Dhanbad Municipal Corporation i - JnNURM
Dhanbad Municipal Corporation i - JnNURM
Dhanbad Municipal Corporation i - JnNURM
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong><br />
i
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong><br />
ii
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
SECTION I: INTRODUCTION<br />
Table of Contents<br />
I. BACKGROUND....................................................................................................... 1<br />
A. Introduction.................................................................................................................................1<br />
B. Outcomes of JNNURM...............................................................................................................1<br />
C. Admissible Component under JNNURM.....................................................................................2<br />
D. Scope of Work .........................................................................................................................2<br />
E. Approach Methodology ...............................................................................................................3<br />
1. Stage 1- Preparatory Phase ............................................................................................................3<br />
2. Stage II – Consensus-building / Visioning Phase...............................................................................3<br />
3. Stage III – Strategy Formulation Phase............................................................................................4<br />
F. Report Structure...........................................................................................................................7<br />
SECTION II: CITY ASSESSMENT<br />
II. CITY PROFILE.................................................................................................... 8<br />
A. Overview .....................................................................................................................................8<br />
B. Population Trends and Urbanization..........................................................................................15<br />
Growth Trends and Projections .............................................................................................................20<br />
C. Socio-Economic Profile .............................................................................................................21<br />
1. Health .....................................................................................................................................21<br />
2. Education Facility......................................................................................................................22<br />
III. ECONOMIC BASE ............................................................................................ 23<br />
A. Overview ...................................................................................................................................23<br />
Value of Coal Production ....................................................................................................................28<br />
Coal Acts and Notification..................................................................................................................28<br />
New Government Policy for the Coal Sector.............................................................................................28<br />
Manpower ........................................................................................................................................29<br />
1. Sectoral Growth.........................................................................................................................29<br />
2. Industrial Development................................................................................................................30<br />
B. Tourism Development ...............................................................................................................34<br />
C. Urban Economy - SWOT Analysis.............................................................................................35<br />
IV. MUNICIPAL FINANCIAL MANAGEMENT................................................... 37<br />
A. Overview ...................................................................................................................................37<br />
B. Financial Status ..........................................................................................................................37<br />
C. Revenue Income ........................................................................................................................40<br />
D. Revenue Expenditure.............................................................................................................43<br />
E. Capital Account .........................................................................................................................45<br />
F. Financial Performance Indicators and Key Issues.......................................................................46<br />
MADA – Fund Assessment...............................................................................................................49<br />
G. <strong>Municipal</strong> Finance - SWOT Analysis......................................................................................53<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong><br />
i
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
V. EXISTING INFRASTRUCTURE ASSESSMENT............................................. 54<br />
A. Water Supply..............................................................................................................................54<br />
1. Overview ..................................................................................................................................54<br />
2. Sources of Water Supply..............................................................................................................55<br />
3. Distribution System....................................................................................................................57<br />
4. Water Supply - SWOT Analysis .................................................................................................62<br />
5. Performance Indicators and Key Issues............................................................................................63<br />
B. Sewerage and Sanitation .............................................................................................................65<br />
1. Overview ..................................................................................................................................65<br />
2. Sewerage & Sanitation - SOWT Analysis.....................................................................................65<br />
3. Performance Indicators and Key Issues............................................................................................66<br />
C. Storm Water Drainage and Primary Drainage.............................................................................66<br />
1. Overview ..................................................................................................................................66<br />
2. Natural/Primary Drainage System...............................................................................................67<br />
3. Performance Indicators and Key Issues............................................................................................67<br />
D. Preservation / Rejuvenation of Water Bodies.........................................................................69<br />
1. Overview ..................................................................................................................................69<br />
2. Key Issues.................................................................................................................................69<br />
E. Solid Waste Management ...........................................................................................................70<br />
1. Overview ..................................................................................................................................70<br />
2. Solid Waste Management - SOWT Analysis..................................................................................74<br />
3. Performance Indicators and Key Issues............................................................................................74<br />
F. Roads and Traffic Management..................................................................................................77<br />
1. Road Sector Overview .................................................................................................................77<br />
2. Performance Indicators and Key Issues............................................................................................78<br />
3. Traffic and Transportation Sector Overview.....................................................................................79<br />
4. Urban Roads - SOWT Analysis..................................................................................................82<br />
5. Key Issues.................................................................................................................................83<br />
G. Street Lighting........................................................................................................................85<br />
1. Overview ..................................................................................................................................85<br />
2. Performance Indicators and Key Issues............................................................................................85<br />
H. Fire Services...........................................................................................................................86<br />
VI. URBAN ENVIRONMENT................................................................................ 88<br />
A. Overview ...................................................................................................................................88<br />
B. Soil Types & Soil Erosion ..........................................................................................................88<br />
C. Mining Environment..................................................................................................................89<br />
D. Water Resource......................................................................................................................90<br />
E. River Water Quality....................................................................................................................92<br />
F. Air Environment........................................................................................................................92<br />
G. Study Findings .......................................................................................................................97<br />
H. Noise Quality.........................................................................................................................97<br />
I. Hot Spots...................................................................................................................................99<br />
J. Hazards....................................................................................................................................100<br />
VII. PHYSICAL PLANNING AND GROWTH MANAGEMENT .......................... 109<br />
A. Overview .................................................................................................................................109<br />
B. Planning Efforts in the Past .....................................................................................................109<br />
C. Land Use Management.............................................................................................................109<br />
D. Urban Sprawl .......................................................................................................................111<br />
E. Jharia Rehabilitation Plan .........................................................................................................113<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong><br />
ii
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
F. Key Developmental Issues .......................................................................................................115<br />
VIII. URBAN GOVERNANACE............................................................................ 116<br />
A. ULBs in the Context of 74th Constitutional Amendment.........................................................116<br />
1. Political Context......................................................................................................................116<br />
2. Administrative and Financial Context.........................................................................................116<br />
B. Institutions and Capacity..........................................................................................................119<br />
1. Institutional Framework............................................................................................................119<br />
2. Service Delivery and Performance of ULB.....................................................................................121<br />
C. Proposed Organization Structure of DMC ...............................................................................121<br />
1. Institutional Strengthening and Capacity Building...........................................................................127<br />
D. Urban Governance - SWOT Analysis...................................................................................127<br />
E. Key Issues................................................................................................................................127<br />
F. Key Initiatives ..........................................................................................................................127<br />
SECTION III: BASIC SERVICES TO THE URBAN POOR (BSUP)<br />
IX. BASIC SERVICES FOR URBAN POOR........................................................... 129<br />
A. Overview .................................................................................................................................129<br />
B. Infrastructure Provision in Slums .............................................................................................133<br />
C. Key Issues................................................................................................................................134<br />
SECTION IV: VISION, CAPITAL INVESTMENT PLAN & FINANCING<br />
STRATEGY<br />
X. VISION, GOALS AND SECTORAL STRATEGIES ......................................... 135<br />
A. Identification of Stakeholders...................................................................................................135<br />
B. Consultation Process................................................................................................................135<br />
C. Vision ......................................................................................................................................137<br />
1. Urban Planning & Growth Management.....................................................................................137<br />
2. Water Supply..........................................................................................................................140<br />
3. Sewerage and Sanitation............................................................................................................142<br />
4. Storm Water Drainage and Primary Drainage ..............................................................................143<br />
5. Preservation and Rejuvenation of Water Bodies ..............................................................................145<br />
6. Solid Waste Management ..........................................................................................................146<br />
6. Roads and Traffic Management ..................................................................................................148<br />
7. Street Lighting.........................................................................................................................150<br />
8. Basic Services for Urban Poor.....................................................................................................151<br />
9. Urban Environment .................................................................................................................153<br />
10. City Beautification and Tourism Development............................................................................155<br />
11. Disaster Preparedness and Response/Action Plan ......................................................................155<br />
XI. DEMAND, SUPPLY, GAP ASSESSMENT OF SERVICE DELIVERY............ 159<br />
A. Rationale, Need and Demand...................................................................................................159<br />
1. Water Supply..........................................................................................................................160<br />
2. Sewerage and Sanitation............................................................................................................161<br />
3. Storm Water Drainage .............................................................................................................164<br />
4. Solid Waste Management ..........................................................................................................164<br />
5. Urban Transport .....................................................................................................................166<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong><br />
iii
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
6. Street Lighting.........................................................................................................................168<br />
XII. CAPITAL INVESTMENT PLAN & FINANCING STRATEGY...................... 170<br />
A. Concept Plan for Proposed Investment....................................................................................170<br />
B. Capital Investment Plan ...........................................................................................................170<br />
1. Urban Planning & Growth Management.....................................................................................170<br />
2. Water Supply..........................................................................................................................170<br />
3. Sewerage and Sanitation............................................................................................................172<br />
4. Solid Waste Management ..........................................................................................................173<br />
5. Storm Water Drainage .............................................................................................................173<br />
6. Urban Transport .....................................................................................................................174<br />
7. Street Lighting.........................................................................................................................178<br />
8. Urban Environment, City Beautification and Tourism Development ..................................................178<br />
9. Preservation of Water Bodies ......................................................................................................179<br />
10. Other Developmental Projects .................................................................................................179<br />
11. Disaster Management pre-preparedness.....................................................................................180<br />
12. Urban Governance ...............................................................................................................181<br />
13. Basic Service for Urban Poor and Housing................................................................................181<br />
14. Summary of Investments ........................................................................................................181<br />
C. Investment Sustenance.............................................................................................................195<br />
1. Revenue Income Assumptions .....................................................................................................195<br />
2. Expenditure Considerations .......................................................................................................196<br />
3. Key Assumption for FOP..........................................................................................................196<br />
D. Public Private Sector Partnership .........................................................................................197<br />
1. Overview ................................................................................................................................197<br />
2. Parking Lots on Public Private Partnership ..................................................................................198<br />
3. Redevelopment of Existing Bus Terminus on PPP framework...........................................................199<br />
4. New Inter State Bus Terminus (ISBT) near Barwadda on PPP format..............................................199<br />
5. Transport Nagar at Pandukki on PPP format..............................................................................199<br />
6. New Ring Road/Elevated High Road on PPP format....................................................................200<br />
7. Redevelopment of Existing <strong>Municipal</strong> <strong>Corporation</strong> on PPP format.....................................................201<br />
8. Construction of New Sports Complex/ Stadium at Bhelatandh on PPP format ...................................201<br />
9. Development of Other Projects on PPP format................................................................................201<br />
10. Water Supply System – Operation and Maintenance on Management Contract................................201<br />
11. Solid Waste Management – Collection and Transportation Outsourcing..........................................202<br />
12. Solid Waste Management – Scientific Disposal Facility Development on BOT basis .........................202<br />
13. Construction and Maintenance of Sewerage Treatment Plant on BOT basis .....................................202<br />
14. Construction of Housing complex at Bhelatandh and Sugiadih & New Residential Township on BOT<br />
basis 203<br />
15. Development of Amusement Park at Rejili Bandh on BOT basis .................................................203<br />
E. Funding Pattern .......................................................................................................................207<br />
Annexure<br />
Annexure 1: Primary Stakeholders Consultation findings ...............................................................................208<br />
Annexure 2: Consultation Workshop -Group Discussion Findings..............................................................240<br />
Annexure 3: List of Participants attend for first day Consultation Workshop ............................................246<br />
Annexure 4: List of Participants attend for second day Consultation Workshop.......................................248<br />
Annexure 5: Reform Agenda................................................................................................................................250<br />
Annexure 6: List of Detailed Project Reports (DPRs) Available with the Local Authorities....................253<br />
Annexure 7: Financial Operating Plan for <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong>..............................................255<br />
Annexure 8: Zone wise proposed investment for major sectors with tentative phasing............................273<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong><br />
iv
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
List of Tables<br />
Table 1: Block wise Registered Rain fall during the Year 2005 in <strong>Dhanbad</strong> DMC .......................................13<br />
Table 2: Decadal Growth Rate and CAGR of <strong>Dhanbad</strong> Urban Agglomeration Population ......................15<br />
Table 3: Town wise Decadal Growth of Population in <strong>Dhanbad</strong> Urban Agglomeration ...........................17<br />
Table 4: Town wise Decadal Population Growth Rate of <strong>Dhanbad</strong> Urban Agglomeration.......................18<br />
Table 5: Projected Populated of <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> .................................................................21<br />
Table 6: Health Facilities in <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> Jurisdiction ...................................................21<br />
Table 7: Basic Health Indicators - <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong>..............................................................22<br />
Table 8: Disease Pattern - <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong>............................................................................22<br />
Table 9: Organization wise no Coal Mines Operated and its Production.......................................................23<br />
Table 10: Future Production Plan of BCCL.........................................................................................................25<br />
Table 11: Category wise Coal Reserves in Underground Blocks in JCF..........................................................26<br />
Table 12: Category wise Coal Reserves in Opencast Blocks in JCF.................................................................27<br />
Table 13: Work Force Participation Rate..............................................................................................................30<br />
Table 14: Category wise Registered SSI Units, Investments and Employment Generation in <strong>Dhanbad</strong><br />
District................................................................................................................................................................31<br />
Table 15: Month wise Domestic Tourist Inflow to <strong>Dhanbad</strong>...........................................................................34<br />
Table 16: Urban Economy – SWOT Analysis .....................................................................................................35<br />
Table 17: Abstract Financial Status of Erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity Account Statement.....................38<br />
Table 18: Abstract Financial Status of Erstwhile Sindri Notified Area Committee ......................................39<br />
Table 19: Details of Erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity Revenue Income ........................................................40<br />
Table 20: Details of Erstwhile Sindri NAC Revenue Income ..........................................................................41<br />
Table 21: Details of Erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity Revenue Expenditure................................................43<br />
Table 22: Details of Erstwhile Sindri NAC Revenue Expenditure..................................................................44<br />
Table 23: Details of Erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity Capital Account Statement ......................................45<br />
Table 24: Details of Erstwhile Sindri NAC Capital Account Statement.........................................................46<br />
Table 25: Key Financial Performance Indicators of Erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity................................46<br />
Table 26: Annual Receipt Statement of MADA..................................................................................................50<br />
Table 27: Annual Expenditure Statement of MADA.........................................................................................50<br />
Table 28: DCB Statement of Water Supply and Holding tax............................................................................52<br />
Table 29: <strong>Municipal</strong> Finance – SWOT Analysis..................................................................................................53<br />
Table 30: Water Supply Sources – <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong>..............................................................55<br />
Table 31: Water Supply Surface Sources Details .................................................................................................56<br />
Table 32: Treatment Plant wise Design and utilized Capacities........................................................................57<br />
Table 33: Rising Main Details.................................................................................................................................57<br />
Table 34: Type wise Location of Storage Reservoirs and its Capacity.............................................................58<br />
Table 35: Type wise Distribution Network Details ............................................................................................60<br />
Table 36: Storage Reservoir wise pumping capacity and Type .........................................................................62<br />
Table 37: Water Supply – SWOT Analysis...........................................................................................................62<br />
Table 38: Performance Indicator - Water Supply................................................................................................63<br />
Table 39: Sewerage and Sanitation – SWOT Analysis........................................................................................65<br />
Table 40: Performance Indicator – Sewerage & Sanitation...............................................................................66<br />
Table 41: Details of Road side Storm Water Drains...........................................................................................67<br />
Table 42: Performance Indicators - Road side Storm Water Drains ...............................................................67<br />
Table 43: Block wise area of the Water Bodies ...................................................................................................69<br />
Table 44: Source wise Distribution of waste Generated....................................................................................71<br />
Table 45: Solid Waste Transportation Vehicle Details.......................................................................................73<br />
Table 46: Solid Waste Management – SWOT Analysis......................................................................................74<br />
Table 47: Performance Indicators - Solid Waste Management.........................................................................75<br />
Table 48: Category wise Road Length...................................................................................................................77<br />
Table 49: Performance Indicators - Road Sector ................................................................................................79<br />
Table 50: Year on Year Registered Vehicles in <strong>Dhanbad</strong>..................................................................................80<br />
Table 51: Traffic and Transportation – SWOT Analysis ...................................................................................82<br />
Table 52: Street Lights Break-up............................................................................................................................85<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong><br />
v
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Table 53: Performance Indicator - Street Lights .................................................................................................86<br />
Table 54: Year wise no of case attended by the Fire Department....................................................................87<br />
Table 55: Details of Fire Service Equipments......................................................................................................87<br />
Table 56: Staffing Pattern in Fire Service Department.......................................................................................87<br />
Table 57: Ground Water Resources in <strong>Dhanbad</strong> ................................................................................................90<br />
Table 58: Ground Water Resources in <strong>Dhanbad</strong>................................................................................................91<br />
Table 59: Sewerage Quality Test Results at Damodar River .............................................................................91<br />
Table 60: Industrial Pollution Level ......................................................................................................................93<br />
Table 61: Ambient Air Quality in <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> Jurisdiction..........................................93<br />
Table 62: Industrial Pollution Level of SO 2 in Urban Areas of <strong>Dhanbad</strong> from year 1997 – 2005.............94<br />
Table 63: Industrial Pollution Level of NO 2 in Urban Areas of <strong>Dhanbad</strong> from year 1997 – 2005 ...........95<br />
Table 64: Industrial Pollution Level of SPM in Urban Areas of <strong>Dhanbad</strong> from year 1997 – 2005 ...........96<br />
Table 65: Noise Quality Results in Residential Area...........................................................................................98<br />
Table 66: Noise Quality in Commercial and Residential Areas ........................................................................98<br />
Table 67: Noise Quality in Commercial and Residential Areas ........................................................................98<br />
Table 68: List of Collieries affected by Mine Fires .............................................................................................99<br />
Table 69: List of Disaster Specific Proneness to Various Types of Hazards in <strong>Dhanbad</strong> .........................100<br />
Table 70: Significant Earthquakes in <strong>Dhanbad</strong> & Nearby Vicinities in Jharkhand.....................................102<br />
Table 71: Displacement of Tribe Families..........................................................................................................108<br />
Table 72: Proposed Land Used - 2011................................................................................................................111<br />
Table 73: Draft Jharia Rehabilitation Plan..........................................................................................................115<br />
Table 74: Institutional Responsibility in Service Delivery ...............................................................................120<br />
Table 75: Role of the Private Sectors in Urban Infrastructure Provision .....................................................120<br />
Table 76: Proposed Staffing Pattern for <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> .................................................122<br />
Table 77: Urban Governance – SWOT Analysis ..............................................................................................127<br />
Table 78: List of Slums ..........................................................................................................................................129<br />
Table 79: Strategy Time Frame – Planning & Growth Management.............................................................139<br />
Table 80: Goal and Service Outcome - Water Supply......................................................................................140<br />
Table 81: Strategy Time Frame - Water Supply .................................................................................................141<br />
Table 82: Goal and Service Outcome – Sewerage and Sanitation..................................................................142<br />
Table 83: Strategy Time Frame – Sewerage and Sanitation .............................................................................143<br />
Table 84: Goal and Service Outcome – Drainage............................................................................................144<br />
Table 85: Strategy and Time Frame – Storm Water Drainage ........................................................................145<br />
Table 86: Goal and Service Outcome – Preservation of Water Bodies.........................................................145<br />
Table 87: Strategy Time Frame – Preservation of Water Bodies....................................................................146<br />
Table 88: Goal and Service outcome – Solid Waste Management .................................................................146<br />
Table 89: Strategy Time Frame – Solid Waste Management...........................................................................148<br />
Table 90: Goal and Service Outcome – Roads and Traffic Management.....................................................149<br />
Table 91: Strategy Time Frame – Roads and Traffic Management................................................................150<br />
Table 92: Goal and Service Outcome – Street Lighting...................................................................................151<br />
Table 93: Goal and Service Outcome – Basic Services for Urban Poor .......................................................151<br />
Table 94: Water Demand for the <strong>Dhanbad</strong> .......................................................................................................160<br />
Table 95: Demand, Supply, Gap Assessment for Water Supply System - 2026 ..........................................160<br />
Table 96: Sewage Generation ...............................................................................................................................161<br />
Table 97: Demand, Supply, Gap Assessment for Sewerage System - 2026..................................................162<br />
Table 98: Comparison of various Sewage Technologies..................................................................................163<br />
Table 99: Drainage System Demand ...................................................................................................................164<br />
Table 100: Demand, Supply, Gap Assessment for Drainage System - 2016 ................................................164<br />
Table 101: Solid Waste system Demand..............................................................................................................165<br />
Table 102: Demand, Supply, Gap Assessment for Solid Waste Management System - 2026....................165<br />
Table 103: Demand, Supply, Gap Assessment for Roads - 2016 ...................................................................168<br />
Table 104: Demand, Supply, Gap Assessment for Street Lights - 2016........................................................169<br />
Table 105: Basic Infrastructure and Housing Requirement for Urban Poor................................................169<br />
Table 106: Identified Projects in Water Supply Sector.....................................................................................171<br />
Table 107: Identified Projects in Sewerage System Development Works.....................................................172<br />
Table 108: Proposed Projects in Solid Waste Management.............................................................................173<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong><br />
vi
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Table 109: Investment Proposed in Storm Water Drainage............................................................................173<br />
Table 110: Investment Proposed in Primary Drainage.....................................................................................174<br />
Table 111: Proposed Road Improvements..........................................................................................................174<br />
Table 112: Widening of Arterial Roads -Proposed Investment ......................................................................175<br />
Table 113: Proposed Junction Improvements ...................................................................................................175<br />
Table 114: Proposed Corridors for Under Ground Utility Ducts and Medians...........................................176<br />
Table 115: Proposed Pedestrian Subways & Pedestrian Crossings.................................................................176<br />
Table 116: Proposed Bridges and Elevated Highways & its Costing .............................................................177<br />
Table 117: Proposed Parking Locations..............................................................................................................177<br />
Table 118: Proposed Bypass and Ring Roads ....................................................................................................178<br />
Table 119: Proposed Bus Terminus and Transport Nagar Investments .......................................................178<br />
Table 120: Proposed Investments in Street Lighting Sector............................................................................178<br />
Table 121: Proposed Projects in Environmental Improvement, City Beautification and Tourism<br />
Development...................................................................................................................................................179<br />
Table 122: Proposed Investments in Preservation of Water Bodies..............................................................179<br />
Table 123: Other Developmental Projects.........................................................................................................180<br />
Table 124: Proposed Investments in Disaster Management Pre-Preparedness ...........................................180<br />
Table 125: Proposed Investments in Basic Services for Urban Poor & Housing........................................181<br />
Table 126: Summary of Proposed Investments.................................................................................................182<br />
Table 127: Component wise Investment Phasing (Base Cost)........................................................................183<br />
Table 128: Proposed Parking lots on Public Private Partnership...................................................................199<br />
Table 129: Proposed Other Developmental Projects on Public Private Partnership..................................201<br />
Table 130: Summary of proposed projects on Public Private Partnership ...................................................204<br />
Table 131: Financial Operating Plan (FOP) Results .........................................................................................205<br />
Table 132: Summary of Project Cash flow.........................................................................................................205<br />
Table 133: Proposed Funding Pattern (Base Cost) ...........................................................................................207<br />
List of Figures<br />
Figure 1: City Development Plan (CDP) Approach................................................................................... 5<br />
Figure 2: City Development Plan (CDP) Process........................................................................................ 6<br />
Figure 3: District Boundary Map of Jharkhand........................................................................................... 8<br />
Figure 4: Connectivity Map of <strong>Dhanbad</strong>........................................................................................................ 9<br />
Figure 5: <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> Map......................................................................................10<br />
Figure 6: Urban Agglomeration Population Growth Trend ................................................................15<br />
Figure 7: <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> –Urban Agglomeration Map......................................16<br />
Figure 8: Distribution of UG Blocks Coal Reserves .................................................................................26<br />
Figure 9: Distribution of Open Cast Blocks Coal Reserves...................................................................27<br />
Figure 10: SSI - Employment Generation Distribution...........................................................................32<br />
Figure 11: Revenue Income and Expenditure Trend – Erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity .......37<br />
Figure 12: Capital Income and Expenditure Trend – Erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity ..........38<br />
Figure 13: Revenue Income and Expenditure Trend- Erstwhile Sindri NAC ...............................38<br />
Figure 14: Capital Income and Expenditure Trend – Erstwhile Sindri NAC ................................39<br />
Figure 15: Composition of Average Revenue Income – Erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity.....40<br />
Figure 16: Composition of Average Revenue Income – Erstwhile Sindri NAC...........................41<br />
Figure 17: Composition of Average Revenue Expenditure..................................................................44<br />
Figure 18: Water Charge Collection Performance of MADA...............................................................52<br />
Figure 19: Property Tax Collection Performance of erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity .............52<br />
Figure 20: Erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity Water Supply Rising main and Distribution<br />
Main details ....................................................................................................................................................59<br />
Figure 21: Erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity Water Supply Mains ...................................................61<br />
Figure 22: Year wise Registered Vehicles in <strong>Dhanbad</strong> ...........................................................................80<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong><br />
vii
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Figure 23: Year wise Trend of Fire Accidents ............................................................................................86<br />
Figure 24: Comparison of <strong>Dhanbad</strong> So2 Levels with Standards with..............................................94<br />
Figure 25: Comparison of <strong>Dhanbad</strong> No2 Levels with Standards.......................................................95<br />
Figure 26: Comparison of Jharia SPM Levels with Standards.............................................................96<br />
Figure 27: Comparison of <strong>Dhanbad</strong> SPM Levels with Standards......................................................97<br />
Figure 28: Earthquake Zones in Jharkhand State ...................................................................................107<br />
Figure 29: Past Earthquake Occurrences in <strong>Dhanbad</strong> Region ...........................................................107<br />
Figure 30: Proposed Land Use .......................................................................................................................109<br />
Figure 31: Erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong> area proposed Landuse Map ......................................110<br />
Figure 32: <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> – Future Growth Direction.....................................112<br />
Figure 33: Proposed Jharia Rehabilitation Township Map on Jharia Coal field.........................114<br />
Figure 34: Proposed Organization Setup for New <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong>.............125<br />
Figure 35: Present Organization Setup of MADA..................................................................................126<br />
Figure 36: Sector wise priority based on Consultation findings.......................................................136<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong><br />
viii
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Abbreviation and Acronyms<br />
ARV : Annual Ratable Value<br />
BCCL : Bharat Cooking Coal Limited<br />
BIS : Bureau of Indian Standards<br />
BOLT : Built Own Lease and Transfer<br />
BOOT : Built Own Operate and Transfer<br />
BOT : Built Operate Transfer<br />
CAA : Constitutional Amendment Act<br />
CAGR : Compound Annual Growth Rate<br />
CBD : Central Business District<br />
CDP : City Development Plan<br />
CI : Cast Iron<br />
CIL : Coal India Limited<br />
CIP : City Investment Plan<br />
CMO : Chief Medical Officer<br />
CMRI : Centre for Mining and Research Institutions<br />
CPCB : Central Pollution Control Board<br />
CT : Census Towns<br />
DCB : Demand Collection Balance<br />
DGMS : Director General for Mining Safety<br />
DIC : District Industries Centres<br />
DLDP : Dual Load Dumper Placers<br />
DMC : <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong><br />
DO : Dissolved Oxygen<br />
DPR : Detailed Project Report<br />
DVC : Damodar Valley <strong>Corporation</strong><br />
EPIP : Export Promotion Industrial Park<br />
ESR : Elevated Service Reservoirs<br />
FCI : Fertilizer <strong>Corporation</strong> of India<br />
FY : Financial Year<br />
GIS : Geographical Information System<br />
GLSR : Ground Level Storage Reservoirs<br />
GoI : Government of India<br />
GoJ : Government of Jharkhand<br />
Ha : Hectare<br />
ISM : Indian School of Mining<br />
JCF : Jharia Coal Field<br />
JNNURM : Jawaharlal Nehru National Urban Renewal Mission<br />
JPCB : Jharkhand Pollution Control Board<br />
Kw : Killo Watts<br />
Lpcd : Liters percapita per day<br />
LPG : Liquid Petroleum Gas<br />
MADA : Mineral Area Development Authority<br />
MCM : Million Cubic Meter<br />
ML : Million Liters<br />
MLD : Million Liters per Day<br />
MoEF : Ministry of Environment and Forest<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong><br />
ix
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
MSL : Mean Sea Level<br />
MSW : <strong>Municipal</strong> Solid Waste<br />
MT : Metric Tonnes<br />
NAC : Notified Area Committee<br />
NGO : Non Governmental Organisation<br />
NH : National Highways<br />
NIC : National Informatics Centre<br />
O&M : Operations and Maintenance<br />
OC : Open Cast<br />
OHT : Over Head Tank<br />
PMC : Project Management Consultancy<br />
PSD : Private Sector Developer<br />
PSP : Public Stand Post<br />
PT : Property Tax<br />
PWD : Public Works Department<br />
RCD : Road Construction Department<br />
RE : Revenue Expenditure<br />
RI : Revenue Income<br />
ROB : Rail Over Bridge<br />
RUB : Rail Under Bridge<br />
SEZ : Special Economic Zone<br />
SSI : Small Scale Industries<br />
STP : Sewerage Treatment Plant<br />
SWOT : Strength – Weakness – Opportunities – Threat<br />
TDS : Total Dissolved Solids<br />
UA : Urban Agglomeration<br />
UDD : Urban Development Department<br />
UFW : Unaccounted for Water<br />
UG : Under Ground<br />
UGD : Under Ground Drainage<br />
ULB : Urban Local Body<br />
WPR : Workforce Participation Rate<br />
WS&SD : Water Supply & Sanitation Department<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong><br />
x
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
I. BACKGROUND<br />
A. Introduction<br />
In the present development paradigm, cities are considered “Engines of Growth”. The<br />
agglomeration of economic activities in the process of urbanization contributes to city and<br />
concomitantly to national growth through:<br />
(i.) Real sector: By leveraging productivity of output and employment;<br />
(ii.) Financial sector: By mobilizing savings; and<br />
(iii.) Fiscal flows: With cities providing the major proportion of a nation’s tax revenues.<br />
Development of cities is therefore critical in achieving national goals of improving living<br />
standards, equitability and sustainability - And Cities that understand their competitive<br />
position, and move wisely and quickly to capitalize on their comparative advantage, can<br />
expect significant economic returns.<br />
With a view to integrate the reform initiatives and scale up the effort to catalyse investment in<br />
urban infrastructure across States in the country and to provide reform linked assistance to<br />
State Governments and ULBs in the country, Government of India (GoI) has launched its<br />
very ambitious scheme “Jawaharlal Nehru National Urban Renewal Mission” (JNNURM).<br />
The thrust of JNNURM is to ensure improvement in urban governance and service delivery<br />
so that Urban Local Bodies become financially sound and sustainable for undertaking new<br />
projects. City Development Plan (CDP) is the first milestone of a project development cycle,<br />
which broadly identifies the urban needs and prioritizes projects to be taken up under<br />
JNNURM.<br />
From Jharkhand state, three cities viz. <strong>Dhanbad</strong>, Ranchi and Jamshedpur have been identified<br />
under JNNURM, for which funds would be available under the scheme. As stated before,<br />
these cities need to prepare a City Development Plan (CDP), further to which, projects for<br />
development would be undertaken. <strong>Dhanbad</strong> City Development Plan is prepared by IL&FS<br />
IDC.<br />
B. Outcomes of JNNURM<br />
Following outcomes are envisaged in the JNNURM programme;<br />
(iv.) Universal Access to a minimum level of services;<br />
(v.) Establishment of city-wide framework for planning and governance;<br />
(vi.) Modern and transparent budgeting, accounting, and financial management system at<br />
municipal levels;<br />
(vii.) Financial sustainability for municipalities and other service delivery institutions;<br />
(viii.) Introduction of e-governance in the core functions of municipal governments; and<br />
(ix.) Transparency and accountability in urban service delivery and management.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 1
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
C. Admissible Component under JNNURM<br />
1. Urban Renewal –<br />
Widening of narrow streets,<br />
Shifting of industrial/commercial establishments from nonconforming<br />
(inner-city) areas to ‘conforming’ (outer-city) areas to reduce congestion,<br />
Replacement of old and worn-out water pipes by new/higher capacity ones,<br />
Renewal of sewerage/ drainage/solid waste disposal systems, etc)<br />
2. Water Supply<br />
3. Sewerage<br />
4. Solid Waste Management<br />
5. Construction and Improvement of Drains/Storm Water Drains<br />
6. Urban Transport<br />
7. Laying /improvement/widening of arterial /sub-arterial roads and bridges to remove<br />
transport bottlenecks<br />
8. Parking lots on Public Private Partnership basis<br />
9. Laying of ring roads and bye-passes around metro and mega cities, provided certain<br />
cost recovery measures like toll charges are built in<br />
10. Construction and development of bus and truck terminals<br />
11. Environmental improvement and city beautification schemes<br />
12. Preservation of Water Bodies<br />
13. Development of Heritage Areas<br />
14. Construction of working women hostels, marriage halls, old age and destitute<br />
children’s home, nigh shelter with community toilets<br />
Inadmissible component under JNNURM<br />
1. Power<br />
2. Telecom<br />
3. Health<br />
4. Education<br />
5. Wage Employment Programme & Staff Component<br />
D. Scope of Work<br />
The scope of services for preparing City Development Plan for <strong>Dhanbad</strong> broadly covers the<br />
following areas:<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 2
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
i.) In depth analysis of the existing situation, covering the demographic, economic financial,<br />
infrastructural, physical, environmental and institutional aspects;<br />
ii.) Development of a perspective and vision of the city;<br />
iii.) Formulating a strategy for bridging the gap between where the city is and where it wishes to<br />
go;<br />
iv.) Preparing a City Investment Plan (CIP) and a financing strategy; and<br />
v.) To prioritize the schemes in order to prepare DPR for suitable schemes.<br />
E. Approach Methodology<br />
The approach to preparation of the City Development Plan (CDP) for <strong>Dhanbad</strong> <strong>Municipal</strong><br />
<strong>Corporation</strong> (DMC) area primarily focused on identifying and addressing issues with regards<br />
city development and city management through a consultative process involving various<br />
stakeholders in the city's development.<br />
The CDP shall be based on an assessment of the Strengths-Weakness-Opportunities-Threat<br />
(SWOT) of the city, with regards various elements of urban development and management,<br />
capitalizing on the strengths and opportunities and addressing weaknesses and threats. The<br />
following elements of city development and management shall be dealt with.<br />
(i.) Regional setting and demography;<br />
(ii.) Institutional framework for urban development and management;<br />
(iii.) Urban Economy;<br />
(iv.) Physical planning and growth management;<br />
(v.) Urban transport system and connectivity;<br />
(vi.) Land development and housing;<br />
(vii.) Urban basic service infrastructure / public utilities;<br />
(viii.) Poverty reduction and social development;<br />
(ix.) Environmental management;<br />
(x.) Organization development; and<br />
(xi.) Finances and Capital Investment Sustenance.<br />
The approach to the visioning exercise shall comprise of three basic stages, viz.:<br />
1. Stage 1- Preparatory Phase<br />
This phase shall focus on establishing the existing situation of the city, in terms of the various<br />
developmental elements listed above. The outcome of this phase shall be a “State of the City<br />
Report” elucidating the existing situation with regards the various developmental elements<br />
and identifying key issues and problems involved therein.<br />
This phase involves extensive data collection pertaining to the developmental elements from<br />
concerned stakeholder agencies and other secondary sources. The data shall be compiled and<br />
analyzed to establish the current situation presented in the State of the City Report.<br />
2. Stage II – Consensus-building / Visioning Phase<br />
This stage shall involve stakeholder consultations aimed at consensus building on city<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 3
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
developmental issues and priorities with the state of the city report as the primary basis for<br />
consultations. A shared vision shall be framed and adopted for development of the city of<br />
<strong>Dhanbad</strong> and developmental goals shall be set for achieving the vision. The outcome of this<br />
stage shall be a “shared vision statement” for the development of <strong>Dhanbad</strong> city, sectoral goals<br />
and optional strategies to achieve the goals and preliminary identification of thrust areas and<br />
associated projects. .<br />
3. Stage III – Strategy Formulation Phase<br />
This stage shall involve evaluating strategy options, analysis of strengths and weaknesses,<br />
identification of stakeholder roles, developing implementation and action plans and capacity<br />
building plan within a realistic financing framework.<br />
While carrying out the above, the strategic plan would focus on issues of priority local<br />
concerns for livability, and the implied requirements in terms of:<br />
(i.) Enhancing city productivity through enhanced economy and better quality of life;<br />
(ii.) Ensuring planned and integrated land, housing, infrastructure and other facilities<br />
development;<br />
(iii.) Reducing poverty through enhanced access of the poor to basic urban and social<br />
services;<br />
(iv.) Improving management through integrated approach to development issues;<br />
(v.) Organizational capacity building to meet the requirements of the strategic plan; and<br />
(vi.) Enhancing financial sustainability through improved/ innovative asset management and<br />
project development/ structuring mechanisms involving private-public participation.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 4
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Figure 1: City Development Plan (CDP) Approach<br />
Stage I- Preparatory Phase<br />
Pre-study stage:<br />
• Identification and Listing of Key Stakeholders<br />
• Collection of Primary and Secondary Data<br />
• Consensus building on city priorities<br />
• Finalizing key sectors/elements to be studied<br />
• Preparation of Base Map<br />
Review/ Analysis with regards to:<br />
• Regional setting and linkages;<br />
• Economic development;<br />
• Tourism development;<br />
• Physical planning and growth management;<br />
• Traffic & Transportation;<br />
• Urban infrastructure and public utilities;<br />
• Social infrastructure and facilities;<br />
