö¸êü¤üß ¾Ö 14/06/2013<br />

›üÖ‰ú−Ö»ÖÖê›üàÖ 17:46 ¯ÖÖÃÖæ−Ö<br />

3 - †Öò−Ö »ÖÖ‡Ô−Ö ²Öß›ü ׯÖϯָêü¿Ö−Ö 14/06/2013<br />

(ŸÖÖÓסÖú ¾Ö †ÖÙ£Öú) 17:46 ¯ÖÖÃÖæ−Ö<br />

4 †Öò−Ö »ÖÖ‡Ô−Ö ´Öãôû ×−Ö×¾Ö¤üÖ<br />

- 26/06/2013<br />

ÃÖÓ“Ö ×¾ÖÎúß ²ÖÓ¤ü<br />

15:01 ¯ÖÖÃÖæ−Ö<br />

5 - ´Öãôû ×−Ö×¾Ö¤üÖ ÃÖÓ“Ö ×¸ü-‡Ô−Îú߯¿Ö−Ö 26/06/2013<br />

(ŸÖÖÓסÖú ¾Ö †ÖÙ£Öú ×»Ö±úÖ±úÖ) 17:46 ¯ÖÖÃÖæ−Ö<br />

6 ´Öãôû ×−Ö×¾Ö¤üÖ ÃÖÓ“Ö ˆ‘Ö›üÖê<br />

- 29/06/2013<br />

¾Ö ×−ÖÛ¿“ÖŸÖß (ŸÖÖÓסÖú)<br />

14:01 ¯ÖÖÃÖæ−Ö<br />

7 ´Öãôû ×−Ö×¾Ö¤üÖ ÃÖÓ“Ö ˆ‘Ö›üÖê<br />

- 29/06/2013<br />

¾Ö ×−ÖÛ¿“ÖŸÖß (†ÖÙ£Öú)<br />

14:01 ¯ÖÖÃÖæ−Ö<br />

¯ÖµÖÕŸÖ<br />

פü−ÖÖÓú ¾Ö ¾Öêôû<br />

14/06/2013<br />

17:45 ¯ÖµÖÕŸÖ<br />

22/06/2013<br />

15:00 ¯ÖµÖÕŸÖ<br />

26/06/2013<br />

15:00 ¯ÖµÖÕŸÖ<br />

26/06/2013<br />

17:45 ¯ÖµÖÕŸÖ<br />

29/06/2013<br />

14:00 ¯ÖµÖÕŸÖ<br />

02/07/2013<br />

17:45 ¯ÖµÖÕŸÖ<br />

02/07/2013<br />

17:45 ¯ÖµÖÕŸÖ<br />

×−Ö×¾Ö¤üÖ ¾ÖêôûÖ¯Ö¡ÖúÖŸÖᯙ ´ÖÆüŸ¾ÖÖ“µÖÖ ‡ŸÖ¸ü ²ÖÖ²Öß.<br />

1 ÊxÉÊ´ÉnùÉ {ÉÚ´ÉÇ ¤Éè`öEòÒSÉÉ ÊnùxÉÉÆEò Ê`öEòÉhÉ ´É ´Éä³ý ÊxÉ®ÆúEò<br />

2 ÊxÉÊ´ÉnùÉ


3. ÊxÉÊ´ÉnùEòÉ®úÉÆxÉÒ ÊxÉÊ´ÉnùÉ ºÉÆnù¦ÉÉÇiÉ ºÉ´ÉÇ nùºiÉBä´ÉVÉ +ÉìxɱÉÉ


5<br />

GOVERNMENT OF MAHARASHTRA<br />

PUBLIC WORKS DIVISION, NASHIK<br />

E-TENDER NOTICE NO. 02 <strong>for</strong> 2013 -2014<br />

Online E-Tenders in B-1 Form <strong>for</strong> <strong>the</strong> following work invited by Executive Engineer,<br />

P.W.Division, Nashik Phone No. (0253/2583761-64, 2575324) <strong>for</strong> and on behalf of Governor of<br />

Maharashtra State From Registered Contractors in appropriate ( Public Works Dept. only ) Class<br />

with <strong>Government</strong> of Maharashtra. Tender Notice is also available on Notice Board of P.W.<br />

Division, Nashik and on our website www.mahapwd.com / https://pwd.maharashtra.etenders.in<br />

E-<br />

Tender<br />

Sr. No.<br />

Name of Work<br />

1 Construction of Karanji to<br />

Tarulkhedle Road ODR.182 Km.<br />

0/00 to 3/00 Tal. Niphad Dist.<br />

Nashik<br />

2 Construction of Minor Bridge at<br />

ch. 3/00 on SH No.3 to Adgaon<br />

Sayyadpimpri Sukene Road Tal.<br />

Dist. Nashik<br />

3 Improvements to Gangapadali to<br />

Hinganwedhe Shiv Road VR.19<br />

Km. 0/00 to 1/00 Tal. & Dist.<br />

Nashik<br />

4 Improvements to Shinde College<br />

(Nanegaon) Road VR.19 Km.<br />

0/00 to 1/00 Tal. Dist. Nashik<br />

5. Improvements to Kalvi to<br />

Gangapadali Road VR.4 Km.<br />

0/00 to 1/00 Tal.Dist.Nashik<br />

6 Construction of C.D.Works on<br />

Mahadev Mandir to Deshwandi<br />

Road VR.196 Km. 0/00 to 1/300<br />

Tal. Sinner Dist. Nashik<br />

7 S.T.B.T. Wavi to Sayale Road<br />

VR.145 Tal. Sinner Dist. Nashik<br />

8 S.T.B.T. Wavi Ghotewadi Road<br />

VR.03 Km. 0/500 to 2/00 Tal.<br />

Sinner Dist. Nashik<br />

9 Improvements to Wadzire to<br />

Malegaon Road VR.77 Km.<br />

1/100 to 1/800 Tal. Sinner, Dist.<br />

Nashik<br />

Estimated Cost<br />

put to tender<br />

Earnest<br />

Money<br />

Cost of<br />

Tender<br />

Form<br />

45,24,972/- 42,250/- 1000/-<br />

36,07,421/- 36,074/- 1000/-<br />

23,89,699/- 23,897/- 1000/-<br />

17,17,392/- 17,174/- 1000/-<br />

24,16,131/- 24,161/- 1000/-<br />

17,00,728/- 17,007/- 1000/-<br />

24,98,049/- 24,980/- 1000/-<br />

24,98,588/- 24,986/- 1000/-<br />

15,79,217/- 15,792/- 1000/-<br />

Time Limit of<br />

complition of work/<br />

Reg.Class<br />

Six (06) months<br />

including mansoon/<br />

Class V & Above<br />

Six (06) months<br />

including mansoon/<br />

Class V & Above<br />

Six (06) months<br />

including mansoon/<br />

Class V & Above<br />

Six (06) months<br />

including mansoon/<br />

Class V & Above<br />

Six (06) months<br />

including mansoon/<br />

Class V & Above<br />

Six (06) months<br />

including mansoon/<br />

Class V & Above<br />

Six (06) months<br />

including mansoon/<br />

Class V & Above<br />

Six (06) months<br />

including mansoon/<br />

Class V & Above<br />

Six (06) months<br />

including mansoon/<br />

Class V & Above<br />

Contractor No. of Corrections Executive Engineer


TENDER SCHEDULE<br />

Sr. No. P.W.Deptt. Stage Vendor Stage Start Time<br />

& Date<br />

1 Main Tender<br />

- 14/06/2013<br />

Release<br />

from 10.00<br />

2 - Main Tender Document 14/06/2013<br />

Downloading From 17:46<br />

3 - Online Bid Preparation 14/06/2013<br />

(T1 & C1)<br />

From 17:46<br />

4 Close <strong>for</strong> Bidding of<br />

- 26/06/2013<br />

Main Tender<br />

From 15:01<br />

5 - Re-Encryption of Main Tender 26/06/2013<br />

(T1 & C1)<br />

From 17:46<br />

6 Tender Opening &<br />

- 29/06/2013<br />

Shortlisting (T1)<br />

From 14:01<br />

7 Tender Opening &<br />

- 29/06/2013<br />

Shortlisting (C1)<br />

From 14:01<br />

ADDITIONAL INFORMATION ABOUT SHEDULE<br />

1 Date of Pre-bid meeting Nil<br />

6<br />

Expiry Date &<br />

Time<br />

14/06/2013<br />

Upto 17:45<br />

22/06/2013<br />

Upto 15.00<br />

26/06/2013<br />

Upto 15:00<br />

26/06/2013<br />

Upto 17:45<br />

29/06/2013<br />

Upto 14.00<br />

02/07/2013<br />

Upto 17:45<br />

02/07/2013<br />

Upto 17:45<br />

2 Receipt of bid security and tender<br />

document fees ((in original one day<br />

be<strong>for</strong>e of <strong>the</strong> opening of <strong>the</strong> technical<br />

bid’s date and time )<br />

Upto 28/06/2013 Time: 17.00 hours (In <strong>the</strong><br />

Office of <strong>the</strong> Executive Engineer Public<br />

Works Division Nashik.)<br />

3 Date, Time and Venue of Opening of<br />

Technical Bid (Envelope No.1)<br />

4 Date, Time and Venue of Opening of<br />

Commercial Bid (Envelope No.2)<br />

Note :<br />

On 29/06/2013 Time 14.01 hours to<br />

02/07/2013 upto 17.45 (If Possible) in <strong>the</strong><br />

office of <strong>the</strong> Executive Engineer<br />

P.W.Division Nashik<br />

On 29/06/2013 Time 14.01 hours to<br />

02/07/2013 upto 17.45 (If Possible) in <strong>the</strong><br />

office of <strong>the</strong> Executive Engineer<br />

P.W.Division Nashik<br />

1. All eligible /intrested tenderes are required to be enrolled on portal https://pwd.maharashtra.e tenders.in be<strong>for</strong>e<br />

down loading tender documents and participate in e-tendering.<br />

2. Tenderes are requested to contact on following telephone numbers any doubts/in<strong>for</strong>mation/<br />

difficulty regarding on line enrollment or obtaining digital certificate Sify Technotigies ltd. Nextender(India)<br />

Pvt. Ltd. On 020- 25315555 / 25315556 (Pune ) or 9167969601 / 04<br />

3. Tenderes should submit <strong>the</strong> document related to tender online However, tenderes should submit personally <strong>the</strong><br />

earnest money in <strong>for</strong>m of FDR, tender <strong>for</strong>m fee in <strong>for</strong>m of DD and Affidavite in original one day be<strong>for</strong>e<br />

opening of <strong>the</strong> technical Bid o<strong>the</strong>rwise tenderer cannot participate in e-tendering.<br />

4. O<strong>the</strong>r instructions can be seen in <strong>the</strong> tender <strong>for</strong>m. All or any one of <strong>the</strong> tender may be rejected by<br />

<strong>the</strong> competent authority.<br />

5. The Electronic tendering system <strong>for</strong> Public Works Department of <strong>Government</strong> of Maharashtra will be available<br />

on separate Sub Portal with URL https://pwd.maharashtra.etenders.in as part of <strong>the</strong> Electronic <strong>Tendering</strong><br />

<strong>System</strong> of <strong>Government</strong> of Maharashtra which is available on <strong>the</strong> Portal https://pwd.maharashtra.etenders. in.<br />

O.C.Sign by. E.E.<br />

Executive Engineer<br />

Public Works Division<br />

Nashik<br />

Contractor No. of Corrections Executive Engineer


7<br />

Orignal Agreement No. : B-1/<br />

Name of Work : Constructing Karanji to Tarukhedale Road ODR-182 Km.<br />

0/00 to 3/00, Tal. Niphad, Dist. Nashik<br />

Name of Contractor :<br />

Date of Receipt of :<br />

Tender<br />

No. & Date of Work :<br />

Order<br />

Amount put to Tender : Rs. 45,24,972/-<br />

Percentage quoted :<br />

Amount of Contract :<br />

Date of Commencement :<br />

Time stipulated <strong>for</strong><br />

completion of work<br />

Date of completion as :<br />

per Agreement<br />

Acutual Date of :<br />

Completion<br />

Reference to sanction of :<br />

tender<br />

Extension of time limit : 1<br />

: 6 (Six) Calender Months from <strong>the</strong> date of<br />

written order to start work, which will include <strong>the</strong><br />

monsoon period.<br />

2<br />

3<br />

Contractor No. of Corrections Executive Engineer


8<br />

DETAILS OF WORK<br />

NAME OF WORK: - Constructing Karanji to Tarukhedale Road ODR-182 Km.<br />

0/00 to 3/00, Tal. Niphad, Dist. Nashik<br />

Estimated Cost put to tender 45,24,972.00<br />

Earnest Money 45,250.00<br />

Term Deposit Receipt of Schedule Bank/ Nationalised Bank/ State Bank of India<br />

Challan or Valid E.M.D. Exemption Certificate duly attested shall be uploaded at <strong>the</strong> time of<br />

submission. Total Security Deposit 4% (four percent) Rs. 1,81,000/- (50% in cash at <strong>the</strong><br />

time of Agreement and 50% from R.A.bills).<br />

Contractor No. of Corrections Executive Engineer


9<br />

TO BE FILLED BY THE CONTRACTOR<br />

I/We have quoted my/our offer in percentage rate in words as well as in figures.<br />

I/We fur<strong>the</strong>r undertake to enter into contract in regular “B-1” <strong>for</strong>m in Public Works<br />

Department.<br />

Name and signature of Contractor/<br />

Power of Attorney holder<br />

With complete address.<br />

Contractor No. of Corrections Executive Engineer


10<br />

1. TENDER SCHEDULE<br />

<strong>Government</strong> of Maharashtra<br />

PUBLIC WORKS DEPARTMENT<br />

INVITATION FOR TENDERS.<br />

DETAILED TENDER NOTICE<br />

Online percentage rate tenders in ‘B-1’ Form are released by <strong>the</strong> Executive Engineer, Public Works<br />

Division, Nashik <strong>for</strong> <strong>the</strong> following work from Contractors registered in appropriate class of <strong>the</strong><br />

Public Works Department of Maharashtra state.<br />

Money, Security Deposit, Time limit <strong>for</strong> completion etc. are as under<br />

The Name of Work, Estimated Cost, Earnest<br />

Name of Work :-<br />

Constructing Karanji to Tarukhedale Road ODR-182 Km.<br />

0/00 to 3/00, Tal. Niphad, Dist. Nashik<br />

Estimated Cost Put to Tender :- Rs. 45,24,972.00<br />

Earnest Money Deposit (EMD) Rs. 45,250.00<br />

Security Deposit Rs. 90,500.00<br />

Cost of Tender Form Rs. 1,000/-<br />

Date Time and Venue of Pre-bid<br />

at 15.00 hours, In <strong>the</strong> office of <strong>the</strong><br />

meeting<br />

Last date and time <strong>for</strong> on line bid<br />

preparation and hash submission<br />

(technical and financial)<br />

Date and time <strong>for</strong> online bid data<br />

decryption and re-encryption<br />

(technical and commercial)<br />

Receipt of Earnest money Deposit in<br />

<strong>the</strong> acceptable <strong>for</strong>m and in original<br />

o<strong>the</strong>r than Exemption Certificate<br />

and tender documents fees (in<br />

original one day be<strong>for</strong>e of <strong>the</strong><br />

opening of <strong>the</strong> technical bid’s date<br />

and time)<br />

Registration class of Contractor<br />

Superintending Engineer, P. W. Circle Nashik<br />

Date:<br />

Time. 18.00 hours<br />

From 26.06.2013 time 17.46 hours<br />

to 29.06.2013 time 14.00 hours<br />

Upto 28.06.2013 Time : 17.00 hours In <strong>the</strong> office of <strong>the</strong><br />

Executive Engineer, P. W. Division Nashik<br />

Class – V and above<br />

2. Guidelines to Bidders on <strong>the</strong> operations of Electronic <strong>Tendering</strong> Management <strong>System</strong><br />

[ETMS] of Public Works Department, http://pwd.maharashtra.etenders.in<br />

2(A) Pre-requisites to participate in <strong>the</strong> Tenders processed by PWD.<br />

Contractor No. of Corrections Executive Engineer


11<br />

(i)<br />

Enrolment and Empanelment on [ETMS]:-<br />

(a) Enrolment on [ETMS]:-<br />

I. The Contractors interested in particpating in <strong>the</strong> Tenders of Public Works<br />

Department – processed using <strong>the</strong> ETMS will have to be Enrolled on <strong>the</strong><br />

ETMS and have obtained User ID.<br />

II. After submission of application <strong>for</strong> Enrolment on <strong>the</strong> <strong>System</strong>, <strong>the</strong> Authorized<br />

Representative of <strong>the</strong> Service Provider will verify <strong>the</strong> in<strong>for</strong>mation provided and<br />

will approve <strong>the</strong> Enrolment If <strong>the</strong> in<strong>for</strong>mation is found to be complete and in<br />

order.<br />

(b) Empanelment on [ETMS]:-<br />

I. For participating in Limited and Restricted tenders <strong>the</strong> registered vendors have<br />

to apply <strong>for</strong> Empanelment on <strong>the</strong> sub-portal of PWD in an appropriate class of<br />

registration.<br />

II. After submission of application <strong>for</strong> Empanelment on <strong>the</strong> <strong>System</strong>, <strong>the</strong> respective<br />

officer from <strong>the</strong> PWD will verify <strong>the</strong> in<strong>for</strong>mation provided and will approve <strong>the</strong><br />

Empanelment If <strong>the</strong> in<strong>for</strong>mation is found to be complete and in order.<br />

III. Only Empanelled Contractors with PWD will be allowed to participate in this<br />

tender.<br />

(c) For any assistance on <strong>the</strong> use of ETMS<br />

I. The Contractors may obtain <strong>the</strong> necessary in<strong>for</strong>mation on <strong>the</strong> process of<br />

enrolment and empanelment ei<strong>the</strong>r from Helpdesk Support Team or may visit<br />

<strong>the</strong> in<strong>for</strong>mation published under <strong>the</strong> link Enroll under <strong>the</strong> section E- <strong>Tendering</strong><br />

Toolkit <strong>for</strong> Bidders on <strong>the</strong> Home Page of <strong>the</strong> ETMS.<br />

II. The Users may call <strong>the</strong> below numbers:<br />

Landline No. - 020 – 2531 5555 / 56<br />

E-mail ID - Sopport.gom@nexttenders.com<br />

Mobile No. - 91679 6960 / 04 / 14<br />

(ii). Obtaining a Digital Signature Certificate (DSC):-<br />

a. Intending Tenderers should have valid class II/ III Digital Signature Certificate (DSC)<br />

obtained from an approved Certifying Authority authorized by <strong>the</strong> Controller of<br />

Certifying Authorities of <strong>Government</strong> of India through <strong>the</strong>ir Authorized Representatives<br />

upon receipt of documents required to obtain a DSC.<br />

Contractor No. of Corrections Executive Engineer


12<br />

b. In case of requirement of DSC, Intending Tenderers should go to<br />

http://maharashtra.etenders.in/mah/DigitalCerti.asp and follow <strong>the</strong> procedure mentioned<br />

in <strong>the</strong> document Procedure <strong>for</strong> application of DSC.<br />

c. The DSC (Class – II or Class – III) is used to encrypt <strong>the</strong> data/ in<strong>for</strong>mation and<br />

electronically sign <strong>the</strong> hash value during <strong>the</strong> Bid preparation and Hash Submission<br />

stage.<br />

d. The DSC is required to maintain <strong>the</strong> security of <strong>the</strong> Bid Data and also to establish <strong>the</strong><br />

identity of <strong>the</strong> Contractor transacting on <strong>the</strong> <strong>System</strong>.<br />

e. In case during <strong>the</strong> process of preparing and submitting a bid <strong>for</strong> a particular Tender, <strong>the</strong><br />

contractor loses his/her DSC (i.e. due to virus attack, hardware problem, operating<br />

system problem, etc.), he/she may not be able to submit <strong>the</strong> Bid online and <strong>the</strong><br />

Department will not be responsible <strong>for</strong> that.<br />

f. Hence, <strong>the</strong> Users are advised to store his/ her DSC securely and if possible, keep a<br />

backup at safe place under adequate security to be used in case of need.<br />

g. In case of online tendering, if <strong>the</strong> DSC issued to an Authorized user of a Partnership<br />

Firm is used <strong>for</strong> signing and submitting a bid, it will be considered equivalent to a no<br />

objection certificate / power of attorney to that User to submit <strong>the</strong> bid on behalf of <strong>the</strong><br />

Partnership Firm. The Partnership Firm has to authorize a specific individual via an<br />

authorization certificate signed by a partner / partners of <strong>the</strong> firm (and in case <strong>the</strong><br />

applicant is a partner, all o<strong>the</strong>r partners if <strong>the</strong> same <strong>for</strong>m shall authorize him self <strong>for</strong><br />

DSC) to use <strong>the</strong> DSC as per Indian In<strong>for</strong>mation Technology Act, 2000. Unless <strong>the</strong> DSC<br />

is revoked, it will be assumed to represent adequate authority of <strong>the</strong> Authority User to<br />

bid on behalf of <strong>the</strong> Firm <strong>for</strong> <strong>the</strong> Tenders processed on <strong>the</strong> Electronic Tender<br />

Management <strong>System</strong> of <strong>Government</strong> of Maharashtra as per Indian In<strong>for</strong>mation<br />

Technology Act. 2000.<br />

h. Unless <strong>the</strong> DSC of this Authorized User will be binding on <strong>the</strong> Firm. It Shall be <strong>the</strong><br />

responsibility of Partners of <strong>the</strong> Firm to in<strong>for</strong>m <strong>the</strong> Certifying Authority or sub<br />

Certifying Authority, if <strong>the</strong> Authorized User changes, and apply <strong>for</strong> a fresh DSC. The<br />

procedure <strong>for</strong> application of a DSC will remain <strong>the</strong> same <strong>for</strong> <strong>the</strong> new Authorized User.<br />

i. The Same procedure holds true <strong>for</strong> <strong>the</strong> Authorized Users in Private/ Public Limited<br />

Company. In this case, <strong>the</strong> Authorization Certificate will have to be signed by <strong>the</strong><br />

Director of <strong>the</strong> Company or <strong>the</strong> Reporting Authority of <strong>the</strong> Applicant.<br />

j. For In<strong>for</strong>mation on <strong>the</strong> process of application <strong>for</strong> obtaining DSC, <strong>the</strong> Contractors may<br />

visit <strong>the</strong> section DSC on <strong>the</strong> Home Page of <strong>the</strong> ETMS .<br />

Contractor No. of Corrections Executive Engineer


13<br />

(iii) Recommended Hardware and Internet Connectivity :-<br />

a. Intending Tenderers should install <strong>the</strong> Mandatory Components available on <strong>the</strong> Home<br />

Page of http://maharashtra.etenders.in under <strong>the</strong> section Mandatory Components and<br />

make <strong>the</strong> necessary Browser Settings provided under section ‘Internet Explorer<br />

Settings’<br />

b. To operate on <strong>the</strong> ETMS, <strong>the</strong> Contractors are recommended to use Computer <strong>System</strong><br />

with at least 1 GB of RAM and broadband connectivity with minimum 512 kbps<br />

bandwidth.<br />

(iv) Set up of Computer <strong>System</strong> <strong>for</strong> executing <strong>the</strong> operations on <strong>the</strong> ETMS .<br />

a. To operate on <strong>the</strong> ETMS of GoM, <strong>the</strong> Computer <strong>System</strong> of <strong>the</strong> Contractors is required<br />

is required be set up. The contractors are required to install Utilities available under<br />

<strong>the</strong> section Mandatory Installation Components on <strong>the</strong> Home Page of <strong>the</strong> <strong>System</strong>.<br />

b. The Utilities are available <strong>for</strong> download freely from <strong>the</strong> above mentioned section. The<br />

contractors are requested to refer to <strong>the</strong> E-<strong>Tendering</strong> Toolkit <strong>for</strong> Bidders available<br />

online on <strong>the</strong> Home Page to understand <strong>the</strong> process of setting up <strong>the</strong> <strong>System</strong>, or<br />

alternatively, contact <strong>the</strong> Helpdesk Support Team on in<strong>for</strong>mation/ guidance on <strong>the</strong><br />

process of setting up <strong>the</strong> <strong>System</strong>.<br />

c. The Utilities are available <strong>for</strong> download freely from <strong>the</strong> above mentioned section. The<br />

Contractors are requested to refer to <strong>the</strong> E-<strong>Tendering</strong> Toolkit <strong>for</strong> Bidders available<br />

online on <strong>the</strong> Home Page to Understand <strong>the</strong> process of setting up <strong>the</strong> <strong>System</strong>, or<br />

alternatively, contact <strong>the</strong> Helpdesk Support Team on in<strong>for</strong>mation / guidance on <strong>the</strong><br />

process of setting up <strong>the</strong> <strong>System</strong>.<br />

2(B) Steps to be followed by Contractors to Participate in <strong>the</strong> E-Tenders Processed by<br />

PWD.<br />

(i) Preparation of Online Briefcase :-<br />

a. All Contractors enrolled on <strong>the</strong> ETMS of GoM are provided with dedicated briefcase<br />

facility to store documents/ files in digital <strong>for</strong>mat.<br />

b. The Contractors can use <strong>the</strong> online briefcase to store <strong>the</strong>ir scanned copies of frequently<br />

used documents/ files to be submitted as a part of <strong>the</strong>ir bid response.<br />

c. The Contractors are advised to store <strong>the</strong> relevant documents in <strong>the</strong> briefcase be<strong>for</strong>e<br />

starting <strong>the</strong> Bid Preparation and Hash Submission stage.<br />

d. In Case, <strong>the</strong> Contractors have multiple documents under <strong>the</strong> same type (e.g. multiple<br />

work Completion Certificates) as mentioned above, <strong>the</strong> Contractors advised to ei<strong>the</strong>r<br />

create a single [*.pdf ]file of all <strong>the</strong> documents of same type or compress <strong>the</strong><br />

Contractor No. of Corrections Executive Engineer


14<br />

documents in a single compressed file in [*.zip] or [*.rar] <strong>for</strong>mats and upload <strong>the</strong> same.<br />

e. It is mandatory to upload <strong>the</strong> documents using <strong>the</strong> briefcase facility. There<strong>for</strong>e, <strong>the</strong><br />

Contractors are advised to keep <strong>the</strong> scanned copies of original documents ready in <strong>the</strong>ir<br />

briefcase to ensure timely bid preparation. However he shall attach only required<br />

documents<br />

f. Uploading of documents in <strong>the</strong> briefcase does not mean that <strong>the</strong> documents are available<br />

to PWD at <strong>the</strong> time of Tender Opening stage unless <strong>the</strong> documents are specifically<br />

attached to <strong>the</strong> bid during <strong>the</strong> online Bid Preparation and Hash Submission stage as well<br />

as during Decryption and Re-encryption stage.<br />

(ii). Purchase of Tender Documents<br />

The Tender Documents (Tender <strong>for</strong>m, conditions of contract, specifications and contract<br />

drawings, etc) can be purchased on <strong>the</strong> payment of Tender Fee Rs. 1,000/- (In words Rs.<br />

One Thousand only.) in <strong>for</strong>m of DD/pay order of Scheduled or Nationalised Bank in favour<br />

of Executive Engineer P. W. D. Nashik as per <strong>the</strong> Tender Schedule.<br />

(iii) Download of Tender Documents :-<br />

Tender Document can be downloaded, only after entering <strong>the</strong> details of payment of<br />

Tender Fee on <strong>the</strong> e-tendering portal of PWD, GoM i.e.<br />

http://pwd.maharashtra.etenders.in. Additional in<strong>for</strong>mation regarding <strong>the</strong> work not<br />

mentioned in <strong>the</strong> Tender Document can be obtained from <strong>the</strong> office of <strong>the</strong> Executive<br />

Engineer P. W. D. Nashik during office hours.<br />

(v) Payment <strong>for</strong> Service Provider Fees (SPF):-<br />

The contractors will have to pay Service Providers Fees (SPF) of Rs. 1,038/- through<br />

online payments gateway service available on ETMS. The list of options <strong>for</strong> making<br />

online payments is available on <strong>the</strong> link E-Payment Options under <strong>the</strong> section E-<br />

<strong>Tendering</strong> Toolkit <strong>for</strong> Intending Tenderers on <strong>the</strong> Home Page of <strong>the</strong> ETMS . The details<br />

of SPF will be confirmed during <strong>the</strong> Technical Opening stage. ie Envelope No. 1<br />

It shall be noted that <strong>the</strong> SPF is in Addition to <strong>the</strong> Tender Fees.<br />

3 EXAMINATION OF DRAWING AND SITE CONDITIONS :<br />

(3.1) The tenderer shall in his own interest carefully examine <strong>the</strong> drawings, conditions of<br />

contract specifications etc.<br />

(3.2) He shall also inspect <strong>the</strong> site and acquaint himself about <strong>the</strong> climate, physical and all o<strong>the</strong>r<br />

conditions prevailing at site, <strong>the</strong> nature, magnitude, special features, practicability of <strong>the</strong><br />

<strong>works</strong>, all existing and required means of communications and accesses to site,<br />

availability of housing and o<strong>the</strong>r facilities, <strong>the</strong> availability of labour, materials, Power &<br />

Water, space <strong>for</strong> labour’s camp, plant, stores and Godown etc.<br />

Contractor No. of Corrections Executive Engineer


15<br />

(3.3) He shall obtain all necessary in<strong>for</strong>mation as to <strong>the</strong> risk, contingencies and o<strong>the</strong>r<br />

circumstances, which may affect and influence <strong>the</strong> tender.<br />

(3.4) Should <strong>the</strong>re be any discrepancy or doubt or obscurity as to meaning of any of <strong>the</strong> tender<br />

document or as to <strong>the</strong> instructions to be observed by him, he shall set <strong>for</strong>th in writing such<br />

discrepancies, doubts obscurity and submit <strong>the</strong> same to <strong>the</strong> Executive Engineer, Public Works<br />

Division, Nashik <strong>for</strong> elucidation as soon as possible.<br />

(3.5) No claims on any of <strong>the</strong> above or any o<strong>the</strong>r factors will be entertained by <strong>the</strong> <strong>Government</strong>.<br />

4. PRE – TENDER CONFERENCE :-<br />

(4.1) The Pre – tender conference will be open to all prospective tenderers, who will submit <strong>the</strong><br />

Tender Fee, prior to <strong>the</strong> time of pre–tender conference, and obtain receipt from Circle<br />

office<br />

(4.2) Pre tender conference, will be held at Nashik on at 15.00 hours in <strong>the</strong> office<br />

of <strong>the</strong>, Superintending Engineer, Public Works Circle Bandhkam Bhavan, Traymbak<br />

Road, Nashik 422002 (Phone No. (0253) 2581350 Fax No. 0253 -2578519) wherein <strong>the</strong><br />

prospective tenderers will have an opportunity to obtain clarifications regarding <strong>the</strong> work<br />

and tender conditions<br />

(4.3) The Prospective Tenderers are free to ask <strong>for</strong> any additional in<strong>for</strong>mation or clarification ei<strong>the</strong>r<br />

in writing or orally concerning <strong>the</strong> work, and <strong>the</strong> reply to <strong>the</strong> same will be given by <strong>the</strong><br />

Superintending Engineer, in writing and this clarification referred to as Common Set of<br />

Conditions/ Deviations (CSD.) Shall <strong>for</strong>m part of tender documents and which will also be<br />

common and applicable to all tenderers, <strong>the</strong> point/ points if any raised in writing and/ or<br />

verbally by <strong>the</strong> contractor in pre-tender conference and not finding place in CSD issued after<br />

<strong>the</strong> pre-tender conference, is / are deemed rejected. In such case <strong>the</strong> provision in NIT shall<br />

prevail. No individual correspondence will be made <strong>the</strong>reafter with <strong>the</strong> contractor in this<br />

regard.<br />

(4.4) The tender submitted by <strong>the</strong> tenderer shall be based on <strong>the</strong> clarification, additional facility<br />

issued (if any) by <strong>the</strong> Department, and this tender shall be unconditional. Conditional<br />

tender will be summarily REJECTED.<br />

(4.5) All Intending Tenderers are cautioned that <strong>the</strong> tenders containing any deviation from <strong>the</strong><br />

contractual terms and condition, specifications or o<strong>the</strong>r requirements, and conditional<br />

tenders will be treated as non responsive.<br />

5. EARNEST MONEY DEPOSIT (EMD):-.<br />

(5.1) Earnest Money Deposit (EMD.) which should be paid by Treasury Challan in any<br />

<strong>Government</strong> Treasury/ Sub-Treasury/ State Bank of India/ Hyderabad/ Reserve Bank of<br />

India and <strong>the</strong> receipted Challan attached or Term Deposit Receipt <strong>for</strong> a period of one<br />

Contractor No. of Corrections Executive Engineer


16<br />

year issued by any scheduled Bank in favour of Executive Engineer, Public Works<br />

Division, Nashik separately <strong>for</strong> each work.<br />

(5.2) When <strong>the</strong> amount is remitted through Treasury Challan it should be credited under head<br />

“8782-Cash Remittance – I” Remittances into Treasury” in favour of <strong>the</strong> Executive<br />

Engineer, Public Works Division, Nashik and described as EMD <strong>for</strong> <strong>the</strong> work <strong>for</strong><br />

which <strong>the</strong> tender is given.<br />

(5.3) Earnest Money in any o<strong>the</strong>r <strong>for</strong>m or cash or cheques will not be accepted.<br />

(5.4) Scanned copy of <strong>the</strong> EMD or valid EMD Exemption Certificate should be uploaded<br />

online in Envelope No1.<br />

(5.5) Also <strong>the</strong> Original Copy of <strong>the</strong> EMD or Attested copy of valid EMD Exemption<br />

Certificate has to be submitted Physically as prescribed in this Tender Documents. ( as<br />

specified elsewhere in <strong>the</strong> Tender Document)<br />

(5.6) Any tender not accompanied by <strong>the</strong> Original Copy of <strong>the</strong> EMD or Attested copy of valid<br />

EMD Exemption Certificate required to have been submitted Physically as prescribed<br />

in this Tender Documents be<strong>for</strong>e due date in <strong>the</strong> office of Superintending Engineer,<br />

Public Works Circle, Nashik shall be rejected as non-responsive.<br />

(5.7) The amount of EMD will be <strong>for</strong>feited, in case a successful contractor does not pay <strong>the</strong><br />

amount of initial security deposit within <strong>the</strong> time specified as stipulated by <strong>the</strong><br />

Executive Engineer, and complete <strong>the</strong> contract documents. In all o<strong>the</strong>r cases, EMD<br />

will be refundable.<br />

(5.8) EMD of <strong>the</strong> unsuccessful Tenderers will be refunded on <strong>the</strong>ir application only after<br />

an intimation of rejection of <strong>the</strong>ir tender is sent to <strong>the</strong>m or on <strong>the</strong> expiry of <strong>the</strong><br />

validity period whichever is earlier.<br />

6 Manner of Submission :<br />

6.1 Uploading of Formats, Templates and Tender Documents:-<br />

(a) The Intending Tenderer shall prepare <strong>the</strong> Bids in <strong>the</strong> Templates provided online as part<br />

of tender. The Templetes shall be ei<strong>the</strong>r Documents based (in which <strong>the</strong> Intending<br />

Tenderer is required to attach <strong>the</strong> relevant documents separately) or Forms Based (in<br />

which <strong>the</strong> Intending Tenderer is required to fill in <strong>the</strong> in<strong>for</strong>mation in given Formats).<br />

(b) The required Documents (single document or a compressed file containing multiple<br />

document having size of each document not more than 5 MB) available in Brief Case<br />

shall be attached against each up loadable option in <strong>the</strong> Document Based Templates.<br />

(c) The In<strong>for</strong>mation being filled in <strong>the</strong> Form Based Templates shall be encrypted using a<br />

valid class II / III DSC.<br />

Contractor No. of Corrections Executive Engineer


(d) The Formats/ Templates shall be uploaded in Envelope No.1 (Technical Bid) on <strong>the</strong><br />

sub-Portal http;//pwdmaharashtra.etender.in<br />

1. Scanned Copy of <strong>Government</strong> Treasury Challan or Terms Deposit Receipt valid <strong>for</strong><br />

a period of one year from any Scheduled Bank <strong>for</strong> <strong>the</strong> amount of Earnest Money, or<br />

valid certificate of exemption from payment of Earnest Money, if applicable<br />

[original copy is to be submitted as specified as above]<br />

2. Scanned Copy of Certificate of Registered Contractor with <strong>the</strong> Public Works<br />

Department, GoM in appropriate class as may be applicable<br />

3. Scanned copy of Details of <strong>the</strong> <strong>works</strong> tendered <strong>for</strong> and in hand with <strong>the</strong> value of <strong>the</strong><br />

work unfinished on <strong>the</strong> last date of submission of tender (in Statement No. 1, on page<br />

No. 28). The Statement from <strong>the</strong> Head of <strong>the</strong> Officer under whom <strong>the</strong> <strong>works</strong> are in<br />

progress should be uploaded.<br />

4. Scanned copy of <strong>the</strong> list of owned/ hire machinery and Plants immediately available<br />

with <strong>the</strong> tenderer <strong>for</strong> use on this work and <strong>the</strong> list of machinery proposed to be<br />

utilized on this work, but not immediately available and <strong>the</strong> manner in which it is<br />

proposed to be procured. (In Statement No.2 and 2(A) on page No.29 and 30<br />

respectively.)<br />

Proof of ownership/ hire of drum hot mix plant & o<strong>the</strong>r related machinary. (As In<br />

Statement No. 2 and 2(A) The tenders of those tenderers who do not submit <strong>the</strong> proof<br />

of ownership of hot mix plant & o<strong>the</strong>r related machinary.as stated in statement No 2A<br />

in <strong>the</strong> Envelope No.1 shall not be considered <strong>for</strong> opening of Envelope No 2 of main<br />

tender. Also enclosed scanned copy of Verification certificate of Deputy Engineer / Executive<br />

Engineer regarding Plant location Page No. 84 & 85<br />

1. Scanned copy of <strong>the</strong> list of <strong>the</strong> details of work of similar type and magnitude carried out<br />

by <strong>the</strong> contractor during last three years (in Statement No. 3, Page No. 31)<br />

2. Scanned copy of list of details of Technical personnel on <strong>the</strong> rolls of <strong>the</strong> tenderers. (in<br />

<strong>the</strong> Statement No. IV on Page No. 32)<br />

3. Scanned copy Partnership Deed and Power of Attorney, in case of a firm tendering <strong>for</strong><br />

work.<br />

4. Scanned copy of Valid Professional Tax Registration Certificate in <strong>the</strong> Form of PTR /<br />

PTE under Section (I) of Section 5 of Maharashtra State Tax in Profession, Trade calling<br />

and Employment Act, 1975 Rule 3(2) <strong>for</strong> Employees including technical personnel from<br />

<strong>the</strong> Professional Tax Office of <strong>the</strong> concerned district of Maharashtra<br />

5. Scanned copy of Registration Certificate under Maharashtra Value Added Tax Act 2005<br />

under Rule No. 8 & 9/ or TIN number issued by competent authority.<br />

17<br />

Contractor No. of Corrections Executive Engineer


18<br />

(e) Envelope No. 2 Tender (Financial Bid)<br />

The downloaded Tender Document along with detailed set of conditions issued /<br />

additional stipulations (C.S.D.) shall be signed by <strong>the</strong> Intending Tenderer (In <strong>the</strong> event of<br />

Tender being submitted by Firm, it must be signed by <strong>the</strong> Nominated partner or person<br />

holding power of attorney to sign <strong>the</strong> bid) and <strong>the</strong> Scanned copy of <strong>the</strong> above shall be<br />

uploaded in Envelope No. 2 on <strong>the</strong> sub-Portal http://pwdmaharashtraetender.in<br />

(f) The Intending Tenderer must quote his offer in <strong>for</strong>m of percentage of Estimated Rates only at<br />

<strong>the</strong> appropriate place provided online. Also uploaded <strong>the</strong> offer page of tender document<br />

with quoting his offer.<br />

(6.2) ONLINE Submission:-<br />

(i) Submission of online Tender Documents {uploading of Formats & Templates} (in<br />

Env no1) and Tender Documents (in Env no 2)} shall be followed by Digitally<br />

signed Bid Hashes (Seals) within <strong>the</strong> Tender Time Schedule (Key Dates)<br />

(ii) Then <strong>the</strong> Intending Tenderer is required to enter <strong>the</strong> date and encrypt <strong>the</strong> data using<br />

<strong>the</strong> DSC.<br />

(iii) The Hashes are <strong>the</strong> Thumbprint of electronic Data and are based on one – way<br />

algorithm. The Hashes establish <strong>the</strong> unique identity of Bid Data.<br />

(iv) The Bid hash values are digitally signed using valid Class – II or Class – III DSC<br />

issued any Certifying Authority.<br />

(v) After <strong>the</strong> hash value of bid data is generated, <strong>the</strong> intending Tenderer cannot make any<br />

change / additions in his bid data.<br />

Note -<br />

(a) The Contractor upload a single document or a compressed file containing documents<br />

against each upload able option.<br />

(b) The Hashes are <strong>the</strong> thumbprint data of electronic data and are based on one – way<br />

algorithm. The Hashes establish <strong>the</strong> unique identity of Bid Data.<br />

(c) The Bid Hash values are digitally signed using valid – Class II or Class III DSC<br />

issued any Certifying Authority. The Contractors are required to obtain DSC in<br />

advance<br />

(d) After <strong>the</strong> hash value of bid data is generated, <strong>the</strong> intending Tenderer cannot make any<br />

change / additions in his bid data<br />

(f) The Step by step procedure as per system requirement must be followed.<br />

6.3 Physical Submission:-<br />

Contractor No. of Corrections Executive Engineer


19<br />

Following Documents in original <strong>for</strong>ms shall be submitted in sealed covers<br />

{With The full name and address of <strong>the</strong> tenderer and <strong>the</strong> name of <strong>the</strong> work<br />

written at <strong>the</strong> top of <strong>the</strong> envelope} addressed to <strong>the</strong> Executive Engineer, Public<br />

Works Division, Nashik will be received in <strong>the</strong> office of <strong>the</strong> Executive<br />

Engineer, Public Works Division, Nashik as per <strong>the</strong> Tender Schedule, failing<br />

to which <strong>the</strong> tender shall be treated as Non- Responsive & Tender will be<br />

summarily REJECTED.<br />

(1) The Tender Fee in <strong>the</strong> <strong>for</strong>m of DD/ Pay Order, Drawn in <strong>the</strong> name of<br />

Executive Engineer, Public Works Division, Nashik (If <strong>the</strong> Intending<br />

Tenderer has already submitted <strong>the</strong> tender fee as prescribed above at <strong>the</strong><br />

time of Pre Tender Conference <strong>the</strong>n he should enclose attested xerox copy<br />

of <strong>the</strong> receipt of <strong>the</strong> same in lieu of Tender Fees)<br />

(2) EMD or Attested valid EMD Exemption certificate,<br />

(3) Affidavit regarding correctness of all Documents & Details <strong>the</strong>rein<br />

submitted online.<br />

7. Dead line <strong>for</strong> Submission of Tender<br />

The Engineer-in-Charge may at his discretion extend <strong>the</strong> deadline <strong>for</strong> submission of<br />

tender by issuing an addendum in which case, all rights and obligations of <strong>the</strong><br />

<strong>Government</strong> and Tenderers previously subjected to <strong>the</strong> original dead line shall <strong>the</strong>re<strong>for</strong>e<br />

be subjected to new deadline as extended.<br />

8. Close <strong>for</strong> bidding (Generation of Super Hash Values) :<br />

After <strong>the</strong> expiry of <strong>the</strong> cut off time of Bid Preparation and Hash Submission stage to be<br />

completed by <strong>the</strong> Intending Tenderer has lapsed, <strong>the</strong> Tender will be closed by <strong>the</strong> Tender<br />

Authority. The Step by step procedure as per system requirement must be followed.<br />

The Tender Authority from PWD shall generate and digitally signed <strong>the</strong> Super Hash<br />

values (Seals).<br />

9. Decryption and Re-encryption of Bids (Submitting <strong>the</strong> Bids online) :-<br />

The Intending Tenderers are expected to get <strong>the</strong>mselves fully conversant with <strong>the</strong> GoM E-<br />

Tender <strong>System</strong> and latest changes <strong>the</strong>rein. However brief details about E-Tender <strong>System</strong>, it’s<br />

requirements, necessary procedure regarding purchase of Tender Forms, downloading of<br />

Tender Forms, Submission of Tender Documents, quoting offer etc, has been mentioned below;<br />

Contractor No. of Corrections Executive Engineer


20<br />

(9.1) After <strong>the</strong> time <strong>for</strong> generation of Super Hash values by <strong>the</strong> Tender Authority from PWD has<br />

lapsed, And After making online payment towards Fees of Service Provider, <strong>the</strong><br />

Contractors are required to decrypt <strong>the</strong>ir bid data using <strong>the</strong>ir DSC and immediately reencrypt<br />

<strong>the</strong>ir bid data using <strong>the</strong> Public Key of <strong>the</strong> <strong>Tendering</strong> Authority. The Public Key<br />

of <strong>the</strong> <strong>Tendering</strong> Authority is attached to <strong>the</strong> Tender during <strong>the</strong> Close <strong>for</strong> Bidding stage.<br />

(9.2) At this time, <strong>the</strong> Intending Tenderer are also required to upload <strong>the</strong> files <strong>for</strong> which <strong>the</strong>y<br />

generated <strong>the</strong> Hash Vales during <strong>the</strong> Bid Preparation and Hash Submission stage.<br />

(9.3) The Bid Data and Documents of only those Intending Tenderer who have submitted <strong>the</strong>ir<br />

Bid Hashes (Seals) within <strong>the</strong> stipulated time (as per <strong>the</strong> Tender Schedule), will be<br />

available <strong>for</strong> decryption and re-encryption and to upload <strong>the</strong> relevant documents from<br />

Briefcase.<br />

(9.4) A Intending Tenderer who has not submitted his Bid Preparation and Hash Submission<br />

stage within <strong>the</strong> stipulated time will not be allowed to decrypt/ re-encrypt <strong>the</strong> Bid Data /<br />

submit documents during <strong>the</strong> stage of Decryption and Re-encryption of Bids (submitting<br />

<strong>the</strong> Bids Online)<br />

(9.5) The Step by step procedure as per system requirement must be followed.<br />

10. Receipt of Tender After Deadline<br />

The Tenderer will have to carry out <strong>the</strong>ir respective tasks within <strong>the</strong> deadline defined in<br />

<strong>the</strong> Tender Schedule.<br />

11. Department will not be responsible, For non Enrolment and non Empanelment of ETMS, non<br />

submitting / uploading tender online due to failure of internet services, or power supply or<br />

any o<strong>the</strong>r un<strong>for</strong>eseen or <strong>for</strong>eseen reasons/causes what-so-ever. No claims on any of <strong>the</strong><br />

above or any o<strong>the</strong>r factors in <strong>the</strong> regards will not be entertained.<br />

12. Opening of Technical Bid (Envelope No. 1)<br />

(12.1) Tenders will be opened as per <strong>the</strong> Tender Schedule, in <strong>the</strong> presence of such intending<br />

Tenderers or his/ <strong>the</strong>ir authorized representatives who may be present at that time.<br />

(a) The <strong>Tendering</strong> Authority will first open <strong>the</strong> Envelope – I documents of all Intending<br />

Tenderer and after scrutinizing <strong>the</strong>se documents will shortlist <strong>the</strong> Intending Tenderer<br />

Contractor No. of Corrections Executive Engineer


who are eligible <strong>for</strong> Financial Bidding Process. The Shortlisted Tenderers will be<br />

intimated by e-mail.<br />

21<br />

(b) The Contents in Envelope No. 1 will be verified by <strong>the</strong> Tender opening authority to<br />

check <strong>the</strong>ir validity as per requirements. If any particular document of any tender is<br />

ei<strong>the</strong>r missing or does not meet <strong>the</strong> requirements as specified above <strong>the</strong>n a above to<br />

that effect will be recorded by <strong>the</strong> tender opening authority at <strong>the</strong> time of short<br />

listing of Envelope – 1.<br />

13. Opening of Financial Bid (Envelope No. 2)<br />

(13.1) The Envelope No. 2 of <strong>the</strong> tenderer whose Envelope No. 1 dose not contain <strong>the</strong> specified<br />

documents or any of <strong>the</strong> specified document is missing or do not satisfy <strong>the</strong><br />

requirements, such tenders will be rejected. The Envelope No. 2 of such tender shall not<br />

be opened and a note to that effect will be made online at <strong>the</strong> time of short listing of<br />

Envelope -1<br />

(13.2) After <strong>the</strong> analysis and scrutiny of documents and evaluation with respect to Departmental<br />

Requirement is over, <strong>the</strong> tender opening authority shall intimate <strong>the</strong> date and time of<br />

opening of Envelope No. 2 to <strong>the</strong> Eligible Tenderers. The Envelope No. 2 shall be<br />

opened as per tender schedule.<br />

(13.3) The Envelope No. 2 of Eligible Tenderers shall be opened serially. The percentage above<br />

or below over <strong>the</strong> estimated cost put to tender by <strong>the</strong> Department quoted by each Eligible<br />