• Poverty reduction and social development;<br />
• Environmental management;<br />
• Financial management, <strong>Municipal</strong> Acts; and<br />
• Institutional development.<br />
Stage III- Strategy Formulation & CIP Phase<br />
Stage II- Consultation & Visioning<br />
Phase<br />
Existing situation description, Demand-Supply Gap Assessment, Identification of<br />
key developmental and management issues, SWOT analysis and Strategy options<br />
Department of Local Self Government, GoJ<br />
Preliminary Report<br />
Working Groups on various elements<br />
Stakeholder Workshop<br />
Formulation of<br />
VISION STATEMENT and MISSION STATEMENT<br />
• Policy Reforms<br />
• Innovative Project Development<br />
• Private Sector Participation<br />
Agreed Vision, supported with Strategy options & Action<br />
• Revenue Enhancement & Resource<br />
Plans and Project identification under each element &<br />
Mobilization<br />
Preparation of Capital Investment Plan<br />
Defined Parameters Like:<br />
• Social and Economic Goals,<br />
Thrust Area Identification,<br />
• City Needs;<br />
Strategic Analysis & Prioritization<br />
• Financial Considerations,<br />
Project Cash Flow Analysis and<br />
• Project Structuring<br />
Parameters for Strategic Options<br />
• Stage of Implementation, etc.<br />
Growth Management Framework<br />
Investment Sustenance Assessment through Annual<br />
Financial and Operating Plan (FOP)<br />
Implementation Structure and Capacity Building Framework<br />
City Development Plan<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong><br />
5
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Figure 2: City Development Plan (CDP) Process<br />
Existing Situation Review & Defining City Vision<br />
Existing Situation Review & Defining City Vision<br />
and Goals<br />
and Goals<br />
Review of current service delivery levels from the<br />
Review of current service delivery levels from the<br />
citizens’ perspective through consultation between<br />
citizens’ perspective through consultation between<br />
councillors and technical staff of <strong>Corporation</strong><br />
councillors and technical staff of <strong>Corporation</strong><br />
Agenda Note Preparation on Visions and Goals of the<br />
Agenda Note Preparation on Visions and Goals of the<br />
CDP in Consultation with Planning Partners<br />
CDP in Consultation with Planning Partners<br />
Review of State and Local Organisations/ Institutional<br />
Agenda for the Future<br />
Review of State and Local Organisations/ Institutional<br />
Operations in Service Delivery<br />
Operations in Service Delivery<br />
Sectoral Strategies<br />
Sectoral Strategies<br />
Master Plan<br />
Master Plan<br />
Poverty Reduction Plan<br />
Poverty Reduction Plan<br />
Water Supply Augmentation Plan<br />
Water Supply Augmentation Plan<br />
Sewerage Master Plan<br />
Sewerage Master Plan<br />
Storm Water Master Plan<br />
Storm Water Master Plan<br />
Comprehensive Traffic & Transport Study<br />
Comprehensive Traffic & Transport Study<br />
City City Development Plan Plan Review<br />
Review<br />
Annual Annual Report Report and and Assessment Assessment of of Progress<br />
Progress<br />
Identification of of Shortcomings<br />
Areas Areas of of focus focus for for forthcoming forthcoming CDP<br />
CDP<br />
Draft CDP<br />
City Vision and Goals<br />
Draft Plan Formulation and<br />
Identification of Capital Improvement<br />
Program<br />
Address issues and identify future<br />
requirement within Plan Period<br />
Identify Tasks to address strategies<br />
formulated to cater to future requirement<br />
Identify Institutions involved in<br />
performing tasks<br />
Define sustainability indicators to Monitor<br />
and Evaluate the Plan<br />
Annual Progress Report<br />
City Development Plan<br />
Draft for Public Consultation<br />
CDP CDP Monitoring Monitoring and and Evaluation<br />
Evaluation<br />
Review Review of of Sustainability Indicators<br />
Indicators<br />
Identification of<br />
of<br />
Key Key Areas Areas of of deficiencies<br />
deficiencies<br />
Redressal Redressal of of issues issues and and accounted accounted for<br />
for<br />
Final CDP<br />
For Implementation<br />
Public Consultation, CDP Approval and<br />
Finalisation<br />
Critical Review and Approval of CDP by Citizen<br />
Groups/ Public Representatives, Elected<br />
Councillors and Planning Partners<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong><br />
6
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
F. Report Structure<br />
(i.)<br />
City Profile. The current section detailing the regional settings, urbanization trend,<br />
socio economic profile of the <strong>Municipal</strong> <strong>Corporation</strong>.<br />
(ii.) Economic Base. This section detailing the economic base of the city, SWOT Analysis<br />
and tourism development.<br />
(iii.) <strong>Municipal</strong> Financial Management. Financial Management of <strong>Dhanbad</strong> <strong>Municipal</strong><br />
<strong>Corporation</strong> is detailed in this section.<br />
(iv.) Existing Infrastructure Assessment. This section deals with Water Supply, Sewerage<br />
and Sanitation, Storm water Drainage and Water Bodies Rejuvenation, Solid Waste<br />
Management, Roads and Traffic Management and Street Lighting in the city, and assess<br />
current level of service delivery, system performance, key issues and SWOT Analysis.<br />
(v.) Urban Environment. This section deals with urban environment concerns like mining<br />
environment, river water quality, air environment, Noise quality and hotspots.<br />
(vi.) Physical Planning and Growth Management. This section describes the planning<br />
efforts excised in the past, issues related to physical planning and growth management.<br />
(vii.) Urban Governance. This section deals with the 74 th CAA, Institutional framework,<br />
proposed Organization Structure, SWOT analysis.<br />
(viii.) Basic Services for Urban Poor. This section deals with existing status of slums in the<br />
city and present infrastructure provision in slums, performance indicators and key<br />
issues.<br />
(ix.) Vision, Goals and Sectoral Strategies. This section deals with sectoral visions, goals<br />
and strategies to achieve the defined vision.<br />
(x.) Demand, Supply, Gap Assessment of Service Delivery. This section deals with<br />
sector wise demand, present supply and gap for the present and future designed period<br />
is arrived for the city.<br />
(xi.) Capital Investment Plan & Financing Strategy. This section details out the<br />
proposed capital investment for each sector based demand, supply, gap assessment and<br />
phasing of the proposed investments. Financing strategy also suggested to meet the<br />
fund requirement.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 7
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
II.<br />
CITY PROFILE<br />
A. Overview<br />
Figure 3: District Boundary Map of Jharkhand<br />
The district of <strong>Dhanbad</strong> in<br />
the country occupies a<br />
unique place as an important<br />
resource region which is a<br />
part of the South-East<br />
resource region. The<br />
resource is the coal, often<br />
termed as “Black Diamond”, a<br />
term which befits its<br />
importance as basic fuel in<br />
most industries. The<br />
<strong>Dhanbad</strong> district has the<br />
largest coal reserves, about<br />
13,000 million tons of<br />
metallurgical coal. The<br />
region is most commonly identified as “Jharia Coal Field (JCF)” which is the one single<br />
depository of coal spread over an area of about 480 sq.kms.<br />
This has influenced the location of many coal-oriented industries, such as fertilizers,<br />
washeries, coke plants, ceramic industry, pottery works, steel industries, lead and zinc smelting<br />
and numerous other engineering industries.<br />
In a relative perspective, the region could be linked to industrial zone of Asansol- Durgapur<br />
in the West Bengal and Jamshedpur – Chaibasa in the Jharkhand- the comparative elements<br />
being the Bokaro Steel Plant in the west, Sindri Fertilizer complex, Sulphuric Acid Plant and<br />
ACC Cement Factor in the south and a number of coal-based chemical industries scattered<br />
around the coal-belt.<br />
In this venture of coal mining, a number of new mining towns have sprung up in a chain,<br />
spreading from <strong>Dhanbad</strong> south-wards upto Sindri and westwards upto Katras. This<br />
development is mostly scattered, haphazard and unplanned.<br />
Mineral resource regions compel to scan one more aspect, i.e. limitation of urban growth, as<br />
also conservation and extraction of underground resources. Mineral resource regions and in<br />
particular resource regions based on coal area developed on economic activities of exhaustible<br />
resources. It is important, thus to take a long term view so that the mono-centric economic<br />
activity can be gradually shifted to other activities. Also, diversification of the economic base<br />
is of utmost importance for optimum utilization of the potentialities existing in the region in<br />
terms of basic materials, fuel, ample power resources, well developed and distributed<br />
communication network and proximity to large urban centres, etc.<br />
The <strong>Dhanbad</strong> District consist of eight blocks which include, <strong>Dhanbad</strong> Sadar, Jharia Block,<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 8
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Sindri Block, Baghmara Block, Baliapur Block, Gobindpur Block, Topchanchi Block and<br />
Tundi.<br />
For a balanced growth and improvement of conditions in the region, a preconceived strategy<br />
for the future needs to be spelt out, to control and regulated the urban growth and<br />
development of infrastructure.<br />
Location<br />
Figure 4: Connectivity Map of <strong>Dhanbad</strong><br />
<strong>Dhanbad</strong><br />
<strong>Municipal</strong><br />
<strong>Corporation</strong> is located in the<br />
Eastern part of the Country,<br />
from 85 0 45’ E longitude to 86 0<br />
30’ E longitude and from 23 0 32’<br />
N latitude to 24 0 5’latitude. The<br />
district headquarter, located at<br />
<strong>Dhanbad</strong> is about 170 km from<br />
State Capital of Ranchi and<br />
about 250 km from Kolkata the<br />
premier city of the country.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong><br />
New <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> was formed as per notification vide<br />
/Establishment/Formation – 101/5334/Urban Development Department, Ranchi, dated 01-<br />
02- 2006. The New <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> will consist of urban settlements namely<br />
erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity, Jharia NAC, Sindri NAC, Chhatandh NAC, Katras NAC<br />
and 27 census towns (as per 2001 census). Besides these urban settlements there are 258<br />
villages also form part of the new <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong>. The total population of<br />
new <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> as per Census 2001 is 13,33,719 out which 10,65,327<br />
persons constitutes from Urban Agglomeration (32 towns) and villages constitutes about<br />
268,392 persons. The total area of new <strong>Municipal</strong> <strong>Corporation</strong> is around 355.77 sq.km.<br />
Railways<br />
<strong>Dhanbad</strong> is well connected by the Rail route also. It is the divisional headquarter of Eastern<br />
Railway. The Grand chord line (Golden Quadrilateral – NH 2) which is the main line between<br />
Delhi and Calcutta passes through <strong>Dhanbad</strong>. Trains to Delhi, Calcutta, Bombay, Jammu,<br />
Kalka, Gorakhpur, Lucknow, Patna, Jodhpur etc. can be taken from <strong>Dhanbad</strong>. Important<br />
trains halting at <strong>Dhanbad</strong> are Calcutta Rajdhani Express, Bhubneshwar Rajdhani Express,<br />
Bokaro Calcutta Shatabdi Express. Poorva Express, Kalka Mail, Ludhiana Express., Jammu-<br />
Tawi Express., Howrah-Jodhpur Express and Shakti Punj Express.<br />
Gomoh is another important Railway Junction located in <strong>Dhanbad</strong> district. Neelanchal<br />
Express., Purushottam Express is the important trains halting at Gomoh.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 9
KUSBERIA<br />
RAJGANJ<br />
BHELATAND<br />
200<br />
40<br />
AMJHAR<br />
6<br />
7<br />
BHUDA<br />
3<br />
5<br />
GOLMARA<br />
4<br />
BERA<br />
DHOKHRA<br />
PALANI<br />
RAKHITPUR<br />
BAROMA<br />
DHAIYA<br />
BARADAHA<br />
HIRAPUR<br />
DHOWATANR<br />
CHANDUD<br />
GOTTOPA<br />
SAMAIDIH<br />
SABALPUR<br />
KOLAKUSMA<br />
SAPTA<br />
NARAINPUR<br />
AMAGHATA<br />
DHANGI<br />
9<br />
SAHARPURA<br />
KUSBERIA<br />
1<br />
GOLAKDIH<br />
OJHADIH<br />
BAGAGI<br />
JINAGORA<br />
GOPALICHAK<br />
202<br />
PETIA<br />
111<br />
PARASIA<br />
MUNIDIH<br />
KARITANR<br />
GANSADIH<br />
City Development Plan, <strong>Dhanbad</strong> Final Report<br />
Figure 5: <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> Map<br />
TO DELHI<br />
TO KOLKATA<br />
NH32<br />
NH2<br />
230<br />
NH33<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 10<br />
CITY DEVELOPMENT PLAN<br />
DHANBAD<br />
DHANBAD MUNICIPAL CORPORATION<br />
BOUNDRY MAP<br />
LEGEND<br />
MAJOR ROADS<br />
RAILWAY LINE<br />
MAJOR RIVER<br />
JHARIA NAC & RURAL + SINDRI<br />
BALIAPUR BLOCK (PART)<br />
DHANBAD RURAL + CHHATATAND<br />
NAC<br />
DHANBAD MUNICIPAL AREA<br />
GOVINDPUR BLOCK (PART)<br />
DHANBAD RURAL + CHHATATAND<br />
NAC<br />
BAGHMARA BLOCK (PART) + KATRAS<br />
NAC<br />
OTHER URBAN AREA<br />
CITY/ TOWN<br />
SINDRI<br />
N<br />
DHANBAD MUNICIPAL CORPORATION<br />
INFRASTRUCTURE DEVELOPMENT<br />
CORPORATION LIMITED<br />
FIGURE NO:<br />
DAMODAR RIVER<br />
192<br />
SINDRI<br />
186<br />
187<br />
189<br />
CHHIPATAND<br />
SOULAPUR<br />
183<br />
174<br />
ROHARABAND<br />
169<br />
DOMGARH<br />
TASRA<br />
168<br />
167<br />
174<br />
173 172<br />
129<br />
184<br />
JIALGORA<br />
VARANASI<br />
198<br />
201<br />
207<br />
212<br />
217<br />
215<br />
208<br />
207<br />
LALCHAK<br />
241<br />
237<br />
DUNGRI<br />
261<br />
288<br />
253<br />
220<br />
216<br />
BLAITANR<br />
BAGDAHA<br />
DALDALI<br />
PHATA MAHL<br />
BHUIAN RARARPUR<br />
SONDAHA<br />
SALDAHA<br />
TILATANR<br />
213<br />
BARWADI<br />
UDALBANI<br />
238<br />
232<br />
263<br />
KAILUDIH<br />
88<br />
8 15<br />
49<br />
151<br />
148<br />
36<br />
37<br />
34<br />
154<br />
35<br />
30<br />
152<br />
52<br />
50<br />
140<br />
139<br />
14<br />
94<br />
85<br />
86<br />
87<br />
48<br />
47<br />
46<br />
141<br />
49<br />
44<br />
45<br />
142<br />
131<br />
42<br />
BALGRIA<br />
143<br />
144<br />
150<br />
127<br />
146<br />
122<br />
144<br />
126<br />
147<br />
121<br />
153<br />
155<br />
177<br />
158<br />
156<br />
238<br />
231<br />
264<br />
282<br />
270<br />
271<br />
280<br />
68<br />
273<br />
69<br />
274<br />
67<br />
71<br />
66<br />
72<br />
80<br />
84<br />
81<br />
82<br />
61<br />
59<br />
93<br />
97<br />
99<br />
75<br />
100<br />
103<br />
104<br />
138<br />
137<br />
106<br />
136<br />
107<br />
135<br />
108<br />
112<br />
113<br />
114<br />
116<br />
160<br />
159<br />
SHYAMDIH<br />
260<br />
84<br />
BANDARCHUA<br />
221<br />
278<br />
86<br />
79<br />
85<br />
94<br />
256<br />
289<br />
226<br />
MUKUNDA<br />
MATKURIA<br />
RANGUNI<br />
224<br />
383<br />
272<br />
229<br />
225<br />
223<br />
284<br />
233<br />
235<br />
266<br />
267<br />
265<br />
269<br />
286<br />
228<br />
349<br />
276<br />
55<br />
65<br />
54<br />
53<br />
CHANDKUYIH<br />
BASTACOLA<br />
BANSMORI<br />
GONDUDIH<br />
CHHOTA<br />
KHARIKABAD<br />
KUJUMA<br />
NICHITPUR<br />
PARUTIA<br />
SURANGA<br />
PAHARPUR<br />
DAMODARPUR<br />
SUSNILEWA<br />
DAMKAR BRWA<br />
BISUNPUR<br />
ALAKHDIHA<br />
BHAGRAMPUR<br />
PANEARA<br />
MADHUBAN<br />
87<br />
73<br />
58<br />
PARASBANIA<br />
KUSUNDA<br />
ALKUSA<br />
JIALGORA<br />
SONARIA GORERIED EKRA<br />
77<br />
96<br />
88<br />
89<br />
92<br />
91<br />
102<br />
101<br />
105<br />
133<br />
ARULGRIA<br />
TETULMARI<br />
SIALGUDRI<br />
DHONDABAD<br />
DHOBANI<br />
GOPINATHDIH<br />
BARRAGARY<br />
GARBHUDIH<br />
BARADUBHI<br />
18<br />
181<br />
PARBAD<br />
157<br />
BHATDIH<br />
117<br />
GANDUBAD<br />
DHARJORI<br />
KURMIDIH<br />
PICHHARI<br />
BARA<br />
OR<br />
KARI TANR<br />
UDAYPUR<br />
GOVINDADIH<br />
CHHOT<br />
PICHHARI<br />
PARGHABAD<br />
163<br />
182<br />
RAGHUNATHPUR<br />
179<br />
MANAITAND<br />
RANGAMATIA<br />
175<br />
172<br />
MANOHARTANR<br />
171<br />
164<br />
133<br />
NAGRIKALA<br />
BAUOKALA<br />
SARAIDHELA<br />
DHANBAD<br />
51<br />
BHAGATDIH<br />
PATHRA KULHI<br />
JHARNA<br />
JHARIA<br />
TISRA<br />
CHHATABAD<br />
UPARKANDRA<br />
KUSTOR<br />
165<br />
CHASNALA<br />
PATHARDIH<br />
LOYABAD<br />
162<br />
PUTKI<br />
RAMPUR<br />
SARADHA<br />
MAJHILADIH<br />
LAKARKHAOARI<br />
BHAGABAND<br />
JITPUR<br />
KENDUADIH<br />
SIJUA<br />
SABALDIH<br />
RAJASDHRA<br />
BHOWRA<br />
JARMA<br />
DAMODAR RIVER<br />
JATUDIH<br />
TETENGABAD<br />
287<br />
299 300<br />
286<br />
301<br />
348<br />
90<br />
PATRA KULHI<br />
KUPURIA<br />
MALKERA<br />
BHULI<br />
GODHAR<br />
DHANSAR<br />
BASARIA<br />
CHANDRABAD<br />
PONDERKANLI<br />
KATRAS<br />
ANGARPATHRA<br />
JAMADOVA<br />
BALIHARI<br />
258<br />
122<br />
10<br />
KUSUMDAHA<br />
123<br />
11<br />
125<br />
126<br />
127<br />
128<br />
76<br />
13<br />
170 171<br />
16<br />
185<br />
KOLKATA<br />
17<br />
GOPINATHDIH<br />
SABIPUR<br />
12<br />
PRADHAN KHANTA<br />
89<br />
JORAPOKHAR<br />
32<br />
KARMATANR<br />
AMGHATA<br />
CHANDAUR<br />
KERKEND<br />
SUDAMDIH<br />
BANDHDIA<br />
TO RANCHI<br />
TO RANCHI
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Topography<br />
It is situated on the lower steps of Chota Nagpur plateau at an altitude of 750’ above Mean<br />
Sea Level (MSL).<br />
Geology<br />
Geologically, the major feature is the great coal basin of Jharia with intervening areas of<br />
crystalline rocks. The ancient rock types Dharwar and post dharwar period form the<br />
basement rock over which the lower Gondwana group of sedimentary strata consisting of<br />
coal seams and patches of sand stone is formed. The region is important for its large reserves<br />
of Lower Gondwana coal distributed in three fields, the Jharia and Chandrapura Coalfields<br />
and Barkar series which extends into the Raniganj Coalfield in West Bengal.<br />
The main axis of the synclinal Jharia Coalfield basin runs West-East – South-East and is<br />
pitching gently towards West and can be seen by the dips of the Raniganj strata along the<br />
Jamunia river.<br />
This line of axis is neither straight nor curved in simple manner, but is itself corrugated due to<br />
the forces probably coming from East to West. Though hardly a dozen minerals of economic<br />
importance occur in the region, it is one of the premier areas of India so far as the coal is<br />
concerned. The Jharia Coalfield reserves are estimated upto 12,815 million tones upto a depth<br />
of 600 meters out of which 5,640 million tones have been estimated as of prime coking coal<br />
variety, according to a BCCL report on estimates of coal reserves.<br />
Fireclay suitable for manufacture of firebricks as layers or thin beds in the coal bearing<br />
sedimentary formations at Nadkharki, Sonardih East, Kenduadih, Tisra and Patherdih are<br />
found.<br />
Silica is found in Dhangi hills, exploitation is done on a very small scale. Other economic<br />
minerals which are found in the region are building stones, kankar, steatite, soapstone, mica,<br />
iron-ore, chinaclay, graphite etc.<br />
Soil Characteristics<br />
Alluvial soil is found along river bed, which is used for agriculture. It is found in small patches<br />
especially in Baliapur block. Sandy soil is also found in the river beds, which is the<br />
characteristic of granitic rocks and sandstones. It is used for stowing and building purposes.<br />
Coarse gritty soil is predominant in coal basins. This type of soil mixed with big fragment of<br />
rocks is formed from the weathering of pegmatites, quartz and conglomeratic sandstones.<br />
Laterite or Kankar is found in the foot of hills which red soil is found further ahead. Some<br />
cultivation is practiced on red soil. Cultivable soils are found mainly in south eastern part of<br />
the region, near Sindri and North to North western part of the region in Gobindpur block.<br />
Climate and Rainfall.<br />
The climate of region is characterized by general dryness and hot summer except in the<br />
monsoon season. The cold weather prevails from November to February. The temperature<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 11
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
goes down as low as 6-7 0 C. The summer is hot with the temperature going to 47-48 0 C. The<br />
summer season is between March to June. The monsoon is from July to October. The rainfall<br />
is generally heavy accompanied of ten with stormy winds. The metrological observatory is at<br />
<strong>Dhanbad</strong>. Table 1 presents the block wise registered rainfalls during 2005 in DMC area.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 12
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Table 1: Block wise Registered Rain fall during the Year 2005 in <strong>Dhanbad</strong> DMC<br />
Months<br />
<strong>Dhanbad</strong> Jharia Balaiapur Baghmara Govindpur<br />
Rain fall<br />
(mm)<br />
No of Rainy<br />
Days<br />
Rain fall<br />
(mm)<br />
No of Rainy<br />
Days<br />
Rain fall<br />
(mm)<br />
No of Rainy<br />
Days<br />
Rain fall<br />
(mm)<br />
No of Rainy<br />
Days<br />
Rain fall<br />
(mm)<br />
No of Rainy<br />
Days<br />
2005<br />
January 26.8 3 31.3 3 37.2 3 18.6 1 103 7<br />
February 13.2 2 28 3 31.4 3 NA NA 20.6 3<br />
March 4 1 53 3 43 5 NA NA 22.6 1<br />
April 23 2 11.5 1 51 4 NA NA 22.2 3<br />
May 22.8 2 38.5 4 50.8 5 NA NA 40.4 2<br />
June 106.4 8 126.8 8 116.8 8 NA NA 204.8 8<br />
July 312.2 21 515.2 18 523.6 17 372.1 16 467.2 17<br />
August 131.8 10 75 7 90 8 213.2 12 200 9<br />
September 70.6 6 114.2 6 89.4 6 104 7 111.6 9<br />
October 92.6 8 136.8 7 146.8 5 85.2 5 104 5<br />
November - - 3.2 1 - - - - - -<br />
December 2.2 - 3.2 1 4.2 1 2.2 - 2.4 -<br />
Total 805.6 63 1,136.7 62 1,184.2 65 795.3 41 1,298.8 64<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 13
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
The climate of the district is characterized by general dryness. It is very pleasant during the<br />
cold weather from November to February. Thereafter the climate becomes warm. It remains<br />
hot until the monsoon breaks towards the middle of June. With the setting in of rains the<br />
temperature falls and humidity rises, July to October are the rainy months. July and August<br />
are the wettest months. The details of block wise rainfall and no of rainy days during the year<br />
2005 in <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> jurisdiction is presented in Table 1. The rainfall<br />
during (2005) July is varies from 312.2 mm in <strong>Dhanbad</strong> block to 523.6 mm in Baliapur Block.<br />
The average no of rainy days recorded in the year 2005 in DMC jurisdiction is 55 days.<br />
History<br />
<strong>Dhanbad</strong> district was constituted in 1956 by carving out the old <strong>Dhanbad</strong> subdivision, Chas<br />
and Chandankiyari police stations of the Sadar subdivision of the erstwhile Manbhum district.<br />
<strong>Dhanbad</strong> is Police district since 1928. The re-organisation of the districts in the State of Bihar<br />
which took place after 1971 did not affect the district of <strong>Dhanbad</strong>. Erstwhile <strong>Dhanbad</strong><br />
<strong>Municipal</strong>ity is the most urbanized in the district and the headquarters of the district. In the<br />
year 1991, Bokaro District was constituted by carving out Chas Sub-division of <strong>Dhanbad</strong><br />
district and Bermo Sub-division of Giridih District.<br />
The district is bounded on the west by Giridih and Bokaro on the north by Giridih and<br />
Dumka and on the east and south by Purulia district of West Bengal.<br />
The early history of the greater part of the Chotanagpur plateau is shrouded in mystery and<br />
that of <strong>Dhanbad</strong> district is particularly so. Details of even later periods are difficult to trace as<br />
the present district formed but a small and insignificant part of Manbhum. In the Settlement<br />
Report for Manbhum (1928) it has been stated that no rock inscriptions, copper plates or old<br />
coins were discovered and not a single document of copper plate or palm leaf was found in<br />
course of the Survey and Settlement operations. The oldest authentic documents produced<br />
were all on paper and barely even a hundred years old.<br />
In view of these circumstances the District Gazetteer for <strong>Dhanbad</strong> (1964) merely reproduces<br />
the chapter on history in the Settlement Report of 1928 which pertains to the entire district of<br />
Manbhum.<br />
It was a small village of the erstwhile district of Manbhum which had it’s headquarter in<br />
Purulia (now in West Bengal). Manbhum in turn, derived its name from Raja Man Singh who<br />
was gifted this territory by Emperor Akbar, following his victory in a certain battle. The<br />
district being extremely vast and far-flung soon got divided into Birbhum, Manbhum and<br />
Singhbhum, for administrative purposes.<br />
However, on 24.10.1956 <strong>Dhanbad</strong> was declared a District on the Recommendation of the<br />
State Reconstitution Commission vide notification 1911. Its geographical length, extending<br />
from North to South, was 43 miles and breadth, 47 miles, stretching across East to West. In<br />
1991 a part of <strong>Dhanbad</strong> was sliced away from Bokaro district, diminishing thereby its total<br />
area to 2,995 Sq.Kms.<br />
Earlier, the district was split into two sub – divisions – <strong>Dhanbad</strong> Sadar and Baghmara. The<br />
former incorporated 6 blocks, while the latter had four. The then vastness of the district<br />
called for two police headquarters, based at Bokaro and <strong>Dhanbad</strong> respectively. Meanwhile,<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 14
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
the district as its stands today, has only one sub-division called the <strong>Dhanbad</strong> Sadar. There are<br />
presently, 8 blocks here viz. Jharia, Baghmara, <strong>Dhanbad</strong>, Nirsa, Govindpur, Baliapur, Tundi,<br />
and Topchanchi.<br />
There are 100,850 acres of hillocks and 56,454 acres of forests. It is about 500-1,000 feet<br />
above Sea level. Its soil is, by and large lateritic in nature.<br />
B. Population Trends and Urbanization<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong>, covering about 355.77 sq. kms (include <strong>Dhanbad</strong> Urban<br />
Agglomeration Area and 158 villages), comprises of a total population of 13,33,719 persons<br />
(as per Census 2001), whereas the <strong>Dhanbad</strong> Urban Agglomeration comprising of erstwhile<br />
<strong>Dhanbad</strong> <strong>Municipal</strong>ity, Jharia NAC, Katras NAC, Sindri NAC, Chhatatanr NAC and 27<br />
census towns houses a population of 1,065,327 persons. The following table presents Urban<br />
Agglomeration growth trend in past decades.<br />
Table 2: Decadal Growth Rate and CAGR of <strong>Dhanbad</strong> Urban Agglomeration Population<br />
Year UA Population No of Towns<br />
in UA<br />
Decadal Growth<br />
Rate<br />
Compounded Annual<br />
Growth Rate (CAGR)<br />
1951 291,833 19 - -<br />
1961 272,503 19 -6.62 -0.68<br />
1971 472,980 19 73.57 5.67<br />
1981 689,460 19 45.77 3.84<br />
1991 821,058 24 19.09 1.76<br />
2001 1,065,327 32 29.75 2.64<br />
Source: Census Hand Book and Analysis.<br />
Figure 6: Urban Agglomeration Population Growth Trend<br />
The <strong>Dhanbad</strong> Urban<br />
Population Growth Trend of <strong>Dhanbad</strong> UA<br />
Agglomeration area<br />
witnessed growth rates in the<br />
12.00<br />
range of (–) 6.62 percent to<br />
10.00<br />
73.57 percent. Noteworthy 8.00<br />
surge in growth rate to 73.57<br />
percent, registered in 1961 –<br />
6.00<br />
1971, can be attributed to the 4.00<br />
industrialization and mining 2.00<br />
activities in the region. The<br />
0.00<br />
decline in the Urban<br />
1951 1961 1971 1981 1991 2001<br />
Agglomeration decadal<br />
Years<br />
growth rate in the past two<br />
decades can be attributed to the increasing trend of sick industries in the region and<br />
bifurcation of Bokaro district from <strong>Dhanbad</strong> and etc, The Compounded Annual Growth Rate<br />
(CAGR) has reduced from 3.84 percent during 1971-81 to 1.76 percent during 1981-1991.<br />
However, during the decadal year 1991 – 2001 the urban agglomeration population has<br />
witnessed increase in CAGR over previews decade, this may be attributing to the inclusion of<br />
eight more towns within Urban Agglomeration area. The Table 3 & Table 4 present the<br />
urbanization trend in <strong>Dhanbad</strong> region from 1951 to 2001.<br />
Population in Lakhs<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 15
CITY DEVELOPMENT PLAN<br />
DHANBAD<br />
DHANBAD MUNICIPAL CORPORATION<br />
URBAN SETTLEMENT<br />
9<br />
LEGEND<br />
8<br />
40<br />
MAJOR ROADS<br />
RAILWAY LINE<br />
6<br />
MAJOR RIVER<br />
7<br />
SETTLEMENT BOUNDARY<br />
3<br />
5<br />
CITY/ TOWN<br />
SINDRI<br />
4<br />
CITY/ TOWN -<br />
1<br />
Higher Annual Growth Rate<br />
over Average Growth Rate<br />
200<br />
JAMADOVA<br />
202<br />
LOYABAD<br />
111<br />
N<br />
DHANBAD MUNICIPAL CORPORATION<br />
INFRASTRUCTURE DEVELOPMENT<br />
CORPORATION LIMITED<br />
FIGURE NO:<br />
DAMODAR RIVER<br />
192<br />
SINDRI<br />
186<br />
187<br />
189<br />
183<br />
174<br />
169<br />
167<br />
168<br />
165<br />
182<br />
175<br />
133<br />
171<br />
164<br />
163<br />
City Development Plan, <strong>Dhanbad</strong> Final Report<br />
Figure 7: <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> –Urban Agglomeration Map<br />
174<br />
173<br />
172<br />
129<br />
184<br />
TO KOLKATA<br />
170 171<br />
125<br />
128<br />
185<br />
127<br />
126<br />
123<br />
KOLKATA<br />
18<br />
122<br />
10<br />
89<br />
NH32<br />
13<br />
17<br />
16<br />
12<br />
32<br />
15<br />
34<br />
88<br />
NH2<br />
49<br />
14<br />
42<br />
48<br />
49<br />
30<br />
37<br />
35<br />
36<br />
177<br />
148<br />
154<br />
153<br />
94<br />
152<br />
47<br />
50<br />
46 44<br />
45<br />
140<br />
151<br />
150<br />
146<br />
87<br />
86<br />
85<br />
144<br />
221 226<br />
217<br />
225<br />
223<br />
SARAIDHELA<br />
84<br />
220<br />
53<br />
181<br />
179<br />
PATHRA KULHI<br />
VARANASI<br />
51<br />
52<br />
139<br />
141<br />
142<br />
131<br />
143<br />
144<br />
127<br />
122<br />
147<br />
198<br />
126<br />
121<br />
155<br />
158<br />
156<br />
61<br />
59<br />
201<br />
67<br />
75<br />
138<br />
207<br />
212<br />
68<br />
137<br />
69<br />
136<br />
135<br />
108<br />
NH33<br />
113<br />
114<br />
TO DELHI<br />
112<br />
116<br />
160<br />
159<br />
207<br />
215<br />
241<br />
208<br />
237<br />
253<br />
238<br />
261<br />
216<br />
232<br />
238<br />
263<br />
256<br />
231<br />
284<br />
264<br />
260<br />
233<br />
235<br />
266<br />
267<br />
265<br />
289<br />
269<br />
224<br />
230<br />
383<br />
282<br />
272<br />
288<br />
229<br />
270<br />
271<br />
286<br />
228<br />
273<br />
280<br />
278<br />
274<br />
349<br />
71<br />
65<br />
66<br />
276<br />
55<br />
72<br />
80<br />
84<br />
54<br />
81<br />
86<br />
79<br />
82<br />
85<br />
87<br />
73<br />
58<br />
77<br />
96<br />
94<br />
88<br />
93<br />
97<br />
99<br />
100<br />
89<br />
103<br />
92<br />
91<br />
104<br />
102<br />
101<br />
105<br />
106<br />
107<br />
133<br />
157<br />
117<br />
172<br />
KUSTOR<br />
NAGRIKALA<br />
JHARIA<br />
TISRA<br />
PATHARDIH<br />
162<br />
PUTKI<br />
BHAGATDIH<br />
KENDUADIH<br />
TO RANCHI<br />
TO RANCHI<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 16<br />
ROHARABAND<br />
TO GOVINDPUR<br />
DHANBAD<br />
BHULI<br />
DHANSAR<br />
BAUOKALA<br />
BASARIA GODHAR<br />
213<br />
BALIHARI<br />
76<br />
JORAPOKHAR<br />
SIJUA<br />
PONDERKANLI<br />
BHOWRA<br />
258<br />
KERKEND<br />
DAMODAR RIVER<br />
KATRAS<br />
ANGARPATHRA<br />
KAILUDIH<br />
CHANDAUR<br />
287 286<br />
90<br />
348<br />
MALKERA<br />
299 300 301
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Table 3: Town wise Decadal Growth of Population in <strong>Dhanbad</strong> Urban Agglomeration<br />
Towns 1951 1961 1971 1981 1991 2001<br />
<strong>Dhanbad</strong> (M) 34,077 57,352 79,838 120,221 151,789 199,258<br />
Jharia (NAC) 26,480 33,683 45,236 57,496 69,641 81,983<br />
Sindri (NAC) 13,045 41,315 46,385 70,645 72,333 76,746<br />
Katras (NAC) 13,365 17,224 19,444 29,587 37,520 51,233<br />
Chhatatanr (NAC) 35,540 6498 51,314 75,186 28,420 32,173<br />
Kailudih (CT) - - - - 4,314 8,913<br />
Malkera (CT) 2,827 2,031 4,830 5,094 4,991 9,806<br />
Lakraka (CT) - - - - - 6,966<br />
Chandaur (CT) 2,471 3,721 5,271 6,297 9,690 13,761<br />
Nagri Kalan (CT) - - - - - 7,688<br />
Pondar Kanali (CT) - - - - 6,628 7,485<br />
Sijua (CT) 16,045 9,997 16,346 20,614 25,448 29,828<br />
Loyabad (CT) 22,909 11,553 19,287 26,475 31,297 32,721<br />
Kenduadih (CT) 5,979 5,542 4,220 5,470 6,740 8,359<br />
Baliari (CT) - - - - 10,501 11,536<br />
Chhotaputki (CT) - - - - - 6,727<br />
Basaria (CT) - - - - - 4,022<br />
Bhuli (CT) 4,956 11,299 20,876 40,832 56,774 89,534<br />
Godhar (CT) - - - - 7,200 9,552<br />
Dhaunsar (CT) - - - - - 9,214<br />
Kustai (CT) - - - - 11,830 12,280<br />
Saraidhela (CT) 2,208 2,879 6,603 11,956 16,393 24,189<br />
Jamadoba (CT) 23,245 6,568 16,646 25,171 31,761 34,092<br />
Jharia Khas (CT) - - - - - 19,831<br />
Tisra (CT) 27,390 7,470 33,891 46,930 55,677 53,572<br />
Jorapokhar (CT) 18,196 15,595 44,675 65,156 72,919 85,100<br />
Bhowrah (CT) 20,614 10,587 25,597 31,695 45,425 44,295<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 17
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Towns 1951 1961 1971 1981 1991 2001<br />
Pathardih (CT) 6,358 8,796 9,906 22,720 27,319 39,541<br />
Rohraband (CT) - - - - - 4,285<br />
Angarpathar (CT) 6,607 6,001 5,150 5,401 6,274 8,305<br />
Bhagatdih (CT) 9,521 14,392 17,465 22,514 30,174 33,507<br />
Baua Kalan (CT) 8,825<br />
Total Urban Agglomeration<br />
291,833 272,503 472,980 689,460 821,058 1,065,327<br />
Population<br />
No of Towns in UA 19 19 19 19 24 32<br />
Source: Census Hand Book.<br />
Table 4: Town wise Decadal Population Growth Rate of <strong>Dhanbad</strong> Urban Agglomeration<br />
Towns 1951-61 1961-71 1971-81 1981-91 1991-2001<br />
Percentage<br />
<strong>Dhanbad</strong> (M) 68.30 39.21 50.58 26.26 31.27<br />
Jharia (NAC) 27.20 34.30 27.10 21.12 17.72<br />
Sindri (NAC) 216.71 12.27 52.30 2.39 6.10<br />
Katras (NAC) 28.87 12.89 52.17 26.81 36.55<br />
Chhatatanr (NAC) -81.72 689.69 46.52 -62.20 13.21<br />
Kailudih (CT) - - - - 106.61<br />
Malkera (CT) -28.16 137.81 5.47 -2.02 96.47<br />
Lakraka (CT) - - - -<br />
Chandaur (CT) 50.59 41.66 19.46 53.88 42.01<br />
Nagri Kalan (CT) - - - - -<br />
Pondar Kanali (CT) - - - - 12.93<br />
Sijua (CT) -37.69 63.51 26.11 23.45 17.21<br />
Loyabad (CT) -49.57 66.94 37.27 18.21 4.55<br />
Kenduadih (CT) -7.31 -23.85 29.62 23.22 24.02<br />
Baliari (CT) - - - - 9.86<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 18
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Towns 1951-61 1961-71 1971-81 1981-91 1991-2001<br />
Percentage<br />
Chhotaputki (CT) - - - - -<br />
Basaria (CT) - - - - -<br />
Bhuli (CT) 127.99 84.76 95.59 39.04 57.70<br />
Godhar (CT) - - - - 32.67<br />
Dhaunsar (CT) - - - - -<br />
Kustai (CT) - - - - 3.80<br />
Saraidhela (CT) 30.39 129.35 81.07 37.11 47.56<br />
Jamadoba (CT) -71.74 153.44 51.21 26.18 7.34<br />
Jharia Khas (CT) - - - - -<br />
Tisra (CT) -72.73 353.69 38.47 18.64 -3.78<br />
Jorapokhar (CT) -14.29 186.47 45.84 11.91 16.70<br />
Bhowrah (CT) -48.64 141.78 23.82 43.32 -2.49<br />
Pathardih (CT) 38.35 12.62 129.36 20.24 44.74<br />
Rohraband (CT) - - - - -<br />
Angarpathar (CT) -9.17 -14.18 4.87 16.16 32.37<br />
Bhagatdih (CT) 51.16 21.35 28.91 34.02 11.05<br />
Baua Kalan (CT) - - - - -<br />
Total Urban Agglomeration -6.62 73.57 45.77 19.09 29.75<br />
Source: Census Hand Book and Analysis.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 19
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Sex Ratio<br />
The current (2001 census) sex ratio (female population per 1,000 male population) in<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> is 848, which is lower than the district figure of 874 and the<br />
state average of 941. Owing to the large number of male migrant workers in the region<br />
attributes to the lower sex ratio than other urban cities in the State.<br />
Literacy Rate<br />
In 2001, the literacy rate (percentage of literate population to the total population above six<br />
years of age) in the Urban Agglomeration (UA) area was 74.94 percent. The literacy rate of<br />
<strong>Dhanbad</strong> UA is higher than that of <strong>Dhanbad</strong> District (67.49 percent) and the State of<br />
Jharkhand (53.60 percent). The male and female literacy rate was 83.91 percent and 64.05<br />
percent, respectively. The main reason behind the high literacy rate is due to the presence of<br />
good number of educational and research institutions and other governmental offices in the<br />
<strong>Municipal</strong> <strong>Corporation</strong> jurisdiction.<br />
Household Size<br />
The total number of households in <strong>Dhanbad</strong> Urban Agglomeration area has increased from<br />
5.00 in 1991 to 5.54 in 2001. The household size for <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> is 5.57<br />
(as per census 2001), which is just below the district figure of 5.6 and well below the national<br />
average household size of 6.3 (as per Census 2001).<br />
Growth Trends and Projections<br />
The future population of <strong>Municipal</strong> <strong>Corporation</strong> is projected separately for the <strong>Dhanbad</strong><br />
Urban Agglomeration area and the 158 villages with in the <strong>Municipal</strong> <strong>Corporation</strong><br />
jurisdiction. To carry out the demand analysis of urban infrastructure facilities required for the<br />
<strong>Municipal</strong> <strong>Corporation</strong>, the different projection methods were analyzed. In case of <strong>Dhanbad</strong><br />
Urban Agglomeration, since decadal population figures are available from the Census for the<br />
period from 1951 to 2001, the trend line method is analyzed. However, owing to the<br />
inconsistency in growth rate (due addition of no of towns in to UA) average growth rate has<br />
been adopted based on five decadal figures. In case of the 158 villages with in the <strong>Municipal</strong><br />
<strong>Corporation</strong> jurisdiction, since population figures are available only for 1991 to 2001, the<br />
average growth rate during 1991 to 2001 is compared with the national average and the same<br />
is adopted to project the population. From different methods, constant growth rate of 2<br />
(average CAGR of last five decades) is assumed for <strong>Dhanbad</strong> Urban Agglomeration and for<br />
158 villages the national average figure of 2 percent annual growth rate has been assumed<br />
over the design period (2036). Table 5 presents the projected population of Urban<br />
Agglomeration and 158 villages for the year 2036. The present (2006) projected population<br />
for UA is 12.13 lakhs and for village areas it is 2.96 lakhs. As per the projection, the total<br />
projected population for <strong>Municipal</strong> <strong>Corporation</strong> jurisdiction is 30.83 lakhs in 2036.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 20
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Table 5: Projected Populated of <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong><br />
Year UA Area Other Villages Total<br />
2001(Census) 1,065,327 268,392 1,333,719<br />
2006 1,213,896 296,326 1,510,222<br />
2011 1,374,460 325,959 1,700,419<br />
2016 1,556,263 358,555 1,914,818<br />
2021 1,762,114 394,411 2,156,524<br />
2026 1,995,192 433,852 2,429,044<br />
2031 2,259,101 477,237 2,736,337<br />
2036 2,557,917 524,960 3,082,877<br />
Source: Analysis.<br />
C. Socio-Economic Profile<br />
1. Health<br />
The <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> has both government and private run hospitals and<br />
clinics. There are two Government Hospitals with about 500 bed strengths, 15 private<br />
hospitals and 33 doctors are working. Apart from this there are nine maternity centres, 135<br />
health centres and 47 dispensaries are functioning with the <strong>Municipal</strong> <strong>Corporation</strong><br />
jurisdiction. Population per health centers works out to around 6,400 persons per hospital<br />
and the no of persons per doctor ratio is comes around 12,230 persons to a doctor in the city.<br />
The command area per health center works out to 0.62 sq.km per hospital with in the<br />
Jurisdiction of <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong>. The Table 6 presents health facilities<br />
available with in <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> Jurisdiction.<br />
Table 6: Health Facilities in <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> Jurisdiction<br />
Health Centres Nos Number of<br />
Doctors<br />
No of<br />
Beds<br />
Average Patients per<br />
day<br />
Hospitals 17 33 3,042 1,000<br />
Maternity Centres 9 76 42 50<br />
Health Centres 135 - -<br />
Dispensaries 47<br />
- -<br />
Total 208 109 3,084 1,050<br />
Source: Compiled from various sources.<br />
The number of birth has increased from 6,704 to 21,858 from 2001 to 2004 and the number<br />
of death is also witnessed increasing trend from 120 to 651 for the same period. Table 7<br />
presents basic health indicators of the city.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 21
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Table 7: Basic Health Indicators - <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong><br />
Description 2000-01 2001-02 2002-03 2003-04 2004-05<br />
No of Birth 6,704 12,484 18,911 21,858 11,776<br />
No of Deaths 120 117 314 651 78<br />
Infant Mortality Rate (per 71% 71% 71% 71% 71%<br />
1,000)<br />
Child Mortality Rate (per 9.8% 9.8% 9.8% 9.8% 9.8%<br />
1,000)<br />
Maternity Mortality Rate<br />
(per lack)<br />
4.37% 4.37% 4.37% 4.37% 4.37%<br />
Source: CMO, <strong>Dhanbad</strong>.<br />
Disease Pattern<br />
In 2004-05, 2,397 malaria cases were registered, which has increased by 78 percent from<br />
2001-02 to 2004-05. The cholera cases have decreased from 1,332 in 2003-04 to 608 in 2004-<br />
05. Both these diseases could be attributed to the lack of proper sanitation systems, mixing of<br />
sewage with water, large quantity of on-street waste, allowing water stagnation and lack of<br />
awareness among the populace in terms of its health implications. Following table presents<br />
disease pattern recorded in <strong>Dhanbad</strong>.<br />
Table 8: Disease Pattern - <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong><br />
Disease Type 2000-01 2001-02 2002-03 2003-04 2004-05<br />
Cholera 680 289 836 1,332 608<br />
Malaria 2,253 1,347 1,918 2,068 2,397<br />
Source: CMO, <strong>Dhanbad</strong>.<br />
2. Education Facility<br />
<strong>Dhanbad</strong> houses government education and research institutions along with aided and private<br />
institutions. The literacy rate in the Urban Agglomeration is 74.94 percent and is high in<br />
comparison to the district figure of 67.49 percent. GoJ’s Education Department has control<br />
over administrative and financial aspects of the schools.<br />
<strong>Dhanbad</strong> city has Centre for Mining and Research Institutions (CMRI), ISM, Mining Institute<br />
at Bhaga, Rajkia Polytechnic Institution and PMCH. State Government and private sector<br />
impart education in <strong>Dhanbad</strong>. While, the State Government manages school education, the<br />
private sector provides higher education and manages colleges. The total number of students<br />
enrolled in schools is 43,764. The ratio between numbers of students per teacher in State<br />
Government run institutions is about one teacher for 60 students and the proportion varies in<br />
different hierarchy of institutions in the city.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 22
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
III.<br />
ECONOMIC BASE<br />
A. Overview<br />
<strong>Dhanbad</strong> – Jharia – Sindri region is situated at the epicentre of the rice mineral zone. The<br />
region’s mainstay in industrial production is coal and fertilizers, including a number of coal<br />
based chemical products. The region is well connected to other major centres by the G.T<br />
Road (NH 2) and other State Highways. The region is also situated close to a metropolitan<br />
marketing centre. Kolkata, provides all facilities for import and export trade by sea. By<br />
railways, the region is equally well linked with Delhi, Kolkata, Kanpur, Moghulsarai, Patna,<br />
Allahabad, Bombay and Southern India.<br />
The basic function of <strong>Dhanbad</strong> – Jharia – Sindri region is coal mining and this will continue<br />
for considerable span of time until the resources are depleted. The region has<br />
characteristically good potential for chemical industries based on coal by products. Even<br />
though the basic economy of the region is coal mining, the urban centres, such as <strong>Dhanbad</strong>,<br />
Jharia, Sindri, Katras, Karkend etc., have developed quite a diverse economic base. Industries<br />
of manufacturing, processing, servicing, repairing types and trade and commerce activities<br />
have come up in large numbers and even the “other service” sector contributes to a major<br />
extent in providing employment in the region.<br />
The coal mining activity will continue to guide the regional economy for many more years. At<br />
present, there are 112 coal mines operating in the district which totally produce 26.70 million<br />
metric tones of coal annually of a total value nearly Rs. 7,000 million. This activity directly<br />
employs nearly 180,000 workers in the district, which is as much as 25-30% of the total<br />
workers in the district.<br />
As described earlier coal mining is the predominant activities in the district of <strong>Dhanbad</strong>.<br />
There are 112 coal mines functioning with in the district, which are being operated four<br />
companies such as BCCL, ECL, TISCO and HSCO. Following table presents the details of<br />
organization wise no of mines operated and production per annum.<br />
Table 9: Organization wise no Coal Mines Operated and its Production<br />
Name of the Company No of Mines Production<br />
Thousand Tons<br />
BCCL 86 19,110.00<br />
ECL 17 338.49<br />
TISCO 6 763.66<br />
HSCO 3 242.40<br />
Total 112 20,454.55<br />
Source: NIC, <strong>Dhanbad</strong>.<br />
In larger interest of the Nation, the coal mining activity was nationalized in 1971 and all the<br />
mines were brought under Coal India Limited (CIL). The main objectives of the<br />
nationalization were:<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 23
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
(i.) To carry out systematic and scientific exploitation of coal;<br />
(ii.) To regulate the coal supply as per the country’s needs;<br />
(iii.) To create safe conditions in mines and achieve optimum exploitation of the resources<br />
by eliminating small individual lease holdings; and<br />
(iv.) To cater to the interest of the coal mine works who form a large part of the society.<br />
The coal production is expected to increase to 50 million tones, a nearly doubling of the<br />
present production. This would generate more employment in this activity. In elucidates the<br />
BCCL’s future projects or production plan up to 12 th Five Year Plan. The BCCL is planning<br />
to produce about 28.45 million tonnes of coal in 2016 -17. This would also provide impetus<br />
to the industrial growth in the region.<br />
The Jharia coalfields cover an area of about 448 sq. kms entirely situated within the district.<br />
The total reserve of this field is estimated at 5,000 million tonnes. The coal seams found here<br />
are, however, thinner and also fewer than in the Barakar field. A large part of the Jharia Coal<br />
Field is made up of Talchar rocks. The moisture content of the Barakar coals is comparatively<br />
low.<br />
Among other important minerals found in the district are fire clay for the manufacture of fire<br />
bricks and iron ore. Mica is found in the eastern portion of Baliapur. China clay and graphite<br />
are also available in certain pockets of the district.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 24
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Table 10: Future Production Plan of BCCL<br />
Name of Projects Type Capacity 06-07 07-08 08-09 09-10 10-11 11-12 12-13 13-14 14-15 15-16 16-17<br />
Million Tonnes<br />
Kharkharee/Maheshpur/ UG 1.00 0.10 0.20 0.30 0.40 0.50<br />
Dharmaband/Teturia<br />
Bhalgora UG 1.00 0.30 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00 1.00<br />
Mahuda T&B UG 0.40 0.10 0.15 0.20 0.25 0.30 0.35 0.40<br />
Bhowra-Sudamdih Re-org UG 0.40 0.10 0.15 0.20 0.25 0.30 0.40<br />
Moonidih PSLW UG 1.00 0.60 0.70 0.80 0.90 1.00 1.00 1.00 1.00 1.00<br />
Madhubad_Phularitand UG 0.40 0.10 0.20 0.25 0.35 0.35<br />
Amlabad UG 0.40 0.20 0.25 0.30<br />
Kapuria UG 1.00 0.10 0.20 0.30 0.40 0.50<br />
North-South Tisra OC 5.00 1.50 1.50 1.50 2.00 3.00 4.00 5.00 5.00 5.00 5.00 5.00<br />
Block –IV<br />
OC 5.00 2.00 2.00 3.00 4.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00<br />
(Incl.Akashkinaree)<br />
Block – III (incl. SOCP & OC 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00<br />
MOCP)<br />
Kalaneshwari OC 4.00 1.00 2.00 3.00 4.00 4.00 4.00 4.00<br />
Block – II OC 5.00 4.00 4.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00<br />
Total 29.60 12.50 12.80 15.40 17.10 20.40 22.75 25.35 26.85 27.50 28.05 28.45<br />
Source: BCCL, <strong>Dhanbad</strong>.<br />
Note: UG – Under Ground block, OC – Open Cast block<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 25
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Following table presents the Under<br />
Ground block wise net geological<br />
coal reserves in BCCL areas of Jharia<br />
Coal Field. The available/identified<br />
coal reserves have been classified in<br />
to three categories namely, prime<br />
coking, medium coking and non<br />
coking coals. Out of the total reserve<br />
of 11,066.73 million tonnes medium<br />
coking coal constitutes a maximum<br />
of 4,144.35 million tones (37 percent<br />
to total reserves) and prime coking<br />
coal contributes about 3,641.88<br />
million tones (33 percent of the total<br />
reserves).<br />
Figure 8: Distribution of UG Blocks Coal Reserves<br />
Prime Coking<br />
33%<br />
Coal Reserves (Underground Blocks)<br />
Medium Coking<br />
37%<br />
Non Coking<br />
30%<br />
Table 11: Category wise Coal Reserves in Underground Blocks in JCF<br />
Location Prime Coking Medium Non Coking Grand Total<br />
Coking<br />
Million Tonnes<br />
Madhuband 172.01 190.81 273.00 635.82<br />
Kharkharee – 162.80 222.20 349.00 734.00<br />
Dharmaband<br />
Katras-Choitudih 56.20 98.00 92.00 246.20<br />
Pootkee-Bulliary 275.70 123.20 533.00 931.90<br />
Bhutgoria 55.00 56.00 165.00 276.00<br />
Kustore 47.80 26.10 199.00 272.90<br />
Bhalgora 134.00 150.90 203.00 487.90<br />
Bhowrah 175.08 446.11 - 621.19<br />
Sitanala 100.41 20.50 - 120.91<br />
Amlabad 199.30 94.40 64.00 357.70<br />
Patherdih 63.30 185.50 - 248.80<br />
Tasra 30.58 254.13 - 284.71<br />
West Mohuda - 102.00 - 102.00<br />
South Mohuda - 68.40 - 68.40<br />
South Mohuda - 73.80 - 73.80<br />
East Mohuda - 50.80 - 50.80<br />
Sudamdih 213.60 407.00 - 620.60<br />
Moonidih 198.60 114.90 700.00 1013.50<br />
Kapuria 52.40 188.60 446.00 687.00<br />
Parbatpur 705.60 166.30 92.50 964.40<br />
Mahal 499.20 518.50 - 1017.70<br />
Damuda 33.30 36.20 35.00 104.50<br />
Pipratand – Singra 467.00 550.00 129.00 1146.00<br />
Total 3,641.88 4,144.35 3,280.50 11,066.73<br />
Source: BCCL, <strong>Dhanbad</strong>.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 26
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
BCCL has identified net<br />
geological coal reserves to the<br />
tune of 6,010 million tonnes in<br />
opencast blocks of Jharia Coal<br />
Field. The total coals reserves in<br />
the JCF are classified in to three<br />
categories namely prime coking,<br />
medium coking and non coking<br />
coals. The details of the same<br />
have been presented in the<br />
Table 12. From the figure and<br />
the table it is evident that the<br />
coal reserves available in the<br />
opencast blocks constitutes a<br />
maximum share of 59 percent<br />
from non coking coal.<br />
Figure 9: Distribution of Open Cast Blocks Coal Reserves<br />
Prime Coking<br />
17%<br />
Distribution of Coal Reserves (Opencast Blocks)<br />
Medium Coking<br />
24%<br />
Non Coking<br />
59%<br />
Table 12: Category wise Coal Reserves in Opencast Blocks in JCF<br />
Block Prime Coking Medium Non Coking Grand Total<br />
Coking<br />
Million Tonnes<br />
OCP – I 29.00 43.00 32.00 104.00<br />
OCP – II 61.00 40.00 285.00 386.00<br />
OCP – III 37.00 179.00 262.00 478.00<br />
OCP – IV 86.00 143.00 262.00 491.00<br />
OCP IV & VI 259.00 284.00 941.00 1,484.00<br />
OCP – VI 28.00 17.00 139.00 184.00<br />
OCP – VII 71.00 234.00 525.00 830.00<br />
OCP – VIII 134.00 204.00 493.00 831.00<br />
Mukunda OCP IX 313.00 275.00 634.00 1,222.00<br />
& U/G -9<br />
Total 1,018.00 1,419.00 3,573.00 6,010.00<br />
Source: BCCL, <strong>Dhanbad</strong>.<br />
<strong>Dhanbad</strong> district has estranged in to eight blocks of which five blocks are forming the part of<br />
the <strong>Municipal</strong> <strong>Corporation</strong> Area such as <strong>Dhanbad</strong> Sadar, Jharia, Baghbmara, Balaiapur and<br />
Gobindpur part. Major economic activities which are eminent in <strong>Dhanbad</strong> block is Mines,<br />
Hard Coke, Soft coke, Fire Bricks, Kil Bricks, Stone Crusher, Gate Grill Wooden, Furniture,<br />
Battery, automobiles, jwellery, cyber café, Pottery, Printing Press, Photo Studio, Flour Mills,<br />
Small Business and trading activities. In Jharia Block Mines, Hard Coke, Soft Coke,<br />
Refractories, Jwellery, Chemicals, Coal Briquettes are the predominant activities. Mines, Coal<br />
briquettes, Chemicals, Rolling mills, Small Business, Handicraft, Pottery, leather works are the<br />
main economic activities observed in Baghmara Block. In Baliapur Fertilizer Plants, Cement<br />
Plants, Chemicals, Soft-Coal, Agriculture and Handicraft are the important activities which<br />
are generating major work force. Gobindpur is known for its Soft Coal, Hard Coke,<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 27
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Washeries Chemicals, Crushers, Kiln Brick, Refractories, Rolling Mills, Agriculture Handicraft<br />
Pottery, Bamboo Crafts, and Weavers.<br />
Value of Coal Production<br />
The quality of the coal produced in this region are in different grades, based on the type and<br />
quality of the coal produced the value of the same will vary accordingly. As per discussion<br />
with BCCL official’s value of the coal produced in this region varies from Rs. 700 to Rs. 1,000<br />
per tones. The value of the production would be in the range of Rs. 22,750 Millions, this is<br />
worked out based on the BCCL’s production plan for 2016-17.<br />
Coal Acts and Notification<br />
Following acts and notifications are governs the Coal Mining activities in the country.<br />
(i.) Colliery Control Order, 2000<br />
(ii.) Notification Regarding Colliery Control Order<br />
(iii.) Mines & Minerals (Development & Regulation) Act, 1957 (as amended upto 20th<br />
December, 1999)<br />
(iv.) Mineral Concession Rules, 1960 (As Amended upto 18th January, 2000)<br />
(v.) The coal Mines (Nationalisation) Act (26 of 1973)<br />
(vi.) Coal Bearing Areas Acquisition & Development Act, 1957 (20 of 1957) as modified<br />
upto 1st December, 1976<br />
(vii.) Notification for Coal Bearing Areas Acquisition & Development Act<br />
(viii.) Coal Mines Provident Fund and Miscellaneous Provisions Act, 1948<br />
(ix.) Coal mines Provident Fund, Coal Mines Family Pension, coal Mines Deposit Linked<br />
Insurance Schemes (as modified upto 8th April, 1989)<br />
(x.) The Coking & Non Coking Coal Mines (Nationalization) Amendment Act, 1973<br />
(xi.) The Coal Mines (Nationalisation) Amendment Act, 1976<br />
(xii.) The Coal Mines Nationalisation Laws (Amendment) Act 1978<br />
(xiii.) The Coking Coal Mines (Nationalisation) Act, 1972<br />
(xiv.) The Coal Mines Nationalisation Law (Amendment) Act, 1986<br />
(xv.) The Coking Coal Mines (Emergency Provisions) Act , 1971<br />
(xvi.) The Coal Mines (Taking Over of Management) Act,1973<br />
(xvii.)Coal Mines (Conservation and Development) Rule , 1975<br />
(xviii.) Coal Mines (Conservation & Development) Act, 1974 No. 28 of 1974<br />
(xix.) Notifications related to Coal Mines Conservation & Development<br />
(xx.) Coal Mines Pension Scheme 1998<br />
New Government Policy for the Coal Sector<br />
Coal mining continues in the public sector except for captive mining purposes and a Bill,<br />
namely, the Coal Mines (Nationalisation) Amendment Bill, 2000, has already been introduced<br />
in Parliament to open up the coal sector to private investment. The Bill was referred to the<br />
Standing Committee on Energy for examination and report. The Standing Committee has<br />
since submitted its report, which was tabled on both the Houses of Parliament in August,<br />
2001. The Committee has recommended for adoption of the Bill subject to certain<br />
conditions. Meanwhile, a new policy dimension has been added by a policy decision taken by<br />
the Government. Under this decision, the State Government companies or undertakings are<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 28
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
allowed to do mining of coking and non-coking coal or lignite reserves, either by opencast or<br />
underground method, anywhere in the country, without the earlier restriction of isolated small<br />
pockets, subject to the following conditions:<br />
(i.)<br />
The State Government company or undertaking (referred to as the ‘company’ hereafter)<br />
is authorised to do coal or lignite mining by its Memorandum and Articles of<br />
Association.<br />
(ii.) The company will do coal or lignite mining in accordance with the provisions of the<br />
Coal Mines (Nationalisation) Act, 1973, the Mines & Minerals (Development &<br />
Regulation) Act, 1957, the Contract Labour (Regulation & Abolition) Act, 1970, and all<br />
other mineral, environmental and labour laws and other regulations governing the<br />
Indian coal industry.<br />
(iii.) For coal the company shall obtain a certificate from Coal India Limited to the effect<br />
that the latter has no plan or willingness to undertake mining operations for coal in the<br />
concerned area. For lignite, the company shall obtain a certificate from Neyveli Lignite<br />
<strong>Corporation</strong>.<br />
(iv.) The proposed mining area has not been allotted to a captive mining company under the<br />
provisions of Section 3(3)(a)(iii) of the Coal Mines (Nationalisation) Act, 1973.<br />
(v.) No financial assistance from the Central Government or Coal India Limited or Neyveli<br />
Lignite <strong>Corporation</strong> shall be provided to the company for coal or lignite mining in the<br />
concerned area.<br />
(vi.) None of the coal or lignite mines operated by the company will be taken over by the<br />
Central Government or Coal India Limited or Neyveli Lignite <strong>Corporation</strong> in the event<br />
of closure of such a mine or otherwise.<br />
(vii.) No employee of the company, engaged in a coal or lignite mine operated by it, will be<br />
absorbed in Coal India Limited or Neyveli Lignite <strong>Corporation</strong> at any point of time.<br />
Manpower<br />
Considering the value of coal mining activity in the district, indirect employment<br />
opportunities will arise. Since BCCL does’t have a manpower expansion plan for next 10<br />
years, they are planning achieve the production based on the effective usage of man and<br />
materials and resources available with BCCL. Indirect employment would be generated in the<br />
tune of 1.5 lakh to 2 lakh during the next 10 years period.<br />
1. Sectoral Growth<br />
As per Census 2001, the Workforce Participation Rate (WPR) in <strong>Dhanbad</strong> Urban<br />
Agglomeration area is only 24.83 percent. Owing to the absence of occupation pattern for<br />
villages only Urban Agglomeration occupation patter is discussed hereunder. Overall, the<br />
major workforce is concentrated in primary sector (other workers) like mining sector, which is<br />
about 85.91 percent of the total workforce in <strong>Dhanbad</strong> Urban Agglomeration. This may be<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 29
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
attributing to the large no of mining activity in the region. The occupational pattern of<br />
<strong>Dhanbad</strong> Urban Agglomeration in 2001 is presented in Table 13. From the following table it<br />
is evident that the female WPR is very low it is just 4.53 percent, while male WPR is 41.86<br />
percent. This attributes to the most of the male workers are engaged in mining and related<br />
activity in the <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> jurisdiction.<br />
Table 13: Work Force Participation Rate<br />
Description<br />
As per Census 2001<br />
Total % of Total Male Female<br />
Population 1,065,327 579,150 486,177<br />
Working Persons 2,64,479 2,42,457 22,022<br />
Workforce Participation Rate (%) 24.83 41.86 4.53<br />
Main Workers 234,616 88.71 217,878 16,738<br />
Main Workers – Cultivators 1,626 0.61 1,397 229<br />
Main Workers – Agricultural<br />
1,038 0.39 916 122<br />
Labourers<br />
Main Workers – House Holds<br />
4,733 1.79 4,007 726<br />
Industry<br />
Main Workers – Other Workers 227,219 85.91 211,558 15,661<br />
Marginal Workers 29,863 11.29 24,579 5,284<br />
Non Workers 800,848 75.17 336,693 464,155<br />
Source: Census, 2001.<br />
2. Industrial Development<br />
<strong>Dhanbad</strong> is the most industrialized district in the State of Jharkhand. The dominant industry<br />
of the district is coal mining and it is coal which has attracted and brought about a<br />
concentration of numerous other industries within its limits. The metallurgical coal of the<br />
Jharia coalfield within the district has given <strong>Dhanbad</strong> a very important place in the industrial<br />
map of the Nation.<br />
Next in importance among the industries in this district are the Fertilizers and Chemical<br />
industry at Sindri and the Bihar State Super phosphate Factory, a Govt. of Jharkhand (GoJ)<br />
undertaking. Another major industry in the district is the Refractory and Ceramic Industry.<br />
Among the few other large industrial establishments of the district, mention may be made of<br />
(i) Kumardhubi Fireclay and Silica Works Ltd., Kumardhubi, (ii) Reliance Firebricks &<br />
Pottery Co. Ltd., Chanch, Chirkunda, (iii) The Bihar Firebricks and Potteries Ltds., Mugma,<br />
(iv) Hindustan General Electrical <strong>Corporation</strong> Ltd., Karampura, (v) Khandelwal Glass Works,<br />
Ambona, (vi) Loyabad Coking Byproducts Recovery Plant, Bansjora, (vii) M/s. Shalimar Tar<br />
Products Ltd., Jharia (viii) The A.C.C. Ltd., Sindri Cement Works, Sindri, (ix) The Sijua<br />
(Jharia) Electric Supply Co. Ltd., Loyabad. (X) The Hindustan Malleable and Forgings Ltd.<br />
and (xi) McNally Bharat.<br />
The district is rich in coal deposit. In the present century the working in the vast coal<br />
resources of the district has gradually transformed it from comparatively a barren track the<br />
prosperous and industrialized area.<br />
Exploitation of rich mineral wealth of district has encouraged the growth of large number of<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 30
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
large and medium industrial units in this district. This has encouraged in its walk in<br />
development of small and ancillary industrial units around important centres like Govindpur,<br />
Sindri, Baghmara, Balliapur, Nirsa and <strong>Dhanbad</strong>.<br />
The existing industrial status of the district exposures that out of 37 number of large and<br />
medium. Industrial units 7 large and 16 medium scale industrial units are functioning in this<br />
district under public and private sector and 13 numbers of medium scale industrial units are<br />
closed in this district. The above medium scale industries are producing ziner, refractories<br />
items, high grade iron and steel casting, coal washeries plant, chemical and mining equipment.<br />
Small Scale Industries<br />
There are 5,177 Small Scale Industries (SSI) and Tiny scale industrial units are registered<br />
under district industries centre, <strong>Dhanbad</strong> from inception until 31 st March 2005, out of which<br />
381 SSI/Ancillary industrial units are engaged in producing B.H. Hard Cock, Soft cock, Coal<br />
Briquitte, Refrectories items, M.S. Roads, flates, Angle, Chemicals, flour, sujji, Bran, Rice, iron<br />
casting engineering and allied and 106 SSI units are closed/sick in this district. Despite of the<br />
facts that the region endowed with immense natural resources, the several small scale<br />
industrial units in particular have also been suffered in recent year from constraints on their<br />
operations resulting from raw materials demand to edit bottle-necks, water shortages during<br />
summer month have also hampered industrial activities in a few areas. A large proportion of<br />
credits sales and delayed payments in transactions with public sector units or other<br />
government agencies have strained the limited financial strength and thus very small scale<br />
units forcing them to be sick over a long period. Table 14 presents the registered SSI units,<br />
employment generation and investment in <strong>Dhanbad</strong> district.<br />
Table 14: Category wise Registered SSI Units, Investments and Employment Generation in<br />
<strong>Dhanbad</strong> District<br />
Categories Registered units Investment Employment<br />
Nos Rupees in Lakh Nos<br />
Agriculture and food<br />
287 141.61 1,935<br />
processing<br />
Forest Based 259 130.35 1,295<br />
Mineral & Ceramic Based 242 956.14 5,082<br />
Engineering & Allied Based 598 563.46 3,925<br />
Chemical Based 493 1,233.75 11,952<br />
Leather Based 68 65.95 252<br />
Textile based 345 145.59 1,035<br />
Electrical/Electronics & allied<br />
649 133.76 2,596<br />
based<br />
Repairers /servicing & other<br />
1,079 361.52 4,290<br />
Misc.<br />
Total 4,020 3,732.13 32,362<br />
Source: DIC, <strong>Dhanbad</strong>.<br />
The resulting impact of these constraints in the slow pace of industrial activities and the<br />
growing incidence of sickness in the district as many as 106 SSI units are closed and sick.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 31
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Figure 10: SSI - Employment Generation Distribution<br />
Any efforts in quickening the<br />
pace of industrial developments<br />
in the District has to take<br />
cognizance of the existing<br />
constraints on the operations of<br />
industrial units and top priority<br />
should be given to measures for<br />
strengthening infrastructure,<br />
where necessary and removing<br />
the other constraints that have<br />
come to notice. The basic<br />
objectives of industrial<br />
promotion in the district should<br />
be;<br />
Forest Based<br />
4%<br />
Agriculture and food<br />
processing<br />
6%<br />
Repairers /servicing &<br />
other Misc.<br />
13%<br />
Mineral & Ceramic<br />
Based<br />
16%<br />
Electrical/Electronics &<br />
Textile based<br />
allied based<br />
3%<br />
8%<br />
Employment Generation<br />
Leather Based<br />
1%<br />
Engineering & Allied<br />
Based<br />
12%<br />
Chemical Based<br />
37%<br />
(i.) To establish greater backward and forward linkages with large and medium industrial<br />
units in operations through;<br />
(ii.) The manufacture and supply of intermediate goods and other industrial products<br />
brought by them in large quantity regularly;<br />
(iii.) Utilization of their by-products and wastes for manufacture;<br />
(iv.) Promoting a wider dispersal of industrial activities in the district with particular attention<br />
to the rural area;<br />
(v.) The immense coal deposits of the districts should be used to greater advantage for<br />
development of coal based industries;<br />
(vi.) Integrated planning is necessary for re-settlement of man power and rehabilitation of<br />
displaced persons; and<br />
(vii.) To promote the development of industries for manufacture of selected consumer<br />
durables and consumer goods for which there is a large demand in the district this can<br />
be produced there at an economic cost largely with the skills available locally.<br />
Industrial Area Development<br />
The Bokaro Industrial Area Development Authority is functioning for the planned<br />
development of industrial areas with in the district. There are two industrial areas namely<br />
Kandra I/E with 186 sites (land) and developed plots to the total extent of 26.78 Ha and<br />
Sindri I/E which has 98 sites (land) and developed plots in a 55 Ha total area.<br />
Trade and Commerce<br />
Trade in <strong>Dhanbad</strong> is consists mainly of exporting coal, hides and skines, marble and stone,<br />
oil, fuel other mineral oils, gunnies, iron and steel, fireclay, firebricks, cement, sulphate of<br />
ammonia, importing of cotton piece goods, salt, grains and pulses, kerosene oil, petrol, lime,<br />
vegetable, mustard oil, shoes, fish, sugar, tobacco and chillies. There are four major retail<br />
centers are functioning with the <strong>Municipal</strong> <strong>Corporation</strong> jurisdiction, which are located at<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 32
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
<strong>Dhanbad</strong>, Jharia, Sindri and Gobindpur.<br />
Weekly Market<br />
Weekly Market/Haats are an important point of transaction between the producers and<br />
consumers of a variety of goods and animals. There are 28 markets in the district out of<br />
which 20 markets functioning with in the <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong>.<br />
Proposed Growth Centres<br />
The State Government has formulated an ambitious plan to setup and promote three tier<br />
growth centres, namely, Mega, Mini and Micro levels. The proposed mega growth centres are<br />
at Barhi and Hazaribagh. These two towns have been taken up for providing modern<br />
infrastructure facilities for rapid industrialization. Mini growth centres are being contemplated<br />
to be set up by the Government of Jharkhand (GoJ) at different location in the state where<br />
specific industrial activity needs to be boosted. Export Promotion Industrial Park (EPIP) is<br />
proposed to set up in <strong>Dhanbad</strong> District under the category of mini growth centre.<br />
Thrust Areas<br />
The potential for growth in mining and mineral based industries are immense. This sector has<br />
huge potential for attracting large investments to create employment and raise resources. It<br />
would be the endeavour of the State Government to expedite the granting of mining lease<br />
and simplify the procedures with respect to the grant of mining leases. In addition, the state<br />
government would also provide certain relief to make mining activities easier.<br />
(i.) Engineering, auto component, iron & steel and steel based down stream industries.<br />
(ii.) Chemical based industries<br />
(iii.) Power generating and allied industries<br />
(iv.) Industries based on non-conventional energy<br />
(v.) Industries based on recycling of wastes, eco friendly raw materials and processes.<br />
(vi.) Electronic and computers and IT based industries.<br />
(vii.) Promotion of Special Economic Zone (SEZ).<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 33
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
B. Tourism Development<br />
Shakti Mandir<br />
A much revered temple of goddess Durga in hear<br />
of the city, Shakti temple draws a large number of<br />
devotees.<br />
Kalyaneswari Madir<br />
Close to Maithan Dam, 46 km away from<br />
<strong>Dhanbad</strong>, is the famous temple presiding deity of<br />
which is Maa Kalyaneshwari. It draws a large<br />
number of devotees throughout the year. So<br />
famous is the temple that even the name Maithan is said to have been derived from Mai-kathan<br />
meaning abode of Goddess. There is also a deer park and a bird sanctuary in the vicinity.<br />
Sindri<br />
The famous fertilizer complex, 30 km away from <strong>Dhanbad</strong>, is located at Sindhi on the bank<br />
of Damodhar River. An engineering college, Bihar Institute of Engineering is also located<br />
here.<br />
Maithon Dam<br />
It has the biggest reservoir of the Damodar Valley <strong>Corporation</strong> India’s first multipurpose<br />
project. Stay in the lovely rest house on the island in the center of the 65 sq.km expanses of<br />
the lake.<br />
Panchet Dam<br />
Yet another dam to control the strong male rover Damodar. Panchet Hill overlooks the dam.<br />
Following table presents the monthly domestic tourist inflow to <strong>Dhanbad</strong> for a period of<br />
2002 to 2005.<br />
Table 15: Month wise Domestic Tourist Inflow to <strong>Dhanbad</strong><br />
Month/Year 2002 2003 2004 2005<br />
No of Domestic Tourists<br />
January - 1,707 1,617 5,115<br />
February - 1,421 2,912 6,225<br />
March 1,974 1,865 1,563 4,409<br />
April 2,056 2,846 2,068 5,342<br />
May 1,533 1,270 1,913 4,763<br />
June 1,781 2,093 5,670 5,312<br />
July 1,400 1,434 5,410 5,641<br />
August 1,346 1,222 6,140 4,949<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 34
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Month/Year 2002 2003 2004 2005<br />
No of Domestic Tourists<br />
September 2,395 1,551 4,613 5,551<br />
October 1,000 - 3,800 6,125<br />
November 5,243 2,656 3,395 7,614<br />
December 2,779 1,708 3,053 7,321<br />
Total 21,057 19,773 42,154 68,367<br />
C. Urban Economy - SWOT Analysis<br />
SWOT analysis has been undertaken to assess on the negative and positive aspects of the<br />
Urban Economy. It involves analyzing the internal positive (strengths) and negative<br />
(weakness) aspects of an organization and considering these in relation to aspects of the<br />
external environment – both the positive aspects (or opportunities) and negative aspects (or<br />
threats). The Table 16 gives the details of the SWOT analysis of Urban Economy.<br />
Table 16: Urban Economy – SWOT Analysis<br />
Strength<br />
<strong>Dhanbad</strong> is a “Commercial Capital” of Jharkhand;<br />
Abundant mineral (with a reserve of 6,000 MT coking coal) & human<br />
resources;<br />
More than 50 percent of the <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> area is under coal<br />
mining;<br />
Major industries like BCCL, TISCO, IISCO and ACC are accelerating city’s<br />
economy;<br />
BCCL is a subsidiary of CIL which creates employment opportunities<br />
(approx.75,000) for the citizens of <strong>Dhanbad</strong> and as well as drives the city’s<br />
economy;<br />
A high literacy rate of 74.94 in the District of <strong>Dhanbad</strong> and higher than the<br />
state of Jharkhand;<br />
Very Less unemployment;<br />
Highest rate of capital formation and a highly vibrant city of economic<br />
condition;<br />
Strategic location of <strong>Dhanbad</strong> geographically – ideal connectivity from Kolkata,<br />
Delhi and other parts of the country through road and rail;<br />
The location of city has helped to establish some consumer goods, engineering,<br />
plastic and chemical industries;<br />
Haldia is the nearest port, which is well connected with road and rail;<br />
<strong>Dhanbad</strong> district has 45 industrial units, which attributes to industrial and<br />
economic development for promoting future entrepreneurship;<br />
Most popular and top most research and training institutions like CMRI, ISM,<br />
DGMS, CMPDIL and BIT are functioning within the corporation limit, which<br />
not only impart training and research but also helps in to accelerate economic<br />
development; and<br />
Thermal power plants and DVC – hydro power generation unit also contributes<br />
to the economy of the state as well as the city.<br />
Weakness<br />
Widespread pollution leading to health related epidemics;<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 35
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Receding of the Water Table; and<br />
Poor mining techniques causing loss of life and property.<br />
Opportunities<br />
Coal and coal based industries can provide larger employment opportunities<br />
thereby giving a boost to a larger human resource the potential of which has<br />
not been tapped fully;<br />
Abundant reserves of Coal Bed Methane found in the district which can be<br />
used for LPG and also as on alternative to fuel for pollution free environment;<br />
To explore Tourism development and related tourism industry; and<br />
The diesel and EMU workshop at Gomoh junction has opened scope for small<br />
scale and ancillary units.<br />
Threats<br />
Underground fires in Jharia have led to the submission of the surface even in<br />
residential area;<br />
Two whole blocks of the district namely Tundi & Topchanchi and parts of<br />
other blocks i.e. Govindpur and Baghmara are naxalite affected further<br />
retarding the pace of development;<br />
The district is also prone to natural hazards. Like earthquake, cyclone. Drought,<br />
heat stroke, occasional floods and most prominently fire accident taking place<br />
in mining areas. The accident occurs any time causing loss of life stock<br />
infrastructure crops, animals, water, houses, etc. there by depleting the exiting<br />
strengths of the <strong>Dhanbad</strong>; and<br />
Large scale industrialization in the district has resulted in creating health hazards<br />
for general masses and giving rise to problem like tuberculosis, asthma,<br />
breathing problem, kidney problem, malnutrition and health related problems.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 36
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
IV.<br />
MUNICIPAL FINANCIAL MANAGEMENT<br />
A. Overview<br />
Presently only erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity and erstwhile Sindri NAC are getting revenue<br />
from there own sources, whereas in other erstwhile NACs and other local bodies and villages<br />
are getting scheme funds from central and state government towards implementation of<br />
scheme works and establishment grants for staffs salary purpose and hence, the above<br />
mentioned local bodies and villages are not maintaining accounts statements.<br />
This section contains a description of the erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity finances and<br />
erstwhile Sindri NACs finances, the sources and uses of funds, and an assessment of local<br />
body finances based on important financial indicators. The accounts of the local body<br />
account are maintained on a cash based single entry system. All recurring items of income and<br />
expenditure are included under the revenue account head. These include taxes, charges,<br />
salaries, maintenance expenditure, debt servicing etc. Income and expenditure items under<br />
this account are primarily non-recurring in nature are classified under capital account. Income<br />
items include loans, contributions by GoJ, other agencies and capital grants under various<br />
State and Central Government programs, revenue account transfer for capital works and<br />
income from sale of assets. Expenditure items include expenses booked under developmental<br />
works and purchase of capital assets.<br />
B. Financial Status<br />
Revenue income of<br />
erstwhile <strong>Dhanbad</strong><br />
<strong>Municipal</strong>ity has<br />
grown to Rs. 128.02<br />
Lakh in the FY<br />
2005-06 from Rs.<br />
101.89 Lakh in FY<br />
2001-02, at an<br />
annual growth of<br />
5.87 percent.<br />
Revenue<br />
expenditure<br />
decreased at an<br />
Figure 11: Revenue Income and Expenditure Trend –<br />
Erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity<br />
Amount in Rs. Lakh<br />
250.00<br />
200.00<br />
150.00<br />
100.00<br />
50.00<br />
-<br />
2001-02 2002-03 2003-04 2004-05 2005-06<br />
Year<br />
Revenue<br />
Income<br />
Revenue<br />
Expenditure<br />
average annual rate of 2.60 percent from Rs. 134.44 lakh to Rs. 120.98 lakh during the<br />
assessment period. The revenue account maintains deficit during the entire assessment period<br />
except during 2005-06. The trends for the revenue fund are presented in Table 17. The<br />
maximum revenue income during the FY 03-04 has attributed to non plan grant to the tune<br />
of Rs. 33.64 lakh. Revenue income and expenditure trend in presented in Figure 11.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 37
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Table 17: Abstract Financial Status of Erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity Account Statement<br />
Description 2001-02 2002-03 2003-04 2004-05 2005-06<br />
Rs. Lakh<br />
Revenue A/C<br />
Revenue Income 101.89 85.40 154.22 122.92 128.02<br />
Revenue<br />
Expenditure<br />
134.44 168.12 207.51 172.00 120.98<br />
Surplus/Deficit (32.55) (82.73) (53.29) (49.08) 7.04<br />
Capital A/C<br />
Capital Income 1,005.43 321.38 199.53 303.99 478.47<br />
Capital<br />
Expenditure<br />
397.23 248.33 70.34 337.40 23.79<br />
Surplus/Deficit 608.21 73.05 129.18 (33.42) 454.68<br />
Overall Status 575.66 (9.67) 75.89 (82.49) 461.72<br />
Capital income comprises of<br />
loans for plan, plan grants<br />
and contribution in the form<br />
of initial deposit for water<br />
supply connections. Majority<br />
of the capital income is in<br />
the form of grants and loans.<br />
The capital account has<br />
witnessed surplus except<br />
during FY 04-05 (refer<br />
Figure 12),<br />
implying loan drawn and<br />
Figure 12: Capital Income and Expenditure Trend –<br />
Erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity<br />
Amount in Rs. Lakh<br />
1,200.00<br />
1,000.00<br />
800.00<br />
600.00<br />
400.00<br />
200.00<br />
-<br />
2001-02 2002-03 2003-04 2004-05 2005-06<br />
grant received was utilized less for capital works. Fiscal status of revenue account and capital<br />
account status witnessed inconsistent in terms surplus during the entire assessment period.<br />
Year<br />
Capital<br />
Income<br />
Capital<br />
Expenditure<br />
Figure 13: Revenue Income and Expenditure Trend-<br />
Erstwhile Sindri NAC<br />
Revenue income of<br />
erstwhile Sindri<br />
120.00<br />
Notified Area<br />
Revenue<br />
Income<br />
100.00<br />
Committee (NAC)<br />
has grown to Rs.<br />
35.68 lakh in the FY<br />
80.00<br />
2005-06 from Rs.<br />
60.00<br />
33.39 lakh in FY<br />
40.00<br />
2001-02, at an<br />
annual growth of<br />
20.00<br />
1.67 percent.<br />
-<br />
Revenue expenditure<br />
2001-02 2002-03 2003-04 2004-05 2005-06<br />
decreased at an<br />
Year<br />
average annual rate of 1.79 percent from Rs. 62.86 lakh to Rs. 58.55 lakh during the<br />
Amount in Rs. Lakh<br />
Revenue<br />
Expenditure<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 38
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
assessment period. The revenue account maintains deficit during the entire assessment period.<br />
The trends for the revenue fund are presented in Table 18. Revenue income and expenditure<br />
trend in presented in Figure 13.<br />
Table 18: Abstract Financial Status of Erstwhile Sindri Notified Area Committee<br />
Description 2001-02 2002-03 2003-04 2004-05 2005-06<br />
Rs. Lakh<br />
Revenue A/C<br />
Revenue Income 33.39 35.60 68.53 42.40 35.68<br />
Revenue<br />
Expenditure<br />
58.55 35.60 100.18 51.07 62.86<br />
Surplus/Deficit (25.16) - (31.65) (8.67) (27.18)<br />
Capital A/C<br />
Capital Income 132.20 198.55 103.39 67.90 58.85<br />
Capital<br />
Expenditure<br />
101.89 193.66 58.80 14.49 14.00<br />
Surplus/Deficit 30.31 4.89 44.58 53.41 44.85<br />
Overall Status 5.15 4.89 12.93 44.74 17.67<br />
Figure 14: Capital Income and Expenditure Trend –<br />
Erstwhile Sindri NAC<br />
Capital income of erstwhile<br />
Sindri NAC comprises of<br />
loans for plan, plan grants<br />
and contribution in the form<br />
of initial deposit for water<br />
supply connections. Majority<br />
of the capital income is in<br />
the form of grants and loans.<br />
The capital account has<br />
witnessed surplus except<br />
during FY 04-05 (refer<br />
Figure 14), implying loan<br />
drawn and grant received<br />
was utilized less for capital<br />
Am ount in Rs. Lakh<br />
250.00<br />
200.00<br />
150.00<br />
100.00<br />
50.00<br />
-<br />
2001-02 2002-03 2003-04 2004-05 2005-06<br />
Year<br />
Capital<br />
Income<br />
Capital<br />
Expenditure<br />
works. Fiscal status of revenue account and capital account status witnessed inconsistent in<br />
terms surplus during the entire assessment period.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 39
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
C. Revenue Income<br />
The revenue sources of<br />
erstwhile <strong>Dhanbad</strong><br />
<strong>Municipal</strong>ity can be broadly<br />
categorized as own sources,<br />
assigned revenues and grants<br />
(refer<br />
Figure 15). The sourcewise<br />
income generated<br />
during the review period is<br />
presented in Table 19. The<br />
base and basis of each<br />
income source has been<br />
further elaborated in the<br />
following section. The<br />
Figure 15: Composition of Average Revenue Income –<br />
Erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity<br />
Revenue Grants<br />
12%<br />
Non Tax- Ow n<br />
Sources<br />
6%<br />
Assigned<br />
Revenues<br />
2%<br />
Tax- Ow n<br />
Sources<br />
80%<br />
revenue income of erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity has increased from Rs. 101.89 Lakh in<br />
2000-01 to Rs. 128.02 Lakh in 2005-06 – at a nominal Compound Annual Growth Rate<br />
(CAGR) of about 5.87 percent.<br />
Table 19: Details of Erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity Revenue Income<br />
Description 2001-02 2002-03 2003-04 2004-05 2005-06<br />
Rs. Lakh<br />
Tax – Own Sources<br />
Property Tax 77.51 77.65 97.62 103.36 100.87<br />
Professional Tax 1.00 1.50 1.25 1.60 1.60<br />
Total – Tax Own<br />
Sources<br />
78.51 79.15 98.87 104.96 102.47<br />
Assigned Revenue<br />
Surcharge on - - 14.51 - -<br />
Stamp Duty<br />
Total Assigned - - 14.51 - -<br />
Revenue<br />
Non – Tax Own<br />
Sources<br />
Income from<br />
<strong>Municipal</strong><br />
2.50 3.00 3.50 4.00 4.50<br />
Properties<br />
User Charges 1.93 2.00 2.20 2.71 3.00<br />
<strong>Municipal</strong> Fees and<br />
Fines<br />
1.00 1.25 1.50 1.75 2.00<br />
Total – Non Tax 5.43 6.25 7.20 8.46 9.50<br />
Revenue Grants<br />
Non Plan Grants 17.95 - 33.64 9.50 16.06<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 40
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Description 2001-02 2002-03 2003-04 2004-05 2005-06<br />
Rs. Lakh<br />
Total – Revenue<br />
Grants<br />
17.95 - 33.64 9.50 16.06<br />
Total Revenue<br />
Income<br />
101.89 85.40 154.22 122.92 128.02<br />
The revenue sources of<br />
erstwhile Sindri NAC can be<br />
broadly categorized as own<br />
sources, assigned revenues<br />
and grants (refer<br />
Figure 16). The<br />
source-wise income<br />
generated during the review<br />
period is presented in Table<br />
20. The base and basis of<br />
each income source has been<br />
further elaborated in the<br />
following section. The<br />
revenue income of erstwhile<br />
Figure 16: Composition of Average Revenue Income –<br />
Erstwhile Sindri NAC<br />
Non Tax- Ow n<br />
Sources<br />
5%<br />
Revenue Grants<br />
24%<br />
Tax- Ow n<br />
Sources<br />
71%<br />
<strong>Dhanbad</strong> <strong>Municipal</strong>ity has increased from Rs. 101.89 Lakh in 2000-01 to Rs. 128.02 Lakh in<br />
2005-06 – at a nominal Compound Annual Growth Rate (CAGR) of about 5.87 percent.<br />
Table 20: Details of Erstwhile Sindri NAC Revenue Income<br />
Description 2001-02 2002-03 2003-04 2004-05 2005-06<br />
Rs. Lakh<br />
Tax – Own Sources<br />
Property Tax 14.73 29.01 43.71 30.17 19.14<br />
Professional Tax 4.95 3.47 1.26 4.37 1.90<br />
Total – Tax Own<br />
Sources<br />
19.68 32.47 44.97 34.54 21.04<br />
Non – Tax Own<br />
Sources<br />
Income from<br />
<strong>Municipal</strong><br />
2.11 2.80 1.03 1.74 0.70<br />
Properties<br />
User Charges 0.27 0.32 0.13 0.11 0.22<br />
<strong>Municipal</strong> Fees and<br />
Fines<br />
- 0.01 0.00 - 0.01<br />
Total – Non Tax 2.38 3.13 1.17 1.85 0.93<br />
Revenue Grants<br />
Non Plan Grants 11.33 - 22.39 6.01 13.71<br />
Total – Revenue<br />
Grants<br />
11.33 - 22.39 6.01 13.71<br />
Total Revenue 33.39 35.60 68.53 42.40 35.68<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 41
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Description 2001-02 2002-03 2003-04 2004-05 2005-06<br />
Rs. Lakh<br />
Income<br />
Own-source income includes income from resource mobilization activities of erstwhile<br />
<strong>Dhanbad</strong> municipality and erstwhile Sindri NAC is in the form of taxes, income from<br />
municipal properties and markets (rent/lease), user charges and income from fees and fines,<br />
etc. Own revenue sources are further classified as tax revenue and non-tax sources that are<br />
generated by various sections of the ULB. The salient features of the revenue head is detailed<br />
below:<br />
(i)<br />
Own Sources/Tax. This item head comprises of income sourced primarily from<br />
property tax (General purpose tax, Lighting tax, Scavenging tax and Education tax,<br />
Water and Drainage tax), professional tax and other taxes. The property tax is the<br />
largest revenue-generating item for both erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity and<br />
erstwhile Sindri NAC. Own sources of erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity tax income is<br />
presented in Table 19 and own sources of erstwhile Sindri NAC tax income is given<br />
Table 20 Average income of erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity from own sources<br />
constituted 79.81 percent of the total revenue income during the review period and<br />
has increased at an average compounded annual growth rate of 5.93 percent. While<br />
average income of erstwhile Sindri NAC from own sources constituted 71.24 percent<br />
of the total revenue income during the same review period and has increased at n<br />
average CAGR of 1.68 percent. Tax sources of erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity<br />
contributed 79.81 percent of the revenue income and non-tax sources contribute<br />
6.05 percent of the revenue income. Whereas, erstwhile Sindri NAC tax sources<br />
contributed 71.24 percent of the revenue income and non- tax sources contribute<br />
only 4.92 percent of the revenue income.<br />
Property Tax is the most important category of own source income to the erstwhile<br />
<strong>Dhanbad</strong> <strong>Municipal</strong>ity it levies a consolidated property tax of 27 percent of the<br />
Annual Ratable Value (ARV). During the assessment period, the numbers of<br />
property tax assessments increased at an average growth rate of 1.76 percent per<br />
annum. Property tax current demand however has increased at a CAGR of about<br />
1.04 percent during the assessment period.<br />
(ii)<br />
(iii)<br />
Own Sources/Non Tax. This item head comprises of income from municipal<br />
properties, user charges and fees on municipal services. On an average, through the<br />
assessment period, own source/non tax income of erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity<br />
constitutes 6.32 percent of the total revenue income. However, incase of erstwhile<br />
Sindri NAC it is only 4.92 percent of the revenue income. Income from<br />
remunerative enterprises, income from user charges constitutes the major revenue<br />
sources under this item head. Income through non-tax own sources of the erstwhile<br />
<strong>Dhanbad</strong> <strong>Municipal</strong>ity has grown over the assessment period at a CAGR of about<br />
15.01 percent, while in case of erstwhile Sindri NAC the CAGR is negative growth<br />
of 20.99 percent.<br />
Assigned Revenues. This item head comprises of income from Government of<br />
Jharkhand (GoJ)/State transfers of erstwhile <strong>Municipal</strong>ity income collected by the<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 42
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
state line department. Transfers are in the form of municipality’s share of taxes levied<br />
and collected by GoJ from establishments/operations within the municipal limits.<br />
However, currently, surcharge on transfer of immovable properties are not<br />
transferred to erstwhile municipality. While, in case of erstwhile Sindri NAC no<br />
assigned revenue transfers to local body during the assessment period.<br />
(iv)<br />
Revenue Grants and Contribution. This item mainly comprises revenue grants<br />
and compensations from the State Government under various heads. The regular<br />
grants include the non plan for establishment purposes. Grants which are for specific<br />
purposes are ad-hoc in nature. In case of erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity, revenue<br />
grants and contributions constitute about 11.94 percent of the total revenue income<br />
and have registered an average annual negative growth rate of 2.76 percent. While in<br />
case of erstwhile Sindri NAC, revenue grants and contributions constitute about<br />
23.84 percent of the total revenue income and have witnessed an average CAGR of<br />
4.90 percent during the assessment period.<br />
D. Revenue Expenditure<br />
Revenue expenditure of erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity has been analyzed based on<br />
expenditure heads broadly classified under the following departments- General<br />
Administration, Public Works and Roads, Street Lighting, Public Health & Conservancy,<br />
drainage and etc. Revenue expenditure is further classified under Establishment, Operation &<br />
Maintenance and Debt Servicing.<br />
Table 21: Details of Erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity Revenue Expenditure<br />
Description 2001-02 2002-03 2003-04 2004-05 2005-06<br />
Rs. Lakh<br />
General<br />
Administration<br />
108.00 108.00 108.00 108.00 108.00<br />
Staff Salary and<br />
Employee Related 0.05 0.07 0.09 0.10 0.10<br />
Expenses<br />
Administration<br />
Expenditure<br />
0.05 0.10 0.15 0.15 0.15<br />
Total – General<br />
Administration<br />
108.10 108.17 108.24 108.25 108.25<br />
Operation and<br />
Maintenance<br />
Water Supply - - 21.92 - -<br />
Public Works and<br />
Roads<br />
- - - - -<br />
Public Health and<br />
Conservancy<br />
6.50 6.55 7.25 8.10 8.50<br />
Drainage<br />
Maintenance<br />
- 29.26 19.25 4.23<br />
Sanitation – Sulab 19.84 53.40 40.84 - -<br />
Ponds - - - 36.40 -<br />
Total – O&M 26.34 59.95 99.27 63.75 12.73<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 43
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Description 2001-02 2002-03 2003-04 2004-05 2005-06<br />
Rs. Lakh<br />
Debt Servicing - - - - -<br />
Total Revenue<br />
Expenditure<br />
134.44 168.12 207.51 172.00 120.98<br />
(a) Establishment<br />
Expenditure.<br />
Establishment<br />
expenditure alone<br />
accounts for about 80<br />
percent of revenue<br />
Figure 17: Composition of Average Revenue Expenditure<br />
& Operation<br />
Maintenance<br />
30%<br />
Establishments<br />
70%<br />
expenditure (refer<br />
Figure 17). About 69.86<br />
percent of the total<br />
revenue income is utilized<br />
for payment of salaries<br />
and other related<br />
expenses. Based on the<br />
annual account statement<br />
provide the ULB, debt servicing of the erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity is nil during the<br />
assessment period.<br />
(b) Operations & Maintenance. Operation and maintenance expenditure of all sections<br />
together accounts for 30.14 percent of revenue expenditure.<br />
Revenue expenditure details of the erstwhile Sindri NAC are presented in Table 22.<br />
Table 22: Details of Erstwhile Sindri NAC Revenue Expenditure<br />
Description 2001-02 2002-03 2003-04 2004-05 2005-06<br />
Rs. Lakh<br />
General<br />
Administration<br />
Staff Salary and<br />
Employee Related 43.37 33.96 98.51 48.59 60.97<br />
Expenses<br />
Administration<br />
Expenditure<br />
0.35 0.36 0.36 0.36 0.36<br />
Total – General<br />
Administration<br />
43.72 34.32 98.87 48.95 61.33<br />
Operation and<br />
Maintenance<br />
Water Supply 13.60 - - - -<br />
Public Works and<br />
Roads<br />
- - - 0.75 -<br />
Public Health and 0.65 0.67 0.70 0.73 0.89<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 44
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Description 2001-02 2002-03 2003-04 2004-05 2005-06<br />
Rs. Lakh<br />
Conservancy<br />
Drainage<br />
Maintenance<br />
- - - - -<br />
Sanitation – Sulab 0.25 0.27 0.27 0.27 0.28<br />
Ponds 0.02 0.04 0.03 0.05 0.01<br />
Miscellaneous 0.30 0.31 0.31 0.33 0.35<br />
Total – O&M 14.82 1.28 1.32 2.12 1.53<br />
Debt Servicing - - - - -<br />
Total Revenue<br />
Expenditure<br />
58.55 35.60 100.18 51.07 62.86<br />
E. Capital Account<br />
Capital Income. Capital income comprises of loans and grants. The detailed components of<br />
capital income are detailed in Table 23. An analysis of this account indicates that grants &<br />
contributions have contributed the maximum share of income under this account. While on<br />
an average 58.45 percent of the capital income is in the form of grants and contributions for<br />
(plan grant) creation of assets. Loans were acquired during the assessment period for public<br />
works and roads and other improvement works which contributes on an average 41.55<br />
percent of the total capital income during the assessment period.<br />
Table 23: Details of Erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity Capital Account Statement<br />
Description 2001-02 2002-03 2003-04 2004-05 2005-06<br />
Rs. Lakh<br />
Capital Income<br />
Loans 456.76 205.20 57.86 75.67 213.28<br />
Grants 548.67 116.18 141.67 228.31 265.19<br />
Total – Capital Income 1,005.43 321.38 199.53 303.99 478.47<br />
Capital Expenditure<br />
Water Supply 130.66 - - - -<br />
Public Works &<br />
Roads<br />
133.88 248.33 70.34 18.12 23.79<br />
Public Health & 132.68 - - - -<br />
conservancy<br />
Others - - - 319.28 -<br />
Capital Expenditure 397.23 248.33 70.34 337.40 23.79<br />
Surplus/ (Deficit ) 608.21 73.05 129.18 (33.42) 454.68<br />
Capital Expenditure. The majority of capital expenditure has been directed towards public<br />
works and roads, general purpose includes all item of works excluding water supply and<br />
drainage and public health & conservancy over the past five years.<br />
Capital income of erstwhile Sindri NAC is presented in Table 24. Loans form State<br />
Government constitutes about 61.24 percent and grants contributes 38.76 percent. Capital<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 45
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
account overall status is surplus during the entire review period.<br />
Table 24: Details of Erstwhile Sindri NAC Capital Account Statement<br />
Description 2001-02 2002-03 2003-04 2004-05 2005-06<br />
Rs. Lakh<br />
Capital Income<br />
Loans 78.71 128.87 64.87 35.36 39.39<br />
Grants 53.49 69.68 38.51 32.55 19.46<br />
Total – Capital Income 132.20 198.55 103.39 67.90 58.85<br />
Capital Expenditure<br />
Water Supply - - - - -<br />
Public Works &<br />
Roads<br />
53.04 172.68 30.16 - -<br />
Street Lighting - - - 7.27 14.00<br />
Construction of<br />
Drains<br />
33.85 - 12.39 1.75 -<br />
Others 15.00 20.98 16.25 5.47 -<br />
Capital Expenditure 101.89 193.66 58.80 14.49 14.00<br />
Surplus/ (Deficit ) 30.31 4.89 44.58 53.41 44.85<br />
F. Financial Performance Indicators and Key Issues<br />
A set of key financial performance indicators has been derived using the financial data<br />
procured from the erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity and Sindri NAC for the assessment<br />
period (5 yrs average). Table 25 presents these indicators. These indicators are used to assess<br />
the ULB’s performance with regards resource mobilization, fund utilization, financial<br />
performance and collection efficiencies<br />
Table 25: Key Financial Performance Indicators of Erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity<br />
Description <strong>Dhanbad</strong> NAC Unit<br />
A Resource Mobilization<br />
1 Per Capita Income 53 49 Rs. p.a<br />
2 Sources of Funds<br />
a Share of Own Sources in Total Revenue Income (RI) 85.86 79.81 %<br />
b Share of Property Tax in Total Revenue Income 78.60 65.13 %<br />
c Share of Revenue Grants & Subsidies in Total RI 11.79 20.19 %<br />
3 Growth in Revenue Income 5.87 1.67 % p.a<br />
4 Growth in Own Sources of Revenue Income 8.22 17.46 %<br />
5 Per Capita Own Income 45 37 Rs. P.a<br />
B Fund Application<br />
1 Per Capita Expenditure 73 70 Rs. p.a<br />
2 Uses of Funds<br />
a Share of Establishment Expenditure in Total RE 64.96 91.41 %<br />
b<br />
Share of O&M Expenditure in Total Revenue<br />
Expenditure 35.04 8.59 %<br />
c Share of Establishment Expenditure to Total RI 93.18 125.53 %<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 46
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Description <strong>Dhanbad</strong> NAC Unit<br />
3 Growth in Establishment Expenditure 0.03 28.27 %<br />
4 Growth in O&M Expenditure 15.48 (11.04) %<br />
5 Growth in Total Revenue Expenditure 0.48 29.07 % p.a<br />
C Liability Management<br />
1 Per Capita Liability (2005-06 estimated)<br />
a Outstanding Debt per Capita 466 388 Rs.<br />
As a Proportion of Property Tax Current Demand<br />
2 (2005-06 estimated)<br />
a Outstanding Debt as % of P.T Demand 11,312 3,762 %<br />
a Outstanding Debt as % of Own Revenue Sources 977 1,013 %<br />
3 Debt Servicing Ratio (D.S/ Revenue Income) - - %<br />
D Performance Indicators<br />
1 Operating Ratio 1.51 1.35 Ratio<br />
2 Growth in Per Capita Own Income 3.74 (3.58) % p.a<br />
3 Growth in Per Capita Grant (6.13) 1.25 % p.a<br />
4 Growth in Per Capita Total Revenue Income 2.20 1.86 % p.a<br />
5 Growth in Per Capita Establishment Expenditure (3.44) 5.05 % p.a<br />
6 Growth in Per Capita O&M Expenditure (19.52) (45.25) % p.a<br />
7 Growth in Per Capita Revenue Expenditure (5.99) (1.74) % p.a<br />
8 Capital Utilization Ratio 0.66 0.63 Ratio<br />
E Efficiency Indicators<br />
1 Tax Collection Performance<br />
a Property Tax 38 30 %<br />
b Water Charges 44 - %<br />
c Profession Tax 75 NA %<br />
6 Population per Residential P.T Assessment 19.34 9.12 Persons<br />
Resource Mobilization Indicators. These indicators summarize the performance of the<br />
ULBs with regards sources of funds. Erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity derives about 85.86<br />
percent of its revenue income from own sources and erstwhile Sindri NAC mobilizes own<br />
revenue to tune of 79.81 percent of the total revenue income, while grants account for just<br />
about 11.79 percent of the erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity revenue income and erstwhile<br />
Sindri NAC grants accounts for 20.19 percent of the total revenue income.<br />
Fund Application Indicators. These indicators are a measure to ascertain the utilization<br />
from the ULBs fund. In case of erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity, around 65 percent of the<br />
revenue expenditure is spent on establishment heads, about 35 percent for O&M of ULB<br />
assets and services. It should be noted that ULB did not repay during the review period.<br />
While, incase of erstwhile Sindri NAC spent 91.41 percent of the total revenue expenditure<br />
towards establishments expenditure and leaving only 8.59 percent of the total revenue<br />
expenditure towards maintenance of assets.<br />
Liability Management Indicators. These indicators are a measure to ascertain the<br />
utilization from the ULB fund regards to debt servicing. The ratio of debt servicing to<br />
revenue income is Nil during the assessment period for both erstwhile individual ULBs. The<br />
percapita average outstanding debt works out to 466 rupees for erstwhile <strong>Dhanbad</strong><br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 47
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
<strong>Municipal</strong>ity and erstwhile Sindri NAC is 388.<br />
Overall Financial Performance Indicators. These indicators are a measure to assess the<br />
overall financial performance of the ULB with regards operational performance and effective<br />
growth in revenue income and expenditure. The average operating ratio of the erstwhile<br />
<strong>Dhanbad</strong> <strong>Municipal</strong>ity and erstwhile Sindri NAC during the assessment period was vulnerable<br />
at 1.51 and 1.35 respectively. The capital utilization ratio of erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity<br />
and erstwhile Sindri NAC was low at 0.66 and 0.63 respectively, which indicating lower<br />
utilization of revenue account fund in asset creation. The indicators of growth in per capita<br />
income and expenditure item heads indicate the effective growth, giving a performance<br />
measure relative to the growing population. The erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity and<br />
erstwhile Sindri NAC has demonstrated 2.20 percent and 1.86 percent respectively annual<br />
growth in per capita revenue income during the assessment period, while the per capita<br />
revenue expenditure of erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity and erstwhile Sindri NAC has<br />
declined at a significantly lower 5.99 percent and 1.74 percent respectively during the<br />
corresponding period. Which indicates that as population increases revenue fund will be in<br />
surplus. However this reveals adequate fund was not utilized toward maintenance of the<br />
assets owned by ULB.<br />
Efficiency Indicators. These indicators are essentially a measure to assess ULBs efficiency<br />
with regards revenue base coverage and realization. The erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity has<br />
maintained an average collection performance with regard to property tax (38 percent) water<br />
charges (44 percent). The average no of persons per residential assessment for erstwhile<br />
<strong>Dhanbad</strong> <strong>Municipal</strong>ity is at 19.34 indicates that the property tax base has lesser coverage.<br />
Key issues and conclusions are based on the review and assessment ULB finances and<br />
discussions with relevant ULB officials.<br />
(i)<br />
(ii)<br />
(iii.)<br />
(iv.)<br />
(iv.)<br />
(v.)<br />
Maintenance and Reporting of Accounts. There is no proper accounting system,<br />
accounting code /manual to follow and the auditing system also poor. ULB don’t<br />
maintain abstract of account statement, it follows only in cash based accounting<br />
system. ULB’s do not maintain department/sector wise salary expenditure.<br />
Dearth of long term financial planning for want of perspective physical planning of<br />
huge capital outlays;<br />
Lack of diversity in the tax structure;<br />
Property/holding tax (including arrear and current) collection performance during the<br />
last 5 years is only 38 percent;<br />
Water charges demand collection during the last 5 years work out to only 44 percent;<br />
The property tax rates are already due for 2 increases, which needs to be revised soon;<br />
(vi.)<br />
(vii.)<br />
Need to adopt area based computation of property tax rather than value based;<br />
Need to increase the property tax net;<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 48
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
(viii.)<br />
Proper and transparent accounting system should be in place;<br />
MADA – Fund Assessment<br />
Overview. The fund of MADA is analyzed in detail based on its accounts statement for the<br />
last seven financial years (FY), i.e. FY 1997-98 to FY 2003-04. Table 26 presents a summary<br />
of MADA finances from FY 1997-98 to FY 2003-04. The total size of the MADA fund, in<br />
terms of income has increased from 1,592.95 lakh in 1999-00 to over Rs. 1,833.79 lakh in<br />
2003-04 – a compounded annual growth rate (CAGR) of about 2.03 percent. The detailed<br />
statement is presented in Table 26 & Table 27.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 49
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Table 26: Annual Receipt Statement of MADA<br />
Receipts 1997-98 1999-99 1999-2000 2000-01 2001-02 2002-03 2003-04<br />
Rs. Lakh<br />
Water Tax (Mining) 1,360.30 1,445.85 1,413.37 1,236.04 1,476.00 1,372.00 1,188.20<br />
Water Tax (Non –<br />
Mining) 7.23 7.12 19.58 84.05 95.00 97.00 46.95<br />
Land Use Tax 2.50 2.00 2.00 0.70 - - -<br />
Stamp Duty 110.40 92.00 220.00 187.75 337.50 280.39 464.10<br />
Holding (Latrine) Tax 22.40 15.87 18.00 18.87 16.68 21.32 32.75<br />
Loan (HUDCO) 50.90 14.90 - - - - -<br />
Grant (District<br />
Planning) 0.95 24.24 1.80 - 38.58 35.87 -<br />
Licence Fee 1.30 1.00 1.54 0.90 1.25 1.37 2.20<br />
Others 26.82 15.43 52.25 36.25 43.54 48.25 88.36<br />
Deposit 6.82 6.04 2.88 4.15 7.07 5.94 6.75<br />
Miscellaneous 3.33 2.35 12.41 0.40 0.50 0.55 4.48<br />
Over Draft - - - 135.00 - - -<br />
Other Revenues<br />
Total 1,592.95 1,626.80 1,743.83 1,704.11 2,016.12 1,862.69 1,833.79<br />
Table 27: Annual Expenditure Statement of MADA<br />
Expenditure 1997-98 1999-99 1999-2000 2000-01 2001-02 2002-03 2003-04<br />
Rs. Lakh<br />
Establishment 1,401.95 1,465.11 1,540.59 1,575.18 1,863.44 1,694.00 1,663.30<br />
Principle Construction<br />
Work 22.71 1.24 9.23 13.44 40.31 37.50 39.00<br />
Repair and<br />
Maintenance Work 118.59 119.76 80.88 107.25 80.04 90.19 100.02<br />
Central Purchase 5.69 9.05 5.58 0.86 8.21 4.12 -<br />
Medicine and<br />
Chemicals 0.12 0.21 0.32 0.69 14.29 11.61 22.35<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 50
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Expenditure 1997-98 1999-99 1999-2000 2000-01 2001-02 2002-03 2003-04<br />
Rs. Lakh<br />
Instruments and<br />
Furniture 0.03 - - - 1.21 1.20 -<br />
Return of Deposit 4.44 2.72 4.82 3.08 2.35 2.31 4.10<br />
Advance (Employees) 11.39 10.70 9.25 5.55 12.50 11.00 11.82<br />
Repayment of<br />
HUDCO Loan 53.70 24.21 90.70 5.96 - - -<br />
Miscellaneous 0.15 0.36 5.96 0.94 0.56 0.76 3.20<br />
Total 1,618.77 1,633.36 1,747.33 1,712.95 2,022.91 1,852.69 1,843.79<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 51
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Figure 18: Water Charge Collection Performance of MADA<br />
In Table 28 the average<br />
collection performance of<br />
Water Supply charges and<br />
Property Tax for the review<br />
period is 44 percent and 38<br />
percent respectively. It is<br />
observed that the <strong>Corporation</strong><br />
maintained a low arrear<br />
collection during the entire<br />
assessment period. The<br />
demand of water supply<br />
charges witnessed increasing<br />
Rs. Lakh<br />
3500<br />
3000<br />
2500<br />
2000<br />
1500<br />
1000<br />
500<br />
0<br />
Water Charge Collection Performance<br />
2000-01 2001-02 2002-03 2003-04<br />
Year<br />
Total-<br />
Demand<br />
Total-<br />
Collection<br />
trend, from Rs. 3,085 lakh to Rs. 3,181 lakh while total collection also has increased from Rs.<br />
1,282 lakh to Rs. 1,383 lakh.<br />
Figure 19: Property Tax Collection Performance of erstwhile<br />
<strong>Dhanbad</strong> <strong>Municipal</strong>ity<br />
In terms of Holding<br />
tax/property tax total demand<br />
has increased from Rs. 244.76<br />
lakh to Rs. 277.55 lakh during<br />
the review period. In chase of<br />
total collection, during the<br />
review period has increased<br />
from Rs. 82.75 lakh to Rs.<br />
110.71 lakh.<br />
Rs. Lakh<br />
300<br />
250<br />
200<br />
150<br />
100<br />
50<br />
0<br />
Property Tax Collection Performance<br />
2000-01 2001-02 2002-03 2003-04<br />
Total-<br />
Demand<br />
Total-<br />
Collection<br />
Year<br />
Table 28: DCB Statement of Water Supply and Holding tax<br />
Description 2000-01 2001-02 2002-03 2003-04 2004-05<br />
Rs. Lakh<br />
W/S DCB – MADA<br />
Arrear Demand 1,742.19 1,803.72 1,415.40 1,615.39 1,776.29<br />
Current Demand 1,343.57 1,289.61 1,496.84 1,330.35 1,405.42<br />
Total Demand 3,085.75 3,093.33 2,912.24 2,945.74 3,181.70<br />
Total Collection 1,282.03 1,639.97 1,296.85 1,169.45 1,383.92<br />
Coll. Performance 42% 53% 45% 40% 43%<br />
Erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity – Holding Tax DCB<br />
Arrear Demand 149.15 162.01 172.31 184.80 178.93<br />
Current Demand 95.62 96.24 96.88 9.80 98.62<br />
Total Demand 244.76 258.25 269.20 194.60 277.55<br />
Arrear Collection 56.26 57.87 56.89 74.77 81.56<br />
Current Collection 26.50 28.06 27.50 29.10 29.16<br />
Total Collection 82.75 85.93 84.40 103.87 110.71<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 52
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Description 2000-01 2001-02 2002-03 2003-04 2004-05<br />
Rs. Lakh<br />
Coll. Performance 34% 33% 31% 53% 40%<br />
Source: MADA, erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity.<br />
G. <strong>Municipal</strong> Finance - SWOT Analysis<br />
SWOT analysis has been undertaken to assess on the negative and positive aspects of the<br />
<strong>Municipal</strong> Finance. It involves analyzing the internal positive (strengths) and negative<br />
(weakness) aspects of an organization and considering these in relation to aspects of the<br />
external environment – both the positive aspects (or opportunities) and negative aspects (or<br />
threats). The Table 29 gives the details of the SWOT analysis.<br />
Table 29: <strong>Municipal</strong> Finance – SWOT Analysis<br />
Strength<br />
Power to tax as per 74th CAA; and<br />
Authority to collect taxes.<br />
Weakness<br />
Dearth of long term financial planning for want of perspective physical<br />
planning of huge capital outlays;<br />
Lack of initiatives in financial resource mobilization;<br />
Lack of proper co-ordination between the different line agencies and<br />
department in service delivery;<br />
Lack of propensity to pay land holding tax and water user charges;<br />
Lack of diversity in the tax structure; and<br />
Absence of auditing practice.<br />
Opportunities<br />
Emergence of new concepts such as BOT, BOOT, BOLT on a smaller scale;<br />
and<br />
Outsourcing project management.<br />
Threats<br />
Closed mind set among officials.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 53
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
V. EXISTING INFRASTRUCTURE ASSESSMENT<br />
A. Water Supply<br />
1. Overview<br />
<strong>Municipal</strong><br />
<strong>Corporation</strong> of<br />
<strong>Dhanbad</strong> meets its<br />
water requirement<br />
through surface<br />
sources, sub surface<br />
sources and ground<br />
water sources. The<br />
new <strong>Municipal</strong><br />
<strong>Corporation</strong> area<br />
includes five blocks<br />
namely <strong>Dhanbad</strong><br />
Sadar Block, Jharia<br />
Block, Baliapur Block,<br />
Baghmara Block and<br />
Gobindpur Block<br />
(partly). Major urban centres like erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity, Jharia NAC, Katras NAC,<br />
Sindri NAC and Chatanadh NAC are also form part of the new <strong>Corporation</strong> area.<br />
Following table presents the surface, sub surface sources and ground water sources of<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong>. For provision of water supply, three agencies are involved<br />
in the <strong>Municipal</strong> <strong>Corporation</strong> jurisdiction namely, MADA, PHED (WS&DB) and FCI. The<br />
entire mineral areas with in the district is being supplied by MADA (bulk water supply and<br />
distribution), FCI supplies protected piped water to the Sindri NAC alone and PHED does<br />
the distribution of water supply to erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong> area and also it covers other<br />
urban areas with in the jurisdiction of <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> (excluding MADA<br />
and FCI distribution areas) either through piped water or hand pumps to meet the growing<br />
demand. MADA supplies bulk water to BCCL for distribution and BCCL supplies water to<br />
their collieries. However, in some areas BCCL themselves extract and supplies water to their<br />
collieries.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 54
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Table 30: Water Supply Sources – <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong><br />
Description Surface/ Sub Surface Source Ground Water Source<br />
Source<br />
Dhamodar River, Topchanchi<br />
Lake<br />
No of Hand Pump/Tube<br />
- 2,753<br />
Wells<br />
No of High yield Bore<br />
- 9<br />
Wells<br />
No of Open Wells 367<br />
Supply (MLD) 89.81 9.47<br />
Source: MADA, PHED, FCI.<br />
The water supply system of <strong>Dhanbad</strong> <strong>Municipal</strong><br />
<strong>Corporation</strong> area is based on surface water of<br />
Topchanchi Lake and Damodar river which is<br />
treated at Topchanchi lake and Jamadoba water<br />
works respectively and having a total capacity of 108<br />
MLD. The Jamadoba water works is located at 20<br />
km from <strong>Dhanbad</strong> city. The Jamadoba water works<br />
is based on conventional treatment employing<br />
clarifloculator, rapid sand filtration followed by<br />
chlorination. The water works is under the<br />
jurisdiction of MADA and serves coal mines area of <strong>Dhanbad</strong> namely, Jharia, Putki,<br />
Kenduam Chhatatand etc. besides erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong> Area. Jadmadoba water<br />
works never work on full capacity due to operational problems as well as due to old/out lived<br />
mechanical and electrical equipments as well as old civil structures. With the existing system,<br />
the Jamadoba water works can deliver 72 MLD of water on an average. MADA supplies<br />
water to Jharia NAC area and coal mining area of Putki, Kendua, Kerkend etc. from its<br />
Jamaboda water works.<br />
The treated water from Jamadoba is pumped to Jharia pumping station from where water is<br />
pumped to distribution system of <strong>Dhanbad</strong> city. The Jamadoba water works and Jharia<br />
Pumping station are operated and maintained by PHED and erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity<br />
collects revenue.<br />
2. Sources of Water Supply<br />
The first protected water supply was provided during<br />
the year 1914-24 to coal mining areas from<br />
Topchanchi Lake which is located at a distance of 20<br />
km from the city with a total production capacity of<br />
13.50 MLD and is being supplied through gravity.<br />
The second protected water supply scheme was<br />
commissioned during the year 1955-60 for the<br />
mineral areas in the region to meet the rapidly<br />
growing population. The second water supply<br />
scheme depends on damodar river (Jamadoba water works) which is located at a distance of<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 55
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
22 km from the city of <strong>Dhanbad</strong>. The total extraction capacity of Jamadoba water works is<br />
about 94.50 MLD out of which presently around 72 MLD of water is supplied daily through<br />
pumping to Mineral areas in the district. The following table presents the details of existing<br />
water supply scheme details. The total extracted water from the Damodar river and<br />
Topchanchi lake is around 89.81 MLD which include FCI’s supply amount of 6.81 MLD to<br />
Sindri NAC area. Besides this PHED also supplies waster from ground water sources through<br />
high yield bore wells to urban settlements with in the <strong>Municipal</strong> <strong>Corporation</strong> jurisdiction.<br />
Table 31 presents the each surface source wise details and its treatment capacity.<br />
Table 31: Water Supply Surface Sources Details<br />
Surface Source Details Unit Source 1 Source 2 Source 3<br />
MADA<br />
FCI- Sindri<br />
Name of the River / Tank Damodar Topchanchi Damodar<br />
Lake<br />
Water produced / extracted MLD 94.50 13.50 9.08<br />
Water transmitted MLD 72.00 11.00 6.81<br />
Distance from Source to<br />
M 80 50 3,000<br />
Treatment Plant<br />
Distance from source to town Km 22 20 6,000<br />
Transmission type Pumping Gravity Pumping<br />
Estimated transmission loss % of the<br />
15 20 30<br />
total<br />
supply<br />
Year of commissioning of scheme 1955-60 1914 – 24 1950<br />
Project cost Rs. Lakh 70.00 20.00 -<br />
Status of water supply lines Repaired Repaired Repaired<br />
Source: MADA, PHED and FCI.<br />
Treatment Plant<br />
There are three treatment plants presently used to<br />
treat and supply 89.81 MLD of water to the entire<br />
<strong>Municipal</strong> <strong>Corporation</strong> area. Two treatment plants<br />
are located at Jamadoba and one at Topchanchi with<br />
a total design capacity of 143.40 MLD. However,<br />
present utilization capacity of treatment plant is only<br />
89.80 MLD (around 62 percent of the total design<br />
capacity). All the three treatment plants are very old<br />
and ranging form 45 years to 81 years. Owning to<br />
the age oldness of the treatment plants, it is not taking up its full capacity to treat the water.<br />
The following table gives the location wise details of treatment plants.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 56
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Table 32: Treatment Plant wise Design and utilized Capacities<br />
Treatment Details Unit Jamadoba Topchanchi FCI<br />
Design capacity of Treatment MLD 94.50 13.50 35.40<br />
Plant<br />
Utilized capacity of plant MLD 72.00 11.00 6.80<br />
Age Years 45 81 56<br />
Operation & Maintenance Regular Regular Regular<br />
Status Repaired Repaired Repaired<br />
Source: MADA and FCI.<br />
3. Distribution System<br />
The total length of the rising mains laid with in the jurisdiction of MADA is 62.31 km, with<br />
pipe materials of CI and lime mortar. The age of the rising main which are presently used to<br />
carry water to <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> various from 25 years to 81 years. Water from<br />
MADA owned Jharia Pumping Station is pumped to raising main of 350 mm dia and 700 m<br />
dia (laid under reorganization scheme) CI pipes and water is distributed by PHED to<br />
erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong> area through overhead service reservoirs, underground sumps<br />