Tenderers shall <strong>the</strong>n be read out by tender opening authority and shall be reflected online<br />

<strong>for</strong> in<strong>for</strong>mation of those present / participated.<br />

14. Tender Liable <strong>for</strong> Rejection.<br />

Tender is liable <strong>for</strong> outright rejection if on opening it is found that –<br />

(a) The Tenderer has not strictly followed <strong>the</strong> procedure laid down <strong>for</strong> submission of<br />

tender.<br />

(b) If <strong>the</strong> tender is CONDITIONAL<br />

(c) If <strong>the</strong> Tenderer has quoted his offer anywhere else o<strong>the</strong>r than specified place<br />

provided.<br />

(d) The Tenderer has not uploaded <strong>the</strong> documents or Failed to fill <strong>the</strong> templates as<br />

stated<br />

Contractor No. of Corrections Executive Engineer


22<br />

(e)<br />

(f)<br />

The set of conditions issued / additional stipulations (CSD) duly signed by <strong>the</strong><br />

Intending Tenderer made by <strong>the</strong> <strong>department</strong> on <strong>the</strong> sub-Portal<br />

http:;//pwdmaharashtraetender.in is not uploaded in Envelope No. 2<br />

Any Corrections, modifications, additions, omission or any type of changes in<br />

main tender document or CSD is not permissible and if it is found at any stage <strong>the</strong><br />

tender shall be rejected by <strong>for</strong>feiting <strong>the</strong> Security Deposit.<br />

15. The Contractor will have to sign <strong>the</strong> tender papers and <strong>the</strong> drawings according to which <strong>the</strong><br />

work is to be carried out & upload <strong>the</strong> same as prescribed. He shall also have to give a<br />

declaration to <strong>the</strong> effect that he has fully studied <strong>the</strong> plans, specifications, local conditions<br />

and availability of labour and materials and that he has quoted his rates with due<br />

consideration to all <strong>the</strong>se factors.<br />

16. The acceptance of <strong>the</strong> tender may be intimated to <strong>the</strong> Contractor telegraphically or<br />

o<strong>the</strong>rwise (even may be by e-mail) and ei<strong>the</strong>r by <strong>the</strong> Officer competent to accept <strong>the</strong><br />

tender or any authority in <strong>the</strong> <strong>department</strong> including <strong>Government</strong> and such intimation shall<br />

be deemed to be an intimation of acceptance of <strong>the</strong> tender given by <strong>the</strong> authority<br />

competent to accept <strong>the</strong> tender<br />

17 CONDITION FOR PAYMENT OF PERFORMANCE SECURITY DEPOSIT IF THE<br />

OFFER IS RECEIVED LOWER THAN 15% BELOW<br />

In case <strong>the</strong> tenderer offers rates lower than 15 % below <strong>the</strong> estimated cost put to tender, in that case,<br />

<strong>the</strong> tenderer will have to pay additional security deposit alongwith <strong>the</strong> initial security deposit <strong>for</strong><br />

per<strong>for</strong>mance of work to <strong>the</strong> extent of amount exceeding 15% below offer, in <strong>the</strong> <strong>for</strong>m of demand<br />

draft, interest bearing securities, pledged in favour of Executive Engineer, P. W. Division, Nashik or<br />

in <strong>the</strong> <strong>for</strong>m of bank Guarantee, <strong>for</strong> full period of completion of work and it should be extendable upto<br />

expiry of valid extension if any, as directed by Engineer -in-charge, failing to which, such tender,<br />

will be considered as withdrawn and earnest money deposit shall be <strong>for</strong>feited to <strong>Government</strong>. The<br />

Additional Security Deposit shall be refundable after satisfactorily completion of work.<br />

18. SECURITY DEPOSIT :-<br />

(18.1) The Total Security Deposit to be paid shall be 4% (Four Percent) [Rs.1,81,000/-] of<br />

amount put to tender.<br />

(18.2) The Successful tenderer shall have to pay, half of <strong>the</strong> Security Deposit preferably in <strong>the</strong><br />

<strong>for</strong>m of National Saving Certificate or in <strong>the</strong> <strong>for</strong>m of Bank Guarantee (in <strong>the</strong> <strong>for</strong>m as<br />

prescribed by Govt.) from any Scheduled Bank in favour of Executive Engineer,<br />

Public Works Division, Nashik within 10 days of acceptance of tender, and <strong>the</strong> balance<br />

Contractor No. of Corrections Executive Engineer


23<br />

security deposit will be recovered from running account bills at <strong>the</strong> percentage as shown<br />

in item (d) of <strong>the</strong> memorandum in printed B-1 <strong>for</strong>m or as may be decided by <strong>the</strong><br />

Executive Engineer during course of execution of <strong>the</strong> work looking to <strong>the</strong> position and<br />

circumstances that may prevail, whose orders will be final and binding on <strong>the</strong> contractor.<br />

(18.3) The Security Deposit <strong>for</strong> <strong>the</strong> due per<strong>for</strong>mance of <strong>the</strong> contract shall be as detailed in <strong>the</strong><br />

tender documents elsewhere. Fifty percent of <strong>the</strong> Security deposit will have to deposited<br />

within ten days of <strong>the</strong> acceptance of <strong>the</strong> tender and <strong>the</strong> Balance Security Deposit will be<br />

recovered from <strong>the</strong> Running Bills at <strong>the</strong> rates as specified in <strong>the</strong> tender <strong>for</strong>m on <strong>the</strong> cost<br />

of work as per CSR prevailing at <strong>the</strong> time of acceptance of tender. Amount of total<br />

security deposit to be paid shall be 4% (Four Percent) of <strong>the</strong> cost of work worked out as<br />

per D.S.R. 2011-12 of respective District.<br />

(18.4) Initial Security Deposit may be in Bank Guarantee <strong>for</strong>m in <strong>for</strong>mat on page no. ...... to<br />

............ of Tender document <strong>for</strong> full period of completion of work and it should be<br />

extendable upto expiry of valid extension if any, as directed by Engineer-in-charge.<br />

(18.5) In <strong>the</strong> event of <strong>the</strong> tenderer to pay cash security deposit within 10 days (unless extended<br />

in writing by <strong>the</strong> Executive Engineer,) from <strong>the</strong> date of receipt of notice (sent by<br />

Registered Post) of acceptance of his tender, <strong>the</strong> amount of EMD shall be <strong>for</strong>feited to<br />

<strong>Government</strong> and <strong>the</strong> acceptance of his tender, shall be considered withdrawn. Except<br />

that in <strong>the</strong> event of <strong>the</strong> notice of acceptance of <strong>the</strong> tender not being issued within 120<br />

days of <strong>the</strong> date of opening of Envelope No. 2 (financial bid). All <strong>the</strong> tenders shall<br />

remain open <strong>for</strong> acceptance <strong>for</strong> 120 days from <strong>the</strong> date fixed <strong>for</strong> opening of envelope<br />

No.2 (financial bid) and <strong>the</strong>reafter until it is withdrawn by <strong>the</strong> tenderer by notice in<br />

writing as per condition No2 of <strong>the</strong> Memorandum on 39 to 42<br />

19. Income Tax :-<br />

Income tax @ 2.00 % and surcharge <strong>the</strong>reon or at <strong>the</strong> rates amended from time to time<br />

as intimated by competent Income tax authority shall be deducted from bill amount,<br />

whe<strong>the</strong>r measured bills, advance payment or secured advance.<br />

20. VAT Tax :-<br />

VAT Tax @ 2.00 % shall be deducted from <strong>the</strong> contractor’s bill amount who are<br />

registered under Maharashtra Value added Tax Act. 2005 and 4.00 % shall be<br />

deducted from <strong>the</strong> contractor’s bill amount those who are not registered under<br />

Maharashtra Value added Tax Act. 2005.<br />

21 Insurance:-<br />

Contractor No. of Corrections Executive Engineer


24<br />

As per <strong>the</strong> Govt. Resolution No. FD/Insurance 1098/cess No. 28/98 dated<br />

19/08/1998 and Director of Insurance Maharashtra, Mumbai letter dated 26/04/2005.<br />

Contractor has to submit Govt. insurance policy be<strong>for</strong>e starting <strong>the</strong> work, failing to<br />

which an amount equivalent to (1%) one percent of <strong>the</strong> tendered cost will be<br />

recovered from <strong>the</strong> first Running Account Bill of this work.<br />

22 BUILDING & OTHER CONSTRUCTION WORKERS WELFARE CESS:-<br />

Building & o<strong>the</strong>r Construction workers welfare cess @ 1% or at <strong>the</strong> rates amended from<br />

time to time as intimated by <strong>the</strong> competent authority of Building and o<strong>the</strong>r construction<br />

workers welfare Act, 1996 shall be deducted from bill amount, whe<strong>the</strong>r measured bill,<br />

advance payment or secured advance.<br />

23. The contractor whose tender is accepted is required to note that no <strong>for</strong>eign exchange will be<br />

released by <strong>the</strong> Department.<br />

24. The e-notice-inviting tender and shall <strong>for</strong>m part of <strong>the</strong> tender agreement.<br />

25. The Tender Authority is interested to make payment of contractor’s bill through ECS /<br />

NEAFT system. For this purpose contractor should open his Bank Account, having core<br />

banking facility only.<br />

26. TIME LIMIT:-<br />

The work is to be completed within time limit as specified in <strong>the</strong> Tender which shall be reckoned<br />

from <strong>the</strong> date of written order of commencing <strong>the</strong> work and shall be inclusive of monsoon period.<br />

27. TENDER RATE :-<br />

No alteration in <strong>the</strong> <strong>for</strong>m of tender and <strong>the</strong> schedule of tender and no additions in <strong>the</strong><br />

scope of special stipulation will be permitted. Rates quoted <strong>for</strong> <strong>the</strong> tender shall be taken as<br />

applicable to all leads and lifts.<br />

28. TENDER UNITS :-<br />

The tenderer should particularly note that <strong>the</strong> unit mentioned in <strong>the</strong> schedule ‘B’ on which <strong>the</strong><br />

rates are based. No changes in <strong>the</strong> units shall be allowed . In <strong>the</strong> case of difference between <strong>the</strong> rates<br />

written in figures and in words, <strong>the</strong> correct rate will be <strong>the</strong> one, which is lower of <strong>the</strong> two.<br />

29. CORRECTION :-<br />

No correction shall be made in <strong>the</strong> tender documents. Any corrections that are to be<br />

made, shall be made by crossing <strong>the</strong> incorrect portion and writing <strong>the</strong> correct portions above with<br />

<strong>the</strong> initials of tenderer.<br />

30. TENDER ACCEPTANCE :-<br />

Acceptance of tender will rest with <strong>the</strong> Chief Engineer, Public Works Region, Nashik,<br />

who reserve <strong>the</strong> right to reject any or all tenders without assigning any reason <strong>the</strong>reof. The<br />

Contractor No. of Corrections Executive Engineer


25<br />

tenderer whose tender is accepted will have to enter in to a regular B-1 agreement within 10 days<br />

of being notified to do so. In case failure on <strong>the</strong> part of tenderer to sign <strong>the</strong> agreement within <strong>the</strong><br />

stipulated time, <strong>the</strong> earnest money paid by him shall stand <strong>for</strong>feited to <strong>the</strong> Govt. and <strong>the</strong> offer of<br />

<strong>the</strong> tenderer shall be considered as withdrawn by him.<br />

31. POWER OF ATTORNEY :-<br />

I. If <strong>the</strong> tenderer are a firm or company, <strong>the</strong>y should in <strong>the</strong>ir <strong>for</strong>warding letter mention <strong>the</strong> names<br />

of all partners toge<strong>the</strong>r with <strong>the</strong> name of <strong>the</strong> person who holds <strong>the</strong> power of Attorney<br />

authorising him to conduct all transactions on behalf of <strong>the</strong> body, alongwith <strong>the</strong> tender.<br />

II. The tenderer may in <strong>the</strong> <strong>for</strong>warding letter mention any points he may wish to make clear<br />

but right is reserved to reject <strong>the</strong> same or <strong>the</strong> whole of <strong>the</strong> tenders if <strong>the</strong> same become<br />

conditional tender <strong>the</strong>reby.<br />

III. The contractor or <strong>the</strong> firms tendering <strong>for</strong> <strong>the</strong> work shall in<strong>for</strong>m <strong>the</strong> Department if <strong>the</strong>y<br />

appoint <strong>the</strong>ir authorised Agent on <strong>the</strong> work.<br />

IV. No <strong>for</strong>eign exchange will be released by <strong>the</strong> dept. <strong>for</strong> <strong>the</strong> purchase of plants and<br />

machinery <strong>for</strong> <strong>the</strong> work by <strong>the</strong> contractor.<br />

V. Any dues arising out of contract will be recovered from <strong>the</strong> contractor as arrears of Land<br />

Revenue if not paid amicably. Moreover, recovery of <strong>Government</strong> dues from <strong>the</strong><br />

contractors will be affected from <strong>the</strong> payment due to <strong>the</strong> contractor from any o<strong>the</strong>r<br />

<strong>Government</strong> <strong>works</strong> under execution with <strong>the</strong>m.<br />

VI. All pages of tender document, conditions, specifications correction slips etc. shall be<br />

initialed by <strong>the</strong> tenderer. The tender should bear full signature etc shall be initialed by<br />

<strong>the</strong> tenderer. or his authorised power or Attorney holder in case of firm.<br />

VII. The Successful tenderers will be required to produce to <strong>the</strong> satisfaction of <strong>the</strong> specified<br />

concerned authority, a valid and concurrent license issued in his favour.<br />

32. VALIDITY PERIOD:<br />

The offer shall remain open <strong>for</strong> acceptance <strong>for</strong> minimum period of 120 days from <strong>the</strong> date of<br />

opening of Envelope No. 2 (financial Bid) and <strong>the</strong>reafter until it is withdrawn by <strong>the</strong> contractor by<br />

notice in writing duly addressed to <strong>the</strong> authority opening <strong>the</strong> tender and sent by registered post.<br />

Acknowledgment due. (refer to memorandum on page 29 to 32 of B-1 <strong>for</strong>m chapter)<br />

33. The right is reserved to revise or amend <strong>the</strong> contract document prior to <strong>the</strong> due notified <strong>for</strong><br />

<strong>the</strong> receipt of tender or extended date. Such deviations, amendment or extensions, if any,<br />

shall be communicated in <strong>the</strong> <strong>for</strong>m of corrigendum, by letter and / or by notice in<br />

newspapers as may be considered suitable.<br />

Contractor No. of Corrections Executive Engineer


26<br />

34 . The tender submitted by <strong>the</strong> tenderer remain valid <strong>for</strong> a period of 120 days from <strong>the</strong> date of<br />

opening of Envelope No. 2(Financial Bid) tenderers. Also see para 2 of General Rules etc.<br />

of contract <strong>for</strong>m.<br />

35. The contractor(s) whose tender is accepted is required to note that no <strong>for</strong>eign exchange will<br />

be released by <strong>the</strong> Department.<br />

36. The tenderers, who do not fulfill all or any of <strong>the</strong> conditions or are incomplete in any<br />

respect are liable to summarily rejection.<br />

37. Right to reject any or all tenders without assigning reasons <strong>the</strong>re<strong>for</strong>e is reserved. The<br />

acceptance of <strong>the</strong> tender lies with <strong>the</strong> Superintending Engineer Public Works Circle, Nashik.<br />

38. The Notice inviting tender shall from part of <strong>the</strong> tender agreement.<br />

39. The successful tenderers will be required to produce to <strong>the</strong> satisfaction of <strong>the</strong> specified concerned<br />

authority, a valid and concurrent license issued in his favour under <strong>the</strong> provisions of <strong>the</strong> Contract<br />

Labour (Regulation and Abolition) Act 1970 be<strong>for</strong>e starting <strong>the</strong> work. Failure to do so,<br />

acceptance of <strong>the</strong> tender shall be liable to be with drawn and earnest money <strong>for</strong>feited.<br />

40. INSTRUCTION TO CONTRACTOR:-<br />

1. In case <strong>the</strong> tenderer whose offer is found lowest is requested to negotiate and reduce <strong>the</strong><br />

offer & If <strong>the</strong> contractor, does not respond within a period of 10 days <strong>the</strong> tender accepting<br />

authority without issuing any reminder <strong>the</strong> right to reject such tender.<br />

2. In case <strong>the</strong> contractor who is in<strong>for</strong>med of acceptance of his tender, dose not remit <strong>the</strong> initial<br />

Security Deposit within a period of 10 days, <strong>the</strong> tender accepting authority reserves <strong>the</strong> right<br />

to <strong>for</strong>feit <strong>the</strong> Earnest Money Deposit without issuing any reminder to take fur<strong>the</strong>r action<br />

according to <strong>the</strong> tender provision.<br />

Contractor No. of Corrections Executive Engineer


27<br />

AFFIDAVIT<br />

I .................................. age ........ years ......... is resident of ......................... do<br />

hereby certified that given undertaking that I am <strong>the</strong> proprietor / Partner / Owner of<br />

<strong>the</strong> Company / Firm and has submitted <strong>the</strong> Tender <strong>for</strong> <strong>the</strong> work ............. (Name of<br />

work) ........................................................ The documents uploaded (in Envelope No.<br />

1) on http://pwdmaharashtraetenders.in are TRUE, CORRECT & COMPLETE (in<br />

all respect) to <strong>the</strong> best of my knowledge.<br />

It is ought to have been held that <strong>the</strong>re are no errors and / or mistakes in <strong>the</strong> uploaded<br />

docuemnts.<br />

It <strong>the</strong>re is any wrong, false misleading, in<strong>for</strong>mation l will be liable <strong>for</strong> legal action<br />

against me<br />

Contractor’s Signature<br />

[The Bound of <strong>the</strong> above affidavit should be submitted along-with <strong>the</strong> Tender<br />

Fees’s DD / Pay order & EMD)<br />

Contractor No. of Corrections Executive Engineer


28<br />

STATEMENT No. 1<br />

Statement of list of <strong>works</strong> in hand and <strong>works</strong> tendered <strong>for</strong> as on <strong>the</strong> last date of<br />

submission of this Tender.<br />

NAME OF CONTRACTOR:-<br />

(A)<br />

WORKS IN HAND<br />

Name<br />

Stipulated<br />

Sr.<br />

Agreement Tendered Date of<br />

of<br />

Date of<br />

No.<br />

No. Amount. Commencement.<br />

Work.<br />

Completion.<br />

Value of<br />

work<br />

Already<br />

Done.<br />

Value of<br />

Balance<br />

Work<br />

Value of<br />

Balance<br />

Work to be<br />

executed<br />

Probable<br />

Date of Remark.<br />

Completion.<br />

1 2 3 4 5 6 7 8 9 10 11<br />

-----------------------------------Sample <strong>for</strong>m-----------------------------------------<br />

(B)<br />

WORKS TENDERED FOR<br />

SR. NO.<br />

NAME OF<br />

WORK<br />

NAME AND ADDRESS<br />

OF CLIENT<br />

TENDERED AMOUNT<br />

TIME<br />

LIMIT<br />

PROBABLE DATE<br />

WHEN DECISION IS<br />

EXPECTED<br />

OTHER<br />

REVELENT<br />

DETAILS IF<br />

ANY<br />

1 2 3 4 5 6 7<br />

---------------------------------------Sample <strong>for</strong>m-------------------------------------------------------<br />

---<br />

NOTE :- Details are to be uploaded in this <strong>for</strong>mat in envelope - 1. duly signed<br />

Signature of Contractor<br />

Executive Engineer<br />

Contractor No. of Corrections Executive Engineer


29<br />

STATEMENT – 2<br />

DETAILS OF PLANT & MACHINERY IMMEDIATELY AVAILABLE WITH THE<br />

TENDERER FOR THIS WORK<br />

NAME OF TENDERER:………….<br />

SR. NO.<br />

NAME OF NO. OF KIND &<br />

EQUIPMENT<br />

UNITS<br />

MAKE<br />

CAPACITY<br />

AGE & PRESEDNT<br />

CONDITION<br />

LOCATION<br />

1 2 3 4 5 6 7 8<br />

REMARKS<br />

---------------------------------------Sample <strong>for</strong>m-------------------------------------------<br />

Signature of Contractor<br />

NOTE :- Details are to be uploaded in this <strong>for</strong>mat in envelope - 1. duly signed<br />

Contractor No. of Corrections Executive Engineer


STATEMENT NO 2 (A)<br />

(TO BE UPLOADED IN ENVELOPE NO. 1)<br />

Questionnaires on Machinery: -<br />

Pro<strong>for</strong>ma <strong>for</strong> in<strong>for</strong>mation regarding availability / Procurement of machinery required <strong>for</strong> this<br />

work<br />

1. Modern Drum Mix plant con<strong>for</strong>ming to clause 504.3.4 of 1 No.<br />

MORT and H specifications 2011<br />

2. Mechanical Sprayer: Truck mounted or towed type bituminous<br />

pressure sprayer of minimum 3 M.T. capacity<br />

3. Static/ Vibratory roller of 8 to 10 tonne static weight with<br />

amplitude and frequency of vibration desired <strong>for</strong> earthwork<br />

WBM, BBM, B.M. and Carpet<br />

4. Self propelled mechanical paver finisher confirming to clause<br />

504.3.5 of MOST specification of 2001<br />

1 No.<br />

1 No.<br />

1 No.<br />

Question – 1<br />

Is <strong>the</strong> above machinery owned by you and available with you <strong>for</strong> immediate<br />

deployment of this work ?<br />

if “yes” Please attached <strong>the</strong> documentary proof of ownership of above machinery &<br />

upload in<strong>for</strong>mation in this sample <strong>for</strong>m<br />

Type of<br />

Machine<br />

No. of<br />

Units<br />

Names of Works on<br />

Which Deployed at<br />

Present<br />

Location Out-put Works in Hand<br />

1 2 3 4 5 6<br />

------------------ Sample Form ------------------<br />

Question 2 :<br />

If answer to Question 1 is "No" <strong>the</strong>n <strong>the</strong> contractor shall have to procure <strong>the</strong> same on<br />

hire from ano<strong>the</strong>r Agency/ Contractor who owns it. Leval agreement on stamp paper<br />

executed <strong>for</strong> hire with <strong>the</strong> Agency/ Contractor who owns this machinery and also <strong>the</strong><br />

in<strong>for</strong>mation mentioned in Question 1 above shall have to be attached alongwith with this<br />

statement as well as <strong>the</strong>ir proof of ownership of machinery (i.e. Attested copies of invoices)<br />

as well as <strong>the</strong> valid certificate issued by Asst. Chief Engineer (Mech.) of Public Works<br />

Department to <strong>the</strong> effect that <strong>the</strong>se machineries are in "Efficient".<br />

(Duly attested by Gazetted Officer).<br />

Note : The Contractor must own Modern Drum Mix Plant mentioned at (I) above.<br />

Attested copy of proof of ownership of modern drum mix plant con<strong>for</strong>ming to Clause<br />

No. 504.3.4 of M.O.S.T. Specification of (4th Revision, August 2001 edition) and proof<br />

<strong>the</strong>reof must be enclosed in Envelope No.1. If <strong>the</strong> present location of Modern Drum Mix<br />

Plant owned or hired by <strong>the</strong> contractor is away from <strong>the</strong> site of work <strong>the</strong> contractor shall shift<br />

his Modern Drum Mix Plant confirming to Clause No. 504.3.4 of M.O.S.T. Specifications,<br />

(4th Revision, August 2001 edition) within 40 Kms. and also within one hour motorable<br />

distance from <strong>the</strong> work site and commission <strong>the</strong> same within 30 days from <strong>the</strong> date of issue<br />

of work order to do so in writing.<br />

30<br />

Contractor No. of Corrections Executive Engineer


31<br />

STATEMENT NO. 3<br />

Details of <strong>works</strong> of similar type and magnitude carried out by <strong>the</strong><br />

contractor in last three years (i.e. 2009-10, 2010-11 & 2011-12)<br />

NAME OF TENDERER: -<br />

SR. NO.<br />

NAME OF<br />

WORK<br />

Name & Address<br />

Of The<br />

Organisation For<br />

Whom The Work<br />

Was Done<br />

Place And<br />

Country.<br />

Agreement No.<br />

& Date<br />

Date Of<br />

Commencement<br />

Tendered<br />

Cost<br />

Total Cost<br />

Of Work<br />

Done.<br />

Date Of<br />

Completion<br />

1 2 3 4 5 6 7 8 9 10<br />

--------------------------------------------Sample <strong>for</strong>m---------------------------------------<br />

Remarks<br />

(Principle<br />

Features In<br />

Brief.)<br />

NOTE :- Details are to be uploaded in this <strong>for</strong>mat in envelope - 1. duly signed<br />

Contractor No. of Corrections Executive Engineer


32<br />

STATEMENT – 4<br />

Statement Showing Technical Personnel Available With Contractor Which Can Be Spared<br />

Exclusively For This Work<br />

NAME OF TENDERER:<br />

Whe<strong>the</strong>r working in<br />

Sr. No. Name of Person Qualification<br />

field or in office<br />

Experience of Period <strong>for</strong> which <strong>the</strong><br />

Execution of Similar Person is Working Remarks<br />

Works<br />

With The Tenderer<br />

1 2 3 4 5 6 7<br />

****************** SAMPLE FORM ************************<br />

Signature of Contractor<br />

NOTE :- Details are to be uploaded in this <strong>for</strong>mat in envelope - 1. duly signed<br />

Contractor No. of Corrections Executive Engineer


33<br />

STATEMENT NO. 5<br />

Statement showing work done in all classes of Civil Engineering Construction <strong>works</strong><br />

during last three year (i.e. 2009-10, 2010-11 & 2011-12)<br />

Name of Contractor :-<br />

Name of<br />

Sr. No.<br />

Division<br />

Amount Put to<br />

tender / tendered<br />

cost<br />

Agreement<br />

No.<br />

Date of<br />

Amount of work done during each of<br />

last three years.<br />

Total<br />

Amount of<br />

commencement of<br />

work still<br />

Remarks<br />

work<br />

2009-10 2010-11 2011-12<br />

remaining to<br />

be executed<br />

1 2 3 4 5 8 9 10 11 12<br />

----------- Sample Form --------------------------<br />

Grand Total :-<br />

Outward No. and date of certificate issuing authority<br />

NOTE :- Details are to be uploaded in this <strong>for</strong>mat in envelope - 1. duly signed<br />

Contractor No. of Corrections Executive Engineer


34<br />

STATEMENT NO. 6<br />

STATEMENT SHOWING QUANTITIES OF WORK EXECUTED IN DURING LAST<br />

THREE YEARS (i.e. 2009-10, 2010-11 & 2011-12)<br />

Quality of Work Pre<strong>for</strong>med<br />

Sr No.<br />

Name of Work<br />

Year<br />

Agreement No.<br />

B.B.M<br />

B.M.<br />

S.D.B.C.<br />

CARPET<br />

Seal Coat<br />

Remarks<br />

(Indicate<br />

contract<br />

Reference )<br />

1 2 3 4 5 6 7 8 9<br />

10<br />

2009-10<br />

2010-11 Sample Form -------<br />

-<br />

-----<br />

2012-11<br />

NOTE :- Details are to be uploaded in this <strong>for</strong>mat in envelope - 1. duly signed<br />

Signature of Contractor<br />

Contractor No. of Corrections Executive Engineer


35<br />

(On Stamp paper worth Rs. 100/-)<br />

MODEL FORM OF BANK GUARANTEE BOND<br />

FOR SECURITY DEPOSIT<br />

In consideration of <strong>the</strong> <strong>Government</strong> of Maharashtra (herein after referred to as “The<br />

<strong>Government</strong>”) having agreed to exempt ----------------------------------- (herein after<br />

referred to as :The Contractor”) from depositing with <strong>the</strong> <strong>Government</strong> ( i.e. The<br />

Executive Engineer, P.W.Division, Nashik) in cash <strong>the</strong> sum of Rs. ----------<br />

--- (Rupees ----------------------- ----------------------------------------- only.) being <strong>the</strong><br />

amount of security deposit payable by <strong>the</strong> Contractor to <strong>the</strong> <strong>Government</strong> under <strong>the</strong><br />

terms and conditions of <strong>the</strong> agreement dated <strong>the</strong> _____________ day of<br />

____________and made between <strong>the</strong> <strong>Government</strong> of <strong>the</strong> one part and <strong>the</strong><br />

Contractor of <strong>the</strong> o<strong>the</strong>r part (herein after referred to as “<strong>the</strong> said Agreement”) <strong>for</strong><br />

________________as security <strong>for</strong> due observance and per<strong>for</strong>mance by <strong>the</strong><br />

Contractor of <strong>the</strong> terms and conditions of <strong>the</strong> said Agreement, on <strong>the</strong> contractor<br />

furnishing to <strong>the</strong> <strong>Government</strong> a guarantee in <strong>the</strong> prescribed <strong>for</strong>m of a scheduled<br />

bank in India in face those presents in <strong>the</strong> like sum of Rs. __________<br />

(Rupees________________ ___________________only).<br />

BANK/LIMITED registered in India under ___________________Act and having<br />

one of our local Head office at __________________do here by:-<br />

1. GUARANTEE TO THE GOVERNMENT :-<br />

(A) Due per<strong>for</strong>mance and observance by <strong>the</strong> Contractor of <strong>the</strong> terms and<br />

conditions on <strong>the</strong> part of <strong>the</strong> contractor contained in <strong>the</strong> said Agreement and<br />

(B)<br />

Due and punctual payment by <strong>the</strong> Contractor to <strong>the</strong> <strong>Government</strong> of all sums<br />

of money, losses, damages, cost charges, penalties and expenses payable to<br />

<strong>the</strong> <strong>Government</strong> by <strong>the</strong> Contractor under or in respect to <strong>the</strong> said Agreement.<br />

2. Undertake to pay to <strong>the</strong> <strong>Government</strong> on demand and without demur and not<br />

withstanding any dispute or disputes raised by <strong>the</strong> Contractor(s) in any suit or<br />

proceeding filed in any Court of tribunal relating <strong>the</strong>reto <strong>the</strong> said sum of Rs.-<br />

________ (Rupees ____________________only) or such less sum may be<br />

demanded by <strong>the</strong> <strong>Government</strong> from us, our liability hereunder being absolute<br />

and unequivocal and agree that.<br />

3.a)<br />

The guarantee herein contained shall remain in full <strong>for</strong>ce and effect<br />

during <strong>the</strong> subsistence of <strong>the</strong> said Agreement and that <strong>the</strong> same will<br />

continue to en<strong>for</strong>ceable till all <strong>the</strong> dues of <strong>the</strong> <strong>Government</strong> under or by<br />

virtue of <strong>the</strong> said Agreement have been duly paid and it’s claims<br />

satisfied or discharged and till <strong>the</strong> <strong>Government</strong> certifies that <strong>the</strong> terms<br />

and conditions of <strong>the</strong> said Agreement have been fully, properly carried<br />

out by <strong>the</strong> Contractor.<br />

Contractor No. of Corrections Executive Engineer


36<br />

(b)<br />

(i)<br />

(ii)<br />

(iii)<br />

(iv)<br />

(v)<br />

(vi)<br />

(c)<br />

We shall not be discharged or released from <strong>the</strong> liability under this<br />

guarantee by reasons of<br />

Any change in <strong>the</strong> constitution of <strong>the</strong> bank of <strong>the</strong> Contractor, or<br />

Any arrangement entered into between <strong>the</strong> <strong>Government</strong> and <strong>the</strong><br />

Contractor with or without our consent;<br />

Any <strong>for</strong>bearance or indulgence shown to <strong>the</strong> Contractor.<br />

Any variation in <strong>the</strong> terms and conditions contained in <strong>the</strong> said<br />

Agreement.<br />

Any time given to <strong>the</strong> Contractor, or;<br />

Any o<strong>the</strong>r conditions or circumstances under which, in law, a surety<br />

would be discharged.<br />

Our liability herein under shall be joint and several with that of <strong>the</strong><br />

Contractor as if we were principal debtors in respect of <strong>the</strong> said sum<br />

of Rs._____(Rupees _________________________ _only).<br />

(d)<br />

We shall not revoke this guarantee during its currency except with <strong>the</strong><br />

previous consent in writing of <strong>the</strong> <strong>Government</strong>.<br />

IN WITNESS WHERE OF THE common seal of _____________<br />

_______________________ has been herein affixed this<br />

________________day of ______________ 20. The common seal of<br />

______ was pursuant to <strong>the</strong> resolution of <strong>the</strong> Board of Directors of <strong>the</strong><br />

Company dated <strong>the</strong> _________________ day of ____________<br />

herein affixed in <strong>the</strong> presence of ______________who, in token<br />

<strong>the</strong>reof, have here to set <strong>the</strong>ir respective hands in <strong>the</strong> presence of.<br />

(1) -------------------------------------------- (2) ------------------------------<br />

Contractor No. of Corrections Executive Engineer


37<br />

DECLARATION OF THE CONTRACTOR<br />

NAME OF WORK :<br />

Constructing Karanji to Tarukhedale Road ODR-182 Km. 0/00 to 3/00, Tal. Niphad,<br />

Dist. Nashik<br />

I/We hereby declare that I/We have made myself/ourselves<br />

thoroughly conversant with <strong>the</strong> sub-soil conditions, <strong>the</strong> local conditions<br />

regarding all materials (such as stone, murum, sand, etc.) and labour<br />

on which I/We have based my/our rates <strong>for</strong> this work. The<br />

specifications, conditions, bore results and lead of materials on this<br />

work have been carefully studied and understood by me/us be<strong>for</strong>e<br />

submitting this tender. I/We undertake to use only <strong>the</strong> best materials<br />

approved by <strong>the</strong> Executive Engineer, Public Works Division, Nashik or<br />

his duly authorised assistant, be<strong>for</strong>e starting <strong>the</strong> work and to abide by<br />

his decision.<br />

I/We hereby fur<strong>the</strong>r declare that my/our tender is unconditional in<br />

every manner of whatsoever in nature.<br />

I/We hereby undertake to pay <strong>the</strong> labourers engaged on <strong>the</strong> work<br />

as per minimum wages Act, 1948 applicable to <strong>the</strong> zone concerned.<br />

TO BE FILLED BY THE CONTRACTOR<br />

I/We have quoted my/our offer in percentages rate in words as well as in<br />

figures. I/We fur<strong>the</strong>r undertake to enter in to contract in regular “B-1” <strong>for</strong>m in<br />

<strong>public</strong> <strong>works</strong> <strong>department</strong>.<br />

Name and signature of contractor(s) power of attorney<br />

holder with complete address.<br />

Contractor No. of Corrections Executive Engineer


38<br />

Agreement <strong>for</strong>m B – 1<br />

Contractor No. of Corrections Executive Engineer


39<br />

Percentage Rate Tender & Contract <strong>for</strong> <strong>the</strong> Work<br />

DEPARTMENT : Public Works Department.<br />

CIRCLE : Public Works Circle, Nashik<br />

DIVISION : Public Works Division, Nashik<br />

NAME OF WORK : Constructing Karanji to Tarukhedale Road ODR-182 Km. 0/00 to 3/00,<br />

Tal. Niphad, Dist. Nashik<br />

GENERAL RULES & DIRECTIONS FOR THE GUIDANCE TO CONTRACTORS.<br />

1. All <strong>works</strong> proposed to be executed by contract shall be notified in a <strong>for</strong>m of invitation to<br />

tender pasted on a board hung up in <strong>the</strong> office of <strong>the</strong> Executive Engineer and signed by<br />

<strong>the</strong> Executive Engineer. This <strong>for</strong>m will state <strong>the</strong> work to be carried out as well as <strong>the</strong> date<br />

<strong>for</strong> submitting and opening tenders and <strong>the</strong> time allowed <strong>for</strong> carrying out <strong>the</strong> work, also <strong>the</strong><br />

amount of earnest money to be deposited with <strong>the</strong> tender, and <strong>the</strong> amount of <strong>the</strong> security<br />

deposit to be deposited by <strong>the</strong> successful tenderer and <strong>the</strong> percentage, if any, to be deducted<br />

from bills. Copies of <strong>the</strong> specifications, designs and drawings and estimated rates, scheduled<br />

rates and any o<strong>the</strong>r documents required in connection with <strong>the</strong> work shall be signed by<br />

<strong>the</strong> Executive Engineer <strong>for</strong> <strong>the</strong> purpose of identification and shall also be open <strong>for</strong><br />

inspection by contractors at <strong>the</strong> office of <strong>the</strong> Executive Engineer during office hours.<br />

2. In <strong>the</strong> event of <strong>the</strong> tender being submitted by a firm, it must be signed separately by each<br />

partner <strong>the</strong>reof, or in <strong>the</strong> event of <strong>the</strong> absence of any partner, it shall be signed on his behalf<br />

by a person holding a power of attorney authorising him to do so.<br />

2(A) (i) The contractor shall pay along with <strong>the</strong> tender <strong>the</strong> sum of<br />

Rs.45,250/- (Rs. Fourty Five<br />

Thousand Two Hundred Fifty Only) as and by way of earnest money. by <strong>for</strong>warding along<br />

with <strong>the</strong> tender a Treasury challan / Term deposit receipt <strong>for</strong> a period of one year drawn of<br />

any scheduled Bank <strong>for</strong> <strong>the</strong> like amount in favour of Executive Engineer or certificate of<br />

exemption with bond <strong>for</strong> payment of earnest money from any Division of P.W. Department<br />

working under control of <strong>Government</strong> of Maharashtra, duly attested by a Gazetted Officer<br />

The said amount of earnest money shall not carry any interest whatsoever.<br />

ii)‚ In <strong>the</strong> event of his tender being accepted subject to <strong>the</strong> provisions of sub-clause (iii) below, <strong>the</strong><br />

said amount of earnest money shall be appropriated towards <strong>the</strong> amount of security deposit<br />

payable by him under conditions of General conditions of contract.<br />

Contractor No. of Corrections Executive Engineer


40<br />

iii) If, after submitting <strong>the</strong> tender, <strong>the</strong> contractor withdraws his offer, or modifies <strong>the</strong> same, or if<br />

after <strong>the</strong> acceptance of his tender <strong>the</strong> contractor fails or neglects to furnish <strong>the</strong> balance of<br />

security deposit without prejudice to any o<strong>the</strong>r rights and powers of <strong>the</strong> <strong>Government</strong>, here<br />

under, or in law, <strong>Government</strong> shall be entitled to <strong>for</strong>feit <strong>the</strong> full amount of <strong>the</strong> earnest money<br />

deposited by him.<br />

iv) In <strong>the</strong> event of his tender not being accepted, <strong>the</strong> amount of earnest money deposited by <strong>the</strong><br />

contractor, shall unless it is prior <strong>the</strong>reto <strong>for</strong>feited under <strong>the</strong> provisions of clause (iii) above, be<br />

refunded to him on his passing receipt <strong>the</strong>re<strong>for</strong>.<br />

3. Receipts <strong>for</strong> payments made on account of any work, when executed by a firm, shall also<br />

be signed by all <strong>the</strong> partners except where <strong>the</strong> contractors are described in <strong>the</strong>ir tender as a<br />

firm, in which case <strong>the</strong> receipt shall be signed in <strong>the</strong> name of <strong>the</strong> firm by one of <strong>the</strong> partners,<br />

or by some o<strong>the</strong>r person having authority to give effectual receipts <strong>for</strong> <strong>the</strong> firm.<br />

4. Any person who submits a tender shall fill-up usual printed <strong>for</strong>m stating at what percentage<br />

above or below <strong>the</strong> rates specified in schedule `B' (Memorandum showing items of work to<br />

be carried out) he is willing to undertake <strong>the</strong> work. Only one rate or such percentage on all <strong>the</strong><br />

Estimated rates / Schedule rate shall be named. Tenders which propose any alteration in <strong>the</strong><br />

<strong>works</strong> specified in <strong>the</strong> said <strong>for</strong>m of invitation to tender, or in <strong>the</strong> time allowed <strong>for</strong> carrying out<br />

<strong>the</strong> work, or which contain any o<strong>the</strong>r conditions, will be liable to rejection. No printed <strong>for</strong>m of<br />

tender shall include a tender <strong>for</strong> more than one work, but if contractors wish to tender <strong>for</strong> two<br />

or more <strong>works</strong>, <strong>the</strong>y shall submit a separate tender <strong>for</strong> each. Tender shall have <strong>the</strong> name and<br />

number of <strong>the</strong> work to which <strong>the</strong>y refer, written outside <strong>the</strong> envelope.<br />

5. The Superintending Engineer, Public Works Circle, Nashik, or his duly authorised<br />

assistant shall open tenders in <strong>the</strong> presence of contractors who have submitted tenders or <strong>the</strong>ir<br />

representative who may be present at <strong>the</strong> time, and he will enter <strong>the</strong> amounts of <strong>the</strong> several<br />

tenders in a comparative statement in a suitable <strong>for</strong>m. In <strong>the</strong> event of a tender being accepted,<br />

<strong>the</strong> contractor shall <strong>for</strong> <strong>the</strong> purpose of identification, sign copies of <strong>the</strong> specifications and o<strong>the</strong>r<br />

documents mentioned in Rule 1.In <strong>the</strong> event of tender being rejected, <strong>the</strong> Divisional Officer<br />

shall authorise <strong>the</strong> Treasury officer/Bank concerned to refund <strong>the</strong> amount of <strong>the</strong> earnest money<br />

deposited, to <strong>the</strong> contractor making <strong>the</strong> tender, on his giving a receipt <strong>for</strong> <strong>the</strong> return of <strong>the</strong><br />

money.<br />

6. The officer competent to dispose off <strong>the</strong> tenders shall have <strong>the</strong> right of rejecting all or<br />

any of <strong>the</strong> tenders.<br />

Contractor No. of Corrections Executive Engineer


41<br />

7. No receipt <strong>for</strong> any payment alleged to have been made by a contractor in regard to any<br />

matter relating to this tender or <strong>the</strong> contract shall be valid and binding on <strong>Government</strong><br />

unless it is signed by <strong>the</strong> Executive Engineer.<br />

8. The memorandum of work to be tendered <strong>for</strong> and <strong>the</strong> schedule of materials to be<br />

supplied by <strong>the</strong> Public Works Department and <strong>the</strong>ir rates shall be filled in and completed<br />

by <strong>the</strong> office of <strong>the</strong> Executive Engineer be<strong>for</strong>e <strong>the</strong> tender <strong>for</strong>m is issued. If a <strong>for</strong>m issued<br />

to an intending tenderer has not been so filled in and completed he shall request <strong>the</strong> said<br />

office to have this done be<strong>for</strong>e he completes and delivers this tender.<br />

9. All work shall be measured net by standard measure and according to <strong>the</strong> rules and<br />

customs of <strong>the</strong> Public Works Department and without reference to any local custom.<br />

10. Under no circumstances shall any contractor be entitled to claim enhanced rates <strong>for</strong><br />

items in this contract.<br />

11. Every registered contractor should produce alongwith his tender certificate of<br />

registration as approved contractor in <strong>the</strong> appropriate class and renewal of such<br />

registration with date of expiry. (Copies to be attested by a Gazetted Officer of<br />

P.W.D. & I. P. Deptt.)<br />

12. All corrections and additions or pasted slips should be initialed.<br />

13. The measurements of work will be taken according to <strong>the</strong> usual methods in use in <strong>the</strong><br />

Public Works Department and no proposals to adopt alternative methods will be<br />

accepted. The Executive Engineer’s decision as to what is "<strong>the</strong> usual method in use in<br />

<strong>the</strong> Public Works Department" will be final.<br />

14. In view of <strong>the</strong> difficult position regarding <strong>the</strong> availability of <strong>for</strong>eign exchange, no<br />

<strong>for</strong>eign exchange would be released by <strong>the</strong> Department <strong>for</strong> <strong>the</strong> purchase of plant<br />

and machinery required <strong>for</strong> <strong>the</strong> execution of <strong>the</strong> work contracted <strong>for</strong>.<br />

15. The contractor will have to construct shed / godown <strong>for</strong> storing controlled and<br />

valuable materials brought by him at work site at contractor’s cost. The material will be<br />

taken <strong>for</strong> use in <strong>the</strong> presence of <strong>the</strong> <strong>department</strong>al person. No material will be allowed to<br />

be removed from <strong>the</strong> site of work.<br />

16. The tendering contractor shall furnish a declaration along with <strong>the</strong> tender showing all<br />

<strong>works</strong> <strong>for</strong> which he has already entered in to contract and <strong>the</strong> value of <strong>the</strong> work that<br />

Contractor No. of Corrections Executive Engineer


42<br />

remains to be executed in each case on <strong>the</strong> date of submitting <strong>the</strong> tender (with certificate<br />

from <strong>the</strong> head of <strong>the</strong> office concerned.)<br />

17. The contractors shall also give a list of machinery in <strong>the</strong>ir possession and which <strong>the</strong>y<br />

propose to use on <strong>the</strong> work in <strong>the</strong> <strong>for</strong>m of Statement No. II and statement 2(A) on Page No.<br />

24 & 25 respectively.<br />

18. Successful tenderer will have to produce to <strong>the</strong> satisfaction of <strong>the</strong> accepting authority a<br />

valid and current licence issued in his favour under <strong>the</strong> provision of Contract Labour<br />

(Regulation and Abolition) Act 1970 be<strong>for</strong>e starting work, failing which acceptance of<br />

<strong>the</strong> tender will be liable <strong>for</strong> withdrawal and earnest money will be <strong>for</strong>feited to<br />

<strong>Government</strong>.<br />

19. The contractor shall comply with <strong>the</strong> provision of <strong>the</strong> Apprentices Act 1961 and <strong>the</strong><br />

rules and orders issued <strong>the</strong>reunder from time to time. If he fails to do so, his failure will<br />

be breach of <strong>the</strong> contract and <strong>the</strong> Superintending Engineer, may in his discretion cancel<br />

<strong>the</strong> contract. The contractor shall also be liable <strong>for</strong> any pecuniary liability arising on<br />

account of any violation by him of <strong>the</strong> provisions of <strong>the</strong> Act.<br />

Contractor No. of Corrections Executive Engineer


43<br />

I / we hereby tender <strong>for</strong> <strong>the</strong> execution <strong>the</strong> Governor of<br />

Maharashtra (here-in-be<strong>for</strong>e and hereinafter<br />

referred to as "<strong>Government</strong>") of <strong>the</strong> work specified<br />

in <strong>the</strong> under written memorandum within <strong>the</strong> time<br />

* In figure as well as in<br />

words<br />

specified in such memorandum at<br />

*_______________________ __ _____<br />

________________________ percent<br />

below/above<br />

<strong>the</strong> estimated rates entered in Schedule -B<br />

(Memorandum showing items of work to be carried<br />

out) and in accordance in all respects with <strong>the</strong><br />

specifications, designs, drawings, and instructions<br />

in writing referred to in Rule 1 hereof and in<br />

Clause 12 of <strong>the</strong> annexed conditions of contract<br />

and agree that when material <strong>for</strong> <strong>the</strong> work are<br />

provided by <strong>the</strong> <strong>Government</strong> such materials and <strong>the</strong><br />

rates to be paid <strong>for</strong> <strong>the</strong>m shall be as provided in<br />

Schedule `A' hereto<br />

Contractor No. of Corrections Executive Engineer


44<br />

(a) If several sub-<strong>works</strong> are included<br />

<strong>the</strong>y should be detailed in separate list .<br />

1. (a) General Description<br />

Constructing Karanji to Tarukhedale Road ODR-<br />

182 Km. 0/00 to 3/00, Tal. Niphad, Dist. Nashik<br />

(b)Estimated cost: Rs. 45,24,972.00<br />

(C)The amount of earnest - money to<br />

be deposited shall be in accordance<br />

with <strong>the</strong> provisions of paras 206 &<br />

207 of <strong>the</strong> M.P.W. Manual.<br />

(d) This deposit shall be in accordance<br />

with paras 213 and 214 of M. P. W.<br />

Manual.<br />

(c) Earnest Money: Rs. 45,250.00<br />

(d) Security Deposit<br />

i) cash (not less than <strong>the</strong> Rs. 90,500.00<br />

amount of earnest money)<br />

ii) To be deducted from<br />

current bills Rs. 90,500.00<br />

Total Rs. 1,81,000.00<br />

e) This percentage where no<br />

security deposit is taken will vary<br />

from 5 to 10% according to <strong>the</strong><br />

requirements of <strong>the</strong> Case Where<br />

security deposit is taken see note to<br />

Clause 1 of conditions of contract.<br />

(f) Give schedule where necessary<br />

showing dates by which <strong>the</strong> various<br />

items are to be completed.<br />

(e) Percentage, if any to be deducted from bills<br />

so as to make up <strong>the</strong> total amount<br />

required as security deposit by <strong>the</strong> time,<br />

half <strong>the</strong> work, as measured by <strong>the</strong> cost is<br />

done.<br />

4 (Four) percent<br />

(f) Time allowed <strong>for</strong> <strong>the</strong> work from date of<br />

written order to commence 06 (Six)<br />

calendar months (Including Monsoon<br />

Season)<br />

2) I / We agree that this offer shall remain open <strong>for</strong><br />

acceptance <strong>for</strong> a minimum period of 120 days from <strong>the</strong> date<br />

fixed <strong>for</strong> opening <strong>the</strong> "same” means envelope No.2 and<br />