and distribution network. The following table presents the details of rising main used to<br />
transmit the water from the treatment plant to storage reservoirs.<br />
Table 33: Rising Main Details<br />
Rising Main Details Pipe Material Pipe Length Age<br />
mm dia Km Years<br />
750 C.I 2.74 45<br />
900 C.I 2.13 45<br />
1000 C.I 3.04 45<br />
450 C.I 18.00 27<br />
400 C.I 13.00 81<br />
350/300 C.I 9.00 25<br />
450 (Conduct main) Lime mortar 9.40 81<br />
525 C.I 5.00 81<br />
Total 62.31<br />
Source: MADA, PHED and FCI.<br />
In <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> Jurisdiction three types of service reservoirs are used to<br />
store and supply the water to entire area. As discussed earlier, three agencies are involved in<br />
distribution of water to the citizens of <strong>Dhanbad</strong>. The total storage capacities available with all<br />
the three agencies are works out to 44.86 MLD which include Elevated Service Reservoirs<br />
(ESR/OHT), Ground Level Storage Reservoirs (GLSR) and Under Ground Sumps. The<br />
details of the location of service reservoirs are presented in the Table 34.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 57
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Table 34: Type wise Location of Storage Reservoirs and its Capacity<br />
Location<br />
Capacity<br />
ML<br />
Elevated Service Reservoirs<br />
MADA<br />
Jharia 2.250<br />
Patherdeh 0.225<br />
Putki 0.225<br />
Kirkend 0.450<br />
Godhar 0.450<br />
Chaitudih (Katras) 0.675<br />
Sub Total (MADA) 4.275<br />
PHED<br />
Dhansar 0.681<br />
Purana Bazar 0.454<br />
Manaitand 0.681<br />
Hirapur 0.454<br />
Hospital 0.114<br />
Matkuria 0.681<br />
Chiragorah 0.454<br />
Sub Total (PHED) 3.519<br />
FCI<br />
Saharpura 0.454<br />
Rohrabandh 0.454<br />
Rangamati 0.901<br />
Church 0.901<br />
SL- 2 0.454<br />
Domgarh 0.901<br />
FCIL 0.250<br />
PDIL 0.454<br />
Sub Total (FCI) 4.769<br />
Sub Total (Elevated Service Reservoirs) 12.563<br />
Underground Sumps/Ground Level Storage Reservoirs<br />
MADA<br />
Jharia 6.30<br />
Putkee 1.35<br />
Godhar 1.35<br />
Kusunda 1.35<br />
Tilatand 18.00<br />
Sub Total (MADA) 28.35<br />
PHED<br />
<strong>Municipal</strong> Office Campus 2.00<br />
Hirapur Panitanki Campus 1.50<br />
Sub Total (PHED) 3.50<br />
FCI<br />
Mandhartand 0.45<br />
Sub Total (FCI) 0.45<br />
Sub Total 32.30<br />
Grand Total 44.86<br />
Source: MADA, PHED and FCI.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 58
CITY DEVELOPMENT PLAN<br />
DHANBAD<br />
DHANBAD WATER SUPPLY SCHEME<br />
BY PHED<br />
120<br />
137<br />
119<br />
121<br />
151<br />
PWD<br />
127<br />
131<br />
153<br />
ADRAS<br />
NAGAR<br />
P . W . D .<br />
149<br />
126<br />
LEGEND<br />
154<br />
152<br />
136<br />
125<br />
130<br />
123<br />
150<br />
148<br />
150 Ø<br />
300 m<br />
135<br />
100 Ø<br />
400 m<br />
129<br />
124<br />
122<br />
118<br />
147<br />
144<br />
146<br />
100 Ø<br />
300 m 140<br />
134<br />
185<br />
133<br />
132<br />
128<br />
184<br />
113<br />
138<br />
114<br />
RAILWAY TRACK<br />
200 Ø115<br />
120m<br />
117<br />
112<br />
116<br />
145<br />
143<br />
139<br />
111<br />
ROAD<br />
142<br />
156<br />
141<br />
RISING PIPE LINE<br />
OLD<br />
155<br />
NEW<br />
157<br />
174<br />
DISTRIBUITION MAIN<br />
158<br />
163<br />
A. RE USED PIPE LINE<br />
160<br />
159<br />
168<br />
161<br />
166<br />
82<br />
162<br />
B. TO BE TAKEN OUT PIPE LINE<br />
81<br />
100 Ø<br />
300 m<br />
C. NOT TO BETAKEN OUT PIPE LINE<br />
175<br />
165<br />
176<br />
WATER TOWER<br />
80<br />
164<br />
177<br />
83 79<br />
169<br />
167<br />
76<br />
188<br />
78<br />
190<br />
180<br />
178<br />
75<br />
69<br />
179<br />
77<br />
171<br />
170<br />
70<br />
68<br />
172<br />
74<br />
300 Ø<br />
120m.<br />
65<br />
72<br />
71<br />
150Ø<br />
80m.<br />
64<br />
73<br />
67<br />
150 Ø<br />
200 m<br />
173<br />
150 Ø<br />
80 m.<br />
300 Ø<br />
1307.25 m.<br />
66<br />
100 Ø<br />
400 m.<br />
100 Ø<br />
190 m.<br />
62<br />
63<br />
180m<br />
61<br />
91<br />
250 m.<br />
60<br />
City Development Plan, <strong>Dhanbad</strong> Final Report<br />
Figure 20: Erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity Water Supply Rising main and Distribution Main details<br />
80 Ø<br />
600 m<br />
80 Ø<br />
350 m<br />
100 Ø<br />
SARAIDHELA<br />
57<br />
KOLYLA NAGAR<br />
194<br />
195<br />
196<br />
191<br />
193<br />
400 m<br />
80 Ø<br />
320 m<br />
100 Ø<br />
SADAR HOSPITAL<br />
192<br />
189<br />
650 m<br />
150 Ø<br />
100 Ø<br />
300 m<br />
150 Ø<br />
200 m<br />
250 Ø<br />
200 m<br />
250 Ø<br />
400 m<br />
350 m<br />
100 Ø<br />
250 m<br />
100 Ø<br />
100 Ø<br />
350 m<br />
42<br />
30 m<br />
150 Ø<br />
100 Ø<br />
300 m<br />
600 m<br />
250 Ø<br />
181<br />
100 Ø<br />
200 m<br />
187<br />
87<br />
150 m<br />
80 Ø<br />
90<br />
100 Ø<br />
300 m<br />
58<br />
100Ø<br />
100 Ø 59<br />
220m<br />
200 m. 100Ø<br />
100m<br />
250 mm.<br />
75.0 m<br />
100 Ø<br />
320 m<br />
50 m<br />
100 Ø 186<br />
200m<br />
200 Ø<br />
150 m<br />
100 Ø<br />
150Ø<br />
200 m<br />
56<br />
100 Ø<br />
200 m<br />
200 Ø<br />
250m<br />
50 m<br />
100 Ø<br />
80 Ø<br />
150 m<br />
100 Ø 100 Ø<br />
160 m. 54 80 m.<br />
100 Ø<br />
600 m<br />
43<br />
100 Ø<br />
100 m<br />
86<br />
100 Ø<br />
200 m<br />
100 Ø<br />
200 m<br />
100 Ø<br />
55<br />
180 m.<br />
100 Ø<br />
150 m<br />
41<br />
650 m<br />
100 Ø<br />
93<br />
89<br />
200 m<br />
200 Ø<br />
95<br />
200 Ø<br />
130m<br />
84<br />
200 Ø<br />
100 m<br />
97<br />
85<br />
48<br />
39<br />
98<br />
47<br />
88<br />
90 m.<br />
150 Ø<br />
46<br />
44<br />
29.<br />
92<br />
80Ø<br />
150m<br />
110<br />
94<br />
170 m.<br />
37<br />
200 Ø<br />
800 m.<br />
800 m.<br />
200 Ø<br />
150 Ø<br />
100 m.<br />
96<br />
60 m.<br />
200 Ø<br />
100 Ø<br />
40<br />
35<br />
38<br />
36<br />
106<br />
99<br />
545 m.<br />
104<br />
150 Ø<br />
103<br />
300 m<br />
250 Ø<br />
300m.<br />
150 Ø<br />
80 Ø 27.<br />
300 m.<br />
100 Ø 28.<br />
100 m.<br />
30<br />
34<br />
11.<br />
101<br />
26.<br />
31<br />
10.<br />
182<br />
105<br />
183<br />
32<br />
33<br />
6.<br />
14. 13.<br />
12.<br />
25.<br />
9.<br />
7.<br />
1.5 LAC.GALLAN<br />
MATKURIA<br />
108<br />
3.<br />
250Ø<br />
120 m.<br />
8.<br />
15.<br />
NALA<br />
107<br />
16.<br />
80Ø<br />
18. 250 m<br />
21.<br />
17.<br />
22.<br />
24.<br />
23.<br />
C H A S R O A D<br />
TO K A T R A S<br />
JHARIA WATER<br />
BOARD<br />
RESERVOIR<br />
P. W. D.<br />
P A T H R A K U L H I<br />
A S N S O A L<br />
B H U D A<br />
D A M O D A R P U R<br />
D H A N B A D G O V I N D P U R R O A D<br />
DAMODARPUR<br />
D H A N B A D B A L I A P U R R O A D<br />
DEVIPARA<br />
CHIRA GORA<br />
CENTRAL<br />
HOSPITAL<br />
300 M<br />
CHIRA GORA<br />
200Ø<br />
J.C. MALLICK ROAD<br />
D U H A T A N D<br />
J. C. MALLIC<br />
C.M.P.F. COLONY<br />
HIRAPUR<br />
I . S . M . CAMPUS<br />
B A R M A S I A<br />
A<br />
100 Ø<br />
250 m<br />
190 m<br />
100 Ø<br />
100 Ø<br />
500 m<br />
102<br />
100m<br />
100 Ø<br />
300 m<br />
100 Ø<br />
120m<br />
100 Ø<br />
100 Ø<br />
275 m<br />
100 Ø<br />
300 m<br />
100 Ø<br />
150 m<br />
100 Ø<br />
180 m<br />
250 Ø<br />
75 m.<br />
250 Ø<br />
75 m.<br />
110 m.<br />
150 Ø<br />
150 Ø<br />
150 m.<br />
150 Ø<br />
120 m.<br />
200m.<br />
150 Ø<br />
650 m.<br />
100 Ø<br />
100Ø<br />
245m.<br />
100 Ø<br />
200 m.<br />
170m.<br />
150Ø<br />
200 Ø<br />
150m.<br />
150m.<br />
300 Ø<br />
150 Ø<br />
90 m.<br />
100 Ø<br />
70m.<br />
100 Ø<br />
120 m.<br />
100Ø<br />
130m<br />
100Ø<br />
100 Ø<br />
400 m.<br />
100 Ø<br />
230 m.<br />
SHIV MANDIR<br />
109<br />
G A N D H I N A G A R<br />
80 Ø<br />
300 m<br />
60 m.<br />
150 Ø<br />
100<br />
100m<br />
80Ø<br />
100 M<br />
80 Ø<br />
300 m.<br />
250 Ø<br />
80Ø<br />
110m<br />
30m<br />
80Ø<br />
100 Ø<br />
250 m<br />
G A N D H I R O A D.<br />
B E R A C 0 L L I E R Y R O A D<br />
80 Ø<br />
150 M<br />
300 Ø<br />
110 m.<br />
200 Ø<br />
10 m.<br />
100 Ø<br />
50 M<br />
100 M<br />
80 Ø<br />
100 Ø<br />
110 m.<br />
150 M<br />
80 Ø<br />
TELEPHONE EXCHANGE ROAD<br />
POLYTECHNIC<br />
DHANBAD<br />
200 Ø<br />
600 m.<br />
200Ø<br />
350 m.<br />
370m.<br />
250Ø<br />
100 m<br />
100 Ø<br />
250Ø<br />
240 m<br />
150 m<br />
150 Ø<br />
80 Ø<br />
300 m100 Ø<br />
250 m<br />
70 m<br />
250Ø<br />
100 m<br />
250Ø<br />
100 m<br />
150Ø<br />
ZILA SCHOOL<br />
MATKURIA<br />
GAJUA TAND<br />
KUMBHAR PATTI<br />
MARIGODAM<br />
D U H A T A N D<br />
BARMASIA<br />
L. XING<br />
AJANTAPARA<br />
HOUSING COLONY<br />
I. S. M.<br />
D H A I Y A<br />
H.E. SCHOOL<br />
GIRLS<br />
SCHOOL<br />
ROAD<br />
I. 5 LAC. GALL.<br />
CAPACITY WT.<br />
AT BLOCK<br />
CAMPUS<br />
CHIRAGORA<br />
POLICE LINE<br />
COLONY<br />
VISTIPARA<br />
D.C. OFFICE<br />
I . S . M R O A D.<br />
H.E. SCHOOL ROAD<br />
HOUSING COLONY ROAD<br />
BARTAND MUHALLA<br />
D H A I Y A<br />
C. M. R. I. COLONY<br />
D H A I Y A<br />
JHARUDIH<br />
JAIPRAKASH<br />
NAGAR<br />
B U S S T A N D.<br />
CIRCUIT<br />
HOUSE<br />
D.C.<br />
BUNGL.<br />
DIST. BOND<br />
OFFICER<br />
COLONY 200 Ø<br />
100 M<br />
GOLF GROUND<br />
D.S. OFFICE<br />
RLY.<br />
BEKAR BANDH<br />
D H A N B A D<br />
14"Ø<br />
4225 mts.<br />
300Ø<br />
400 m.<br />
300Ø<br />
1000 m.<br />
1.<br />
2.<br />
4.<br />
5.<br />
450 Ø<br />
400 m.<br />
1.00 Lac Gallan<br />
PURANA BAZAR<br />
WATER TOWER<br />
Rising main 700 mm.<br />
4275 mts.<br />
T E L I P A R A R O A D<br />
1.5 LAC. GALLAN<br />
MANAITARND<br />
WATER TOWER<br />
PUJA TAKIES<br />
1.5 LAC. GALLAN<br />
DANSAR E. S.R.<br />
2.0 LAC.GALLAN SUMP<br />
DHANBAD MUNICIPALITY<br />
D H O B A T A N D<br />
20<br />
19.<br />
80Ø<br />
300 m.<br />
65 Ø<br />
300 m.<br />
100 Ø<br />
1200 m<br />
250 Ø<br />
350 m<br />
80 Ø<br />
200 m<br />
200 Ø<br />
300 m.<br />
250 Ø<br />
200 m<br />
100 Ø<br />
800 m<br />
DHANSAR<br />
150 m<br />
80 Ø<br />
100 Ø<br />
500 m<br />
80 Ø<br />
300 m<br />
100 Ø<br />
300 m<br />
275 m<br />
100 Ø<br />
100 Ø<br />
300 m<br />
150 Ø<br />
200 m<br />
150 Ø<br />
150m.<br />
150 Ø<br />
80 m.<br />
150 Ø<br />
270 m<br />
100 Ø<br />
180 m<br />
100 Ø<br />
400 m.<br />
GAYA BRIDGE<br />
100 Ø<br />
110 m.<br />
80 Ø<br />
200 m<br />
80 Ø<br />
200 m<br />
500 m.<br />
100 Ø<br />
80 Ø<br />
400 m.<br />
100 Ø<br />
200 m.<br />
100 Ø<br />
150 m.<br />
100 Ø<br />
300 m.<br />
300 m.<br />
80 Ø<br />
100 Ø<br />
500 m.<br />
500 m.<br />
100 Ø<br />
840 m.<br />
100 Ø<br />
CHHATH TALAB ROAD<br />
200 Ø<br />
200 m.<br />
80 Ø<br />
300 m.<br />
225 m.<br />
100 Ø<br />
BANDH<br />
BEKAR<br />
M U N I C I P A L<br />
R O A D<br />
D. A. V<br />
R A N G A T A N D<br />
150 m.<br />
200 Ø<br />
100 Ø<br />
900 m.<br />
300 m.<br />
80 Ø<br />
450 Ø<br />
450 m<br />
H O W A R A<br />
MOTORS<br />
R O A D<br />
GURUNANAK DUARA<br />
150 Ø<br />
400 m<br />
N A G A R E A S T<br />
S H A S T R I<br />
WEST<br />
GOMOH<br />
GAYA<br />
ASHOK MOTERS<br />
POST OFFICE<br />
BANK MORE<br />
RAY TALKIES<br />
KABARI PATTI<br />
L A R O A D<br />
300 m<br />
100 Ø<br />
80 Ø<br />
150 m<br />
150 Ø<br />
30 m<br />
150 m<br />
100 Ø<br />
100 Ø<br />
200 m<br />
150 Ø<br />
650 m<br />
100 Ø<br />
1300 m<br />
450 Ø<br />
250 m<br />
300 Ø<br />
450 m<br />
100 Ø<br />
500 m<br />
945 m<br />
80 Ø<br />
230 m<br />
450 Ø<br />
500 m<br />
80 Ø<br />
450 Ø<br />
970 m<br />
80 Ø<br />
200 m<br />
250 Ø<br />
220 m<br />
300 Ø<br />
400 m<br />
200 m<br />
150 Ø<br />
300 m<br />
80 Ø<br />
100 Ø<br />
320 m<br />
300 Ø<br />
750 m<br />
100 Ø<br />
400 m<br />
120 m<br />
250 Ø<br />
100 Ø<br />
200 m<br />
100 Ø<br />
600 m<br />
150 Ø<br />
1200 m<br />
175 m<br />
250 Ø<br />
80 Ø<br />
200 m<br />
80 Ø<br />
800 m<br />
400 m<br />
100 Ø<br />
100 m<br />
250 Ø<br />
100 Ø<br />
300 m<br />
100 Ø<br />
150 m<br />
300 m<br />
100 Ø<br />
250 Ø<br />
110 m 150 Ø<br />
175 m<br />
250 Ø<br />
75 m<br />
50 m<br />
250 Ø<br />
300 m<br />
100 Ø<br />
80 Ø<br />
600 m<br />
400 m<br />
150 Ø<br />
400 m<br />
100 Ø<br />
300 m<br />
80 Ø<br />
300 m<br />
100 Ø<br />
100 Ø<br />
625 m<br />
80 Ø<br />
200 m<br />
150 Ø<br />
300 m<br />
80 Ø<br />
300 m<br />
100 Ø<br />
300m<br />
100 Ø<br />
200 m<br />
150 M<br />
100 Ø<br />
80 Ø<br />
600 m<br />
100 Ø<br />
350 m<br />
100 Ø<br />
950 m<br />
500 m<br />
80 Ø<br />
250 m<br />
100 Ø<br />
300 m<br />
100 Ø<br />
100 m<br />
100 Ø<br />
150 m<br />
100 Ø<br />
230 m<br />
150Ø<br />
VILLAGE ROAD<br />
D H A I Y A<br />
LINK TO G. T. ROAD.<br />
B A R W A<br />
C . M. R . I.<br />
MOUNT<br />
CARMEL<br />
100 Ø<br />
100 m.<br />
150 Ø<br />
125 m.<br />
53<br />
52<br />
51<br />
49<br />
50<br />
45<br />
N<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 59<br />
DHANBAD MUNICIPAL CORPORATION<br />
INFRASTRUCTURE DEVELOPMENT<br />
CORPORATION LIMITED<br />
FIGURE NO:<br />
100Ø<br />
600 m<br />
230 m<br />
100Ø<br />
K A R W A
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
The existing diameter of distribution network provided by the MADA in coal mining area<br />
various from 900 mm diameter to 75 mm diameter. The total length of distribution network<br />
provided by MADA is 104.56 km and age of the pipe varies from 27 years to 81 years. The<br />
existing distribution system is pretty old and suffers from leakages etc. thus reducing its<br />
carrying capacity. The existing distribution network need complete overhauling by replacing<br />
old defunct and inadequate piping system by proper distribution network. The existing<br />
distribution network is inadequate in its capacity and improper. The main problem with the<br />
existing water supply system is non-uniform supply in different areas. Many of the areas are<br />
either having scanty or no water supply at all. Many new colonies and areas adjoining to the<br />
<strong>Dhanbad</strong> town have been developed without having piped water supply system.<br />
PHED has 21.85 km length of distribution network within the <strong>Dhanbad</strong> <strong>Municipal</strong><br />
<strong>Corporation</strong> Jurisdiction. PHED also distributing water to erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong> area,<br />
Rohrabadh, Baliapur, Chatti Gobinpur, Kola Kushma and Munidi. The Table 35 presents the<br />
details of distribution network by type, diameter, length and age.<br />
Table 35: Type wise Distribution Network Details<br />
Distribution Main Details Pipe Material Pipe Length Age<br />
Mm dia. KM Year<br />
MADA<br />
900/750 C.I 2.43 33<br />
600 C.I 14.41 33<br />
525 C.I 9.14 81<br />
450 C.I 4.06 27&81<br />
400 C.I 7.76 27<br />
375 C.I 4.51 27<br />
350 C.I 1.31 27<br />
300 C.I 11.51 27<br />
250 C.I 6.32 27<br />
225 C.I 2.16 27<br />
200 C.I 8.96 27<br />
175 C.I 11.33 27<br />
150 C.I 6.93 27<br />
125 C.I 10.78 27<br />
75 C.I 2.95 27<br />
Sub Total 104.56<br />
PHED<br />
200 CI 1.635<br />
150 CI/AC/PVC 3.150<br />
100 CI/PVC/HDPE 13.010<br />
80 CI 1.087<br />
80 PVC 2.465<br />
75 PVC 0.500<br />
Sub Total 21.847<br />
Grand Total 126.41<br />
Source: MADA and PHED.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 60
CITY DEVELOPMENT PLAN<br />
DHANBAD<br />
DHANBAD MUNICIPAL CORPORATION<br />
WATER SUPPLY NETWORK<br />
BAHARAT FIRE BRICKS<br />
LEGEND<br />
PIPE LINE<br />
RIVER / JORIA<br />
RAILWAY LINE<br />
MAJOR ROADS<br />
TOWER & RESERVOIR<br />
SHOW THUS<br />
BAZAR<br />
2"Ø<br />
650'0"<br />
SURATAND<br />
MORE<br />
ROAD<br />
TO PATHERDIH<br />
JEENAGORA SIDINGY<br />
City Development Plan, <strong>Dhanbad</strong> Final Report<br />
Figure 21: Erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity Water Supply Mains<br />
JEENAGORA<br />
DESPANSARY<br />
TO JAIRAMPUR<br />
JAIRAMPUR MORE<br />
TO CHANDKUAN<br />
HOSPITAL<br />
GOLOKDIH OPEN<br />
CAST PROJECT WORK<br />
TO LODNA BAZAR JAIRAMPUR WATER TANK<br />
LODNA BAZAR<br />
SINDRI ROAD<br />
SHAMSHIR NAGAR ROAD<br />
TO BALIAPUR<br />
SHOP<br />
GOLAKDIH<br />
OPEN CAST PROJECT<br />
To Kujama Coliery<br />
JARIA (R.5)<br />
To Patherdih<br />
TO DOBARI<br />
TO BARH COLIERY<br />
NAYAKANALI HALT<br />
BALUHA ROAD<br />
FATEHPUR<br />
NAIDUNIA ROAD<br />
DESHBANDHU<br />
CINEMA HALL<br />
FATEHPUR ROAD<br />
BATA MORE<br />
EKKA STAND<br />
BUS<br />
STAND<br />
PUNCHADEV<br />
MANDIR<br />
TO PANI TANKI<br />
KELA PATTI<br />
DHANSAR<br />
MANDIR<br />
TO DHANBAD<br />
4"Ø<br />
430<br />
TO SINDRI ROAD<br />
AGARSEI<br />
BHAWAN<br />
DARAMSHALA ROAD<br />
LAL<br />
DHANSAR RLY. OVER BRIDGE<br />
BHAWAN<br />
ANAND<br />
M A N B A D<br />
M.A.D.A<br />
OFFICE<br />
UPPER<br />
KULI<br />
UPPER KULI<br />
TELEPHONE<br />
EXCHANGE<br />
PARK<br />
CHILDREN<br />
APPALO<br />
CHOWK<br />
NICHE KULI<br />
M A N B A D<br />
THANA<br />
MORE<br />
JHARIA<br />
THANA<br />
VIHAR CINEMA<br />
BANDH<br />
RANI<br />
TO BATA MORE<br />
RAJA<br />
TALAB<br />
MORE<br />
LAXMANIA<br />
K<br />
8' WIDE<br />
LANE<br />
Q I R I B A N D H<br />
D.B OFFICE<br />
ROAD<br />
RAJBARI<br />
KATRAS<br />
MORE<br />
SATH<br />
MORE<br />
TO ENA PROJECT<br />
PHULARITAND ROAD<br />
SINDRI ROAD<br />
CHOUTHAIKULI ROAD<br />
KHAS COLLIERY JHARIA<br />
TO HUSSANABAD<br />
BANIAHIR No. 10<br />
TO BANK MORE<br />
MANJHLI BASTI<br />
TO GODHAR RESERVOIR<br />
INDUSTRY COLIERY<br />
Fly Over Bridge<br />
HARIMANDIR<br />
SIMLA BAHAL BASTI<br />
TO KARKEND<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 61<br />
TOPCHANCHI LAKE<br />
SHOWN THUS<br />
N<br />
DHANBAD MUNICIPAL CORPORATION<br />
INFRASTRUCTURE DEVELOPMENT<br />
CORPORATION LIMITED<br />
FIGURE NO:<br />
TOPCHANCHI LAKE<br />
TILATAND RESERVOIR<br />
CAP- 311.5 LAKH GALLONS.<br />
GODHARRESERVOIR<br />
CAP. 40 LAKH GALLONS.<br />
PUTKI SUMP<br />
CAP- 3.0 LAKH<br />
DAMODAR HEAD WORKS<br />
I.M.G.D PLANT<br />
CONMSTRUCTED - 1960<br />
DAMODAR HEAD WORKS<br />
I.M.G.D PLANT<br />
CONMSTRUCTED - 1990<br />
INTAKE WELL<br />
INTAKE WELL
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Following table presents the details of storage reservoirs owned by MADA. There are five<br />
ground level service reservoirs and six elevated reservoirs with a total capacity of 32.63 MLD.<br />
The details of pumping capacity and pumping hours are also detailed out in the table.<br />
Table 36: Storage Reservoir wise pumping capacity and Type<br />
Water Supply<br />
Zone<br />
Pumpin<br />
g Hours<br />
Pumping Capacity Ground Level Service<br />
Reservoir (GLSR)<br />
Elevated Storage<br />
Reservoir (OHT)<br />
Hrs HP No Nos. ML Nos. ML<br />
Jharia 20 120 & 175 2 & 1 1 6.3 1 2.250<br />
Patherdeh - - - - 1 0.225<br />
Putkee 20 200 & 175 1 & 1 1 1.35 1 0.225<br />
Kirkend 8 55 1 - 0 1 0.450<br />
Godhar Gravity - 1 1.35 1 0.450<br />
Kusunda 10 175, 200 & 1, 1 1 1.35 - -<br />
60 &1<br />
Tilatand Gravity - 1 18.00 - -<br />
Chaitudih<br />
3 150 1 - - 1 0.675<br />
(Katras)<br />
Total 5 28.35 6 4.28<br />
Source: MADA.<br />
4. Water Supply - SWOT Analysis<br />
SWOT analysis has been undertaken to assess on the negative and positive aspects of the<br />
present Water Supply System of <strong>Dhanbad</strong>. It involves analyzing the internal positive<br />
(strengths) and negative (weakness) aspects of an organization and considering these in<br />
relation to aspects of the external environment – both the positive aspects (or opportunities)<br />
and negative aspects (or threats). The Table 37 gives the details of the SWOT analysis.<br />
Table 37: Water Supply – SWOT Analysis<br />
Strength<br />
Damodar river is a perennial source for the city <strong>Dhanbad</strong> is a commercial<br />
capital of Jharkhand; and<br />
MADA meets the BCCL’s water requirements for their collieries, through<br />
which it fetches maximum revenue.<br />
Weakness<br />
Low pressure in supply is developed in some part of city owing to the old pipe<br />
line/worn-out network and to cater the increasing population demand;<br />
Inadequate house service coverage;<br />
Inadequate distribution network coverage;<br />
Many parts of the corporation area does not have potable piped water supply<br />
system;<br />
Water supply asset creation and maintenance are being carried out by three<br />
different departments which leads to lack of coordination and clash of<br />
responsibilities;<br />
Ground water pollution by industrial effluents; and<br />
Lack of awareness in people to use water efficiently.<br />
Opportunities<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 62
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
<br />
<br />
<br />
<br />
<br />
Threats<br />
<br />
Use of UCPs as water lakes to store water as well as to develop tourism;<br />
New scheme will cater to the needs of domestic and industries;<br />
Financial assistance will help in asset creation and to cater the needs of public;<br />
Private Sector Participation in service delivery; and<br />
Open cast mines can be used as storage thanks.<br />
Lack of interest in getting house service connection and willingness to pay for<br />
the same.<br />
5. Performance Indicators and Key Issues<br />
The performance indicators and key issues have been identified based on the information<br />
collected and field visits and the same is presented in this section. Key performance indicators<br />
are used to assess service adequacy of <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong>. Table 38 exhibits the<br />
performance indicators of <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> in water supply system and<br />
subsequently the key issues have been presented.<br />
Table 38: Performance Indicator - Water Supply<br />
Description Units Present Status Norms<br />
Installed Capacity MLD 143.40 -<br />
Gross Percapita Supply Lpcd 66 150<br />
Population Covered Percent 30 100<br />
Properties covered by house service Percent 15-20 90<br />
connections<br />
Road Coverage by Distribution Percent 13 95<br />
Network – DMC area<br />
Total Storage Capacity to Supply Percent 49 33<br />
Treatment Capacity to Supply Percent 158 100<br />
Frequency of Supply Daily Daily<br />
Duration of Supply Hrs 2 2<br />
Source: Analysis.<br />
(i.)<br />
(ii.)<br />
Low Supply Levels. Low per Capita supply is noticed; the situation becomes worse in<br />
Summer Season with Per Capita Supply coming to as low as 40 - 50 lpcd. The present<br />
gross percapita supply is 74 in Urban Agglomeration areas and 66 lpcd in entire DMC<br />
area. The frequency of supply in the city is daily in normal season, which deteriorates to<br />
once in three or seven days in Summer Season.<br />
Age old Distribution Network System. The existing distribution system is pretty old<br />
and suffers from leakages etc. thus reducing its carrying capacity. The existing distribution<br />
network need complete overhauling by replacing old defunct and inadequate piping<br />
system by proper distribution network. The existing distribution network is inadequate in<br />
its capacity and improper. The main problem with the existing water supply system is<br />
non-uniform supply in different areas. The system needs a comprehensive rehabilitation<br />
measure based on detail study.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 63
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
(iii.) Inadequate and age old Treatment<br />
Capacity/ Plant. However, the present<br />
treatment capacity is surplus, in respect of<br />
increasing demand in the future, the treatment<br />
capacity needs augmentation. The existing<br />
treatment plants are very which needs<br />
rehabilitation works.<br />
(iv.)<br />
(v.)<br />
Inadequate Service Coverage. Only 30 percent of the population is served with<br />
protected piped water supply system. Also only 15-20 percent of the PT Assessment is<br />
provided with House Service Connections. Besides, demand for water supply has not<br />
taken into account the requirements of water supply to the peripheral areas.<br />
Inadequate Network Coverage. Distribution<br />
network runs approximately 21 percent of the<br />
road length in Urban Agglomeration areas while<br />
for entire DMC distribution network reach is<br />
only 13 percent. Considering the high<br />
population density within the <strong>Municipal</strong><br />
<strong>Corporation</strong> jurisdiction, the network adequacy<br />
demand, as a percent of road length, is high.<br />
(vi.)<br />
(vii.)<br />
(viii.)<br />
(ix.)<br />
(x.)<br />
Inadequate Summer Storage. The pattern of rainfall is erratic. There is no scope for<br />
storing rainwater for recharging, as most of the water bodies are encroached, silted and<br />
used as sewerage outlets.<br />
Need for Source Augmentation. The present source of water is not adequate to meet<br />
out the requirements of the people, and augmentation is required to meet future<br />
requirements.<br />
Desilting of Topchanchi Lake. Topchanchi Lake is the first water supply source for the<br />
city, desilting of Topchanchi Lake is must for the city meet the water demand.<br />
Need for Asset Management Action Plan. It is required to maintain an O & M<br />
Schedule, for Water Supply Assets, for regular maintenance and energy consumption<br />
optimization.<br />
System (Transmission & Distribution) Losses<br />
and Unaccounted for Water. The gross<br />
average supply in the DMC area is 66 lpcd and<br />
in Urban Agglomeration area is 74 lpcd. It is<br />
estimated that transmission and distribution<br />
losses account for 20- 30 percent of the total<br />
supply. Studies are needed to be carried out to<br />
block the amount of Unaccounted for Water<br />
(UFW).<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 64
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
(xi.)<br />
Leakage and contamination of water at household connections apart from low<br />
Pressure in Water Supply. Though rehabilitation of the old pipe lines has been taken up<br />
during the past five years, the problem of low pressure in water supply persists due to the<br />
usage and existence of aged network especially in old city. Increasing population has also<br />
added to the already existing woes. Apart from this the usage of GI pipes for household<br />
connections is leading to leakage and contamination of water in several areas of the<br />
corporation increasing the maintenance costs.<br />
B. Sewerage and Sanitation<br />
1. Overview<br />
<strong>Municipal</strong> <strong>Corporation</strong> does not have sewerage system to dispose sewage generated with from<br />
the city. <strong>Municipal</strong> <strong>Corporation</strong> has 38,000 individual septic tanks, which serves as one of the<br />
major means of safe disposal of human waste. The septic tanks serve about 20 percent of<br />
Urban Agglomeration population (since in most of the villages doesn’t have septic tank<br />
facilities urban agglomeration population were considered for comparison). In addition, the<br />
<strong>Corporation</strong> has provided about 1,025 low cost sanitation units, which serves less than one<br />
percent of the total population. Overall, about 21 percent of Urban Agglomeration<br />
population has safe disposal facilities and the remaining either opt for community toilets or<br />
go for open defecation, which is an area of major concern as the coverage of safe disposal<br />
facilities is very low.<br />
2. Sewerage & Sanitation - SOWT Analysis<br />
SWOT analysis has been undertaken to assess on the negative and positive aspects of the<br />
present Sewerage and Sanitation System of <strong>Dhanbad</strong>. It involves analyzing the internal<br />
positive (strengths) and negative (weakness) aspects of an organization and considering these<br />
in relation to aspects of the external environment – both the positive aspects (or<br />
opportunities) and negative aspects (or threats). The Table 39 gives the details of the SWOT<br />
analysis.<br />
Table 39: Sewerage and Sanitation – SWOT Analysis<br />
Strength<br />
Weakness<br />
Absence of under ground drainage system;<br />
Septic tank is the major mode of disposal which may leads to shallow ground<br />
water pollution;<br />
Inadequate Public convenience facilities; and<br />
Unhygienic dry latrines and open defecation.<br />
Opportunities<br />
Reuse of treated waste water for irrigation purpose;<br />
Private sector can monitor the sewerage/effluent treatment;<br />
Financial resource generation from sewage (e.g. selling of sludge to farmers);<br />
and<br />
To create civic sense among the citizen’s of <strong>Dhanbad</strong>.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 65
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Threats<br />
<br />
<br />
Environmental degradation; and<br />
Topography of the corporation does not permit single treatment plant, and<br />
hence multiple treatment plants have to be developed to cover the entire area.<br />
This leads to high capital cost for the creation the same.<br />
3. Performance Indicators and Key Issues<br />
The performance indicators and key issues have been identified based on the information<br />
collected and field visits and the same is presented in this section. Key performance indicators<br />
are used to assess service adequacy of <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong>. Table 40 exhibits the<br />
performance indicators of <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> in Sewerage and Sanitation<br />
system and subsequently the key issues have been presented.<br />
Table 40: Performance Indicator – Sewerage & Sanitation<br />
Description Units Present Status<br />
UGD System<br />
Absent<br />
Households to Septic Tanks – UA Percent 20<br />
Households to Septic Tanks – DMC area Percent 1.43<br />
Source: Analysis.<br />
(i.)<br />
(ii.)<br />
(iii.)<br />
Absence of Safe Disposal System. In addition to the dearth in sanitary units, sullage and<br />
night soil is disposed into roadside/storm water drains. The problem needs immediate<br />
attention as it pollutes the watercourses (storm water drains lead sullage/wastewater to<br />
the natural drain/stream).<br />
Dearth of Safe Sanitation Facilities. Only 21 percent of residential properties are<br />
served with sanitation facilities in Urban Agglomeration area, whereas in DMC area only<br />
1.43 percent properties have access to safe sanitation facilities. With rapid population<br />
growth, it is important that the DMC should provide for a comprehensive sewerage<br />
system.<br />
Inadequate and Ill-maintained Public Sanitation. There is a high dependency by<br />
slum population on public conveniences, the seat per person is limited and most slum<br />
dwellers resort to open defecation; public awareness regarding safe sanitation is very poor.<br />
C. Storm Water Drainage and Primary Drainage<br />
1. Overview<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> does not have an effective network of storm water drains to<br />
dispose waste water generated in the city. The total length of drains in the <strong>Dhanbad</strong><br />
<strong>Municipal</strong> <strong>Corporation</strong> jurisdiction is about 581.62 km, which covers about 41.09 of the total<br />
road network in the <strong>Corporation</strong> area. In the absence of closed drainage system in the city,<br />
silting and uncontrolled solid waste dumping causes blockages and stagnation of waste water<br />
flow. The drainage system in the city carries the wastewater as well as storm water from the<br />
entire municipal corporation area and finally discharges into nallahs. The following table<br />
provides further details regarding the type of storm water drains in the city.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 66
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Table 41: Details of Road side Storm Water Drains<br />
Description Length Proportion<br />
Pucca Open Drains 260.94 44.86<br />
Kutcha Open Drains 195.29 33.58<br />
Pucca Closed Drains 125.39 21.56<br />
Total 581.62 100.00<br />
Source: Analysis.<br />
Topography. <strong>Dhanbad</strong> city is situated on lower steps of Chota Nagpur Plateau. The<br />
maximum ground elevation is 750 above Men Sea Level (MSL). The overall ground slope is<br />
gradual and from south to north.<br />
2. Natural/Primary Drainage System<br />
Since the <strong>Dhanbad</strong> doesn’t have sewerage and storm<br />
water drainage system, the waste water generated<br />
with in the city are being collected from various<br />
primary nallahs which are passing with in the<br />
<strong>Corporation</strong> jurisdiction. The major natural drainage<br />
channels which are carrying waste water from the<br />
city are Matkuria Nallah, Kantra Nallah (Jharia<br />
Nallah), Manitind Nallah, Katri Nadhi, Jamunia<br />
Nadi and Kodhiya Nadhi. Matkuria Nallah is the<br />
longest nallah among the all nallahs in the city, the<br />
total length primary drainage system in the city is approximately 75 km. Finally, the waste<br />
water collected from all these nallash is disposing it to Damodar River.<br />
The total rain fall in <strong>Dhanbad</strong> is varies from 800 mm to 1,300 mm per annum and the average<br />
no of rainy days in a year is about 55 days. Rainy months are June, July, August and<br />
September.<br />
3. Performance Indicators and Key Issues<br />
The performance indicators and key issues have been identified based on the information<br />
collected and field visits and the same is presented in this section. Key performance indicators<br />
are used to assess service adequacy of <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong>. Table 42 exhibits the<br />
performance indicators of <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> in Storm Water Drainage system<br />
and subsequently the key issues have been presented.<br />
Table 42: Performance Indicators - Road side Storm Water Drains<br />
Description Units Present Status Norms<br />
Pucca Drains Percent 42 -<br />
Total Drains to Road Length Percent 63 150<br />
Source: Analysis.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 67
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
(i.)<br />
(ii.)<br />
Inadequate Closed Drainage System. Owing to the<br />
inadequate closed drainage system in the <strong>Municipal</strong><br />
<strong>Corporation</strong> area leads to overflow of waste water during<br />
the rainy season.<br />
Disposal of Domestic Sewage. In the absence of a<br />
sewerage system covering the entire <strong>Municipal</strong><br />
<strong>Corporation</strong> area and inadequate sanitation facilities, a<br />
large amount of the domestic sewage is let into storm<br />
water drains. This is resulting in pollution of the public<br />
water bodies such as river and nallahs /canals, as the<br />
waste runoff leads to these watercourses.<br />
(iii.)<br />
Inadequate Coverage. Only 41 percent roads<br />
have built up drains. Unhygienic conditions<br />
prevail in areas, which do not have surface<br />
drains.<br />
(iv.)<br />
Absence of Comprehensive Storm Water<br />
Drainage System. Owing to the absence of<br />
continues waste water carrying system leads to<br />
unhealthy environment. Most of the drainage<br />
network in the city does not design to carry the<br />
entire storm water as well as waste water<br />
generated in the city.<br />
(v.)<br />
Silting and Solid Waste Accumulation. Silting and uncontrolled solid waste dumping<br />
cause blockage and stagnate storm water/wastewater runoff. Consequently, storm water<br />
drains and primary channels like, nallahs choke and may overflow into neighboring areas.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 68
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
D. Preservation / Rejuvenation of Water Bodies<br />
1. Overview<br />
In <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> jurisdiction<br />
more than 125 small, medium and large ponds/lakes<br />
are there, which are spared out in different parts of<br />
the city. The total area of the water bodies are to<br />
tune of 342.63 acres. Summary of block wise area<br />
under water are presented in Table 43. Some of the<br />
important water bodies are Bekar Bandh, Rejili<br />
Bandh, Raja Talab, Rohra Pond, Chota Pichiri<br />
Talab, Suranga Bandh, Baghmara Talab and Ranguni<br />
Bandh. Bekar Bandh and Rejili Bandh both are<br />
maintained by district Zila Parisad and all other water bodies are maintained by the<br />
Government of Jharkhand Fisheries Department.<br />
Table 43: Block wise area of the Water Bodies<br />
Description<br />
Area (acres)<br />
Water Bodies in <strong>Dhanbad</strong> Block 87.87<br />
Water Bodies in Jharia Block 56.44<br />
Water Bodies in Baliapur Block 128.04<br />
Water Bodies in Gobindpur Block 29.73<br />
Water Bodies in Baghmara Block 40.55<br />
Grand Total 342.63<br />
2. Key Issues<br />
(i.)<br />
Low level of Utilization of Water Bodies.<br />
More than 125 water bodies available with in<br />
<strong>Municipal</strong> <strong>Corporation</strong> jurisdiction, which are<br />
not utilized in a productive manner. Presently,<br />
the water bodies are in dilapidated condition and<br />
are only being used for recharge purpose.<br />
Misuse of Water Bodies is also noticed in terms<br />
of uncontrolled solid waste dumping in some<br />
places.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 69
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
(ii.)<br />
(iii.)<br />
(iv.)<br />
Pollution of Water Bodies. Chemical waste from industries and domestic sewers flows<br />
directly in to ponds/lakes which lead to polluting the water bodies in the city.<br />
Lack of Institutional set. Due to the lack of<br />
institutional framework and funds to maintain<br />
the water bodies.<br />
Encroachments on Lake/ponds. In the<br />
absence of proper fencing/compound wall<br />
around water bodies, most of the lakes/ponds<br />
are encroached by the inhabitant<br />
E. Solid Waste Management<br />
1. Overview<br />
As per the definition provided by the <strong>Municipal</strong> Solid Waste (Management and Handling)<br />
Rules, 2000 of Government of India, municipal solid waste (MSW) includes commercial and<br />
residential wastes generated in municipal or notified areas in either solid or semi-solid form<br />
excluding industrial hazardous wastes but including treated bio-medical wastes. The present<br />
section elucidates the status of municipal solid waste management in <strong>Dhanbad</strong> <strong>Municipal</strong><br />
<strong>Corporation</strong>. The collection, transportation and disposal of municipal solid waste, is an<br />
obligatory function of the <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> (DMC). However, the <strong>Dhanbad</strong><br />
<strong>Municipal</strong> <strong>Corporation</strong> is recently formed by including erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity,<br />
Sindri NAC, Jharia NAC, Gobindpur NAC, Katras NACs, Chhatatand NAC, 27 census<br />
towns and 158 villages in blocks like <strong>Dhanbad</strong>, Baliapur, Jharia, Baghmara and Gobindpur<br />
part in <strong>Dhanbad</strong> district. Currently erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity, Sindri Notified Area<br />
Committee and MADA are responsible for the municipal waste collection and transportation.<br />
The municipal solid waste mainly comprises waste from households, markets, commercial<br />
establishments, hotels, hospitals and industries in the <strong>Municipal</strong> <strong>Corporation</strong>. The health<br />
department of the MADA, headed by Chief Medical Officer (CMO), is responsible for the<br />
solid waste management of the Mineral Areas excluding <strong>Dhanbad</strong> <strong>Municipal</strong>ity and Sindri<br />
NAC. For the efficient administration and for day-to-day operational purposes, the <strong>Dhanbad</strong><br />
<strong>Municipal</strong> <strong>Corporation</strong> (excluding areas of Sindri and <strong>Dhanbad</strong>) is divided into eight sanitary<br />
zones covering entire <strong>Corporation</strong> area.<br />
Solid Waste Generation<br />
The major waste generating sources are households and other bulk waste generation sources<br />
such as markets, hotels, restaurants, shops and function halls. The other waste generating<br />
sources include hospital and health institutions that generate hazardous biomedical waste.<br />
There is no quantification of waste generated in the <strong>Municipal</strong> <strong>Corporation</strong>. The estimates of<br />
the erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity, Sindri NAC and MADA indicated that around 440 tons<br />
of waste is generated every day in the <strong>Municipal</strong> <strong>Corporation</strong> jurisdiction and the responsible<br />
agencies are collecting about 165 tons (about 37 percent of the total waste generated) through<br />
its solid waste collection system. Since, there is no estimates are available with the DMC, the<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 70
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
per capita waste generation from the DMC is assumed as 300 gm per capita per day as per<br />
CPHEEO norms. Table 44 presents the total waste generated in <strong>Municipal</strong> <strong>Corporation</strong> area.<br />
Table 44: Source wise Distribution of waste Generated<br />
Description Quantity Proportion<br />
MT/Day<br />
Percentage<br />
Domestic Waste 286 65<br />
Commercial and Hotel Waste 110 25<br />
Market Waste 44 10<br />
Waste Generated 440 100.00<br />
Waste Collected 165 37.50<br />
Source: Discussion with officials.<br />
Household Waste: In <strong>Dhanbad</strong>, major source of waste generation, as in any typical Indian<br />
city, has been the household. The quantum of waste generated from households is about 286<br />
tons per day, which is 65 percent of the total waste generated in the city. The household waste<br />
mainly consists of organic waste such as vegetable waste, food etc. Significant quantities of<br />
paper and plastic are also present in the waste.<br />
Commercial and Hotel Waste: Owing to the large number of commercial establishments<br />
like hotels and restaurants, <strong>Dhanbad</strong> generates about 110 tons of solid waste every day. The<br />
city also houses number of small and medium size hotels to cater to the needs of floating<br />
population. Being the industrial, commercial and trade centre in the region, wholesale and<br />
retail trade activities are dominant, these however, are confined to certain parts of the city.<br />
The total commercial and hotel waste thus constitutes about 25 percent of the total waste<br />
generated in the city.<br />
Market Waste: <strong>Dhanbad</strong> city has no of wholesale vegetable markets and retail markets in the<br />
<strong>Corporation</strong> area which generally cater to the daily needs of residence of <strong>Dhanbad</strong>. The total<br />
waste generated from these markets is about 44 tons per day constituting 10 percent of the<br />
total waste. The waste is mainly organic in nature.<br />
Biomedical Waste: <strong>Dhanbad</strong>, being the district head quarter and important centre in this<br />
region, there are a total of more than 3,000 beds available with in the <strong>Municipal</strong> <strong>Corporation</strong><br />
area. However, many of these are first aid centres and clinics. As there are no scientific<br />
biomedical waste disposal facilities in the city, many a times hazardous and infectious<br />
biomedical waste is also mixed with the municipal solid waste and some times it is burnt by<br />
the hospital authorities.<br />
Other Sources. The other sources of waste generation in the city are construction activities,<br />
marriage and function halls, and the floating population. Another important issue with regard<br />
to the solid waste generation in <strong>Dhanbad</strong> is that though the quantity of waste generated from<br />
street sweeping and drain desilting activities is significant, there was no estimate available on<br />
total quantity of waste generation. However, the discussion with local authority reveals that<br />
this waste is added into the categories such as households, commercial and construction<br />
waste.<br />
Composition of Waste: Owing to absence of waste characterization study conducted by local<br />
authority, through the discussion it was understood that organic waste is about 45 percent of<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 71
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
the total waste generated it the city. The remaining waste mainly paper, plastics agricultural<br />
dry wastes, construction waste and waste from street sweepings and drain desiltings are<br />
mainly inorganic.<br />
Waste Collection<br />
Primary Collection: At present, in <strong>Dhanbad</strong><br />
doesn’t have any primary collection system. The<br />
individual households dispose their waste in the<br />
street dustbins by their own means. Local<br />
authorities have provided 210 bins at various<br />
locations with in the <strong>Municipal</strong> <strong>Corporation</strong> limit. In<br />
addition, there are around 50 open points all over<br />
the <strong>Corporation</strong> area. Dustbins are provided mainly<br />
on major roads and important localities in the city.<br />
In majority of areas, there are no dustbins and<br />
people dump their waste at a point in the vicinity from where the local authority collects the<br />
waste.<br />
The reconnaissance survey conducted in the city and discussion with the local authorities<br />
reveals that many of the households, shops and commercial establishments throw the waste<br />
on to the streets, drains and open spaces within the locality creating unhygienic conditions.<br />
Further, the waste thrown into the open drains leads to choking and consequently the<br />
wastewater flows on the streets rather than in drains and forms wastewater pools at some<br />
places.<br />
Due to insufficient number and capacity of bins solid waste often spills over on the ground.<br />
Further, due to lack of maintenance, many bins are not in usable condition making the<br />
situation worse. The average distance between dustbins varies from 1,500 m to as high as<br />
2,000 m in some localities.<br />
Street Sweeping: One of the major activities in the solid waste management is the street<br />
sweeping activity, which is time consuming, and labour intensive. In addition to street<br />
sweeping, due to the open drain system of waste water collection, drain desilting is also<br />
essential. Local authorities carry out street sweeping and drain desilting in all sanitary circles<br />
covering all wards. The total road length in the city is 940 Km, of which around 100 Km are<br />
high density roads, around 250 Km are medium and balance are low density roads.<br />
Due to lack of sufficient manpower with the local authorities, frequency of the street<br />
sweeping and desilting activities is not uniform all over the <strong>Municipal</strong> <strong>Corporation</strong><br />
jurisdiction. Depending on the locality and necessity, street sweeping is taken up on priority<br />
basis. In all, only 25-30 percent of the streets are swept daily. The street sweeping frequency<br />
of other roads ranges from weekly once to monthly once. Further, some of the streets are<br />
cleaned occasionally. In addition, local authorities also takes up drain desilting works based on<br />
the necessity. Total length of pucca drains in <strong>Dhanbad</strong> is about 386 Km.<br />
Four hundred and ninety sanitary working are engaged in street sweeping and as well as drain<br />
desilting operations in <strong>Dhanbad</strong>. Sweepers use long handle brooms for sweeping and make<br />
heaps at regular intervals along the streets. The street sweeping waste is collected and<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 72
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
transported to the nearest community dustbins.<br />
Secondary Collection. The secondary collection refers to collection of waste from<br />
community dustbins and intermediate collection points or transit points. However, in<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> area, there are no intermediate collection or transit points<br />
and the waste is directly transported to the disposal site from dustbins. Waste is collected<br />
from dustbins and open dumping sites in the city and manually loaded into the transportation<br />
vehicles. The local authorities collect from about 210 locations including 100 open collection<br />
points.<br />
Frequency of Collection: The frequency of waste collection from the dust bins and other<br />
dumping points in the <strong>Municipal</strong> <strong>Corporation</strong> area varies from weekly once to monthly once,<br />
depending on the quantity of waste accumulation and the locality. The waste from prime<br />
residential locations, commercial areas, public places like markets, bus stand etc is collected<br />
regularly.<br />
Transportation of Wastes<br />
In <strong>Dhanbad</strong>, solid waste transportation is being carried out using open vehicles. The local<br />
authorities have a total of 38 vehicles for solid waste transportation excluding handcarts, of<br />
which, 17 tractors, 15 tipper, 5 loaders / excavators and 129 handcarts/wheel borrows. The<br />
total carrying capacity of all transportation vehicles work out of 165.40 tons per day. The total<br />
carrying capacity of transportation vehicles in <strong>Dhanbad</strong> is worked out by multiplying by no of<br />
vehicles, no of trips made per day, rated capacity and bulk density of 0.40 kg per cu.m. Based<br />
on the information available from local authorities and discussions with the local officials on<br />
an average tractors make 6 trips per day and mini lorry makes 2 trips per day.<br />
It is observed that vehicles used in the areas of high waste generation undertake more number<br />
of trips. It is mainly because of reduction in loading time. Vehicle repairs also reduce the total<br />
number of trips performed per day. The total waste transported per day is about 165.40 tons.<br />
The following table illustrates the details of solid waste transportation vehicles used in<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> jurisdiction.<br />
Table 45: Solid Waste Transportation Vehicle Details<br />
Description Nos Capacity Trip/Day Total carrying<br />
Capacity<br />
Tons Nos Tons/Day<br />
Mini Lorry 1 2.50 2 2.00<br />
Tractors 17 2.00 6 81.60<br />
Tippers 15 2.00 4 48.00<br />
Loaders/excavator 5 2.00 2 8.00<br />
Hand Carts/Wheel 129 0.05 10 25.80<br />
Borrows<br />
Total 167 8.55 24 165.40<br />
Disposal of Solid Waste<br />
Currently, <strong>Dhanbad</strong> does not practicing any scientific method of solid waste disposal. The<br />
waste collected from various localities in the <strong>Municipal</strong> <strong>Corporation</strong> is directly disposed off by<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 73
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
open dumping on the low-lying area in the city. Solid wastes generated from all sanitary circles<br />
are disposed off at different localities.<br />
Institutional Arrangements<br />
As detailed out in the earlier segment, municipal solid waste management is an obligatory<br />
function of the local body. MADA’s public health department, headed by Chief Medical<br />
Officer (CMO), is responsible for the solid waste management in the Mining Area. The CMO<br />
is supported by one Medical Officer for sanitation and 16 Sanitary Inspector to manage 16<br />
circles within the mining area. Sanitary Inspectors are responsible for street sweeping, drain<br />
desilting, collection, transportation and disposal of waste in their sanitary circle.<br />
2. Solid Waste Management - SOWT Analysis<br />
SWOT analysis has been undertaken to assess on the negative and positive aspects of the<br />
present Solid Waste Management System of <strong>Dhanbad</strong>. It involves analyzing the internal<br />
positive (strengths) and negative (weakness) aspects of an organization and considering these<br />
in relation to aspects of the external environment – both the positive aspects (or<br />
opportunities) and negative aspects (or threats). The Table 46 gives the details of the SWOT<br />
analysis.<br />
Table 46: Solid Waste Management – SWOT Analysis<br />
Strength<br />
Weakness<br />
Inadequate dust bins;<br />
Non- civic practice of throwing garbage on public places and roads;<br />
Absence of door to door primary collection;<br />
Existing system of loading the waste in open transport vehicle;<br />
Lack of an effective technology for scientific disposal of bio-medical waste;<br />
Inadequate secondary collection vehicles; and<br />
Lack of scientific disposal system.<br />
Opportunities<br />
To improve the system of primary collection of solid ;<br />
To device more efficient system of day to day cleaning of street and public<br />
places;<br />
To devise innovative scientific method to curb incidences of public nuisance;<br />
To modernize secondary storage system;<br />
To have an efficient systematic method of segregating solid waste at source;<br />
To develop scientific landfill and compost for disposal arrangements; and<br />
Solid Waste to energy.<br />
Threats<br />
Increasing population of <strong>Dhanbad</strong> will lead to large solid waste; and<br />
Liberal legal framework inhibits stringent purities measure to the offender of<br />
industrial waste.<br />
3. Performance Indicators and Key Issues<br />
The performance indicators and key issues have been identified based on the information<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 74
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
collected and field visits and the same is presented in this section. Key performance indicators<br />
are used to assess service adequacy of <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong>. Table 47 exhibits the<br />
performance indicators of <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> in solid Waste Management and<br />
subsequently the key issues have been presented.<br />
Table 47: Performance Indicators - Solid Waste Management<br />
Description Unit Present<br />
Status<br />
Benchmarks/<br />
Norms<br />
Percapita Waste Generation Grams/Day 300<br />
Waste Collection Performance Percent 37 100<br />
Spacing Between Dustbins M 1,500 – 2,000 100<br />
Road Length /Conservancy Staff M 1,900 400 - 600<br />
Conservancy staff /1,000 Population Nos 0.40 3<br />
Source: Analysis.<br />
(i)<br />
Dearth of Effective Primary Collection Mechanism: The absence of door-todoor<br />
waste collection system in the <strong>Municipal</strong> <strong>Corporation</strong> area is leading to<br />
unhygienic conditions in the city. The practice of throwing waste onto the streets is<br />
exaggerating the problem. Segregation of waste is not practiced in the city.<br />
(ii) Inadequate Number of Dustbins:<br />
Average spacing of dustbins is around<br />
1,500 – 2,000 m, which is much higher than<br />
the specified spacing of 100 m. More than<br />
50 percent of the <strong>Municipal</strong> <strong>Corporation</strong><br />
area is not adequately provided with<br />
dustbins. As specified earlier, there are 210<br />
open temporary storage points in the city<br />
reveals the need for dustbins.<br />
(iii)<br />
(iv)<br />
Irregular Street Sweeping. The frequency of street sweeping varies from week<br />
once to monthly once. Considering the total manpower with local authorities the<br />
actual length of street per sweeper is around 1,900 m. hence, owing to the lack of<br />
manpower only 20-30 percent area is swept daily.<br />
Poor Collection Performance. At present<br />
the collection performance is only about 37<br />
percent. As the analysis reveals around 275<br />
tons of waste is not collected daily. This<br />
creates unhygienic conditions in the city<br />
and some percentage of this residual waste<br />
adds to the accumulation day by day that<br />
forming the heaps of wastes in the town.<br />
Hence, there is a need to increase the<br />
collection performance of the city to keep the <strong>Municipal</strong> <strong>Corporation</strong> clean and<br />
healthy.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 75
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
(v)<br />
(vi)<br />
(vii)<br />
(viii)<br />
Absence of Covered Vehicles for Transportation of Waste. At present waste is<br />
being transported in open vehicles to the<br />
disposal site. The spillage of waste all along<br />
the route and odour from the waste is a<br />
common problem associated with open<br />
transportation of waste in <strong>Dhanbad</strong><br />
<strong>Municipal</strong> <strong>Corporation</strong>. As per the analysis,<br />
the existing fleet strength can transport<br />
only 165.40 tons of waste<br />
Absence of Scientific Disposal of Waste:<br />
Since, there is no safe disposal facility in the city, the waste is being disposed through<br />
open dumping on low-lying areas. The waste is disposed improperly forming heaps<br />
of waste at the site and the waste finds its way onto the roads and surrounding areas<br />
due to blowing wind, making the whole area around the site unhygienic, posing<br />
problem to environment and health of the local people. The effect of odour nuisance<br />
can be seen up to 100 to 200 m around the dumping sites. There is a probability of<br />
ground water contamination due to leaching.<br />
Mixing of Biomedical Waste with <strong>Municipal</strong> Solid Waste. The biomedical waste<br />
is mixed with the other municipal waste and dumped at the disposal sites with out<br />
any treatment. This may create serious health and contamination problems due to<br />
hazardous nature of waste. As per the <strong>Municipal</strong> Solid Waste (Management &<br />
Handling) Rules, 2000 bio medical waste should be treated separately and the same<br />
should not be mixed with municipal solid wastes.<br />
Inadequacy in Manpower. The total available conservancy staff strength with local<br />
authorities is 490 workers. Considering the norm of 3 conservancy staff per 1,000<br />
population, in existing situation, the local authorities have 0.40 conservancy staff per<br />
1,000 population showing inadequate staff strength. Owing to this, the street<br />
sweeping has not been done daily, only 20 -30 percent of the streets are swept daily,<br />
leaving the other areas leading to unhealthy conditions.<br />
(ix)<br />
Occupation Health Hazards. The waste<br />
collection, loading and unloading operations<br />
have been done manually. The sanitary<br />
workers have not provided with any<br />
protective equipment posing heath hazards.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 76
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
F. Roads and Traffic Management<br />
1. Road Sector Overview<br />
<strong>Dhanbad</strong> has good connectivity by road and rail to other parts of the country. Two important<br />
arterial roads namely NH 2 and NH 32 are traversing city. NH 2 connects <strong>Dhanbad</strong> to Delhi,<br />
Agra, Kanpur, Varanasi and Kolkata and NH 32 connects <strong>Dhanbad</strong> to Bokaro and Ranchi.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong>’s role in road sector comprises construction of corporation<br />
roads and maintenance of all corporation roads in its jurisdiction, except roads belonging to<br />
National Highways/Public Works Department and other departments such as Zilla Parisad.<br />
In new extension areas within corporation limits, where the land belongs to the corporation,<br />
the internal roads are developed and maintained by the <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong>. The<br />
corporation is also responsible for implementing Master Plan/CDP proposals with regards to<br />
new major/minor roads and road widening activities.<br />
Development of <strong>Dhanbad</strong> is governed by the Master Plan prepared by the Mineral Area<br />
Development Authority (MADA). However, there are essential issues associated with the<br />
city’s development and in particular the circulation pattern and road networks. The broad<br />
issues comprise a poor network of roads, poor surface condition of existing roads, poor<br />
facilities to pedestrians and vehicles, poor safety management, road surface condition exhibits<br />
distress such as cracks, potholes, undulations, poorly maintained earthen shoulders, and<br />
excess soil/earth on the carriage-way and shoulders.<br />
Following table presents the category wise road length maintained by local body and other<br />
agencies.<br />
Table 48: Category wise Road Length<br />
Surface Type Length Proportion<br />
Km<br />
Percentage<br />
Local Body Roads<br />
Concrete (P.C.C) 298.48 42.22<br />
Black Topped/Bituminous Topped 86.80 12.28<br />
Water Bound Macadam 61.25 8.66<br />
Earthen 192.35 27.21<br />
Others 68.00 9.63<br />
Total Length of Local Body Roads 706.88 100.00<br />
National Highways 85.75<br />
State Highways/ PWD Roads 147.50<br />
Total 940.13<br />
Roads in old areas of the <strong>Municipal</strong> <strong>Corporation</strong> area are narrow and have a width ranging<br />
from around 2 to 6 m including drain. Mostly the surface is concrete / bituminous in nature,<br />
all along. Of the 940.13 km of roads in corporation limit, 75 percent is maintained by local<br />
bodies and the PWD, Rural Roads and National Highways maintain the remaining 233.25 km.<br />
Cement concrete roads constitute about 42 percent of total roads in the <strong>Corporation</strong> limit;<br />
bitumen roads constitute 12.28 percent of total roads maintained by the local body.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 77
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
The density of roads in the <strong>Corporation</strong> is 2.81 km/sq. km. According to the land use plan<br />
for 2011, transportation and circulation occupies around 20 percent of the total developable<br />
area in <strong>Dhanbad</strong>.<br />