<strong>the</strong>reafter until it is withdrawn by me/us by notice in writing<br />

duly addressed to <strong>the</strong> authority opening <strong>the</strong> tenders and sent<br />

Contractor No. of Corrections Executive Engineer


45<br />

by registered post A. D. or o<strong>the</strong>rwise delivered at <strong>the</strong> office<br />

of such authority.<br />

“Treasury” Challan No…………………………..<br />

dated____________ in / or Term Deposit Receipt <strong>for</strong> a<br />

period of one year receipt No. ………………… dated<br />

……… in respect of sum of Rs. 45,250/- [Rupees Fourty<br />

Five Thousand Two Hundred Fifty only) representing <strong>the</strong><br />

earnest money is herewith <strong>for</strong>warded. The amount of<br />

earnest money shall not bear interest and shall be liable to be<br />

<strong>for</strong>feited to <strong>the</strong> <strong>Government</strong> should I/We fail to (i) abide by<br />

<strong>the</strong> stipulation to keep <strong>the</strong> offer open <strong>for</strong> <strong>the</strong> period<br />

mentioned above or (ii) Sign and complete <strong>the</strong> contract<br />

documents as required by <strong>the</strong> Engineer and furnish <strong>the</strong><br />

security deposit as specified in item (d) of <strong>the</strong> memorandum<br />

contained in paragraph (i) above within <strong>the</strong> time limit laid<br />

down in Clause (1) of <strong>the</strong> annexed General conditions of<br />

contract. The amount of earnest money may be adjusted<br />

towards <strong>the</strong> security deposit or refunded to me/us if so<br />

desired by me/us in writing, unless <strong>the</strong> same or any part<br />

<strong>the</strong>reof has been <strong>for</strong>feited as a<strong>for</strong>esaid.<br />

Contractor No. of Corrections Executive Engineer


46<br />

3) I / We have secured exemption from payment of<br />

earnest money after executing <strong>the</strong> necessary bond in<br />

favour of <strong>the</strong> <strong>Government</strong> a true copy of which<br />

(exemption certificate with bond) is enclosed<br />

herewith. Should any occasion <strong>for</strong> <strong>for</strong>feiture of<br />

earnest money <strong>for</strong> this work arise due to failure on<br />

my/our part to (i) abide by <strong>the</strong> stipulation to keep <strong>the</strong><br />

offer open <strong>for</strong> <strong>the</strong> period mentioned above or (ii)sign<br />

and complete <strong>the</strong> contract documents and furnish <strong>the</strong><br />

security deposit as specified in item (d) of <strong>the</strong><br />

Memorandum contained in paragraph (i) above within<br />

<strong>the</strong> time limit laid down in clause (1) of <strong>the</strong> annexed<br />

General conditions of <strong>the</strong> contract <strong>the</strong> amount payable<br />

by me/us may at <strong>the</strong> option of <strong>the</strong> Engineer, be<br />

recovered out of <strong>the</strong> amount deposited in lumpsum<br />

<strong>for</strong> securing exemption in so far as <strong>the</strong> same may<br />

extend in terms of <strong>the</strong> said bond and in <strong>the</strong> event of <strong>the</strong><br />

deficiency out of any o<strong>the</strong>r moneys which are due or<br />

payable to me/us by <strong>the</strong> <strong>Government</strong> under any o<strong>the</strong>r<br />

contract or transaction of any nature whatsoever or<br />

o<strong>the</strong>rwise.<br />

4) Should this tender be accepted I / We here by agree<br />

to abide by and fulfill all <strong>the</strong> terms and provisions of<br />

<strong>the</strong> conditions of contract annexed hereto so far as<br />

applicable, and in default <strong>the</strong>reof to <strong>for</strong>feit and pay to<br />

Govt. <strong>the</strong> sums of money mentioned in <strong>the</strong> said<br />

conditions.<br />

Contractor No. of Corrections Executive Engineer


47<br />

✚ Signature of Contractor be<strong>for</strong>e<br />

submission of tender.<br />

٭<br />

Signature of witness to contractor's signature.<br />

✚<br />

Contractor..............................................Address<br />

..............................................................................................<br />

..............................................................................................<br />

....................................................<br />

Date <strong>the</strong>................ <strong>the</strong> day of .......................2012.<br />

٭<br />

(Witness)...................................................... Address:.................................................................................<br />

............................................<br />

(Occupation).......................................................<br />

The above tender is hereby accepted by me <strong>for</strong> and on behalf of <strong>the</strong> Governor of Maharashtra.<br />

................................................................................................................................................................<br />

................................................................................................................................................................<br />

................................................................................................................................................................<br />

................................................................................................................................................................<br />

...................................................<br />

✒ Executive Engineer,<br />

Public Works Division, Nashik<br />

✒ Signature of <strong>the</strong> officer by whom accepted<br />

Dated Day of ........................ 2012....................<br />

Contractor No. of Corrections Executive Engineer


48<br />

Security<br />

deposit.<br />

CONDITIONS OF CONTRACT<br />

Clause 1: The person / persons whose tender may be accepted (hereafter<br />

called <strong>the</strong> contractor, which expression shall unless excluded by or repugnant<br />

to <strong>the</strong> context include his, heirs, executors, administrators, and assigns) shall<br />

(A) within 10 days (which may be extended by <strong>the</strong> Executive Engineer/<br />

Superintending Engineer/or <strong>the</strong> Chief Engineer concerned up to one<br />

month/two months/three months respectively if <strong>the</strong> Executive Engineer/<br />

Superintending Engineer / Chief Engineer thinks fit to do so) of <strong>the</strong> receipt<br />

by him of <strong>the</strong> notification of <strong>the</strong> acceptance of his tender deposit with <strong>the</strong><br />

Executive Engineer in cash or <strong>Government</strong> securities endorsed to <strong>the</strong><br />

Executive Engineer (if deposited <strong>for</strong> more than 12 months) of sum<br />

sufficient which will make up <strong>the</strong> full security deposit specified in <strong>the</strong><br />

tender or (B) Permit <strong>Government</strong> at <strong>the</strong> time of making any payment to<br />

him <strong>for</strong> work done under <strong>the</strong> contract to deduct such sum as will amount to<br />

* Four percent‚ of all moneys so payable such deductions to be held by<br />

<strong>Government</strong> by way of security deposit, provided always that in <strong>the</strong> event<br />

of <strong>the</strong> contractor depositing a lump sum by way of security deposit as<br />

contemplated at (A) above <strong>the</strong>n and in such case if <strong>the</strong> sum so deposited<br />

shall not amount to *Four percent‚ of <strong>the</strong> total estimated cost of <strong>the</strong> work it<br />

shall be lawful <strong>for</strong> <strong>Government</strong> at <strong>the</strong> time of making any payment to <strong>the</strong><br />

contractor <strong>for</strong> work done under <strong>the</strong> contract to make up <strong>the</strong> full amount of‚<br />

*Four percent‚ by deducting a sufficient sum from every such payment as<br />

last a<strong>for</strong>esaid until <strong>the</strong> full amount of <strong>the</strong> security deposit is made up. All<br />

compensation or o<strong>the</strong>r sums of money payable by <strong>the</strong> contractor to<br />

<strong>Government</strong> under <strong>the</strong> terms of his contract may be deducted from, or paid<br />

by <strong>the</strong> sale of a sufficient part of his security deposit or from <strong>the</strong> interest<br />

arising <strong>the</strong>refrom, or from any sums which may be due or may become due<br />

by <strong>Government</strong> to <strong>the</strong> contractor under any o<strong>the</strong>r contract or transaction of<br />

any nature on any account whatsoever and in <strong>the</strong> event of his security<br />

deposit being reduced by reason of any such deduction or sale as<br />

a<strong>for</strong>esaid, <strong>the</strong> contractor shall, within 10 days <strong>the</strong>re after make good in<br />

cash or <strong>Government</strong> securities endorsed as a<strong>for</strong>esaid any sum or sums<br />

which may have been deducted from or raised by sale of his security<br />

deposit or any part <strong>the</strong>reof. The security deposit referred to when paid in<br />

cash may, at <strong>the</strong> cost of <strong>the</strong> depositor, be converted into <strong>the</strong> interest<br />

Contractor No. of Corrections Executive Engineer


49<br />

Compensation<br />

<strong>for</strong> delay.<br />

bearing securities provided that <strong>the</strong> depositor has expressly desired this in<br />

writing. If <strong>the</strong> amount of <strong>the</strong> security deposit to be paid in a lump sum<br />

within <strong>the</strong> period specified at (A) above is not paid, <strong>the</strong> tender/contract<br />

already accepted shall be considered as cancelled and legal steps taken<br />

against <strong>the</strong> contractor <strong>for</strong> recovery of <strong>the</strong> amounts. The amount of <strong>the</strong><br />

security deposit lodged by a contractor shall be refunded along with <strong>the</strong><br />

payment of <strong>the</strong> final bill, if <strong>the</strong> date up to which <strong>the</strong> contractor has agreed<br />

to maintain <strong>the</strong> work in good order is over. If such date is not over, only 50<br />

per cent amounts of security deposit shall be refunded along with <strong>the</strong><br />

payment of <strong>the</strong> final bill. The amount of <strong>the</strong> security deposit retained by<br />

<strong>the</strong> <strong>Government</strong> shall be released after expiry of period up to which <strong>the</strong><br />

contractor has agreed to maintain <strong>the</strong> work in good order is over. In <strong>the</strong> event<br />

of <strong>the</strong> contractor failing or neglecting to complete rectification work<br />

within <strong>the</strong> period up to which <strong>the</strong> contractor has agreed to maintain <strong>the</strong><br />

work in good order, <strong>the</strong>n, subject to provisions of clauses 17 and 20<br />

hereof <strong>the</strong> amount of security deposit retained by <strong>Government</strong> shall be<br />

adjusted towards <strong>the</strong> excess cost incurred by <strong>the</strong> Department on<br />

rectification work.<br />

*Note: This will be <strong>the</strong> same percentage as that in <strong>the</strong> tender at (e).<br />

Clause-2:The time allowed <strong>for</strong> carrying out <strong>the</strong> work as entered in <strong>the</strong><br />

tender shall be strictly observed by <strong>the</strong> contractor and shall be reckoned<br />

from <strong>the</strong> date on which <strong>the</strong> order to commence work is given to <strong>the</strong><br />

contractor.<br />

The work shall through out stipulated period of <strong>the</strong> contract be proceeded<br />

with, with all due diligence (time being deemed to be of <strong>the</strong> essence of <strong>the</strong><br />

contract on <strong>the</strong> part of <strong>the</strong> contractor) and <strong>the</strong> contractor shall pay as<br />

compensation an amount equal to one per cent or such smaller amount as<br />

<strong>the</strong> Superintending Engineer (whose decision in writing shall be final) may<br />

decide, of <strong>the</strong> amount of <strong>the</strong> estimated cost of <strong>the</strong> whole work as shown by<br />

<strong>the</strong> tenderer <strong>for</strong> every day that <strong>the</strong> work remains uncommenced, or<br />

unfinished after <strong>the</strong> proper dates. And fur<strong>the</strong>r to ensure good progress<br />

during execution of <strong>the</strong> work, <strong>the</strong> contractor shall be bound, in all cases in<br />

which <strong>the</strong> time allowed <strong>for</strong> any work exceeds one month to complete.<br />

The contractor should complete <strong>the</strong> work as per phase period given below<br />

Contractor No. of Corrections Executive Engineer


50<br />

Action<br />

when<br />

whole of<br />

security<br />

deposit is<br />

<strong>for</strong>feited<br />

15% of <strong>the</strong> work in 1/4 of <strong>the</strong> time<br />

40% of <strong>the</strong> work in 1/2 of <strong>the</strong> time<br />

70% of <strong>the</strong> work in 3/4 of <strong>the</strong> time<br />

Full of <strong>the</strong> work in full of <strong>the</strong> time<br />

Full work will be completed in 06 (Six) calendar months<br />

(excluding monsoon.)<br />

Note: The quantity of <strong>the</strong> work to be done within <strong>the</strong> particular time to be<br />

specified above shall be fixed and inserted in <strong>the</strong> blank space kept <strong>for</strong> <strong>the</strong><br />

purpose by <strong>the</strong> Officer competent to accept <strong>the</strong> contracts after taking into<br />

consideration <strong>the</strong> circumstances of each case and abide by <strong>the</strong> programme of<br />

detailed progress laid down by <strong>the</strong> Executive Engineer.<br />

In <strong>the</strong> event of <strong>the</strong> contractor failing to comply with this conditions he<br />

shall be liable to pay as compensation an amount equal to one percent or such<br />

smaller amount as <strong>the</strong> Superintending Engineer (whose decision in writing<br />

shall be final) may decide of <strong>the</strong> said estimated cost of <strong>the</strong> whole work <strong>for</strong><br />

every day that <strong>the</strong> due quantity of work remains incomplete. Provided always<br />

that <strong>the</strong> total amount of compensation to be paid under <strong>the</strong> provisions of this<br />

clause shall not exceed 10 percent of <strong>the</strong> estimated cost of <strong>the</strong> work as shown<br />

in tender.<br />

Clause - 3 : In any case in which under<br />

any clause or clauses of this<br />

contract <strong>the</strong> contractor shall have rendered himself liable to pay<br />

compensation amounting to <strong>the</strong> whole of his security deposit (whe<strong>the</strong>r paid in<br />

one sum or deducted by installments,) or in <strong>the</strong> case of abandonment of <strong>the</strong><br />

work owing to serious illness or death of <strong>the</strong> contractor or any o<strong>the</strong>r cause,<br />

<strong>the</strong> Engineer, on behalf of <strong>the</strong> Governor of Maharashtra, shall have power to<br />

adopt of <strong>the</strong> following courses, as he may deem best suited to <strong>the</strong> interest of<br />

<strong>Government</strong>;<br />

(a) To rescind <strong>the</strong> contract (<strong>for</strong> which rescission notice in writing to <strong>the</strong> contractor<br />

under <strong>the</strong> hand of Executive Engineer shall be conclusive evidence) and in<br />

that case <strong>the</strong> Security deposit of <strong>the</strong> contractor shall stand <strong>for</strong>feited and be<br />

absolutely at <strong>the</strong> disposal of <strong>Government</strong>.<br />

(b) To carry out <strong>the</strong> work or any part of <strong>the</strong> work <strong>department</strong>ally debiting <strong>the</strong><br />

contractor with <strong>the</strong> cost of <strong>the</strong> work, expenditure incurred on tools and plant,<br />

and charges on additional supervisory staff including <strong>the</strong> cost of work<br />

charged establishment employed <strong>for</strong> getting unexecuted part of <strong>the</strong> work<br />

Contractor No. of Corrections Executive Engineer


51<br />

completed and crediting him with <strong>the</strong> value of <strong>the</strong> work done<br />

<strong>department</strong>ally in all respects in <strong>the</strong> same manner and at <strong>the</strong> same rates as if<br />

it had been carried out by <strong>the</strong> contractor under <strong>the</strong> terms of his contract.<br />

The certificate of <strong>the</strong> Executive Engineer as to <strong>the</strong> costs and o<strong>the</strong>r allied<br />

expenses so incurred and as to <strong>the</strong> value of <strong>the</strong> work so done<br />

<strong>department</strong>ally shall be final and conclusive against <strong>the</strong> contractor.<br />

(c) To order that <strong>the</strong> work of <strong>the</strong> contractor be measured up and to take such<br />

part <strong>the</strong>reof as shall be unexecuted out of his hands, and to give it to<br />

ano<strong>the</strong>r contractor to complete, in which case all expenses incurred on<br />

advertisement <strong>for</strong> fixing a new contracting agency, additional supervisory<br />

staff including <strong>the</strong> cost of work charged establishment and <strong>the</strong> cost of<br />

<strong>the</strong> work executed by <strong>the</strong> new contract agency will be debited to <strong>the</strong><br />

contractor and <strong>the</strong> value of <strong>the</strong> work done or executed through <strong>the</strong> new<br />

contractor shall be credited to <strong>the</strong> contractor in all respects and in <strong>the</strong><br />

same manner and at <strong>the</strong> same rates as if it had been carried out by <strong>the</strong><br />

contractor under <strong>the</strong> terms of his contract. The certificate of <strong>the</strong> Executive<br />

Engineer as to all <strong>the</strong> cost of <strong>the</strong> work and o<strong>the</strong>r expenses incurred as<br />

a<strong>for</strong>esaid <strong>for</strong> or in getting <strong>the</strong> unexecuted work done by <strong>the</strong> new contractor<br />

and as to <strong>the</strong> value of <strong>the</strong> work so done shall be final and<br />

conclusive against <strong>the</strong> contractor.<br />

In case <strong>the</strong> contract shall be rescinded under clause (a) above <strong>the</strong> contractor<br />

shall not be entitled to recover or be paid, any sum <strong>for</strong> any work <strong>the</strong>re<strong>for</strong><br />

actually per<strong>for</strong>med by him under this contract unless and until <strong>the</strong> Executive<br />

Engineer shall have certified in writing <strong>the</strong> per<strong>for</strong>mance of <strong>the</strong> such work and <strong>the</strong><br />

amount payable to him in respect <strong>the</strong>reof and he shall only be entitled to be paid<br />

<strong>the</strong> amount so certified.<br />

In <strong>the</strong> event of ei<strong>the</strong>r of <strong>the</strong> courses referred to in clause (b) or (c) being<br />

adopted and <strong>the</strong> cost of <strong>the</strong> work executed <strong>department</strong>ally or through a new<br />

contractor and o<strong>the</strong>r allied expenses exceeding <strong>the</strong> value of such work credited<br />

to <strong>the</strong> contractor <strong>the</strong> amount of excess shall be deducted from any money due to<br />

<strong>the</strong> contractor, by <strong>Government</strong> under <strong>the</strong> contract or o<strong>the</strong>rwise, howsoever or<br />

from his security deposit or <strong>the</strong> sale proceeds <strong>the</strong>reof provided, however that <strong>the</strong><br />

contractor shall have no claim against <strong>Government</strong> even if <strong>the</strong> certified value of<br />

<strong>the</strong> work done <strong>department</strong>ally or through a new contractor exceeds <strong>the</strong> certified<br />

Contractor No. of Corrections Executive Engineer


52<br />

cost of such work and allied expenses, provided always that whichever of <strong>the</strong><br />

three courses mentioned in clause (a),(b) or (c) is adopted by <strong>the</strong> Executive<br />

Engineer, <strong>the</strong> contractor shall have no claim to compensation <strong>for</strong> any loss<br />

sustained by him by reason of his having purchased or procured any materials, or<br />

entered into engagements, or made any advances on account of or with a view<br />

of <strong>the</strong> execution of <strong>the</strong> work or <strong>the</strong> per<strong>for</strong>mance of <strong>the</strong> contract.<br />

Action when<br />

<strong>the</strong><br />

progress<br />

of any<br />

particular<br />

portion of<br />

<strong>the</strong> work is<br />

unsatisfactory<br />

Clause 4 : If <strong>the</strong> progress of any particular portion of <strong>the</strong> work is unsatisfactory<br />

<strong>the</strong> Executive Engineer shall notwithstanding that <strong>the</strong> general progress of <strong>the</strong><br />

work is in accordance with <strong>the</strong> conditions mentioned in clause 2, be entitled<br />

to take action under clause 3 (b) after giving <strong>the</strong> contractor 10 days notice in<br />

writing. The contractor will have no claim <strong>for</strong> compensation, <strong>for</strong> any loss<br />

sustained by him owing to such action.<br />

Contractor<br />

remains liable to<br />

pay compensation<br />

if action not taken<br />

under clauses 3<br />

and 4<br />

Power to take<br />

possession of or<br />

require removal<br />

of or sell<br />

contractor's plant<br />

Clause -5: In any case in which any of <strong>the</strong> powers conferred upon <strong>the</strong><br />

Executive Engineer by clauses 3 and 4 hereof shall have become exercisable<br />

and <strong>the</strong> same shall not have been exercised <strong>the</strong> non-exercise <strong>the</strong>reof shall not<br />

constitute a waiver of any of <strong>the</strong> conditions hereof and such powers shall<br />

notwithstanding be exercisable in <strong>the</strong> event of any future case of default by <strong>the</strong><br />

contractor <strong>for</strong> which under any clause or clauses hereof he is declared liable to<br />

pay compensation amounting to <strong>the</strong> whole of his security deposit and <strong>the</strong> liability<br />

of <strong>the</strong> contractor <strong>for</strong> past and future compensation shall remain unaffected. In<br />

<strong>the</strong> event of <strong>the</strong> Executive Engineer taking action under sub-clause (a) or (c)<br />

of clause-3, he may,<br />

if he so desires, take possession of<br />

all or any tool and plant, materials and<br />

stores in or upon <strong>the</strong> <strong>works</strong> or <strong>the</strong> site <strong>the</strong>reof or belonging to <strong>the</strong> contractor, or<br />

procured by him and intended to be used <strong>for</strong> <strong>the</strong> execution of <strong>the</strong> work or any<br />

part <strong>the</strong>reof, paying or allowing <strong>for</strong> <strong>the</strong> same in account at <strong>the</strong> contract rates, or<br />

in <strong>the</strong> case of contract rates not being applicable at current market rates to be<br />

certified by Executive Engineer whose certificate <strong>the</strong>reof shall be final. In <strong>the</strong><br />

alternative, <strong>the</strong> Executive Engineer may, after giving notice in writing to <strong>the</strong><br />

contractor or his clerk of <strong>the</strong> work, <strong>for</strong>eman or o<strong>the</strong>r authorised agent require him<br />

to remove such tools and plant, materials or stores from <strong>the</strong> premises within a<br />

time to be specified in such notice, and in <strong>the</strong> event of <strong>the</strong> contractor failing to<br />

comply with any such requisition, <strong>the</strong> Executive Engineer may remove <strong>the</strong>m at <strong>the</strong><br />

Contractor No. of Corrections Executive Engineer


53<br />

Extension of<br />

time.<br />

Final<br />

certificate.<br />

contractor's expense or sale <strong>the</strong>m by auction or private sale on account of <strong>the</strong><br />

contractor and at his risk in all respects, and <strong>the</strong> certificate of <strong>the</strong> Executive<br />

Engineer as to <strong>the</strong> expense of any such removal and <strong>the</strong> amount of <strong>the</strong> proceeds<br />

and expenses of any such sale shall be final and conclusive against <strong>the</strong><br />

contractor.<br />

Clause - 6 : If <strong>the</strong> contractor shall desire an extension of <strong>the</strong> time <strong>for</strong><br />

completion of work on <strong>the</strong> ground of his having been unavoidably hindered in<br />

its execution or on any o<strong>the</strong>r ground he shall apply in writing to <strong>the</strong> Executive<br />

Engineer be<strong>for</strong>e <strong>the</strong> expiration of <strong>the</strong> period stipulated in <strong>the</strong> tender or be<strong>for</strong>e<br />

<strong>the</strong> expiration of 30 days from <strong>the</strong> date on which he was hindered as<br />

a<strong>for</strong>esaid or on which <strong>the</strong> cause <strong>for</strong> asking <strong>for</strong> extension occurred,<br />

whichever is earlier ever and <strong>the</strong> Executive Engineer, may, with prior<br />

approval of <strong>the</strong> authority component to accept <strong>the</strong> tender if in his opinion,<br />

<strong>the</strong>re are reasonable ground <strong>for</strong> granting an extension, grant such extension<br />

as he thinks necessary or proper <strong>the</strong> decision of <strong>the</strong> Executive Engineer in<br />

this matter shall be final.<br />

Clause - 7: On <strong>the</strong> completion of <strong>the</strong> work <strong>the</strong> contractor shall be<br />

furnished with a certificate by <strong>the</strong> Executive Engineer (hereinafter called<br />

The Engineer-in-charge) of such completion; but no such certificate shall be<br />

given nor shall <strong>the</strong> work be considered to be complete until <strong>the</strong> contractor<br />

shall have removed from <strong>the</strong> premises on which <strong>the</strong> work shall have been<br />

executed, all scaffolding, surplus materials and rubbish, and shall have<br />

cleaned off, <strong>the</strong> dirt from all wood work, doors windows, wall, floors or o<strong>the</strong>r<br />

parts of any building in or upon which <strong>the</strong> work has been executed, or of<br />

which he may have had possession <strong>for</strong> <strong>the</strong> purpose of executing <strong>the</strong> work, nor<br />

until <strong>the</strong> work shall have been measured by <strong>the</strong> Engineer-in-charge or where<br />

<strong>the</strong> measurements have been taken by his subordinates until <strong>the</strong>y have received<br />

<strong>the</strong> approval of <strong>the</strong> Engineer-in-charge, <strong>the</strong> said measurements being binding<br />

and conclusive against contractor. If <strong>the</strong> contractor shall fail to comply with<br />

<strong>the</strong> requirements of this clause as to <strong>the</strong> removal of scaffolding, surplus<br />

materials and rubbish and cleaning off dirt on or be<strong>for</strong>e <strong>the</strong> date fixed <strong>for</strong> <strong>the</strong><br />

completion of <strong>the</strong> work <strong>the</strong> Engineer- in-charge may at <strong>the</strong> expense of <strong>the</strong><br />

contractor, remove such scaffolding, surplus materials and rubbish and<br />

Contractor No. of Corrections Executive Engineer


54<br />

Payment on<br />

intermediate<br />

certificate to be<br />

regarded as<br />

advances.<br />

Payments at<br />

reduced rates on<br />

account of item<br />

of work not<br />

accepted as<br />

completed to be<br />

at <strong>the</strong> discretion<br />

of <strong>the</strong> Engineerin<br />

charge.<br />

dispose off <strong>the</strong> same as he thinks fit and clean off such dirts as a<strong>for</strong>esaid and<br />

<strong>the</strong> contractor shall <strong>for</strong>thwith pay <strong>the</strong> amount of all expenses so incurred, but<br />

shall have no claim in respect of any such scaffolding or surplus materials as<br />

a<strong>for</strong>esaid except <strong>for</strong> any sum actually realised by <strong>the</strong> sale <strong>the</strong>reof.<br />

Clause- 8: No payment shall be made <strong>for</strong> any work, estimated to cost less<br />

than rupees one thousand, till after <strong>the</strong> whole of work shall have been<br />

completed and a certificate of completion given. But in <strong>the</strong> case of <strong>works</strong><br />

estimated to cost more than rupees one thousand <strong>the</strong> contractor shall on<br />

submitting a monthly bill <strong>the</strong>re<strong>for</strong> be entitled to receive payment<br />

proportionate to <strong>the</strong> part of <strong>the</strong> work <strong>the</strong>n approved and passed by <strong>the</strong><br />

Engineer-in-charge, whose certificate of such approval and passing of <strong>the</strong> sum<br />

payable shall be final and conclusive against <strong>the</strong> contractor. All such<br />

intermediate payments shall be regarded as payments by way of advance<br />

against <strong>the</strong> final payments only and not as payments <strong>for</strong> work actually done<br />

and completed and shall not preclude <strong>the</strong> Engineer-in-charge from requiring<br />

any bad, unsound imperfect or unskillful work to be removed or taken away<br />

and reconstruction or reerected nor shall any such payment be considered as<br />

an admission of <strong>the</strong> due per<strong>for</strong>mance of <strong>the</strong> contract or any part <strong>the</strong>reof in<br />

any respect or <strong>the</strong> occurring of any claim nor shall it conclude, determine or<br />

effect in any o<strong>the</strong>r way <strong>the</strong> powers of <strong>the</strong> Engineer-in- charge as to <strong>the</strong> final<br />

settlement and adjustment of <strong>the</strong> accounts or o<strong>the</strong>rwise, or in any o<strong>the</strong>r way<br />

vary or effect <strong>the</strong> contract. The final bill shall be submitted by <strong>the</strong> contractor<br />

within one month of <strong>the</strong> date fixed <strong>for</strong> <strong>the</strong> completion of <strong>the</strong> work, o<strong>the</strong>rwise<br />

<strong>the</strong> Engineer-in-charge's certificate of <strong>the</strong> measurements and of <strong>the</strong> total<br />

amount payable <strong>for</strong> <strong>the</strong> work shall be final and binding on all parties.<br />

Clause 9: The rates <strong>for</strong> several items of <strong>works</strong> estimated to cost more<br />

than Rs. 1000/- agreed to within shall be valid only when <strong>the</strong> item<br />

concerned is accepted as having been completed fully in accordance with <strong>the</strong><br />

sanctioned specifications. In cases where <strong>the</strong> items of work are not<br />

accepted as so completed by <strong>the</strong> Engineer-in-charge may make payment<br />

on account of such items at such reduced rates as he may consider<br />

reasonable in <strong>the</strong> preparation of final or on account bills.<br />

Bill to be<br />

submitted<br />

Clause - 10: A bill shall<br />

be submitted by <strong>the</strong> contractor each month<br />

Contractor No. of Corrections Executive Engineer


55<br />

monthly.<br />

on or be<strong>for</strong>e <strong>the</strong> date fixed by <strong>the</strong> Engineer-in-charge <strong>for</strong> all work<br />

executed in <strong>the</strong> previous month , and <strong>the</strong> Engineer-in-charge shall take or<br />

cause to be taken <strong>the</strong> requisite measurement <strong>for</strong> <strong>the</strong> purpose of having <strong>the</strong><br />

same verified and <strong>the</strong> claim, so far as it is admissible, shall be adjusted, if<br />

possible, within ten days from <strong>the</strong> presentation of <strong>the</strong> bill. If <strong>the</strong> contractor<br />

does not submit <strong>the</strong> bill within <strong>the</strong> time fixed as a<strong>for</strong>esaid, <strong>the</strong> Engineer-incharge<br />

may depute a subordinate to measure up <strong>the</strong> said work in <strong>the</strong><br />

presence of <strong>the</strong> contractor or his duly authorised agent whose countersignature<br />

to <strong>the</strong> measurement list shall be sufficient warrant, and <strong>the</strong><br />

Engineer-in-charge may prepare a bill from such list which shall be binding<br />

on <strong>the</strong> contractor in all respects.<br />

Bill to be on<br />

printed <strong>for</strong>ms.<br />

Clause-11: The contractor shall submit all bills on <strong>the</strong> printed <strong>for</strong>ms to<br />

be had on application at <strong>the</strong> office of <strong>the</strong> Engineer-in- charge. The charges to<br />

be made in <strong>the</strong> bills shall always be entered at <strong>the</strong> rates specified in <strong>the</strong><br />

tender or in <strong>the</strong> case of any extra work ordered in pursuance of <strong>the</strong>se<br />

conditions, and not mentioned or provided <strong>for</strong> in <strong>the</strong> tender at <strong>the</strong> rates<br />

hereinafter provided <strong>for</strong> such work.<br />

Stores supplied by<br />

<strong>Government</strong><br />

Clause-12: If <strong>the</strong> specification or estimate of <strong>the</strong> work provides <strong>for</strong> <strong>the</strong> use of<br />

any special description of materials to be supplied from <strong>the</strong> store of <strong>the</strong><br />

Public Works Dept. store or if it is required that <strong>the</strong> contractor shall use<br />

certain stores to be provided by <strong>the</strong> Engineer-in- charge (such material and<br />

stores and <strong>the</strong> prices to be charged <strong>the</strong>re<strong>for</strong> as hereinafter mentioned being so<br />

far as practicable <strong>for</strong> <strong>the</strong> convenience of <strong>the</strong> contractor but not so as in any<br />

way to control <strong>the</strong> meaning or effect of this contract specified in <strong>the</strong> schedule<br />

or memorandum hereto annexed) <strong>the</strong> contractor shall be supplied with such<br />

materials and stores as may be required from time to time to be used by him<br />

<strong>for</strong> <strong>the</strong> purpose of <strong>the</strong> contract only and value of <strong>the</strong> full quantity of <strong>the</strong><br />

materials and stores so supplied shall be set off or deducted from any sums<br />

<strong>the</strong>n due or <strong>the</strong>reafter to become due to <strong>the</strong> contractor under <strong>the</strong> contract, or<br />

o<strong>the</strong>rwise or from <strong>the</strong> security deposit or <strong>the</strong> proceeds of sale <strong>the</strong>reof, if <strong>the</strong><br />

security deposit is held in <strong>Government</strong> securities, <strong>the</strong> same or a sufficient<br />

portion <strong>the</strong>re of shall in that case be sold <strong>for</strong> all purpose. All materials<br />

supplied to <strong>the</strong> contractor shall remain <strong>the</strong> absolute property of Govt. and<br />

Contractor No. of Corrections Executive Engineer


56<br />

Work to be executed<br />

in accordance with<br />

specifications,<br />

Drawings, orders,<br />

etc.<br />

Alterations in<br />

specifications<br />

and designs not<br />

to invalidate<br />

contracts.<br />

shall on no account be removed from <strong>the</strong> site of <strong>the</strong> work, and shall at all times<br />

be open <strong>for</strong> inspection by <strong>the</strong> Engineer-in-charge. Any such materials unused<br />

and in perfectly good condition at <strong>the</strong> time of completion or determination of<br />

<strong>the</strong> contract shall be returned to <strong>the</strong> Public Works Departmental store if <strong>the</strong><br />

Engineer-in-charge so requires by a notice in writing given under his hand, but<br />

<strong>the</strong> contractor shall not be entitled to return any such materials except with<br />

consent of <strong>the</strong> Engineer in-charge and he shall have no claim <strong>for</strong> compensation<br />

on account of any such material supplied to him as a<strong>for</strong>esaid but remaining<br />

unused by him or <strong>for</strong> any wastage in or damage to any such materials.<br />

Clause- 13: The contractor shall execute <strong>the</strong> whole and every part of <strong>the</strong><br />

work in <strong>the</strong> most substantial and workmanlike manner, and both as regards<br />

materials and every o<strong>the</strong>r respect in strict accordance with specifications.<br />

The contractor shall also con<strong>for</strong>m exactly, fully and faithfully to <strong>the</strong><br />

designs, drawings and instructions in writing relating to <strong>the</strong> work signed by<br />

<strong>the</strong> Engineer- in-charge and lodged in his office and to which <strong>the</strong><br />

contractor shall be entitled to have access <strong>for</strong> <strong>the</strong> purpose of inspection at<br />

such office, or on site of <strong>the</strong> work during office hours. The contractor will be<br />

entitled to receive three sets of contract drawing and working drawings as<br />

well as one certified copy of <strong>the</strong> accepted tender along with <strong>the</strong> work order<br />

free of cost. Fur<strong>the</strong>r copies of <strong>the</strong> contract drawings and working drawings if<br />

required by him, shall be supplied at <strong>the</strong> rate of Rs.300/- per set of contract<br />

Drawings and Rs.150/- per working drawings except where o<strong>the</strong>r wise<br />

specified.<br />

Clause-14: The Engineer -in- charge shall have power to make any<br />

alterations in or additions to <strong>the</strong> original specifications, drawings, designs,<br />

and instructions that may appear to him to be necessary or advisable during<br />

<strong>the</strong> progress of <strong>the</strong> work, and <strong>the</strong> contractor shall be bound to carry out<br />

<strong>the</strong> work in accordance with any instructions in this connection which may<br />

be given to him in writing signed by <strong>the</strong> Engineer-in-charge and such<br />

alteration shall not invalidate <strong>the</strong> contract, and any additional work which<br />

<strong>the</strong> contractor may be directed to do in <strong>the</strong> manner above specified as part of<br />

<strong>the</strong> work shall be carried out by <strong>the</strong> contractor on <strong>the</strong> same conditions in all<br />

respects on which he agreed to do <strong>the</strong> main work, and at <strong>the</strong> same rates as are<br />

specified in <strong>the</strong> tender <strong>for</strong> <strong>the</strong> main work. And if <strong>the</strong> additional and altered<br />

Contractor No. of Corrections Executive Engineer


57<br />

Rates <strong>for</strong> <strong>works</strong><br />

not entered in<br />

estimate or<br />

schedule of rate<br />

of <strong>the</strong> districts.<br />

Extension of time<br />

in consequence of<br />

additions or<br />

alterations.<br />

work includes any class of work <strong>for</strong> which no rate is Specified in this<br />

contract, <strong>the</strong>n such class of work shall be carried out at <strong>the</strong> rates entered in <strong>the</strong><br />

schedule of Rates of <strong>the</strong> Division or at <strong>the</strong> rates mutually agreed upon between <strong>the</strong><br />

Engineer-in-charge and <strong>the</strong> contractor, whichever, are lower. If <strong>the</strong> additional or<br />

altered work <strong>for</strong> which no rate is entered in <strong>the</strong> schedule of Rates of <strong>the</strong> Division,<br />

is ordered to be carried out be<strong>for</strong>e <strong>the</strong> rates are agreed upon <strong>the</strong>n contractor shall<br />

within seven days of <strong>the</strong> date of receipt by him of <strong>the</strong> order to carry out <strong>the</strong> work,<br />

in<strong>for</strong>m <strong>the</strong> Engineer-in-charge of <strong>the</strong> rate which it is his intention to charge <strong>for</strong><br />

such class of work, and if <strong>the</strong> Engineer-in-charge does not agree to this rate he<br />

shall by notice in writing be at liberty to cancel his order to carry out such class of<br />

work and arrange to carry it out in such manner as he may consider advisable<br />

provided always that if <strong>the</strong> contractor shall commence work or incur any<br />

expenditure in regard <strong>the</strong>re to be<strong>for</strong>e <strong>the</strong> rates shall have been determined as<br />

lastly herein-be<strong>for</strong>e mentioned, <strong>the</strong>n in such case he shall only be entitled to be<br />

paid in respect of <strong>the</strong> work carried out or expenditure incurred by him prior to<br />

date of <strong>the</strong> determination of <strong>the</strong> rate as a<strong>for</strong>esaid according to such rate or rates as<br />

shall be fixed by <strong>the</strong> Engineer-in-charge. In <strong>the</strong> event of a dispute, <strong>the</strong> decision of<br />

<strong>the</strong> Superintending Engineer, of <strong>the</strong> Circle will be final.<br />

Where, however, <strong>the</strong> work is to be executed according to <strong>the</strong> designs,<br />

drawings & specifications recommended by contractor and accepted by <strong>the</strong><br />

competent authority <strong>the</strong> alterations above referred to shall be within <strong>the</strong> scope<br />

of such designs, drawings and specifications appended to <strong>the</strong> tender.<br />

The time limit <strong>for</strong> <strong>the</strong> completion of <strong>the</strong> work shall be extended in <strong>the</strong><br />

proportion that <strong>the</strong> increase in its cost occasioned by alterations or additions<br />

bears to <strong>the</strong> cost of <strong>the</strong> original contract work, and <strong>the</strong> certificate of <strong>the</strong><br />

Engineer-in- charge as to such proportion shall be conclusive.<br />

No claim to any<br />

payment or<br />

compensation <strong>for</strong><br />

alteration in or<br />

restriction of<br />

work.<br />

Clause-15: (1) If at any time after <strong>the</strong> execution of <strong>the</strong> contract<br />

documents, <strong>the</strong> Engineer shall <strong>for</strong> any reason what-so-ever (o<strong>the</strong>r than<br />

default on <strong>the</strong> part of <strong>the</strong> contractor <strong>for</strong> which <strong>the</strong> <strong>Government</strong> is entitled to<br />

rescind <strong>the</strong> contract) desires that <strong>the</strong> whole or any part of <strong>the</strong> work<br />

specified in <strong>the</strong> tender should be suspended <strong>for</strong> any period or that <strong>the</strong> whole<br />

or part of <strong>the</strong> work should not be carried out at all he shall give to <strong>the</strong><br />

contractor a notice in writing of such desire and upon <strong>the</strong> receipt of such<br />

Contractor No. of Corrections Executive Engineer


58<br />

notice <strong>the</strong> contractor shall <strong>for</strong>thwith suspend or stop <strong>the</strong> work wholly or in<br />

part as required, after having due regard to <strong>the</strong> appropriate stage at which<br />

<strong>the</strong> work should be stopped or suspended so as not to cause any damage or<br />

injury to <strong>the</strong> work already done or endanger <strong>the</strong> safety <strong>the</strong>reof provided that<br />

<strong>the</strong> decision of <strong>the</strong> Engineer as to <strong>the</strong> stage at which <strong>the</strong> work or any part of it<br />

could be or could have been safely stopped or suspended shall be final and<br />

conclusive against <strong>the</strong> contractor. The contractor shall have no claim to any<br />

payment or compensation whatsoever by reason of or in pursuance of any<br />

notice as a<strong>for</strong>esaid on account of any suspension, stoppage or curtailment<br />

except to <strong>the</strong> extent specified hereinafter.<br />

(2) Where <strong>the</strong> total suspension of work ordered as a<strong>for</strong>esaid continued <strong>for</strong> a<br />

continuous period exceeding 90 days <strong>the</strong> contractor shall be at liberty to<br />

withdraw from <strong>the</strong> contractual obligations under <strong>the</strong> contract so far as it<br />

pertains to <strong>the</strong> unexecuted part of <strong>the</strong> work by giving a 10 day’s prior notice<br />

in writing to <strong>the</strong> Engineer, within 30 days of <strong>the</strong> expiry of <strong>the</strong> said period<br />

of 90 days, of such intention and requiring <strong>the</strong> Engineer, to record <strong>the</strong><br />

final measurements of <strong>the</strong> work already done and to pay <strong>the</strong> final bill.<br />

Upon given such notice, <strong>the</strong> contractor shall be deemed to have been<br />

discharged from his obligation to complete <strong>the</strong> remaining unexecuted work<br />

under his contract. On receipt of such notice <strong>the</strong> Engineer shall proceed to<br />

complete <strong>the</strong> measurement and make such payment as may be finally due to<br />

<strong>the</strong> contractor within a period of 90 days from <strong>the</strong> receipt of such notice<br />

in respect of <strong>the</strong> work already done by <strong>the</strong> contractor .Such<br />

payment shall not in any manner prejudice <strong>the</strong> right of <strong>the</strong> contractor to<br />

any fur<strong>the</strong>r compensation under <strong>the</strong> remaining provisions of this clause.<br />

(3) Where <strong>the</strong> Engineer requires <strong>the</strong> contractor to suspend <strong>the</strong> work <strong>for</strong> a period<br />

in excess of 30 days at any time or 60 days in <strong>the</strong> aggregate, <strong>the</strong> contractor<br />

shall be entitled to apply to <strong>the</strong> Engineer within 30 days of <strong>the</strong> resumption<br />

of work after such suspension <strong>for</strong> payment of compensation to <strong>the</strong> extent of<br />

pecuniary loss suffered by him in respect of working machinery remained idle<br />

on <strong>the</strong> site or on <strong>the</strong> account of his having had to pay <strong>the</strong> salary or wages of<br />

labour engaged by him during <strong>the</strong> said period of suspension provided always<br />

that <strong>the</strong> contractor shall not be entitled to any claim in respect of any such<br />

working machinery, salary or wages <strong>for</strong> <strong>the</strong> first 30 days whe<strong>the</strong>r consecutive or<br />

Contractor No. of Corrections Executive Engineer


59<br />

in <strong>the</strong> aggregate of such suspension or in respect of any suspension whatsoever<br />

occasioned by unsatisfactory work or any o<strong>the</strong>r default on his part. The decision<br />

of <strong>the</strong> Engineer in this regard shall be final and conclusive against<br />

<strong>the</strong> contractor.<br />

(4) In <strong>the</strong> event of -<br />

i) Any total stoppage of work on notice from <strong>the</strong> Engineer under sub<br />

clause (1), in that behalf,<br />

ii) Withdrawal by <strong>the</strong> contractor from <strong>the</strong> contractual obligation to<br />

complete <strong>the</strong> remaining unexecuted work under sub clause (2) on<br />

account of continued suspension of work <strong>for</strong> a period exceeding 90<br />

days.<br />

OR<br />

iii) Curtailment in <strong>the</strong> quantity of item or items originally tendered on<br />

account of any alteration, omission or substitutions in <strong>the</strong><br />

specifications, drawings, designs, or instructions under clause 14 where<br />

such curtailment exceeds 25% in quantity and <strong>the</strong> value of <strong>the</strong> quantity<br />

curtailed beyond 25% at <strong>the</strong> rates <strong>for</strong> <strong>the</strong> item specified in <strong>the</strong> tender is<br />

more than Rs. 5000/-<br />

It shall be open to <strong>the</strong> contractor within 90 days from <strong>the</strong> service of<br />

(i) The notice of stoppage of work or<br />

(ii) The notice of withdrawal from <strong>the</strong> contractual obligations under <strong>the</strong><br />

contract on account of <strong>the</strong> continued suspension of work or<br />

(iii) Notice under clause 14 resulting in such curtailment to produce to <strong>the</strong><br />

Engineer satisfactory documentary evidence that he had purchased or agreed<br />

to purchase material <strong>for</strong> use in <strong>the</strong> contracted work, be<strong>for</strong>e receipt by him of<br />

<strong>the</strong> notice of stoppage, suspension or curtailment and require <strong>the</strong><br />

<strong>Government</strong> to take over on payment such material at <strong>the</strong> rates determined<br />

by <strong>the</strong> Engineer, provided however, such rates shall in no case exceed <strong>the</strong><br />

rates at which <strong>the</strong> same were acquired by <strong>the</strong> contractor. The <strong>Government</strong><br />

shall <strong>the</strong>reafter take over <strong>the</strong> material so offered, provided <strong>the</strong> quantities<br />

offered, are not in excess of <strong>the</strong> requirements of <strong>the</strong> unexecuted work as<br />

specified in <strong>the</strong> accepted tender and are of quality and specifications<br />

approved by <strong>the</strong> Engineer.<br />

Contractor No. of Corrections Executive Engineer


60<br />

No claim to<br />

compensation on<br />

account of loss due<br />

to delay in supply of<br />

materials by<br />

<strong>Government</strong><br />

Time limit <strong>for</strong><br />

un<strong>for</strong>eseen<br />

claims.<br />

Action and<br />

compensation<br />

payable in case of<br />

bad work.<br />

Clause-15(A):The contractor shall not be entitled to claim any<br />

compensation from <strong>Government</strong> <strong>for</strong> <strong>the</strong> loss suffered by him on account of<br />

delay by <strong>Government</strong> in <strong>the</strong> supply of materials entered in Schedule -A where<br />

such delay is caused by<br />

i) difficulties relating to <strong>the</strong> supply of railway wagons.<br />

(ii) Force majeure,<br />

(iii)Act of God,<br />

(iv) Act of enemies of <strong>the</strong> state or any o<strong>the</strong>r reasonable cause beyond <strong>the</strong><br />

control of <strong>Government</strong>.<br />

In <strong>the</strong> case of such delay in <strong>the</strong> supply of materials, <strong>Government</strong> shall grant<br />

such extension of time <strong>for</strong> <strong>the</strong> completion of <strong>the</strong> <strong>works</strong> as shall appear to <strong>the</strong><br />

Executive Engineer to be reasonable in accordance with <strong>the</strong> circumstances<br />

of <strong>the</strong> case. The decision of <strong>the</strong> Executive Engineer as to <strong>the</strong> extension of<br />

time shall be accepted as final by <strong>the</strong> contractor.<br />

Clause -16: Under no circumstances whatsoever shall <strong>the</strong> contractor be<br />

entitled to any compensation from <strong>Government</strong> on any account unless <strong>the</strong><br />

contractor shall have submitted a claim in writing to <strong>the</strong> Engineer-in- charge<br />

within one month of <strong>the</strong> cause of such claim occurring.<br />

Clause -17: If any time be<strong>for</strong>e <strong>the</strong> security deposit or any part <strong>the</strong>reof is<br />

refunded to <strong>the</strong> contractor it shall appear to <strong>the</strong> Engineer-in-charge or his<br />

subordinate in charge of <strong>the</strong> work, that any work has been executed with<br />

unsound, imperfect or unskillful workmanship or with materials of inferior<br />

quality, or that any materials or articles provided by him <strong>for</strong> <strong>the</strong> execution of<br />

<strong>the</strong> work are unsound or of a quality inferior to that contracted <strong>for</strong>, or are<br />

o<strong>the</strong>rwise not in accordance with contract, it shall be lawful <strong>for</strong> <strong>the</strong> Engineerin-charge<br />

to intimate this fact in writing to <strong>the</strong> contractor and <strong>the</strong>n<br />

notwithstanding <strong>the</strong> fact that <strong>the</strong> work, materials or articles complained of<br />

may have been inadvertently passed, certified and paid <strong>for</strong>, <strong>the</strong> contractor shall<br />

be bound <strong>for</strong>thwith to rectify, or remove and reconstruct <strong>the</strong> work so specified<br />

in whole or in part, as <strong>the</strong> case may require or if so required, shall remove <strong>the</strong><br />

materials or articles so specified and provide o<strong>the</strong>r proper and suitable materials<br />

or articles at his own charge and cost, and in <strong>the</strong> event of his failing to do<br />

so within a period to be specified by <strong>the</strong> Engineer-in- charge in <strong>the</strong> written<br />

Contractor No. of Corrections Executive Engineer


61<br />

Works to be<br />

open to<br />

inspection.<br />

Contractor or<br />

responsible<br />

agent to be<br />

present<br />

Notice to be<br />

given be<strong>for</strong>e<br />

work is<br />

covered up.<br />

Contractor liable<br />

<strong>for</strong> damage done<br />

and <strong>for</strong><br />

imperfections<br />

intimation a<strong>for</strong>esaid, <strong>the</strong> contractor shall be liable to pay compensation at <strong>the</strong><br />

rate of 1% on <strong>the</strong> amount of <strong>the</strong> estimate <strong>for</strong> every day not exceeding 10 days<br />

during which <strong>the</strong> failure so continues and in <strong>the</strong> case of any such failure <strong>the</strong><br />

Engineer-in-charge may rectify or remove, and re-execute <strong>the</strong> work or remove<br />

and replace <strong>the</strong> materials or articles complained of as <strong>the</strong> case may be at <strong>the</strong><br />

risk and expense in all respects of <strong>the</strong> contractor. Should <strong>the</strong> Engineer-in-charge<br />

consider that any such inferior work or materials as described above may be<br />

accepted or made use of it shall be within his discretion to accept <strong>the</strong> same at<br />

such reduced rates as he may fix <strong>the</strong>re<strong>for</strong>.<br />

Clause-18: All <strong>works</strong> under or in course of execution or executed in<br />

pursuance of <strong>the</strong> contract shall at all times be open to <strong>the</strong> inspection and<br />

supervision of <strong>the</strong> Engineer-in- charge and his subordinates and <strong>the</strong><br />

contractor shall at all time during <strong>the</strong> usual working hours, and at all o<strong>the</strong>r<br />

times at which reasonable notice of <strong>the</strong> intention of <strong>the</strong> Engineer-in-charge<br />

or his subordinate to visit <strong>the</strong> work shall have been given to <strong>the</strong> contractor,<br />

ei<strong>the</strong>r himself be present to receive orders and instructions or have<br />

responsible agent duly authorised in writing, present <strong>for</strong> that purpose.<br />

Orders given to <strong>the</strong> contractor’s duly authorised agent shall be considered to<br />

have <strong>the</strong> same <strong>for</strong>ce and effect as if <strong>the</strong>y had been given to <strong>the</strong> contractor<br />

himself.<br />

Clause 19: The contractor shall give not less than five days notice in<br />

writing to <strong>the</strong> Engineer-in-charge or his subordinate in charge of <strong>the</strong> work<br />

be<strong>for</strong>e covering up or o<strong>the</strong>rwise placing beyond <strong>the</strong> reach of measurements<br />

any work in order that <strong>the</strong> same may be measured and correct dimensions<br />

<strong>the</strong>reof taken be<strong>for</strong>e <strong>the</strong> same is so covered up or placed beyond <strong>the</strong> reach of<br />

measurement, and shall not cover up or place beyond <strong>the</strong> reach of<br />

measurement any work without <strong>the</strong> consent in writing of <strong>the</strong> Engineer-incharge<br />

or his subordinate in charge of <strong>the</strong> work, and if any work shall be<br />

covered up or placed beyond <strong>the</strong> reach of measurement without such notice<br />

having been given or consent obtained <strong>the</strong> same shall be uncovered at <strong>the</strong><br />

contractor's expense and in default <strong>the</strong>reof no payment or allowance shall be<br />

made <strong>for</strong> such work or <strong>for</strong> <strong>the</strong> materials with which <strong>the</strong> same was executed.<br />

Clause 20: If during <strong>the</strong> period of “24 months” from <strong>the</strong> date of<br />

completion as certified by <strong>the</strong> Engineer-in-charge pursuant to clause 7 of <strong>the</strong><br />

Contractor No. of Corrections Executive Engineer


62<br />

Contractor<br />

to supply<br />

plant,<br />

ladders,<br />

scaffolding<br />

etc<br />

contract or “27 months” after commissioning <strong>the</strong> work, whichever is earlier<br />

in <strong>the</strong> opinion of <strong>the</strong> Executive Engineer, <strong>the</strong> said work is defective in any<br />

manner whatsoever, <strong>the</strong> contractor shall <strong>for</strong>thwith on receipt of notice in that<br />

behalf from <strong>the</strong> Executive Engineer, duly commence execution and<br />

completely carry out at his cost in every respect all <strong>the</strong> work that may be<br />

necessary <strong>for</strong> rectifying and setting right <strong>the</strong> defects specified <strong>the</strong>rein<br />

including dismantling and reconstruction of unsafe portion strictly in<br />

accordance with and in <strong>the</strong> manner prescribed and under <strong>the</strong> supervision of<br />

<strong>the</strong> Executive Engineer. In <strong>the</strong> event of <strong>the</strong> contractor failing or neglecting to<br />

commence execution of <strong>the</strong> said rectification work within <strong>the</strong> period<br />

prescribed <strong>the</strong>re<strong>for</strong> in <strong>the</strong> said notice, and/or to complete <strong>the</strong> same as a<strong>for</strong>esaid<br />

as required by <strong>the</strong> said notice, <strong>the</strong> Executive Engineer get <strong>the</strong> same executed<br />

and carried out <strong>department</strong>ally or by any o<strong>the</strong>r agency at <strong>the</strong> risk on account<br />

and at <strong>the</strong> cost of <strong>the</strong> contractor. The contractor shall <strong>for</strong>th with on demand<br />

pay to <strong>the</strong> <strong>Government</strong> <strong>the</strong> amount of such costs, charges and expenses<br />

sustained or incurred by <strong>the</strong> <strong>Government</strong> of which <strong>the</strong> certificate of <strong>the</strong><br />

Executive Engineer shall be final and binding on <strong>the</strong> contractor. Such cost,<br />

charges and expenses shall be deemed to be arrears of land revenue and in <strong>the</strong><br />

event of <strong>the</strong> contractor failing or neglecting to pay <strong>the</strong> same on demand as<br />

a<strong>for</strong>esaid without prejudice to any o<strong>the</strong>r rights and remedies of <strong>the</strong><br />

<strong>Government</strong>, <strong>the</strong> same may be recovered from <strong>the</strong> contractor as arrears of<br />

land revenue. The <strong>Government</strong> shall also be entitled to deduct <strong>the</strong> same from<br />

any amount which may <strong>the</strong>n be payable or which may <strong>the</strong>reafter become<br />

payable by <strong>the</strong> <strong>Government</strong> to <strong>the</strong> contractor ei<strong>the</strong>r in respect of <strong>the</strong> said work<br />

or any o<strong>the</strong>r work whatsoever, or from <strong>the</strong> amount of <strong>the</strong> security deposit<br />

retained by <strong>Government</strong>.<br />

Clause -21:‚ The contractor shall supply at his own cost all material (except<br />

such special materials, if any, as may in accordance with <strong>the</strong> contract, be supplied<br />

from <strong>the</strong> Public Works Dept’s. stores), plant, tools, appliances, implements,<br />

ladders, cordage, tackle, scaffolding and temporary <strong>works</strong> which may required <strong>for</strong><br />

<strong>the</strong> proper execution of <strong>the</strong> work, whe<strong>the</strong>r in <strong>the</strong> original, altered or substituted<br />

<strong>for</strong>m, and whe<strong>the</strong>r included in <strong>the</strong> specification or o<strong>the</strong>r documents <strong>for</strong>ming part<br />

of <strong>the</strong> contract or referred to in <strong>the</strong>se conditions or not and which may be<br />

necessary <strong>for</strong> <strong>the</strong> purpose of satisfying or complying with <strong>the</strong> requirements of <strong>the</strong><br />

Contractor No. of Corrections Executive Engineer


63<br />

And is liable<br />

<strong>for</strong> damage<br />

arising from<br />

non-provision<br />

of light,<br />

fencing etc.<br />

Engineer-in- charge as to any matter as to which under <strong>the</strong>se conditions he is<br />

entitled to be satisfied, or which he is entitled to require toge<strong>the</strong>r with <strong>the</strong> carriage<br />

<strong>the</strong>re<strong>for</strong> to and from <strong>the</strong> work. The contractor shall also supply without charge <strong>the</strong><br />

requisite number of persons with <strong>the</strong> means and materials necessary <strong>for</strong> <strong>the</strong><br />

purpose of setting out <strong>works</strong> and counting, weighing and assisting in <strong>the</strong><br />

measurement or examination at any time and from time to time of <strong>the</strong> work or<br />

<strong>the</strong> materials. Failing which <strong>the</strong> same may be provided by <strong>the</strong> Engineer-in-charge<br />

at <strong>the</strong> expense of <strong>the</strong> contractor and <strong>the</strong> expenses may be deducted from any<br />

money due to <strong>the</strong> contractor under <strong>the</strong> contract or from his security deposit or <strong>the</strong><br />

proceeds of sale <strong>the</strong>reof, or of a sufficient portion <strong>the</strong>reof.’<br />

The contractor shall provide all necessary fencing and lights required to<br />

protect <strong>the</strong> <strong>public</strong> from accident, and shall also be bound to bear <strong>the</strong> expenses<br />

of defence of every suit, action or o<strong>the</strong>r legal proceedings that may be brought<br />

by any person <strong>for</strong> injury sustained owing to neglect of <strong>the</strong> above precautions,<br />

and to pay any damages and costs which may be awarded in any such suit<br />

action or proceedings to any such person, or which may with consent of<br />

<strong>the</strong> contractor be paid <strong>for</strong> compromising any claim by any such person.<br />

Clause-21(A): The contractor shall provide suitable scaffolds and<br />

working plat<strong>for</strong>ms, gangways and stairways and shall comply with <strong>the</strong><br />

following regulations in connection <strong>the</strong>re with:<br />

(a) Suitable scaffolds shall be provided <strong>for</strong> workmen <strong>for</strong> all <strong>works</strong> that cannot<br />

be safely done from a ladder or by o<strong>the</strong>r means.<br />

(b) A scaffold shall not be constructed, taken down, or substantially<br />

altered except:-<br />

(i) Under <strong>the</strong> supervision of a competent and responsible person; and<br />

(ii) as far as possible by competent workers possessing adequate<br />

experience in this kind of work.<br />

(c) All scaffold and appliances connected <strong>the</strong>rewith and all ladders shall :-<br />

(i) be of sound material,<br />

(ii) be of adequate strength having regard to <strong>the</strong> loads and strains to which<br />

<strong>the</strong>y will be subjected and<br />

(iii) be maintained in proper condition.<br />

(d) Scaffolds shall be so constructed that no part <strong>the</strong>reof can be displaced in<br />

consequence of normal use.<br />

Contractor No. of Corrections Executive Engineer


64<br />

(e) Scaffolds shall not be over- loaded and so far as practicable <strong>the</strong> load shall<br />

be evenly distributed.<br />

(f) Be<strong>for</strong>e installing lifting gear on scaffolds special precautions shall be taken<br />

to ensure <strong>the</strong> strength and stability of <strong>the</strong> scaffolds.<br />

(g) Scaffolds shall be periodically inspected by a competent person.<br />

(h) Be<strong>for</strong>e allowing a scaffold to be used by his workmen <strong>the</strong> contractor<br />

shall , whe<strong>the</strong>r <strong>the</strong> scaffold has been erected by his workmen or not,<br />

take steps to ensure that it complies fully with <strong>the</strong> regulation here-inspecified.<br />

(i) Working plat<strong>for</strong>ms, gangways and stairways shall:- (i) be so<br />

constructed that no part <strong>the</strong>reof can sag unduly or unequally.<br />

(ii) be so constructed and maintained, having regard to <strong>the</strong> prevailing<br />

conditions as to reduce as far as practicable risks of persons tripping or<br />

slipping, and<br />

iii) be kept free from any unnecessary obstruction.<br />

(j) in <strong>the</strong> case of working plat<strong>for</strong>m, gangways, working places and stairways<br />

at a height exceeding 3.00 Metres (to be specified).<br />

(i) every working plat<strong>for</strong>m and every gangway shall be closely boarded<br />

unless o<strong>the</strong>r adequate measures are taken to ensure safety.<br />

(ii) Every working plat<strong>for</strong>m and gangway, shall have adequate width<br />

and<br />

(iii) every working plat<strong>for</strong>m, gangway, working place and stairway<br />

shall be suitably fenced.<br />

(k) Every opening in <strong>the</strong> floor of a building or in a working plat<strong>for</strong>m shall<br />

except <strong>for</strong> <strong>the</strong> time and to <strong>the</strong> extent required to allow <strong>the</strong> excess of persons or<br />

<strong>the</strong> transport or shifting of material be provided with suitable means to prevent<br />

<strong>the</strong> fall of persons or material.<br />

(l) When persons are employed on roof where <strong>the</strong>re is a danger of falling<br />

from a height exceeding 3.00 Mts. suitable precautions shall be taken to<br />

prevent <strong>the</strong> fall of persons or material.<br />

(m) Suitable precautions shall be taken to prevent persons being struck by<br />

articles which might fall from scaffolds or o<strong>the</strong>r working places.<br />

(n) Safe means of access shall be provided to all working plat<strong>for</strong>ms and<br />

o<strong>the</strong>r working places.<br />

Contractor No. of Corrections Executive Engineer


65<br />

Clause-21(B) : The contractor shall comply with <strong>the</strong> following regulations as<br />

regards <strong>the</strong> Hoisting Appliances to be used by him.:<br />

(a) Hoisting machines and tackle, including <strong>the</strong>ir attachments, anchorages<br />

and supports shall-<br />

(i) be of good mechanical construction, sound material and adequate strength<br />

and free from patent defect and<br />

(ii) be kept in good repair and in good working order.<br />

(b) Every rope used in hoisting or lowering materials or as a means of<br />

suspension shall be of suitable quality and adequate strength and free from<br />

patent defect.<br />

(c) Hoisting machines and tackle shall be examined and adequately tested<br />

after erection on <strong>the</strong> site and be<strong>for</strong>e use and be re-examined in position at<br />

intervals to be prescribed by <strong>the</strong> <strong>Government</strong>.<br />

(d) Every chain ring, hook shackle swivel and pulley block used in hoisting<br />

or lowering materials or as a means of suspension shall be periodically<br />

examined.<br />

(e) Every crane driver or hoisting appliance operator shall be properly<br />

qualified.<br />

(f) No person who is below <strong>the</strong> age of 21 years shall be in control of any<br />

hoisting machine, including any scaffolding which, or give signals to <strong>the</strong><br />

operator.<br />

(g) In <strong>the</strong> case of every hoisting machine and of every chain, ring, hook,<br />

shackle, swivel pulley block used in hoisting or lowering or as means<br />

of suspension , <strong>the</strong> safe working load shall be ascertained by adequate<br />

means.<br />

(h) Every hoisting machine and all gear referred to in <strong>the</strong> preceding<br />

regulation shall be plainly marked with <strong>the</strong> safe working load<br />

(i) In <strong>the</strong> case of a hoisting machine having a variable safe working load<br />

each safe working load and <strong>the</strong> conditions under which it is applicable<br />

shall be clearly indicated.<br />

(j) No part of any hoisting machine or of any gear referred to in regulation<br />

Contractor No. of Corrections Executive Engineer


66<br />

(h) above shall be loaded beyond <strong>the</strong> safe working load except <strong>for</strong> <strong>the</strong><br />

purpose of testing.<br />

(k) Motors, gearing transmissions, electric wiring and o<strong>the</strong>r dangerous<br />

part or hoisting appliances shall be provided with efficient<br />

safeguards.<br />

(l) Hoisting appliances shall be provided with such means as will reduce to<br />

a minimum <strong>the</strong> risk of <strong>the</strong> accidental descent of <strong>the</strong> load.<br />

Measure <strong>for</strong><br />

prevention of<br />

fire<br />

Liability of<br />

contractor <strong>for</strong><br />

any damage<br />

done in or<br />

outside work<br />

area<br />

(m) Adequate precautions shall be taken to reduce to a minimum <strong>the</strong> risk<br />

of any part of a suspended load becoming accidentally displaced.<br />

Clause-22:_ The contractor shall not set fire to any standing jungle, trees<br />

brushwood or grass without a written permit from <strong>the</strong> Executive Engineer.<br />

When such permit is given, and also in all cases when destroying cut or<br />

dug up trees brushwood, grass etc. by fire; <strong>the</strong> contractor shall take<br />

necessary measure to prevent such fire spreading to or o<strong>the</strong>rwise damaging<br />

surrounding property.<br />

The contractor shall make his own arrangements <strong>for</strong> drinking water <strong>for</strong><br />

<strong>the</strong> labour employed by him.<br />

Clause-23: Compensation <strong>for</strong> all damages done intentionally or<br />

unintentionally by contractor's labour whe<strong>the</strong>r in or beyond <strong>the</strong> limits of<br />

<strong>Government</strong> property including any damage caused by <strong>the</strong> spreading of fire<br />

mentioned in clause 22 shall be estimated by <strong>the</strong> Engineer-in-charge or such<br />

o<strong>the</strong>r officer as he may appoint and <strong>the</strong> estimates of <strong>the</strong> Engineer-in-charge<br />

subject to <strong>the</strong> decision of <strong>the</strong> Superintending Engineer on appeal shall be<br />

final and <strong>the</strong> contractor shall be bound to pay <strong>the</strong> amount of <strong>the</strong> assessed<br />

compensation on demand, failing which, <strong>the</strong> same will be recovered from<br />

<strong>the</strong> contractor as damages in <strong>the</strong> manner prescribed in clause 1 or deducted<br />

by <strong>the</strong> Engineer-in-charge from any sums that may be due or become<br />

due from <strong>Government</strong> to <strong>the</strong> contractor under this contract or o<strong>the</strong>rwise.<br />

The contractor shall bear <strong>the</strong> expenses of defending any action or o<strong>the</strong>r legal<br />

proceedings that may be brought by any persons <strong>for</strong> injury sustained by him<br />

owing to neglect of precautions to prevent <strong>the</strong> spread of fire and he shall pay<br />

any damages and cost that may be awarded by <strong>the</strong> court in consequence.<br />

Contractor No. of Corrections Executive Engineer


67<br />

Employment of<br />

female labour<br />

Work on<br />

Sunday.<br />

Work not to be<br />

sublet.<br />

Contract<br />

may be<br />

rescinded<br />

and<br />

security<br />

deposit<br />

<strong>for</strong>feited<br />

<strong>for</strong><br />

subletting<br />

it without<br />

approval or<br />

<strong>for</strong> bribing<br />

a <strong>public</strong><br />

officer or if<br />

contractor<br />

becomes<br />

insolvent.<br />

Sum payable by<br />

way of<br />

compensation to be<br />

considered as<br />

reasonable<br />

compensation<br />

without reference<br />

to actual loss.<br />

Change in<br />

<strong>the</strong><br />

constitution<br />

of firm to be<br />

notified.<br />

Clause 24:-The employment of female labours on <strong>works</strong> in<br />

neighbourhood of soldiers barracks should be avoided as far as possible<br />

Clause 25 :- No work shall be done on a Sunday without <strong>the</strong> sanction in<br />

writing of <strong>the</strong> Engineer-in-charge.<br />

Clause 26:- The contract shall not be assigned or sublet without <strong>the</strong> written<br />

approval of <strong>the</strong> Engineer-in-charge. And if <strong>the</strong> contractor shall assign or sublet<br />

his contract, or attempt so to do, or become insolvent or commence any<br />

proceeding to get himself adjudicated<br />

and insolvent or make any composition with his creditors or attempt so to do<br />

or if bribe, gratuity, gift, loan perquisite, reward or advantage pecuniary or<br />

o<strong>the</strong>rwise shall ei<strong>the</strong>r directly or indirectly be given, promised or offered by<br />

<strong>the</strong> contractor or any of his servants or agents to any <strong>public</strong> officer<br />

or person in <strong>the</strong> employ of <strong>Government</strong> in any way relating to his office or<br />

employment, or if any such officer or person shall become in any<br />

way directly or indirectly interested in <strong>the</strong> contract <strong>the</strong> Engineer-in-charge<br />

may <strong>the</strong>re upon by notice in writing rescind <strong>the</strong> contract. and <strong>the</strong> security<br />

deposit of contractor shall <strong>the</strong>reupon stand <strong>for</strong>feited and be absolutely at <strong>the</strong><br />

disposal of <strong>Government</strong> and <strong>the</strong> same consequences shall ensure as if <strong>the</strong><br />

contract had been rescinded under Clause -3 hereof and in addition <strong>the</strong><br />

contractor shall not be entitled to recover or be paid <strong>for</strong> any work <strong>the</strong>re<strong>for</strong><br />

actually per<strong>for</strong>med under <strong>the</strong> contract.<br />

Clause - 27: All sums payable by a contractor by way of compensation<br />

under any of this conditions shall be considered as a reasonable<br />

compensation to be applied to <strong>the</strong> use of <strong>Government</strong> without reference to<br />

<strong>the</strong> actual loss or damage sustained, and whe<strong>the</strong>r any damage has or has not<br />

been sustained.<br />

Clause-28:In <strong>the</strong> case of tender by partners, any change in <strong>the</strong><br />

constitution of a firm shall be <strong>for</strong>thwith notified by <strong>the</strong> contractor to <strong>the</strong><br />

Engineer-in-charge <strong>for</strong> his in<strong>for</strong>mation.<br />

Contractor No. of Corrections Executive Engineer


68<br />

Direction<br />

and<br />

control<br />

of <strong>the</strong><br />

Superint<br />

ending<br />

Engineer<br />

Direction<br />

and<br />

control<br />

of <strong>the</strong><br />

Superint<br />

ending<br />

Engineer<br />

Clause-29: All <strong>works</strong> to be executed under <strong>the</strong> contract shall be<br />

executed under <strong>the</strong> direction and subject to <strong>the</strong> approval in all respects of<br />

<strong>the</strong> Superintending Engineer of <strong>the</strong> circle, <strong>for</strong> <strong>the</strong> time being, who shall<br />

be entitled to direct at what point or points and in what manner <strong>the</strong>y are<br />

to be commenced , and from time to time carried on<br />

Clause-30 (1): Except where o<strong>the</strong>rwise specified in <strong>the</strong> contract and subject<br />

to <strong>the</strong> powers delegated to him by Govt. under <strong>the</strong> code, rules <strong>the</strong>n in <strong>for</strong>ce.<br />

The decision of <strong>the</strong> Superintending Engineer of <strong>the</strong> circle <strong>for</strong> <strong>the</strong> time being<br />

shall be final, conclusive, and binding on all parties to <strong>the</strong> contract upon all<br />

questions relating to <strong>the</strong> meaning of <strong>the</strong> specifications, designs, drawings, and<br />

instructions here in be<strong>for</strong>e mentioned and as to <strong>the</strong> quality of workmanship or<br />

materials used on <strong>the</strong> work, or as to any o<strong>the</strong>r question, claim, right, matter,<br />

or things whatsoever, if any way arising out of, or relating to <strong>the</strong> contract,<br />

designs, drawings, specifications, estimates, instructions, orders, or o<strong>the</strong>r<br />

conditions or o<strong>the</strong>rwise concerning <strong>the</strong> <strong>works</strong>, or <strong>the</strong> execution or failure to<br />

execute <strong>the</strong> same, whe<strong>the</strong>r arising during <strong>the</strong> progress of <strong>the</strong> work or after <strong>the</strong><br />

completion or abandonment <strong>the</strong>reof.<br />

Clause 30 (2) : The contractor may within 30 days of receipt by him of<br />

any order passed by <strong>the</strong> Superintending Engineer of <strong>the</strong> circle as a<strong>for</strong>esaid<br />

appeal against it to <strong>the</strong> Chief Engineer concerned with <strong>the</strong> contract, work or<br />

project provided that-<br />

(a) The accepted value of <strong>the</strong> contract exceeds Rs.10 Lakhs (Rs. Ten Lakhs)<br />

(b) Amount of claim is not less than Rs.1.00 lakh (Rupees one lakh)<br />

Clause 30 (3): If <strong>the</strong> contractor is not satisfied with <strong>the</strong> order passed by <strong>the</strong><br />

Chief Engineer as a<strong>for</strong>esaid <strong>the</strong> contractor may, within thirty days of receipt<br />

by him of any such order, appeal against it to <strong>the</strong> concerned Secretary, Public<br />

Works Department who if convinced that prima-facia <strong>the</strong> contractors claim<br />

rejected by Superintending Engineer/Chief Engineer is not frivolous and that<br />

<strong>the</strong>re is some substance in <strong>the</strong> claim of <strong>the</strong> contractor as would merit a detailed<br />

examination and decision by <strong>the</strong> Standing Committee, shall put up to <strong>the</strong> Standing<br />

Committee at <strong>Government</strong> level <strong>for</strong> suitable decisions.<br />

Contractor No. of Corrections Executive Engineer


69<br />

Stores of<br />

European<br />

or<br />

American<br />

manufact<br />

ure to be<br />

obtained<br />

from<br />

Governm<br />

ent.<br />

Lumpsums<br />

in<br />

estimate<br />

s.<br />

Action<br />

where<br />

no<br />

specifica<br />

tions.<br />

Clause-31: The contractor shall obtain from <strong>the</strong> Public Works Departmental<br />

stores, all stores and articles of European or American manufacture which may<br />

be required <strong>for</strong> <strong>the</strong> work, or any part <strong>the</strong>reof or in making up any articles<br />

required <strong>the</strong>re<strong>for</strong> or in connection <strong>the</strong>rewith unless he has obtained permission<br />

in writing from <strong>the</strong> Engineer-in-charge to obtain such stores and articles<br />

elsewhere. The value of such stores and articles as may be supplied to <strong>the</strong><br />

contractor by <strong>the</strong> Engineer-in- charge will be debited to <strong>the</strong> contractor in his<br />

account at <strong>the</strong> rates shown in <strong>the</strong> Schedule, in <strong>for</strong>m- A attached to <strong>the</strong> contract<br />

and if <strong>the</strong>y are not entered in <strong>the</strong> said schedule, <strong>the</strong>y shall be debited to him at<br />

cost price which <strong>for</strong> <strong>the</strong> purpose of this contract shall include <strong>the</strong> cost of<br />

carriage and o<strong>the</strong>r expenses whatsoever which shall have been incurred in<br />

obtaining delivery of <strong>the</strong> same at <strong>the</strong> stores a<strong>for</strong>esaid.<br />

Clause-32:‚When <strong>the</strong> estimate on which a tender is made includes lumpsums in<br />

respect of parts of <strong>the</strong> work <strong>the</strong> contractor shall be entitled to payment in<br />

respect of <strong>the</strong> items of work involved or <strong>the</strong> part of <strong>the</strong> work in question at <strong>the</strong><br />

same rates as are payable under this contract <strong>for</strong> each items, or if <strong>the</strong> part of<br />

<strong>the</strong> work in question is not in <strong>the</strong> opinion of <strong>the</strong> Engineer-in- charge capable of<br />

measurement, <strong>the</strong> Engineer-in-charge may at his discretion pay <strong>the</strong> lump sum<br />

amount entered in <strong>the</strong> estimate and <strong>the</strong> certificate in writing of <strong>the</strong> Engineer-incharge<br />

shall be final and conclusive against <strong>the</strong> contractor with regard to any<br />

sum or sums payable to him under <strong>the</strong> provisions of this clause.<br />

Clause - 33: - In <strong>the</strong> case of any class of work <strong>for</strong> which <strong>the</strong>re is no such<br />

specifications as is mentioned in rule 1 such work shall be carried out in<br />

accordance with <strong>the</strong> Divisional specifications, and in <strong>the</strong> event of <strong>the</strong>re being<br />

no Divisional specifications, <strong>the</strong>n in such case <strong>the</strong> work shall be carried out in<br />

all respects in accordance with <strong>the</strong> instructions and requirements of <strong>the</strong><br />

Engineer-in- charge.<br />

Definition of<br />

work.<br />

Clause -34:- The expression "<strong>works</strong>" or "work" where used in <strong>the</strong>se<br />

conditions, shall unless <strong>the</strong>re be something in <strong>the</strong> subject or context repugnant<br />

to such construction be construed to mean <strong>the</strong> work or <strong>works</strong> contracted to be<br />

executed under or in virtue of <strong>the</strong> contract, whe<strong>the</strong>r temporary or permanent<br />

and whe<strong>the</strong>r original, altered, substituted or additional.<br />

Contractor No. of Corrections Executive Engineer


70<br />

Contractor’s<br />

percentage<br />

whe<strong>the</strong>r applied to<br />

net or gross<br />

amount of bill<br />

Quarry fees and<br />

Royalties.<br />

Compensation<br />

under <strong>the</strong><br />

workmen's<br />

compensation act.<br />

Clause - 35 : The percentage referred to in <strong>the</strong> tender shall be deducted<br />

from/added to <strong>the</strong> gross amount of <strong>the</strong> bill be<strong>for</strong>e deducting <strong>the</strong> value of any<br />

stock issued.<br />

Clause-36: All quarry fees, royalties, octori dues and ground rent, <strong>for</strong><br />

stacking materials, if any, should be paid by <strong>the</strong> contractor.<br />

Clause - 37: The contractor shall be responsible <strong>for</strong> and shall pay<br />

compensation to his workmen payable under <strong>the</strong> Workman’s Compensation<br />

Act 1923 (VIII th of 1923) (hereinafter called <strong>the</strong> said act) <strong>for</strong> injuries caused<br />

to <strong>the</strong> workmen. If such compensation is payable/paid by <strong>the</strong> <strong>Government</strong> as<br />

principal under subsection (1) of section 12 of <strong>the</strong> said Act on behalf of <strong>the</strong><br />

contractor it shall be recoverable by <strong>Government</strong> from <strong>the</strong> contractor under<br />

subsection (2) of <strong>the</strong> said section. Such compensation shall be recovered in <strong>the</strong><br />

manner laid down in clause 1 above.<br />

Clause - 37 (A): The contractor shall be responsible <strong>for</strong> and shall pay <strong>the</strong><br />

expenses of providing medical aid to any workmen who may suffer a bodily<br />

injury as a result of an accident. If such expenses are incurred by <strong>Government</strong><br />

<strong>the</strong> same shall be recoverable from <strong>the</strong> contractor <strong>for</strong>thwith and be deducted<br />

without prejudice to any o<strong>the</strong>r remedy of <strong>Government</strong> from any amount due or<br />

that may become due to <strong>the</strong> contractor.<br />

Clause - 37 (B): The contractor shall provide all necessary personnel safety<br />

equipment and first aid apparatus available <strong>for</strong> <strong>the</strong> use of <strong>the</strong> persons employed<br />

on <strong>the</strong> site, and shall maintain <strong>the</strong> same in condition suitable <strong>for</strong> immediate use<br />

at any time and shall comply with <strong>the</strong> following regulations in connection<br />

<strong>the</strong>rewith:-<br />

(a) The workers shall be required to use <strong>the</strong> equipment so provided by <strong>the</strong><br />

contractor and <strong>the</strong> contractor shall take adequate steps to ensure proper<br />

use of <strong>the</strong> equipment by those concerned.<br />

(b) When work is carried on in proximity to any place where <strong>the</strong>re is a risk<br />

of drowning all necessary equipment shall be provided and kept ready<br />

<strong>for</strong> use and all necessary steps shall be taken <strong>for</strong> <strong>the</strong> prompt rescue of<br />

any person in danger.<br />

Contractor No. of Corrections Executive Engineer


71<br />

(c) Adequate provision shall be made <strong>for</strong> prompt first-aid treatment of all<br />

injuries likely to be sustained during <strong>the</strong> course of <strong>the</strong> work<br />

Clause - 37 (C) : The contractor shall duly comply with <strong>the</strong> provisions of<br />

"The Apprentices Act 1961 (III of 1961), <strong>the</strong> rules made <strong>the</strong>re under and <strong>the</strong><br />

orders that may be issued from time to time under <strong>the</strong> said Act and <strong>the</strong> said rules<br />

and on his failure or neglect to do so, he shall be subject to all <strong>the</strong> liabilities and<br />

penalties provided by <strong>the</strong> said act and said rules.<br />

Claim <strong>for</strong><br />

quantities<br />

entered in <strong>the</strong><br />

tender or<br />

estimate.<br />

Clause- 38: (1) Quantities in respect of <strong>the</strong> several items shown in<br />

<strong>the</strong> tender are approximate and no revision in <strong>the</strong> tendered rate shall be<br />

permitted in respect of any of <strong>the</strong> items so long as, subject to any special<br />

provision contained in <strong>the</strong> specifications prescribing a different<br />

percentage of permissible variation, <strong>the</strong> quantities of <strong>the</strong> items does not<br />

exceed <strong>the</strong> tender quantity by more than 25 % and so long as <strong>the</strong> value of<br />

<strong>the</strong> excess quantity beyond this limit, at <strong>the</strong> rate of <strong>the</strong> item specified in<br />

<strong>the</strong> tender, is not more than Rs. 5000/-<br />

(2) The contractor shall if ordered in writing by <strong>the</strong> Engineer, so to do<br />

also carry out any quantities in excess of <strong>the</strong> limit mentioned in subclause<br />

(1) hereof on <strong>the</strong> same conditions as and in accordance with<br />

specifications in <strong>the</strong> tender and at <strong>the</strong> rates (i) derived from <strong>the</strong> rates<br />

entered in <strong>the</strong> current schedule of rates and in <strong>the</strong> absence of such rates<br />

(ii) at <strong>the</strong> rate prevailing in <strong>the</strong> market <strong>the</strong> said rates being increased or<br />

decreased as <strong>the</strong> case may be, by <strong>the</strong> percentage which <strong>the</strong> total tendered<br />

amount bears to <strong>the</strong> estimated cost of <strong>the</strong> work as put to tender, based<br />

upon <strong>the</strong> schedule of rates applicable to <strong>the</strong> year in which <strong>the</strong> tenders<br />

were invited. (<strong>for</strong> <strong>the</strong> purposes of operation of this clause, this cost<br />

shall be taken, as arrived at as per DSR 2012-2013 <strong>for</strong> Nashik Dist.)<br />

Rs. 45,24,972/- (Rs. Fourty Five Lakhs Twenty Four Thousand<br />

Nine Hundred Seventy Two Only)<br />

Employ<br />

ment of<br />

(3) Claims arising out of reduction in <strong>the</strong> tendered quantity of any item<br />

beyond 25 % will be governed by <strong>the</strong> provisions of clause 15 only when<br />

<strong>the</strong> amount of such reduction beyond 25 % at <strong>the</strong> rate of <strong>the</strong> item specified<br />

in <strong>the</strong> tender is more than Rs. 5000/-.<br />

Clause - 39: The contractor shall employ any famine convict or o<strong>the</strong>r<br />

Contractor No. of Corrections Executive Engineer


72<br />

famine<br />

labour<br />

etc.<br />

Claim <strong>for</strong><br />

compensat<br />

ion <strong>for</strong><br />

delay in<br />

starting<br />

work.<br />

Claim <strong>for</strong><br />

compensatio<br />

n <strong>for</strong> delay<br />

in execution<br />

of work.<br />

Entering<br />

upon or<br />

commenc<br />

ing any<br />

portion<br />

of work.<br />

Minimum<br />

age of<br />

persons e<br />

mployed,<br />

<strong>the</strong><br />

employme<br />

nt of<br />

donkeys<br />

and/or<br />

o<strong>the</strong>r<br />

animals<br />

and <strong>the</strong><br />

payment of<br />

fair wages.<br />

labour of a particular kind or class, if ordered in writing to do so by <strong>the</strong><br />

Engineer-in-charge.<br />

Clause 40: No compensation shall be allowed <strong>for</strong> any delay caused in<br />

<strong>the</strong> starting of <strong>the</strong> work on account of acquisition of land or in <strong>the</strong> case of<br />

clearance <strong>works</strong> on account of any delay in according to sanction of<br />

estimates.<br />

Clause - 41: No compensation shall be allowed <strong>for</strong> any delay in <strong>the</strong><br />

execution of <strong>the</strong> work on account of water standing in borrow pits or<br />

compartments. The rates are inclusive of hard or cracked soil excavation in<br />

mud, subsoil water or water standing in borrow pits and no claim <strong>for</strong> an extra<br />

rate shall be entertained, unless o<strong>the</strong>rwise expressly specified.<br />

Clause - 42: The contractor shall not enter upon or commence<br />

any portion of work except with <strong>the</strong> written authority and instruction of <strong>the</strong><br />

Engineer-in-charge or of his subordinate in charge of <strong>the</strong> work. Failing<br />

such authority <strong>the</strong> contractor shall have no claim to ask <strong>for</strong> measurements<br />

of or payments <strong>for</strong> work.<br />

Clause - 43 : (i) No contractor shall employ any person who is<br />

and <strong>the</strong> payment person who is under <strong>the</strong> age of 18 years.<br />

(ii) No contractor shall employ donkeys or o<strong>the</strong>r animals with breaching<br />

of string or thin rope. The breaching must be at least 7.50 cms. wide and<br />

should be of tape (Newar)<br />

(iii) No animal suffering from sores; lameness or emaciation or which is<br />

immature shall be employed on <strong>the</strong> work.<br />

(iv) The Engineer-in-charge or his agent is authorised to remove from <strong>the</strong><br />

work any person or animal found working which does not satisfy <strong>the</strong>se<br />

conditions and no responsibility shall be accepted by <strong>Government</strong> <strong>for</strong><br />

any delay caused in <strong>the</strong> completion of <strong>the</strong> work by such removal.<br />

(v) The contractor shall pay fair and reasonable wages to <strong>the</strong> workmen<br />

employed by him in <strong>the</strong> contract undertaken by him. In <strong>the</strong> event of any<br />

dispute arising between <strong>the</strong> contractor and his workmen on <strong>the</strong> grounds<br />

that <strong>the</strong> wages paid are not fair and reasonable, <strong>the</strong> dispute shall be<br />

referred without delay to <strong>the</strong> Executive Engineer who shall decide <strong>the</strong><br />

same. The decision of <strong>the</strong> Executive Engineer, shall be conclusive and<br />

Contractor No. of Corrections Executive Engineer


73<br />

binding on <strong>the</strong> contractor but such decision shall not in any way affect<br />

<strong>the</strong> conditions in <strong>the</strong> contract regarding <strong>the</strong> payment to be made by<br />

<strong>Government</strong> at <strong>the</strong> sanctioned tender rates.<br />

(vi) Contractor shall provide drinking water facilities to <strong>the</strong> workers. Similar<br />

amenities shall be provided to <strong>the</strong> workers engaged on large work in<br />

urban areas.<br />

(vii) Contractor to take precaution against accidents which take place on<br />

account of labour using loose garments while working near machinery.<br />

Method<br />

of<br />

payment<br />

Acceptance of<br />

conditions<br />

compulsory<br />

be<strong>for</strong>e tendering<br />

<strong>for</strong> work.<br />

Employme<br />

nt of<br />

scarcity<br />

labour.<br />

Clause 44: Payment to Contractor shall be made by cheque drawn on any<br />

treasury within <strong>the</strong> division convenient to <strong>the</strong>m, provided <strong>the</strong> amount<br />

exceeds Rs.10. Amount not exceeding Rs.10 will be paid in cash.<br />

Clause - 45 : Any contractor who does not accept <strong>the</strong>se conditions<br />

shall not be allowed to tender <strong>for</strong> <strong>works</strong><br />

Clause 46 : If <strong>Government</strong> declares a state of scarcity or famine to<br />

exist in any village situated within 16 kms. of <strong>the</strong> work, <strong>the</strong> Contractor<br />

shall employ upon such parts of <strong>the</strong> work, as are suitable <strong>for</strong> unskilled<br />

labour, any person certified to him by <strong>the</strong> Executive Engineer, or by any<br />

person to whom <strong>the</strong> Executive Engineer may have delegated this duty in<br />

writing to be in need of relief and shall be bound to pay to such persons<br />

wages not below <strong>the</strong> minimum which <strong>Government</strong> may have fixed in this<br />

behalf. Any disputes which may arise in connection with <strong>the</strong><br />

implementation of this clause shall be decided by <strong>the</strong> Executive Engineer<br />

whose decision shall be final and binding on <strong>the</strong> contractor.<br />

Clause - 47 :‚ The price quoted by <strong>the</strong> contractor shall not in any case<br />

exceed <strong>the</strong> control price, if any, fixed by <strong>Government</strong> or reasonable<br />

price which it is permissible <strong>for</strong> him to charge a private purchaser <strong>for</strong> <strong>the</strong><br />

same class and description <strong>the</strong> controlled price or <strong>the</strong> price permissible<br />

under Hoarding and Profiteering Ordinance, 1943 as amended from time to<br />

time. If <strong>the</strong> price quoted exceeds <strong>the</strong> controlled price or <strong>the</strong> price<br />

permissible under Hoarding and Profiteering Prevention Ordinance, <strong>the</strong><br />

contractor will specifically mention this fact in his tender alongwith <strong>the</strong><br />

Contractor No. of Corrections Executive Engineer


74<br />

reasons <strong>for</strong> quoting such higher prices.<br />

The purchaser at his discretion will in such case exercise <strong>the</strong> right of<br />

revising <strong>the</strong> price at any stage so as to con<strong>for</strong>m with <strong>the</strong> controlled price on<br />

<strong>the</strong> permissible under <strong>the</strong> Hoarding and Profiteering Prevention Ordinance.<br />

This discretion will be exercised without prejudice to any o<strong>the</strong>r action that<br />

may be taken against <strong>the</strong> contractor.<br />

Clause - 47 (A): - "The tendered rates are inclusive of all taxes, rates,<br />

cesses and are also be inclusive of <strong>the</strong> leviable tax in respect of sale by<br />

transfer of property in goods involved in <strong>the</strong> execution of a Works Contract<br />

under <strong>the</strong> provision of rule 58 of <strong>the</strong> Maharashtra Value Added Tax Act<br />

2005 <strong>for</strong> <strong>the</strong> purpose of levy of tax<br />

Clause - 48: The rates to be quoted by <strong>the</strong> contractor must be inclusive of<br />

sales tax. No extra payment on this account will be made to <strong>the</strong> contractor.<br />

Clause - 49:In case of materials that may remain surplus with <strong>the</strong><br />

contractor from those issued <strong>for</strong> <strong>the</strong> work contracted <strong>for</strong> <strong>the</strong> date of<br />

ascertainment of <strong>the</strong> materials being surplus will be taken as <strong>the</strong> date of sale<br />

<strong>for</strong> <strong>the</strong> purpose of sales tax and <strong>the</strong> sale tax will be recovered on such sale.<br />

Clause - 49 (A):Contractor should note that recovery at penal rate of<br />

twice <strong>the</strong> issue rates will be effected if <strong>the</strong> contractor does not return<br />

surplus material. Sale tax and General tax will be recovered from <strong>the</strong>m.<br />

Clause - 50 : The contractor shall employ unskilled labour to be<br />

employed by him on <strong>the</strong> said work only from locally available labours and<br />

shall give preference to those persons enrolled under Maharashtra<br />

<strong>Government</strong> and Self Employment Department’s Scheme.<br />

Provided, however, that if <strong>the</strong> required unskilled labour are not available<br />

locally, <strong>the</strong> contractor shall in <strong>the</strong> first instance employ such number of persons<br />

as is available and <strong>the</strong>reafter may with previous permission in writing of <strong>the</strong><br />

Executive Engineer-in-charge of <strong>the</strong> said work, obtain <strong>the</strong> rest of his<br />

requirement of unskilled labour from out side <strong>the</strong> above scheme.<br />

Clause - 51 : Wages to be paid to <strong>the</strong> skilled and unskilled labours engaged by<br />

<strong>the</strong> contractor. The contractor shall pay <strong>the</strong> labours skilled and unskilled<br />

Contractor No. of Corrections Executive Engineer


75<br />

according to <strong>the</strong> wages prescribed by <strong>the</strong> Minimum Wages Act 1948<br />

applicable to <strong>the</strong> area in which <strong>the</strong> work of <strong>the</strong> contractor is located.<br />

Clause - 52 : All amounts whatsoever which <strong>the</strong> contractor is liable to<br />

pay to <strong>the</strong> <strong>Government</strong> in connection with <strong>the</strong> execution of <strong>the</strong> work<br />

including <strong>the</strong> amount payable in respect of (i) materials and / or stores<br />

supplied / issued hereunder by <strong>the</strong> <strong>Government</strong> to <strong>the</strong> Contractor (ii) hire<br />

charges in respect of heavy plant, machinery and equipment given on hire<br />

by <strong>the</strong> <strong>Government</strong> to <strong>the</strong> contractor <strong>for</strong> execution by him of <strong>the</strong> work and/or<br />

on which <strong>the</strong> advances have been given by <strong>the</strong> <strong>Government</strong> to <strong>the</strong><br />

contractor shall be deemed to be Arrears of Land Revenue and <strong>the</strong><br />

<strong>Government</strong> may without prejudice to any o<strong>the</strong>r rights and remedies of <strong>the</strong><br />

<strong>Government</strong> recover <strong>the</strong> same from <strong>the</strong> contractor as arrears of land<br />

revenue.<br />

Clause - 53 : The contractor shall duly comply with all <strong>the</strong> provisions of<br />

<strong>the</strong> Contract Labour (Regulation and Abolition) Act 1970, (37 of 1970)<br />

and <strong>the</strong> Maharashtra Contract Labour (Regulation and Abolition ) Rules,<br />

1971 as amended from time to time and all o<strong>the</strong>r relevant statutes and<br />

statutory<br />

provision concerning payment of wages particularly to workmen employed<br />

by <strong>the</strong> contractor and working on <strong>the</strong> site of <strong>the</strong> work. In particular <strong>the</strong><br />

contractor shall pay wages to each worker employed by him on <strong>the</strong> site of<br />

<strong>the</strong> work at <strong>the</strong> rates prescribed under <strong>the</strong> Maharashtra Contract Labour<br />

(Regulation And Abolition) Rules 1971. If <strong>the</strong> contractor fails or neglects to<br />

pay wages at <strong>the</strong> said rates or makes short payment and <strong>the</strong> <strong>Government</strong><br />

makes such payment of wages in full or part <strong>the</strong>reof less paid by <strong>the</strong><br />

contractor, as <strong>the</strong> case may be, <strong>the</strong> amount so paid by <strong>the</strong> <strong>Government</strong> to<br />

such <strong>works</strong> shall be deemed to be an arrears of land revenue and <strong>Government</strong><br />

shall be entitled or deduct <strong>the</strong> same from <strong>the</strong> amount payable by <strong>the</strong> Govt. to<br />

<strong>the</strong> contractor here under or from any o<strong>the</strong>r amounts payable to him by <strong>the</strong><br />

<strong>Government</strong>.<br />

Clause - 54: The Contractor shall engage apprentices such as bricks<br />

layers, carpenters, wiremen, plumber as well as black-smith as<br />

Contractor No. of Corrections Executive Engineer


76<br />

recommended by <strong>the</strong> State Apprenticeship Advisor, Director of<br />

Technical Education, Dhobi Talao, Mumbai-1 on <strong>the</strong> construction work.<br />

Clause - 55: (A) The antimalaria and o<strong>the</strong>r health measures shall be as<br />

directed by <strong>the</strong> Joint Director (Malaria and Filaria) of Health Services, Pune.<br />

(B.) Contractor shall see that mosquitogenic conditions are not created so<br />

as to keep vector populations to <strong>the</strong> minimum level.<br />

(C.) Contractor shall carry out anti- malaria measures in <strong>the</strong> area as per<br />

guidelines prescribed under National Malaria Eradication Programme<br />

and as directed by <strong>the</strong> Joint Director (M & F) of Health Services, Pune.<br />

(D.) In case of default in carrying out prescribed antimalaria measure<br />

resulting increasing in malaria incidence contractor shall be liable to<br />

pay to <strong>Government</strong> <strong>the</strong> amount pent by <strong>Government</strong> on antimalaria<br />

measures to control <strong>the</strong> situation in addition to fine.<br />

(E.) RELATION WITH PUBLIC AUTHORITIES:<br />

The contractor shall make sufficient arrangement <strong>for</strong> draining away <strong>the</strong><br />

sullage water as well as water coming from <strong>the</strong> bathing and washing places<br />

and shall dispose off this water in such a way as not to cause any nuisance.<br />

He shall also keep <strong>the</strong> premises clean by employing sufficient number of<br />

sweepers. The contractor shall comply with all rules regulation, byelaws and<br />

direction given time to time by any local or <strong>public</strong> authority in connection<br />

with this work and shall pay fees or charges which are leviable on him<br />

without any extra cost to <strong>Government</strong>.<br />

Clause 57 - The Contractor shall comply with all <strong>the</strong> provisions of <strong>the</strong><br />

Apprentices Act. 1961 and rules and orders issued <strong>the</strong>re under <strong>for</strong>m time to<br />

time. If he fails to do so, his failure will be a breach of <strong>the</strong> from time to<br />

time. If <strong>the</strong> fails to do so, his failure will be a breach of <strong>the</strong> contract and <strong>the</strong><br />

Superintending Engineer may, in his discretion, canal <strong>the</strong> Contract. The<br />

contractor shall also be liable <strong>for</strong> an pecuniary liability The contractor<br />

shall also be liable <strong>for</strong> an pecuniary liability arising on account of any<br />

violation by him of <strong>the</strong> provision of <strong>the</strong> Act( vide <strong>Government</strong> Circular No<br />