The condition of major and minor roads is poor. Concrete roads that were laid recent years<br />
are in satisfactory condition. Footpaths and parking facilities are the major problems faced.<br />
Since the shoulders are not paved, the roads surface gets covered with the soil, making it<br />
dangerous to ride.<br />
The per-capita road length in the corporation area is only 0.62 m, which is less than the<br />
standard of 1.75 m.<br />
Following are the list of the roads which are maintained by PWD;<br />
<strong>Dhanbad</strong>-Patherdih-Sindri Road<br />
Jharia-Baliapur Road<br />
Baliapur-Sindri Agricultural Road<br />
Govindpur-Baliapur-Sindri Road<br />
Baliapur-Patlabadi-Chirkunda Road<br />
Mugma Chirkunda Road<br />
Chirkunda-Panchet Road<br />
Kanko-Tetulmari-Bhuli-<strong>Dhanbad</strong> Road<br />
Patherdih-Chandankiyari Road (Partly)<br />
Rajganj-Katras-Jamdiha Road<br />
Katras-Panchgadhi-Kerkend Road<br />
Dumra-Jagrahi-Katras Road<br />
Kenduadih Link Road<br />
Jharia-Kenduadihdih Road<br />
Sijua-Rajganj Road<br />
Dumra-Keshargadh Road<br />
Putki-Bhaga-Bhaura-Sudamdih Road<br />
Chirkunda Link Road<br />
Link Road <strong>Dhanbad</strong><br />
Bus Stand-Sarweshri Aasham and Jaiprakashnagar<br />
Shramik Road to Barwadda Road<br />
(including Link Road 0.5 + 1.00)<br />
Bank More – Purana Bazar Pani Tanki- Joraphatak Road<br />
Hatia More Hiraput - Barmasia Howrah Motor Road<br />
2. Performance Indicators and Key Issues<br />
The performance indicators and key issues have been identified based on the information<br />
collected and field visits and the same is presented in this section. Key performance indicators<br />
are used to assess service adequacy of <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong>. Table 49 exhibits the<br />
performance indicators of <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> in roads sector and subsequently<br />
the key issues have been presented.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 78
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Table 49: Performance Indicators - Road Sector<br />
Description Unit Present Status Benchmarks<br />
Percapita Road Length M 0.62 1.75<br />
Road Density Km/sq.km 2.81 -<br />
B.T Roads to Total Road Length Percent 34 -<br />
Source: Analysis.<br />
(i)<br />
(ii)<br />
(iii)<br />
High Density and Congested Lanes.<br />
Central areas of the city are narrow and<br />
surrounded by heavily built-up areas. These<br />
roads also carry large volumes of traffic that<br />
cater to heavy moving vehicles carrying<br />
coal, commercial trading in the area. These<br />
factors make the lanes highly susceptible to<br />
distress development, air pollution and<br />
delayed travel times.<br />
Improper Connectivity in Peripheral Areas. Recent developments were towards<br />
the peripheral areas of the city towards the north, south and southeast. While the<br />
growth in these areas has been considerable, the connectivity of these roads with the<br />
main corridors is inadequate.<br />
Encroachment. The margins of roads are<br />
encroached upon in several sections of<br />
major roads of the city small time street<br />
vendors, illegal parking and other informal<br />
activities. With no margins left on the<br />
roads, the effective carriageway of the road<br />
is reduced drastically leading to traffic<br />
congestion and accidents.<br />
(iv) Inadequate Surfaced Roads. Total<br />
municipal roads that are surfaced constitute<br />
around 54 percent of total local body roads;<br />
the rest are unsurfaced. Poor road<br />
maintenance results in further deterioration<br />
due to traffic and monsoon. The ingress of<br />
water into the black cotton soil beneath<br />
creates severe pavement failures.<br />
(v)<br />
Absence of Street Furniture/Signage’s.<br />
The roads lack signals, signage’s, and footpaths. Improper road sweeping on most of<br />
the roads results in dust nuisance.<br />
3. Traffic and Transportation Sector Overview<br />
Regional Connectivity. <strong>Dhanbad</strong> is well connected by road to other parts of the country. NH 2<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 79
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
which connects <strong>Dhanbad</strong> to Kolkatta, NH 32 connects to Bokaro also traverses the city.<br />
<strong>Dhanbad</strong> is well connected by the Rail route also. It is the divisional headquarter of Eastern<br />
Railway. The Grand chord line which is the main line between Delhi and Calcutta passes<br />
through <strong>Dhanbad</strong>. Trains to Delhi, Calcutta, Bombay, Jammu, Kalka, Gorakhpur, Lucknow,<br />
Patna, Jodhpur etc. can be taken from <strong>Dhanbad</strong>. Important trains halting at <strong>Dhanbad</strong> are<br />
Calcutta Rajdhani Express, Bhubneshwar Rajdhani Express, Bokaro Calcutta Shatabdi<br />
Express, Poorva Express, Kalka Mail, Ludhiana Express, Jammu-Tawi Express, Howrah-<br />
Jodhpur Express and Shakti Punj Express.<br />
City’s Transport Scenario. Major activities in <strong>Dhanbad</strong> include industrial activities like coal<br />
mining and its ancillary industrial activities, trade and commerce, education institution and<br />
public administration. Administrative offices are located on <strong>Dhanbad</strong> – Gobindpur road,<br />
Jharia road, Katras road. Public transport i.e. buses currently operated by Bihar Road<br />
Transport <strong>Corporation</strong> has very little patronage due to unreliable and inadequate services.<br />
Due to small trip-length activities in the city, cycle ricksaw, cycling and walk form the<br />
preferred mode of non-motorised transport. With very little pedestrian facilities in the<br />
<strong>Municipal</strong> <strong>Corporation</strong> area, large volumes of pedestrian traffic can be observed on city roads<br />
especially near Bank more, Railway Station, Hirapur, Bus stand, Main Bazaar, Purana Bazaar,<br />
Sindri SBI bank circle, Kerkend and market areas. Unauthorized parking of private and<br />
commercial vehicles was observed along most of the roads and open spaces located in the<br />
CBD and along NH-32. There is no authorized parking infrastructure provided in the city.<br />
Parking of cycle rickshaws, vans, auto-rickshaws parked near major junctions is a common<br />
phenomenon in the city.<br />
Figure 22: Year wise Registered Vehicles in <strong>Dhanbad</strong><br />
In Table 50 presents the<br />
20000<br />
year wise registered<br />
18000<br />
vehicles in <strong>Dhanbad</strong> for<br />
16000<br />
last five years and this<br />
2005-06<br />
14000<br />
table reveals that the total<br />
2004-05<br />
12000<br />
registered vehicles are<br />
2003-04<br />
10000<br />
2002-03<br />
almost become doubled in<br />
2001-02<br />
the year 2005-06.<br />
8000<br />
Maximum no of vehicles<br />
6000<br />
registered during the last<br />
4000<br />
five years are two wheelers<br />
2000<br />
and it has increased from<br />
0<br />
9,796 to 20,575 in 2001 -02<br />
to 2005-06. Besides the<br />
two wheelers vehicle population, private four wheelers have increased from 1,514 to 1,947<br />
during the same period. Interestingly, Trucks and three wheelers have grown 5.74 times and<br />
5.48 times respectively from 2001-02 to 2005-06.<br />
No of Vehicles<br />
Truck<br />
Bus<br />
Privat<br />
Taxi<br />
Zeep<br />
Three<br />
Two<br />
Tract<br />
Traile<br />
Table 50: Year on Year Registered Vehicles in <strong>Dhanbad</strong><br />
Description 2001-02 2002-03 2003-04 2004-05 2005-06<br />
Trucks 112 95 177 317 643<br />
Bus 35 25 20 9 67<br />
Private<br />
Taxi/cars<br />
1,514 1,295 1,551 1,729 1,947<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 80
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Taxi 166 108 93 134 69<br />
Jeep 371 129 116 124 583<br />
3 Wheelers 162 362 254 348 888<br />
2 Wheelers 9,796 12,450 13,641 17,996 20,575<br />
Tractors 371 171 188 125 198<br />
Trailers 123 126 153 102 130<br />
Total 12,650 14,761 16,193 20,884 25,100<br />
Freight Traffic: Commercial vehicle traffic on NH-32 & NH-2, and other major district roads<br />
passing through the <strong>Municipal</strong> <strong>Corporation</strong>, occupy majority of the city road space. Large<br />
volumes of truck traffic transport coal from Jharia Coal Field mines to other parts of the<br />
country. The bulk of this traffic passes through the Jharia, Bank more area, causing traffic<br />
congestion and pollution. Presently, heavy vehicles are not allowed during daytime in to the<br />
city. Since the bypass road is only partially complete and not in good condition, commercial<br />
vehicles are forced to use city roads creating huge congestion, noise pollution, and affecting<br />
the safety of the road users predominantly pedestrians in the city.<br />
Major Traffic Bottlenecks<br />
Major bottlenecks include railway level crossings, poorly designed intersections. There are<br />
many no of railway level crossings with in the jurisdiction which cause inordinate delay in<br />
road users. The main cause if bottlenecks are encroachment by the retail shops, hoardings,<br />
containers & display along the streets, varying carriage way of roads in the major arterial roads<br />
and mining areas, unauthorized parking along the roads, restricting the smooth traffic flow<br />
and absence of clear defined pedestrian footpaths, results in consumption of carriage way.<br />
Accident prone spots<br />
As per the discussion with the <strong>Dhanbad</strong> Traffic<br />
Police department and District Transport Officers<br />
records reveals that on an average every year about<br />
450 to 500 accidents are occurring with in the<br />
<strong>Municipal</strong> <strong>Corporation</strong>. Following are the some of<br />
the important accident prone zones/spot in the<br />
corporation limit, which needs to be addressed<br />
through proper geometric design and providing<br />
street furniture.<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
ISM Gate<br />
Matkuria<br />
Puja Talkies<br />
NH2 near Gobindpur – <strong>Dhanbad</strong> Junction<br />
Bank More ( JP Chawk and BM Chawk)<br />
Near Rajkamal School, Jharia Road<br />
Near <strong>Dhanbad</strong> Police Station on Bridge<br />
Near R.S College, Jharia<br />
Uparkuli, Sindri Road<br />
Kenduadih Road, Godhar<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 81
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
<br />
<br />
Kenduadih Petrol Pump<br />
Putki Bridge<br />
Parking Demand<br />
Land Use and Economic Activities in the City drive the Parking demand in the City. Here, the<br />
City is a major regional center for coal mining industry, Trade and Commerce in Jharkhand,<br />
which drives the heavy influx of floating population. Consequently, heavy movement of<br />
Vehicular Traffic has increased congestion and induced Parking demand within the<br />
<strong>Corporation</strong> jurisdiction. High parking demand areas are listed below;<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
Purana Bazar<br />
Bank More<br />
On Katras Road – JP Chawk towards Matkuria<br />
On Katras Road – JP Chawk towards Rajkamal School<br />
Naya Bazar<br />
Park Market Heerapur<br />
Shranik Chawk – Gaya Bridge<br />
Shranik Chawk – Railway Station<br />
Near Textile Market<br />
Saraidhela Maket<br />
Near Petrol Pump Chawk to Bata More (Jharia)<br />
Bata More – Jharia Bus stand<br />
Near Katras Market<br />
Near Katras Railway Station<br />
4. Urban Roads - SOWT Analysis<br />
SWOT analysis has been undertaken to assess on the negative and positive aspects of the<br />
present Traffic and Transportation System of <strong>Dhanbad</strong>. It involves analyzing the internal<br />
positive (strengths) and negative (weakness) aspects of an organization and considering these<br />
in relation to aspects of the external environment – both the positive aspects (or<br />
opportunities) and negative aspects (or threats). The Table 51 gives the details of the SWOT<br />
analysis.<br />
Table 51: Traffic and Transportation – SWOT Analysis<br />
Strength<br />
NH-32 & NH 2;<br />
Strategic location of <strong>Dhanbad</strong> DRM connects city with other parts of the<br />
country;<br />
Airport Facility available.<br />
Weakness<br />
Absence of planned and narrow road network;<br />
Encroachment on major roads and important junctions;<br />
Mixed traffic on arterial roads;<br />
Lack of parking lots;<br />
Absence of organized Bus terminals and truck terminals;<br />
Absence of bye-bass road to take care of the through truck traffic;<br />
Lack of mass transport system;<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 82
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Inadequate parking lots in Railway Station premises; and<br />
Existing airport is not in use.<br />
Opportunities<br />
Private sector partnership is possible in mass transport system;<br />
Private sector partnership in developing parking lots; and<br />
Private Sector Partnership in maintaining air port.<br />
Threats<br />
Unauthorized private transport system and passengers are traveling over the<br />
roof of the three wheeler vehicles which leads to unsecured to life; and<br />
Noise Pollution.<br />
5. Key Issues<br />
The key issues have been identified based on the information collected and field visits and the<br />
same is presented in this section.<br />
(i)<br />
(ii)<br />
(iii)<br />
Traffic Congestion. Major roads leading to<br />
other important urban centers of the State<br />
follow radial pattern and converge towards<br />
the central area of the city resulting in over<br />
accumulation of traffic in the central area<br />
(Bank more etc). Because of the inadequate<br />
widths especially in the central area and<br />
railway crossings, radial roads and ring<br />
roads suffer from bottlenecks and<br />
congestion. Presence of no of mining activities also induces more congestion and<br />
pressure on the exiting core area roads. Two – wheelers and increasing volumes of<br />
three wheeled auto rickshaws, the most widely used personalized mode of transport,<br />
increase the traffic density, and owing to the high maneuverability they add to<br />
indiscipline and occasional traffic blockages.<br />
Absence of Mass Transit System. As per the ministry of Urban Development, GoI,<br />
Guidelines, the total share of public transport to be desired minimum of 80 percent.<br />
Ineffective Intermediate Public Transport System (IPTs). Most of the passengers<br />
found that the existing transport system is in<br />
effective and efficient to cater the needs of<br />
the growing demand. This can be attributing<br />
to high cost, poor service, discomfort<br />
caused by over loading of passengers, slow<br />
speed, discrimininate stoppages.<br />
(iv)<br />
Absence of Peripheral Ring Road. In absence of a complete peripheral Ring Road,<br />
regional traffic is directed into the City thus causing congestion and delay due to<br />
Heavy Moving Vehicles.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 83
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
(v)<br />
Traffic Bottlenecks. Absence of Rail Over Bridges and narrow width of existing<br />
Bridges and Culverts, causes traffic bottlenecks and congestion in the City. Absence<br />
of Sub-ways at important junctions is also noticed as a cause of congestion.<br />
(vi) Inadequate Parking Areas. Heavy<br />
congestion is created by high vehicular<br />
density in the City (freight traffic and<br />
floating traffic), especially in the core areas,<br />
which is not adequately served with<br />
infrastructure facilities like Parking area.<br />
Traffic management measure, like One Way<br />
System, has been implemented but fails to<br />
address the Problem effectively.<br />
(vii)<br />
Absence of Proper Bus Terminus and Truck Terminus. City does not have a<br />
decentralized bus terminus. The existing bus<br />
terminus also not sufficient to meet the<br />
vehicle growth rate. Although, being a<br />
center mining activity in the region, the city<br />
is not provided with a proper truck terminal<br />
and ancillary facilities, which induces<br />
congestion due to inflow of Goods Carriage<br />
Vehicles within the City Area.<br />
(viii)<br />
(ix)<br />
Absence of Street Furniture. None of the roads have road line painting, zebra<br />
crossings resulting in unguided crossing pedestrian & leverage to violate traffic rules.<br />
Absence of Signals. There are no signalized<br />
traffic intersections in the city, the traffic<br />
department does the monitoring of traffic.<br />
(x) Un organized and hap hazardous<br />
movement of rickshaw. Weaving of<br />
rickshaw heterogeneous traffic, traffic rule<br />
violation & bottlenecks result in congestions<br />
and traffic jams.<br />
(xi)<br />
Overlapping of Responsibilities. No single agency is solely responsible and<br />
accountable for traffic and transportation management. Results to overlapping of<br />
functions and spatial and functional fragmentation.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 84
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
G. Street Lighting<br />
1. Overview<br />
The provision and maintenance of streetlights is an<br />
obligatory function of <strong>Dhanbad</strong> <strong>Corporation</strong>.<br />
However, at presently erstwhile <strong>Dhanbad</strong><br />
municipality, Sindri NAC is maintaining the<br />
streetlight in their respective towns jurisdiction rest<br />
all maintained by Electricity Department of<br />
Jharkhand. Streetlights operation and maintenance is<br />
privatized in erstwhile <strong>Dhanbad</strong> municipality area<br />
alone.<br />
There are 3,561 streetlight poles in <strong>Dhanbad</strong> <strong>Corporation</strong> jurisdiction. The average spacing of<br />
streetlight pole is 264 m, which is lower than the preferred spacing of 25 to 30 m. Larger<br />
spacing of light poles leads to inadequate illumination and thereby results in darkness in most<br />
part of the city. Table 52 below summarizes the street light composition of the <strong>Dhanbad</strong><br />
<strong>Municipal</strong> <strong>Corporation</strong>.<br />
Table 52: Street Lights Break-up<br />
Description Units Proportion<br />
Nos<br />
Percent<br />
High Mast Lamps 20 0.56<br />
Halogen Lamps 180 5.05<br />
Mercury Vapor Lamps 252 7.08<br />
Sodium Vapor Lamps 477 13.40<br />
Tube Lights 2381 66.86<br />
Others 251 7.05<br />
Total 3,561 100.00<br />
Tube lights constitute almost 67 percent of the total lighting fixtures; tube lights are of poor<br />
lighting quality and have a shorter life in comparison to high power fixtures. About 13.40<br />
percent fixtures are sodium vapor lamps and 7 percent fixtures are mercury vapor lamps.<br />
Conventional fluorescent tube lights (4’, 40 W), which have a relatively longer life and are<br />
economical in terms of their power consumption compared to bulbs, account for about 67<br />
percent of total streetlights.<br />
2. Performance Indicators and Key Issues<br />
The performance indicators and key issues have been identified based on the information<br />
collected and field visits and the same is presented in this section. Key performance indicators<br />
are used to assess service adequacy of <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong>. Table 53 exhibits the<br />
performance indicators of <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> in street lighting and<br />
subsequently the key issues have been presented.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 85
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Table 53: Performance Indicator - Street Lights<br />
Description Unit Present Status Benchmarks<br />
Spacing between Lamp Posts M 264 25-30<br />
Area Coverage Percent 10 100<br />
Tube Lights to Total Lights Percent 66.86 -<br />
High Power fixtures to Total Lights Percent 26.09 -<br />
Source: Analysis.<br />
(i)<br />
(ii)<br />
(iii)<br />
Low Coverage and High Spacing between Lamp Posts. As per the norms the<br />
spacing between the lamp post should not be more than 30 m, whereas in <strong>Dhanbad</strong><br />
<strong>Municipal</strong> <strong>Corporation</strong> the spacing between the lamp post is at average of 264 m. this<br />
higher than adopted norms, which leads to low coverage in the city.<br />
Large Number of Vacant Poles. Large number of vacant poles and low<br />
performance of existing lighting fixtures result in high recurring expenditure.<br />
Power Fluctuation and Short Circuit Problems. This leads to low carrying<br />
capacity of the cables and improper street lighting in the newly formed extension<br />
areas and major junctions.<br />
H. Fire Services<br />
The Fire Department is responsible for fire-related services and support during calamities.<br />
The Fire Department provides services to entire <strong>Dhanbad</strong> district. The department also<br />
serves the hinterland and nearby areas. It is also responsible for attending to;<br />
<br />
<br />
<br />
Emergency calls,<br />
For rescue operations in accidents like drowning; and<br />
Disposal of dangerous stray animals that are a nuisance to society.<br />
Figure 23: Year wise Trend of Fire Accidents<br />
Operations. The fire station<br />
attends to both direct and<br />
140<br />
indirect calls. The indirect calls<br />
120<br />
are assistance needed calls made<br />
100<br />
by the fire station office of some<br />
80<br />
other location if they need<br />
60<br />
assistance from the <strong>Dhanbad</strong> fire<br />
40<br />
20<br />
station office. The last five years<br />
0<br />
data from 2002 to 2006 (up to<br />
2002 2003 2004 2005 2006<br />
31- 05-06) data indicates that the<br />
Year<br />
total fire cases attended were in<br />
the range of 75 to 128. In 2005, the total fire accidents recorded were 128 in which the<br />
estimated loss of property was to the tune of Rs.71.85 however during 2002 there are 75 fire<br />
accidents were attended in which as high as Rs. 842.82 lakh loss was recorded. Table 54<br />
exhibits the year wise no of cases attended by the fire department, estimated loss.<br />
N o of A c cide nts<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 86
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Table 54: Year wise no of case attended by the Fire Department<br />
Description Unit 2002 2003 2004 2005 2006<br />
Fire accidents No 75 80 110 128 98<br />
Estimated loss Rs. Lakh 842.82 446.39 397.43 71.85 35.07<br />
Source: Fire Service Department.<br />
Vehicles and Equipments. The Fire Department owns and operates four water tenders for fire<br />
fighting, water tenders have a capacity of 4,500 liters each and the age of the water tenders<br />
varies from two years to four years. The Department has one foam tender with a water<br />
capacity of 4,000 liters and foam capacity of 600 liters. The fire station also has one mini<br />
water tender with a capacity of 750 liters and one emergency & rescue tender for emergency<br />
purpose. After the purchase of water tenders (2002 & 2004) the property damages due to the<br />
fire accident has come down significantly.<br />
Table 55: Details of Fire Service Equipments<br />
Type of Fire Tender No Water Capacity Foam Capacity Year of<br />
Purchase<br />
Litres Litres Year<br />
Water Tender 4 4,500 2002 & 2004<br />
Foam Tender 1 4,000 600<br />
Emergency &Rescue 1 - - -<br />
Tender<br />
Mini Water Tender 1 750 - -<br />
Source: Fire Service Department.<br />
The department does not possess any specialized equipment like hydraulic platform, portable<br />
pump and trailer pump that is required for fire fighting and rescue operations.<br />
Staffing Pattern. The following table provides the staffing pattern at the fire service station;<br />
almost eighty two percent of posts remain unfilled.<br />
Table 56: Staffing Pattern in Fire Service Department<br />
Designation Sanctioned Staff Existing Staff Vacant<br />
Fire Station Officer 1 1 -<br />
Sub – Officer 1 - 1<br />
Leading Firemen 4 3 1<br />
Driver 4 3 1<br />
Fireman 40 2 38<br />
Total 50 9 41<br />
Source: Fire Service Department.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 87
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
VI.<br />
URBAN ENVIRONMENT<br />
A. Overview<br />
Jharkhand is one of the few states in the country endowed with rich deposits of several<br />
principal minerals and occupies unique position in mineral productions and mineral based<br />
industries. Mining and mineral based industries have important economic, environmental and<br />
social effects in the region where it is carried out and beyond. Jharkhand witnessed prolific<br />
mining and industrial activities leading to serious environmental degradation. In the absence<br />
of effective implementation of mining and reclamation policies, urban planning and industrial<br />
siting policies by the concerned regulatory authorities caused widespread growth of polluting<br />
industries. The development of any region can only be sustained if it is within the carrying<br />
capacity of the region. If the mining and industrial activities are followed in a well integrated<br />
planned, environmentally benign way by continuous monitoring and taking effective<br />
mitigative measures in a timely manner then it will definitely prove to be economically<br />
beneficial in a sustainable manner.<br />
The Jharkhand is dotted with several major deposits of principal minerals and is now one of<br />
the leading producers of minerals in the country viz. apatite, bauxite, barytes, chineclay,<br />
chromite, coal, copper, feldspar, hematite, limestone, manganese, quartz, etc. Almost all the<br />
major mining projects, processing units, mineral based industries are in this region. If the rich<br />
mineral assets are properly exploited and utilized, the mining sector will contribute<br />
significantly to the economy of the new State.<br />
Presently, mining of major minerals is reported from almost all the districts of Jharkhand but<br />
extensive mining is carried out in Singhbhum East and West, Palamau, Lohardaga, Gumla,<br />
Hazaribagh, <strong>Dhanbad</strong>, Giridih, Koderma, Ranchi and Sahebganj districts.<br />
The complex environmental matrix, large scale mining activity, huge mineral resource<br />
available and ever depleting environmental quality along with flora and fauna, has attracted<br />
attention at both national as well as international level.<br />
The industries here includes thermal power stations, coal washeries, metal smelting plants,<br />
cement mills, coke oven and by-product plants, beehive coke over and allied briquette plants,<br />
metal casting and steel rolling plants, refractories and engineering industries, store crushes,<br />
line kiln, brick kilns etc.<br />
B. Soil Types & Soil Erosion<br />
Most part of the DMC Area is under granite landscape. Alluvial soil is found usually along<br />
river bed, particularly in Baliapur Block. Sandy soil is also found in the river beds, which is the<br />
characteristic of granitic rocks and sandstones. It is used for stowing & building purposes.<br />
Coarse gritty soil is predominant in coal basins. This type of soil mixed with big fragment of<br />
rocks is formed from the weathering of pegmatites, quartz and conglomeratic sandstones.<br />
Laterite is found in the foot of hills, followed by red soil further ahead. Some cultivation is<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 88
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
practiced on read soil. Cultivable soils are found mainly in the south eastern part of the<br />
Region, near sindri and north to north western part of the region in Gobindpur Block.<br />
Soil Erosion. Erosion is the prime process, which is responsible for the variation in the<br />
topography. It is aggravated due to human intervention through indiscrimination cutting of<br />
tress, mining, overburden dumping etc., thus affecting natural ecosystem. Based on the field<br />
studies done by Central Mining Research Station, <strong>Dhanbad</strong>, the whole study area is affected<br />
by Moderate to Severe soil erosion. Such area need immediate attention for soil conservation<br />
measures like bunding, contour farming, gully, farm forestry, water harvesting, etc.<br />
C. Mining Environment<br />
Jharia Coalfield is one of the oldest coalfields in the Country. Located in the north of<br />
Damodar river in <strong>Dhanbad</strong>, the sickle shaped Jharia Coalfield with an area of 450 sq.km<br />
(total) is the only source of prime cocking coal in India. This coalfield belongs to Gondwana<br />
group of Permian age. It has a reserve of about 19,000 million tones, of which 5,000 million<br />
tones coal is of prime cocking quality. Nearly 58% of this reserve proved. This Coalfield has<br />
got one of the world’s densest concentration of thick coal seems at relatively shallow depths<br />
with 40 seams of 0.5 to 20 m thickness, out of which 18 seams including the split ones, are<br />
workable.<br />
Inspite of its favorable physical characteristics, long history of unscientific mining and rapid<br />
growth of human settlements has lead to a situation where ecological balance has been<br />
disturbed in the region.<br />
The history of mining coal here can be traced back to the late Eighteen centaury.<br />
Predominately underground mining methods were adopted in the past and due to inherently<br />
complex geological nature of these coalfields coupled with not so scientific mining practices<br />
these coalfields are faced with many serious problems like subsidence, mine fire, danger of<br />
inundation etc. These problems slowly grew to a significant proportion and had been drawing<br />
attention of all stakeholders. Post nationalization era of coal mining in these coalfield saw a<br />
rise in small opencast workings to liquidate easily available coal near surface. These opencast<br />
working could not be planned in a scientific manner due to pressure of global market<br />
competence and rapid growth of human habitation in and around the coal bearing area. Many<br />
of these opencast workings were made to already develop pillars at shallow depths.<br />
Opencast and Underground Coal Mining: Jharkhand is rich in mineral resources and BCCL<br />
and CCL extensively carry out coal mining. Apart from coal mining other mining activities<br />
also exist. Opencast and underground mining methods are used for winning the minerals.<br />
Dust is the major pollutant from these mines.<br />
Jharia Coalfield with its excellent quality of coal become the hub of coal mining activities in<br />
the country during the end of 19th century and urbanization of Jharia and around started<br />
around 1890s. Industrial growth in the area resulted in the concentrated growth of dwellings<br />
and rapid escalation of population. After the nationalization of coal mines in the years 1973<br />
& 1975 urbanization takes place Jharia coalfield measures around 450 sq.kms. with multiple<br />
seams of coal occurring within its ambit. Three major coal mining companies operate in this<br />
area. These companies are M/s. Bharat Cocking Coal Limited, M/s. Tata Steel and M/s.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 89
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
IISCO. Majority of the area falls under the jurisdiction of M/s. BCCL which controls an area<br />
of about 270 Sq. kms. within its leasehold.<br />
D. Water Resource<br />
Surface Water availability<br />
DMC Area falls under the Damodar River Basin, comprises of Damodar & Barakar Rivers as<br />
major source of Surface Water. River of the region have the usual characteristics of hill<br />
streams. Due to hilly characteristics, the river is not navigable. All the rivers have an easterly<br />
or south easterly course. The catchments of Damodar river is primarily divided into three<br />
prominent watersheds under the study area. Jamunia Nadi is the another major tributary of<br />
Damodar. Katri nadi dissects the Jharia Coal field North-South through a number of<br />
tributaries, such as Khudiya Nadi ,Bans Jhor, Kamari Jhor etc., meeting katri at different<br />
levels. By constructing weirs on Katri at 2-3 places, it is used for water supply to Railway<br />
Colony, Katras.<br />
Khas Jor is the another tributaries of Damodar flowing N-S and merging into the Damodar<br />
west of Bhowra, touching <strong>Dhanbad</strong>, Jamadoba, Jorapokhar, Bhowra on its way. It s a<br />
seasonal nallah. Domohani Nadi marks the boundary of Sindri NAC. It flows from north to<br />
East merging into Damodar River near Chasnala. There are number of Ponds/tanks scattered<br />
throughout the region.<br />
Some Import lakes also exist to provide surface water for drinking and industrial purpose.<br />
Topchanchi lake, having catchments area of serves as source of drinking water for Katras &<br />
adjacent regions.<br />
Ground Water Resources<br />
At present the ground water is being exploited through tube as well as open wells. The<br />
Ground water level is varying from 150 Meter in east to 250 Meter in the west to 250. The<br />
Dug well are 10-15 m deep below ground level in fissured formations. The ground water yield<br />
is 1-5 liter/sec in larger northern half of the <strong>Corporation</strong> from ground water restricted to<br />
weathered residuum and fractured zones having secondary porosity, whereas yield is 25-40<br />
litre/sec in Southern half along river Damodar from moderately thick confined/unconfined<br />
aquifer river of the Large scale ground water withdrawal through deep tube wells (heavy as<br />
well as low duty) has gained momentum in the areas other than hard core mining regions.<br />
Table 57: Ground Water Resources in <strong>Dhanbad</strong><br />
Description<br />
<strong>Dhanbad</strong><br />
Utilizable GW resources for irrigation (MCM/yr) 180.28<br />
Net annual GW Draft (MCM/Yr) 2.77<br />
GW Balance (MCM/Yr) 177.51<br />
Status of GW Development 1.53<br />
Surface Water Quality is one of the significant indicator of environment status of the city.<br />
Jharkhand Pollution Control Board is responsible for monitoring water and air quality<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 90
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
samples at various locations in the city on a regular basis. Samples of Nallah & sewerage at<br />
different locations along with CPCB Standards are described below:<br />
Table 58: Ground Water Resources in <strong>Dhanbad</strong><br />
Designated-Best-Use Class<br />
Criteria<br />
of<br />
water<br />
Total Coliforms OrganismMPN/100ml<br />
Drinking Water Source<br />
shall be 50 or less<br />
without conventional<br />
pH between 6.5 and 8.5<br />
A<br />
treatment but after<br />
Dissolved Oxygen 6mg/l or more<br />
disinfection<br />
Biochemical Oxygen Demand 5 days<br />
20oC 2mg/l or less<br />
Total Coliforms Organism MPN/100ml<br />
shall be 500 or less<br />
pH between 6.5 and 8.5<br />
Outdoor bathing (Organised) B<br />
Dissolved Oxygen 5mg/l or more<br />
Biochemical Oxygen Demand 5 days<br />
20oC 3mg/l or less<br />
Total Coliforms Organism MPN/100ml<br />
shall be 5000 or less<br />
Drinking water source after<br />
pH between 6 to 9<br />
conventional treatment and C<br />
Dissolved Oxygen 4mg/l or more<br />
disinfection<br />
Biochemical Oxygen Demand 5 days<br />
20oC 3mg/l or less<br />
Propagation of Wild life and<br />
Fisheries<br />
Irrigation, Industrial Cooling,<br />
Controlled Waste disposal<br />
D<br />
E<br />
Below-<br />
E<br />
pH between 6.5 to 8.5<br />
Dissolved Oxygen 4mg/l or more<br />
Free Ammonia (as N) 1.2 mg/l or less<br />
pH between 6.0 to 8.5<br />
Electrical Conductivity at 25oC micro<br />
mhos/cm Max.2250<br />
Sodium absorption Ratio Max. 26<br />
Boron Max. 2mg/l<br />
Not Meeting A, B, C, D & E Criteria<br />
Table 59: Sewerage Quality Test Results at Damodar River<br />
Particulars Limit Sudam Sudam Jamado Jamado Sudam Remark<br />
dih at dih at ba U/S ba D/S dih s<br />
U/S D/S<br />
Temp A/W 35/32 32/27 38/28 36/28 32/28<br />
PH 6.5-8.5 6.5 7.5 7.3 7.7 7.2 Within<br />
Limit<br />
BOD 3 mg/L
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Particulars Limit Sudam<br />
dih at<br />
U/S<br />
Sudam<br />
dih at<br />
D/S<br />
Jamado<br />
ba U/S<br />
Jamado<br />
ba D/S<br />
Sudam<br />
dih<br />
COD mg/L 20.0 20 18 8 40<br />
T.S. mg/L 491.0 363.0 793 292 5162<br />
T.S.S. mg/L 25 20 81 15 23<br />
T.D.S mg/L 1,500 466 343 712 277 5139<br />
D.O >4 7.00 5.00 2.6 2.8 5.5<br />
Calcium 33.0 38.0 105.6 44.0 83.2<br />
Magnesium 44.0 13.66 4.37 10.248<br />
Free<br />
0.30 0.5 0.09 0.08 0.48<br />
Chlorine<br />
Total<br />
94.0 108 320.0 28.0 250<br />
Hardness<br />
Chloride 600 36.0 46.0 28.0 22.0 48.0<br />
Phosphate 0.38 0.77 0.80 0.42 0.66<br />
Remark<br />
s<br />
Sudam<br />
dih<br />
Dissolved Oxygen. As per Designated-Best-Use of surface Water by CPCB, Delhi, it can not be<br />
used as Drinking Water Source without conventional treatment in Damodar River at U/S &<br />
D/S on River Damodar at Jamadoba & D/S in River Damodar at Sudamdih. Whereas after<br />
conventional treatment and disinfection it can be used for Drinking water supply, propagation<br />
of Wild life and Fisheries and for organized bathing purposes.<br />
E. River Water Quality<br />
Industrial development & related increase in air pollution emissions/ wastewater discharge,<br />
population growth and the resultant increase in domestic wastewater discharges, mining<br />
activities and the associated increase in fugitive emissions and wastewater discharges and non<br />
point sources of pollution from other sources are likely to affect Damodar river water quality.<br />
In addition there will be an increase in water demand from different sectors. A number of<br />
new industries and new human settlements are likely to come up in years ahead. The<br />
population is likely to increase manifolds at the present growth rate. The current picture<br />
shows that the Dissolved Oxygen levels are very low and BOD levels are high in Damodar<br />
River.<br />
F. Air Environment<br />
Mining and allied industries, domestic fuel combustion and transportation network sources<br />
are the main sources of air pollution. Mining is carried out both by opencast and underground<br />
methods. . Air Quality is very low due to coal dust and gases coming out from the cracks<br />
formed on the surface.<br />
Major air polluting industries in the state include thermal power plants, integrated steel plants,<br />
coke ovens, fertilizer plants, cement plants, refractories and other miscellaneous industries.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 92
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Besides these, there are several small-scale industries. Among the steel plants, Bokaro steel<br />
plant recorded the highest emission load of 6.5 MT. Thermal power station and fertilizer<br />
plants did not have any ESP installed. The emission from hard and beehive coke oven plants<br />
are about 5.96 MT/ year while cement plants contribute about 1.2 MT/year.<br />
Table 60: Industrial Pollution Level<br />
Description SO 2 &NO 2 SPM<br />
µg/m 3 µg/m 3<br />
Low (L) 0-40 0-180<br />
Moderate (M) 40-80 180-360<br />
High (H) 80-120 360-540<br />
Critical (C) >120 >540<br />
Table 61: Ambient Air Quality in <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> Jurisdiction<br />
Pollutants Time Weighted Concentration in Ambient Air Method<br />
Average Industrial<br />
Areas<br />
Residential<br />
Rural &<br />
Other<br />
Areas<br />
Sensitive<br />
Areas<br />
Measurement<br />
Sulphur<br />
Dioxide<br />
(So 2 )<br />
Annual<br />
Average<br />
80 µg/m3 60 µg/m3 15<br />
µg/m3<br />
24 hours 120 µg/m3 80 µg/m3 30<br />
µg/m3<br />
-Improved West<br />
and Geake Method<br />
- Ultraviolet<br />
Fluorescence<br />
of<br />
Oxides<br />
Nitrogen<br />
as (NOx)<br />
Annual<br />
Average<br />
80 µg/m3 60 µg/m3 15<br />
µg/m3<br />
- Jacob &<br />
Hochheiser<br />
Modified<br />
(Na-Arsenite)<br />
Method<br />
24<br />
hours<br />
120 µg/m3 80 µg/m3 30<br />
µg/m3<br />
- Gas Phase<br />
Chemiluminescence<br />
Suspended<br />
Particulate<br />
Matter<br />
(SPM)<br />
Annual<br />
Average<br />
360 µg/m3 140<br />
µg/m3<br />
70<br />
µg/m3<br />
- High Volume<br />
Sampling,<br />
(Average flow rate<br />
not less than<br />
1.1 m3/minute).<br />
24<br />
hours<br />
500 µg/m3 200<br />
µg/m3<br />
100<br />
µg/m3<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 93
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Table 62: Industrial Pollution Level of SO 2 in Urban Areas of <strong>Dhanbad</strong> from year 1997 –<br />
2005<br />
Location 1997 1998 1999 2000 2001 2002 2003 2004 2005<br />
Jharia 45.00 76.40 80.10 22.30 16.30 16.50 16.10 13.40 17.80<br />
(R.P<br />
College)<br />
Sindri 41.00 64.50 69.30 21.00 17.10 15.60 14.50 11.20 17.40<br />
BIT<br />
(Near<br />
FCI Main<br />
Hospital)<br />
<strong>Dhanbad</strong><br />
(R.O<br />
<strong>Dhanbad</strong>)<br />
37.30 65.60 84.40 16.50 17.30 15.40 15.90 11.10 16.00<br />
The Selected stations for conducting ambient air quality monitoring are available in Jharia,<br />
Sindri and <strong>Dhanbad</strong>. As evident in<br />
Figure 24, SO2 levels were above the<br />
national standards (60 microgram/cu.m) in 1998 & 1999. The levels are still in increasing<br />
trend since 2004 as shown in all the three National Ambient Air Quality Monitoring stations<br />
of the city.<br />
Figure 24: Comparison of <strong>Dhanbad</strong> So2 Levels with Standards with<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 94
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Table 63: Industrial Pollution Level of NO2 in Urban Areas of <strong>Dhanbad</strong> from year 1997 –<br />
2005<br />
Location 1997 1998 1999 2000 2001 2002 2003 2004 2005<br />
Jharia<br />
(R.P<br />
College)<br />
Sindri<br />
BIT<br />
(Near<br />
FCI Main<br />
Hospital)<br />
<strong>Dhanbad</strong><br />
(R.O<br />
<strong>Dhanbad</strong>)<br />
57.00 53.70 51.30 18.50 35.90 69.50 63.40 58.60 44.40<br />
54.40 58.40 46.10 17.80 38.40 56.90 62.00 61.00 46.00<br />
47.50 57.50 53.60 17.60 32.30 48.40 65.90 66.50 47.70<br />
Figure 25: Comparison of <strong>Dhanbad</strong> No2 Levels with Standards<br />
As figures depicts in Table 63 Nox levels were above the national standards (60 microgram/<br />
cu.m) in years 2002 to 2004. The current trend is showing reduced NOx levels since 2004.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 95
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Table 64: Industrial Pollution Level of SPM in Urban Areas of <strong>Dhanbad</strong> from year 1997 –<br />
2005<br />
Location 1997 1998 1999 2000 2001 2002 2003 2004 2005<br />
Jharia (R.P<br />
College)<br />
408 454 458 373 357 368 284 339 354<br />
Sindri BIT<br />
(Near FCI<br />
Main<br />
Hospital)<br />
<strong>Dhanbad</strong><br />
(R.O<br />
<strong>Dhanbad</strong>)<br />
212 177 174 204 220 301 244 - -<br />
181 238 228 274 270 263 275 - -<br />
As evident in<br />
Figure 26, SPM levels were stayed high above the national<br />
standards (360 microgram /cu.m) for more than a decade from 1991 to 2002. The present<br />
SPM levels are at moderate level since 2004 in all three stations of the district.<br />
Figure 26: Comparison of Jharia SPM Levels with Standards<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 96
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Figure 27: Comparison of <strong>Dhanbad</strong> SPM Levels with Standards<br />
G. Study Findings<br />
High observed concentration was due to sources located in and around the city, which<br />
include Jamadoba TPS, Mining sources. High SPM values, which were in excess of the<br />
prescribed standards, were due to contribution from area sources as SO2 and NOx<br />
concentration could be attributed to industrial point sources. TPS, Beehives coke oven plants,<br />
hard coke ovens, refractories. Jharia, Sindri, Jamadoba and Baliapur were the major areas of<br />
concerns from the pollution point of view.<br />
As per the combined study of MoEF, Delhi & CMRI <strong>Dhanbad</strong>, the Air Quality status<br />
decreased from Bad & Poor in 1997 to Dangerous in 2021. as per the present prevailing rates<br />
of the pollution.<br />
H. Noise Quality<br />
Noise is among most pervasive pollutants today. But it is an inescapable by product of<br />
urbanization and industrialization. CPCB set standards for noise pollution in 1989 and the<br />
Ministry of Environment & Forest (MoEF ) formulated Noise Pollution Rules only in 2000.<br />
Noise Levels was monitored last year with coordination with CPCB, New Delhi by <strong>Dhanbad</strong><br />
Regional Office of Jharkhand State Pollution Control Board. The location of the Noise<br />
Monitoring stations and their associated noise levels are given in Table 65.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 97
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Table 65: Noise Quality Results in Residential Area<br />
Time of<br />
Residential Area<br />
Monitoring D.S.Colony MADA Colony Bhisti Para Limit<br />
1 ST Jan ‘05<br />
10:30 68.4 69.7 64.2 55<br />
12:30 86.4 75.2 77.00 55<br />
2:30 87.3 78.5 78.1 55<br />
4:30 82.1 77.4 78.6 55<br />
6:30 79.2 82.3 88.6 55<br />
8:30 98.7 94.6 92.6 55<br />
10:30 1oo.2 99.4 100.0 45<br />
Table 66: Noise Quality in Commercial and Residential Areas<br />
Commercial / Residential Area<br />
Time of Monitoring<br />
1 ST November ‘05<br />
R.O Office<br />
Near Bus Stand<br />
Near MIG Colony<br />
Near<br />
LIG<br />
Colony<br />
Limit (in<br />
dB)<br />
10:00 AM 60.8 58.8 60.3 65<br />
12:00 Noon 82.1 72.2 78.3 65<br />
4:00 PM 92.1 74.7 73.2 65<br />
6:00 PM 97.4 78.8 75.8 65<br />
8:00 PM 99.8 97.5 102.5 65<br />
9: 00 PM 82.3 74.6 76.1 65<br />
10:00 PM 79.00 101.2 101.5 65<br />
Source: Jharkhand State Pollution Control Board, Regional Office, <strong>Dhanbad</strong><br />
Table 67: Noise Quality in Commercial and Residential Areas<br />
Residential / Commercial Area<br />
Time of Monitoring<br />
Shastri Nagar Bank More Gujrat Mohalla Limit<br />
1 ST November‘05<br />
TRD Colony<br />
(in dB)<br />
11:00 AM 67.5 67.7 66.2 65<br />
1:00 PM 82.4 83.4 78.4 65<br />
3:00 PM 82.5 82.9 79.1 65<br />
5:00 PM 82.4 81.5 80.4 65<br />
7:00 PM 88.4 94.9 88.4 65<br />
9: 00 PM 92.6 94.6 91.5 65<br />
11:00 PM 100.4 99.7 99.6 65<br />
It is evident from the above tables that almost in all land uses areas, the permissible noise<br />
levels are exceeding both during Day & night at Commercial as well as in Residential area.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 98
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
I. Hot Spots<br />
Land Environment<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> suffers from<br />
various categories of land degradation. Land<br />
gets degraded here due to variety of reasons<br />
(erosion, mining, overburden dumping and<br />
abandoned mines, mine fire & subsidence).<br />
Degraded land need to be appropriately<br />
treated to make them suitable for the<br />
designated usage.<br />
Mine Fire<br />
Jharia is facing the burnt of mine fire and subsidence. It has more than 70 mine fires spread<br />
over an area of about 17 sq.km.<br />
Table 68: List of Collieries affected by Mine Fires<br />
S.No Colliery Affected Sl.No Colliery Affected<br />
1 East Katras Colliery 19 Alkusa<br />
2 Katras Choitudih 20 Kustore<br />
3 Gaslitandh 21 Ena Industry<br />
4 Mudlidih 22 East Bhuggatdih<br />
5 Jogta 23 Bhalgora Simlabahal<br />
6 Kankanee 24 Rajapur<br />
7 Loyabad 25 Kujama<br />
8 Sendra Bansjora 26 Lodna<br />
9 Tetulmari 27 Jealgora<br />
10 Bansdeopur 28 Bagdigi<br />
11 East Basuriya 29 Bararee<br />
12 Basuriya 30 Bhulan Bararee<br />
13 Kusunda 31 North Tisra/GOCP<br />
14 Industry 32 South Tisra<br />
15 Gopalichak 33 Jeenagora<br />
16 Kendwadih 34 Joyrampur<br />
17 Bhagabandh 35 Bhowra North & South<br />
18 Kachhi Balihari 36 Sudamdih & Patherdigh<br />
37 Amlabad<br />
From the early days mining has been carried out herewith disregard towards safety, health<br />
and environment. According to the Environment Management Plan (EMP) of the Coalfield<br />
prepared by Norwest Mine Services Limited in 1997, the entire coalfield has been disturbed<br />
by human activities for a long period of over 100 years. Most of the core & buffer zones of<br />
the coalfield suffer from excessive soil erosion as initial forest cover over them has been<br />
denuded due to mining activities. Air Quality is very low due to coal dust and gases coming<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 99
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
out from the cracks formed on the surface. Reclamation of degraded land due to mining and<br />
other human activities are ignored.<br />
This Coalfield has large number of water bodies, i.e. rivers, jorias, nallahs, ponds and lakes.<br />
They are seasonal & shallow and often dry up in summer, resulting in water scarcity at places.<br />
However in rainy season, they carry much water and in case of excess downpour, they<br />
sometime get flooded. Moreover there are many abandoned underground waterlogged mine<br />
workings, whether developed or worked out, which form subsurface water bodies.<br />
An area of about 35 sq. km. has subsided in JCF due to mining activities damaging the natural<br />
surface drainage pattern in and around the coalfield. More than 100 km of the first and<br />
second order streams have been lost and aquifers upto a depth of about 120-140 m have been<br />
affected. While rainfall has gone up here in the recent years, groundwater yield has reduced<br />
considerably over the years, especially during the summer months.<br />
J. Hazards<br />
The District of <strong>Dhanbad</strong>, situated on the eastern side of Jharkhand is vulnerable to various<br />
kind of hazard like earthquake, fire subsidence in mining areas, fire hazard, drought, flood,<br />
railway accidents, chemical hazard, communal violence, epidemics etc.<br />
Disaster Specific proneness to Various Types of Hazards in <strong>Dhanbad</strong><br />
The following table depicts about the various type of natural hazard that are prone in<br />
<strong>Dhanbad</strong>, its period of occurrence, potential impacts and the vulnerable areas of <strong>Dhanbad</strong><br />
District.<br />
Table 69: List of Disaster Specific Proneness to Various Types of Hazards in <strong>Dhanbad</strong><br />
Type of Hazards Time of<br />
Occurrence<br />
Potential Impact Vulnerable Areas<br />
Earth Quake Any Time Loss of Life,<br />
Livestock and<br />
Infrastructure<br />
Entire Region<br />
Cyclone<br />
June – October<br />
Loss of life, crop,<br />
infrastructure and<br />
animals<br />
Eastern portion of<br />
the District, mainly<br />
in Nirsa and Tundi<br />
Block<br />
Drought July – October Crop Loss, Water<br />
scarcity<br />
Entire District<br />
Heat Stoke April – June Loss of Life -do-<br />
Epidemics Any Time Loss to human life -do-<br />
Fire Accidents March – May Human Loss and<br />
house damage<br />
-do-<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 100
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Type of Hazards<br />
Time of<br />
Occurrence<br />
Potential Impact<br />
Vulnerable Areas<br />
Flood<br />
June - September<br />
Loss of life,<br />
livestock, crop and<br />
infrastructure<br />
Eastern and<br />
southern portion of<br />
the District, mainly<br />
in Nirsa, Baliapur<br />
and Tundi Block<br />
From the above table it is evident that, it becomes pertinent to say that <strong>Dhanbad</strong> is also<br />
vulnerable to various kind of hazards, which may cause severe damage to lives and properties.<br />
Further the Multi-hazard map of Jharkhand (Figure 28) also shows that the eastern portion<br />
of <strong>Dhanbad</strong> is more prone to the hazards especially, the wind, cyclone, earthquake and flood<br />
hazards.<br />
Natural Hazards<br />
In recent years, much of the seismic activity in the state of Jharkhand has been in the north, at<br />
the Himalayan foot hill zone of Ganga-Damodar region lying at northern side of Jharkhand.<br />
The state of Jharkhand lies in the Tatapani Fault. As per their categorization <strong>Dhanbad</strong> city lies<br />
in zone III same as Ahmedabad (which faced massive disaster during last Bhuj earthquake<br />
happened on 26th January 2001.) and having population of more than 13 lakhs, any<br />
earthquakes striking this city will turn into a major disaster. Regional Earthquakes that<br />
affected city in the past occurred in 1868, 1881, 1892, 1918, 1927, 1930, 1935, 1934, 1943,<br />
1953, 1963, 1969, 1970, 1971, 1979, 1985, 2003.<br />
The list of earthquakes those were notable either due to their location or due to their effects<br />
are given below. Time is reported as Indian Standard Time (IST).<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 101
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Table 70: Significant Earthquakes in <strong>Dhanbad</strong> & Nearby Vicinities in Jharkhand<br />
Date Time Magnitude Intensity Latitude Longitude Location & Comments<br />
15 January<br />
1934<br />
14:13:25 8.1 IX 26.500 86.500<br />
Close to 10,700 people killed in North Bihar and Nepal.<br />
Buildings developed cracks at Deogarh, Dumka, Hazaribagh,<br />
Giridh, Koderma, Jhumri Telaiya, Palamau and Ranchi. At<br />
Hazaribagh, walls of many buildings developed cracks and<br />
the turret of a local college collapsed. At Deogarh, portions<br />
of some buildings collapsed. At the village of Singra, near<br />
Daltonganj, the earth on the banks of the Amanat and<br />
Gursote rivers were cracked. Water “shot out up to five feet<br />
in height” at the junction of the Amanat and Koel rivers.<br />
23 October<br />
1943<br />
22 May<br />
1953<br />
09 April<br />
1963<br />
10 May<br />
1969<br />
29 July<br />
1970<br />
27 January<br />
1971<br />
05 August<br />
1979<br />
22:53:17 7.0 VIII 26.000 93.000 Damage at Dimapur in Assam. Felt as far as <strong>Dhanbad</strong> and<br />
Hazaribagh.<br />
- - III - - Felt at Jamshedpur.<br />
05:33:32 4.5 III 22.000 85.700 Felt at Baripada, Cuttack, Jamshedpur, Kolkata and Rourkela.<br />
- - IV - - Felt at Jamshedpur, accompanied by a rumbling noise.<br />
People rushed onto the streets in panic.<br />
15:46:19 6.5 - 26.000 95.400 Epicentre along the Nagaland-Myanmar border. Felt as far as<br />
Jamshedpur, Kolkata, Krishnagar, Kishanganj, Munger and<br />
Ranchi.<br />
- - IV - - Felt at Jamshedpur for 3 seconds. Doors and windows rattled<br />
and people ran outdoors.<br />
06:48:37 4.7 - 22.100 84.900 Epicentre along the Jharkhand-Orissa border, near<br />
Dublabera.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 102
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Date Time Magnitude Intensity Latitude Longitude Location & Comments<br />
18 Feb<br />
1985<br />
20 October<br />
2003<br />
04:36:55 4.7 - 24.670 85.480 Epicentre along the Bihar-Jharkhand border, near Rajauli.<br />
06:09:52 4.0 VI 23.730 86.580 Felt at <strong>Dhanbad</strong> and Koylanchal for 30 seconds. Doors and<br />
windows rattled and people ran outdoors. Also felt At<br />
Bokaro and Ranchi. A few cracks in buildings were reported<br />
from Bokaro where it was felt for 15-20 seconds.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 103
DAMIDA OCP<br />
DAMUDA<br />
W.MOHUDA(NORTH)<br />
W.MOHUDA(NORTH)<br />
LAHAPATI<br />
KALYANPUR<br />
BLOCK-III(NC)<br />
N.MAHUDA<br />
MURAIDIH<br />
KHUDIA NALA<br />
SHATARI<br />
20<br />
21 PITS<br />
ALUARA<br />
ALUARA<br />
RAJGANJ<br />
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
TO DELHI<br />
CITY DEVELOPMENT PLAN<br />
DHANBAD<br />
G.T.ROAD<br />
UNSTABLE SITES OF DEVELOPMENT<br />
IN DMC, DHANBAD<br />
GOVINDPUR<br />
GOMOH STN.<br />
KOYLACITY II<br />
HAQARIKALAN<br />
KOYLACITY I<br />
14<br />
TO GORAH<br />
BARAPANDIYDIH<br />
KESSURGARH NUD<br />
KHURKI<br />
BARORA<br />
NUD<br />
BENEDIH<br />
AREA<br />
JAMUNIA KHURKI<br />
OCP<br />
OCP<br />
BLOCK-I OCP<br />
COKING<br />
23 MADHUBAND 1<br />
PHULARITAND<br />
MADHUBAND<br />
DAMUDA<br />
24<br />
PIPRATAND-RADHANAGAR<br />
14A<br />
DAMODAR RIVER<br />
16<br />
(PHULARITAND<br />
OCP$SECT)<br />
PHULARITAND<br />
15<br />
MURAIDIH<br />
OCP<br />
BHURANGIA<br />
DARIDA<br />
2<br />
DHARWABAND<br />
E.MAHUDA<br />
17<br />
KOUMURNA<br />
SALAN<br />
JOGIDIH<br />
AKASKINARI PUR<br />
KOORIDIH BLOCK-IV<br />
OCP(NC)<br />
GOVINDPUR<br />
AKASKINARI<br />
OCP<br />
DCP<br />
E.KATRAS<br />
KHARKHAREE<br />
EXLENSION DHARMABAND-EXTENSION<br />
25 26<br />
BHATDIH<br />
MURULIDIH<br />
MURULIDIH<br />
20<br />
KATRI<br />
NALA<br />
KHUDIA<br />
NALA<br />
KESHALPUR<br />
RAMKANALI<br />
W.MUDIDIH<br />
NT OCP<br />
SIJUA<br />
AREA<br />
RAMKANALI<br />
W.MUDIDIH<br />
OCP<br />
KESHALPUR TETULMARI<br />
OCP<br />
NICHITPUR<br />
TETULMARI<br />
SENDRABANSJORA<br />
OCP<br />
OCP EAST<br />
ANGARPATHRA<br />
BASURIA<br />
BUSSURIYA<br />
KATRAS<br />
SENDRABANSJORA<br />
OCP<br />
AREA<br />
BUSSURIYA KHAS<br />
TO<br />
KUSUNDA<br />
DHANBAD<br />
STN.<br />
LOYABAD<br />
KHASKUSUNDA<br />
S.POOTKEE<br />
OCP<br />
LOYABAD<br />
VI<br />
GODHUR<br />
DHANSAR<br />
BANSDEOPUR<br />
4<br />
KENDW GODHUR<br />
ADIH<br />
OCP<br />
KOCP<br />
GOPALI<br />
KUSUNDA<br />
ARE VII<br />
BAS<br />
BHAGABAND<br />
CHUCK<br />
ACOLLA<br />
BHAGABAND<br />
KUSUNDA<br />
DHANSAR<br />
OCP<br />
OCP<br />
5<br />
PUTKI-BALIHARI<br />
KUSUNDA<br />
VII<br />
KAPURIA<br />
INDUSTRY<br />
MOONIDIH<br />
7<br />
KUSTORE<br />
ENA OCP<br />
27<br />
SINGRA<br />
DAMODAR RIVER<br />
EASTERN<br />
JHARIA<br />
AREA<br />
SINGRA<br />
ADRA-GOMOH<br />
RLY. LINE<br />
JARMA<br />
19<br />
BHUTGARIA<br />
6<br />
6<br />
BHUT<br />
GORIA<br />
BIJRA<br />
GARH<br />
ISSCO<br />
BHULI<br />
SINLA<br />
BAHAL<br />
27<br />
HURRIDIH<br />
SAPTA<br />
LODHA<br />
LODHA<br />
ROCP<br />
S.JHARIA<br />
ROCP<br />
IX<br />
BERA<br />
DOBARI<br />
KUYA<br />
GANOODIH<br />
GANOODI<br />
OCPH<br />
BASTACOLLA<br />
AREA<br />
KUJAMA<br />
GOLUCKDIH<br />
NORTH<br />
TISRA<br />
SOUTH<br />
TISRA<br />
PATRAKULI<br />
JHARNA<br />
BHAGRAMPUR<br />
AMTAL<br />
GOLUCKDIH<br />
OCP<br />
DHANBAD PATHARDIH RLY<br />
N.TISRACP<br />
GOLMORA<br />
BIJOYDIH<br />
BELGARIA<br />
LUPANIA<br />
TO HOWRAH<br />
PALANI<br />
SABAIGARHA<br />
GOVINDPUR<br />
TO CALCUTTA<br />
SAPTA<br />
LEGEND<br />
II<br />
REHABILITATION SITE<br />
FOR HIGH INCOME GROUP<br />
REHABILITATION SITE<br />
FOR MEDIUM INCOME GROUP<br />
REHABILITATION SITE<br />
FOR LOW INCOME GROUP<br />
AREA BOUNDRY<br />
COLLIERY BOUNDARY<br />
RIVER / JORIA<br />
RAILWAY LINE<br />
OPERATING OCP<br />
MAJOR ROADS<br />
UNDERGROUND BLOCKS<br />
OPENCAST BLOCKS (ORIGINAL)<br />
OPENCAST BLOCKS (REVISED)<br />
TISCO<br />
JEAL<br />
GORA<br />
BAG<br />
DIG<br />
JOYRAMPUR<br />
JEENAGORA<br />
OCP<br />
5.TISRA OCP & AUGN<br />
UNSTABLE UNCONTROLLABLE SITES<br />
28<br />
PARBATPUR<br />
21<br />
PARBATPUR<br />
AMLABAD<br />
PROJECT<br />
9<br />
JEALGORA<br />
BARAREE<br />
10<br />
BHAWRAH BHAWRAH NORTH<br />
BHAWRAH OCP<br />
NORTH<br />
JEENAGORA<br />
SULANGA<br />
AMLABAD<br />
11<br />
EASTERN<br />
JHARIA<br />
AREA<br />
BHAWRAH<br />
SOUTH<br />
BHAWRAH SOUTH<br />
OCP<br />
PATHAR<br />
DIH<br />
SUDAMDIH 12<br />
INC.<br />
E.RLY PRADMANKHANTA<br />
PATHARDIH CHORD<br />
MAHAL<br />
SITAHAL<br />
SAPTA<br />
SUDAMDIH<br />
22<br />
28 SHAFT<br />
18<br />
IISCO<br />
SUDAMDIH<br />
MOHAL<br />
30 23<br />
SAPTA<br />
GOURIGRAH<br />
GOURDGRAM<br />
TASRA<br />
TO ADRA<br />
DHANBAD MUNICIPAL CORPORATION<br />
INFRASTRUCTURE DEVELOPMENT<br />
CORPORATION LIMITED<br />
FIGURE NO:<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 104
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
It can be easily assessed from the Table 70, that the region is only 200-250 km far away from<br />
zone 4 and 5 which are most earthquake vulnerable zones. A single high intensity earthquake<br />
having magnitude of more than six occurred in zone 4 or 5 will cause a massive disaster as<br />
happened in Ahemedabad during 2001.<br />
Further <strong>Dhanbad</strong> is surrounded by large reservoirs of Damodar Valley <strong>Corporation</strong>s. Major<br />
faults of the region lie in and around DVC reservoirs with huge amount of water reserve load.<br />
This aspect may increase the chances of any local earthquakes by widening or displacing the<br />
faults in the interior. Over last 40 years, DVC area near <strong>Dhanbad</strong> has received many minor<br />
and major earthquakes.<br />
Thus Keeping in mind this possible disasters, there is a critical need to adopt earthquake<br />
hazard-reduction measures and adopt proper guidelines for construction of buildings as it is<br />
not the earthquake that kills people but unsafe structures do. Beside that awareness,<br />
preparedness, capacity building, education are all necessary and important for the city’s<br />
residents to equip themselves for any upcoming disasters.<br />
Cyclone<br />
As the district lies on eastern side facing Bay of Bengal, it is vulnerable to cyclonic storms.<br />
Cyclones ordinarily bring in their trail of heavy rains causing floods.<br />
According to the multi-hazard maps of Jharkhand the CD-Blocks like Nirsa and Tundi of<br />
<strong>Dhanbad</strong> District have been identified as cyclone prone blocks.<br />
Fire Accidents<br />
Fire accident happen due to several causes like: Housing Pattern, Lose circuit of electricity etc.<br />
In Jharkhand due to peculiar housing patterns maximum fire accident cases takes place. The<br />
city of <strong>Dhanbad</strong> is quite prone to fire accidents. This is mostly because of the unplanned &<br />
haphazard, housing development within the city. Even in adverse cases in most parts of the<br />
cities, fire extinguisher vehicle can’t approach the accident site due to narrow allies even in<br />
commercial places.<br />
Draught<br />
Occurrence of drought is also frequent in <strong>Dhanbad</strong> district as it little differs from monsoon<br />
corridor. Many of its regions lie in the leeward side of monsoon corridor, due to presence of<br />
mountain ranges oppositely facing to monsoon winds. Past occurrences show that the entire<br />
district is prone to draught.<br />
Mining Hazards<br />
Mining is the hazardous operation against the force of nature. Unless adequate safeguards are<br />
taken while operating mines, safety of persons working may become the first causality.<br />
Unscientific and irregular development, extraction and abandonment of mine workings in the<br />
area of Jharia Coalfield have led to mine fire and subsidence problem in this region. On the<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 105
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
other hand, as the natural outcome of industrial growth, the township of Jharia started<br />
coming with concentrated growth of dwellings. Impact of mine fire and subsidence has led to<br />
grave socioeconomic problems for the people residing and/or working here.<br />
Unplanned civil construction and spread of populace over coal bearing areas have<br />
compounded problems of coal theft. In the past, growth of habitation over coal bearing areas<br />
remained unchecked and associated human activities which grow with population continued<br />
to flourished. Now initiatives must be taken to stop and reduce the pressure of population<br />
from mining operated areas.<br />
Abandoned Mines<br />
The Region is full of small abandoned mines, many of them a legacy of unscientific mining by<br />
the erstwhile private owners. A very complex geotechnical nature of seams in Jharia Coalfield<br />
had forced abandonment of the operation before complete extraction of coal, in many cases<br />
large scale urbanization over coal bearing areas had forced mine operators to stop mining.<br />
Moreover, due to multiple seam situations and for lack of a proper mine closure plan<br />
subsistence takes place even in some habitation areas.<br />
Protective works like fencing off abandoned quarries, filling up of voids etc. should be<br />
completed by the lessee before abandonment of workings. Numbers of statuary orders have<br />
been issued by Director General of Mines Safety (Authority Body for granting consent for<br />
lease mining) under regulation 112 of the CMR, 1957 in this regard. The time frames for<br />
completion of these jobs need to be attached to it.<br />
Seismic Hazard<br />
The seismic hazard map of India was updated in 2000 by the Bureau of Indian Standards<br />
(BIS). According to the new map, the state of Jharkhand lies in Zones II , III and IV. The<br />
northwestern part of the State adjacent to West Bengal falling in Goda and Sahibganj district<br />
comes under zone 4, where a maximum MSK intensity of VIII can be expected. The districts<br />
of Gharwa, Palamu, Chatra, Hazaribag, Koderma, Girdidih, Deoghar, Bokaro, <strong>Dhanbad</strong>,<br />
Dumka, Pakur , Lohkardaga lie in Zone III, where a maximum<br />
MSK intensity of VII can be expected. The remaining districts of Gumia, Ranchi, West<br />
Singhbhum and East Singhbhum lie in Zone II.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 106
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Figure 28: Earthquake Zones in Jharkhand State<br />
Figure 29: Past Earthquake Occurrences in <strong>Dhanbad</strong> Region<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 107
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
(i.) <strong>Dhanbad</strong> lies in a Moderate Damage Risk Zone as per the latest seismic zone map of<br />
India.<br />
(ii.) The population is concentrated in the area of earthquake hazard.<br />
(iii.) The building and lifelines have low earthquake resistance.<br />
There is a critical need to adopt earthquake hazard-reduction measures and adopt proper<br />
guidelines for construction of buildings as it’s not the earthquake that kills people but unsafe<br />
structures do. Awareness, preparedness, capacity building, education are all necessary and<br />
important for the city’s residents.<br />
Displacement of Schedule Tribe Families from Major Projects in DMC Area.<br />
Table 71: Displacement of Tribe Families<br />
Project<br />
No of Families<br />
Displaced<br />
Area from which<br />
the families<br />
Displaced<br />
No. of<br />
Families<br />
Resettled<br />
Sindri Fertilizer 597 1,228 973<br />
Maithon Dam<br />
3,296 13,138 484<br />
(Jharkhand & W.Bengal)<br />
Panchet Dam<br />
(Jharkhand & W.Bengal)<br />
1,916 1951<br />
There is also very sharp decline in the relative share of tribal population from these areas. In<br />
<strong>Dhanbad</strong> Region alone the decline is from 15.7% in 1951 to 8.5% in 1991in 2001 attracts<br />
concerns of the administrative authorities.<br />
Limitations<br />
Since the available environmental data is meager, findings were arrived at based on past data<br />
and qualitative data analysis.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 108
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
VII. PHYSICAL PLANNING AND GROWTH MANAGEMENT<br />
A. Overview<br />
The structure of the city is determined by physical planning. Physical planning gives blueprint<br />
of the growth pattern and means to regulate and manage it. The settlement pattern of<br />
<strong>Dhanbad</strong> has some typical characteristics of most of the Indian cities including, it being<br />
situated on near by Damodar riverbank. Besides this, <strong>Dhanbad</strong> has got special character<br />
owing to the large coal mining activity and allied industrial development leads to unplanned<br />
developments and unsafe to reside in Jharia Coal Field (JCF) area in the <strong>Dhanbad</strong> <strong>Municipal</strong><br />
<strong>Corporation</strong> jurisdiction. Though town planning is an age-old presence in India, most of the<br />
cities here have grown in parts without substantial level of regulations and planning. Similarly,<br />
<strong>Dhanbad</strong> has also seen organic growth accelerating much faster than and different from the<br />
planned growth.<br />
B. Planning Efforts in the Past<br />
Mineral Area Development Authority (MADA) prepared the first Master Plan for <strong>Dhanbad</strong><br />
in 1989. To ensure orderly development of <strong>Dhanbad</strong> mineral areas in the region, the first<br />
Master Plan was envisaged the land use plan for the year 2011. The area demarcated for the<br />
preparation of Master Plan study was 5,600 Hectares, which is actually the erstwhile <strong>Dhanbad</strong><br />
<strong>Municipal</strong> area.<br />
C. Land Use Management<br />
The Master Plan envisages out<br />
of the total area of 5,600<br />
hectares, 5,415 hectares will be<br />
developed in 2011. The<br />
residential areas in <strong>Dhanbad</strong><br />
constitute about 44.32 percent<br />
of the future developable land.<br />
Reasonable land was proposed<br />
for circulation pattern in<br />
<strong>Dhanbad</strong> for the year 2011.<br />
Next to the circulation pattern,<br />
industrial activity occupies a<br />
share of 12.74 percent and<br />
institutional & Housing activity<br />
occupies a share of 9.23<br />
percent. Detail breakup of the<br />
Residential<br />
45%<br />
Figure 30: Proposed Land Use<br />
Proposed Land Use<br />
Industrial<br />
13%<br />
Circulation<br />
20%<br />
Commercial<br />
5%<br />
Institutional & Housing<br />
9%<br />
Recreational<br />
6%<br />
Public & Semi Public<br />
2%<br />
proposed land use is presented in Table 72. Since there is no master plan for entire area of<br />
the <strong>Corporation</strong> conceptual master plan has been presented in Figure 31.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 109
S<br />
PG<br />
PG<br />
PG<br />
S<br />
S<br />
TETULIATAND<br />
PG<br />
S<br />
GOSAI DI<br />
PG<br />
PG<br />
S<br />
PG<br />
PG<br />
PG<br />
S<br />
S<br />
S<br />
BS<br />
PG<br />
S<br />
S<br />
COL.<br />
S<br />
S<br />
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Figure 31: Erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong> area proposed Landuse Map<br />
S<br />
S<br />
CITY DEVELOPMENT PLAN<br />
DHANBAD<br />
PROPOSED LAND USE<br />
S<br />
MASTER PLLAN FOR DHANBAD<br />
COL<br />
LEGEND<br />
RESIDENTIAL<br />
COMMERCIAL<br />
WHOLE SALE<br />
RANGADI<br />
RETAIL<br />
INDUSTRIAL<br />
LIGHT AND MEDIUM<br />
KHILKNALI<br />
SERVICE<br />
RIVER, NALLA<br />
PONDS<br />
RECREATIONAL<br />
PLANTATIONS<br />
KANDRA<br />
NH2<br />
PG<br />
S<br />
NARAYANPUR<br />
TO CALCUTTA<br />
BALIAPUR<br />
PUBLIC UTILITIES & SOCIAL AMENITIES<br />
POLICE STATION<br />
HEALTH CENTRE<br />
BANK<br />
POST OFFICE<br />
COMMUNITY CENTRE<br />
PG<br />
S<br />
PG<br />
PLAY GROUND / PARK<br />
KASITAND<br />
BS<br />
PG<br />
S<br />
SECONDARY SCHOOL<br />
TUMBAHA<br />
SIMLA BERA<br />
SABALPUR<br />
COL<br />
HOSP<br />
KOYALA NAGAR<br />
DAMODARPUR<br />
PG<br />
DHOKHARA<br />
COL<br />
HOSP<br />
PRIMARY SCHOOL<br />
TREKKER STAND<br />
CYCLE, RICKSHAW STAND<br />
PUBLIC INSTITUTION AND HOUSING<br />
COLLEGE<br />
HOSITAL<br />
SIMLATAND<br />
KISITAND<br />
BARWA<br />
ADDA<br />
SAHARJORI<br />
TRUCK<br />
TERMINAL<br />
PANDUKI<br />
APMC<br />
BHELATAND<br />
AIRSTRIP<br />
S<br />
SUSNIL EWA<br />
PG<br />
PG<br />
S<br />
PG<br />
DHAIYA<br />
PG<br />
S<br />
PG<br />
I S M<br />
S<br />
C M R I<br />
JAGJIVAN NAGAR<br />
S<br />
PG<br />
COL<br />
LIBR<br />
HIRAPUR<br />
S<br />
PG<br />
BHUDA<br />
DHANBAD<br />
RLY. STN.<br />
BS<br />
BARMASIA<br />
DHANBAD<br />
MANAITAND<br />
DHUHATAND<br />
s<br />
BS/RS<br />
BUS / RAILWAY STATION<br />
AIR STRIP<br />
RAILWAY LINE<br />
PROPOSED ROADS<br />
250'- 00" R/W ROAD<br />
200'- 00" "<br />
150'- 00" "<br />
100'- 00" "<br />
80'- 00" "<br />
60'- 00" "<br />
40'- 00" "<br />
30'- 00" "<br />
20'- 00" "<br />
EXISTING ROADS<br />
250'- 00" "<br />
200'- 00" "<br />
150'- 00" "<br />
100'- 00" "<br />
80'- 00" "<br />
PARKING AREA<br />
SL NO. ELEMENT<br />
Area in hec<br />
PLANNING AREA<br />
BOUNDARY<br />
VILLAGE BOUNDARY<br />
Percentage of total land use<br />
BADA JAMUA<br />
DAMKARA BARWA<br />
S<br />
PG<br />
NATIONAL HIGH WAY BY PASS<br />
KURUMIDI<br />
CITY<br />
PARK<br />
PG<br />
BAROMURI<br />
BISHUNPUR<br />
POLYTECH<br />
PANDERPALHA<br />
MATKURIA<br />
BANK MORE<br />
1. Residential<br />
2400 42.56<br />
2. Industrial 690 12.86<br />
3. Commercial 270 4.82<br />
4. Circulation(Road & Railway) 1100<br />
19.64<br />
5. Water bodies 185 3.30<br />
6. Institutinal & housing<br />
500<br />
8.93<br />
7. Public adminstrtion &<br />
120 2.14<br />
services<br />
8. Social amentities &<br />
335<br />
5.98<br />
recreativ<br />
TO DELHI<br />
NAWADIH<br />
PG<br />
SPORTS<br />
STADIUM<br />
PG<br />
Total land use 5600 100<br />
TO BHULI<br />
NH 32<br />
N<br />
TO BOKARO<br />
DHANBAD MUNICIPAL CORPORATION<br />
SOURCE : KIRLOSKAR CONSULTANTS FOR MADA<br />
TO NEW DELHI<br />
FIGURE NO:<br />
INFRASTRUCTURE DEVELOPMENT<br />
CORPORATION LIMITED<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 110
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Table 72: Proposed Land Used - 2011<br />
Land Use 2011 Distribution<br />
Hectare %<br />
Developed Area<br />
Residential 2,400 44.32<br />
Industrial 690 12.74<br />
Commercial 270 4.99<br />
Institutional & Housing 500 9.23<br />
Recreational 335 6.19<br />
Public & Semi Public 120 2.22<br />
Circulation 1,100 20.31<br />
Sub Total Developed Area 5,415 100.00<br />
Water Bodies 185<br />
Urbanized Area 5,600<br />
Source: Master Plan Report, 1989.<br />
D. Urban Sprawl<br />
The present outline of the new <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> has grown by development<br />
in parts like, <strong>Dhanbad</strong>, Sindri, Jharia, Kataras, Chattantand and etc. At different periods, the<br />
urban settlements grew in different directions. When the development reached some physical<br />
barrier in one direction, then the direction for development changed for next best option.<br />
Initially, the <strong>Municipal</strong> <strong>Corporation</strong> area grew Sindri, Jharia and <strong>Dhanbad</strong> because of the coal<br />
mining and industrial developments. A no of mining settlements have sprung up along two<br />
major arterial roads in the <strong>Corporation</strong> Jurisdiction. Jharia, Jorapokhar, Tisra, Bowra,<br />
Jamadoba, Pathardih, Chasnala, Sindri and Bhagatdih have come up along <strong>Dhanbad</strong> – Jharia-<br />
Sindri road. Urban Settlements like, Chaitudih, Sijua, Angarpathar, Katras- Salanpur, Malkera,<br />
Chandur are developed along <strong>Dhanbad</strong> –Karkend – Katras road. Thus, <strong>Dhanbad</strong> Urban<br />
Agglomeration is one of the most urbanized regions in the Country.<br />
Future growth directions (Figure 32), owing to the implementation of Jharia Rehabilitation<br />
Plan development will be directed towards the proposed townships. High potential areas<br />
available for future developments are anticipated between railway track (Kolkata – Delhi) and<br />
NH 2 Road towards Gobindpur.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 111
CITY DEVELOPMENT PLAN<br />
DHANBAD<br />
DHANBAD MUNICIPAL CORPORATION<br />
GOTTOPA<br />
FUTURE POTENTIAL AREA AND<br />
PROPOSED CONCEPTUAL LANDUSE<br />
CHANDUD<br />
AMAGHATA<br />
SAMAIDIH<br />
SABALPUR<br />
DHANGI<br />
KOLAKUSMA<br />
SAPTA<br />
NARAINPUR<br />
9<br />
LEGEND<br />
8<br />
BHELATAND<br />
PALANI<br />
MAJOR ROADS<br />
40<br />
RAILWAY LINE<br />
RAKHITPUR<br />
MAJOR RIVERS<br />
AMJHAR<br />
6<br />
DHAIYA<br />
CITY/ TOWN<br />
SINDRI<br />
BARADAHA<br />
HIRAPUR<br />
7<br />
DHOKHRA<br />
BHUDA<br />
FUTURE AREA OF GROTH<br />
3<br />
UNSUITABLE SITE FOR DEVELOPMENT<br />
BAROMA<br />
5<br />
DHOWATANR<br />
PROPOSED BCCL TOWNSHIPS<br />
GOLMARA<br />
KUSBERIA<br />
Environmentally Sensitive Area<br />
4<br />
RESIDENTIAL<br />
SAHARPURA<br />
BERA<br />
1<br />
COMMERCIAL<br />
GOLAKDIH<br />
RAJGANJ<br />
MIXED LAND USE<br />
OJHADIH<br />
AGRICULTURAL<br />
200<br />
JINAGORA<br />
BAGAGI<br />
GOPALICHAK<br />
UPARKANDRA<br />
BHATDIH<br />
202<br />
JAMADOVA<br />
LOYABAD<br />
ARULGRIA<br />
PETIA<br />
111<br />
GANSADIH<br />
PARASIA<br />
MUNIDIH<br />
KARITANR<br />
N<br />
DHANBAD MUNICIPAL CORPORATION<br />
INFRASTRUCTURE DEVELOPMENT<br />
CORPORATION LIMITED<br />
FIGURE NO:<br />
DAMODAR RIVER<br />
192<br />
SINDRI<br />
186<br />
187<br />
189<br />
CHHIPATAND<br />
SOULAPUR<br />
183<br />
174<br />
169<br />
DOMGARH<br />
TASRA<br />
168<br />
167<br />
City Development Plan, <strong>Dhanbad</strong> Final Report<br />
Figure 32: <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> – Future Growth Direction<br />
174<br />
173 172<br />
129<br />
184<br />
JIALGORA<br />
TO KOLKATA<br />
122<br />
11<br />
185<br />
18<br />
32<br />
towards Baliapur<br />
towards Govindpur<br />
10<br />
123<br />
125<br />
126<br />
127<br />
128<br />
NH32<br />
34<br />
30<br />
NH2<br />
35<br />
towards Barwadda & Bhuli<br />
151<br />
36<br />
37<br />
DHANBAD<br />
49<br />
13<br />
152<br />
140<br />
170 171<br />
14<br />
141<br />
16<br />
15<br />
142<br />
131<br />
144<br />
17<br />
12<br />
88<br />
89<br />
94<br />
52<br />
50<br />
139<br />
48<br />
47<br />
46<br />
49<br />
44<br />
45<br />
42<br />
85<br />
86<br />
87<br />
143<br />
150<br />
127<br />
146<br />
122<br />
144<br />
126<br />
147<br />
148<br />
153<br />
121<br />
154<br />
155<br />
177<br />
198<br />
158<br />
156<br />
61<br />
59<br />
201<br />
67<br />
75<br />
138<br />
207<br />
68<br />
137<br />
69<br />
136<br />
135<br />
108<br />
114<br />
116<br />
160<br />
159<br />
207<br />
217<br />
215<br />
208<br />
270<br />
271<br />
71<br />
66<br />
72<br />
100<br />
NH33<br />
237<br />
273<br />
113<br />
241<br />
274<br />
80<br />
81<br />
82<br />
99<br />
107<br />
TO DELHI<br />
280<br />
97<br />
103<br />
106<br />
112<br />
253<br />
238<br />
261<br />
220<br />
216<br />
238<br />
263<br />
256<br />
231<br />
264<br />
260<br />
84<br />
VARANASI<br />
KOLKATA<br />
PRADHAN KHANTA<br />
BALGRIA<br />
BANDARCHUA<br />
221<br />
230<br />
289<br />
226<br />
MUKUNDA<br />
MATKURIA<br />
224<br />
383<br />
282<br />
272<br />
288<br />
229<br />
287<br />
225<br />
223<br />
212<br />
232<br />
284<br />
233<br />
235<br />
266<br />
267<br />
265<br />
269<br />
299 300<br />
286<br />
228<br />
286<br />
301<br />
278<br />
349<br />
348<br />
276<br />
55<br />
65<br />
84<br />
54<br />
86<br />
53<br />
DALDALI<br />
79<br />
85<br />
87<br />
73<br />
58<br />
77<br />
96<br />
94<br />
88<br />
93<br />
89<br />
92<br />
91<br />
104<br />
102<br />
90<br />
101<br />
105<br />
133<br />
SHYAMDIH<br />
RANGUNI<br />
CHANDKUYIH<br />
BASTACOLA<br />
BANSMORI<br />
GONDUDIH<br />
CHHOTA<br />
KHARIKABAD<br />
KUJUMA<br />
NICHITPUR<br />
PARUTIA<br />
SURANGA<br />
PAHARPUR<br />
ALAKHDIHA<br />
BHAGRAMPUR<br />
MADHUBAN<br />
PARASBANIA<br />
KUSUNDA<br />
ALKUSA<br />
JIALGORA<br />
SONARIA GORERIED EKRA<br />
TETULMARI<br />
SIALGUDRI<br />
DHONDABAD<br />
DHOBANI<br />
GOPINATHDIH<br />
BARRAGARY<br />
GARBHUDIH<br />
BARADUBHI<br />
PARBAD<br />
157<br />
117<br />
PHATA MAHL<br />
LALCHAK<br />
TILATANR<br />
UDALBANI<br />
GANDUBAD<br />
BARWADI<br />
GOPINATHDIH<br />
SABIPUR<br />
KUSUMDAHA<br />
KARMATANR<br />
AMGHATA<br />
BISUNPUR<br />
PANEARA<br />
DAMODARPUR<br />
SUSNILEWA<br />
DAMKAR BRWA<br />
SONDAHA<br />
DHARJORI<br />
KURMIDIH<br />
PICHHARI<br />
BARA<br />
OR<br />
KARI TANR<br />
181<br />
BLAITANR<br />
BAGDAHA<br />
UDAYPUR<br />
GOVINDADIH<br />
BHUIAN RARARPUR<br />
CHHOT<br />
PICHHARI<br />
SALDAHA<br />
164<br />
165<br />
CHASNALA<br />
PARGHABAD<br />
163<br />
182<br />
RAGHUNATHPUR<br />
179<br />
MANAITAND<br />
RANGAMATIA<br />
175<br />
51<br />
JHARNA<br />
172<br />
MANOHARTANR<br />
133<br />
NAGRIKALA<br />
162<br />
171<br />
KUSTOR<br />
PUTKI<br />
SARAIDHELA<br />
BHAGATDIH<br />
PATHRA KULHI<br />
JHARIA<br />
TISRA<br />
PATHARDIH<br />
RAMPUR<br />
SARADHA<br />
MAJHILADIH<br />
LAKARKHAOARI<br />
BHAGABAND<br />
JITPUR<br />
KENDUADIH<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 112<br />
ROHARABAND<br />
BAUOKALA<br />
DHANBAD<br />
BHULI<br />
DHANSAR<br />
GODHAR<br />
CHHATABAD<br />
BASARIA<br />
213<br />
KERKEND<br />
CHANDRABAD<br />
JORAPOKHAR<br />
BALIHARI<br />
76<br />
SUDAMDIH<br />
SABALDIH<br />
RAJASDHRA<br />
DUNGRI<br />
BHOWRA<br />
JARMA<br />
DAMODAR RIVER<br />
JATUDIH<br />
TETENGABAD<br />
PATRA KULHI<br />
KUPURIA<br />
MALKERA<br />
SIJUA<br />
PONDERKANLI<br />
KATRAS<br />
ANGARPATHRA<br />
KAILUDIH<br />
CHANDAUR<br />
258<br />
BANDHDIA<br />
TO RANCHI<br />
TO RANCHI
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
E. Jharia Rehabilitation Plan<br />
Owing to the Jharia under ground fire and subsidence issues in Jharia Coal Field, the Standing<br />
Sub-committee of SSRC on Environment and Ecology has directed CMPDI on 30 th June<br />
1999 to prepare a Master Plan for dealing with problems of fire and subsidence and<br />
rehabilitation in the lease hold of BCCL. Draft Master Plan has been prepared on the basis of.<br />
World Bank funded reports for development of Fire Fighting Programme in JCF (1996),<br />
Identification of Subsidence Prone Habitated Areas (Phase -I) prepared by CMPDI (1998)<br />
and Technological measures for subsidence Control/Rehabilitation of the Habitated Areas<br />
(Phase –II) prepared by CMPDI (1991).<br />
Main tasks and the objectives of the Jharia Rehabilitation Plan are as follows;<br />
<br />
<br />
<br />
<br />
To identify people of the BCCL and Non-BCCL houses and other buildings which are<br />
situated over unstable old underground workings/fire and subsidence affected areas in<br />
BCCL /ECL leasehold areas falling in <strong>Dhanbad</strong> District;<br />
To draw a plan or schemes and rehabilitation packages for shifting and rehabilitation for<br />
the families identified;<br />
Draw a plan for welfare of the person identified who are to be shifted to risk free area;<br />
and<br />
Review the progress in the execution of these activates as well as effectiveness for the<br />
benefits directed towards the persons shifted and rehabilitated from unsafe areas.<br />
As per the draft Jharia Rehabilitation Plan, the rehabilitation scheme was planed to implement<br />
in four phases for a span of 20 years. The Table 73 presents the abstract of draft Jharia<br />
Rehabilitation Action Plan prepared by CMPDI for BCCL. As per the discussion with the<br />
BCCL and CMPDI officials, the draft master plan yet to be approved by the central<br />
government. The Central Government has suggested to rework on the implementation period<br />
(10+2 years) instead of 20 years and also to include the increasing no of affected persons in<br />
the region, since estimates of affected persons figures are outdated. Hence the master plan is<br />
under preparation. We were told that unless and until government approves the Master Plan<br />
BCCL cannot share for public / study purposes.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 113
I<br />
DAMIDA OCP<br />
DAMUDA<br />
W.MOHUDA(NORTH)<br />
W.MOHUDA(NORTH)<br />
LAHAPATI<br />
14A<br />
KALYANPUR<br />
BLOCK-III(NC)<br />
N.MAHUDA<br />
MURAIDIH<br />
KHUDIA NALA<br />
SHATARI<br />
20<br />
21 PITS<br />
ALUARA<br />
G.T.ROAD<br />
ALUARA<br />
RAJGANJ<br />
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Figure 33: Proposed Jharia Rehabilitation Township Map on Jharia Coal field<br />
TO DELHI<br />
CITY DEVELOPMENT PLAN<br />
DHANBAD<br />
PROPOSED JHARIA<br />
REHABILITATION<br />
GOVINDPUR<br />
GOMOH STN.<br />
KOYLACITY<br />
II<br />
HAQARIKALAN<br />
KOYLACITY<br />
BARORA<br />
AREA<br />
23<br />
KESSURGARH NUD<br />
KHURKI<br />
NUD<br />
BENEDIH<br />
JAMUNIA KHURKI<br />
OCP<br />
OCP<br />
BLOCK-I OCP<br />
COKING<br />
MADHUBAND 1<br />
PHULARITAND<br />
MADHUBAND<br />
DAMUDA<br />
PIPRATAND-RADHANAGAR<br />
14<br />
TO GORAH<br />
DAMODAR RIVER<br />
BARAPANDIYDIH<br />
24<br />
16<br />
(PHULARITAND<br />
OCP$SECT)<br />
15<br />
PHULARITAND<br />
MURAIDIH<br />
OCP<br />
BHURANGIA<br />
DARIDA<br />
KHARKHAREE<br />
EXLENSION<br />
25<br />
BHATDIH<br />
SALAN<br />
JOGIDIH<br />
AKASKINARI PUR<br />
KOORIDIH BLOCK-IV<br />
OCP(NC)<br />
AKASKINARI<br />
GOVINDPUR<br />
OCP<br />
DCP<br />
E.KATRAS<br />
2<br />
DHARMABAND-EXTENSION<br />
MURULIDIH<br />
DHARWABAND<br />
E.MAHUDA<br />
17<br />
26<br />
KOUMURNA<br />
MURULIDIH<br />
20<br />
KATRI<br />
NALA<br />
KHUDIA<br />
NALA<br />
KESHALPUR<br />
RAMKANALI<br />
W.MUDIDIH<br />
NT OCP<br />
SIJUA<br />
AREA<br />
RAMKANALI<br />
W.MUDIDIH<br />
OCP<br />
KESHALPUR TETULMARI<br />
OCP<br />
NICHITPUR<br />
TETULMARI<br />
SENDRABANSJORA<br />
OCP<br />
OCP EAST<br />
ANGARPATHRA<br />
BASURIA<br />
BUSSURIYA OCP<br />
KATRAS<br />
SENDRABANSJORA<br />
AREA<br />
BUSSURIYA<br />
KHAS<br />
TO<br />
KUSUNDA<br />
DHANBAD<br />
STN.<br />
LOYABAD<br />
KHASKUSUNDA<br />
S.POOTKEE<br />
OCP<br />
LOYABAD<br />
VI<br />
GODHUR<br />
DHANSAR<br />
BANSDEOPUR<br />
4<br />
KENDW GODHUR<br />
ADIH<br />
OCP<br />
KOCP<br />
GOPALI<br />
KUSUNDA<br />
BAS<br />
BHAGABAND<br />
CHUCK<br />
ARE VII<br />
ACOLLA<br />
BHAGABAND<br />
KUSUNDA<br />
DHANSAR<br />
OCP<br />
OCP<br />
5 PUTKI-BALIHARI<br />
KUSUNDA<br />
VII<br />
KAPURIA<br />
INDUSTRY<br />
MOONIDIH<br />
7<br />
KUSTORE<br />
ENA OCP<br />
ROCP<br />
BHUTGARIA<br />
S.JHARIA<br />
6<br />
ROCP<br />
27<br />
SINGRA<br />
DAMODAR RIVER<br />
ADRA-GOMOH<br />
RLY. LINE 19<br />
EASTERN<br />
JHARIA<br />
AREA<br />
SINGRA<br />
JARMA<br />
6<br />
BHUT<br />
GORIA<br />
BIJRA<br />
GARH<br />
ISSCO<br />
27<br />
BHULI<br />
SINLA<br />
BAHAL<br />
HURRIDIH<br />
SAPTA<br />
LODHA<br />
LODHA<br />
IX<br />
BERA<br />
PATRAKULI<br />
JHARNA<br />
DOBARI<br />
BHAGRAMPUR<br />
KUYA<br />
GANOODIH<br />
AMTAL<br />
GOLMORA<br />
BIJOYDIH<br />
BELGARIA<br />
GANOODI<br />
OCPH<br />
GOLUCKDIH<br />
BASTACOLLA OCP<br />
AREA<br />
DHANBAD PATHARDIH RLY<br />
GOLUCKDIH<br />
KUJAMA<br />
NORTH N.TISRACP<br />
TISRA<br />
SOUTH<br />
LUPANIA<br />
TISRA<br />
TO HOWRAH<br />
PALANI<br />
SABAIGARHA<br />
GOVINDPUR<br />
TO CALCUTTA<br />
SAPTA<br />
LEGEND<br />
II<br />
REHABILITATION SITE<br />
FOR HIGH INCOME GROUP<br />
REHABILITATION SITE<br />
FOR MEDIUM INCOME GROUP<br />
REHABILITATION SITE<br />
FOR LOW INCOME GROUP<br />
AREA BOUNDRY<br />
COLLIERY BOUNDARY<br />
RIVER / JORIA<br />
RAILWAY LINE<br />
OPERATING OCP<br />
MAJOR ROADS<br />
UNDERGROUND BLOCKS<br />
OPENCAST BLOCKS (ORIGINAL)<br />
OPENCAST BLOCKS (REVISED)<br />
TISCO<br />
JEAL<br />
GORA<br />
BAG<br />
DIG<br />
JOYRAMPUR<br />
JEENAGORA<br />
OCP<br />
5.TISRA OCP & AUGN<br />
28<br />
21<br />
PARBATPUR<br />
PARBATPUR<br />
AMLABAD<br />
PROJECT<br />
9<br />
JEALGORA<br />
BARAREE<br />
10<br />
BHAWRAH BHAWRAH NORTH<br />
BHAWRAH OCP<br />
NORTH<br />
JEENAGORA<br />
SULANGA<br />
AMLABAD<br />
11<br />
EASTERN<br />
JHARIA<br />
AREA<br />
BHAWRAH<br />
SOUTH<br />
BHAWRAH SOUTH<br />
OCP<br />
PATHAR<br />
DIH<br />
SUDAMDIH 12<br />
INC.<br />
E.RLY PRADMANKHANTA<br />
PATHARDIH CHORD<br />
MAHAL<br />
SITAHAL<br />
SAPTA<br />
SUDAMDIH<br />
SHAFT<br />
22<br />
28 18<br />
IISCO<br />
SUDAMDIH<br />
MOHAL<br />
30<br />
GOURIGRAH<br />
GOURDGRAM<br />
TO ADRA<br />
23<br />
SAPTA<br />
TASRA<br />
DHANBAD MUNICIPAL CORPORATION<br />
INFRASTRUCTURE DEVELOPMENT<br />
CORPORATION LIMITED<br />
FIGURE NO:<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 114
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Table 73: Draft Jharia Rehabilitation Plan<br />
Description<br />
Phase – I<br />
(1 st -5 th yr)<br />
Phase – II<br />
(6 th -10 th<br />
yr)<br />
Phase –<br />
III (11 th -<br />
15 th yr)<br />
Phase –<br />
IV (16 th -<br />
20 th yr)<br />
Total<br />
No of Sites 119 124 143 146 532<br />
Rehabilitation of BCCL 8,634 11,750 9,101 5,223 34,708<br />
Houses<br />
Rehabilitation of 3,714 4,491 4,658 3,510 16,373<br />
Private Houses<br />
Rehabilitation of 3,036 2,620 2,562 1,401 9,619<br />
Encroachments<br />
Total 15,384 18,861 16,321 10,134 60,700<br />
Land Requirement 487.34 515.82 442.42 274.33 1,719.91<br />
(acres)<br />
Capital Cost (Crs) 548.45 671.68 650.30 421.47 2,291.90<br />
BCCL and CMPDI has initiated following activities like survey of non-BCCL families falling<br />
within first phase of Jharia Action Plan completed. In Belgoria village within Baliapur Anchal<br />
about 45.11 acres of land has been identified for rehabilitation of non –BCCL families. In<br />
addition about 408.72 acres of land to be acquired for that proposal is being prepared by<br />
CMPDI. Construction of 900 units houses for first phase in progress on demonstration<br />
model.<br />
F. Key Developmental Issues<br />
(i)<br />
(ii)<br />
(iii)<br />
(iv)<br />
(v)<br />
(vi)<br />
(vii)<br />
Absence of upto date or latest Master Plan/ Landuse Plan for the entire <strong>Municipal</strong><br />
<strong>Corporation</strong> leads to haphazard and uncontrolled development;<br />
Jharia Coal Field (JCF) covers significant area of the DMC , which ultimately leads to<br />
barrier for developments and hence future developments are restricted with in small<br />
portion of the <strong>Municipal</strong> <strong>Corporation</strong> Area;<br />
Absence of adequate implementation mechanism (like building by-laws and etc) and<br />
tools;<br />
Inadequate financial resources to implement schemes;<br />
Lack of private sector and community participation in development;<br />
Inadequate understanding and co-ordination between stakeholders agencies which are<br />
working for the city;<br />
Since, the <strong>Dhanbad</strong> is falling under seismic earthquake zone III, suitable construction<br />
technology and material are must for the guided and safe development.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 115
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
VIII. URBAN GOVERNANACE<br />
A. ULBs in the Context of 74th Constitutional Amendment<br />
In order to enable the urban local bodies “to perform effectively as vibrant democratic units<br />
of self government”, the 74th Constitutional Amendment was introduced in the Parliament<br />
and it became an Act in December 1992.<br />
This Act is a great reform act in the political context as well as in the administrative and<br />
financial aspects concerning the urban local bodies.<br />
1. Political Context<br />
As per Article 243-Q, every State has to constitute three types of urban local bodies - Nagar<br />
Panchayats (Town Panchayats) in the transitional area which is in the process of growth from<br />
rural to urban area; a <strong>Municipal</strong>ity for smaller urban area and a <strong>Corporation</strong> for a larger urban<br />
area. This article also lays down the broad parameters such as - population of the area, the<br />
density of the population therein, the revenue generated for local administration, the<br />
percentage of employment in non-agricultural activities, the economic importance or such<br />
other factors as the Governor may, by public notification specify- for formation of urban<br />
local bodies.<br />
As per Article 243R, every urban local body should comprise of elected councilors chosen by<br />
direct election from the territorial constituencies or wards as delimited for this purpose.<br />
Article 243-S provides for Constitution of Ward Committees consisting of one or more wards<br />
within the territorial area of the municipality having a population of three lakhs or more.<br />
As per Article 243-T seats have to be reserved for persons belonging to Scheduled Castes and<br />
Scheduled Tribes in every municipality and the number of seats reserved to be in the same<br />
proportion of their population to the total population. It also provides for reservation of the<br />
office of Chairman in all municipalities for persons belonging to Scheduled Castes/<br />
Scheduled Tribes and for women as the State Legislature may provide by law.<br />
Article 243-U provides for the continuance for five years from the date appointed for its first<br />
meeting, unless sooner dissolved under any law in force. It also provides that such dissolution<br />
can be done only after the municipality is given a reasonable opportunity of being heard.<br />
More importantly, this article stipulates that an election to constitute a municipality should be<br />
completed before expiry of its duration and before the expiration of a period of six months<br />
from the date of its dissolution.<br />
2. Administrative and Financial Context<br />
Article 243W lays that the State may endow municipalities with necessary powers and<br />
authority to enable them to function as institutions of local self government with respect to<br />
the preparation of plans for economic development and social justice and performance of<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 116
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
functions and the implementation of the schemes entrusted to them including the matter<br />
listed in the twelfth schedule.<br />
<strong>Municipal</strong> Finance and Taxes.<br />
The 74th Constitutional Amendment Act provides for the Constitution of a State Finance<br />
Commission to review the financial position of the municipalities (as well as the Panchayats)<br />
and make recommendations to the Governor as to the principles, which should govern:<br />
<br />
<br />
<br />
The distribution between the State and the municipalities of the net proceeds of the taxes,<br />
duties, tolls and fees leviable by the State, which may be divided between them under this<br />
part and the allocation between the municipalities at all levels of their respective shares of<br />
such proceeds.<br />
The determination of the taxes, duties, tolls and fees which may be assigned to or<br />
apportioned by the municipalities.<br />
The grants-in-aid to the municipalities from the consolidated fund of the state.<br />
Bihar <strong>Municipal</strong> Act authorizes a municipality to levy, collect and appropriate such taxes,<br />
duties, tolls and fees in accordance with the procedures subject to limits as specified by the<br />
legislature. Besides these, the ULBs are also empowered with certain other financial powers.<br />
It also provides for recommending the measures needed to improve the financial position of<br />
the municipalities.<br />
Article 243-X of the Constitution provides that the Legislature of a State may by law:<br />
<br />
<br />
<br />
<br />
Authorize a <strong>Municipal</strong>ity to levy, collect and appropriate such taxes, duties, tolls and fees<br />
in accordance with such procedure and subject to such limits.<br />
Assign to a municipality such taxes, duties, tolls and fees levied and collected by the State<br />
Government for such purposes and subject to such conditions and limits.<br />
Provide for making such grants-in-aid to the municipalities from the consolidated fund of<br />
the state and<br />
Provide for constitution of such funds for crediting all moneys received by or on behalf<br />
of the municipalities and also for the withdrawals of such moneys there from as may be<br />
specified in the law.<br />
Besides the above, the 74th Constitutional Amendment Act lays emphasis on Urban<br />
environment management and focusing on development planning and integration of rural and<br />
urban development plans in any district or metropolitan area. The Constitution provides for a<br />
District Planning Committee to consolidate the plans prepared by the Panchayats and the<br />
municipalities in the district and to prepare a draft development plan for the district as a<br />
whole.<br />
The 74 th Constitution Amendment Act (CAA), 1992 has imparted constitutional status on the<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 117
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Urban Local Bodies and assigned appropriate functions to them. A constitutional Backing is<br />
given to the relationship of the Urban Local Bodies (ULBs) with the State Government with<br />
respect to their functions and powers, ensuring of timely and regular elections, arrangements<br />
for revenue sharing etc. Urban Local Bodies are given additional powers including<br />
preparation of local development plans, programmes for ensuring social justice,<br />
environmental management making them responsive to the local needs. This is facilitated by<br />
Article 243 -W of the Constitutional Amendment (74th) Act, 1992. Following are the<br />
functions of the ULBs as per the 74 th CAA.<br />
(1) Urban planning including town planning.<br />
(2) Regulation of land-use and construction of buildings.<br />
(3) Planning for economic and social development.<br />
(4) Roads and bridges.<br />
(5) Water supply for domestic, industrial and commercial purposes.<br />
(6) Public health, sanitation conservancy and solid waste management.<br />
(7) Fire services.<br />
(8) Urban forestry, protection of the environment and promotion of ecological aspects.<br />
(9) Safeguarding the interests of weaker sections of society, including the handicapped<br />
and mentally retarded.<br />
(10) Slum improvement and up gradation.<br />
(11) Urban poverty alleviation.<br />
(12) Provision for urban amenities and facilities such as parks, gardens and playgrounds.<br />
(13) Promotion of cultural, educational and aesthetic aspects.<br />
(14) Burials and burial grounds; cremations, cremation grounds and electric crematoriums.<br />
(15) Cattle pounds; prevention of cruelty to animals.<br />
(16) Vital statistics including registration of births and deaths.<br />
(17) Public amenities including street lighting, parking lots, bus stops and public<br />
conveniences.<br />
(18) Regulation of slaughterhouses and tanneries.<br />
In conformity with the 74 th CAA, the Bihar <strong>Municipal</strong> Act, 1922 was amended and the ULBs<br />
are entrusted with the functions listed in the Twelfth Schedule of the constitution or Article<br />
243 -W of the Constitutional Amendment (74th) Act, 1992.<br />
The 74 th CAA also provides for the constitution of a State Finance Commission to review the<br />
financial position of the municipalities and make recommendation.<br />
The urban reforms resulting from the 74 th Constitution Amendment Act lays larger<br />
responsibility on the <strong>Municipal</strong> Bodies, in terms of development planning, service provision<br />
and fiscal affairs. The policy framework of the state and central government has provided the<br />
necessary impetus to the urban sector to play a pro-active role in the development process. In<br />
the recent developments, it is imperative for the ULBs to set their priorities and strategies<br />
right, designed to achieve a clear vision with an action plan.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 118
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
B. Institutions and Capacity<br />
There are various governmental agencies involved in the developmental works of any urban<br />
area and they are assigned different functions in their own respective jurisdictions. The<br />
integration and co-ordination between these agencies determine the efficiency of urban<br />
management and quality of life to the citizens.<br />
1. Institutional Framework<br />
(a) <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> (DMC). <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> is responsible<br />
for provision and services delivery with in its jurisdiction. However, <strong>Dhanbad</strong> <strong>Municipal</strong><br />
<strong>Corporation</strong> has been created very recently (01 st February 2006) and hence it is not yet<br />
involved in service delivery activity other than erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity<br />
jurisdiction.<br />
(b) Mineral Area Development Authority (MADA). The Mineral Area Development<br />
Authority in <strong>Dhanbad</strong> in currently responsible for creation of water and sewerage<br />
infrastructure asset creation and bulk water supply to the entire mineral area excluding<br />
<strong>Dhanbad</strong> and Shindri town. MADA is also responsible for preparation of master<br />
plan/land use plan for the entire mineral area. The Town Planning Department in<br />
MADA prepares the Master Plan and Comprehensive Development Plan (CDP) for the<br />
city/town, and the mandate of implementing the Master Plan /CDP lies with the MADA<br />
and ULB. MADA also responsible for sanitation and solid waste management with in its<br />
jurisdiction. Planning, land development and provision of city-level infrastructure in the<br />
<strong>Dhanbad</strong> urban area is the responsibility of the MADA and the operation and<br />
maintenance of infrastructure / facilities created are the responsibility of the<br />
MADA/<strong>Corporation</strong>.<br />
(c) Water Supply & Sanitation Department (WS&SD). The Jharkhand Water Supply and<br />
Sanitation Department is the responsible agency for maintenance of water supply<br />
distribution system excluding MADA distribution area in the <strong>Municipal</strong> <strong>Corporation</strong><br />
jurisdiction.<br />
(d) Fertilizer <strong>Corporation</strong> of India (FCI). The Fertilizer <strong>Corporation</strong> of India (FCI) provides<br />
water to entire Sindri town.<br />
(e) National Highways (NH). National Highway department is responsible for creation of<br />
National Highway roads with in the city and maintain the same with a specified<br />
standards.<br />
(f) Road Construction Department (RCD)/Public Works Department (PWD). The Road<br />
Construction Department (RCD) /Public Works Department (PWD) is responsible for<br />
creation and maintenance of PWD Roads passes through the city.<br />
(g) Jharkhand Pollution Control Board (JPCB). The Jharkhand Pollution Control Board<br />
(JPCB) is responsible for environmental protection and enforcement of rulings related to<br />
the same, passed by the competent authorities.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 119
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
In addition to involvement of various institutions in the development of local-level<br />
infrastructure, the Urban Development Department (UDD) controls local-level governance<br />
through the Deputy Commissioner of <strong>Dhanbad</strong>.<br />
Multiple Agencies such as State Highways, National Highways, Zila Parisad, and Jharkhand<br />
Housing Board are working for the provision of basic services and infrastructure in the<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> area, with their own budget allotments from the State<br />
Government. If there are deficiencies in their service sector the respective Agencies are<br />
responsible. As far as Basic Services such as WS & Drainages are concerned MADA or<br />
WS&DB are executing agencies and if there are any deficiencies in these services,<br />
responsibility lies with DMC only.<br />
Table 74: Institutional Responsibility in Service Delivery<br />
Urban<br />
Infrastructure<br />
Planning &<br />
Design<br />
Construction<br />
/Implementation<br />
Operation and<br />
Maintenance<br />
Landuse/Master MADA MADA MADA<br />
Plan/Building<br />
Byelaws<br />
Water Supply MADA, DMC, MADA, DMC, MADA, DMC,<br />
WS&DB,FCI WS&DB,FCI WS&DB,FCI<br />
Sewerage & MADA, DMC MADA, DMC MADA, DMC<br />
Sanitation<br />
Drainage DMC DMC DMC<br />
Storm Water DMC DMC DMC<br />
Drainage<br />
Solid Waste MADA, DMC MADA, DMC MADA, DMC<br />
Management<br />
<strong>Municipal</strong> Roads DMC DMC DMC<br />
(including Flyovers)<br />
Street lighting DMC DMC DMC<br />
MADA: Mineral Area Development Authority, DMC: <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong>, WS&DB: Water<br />
Supply and Drainage Board, FCI: Fertilizer <strong>Corporation</strong> of India.<br />
Table 75: Role of the Private Sectors in Urban Infrastructure Provision<br />
Urban<br />
Role of Private Sector<br />
Infrastructure<br />
Present Status<br />
Proposed<br />
Water Supply - Water Treatment & Pumping Machinery<br />
Operations ands Maintenance are proposed<br />
to let out to private Sector<br />
Sewerage - Sewerage Treatment Plant Operations and<br />
Maintenance are proposed let out to private<br />
sector<br />
Drainage - -<br />
Storm Water<br />
- -<br />
Drainage<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 120
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Urban<br />
Infrastructure<br />
Solid Waste<br />
Management<br />
<strong>Municipal</strong> Roads<br />
(including Flyovers)<br />
Street lighting<br />
Role of Private Sector<br />
- In a phased manner collection and disposal<br />
are planned to privatize<br />
- Only major by-pass or ring road proposed<br />
to be constructed under BOT<br />
Only in erstwhile It is proposed to provide Operations and<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> Maintenance to Private Sector<br />
area street lights are<br />
privatized<br />
Regulatory Frame work. The Bihar <strong>Municipal</strong> Act, 1922 and Patna <strong>Municipal</strong> <strong>Corporation</strong><br />
Act, 1951 governs the management of Urban Local Bodies of Jharkhand and the same is<br />
applicable to <strong>Dhanbad</strong>.<br />
2. Service Delivery and Performance of ULB<br />
The Bihar <strong>Municipal</strong> Act, 1922 and Patna <strong>Municipal</strong> <strong>Corporation</strong> Act, 1951, governs the<br />
management of the <strong>Municipal</strong> <strong>Corporation</strong>. The <strong>Corporation</strong> is responsible for provision of<br />
services and basic amenity to the citizens, which include:<br />
i.) Distribution of potable water;<br />
ii.) Operation and maintenance of drainage and sewerage systems;<br />
iii.) Public lighting;<br />
iv.) Sanitation and public hygiene;<br />
v.) Construction and maintenance of bus terminals, roads, culverts, and bridges;<br />
vi.) Maintenance of public parks and gardens;<br />
vii.) Ensuring systematic urban growth;<br />
viii.) Regulation of building construction; and<br />
ix.) Licensing of commercial activities, etc.<br />
C. Proposed Organization Structure of DMC<br />
The Administrator heads the executive wing of the <strong>Corporation</strong>, and various officers in<br />
charge of different departments or sections assist the Administrator in managing the DMC.<br />
The personnel include an Additional Administrator, Deputy Administrator, Assistant<br />
Administrator, Chief <strong>Municipal</strong> Engineer, Public Health Officer, Chief Assessment &<br />
Valuation Officer, Chief Accounts Officer, Chief Administrative Officer, Town Planner and<br />
Medical Officer. These officers are assisted in their work by junior officials. As per the<br />
Restructuring Urban Management in Jharkhand prepared by Regional Centre for Urban<br />
Environmental Studies, Lucknow University, Luknow, the proposed organization structure of<br />
the <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> is presented Figure 34.<br />
For senior positions, one or two officers for each of the departments are usually deputed<br />
from the State Government. The <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> has neither supervisory<br />
powers nor any control over them. At the junior level, there are several employees for jobs<br />
like bill collection, sweeping, etc.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 121
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Table 76: Proposed Staffing Pattern for <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong><br />
Proposed Staff Structure<br />
No of Staff<br />
Administration<br />
<strong>Municipal</strong> Commissioner/Administrator 1<br />
Additional <strong>Municipal</strong> Commissioner/Administrator 1<br />
Deputy <strong>Municipal</strong> Commissioner Administrator 3<br />
Assistant <strong>Municipal</strong> Commissioner /Administrator 4<br />
Engineering<br />
Chief <strong>Municipal</strong> Engineer 1<br />
Executive Engineer (Civil) 2<br />
Executive Engineer (Elec.) 1<br />
Assistant Engineer (Civil) 4<br />
Assistant Engineer (Elec.) 1<br />
Assistant Engineer (Mech.) 1<br />
Assistant Engineer (Transport) 1<br />
Jr. Engineer (Civil) 8<br />
Jr. Engineer (Elec.) 3<br />
Street Lighting Inspector 5<br />
Public Health<br />
Public Health Officer / Environmental Engineer 1<br />
Assistant Public Health Officer 3<br />
Chief Sanitary Inspector 1<br />
Sanitary & Food Inspector 5<br />
Sanitary Supervisor 50<br />
Revenue Department<br />
Chief Assessment & Valuation Officer 1<br />
Assessment & Valuation Officer 2<br />
Assistant Revenue Officer 2<br />
Assistant Valuation Officer 2<br />
Tax Superintendent 2<br />
Assistant Tax Superintendent 2<br />
Revenue Inspector 8<br />
Accounts<br />
Chief Accounts Officer 1<br />
Accounts Officer 1<br />
Assistant Accounts Officer 1<br />
Accountant – cum – cashier 3<br />
Accounts Clerk 3<br />
Horticulture<br />
Horticulture Officer 1<br />
Garden Superintendent 2<br />
Public Relations<br />
Public Relations Officer 1<br />
Public Assistant 1<br />
Legal<br />
Law Officer 1<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 122
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Assistant Law Officer<br />
Legal Assistant 1<br />
Office Management<br />
Chief Administrative Officer 1<br />
Administrative Officer 2<br />
Office Superintendent 2<br />
Section Officer 2<br />
Personal Secretary 4<br />
Personal Assistant/Stenographer 4<br />
Office Assistant 11<br />
Planning<br />
Town Planner 1<br />
Associate Town Planner 1<br />
Jr. Town Planner<br />
Assistant Traffic & Transport Planner 1<br />
Assistant Town Planner 2<br />
Surveyor 1<br />
Statistical Assistant 1<br />
Draftsman 1<br />
Tracer 1<br />
Blue Printer 1<br />
Social<br />
Assistant Project Officer 2<br />
Community Organizer 4<br />
Social Assistant 8<br />
Medical<br />
Medical Officer 1<br />
Assistant Medical Officer 1<br />
Veterinary Officer 1<br />
Source: Restructuring Urban Management in Jharkhand Report.<br />
Administrator. The Administrator is at the apex of this proposed structure and is responsible<br />
for all activities carried out by the <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong>. The Administrator is<br />
responsible for preparation and certification of all periodical records, returns and furnishes all<br />
information as may from time to time be required by the <strong>Municipal</strong> <strong>Corporation</strong>. He is also<br />
accountable for preparation of accounts.<br />
Additional Administrator. The Additional Administrator follows the Administrator in the<br />
hierarchy and is responsible for the daily functioning of the <strong>Corporation</strong>. The additional<br />
administrator provides necessary inputs to the administrator in day to day operations of the<br />
<strong>Corporation</strong>. In the absence of the administrator additional administrator may act as in charge<br />
administrator. Next to additional administrator deputy administrator will take charge of zonal<br />
level issues and administration of the same.<br />
Engineering Department (Water Supply). A Chief Water Supply Engineer heads the Engineering<br />
Department water supply and is assisted by executive engineers, assistant engineer, and junior<br />
engineers. To assist the engineering department functions supporting staffs are also deployed<br />
like, pipe line inspector, street lighting inspector, surveyor, meter reader, mechanic staff. The<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 123
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Executive Engineer has overall responsibility and supervises all the work taken up by the<br />
department. The junior engineers have ward-specific responsibilities. The major duties and<br />
responsibilities of the Engineering Section include construction and maintenance of roads,<br />
maintenance of the water supply infrastructure and maintenance of public buildings and<br />
structures.<br />
Chief Accounts Officer. The Chief Accounts Officer is head of the accounts department in<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong>. The Accounts Section a key department of the <strong>Municipal</strong><br />
<strong>Corporation</strong> manages ULB finances and monitors the use of allocated funds for different<br />
schemes. It plays a major role in the formulation of the budget. The Chief Accounts Officer<br />
is responsible for supervising all financial transactions related to the DMC, advising the<br />
Administrator and additional Administrator on all internal financial matters, updating financial<br />
receipts and expenditure details in accordance with the utilization of funds, reporting<br />
deviations in expenditure of funds in any of the allocated schemes, assisting preparation of<br />
the DMC budget, maintenance of accounts regarding stamp duty, Grants, MP Grants,<br />
maintenance of petty cash book and general cash book and attending to audit requirements<br />
and other such accounts-related duties.<br />
Revenue Department. The Revenue Department is another important department of the<br />
<strong>Corporation</strong>, consisting of a Chief Assessment and Valuation Officer, Assessment &<br />
Valuation Officer, assistant valuation and revenue officer and etc. Some of the major<br />
responsibilities of the Chief Assessment and Valuation Officer include responsibility for<br />
collecting taxes such as, trade tax, holding /property /holding tax, advertisement tax, and<br />
entertainment tax; development charges; collection of duty; issuing notices for recovery of<br />
tax; and monitoring revenue collections of the <strong>Corporation</strong>.<br />
Public Health Department. The Public Health Department is responsible for <strong>Corporation</strong><br />
services such as solid waste management, sanitation, environmental management etc., apart<br />
from other public health duties. The Public Health Officer / Environmental Officer has the<br />
overall responsibility for the department. One Medical Officer, Assistant Public Health<br />
Officer, Chief Sanitary Inspector, Head Sanitation Inspector and six Sanitary and Food<br />
Inspector and vaccinators, assist the Public Health Officer/Environmental Officer. Junior<br />
officers are in-charge of works execution at the field level, which includes monitoring and<br />
supervising the work of sanitary labourers in the wards under their charge and attending to<br />
specific local complaints.<br />
The present Organization setup of Mineral Area Development Authority (MADA) is<br />
presented in Figure 35.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 124
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Figure 34: Proposed Organization Setup for New <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong><br />
Administrator<br />
Deputy Administrator<br />
Assistant Assistant Administrator<br />
Administrator<br />
Chief Chief <strong>Municipal</strong> Engineer<br />
Public Public Health Health Officer Officer /CMO<br />
/CMO<br />
Chief Chief Assessment &<br />
Valuation Officer<br />
Officer<br />
Chief Chief Accounts<br />
Officer<br />
Officer<br />
Superintending<br />
Engineers<br />
Executive Engineers<br />
Town Town Planner<br />
Assistant Public<br />
Public<br />
Health Health Officer<br />
Officer<br />
Assessment &<br />
Valuation Officer<br />
Officer<br />
Accounts Officer<br />
Officer<br />
Assistant Engineer<br />
Associate Town<br />
Town<br />
Planner<br />
Chief Chief Sanitary<br />
Inspector<br />
Assistant Revenue<br />
Officer<br />
Officer<br />
Assistant Accounts<br />
Officer<br />
Officer<br />
Jr. Jr. Engineers<br />
Junior Junior Town Town Planner<br />
Sanitary Food<br />
Food<br />
Inspector<br />
Sanitary<br />
Supervisor<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 125
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Figure 35: Present Organization Setup of MADA<br />
Chairman<br />
Managing Director<br />
Technical Member<br />
Executive Engineer<br />
(Building Division)<br />
Executive Engineer<br />
(Water Supply)<br />
Executive Engineer<br />
(Town Planning)<br />
Secretary<br />
(Administration)<br />
Chief Medical Officer<br />
Horticulture<br />
Officer Garden &<br />
Environment<br />
H.Q H.Q Building<br />
AE<br />
AE<br />
Jharia<br />
Building AE<br />
AE<br />
Sub Sub Divisions<br />
<strong>Dhanbad</strong> AE<br />
AE<br />
Chas AE<br />
AE<br />
Water work<br />
work<br />
Accounts Section<br />
Medical Officer (H.Q)<br />
Superintend<br />
Administrative<br />
Medical Officer (I.O<br />
(I.O<br />
Section<br />
Jharia --I I AE<br />
Hospital)<br />
AE<br />
Water<br />
Jharia --II II AE<br />
Section<br />
Bacteriologist<br />
AE<br />
Holding Section<br />
Public Analyst<br />
Tetulmar AE<br />
AE<br />
Estate Section<br />
Kusunda AE<br />
AE<br />
Law Law Section<br />
Topchanchi AE<br />
AE<br />
Personal Officer<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 126<br />
Sanitary Inspectors<br />
<strong>Dhanbad</strong>,<br />
Baghmara, Katras,<br />
Jharia, Govindpur,<br />
Nirsa, Baliapur,<br />
Chirkunda, Chas,<br />
Mohuda,<br />
Chandankirari,<br />
Topchanchi,<br />
Bnojudih, Tundi,<br />
Gomoa,<br />
Bhulanbarari
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
1. Institutional Strengthening and Capacity Building<br />
Since the <strong>Municipal</strong> <strong>Corporation</strong> of <strong>Dhanbad</strong> has structured recently the proposed staff<br />
strength has to be recruited as per guidelines.<br />
D. Urban Governance - SWOT Analysis<br />
SWOT analysis has been undertaken to assess on the negative and positive aspects of the<br />
Urban Governance. It involves analyzing the internal positive (strengths) and negative<br />
(weakness) aspects of an organization and considering these in relation to aspects of the<br />
external environment – both the positive aspects (or opportunities) and negative aspects (or<br />
threats). The Table 77 gives the details of the SWOT analysis of Urban Governance.<br />
Table 77: Urban Governance – SWOT Analysis<br />
Strength<br />
Weakness<br />
Absence of elected body/ public representatives;<br />
Lack of sufficient staff strength for administration ;<br />
Lack of proper co-ordination between the different line agencies and<br />
department in service delivery;<br />
No predefined work norms, job description and specific personal liability;<br />
Lack of political will to revise upward the holding tax;<br />
Very low own resources base for the corporation;<br />
Implementation of the provision of the 74th amendment; and<br />
Low level of awareness and participation among general public.<br />
Opportunities<br />
Threats<br />
E. Key Issues<br />
(i.)<br />
(ii.)<br />
(iii.)<br />
(iv.)<br />
(v.)<br />
Absence of Elected Body at <strong>Municipal</strong> <strong>Corporation</strong> level;<br />
Lack of powers/functions to New <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong>;<br />
Lack of coordination between various service delivery agencies in <strong>Dhanbad</strong>;<br />
Overlapping of jurisdiction responsibilities among various service delivery agencies; and<br />
Lack of reforms initiatives.<br />
F. Key Initiatives<br />
(i.)<br />
(ii.)<br />
(iii.)<br />
(iv.)<br />
(v.)<br />
To avoid municipality of institutions/authorities, co ordination system along with detailed<br />
responsibility matrix to be prepared and enforced;<br />
New DMC should consist of elected body;<br />
Need to revamp the existing legal framework on the line of the Model <strong>Municipal</strong> Law;<br />
Devolution of powers and functions to New DMC;<br />
Need to strengthen the human resources by immediately filling the proposed staff<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 127
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
(vi.)<br />
(vii.)<br />
(viii.)<br />
(ix.)<br />
(x.)<br />
(xi.)<br />
(xii.)<br />
(xiii.)<br />
(xiv.)<br />
strength the DMC;<br />
Capacity Building to all levels of staffs in DMC and other local service delivery agencies<br />
As a part of reforms initiatives, e – governance by using IT applications and GIS mapping<br />
to wards documentation, complaint registration, logs and redressal system, upkeeping of<br />
centralized data base of citizens;<br />
As suggest in the JNNURM reforms are need to carried out;<br />
Outsourcing and Private Sector Partnership areas are needed to be explored and also to<br />
be encouraged;<br />
All assistants and clerks should have working knowledge of computer;<br />
The Tax Collection work may be outsourced by amending the <strong>Municipal</strong> acts;<br />
The services of Meter Reader, Tax Collectors, Admin, Electrician/Mechanic, Driver,<br />
Peon, Guard, Cleaner and Scavengers etc., should be contract basis;<br />
The number of scavengers should be minimum and the scavenging should be arranged<br />
under public private partnership; and<br />
Development and maintenance of parks, play grounds etc. should be outsourced or done<br />
under public private partnership.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 128
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
IX.<br />
BASIC SERVICES FOR URBAN POOR<br />
A. Overview<br />
Slums and squatter settlements are essentially products of urban poverty. Almost by<br />
definition, the population living in slums lack access to basic infrastructure services such as<br />
safe water, sanitation, solid waste collection and disposal, drainage, access roads, streetlights,<br />
neighborhood amenities (e.g., safe play areas for children and community facilities), and<br />
electricity.<br />
Owing to rapid urbanization in and around the city, large influx of the migrants has been<br />
observed, which has resulted in formation of slums. The city presents a wide range of<br />
activities in various Industrial, Institutional, Commercial and Tread sectors. Growth in such<br />
activities, possibilities of absorption in various service sectors, scope of employment in trade<br />
and business activities, hawking, retailing, carting etc. could have attracted rural poor to the<br />
city. There is no comprehensive estimated/surveyed slum population living in <strong>Dhanbad</strong><br />
<strong>Municipal</strong> <strong>Corporation</strong> jurisdiction and hence through discussion it was estimated that around<br />
three lakh population will reside in slum. Following table presents the detailed slum<br />
settlement wise population records available with local authority. Besides this there are many<br />
slums in the city, since the <strong>Municipal</strong> <strong>Corporation</strong> newly formed base line survey need to be<br />
carried out.<br />
Table 78: List of Slums<br />
Slum Location Population - 2001<br />
<strong>Dhanbad</strong><br />
Bauripara 294<br />
Dompara 283<br />
Maiyarapara 230<br />
Masterpara 188<br />
Simaldih 299<br />
Telipara 379<br />
Devipara 193<br />
Aitbarinagar 307<br />
Jharnapara 267<br />
Jharnapada Khatal 196<br />
Adivasi Tola 97<br />
Pampu Talab 126<br />
Hadipara 403<br />
Bhistipara 483<br />
VinodNagar JhapadPatti 911<br />
CheeraGora 82<br />
Hindu Mission Road PremNagar 407<br />
LaadBani 773<br />
KorangaPatti 3693<br />
Dompara Housing Collony 396<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 129
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Slum Location Population - 2001<br />
Pandit Clinic Road 101<br />
Mochi Basti 201<br />
BekarBandh Khataal 542<br />
RamNagar Collony 183<br />
Khatik Basti 61<br />
Kasturba Nagar 192<br />
Combined Building Area 99<br />
Shimla Beda 537<br />
Kali Mandir 132<br />
Jharudih 361<br />
Das Tola 97<br />
RangaTand 284<br />
Kabristan Road 163<br />
Kumhar Club 246<br />
Paryatan Collony 179<br />
Hill Collony 299<br />
Bhatta Muhalla 281<br />
Dhobi Muhalla 301<br />
Traction Collony RangaTand 191<br />
Dompara Naya Bazaar 99<br />
YatimKhana 335<br />
Gaddi Muhalla 377<br />
Diamond Crossing 694<br />
Bauripara 109<br />
Bhuli Mod Khataal 142<br />
Ghurni Juria 655<br />
Karbala Road 150<br />