CST- 1086/CR 243 Ka-Building-2/ Mantralaya Bimbay-400032, dated 11<br />

Contractor No. of Corrections Executive Engineer


77<br />

Sept.1987)<br />

(EÆòjÉÉnùÉ®úÉxÉä<br />

ÉɺÉEòÒªÉ Ê´É¨ÉÉ<br />

|ÉÊiÉÊxÉvÉÒ{ÉÉÉÒ<br />

EÆòjÉÉ]õ EòɨÉÉSÉÉ<br />

ʴɨÉÉ =iÉ®ú´ÉÉ´ÉÉ<br />

¨½þhÉÚxÉ<br />

Eò®úÉ®úxÉɨªÉÉiÉ<br />

ºÉ¨ÉÉʴɹ]õ<br />

Eò®úɴɪÉÉSªÉÉ +]õÒ)<br />

Clause 58 - EÆòjÉÉ]õnùÉ®úÉ´É®ú ºÉÉä{ÉʴɱÉ䱪ÉÉ EÆòjÉÉ]õ EòɨÉÉSÉÉ Ê´É¨ÉÉ EÆòjÉÉ]õnùÉ®úÉÆxÉÒ Ê´É¨ÉÉ<br />

ºÉÆSÉɱÉxÉɱɪÉ,¨É½þÉ®úɹ]Åõ ®úÉVªÉ MÉÞ½þ ÊxɨÉÉÇhÉ ¦É´ÉxÉ, 264,{Éʽþ±ÉÉ ¨ÉVɱÉÉ Eò±ÉÉxÉMÉ®ú ºÉ¨ÉÉä®úh ¤ÉÉÆpùÉ<br />

{ÉÚ´ÉÇ ¨ÉÆÖ¤É


78<br />


79<br />

(5) Bitumen Component - 60/70 – Rs. 48004.00/- Per M.T.<br />

80/100 – Rs. 46974.00/- Per M.T.<br />

(6) HYSD & Mild. Steel Component Actual<br />

(7) Cement Component Rs. per M.T.<br />

(8) IS NP2 Class of 600 mm. dia pipe Rs. per Rmt.<br />

Note :- If Cement, HYSD & Mild. Steel, Bitumen, C.I. and D.I. Pipes are supplied on<br />

Schedule “A” <strong>the</strong>n respective component shall not be considered. Also if particular<br />

component is not relevant same shall be deleted.<br />

1) FORMULA FOR LABOUR COMPONENT :<br />

V 1 = 0.85 P [ K 1 x L 1 - L 0 ]<br />

[100 L 0 ]<br />

Where,<br />

V 1 = Amount of price variation in Rupees to be allowed <strong>for</strong> Labour component.<br />

P =<br />

K 1 =<br />

L 0 =<br />

L 1 =<br />

Cost of work done during <strong>the</strong> quarter under consideration minus <strong>the</strong> cost of Cement,<br />

HYSD & Mild. Steel, Bitumen, C.I. and D.I. Pipes calculated at <strong>the</strong> basic star rates as<br />

applicable <strong>for</strong> <strong>the</strong> tender, consumed during <strong>the</strong> quarter under consideration.<br />

Kind of material Star Rate including all taxes<br />

1) Asphalt 60/70 Rs. 48004.00 Per M.T.<br />

2) Asphalt 80/100 Rs. 46974.00 Per M.T.<br />

Percentage of Labour Component as indicated above.<br />

Basic Consumer Price Index <strong>for</strong> Mumbai center shall be average consumer price index<br />

<strong>for</strong> <strong>the</strong> quarter preceding <strong>the</strong> month in which <strong>the</strong> last date prescribed <strong>for</strong> receipt of<br />

tender falls.<br />

Average Consumer Price Index <strong>for</strong> Mumbai center <strong>for</strong> <strong>the</strong> quarter under<br />

consideration.<br />

2) FORMULA FOR MATERIALS COMPONENT<br />

V 2 = 0.85 P [ K 2 x M 1 - M 0 ]<br />

[100 M 0 ]<br />

Where,<br />

V 2 = Amount of price variation in Rupees to be allowed <strong>for</strong> Materials component.<br />

P = Same as worked out <strong>for</strong> Labour component.<br />

K 2 = Percentage of Materials Component as indicated above.<br />

M 0 = Basic wholesale Price Index shall be average wholesale price index <strong>for</strong> <strong>the</strong> quarter<br />

Contractor No. of Corrections Executive Engineer


M 1 =<br />

preceding <strong>the</strong> month in which <strong>the</strong> last date prescribed <strong>for</strong> receipt of tender falls.<br />

Average wholesale Price Index during <strong>the</strong> quarter under consideration.<br />

3) FORMULA FOR PETROL, OIL AND LUBRICANT COMPONENT :-<br />

Where,<br />

V 3 =<br />

P =<br />

K 3 =<br />

P 0 =<br />

P 1 =<br />

V 3 = 0.85 P [ K 3 x P 1 - P 0 ]<br />

[100 P 0 ]<br />

Amount of price variation in Rupees to be allowed <strong>for</strong> POL component.<br />

Same as worked out <strong>for</strong> Labour component.<br />

Percentage of Petrol, Oil & Lubricant Component.<br />

Average price of HSD at Mumbai during <strong>the</strong> quarter preceding <strong>the</strong> month in which <strong>the</strong><br />

last date prescribed <strong>for</strong> receipt of tender falls.<br />

Average price of HSD at Mumbai during <strong>the</strong> quarter under consideration.<br />

4) FORMULA FOR BITUMEN COMPONENT :-<br />

Where,<br />

V 4<br />

V 4 = QB ( B 1 – B 0 )<br />

= Amount of price variation in Rupees to be allowed <strong>for</strong> Bitumen component<br />

QB = Quantity of Bitumen (Grade 30/40 & Grade 60/70) in metric tonnes used in <strong>the</strong><br />

B 1<br />

B 0<br />

permanent <strong>works</strong> and approved enabling <strong>works</strong> during <strong>the</strong> quarter under consideration<br />

= Current, average ex-refinery price per metric tonne of Bitumen (Grade 30/40 & Grade<br />

60/70) under consideration including taxes (octroi, excise, sales tax) during <strong>the</strong> quarter<br />

under consideration.<br />

= Basic rate of Bitumen in rupees per metric ton as considered <strong>for</strong> working out value of<br />

P. or average ex-refinery price in rupees per metric ton including taxes (octroi, excise<br />

sales tax) of Bitumen <strong>for</strong> <strong>the</strong> grade of bitumen under consideration prevailing quarter<br />

preceding <strong>the</strong> month in which <strong>the</strong> last date prescribe <strong>for</strong> receipt of tender; falls,<br />

whichever is higher.<br />

5) FORMULA FOR HYSD AND MILD STEEL COMPONENT :-<br />

V 5 = S0 (SI 1 - SI 0 )<br />

---------------- x T<br />

SI 0<br />

Where,<br />

V 5<br />

= Amount of price variation in Rupees to be allowed <strong>for</strong> H.Y.S.D. Steel component.<br />

S0 = Basic rate of H.Y.S.D. Steel in rupees per metric tonne as considered <strong>for</strong> working out<br />

value of P<br />

80<br />

Contractor No. of Corrections Executive Engineer


SI 1<br />

SI 0<br />

T<br />

= Average Steel Index as per RBI Bulletin during <strong>the</strong> quarter under consideration.<br />

= Average of Steel Index as per RBI Bulletin <strong>for</strong> <strong>the</strong> quarter preceding <strong>the</strong> month in<br />

which <strong>the</strong> last date prescribed <strong>for</strong> receipt of tender falls.<br />

= Tonnage of steel used in <strong>the</strong> permanent <strong>works</strong> <strong>for</strong> <strong>the</strong> quarter under consideration.<br />

6) FORMULA FOR CEMENT COMPONENT :-<br />

V 6 = C 0 (CI 1 - CI 0 )<br />

---------------- x T<br />

Cl 0<br />

81<br />

Where,<br />

V 6<br />

= Amount of price escalation in Rupees to be allowed <strong>for</strong> Cement component.<br />

C 0 = Basic rate of cement in rupees per metric tonne as considered <strong>for</strong> working out value of<br />

P.<br />

CI 1 = Average of cement Index published in <strong>the</strong> RBI Bulletin <strong>for</strong> <strong>the</strong> quarter under<br />

consideration.<br />

CI 0 = Average of cement Index published in <strong>the</strong> RBI Bulletin <strong>for</strong> <strong>the</strong> quarter preceding <strong>the</strong><br />

month in which to <strong>the</strong> last date prescribed <strong>for</strong> receipt of tender falls.<br />

T = Tonnage of cement used in <strong>the</strong> permanent <strong>works</strong> <strong>for</strong> <strong>the</strong> quarter under consideration.<br />

7) FORMULA FOR C.I./ D.I. PIPE COMPONENT :-<br />

V 7 = Q d (D 1 - D 0 )<br />

Where,<br />

V 7<br />

= Amount of price escalation in rupees to be allowed <strong>for</strong> C.I./D.I. pipe component.<br />

D 0 = Pig Iron basic price in rupees per tonne considered <strong>for</strong> working out value of P<br />

D 1 = Average Pig Iron price in rupees per tonne during <strong>the</strong> quarter under consideration<br />

(published by IISCO)<br />

Q d = Tonnage of C.I./D.I. pipes used in <strong>the</strong> <strong>works</strong> during <strong>the</strong> quarter under consideration.<br />

The following conditions shall prevail :<br />

i) The operative period of <strong>the</strong> Contract shall mean <strong>the</strong> period commencing from <strong>the</strong> date of<br />

work order issued to <strong>the</strong> Contractor and ending on <strong>the</strong> date on which <strong>the</strong> time allowed <strong>for</strong><br />

<strong>the</strong> completion of <strong>the</strong> <strong>works</strong> specified in <strong>the</strong> Contract <strong>for</strong> work expires, taking into<br />

consideration <strong>the</strong> extension of time, if any, <strong>for</strong> completion of <strong>the</strong> work granted by <strong>the</strong><br />

Engineer under <strong>the</strong> relevant clause of <strong>the</strong> Conditions of Contract in cases o<strong>the</strong>r than<br />

those where such extension is necessitated on account of default of <strong>the</strong> Contractor. The<br />

decision of <strong>the</strong> Engineer as regards <strong>the</strong> operative period of <strong>the</strong> Contract shall be final and<br />

binding on <strong>the</strong> Contractor. Where any compensation <strong>for</strong> liquidated damages is levied on<br />

Contractor No. of Corrections Executive Engineer


82<br />

<strong>the</strong> Contractor on account of delay in completion or inadequate progress under <strong>the</strong><br />

relevant Contract provisions, <strong>the</strong> price adjustment amount <strong>for</strong> <strong>the</strong> balance of work from<br />

<strong>the</strong> date of levy of such compensation shall be worked out by pegging <strong>the</strong> indices, L 1 , M 1 ,<br />

C 1 , P 1 , B 1 , S1 1 and C1 1 to <strong>the</strong> levels corresponding to <strong>the</strong> date from which such<br />

compensation is levied.<br />

ii) This price variation clause shall be applicable to all contracts in B1/B2 & C from but shall<br />

not apply to piece <strong>works</strong>. The price variation shall be determined during each quarter as<br />

per <strong>for</strong>mula given above in this clause.<br />

iii) The price variation under this Clause shall not be payable <strong>for</strong> <strong>the</strong> extra items required to<br />

be executed during <strong>the</strong> completion of <strong>the</strong> work and also on <strong>the</strong> excess quantities of items<br />

payable under <strong>the</strong> provisions of Clause 38/37 of <strong>the</strong> contract from B1/B2 respectively.<br />

Since <strong>the</strong> rates payable <strong>for</strong> extra items or <strong>the</strong> extra quantities under Clause 38/37 are to be<br />

fixed as per current DSR or as mutually agreed to yearly revision till completion of such<br />

work. In o<strong>the</strong>r words, when <strong>the</strong> completion/ execution of extra items as well as extra<br />

quantities under Clause 38/37 of <strong>the</strong> contract from B1/B2 extends beyond <strong>the</strong> operative<br />

date of <strong>the</strong> DSR <strong>the</strong>n rates payable <strong>for</strong> <strong>the</strong> same beyond <strong>the</strong> date shall be revised with<br />

reference to <strong>the</strong> current DSR prevalent at that time on year to year basis or revised in<br />

accordance with mutual agreement <strong>the</strong>reon, as provided <strong>for</strong> in <strong>the</strong> Contract, whichever is<br />

less.<br />

iv) This clause is operative both ways, i.e. if <strong>the</strong> price variation as calculated above is on <strong>the</strong><br />

plus side, payment on account of <strong>the</strong> price variation shall be allowed to <strong>the</strong> contractor and<br />

if it is on <strong>the</strong> negative side, <strong>the</strong> <strong>Government</strong> shall be entitled to recover <strong>the</strong> same from <strong>the</strong><br />

Contractor and <strong>the</strong> amount shall be deductible from any amounts due and payable under<br />

<strong>the</strong> contract.<br />

v) To <strong>the</strong> extent that full compensation <strong>for</strong> any rise or fall in costs to <strong>the</strong> Contractor is not<br />

entirely covered by <strong>the</strong> provision of this or o<strong>the</strong>r clauses in <strong>the</strong> contract, <strong>the</strong> unit rate and<br />

prices included in <strong>the</strong> contract shall be deemed to include amounts to cover <strong>the</strong><br />

contingency of such o<strong>the</strong>r actual rise or fall in costs.<br />

Contractor No. of Corrections Executive Engineer


83<br />

ADDITIONAL CONDITION<br />

1. The Tenderer who quotes more than 15% below <strong>the</strong> estimated rates must submit an<br />

Additional Security Deposit equal to <strong>the</strong> amount below so quoted by him below 15% in <strong>the</strong> <strong>for</strong>m of<br />

demand draft/FDR/TDR from any scheduled Bank having branches in Maharashtra in favour of <strong>the</strong><br />

Executive Engineer, concern as specified in Tender Data <strong>for</strong> a period of one year/ <strong>for</strong> <strong>the</strong> stipulated<br />

period of completion whichever is more at <strong>the</strong> time of payment of Initial Security Deposit. Failing<br />

which, <strong>the</strong> work order will not be issued to <strong>the</strong> Tender and all his deposits <strong>for</strong> this work will be<br />

<strong>for</strong>feited to <strong>the</strong> absolute disposal of <strong>Government</strong>.<br />

ADDITIONAL CONDITION<br />

In case of Executive Engineer desires to discontinue <strong>the</strong> Execution of work <strong>for</strong> any reason<br />

<strong>the</strong>re to or if contractor has shown poor per<strong>for</strong>mance <strong>for</strong> execution of work or fails to start <strong>the</strong> work<br />

within fifteen days from <strong>the</strong> date of work order, Executive Engineer shall be entitled to withdraw <strong>the</strong><br />

work in full or part / parts from contractor at his risk and cost after giving <strong>the</strong> contractor three days<br />

notice in writing. The contractor will have to claim <strong>for</strong> compensation <strong>for</strong> any loss sustained by him<br />

owing to such action, moreover <strong>the</strong> Executive Engineer shall be entitled to recovered <strong>the</strong> excess cost<br />

involved from <strong>the</strong> contractor wherever <strong>the</strong> work is to be executed at <strong>the</strong> risk and cost of <strong>the</strong> contractor<br />

after giving notice of Three days.<br />

Contractor No. of Corrections Executive Engineer


¯ÖÏן֖ÖÖ¯Ö¡Ö / Æü´Öß ¯Ö¡Ö<br />

[Affidavit on stamp paper of Rs 100/- registered be<strong>for</strong>e <strong>the</strong> notary or Executive Magistrate]<br />

84<br />

´Öß / †Ö´Æüß ÖÖ»Öᯙ ÃÖÆüß ú¸üÖÖ¸ü ¯ÖÏן֖ÖÖ¯Ö¡Ö ×»ÖÆãü−Ö ¤êüŸÖê úß<br />

µÖÖ úÖ´ÖÖÃÖÖšüß †Ö´Ö“µÖÖ Ã¾ÖŸÖ:“µÖÖ ´ÖÖ»Öúß“ÖÖ/ ³ÖÖ›üÖ“ÖÖ<br />

Drum Mix plant / Batch Mix plant ÃÖªÛã֟ÖßŸÖ µÖÖ ×šüúÖÖß †ÖÆêü. /*<br />

ÃÖ¤ü¸ü“ÖÖ ¯»ÖÑü †¿ÖÖ †ÓŸÖ¸üÖ¾Ö¸ü ¾Ö ãÖôûÖ¾Ö¸ü †ÖÆêü úß, úÖ´ÖÖ“µÖÖ •ÖÖÖê¾Ö¸ü µÖêÖÖ¸êü ˆÂÖ ×´ÖÁÖßŸÖ ´ÖÖ»ÖÖ“Öê<br />

¯ÖÃÖ¸ü×¾ÖµÖÖÃÖÖšüß ¾Ö †ÓŸÖß´Ö ¤ü²ÖÖ‡Ô ÃÖÖšüß ŸÖÖ¯Ö´ÖÖ−Ö MORT & H New Delhi 2001 “µÖÖ ´ÖÖ−ÖúÖ¯ÖÏ´ÖÖÖê ¾Ö<br />

¿ÖÖÃÖ−Ö ¯Ö׸ü¯Ö¡ÖúÖŸÖ −Ö´Öã¤ü êú»Ö껵ÖÖ ´ÖÖ−ÖúÖ ¯ÖÏ´ÖÖÖê ¸üÖÆüß»Ö.<br />

[Optional]<br />

/*ÃÖ¤ü¸ü“Öê †ÓŸÖ¸ü ´ÖÖ−ÖúÖ¯ÖÏ´ÖÖÖê ˆÂÖ×´ÖÁÖßŸÖ ´ÖÖ»ÖÖ“Öê ŸÖÖ¯Ö´ÖÖ−Ö ¸üÖÖµÖÖ“µÖÖ ¥üÂüß−Öê †×¬Öú †ÃÖ»µÖÖ−Öê<br />

ÃÖ¤ü¸ü úÖ´ÖÖÃÖÖšüß †Ö´Ö“Öß ±ú´ÖÔ / Óú¯Ö−Öß ¯ÖÖ¡Ö šü¸ü»µÖÖÃÖ ÃÖ¤ü¸ü“ÖÖ ¯»ÖÑü †Ö´Æüß úÖ´ÖÖ“µÖÖ •Ö¾Öôû¯ÖÖÃÖ“µÖÖ ×šüúÖÖß<br />

þ֟Ö:“µÖÖ Ö“ÖÖÔ−Öê ŸÖÖŸúÖôû ãֻÖÖÓŸÖ¸üßŸÖ ú¹ý−Ö ¤êü‰ú †ÃÖê Æü´Öß ¯Ö¡Ö ×»ÖÆãü−Ö ¤êüŸÖ †ÖÆüÖêŸÖ. ÃÖ¤ü¸ü Æü´Öß ¯ÖÖêüß ¹ý 2.00<br />

»ÖÖ (¹ý¯ÖµÖê ¤üÖê−Ö »ÖÖ) ´ÖÖ¡Ö ‹¾ÖœüÖ ¸üŒú´Öê“ÖÖ ¬Ö−ÖÖúÂÖÔ (Demand Draft) úÖµÖÔúÖ¸üß †×³ÖµÖÓŸÖÖ ÃÖÖ. ²ÖÖÓ.<br />

×¾Ö³ÖÖÖ −ÖÖ׿Öú µÖÖÓ“Öê −ÖÖ¾Öê Æü´Öß ¸üŒú´Ö ´ÆüÖã−Ö •ÖÖê›ü»ÖÖ †ÖÆêü. ÃÖ¤ü¸ü úÖ´ÖÖÃÖ †Ö´Æüß ¯ÖÖ¡Ö šü¸ü»µÖÖÃÖ ¾Ö úÖ´ÖÖ“Öê<br />

†Ö¤êü¿Ö (Work order) ¯ÖÏÖ¯ŸÖ —ÖÖ»µÖÖÃÖ ŸµÖÖ ŸÖÖ¸üÖê¯ÖÖÃÖã−Ö 15 פü¾ÖÃÖÖÓ“Öê †ÖŸÖ ÆüÖòü×´ÖŒÃÖ ¯»ÖÑü ãֻÖÖÓŸÖ¸üßŸÖ ú¹ý−Ö<br />

¤êü‰ú ŸÖÃÖê −Ö êú»µÖÖÃÖ ÃÖ¤ü¸ü“Öß ¸üŒú´Ö ¿ÖÖÃÖ−ÖÖú›êü •Ö´ÖÖ ú¸üµÖÖŸÖ µÖê‡Ô»Ö µÖÖ“Öß †Ö´ÆüÖÃÖ •ÖÖÖß¾Ö †ÖÆêü. ŸµÖÖ¯ÖÖêüß Æêü<br />

Æü´Öß¯Ö¡Ö Ã¾ÖÖã¿Öß−Öê ×»ÖÆãü−Ö ¤êüŸÖ †ÖÆêÖŸÖ.<br />

פü−ÖÖÓú-<br />

×»ÖÆãü−Ö ¤êüÖÖ¸ü<br />

ךüúÖÖ (----------)<br />

ÃÖÖÖߤüÖ¸ü<br />

1)<br />

2)<br />

ÃÖ´ÖÖ<br />

−ÖÖêü¸üß / úÖµÖÔúÖ¸üß ¤Óü›üÖ׬ÖúÖ¸üß<br />

Contractor No. of Corrections Executive Engineer


¯Ö›üŸÖÖôûÖß ¯Ö¡Ö<br />

85<br />

ÁÖß. / ´Öê µÖÖÓ−Öß ÃÖÖê²ÖŸÖ“µÖÖ<br />

Affidavit ´Ö¬µÖê −Ö´Öã¤ü êú»Ö껵ÖÖ ²ÖÖ²Öà“Öß ¯ÖÏŸµÖÖ ¯Ö›üŸÖÖôûÖß / ÖÖ¡Öß êú»Öß †ÖÆêü ¾Ö −Ö´Öã¤ü<br />

êú»Öê»Öß ´ÖÖ×ÆüŸÖß ²Ö¸üÖê²Ö¸ü †Öœüôû»Öß. ÃÖ²Ö²Ö ÃÖ¤ü¸ü“Öê Æü´Öß ¯Ö¡Ö ÖÏÖÊ ¬Ö¸üµÖÖÃÖ Æü¸üúŸÖ −ÖÖÆüß<br />

פü−ÖÖÓú-<br />

ÃÖÓ²ÖÓ¬ÖßŸÖ ˆ¯Ö†×³ÖµÖÓŸÖÖ / úÖµÖÔúÖ¸üß †×³ÖµÖÓŸÖÖ<br />

Contractor No. of Corrections Executive Engineer


SCHEDULE A<br />

Name of work: - Constructing Karanji to Tarukhedale Road ODR-182 Km. 0/00 to<br />

3/00, Tal. Niphad, Dist. Nashik<br />

86<br />

Schedule showing (approximately) <strong>the</strong> materials to be supplied from P. W.<br />

Department Store <strong>for</strong> Work contracted to be executed and Preliminary and ancillary<br />

Works and <strong>the</strong> rates at which <strong>the</strong>y are to charge <strong>for</strong>.<br />

Sr.<br />

No.<br />

Particulars<br />

Quantity<br />

Rate in<br />

Figures Words<br />

Place of<br />

Delivery<br />

NOTE: - The person or firm submitting <strong>the</strong> tender should see that <strong>the</strong> rates in<br />

<strong>the</strong> above schedule are filled by <strong>the</strong> Executive Engineer-in-charge on <strong>the</strong> issue of<br />

<strong>the</strong> <strong>for</strong>m prior to <strong>the</strong> submission of <strong>the</strong> tender.<br />

Contractor No. of Corrections Executive Engineer


87<br />

ADDITIONAL CONDITIONS FOR MATERIALS<br />

(CEMENT, HYSD/T.M.T. /MILD STEEL BARS, HIGH TENSILE STEEL BARS, BULK ASPHALT<br />

ETC.)<br />

BROUGHT BY CONTRACTOR.<br />

1) All <strong>the</strong> materials such as cement, T.M.T. / H.Y.S.D. steel bars, Granite, Marble, Tiles and<br />

Electrical item etc. required <strong>for</strong> execution of work shall be brought by <strong>the</strong> contractor at his own<br />

cost.<br />

2) The contractor shall maintain <strong>the</strong> record of <strong>the</strong>se materials (cement, steel, granite, marble, tiles<br />

etc.) in <strong>the</strong> prescribed pro<strong>for</strong>ma and registers as directed by Engineer-in-charge. The sample of<br />

prescribed pro<strong>for</strong>ma is attached at <strong>the</strong> end (Page No. to ). These registers shall be signed<br />

by both, <strong>the</strong> contractors and representative of <strong>the</strong> Engineer-in-charge. These registers shall be<br />

made available <strong>for</strong> inspection, verification <strong>for</strong> <strong>the</strong> Department as and when required. These<br />

registers shall be in <strong>the</strong> custody of Department, and shall be maintained by <strong>the</strong> Department.<br />

The Contractor shall submit periodically as well as on completion of work, an<br />

account of all materials used by him on <strong>the</strong> work. In addition, a separate register shall<br />

be maintained on site <strong>for</strong> recording daily item wise asphalt, cement consumption<br />

and also item wise consumption of o<strong>the</strong>r materials. This shall be signed daily<br />

by Contractor or his representative and representative of Engineer-in-charge.<br />

3) The material required only <strong>for</strong> this work shall be kept in <strong>the</strong> godown at site. No material shall be<br />

shifted outside of <strong>the</strong> godown site except <strong>for</strong> <strong>the</strong> work <strong>for</strong> which this agreement is entered,<br />

without prior approval of <strong>the</strong> Engineer-in-charge.<br />

4) The materials i.e. cement, steel, Granite, Marble, Tiles and Electrical Item etc. brought on <strong>the</strong><br />

work site shall be accompanied with necessary Company / Manufacturing firm’s test<br />

certificates. In addition <strong>the</strong>se materials shall be tested as per frequency prescribed by <strong>the</strong><br />

<strong>department</strong> and <strong>the</strong> cost of such testing shall be borne by <strong>the</strong> contractor. If <strong>the</strong> test results are<br />

satisfactory, <strong>the</strong>n and <strong>the</strong>n only <strong>the</strong> material shall be allowed to be used on <strong>the</strong> work. If<br />

<strong>the</strong> test results are not as per standards prescribed, <strong>the</strong>se materials shall be immediately<br />

removed from <strong>the</strong> work site at contractor’s cost. In case of cement, if so requested by <strong>the</strong><br />

contractor in writing, material shall be allowed to be used be<strong>for</strong>e receipt of test results but this<br />

will be entirely at <strong>the</strong> risk and cost of <strong>the</strong> contractor.<br />

5) The contractor shall produce sufficient documentary evidence i.e. bill <strong>for</strong> <strong>the</strong> purchase, Octroi<br />

receipts etc., bill <strong>for</strong> <strong>the</strong> purchase of materials brought on <strong>the</strong> work site at once if so requested<br />

by <strong>the</strong> Department.<br />

6) All <strong>the</strong>se materials i.e. cement, steel, etc. shall be protected from any damages, rains etc. by<br />

<strong>the</strong> contractor at his own cost.<br />

7) The Contractor will have to erect temporary shed of approved specifications <strong>for</strong> storing of<br />

above materials at work site at contractor’s cost having double locking arrangements (By<br />

double lock it is meant that godown shall always be locked by two locks, one lock being owned<br />

and operated by Contractor and o<strong>the</strong>r by Engineer-in-charge or his authorised representative )<br />

and <strong>the</strong> door shall be openable only after both locks are opened.<br />

8) If required, <strong>the</strong> weighment of cement bags, steel etc. brought by <strong>the</strong> contractor shall be carried<br />

out by <strong>the</strong> contractor at his own cost.<br />

9) The contractor shall not use cement and o<strong>the</strong>r material <strong>for</strong> <strong>the</strong> item to be executed outside <strong>the</strong><br />

scope of this contract except <strong>for</strong> such ancillary small items as are connected and absolutely<br />

necessary <strong>for</strong> this work as may be decided by <strong>the</strong> Engineer-in-charge.<br />

Contractor No. of Corrections Executive Engineer


88<br />

10) The <strong>Government</strong> shall not be responsible <strong>for</strong> <strong>the</strong> loss in cement, steel, granite, marble, tiles<br />

and electrical item during transit to work site.<br />

The cement brought by <strong>the</strong> contractor at <strong>the</strong> work site store shall mean 50 Kg.,<br />

equivalent to 0.0347 cubic metre per bag by weight. The rate quoted should correspond to this<br />

method of reckoning. In case of ordinary/controlled concrete, if cement is found short, <strong>the</strong><br />

shortage / shortages will be made good by <strong>the</strong> contractor at his cost.<br />

11) INDEMNITY<br />

The condition regarding indemnity as defined on Page No. at Sr.No. will apply mutatis<br />

mutandis in case of materials brought by contractor at <strong>the</strong> site <strong>for</strong> <strong>the</strong> execution of <strong>the</strong> work<br />

being executed under this contract.<br />

12) In case <strong>the</strong> materials brought by <strong>the</strong> contractor become surplus owing to <strong>the</strong> change in <strong>the</strong><br />

design of <strong>the</strong> work, <strong>the</strong> materials should be taken back by <strong>the</strong> contractor at his own cost after<br />

prior permission of Engineer-in-charge.<br />

13) All empty bags or empty asphalt drums shall be <strong>the</strong> property of contractor and <strong>the</strong> same shall<br />

be removed immediately after completion of work.<br />

Contractor No. of Corrections Executive Engineer


89<br />

ADDITIONAL GENERAL CONDITIONS<br />

1. COMPETANCY OF TENDER: The work will be awarded only to those contractors who are<br />

considered to be substantially responsive bidders, capable of per<strong>for</strong>ming <strong>the</strong> class of work to<br />

be completed. Be<strong>for</strong>e passing <strong>the</strong> final award any or all bidders may have to show that <strong>the</strong>y<br />

have <strong>the</strong> necessary experience, facilities, ability and financial resources to execute <strong>the</strong> work in<br />

satisfactory manner and also within <strong>the</strong> stipulated time.<br />

2. PAYMENTS:The tenderers must understand clearly that <strong>the</strong> rates quoted are <strong>for</strong> completed<br />

work and include all costs due to labour, all leads and lifts involved and if fur<strong>the</strong>r necessitated,<br />

scaffolding plant, supervision, service <strong>works</strong>, power, royalties, octroi taxes etc. and to include<br />

all to cover <strong>the</strong> cost of lighting on night work if any and round <strong>the</strong> clock work as and when<br />

required and no claim <strong>for</strong> additional payment beyond <strong>the</strong> prices or rates quoted will be<br />

entertained and <strong>the</strong> tenderers shall not be entitled subsequently to make any claim on <strong>the</strong><br />

ground of any representation or on any promise by any person (whe<strong>the</strong>r member in <strong>the</strong><br />

employment of any Public Works Department or not ) or on <strong>the</strong> ground of any failure on his part<br />

to obtain all necessary in<strong>for</strong>mation <strong>for</strong> <strong>the</strong> purpose of making his tender and fixing <strong>the</strong> several<br />

prices and rates <strong>the</strong>rein relieve him from any risks or liabilities arising out of <strong>the</strong> tender.<br />

3. ERASER:Persons tendering are in<strong>for</strong>med that no erasers of any alterations by <strong>the</strong>m in <strong>the</strong> text<br />

of <strong>the</strong> documents set herewith will be allowed and any such eraser or an alteration will be<br />

disregarded. If <strong>the</strong>re is any error in writing, no overwriting should be done but <strong>the</strong> wrong words<br />

or figures should be struck out and <strong>the</strong> correct one written above or near it in an unambiguous<br />

way. Such correction should be initialled and dated.<br />

4. ACCEPTANCE:Intimation of acceptance of tender will be given by a telegram or a letter sent<br />

by Registered Post to <strong>the</strong> address given below <strong>the</strong> signature of <strong>the</strong> tenderer in <strong>the</strong> tenders.<br />

The tenders which do not fulfil any of <strong>the</strong> above conditions or those in <strong>the</strong> <strong>for</strong>m and which are<br />

incomplete in any respect shall be liable <strong>for</strong> rejection.<br />

5. PRECAUTIONS TO BE TAKEN BY THE CONTRACTOR TO PREVENT ACCIDENT:<br />

i) No live electric lines should be allowed to run along <strong>the</strong> ground in <strong>the</strong> blasting zone and <strong>the</strong>y<br />

should be at least about 10 ft. above ground if not more.<br />

ii)<br />

iii)<br />

iv)<br />

The wiring cable should not be taken near <strong>the</strong> live electric line and it should be preferably shot<br />

firing cable as supplied by <strong>the</strong> supplier of explosives. If such a cable is not available a<br />

substitute cable recommended by <strong>the</strong> explosive suppliers should only be used. Under no<br />

circumstances should cable made up of several pieces jointed and tapped be used.<br />

The blasting shed from where <strong>the</strong> exploder is to finally operated should be at least 150 metre<br />

away from <strong>the</strong> area to be blasted. It should have a strong roof which can with stand <strong>the</strong> impact<br />

of flying stones at this range.<br />

Only trained hands should be allowed to handle explosives, cable detonators etc.<br />

CONTRACTOR TO INFORM HIMSELF FULLY: The contractors shall be deemed to have<br />

carefully examined <strong>the</strong> work and site conditions including labour, <strong>the</strong> general and special<br />

conditions, <strong>the</strong> specifications, schedules and drawings and shall be deemed to have visited <strong>the</strong><br />

site of <strong>the</strong> work and to have fully in<strong>for</strong>med himself regarding <strong>the</strong> local conditions and carried out<br />

his own investigations to arrive at <strong>the</strong> rates quoted in <strong>the</strong> tender. In this regard, he will be given<br />

necessary in<strong>for</strong>mation to <strong>the</strong> best of <strong>the</strong> knowledge of Department but without any guarantee<br />

about it.<br />

Contractor No. of Corrections Executive Engineer


90<br />

If he shall have any doubt as to <strong>the</strong> meaning of any portion of <strong>the</strong>se general<br />

conditions or <strong>the</strong> special condition, to <strong>the</strong> scope of working of <strong>the</strong> specifications and drawings<br />

or any o<strong>the</strong>r matter concerning <strong>the</strong> contract, he shall in good time, be<strong>for</strong>e submitting his tender,<br />

set <strong>for</strong>th <strong>the</strong> particulars <strong>the</strong>reof and submit <strong>the</strong>m to <strong>the</strong> Engineer in writing in order that such<br />

doubts may be clarified authoritatively be<strong>for</strong>e tendering. Once a tender is submitted, <strong>the</strong> matter<br />

will be decided in accordance with tender conditions in <strong>the</strong> absence of such au<strong>the</strong>ntic preclarification.<br />

6.2 ERROR, OMISSIONS AND DISCREPANCIES:<br />

(A)<br />

(I)<br />

(II)<br />

(III)<br />

(B)<br />

In case of errors, omissions and /or disagreement between written and scaled dimensions in<br />

<strong>the</strong> drawing or between <strong>the</strong> drawings and specifications etc., The following order of preference<br />

shall apply.<br />

Between actual scaled and written dimensions or descriptions on a drawing, <strong>the</strong> latter shall be<br />

adopted.<br />

Between <strong>the</strong> written or shown description of dimensions in <strong>the</strong> drawing and corresponding one<br />

in <strong>the</strong> specifications, <strong>the</strong> latter shall apply.<br />

Between <strong>the</strong> quantities shown in schedule of quantities and those arrived at from <strong>the</strong> drawings,<br />

<strong>the</strong> latter shall be preferred.<br />

In all cases of omission and / or doubts of discrepancies in <strong>the</strong> dimensions or description of any<br />

item or specifications, a reference shall be made to <strong>the</strong> Engineer, whose elucidation,<br />

elaboration or decision shall be considered as au<strong>the</strong>ntic. The contractor shall be held<br />

responsible <strong>for</strong> any errors that may occur in <strong>the</strong> work through lack of such reference and<br />

precaution.<br />

6.3 WORKING METHODS AND PROGRESS SCHEDULES:<br />

(a)<br />

The Contractor shall submit within <strong>the</strong> time stipulated by <strong>the</strong> Engineer-in-charge in writing <strong>the</strong><br />

details of actual methods that would be adopted by <strong>the</strong> Contractor <strong>for</strong> <strong>the</strong> execution of any item<br />

as required by Engineer at each of <strong>the</strong> location, supported by necessary detailed drawing and<br />

sketches including those of <strong>the</strong> plant and machinery that would be used, <strong>the</strong>ir locations,<br />

arrangement <strong>for</strong> conveying and handling materials etc. and obtain prior approval of <strong>the</strong><br />

Engineer-in-charge well in advance of starting of such item of work. The Engineer-in-charge<br />

reserves <strong>the</strong> right to suggest modifications or make corrections in <strong>the</strong> method proposed by <strong>the</strong><br />

contractor, whe<strong>the</strong>r accepted previously or not, at any stage of <strong>the</strong> work to obtain <strong>the</strong> desired<br />

accuracy, quality and progress which shall be binding on <strong>the</strong> contractor. No claim on account of<br />

such change in method of execution will be entertained by <strong>Government</strong> so long as<br />

specifications of <strong>the</strong> item remain unaltered. The full responsibility <strong>for</strong> <strong>the</strong> safety and adequacy<br />

of <strong>the</strong> methods adopted by <strong>the</strong> contractor shall however, rest on <strong>the</strong> contractor, irrespective of<br />

any approved given by <strong>the</strong> Engineer.<br />

In case of slippage from <strong>the</strong> approved work programme at any stage, <strong>the</strong> contractor<br />

shall furnish revised programme to make up <strong>the</strong> slippage within <strong>the</strong> stipulated time schedule<br />

and obtain <strong>the</strong> approved of <strong>the</strong> Engineer to <strong>the</strong> revised programme.<br />

PROGRESS SCHEDULE<br />

(b) The Contractor shall furnish within <strong>the</strong> period stipulated in writing by <strong>the</strong> Engineer-in-charge of<br />

<strong>the</strong> order to start <strong>the</strong> work, progress schedule using PERT/CPM technique in quadruplicate<br />

indicating <strong>the</strong> date of actual start, <strong>the</strong> monthly progress expected to be achieved and<br />

anticipated completion date of each major item of work to be done by him, also indicating and<br />

setting up materials, plants and machinery. The schedule is to be such as is practicable of<br />

achievement towards <strong>the</strong> completion of <strong>the</strong> whole work in <strong>the</strong> time limit and of <strong>the</strong> particular<br />

items, if any on <strong>the</strong> due date specified in <strong>the</strong> contract and shall have <strong>the</strong> approval of <strong>the</strong><br />

Engineer-in-charge. No revised schedule shall be operative without such acceptance in writing.<br />

Contractor No. of Corrections Executive Engineer


The Engineer is fur<strong>the</strong>r empowered to ask <strong>for</strong> more detailed schedule or schedules in weekly<br />

<strong>for</strong>m, <strong>for</strong> any item or items, in any case of urgency of work as will be directed by him and <strong>the</strong><br />

contractor shall supply <strong>the</strong> same as and when asked <strong>for</strong>.<br />

91<br />

(c)<br />

The Contractor shall employ sufficient plant, equipment and labour as may be necessary to<br />

maintain <strong>the</strong> progress schedule. The working and shift hours restricted to one shift a day <strong>for</strong><br />

operations to be done under <strong>the</strong> <strong>Government</strong> supervision shall be such as may be approved by<br />

<strong>the</strong> Engineer-in-charge. They shall not be varied without <strong>the</strong> prior approval of <strong>the</strong> Engineer.<br />

Night work requiring supervision shall not be permitted expect when specifically allowed by<br />

Engineer on each item, if requested by Contractor. The Contractor shall provide necessary<br />

lighting arrangements etc. <strong>for</strong> night work as directed by <strong>the</strong> Engineer without extra cost to<br />

<strong>Government</strong>.<br />

Fur<strong>the</strong>r, <strong>the</strong> contractor shall submit <strong>the</strong> progress of work in prescribed <strong>for</strong>ms and<br />

charts etc. at periodical intervals, as may be specified by <strong>the</strong> Engineer-in-charge. Schedule<br />

shall be in <strong>the</strong> <strong>for</strong>m of progress charts, <strong>for</strong>ms, progress statement and/or reports as may be<br />

approved by <strong>the</strong> Engineer. The contractor shall maintain Per<strong>for</strong>ma, charts, details regarding<br />

machinery, equipment, labour, materials, personnel etc. as may be specified by <strong>the</strong> Engineer<br />

and submit periodical returns <strong>the</strong>reof as may be specified by <strong>the</strong> Engineer-in-charge.<br />

(d)<br />

CONSTRUCTION EQUIPMENT AND LOCATION:<br />

The Contractor shall be required to give a trial run of <strong>the</strong> equipment’s <strong>for</strong> establishing, <strong>the</strong>ir<br />

capability to achieve <strong>the</strong> laid down specifications and tolerance to <strong>the</strong> satisfaction of <strong>the</strong><br />

Engineer be<strong>for</strong>e commencement of <strong>the</strong> work. All equipment provided shall be of proven<br />

efficiency and shall be operated and maintained at all times, in a manner acceptable to <strong>the</strong><br />

Engineer and no equipment or personnel will be removed from site without permission of <strong>the</strong><br />

Engineer.<br />

6.4 TREASURE TROVE: In <strong>the</strong> event of discovery by <strong>the</strong> Contractor or his employees, during <strong>the</strong><br />

progress of <strong>the</strong> <strong>works</strong> of any treasure, fossils, minerals or any o<strong>the</strong>r articles or value of<br />

interest, <strong>the</strong> Contractor shall give immediate intimation <strong>the</strong>reof to <strong>the</strong> Engineer such treasure of<br />

things which shall be <strong>the</strong> property of <strong>the</strong> <strong>Government</strong>.<br />

6.5 QUARRIES:<br />

6.5.1 The Contractor (s) shall have to arrange himself / <strong>the</strong>mselves to procure <strong>the</strong> quarry.<br />

However necessary assistance without any extra cost to <strong>Government</strong> will be<br />

rendered by <strong>the</strong> Department <strong>for</strong> procuring <strong>the</strong> quarries if required by <strong>the</strong> Contractor.<br />

6.5.2 The quarrying operation shall be carried out by <strong>the</strong> Contractor with proper equipment such as<br />

compressor, jack-hammers, drill bits, explosives etc. and sufficient numbers of workmen shall<br />

be employed so as to get <strong>the</strong> required out-turn.<br />

6.5.3 The Contractor shall carry out <strong>the</strong> <strong>works</strong> in <strong>the</strong> quarries in con<strong>for</strong>mity with all <strong>the</strong> rules<br />

and regulations already laid down or that may be laid down from time to time by <strong>the</strong><br />

<strong>Government</strong>. Any cost incurred by <strong>the</strong> <strong>Government</strong> due to noncompliance of any<br />

rules or regulations or due to damages by <strong>the</strong> Contractor shall be <strong>the</strong> responsibility of<br />

<strong>the</strong> Contractor. The Engineer-in-charge or his representative shall be given full<br />

facility by <strong>the</strong> Contractor <strong>for</strong> inspection at all times of <strong>the</strong> working of <strong>the</strong> quarry,<br />

records maintained, <strong>the</strong> stocks of <strong>the</strong> explosives and detonators etc. So as to enable<br />

him to check that <strong>the</strong> working records and storage are all in accordance with <strong>the</strong><br />

relevant rules. The Engineer-in-charge or his representative shall at any times be<br />

allowed to inspect <strong>the</strong> work, building and equipment at <strong>the</strong> quarters.<br />

6.5.4 The Contractor shall maintain at his own cost <strong>the</strong> books, registers etc. required to be<br />

maintained under <strong>the</strong> relevant rules and regulations and as directed by <strong>the</strong> Engineer-incharge.<br />

These books shall be open <strong>for</strong> inspection at all times by <strong>the</strong> Engineer-in-charge or his<br />

Contractor No. of Corrections Executive Engineer


epresentative and <strong>the</strong> Contractor shall furnish <strong>the</strong> copies or extract of books or registers as<br />

and when required.<br />

6.5.5 All quarrying operations shall be carried out by <strong>the</strong> Contractor in organized and expeditious<br />

manner, systematically and with proper planning. The Contractor shall engage licensed<br />

blasters and adopt electric blasting and / or any o<strong>the</strong>r approved method which would ensure<br />

complete safety to all <strong>the</strong> men engaged in <strong>the</strong> quarry and its surroundings. The Contractor<br />

shall himself provide suitable magazines and arrange to procure and store explosives etc. as<br />

required under <strong>the</strong> rules at his own cost.<br />

The designs and <strong>the</strong> location of <strong>the</strong> magazine shall be got approved in advance from <strong>the</strong> Chief<br />

Inspector of Explosives and <strong>the</strong> Rules and Regulations in this connection as laid down by <strong>the</strong><br />

Chief Inspector of Explosives from time to time shall be strictly adhered to by <strong>the</strong> Contractor. It<br />

is generally experienced that it takes time to obtain <strong>the</strong> necessary license <strong>for</strong> blasting and<br />

license <strong>for</strong> storage of materials from <strong>the</strong> concerned authorities. The Contractor must<br />

<strong>the</strong>re<strong>for</strong>e, take timely advance action <strong>for</strong> procuring all such licenses so that <strong>the</strong> work progress<br />

may not be hampered.<br />

6.5.6 The approaches to <strong>the</strong> quarrying place from <strong>the</strong> existing <strong>public</strong> roads shall have to be<br />

arranged by <strong>the</strong> Contractor at his own cost and <strong>the</strong> approaches shall be maintained by <strong>the</strong><br />

Contractor at his own cost till <strong>the</strong> work is over.<br />

6.5.7 The Quarrying operations shall be carried out by <strong>the</strong> Contractor to <strong>the</strong> entire satisfaction of <strong>the</strong><br />

Engineer-in-charge and <strong>the</strong> development of <strong>the</strong> quarry shall be made efficiently so as to avoid<br />

wastage of stones. Only such stones as are of <strong>the</strong> required quality shall be used on <strong>the</strong> work.<br />

Any stone which is in <strong>the</strong> opinion of <strong>the</strong> Engineer-in-charge, not in accordance with <strong>the</strong><br />

specifications or of required quality will be rejected at any time, at <strong>the</strong> quarry or at <strong>the</strong> site of<br />

work. The rejected stones shall not be used on <strong>the</strong> work and such rejected materials shall be<br />

removed to <strong>the</strong> place shown at <strong>the</strong> Contractor's cost.<br />

6.5.8 Since all stones quarried from <strong>Government</strong> quarry (if made available) by <strong>the</strong> Contractor<br />

including <strong>the</strong> excavated over burden are <strong>the</strong> property of <strong>the</strong> <strong>Government</strong>, no stones or earth<br />

shall be supplied by Contractor to any o<strong>the</strong>r agencies or <strong>works</strong> and are not allowed to be<br />

taken away <strong>for</strong> any o<strong>the</strong>r <strong>works</strong>. All such surplus quarried materials not required <strong>for</strong> work<br />

under this contract shall be <strong>the</strong> property of <strong>the</strong> <strong>Government</strong> and shall be handed over by <strong>the</strong><br />

Contractor to <strong>the</strong> <strong>Government</strong> free of cost at <strong>the</strong> quarry site duly heaped at <strong>the</strong> spots indicated<br />

by <strong>the</strong> Engineer-in-charge.<br />

6.5.9 Quarrying permission will have to be directly obtained by <strong>the</strong> Contractor, from <strong>the</strong> Collector of<br />

<strong>the</strong> District concerned <strong>for</strong> which purpose <strong>the</strong> Department will render necessary assistance. All<br />

quarry fees, royalty charges, Octroi duties, ground rent <strong>for</strong> staking material etc. if any to be<br />

paid, shall be paid directly by <strong>the</strong> contractor as per prevailing rules in <strong>for</strong>ce.<br />

6.5.10 The Contractor will be permitted to erect structures such as stores, office, huts <strong>for</strong><br />

<strong>the</strong> labours at his own risk and cost at <strong>the</strong> quarry site, if suitable vacant space in<br />

<strong>Government</strong> area is available <strong>for</strong> <strong>the</strong> purpose at places approved by <strong>the</strong> Engineer-incharge.<br />

On completion of <strong>the</strong> work <strong>the</strong> Contractor shall remove all <strong>the</strong> structures<br />

erected by him and restore <strong>the</strong> site to its original condition.<br />

6.5.11 The Contractor shall not use any land in <strong>the</strong> quarry <strong>for</strong> cultivation or <strong>for</strong> any o<strong>the</strong>r<br />

purpose except, that required <strong>for</strong> breaking or stacking or transporting stones.<br />

6.6 COLLECTION OF MATERIALS:-<br />

92<br />

(I)<br />

where suitable and approved P.W. Department's quarries exist <strong>the</strong> Contractor or piece<br />

worker will be allowed if o<strong>the</strong>rwise <strong>the</strong>re is no objection to obtain <strong>the</strong> materials to <strong>the</strong><br />

extent required <strong>for</strong> <strong>the</strong> work from <strong>the</strong> quarry. He will be, however, liable to pay<br />

compensation, if any damage caused to <strong>the</strong> quarry ei<strong>the</strong>r deliberately or through<br />

negligence or <strong>for</strong> wastage of materials by himself or his staff or labour. The Contractor<br />

Contractor No. of Corrections Executive Engineer


93<br />

(II)<br />

(III)<br />

shall pay necessary royalty in advance and claim refund according to rules, if<br />

admissible and shall submit detailed accounts of materials quarried as directed.<br />