Jain Mahaliya 189<br />
HadiPara 477<br />
Matkuria Khataal 277<br />
Gurudwara Khataal 368<br />
Mahavir Sthaan 517<br />
Bhiyan Ghoda, Dhansar 506<br />
Prem Nagar 577<br />
Anugrah Nagar 154<br />
Bank More Khataal 178<br />
ChandraVanshi Nagar 83<br />
Exchange Road Gali 315<br />
Dari Muhalla PuranaBazaar 408<br />
Shamshan Road Khataal 119<br />
SurendraNagar DhobiPara 175<br />
B P Sinha Smarak College Campus 2578<br />
Chhai Gadda 773<br />
DomPara 200<br />
KhatikPara 395<br />
Thathera Basti 265<br />
GandhiNagar 1465<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 130
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Slum Location Population - 2001<br />
Refugee Collony 54<br />
Refugee Market DomPara 825<br />
Bari 129<br />
TikiyaPara 580<br />
ImariyaTand 446<br />
S T C Compound 356<br />
D S Collony JhopadPatti 56<br />
Purana Station 771<br />
Dompara JhopadPatti 307<br />
KhatikBasti Goshala 231<br />
Dhobia Talab Kshetra 276<br />
Bhooda Basti 587<br />
Mahavir Nagar 530<br />
Barmasia Shankar Nagar 783<br />
BRTC Kushth Collony 132<br />
Gajua Tand 789<br />
Kumhar Patti Kshetra 560<br />
Gadi Godaam 267<br />
ManaiTand Basti 237<br />
Shanti Collony Kshetra 149<br />
Rajpati Sahu Collony 188<br />
Chhoti Maszid Kshetra 356<br />
Gadi Godaam SchoolKshetra 479<br />
SivaPara Talab Kshetra 338<br />
KurmiPara Kshetra, DomPara ManiTand 308<br />
Jahrkhand Office Kshetra 328<br />
Chhath Talab Kshetra 298<br />
Gopal Nagar Kshetra 126<br />
ManaiTand PaniTanki Area 217<br />
TaadBagaan Khsetra 469<br />
Rani Talab Kshetra 600<br />
DomPara Kshetra 478<br />
Sub Total – <strong>Dhanbad</strong> 39,287<br />
Jharia<br />
MalGarha<br />
6,600<br />
Husainabad Shivnagar<br />
Chauthaikulhi Dharmnagar<br />
Chauthaikulhi Husainabad<br />
Chauthaikulhi BauriMuhalla<br />
Chauthaikulhi AnandNagar<br />
Chauthaikulhi IndiraNagar<br />
Chauthaikulhi TabarBaghan<br />
Suratand<br />
4,000<br />
Baniaheer<br />
Shahnagar Jharia<br />
ShamsherNagar Ghaskapatti<br />
Santoshnagar 2,400<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 131
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Slum Location Population - 2001<br />
Sabzi Baghan<br />
Charnambar Jharia<br />
Nayi Dunia Kodiapatti<br />
Balugadda Kodiapatti<br />
2,400<br />
Cheenkodi<br />
Balugadda<br />
Balugadda Khadan<br />
KoyariBandh Razakpatti<br />
2,600<br />
KoyariBandh Balmiki Muhalla<br />
Kumharpatti<br />
Bakrihaat Jharia<br />
1,500<br />
KumharPatti KatrasMore<br />
PuranaRazaGarh<br />
Bauri Muhalla<br />
Sub Total – Jharia 19,500<br />
Katras<br />
Shakra Tand 198<br />
SalamPur 420<br />
Bhandaridih 258<br />
Chatabad 534<br />
Katras Bazar Handitola 378<br />
Sub Total – Katras 1,788<br />
Chattatand<br />
E B Section 1500<br />
Etwal 900<br />
Rajputi Basti (Muslim Patti) 1450<br />
Chhath Talab (Kali Mandir) 300<br />
Simariyan Tand 340<br />
Neemtalla 125<br />
Harizan Tola 230<br />
Keduahdih 5 no 250<br />
Gwala Patti 992<br />
Khatik Patti, Pasi Mullah, Sabzi Mandi 345<br />
Gwala Patti, Kendua Bazaar 350<br />
Bauri Tola, Kendua 569<br />
Kendua Kathgola 1870<br />
9 no. Chhatatand 240<br />
Munda, Babu Basa 800<br />
Pasi Tola, Ghuiyan Tola, Karkend 500<br />
Sub Total – Chattatand 10,761<br />
Sindhri<br />
Old Market Sindri 163<br />
At Roharabandh 115<br />
Domgarh Near DKN 17<br />
DL2 Sundar Nagar 253<br />
CT, Domgarh 68<br />
Behind Roharabandh P.O. 31<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 132
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Slum Location Population - 2001<br />
Anand Lake 223<br />
Badia Tola Chatatand 216<br />
Sub Total – Sindhri 1,086<br />
Grand Total 72,621<br />
B. Infrastructure Provision in Slums<br />
Slums in <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> lack proper infrastructure facilities, as like any<br />
other slum in the country. As per the discussion with the local authorities, the overall view<br />
about the existing infrastructure in the slums is understood and presented below. To improve<br />
the condition of slums and to make slum dwellers self-dependent, government is initiating<br />
various programs, which has been described in the following section.<br />
Housing. Hosing condition in <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> slums found very poor. A large<br />
proportion of households were found staying in kutcha houses and remaining households<br />
stay in pucca houses, where, percentage of households staying in R.C.C. is very less. Majority<br />
of households reside in houses with built area less than 100 Sq. ft. It was noticed that<br />
residential status of most of the Unapproved Slum households was temporary, where<br />
settlement have developed within the last 10 years due to growing migration in the City. As<br />
per the records almost 50,000 dwelling units are required to meet the demand.<br />
Water Supply. The main source of water supply in<br />
slums is met through hand pumps and public stand<br />
posts (PSPs). The local authorities have provided<br />
2,753 units of Water Tank Taps/Hand pumps/PSPs<br />
covering all the slums. Dependency on the hand<br />
pump is high, varies between a very high of<br />
approximately 500 persons per PSP to a low of<br />
approximately 50 persons per PSP in Slums.<br />
Average dependency is approximately 500 persons<br />
per PSP against the standard norm of 75 persons<br />
per hand pumps or PSPs.<br />
Sewerage and Sanitation. The most prevalent safe sanitation facility available in slum is public<br />
conveniences. However, existing sanitation facilities are inadequate to meet the requirement.<br />
The population in slums either use nearby public toilets or defecate on open lands.<br />
Solid Waste Management. There is no proper solid waste management mechanism exist in slums.<br />
As per the discussions with the slum dwellers, it was stated that only very few slums have<br />
dustbins, which are also in bad condition and need replacements. As a result, in most of the<br />
slums, the waste is disposed in nearby vacant areas creating unhygienic conditions.<br />
Roads. The local authorities have provided only un-surfaced roads in the slum areas in<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> area. As per discussion with the local authorities most of the<br />
slum area roads have to be resurfaced or strengthened.<br />
Storm Water Drains. As per discussions with local authorities, it was indicated that Slums in<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 133
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
<strong>Dhanbad</strong> city is not provided with pucca Storm<br />
water drains. Although, there are kutcha drains,<br />
which were often noticed to damaged or clogged due<br />
to solid waste dumping. Hence, there is a demand<br />
for new formation of drains along existing roads and<br />
new roads.<br />
Street Lights. It is noticed that several road junctions<br />
and street stretches are poorly lighting facility, and<br />
some of the slums are devoid of any facilities for street lighting.<br />
C. Key Issues<br />
The following are key issues pertaining to basic services for poor in <strong>Dhanbad</strong> <strong>Municipal</strong><br />
<strong>Corporation</strong>.<br />
(i.)<br />
(ii.)<br />
(iii.)<br />
(iv.)<br />
(v.)<br />
Lack of Basic Infrastructure Facilities. Although most of the slums are located in the<br />
core areas of the city, they are characterized by poor quality of life induced by inadequate<br />
basic infrastructure. Absence of dustbins, drains, surfaced roads and solid waste collection<br />
systems lead to poor quality of living.<br />
Inadequate Access to Sanitation. The poorest of poor households do not have the<br />
means to afford individual toilets. Non existence of public toilets and sanitation facilities,<br />
resulting in open defection and drains being used for sewer outlays. The issue is to devise<br />
strategies to ensure adequate access to toilets to all poor households in the city.<br />
Inadequate Public Stand Post. There obviously exists a high dependence of slum<br />
population on public stand post.<br />
Dearth of health and education facilities. Owing to the absence of health facilities,<br />
education institutions and community infrastructure facilities in the slum area has resulted<br />
unhygienic living conditions and lack of awareness amount community.<br />
Ineffective Poverty Alleviation Programs. The benefits of urban poverty alleviation<br />
programs (UPAPs) have not reached the city’s slum/urban poor households. Lack of<br />
community participation.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 134
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
X. VISION, GOALS AND SECTORAL STRATEGIES<br />
A. Identification of Stakeholders<br />
The stakeholders cover all the defined sectors and include NGOs, Government organisations<br />
(like DMC, MADA, PHED (WS&DB), <strong>Dhanbad</strong> Deputy Commissioner, Urban<br />
Development Department, District Collectorate, Public Works Department (PWD), Road<br />
Construction Department (RCD), Jharkhand Pollution Control Board, BCCL, TISCO, Block<br />
Development Officers (BDOs), Circle Officers (COs), District Mining Department, Railway<br />
Department, ISM, FCI, CMRI, CMPDI, District Industrial Centre, Police Department,<br />
Tourism Officer, Fire Station Officer, Jharia Rehabilitation Development Authority (JRDA)<br />
and District Development Commissioner and etc.), Commercial organisations, Industries and<br />
Trade Unions, Jharkhand State Urban Development Minister, M.P, MLAs, Ex-MLAs, Ex-<br />
MPs, eminent citizens, technocrats, social workers etc. All the stakeholders and the citizens of<br />
the City become the planning partners of the City Development Plan.<br />
All the stakeholders identified are a part of the City Development Planning Process and their<br />
identification of the various issues and suggestions for the improvement of the quality of life<br />
in the City are very much a part of the City Development Plan.<br />
B. Consultation Process<br />
This is a significant phase, involving consensus<br />
building through stakeholder consultations to<br />
identify key issues facing the particular city,<br />
establishing a vision for development and<br />
identifying specific goals, objectives and priorities.<br />
The focus of the City Development Plan<br />
preparation visioning exercise was on ensuring<br />
adequate stakeholder participation to arrive at a<br />
shared vision for the city, with regards economic<br />
development and quality of life.<br />
One day kick-off meeting was organized on 18 th of<br />
May 2006 to brief the City Development Plan<br />
process and approach at Deputy Commissioner<br />
Officer. Deputy Commissioner Chaired the meeting<br />
and key stakeholders were invited to participate in<br />
the planning process of CDP.<br />
Two -day consultation workshop was organized on<br />
10 th and 11 th of July 2006 at ISM Lecture Theatre<br />
and at CMRI Auditorium respectively. List of<br />
participants attended for consultation workshop are<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 135
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
presented in Annexure. The “State of City Report”<br />
was presented before the stakeholder, to arrive at a<br />
shared vision, goals and projects and its<br />
prioritization by involving all stakeholders. After the<br />
presentation in the second half of the first day,<br />
Focused group discussions was organized to<br />
deliberate on the various issues facing the city and to<br />
identify a long list of projects/broad strategies to<br />
address the issues. Four different groups were<br />
formed namely, Urban Infrastructure facilities &<br />
Urban Environment, Urban Planning & Growth Management, Urban Transport, Urban<br />
Governance and <strong>Municipal</strong> Finance. In the second day of the workshop out come of the first<br />
day workshop was presented and subsequently consensus were arrived. The outcome of the<br />
focused group discussions was establishing the key issues facing the city, and strategies to<br />
address them.<br />
Based on the outcomes of the focused group discussions and the SWOT analysis a vision<br />
regarding economic development and quality of life for the city was drafted so as to address<br />
the economic development and quality of life<br />
The City Development Plan process of <strong>Dhanbad</strong> has undergone extensive consultative<br />
process with its key stakeholders, including consultation workshops and individual<br />
consultation with key stake holders in prioritizing the key sectors for investments and reform<br />
initiatives. Existing status of infrastructure facilities is presented in Figure 36.<br />
Figure 36: Sector wise priority based on Consultation findings<br />
Storm Water Drainage<br />
Street Light<br />
Water Supply<br />
Urban Transport<br />
Solid Waste Management<br />
Drainage and Sanitation<br />
Ok<br />
Poor<br />
Very Poor<br />
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%<br />
Quality of Service<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 136
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
C. Vision<br />
Vision of <strong>Dhanbad</strong> is:<br />
“To improve the quality of life,<br />
Develop Eco – friendly,<br />
Universal Services for all and Economically Vibrant City “<br />
1. Urban Planning & Growth Management<br />
The key issues emerging out of planning and growth management areas are absence of Master<br />
Plan/Landuse plan for the entire <strong>Municipal</strong> <strong>Corporation</strong> leads to unplanned haphazard<br />
development. Since, the Jharia Coal Field covers significant portion of DMC, which restrict<br />
the developments towards one single direction. Absence of implementation mechanism and<br />
tools, inadequate financial resources to implement the schemes and lack of private sector<br />
participation and community involvement in development process.<br />
Vision for Urban Planning & Growth Management: “Guided Urban Development with<br />
open spaces and recreational facilities for the City”<br />
Strategies and Action Plan<br />
Considering the present key issues emerged from the study, a robust strategy for Planning and<br />
Growth Management is adopted. Detailed strategy is furnished below which covers policy<br />
level planning, reforms, institutional strengthening, preparation of Master Plan/Landuse Plan<br />
and Land development mechanism.<br />
(i.)<br />
Preparation of Comprehensive Master Plan/Landuse Plan. Preparation of a<br />
comprehensive Master Plan and Landuse Plan that adopts the spirit of the final vision<br />
document / plan, covering various developmental elements including:<br />
a. Urban Economy;<br />
b. Urban Environment & Hazards Zones;<br />
c. Housing and land development;<br />
d. Urban Poor and Slum Infrastructure;<br />
e. Urban Infrastructure development;<br />
f. Transportation;<br />
g. Social Infrastructure; and<br />
h. Institutional development and organizational responsibilities.<br />
(ii.)<br />
Development of Implementation Mechanism. Devising and adopting appropriate<br />
implementation mechanisms to facilitate implementation of the master plan and Landuse<br />
plan proposals;<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 137
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
(iii.)<br />
(iv.)<br />
(v.)<br />
(vi.)<br />
Preparation of Resource Mobilization Plan. Preparation of a financial and operating<br />
plan that addresses the resource requirement for implementation and maintenance of the<br />
master plan proposals;<br />
Development of New areas through Town Planning Schemes. Development of new<br />
areas through implementation of Town Planning Schemes. Detailed development plan<br />
has to be prepared for the selected new areas with the guidance of master plan /land use<br />
plan for the city.<br />
Institutional Strengthening and Capacity Building. Preparation of an institutional<br />
action plan matrix that lists out and defines roles and responsibilities of various<br />
stakeholder agencies; and<br />
Encourage Private Sector Participation in Urban Development. Formulate<br />
guidelines that facilitate and encourage private investment in implementation and/or<br />
operation and maintenance of urban infrastructure projects.<br />
Land is the key resource in physical planning, growth management and housing development,<br />
and the success of any housing strategy depends largely on availability of land parcels of<br />
appropriate size and at appropriate locations. It would be very relevant for the MADA to<br />
garner large tracts of land and prepare zonal and local area plans earmarking and allocating<br />
land for master plan proposals.<br />
The simplest mechanism for procuring land for development is by way of acquisition against<br />
monetary compensation. But for this, the implementation agency would require significant<br />
financial capital resources upfront, which is not possible considering already constrained fiscal<br />
situation of governments. Also, land acquisition is a time-consuming and cumbersome<br />
process, involving several legal issues. Some of the mechanisms for land assembly or<br />
development that could be considered are:<br />
(i.) Land Sharing Mechanism<br />
(ii.) Mechanism of Transferable Development Rights<br />
(iii.) Mechanism of Accommodation Reservation<br />
(iv.) Concept of FAR Bank for Resource Mobilization<br />
(i.)<br />
(ii.)<br />
Land Sharing Mechanism. Under the land sharing mechanism, the implementing<br />
agency takes over for development a large area of land belonging to several owners. Land<br />
is organized into regular plots of standard size, after provision of land for roads, open<br />
spaces and social amenities. The organized plots are then returned to the original owners,<br />
so that the owners get back 40 to 50 per cent of their original land holding. By this<br />
mechanism, the implementing agency acquires 60 per cent of the total land, free of cost,<br />
to provide for the road network and other infrastructure and social amenities as per<br />
planning norms.<br />
Mechanism of Transferable Development Rights. This mechanism is aimed at<br />
procuring land for provision of social amenities. Under this mechanism, the<br />
implementing agency negotiates with the landowner to trade his/her land for additional<br />
development rights (in the form of additional FAR) elsewhere (in designated areas, which<br />
can take the pressure of higher FAR) in the city. In this process, the implementing agency<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 138
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
acquires land free of cost.<br />
(iii.)<br />
(iv.)<br />
Mechanism of Accommodation Recommendation. The mechanism of accommodation<br />
reservation is also aimed at procuring land for provision of social amenities. Here, the<br />
owner of the land where the social amenity is proposed to be developed is required to<br />
part with a part of his/her land (say 50 per cent), while he/she is allowed to develop the<br />
remaining part up to an extent equivalent to the full FAR achievable on the original plot<br />
size. In this process, the owner of the plot does not lose out on the achievable built-up<br />
area, while the implementing agency gets land free of cost. This mechanism also needs to<br />
be implemented in designated areas that have the capacity to service additional FAR.<br />
Concept of FAR Bank for Resource Mobilization. The concept of FAR bank can be<br />
an effective tool for resource mobilization, while ensuring controlled development. This<br />
concept entails establishing and applying a base FAR at say 0.75 to 1.0, which is<br />
permissible in all areas. The implementing agency designates certain prime areas like<br />
commercial centers and high-rise residential complexes, where extra FAR can be bought<br />
at a premium. The rate of premium is set depending upon market value and the demand<br />
for additional FAR in different areas. However, as in the case of other mechanisms<br />
involving trading of land for additional FAR, the concept of FAR bank would also require<br />
adequate provisions in the development plan that earmark locations/zones where<br />
additional FAR can be absorbed, based on available road-width and capacity of the<br />
infrastructure.<br />
Table 79: Strategy Time Frame – Planning & Growth Management<br />
Strategy 2007 2008 2009 2010 2011 2012 2013<br />
Preparation of Comprehensive<br />
Master Plan / Landuse Plan<br />
for DMC and integration of<br />
existing master plan erstwhile<br />
<strong>Dhanbad</strong> <strong>Municipal</strong>ity<br />
Preparation of Micro level<br />
plans to support the Master<br />
Plan / Landuse Plan (TP<br />
Schemes)<br />
Development of New<br />
Residential Township<br />
Development of Land through<br />
innovative mechanism for land<br />
acquisition and resource<br />
mobilization<br />
Decongest the existing CBD<br />
and development of alternative<br />
CBD<br />
Institutional Strengthening and<br />
Capacity Building<br />
Encourage Private Sector<br />
Participation in Urban<br />
Development<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 139
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
2. Water Supply<br />
Based on the review of the existing water supply scenario, the following key issues are<br />
identified. There is a low level of supply due to inadequate perennial source, owing to age old<br />
/worn-out distribution network leakages and low carrying capacity also noticed in the water<br />
supply system. Inadequate distribution network coverage and absence of summer storage tank<br />
also an importance factor in water supply system. There is a huge demand supply gap which is<br />
likely to widen drastically in future. No regulatory mechanism to oversee the functioning of<br />
the sector and to fix service standards as well as tariff to meet capital and operating<br />
expenditure is another problem.<br />
Vision for Water Supply: “Adequate supply of potable water within easy reach to each<br />
and every household”<br />
Goals and Service Outcome<br />
Considering the above key issues, the following goals for different horizon period have been<br />
identified.<br />
Table 80: Goal and Service Outcome - Water Supply<br />
Goal<br />
Current 2011 2013 2016 2026<br />
Status<br />
Network coverage to 15-20% 100% 100% 100% 100%<br />
households<br />
Per Capita Supply 66 lpcd 150 lpcd 150% 150 lpcd 150 lpcd<br />
24 / 7 Water Supply - 50% 60% 80% 100%<br />
Quality of Water Good Safe &<br />
Good<br />
Safe &<br />
Good<br />
Safe &<br />
Good<br />
Safe &<br />
Good<br />
Non Revenue Water 40% 30% 20% 20% 15%<br />
Consumer Metering 50% 75% 25% 100% 100%<br />
Cost Recovery<br />
(percent of O&M)<br />
- 80% 100% 100% 100%<br />
Strategies and Action Plan<br />
Considering the present key issues and identified goals, a robust strategy for water supply is<br />
adopted. Detailed strategy is furnished below which covers policy level planning, reforms,<br />
institutional strengthening, source augmentation and service delivery aspects.<br />
(i.)<br />
(ii.)<br />
Water Supply System Rehabilitation Plan. The existing distribution system is pretty<br />
old and suffers from leakages etc. thus reducing its carrying capacity. The existing<br />
distribution network need complete overhauling by replacing old defunct and inadequate<br />
piping system by proper distribution network.<br />
Comprehensive Water Supply Planning. While the current works shall focus on the<br />
source augmentation, yield increase, adequate storage, adequate distribution network<br />
reach and treatment facilities for future requirements, the programme shall be so designed<br />
to match the <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> needs. The entire system shall be<br />
augmented and structured in a sustained process.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 140
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
(iii.)<br />
(iv.)<br />
(v.)<br />
(vi.)<br />
(vii.)<br />
(viii.)<br />
Asset Management Plan. To address the condition assessment and the performance of<br />
the water supply assets, it is recommended that an asset management plan be prepared for<br />
the assets of water supply in <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong>.<br />
Water Supply Operation and Maintenance Plan. Adoption of an O&M Plan and<br />
Schedule, including options of using the private sector for O&M (e.g. management<br />
contract). The management contracts entered into by the corporation with private<br />
companies to improve the O&M facilities making the private company solely responsible<br />
for the entire O&M of the system, based on an agreed annual fee shall be continued<br />
vigorously added with inbuilt incentives for improved performance.<br />
Water Management Plan. Adoption of comprehensive strategy for water management<br />
through leak detection, conducting energy audit study for checking of Unaccounted for<br />
water and strategy for use of recycled water for non potable use, based on a pilot study<br />
for the <strong>Municipal</strong> <strong>Corporation</strong>.<br />
Mapping and Geographical Information System (GIS). To address the issue of<br />
system rehabilitation, mapping and establishing a GIS system is pertinent to detail out<br />
system location, characteristics, age and condition. This would enable identifying<br />
dilapidated sections of the network and those that require replacement.<br />
Performance Benchmarking and Monitoring. Developing key performance indicators<br />
to monitor and adopting best practices to improve the sustainable performance of the<br />
water supply system.<br />
Institutional Strengthening and Capacity Building. The proposed staff members of<br />
the Engineering department in DMC, existing staff members in MADA, PHED shall<br />
undergo training in project planning, implementation, monitoring and evaluation.<br />
Significance of peoples’ participation on water conservation shall also be realised.<br />
The time frame to achieve the above mentioned strategies are presented in the following<br />
table.<br />
Table 81: Strategy Time Frame - Water Supply<br />
Strategy 2007 2008 2009 2010 2011 2012 2013<br />
Water Supply Rehab. Plan<br />
Comprehensive W/S Planning<br />
Asset Management Plan<br />
Water Management Plan<br />
Mapping & GIS<br />
Piloting 24/7 water supply<br />
Source Augmentation<br />
Storage Capacity<br />
Augmentation<br />
Network coverage for general<br />
households<br />
Performance Benchmarking &<br />
monitoring<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 141
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Strategy 2007 2008 2009 2010 2011 2012 2013<br />
Institutional Strengthening and<br />
Capacity Building<br />
3. Sewerage and Sanitation<br />
The key issues pertaining to sewerage and sanitation is absence of safe disposal system, dearth<br />
of safe sanitation facilities and inadequate and ill maintained public sanitation facilities leads to<br />
unhygienic living environment in the city. Following goals and strategies are framed to<br />
overcome the deficiencies in the system.<br />
Vision for Sewerage and Sanitation: “To Develop a recyclable, cost effective<br />
environmental friendly sewerage system and safe sanitation facilities for all“<br />
Goals and Service Outcome<br />
Considering the above key issues in sewerage and sanitation sector, the following goals for<br />
different horizon years have been identified.<br />
Table 82: Goal and Service Outcome – Sewerage and Sanitation<br />
Goal<br />
Current 2011 2013 2016 2026<br />
Status<br />
Sewer Network<br />
Nil 80% 100% 100% 100%<br />
coverage to<br />
households<br />
Treatment and<br />
Nil 100% 100% 100% 100%<br />
Disposal arrangements<br />
Recycling and Reuse Nil 10% 15% 20% 50%<br />
Cost Recovery (as a Nil 50% 60% 85% 100%<br />
percent of O&M)<br />
Safe Sanitation<br />
Facilities<br />
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
(iii.)<br />
(iv.)<br />
(v.)<br />
(vi.)<br />
Awareness Campaign on Recycle and Reuse. An awareness campaign regarding the<br />
importance of recycling and reusing of waste water for various household purposes shall<br />
be taken up to tackle any unforeseen situation in future. A plan shall also be drawn to<br />
setup recycling plants in near future along with treatment plants.<br />
Asset Management Plan. To address the condition assessment and the performance of<br />
the sewerage system, it is recommended that an asset management plan be prepared for<br />
the assets of sewerage system in <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong>.<br />
Performance Benchmarking and Monitoring. Developing key performance indicators<br />
to monitor and adopting best practices to improve the sustainable performance of the<br />
water supply system.<br />
Institutional Strengthening and Capacity Building. The proposed staff members of<br />
the Engineering department in DMC and existing staff members in MADA shall undergo<br />
training in project planning, implementation, monitoring and evaluation.<br />
The time frame to achieve the above mentioned strategies are presented in the following<br />
table.<br />
Table 83: Strategy Time Frame – Sewerage and Sanitation<br />
Strategy 2007 2008 2009 2010 2011 2012 2013<br />
Comprehensive Sewerage<br />
System Plan<br />
Awareness Campaign on<br />
Recycle and Reuse<br />
Asset Management Plan<br />
Mapping & GIS<br />
Creation of STPs<br />
Network coverage for general<br />
households<br />
Performance Benchmarking &<br />
Monitoring<br />
Institutional Strengthening and<br />
Capacity Building<br />
4. Storm Water Drainage and Primary Drainage<br />
The key issues pertaining to storm water drainage and primary drainage is absence of safe<br />
disposal system, dearth of safe sanitation facilities and inadequate and ill maintained public<br />
sanitation facilities leads to unhygienic living environment in the city. Following goals and<br />
strategies are framed to overcome the deficiencies in the system.<br />
Vision for Drainage: “To develop an efficient drainage system to ensure cleanliness of<br />
city”<br />
Goals and Service Outcome<br />
Considering the above key issues in storm water drainage and primary drainage sector, the<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 143
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
following goals for different horizon years have been identified.<br />
Table 84: Goal and Service Outcome – Drainage<br />
Goal<br />
Current 2011 2013 2016 2026<br />
Status<br />
Storm Water Drainage 63 100% 100% 100% 100%<br />
Network coverage<br />
Rehabilitation of<br />
- 100% 100% 100% 100%<br />
Existing Pucca Drains<br />
Upgradation of<br />
- 10% 100% 100% 100%<br />
Existing Kutcha<br />
Drains to Pucca<br />
Drains<br />
Rehabilitation of<br />
existing primary<br />
nallahs and water<br />
bodies<br />
- 50% 100% 75% 100%<br />
Strategies and Action Plan<br />
(i.)<br />
(ii.)<br />
(iii.)<br />
(iv.)<br />
(v.)<br />
Storm Water Drainage Rehabilitation Programme. Under this programme a study<br />
shall be taken up to identify the flood spots within the <strong>Municipal</strong> <strong>Corporation</strong>. This shall<br />
be based on the past history of floods and contour survey of all the drains in the city and<br />
their conditions. Mere cleaning of the drains could drain most of the flood spots. In<br />
almost all the cases, strengthening of the drains and construction of leading drains will<br />
have to be taken up. Desilting exercise has to be taken up in all the natural and open<br />
drains. Based on the necessity that arises out of the study, the drains are to be remodeled<br />
from the origin to the outfall.<br />
Rehabilitation and Strengthening of Primary Drainage /Nallahs. The primary<br />
drains are inadequate to handle the flash floods as they are not systematically designed<br />
and are not fully constructed in some sections. Moreover, significant reduction in depth<br />
and width are noticed due to siltation and encroachment of drain bunds. To alleviate<br />
these, a rehabilitation and improvement program is recommended.<br />
Construction and Upgradation of Road side Storm Water Drains. The available road<br />
side storm water drainage is inadequate to meet the current and future requirements and<br />
hence construction and upgradation of road side storm water drains has been<br />
recommended.<br />
Rejuvenation of Water Bodies. Rejuvenation and Rehabilitation works for Water<br />
Bodies, through de-silting, bunding works and Intersection and Diversion of Sewage<br />
wherever required.<br />
Efficient and Effective Operation and Maintenance Plan. There shall be a separate<br />
operation and maintenance plan to be prepared to maintain the road side drains and water<br />
bodies that created or upgraded during the plan period.<br />
The time frame to achieve the above mentioned strategies are presented in the following<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 144
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
table.<br />
Table 85: Strategy and Time Frame – Storm Water Drainage<br />
Strategy 2007 2008 2009 2010 2011 2012 2013<br />
Storm Water Drainage<br />
Rehabilitation Programme<br />
Rehabilitation and<br />
strengthening of primary<br />
Nallahs<br />
Construction and Upgradation<br />
of Drains<br />
Efficient Operation and<br />
Maintenance Plan<br />
5. Preservation and Rejuvenation of Water Bodies<br />
The key issues pertaining to water Bodies preservation is low level of utilization of water<br />
bodies, polluting water bodies through direct let out of domestic sewage, industrial and<br />
chemical wastes. Encroachments of water bodies, lack of institutional framework and<br />
resources ultimately leads to unhygienic condition of lakes and ponds in the city. Following<br />
goals and strategies are framed to overcome the deficiencies in the preservation of water<br />
bodies.<br />
Vision for Preservation Water Bodies: “To develop pollution free water bodies and<br />
optimum utilization of lakes and ponds for recreational facilities in city”<br />
Goals and Service Outcome<br />
Considering the above key issues in preservation of lake and ponds, the following goals for<br />
different horizon years have been identified.<br />
Table 86: Goal and Service Outcome – Preservation of Water Bodies<br />
Goal<br />
Current 2011 2013 2016 2026<br />
Status<br />
Preservation Water<br />
- 100% 100% 100% 100%<br />
Bodies<br />
Rejuvenation of Lakes<br />
and Ponds<br />
- 70% 100% 100% 100%<br />
Strategies and Action Plan<br />
(i.)<br />
(ii.)<br />
Eviction of Encroachments. Under this programme, identify the lakes and ponds which<br />
are encroached and same should be evicted this should be taken as first priority.<br />
Preservation of Water Bodies. Under this programme a study shall be taken up to<br />
identify lakes and ponds which are polluted in the city and necessary actions shall be<br />
taken up to reroute the domestic sewage outfalls, nallahs and chemicals wastes which are<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 145
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
letting out to the water bodies. In almost all the cases, strengthening of the lakes and<br />
ponds desilting exercise has to be taken up in all the water bodies.<br />
(iii.)<br />
Rejuvenation of Water Bodies and Development of Water Parks. Rejuvenation and<br />
Rehabilitation works for Water Bodies, through de-silting, bunding works and<br />
Intersection and Diversion of Sewage wherever required. Development of boating<br />
facilities and other recreational facilities like amusement/water parks.<br />
The time frame to achieve the above mentioned strategies are presented in the following<br />
table.<br />
Table 87: Strategy Time Frame – Preservation of Water Bodies<br />
Strategy 2007 2008 2009 2010 2011 2012 2013<br />
Eviction of Encroachments<br />
Preservation of Water Bodies<br />
Rejuvenation of Water Bodies<br />
Development of Water Parks<br />
IEC Activities<br />
6. Solid Waste Management<br />
The key issues pertaining to solid Waste Management system is dearth of effective primary<br />
collection mechanism, inadequate no of dust bins, irregular street sweeping, poor waste<br />
collection performance and absence of safe and scientific disposal mechanism leads to<br />
unhygienic and unhealthy living environment in the city. Following goals and strategies are<br />
framed to overcome the deficiencies in the system.<br />
Vision for Solid Waste Management: “To achieve environmentally sustainable waste<br />
Management practice”<br />
Goals and Service Outcome<br />
Table 88: Goal and Service outcome – Solid Waste Management<br />
Goal<br />
Current 2011 2013 2016 2026<br />
Status<br />
Door to Door<br />
- 100% 100% 100% 100%<br />
Collection system<br />
Encourage Source - 100% 100% 100% 100%<br />
Segregation<br />
Improved Waste 37% 60% 100% 100% 100%<br />
Collection<br />
Efficiency<br />
Mechanized Waste - 50% 60% 75% 100%<br />
Handling<br />
Scientific Waste<br />
- 60% 75% 100% 100%<br />
Disposal<br />
Cost Recovery of<br />
O&M<br />
- 30% 50% 85% 100%<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 146
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Goal<br />
Private Sector<br />
Participation<br />
Current<br />
Status<br />
2011 2013 2016 2026<br />
- Primary Primary Complete Complete<br />
Waste Waste Collection Collection<br />
Collection Collection and and<br />
Disposal Disposal<br />
Strategies and Action Plan<br />
(i.)<br />
(ii.)<br />
(iii.)<br />
(iv.)<br />
(v.)<br />
Implementation of ‘Door-to-door collection’ through 100 percent privatization. In<br />
order to achieve the above objective, a ‘Bin system of Solid Waste Storage’ at source is<br />
being recommended. As per this system, each of the households shall be directed to keep<br />
separate bins/ containers for biodegradable and non-biodegradable waste generated<br />
within their premises. The segregated waste so stored in these bins will have to be<br />
transferred to the dumper placer provided for each area.<br />
Source Segregation and Collection of Commercial Waste, through privatization;<br />
and Source Segregation and Collection of Hotels and Market Waste. Construction<br />
waste has to be stored at the premises of the construction either in skips or suitable<br />
containers and has to be directly emptied to the notified disposal site by the generator.<br />
Meat and fish markets should store waste in non-corrosive bins of maximum 100-liter<br />
capacity each and transfer contents to large container to be kept at the market just before<br />
lifting of such large containers. Slaughterhouses should keep separate containers for<br />
animal waste and other wastes. It is also being recommended that this system of source<br />
segregation and storage is encouraged through community education and awareness<br />
campaigns and hence no capital investments are envisaged in this regard. Introduction of<br />
bio-medical waste management facility with support from Indian Medical Association, is<br />
also recommended.<br />
Street Sweeping and Mooping on Daily Basis. Since further areas and eventually the<br />
entire city is proposed to be brought under privatization, it is considered that there would<br />
not be any further requirement to induct conservancy workers. The existing street<br />
sweeping operations in <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> are satisfactory and to ensure<br />
operational efficiency of the system, the following measures are suggested. (a) Markets<br />
and other areas of the city shall be swept at least twice a day and sweeping should be done<br />
on Sundays and holidays in core areas and denser areas; (b) Sweepings shall be collected<br />
separately as degradable and non-biodegradable waste and deposit in containers kept at<br />
various locations and a separate crew equipped with appropriate implements may do desilting<br />
of larger drains.<br />
Community Participation and Enforcement of By-laws and Waste Collection and<br />
Handling Rules. It is recommended that the community be involved in primary<br />
collection through segregation at household level to minimize the number of waste<br />
handling operation. Non-biodegradable waste shall be collected separately from premises<br />
where door to door collections are organized. Present system of primary collection should<br />
be supplemented by introducing multi-bin carts (Push carts / Tricycles) covering the<br />
entire area of the city.<br />
Efficient Secondary Collection and Transportation System. It is also recommended<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 147
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
that Dual Loaded Dumper Placers (DLDPs) be introduced to improve the collection<br />
efficiency and to cover 80 percent area of the <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> area in<br />
phased manner. The introduction of Dual Loaded Dumper Placers shall eliminate the<br />
need of the Secondary Collection Points. Instead of these collection points, in the end,<br />
transfer stations with advanced segregation and recycling facilities may be introduced, in<br />
the future.<br />
(vi.)<br />
(vii.)<br />
(viii.)<br />
(vii.)<br />
Composting of Organic Waste. Approximately 60% of the waste generated in <strong>Dhanbad</strong><br />
is organic nature. The land requirement for compost facility will have to be<br />
accommodated Windrow Pads, Ancillaries and Circulation area.<br />
Sanitary Land Filling of Inorganic Waste and the Compost Rejects. Inorganic waste<br />
constitutes approximately 40 percent. Landfill facility design is based on CPHEEO design<br />
assumptions for Sanitary Landfills, wherein a landfill height of 5 m and a bulk density of<br />
0.85 Tons/ m3 are assumed. However, the actual height of landfill depends on the<br />
geological/ geographical conditions of the site and technology of landfill development.<br />
Educating the community on 4R strategy (Reduce, Reuse, Recycle and Recover).<br />
Institutional Strengthening and Capacity Building. The proposed staff members of<br />
the Sanitation department in DMC and existing staff members in MADA shall undergo<br />
training in project planning, implementation, monitoring and evaluation.<br />
The time frame to achieve the above mentioned strategies are presented in the following<br />
table.<br />
Table 89: Strategy Time Frame – Solid Waste Management<br />
Strategy 2007 2008 2009 2010 2011 2012 2013<br />
Source Segregation<br />
Door to Door Collection<br />
Twin bin system<br />
Mechanized Waste Handling<br />
Vehicle Fleet Management<br />
Composting of Organic Waste<br />
Sanitary Landfill Development<br />
Waste Minimization and<br />
Recycling<br />
IEC Activities<br />
Capacity Building<br />
6. Roads and Traffic Management<br />
The key issues pertaining to Road and Traffic Management is traffic congestion, absence of<br />
mass transit system, ineffective intermediate public transport system and etc. Following goals<br />
and strategies are framed to overcome the deficiencies in the system.<br />
Vision for Roads and Traffic Management: “To achieve a modern, self sustainable and<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 148
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
environmental friendly transportation system to facilitate timely access”<br />
Goals and Service Outcome<br />
Table 90: Goal and Service Outcome – Roads and Traffic Management<br />
Goal<br />
Current 2011 2013 2016 2026<br />
Status<br />
Percentage Reduction - 25% 30% 30% 30%<br />
in Travel Time<br />
Riding Comfort 30% 60% 70% 100% 100%<br />
Transport Safety ( to<br />
reduce accidents)<br />
- 80% 100% 100% 100%<br />
Strategies and Action Plan<br />
(i.)<br />
(ii.)<br />
(iii.)<br />
(iv.)<br />
(v.)<br />
(vi.)<br />
(vii.)<br />
(viii.)<br />
(ix.)<br />
(x.)<br />
(xi.)<br />
(xii.)<br />
(xiii.)<br />
(xiv.)<br />
(xv.)<br />
Strengthening and widening of pavement, provision of footpaths, median, railing, road<br />
signage and other street furniture;<br />
Provision of separate lane for slow moving vehicles to avoid congested streets;<br />
Increase the connectivity and improve the missing links in the city;<br />
To avoid the regular digging of roads for laying utilities, development of under ground<br />
utility ducts with the provision of all utility cables including water, sewer pipe lines,<br />
telephone cables and etc;<br />
Encourage shift towards a Mass Transit System;<br />
Junction improvement includes, proper geometric design of rotary, island and<br />
intersections and signalization;<br />
Construction of pedestrian subways and pedestrian crossings at selected heavy traffic<br />
locations in the city;<br />
Identifying potential areas parking and providing authorized parking lots;<br />
Road safety and pollution control checks including the inspection of fitness of vehicles as<br />
well as training and testing of the IPT drivers;<br />
Traffic management initiatives like, restricting usage of road space by heavy vehicles and<br />
private four wheelers in congested streets during the peak hours;<br />
Facilitating smooth flow of traffic through measures such as one-way routes, speed<br />
controls at necessary locations and emphasis on enforcement of traffic regulations;<br />
Construction of ROB/RUB and Elevated roads at selected locations/corridors to release<br />
the traffic congestion;<br />
Construction of By-passes and Ring Roads;<br />
Improvements to existing bus terminus on BOT basis; and<br />
Construction of Transport Nagar for trucks.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 149
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Table 91: Strategy Time Frame – Roads and Traffic Management<br />
Strategy 2007 2008 2009 2010 2011 2012 2013<br />
Eviction of encroachments<br />
Preparation of comprehensive<br />
land use/master plan<br />
Preparation of Traffic<br />
Management Plan<br />
Upgradation of Roads<br />
Formation of New Roads<br />
Pedestrianization & Signages<br />
Parking Management<br />
Junction improvement &<br />
automatic Signalization<br />
Widening and Strengthening of<br />
Existing Roads<br />
Construction of Ring<br />
Road/bypass Road<br />
Bridges & Flyovers/Elevated<br />
Highways<br />
Inter city bus services<br />
connecting major ring road<br />
intersections and important<br />
urban areas<br />
ROB/RUB & Pedestrian<br />
Subways & Pedestrian Crossings<br />
Integration & upgradation of SH<br />
network with NH<br />
Provision of Bus shelters<br />
Transport Nagar, Bus Terminus,<br />
truck terminus and warehouse<br />
facilities<br />
Public Awareness Campaign<br />
Redevelopment of Airport<br />
Encourage CNG as alternate<br />
fuel<br />
Identification of potential<br />
parking areas and construction<br />
of multistoried parking facilities<br />
at selected locations<br />
7. Street Lighting<br />
The key issues pertaining to Street Lighting is low coverage and high spacing between lamp<br />
posts. Following goals and strategies are framed to overcome the deficiencies in the system.<br />
Vision for Street Lighting: “To achieve and maintain energy efficient and better lighting<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 150
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
facilities to entire DMC Jurisdiction”.<br />
Goals and Service Outcome<br />
Table 92: Goal and Service Outcome – Street Lighting<br />
Goal<br />
Current 2011 2013 2016 2026<br />
Status<br />
Improved Area<br />
10% 70% 100% 100% 100%<br />
Coverage<br />
Energy Savings - 10% 20% 30% 30%<br />
Strategies and Action Plan<br />
(i.)<br />
(ii.)<br />
(iii.)<br />
Replacement of Existing fixtures. Most of the existing street fixtures are not<br />
functioning due to improper maintenance and it is proposed to replace the non working<br />
fixtures to new fixtures for better lighting in the city.<br />
Provision of New Fixtures to Uncovered Areas. To increase the fixture spacing from<br />
the current level to meet the standards new lighting fixture are proposed in uncovered<br />
areas in the DMC area.<br />
Provision of Power Saver Switches. To control the energy consumption due to street<br />
lightings automatic on off switches have been proposed.<br />
8. Basic Services for Urban Poor<br />
The key issues pertaining to Basic Services for Urban Poor is lack of basic infrastructure<br />
facilities in slums like, in adequate access to sanitation facilities, public stand posts, dearth of<br />
health, social infrastructure facilities and education facilities, low coverage and high spacing<br />
between lamp posts. Following goals and strategies are framed to overcome the deficiencies<br />
in the slums.<br />
Vision for Basic Services for Urban Poor: “To achieve hygienic environment in slums<br />
and access to all basic services and quality housing for all slum households”.<br />
Goals and Service Outcome<br />
Table 93: Goal and Service Outcome – Basic Services for Urban Poor<br />
Goal<br />
Current 2011 2013 2016 2026<br />
Status<br />
Housing for Urban 50% 100% 100% 100% 100%<br />
Poor<br />
Increase the<br />
10% 70% 100% 100% 100%<br />
Distribution Network<br />
Reach to all Slums<br />
Access to Public 10% 90% 100% 100% 100%<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 151
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Goal<br />
Standposts/Tanks<br />
Provision of Sewer<br />
Lines to all Slums<br />
Access to Public<br />
Toilets and Urinal<br />
Facilities for all Slum<br />
Households<br />
Access to Dust Bins<br />
and Secondary<br />
Storage Points<br />
Upgradation of<br />
Kutcha roads to PCC<br />
Roads in Slums<br />
Improved Drainage<br />
System<br />
Adequate street<br />
Lighting Facilities<br />
Current<br />
Status<br />
2011 2013 2016 2026<br />
- 10% 50% 100% 100%<br />
20% 75% 100% 100% 100%<br />
5% 60% 100% 100% 100%<br />
- 70% 100% 100% 100%<br />
- 60% 100% 100% 100%<br />
- 70% 100% 100% 100%<br />
Education facilities - 50% 75% 100% 100%<br />
Adequate Social<br />
Infrastructure<br />
Facilities<br />
- 75% 100% 100% 100%<br />
Adequate Health<br />
facilities<br />
- 50% 75% 100% 100%<br />
Strategies and Action Plan<br />
(i.)<br />
(ii.)<br />
(iii.)<br />
(iv.)<br />
(v.)<br />
Integrated Development of Slums (Slum Networking). Slum networking is an<br />
integrated up-gradation of the entire city using slums, not as isolated islands but as an<br />
urban net. The spatial spread of slums over the city together with contiguity between<br />
informal settlements gives an opportunity to strengthen the city level infrastructure<br />
networks. There is always a close correlation between the slum locations and the natural<br />
drainage paths of the city which need to be tapped and improved upon with the<br />
infrastructure services. This approach shall help in building low cost service trunks,<br />
particularly for gravity based systems of sewerage and storm drainage.<br />
Rehabilitation of slums. Rehabilitation of existing infrastructure facilities in slums shall<br />
be taken up like replacement of water supply stand post, distribution network, renovation<br />
of septic tanks and other facilities.<br />
Redevelopment of slums. Redevelopment of slum settlement in the same area by<br />
constructing low raise housing schemes with basic infrastructure facilities.<br />
Construction of housing for urban poor. Nearly 50 percent of the urban poor in the<br />
city does not have proper shelter and hence housing schemes are proposed.<br />
Upgrading and Provision of Additional Facilities. In its drive to upgrade the living<br />
environment of the city the DMC has to take up the initiative of upgrading the facilities<br />
available in residential parks in neighborhoods. This includes frequent gardening and<br />
upkeep of facilities.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 152
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
(vi.)<br />
(vii.)<br />
Reduction of Health Risk. The DMC has to work towards the reduction of health risks<br />
and behaviors leading to chronic and infectious diseases and infant mortality, with<br />
particular emphasis on population disproportionately affected by these conditions. The<br />
<strong>Corporation</strong> should also improve the quality, access to health care, including physical and<br />
mental health, and emergency medical services.<br />
Livelihood Restoration and Social Security. Enhancement of livelihood opportunities<br />
through, enabling skill development, activity centers and micro financing. Providing social<br />
security through convergence of programmes on health insurance, asset protection and<br />
community policing.<br />
9. Urban Environment<br />
The key issues pertaining to Urban Environment is Jharia under ground fire, ambient air<br />
pollution, industrial pollution, vehicular pollution, Water Pollution, Noise Pollution, solid<br />
waste /Hazardous waste. Following goals and strategies are framed to overcome the<br />
environmental pollution in the city.<br />
Vision for Urban Environment: “To accomplish clean, green and safe living<br />
environment for all citizens”.<br />
Strategies and Action Plan<br />
Ambient Air Pollution:<br />
(i.) Implementation of air quality improvement Programme by Pollution Control Board<br />
with support of Giant Polluting units to upgrade ambient air quality status to fairs.<br />
(ii.) Water Sprinkling should be facilitated by DMC/Mining bodies on and besides road<br />
stretches to subside dust particles.<br />
(iii.) Use of Cleaner fuel (LPG) in lieu of Coal for domestic cooking.<br />
(iv.) Development of forest cover to meet the national norms for minimum forest cover<br />
(33% of the total land area)<br />
Industrial Pollution:<br />
(i.) Strict adherence to stack emission standards and emissions reduction from various<br />
processes through appropriate and technological feasible installation / modification of<br />
equipments.<br />
(ii.) Upgradation /improvement of the efficiency of exiting air, water and solid/hazardous<br />
waste treatment and disposal facilities.<br />
(iii.) Permission for discharge of treated effluents into rivers from industries only if they<br />
follow the prescribed effluent standards.<br />
(iv.) Strict adherence to stack emission standards and emissions reduction from various<br />
processes through appropriate and technologically feasible modifications.<br />
(v.) Installation of additional pollution control facilities and green belt development around<br />
the industrial emission sources.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 153
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Vehicular Pollution:<br />
(i.) Maintaining the road conditions to reduce the vehicular emission.<br />
(ii.) Adherence to vehicular emission Standards.<br />
(iii.) Promoting the use of clean fuels such as CNG in automobile sector<br />
(iv.) Promotion of stricter emission norms.<br />
(v.) Phasing out of old two stroke, two and three wheelers in a gradual manner.<br />
(vi.) Mass Transportation can be promoted for reducing the vehicle load.<br />
(vii.) Greenbelt development on either side of the road should be developed by the<br />
concerned agencies/NGOs to facilitated attenuation of pollutants.<br />
Water Pollution:<br />
(i.) Several low capacity Water treatment plants can be established as per units waste water<br />
generating capacity<br />
(ii.) Construction of new sewage treatment facilities.<br />
(iii.) Implementation of River Water quality improvement Programme to upgrade Damodar<br />
and other river water qualities to meet the requirements of designated usage (CPCB<br />
classification).<br />
(iv.) Improvement of assimilative/ dilution capacity of river waters by increasing the water<br />
releases from upstream reservoirs, wherever feasible<br />
Noise Pollution:<br />
(i.) Green belt development for noise attenuation<br />
(ii.) Plantation along transportation corridors.<br />
(iii.) Development of buffer zone between industries & residential areas.<br />
(iv.) Use of noise absorbers/barriers near the machinery from preventing hearing loss, in<br />
large noise generating units in the region.<br />
Solid/ Hazardous Waste Management:<br />
(i.) Identification of proper solid waste dumping site in lieu of temporary arrangements,<br />
with adequate land availability.<br />
(ii.) Organized execution of wastes.<br />
(iii.) Adoption of appropriate technology to facilitate recycle and reuse of solid waste for<br />
reducing waste generation.<br />
(iv.) Composting of domestic solid waste.<br />
(v.) Proper collection of waste and disposal in secure landfill.<br />
(vi.) Identification of sites for flyash disposal.<br />
(vii.) Regular monitoring of ground water quality and planning and implementation of<br />
measures to prevent contamination of ground water due to solid/hazardous waste<br />
dumping.<br />
These issues need to be addressed in order to attain clear waters, blue skies, green land,<br />
resource rich and better quality of life.<br />
(i.)<br />
Environmental Master Plan need to be prepared, where Siting of Industries based on<br />
Environmental Considerations need to be promoted.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 154
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
(ii.) Eco-friendly Mining methods and sustainable mineral extraction rates with built-in<br />
rehabilitation and mining area reclamation technology.<br />
(iii.) Reclamation of degraded land.<br />
(iv.) Afforestations need to be initiated at larger level.<br />
(v.) Indoor air pollution in urban household need to be curbed.<br />
(vi.) Wastewater from underground mines & industries need to be collected for recycling and<br />
reuse to save the scarce water resources to the extent possible.<br />
(vii.) From an environmental point of view, it is desirable to adopt a low growth path, so<br />
that further environmental degradation due to mining & industrial pollution can be<br />
minimized.<br />
10. City Beautification and Tourism Development<br />
(i.) Development parks and recreational facilities in the city;<br />
(ii.) Development of water parks /amusement parks; and<br />
(iii.) Exploring new areas for tourism development.<br />
11. Disaster Preparedness and Response/Action Plan<br />
Strategies and Action Plan<br />
Earthquake Preparedness plan<br />
<br />
<br />
<br />
<br />
<br />
<br />
Formation of City and Ward level Disaster Management Teams [DMT] including the<br />
concerned Government Depts. Senior citizens, National Cadet Corps (NCC)/National<br />
Social Service (NSS), Rotary and Lions Clubs, Resident Welfare Associations, Elected<br />
Members, NGOs and other civil society response groups;<br />
Development of city and ward level earthquake preparedness and response plans;<br />
Development of an inventory of resources at all levels for speedy response during<br />
emergencies and establishing linkages with the India Disaster Resources Network<br />
(IDRN);<br />
Development of response structure from ward to city level;<br />
Specialized training of Disaster Management Teams [DMTs] at ward and city levels; and<br />
Preparedness drills at city and ward levels.<br />
Disaster prevention is intrinsically linked to preventive planning. Some of the important steps<br />
in this regard are:<br />
(i.)<br />
Vulnerability Analysis. Introduction of a comprehensive process of vulnerability<br />
analysis and objective risk assessment. Vulnerability mapping should be prepared for<br />
<strong>Dhanbad</strong> in detail ;<br />
(ii.) Building a Robust and Sound Information Database: A comprehensive database of<br />
the land use, demography, various hazards, under ground fire, mining activities, urban<br />
environmental issues, infrastructure developed at the national, state and local levels<br />
along with current information on climate, weather and man-made structures is crucial<br />
in planning, warning and assessment of disasters. In addition, resource inventories of<br />
governmental and non-governmental systems including personnel and equipment help<br />
in efficient mobilisation and optimisation of response measures;<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 155
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
(iii.) Creating State-of-the-art Infrastructure. The entire disaster mitigation game plan<br />
must necessarily be anchored to frontline research and development in a holistic mode.<br />
State-of-the art technologies available worldwide need to be made available in <strong>Dhanbad</strong><br />
for upgradation of the disaster management system; at the same time, dedicated research<br />
activities should be encouraged, in all frontier areas related to disasters like biological,<br />
space applications, information technology, nuclear radiation etc., for a continuous flow<br />
of high quality basic information for sound disaster management planning;<br />
(iv.) Establishing Linkages between all Knowledge- based Institutions. A National<br />
Disaster Knowledge Network, tuned to the felt needs of a multitude of users like<br />
disaster managers, decision makers, community etc., must be developed as the network<br />
of networks to cover natural, manmade and biological disasters in all their varied<br />
dimensions,<br />
The goal of any disaster management initiative is to build a disaster resistant/resilient<br />
community equipped with safer living and sustainable livelihoods to serve its own<br />
development purposes. The community is also the first responder in any disaster situation,<br />
thereby emphasising the need for community level initiatives in managing disasters.<br />
To encourage such initiatives, the following are required:<br />
(i.) Education and Training and Information. Creating awareness through disaster<br />
education and training and information dissemination are necessary steps for<br />