Where no suitable P.W. Department's quarries exist or when <strong>the</strong> quantity of <strong>the</strong><br />

material required cannot be obtained from a P.W. Department quarry, <strong>the</strong> Contractor<br />

or piece worker shall make his own arrangements to obtain <strong>the</strong> material from existing<br />

or a new quarry in <strong>Government</strong> waste land, private land or land belonging to o<strong>the</strong>r<br />

States or Talukas etc. After opening <strong>the</strong> quarry but be<strong>for</strong>e starting collection, <strong>the</strong><br />

quarry shall be got approved from <strong>the</strong> Engineer-in-charge or his representatives. The<br />

Contractor or piece worker shall pay all royally charges, compensation etc. No claims<br />

or responsibility on account of any of obstructions caused to execution of <strong>the</strong> work by<br />

difficulties arising out of private owners of <strong>the</strong> land will be entertained.<br />

The rates in <strong>the</strong> tender, include all incidental charges such as opening of a new quarry,<br />

opening out a new portion in an existing quarry, removing top soil and <strong>the</strong> unsuitable material,<br />

dewatering, quarry, cost of blasting powder and fuse, lift and lead, repairs to existing cart<br />

tracks, making new cart tracks, control charges, Central/State <strong>Government</strong> or Municipal Taxes,<br />

etc.<br />

(IV) The rates in <strong>the</strong> tender are <strong>for</strong> <strong>the</strong> delivery of <strong>the</strong> approved material on road side, properly<br />

stacked at <strong>the</strong> places specified by <strong>the</strong> Engineer-in-charge and are inclusive of conveyance<br />

charges in respect of <strong>the</strong> leads and lifts. No claims on account of changes in lead will be<br />

entertained.<br />

(V)<br />

No material shall be removed from <strong>the</strong> land within <strong>the</strong> road boundary or from <strong>the</strong> land touching<br />

it without <strong>the</strong> written permission of <strong>the</strong> Engineer-in-charge or his authorised agent. If any<br />

material is unauthorisely obtained from such places, <strong>the</strong> Contractor or piece worker shall have<br />

to make good <strong>the</strong> damages and pay such compensation, in addition as may be decided by <strong>the</strong><br />

Executive Engineer and will have to stop fur<strong>the</strong>r collection.<br />

(VI) Any material that falls on any P.W.D. Road from <strong>the</strong> cart etc. during conveyance shall be<br />

immediately picked up and removed by <strong>the</strong> Contractor or piece worker, failing which it will be<br />

got removed <strong>department</strong>ally at his cost. No heap shall be left prior to stacking even temporarily<br />

on <strong>the</strong> road surface or in any way so as to cause any obstruction or danger to <strong>the</strong> traffic. The<br />

Contractor or <strong>the</strong> piece worker shall be liable to pay <strong>for</strong> any claims of compensation etc. arising<br />

out of any accident, etc. Any such materials causing obstruction or danger etc. will be got<br />

removed <strong>department</strong>ally at his cost and no claim <strong>for</strong> any loss or damage to <strong>the</strong> material, thus<br />

removed will be entertained. The Contractor shall also be responsible <strong>for</strong> <strong>the</strong> damage or<br />

accident etc. arising out of any material that falls on <strong>the</strong> road or track, not in charge of <strong>the</strong><br />

Department and shall attend to any complaints which may be received.<br />

(VII) The materials shall not be stacked in place where it is liable to be damaged or lost due to traffic<br />

passing over it, to be washed away by rain or floods, to be buried under <strong>the</strong> land slides etc. or<br />

<strong>the</strong> slip down an embankment or hill side etc. No claims <strong>for</strong> any loss due to <strong>the</strong>se and similar<br />

causes will be entertained.<br />

(VIII) Be<strong>for</strong>e stacking, <strong>the</strong> materials shall be free from all earth, rubbish, vegetable matter and o<strong>the</strong>r<br />

extraneous substance and in <strong>the</strong> case of metal, screened to gauge if so directed when ready.<br />

It shall be stacked entirely clear of <strong>the</strong> road way on ground which has been cleaned of<br />

vegetation and levelled. On high banks, ghat roads etc. where it may not be practicable to<br />

stack it entirely clear of <strong>the</strong> roadway, it may be stacked with <strong>the</strong> permission of <strong>the</strong> Engineer-incharge<br />

on terms in such a way as to cause minimum danger and obstruction to <strong>the</strong> traffic or as<br />

may be directed by him.<br />

(IX) The size of <strong>the</strong> stack of <strong>the</strong> materials o<strong>the</strong>r than rubble shall be 3 x 1.5 x 0.60 metre or such<br />

o<strong>the</strong>r size as may be directed by <strong>the</strong> Engineer-in-charge and all but one stack in 200 metres<br />

shall be of <strong>the</strong> same uni<strong>for</strong>m size and shall be uni<strong>for</strong>mly distributed over whole lengths. One<br />

stack (at <strong>the</strong> end) in each 200 metres may be of length different from <strong>the</strong> rest in order to adjust<br />

total quantity to be required but its width and height will be <strong>the</strong> same as those of <strong>the</strong> rest.<br />

Contractor No. of Corrections Executive Engineer


94<br />

(X)<br />

XI)<br />

The Engineer in charge or his authorised representative shall supply <strong>the</strong> Contractor with<br />

statement showing 200 metres wise quantities that will be required and <strong>the</strong> order in which <strong>the</strong><br />

collection is to be done. No materials in excess of requirements in those 200 metres shall be<br />

stacked. Any excess quantity shall be removed at <strong>the</strong> expense of <strong>the</strong> Contractor or piece<br />

worker to where it is required be<strong>for</strong>e <strong>the</strong> material in that 200 metres is finally measured.<br />

All materials shall be examined and measured be<strong>for</strong>e it is spread. The labour <strong>for</strong><br />

measurements (and check measurements wherever carried out) shall be supplied by <strong>the</strong><br />

Contractor or piece worker. Immediately after <strong>the</strong> measurements are recorded, <strong>the</strong> stacks shall<br />

be marked by <strong>the</strong> contractor or piece worker by white wash or o<strong>the</strong>rwise as may be directed by<br />

<strong>the</strong> Executive Engineer to prevent from any possibility of <strong>the</strong> same material being measured<br />

and recorded over again and to prevent any unauthorized tampering with <strong>the</strong> stacks. If <strong>the</strong><br />

contractor or <strong>the</strong> piece worker fails to attend <strong>the</strong> measurements of materials after receiving <strong>the</strong><br />

notice from <strong>the</strong> Sub Divisional Officer or his subordinate stating date and time of <strong>the</strong> intention<br />

to measure <strong>the</strong> work, <strong>the</strong> same shall be measured never<strong>the</strong>less and no complaint in this<br />

respect will be entertained later-on. If <strong>the</strong> contractor or piece worker fails to supply sufficient<br />

labour or <strong>the</strong> materials required at <strong>the</strong> time measurements or check measurements, after due<br />

notice has been given to him, <strong>the</strong> expenses incurred on account of employing <strong>department</strong>al<br />

labour or material etc. shall be charged against his account.<br />

6.7 AGENT AND WORK ORDER BOOKS: -<br />

The contractor shall himself engaged an authorised all time agent on <strong>the</strong> work capable<br />

of managing and guiding <strong>the</strong> work and understand <strong>the</strong> specifications and contract<br />

condition. A qualified and experienced, Engineer shall be employed by <strong>the</strong> contractor<br />

as his agent <strong>for</strong> technical matters in case <strong>the</strong> Engineer-in-charge considers this as<br />

essential <strong>for</strong> <strong>the</strong> work and so directs contractors. He will take orders as will be given<br />

by <strong>the</strong> Executive Engineer or his representative and shall be responsible <strong>for</strong> carrying<br />

<strong>the</strong>m out.<br />

This agent shall not be changed without prior intimation to <strong>the</strong> Executive Engineer<br />

and his representative on <strong>the</strong> work site. The Engineer-in-charge has <strong>the</strong> unquestionable right to<br />

ask <strong>for</strong> change in <strong>the</strong> quality and strength of contractor’s supervisory staff and to order removal<br />

from work of any of such staff. The contractor shall comply with such orders and effect<br />

replacements to <strong>the</strong> satisfaction of <strong>the</strong> Engineer-in-charge.<br />

A work order book shall be maintained on site and it shall be <strong>the</strong> property of <strong>the</strong><br />

<strong>Government</strong> and <strong>the</strong> contractor shall promptly sign orders given <strong>the</strong>rein by <strong>the</strong> Executive<br />

Engineer or his representative and his superior officers and comply with <strong>the</strong>m. The compliance<br />

shall be reported by <strong>the</strong> Contractor to <strong>the</strong> Engineer in good time so that it can be checked. The<br />

blank work order with machine numbered pages will be provided by <strong>the</strong> Department free of<br />

charge <strong>for</strong> this purpose. The contractor will be allowed to copy out instructions <strong>the</strong>rein from<br />

time to time.<br />

6.8 INITIAL MEASUREMENTS FOR RECORD:-<br />

Where <strong>for</strong> proper measurement of work, it is necessary to have initial set of levels or o<strong>the</strong>r<br />

measurements taken, <strong>the</strong> same as recorded in <strong>the</strong> authorised field book or measurement book<br />

of <strong>Government</strong> by <strong>the</strong> Engineer or his authorised representative will be signed by <strong>the</strong><br />

Contractor who will be entitled to have a true copy of <strong>the</strong> same made at his cost. Any failure on<br />

<strong>the</strong> part of <strong>the</strong> Contractor to get such levels etc. recorded be<strong>for</strong>e starting <strong>the</strong> work will render<br />

him liable to accept <strong>the</strong> decision of <strong>the</strong> Engineer as to <strong>the</strong> basis of taking measurements. Likewise<br />

<strong>the</strong> Contractor will not cover any work which will render its subsequent measurements<br />

difficult or impossible without first getting <strong>the</strong> same jointly measured by himself and <strong>the</strong><br />

authorised representative of <strong>the</strong> Executive Engineer. The record of such measurements on <strong>the</strong><br />

<strong>Government</strong> side will be signed by <strong>the</strong> Contractor and he will be entitled to have a true copy of<br />

<strong>the</strong> same made at his cost.<br />

Contractor No. of Corrections Executive Engineer


95<br />

6.9 HANDING OVER OF WORK: -<br />

All <strong>the</strong> <strong>works</strong> and materials be<strong>for</strong>e finally taken over by <strong>Government</strong> it will be <strong>the</strong> entire liability<br />

of <strong>the</strong> Contractor to guard, maintain and make good any damage of any magnitude. Interim<br />

payments made <strong>for</strong> such work will not alter this position. The handing over by <strong>the</strong> Contractor<br />

and taking over by <strong>the</strong> Executive Engineer or his authorised representative will be always in<br />

writing copies of which will go to <strong>the</strong> Executive Engineer or his authorised representative and<br />

<strong>the</strong> Contractor. It is however, understood that be<strong>for</strong>e taking over such work, <strong>Government</strong> will<br />

not put it into regular use as distinct from casual or incidental one, expects as specifically<br />

mentioned elsewhere in this contract, or as mutually agreed to.<br />

6.10 ASSISTANCE IN PROCURING PRIORITIES, PERMITS ETC :<br />

The Engineer on a written request by Contractor will, if in his opinion <strong>the</strong> request is reasonable<br />

and in <strong>the</strong> interest of work and its progress, assist <strong>the</strong> Contractor in securing, <strong>the</strong> priorities <strong>for</strong><br />

deliveries, transport, permits <strong>for</strong> controlled materials etc. where such are needed. The<br />

Department will not however be responsible <strong>for</strong> <strong>the</strong> non-availability of such facilities or delays<br />

on this behalf and no claims on account of such failure of delays shall be allowed by <strong>the</strong><br />

Department.<br />

The Contractor shall have to make his own arrangement <strong>for</strong> machinery required <strong>for</strong> <strong>the</strong> work.<br />

However if <strong>the</strong> same is conveniently available with <strong>the</strong> Department it may be spared as per <strong>the</strong><br />

rules in <strong>for</strong>ce on recovery of necessary Security Deposit and rent at <strong>the</strong> rate approved from<br />

time to time by <strong>the</strong> independent agreement to this contract and <strong>the</strong> supply or non supply of<br />

machinery shall not <strong>for</strong>m a ground <strong>for</strong> any claim or extension of time <strong>for</strong> this work.<br />

7. SAMPLES AND TESTING OF MATERIALS:<br />

i) All materials to be used on work, such as cement, lime, aggregates, stone, asphalt, etc. shall<br />

be got approved in advance from <strong>the</strong> Engineer-in-charge and shall pass <strong>the</strong> tests and analysis<br />

required by him, which will be :<br />

a) as specified in <strong>the</strong> specifications of <strong>the</strong> items concerned and / or<br />

b) Red book<br />

c) as specified by <strong>the</strong> Indian Road Congress Standard Specification and code of practice<br />

<strong>for</strong> Road and Bridges or<br />

d) I.S.I. Specifications (whichever and wherever applicable ) or<br />

e) As per M.O.R.T. & H specifications <strong>for</strong> Roads and Bridges latest edition Section 900 quality<br />

control <strong>for</strong> road work.<br />

f) Such recognized specifications acceptable to <strong>the</strong> Engineer-in-charge as equivalent <strong>the</strong>re to or<br />

in <strong>the</strong> absence of such authorised specifications<br />

g) Such requirements test and/or analysis as may be specified by <strong>the</strong> Engineer-in-charge in <strong>the</strong><br />

order of procedure given above.<br />

ii)<br />

iii)<br />

The Contractor shall at his risk and cost make all arrangement and/or shall provide <strong>for</strong> all such<br />

facilities as <strong>the</strong> Engineer-in-charge may require <strong>for</strong> collecting, preparing required number of<br />

samples <strong>for</strong> test or analysis at such time and to such places as may be directed by Engineer<br />

and bear all such charges, such samples shall also be deposited with Engineer-in-charge.<br />

The Contractor shall as and when required submit at his cost <strong>the</strong> samples of materials to be<br />

tested or analyzed and if, so directed, shall not make use of or incorporate in <strong>the</strong> work any<br />

material represented by <strong>the</strong> samples until <strong>the</strong> required test or analysis have been made and<br />

after <strong>the</strong> test of <strong>the</strong> materials, finally accepted by <strong>the</strong> Engineer-in-charge<br />

Contractor No. of Corrections Executive Engineer


96<br />

iv)<br />

The contractor shall not be eligible <strong>for</strong> any claim or compensation ei<strong>the</strong>r rising out of any delay<br />

in <strong>the</strong> work or due to any corrective measure required to be taken on account of and as a result<br />

of testing of <strong>the</strong> materials.<br />

v) The contractor or his authorised representative will be allowed to remain present in <strong>the</strong><br />

Department laboratory which testing <strong>the</strong> samples furnished by him. However <strong>the</strong> results of all<br />

<strong>the</strong> tests carried out in <strong>the</strong> Departmental laboratory whe<strong>the</strong>r in <strong>the</strong> presence or in absence of<br />

<strong>the</strong> contractor or his authorised representative will be binding on <strong>the</strong> contractor.<br />

vi)<br />

vii)<br />

Quality Control Tests: - The contractor shall at his own cost set up Laboratory at site of work<br />

to carry out <strong>the</strong> testing of materials which are to be used <strong>for</strong> <strong>the</strong> work. This laboratory shall be<br />

approved by <strong>the</strong> Engineer-in-charge. The testing shall be done as per frequencies mentioned<br />

in <strong>the</strong> specification/additional specification of each item of Schedule 'B'. The 30% of <strong>the</strong> test<br />

included in Annexure 'A' (On Page No. ) shall be carried out in Vigilance and Quality Control<br />

Laboratory at <strong>the</strong> cost of contractor and balance 70% in <strong>the</strong> site laboratory. The test which are<br />

not included in Annexure 'A' 50% test shall be carried out each in Vigilance and Quality Control<br />

laboratory and site laboratory. The frequency of testing of construction materials is mentioned<br />

in Annexure-B on Page No. to .<br />

In case of material procured by <strong>the</strong> contractor, testing as required by <strong>the</strong> Codes and<br />

Specifications shall be arranged by him at his own cost. Testing shall be done in <strong>the</strong> presence<br />

of authorized representative of <strong>the</strong> Engineer in charge, at <strong>the</strong> nearest approved laboratory. If<br />

additional testing o<strong>the</strong>r than as required by specification is ordered, <strong>the</strong> testing charges, shall<br />

be borne by <strong>the</strong> Department, in case <strong>the</strong> test results are satisfactory and by <strong>the</strong> contractor if <strong>the</strong><br />

same are not satisfactory.<br />

viii) In case of materials specified by <strong>the</strong> <strong>Government</strong>, if <strong>the</strong> contractor demands certain testing, <strong>the</strong><br />

charges <strong>the</strong>reof shall be paid by <strong>the</strong> contractor if <strong>the</strong> testing results are satisfactory and <strong>the</strong><br />

Department if <strong>the</strong> same are not satisfactory.<br />

ix)<br />

Contractor shall have testing machinery/apparatus in his possession as mentioned on Page<br />

106.<br />

7.1 QUALITY CONTROL ON WORKS AND MATERIALS: The Contractor shall be responsible <strong>for</strong><br />

<strong>the</strong> quality of <strong>the</strong> work in <strong>the</strong> entire construction work within <strong>the</strong> contract. He shall, <strong>the</strong>re<strong>for</strong>e,<br />

have his own independent and adequate set up <strong>for</strong> ensuring <strong>the</strong> same. This shall include<br />

establishing field laboratory <strong>for</strong> testing required <strong>for</strong> <strong>works</strong>. The laboratory shall be equipped<br />

with <strong>the</strong> equipment’s and apparatus required <strong>for</strong> <strong>the</strong> testing. The list of various<br />

equipment’s/apparatus is enclosed on Page <strong>for</strong> in<strong>for</strong>mation and guidance of <strong>the</strong> Contractor.<br />

This equipment’s shall be in working condition. The Engineer in charge of <strong>the</strong> work will<br />

verify <strong>the</strong>se equipment’s in <strong>the</strong> laboratory at site. The work shall not be started unless and until<br />

<strong>the</strong> laboratory is equipped with equipment’s. (Ref. Page ).<br />

7.2 CO-ORDINATION: When several agencies <strong>for</strong> different sub-<strong>works</strong> of <strong>the</strong> project are to work<br />

simultaneously on <strong>the</strong> project site, <strong>the</strong>re must be full coordination between <strong>the</strong> contractors to<br />

ensure timely completion of <strong>the</strong> whole project smoothly. The scheduled dates <strong>for</strong> completion<br />

specified in each contract shall <strong>the</strong>re<strong>for</strong>e, are strictly adhered to. Each contractor may make<br />

his independent arrangements <strong>for</strong> water, power, housing etc. if <strong>the</strong>y so desire. On <strong>the</strong> o<strong>the</strong>r<br />

hand <strong>the</strong> Contractor is at liberty to come to mutual agreement in this behalf and make joint<br />

arrangements with <strong>the</strong> approval of <strong>the</strong> Engineer . No Contractor shall take or cause to be<br />

taken any steps or action that may cause, disruption, discontent, or disturbance of work,<br />

labour or arrangement etc. of <strong>the</strong> contractor in <strong>the</strong> project localities. Any action by any<br />

Contractor which <strong>the</strong> Engineer in his unquestioned discretion may consider as infringement of<br />

<strong>the</strong> above code, would be considered as a breach of <strong>the</strong> contract conditions and shall be dealtwith<br />

accordingly.<br />

In case of any dispute of disagreement between <strong>the</strong> Contractors, <strong>the</strong> Engineer’s decision<br />

regarding <strong>the</strong> co-ordination, co-operation and facilities to be provided by any of <strong>the</strong> Contractor shall<br />

Contractor No. of Corrections Executive Engineer


e final and binding on <strong>the</strong> contractors concerned and such a decision shall not vitiate any contract<br />

nor absolve <strong>the</strong> Contractor of his obligations under <strong>the</strong> contract nor consider from <strong>the</strong> grounds <strong>for</strong> any<br />

claim or compensation.<br />

7.3 TEMPORARY QUARTER AND SITE OFFICE<br />

I) The Contractor shall at his own expense maintain sufficient experienced supervisory staff etc.<br />

required <strong>for</strong> <strong>the</strong> work and shall make his own arrangements <strong>for</strong> housing such staff with all<br />

necessary amenities. General layout plan <strong>for</strong> such structures shall be got approved from <strong>the</strong><br />

Engineer-in-charge. It will be <strong>the</strong> responsibility of <strong>the</strong> Contractor to get his lay out plan of<br />

temporary structure approved from <strong>the</strong> local competent authority.<br />

97<br />

II)<br />

The contractor shall provide furnish, maintain and remove on completion of <strong>the</strong> work; a suitable<br />

office on <strong>the</strong> work site <strong>for</strong> <strong>the</strong> use of Executive Engineer or his representative. He should<br />

provide latrines, urinals and keep <strong>the</strong>m clean daily. This will be supposed to be included in his<br />

offer.<br />

7.4 PATENTED DEVICES, MATERIALS AND PROCESSES: When <strong>the</strong> Contractor desires to use<br />

any designed device, materials or process covered by letter of patent or copy right, <strong>the</strong> right <strong>for</strong><br />

such use should be secured by suitable legal arrangement and agreement with patent owner<br />

and a copy of <strong>the</strong>ir agreement shall be filed with <strong>the</strong> Engineer-in-charge if so desired by <strong>the</strong><br />

latter.<br />

7.5 WATER SUPPLY: Availability of adequate water <strong>for</strong> <strong>works</strong> and sources <strong>the</strong>reof shall be<br />

confirmed by <strong>the</strong> Contractor be<strong>for</strong>e submitting <strong>the</strong> tender.<br />

The Contractor shall make his own arrangements at his own cost <strong>for</strong> entering into<br />

contract with concerned authorities <strong>for</strong> obtaining <strong>the</strong> connection and carry <strong>the</strong> water up to <strong>the</strong><br />

work site as required by him. The location of <strong>the</strong> pipe line with respect to <strong>the</strong> road shall be<br />

decided by Engineer-in-charge and shall be binding on <strong>the</strong> Contractor.<br />

The Contractor is advised to provide water storage tank of adequate capacity<br />

to take care of possible shutdown of water supply system.<br />

The Contractor shall have to supply water required by <strong>the</strong> Department <strong>for</strong> its<br />

establishment at work site. The water consumed by <strong>the</strong> Department will be metered.<br />

For providing <strong>the</strong> meter permission, if necessary will be arranged by <strong>the</strong> Department.<br />

Charges <strong>for</strong> <strong>the</strong> water consumed by <strong>the</strong> Department will be paid to <strong>the</strong> Contractor at<br />

<strong>the</strong> rates of 125% of <strong>the</strong> recurring costs or actually charged to him by concerned<br />

authorities and no o<strong>the</strong>r charges would be payable by <strong>the</strong> Department.<br />

7.6 ELECTRICITY: The Contractor will have to make his own arrangement at his own cost <strong>for</strong><br />

obtaining or providing electric supply at work site. Electrical supply <strong>for</strong> <strong>the</strong> Departments use at<br />

work site shall be provided by <strong>the</strong> contractor. No charges would be payable by <strong>the</strong> Department.<br />

8. SAFETY MEASURES AND AMENITIES:<br />

8.1 SAFETY MEASURES: The Contractor shall take all necessary precautions <strong>for</strong> <strong>the</strong> safety of <strong>the</strong><br />

workers and preserving <strong>the</strong>ir health while working on such job as require special protection and<br />

precautions wherever required. The following are some of <strong>the</strong> requirements listed, through not<br />

exhaustive. The contractor shall also comply with <strong>the</strong> directions issued by <strong>the</strong> Engineer in this<br />

behalf from time to time and at all times.<br />

Contractor No. of Corrections Executive Engineer


98<br />

(i)<br />

(ii)<br />

(iii)<br />

Providing protective foot-wear to workers, in situations like mixing and placing of<br />

mortar or concrete, in quarries and place where <strong>the</strong> work is to be done under too<br />

much wet conditions as also <strong>for</strong> movements over surfaces infected with oyster growth<br />

etc.<br />

Providing protective head wear to workers, working in quarries etc. to protect <strong>the</strong>m against<br />

accidental fall of materials from above.<br />

Taking such normal precautions like providing hand rails to <strong>the</strong> edges of <strong>the</strong> floating plat<strong>for</strong>m or<br />

barges, not allowing nails or metal parts or useless timber to spread around etc.<br />

8.1 Condition <strong>for</strong> Payment of Bituminous <strong>works</strong> of Cost of carpet and Seal Coat :- In<br />

respect of bituminous work, 20% (Twenty percent) payment of work of carpet and seal coat in a<br />

particular kilometre will be withheld till completion of agreement items of side beams, built up<br />

drains, site clearance, road side furniture, C.D. Works and o<strong>the</strong>r items in that kilometre as per<br />

<strong>the</strong> instruction of <strong>the</strong> Engineer-in-Charge.<br />

After Completion of <strong>the</strong>se items in <strong>the</strong> particular kilometre <strong>the</strong> withheld amount will be finally<br />

released.<br />

8.2 Contractor to take photographs :- The contractor would have to take coloured photographs<br />

at various stages/facilities of <strong>the</strong> work including interesting and novel features of work as<br />

directed by <strong>the</strong> Engineer-in-Charge. The photographs should be of acceptable quality and<br />

shall be taken by a professional competent photographer with camera having facility to record<br />

<strong>the</strong> date of photographs taken in <strong>the</strong> prints and negatives. The contractor should supply two<br />

coloured prints of each of <strong>the</strong> photograph taken to <strong>the</strong> standard postcard size in albums of<br />

acceptable quality. Also <strong>the</strong> to do so will entitle <strong>the</strong> <strong>Government</strong> to recover an amount of<br />

Rs.20/- per photograph per print. The number of photographs however be limited to 10<br />

photographs per kilometre length.<br />

8.3 Special conditions <strong>for</strong> hot Mix asphalts <strong>works</strong> :-<br />

(I) Clause No. 106 of Ministry’s specifications (4 th revision 2001)<br />

This clause stipulates certain conditions relating to choice and use of equipments which have<br />

relevance to production of quality work. These are;<br />

(a)<br />

(b)<br />

(c)<br />

The contractor shall be required to give a trial run of <strong>the</strong> equipments <strong>for</strong> establishing capacity to<br />

achieve <strong>the</strong> laid down specifications and tolerances to <strong>the</strong> satisfaction of <strong>the</strong> Engineer be<strong>for</strong>e<br />

commencement of work.<br />

All equipments provided should be of proven efficiency and shall be operated and maintained<br />

at all items in a manner acceptable to <strong>the</strong> Engineer.<br />

No equipment and personnel will be removed from <strong>the</strong> site without <strong>the</strong> permission of <strong>the</strong><br />

Engineer.<br />

(II) Clause No. 901 of Ministry’s specifications 4 th revision 2001 :-<br />

(a)<br />

(b)<br />

(c).<br />

The responsibility <strong>for</strong> <strong>the</strong> quality of <strong>the</strong> entire construction <strong>works</strong> is on <strong>the</strong> contractor. For this<br />

purpose, he is required to have his own independent and adequate set-up.<br />

The Engineer <strong>for</strong> satisfying himself about <strong>the</strong> quality of <strong>the</strong> materials and work will also have<br />

tests Conducted by quality control units or by any o<strong>the</strong>r agency, generally to <strong>the</strong> frequency set<br />

out in <strong>the</strong>se Specifications. For test to be done by <strong>the</strong> Engineer, <strong>the</strong> contractor including <strong>the</strong><br />

provision of labour Assistance in packing and dispatching samples etc.<br />

For <strong>the</strong> work of embankment, sub grade and pavement, construction of subsequent layer of<br />

<strong>the</strong> same or o<strong>the</strong>r material over <strong>the</strong> finished layer shall be done only after obtaining approval<br />

from <strong>the</strong> Engineer.<br />

Contractor No. of Corrections Executive Engineer


99<br />

(d)<br />

(III)<br />

(a)<br />

(b)<br />

(c)<br />

(IV)<br />

The contractor shall be responsible <strong>for</strong> rectifying/replacing any work falling short of quality<br />

Requirements as directed by <strong>the</strong> Engineer.<br />

Clauses in <strong>the</strong> conditions of contract:<br />

All materials and workmanship shall be of <strong>the</strong> respective type described in <strong>the</strong> contract and in<br />

accordance with <strong>the</strong> Engineer’s instructions and shall be subjected <strong>for</strong>m time to time to such<br />

tests as <strong>the</strong> Engineer may direct at <strong>the</strong> place of manufacture or fabrication of on <strong>the</strong> site. All<br />

samples shall be Supplied by <strong>the</strong> contractor.<br />

No work is to be covered up or put out of view without <strong>the</strong> approval of <strong>the</strong> Engineer <strong>for</strong> his<br />

examination and measurements.<br />

During <strong>the</strong> progress of <strong>the</strong> <strong>works</strong> <strong>the</strong> Engineer shall have <strong>the</strong> power to order <strong>the</strong> removal from<br />

<strong>the</strong> site of any unsuitable Material substitution of proper suitable material and <strong>the</strong> removal and<br />

proper Re-election hot withstanding any previous test or interim payment <strong>the</strong>re<strong>for</strong>e, and of any<br />

work which in respect of materials of workmanship is not in <strong>the</strong> opinion of <strong>the</strong> Engineer in<br />

accordance with <strong>the</strong> contract.<br />

Guidelines on quality control operation:- The onus of achieving quality of work will be on<br />

<strong>the</strong> contractor who will take actions as stipulated in section 900 of Ministry’s specifications <strong>for</strong><br />

Road and Bridge <strong>works</strong> ( 4 th revision, 2001)<br />

MINISTY’S SPECIFICATIONS FOR ROAD AND BRIDGE WORKS (4 th REVISION 2001 )<br />

Ministry’s sped5tificationsw <strong>for</strong> road Bridge work (4 th revision, 2001 ) will <strong>for</strong>m part of<br />

contract documents and <strong>the</strong> contractor will be legally bound to <strong>the</strong> various stipulations made<br />

<strong>the</strong>rein unless specifically relaxed or waived wholly or partly through a special clause in <strong>the</strong><br />

contract documents.<br />

(V)<br />

CONTRACTOR’S FACILITIES:<br />

According to <strong>the</strong> contract (see Para 1.3 above ) <strong>the</strong> contractor is responsible <strong>for</strong> <strong>the</strong><br />

quality of <strong>the</strong>y Entire construction work, and <strong>for</strong> this purpose, he is required to have his own<br />

independent and Adequate set up. To meet this requirement:-<br />

(a)<br />

The contractor shall set up his own laboratory at locations(s) approved by <strong>the</strong> Engineer, The<br />

laboratory Shall be equipped with modern and efficient equipments with sufficient standbys<br />

suitable to carry out The tests prescribed <strong>for</strong> different materials and work according to <strong>the</strong><br />

specifications.<br />

The list of equipments to be procured and <strong>the</strong> facilities to be provided shall be got approved by<br />

<strong>the</strong> Engineer. The equipment shall be maintained in workable condition to <strong>the</strong> satisfaction of<br />

<strong>the</strong> Engineer.<br />

(b)<br />

Sampling and testing procedures shall be in accordance with <strong>the</strong> relevant standards of BIS<br />

(previously) called ISI) or IRC. Frequency of testing shall be as laid down in <strong>the</strong> Ministry’s<br />

specification of Road and Bridge work (4 th revision,2001) In <strong>the</strong> absence of relevant<br />

Indian standards sampling and testing procedures shall be as approved by <strong>the</strong> Engineer.<br />

(c) The laboratory should be manned by qualified Engineer Assisted by Materials Inspector /<br />

Technicians and <strong>the</strong> set up should be got approved by <strong>the</strong> Engineer.<br />

(d)<br />

The Contractor should prepare printed per<strong>for</strong>m <strong>for</strong> recording readings and results of each type<br />

of test after getting <strong>the</strong> <strong>for</strong>mats of <strong>the</strong> Per<strong>for</strong>ma approved <strong>for</strong>m <strong>the</strong> Engineer. He should keep a<br />

daily record of all <strong>the</strong> tests conducted by him. Two copies of <strong>the</strong> test results should be<br />

submitted to <strong>the</strong> Engineer <strong>for</strong> his examinations and approval of which one copy will be returned<br />

to <strong>the</strong> contractor <strong>for</strong> being kept at site of work.<br />

Contractor No. of Corrections Executive Engineer


100<br />

(e)<br />

The materials Engineer of <strong>the</strong> contractor should keep close liaison with <strong>the</strong> quality control units<br />

of <strong>the</strong> Engineer and keep later in<strong>for</strong>med of <strong>the</strong> sampling and testing programme so that <strong>the</strong><br />

Engineer’s representative could be present during this activity if considered necessary.<br />

(VI) Day to day quality control operation :- The day to day controls to be exercised by <strong>the</strong><br />

Contractor and <strong>the</strong> Engineer are enumerated in <strong>the</strong> following paragraphs.<br />

(VII) ALIGNMENT AND LEVEL CONTROL<br />

(a)<br />

(b)<br />

(c)<br />

(d)<br />

(e)<br />

(f)<br />

(g)<br />

The Contractor should locate <strong>the</strong> centre line of <strong>the</strong> road from <strong>the</strong> pegs, pillars or reference<br />

points fixed during <strong>the</strong> location survey and from <strong>the</strong> in<strong>for</strong>mation furnished in <strong>the</strong> contract<br />

drawings. Any discrepancy between <strong>the</strong> reference points on <strong>the</strong> ground and those on <strong>the</strong><br />

drawings should immediately be brought to <strong>the</strong> notice of <strong>the</strong> Engineer <strong>for</strong> reconciliation.<br />

Based on <strong>the</strong> approved centre line <strong>the</strong> contractor should set up batter pegs (to delineate <strong>the</strong><br />

limits, of embankments/cutting) and cleaning stakes ( to delineate limits of cleaning and<br />

grubbing) and have <strong>the</strong>se got checked and approved by <strong>the</strong> Engineer.<br />

The contractor should check <strong>the</strong> reduced levels of bench marks set up along <strong>the</strong> alignments.<br />

Any discrepancy in <strong>the</strong> reduced levels of those at site and as indicated in <strong>the</strong> drawings should<br />

immediately be brought to <strong>the</strong> notice of <strong>the</strong> Engineer <strong>for</strong> reconciliation. The contractor should<br />

re-establish those bench marks which are found missing at site, and should establish additional<br />

bench marks as needed, <strong>for</strong> ensuring effective level control.<br />

The contractor shall be responsible <strong>for</strong> <strong>the</strong> true and proper setting out of <strong>the</strong> <strong>works</strong> in relation to<br />

<strong>the</strong> original survey points, lines and levels of reference given by Engineer in writing. If at any<br />

time during <strong>the</strong> progress of <strong>the</strong> <strong>works</strong> any error shall a[[ear or arise in <strong>the</strong> position levels<br />

dimensions or alignments of any part of <strong>the</strong> <strong>works</strong> his own cost rectify <strong>the</strong> error to <strong>the</strong><br />

satisfaction of <strong>the</strong> Engineer unless such error is based on incorrect data supplied in writing by<br />

<strong>the</strong> Engineer.<br />

The contractor shall carefully project and prepare all bench marks reference pillars and pegs<br />

used in setting out <strong>the</strong> <strong>works</strong> till final take over by <strong>the</strong> Engineer.<br />

The contractor should arrange to obtain approval to each and every activity of <strong>the</strong> work prior to<br />

its commencements. Unless and until <strong>the</strong> proceeding activity has been approved by <strong>the</strong><br />

concerned Deputy Engineer, in writing no nest activity should be commenced by <strong>the</strong> contractor.<br />

Any work done without prior approval of <strong>the</strong> concerned Deputy Engineer, would be regarded<br />

as unauthorized and would be summarily rejected.<br />

i) The Contractor should maintain an “Event register” at site incorporating <strong>the</strong>rein details of<br />

machinery employed on <strong>the</strong> work machinery in working order bitumen consumed on that day<br />

record of accidents if any record of visit of higher officers and so on. This event register<br />

should be got initialled by <strong>the</strong> Deputy Engineer every day.<br />

ii) The frequency of testing of various items shall be as per section 901 of M.O.R.T.& H.<br />

specification. In case <strong>the</strong> required number of tests are not carried out by <strong>the</strong> agency <strong>the</strong> work<br />

may not be accepted by <strong>the</strong> Executive Engineer and if inadvertently accepted <strong>the</strong> shortfall in<br />

frequency will be recovered at <strong>the</strong> Prevailing PWD guidelines.<br />

(IX) SHOULDERS:-<br />

(a)<br />

(b)<br />

(c)<br />

Checking <strong>for</strong> <strong>the</strong> quality of shoulder materials including gradation shall be done.<br />

Field compaction shall be checked at site on <strong>the</strong> compacted layer.<br />

Checking <strong>for</strong> <strong>the</strong> cross fall shall be done<br />

Contractor No. of Corrections Executive Engineer


101<br />

(X)<br />

(a)<br />

(b)<br />

(c)<br />

BITUMINOUS CONSTRUCTION GENERAL:-<br />

Manufacture test certificate <strong>for</strong> quality of bitumen will be acceptable to <strong>the</strong> Engineer. However<br />

where <strong>the</strong> quality is in doubt <strong>the</strong> Engineer may call call <strong>for</strong> tests to be conducted by <strong>the</strong><br />

Contractor <strong>for</strong> verification.<br />

The base which bituminous courses are to be laid must be dry and free of just and o<strong>the</strong>r<br />

deleterious matters<br />

Mineral aggregates to be used should be checked <strong>for</strong> <strong>the</strong>ir specification requirements and got<br />

approved by <strong>the</strong> Engineer.<br />

SPECIFICATIONS FOR BITUMINOUS BOUND MACADAM<br />

(Ref. <strong>Government</strong> of Maharashtra, Public Works Department, <strong>Government</strong> Circular No.<br />

Misc. 2001/ P.C.-2/ PLN-3, Mantralaya, Mumbai-400 001 Dated 24.01.2001<br />

SPECIFICATIONS<br />

ITEM :<br />

Providing and laying 50/70 millimeter thick bituminous bound macadam road surface<br />

including supplying all materials, preparing <strong>the</strong> existing road surface, spreading 40 mm. steel<br />

metal layers, heating and spraying <strong>the</strong> bitumen, spreading 12 mm. size chips compacting with<br />

power roller etc. complete.<br />

1. GENERAL : The work consists of supplying of maerials and labour required <strong>for</strong><br />

providing and laying bituminous bound macadam surface <strong>for</strong> compacted thickness of 50/75<br />

mm. This item includes preparing <strong>the</strong> existing road surface to receive <strong>the</strong> bituminous bound<br />

macadam course i.e. picking <strong>the</strong> existing W.B.M. surface or application of tack coat on,<br />

existing B.T. surface spreading of 40 mm. size metal layer in required thickness with<br />

compaction with power roller heating and spraying bitumen with sprayer etc. spreading key<br />

aggregates 12 mm. chips and final compaction with power roller etc. complete and finishing<br />

in accordance with <strong>the</strong> requirement in close confirmity with grades lines, cross sections and<br />

thickness as per approved drawing etc. complete.<br />

2. DIVERSIONS : Temporary diversions shall be constructed and maintained by <strong>the</strong><br />

contractor at his own cost. Diversion shall be watered if dust is likely to blow on <strong>the</strong> road<br />

being bituminoused.<br />

3. MATERIALS :<br />

A) AGGREGATES : The aggregates <strong>for</strong> provising B.B.M. surface shall comply with<br />

specification Nos. Rd.41 <strong>for</strong> 40 mm. and 12 mm. size metal and shall normally comply with<br />

<strong>the</strong> following regarding size and quantity of aggregates and grade and quantities of bitumen.<br />

Contractor No. of Corrections Executive Engineer


Description<br />

Rate of application <strong>for</strong> 100 Sqmt.<br />

On Asphalt<br />

Surface<br />

On W.B.M.<br />

Surface<br />

On Asphalt<br />

Surface<br />

On W.B.M.<br />

Surface<br />

40 mm. size hand broken metal 9.00 Cum. 9.00 Cum. 6.00 Cum. 6.00 Cum.<br />

12 mm. size chips 1.80 Cum. 1.80 Cum. 1.80 Cum. 1.80 Cum.<br />

Bitumen <strong>for</strong> grouting I.S. grade S 35 200 Kg. 200 Kg. 175 Kg. 175 Kg.<br />

with 30/40 penetration or S 65 with<br />

60/70 penetration<br />

Tack coat <strong>for</strong> existing bituminous 50 Kg. -- 50 Kg.<br />

NOTE : Hand broken metal is prefered. However upto 30% of total quantity of 40<br />

mm. size metal, 40 mm. crusher broken metal can be used.<br />

B) BITUMEN : The Bitumen shall be paving bitumen of suitable penetration grade<br />

within <strong>the</strong> range S-35, S-65 or A-65 (30/40 to 60/70 as per Indian Standard Specifications <strong>for</strong><br />

"Paving Bitumen" IS-73-1992.<br />

4) PREPARING THE BASE : Any pot hole in <strong>the</strong> existing bituminous road surface<br />

and broken edges shall be patched well in advance and <strong>the</strong> surface shall be brought to correct<br />

level and camber with additional metal and bitumen as required which will be paid<br />

seperately. Be<strong>for</strong>e starting <strong>the</strong> work <strong>the</strong> bituminous surface shall be swept clean of all <strong>the</strong><br />

dirt, mud cakes, animal droppings o<strong>the</strong>r loose <strong>for</strong>eign material.<br />

If so required by <strong>the</strong> Engineer, <strong>the</strong> contractor shall keep <strong>the</strong> side width and nearby<br />

diversion watered to prevent dust from blowing over <strong>the</strong> surface to be bituminised.<br />

Existing water bound macadam surface shall be picked <strong>for</strong> and surface loosened <strong>for</strong> a<br />

depth of 7.5 cm. and picked surface shall be brought approximately to <strong>the</strong> correct camber and<br />

section. Edge line shall be correctly marked by dog belling <strong>the</strong> surface to <strong>for</strong>m a contineous<br />

vee notch.<br />

There shall always be specified length of prepared surface ahead of <strong>the</strong> bituminous<br />

surfacing operations as directed by <strong>the</strong> Engineer to keep <strong>the</strong>se operations continue.<br />

5) Tack coat on Bitumen surface : Applying tack coat <strong>for</strong> existing W.B.M. surface only<br />

at <strong>the</strong> rate of 50 Kg/ 100 Sqm. as per specification No. Rd. 47.3.3.<br />

6) Picking of existing W.B.M. Surface : Picking of existing W.B.M. surface <strong>for</strong><br />

receiving Bituminous Bound Macadam as per Rd.33.<br />

7.1 Spreading of 40 mm. Metal : 40 mm. size metal shall be spread evently at <strong>the</strong><br />

specified rate of 9 cubic metre/ 6 cubic metre per 100 Square meter of area so as to <strong>for</strong>m a<br />

layer even <strong>the</strong> width of road with correct camber/ super elevetion as required. Any <strong>for</strong>eign<br />

102<br />

Contractor No. of Corrections Executive Engineer


matter organic matter, dust grass etc. shall be removed immediately. The sections shall be<br />

checked with camber board and straight edge batten etc. any regulations shall be made good<br />

by adding aggregates in case of depressions and removing aggregates from high sports.<br />

7.2 Compaction of 40 mm. size metal : The surface of 40 mm. metal layer after bringing<br />

it to necessary grades and sections shall be rolled with <strong>the</strong> use of 8 to 10 tonnes power roller.<br />

Rolling shall commence from <strong>the</strong> edges and progress towards center longitudinally except on<br />

super elevated portion it shall progress from <strong>the</strong> lower to upper edge parallel to <strong>the</strong> center<br />

line of pavement. When <strong>the</strong> roller has passed over <strong>the</strong> whole area any high spots of<br />

depressions which become apparent shall be corrected by removing or adding aggregates.<br />

The rolling shall <strong>the</strong>n be continued till <strong>the</strong> entire surface has been rolled to designed<br />

compaction such that <strong>the</strong>re is no crushing of aggregates and all roller marks have been<br />

aliminated. Each pass of roller shall uni<strong>for</strong>mly over lap not than one third of <strong>the</strong> track made<br />

in <strong>the</strong> preceding pass.<br />

8) Application of Bitumen : Bitumen of I.S. grades S35 or S65 supplied <strong>for</strong> <strong>the</strong> work<br />

shall be heated to temperature of 1770C to 1910C. (350 F to 375 F) in a bitumen boiled and<br />

temperature shall be maintained at <strong>the</strong> time of actual application. The bot bitumen shall be<br />

applied through a pressure sprayer on <strong>the</strong> road surface uni<strong>for</strong>mity at <strong>the</strong> rate of 200 Kg/ 100<br />

Sqm. The road surface shall be devide into suitable rectangles marked by chalk so as to<br />

ensure correct rate of application of <strong>the</strong> bitumen.<br />

9) Key Aggregates : On completion of bitumen application 12 mm. size key aggregate<br />

shall be spread immediately at a uni<strong>for</strong>m rate of 1.8 cubic metre/ 1.2 cubic metre per 00<br />

square metre area when entire surface is in hot condition. Brooms shall be used to ensure<br />

even distribution of key aggregate.<br />

10) Final Compaction : Immediately after spraying of bitumen and spreading of key<br />

aggregates, <strong>the</strong> suface shall be rolled witha power roller to obtain full compaction and to<br />

<strong>for</strong>ce <strong>the</strong> bindage of kay aggregate into <strong>the</strong> interstices of <strong>the</strong> course aggregate. The rolling<br />

shall continue till <strong>the</strong> asphalt surface hardns and key aggregates stop moving under <strong>the</strong> power<br />

roller.<br />

11) The suface finish shall confirm to requirements of clause 902 of specification <strong>for</strong> road<br />

and bridges by ministry of surface transport (copy enclosed) Quality Control Test. and <strong>the</strong>ir<br />

frequencies shall be as per table below.<br />

S.No. Test Frequency<br />

1. Quality of Binder Two samples per lot to be subjected to all of some best<br />

as directed by <strong>the</strong> Engineer in charge.<br />

2. Aggregate impact One test per 200 Cubic Meter of aggregate<br />

3. Flakiness Index and One test per 200 Cubic Meter of aggregate<br />

Elongation Index<br />

103<br />

Contractor No. of Corrections Executive Engineer


104<br />

S.No. Test Frequency<br />

4. Stripping Value Intially one set of three representative specimen <strong>for</strong><br />

each source of supply subsequently when warranted by<br />

changes in <strong>the</strong> quality of aggregate.<br />

5. Water absorption of<br />

aggregates<br />

Intially one set of three representative specimen <strong>for</strong><br />

each source of supply subsequently when warranted by<br />

changes in <strong>the</strong> quality of aggregate.<br />

6. Aggregate grading One test per 200 Cubic Meter of aggregate<br />

7. Temperature of binder At regular clause intervals.<br />

8. Rate of spread of One tet per 500 Square meter of area.<br />

12 Item in include :<br />

i) Diversions unless seperately provided in <strong>the</strong> tender.<br />

ii) Preparing <strong>the</strong> road surface<br />

iii) Applying tack coat on existing B.I. on picking <strong>the</strong> existing<br />

iv) W.B.M.Surface<br />

v) Supplying, heating and spreading bitumen<br />

vi) Supplying, heating spreading and compaction of 12mm size chips<br />

vii) All labour, materials, including bitumen and aggregates use of tools, plants and<br />

equipments <strong>for</strong> completing <strong>the</strong> item satisfactory.<br />

13) Mode of Measurement - The Contract rates shall be <strong>for</strong> 100 Sq.mt. The<br />

measurement shall be <strong>for</strong> <strong>the</strong> width of <strong>the</strong> roads executed, limiting it to <strong>the</strong> width specified or<br />

as ordered by <strong>the</strong> Engineer <strong>for</strong> <strong>the</strong> length measured along <strong>the</strong> centerline.<br />

The measurement of dimensions shall be recorded upto two places of decimals of<br />

meter and <strong>the</strong> ares worked out correct upto one place of decimal of a sq.mt.<br />

BITUMINOUS SORAYED WORK:-<br />

(a)<br />

(b)<br />

(c)<br />

Temperature of binder in <strong>the</strong> boiler and rate of spray at site shall be checked. Spraying shall<br />

be uni<strong>for</strong>m and shall be carried out with <strong>the</strong> help of ei<strong>the</strong>r self propelled or towed bitumen<br />

pressure sprayer spraying nozzles arrangements.<br />

Rate and uni<strong>for</strong>mity of s[read of chippings should be checked and controlled.<br />

Adequate embedment of <strong>the</strong> chippings by rolling shall be ensured.<br />

(XI) HOT MIXED AND AND HOT LAID BITUMINOUS CONSTRUCTION:-<br />

(a)<br />

(b)<br />

(c)<br />

Job mix <strong>for</strong>mula (JMF) satisfying specification requirements should be worked out based on<br />

laboratory tests and got approved by <strong>the</strong> Engineer. The Engineer will have independent tests<br />

made be<strong>for</strong>e approving <strong>the</strong> JMF.<br />

The plant should be checked <strong>for</strong> capability to produce mix con<strong>for</strong>ming to <strong>the</strong> JMF. If necessary<br />

trial stretches should be laid and checked approximately.<br />

Control should be exercised on temperature of binder in <strong>the</strong> boiler aggregate in <strong>the</strong> dryer and<br />

Contractor No. of Corrections Executive Engineer


105<br />

mix at <strong>the</strong> time of laying and rolling.<br />

(d)<br />

(e)<br />

Tests <strong>for</strong> stability flow unit weight etc. of mix collected from <strong>the</strong> discharge points of <strong>the</strong> plant<br />

extraction test <strong>for</strong> binder content and aggregate gradation should be per<strong>for</strong>med to check on <strong>the</strong><br />

quality of mix discharged from <strong>the</strong> plant.<br />

Thickness and density of <strong>the</strong> compacted mix should be checked by taking core samples.<br />

PAVEMENT COURSES GENERAL CONTROLS:-<br />

(f)<br />

(g)<br />

The base of which <strong>the</strong> pavements layer is to be placed should be checked <strong>for</strong> levels and<br />

regularity and should be in a condition to receive <strong>the</strong> pavement layer.<br />

Each layer should be checked <strong>for</strong> thickness levels cross fall (camber) regularity and strength<br />

be<strong>for</strong>e next layer is permitted to be laid.<br />

(XII) SEQUENCE FO WORK:-<br />

1. Excavation of Gutters and spreading B.C. soil from gutters on apposite side of road at<br />

sufficient distance by mechanical means.<br />

2. Cutting down road side tourney bushes and conveying materials up to 1 Km. Dressing <strong>the</strong> side<br />

shoulders in 5% camber as directed by Engineer in charge.<br />

3. Collection of rubble at site required <strong>for</strong> BBM<br />

4. Breaking <strong>the</strong> rubble to 40mm metal size which is required <strong>for</strong> BBM<br />

5. Collection of crushed metal at site which is required <strong>for</strong> BBM<br />

6. Collection of hard murum required <strong>for</strong> side shoulder<br />

7. Applying tack coat <strong>for</strong> BBM on Bt surface and spreading <strong>the</strong> had broken 40mm metal and<br />

crushed metal <strong>for</strong> BBM in 3% camber using straight edge and camber plate and providing<br />

super elevation as per design and compacting <strong>the</strong> same. Providing <strong>the</strong> hard murum, side<br />

shoulders compacting <strong>the</strong> had murum be<strong>for</strong>e BBM.<br />

1. Spraying <strong>the</strong> bitumen 80/100 grade <strong>for</strong> BBM and spreading crushed metal and compacting <strong>the</strong><br />

same along with compaction of side shoulders at 5% camber as directed by Engineer in<br />

charge.<br />

2. Getting certified <strong>the</strong> super elevation provided at <strong>the</strong> site by <strong>the</strong> Executive Engineer.<br />

3. Open <strong>the</strong> BBM surface to traffic.<br />

4.<br />

5. Preparing <strong>the</strong> surface <strong>for</strong> hot mix hot laid carpet.<br />

6. Applying tack coat by mechanical sprayer only and <strong>the</strong>n laying of hot mix hot laid carpet<br />

including providing 3% camber and spreading murum re4quired <strong>for</strong> side shoulders in 5% camber<br />

an d compacting side shoulders as well as carpet to <strong>the</strong> required density open <strong>the</strong> road surface<br />

to ;<strong>the</strong> trarffic <strong>for</strong> at least one month. Clean <strong>the</strong> surface of carpet by mechanical broom, wire<br />

brushed etc. Apply <strong>the</strong> seal coat of 60/70 grade bitumen at rate one kg per square metre in <strong>the</strong><br />

presence of Deputy Engineer and Junior Engineer only.<br />

1) Fixing in<strong>for</strong>mation Board having details of name of work, name of scheme cost of work, name<br />

of contractors, etc. in Marathi as per details given.<br />

2) Fixing km stones and 200 m stones in concrete block. The top surface of concrete block shall<br />

be 30 cm above <strong>the</strong> road top level.<br />

3) Providing traffic lane line strip 10 cm. in width with approver <strong>the</strong>rmo plastic paint.<br />

4) Carrying Out Roughness index test with surmounted / jeep towed ARUR Machine.<br />

Contractor No. of Corrections Executive Engineer


(9) CONDITION FOR TRAFFIC SAFETY : TRAFFIC SAFETY MEASURES TO BE TAKEN BY<br />

THE CONTRACTOR AT HIS OWN COST DURING IMPROVEMENT OF ROADS WHERE<br />

TRAFFIC CAN BE PASSED OVER PART WIDTH ITEM.<br />

Providing Traffic Safety Measures on road during IMPROVEMENTS of existing road<br />

comprising of Traffic Sign Boards and devices as per detailed design drawing and specification and<br />

as directed by Engineer in Charge.<br />

SPECIFICATIONS:- The item includes providing traffic safety arrangements required <strong>for</strong> traffic<br />

control near <strong>the</strong> stretch of road where improvement work is being taken up, be<strong>for</strong>e actual start<br />

of improvement work of road. The contractor will have to provide <strong>the</strong> traffic safety<br />

arrangements as per detailed drawing. The traffic safety arrangements will have to be got<br />

approved from Engineer in Charge by <strong>the</strong> contractor be<strong>for</strong>e taking any construction activities<br />

<strong>for</strong> improvement of road.<br />

The Engineer in Charge shall get himself satisfied about <strong>the</strong> traffic safety arrangement<br />

provided on <strong>the</strong> work site be<strong>for</strong>e allowing Contractor to commence <strong>the</strong> improvements activity and a<br />

certificate to that effect shall be recorded in <strong>the</strong> Measurement Book.<br />

(a) The Sign.No.1 SPEED LIMIT (20) shall be placed at a distance of 120 metre away from <strong>the</strong><br />

point where <strong>the</strong> transition of carriage way begins. The Sign Board shall be circle of size 60<br />

centimetre diameter having white background and red border and <strong>the</strong> numbers shall be in<br />

black colour as per IRC 67-2001 (1 st revision) Distance between sign no.1 and sign no.2 shall<br />

be minimum 20 metre.<br />

106<br />

(b)<br />

The sign no.2 cautionary board indicating “NARROW ROAD AHEAD” shall be placed at a<br />

distance of 80m.away from <strong>the</strong> point of transition of carriageway. The sign board shall be of an<br />

equilateral triangle of size 90m.having white coloured background. Retro –reflective border in<br />

red colour and non reflective symbol in black colour as per IRC 67.2001 (1 st revision)<br />

(c) The sign no.3 sign board indicating “MAIN AT WORK” shall be placed at a distance of 40 m.<br />

away from <strong>the</strong> point of transition of carriageway. The sign board shall be of an equilateral<br />

triangle of size 90 cm having white coloured background. Retro-reflective border in red colour<br />

and non reflective symbol in back colour as per IRC 67.2001 (1 st revision)<br />

(d)<br />

(e)<br />

The sign no.4 displaying <strong>the</strong> message “GO SLOW,WORK IN PROGRESS” shall be placed at<br />

<strong>the</strong> point of transition of carriageway. The size of sign board shall be 1.0 metre having red<br />

back ground and retro reflective messages in white colour.<br />

Sand filled plastic cones mounted with retro reflective arrow hazard marker sign shall be placed<br />

as indicated in <strong>the</strong> drawing. Plastic cone shall be 73 centimetre in height having 39 centimetre<br />

square/ hexagonal base. Sand filled plastic cones shall be placed along <strong>the</strong> road length where<br />

work is in progress as shown in <strong>the</strong> drawing.<br />

(f)<br />

(g)<br />

(h)<br />

Retro reflective strong inviolable Stand Type Barrier shall be placed at ei<strong>the</strong>r ends of <strong>the</strong><br />

widening area upto <strong>the</strong> edge of <strong>the</strong> <strong>for</strong>mation. The barricades shall not be removed unless <strong>the</strong><br />

permission is given by <strong>the</strong> responsible officer of <strong>the</strong> rank not less than Sectional Engineer.<br />

The barricade shall have two plates of size 1.30 metre x 0.20 metre painted black and shall<br />

have white retro reflective strips and mounted on Angle iron Stand of 1.0 metre height.<br />

Yellow light flashers shall be kept lit from sunset to sunrise, 2 numbers along transition line of<br />

traffic and 3 numbers at barriers on both sides as indicated in <strong>the</strong> drawing.<br />

The sign, light, barricades and o<strong>the</strong>r traffic control devices shall be well maintained, till such<br />

time that <strong>the</strong> triadic is commissioned on <strong>the</strong> widened road. The size, shape and colour of all<br />

<strong>the</strong> sign and caution boards shall be as mentioned above as per detailed drawings in<br />

accordance with <strong>the</strong> relevant I. R. C. specifications and as per Ministry of Road Transport and<br />

Highway’s specifications.<br />

Contractor No. of Corrections Executive Engineer


107<br />

(i)<br />

The provision of item of traffic safety measures as per drawing No.1 shall be obligatory to <strong>the</strong><br />

contractor and no sprate payment whatsoever will be made <strong>for</strong> <strong>the</strong> same.<br />

(10) Additional tender condition <strong>for</strong> Traffic Safety :-<br />

Not withstanding whe<strong>the</strong>r it as per rules of <strong>the</strong> traffic authorities or o<strong>the</strong>rwise <strong>the</strong> agency<br />

should ensure that <strong>the</strong>ir vehicles <strong>the</strong> term includes all construction machinery towed or self driven<br />

are equipped with <strong>the</strong> following to emphasize traffic safety.<br />

1) Reflective 4 Nos.<br />

2) Tail imps 2 Nos.<br />

3) One of <strong>the</strong> following slogans.<br />

1. •Ö»¤üß ú¸üŸÖß úÖ´Ö Ö¸üÖ²Ö, ÆüÖê¿Ö ´Öê †Ö†Öê »ÖÖü ÃÖÖÆü²Ö.<br />

2. ¤üÖ¹ý“ÖÖ ‹ú“Ö ¯µÖÖ»ÖÖ úÖ¸üÖ ŸÖã´Ö“µÖÖ −ÖÖ¿ÖÖ»ÖÖ.<br />

3. −ÖúÖê, ´Ö¸üÖ −ÖúÖê †¯ÖÓÖŸÖÖ, ¾ÖêÖÖ¾Ö¸ü ŸÖÖ²ÖÖ ¯ÖÖôûÖ ¤üÖŸÖÖ.<br />

4. ÃÖ´ÖµÖ ´Ö㻵־ÖÖ−Ö Æîü »Öê×ú−Ö •Öß¾Ö−Ö †´Öã»µÖ Æîü<br />

5. ¾ÖÖÆü−Ö ¾µÖ¾ÖÛÃ£ÖŸÖ •Öß¾Ö−Ö ÃÖã¸ü×ÖŸÖ.<br />

6. ‹ú —Ö¯Öúß ‹ú †¯Ö‘ÖÖŸÖ.<br />

7. •Öê£Öê »ÖÖ ×¾Ö“Ö×»ÖŸÖ ŸÖê£Öê †¯Ö‘ÖÖŸÖ ×−ÖÛ¿“ÖŸÖ.<br />

8. †Ö¯Öúß ³Öã»Ö ¤ãüÃÖ¸üÖê úß ¯Ö¸êü¿ÖÖ−Öß.<br />

9. †Ö¾Ö¸üÖ ¾ÖêÖÖ»ÖÖ ÃÖÖ¾Ö¸üÖ •Öß¾ÖÖ»ÖÖ.<br />

10. ´Ö−ÖÖ“ÖÖ ²ÖÎêú ˆ¢Ö´Ö ²ÖÎêú.<br />

11. ¬Öã´ÖϯÖÖ−Ö ´Öª¯ÖÖ−Ö †ÖµÖãµÖÖ“Öß ¬Öãôû¬ÖÖ.<br />

12. Drink and drive you won,s survive.<br />

13. Live and let live.<br />

14. A Cat has 9 lives you have only 1<br />

In absence of <strong>the</strong> above requirements and failure of <strong>the</strong> agency to fulfil <strong>the</strong>m in a reasonable<br />

time, <strong>the</strong> Executive Engineer, in charge of <strong>the</strong> work will get it done from <strong>the</strong> Mechanical wing of <strong>the</strong><br />

P.W. Department and would recover <strong>the</strong> cost from <strong>the</strong> amount due to <strong>the</strong> agency of following rates.<br />

Contractor No. of Corrections Executive Engineer


108<br />

1. Reflective Rs. 25/- Per No.<br />

2. Tail Lamp Rs. 175/- Per No.<br />

3. Slogan Rs. 75/- Per No.<br />

The decision of <strong>the</strong> Executive Engineer will be binding and conclusive in this matter.<br />

(12) GENERALCONDITION AND SPECIFICATION:<br />

12.1 These are to apply as additional specification and conditions unless o<strong>the</strong>rwise already provided<br />

<strong>for</strong> contradictorily elsewhere in this contract.<br />

12.2 CONTRACTOR TO STUDY SITE CONDITION :- The contractor shall be deemed to have<br />

carefully examined <strong>the</strong> work and site conditions including labour, <strong>the</strong> general and <strong>the</strong> special<br />

conditions, specification, schedules and drawing and shall be deemed to have visited <strong>the</strong> site<br />

of <strong>the</strong> work and to have fully in<strong>for</strong>med himself regarding <strong>the</strong> local conditions and carried out his<br />

own investigations to arrive at rates quoted in <strong>the</strong> tender. In this regard, he will be given<br />

necessary in<strong>for</strong>mation to <strong>the</strong> best of knowledge of Department but without any guarantee about<br />

it.<br />

If he shall have have any doubt as to <strong>the</strong> meaning of any portion of <strong>the</strong>se general<br />

conditions or <strong>the</strong> special conditions, or <strong>the</strong> scope of work or <strong>the</strong> specifications and drawings,<br />

or any o<strong>the</strong>r matter concerning <strong>the</strong> contract, he shall in good time, be<strong>for</strong>e submitting his<br />

tender, set <strong>for</strong>th <strong>the</strong> particulars <strong>the</strong>reof and submit <strong>the</strong>m to <strong>the</strong> Executive Engineer in In<br />

Charge of <strong>the</strong> work in writing in order that such doubts may be clarified authoritatively be<strong>for</strong>e<br />

tendering. Once a tender is submitted, <strong>the</strong> matter will be decided according to tender<br />

conditions in <strong>the</strong> absence of such au<strong>the</strong>ntic pre-clarification.<br />

12.3 DECLARATION OF THE CONTRACTOR :- The contractor should sign <strong>the</strong> declaration from on<br />

page no. 25<br />

12.7 PROGRAMME OF WORKI:- The <strong>works</strong> is to be completed within a period of months<br />

(including <strong>the</strong> monsoon period). The tentative programme my be as per <strong>the</strong> bar-chart attached<br />

in ender document.<br />

8.3 EXPLOSIVE: The Contractor shall at his own expense construct and maintain proper<br />

magazines, if such are required <strong>for</strong> <strong>the</strong> storage of explosives <strong>for</strong> use in connection with <strong>the</strong><br />

work and such magazines, being situated constructed and maintained in accordance with <strong>the</strong><br />

<strong>Government</strong> Rules applicable in that behalf. The Contractor shall at his own expenses obtain<br />

such license or licenses as may be necessary <strong>for</strong> storing and using explosives. Not with<br />

standing that <strong>the</strong> location etc. or storage of explosives are approved by <strong>the</strong> Engineer , <strong>the</strong><br />

<strong>Government</strong> , shall not bear any responsibility whatsoever in connection with <strong>the</strong> storage and<br />

use of explosives on <strong>the</strong> site or any accident or occurrence what -so-ever in connection,<br />

<strong>the</strong>rewith, all operations of <strong>the</strong> Contractor in or <strong>for</strong> which explosives employed being at <strong>the</strong> risk<br />

of contractor and upon his sole responsibility and <strong>the</strong> Contractor hereby gives to <strong>Government</strong><br />

an absolute indemnity in respect <strong>the</strong>reof.<br />

8.4 DAMAGE BY FLOODS OR ACCIDENTS:-<br />

The contractor shall take all precautions against damage by floods or from accident etc. No<br />

compensation will be allowed to <strong>the</strong> Contractor on this account or <strong>for</strong> correcting and repairing<br />

any such damage to <strong>the</strong> work during construction The Contractor shall be liable to make good<br />

at his cost any plant or materials belonging to <strong>the</strong> <strong>Government</strong> lost or damaged by floods or<br />

from any o<strong>the</strong>r cause while is in his charge.<br />

8.5 RELATION WITH PUBLIC AUTHORITIES:<br />

Contractor No. of Corrections Executive Engineer


109<br />

The Contractor shall comply with all rules, regulations, bye-laws and directions given from time<br />

to time by any local or <strong>public</strong> authority in connection with this work and shall himself pay all<br />

charges which are legible on him without any extra cost to <strong>the</strong> <strong>Government</strong> .<br />

POLICE PROTECTION: For <strong>the</strong> Special Protection of camp of <strong>the</strong> Contractor's <strong>works</strong>, <strong>the</strong><br />

Department will help <strong>the</strong> Contractor as far as possible to arrange <strong>for</strong> such protection with <strong>the</strong><br />

concerned authorities, if so required by <strong>the</strong> contractor in writing. The full cost of such protection<br />

shall be borne by <strong>the</strong> Contractor.<br />

8.6 INDEMNITY: The Contractor shall indemnify <strong>the</strong> <strong>Government</strong> against all actions, suits, claims<br />

and demands brought or made against it in respect of anything done of committed to be done<br />

by <strong>the</strong> contractor in execution of or in connection with <strong>the</strong> work of this contract and against any<br />

loss or damage to <strong>the</strong> <strong>Government</strong> in consequence to any action or suit being brought against<br />

<strong>the</strong> Contractor <strong>for</strong> anything done or committed to be done during <strong>the</strong> execution of this contract.<br />

The <strong>Government</strong> may at its discretion and entirely at <strong>the</strong> cost of <strong>the</strong> contractor defend such<br />

suit, ei<strong>the</strong>r jointly with <strong>the</strong> Contractor or single in case <strong>the</strong> latter chooses not to defend <strong>the</strong><br />

case.<br />

8.7 MEDICAL AND SANITARY ARRANGEMENTS TO BE PROVIDED FOR<br />

LABOUR EMPLOYED IN THE CONSTRUCTION BY THE CONTRACTOR<br />

a) The Contractor shall provide an adequate supply of pure and wholesome water <strong>for</strong> <strong>the</strong> use of<br />

labourers on work and in camps.<br />

b) The Contractor shall construct trench or semi permanent latrines <strong>for</strong> <strong>the</strong> use of <strong>the</strong> Labours.<br />

Separate latrines shall be provided <strong>for</strong> men and women.<br />

c) The Contractor shall build sufficient number of huts on a suitable plot of land <strong>for</strong> use of <strong>the</strong><br />

labourers according to <strong>the</strong> following specifications :-<br />

1. Huts with Bamboo’s and Grass may be constructed.<br />

2. A good site not liable to submergence shall be selected on high ground remote from jungle but<br />

well provided with tress, shall be chosen wherever it is available. The neighbourhood of tank,<br />

jungle, trees or wood should be particularly avoided; Camps should not be established close to<br />

large cutting of earth work.<br />

3. The lines of huts shall have open space of at least ten metres between rows. When a good<br />

natural site cannot be procured, particular attention should be given to <strong>the</strong> drainage.<br />

4. There should be no overcrowding. Floor space at <strong>the</strong> rate of 3 Sq. metre per head shall be<br />

provided. Care should be taken to see that <strong>the</strong> huts are kept clean and in good order.<br />

5. The Contractor must find his own land and if he wants <strong>Government</strong> land, he should apply <strong>for</strong> it.<br />

Assessment <strong>for</strong> it, if demanded will be payable by Contractor. However <strong>the</strong> Department does<br />

not bind itself <strong>for</strong> making available <strong>the</strong> required land.<br />

a) The Contractor shall construct a sufficient number of bathing places, washing places should<br />

also be provided <strong>for</strong> <strong>the</strong> purpose of washing clo<strong>the</strong>s.<br />

b) The Contractor shall engage a Medical Officer with a travelling dispensary <strong>for</strong> a Camp<br />

containing 500 or more persons if <strong>the</strong>re is no <strong>Government</strong> or o<strong>the</strong>r private dispensary situated<br />

with 8 Kms. from <strong>the</strong> camp. In case of emergency <strong>the</strong> Contractor shall arrange a this cost of<br />

transport <strong>for</strong> quick medical help to his sick worker.<br />

Contractor No. of Corrections Executive Engineer


c) The Contractor shall provide <strong>the</strong> necessary staff <strong>for</strong> effecting satisfactory conservancy and<br />

cleanliness of <strong>the</strong> camp to <strong>the</strong> satisfaction of <strong>the</strong> Engineer-in-charge. At least one sweeper per<br />

200 persons should be engaged.<br />

d) The Assistant Director of Public Health shall be consulted be<strong>for</strong>e opening a labour camp and<br />

his instruction on matters such as water supply, sanitary conveniences, <strong>the</strong> camp site<br />

accommodation and food supply shall be followed by <strong>the</strong> Contractor.<br />

e) The Contractor shall make arrangements <strong>for</strong> all ant malarial measures to provide <strong>for</strong> <strong>the</strong><br />

labours employed on <strong>the</strong> work. The ant malarial measures shall be provided as directed by <strong>the</strong><br />

Assistant Director of Public Health.<br />

f) The anti-malaria and o<strong>the</strong>r health measures shall be as directed by <strong>the</strong> Joint-Director (Malaria<br />

and Filaria) Health Services, Pune.<br />

g) Contractor shall see that mosquitogenic conditions are not created so as to keep vector<br />

populations to minimum level.<br />

h) Contractor shall carry out anti-malaria measures in <strong>the</strong> area as per guidelines prescribed under<br />

National Malaria Eradication Programme and as directed by <strong>the</strong> Joint Director, (M & F) of<br />

Health Services Pune.<br />

i) In case of default in carrying out prescribed antimalaria measures resulting in increase in<br />

Malaria incidence, contractor shall be liable to pay to <strong>Government</strong> <strong>the</strong> amount spent by<br />

<strong>Government</strong> on anti-malaria measure to control <strong>the</strong> situation in addition to fine.<br />

j) The Contractor shall make sufficient arrangements <strong>for</strong> draining away <strong>the</strong> surface and silage<br />

water as well as water coming from <strong>the</strong> bathing and washing places and shall dispose of this<br />

waste water in such way as not to cause any nuisance. He shall also keep <strong>the</strong> premise clean<br />

by employing sufficient number of sweepers.<br />

k) The Contractor shall comply with all rules, regulation bye-law and directions given from time to<br />

time by any local or <strong>public</strong> authority in connection with this work and shall pay fees or charges<br />

which are legible on him without any extra cost to <strong>Government</strong>.<br />

l) In addition to above all provisions of <strong>the</strong> relevant labour act pertaining to basic amenities to be<br />

provided to <strong>the</strong> labourer shall be applicable which will be arranged by <strong>the</strong> Contractor.<br />

9. MISCELLANEOUS:<br />

9.1 For providing electric wiring or water lines etc. recesses shall be provided if necessary through<br />

walls, slabs, beams etc. and later on refilled it with bricks or stones, chipping cement mortar<br />

without any extra cost.<br />

110<br />

9.2 In case it becomes necessary <strong>for</strong> <strong>the</strong> due fulfilment of contract <strong>for</strong> <strong>the</strong> Contractor to occupy<br />

land outside <strong>the</strong> Department limits, <strong>the</strong> Contractor will have to make his own arrangements with<br />

<strong>the</strong> land owners and pay such rents, if any, are payable as mutually agreed between <strong>the</strong>m.<br />

9.3 The Contractor shall duly comply with <strong>the</strong> provision of <strong>the</strong> Apprentices Act 1961 (iii of 1961)<br />

and <strong>the</strong> rules and orders made <strong>the</strong>re under from time to time under <strong>the</strong> said Rules and on his<br />

failure or neglect to do so he shall be subject to all <strong>the</strong> liabilities and penalties provided by <strong>the</strong><br />

said Act and Rules.<br />

9.4 It is presumed that <strong>the</strong> Contractor has gone carefully through <strong>the</strong> Standard Specification (Vol. I<br />

& II 1981 Edition) M.O.R.T. & H specifications (edition 2001) and Schedule of Rate of <strong>the</strong><br />

division, and studied <strong>the</strong> site conditions be<strong>for</strong>e arriving at rates quoted by him. The special<br />

provisions and detailed specification of wording of any item shall gain precedence over <strong>the</strong><br />

Contractor No. of Corrections Executive Engineer


111<br />

corresponding contrary provisions (if any) in <strong>the</strong> standard specification given without<br />

reproducing <strong>the</strong> details in contract. Decision of Engineer-in-charge shall be final in case of<br />

interpretation of specification.<br />

9.5 If <strong>the</strong> standard specifications fall short <strong>for</strong> <strong>the</strong> items quoted in <strong>the</strong> schedule of this contract<br />

reference shall be made to <strong>the</strong> latest Indian Standard specifications, I.R.C. codes. If any of<br />

items of this contract do not fall in reference quoted above, <strong>the</strong> decision and specifications as<br />

directed by <strong>the</strong> Engineer-in-charge shall be final.<br />

9.6 The stacking and storage of building materials at site shall be in such a manner as to prevent<br />

deterioration or inclusion of <strong>for</strong>eign materials and to ensure <strong>the</strong> preservation of <strong>the</strong> quantity,<br />

properties and fitness of <strong>the</strong> work. Suitable precautions shall be taken by Contractor to protect<br />

<strong>the</strong> materials against atmospheric action fire and o<strong>the</strong>r hazards. The materials likely to be<br />

carried away by wind shall be stored in suitable stores or with suitable barricades and where<br />

<strong>the</strong>re is likelihood of subsidence of soil, heavy materials shall be stored on paved plat<strong>for</strong>ms.<br />

Suitable separating barricades and enclosure as directed shall be provided to separate<br />

materials brought by contractor and from different sources of supply.<br />

10. DEFINITIONS:<br />

Unless excluding by or repugnant to <strong>the</strong> context:-<br />

a) The expression "<strong>Government</strong>" as used in <strong>the</strong> tender documents shall mean <strong>the</strong> Public<br />

Works Department of <strong>the</strong> <strong>Government</strong> of Maharashtra.<br />

b) The expression "The Chief Engineer" as used anywhere in <strong>the</strong> tender papers shall mean<br />

officer <strong>for</strong> <strong>the</strong> time being of <strong>the</strong> <strong>Government</strong> of Maharashtra who is designated as such.<br />

c) The expression "Superintending Engineer" as used in <strong>the</strong> tender papers shall mean <strong>the</strong><br />

officer of Superintending Engineer rank (by whatever designation he may be known)<br />

under whose control <strong>the</strong> work lies <strong>for</strong> <strong>the</strong> time being.<br />

d) The expression “Engineer” or “Engineer-In-Charge” as used in <strong>the</strong> tender papers shall<br />

mean <strong>the</strong> Executive Engineer-in-charge of <strong>the</strong> work.<br />

e) The expression "Contractor" as used in <strong>the</strong> tender papers shall mean <strong>the</strong> successful<br />

tenderer that is <strong>the</strong> tenderer whose tender has been accepted, and who has been<br />

authorised to proceed with <strong>the</strong> work.<br />

f) The expression "Contract" as used in <strong>the</strong> tender papers shall mean <strong>the</strong> deed of contract<br />

toge<strong>the</strong>r with or its original accompaniment and those later incorporated in it by mutual<br />

consent.<br />

g) The expression "Plant" as used in <strong>the</strong> tender papers shall mean very temporary and<br />

necessary means necessary or considered necessary by <strong>the</strong> Engineer to execute, construct,<br />

complete and maintain <strong>the</strong> <strong>works</strong> and used in altered, modified, substituted and additional<br />

<strong>works</strong> ordered in <strong>the</strong> time and in <strong>the</strong> manner herein provided and all temporary materials and<br />

special and o<strong>the</strong>r articles of appliances of every sort, kind and description whatsoever<br />

intended or used <strong>the</strong>re <strong>for</strong>.<br />

h) The expression “Department” as used in <strong>the</strong> tender papers shall means Public Works<br />

Department of <strong>Government</strong> of Maharashtra.<br />

i) The “Accepting authority” shall mean <strong>the</strong> officer competent to accept <strong>the</strong> tender.<br />

j) The “Site” shall mean <strong>the</strong> land and/or o<strong>the</strong>r places where <strong>the</strong> work is to be executed under<br />

<strong>the</strong> contract including any o<strong>the</strong>r land or places which may be allotted by <strong>the</strong> <strong>Government</strong> or<br />

use <strong>for</strong> <strong>the</strong> purpose of contract.<br />

11. TESTING ETC.: The Contractor shall be responsible <strong>for</strong> <strong>the</strong> quality of <strong>the</strong> work in <strong>the</strong> entire<br />

construction work within <strong>the</strong> contract. He shall, <strong>the</strong>re<strong>for</strong>e, have his own independent and<br />

Contractor No. of Corrections Executive Engineer


adequate setup <strong>for</strong> ensuring <strong>the</strong> same. This shall include establishing field laboratory <strong>for</strong> testing<br />

required <strong>for</strong> concrete <strong>works</strong>.<br />

12. AUTHORITIES OF THE ENGINEER IN CHARGE:Save in so far as it is legally or physically<br />

impossible <strong>the</strong> Contractor shall execute, complete and maintain <strong>the</strong> <strong>works</strong> in strict accordance<br />

with <strong>the</strong> contract under <strong>the</strong> directions and to <strong>the</strong> entire satisfaction of <strong>the</strong> Engineer in charge<br />

and shall comply with and adhere strictly to <strong>the</strong> Engineer-in-charge’s instructions and directions<br />

on any matter (Whe<strong>the</strong>r mentioned in <strong>the</strong> contract or not) pertaining to this <strong>works</strong>.<br />

112<br />

The Engineer in charge shall decide all questions which may arise as to<br />

quality and acceptability of materials furnished and work executed, manner of<br />

execution, rate of progress of <strong>the</strong> <strong>works</strong>, interpretation of <strong>the</strong> plans and specifications<br />

and acceptability of fulfilment of <strong>the</strong> contract on <strong>the</strong> part of <strong>the</strong> Contractor. He shall<br />

determine <strong>the</strong> amount and quantity of work per<strong>for</strong>med and materials furnished and his<br />

decision shall be final. In all such matters, and in any technical questions which may<br />

arise touching <strong>the</strong> contract, his decision shall be binding on <strong>the</strong> Contractor.<br />

The Engineer in charge shall have <strong>the</strong> power to en<strong>for</strong>ce such decisions and orders if<br />

<strong>the</strong> Contractor fails to carry <strong>the</strong>m out promptly. If <strong>the</strong> Contractor fails to execute <strong>the</strong> work<br />

ordered by <strong>the</strong> Engineer-in-charge . The Engineer in charge may give notice to Contractor<br />

specifying a reasonable period <strong>the</strong>rein and on <strong>the</strong> expiry of that period proceed to execute such<br />

work as may be deemed necessary and recover <strong>the</strong> cost <strong>the</strong>re of from <strong>the</strong> Contractor.<br />

12.1 AUTHORITIES OF THE ENGINEER-IN-CHARGE'S REPRESENTATIVE<br />

The duties of <strong>the</strong> representative of <strong>the</strong> Engineer-in-charge are to watch and<br />

supervise <strong>the</strong> work and to test and examine any material to be used <strong>for</strong> workmanship<br />

employed in connection with <strong>the</strong> <strong>works</strong>.<br />

12.2 The Engineer-in-charge may from time to time, in writing delegate to his representative any of<br />

<strong>the</strong> powers and authorities vested in <strong>the</strong> Engineer-in-charge and shall furnish to <strong>the</strong> Contractor<br />

a copy of all such delegations of powers and authorities. Any written instruction or approval<br />

given by <strong>the</strong> representative of <strong>the</strong> Engineer-in-charge to <strong>the</strong> Contractor within <strong>the</strong> terms of such<br />

delegations (but not o<strong>the</strong>rwise) shall bind <strong>the</strong> Contractor and <strong>the</strong> Department as though it had<br />

been given by <strong>the</strong> Engineer-in-charge, provided always as follows.<br />

a) Failure of <strong>the</strong> representative of <strong>the</strong> Engineer-in-charge to disapprove any work or material shall<br />

not prejudice <strong>the</strong> power of <strong>the</strong> Engineer-in-charge <strong>the</strong>reafter to disapprove such work or<br />

materials and to order to pulling down, removal or breaking up <strong>the</strong>reof.<br />

b) If <strong>the</strong> Contractor is dissatisfied with any decision of <strong>the</strong> Representative of <strong>the</strong> Engineer-incharge<br />

he shall be entitle to refer <strong>the</strong> matter to <strong>the</strong> Engineer-in-charge, who shall <strong>the</strong>re upon<br />

confirm/reverse or vary such decision.<br />

12.8 SEETTING OUT:- I) ROAD WORKS :-<br />

a) The contractor shall establish working bench marks in <strong>the</strong> area soon after taking possession of<br />

<strong>the</strong> site. The reference Bench mark <strong>for</strong> <strong>the</strong> area shall be as indicated in <strong>the</strong> Contract<br />

Document. The working bench mark/s shall be at <strong>the</strong> rate o four per Km. and also at or near all<br />

drainage structures, over bridges and underpasses. The working bench mark/s shall be got<br />

approved from Engineer. Checks must be made on <strong>the</strong>se bench marks once every month and<br />

adjustment if any got approved from Engineer and recorded. An up-to-date record of all bench<br />

marks including approved adjustment. If any shall be maintained by <strong>the</strong> contractor and also a<br />

copy supllied to <strong>the</strong> Engineer <strong>for</strong> his record.<br />

b) The lines and levels of <strong>for</strong>mation, side slopes, drainage, carriageway and shoulders shall be<br />

carefully set and frequently checked, care being taken to ensure that correct gradients and<br />

cross sections are everywhere obtained.<br />

Contractor No. of Corrections Executive Engineer


c) In order to facilitate <strong>the</strong> setting out of <strong>the</strong> <strong>works</strong>, <strong>the</strong> centre line of <strong>the</strong> carriage way or<br />

highway must be accurately established by <strong>the</strong> contractor and approved by <strong>the</strong> Engineer. It<br />

must <strong>the</strong>n be accurately referenced in a manner satisfactory to <strong>the</strong> Engineer, at every 50m<br />

intervals in plain and rolling terrain and 20m . Intervals in hilly terrain and at all curve points a<br />

directed by <strong>the</strong> Engineer, with marker pegs and chain age boards set in or near <strong>the</strong> fence line,<br />

and a schedule of reference dimensions shall be prepared and supplied by <strong>the</strong> contractor to<br />

<strong>the</strong> Engineer. These markers shall be maintained until <strong>the</strong> <strong>works</strong> reach finished <strong>for</strong>mation level<br />

and are accepted by <strong>the</strong> Engineer.<br />

d) On reaching <strong>the</strong> <strong>for</strong>mation level stage, <strong>the</strong> centre line shall again be set out by <strong>the</strong> contractor<br />

and when approved by <strong>the</strong> Engineer, shall be accurately referenced in a manner satisfactory<br />

to <strong>the</strong> Engineer by marker pegs set at <strong>the</strong> outer limits of <strong>the</strong> <strong>for</strong>mation.<br />

e) No reference peg or marker shall be removed or withdraw without <strong>the</strong> approval of <strong>the</strong> Engineer<br />

and no earthwork or structural work shall be commenced until <strong>the</strong> centre line has been<br />

referenced.<br />

f) The contractor will be <strong>the</strong> sole responsible party <strong>for</strong> safeguarding all survey monuments,<br />

bench marks, beacons etc. The Engineer will provide <strong>the</strong> contractor with <strong>the</strong> data necessary <strong>for</strong><br />

<strong>the</strong> setting out of <strong>the</strong> centre line. All dimensions and levels shown on <strong>the</strong> drawings or<br />

mentioned in documents <strong>for</strong>ming part of or issued under <strong>the</strong> contract shall be verified by <strong>the</strong><br />

contractor on <strong>the</strong> site and he shall immediately in<strong>for</strong>m <strong>the</strong> Engineer of any apparent errors or<br />

discrepancies in such dimensions or levels. The contractor shall after or in connection with <strong>the</strong><br />

setting out of <strong>the</strong> center line, survey <strong>the</strong> terrain along <strong>the</strong> road and shall submit to <strong>the</strong><br />

Engineer <strong>for</strong> his approval, a profile along <strong>the</strong> road centreline and cross sections at intervals as<br />

required by <strong>the</strong> Engineer.<br />

g) After obtaining approval of <strong>the</strong> Engineer, work on item of earthwork can commence and <strong>the</strong><br />

profile and cross sections shall <strong>for</strong>m <strong>the</strong> basis <strong>for</strong> measurement and payment . The contractor<br />

is responsible <strong>for</strong> checking that all <strong>the</strong> basic traverse points are in place at <strong>the</strong> commencement<br />

of <strong>the</strong> contract and if any are missing, or appear to have been disturbed, <strong>the</strong> contractor shall<br />

make arrangements in re-establishing <strong>the</strong>se points.<br />

113<br />

A Survey File containing <strong>the</strong> necessary data will be made available <strong>for</strong> this purpose.<br />

If in <strong>the</strong> opinion of <strong>the</strong> Engineer, design, modifications of <strong>the</strong> centreline or grade are advisable,<br />

<strong>the</strong> Engineer will issue detailed instructions to <strong>the</strong> contractor and to contractor shall per<strong>for</strong>m <strong>the</strong><br />

modification in <strong>the</strong> field, as required and modify <strong>the</strong> ground levels on <strong>the</strong> cross sections<br />

accordingly as many times as required. There will be no separate payment <strong>for</strong> any survey work<br />

per<strong>for</strong>med by <strong>the</strong> contractor.<br />

The cost of <strong>the</strong>se services shall be considered as being included in <strong>the</strong> cost of <strong>the</strong> items of<br />

work in <strong>the</strong> Bill of Quantities.<br />

h) The <strong>works</strong> of setting out shall be deemed to be part of general <strong>works</strong>, preparatory to <strong>the</strong><br />

execution of work and no9 separate payment shall be made <strong>for</strong> <strong>the</strong> same.<br />

II) SETTING OUT FOR (BRIDGE WORKS :-<br />

Immediately on receipt of <strong>the</strong> ork order, <strong>the</strong> contractor shall at his own expense clean <strong>the</strong> site<br />

and take up a provisional and final setting out and lining out of <strong>the</strong> work under <strong>the</strong> supervision<br />

of his responsible representative and shall provide necessary material, labour, tools, instrument<br />

etc. required <strong>for</strong> <strong>the</strong> same One tentative abutment location will be indicated by Engineer-incharge<br />

and <strong>the</strong> centre line of <strong>the</strong> bridge shall be defined by him. The contractor will <strong>the</strong>n have<br />

to fix up <strong>the</strong> location of <strong>the</strong> o<strong>the</strong>r abutment. The abutment location will <strong>the</strong>n be verified by <strong>the</strong><br />

Department and may be adjusted. Once <strong>the</strong> final location of abutments is so finalised, it will be<br />

<strong>the</strong> contractor’s responsibility to line out and locate <strong>the</strong> remaining foundations.<br />

Contractor No. of Corrections Executive Engineer


114<br />

The contractor shall he responsible <strong>for</strong> true and proper setting out of <strong>the</strong> <strong>works</strong> and <strong>for</strong> <strong>the</strong><br />

correctness of <strong>the</strong> positions, level dimensions and arrangements of all <strong>works</strong>, and <strong>for</strong> providing<br />

all necessary instruments appliances and labours in connection <strong>the</strong>rewith at his own cost.<br />

Officers may assist <strong>the</strong> contractor in proper setting out . <strong>Government</strong> instruments my be<br />

allowed to be used <strong>for</strong> setting out of work <strong>for</strong> which no cost shall be recovered from <strong>the</strong><br />

contractor. If at any time during <strong>the</strong> progress of work, any errors arise in regard to levels or<br />

dimensions or alignment of any part of <strong>the</strong> work, rectification <strong>the</strong>reof, on being required to do<br />

so, will be carried out by <strong>the</strong> contractor at his own cost, unless such errors are based on<br />

incorrect data, supplied in writing , by <strong>the</strong> Engineer of his authorised representative in which<br />

case <strong>the</strong> expenses of <strong>the</strong> rectification shall be refunded by <strong>Government</strong>.<br />

The checking of any setting out our checking of levels by <strong>the</strong> Engineer or his<br />

authorised representative shall not in any way relieve <strong>the</strong> contractor of his<br />

responsibility <strong>for</strong> <strong>the</strong> correctness <strong>the</strong>reof. The contractor shall carefully protect and<br />

preserve all bench marks site rails, pegs and o<strong>the</strong>r things used in setting out of work.<br />

12.20 TRAFFIC REGULATION FOR ROAD WORKS:-<br />

a) Unless separately provided <strong>for</strong> in <strong>the</strong> contract, <strong>the</strong> contractor shall have to make all necessary<br />

arrangements <strong>for</strong> regulating traffic, day and night during <strong>the</strong> period of construction to <strong>the</strong> entire<br />

Satisfaction of <strong>the</strong> Engineer. This includes <strong>the</strong> construction and maintenance of diversions if<br />

necessary. The contractor shall have to provide necessary caution boards, barricades, flags,<br />

lights and watchmen etc. so as to comply with <strong>the</strong> latest Motor Vehicles rules and regulations<br />

<strong>for</strong> traffic safety and he shall be responsible <strong>for</strong> all claims from accidents which may arise due<br />

to his negligence whe<strong>the</strong>r in regulating <strong>the</strong> traffic or in stacking materials on <strong>the</strong> roads, or due<br />

to any o<strong>the</strong>r reasons.<br />

(a)<br />

The contractor shall at all times carry out <strong>the</strong> work on <strong>the</strong> road in a manner crating least<br />

interferences to <strong>the</strong> flow of traffic, while consistent with <strong>the</strong> satisfactory execution of <strong>the</strong> same.<br />

For all <strong>works</strong>, involving improvements to <strong>the</strong> existing road, <strong>the</strong> contractor shall, in Accordance<br />

with <strong>the</strong> directives of <strong>the</strong> Engineer-in-Charge, provide and maintain, during <strong>the</strong> execution of<br />

work a passage <strong>for</strong> traffic, ei<strong>the</strong>r along or part of <strong>the</strong> existing carriageway under improvement<br />

or along a temporary diversion constructed close to <strong>the</strong> road.<br />

(b)TRAFFIC REGULATION FOR BRIDGES AND C.D.WORKS<br />

It is to be clearly understood that whatever work carried out by <strong>the</strong> Contractor <strong>for</strong> construction<br />

of diversion road including earthwork, W.B.M. Bituminous surface dressing, R.C.C. pipe drains<br />

etc. will be paid <strong>for</strong> only once. If <strong>the</strong> items of temp, diversion are included in <strong>the</strong> contract and if<br />

due to flow of traffic, due to floods or due to any o<strong>the</strong>r cause, this diversion road and/or <strong>the</strong><br />

R.C.C. drain gets damaged it shall be repaired and maintained by <strong>the</strong> contractor in good<br />

condition till completion of <strong>the</strong> whole work at his own expense. Traffic safety and control<br />

shall be as per clause No. 112.4 of M.O.R.T. & H Specifications <strong>for</strong> Roads and bridges ( 4 th<br />

Revision 2001)<br />

12.21 SUPERVISION AND ISPECTION OF WORKS AND QUALITY CONTROL<br />

a) SUPERVISION<br />

The contractor shall ei<strong>the</strong>r himself supervise <strong>the</strong> execution of <strong>the</strong> <strong>works</strong> or shall appoint <strong>the</strong><br />

competent agent approved by <strong>the</strong> Engineer-in-Charge, to act on his behalf. If in <strong>the</strong> opinion of<br />

<strong>the</strong> Engineer-in-Charge, <strong>the</strong> contractor has himself no sufficient knowledge and experience of<br />

receiving instructions of cannot give his full attention to <strong>the</strong> <strong>works</strong>, <strong>the</strong> contractor shall at his<br />

own expenses employ as his accredited agent a qualified Engineer approved by <strong>the</strong> Engineerin-Charge.<br />

Orders given to <strong>the</strong> contractor’s agent shall be considered to have <strong>the</strong> same <strong>for</strong>ce as if <strong>the</strong>re<br />

had been given to <strong>the</strong> contractor himself. If <strong>the</strong> contractor fails to appoint suitable agent as directed<br />

by <strong>the</strong> Engineer-in-Charge, <strong>the</strong> Engineer-in-Charge shall have full power to suspend <strong>the</strong> execution of<br />

Contractor No. of Corrections Executive Engineer


<strong>the</strong> work until such date a suitable agent is appointed and <strong>the</strong> contractor shall be responsible <strong>for</strong> <strong>the</strong><br />

delay so caused to <strong>the</strong> <strong>works</strong> and <strong>the</strong> contractor shall not be entitled <strong>for</strong> any compensation on this<br />

behalf.<br />

12.25 ROTECTION OF UNDERGROUND TELEPHONE CABLE AND AERIAL TELEPHONE<br />

WIRES AND POLES, TRANSMISSION TOWERS, ELECTRICITY CABLES AND WATER<br />

SUPPLY LINES.<br />

115<br />

During <strong>the</strong> execution of work, it is likely that <strong>the</strong> contractor may meet with telephone cables,<br />

electrical cables, water supply lines, etc. It will, <strong>the</strong>re<strong>for</strong>e be <strong>the</strong> responsibility of <strong>the</strong> contractor<br />

to protect <strong>the</strong>m carefully. All such cases should be brought to <strong>the</strong> notice of <strong>the</strong> Engineer-in-<br />

Charges and also of <strong>the</strong> concerned Department by <strong>the</strong> contractor. Any damage what so ever<br />

done to <strong>the</strong>se cables and pipe lines by <strong>the</strong> contractor shall be made good by him at his cost.<br />

12.27 SAFETY CODE :-<br />

1) Suitable scaffolds shall be provided <strong>for</strong> workmen <strong>for</strong> all <strong>works</strong> that cannot safely be done<br />

from <strong>the</strong> ground or from solid construction except such short period work as can be done<br />

safely from ladders. When ladder is used an extra mazdoor shall be engaged <strong>for</strong> holding <strong>the</strong><br />

ladder and if <strong>the</strong> ladder is used <strong>for</strong> carrying materials as well suitable footholds and handholds<br />

shall be provided on <strong>the</strong> ladder and <strong>the</strong> ladder shall be given an inclination not steeper than 1:4<br />

(1.horizontal and 4 vertical).<br />

2) Scaffolding or staging more than 3.25m above <strong>the</strong> ground or floors swung or suspended<br />

from an overhead support or erected with stationary supports, shall have guard rail properly<br />

attached bolted braced and o<strong>the</strong>rwise assured at least 1m high above <strong>the</strong> floor or plat<strong>for</strong>m of<br />

such scaffolding or staging and extending along <strong>the</strong> entire length. Of <strong>the</strong> outside ends <strong>the</strong>reof<br />

with only such openings as may be necessary <strong>for</strong> <strong>the</strong> delivery of materials. Such scaffolding or<br />

staging shall be so fastened as to prevent it from swaying from <strong>the</strong> building or <strong>the</strong> structure.<br />

3) Working plat<strong>for</strong>m, gangways, and stairways shall be so constructed that <strong>the</strong>y do not sag<br />

unduly or is more that 3.25m above ground level or floor level. It shall be closely boarded and<br />

should have adequate width and should be suitably fenced as described in 2 above.<br />

4) Every opening in floor of <strong>the</strong> building or in a working plat<strong>for</strong>m shall be provided with<br />

suitable protection to prevent fall of persons or materials by providing suitable fencing or railing<br />

with minimum height of 1m.<br />

5) Safe means of access shall be provided to all working plat<strong>for</strong>ms and o<strong>the</strong>r working<br />

places. Every ladder shall be securely fixed No portable single ladder shall be over 9m in<br />

length. Width between side rails of ladder shall in no case be less than 30 cms <strong>for</strong> ladder up to<br />

and including 3m in length. For longer ladders this width shall be increases at least 6mm <strong>for</strong><br />

each additional 20 cms. Of length. Uni<strong>for</strong>m step spacing shall not exceed 30 cms.<br />

6) Adequate precautions shall be taken to prevent danger from electrical equipments. No<br />

materials on any of <strong>the</strong> site shall be stacked or placed as to cause danger or inconvenience to<br />

any <strong>public</strong>. The contractor shall provide all necessary fencing and lights to protect <strong>public</strong> from<br />

accidents and shall be bound to bear expense of defence of every suit, action or o<strong>the</strong>r<br />

proceedings of law that may be brought by any person <strong>for</strong> injury sustained owing to neglect of<br />

<strong>the</strong> above precaution and to pay any damages and costs which may be awarded in any such<br />

suit action or proceedings to any such person or which may with <strong>the</strong> consent of <strong>the</strong> contractor<br />

to be paid to compromise any claim by any such person.<br />

12.28 SCOPE OF RATES FOR DIFFERENT ITEMS OF WORK :- For item rate contractors, <strong>the</strong><br />

contract unit rates <strong>for</strong> different items of work shall be <strong>for</strong> payment in full <strong>for</strong> completing <strong>the</strong> work<br />

to <strong>the</strong> requirements of <strong>the</strong> specifications including full compensation fro all <strong>the</strong> operations<br />

detailed in <strong>the</strong> relevant section of <strong>the</strong>se specifications under “Rate” In <strong>the</strong> absence of any<br />

direction to <strong>the</strong> contrary, <strong>the</strong> rates are to be considered as fully inclusive of rate <strong>for</strong> finished<br />

work covering all labour materials, wastage, temporary work, plant, equipment, overhead<br />

charges and profit as well as <strong>the</strong> general liabilities obligations and risks arising out to <strong>the</strong><br />

Contractor No. of Corrections Executive Engineer


116<br />

general conditions of contract.<br />

The item rates quoted by <strong>the</strong> contractor shall unless o<strong>the</strong>rwise specified also include<br />

compliance with / supply of <strong>the</strong> following :-General <strong>works</strong> such as setting out clearance of site<br />

be<strong>for</strong>e setting out and clearance of <strong>works</strong> after completion.<br />

i) A detailed programme <strong>for</strong> <strong>the</strong> construction and completion of <strong>the</strong> <strong>works</strong> (using / CPM / PERT<br />

techniques) giving in addition to construction activities detailed network activities <strong>for</strong> <strong>the</strong><br />

submission and approval of materials procurement of critical materials and equipments.<br />

Fabrication of special products/ equipments and <strong>the</strong>ir installations and testing and <strong>for</strong> all<br />

activities of <strong>the</strong> Employer that are likely to effect <strong>the</strong> progress of work etc. including up dating of<br />

all such activities on <strong>the</strong> basis of <strong>the</strong> decisions taken at <strong>the</strong> periodic site review meetings or as<br />

directed by <strong>the</strong> Engineer in charge.<br />

ii)<br />

iii)<br />

iv)<br />

Samples of various materials proposed to be used on <strong>the</strong> work <strong>for</strong> conducting tests <strong>the</strong>re on as<br />

required as per <strong>the</strong> provisions of <strong>the</strong> contract.<br />

Design of mixes as per <strong>the</strong> relevant clauses of <strong>the</strong> specifications giving proportions of<br />

ingredients sources of aggregates and binder along with accompanying trial mixes as per <strong>the</strong><br />

relevant clauses of <strong>the</strong>se specification to be submitted to <strong>the</strong> Engineer <strong>for</strong> this approval be<strong>for</strong>e<br />

use in <strong>the</strong> <strong>works</strong>.<br />

Detailed designs, calculations and drawings <strong>for</strong> all temporary <strong>works</strong> (such as from work,<br />

staging, cantering, specialised constructional handling and linching equipment and <strong>the</strong> like)<br />

v) Detailed drawings <strong>for</strong> templates support and end anchorage details <strong>for</strong> pre stressing cable<br />

profiles bas bending and cutting schedules <strong>for</strong> rein<strong>for</strong>cements materials lists <strong>for</strong> fabrication of<br />

structural steel etc.<br />

vi)<br />

vii)<br />

viii)<br />

ix)<br />

Mill test reports <strong>for</strong> all mild and high tensile steel and cast steel as per <strong>the</strong> relevant provisions<br />

of <strong>the</strong> specifications.<br />

Testing of various finished items and materials including bitumen cement concrete bearings as<br />

required under <strong>the</strong>se specifications and furnishing test reports/ certificates.<br />

Inspection report in respect of <strong>for</strong>m work staging rein<strong>for</strong>cement and o<strong>the</strong>r items of work as per<br />

<strong>the</strong> relevant specifications.<br />

Any o<strong>the</strong>r data which may be required as per <strong>the</strong>se speculations or <strong>the</strong> conditions of contract<br />

or any o<strong>the</strong>r annexure/ schedules <strong>for</strong>ming part of <strong>the</strong> contract.<br />

x) Any o<strong>the</strong>r item of work which is not specifically provided in <strong>the</strong> bill of quantities but which is<br />

necessary <strong>for</strong> complying with <strong>the</strong> provisions of <strong>the</strong> contract.<br />

xi)<br />

All temporary <strong>works</strong> <strong>for</strong>m and false <strong>works</strong>.<br />

Portion of road <strong>works</strong> beyond <strong>the</strong> limits and or any o<strong>the</strong>r work may be got constructed by <strong>the</strong><br />

employer directly through o<strong>the</strong>r agencies. Accordingly o<strong>the</strong>r agencies employed by <strong>the</strong><br />

Employed by <strong>the</strong> Employer may be working in <strong>the</strong> vicinity of <strong>the</strong> work being executed by <strong>the</strong><br />

contractor. The contractor shall liaise with such agencies and adjust his construction<br />

programme <strong>for</strong> <strong>the</strong> completion of <strong>the</strong> work accordingly and no claim or compensation due to<br />

any reason whatsoever will be entertained on this account. The Employer will be indemnified<br />

by <strong>the</strong> contractor <strong>for</strong> may claims from o<strong>the</strong>r agencies on this account.<br />

14.2 RESPONSIBILITIES FOR LEVEL AND ALIGNMENT:-<br />

The contractor shall be entirely and exclusively responsible <strong>for</strong> <strong>the</strong> horizontal and<br />

vertical alignment, <strong>the</strong> levels and correctness of every part of <strong>the</strong> work and shall rectify<br />

effectually any errors or imperfections <strong>the</strong>rein, such rectifications shall be carried out by <strong>the</strong><br />

Contractor No. of Corrections Executive Engineer


contractor, at his own cost, when instructions are issued to that effect by <strong>the</strong> Engineer in<br />

charge.<br />

15. LEVELING INSTRUMENTS:-<br />

117<br />

If measurements of items of <strong>the</strong> work are based on volumetric measurements<br />

calculated from levels taken be<strong>for</strong>e and after <strong>the</strong> construction of <strong>the</strong> item, a large<br />

number of levelling staves, tapes etc. will have to be kept available by <strong>the</strong> contractor<br />

at <strong>the</strong> site of <strong>the</strong> work <strong>for</strong> this purpose. Lack of <strong>the</strong> levelling staves; tapes etc. in<br />

required numbers may case delay in measurements and <strong>the</strong> work. The contractor<br />

will have <strong>the</strong>re<strong>for</strong>e to keep sufficient numbers of <strong>the</strong>se instruments readily available<br />

at site and in good working condition.<br />

16. STACKING AND STORAGE AND GUARDING OF MATERIALS:<br />

16.1 The stacking and storage of material at site shall be in such a manner as to prevent<br />

deterioration or intrusion of <strong>for</strong>eign matter and to ensure <strong>the</strong> preservation of <strong>the</strong>ir<br />

quality, properties and fitness <strong>for</strong> <strong>the</strong> work. Suitable precautions shall be taken by <strong>the</strong><br />

Contractor to protect <strong>the</strong> materials against atmospheric action, fire and o<strong>the</strong>r hazards.<br />

The materials likely to be carried away by wind shall be stored in suitable stores or<br />

with suitable barricades and where <strong>the</strong>re is likely hood of subsidence of soil, heavy<br />

materials shall be stored on paved plat<strong>for</strong>ms.<br />

Suitable separating barricades and enclosures as directed shall be provided to<br />

separate materials brought by Contractor and materials issued by <strong>Government</strong> to<br />

Contractor under Schedule "A" Same applies <strong>for</strong> <strong>the</strong> material obtained from different<br />

sources of supply.<br />

16.2 The Contractor shall at his own expense engage watchman <strong>for</strong> guarding <strong>the</strong> materials and<br />

plant and machinery and <strong>the</strong> work during day and night against any pilferage or damage and<br />

also <strong>for</strong> prohibiting trespassers.<br />

16.3 No materials brought to <strong>the</strong> site shall be removed from <strong>the</strong> site without <strong>the</strong> prior<br />

approval of <strong>the</strong> Engineer-in-charge.<br />

17. INSPECTION OF WORKS<br />

17.1 The Contractor shall in<strong>for</strong>m <strong>the</strong> Engineer-in-charge in writing when any portion of <strong>the</strong> work is<br />

ready <strong>for</strong> inspection giving him sufficient notice to enable him to inspect <strong>the</strong> same without<br />

affecting <strong>the</strong> fur<strong>the</strong>r progress of <strong>the</strong> work.<br />

17.2 The Contractor shall provide at his cost necessary ladders and such arrangements as<br />

are considered safe by <strong>the</strong> Engineer-in-charge <strong>for</strong> proper inspection of all parts of <strong>the</strong><br />

work.<br />

17.3 Contractor shall extend his full co-operation and make all necessary arrangements<br />

when needed <strong>for</strong> carrying out inspection of <strong>the</strong> work or any part of <strong>the</strong> work by <strong>the</strong><br />

local representatives, M.L.As, M.Ps and officers and dignitaries / delegates of various<br />

<strong>Government</strong> <strong>department</strong>s, local bodies, private sectors etc. No compensation shall be<br />

paid to <strong>the</strong> contractor on this account.<br />

17.4 The work shall be carried out by <strong>the</strong> Contractor without causing damage to <strong>the</strong> existing<br />

<strong>Government</strong> property and / or private property. If any such damage is caused, <strong>the</strong> Contractor<br />

shall pay <strong>for</strong> restoration of <strong>the</strong> property to <strong>the</strong> original conditions, and any o<strong>the</strong>r consequent<br />

damages.<br />

17.5 In <strong>the</strong> event of <strong>the</strong> occurrence of an accident involving serious injuries or death of any person,<br />

at site of work or quarry or at any place in connection with <strong>the</strong> work <strong>the</strong> same shall be reported<br />

Contractor No. of Corrections Executive Engineer


in writing within twenty four hours of <strong>the</strong> occurrence to <strong>the</strong> Engineer-in-charge and<br />

Commissioner of Workmen's compensation.<br />

17.6 The Contractor after completion of work shall clean <strong>the</strong> site of all debris and remove all<br />

unused materials o<strong>the</strong>r than those supplied by <strong>the</strong> <strong>department</strong> and all plant and<br />

machinery, equipment, tools etc. belonging to him within one month from <strong>the</strong> date of<br />

completion of <strong>the</strong> work, or o<strong>the</strong>rwise <strong>the</strong> same will be removed by <strong>the</strong> <strong>department</strong> at<br />

his cost or disposed off as per <strong>department</strong>al procedure. In case <strong>the</strong> material is<br />

disposed off by <strong>the</strong> <strong>department</strong>, <strong>the</strong> sale proceeds will be credited to <strong>the</strong> Contractor’s<br />

account after deducting <strong>the</strong> cost of sale incurred. However, no claim of Contractor<br />

regarding <strong>the</strong> price or amount credited will entertained afterwards.<br />

17.7 All constructional plant, provided by <strong>the</strong> Contractor shall when brought on to <strong>the</strong> site be<br />

deemed to be exclusively intended <strong>for</strong> <strong>the</strong> construction and <strong>the</strong> contractor shall not remove <strong>the</strong><br />

same or any part <strong>the</strong>reof (save <strong>for</strong> <strong>the</strong> purpose of moving it from one part of <strong>the</strong> site to ano<strong>the</strong>r)<br />

without <strong>the</strong> consent in writing of <strong>the</strong> Engineer-in-charge who shall record <strong>the</strong> reasons <strong>for</strong><br />

withholding <strong>the</strong> consent.<br />

12.29 PAYMENTS:-<br />

a) RUNNINGS BILLS :- Two payments in a month will be granted by <strong>the</strong> Engineer-in-Charge if<br />

<strong>the</strong> progress is satisfactory. Contractor should submit bills to <strong>the</strong> Engineer-in-Charge in<br />

appropriate <strong>for</strong>ms.<br />

b) Final Bill:-The contractor should submit final bill within one month after completion of <strong>the</strong> work<br />

and <strong>the</strong> same will be paid within 3 months if it is in order. Disputed items and claims if any shall<br />

be excluded from <strong>the</strong> final bill and settled separately later on.<br />

12.30 CLAIMS :- Bill <strong>for</strong> extra work or <strong>for</strong> any claim shall be paid separately apart from <strong>the</strong> interim<br />

bills <strong>for</strong> <strong>the</strong> main work. The payment of bills <strong>for</strong> <strong>the</strong> main work shall not be withheld <strong>for</strong> want of<br />

decision on <strong>the</strong> extra or claims not covered in <strong>the</strong> appendices.<br />

118<br />

Claims <strong>for</strong> extra work shall be registered within 30days of occurrence of <strong>the</strong> event.<br />

However bills <strong>for</strong> <strong>the</strong>se claims including supporting data/details may be submitted<br />

subsequently.<br />

12.32: MAINTENANCE:-<br />

12.31.1 The contractor shall maintain <strong>the</strong> finished surface of <strong>the</strong> road <strong>for</strong> a period of as per D.L.P<br />

Period in clause No.20 after <strong>the</strong> completion of work without any extra cost of Govt.<br />

12.32.2 On completion of <strong>the</strong> work in all respects, necessary certificate will be issued by <strong>the</strong><br />

concerned Executive and <strong>the</strong> defect liability period will be counted from <strong>the</strong> date of issue of<br />

such certificates.<br />

12.32.3 All damages during execution shall be made good by <strong>the</strong> contractor at his cost. He will<br />

be responsible <strong>for</strong> any damages to <strong>the</strong> road surface including B.T surface in rainy seasons and<br />

during construction and guaranteed maintenance period and no separate payment will be<br />

made <strong>for</strong> restoring such damages.<br />

12.32.4 Defective work is liable to be rejected at any stage. The contractor on no account can<br />

refuse to rectify <strong>the</strong> defects merely on reasons that fur<strong>the</strong>r work has carried out No. extra<br />

payment shall be made <strong>for</strong> such rectification.<br />

12.32.5 The agency has to be commence <strong>the</strong> rectification work as soon as possible and in any case<br />

no later than 3 days of its communication by <strong>the</strong> concerned E.E./D.E/J.E and complete <strong>the</strong><br />

same within 7 days maximum in case <strong>the</strong> agency fails to start <strong>the</strong> rectification work within<br />

above specified period, <strong>the</strong> <strong>department</strong> will levy a compensation of Rs. 5000.00 per day till <strong>the</strong><br />

Contractor No. of Corrections Executive Engineer


119<br />

time commences <strong>the</strong> rectification work.<br />

12.32.6 Alternatively <strong>the</strong> rectification work will be taken up in hand by <strong>the</strong> <strong>department</strong> after 3 days at<br />

<strong>the</strong> risk and cost of <strong>the</strong> agency and all expenses including any incidentals will be recovered<br />

from its immediate <strong>for</strong>thcoming bill or deposit kept with <strong>the</strong> <strong>department</strong> The agency will have to<br />

make all necessary arrangements <strong>for</strong> smooth flow of traffic till <strong>the</strong> time <strong>the</strong> rectification work is<br />

completed or also this will be done by <strong>the</strong> <strong>department</strong> at <strong>the</strong> risk and cost of agency.<br />

12.32.7 The agency will have to make all necessary arrangement <strong>for</strong> smooth flow of traffic till <strong>the</strong> time<br />

<strong>the</strong> rectification work is completed or also this will be done by <strong>the</strong> <strong>department</strong> at <strong>the</strong> risk and<br />

cost of agency.<br />

12.32.8 The contractors liability of maintaining <strong>the</strong> road to <strong>the</strong> required specifications will commence<br />

right from <strong>the</strong> date of work order till <strong>the</strong> expiry of defect liability period. The liability also extends<br />

to <strong>the</strong> un tackled length.<br />

12.33 Additional condition to be incorporated in <strong>the</strong> tenders <strong>for</strong> work primarily of bituminous<br />

nature<br />

1) The roughness index measurements shall be carried out by “Towed fifth wheel bump<br />

integrator” by <strong>the</strong> contractor at his own cost.<br />

2) The agency will be responsible <strong>for</strong> <strong>the</strong> maintenance of <strong>the</strong> entire stretch of <strong>the</strong> road included in<br />

<strong>the</strong> scope of work right from <strong>the</strong> day on which <strong>the</strong> work order is issued <strong>for</strong> <strong>the</strong> work, till <strong>the</strong> end<br />

of defect liability period.<br />

3) Where <strong>the</strong> use of vibratory roller and mechanical pavers is envisaged <strong>for</strong> <strong>the</strong> work , <strong>the</strong> agency<br />

must produce <strong>the</strong> relevant papers to prove that <strong>the</strong> mechanical pavers and vibratory roller is<br />

owned by <strong>the</strong>m, More production of hire agreement/purchase order will not sufficient.<br />

4) The agency must submit a proof of owning mechanical sprayer. (Towed type/truck mounted<br />

type)<br />

5) All items of tack coat, and bituminous overlays of penetration type like B.B.M. etc and liquid<br />

seal coat must be carried out by pressure sprayers only . The pressure sprayer may be a<br />

mechanical sprayer with towing arrangement or truck mounted type.<br />

6) The RCC pipes required <strong>for</strong> <strong>the</strong> work shall be procured from <strong>the</strong> MSSIDC only. The payment<br />

towards providing and fixing NP2 /NP3/NP4 pipes will be released only after <strong>the</strong> Contractor<br />

submits <strong>the</strong> bills of MSSIDE to au<strong>the</strong>nticate that <strong>the</strong> pipes have been purchased from <strong>the</strong><br />

MSSIDE. No payment towards <strong>the</strong> item of providing and laying of <strong>the</strong> pipe will be released in<br />

absence of <strong>the</strong> submission of requisite documents.<br />

7) Steps to be taken to plug <strong>the</strong> loop holes in <strong>the</strong> supply of good quality retro reflective sign<br />

Boards.<br />

a) Signboard manufacturer should be authorized converter of any reflective sheeting<br />

manufacturer or his sole distributor ( presently <strong>the</strong>re are 3 standard companies namely<br />

3m/Nikkalite/Kiwalite) The sign board manufacturer should produce converter certificate on<br />

demand insist <strong>for</strong> it.<br />

b) Sign board manufacturer should given warrantee certificate of every job undertaken. The<br />

warrantee certificate should be from Reflective sheeting manufacturer or his sole distributor<br />

and not from signboard manufacturer. Insist <strong>for</strong> such warrantee certificate, <strong>the</strong> warrantee shall<br />

be <strong>for</strong> 7 years <strong>for</strong> high intensity grade and <strong>for</strong> 5 year Engineering grade sharing.<br />

c) The signboard manufacturer should put his label behind <strong>the</strong> board stating clearly <strong>the</strong> year of<br />

make and time of <strong>the</strong> converter.<br />

Contractor No. of Corrections Executive Engineer


d) In case of ever a slightest doubt avail <strong>the</strong> facility of testing by retro checker being made<br />

available by 3m free of cost.<br />

12.34 SET UP OF EQUIPMENTS<br />

12.34.1 The Contractor shall have at least following equipments calibrated to <strong>the</strong> latest date in <strong>the</strong><br />

laboratory so established. The Contractor will have to carry out <strong>the</strong> calibration of <strong>the</strong><br />

equipments from <strong>the</strong> approved agency as and when directed by <strong>the</strong> Engineer-in-Charge at his<br />

own cost in cases where <strong>the</strong> calibration validity stands expired.<br />

GENERAL<br />

i) Oven - Electrically operated, <strong>the</strong>rmostatically controlled range upto<br />

200 0 C, Sensitivity, 10 0 C,<br />

1 No.<br />

ii) Balance - 20 Kg. Capacity (Self indicating) 1 No.<br />

iii) Electronic Balance - 5 Kg. Capacity accuracy 0.5 gm. 1 No.<br />

iv) Thermometers : 1) Mercury in glass 0 0 to 250 0<br />

2) Mercury in steel with 30 cm. stem up to 300 0 C<br />

2 Nos.<br />

4 Nos.<br />

v) Kerosene or Gas stove / electric hot plate 1 Nos.<br />

vi) Set of IS sieves 45 cm. dia G.I. frame, 125 mm, 100 mm, 90 mm, 80<br />

vii)<br />

viii)<br />

mm, 63 mm, 53 mm, 50 mm, 45 mm, 40 mm, 37.5 mm, 26.5 mm, 25<br />

mm, 22.4 mm, 20 mm, 19 mm, 13.2 mm, 11.2 mm, 9.50 mm, 4.75 mm,<br />

4.25 mm, 6.3 mm, 6 mm, with lid and pan (coarse sieve)<br />

Set of IS Fine sieves with 20 cm. dia brass frame, 2.8 mm, 2.36 mm,<br />

1.18 mm, 0.60 mm, 0.30 mm, 0.15 mm, 0.075 mm, 425 micron, 300<br />

micron, 150 micron,90 micron, 75 micron, with lid and pan (fine sieve)<br />

Glass wares, spatulas, wire gauges, steel scales, measuring tape,<br />

enamelled tray, porcelain dish, plastic bags, gunny bags, digging tools<br />

etc.<br />

1 set of<br />

120<br />

23 Nos sieves<br />

1 set of<br />

13 Nos sieves<br />

As per<br />

ix) First aid kit. 1 No.<br />

b) AGGREGATE & TESTING<br />

i) Atterberg limits (liquid & plastic limit) determination apparatus 1 Set.<br />

ii)<br />

iii)<br />

Dry bulk density test apparatus (sand pouring cylinder, tray, can etc.)<br />

complete.<br />

Core cutter apparatus 10 cm. 10/15 cm. height complete with dolly<br />

rammer etc.<br />

requirement<br />

1 Set.<br />

1 Set.<br />

iv) Aggregate impact value test apparatus 1 Set.<br />

v) Flakiness and elongation test guage 1 Set.<br />

vi) Standard measures of 5,3 and 1 litre 1 Set.<br />

BITUMEN TESTING<br />

i) Electrometer with standard needles. 1 No.<br />

ii)<br />

iii)<br />

Centrifuge type bitumen extractor hand operated complete with<br />

commercial benzene<br />

1 Set.<br />

Filed density apparatus with cutting tray, chisel, hammer and standard 2 Set.<br />

Contractor No. of Corrections Executive Engineer


121<br />

sand.<br />

iv) 3 meter straight edge and camber plate adjustable type 2 Set.<br />

v) Softening point test apparatus. 2 Set.<br />

vi) Measuring cylinders 500 ml. 250 Ml and 100 Ml. 1 No.each.<br />

d) CEMENT AND CONCRRETE TESTING<br />

i) Vicat apparatus <strong>for</strong> testing setting time. 1 Set.<br />

ii) Slump testing apparatus. 2 Set.<br />

iii) Compression and flexural strength testing machine of 200 tone capacity 1 No<br />

with additional dia. For flexural testing.<br />

iv) Moulds a) 150 x 150 x 150 cm. cubical <strong>for</strong> compressive strength.<br />

b) 150 x 150 x 700 cm. Beam <strong>for</strong> flexural strength.<br />

1 Set<br />

1 Set.<br />

v) Compaction factor test equipment 1 Set.<br />

vi) Needle vibrator. 1 Set.<br />

Contractor No. of Corrections Executive Engineer


122<br />

STATEMENT OF FREQUENCY<br />

Sr.No. Material Name of Test Frequency<br />

1) cement a) fineness<br />

b) initial setting time<br />

c) final setting time<br />

d) compressive<br />

strength<br />

e) soundness<br />

2) Cement concrete Compressive strength<br />

(Kg/cm2)<br />

3) Motor Compressive strength<br />

(Kg/cm2)<br />

4) Sand a) Silt content.<br />

5) Brick Burnt IInd<br />

class<br />

b) Fineness module<br />

c) Water Absorption<br />

d) Crushing strength<br />

6) Thermoplastic paint a)Glass bead contents and<br />

grading analysis.<br />

b) Reflectance and<br />

yellowness index.<br />

c) Flowability (% residue)<br />

d) Softening Point (Ring<br />

and Ball method)<br />

e) Drying Time<br />

7) Emulsion bitumen a) % Residue test/<br />

8) 80/60/40 metal and<br />

crush metal<br />

25/20/12/10/6<br />

b) sieve test<br />

c) Particle charge test<br />

a) Sp. Gravity<br />

b) Crushing value<br />

c) Abrasion value<br />

d) Impact value<br />

e) Water Absorption<br />

f) Flakiness<br />

g) Gradation<br />

For each consignment of 50 tonnes<br />

or part <strong>the</strong>reof.<br />

Quantity set 3 cubes upto<br />

Section<br />

5 cum – 1 sets.<br />

6-15 cum – 3 sets.<br />

16.30 cum – 3 sets.<br />

31.50 cum – 4 sets.<br />

51 cum & above- 4 Set + 1<br />

additional set <strong>for</strong> each additional 50<br />

cum or part <strong>the</strong>reof (per day work)<br />

Upto 100 cum. Work/day = one per<br />

mixer<br />

One test <strong>for</strong> each source.<br />

A set of 15 bricks <strong>for</strong> each 50,000<br />

consignment or part <strong>the</strong>reof<br />

One Test <strong>for</strong> 3 Kms. Of<br />

Thermoplastic paint<br />

One test <strong>for</strong> 200 m3 <strong>for</strong> road work<br />

and <strong>for</strong> change of source <strong>for</strong><br />

concrete <strong>works</strong>.<br />

Contractor No. of Corrections Executive Engineer


123<br />

Sr.No. Material Name of Test Frequency<br />

9) Soil a)Proctor density test<br />

B) C.B.R. Test<br />

a)One test per 8000 m3 coil<br />

b) One test per 3000 m2 or as<br />

required<br />

10) Granular Sub base a) Plasticity Index (P.1) a))One test <strong>for</strong> per 25 m3 of Material<br />

(Murum)<br />

11) Hard Murum a)Gradation Test One test <strong>for</strong> per 200 cum. quantity<br />

b) Plasticity Index<br />

12) Soft Murum a) Plasticity Index One test <strong>for</strong> per 25 m3 of quantity<br />

13) Stine/ Rubble a) Sp. Gravity<br />

One test <strong>for</strong> each source<br />

b) Water absorption<br />

c) Compressive strength<br />

14) Concrete a) Compressive strength One test of (15cm) 6 cubes per day<br />

<strong>for</strong> 1 st 3 days <strong>the</strong>reafter <strong>for</strong> every 60<br />

cum. Of concrete of three days work<br />

whichever is less.<br />

15) Bitumen Works a) Penetration<br />

b) ductility<br />

c) Softening Point<br />

d) Extraction<br />

e) Marshall stability test<br />

a) 1 test per bouzer<br />

b) 1 test per bouzer<br />

c) 1 test per bouzer<br />

d) Two tests per day<br />

e) Two tests per day (1 test <strong>for</strong> 3<br />

marshal mould specimen)<br />

16) Inter locking<br />

concrete paving<br />

a) Compressive strength<br />

b) Water absorption<br />

1 set of 8 blocks <strong>for</strong> every 10000<br />

block<br />

block<br />

17) Flooring tiles a) Water absorption 16 tiles <strong>for</strong> each 2000 nos.<br />

(Mangalore and<br />

glazed)<br />

b) Flexural strength<br />

18) Mangalore tile a) Breaking load<br />

b) Water absorption<br />

A set of 16 tiles <strong>for</strong> each 2000 nos.<br />

Note :- The testing charges done by <strong>the</strong> contractor at his own cost. ( as per above frequency<br />

chart) The mix design shall be obtained from <strong>Government</strong> Lab be<strong>for</strong>e start of work. The frequency of<br />

testing materials and concrete cubs should strictly observe as per specifications. Failure to follows<br />

this will liable <strong>for</strong> compensation of five times <strong>the</strong> testing charges and shall have to borne by<br />

contractor.<br />

Contractor No. of Corrections Executive Engineer


²ÖÖÓ¬ÖúÖ´Ö ÃÖÖ×ÆüŸµÖÖ“µÖÖ ‹ú´ÖæÖ “ÖÖ“ÖµÖÖ¯Öîúß ¿ÖÖÃÖúßµÖ ¯ÖϵÖÖêÖ¿ÖÖôêûŸÖ ú¸üÖ¾ÖµÖÖ“µÖÖ “ÖÖ“ÖµÖÖÓ“Öß üŒêú¾ÖÖ¸üß ¾Ö<br />

¾ÖÖ¸Óü¾ÖÖ¸üߟÖÖ²ÖÖ²ÖŸÖ.<br />

´ÖÆüÖ¸üÖÂÒü ¿ÖÖÃÖ−Ö ÃÖÖ¾ÖÔ•Ö×−Öú ²ÖÖÓ¬ÖúÖ´Ö ×¾Ö³ÖÖÖ ¿ÖÖÃÖ−Ö ¯Ö׸ü¯Ö¡Öú Îú´ÖÖÓú ÃÖÓúßÖÔ-2004/¯ÖÏ.Îú.109/¸üÖ.´Ö.2<br />

´ÖÓ¡ÖÖ»ÖµÖ, ´ÖÓã²Ö‡Ô-400032, פü−ÖÖÓú 22 ´ÖÖ“ÖÔ 2005<br />

†) úÖµÖÔúÖ¸üß †×³ÖµÖÓŸÖÖ, ÃÖÖ¾ÖÔ•Ö×−Öú ²ÖÖÓ¬ÖúÖ´Ö ×¾Ö³ÖÖÖ µÖÖÓ−Öß ŸÖ¯ÖÖÃÖæ−Ö ¯ÖÏ´ÖÖ×ÖŸÖ êú»Öê»Öß Öê×¡ÖµÖ ¯ÖϵÖÖêÖ¿ÖÖôûÖ<br />

(Site Laboratory) •µÖÖ úÖ´ÖÖ¾Ö¸ü †ÖÆêü •µÖÖ úÖ´ÖÖ¾Ö¸üᯙ ¯Ö׸ü׿ÖÂü † ´Ö¬Öᯙ −Ö´Öã¤ü êú»Ö껵ÖÖ<br />

²ÖÖÓ¬ÖúÖ´ÖÖ ÃÖÖ×ÆüŸµÖÖ“µÖÖ ‹æúÖ 70 üŒêú “ÖÖ“ÖµÖÖ Öê×¡ÖµÖ ¯ÖϵÖÖêÖ¿ÖÖôêûŸÖã−Ö ¾Ö 30 üŒêú “ÖÖ“ÖµÖÖ ¤üÖŸÖÖ ¾Ö<br />

ÖãÖ×−ÖµÖÓ¡ÖÖ ´ÖÓ›üôûÖ“µÖÖ ¯ÖϵÖÖêÖ¿ÖÖôêûŸÖã−Ö ¾Ö 50 üŒêú “ÖÖ“ÖµÖÖ ¤üÖŸÖÖ ¾Ö ÖãÖ×−ÖµÖÓ¡ÖÖ ´ÖÓ›üôûÖ“µÖÖ<br />

¯ÖϵÖÖêÖ¿ÖÖôêûŸÖã−Ö ú¸üµÖÖÓŸÖ µÖÖ¾µÖÖŸÖ.<br />

²Ö) •µÖÖ úÖ´ÖÖ¾Ö¸ü Öê×¡ÖµÖ ¯ÖϵÖÖêÖ¿ÖÖôûÖ −ÖÃÖê»Ö ŸµÖÖ úÖ´ÖÖÃÖÖšüß“µÖÖ ²ÖÖÓ¬ÖúÖ´Ö ÃÖÖ×ÆüŸµÖÖ“µÖÖ 100 üŒêú “ÖÖ“ÖµÖÖ<br />

¤üÖŸÖÖ ¾Ö ÖãÖ ×−ÖµÖÓ¡ÖÖ ´ÖÓ›üôûÖ“µÖÖ ¯ÖϵÖÖêÖ¿ÖÖôêûŸÖã−Ö ú¸üµÖÓÖŸÖ µÖÖ¾µÖÖŸÖ.<br />

ú) ×−Ö×¾Ö¤üÖ ¯Öϯ֡ÖÖŸÖ ×¾Ö¿ÖêÂÖ †ü (Special Condition) †ÓŸÖÖÔŸÖ ²ÖÖÓ¬ÖÖ´Ö ÃÖÖ×ÆüŸµÖÖ“µÖÖ “ÖÖ“ÖµÖÖÓ¾Ö¸üß»Ö<br />

¾ÖÖ¸Óü¾ÖÖ¸üߟÖÖ (Frequency) ¯ÖÖôûµÖÖ²ÖÖ²ÖŸÖ ‹ú †ü ÃÖ´ÖÖ×¾ÖÂü ú¸üÖ¾Öß µÖÖ †üßÃÖÖê²ÖŸÖ ‹ú ¯Ö׸ü׿ÖÂü ¤êü¾Öæ−Ö<br />

ŸµÖÖ ¯Ö׸ü׿ÖÂüÖŸÖ ÃÖ¾ÖÔ ÃÖÖ×ÆüŸµÖÖÓ“µÖÖ “ÖÖ“ÖµÖÖ“Öß ×ú´ÖÖ−Ö ¾ÖÖ¸Óü¾ÖÖ¸üߟÖÖ (Frequency) −Ö´Öã¤ü ú¸üµÖÖÓŸÖ µÖÖ¾Öß<br />

Æüß ¾ÖÖ¸Óü¾ÖÖ¸üߟÖÖ −Ö´Öã¤ü ú¸üŸÖÖÓ−ÖÖ ÖÖ»Ö߻֯ÖÏ´ÖÖÖê ¯Ö¬¤üŸÖ †¾Ö»ÖÓ²ÖÖ¾Öß.<br />

1) ×−Ö×¾Ö¤üÖŸÖᯙ •µÖÖ ²ÖÖ²ÖàÃÖÖšüß MORT & H Specifications “ÖÖ ÃÖÓ¤ü³ÖÔ ¤êüµÖÖÓŸÖ †Ö»ÖÖ †ÖÆêü. ŸµÖÖ<br />

²ÖÖ²Öß´Ö¬Öᯙ ÃÖÖ×ÆüŸµÖÖÓ“ÖÖ “ÖÖ“ÖµÖÖÃÖÖšüß MORT & H Specifications ´Ö¬µÖê −Ö´Öã¤ü êú»Öê»Öß ¯ÖÏ“Ö×»ÖŸÖ<br />

×ú´ÖÖ−Ö ¾ÖÖ¸Óü¾ÖÖ¸üߟÖÖ ¤êüµÖÖÓŸÖ µÖÖ¾Öß.<br />

2) ×−Ö×¾Ö¤üÖŸÖᯙ •µÖÖ ²ÖÖ²ÖàÃÖÖšüß P.W.D. Specifications “ÖÖ ÃÖÓ¤ü³ÖÔ ¤êüµÖÖÓŸÖ †Ö»ÖÖ †ÖÆêü. ŸµÖÖ ²ÖÖ²ÖŸÖ´Ö¬Öß»Ö<br />

ÃÖÖ×ÆüŸµÖÖÓ“µÖÖ “ÖÖ“ÖµÖÖÓÃÖÖšüß P.W.D. Specifications “ÖÖ ÃÖÓ¤ü³ÖÔ ¤êüµÖÖÓŸÖ †Ö»ÖÖ †ÖÆêü. ŸµÖÖ<br />

²ÖÖ²Öß´Ö¬Öᯙ ÃÖÖ×ÆüŸµÖÖÓ“µÖÖ “ÖÖ“ÖµÖÖÃÖÖšüß P.W.D. Specifications ´Ö¬µÖê −Ö´Öã¤ü êú»Öê»Öß ¯ÖÏ“Ö×»ÖŸÖ<br />

×ú´ÖÖ−Ö ¾ÖÖ¸Óü¾ÖÖ¸üߟÖÖ ¤êüµÖÓÖŸÖ µÖÖ¾Öß.<br />

3) •µÖÖ ²ÖÖ²ÖàÃÖÖšüß / ÃÖÖ×ÆüŸµÖÖÃÖÖšüß ¾Ö¸üᯙ 1 ¾Ö 2 ´Ö¬µÖê −Ö´Öã¤ü ×−Ö×¾Ö¤ìü¿ÖÖŸÖ ¾ÖÖ¸Óü¾ÖÖ¸üߟÖÖ ×¤ü»Öê»Öß −ÖÖÆüß, †¿ÖÖ<br />

²ÖÖ²ÖàÃÖÖšüß ÃÖÓ²ÖÓ¬ÖßŸÖ S.P.Codes “ÖÖ ¾ÖÖ¯Ö¸ü ú¸üµÖÖÓŸÖ µÖÖ¾ÖÖ. ¾Ö ŸµÖÖ¯ÖÏ´ÖÖÖê ×ú´ÖÖ−Ö ¾ÖÖ¸Óü¾ÖÖ¸üߟÖê“ÖÖ ˆ»»ÖêÖ<br />

ú¸üµÖÖÓŸÖ µÖÖ¾ÖÖ.<br />

4) ÃÖ¾ÖÔ “ÖÖ“ÖµÖÖÓÃÖÖšüß ×ú´ÖÖ−Ö ¾ÖÖ¸Óü¾ÖÖ¸üߟÖÖ ¾ÖÖœü×¾ÖµÖÖÃÖ ¯ÖÏŸµÖ¾ÖÖµÖ −ÖÖÆüß.<br />

5) ÃÖÖê²ÖŸÖ - ¯Ö׸ü׿ÖÂü †.<br />

124<br />

Contractor No. of Corrections Executive Engineer


125<br />

QUALITY CONTROL TESTS<br />

Sr.No. Material Test Frequency<br />

1 Masonry Stone i) Compressive Strength<br />

ii)Crushing Value<br />

2 Metal i)Crushing Value<br />

ii) Impact Value<br />

iii) Abrasion Value<br />

IV) Water Absorption<br />

3 Bricks i)Crushing Strength<br />

ii) Water Absorption<br />

4 Mangalore Tiles i)Breaking Load<br />

ii) Water Absorption<br />

5 Flooring Tiles i)Flexural Strength<br />

ii) Water Absorption<br />

6 Glazed Tiles i) Water Absorption<br />

7 Cement i)Compressive Strength<br />

ii)Initial Setting time<br />

iii) Final setting time.<br />

iv)Specific Gravity<br />

v)Soundness<br />

vi)Fineness.<br />

vii) Standard consistency.<br />

8 Steel i)Weight per meter.<br />

ii)Ultimate tensile stress<br />

iii)Yield stress<br />

iv)Elongation<br />

9 Granular i)Density of compacted layer.<br />

ii)C.B.R<br />

10 Lime/Cement<br />

Stabilised soil<br />

sub base<br />

i)Quality of Lime/Cement<br />

ii)Degree of pulverization<br />

iii)Lime/Cement content<br />

IV)CBR/unconfined Compressive strength test<br />

on a set of 3 specimen<br />

V)Density of compacted layer<br />

11 Water Bound<br />

Macadam<br />

i)Aggregate impact value<br />

ii)Flakiness and Elongation Index<br />

12 Wet Mix i) Impact value<br />

Contractor No. of Corrections Executive Engineer


126<br />

Sr.No. Material Test Frequency<br />

Macadam ii)Flakiness and Elongation Index<br />

iii) Density of compacted layer<br />

13 Prime<br />

i)Quality of Binder<br />

Coat/Surface<br />

Dressing<br />

14 Seal<br />

Coat/Surface<br />

Dressing<br />

i)Quality of Binder<br />

ii) Impact value/Los Angle’s Abrasion value.<br />

iii)Flakiness and Elongation Index<br />

iv) Water Absorption<br />

15 Open graded i)Quality of Binder<br />

premix surface/ ii)Impact value/ Abrasion value.<br />

close graded iii)Flakiness and Elongation Index<br />

premix surfacing iv) Water Absorption<br />

16 Bituminous<br />

Macadam<br />

i)Quality of Binder<br />

ii) Impact value/Los Angle’s Abrasion value.<br />

iii)Flakiness and Elongation Index<br />

iv) Density of compacted layer<br />

17 Bituminous<br />

Penetration<br />

Macadam Built<br />

up spray Grout.<br />

i)Quality of Binder<br />

ii)Impact value/ Abrasion value.<br />

iii)Flakiness and Elongation Index<br />

iv) Water Absorption<br />

18 Dense<br />

Bituminous<br />

macadam / semi<br />

dense<br />

Bituminous<br />

Concrete/<br />

Bituminous<br />

i)Quality of Binder<br />

ii)Impact value/ Abrasion value.<br />

iii)Flakiness and Elongation Index<br />

iv) Water Absorption<br />

v)Stability of Mix<br />

vi) Density of compacted layer<br />

vii) Job Mix Design.<br />

Concrete<br />

19 Mastic Asphalt i)Quality of Binder<br />

ii)Impact value/ Abrasion value.<br />

iii)Flakiness and Elongation Index<br />

iv) Water Absorption<br />

20 Slurry Seal i)Quality of Binder<br />

21 Modified Binder i)Softening Point<br />

ii)Penetration at 25 0 C & 4 0 C<br />

iii)Elastic Recovery<br />

Contractor No. of Corrections Executive Engineer


127<br />

Sr.No. Material Test Frequency<br />

iv)Ductility<br />

v)Flash Point<br />

vi)Viscosity<br />

vii)Thin film oven test, penetration, softening<br />

point Elastic recovery of residue, loss on<br />

heating<br />

22 Thermoplastic<br />

Paint<br />

i)Glass beed contents and grading Analysis.<br />

ii)Reflectance and Yellowness index<br />

iii)Flow ability<br />

iv)Drying Time<br />

23 Interlocking<br />

Concrete paving<br />

block<br />

i)Compressive strength<br />

ii)Flexural Test<br />

iii)Resistance To wear.<br />

24 Wood work i)End immersion tests<br />

(shutters) ii)Knife test<br />

iii)Glue adhesion test<br />

25 Cement i)Mix design<br />

Concrete<br />

26 Asphalt Concrete i)Job mix design with all tests on basic<br />

material<br />

27 Rein<strong>for</strong>cement<br />

steel bars<br />

i)Tensile strength<br />

ii)% Elongation.<br />

19. COMPLETION CERTIFICATE:<br />

19.1 The work shall not be considered to have been completed in accordance with <strong>the</strong><br />

terms of <strong>the</strong> contract until <strong>the</strong> Engineer-in-charge shall have certified in writing to that<br />

effect. No approval of material or workmanship or approval of part of work during <strong>the</strong><br />

progress of execution shall bind <strong>the</strong> Engineer-in-charge or in any way prevent him<br />

from even rejecting <strong>the</strong> work which is claimed to be complete and to suspend <strong>the</strong><br />

issue of his certificate of completion until such alteration and modifications or<br />

reconstruction have been effected at <strong>the</strong> cost of <strong>the</strong> Contractor as shall enable him to<br />

certify that <strong>the</strong> work has been completed to his satisfaction.<br />

19.2 After <strong>the</strong> work is completed <strong>the</strong> Contractor shall give notice of such completion to <strong>the</strong><br />

Engineer-in-charge and within 30 days of receipt of such a notice <strong>the</strong> Engineer-incharge<br />

shall inspect <strong>the</strong> work and if <strong>the</strong>re is no defect in <strong>the</strong> work shall furnish <strong>the</strong><br />

Contractor with a certificate indicating <strong>the</strong> date of completion. However, if <strong>the</strong>re are<br />

any defects which in <strong>the</strong> opinion of <strong>the</strong> Engineer-in-charge are rectifiable he shall<br />

in<strong>for</strong>m <strong>the</strong> Contractor <strong>the</strong> defects noticed. The Contractor after rectification of such<br />

defects shall <strong>the</strong>n in<strong>for</strong>m <strong>the</strong> Engineer-in-charge and Engineer-in-charge on his part<br />

shall inspect <strong>the</strong> work and issue <strong>the</strong> necessary completion certificate within 30 days if,<br />

<strong>the</strong> defects are rectified to his satisfaction, and if not, he shall in<strong>for</strong>m <strong>the</strong> Contractor<br />

indicating defects yet to be rectified. The time cycle as above, shall continue.<br />

Contractor No. of Corrections Executive Engineer


19.3 In case defects noticed by <strong>the</strong> Engineer-in-charge which in his opinion are not<br />

rectifiable but o<strong>the</strong>rwise work is acceptable at reduced payment, work shall be treated<br />

as completed. In such cases completion certificate shall be issued by <strong>the</strong> Engineer-incharge<br />

within 30 days indicating <strong>the</strong> un-rectifiable defects <strong>for</strong> which reduction in<br />

payment is being made by him.<br />

19.4 The issue of completion certificate shall not be linked up with <strong>the</strong> site clearance on<br />

completion of <strong>the</strong> work.<br />

28. CONDITION RELATING TO INSURANCE OF CONTRACT WORK. Contractor shall take out<br />

necessary Insurance Policy/ (viz. Contractors All Risks Insurance Policy, Erection All Risks<br />

Insurance Policy etc. as decided by <strong>the</strong> Directorate of Insurance) so as to provide adequate<br />

insurance cover <strong>for</strong> execution of <strong>the</strong> awarded contract work <strong>for</strong> total contract value and<br />

complete contract period compulsorily from <strong>the</strong> “Directorate of Insurance, Maharashtra State,<br />

Mumbai only its postal address <strong>for</strong> Correspondence is “264, MHADA, First Floor, Opp.<br />

Kalanagar, Bandra (East) Mumbai – 400051” ( Telephone Nos. 26590403/26590690 and Fax<br />

No. 26592461/26590403) Similarly, all workmen’s appointed to complete <strong>the</strong> contract work<br />

are required to insure under workmen’s compensation insurance policy. Insurance<br />

policy/policies taken out from any o<strong>the</strong>r Company will not be accepted. If any contractor has<br />

effected Insurance with any insurance company <strong>the</strong> same will not be accepted and <strong>the</strong> amount<br />

of premium calculated by <strong>the</strong> <strong>Government</strong> Insurance Fund will be recovered directly from <strong>the</strong><br />

amount payable to <strong>the</strong> Contractor <strong>for</strong> <strong>the</strong> executed contract work and paid to <strong>the</strong> Directorate of<br />

Insurance Fund, Maharashtra State, Mumbai, The Director of Insurance reserves <strong>the</strong> right to<br />

distribute <strong>the</strong> risks of insurance among <strong>the</strong> o<strong>the</strong>r insurers.<br />

30 ÉɺÉxÉ =tÉäMÉ, =VÉÉÇ ´É EòɨÉMÉÉ®ú ʴɦÉÉMÉ {ÉjÉ Gò. ¤ÉÒºÉÒB/


129<br />

(C)<br />

(D)<br />

(E)<br />

(F)<br />

(G)<br />

The contractor shall if and when required, submit at his cost <strong>the</strong> samples of materials to be<br />

tested or analysed and if, so directed shall not make use of or incorporate in <strong>the</strong> work any<br />

materials represented by <strong>the</strong> samples until <strong>the</strong> required tests or analysis have been made and<br />

<strong>the</strong> materials, finally accepted by <strong>the</strong> Engineer-in-charge.<br />

The contractor shall not be eligible <strong>for</strong> any claim or compensation ei<strong>the</strong>r arising out of any<br />

delay in <strong>the</strong> work or due to any corrective measures required to be taken on account of and as<br />

a result of testing of <strong>the</strong> materials.<br />

The contractor or his authorised representative will be allowed to remain present in <strong>the</strong><br />

<strong>department</strong>al laboratory while testing samples furnished by him. However <strong>the</strong> results of all <strong>the</strong><br />

tests carried out in <strong>the</strong> <strong>department</strong>al laboratory in <strong>the</strong> presence or absence of <strong>the</strong> contractor or<br />

his authorised representative will be binding on <strong>the</strong> contractor.<br />

The contractor shall at his own cost set up laboratory to carry out <strong>the</strong> routine tests of<br />

materials which are to be used on <strong>the</strong> work <strong>the</strong> tests will have to be carried out ei<strong>the</strong>r in his<br />

field laboratory or in an approved laboratory. In case tests are carried out in field<br />

laboratory, at least 50% tests should be carried out in nearest control laboratory of <strong>the</strong><br />

Department.<br />

In case of material procured by <strong>the</strong> contractor, testing as required by <strong>the</strong> codes and<br />

specifications shall be arranged by him at his own cost. Testing shall be done in <strong>the</strong> presence<br />

of authorised representative of <strong>the</strong> Engineer-in-charge at <strong>the</strong> nearest laboratory If additional<br />

testing o<strong>the</strong>r than as required b) specification is ordered, <strong>the</strong> testing charges, shall be borne by<br />

<strong>the</strong> Department, if <strong>the</strong> test results are satisfactory and by <strong>the</strong> contractor if <strong>the</strong> same are not<br />

satisfactory.<br />

(H) In case of materials supplied by <strong>the</strong> <strong>Government</strong>, if <strong>the</strong> contractor demands, certain<br />

testing, <strong>the</strong> charges <strong>the</strong>reof shall be paid by contractor if <strong>the</strong> testing results are satisfactory<br />

and by <strong>the</strong> Department if <strong>the</strong> same are not satisfactory.<br />

Contractor No. of Corrections Executive Engineer


130<br />

DEFECT LIABILITY PERIOD PLATE<br />

[D.L.P. PLATE]<br />

4.5 cm 7.50cm<br />

DLP UPTO Dt.<br />

STRETCH<br />

15 CM<br />

15 CM<br />

60 CM<br />

G.L.<br />

G.L.<br />

CONTRACTOR<br />

& PHONE<br />

PROVISION<br />

START COMPLETE<br />

15 CM<br />

15 CM<br />

15 CM<br />

c.c.<br />

SECTION ELEVATION<br />

SIDE VIEW<br />

Contractor No. of Corrections Executive Engineer