empowering the community to cope with disasters.<br />
(ii.) Community Participation. Community based approach followed by most NGOs and<br />
Community Based Organisations (CBOs) should be incorporated in the disaster<br />
management system as an effective vehicle of community participation.<br />
(iii.) Identification of Vulnerable Groups. Within a vulnerable community, there exist<br />
groups that are more vulnerable like women and children, aged and infirm and<br />
physically challenged people who need special care and attention especially during<br />
disaster situations. Efforts are required for identifying such vulnerable groups and<br />
providing special assistance in terms of evacuation, relief, aid and medical attention to<br />
them in disaster situations. Management of disasters should therefore be an interface<br />
between a community effort to mitigate and prevent disasters as also an effort from the<br />
government machinery to buttress and support popular initiatives.<br />
(iv.) Personnel Training. Personnel involved in the exercise have to draw upon knowledge<br />
of best practices and resources available to them. Information and training on ways to<br />
better respond to and mitigate disasters to the responders go a long way in building the<br />
capacity and resilience of the country to reduce and prevent disasters. Training is an<br />
integral part of capacity building as trained personnel respond much better to different<br />
disasters and appreciate the need for preventive measures.<br />
The directions in this regard are:<br />
(i.)<br />
The multi-sectoral and multi-hazard prevention based approach to disaster management<br />
requires specific professional inputs. Professional training in disaster management<br />
should be built into the existing pedagogic research and education. Specialised courses<br />
for disaster management may be developed by universities and professional teaching<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 156
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
institutions, and disaster management should be treated as a distinct academic and<br />
professional discipline. In addition to separate diploma/degree courses in disaster<br />
management, the subject needs to be discussed and taught as a specific component in<br />
professional and specialised courses like medicine, nursing, engineering, environmental<br />
sciences, architecture, and town and country planning.<br />
(ii.) The focus towards preventive disaster management and development of a national<br />
ethos of prevention calls for an awareness generation at all levels. An appropriate<br />
component of disaster awareness at the school level will help increase awareness among<br />
children and, in many cases, parents and other family members through these children.<br />
Curriculum development with a focus towards dissemination of disaster related<br />
information on a sustained basis, covering junior, middle and high schools may be<br />
worked out by the different school boards in the country.<br />
Training and Capacity Building. Training facilities for government personnel involved in<br />
disaster management are conducted at the national level by the National Centre for Disaster<br />
Management (NCDM) at the Indian Institute of Public Administration, in New Delhi which<br />
functions as the nodal institution in the country for training, research and documentation of<br />
disasters. At the State level, disaster management cells operating within the State<br />
Administrative Training Institutes (ATIs) provide the necessary training. There is a need for<br />
strengthening specialised training, including training of personnel in disaster response.<br />
Capacity building should not be limited to professionals and personnel involved in disaster<br />
management but should also focus on building the knowledge, attitude and skills of a<br />
community to cope with the effects of disasters. Identification and training of volunteers<br />
from the community towards first response measures as well as mitigation measures is an<br />
urgent imperative. A programme of periodic drills should be introduced in vulnerable areas to<br />
enable prompt and appropriate community response in the event of a disaster, which can help<br />
save valuable lives. Capacity building for effective disaster management therefore needs to be<br />
grounded and linked to the community and local level responders on the one hand and also<br />
to the institutional mechanism of the State and the Nation on the other.<br />
Some of the areas where improvement is urgently needed are:<br />
<br />
<br />
<br />
<br />
Integrated planning for disasters, including the integration of relevant Armed Forces<br />
formations into disaster management planning at all levels from District to State and<br />
Central Government.<br />
Setting up of a modern, permanent national command centre or operations room, with<br />
redundant communications and data links to <strong>Dhanbad</strong>. The <strong>Dhanbad</strong> command centre<br />
or operations room needs to be manned on a 24-hour basis by professionals to cater for<br />
instant integrated response. There needs to be a properly equipped operations room at<br />
the State level as well.<br />
Establishment of a <strong>Municipal</strong> <strong>Corporation</strong> /District Level stand by, quick reaction team<br />
composed of experienced professionals. This team can be organized and run<br />
professionally on the same lines as the United Nations Disaster Assessment and<br />
Coordination (UNDAC) teams.<br />
Creation of urban search and rescue capacity at all levels, by establishing a fully equipped<br />
Search and Rescue unit, as part of the fire service in <strong>Dhanbad</strong>, with trained staff and<br />
modern equipment such as thermal imagers, acoustic detection devices etc. This is of<br />
immediate relevance since a major weakness exposed in the Gujarat earthquake was a<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 157
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
<br />
<br />
lack of specialised urban search and rescue capability in India.<br />
Media policy geared to handling the growing phenomenon of real time television<br />
reporting, which generates enormous political pressures on a government to respond<br />
rapidly and efficiently. This needs attention since the effect is going to increase, not<br />
decrease in future.<br />
Standard procedures for dealing with domestic humanitarian and relief assistance from<br />
non-government sources. Procedures and systems need to be set out to avoid confusion<br />
and ensure best utilisation of the assistance being offered, just as in the case of systems<br />
for international assistance.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 158
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
XI.<br />
DEMAND, SUPPLY, GAP ASSESSMENT OF SERVICE DELIVERY<br />
A. Rationale, Need and Demand<br />
Infrastructure Assessment of the <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> indicates inadequate<br />
Service levels, for current scenario which will further enhance given the future growth,<br />
<br />
<br />
<br />
<br />
<br />
Per Capita supply works out to be a low 66 lpcd for entire <strong>Municipal</strong> <strong>Corporation</strong><br />
area and in Urban Agglomeration area it is about 74 lpcd, based on Population figures<br />
for 2006, which is not ensured on continual basis. Owing to this, supply position<br />
within the <strong>Corporation</strong> is unpredictable;<br />
Absence of UGD system in the <strong>Corporation</strong> area leads to unhygienic living<br />
environment, dearth of sanitation facilities and inadequate and ill maintained public<br />
sanitation facilities in the city;<br />
ULB lacks scientific municipal solid waste treatment and disposal system catering to<br />
the waste collected;<br />
Surfaced roads within the ULB is approximately 54 percent; missing links, network<br />
deficiency and lack of traffic management systems causes congestion within the ULB<br />
area and reduces the Carrying Capacity of the roads;<br />
Drainage network of the city covers only 63 percent of the Road Length; which has<br />
been indicated as one of the major causes of water logging. The abysmal levels of<br />
Service therefore provide a strong basis and need for the Project.<br />
(i)<br />
Approach and Design Criteria.<br />
It is evident that, based on the above discussion there are inadequacy in service delivery to<br />
meet the current and future requirements. The <strong>Municipal</strong> <strong>Corporation</strong> should increase the<br />
level of coverage of all facilities, to meet the service norms based on CPHEEO Norms,<br />
UDPFI Norms or other applicable criteria. Based on this, considering the current deficits and<br />
the future requirements for the <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong>, strategies and action plan<br />
are suggested.<br />
(ii)<br />
Component Selection Criteria.<br />
The total investment in the ULB depends on several parameters like, the level of current basic<br />
needs, the city’s affordability, and the assessed implementation capacity of the city or its<br />
agencies. Overall, project component selection is Marjory influenced by affordability and<br />
implementation capacity. In the interest of integrated city development, another criterion<br />
considered in project component selection has been to ensure inter-sector linkages and<br />
optimization. For instance, water supply, sanitation and sewerage have been seen as a<br />
composite sector and not in isolation from each other.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 159
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
(iii)<br />
Least Cost Solutions and Component Selection.<br />
In formulating project components, the preferred option was developed based on least cost<br />
options, taking into account meeting service delivery targets, and whole-life costs, including<br />
considerations on achievable operation and maintenance arrangements, given available<br />
resources in terms of skills and facilities. Based on the considerations and screening referred<br />
to in the preceding section, priority components were selected and scrutinized and their<br />
financial, social and environmental impacts assessed to verify acceptability.<br />
1. Water Supply<br />
Considering the current deficits and the future requirements for water supply, the following<br />
design standards were adopted. For the provision of water supply the <strong>Dhanbad</strong> <strong>Municipal</strong><br />
<strong>Corporation</strong> should facilitate creation of capital assets so as to meet the future requirements.<br />
Design Standards. The <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> should increase the supply levels in<br />
terms of coverage, to achieve an average gross supply of 170 lpcd and to cater to 100 percent<br />
of the population. Assuming that distribution network is extended to more than 95 percent of<br />
the Roads within <strong>Corporation</strong> area, given very high population density within the <strong>Corporation</strong><br />
area, all the citizens will get a equitable supply.<br />
Table 94: Water Demand for the <strong>Dhanbad</strong><br />
Description Unit Norm Demand<br />
Projected Population (2026) Persons 24,29,044<br />
Percapita Supply Lpcd 170<br />
Total Water Requirement MLD 412.94<br />
Treatment Capacity Requirement MLD 100% 384.65<br />
Total Distribution Network km 95% 2,045.00<br />
Demand<br />
Source: Analysis.<br />
The total water demand and net surplus or deficit for the <strong>Municipal</strong> <strong>Corporation</strong> estimated<br />
for Base year (2006) and Ultimate Stage (2036) on standard gross water consumption rate of<br />
170 lpcd. Considering the ongoing maithon scheme demand gap has been worked out (77<br />
MLD and 230 km distribution network).<br />
Table 95: Demand, Supply, Gap Assessment for Water Supply System - 2026<br />
Description Unit Current<br />
Status<br />
Demand Surplus/(<br />
Deficit)<br />
Demand Surplus/(<br />
Deficit)<br />
2006 2026<br />
Raw Water MLD 189.60 256.74 (67.14) 412.94 (136.89)<br />
Pumping<br />
Raw Water MLD 189.60 248.72 (59.12) 400.04 (123.99)<br />
Transmission<br />
Water<br />
Treatment<br />
Plant<br />
MLD 189.60 239.15 (49.55) 384.65 (108.60)<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 160
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Description<br />
Clear Water<br />
Pumping<br />
Clear Water<br />
Transmission<br />
Service<br />
Storage<br />
Distribution<br />
System (1 km<br />
network Per<br />
2000 Persons)<br />
Road Overlay<br />
Cost<br />
Unit Current<br />
Status<br />
Demand Surplus/(<br />
Deficit)<br />
Demand Surplus/(<br />
Deficit)<br />
2006 2026<br />
MLD 189.60 234.46 (44.86) 377.11 (101.06)<br />
MLD 189.60 253.69 (64.09) 408.04 (131.99)<br />
ML 49.50 67.28 (17.78) 108.21 (131.99)<br />
Km 266.88 1,271.77 (1,004.88<br />
)<br />
2,045.51 (58.71)<br />
Km - 63.59 (63.59) 366.51 (1,778.63<br />
)<br />
2. Sewerage and Sanitation<br />
Contemplating the current deficiencies and the future requirements for Sewerage, the<br />
following strategies and action plan is suggested. For the provision of Under Ground<br />
Drainage system, the <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> should facilitate in creation of Capital<br />
Assets, so as to meet the future requirements.<br />
Design Standards. The DMC should increase the Service levels in terms of coverage, to achieve<br />
gross population coverage of 100 percent through protected Sewerage and Sanitation System<br />
with proper disposal facilities. Assuming that the Collection system is extended to more than<br />
100 percent of the Road Length, it is estimated that approximately 90 to 95 percent of the<br />
population will be covered under safe sewer system.<br />
Sewage Generation Demand. The total Sewage Generation in 2026 for a net water supply of 108<br />
lpcd is approximately 262.34 MLD (i.e., 80 percent of consumer end supply -135lpcd*0.80)<br />
indicating a creation of new system to cater the future requirements. The total Sewage<br />
Generation for 2026 is presented in Table 96.<br />
Table 96: Sewage Generation<br />
Description Units Sewage Generation<br />
Base year – 2006 MLD 163.10<br />
Intermediate stage – 2026 MLD 262.34<br />
Ultimate Stage – 2036 MLD 332.95<br />
Source: Analysis.<br />
The Project demand for 2026 is compared with the existing sewerage facilities in the city to<br />
verify the adequacy and need to augment the capacity of components. Proposed<br />
augmentation of required components of the system is indicated in Table 97.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 161
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Table 97: Demand, Supply, Gap Assessment for Sewerage System - 2026<br />
Description Unit Current<br />
Status<br />
Demand Surplus/(<br />
Deficit)<br />
Demand Surplus/(<br />
Deficit)<br />
2006 2026<br />
Sewage MLD - 163.10 (163.10) 262.34 (262.34)<br />
Treatment<br />
Plant<br />
Sewer<br />
Network<br />
Km - 1,208.18 (1,208.18<br />
)<br />
1,943.23 (1,943.23<br />
)<br />
Pumping MLD - 163.10 (163.10) 262.34 (262.34)<br />
Station<br />
Road Overlay<br />
Cost<br />
Km - 1,208.18 (1,208.18<br />
)<br />
1,943.23 (1,943.23<br />
)<br />
A comparison of various treatment technologies, their efficiencies with respect to cost is<br />
explained in the Table 98.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 162
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Table 98: Comparison of various Sewage Technologies<br />
Parameter Units TF ASP AL+MP OD Single Cell Multiple Cell UASP+MP<br />
WSP WSP<br />
Detention Time 1 Day 4 to 6 hr 3 to 5 hr 1 Day 20 to 30 Days 6 to 10 Days 2 to 4 Days<br />
Land Required Ha/MLD 0.3 0.25 0.5 0.3 2 to 3 1 to 2 0.6 to 1<br />
Method of Oxygen<br />
Atmospheric Mechanical Mechanical Mechanical Biological Biological Not Required<br />
Supply<br />
(Algae) (Algae)<br />
Power Required Kw/MLD 180 250 300 400 Nil Nil 120<br />
Ease of Operation Simple Difficult Simple Simple Very Simple Very Simple Simple<br />
Skill for O&M High High Moderate Moderate Low Low Moderate<br />
Capital Cost<br />
Rs. 30.0 35.0 20.0 20.0 6.0 8.0 20.0<br />
Lakh/MLD<br />
Annual O&M Cost Medium High High Medium Very Low Very Low Low<br />
Reliability Good Least Good Good Very Good Very Good Good<br />
FC Removal % 90-96% 90-96% 95-98% 95-98% 98-99% 98-99% 95-99%<br />
Note: TF – Trickling Filter, ASP – Activated Sludge Process, AL – Aerated Lagoon, OD – Oxidation Ditch, WSP – Waste Stabilization Pond, UASP – Upflow<br />
Anaerobic Sludge Blanket, MP – Maturation Pond<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 163
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
3. Storm Water Drainage<br />
Approach and Design Criteria. The <strong>Municipal</strong> <strong>Corporation</strong> should increase the Service levels in<br />
terms of coverage, to achieve coverage of 150 percent of Road Length, through built drains.<br />
The DMC is recommended to adopt strategy for rejuvenation of Lakes and Ponds, to be used<br />
as sources for re-charging and as Summer Storage, and through networking of Water Bodies,<br />
to increase Water Sustainability.<br />
The Drainage demand for 2016, based on 150 percent Road Length is approximately 1,957<br />
kms, as against a minimal Service level of 18 percent for 2005.<br />
Table 99: Drainage System Demand<br />
Description Units Demand<br />
Remodeling of Existing kutcha Drains Km 300<br />
Formation of New Drains Km 2,150<br />
Desilting of Primary Drains Km 75<br />
Source: Analysis.<br />
The Project demand for 2016 is compared with the existing storm water drainage facilities in<br />
the city to verify the adequacy and need to augment the capacity of components. Proposed<br />
augmentation of required components of the system is indicated in Table 100.<br />
Table 100: Demand, Supply, Gap Assessment for Drainage System - 2016<br />
Description Unit Current<br />
Status<br />
Demand Surplus/(<br />
Deficit)<br />
Demand Surplus/(<br />
Deficit)<br />
2006 2016<br />
Upgradation of Drains<br />
Kutcha to Km 100.00 (100.00)<br />
Pucca Open<br />
Kutcha to Km 135.00 (135.00)<br />
Pucca Closed<br />
Pucca Open to Km 65.00 (65.00)<br />
Pucca Closed<br />
New formation of Drains<br />
Pucca Open Km 260.94 755.94 (495.00) 1,120.94 (860.00)<br />
Drains<br />
Pucca Closed<br />
Drains<br />
Km 125.39 865.39 (740.00) 1,415.39 (1,290.00<br />
)<br />
Desilting of Primary Drains<br />
Desilting of Km 75.00 (75.00)<br />
Primary<br />
Drains<br />
4. Solid Waste Management<br />
Approach and Design Criteria. The DMC should increase the Service levels to meet the Norms<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 164
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
recommended by Solid Waste Handling Rules, 2000. The ULB should achieve 100 percent<br />
coverage, through Door-to-Door Collection and Segregation of Waste at Source.<br />
The total Solid Waste Generation in 2006 for a Per Capita Generation of approximately 300<br />
grams/day is estimated at 440 MT, indicating a priority need for Scientific Disposal of Waste.<br />
Since, the Population Density of the ULB is high, the Waste generation has been considered<br />
at 300 grams/day (assumed waste generation), against the generation and the demand for<br />
future is assessed. The total Solid Waste Generation for 2026 is estimated at 776 MT. The<br />
Present Disposal system is Open Waste Dumping, which is creating potential health and<br />
environment hazard considering the quantity of waste generation, location of disposal site and<br />
its environs, hence further option for Scientific Waste Disposal and Composting can be<br />
explored on priority basis. The details of Service Levels for future are presented in Table 101.<br />
Table 101: Solid Waste system Demand<br />
Description<br />
Unit<br />
Based on CPHEEO Norms<br />
2026<br />
Population In Lakh 24.29<br />
Per capita Waste Generation Grams/day 300<br />
Collection Type -<br />
Door-to-Door Collection and<br />
Segregation of Waste at Source<br />
Collection Demand Percent of Generation 100<br />
Vehicle Capacity Adequacy Percent of Rated Capacity 100<br />
Treatment Type -<br />
Composting of Waste &<br />
Sanitary Landfill<br />
Treatment Demand Percent of Generation 100<br />
Total Solid Waste Generation MT 776<br />
Source: Analysis.<br />
The Project demand for 2026 is compared with the existing solid waste management<br />
infrastructure, to verify the adequacy and need to augment the capacity of components.<br />
Proposed augmentation of required components of the system is indicated in Table 102.<br />
Table 102: Demand, Supply, Gap Assessment for Solid Waste Management System - 2026<br />
Description Unit Current<br />
Status<br />
Demand Surplus/(<br />
Deficit)<br />
Demand Surplus/(<br />
Deficit)<br />
2006 2026<br />
Primary Collection vehicles<br />
Push Carts Nos 129 1,267 (1,438) 3,239 (3,110)<br />
Requirement<br />
Containerized Nos 3 1,817 (1,814) 3,014 (3,011)<br />
Tricycle<br />
Secondary Collection<br />
Dumber Bins Nos - 203 (203) 349 (349)<br />
Requirement<br />
Transportation Vehicles<br />
Dual Load Nos 33 51 18 87 (54)<br />
Dumper<br />
Placer<br />
Disposal Site<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 165
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Description<br />
Landfill Site<br />
Development<br />
Compost<br />
Facility<br />
Development<br />
Unit Current<br />
Status<br />
Demand Surplus/(<br />
Deficit)<br />
Demand Surplus/(<br />
Deficit)<br />
2006 2026<br />
TPD 465.85 (465.85)<br />
TPD 310.56 (310.56)<br />
5. Urban Transport<br />
Traffic Management Plan. These shall focus of junction improvements, traffic management<br />
within core areas of the city, regional level proposals, parking and pedestrian facilities. It has<br />
been observed that, in most of the major roads in the city pedestrians are forced to use the<br />
carriageway due to the absence of footpaths. Footpaths of 1.5 m wide are proposed along the<br />
major roads where heavy pedestrian movements are observed. For traffic safety and<br />
convenience, appropriate signs, markings, lighting, guideposts are required to be provided on<br />
curves, intersections, public utility places, etc. Proposals for road furniture are made<br />
considering the importance of the road, safety and aesthetic. The design of the road furniture<br />
and quality proposed are of international standards. It is proposed to provide the following<br />
road furniture for the roadway;<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
Kilometer stones on the major roads<br />
200 m Furlong stones<br />
Road painting using reflectorized thermoplastic road painting<br />
High intensity grade informatory, regulatory and cautionary sign boards<br />
Street lights on all major roads within the municipal limits, which have been considered<br />
for improvement<br />
High mast lighting at all major junctions<br />
Stop signs<br />
Place identification signs<br />
Proposals under Traffic and Transportation focus at improving Citywide transportation<br />
network and linkages, and Provision of City and Regional Level Transport facilities.<br />
Improvement of Core City Areas is proposed in terms of Pedestrianisation, Signages and<br />
Strengthening. Traffic Network is strengthened through provision of Internal Ring Road<br />
within the ULB area, through widening and strengthening of existing alignment, connection<br />
of incomplete linkages, construction of Flyover, Bridges and ROB/RUB’s.<br />
Proposed Parking areas are as follows;<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
Purana Bazar<br />
Bank More<br />
On Katras Road – JP Chawk towards Matkuria<br />
On Katras Road – JP Chawk towards Rajkamal School<br />
Maya Bazar<br />
Park Market Heerapur<br />
Shranik Chawk – Gaya Bridge<br />
Shranik Chawk – Railway Station<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 166
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
<br />
<br />
Textile Market<br />
Saraidhela Market<br />
Road Widening Warrant<br />
<br />
<br />
<br />
<br />
<br />
NH 32 to 6 lanes from Mahuda to GT Road<br />
JP Chawk to Sindri to 6 lanes<br />
Subhash Chawk to Bhuli township to 4 lane<br />
Barmasia Phatan to Dhansar Road to 4 lane<br />
Hatia to Barmasia Phatak to 4 lane<br />
Bus and Truck parking warrant at;<br />
<br />
<br />
<br />
Improvement to existing bus terminus<br />
Near Gobinpur<br />
Jharia & Rajganj<br />
Following road requires medians;<br />
<br />
<br />
<br />
<br />
<br />
Median at Station to Sindri – Jahria Road<br />
Railway station to Gobinpur<br />
Shramik chawk to sarbadda via combined building<br />
Randher verma chawk to combined building<br />
JP Chawk to Mahuda<br />
Improvements to major and minor junctions are also proposed in terms of geometry, traffic<br />
management, lighting and signages. Some of the important junctions are as follows;<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
ISM Gate<br />
Matkuria<br />
Puja Talkies<br />
Bank More ( JP Chawk and BM Chawk)<br />
Near Rajkamal School, Jharia Road<br />
Near <strong>Dhanbad</strong> Police Station on Bridge<br />
Near R.S College, Jharia<br />
Uparkuli, Sindri Road<br />
Kenduadih Road, Godhar<br />
Kenduadih Petrol Pump<br />
Putki Bridge<br />
The Project demand for Roads for 2016 is compared with the existing Road Infrastructure, to<br />
verify the adequacy and need to augment the capacity of components. The future trend of<br />
road network development is envisaged based on population growth and land use; efficient<br />
system of road network; segregation of traffic; designalizing of junction; and Upgradation,<br />
widening and strengthening of major junctions and corridors. Projected road demand, for<br />
internal city roads, for 2016 is indicated in Table 103.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 167
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Table 103: Demand, Supply, Gap Assessment for Roads - 2016<br />
Description Unit Current<br />
Status<br />
Demand Surplus/(<br />
Deficit)<br />
Demand Surplus/(<br />
Deficit)<br />
2006 2016<br />
Total Road Length<br />
Concrete Km 298.48<br />
BT Road Km 320.05<br />
WBM Km 61.25<br />
Cut<br />
Km 260.35<br />
Stone/Earthen<br />
/Others<br />
Strengthening of Existing Roads<br />
Concrete Km (150) -<br />
BT Road Km (195) -<br />
WBM Km (35) -<br />
Upgradation of Existing Roads<br />
BT to Km - (165) -<br />
Concrete<br />
WBM to BT Km - (25) -<br />
Earthen to BT Km - (135) -<br />
New Formation of Roads<br />
Concrete Km (14) (45)<br />
BT Km (228) (750)<br />
WBM Km (27) (90)<br />
6. Street Lighting<br />
The ULB should increase the density of Street lights and the coverage along the roads<br />
depending upto usage and population density, to achieve an overall 100 percent of the Road<br />
Length. Given the high density of population within the ULB area, and also limited area for<br />
development, it is proposed to emphasize High Power Fixtures and Complete n to Tube<br />
Lights.<br />
The strategic intervention in this sector is in increasing the number of lamp posts in the wards<br />
identified to reduce the average spacing between lamp posts in the town to below 30 mt.<br />
Higher density area and commercial areas are proposed to be addressed to with specific<br />
interventions. Further, measures are also to minimize the power consumption charges which<br />
are observed to be on the higher side from the statement of accounts.<br />
Further, to improve upon the O&M of the street lighting it is recommended to mechanism<br />
the system and involve private sector in the same. The mechanization would be towards<br />
introducing dimming systems during non peak hours of operation to reduce the power<br />
consumption.<br />
The Project demand for 2016 is compared with the existing Streetlight Infrastructure, to<br />
verify the adequacy and need to augment the capacity of components. Proposed<br />
augmentation of required components of the system is indicated in Table 104.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 168
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Table 104: Demand, Supply, Gap Assessment for Street Lights - 2016<br />
Description Unit Current<br />
Status<br />
Demand Surplus/(<br />
Deficit)<br />
Demand Surplus/(<br />
Deficit)<br />
2006 2016<br />
Replacement of Existing Fixtures<br />
Tube Lights Nos 2,381 (1,195)<br />
High Power Nos 20 (10)<br />
fixtures<br />
High Mast Nos 909 (710)<br />
Lamps<br />
Others Nos 251 -<br />
Provision of New Fixtures<br />
Tube Lights Nos 23,190 (20,809) 35,632 (34,612)<br />
High Power Nos 313 (293) 482 (462)<br />
fixtures<br />
High Mast Nos 7,835 (6,926) 12,045 (11,352)<br />
Lamps<br />
Power Saver Nos 300 (300)<br />
Switches<br />
Table 105: Basic Infrastructure and Housing Requirement for Urban Poor<br />
Description Unit Surplus/(Deficit)<br />
Housing for Urban Poor Nos 50,000<br />
Water Distribution Network Km 150<br />
No of Public Stand Posts Nos 200<br />
New Sewer Network Km 200<br />
No of Public Toilets Nos 50<br />
No of Public Urinals Nos 100<br />
No of Storage points Nos 20<br />
No of Additional Tricycles Nos 50<br />
No of Push Carts Nos 100<br />
Road Improvement Nos 150<br />
Storm Water Drainage Nos 100<br />
Street Lighting Nos 1000<br />
Educational Facilities Nos 10<br />
Health Facilities Nos 25<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 169
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
XII. CAPITAL INVESTMENT PLAN & FINANCING STRATEGY<br />
A. Concept Plan for Proposed Investment<br />
Based on the population growth, demand gap assessment has been carried out for the entire<br />
city on a comprehensive framework. The proposed investment is phased out based on the<br />
demand for each infrastructure requirements for the city to reach the envisaged vision. Since<br />
some of the areas in the New <strong>Municipal</strong> <strong>Corporation</strong> area is growing faster than the average<br />
population growth of DMC and owing to the Jharia Rehabilitation proposals new areas are<br />
coming up towards proposed Jharia rehabilitation townships. Hence, considering the<br />
constrains for future developments due to the Jharia underground fire and mining activity in<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> area and based on the future growth potentials the entire<br />
<strong>Municipal</strong> <strong>Corporation</strong> area is divided into five Blocks/zones. The high potential zone for<br />
future development and as well as demand for infrastructure comprises of erstwhile <strong>Dhanbad</strong><br />
<strong>Municipal</strong>ity, <strong>Dhanbad</strong> Sadar Block and Govindpur Block part. In Jharia Block mainly<br />
rehabilitation of infrastructure facilities have been proposed (for Jharia NAC area) and for<br />
other areas in the same block like Sindri, Jamadoba, Tirsa and Bagatdih etc new investment is<br />
proposed (for new asset creation) since Jharia area has to be rehabilitated due the<br />
underground fire, unsuitable for future developments and mining activity for which BCCL is<br />
working on rehabilitation progrmme for entire Jharia Coal Field.<br />
Since the entire area of <strong>Municipal</strong> <strong>Corporation</strong> is fairly larger area, zoning concept has been<br />
adopted. For each zone/block separate water supply scheme/system, sewerage system has<br />
been proposed to take care of the zonal needs. Details of the zone wise proposed investment<br />
is given in annexure.<br />
B. Capital Investment Plan<br />
1. Urban Planning & Growth Management<br />
Proposed investment required in urban planning and growth management sector is Rs. 300<br />
lakh. This includes the preparation of Master Plan/ Land use plan for the entire new<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> Area and preparation of micro level development plans or<br />
town planning schemes for the city.<br />
2. Water Supply<br />
Proposed Project component for Water Supply to <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> broadly<br />
classified in to two categories namely, Existing System Refurbishment and System<br />
Augmentation works. The Detailed Project Reports (DPRs) for some of the components of<br />
refurbishment and augmentation works are available with DMC. Same has been adopted and<br />
besides that based on the demand supply gap analysis new projects were identified to meet<br />
the growing demand. In Table 106 identified projects under water supply sector is presented.<br />
Total cost of refurbishment is Rs. 2,102.80 lakh which include desilting of Topchanchi Lake,<br />
rehabilitation of water treatment plants, replacement of old and worn out clear water, raw<br />
water and distribution system. To control the leakage and unaccounted for Water (UFW),<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 170
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
detailed study is proposed at bulk water supply system and distribution system. To meet the<br />
future demand source augmentation, construction of treatment plants, extending the<br />
distribution network reach to un covered areas in the city and 24/7 water supply also<br />
proposed on pilot basis. Total investment proposed in system augmentation work is Rs.<br />
33,913.92 lakh and total project in water supply sector cost including preparation of Technical<br />
Assistance, Preparation of Detailed Project Reports & Project Management consultancy work,<br />
GIS Mapping, asset management plan, conducting technical study and recycle and use of<br />
abandoned mines in the city for storage purposes is Rs. 38,116.71 lakh.<br />
Table 106: Identified Projects in Water Supply Sector<br />
Description<br />
Unit Cost<br />
(Rs. Lakh)<br />
Gap Amount (Rs.<br />
Lakh)<br />
System Refurbishment<br />
De-silting of Topchanchi Lake DPR 827.80<br />
Rehabilitation of Jamadoba Water<br />
100.00 100.00<br />
Treatment Plant including Electrical and<br />
Pumping Machineries<br />
Rehabilitation of Topchanchi Water<br />
50.00 50.00<br />
Treatment Plant<br />
Replacement of old and worn-out Clear<br />
450.00<br />
Water & Raw Water Mains<br />
Replacement of Existing old<br />
380.00<br />
Distribution System<br />
Repair Works to Sindri Water Treatment 25.00 25.00<br />
Plant<br />
Leak Detection Survey and Reduction<br />
Measures<br />
Water Audit and Leak Detection of Bulk<br />
20.00<br />
Water supply System<br />
Water Audit and Leak Detection of<br />
250.00<br />
Distribution System<br />
Sub Total Water Supply System<br />
2,102.80<br />
Refurbishment<br />
System Augmentation<br />
Katras Urban Water Supply Scheme – DPR 870.90<br />
Phase I<br />
Katras Urban Water Supply Scheme – DPR 921.84<br />
Phase –II<br />
Improvement in Kusunda – Katras & DPR 48.50<br />
Bhuli Township<br />
Improvement of Water Supply – Jharia DPR 1,597.30<br />
coal fields including <strong>Dhanbad</strong> Town –<br />
Phase – I<br />
Improvement of Water Supply in Jharia DPR 183.15<br />
Coalfields including <strong>Dhanbad</strong> Town–<br />
Phase – II<br />
Katras Urban Water Supply – Phase III DPR 1,354.00<br />
Raw Water Pumping Main 10.00 136.89 1,368.87<br />
MLD<br />
Raw Water Transmission 5.00 124.00<br />
MLD<br />
619.94<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 171
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Description<br />
Unit Cost<br />
(Rs. Lakh)<br />
Gap Amount (Rs.<br />
Lakh)<br />
Augmentation of Water Treatment Plant 30.00 108.60 3,258.04<br />
MLD<br />
Clear Water Pumping 15.00 101.06 1,515.89<br />
MLD<br />
Clear Water Transmission 5.00 132.00 659.94<br />
MLD<br />
Construction of Storage Reservoirs 55.00 58.71 ML 3,229.26<br />
Extension of Distribution Network<br />
10.00 1,778.00 17,786.29<br />
System<br />
Km<br />
24/7 Water Supply – Piloting Project 500.00<br />
Sub Total – Water Supply System<br />
33,913.92<br />
Augmentation<br />
Preparation Technical Studies and DPRs<br />
700.00<br />
& Project Management Consultancy<br />
(PMC)<br />
Mapping and GIS 200.00<br />
Asset Management Plan 100.00<br />
Conducting Technical Feasibility Study<br />
100.00<br />
for using abandoned mines as Storage<br />
tanks/Treatment plants/Reuse of Pit<br />
Water<br />
Converting Abandoned Open Cast<br />
1,000.00<br />
Mines for Drinking Water Storage<br />
Tanks<br />
Grand Total – Water Supply System 38,116.71<br />
3. Sewerage and Sanitation<br />
Proposed projects in sewerage and sanitation sector were identified based on the future<br />
demand. In this sector proposals are to create new under ground sewerage system for<br />
<strong>Dhanbad</strong>, which include creation of treatment plant, laying of sewer networks, intermediate<br />
pumping stations and road over lay cost also has been considered for road restoration works<br />
after laying sewer networks. In sanitation sector it is proposed to construct 100 nos of public<br />
toilets across various locations in the city. Total proposed investment is Rs. 52,480.08 lakh,<br />
which also includes Preparation of DPRs & Project Management costs, GIS Mapping of<br />
proposed sewer system and awareness campaign.<br />
Table 107: Identified Projects in Sewerage System Development Works<br />
Description<br />
Unit Cost<br />
(Rs. Lakh)<br />
Gap Amount (Rs.<br />
Lakh)<br />
System Augmentation<br />
Laying of Sewer Networks 10.00 1,943 km 19,432.25<br />
Construction of Sewerage Treatment 35.00 262.34 MLD 9,181.79<br />
Plant<br />
Intermediate Pumping Stations 8.00 262.34 MLD 2,098.69<br />
Road Overlay Cost 10.00 1,943 km 19,432.35<br />
Sub Total – Sewerage System 50,145.08<br />
Construction of Public Toilets 5.00 100 Nos 500.00<br />
Preparation of DPRs & PMC 1,500.00<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 172
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Asset Management Plan 100.00<br />
Mapping and GIS 200.00<br />
Awareness Campaign 35.00<br />
Grand Total – Sewerage System 52,480.08<br />
4. Solid Waste Management<br />
Proposed projects identified in Solid water Management component consist of procurement<br />
of additional primary collection vehicles, secondary collection vehicles, and transportation<br />
vehicles like Dual loaded dumped placers. For scientific disposal of waste generated in city,<br />
development of Landfill sites for non-recyclable solid waste disposal and Compost site<br />
development for recyclable wastes. Total capital investment proposed in this component is<br />
Rs. 5,596.09, the detailed breakup is presented in Table 108.<br />
Table 108: Proposed Projects in Solid Waste Management<br />
Description<br />
Unit Cost<br />
(Rs. Lakh)<br />
Gap<br />
Amount (Rs.<br />
Lakh)<br />
System Augmentation<br />
Primary Collection Vehicles<br />
Additional Pushcarts 0.07 2,903 Nos 209.02<br />
Containerized Tricycles 0.08 2,345 Nos 187.60<br />
Secondary Collection<br />
Additional Dumber Bins 0.55 266 Nos 146.30<br />
Transportation Vehicles<br />
Dual Loaded Dumper Placers 10.00 34 Nos 340.00<br />
Disposal Facilities<br />
Land Fill Site Development 8.00 466 TPD 3,726.76<br />
Compost Site Development 2.50 311 TPD 776.41<br />
Medical Waste Management<br />
Incineration Plants 1 No 25.00<br />
Preparation of DPRs & PMC 150.00<br />
IEC Activities 35.00<br />
Grand Total – Solid Waste<br />
Management<br />
5. Storm Water Drainage<br />
5,596.09<br />
The proposed investment for storm water drainage sector includes upgradation and<br />
remodeling of kutcha to pucca drains, open drains to closed drains and formation new drains<br />
in uncovered areas in the city. The total investment proposed in this sector is Rs. 37,070.00<br />
lakh and the same is detailed out in Table 109.<br />
Table 109: Investment Proposed in Storm Water Drainage<br />
Description<br />
Unit Cost<br />
(Rs.<br />
Lakh)<br />
Gap<br />
Amount (Rs.<br />
Lakh)<br />
Upgradation/Remodeling of<br />
Kutcha to Pucca Drains<br />
Kutcha to Pucca Open 12.00 100 km 1,200.00<br />
Kutcha to Pucca Closed 17.00 135 km 2,295.00<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 173
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Description<br />
Unit Cost<br />
(Rs.<br />
Lakh)<br />
Gap<br />
Amount (Rs.<br />
Lakh)<br />
Pucca Open to Pucca Closed 5.00 65 km 325.00<br />
New Formation<br />
New Pucca Open Drains 12.00 860 km 10,320.00<br />
New Pucca Closed Drains 17.00 1,290 km 21,930.00<br />
Sub Total – Storm Water Drainage<br />
36,070.00<br />
System<br />
Preparation of DPRs & PMC 1,000.00<br />
Grand Total – SWD 37,070.00<br />
Primary Drainage<br />
For strengthening of primary drainages in the city Rs. 1,900.00 lakh is proposed. The details<br />
are presented in Table 110.<br />
Table 110: Investment Proposed in Primary Drainage<br />
Description<br />
Unit Cost<br />
(Rs. Lakh)<br />
Strengthening of Natural Drains<br />
/ Channels<br />
Matkuria Nallah<br />
Kantra Nallah (Jharia Nallah)<br />
Manitind Nallah<br />
Katri Nadhi<br />
Jamunia Nadhi<br />
Gap<br />
Amount (Rs.<br />
Lakh)<br />
25.00 75 km 1,875.00<br />
Kodhiya Nadhi<br />
Sub Total – Primary Drainage 1,875.00<br />
Preparation of DPRs 25.00<br />
Grand Total – Primary Drainage 1,900.00<br />
6. Urban Transport<br />
The proposed investments in road improvement works consist of strengthening<br />
/improvement to existing roads, upgradation of roads, widening of sub arterial roads in the<br />
city and new formation of roads in extension areas to maintain a better circulation pattern.<br />
The investment proposed in road improvement works is Rs. 25,621.00 lakh. The details are<br />
presented in Table 111.<br />
Table 111: Proposed Road Improvements<br />
Description<br />
Unit Cost<br />
(Rs. Lakh)<br />
Gap<br />
Amount (Rs.<br />
Lakh)<br />
Strengthening /Improvement to<br />
Existing Roads<br />
Concrete Roads 5.00 150 km 750.00<br />
Black Top (BT Roads) 7.00 193 km 1,365.00<br />
WBM 5.00 31 km 175.00<br />
Upgradation of Existing Roads<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 174
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
BT to Concrete 30.00 165 km 4,950.00<br />
WBM to BT 15.00 25 km 375.00<br />
Earthen to BT 20.00 135 km 2,700.00<br />
Widening of Roads<br />
Widening of Sub arterial Roads 10.00 285 km 2,850.00<br />
New Formation of Roads in<br />
Extension areas<br />
Concrete 50.00 45km 600.00<br />
Black Top 32.00 750 km 6,496.00<br />
WBM 15.00 90 km 360.00<br />
Sub Total – Road Improvement 20,621.00<br />
Preparation of all DPRs & PMC 5,000.00<br />
Grand Total – Road Improvement 25,621.00<br />
The proposed widening of arterial roads include widening of NH32, JP chawk to Sindri to 6<br />
lanes and roads from Subhash Chawk to Bhuli Township, Barmais Phatak to Dhansar Road<br />
and Hatia to Barmasia Phatak to 4 lanes. Total investment proposed in widening of arterial<br />
roads is Rs. 14,400.00 lakh.<br />
Table 112: Widening of Arterial Roads -Proposed Investment<br />
Description<br />
Unit Cost<br />
(Rs. Lakh)<br />
Widening of Arterial Roads<br />
NH 32 to 6 lanes from Mahuda to GT<br />
Road<br />
Gap<br />
Amount (Rs.<br />
Lakh)<br />
200.00 30 km 6,000.00<br />
JP Chawk to Sindri to 6 lanes 200.00 22 km 4,400.00<br />
Subhash Chawk to Bhuli township to 4 200.00 10 km 2,000.00<br />
lane<br />
Barmasia Phatak to Dhansar Road to 4 200.00 7 km 1,400.00<br />
lane<br />
Hatia to Barmasia Phatak to 4 lane 200.00 3 km 600.00<br />
Grand Total – Widening of Arterial<br />
Roads<br />
14,400.00<br />
There are 22 major and 25 minor junctions are proposed for improvements with automatic<br />
singanlization, improved geometric condition of junctions and other works with a total<br />
investment of Rs. 925.00 lakh, the same is given in Table 113.<br />
Table 113: Proposed Junction Improvements<br />
Description Gap Amount (Rs. Lakh)<br />
Junction Improvements<br />
Major Junctions<br />
ISM Gate 1 No 25.00<br />
Matkuria 1 No 25.00<br />
Puja Talkies 1 No 25.00<br />
Bank More 1 No 25.00<br />
Near Rajkamal School on Jharia Road 1 No 25.00<br />
Near <strong>Dhanbad</strong> Police Station on Bridge 1 No 25.00<br />
Near RS College, Jharia 1 No 25.00<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 175
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Description Gap Amount (Rs. Lakh)<br />
Uparkuli on Sindri Road 1 No 25.00<br />
Kenduadih Road, Godhar 1 No 25.00<br />
Kenduadih Petrol Pump 1 No 25.00<br />
Putki Bridge 1 No 25.00<br />
Puja Talkies (Sahid Raju Chawk) 1 No 25.00<br />
Near Puja Talkies at Railway Station Road<br />
1 No 25.00<br />
Intersection<br />
Steel Gate Intersection 1 No 25.00<br />
Katras – Main Market at Railway Station<br />
1 No 25.00<br />
Intersection<br />
Jharkhand More – along NH-2 Towards Barwadda 1 No 25.00<br />
NH2 and NH 32 Intersection towards Bhuiphore 1 No 25.00<br />
Mandir<br />
NH 32 and SH Hirak Intersection 1 No 25.00<br />
Hirak Point 1 No 25.00<br />
Godhar More – Kusunda Rly. Station Intersection 1 No 25.00<br />
Karkend , Katras – <strong>Dhanbad</strong> – Bokaro<br />
1 No 25.00<br />
Intersection<br />
Karkend – Jharia Intersection 1 No 25.00<br />
Minor Junctions<br />
Improvement to Minor Junctions in DMC area 25 Nos 375.00<br />
Grand Total – Junction Improvements 925.00<br />
The total investment proposed for under ground utility ducting and provision of medians<br />
along major traffic corridors in the city is Rs. 3,075.00 lakh.<br />
Table 114: Proposed Corridors for Under Ground Utility Ducts and Medians<br />
Description<br />
Unit Cost<br />
(Rs. Lakh)<br />
Requirement Amount (Rs.<br />
Lakh)<br />
Railway Station to Sindri – Jharia<br />
50.00 25 km 1,250.00<br />
Road<br />
Railway Station to Gobindpur 50.00 13 km 650.00<br />
Shramilk Chawk to Sarbadda via<br />
50.00 10 km 500.00<br />
Combined Building<br />
Randher Verma Chawk to Combined 50.00 1.50 km 75.00<br />
Building<br />
JP Chawk to Madhuda 50.00 12 km 600.00<br />
Grand Total – UG Utility Ducts &<br />
Medians<br />
3,075.00<br />
There are 5 locations identified for pedestrian subways and pedestrian crossing with a total<br />
investment of Rs. 700 lakh.<br />
Table 115: Proposed Pedestrian Subways & Pedestrian Crossings<br />
Description Requirement Amount (Rs. Lakh)<br />
Near Kachehari 1 No 200.00<br />
Between Birsa Chawk and JP Chawk 1 No 200.00<br />
Near JP Chawk on NH 2 1 No 100.00<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 176
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Description Requirement Amount (Rs. Lakh)<br />
Near MADA Office 1 No 100.00<br />
Sindri Road Near Sri Ram Plaza 1 No 100.00<br />
Grand Total – Pedestrian Subways &<br />
Pedestrian Crossing<br />
700.00<br />
The total investment proposed for construction of ROB, widening of ROB, Flyovers and<br />
elevated highways is to the tune of Rs. 16,250.00 Lakh. The elevated highway is proposed at<br />
Bank more and from railway station to ROB to decongest the core city.<br />
Table 116: Proposed Bridges and Elevated Highways & its Costing<br />
Description Requirement Amount (Rs. Lakh)<br />
ROB at Barmasia Phatak 1 No 1,250.00<br />
Widening of Gaya Pul RUB to 6 Lane 1 No 500.00<br />
Elevated Highways 3 km 9,000.00<br />
Flyovers 2 Nos 5,500.00<br />
Grand Total – Bridges and Elevated<br />
Highways<br />
16,250.00<br />
The following table presents the list of proposed parking lots and with a total investment of<br />
Rs. 1,000 lakh.<br />
Table 117: Proposed Parking Locations<br />
Description Gap Amount (Rs. Lakh)<br />
Parking Lots<br />
Purana Bazar 1 No 70.00<br />
Bank More 1 No 100.00<br />
On Katras Road – JP Chawk Towards<br />
1 No 70.00<br />
Matkuria<br />
On Katras Road – JP Chawk Towards<br />
1 No 70.00<br />
Rajkamal School<br />
Naya Bazzar 1 No 70.00<br />
Park Market at Hirapur 1 No 70.00<br />
Sharnik Chawk at Gaya Bridge 1 No 70.00<br />
Sharnik Chawk at Railway Station 1 No 70.00<br />
Near Textile Market 1 No 70.00<br />
Near Saridhela Market 1 No 70.00<br />
Near Petrol Pump Chawk to Bata More<br />
1 No 70.00<br />
(Jharia)<br />
Bata More – Jharia Bus Stand 1 No 70.00<br />
Near Katras Market 1 No 70.00<br />
Near Katras Railway Station 1 No 60.00<br />
Grand Total – Parking Lots 1,000.00<br />
To release the heavy moving trucks and through traffic which are presently using inner city<br />
roads, ring road and bypass road is proposed with a total investment of Rs. 16,800 lakh.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 177
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Table 118: Proposed Bypass and Ring Roads<br />
Description Gap Amount (Rs. Lakh)<br />
Bypass from Barbadda (<strong>Dhanbad</strong>)(@NH2, 6 km 1,800.00<br />
399.00km) to Godhar(@NH32, 16.00km)<br />
Ring Road 50 km 15,000.00<br />
Grand Total – Bypass & Ring Road 16,800.00<br />
Table 119: Proposed Bus Terminus and Transport Nagar Investments<br />
Description Requirement Amount (Rs. Lakh)<br />
Bus Terminus at Bartand (Existing) 1 No 5,000.00<br />
New Bus Terminus at near Barwadda 1 No 5,000.00<br />
Transport Nagar at Pandukki (along NH2) 1 No 7,500.00<br />
Grand Total – Bus and Truck Terminus 17,500.00<br />
7. Street Lighting<br />
The proposed projects in street lighting include replacement repaired and old tube fixtures<br />
and installation of new fixtures as per standards. To curtail the energy consumption in street<br />
lighting sector power saving switches has been proposed. Total investment in street lighting is<br />
Rs. 5,656.57 lakh.<br />
Table 120: Proposed Investments in Street Lighting Sector<br />
Description<br />
Unit Cost<br />
(Rs. Lakh)<br />
Gap<br />
Amount (Rs.<br />
Lakh)<br />
Replacement of Existing Fixtures<br />
Tube Light 0.05 1,195 Nos 59.75<br />
High Power 5.00 10 Nos 50.00<br />
High Mast Lamps 0.05 710 Nos 71.00<br />
Provision of New Fixtures<br />
Tube Light 0.05 34,612 Nos 1,730.58<br />
High Power 5.00 462 Nos 2,310.00<br />
High Mast Lamps 0.05 11,352 Nos 1,135.24<br />
Power Saver Switches 1.00 300 Nos 300.00<br />
Grand Total – Street Lighting 5,656.57<br />
8. Urban Environment, City Beautification and Tourism Development<br />
To improve the living environment in the city, list of projects have been proposed which<br />
include afforestration, river front development at Damodar River, developing green belt for<br />
Noise attenuation along major transportation corridors and development of biological parks<br />
at Dhangi Pahad. Total investment proposed for urban environmental improvement is Rs.<br />
4,850.00 lakh. For beautification of city and development of tourism Topchanchi lake<br />
beautification, development of parks at various locations in the city has been proposed. Total<br />
investment proposed under Urban Environment improvement, city Beautification and<br />
tourism development is to tune of Rs. 1,950.00 lakh. The details are presented in Table 121.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 178
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Table 121: Proposed Projects in Environmental Improvement, City Beautification and<br />
Tourism Development<br />
Description Requirement Amount (Rs. Lakh)<br />
Environmental Improvement<br />
Preparation of Environmental Master Plan 50.00<br />
Afforestration – in Lake/Pond Catchments<br />
200.00<br />
Areas<br />
Reclamation of Degraded Land (abandoned<br />
1,000.00<br />
Open Cast Mines) for Urban Forest and<br />
Creation of Green Belt<br />
River Front Development - Damodar River 15,000.00<br />
Green Belt Development for Noise<br />
Attenuation along major Transportation<br />
Corridor<br />
75.00<br />
Soil and Water Conservation Measures 100.00<br />
Biological Park at Dhangi Pahad 1,000.00<br />
City Beautification & Tourism<br />
Development<br />
Topchanchi Lake – beautification,<br />
improvement to approach roads and<br />
development of parks<br />
1 500.00<br />
Development of Amusement Park at Rejili<br />
1 2,000.00<br />
Bondh<br />
Beautification and boating facility for<br />
1 200.00<br />
Maithon Dam<br />
Development of Parks 25 Nos 500.00<br />
Development of Picnic Spots – boating<br />
500.00<br />
facilities to all major water bodies<br />
Provision of Public Facilities 25 Nos 100.00<br />
Grand Total – Env. and City<br />
Beautification and TD<br />
21,225.00<br />
9. Preservation of Water Bodies<br />
Total investment to the tune of Rs. 554.89 lakh is proposed to desilt and provision of fencing<br />
facilities to all water bodies in the city. The block wise total area under water and proposed<br />
investment is presented in Table 122.<br />
Table 122: Proposed Investments in Preservation of Water Bodies<br />
Description Requirement Amount (Rs. Lakh)<br />
Desilting and Fencing of Water Bodies<br />
Water Bodies in <strong>Dhanbad</strong> Block 87.87 acres 142.30<br />
Water Bodies in Jharia Block 56.44 acres 91.40<br />
Water Bodies in Baliapur Block 128.04 acres 207.37<br />
Water Bodies in Gobindpur Block 29.73 acres 48.15<br />
Water Bodies in Baghmara Block 40.55 acres 65.67<br />
Grand Total – Water Body Rejuvenation 554.89<br />
10. Other Developmental Projects<br />
Total investment proposed under this head is Rs. 6,955.00 lakh, which include redevelopment<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 179
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
of existing municipal corporation office at Bank more, construction of working women<br />
hostel, night shelters, community halls, sports complex, renewal of existing commercial<br />
establishments, construction of slaughter houses, electric crematorium, construction of<br />
auditorium, construction of vegetable markets and etc. The detailed cost estimates are<br />
presented in Table 123.<br />
Table 123: Other Developmental Projects<br />
Description Requirement Amount (Rs. Lakh)<br />
Redevelopment of Existing <strong>Municipal</strong><br />
1 1,000.00<br />
<strong>Corporation</strong> Office (Office cum<br />
Commercial Complex)<br />
Construction of Working Women Hostel 1 30.00<br />
Construction of Night Shelters 1 20.00<br />
Construction o Community Halls 2 100.00<br />
Construction of New Sports Complex<br />
1 5,000.00<br />
(Stadium)<br />
Renewal of Commercial Complexes 2 50.00<br />
Construction of Slaughter Houses 5 100.00<br />
Construction of Electric Crematorium 2 40.00<br />
Construction of Auditorium 1 50.00<br />
Construction of Vegetable Markets 5 500.00<br />
Development of Exhibition Ground 1 30.00<br />
Construction of Old Age Home 1 20.00<br />
Construction of Destitute Children’s Home 1 15.00<br />
Grand Total – Other Development<br />
Projects<br />
6,955.00<br />
11. Disaster Management pre-preparedness<br />
Following table presents the disaster management pre-preparedness and response activity<br />
investment required for <strong>Dhanbad</strong>.<br />
Table 124: Proposed Investments in Disaster Management Pre-Preparedness<br />
Description Requirement Amount (Rs. Lakh)<br />
Preparation of Vulnerability Map<br />
2,000.00<br />
Developing a Information Data Base - GIS<br />
Creating a state –of- the art Infrastructure<br />
Setting up modern operation centre<br />
Laptop Computers<br />
2 Nos<br />
Telefax machines<br />
2 Nos<br />
Satellite Phone with data Communication 2 Nos<br />
Generator (portable)<br />
1 No<br />
Video Phone<br />
1 No<br />
Ready Move Kits for the Response Team<br />
5 No<br />
Solar Panels & Extra Battery Packs<br />
Hydraulic Excavator<br />
2 Nos<br />
Training and Capacity Building<br />
Grand Total – Disaster Prepreparedness<br />
2,000.00<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 180
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
12. Urban Governance<br />
For efficient management of the increasing administrative responsibilities and the welfare<br />
activities it is proposed for e governance, restructuring of <strong>Municipal</strong> corporation (institutional<br />
strengthening) organization setup to takeup new responsibility, double entry accounting<br />
system, town planning and municipal information system (MIS), property Mapping – GIS for<br />
efficient collection performance. Besides this capacity building and periodic training also<br />
proposed with a total investment of Rs. 1,000.00 lakh.<br />
13. Basic Service for Urban Poor and Housing<br />
To improve the basic infrastructure facilities inside the slum area and for redevelopment,<br />
rehabilitation of slums following projects have been identified with a total investment of Rs.<br />
64,148.96 lakh.<br />
Table 125: Proposed Investments in Basic Services for Urban Poor & Housing<br />
Description Requirement Amount (Rs. Lakh)<br />
Houses at Affordable costs for Slum<br />
Dwellers/Urban poor /EWS/LIG Categories<br />
Housing for Urban Poor Population 50,000 Nos 50,000.00<br />
Slum Networking (for Infrastructure)<br />
Water Distribution Network 150 km 375.00<br />
No. of Public Taps/ Handpumps 200 Nos 70.00<br />
Sewer Network 200 km 2,000.00<br />
No. of Public Toilet Seats 50 Nos 25.00<br />
No. of Public Urinals 100 Nos 17.00<br />
No. of Dustbins/ Temporary Waste<br />
Storage Points 20 Nos 0.76<br />
No. of Tricycle Bins 50 Nos 4.00<br />
No. of Push Carts 100 Nos 7.20<br />
Roads and Pavements 150 km 570.00<br />
Storm Water Drains 100 km 1,500.00<br />
Streetlights 1,000 Nos 80.00<br />
Schools 10 Nos 1,000.00<br />
Hospitals 25 Nos 500.00<br />
Livelihood Restoration and Social Security Schemes<br />
For Livelihood Opportunity LS 5,000.00<br />
To Provide Social Security LS 1,000.00<br />
Sub Total – Urban Services for Poor &<br />
62,148.96<br />
Housing<br />
Preparation of DPRs LS 2,000.00<br />
Grand Total - Urban Services for Poor<br />
& Housing<br />
64,148.96<br />
14. Summary of Investments<br />
The summary of proposed investment is presented in Table 126. Total investment proposed<br />
is Rs. 383,274.30 lakh out of which Rs. 319,125.34 lakh is proposed for urban infrastructure<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 181
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
and governance and Rs. 64,148.96 lakh is proposed for basic services to the urban poor and<br />
housing for urban poor.<br />
Table 126: Summary of Proposed Investments<br />
Description<br />
Amount (Rs. Lakh)<br />
Urban Infrastructure and Governance<br />
Urban Planning and Growth Management - Master<br />
300.00<br />
plan/landuse plan and detailed development plan (micro plan)<br />
Water Supply 38,116.71<br />
Sewerage 52,480.08<br />
Solid Waste Management 5,596.09<br />
Construction and Improvement of Storm Water Drains 37,070.00<br />
Construction and Improvement of Drains/Nallahs 1,900.00<br />
Urban Transport<br />
Laying /improvement/widening of arterial /sub-arterial<br />
60,971.00<br />
roads and bridges<br />
Mass Transit System 50,000.00<br />
Parking Lots 1,000.00<br />
Laying of Ring Roads and Bye-Passes 16,800.00<br />
Construction and Development of Bus and Truck<br />
17,500.00<br />
Terminals<br />
Street Lighting 5,656.57<br />
Environmental Improvement and City Beautification<br />
21,225.00<br />
Schemes & Tourism Development<br />
Preservation of Water Bodies 554.89<br />
Other Development Projects 6,955.00<br />
Disaster Management 2,000.00<br />
Urban Governance 1,000.00<br />
Sub Total Urban Infrastructure and Governance 319,125.34<br />
Basic Services to the Urban Poor & Housing<br />
Infrastructure Facilities to Urban Poor – slum networking<br />
(infrastructure)<br />
6,148.96<br />
Housing for Urban Poor & DPRs, PMC 52,000.00<br />
Livelihood Restoration and Social Security Schemes 6,000.00<br />
Sub Total – Basic Services to the Urban Poor & Housing 64,148.96<br />
Grand Total 383,274.30<br />
Grand Total in Crores<br />
3,832.74 Crs<br />
The cost may increase at the rate of 5 percent per year, if the projects are not<br />
completed on the prescribed year.<br />
In Table 127 detailed component wise phasing is presented, which was arrived based on the<br />
discussion with the key stakeholders.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 182
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Table 127: Component wise Investment Phasing (Base Cost)<br />
Description Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 2012-2013<br />
Rs. lakh<br />
Urban Planning & Growth<br />
Management<br />
Preparation of Master Plan & Micro<br />
Level Planning<br />
300.00 150.00 150.00<br />
Water Supply Projects<br />
De-silting of Topchanchi Lake – MADA 827.80 827.80 - - - - - -<br />
Rehabilitation of Jamadoba Water 100.00<br />
Treatment Plant including Electrical and<br />
Pumping Machineries<br />
100.00 - - - - - -<br />
Rehabilitation of Topchanchi Water 50.00<br />
Treatment Plant<br />
50.00 - - - - - -<br />
Replacement of old and worn-out Clear 450.00<br />
Water & Raw Water Mains<br />
225.00 225.00 - - - - -<br />
Replacement of Existing old 380.00<br />
Distribution System<br />
190.00 190.00 - - - - -<br />
Repair Works to Sindri Water Treatment 25.00<br />
Plant<br />
- 25.00 - - - - -<br />
Leak Detection Survey and Reduction<br />
Measures - - - - - - -<br />
Water Audit and Leak Detection of Bulk 20.00<br />
Water supply System<br />
- 20.00 - - - - -<br />
Water Audit and Leak Detection of 250.00<br />
Distribution System<br />
- 250.00 - - - - -<br />
System Augmentation<br />
Katras Urban Water Supply Scheme – 870.90<br />
Phase I<br />
435.45 435.45 - - - - -<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 183
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Description Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 2012-2013<br />
Rs. lakh<br />
Katras Urban Water Supply Scheme – 921.84<br />
Phase –II<br />
460.92 460.92 - - - - -<br />
Improvement in Kusunda – Katras & 48.50<br />
Bhuli Township<br />
24.25 24.25 - - - - -<br />
Improvement of Water Supply – Jharia 1,597.30<br />
coal fields including <strong>Dhanbad</strong> Town –<br />
Phase – I<br />
798.65 798.65 - - - - -<br />
Improvement of Water Supply in Jharia 183.15<br />
Coalfields including <strong>Dhanbad</strong> Town–<br />
Phase – II<br />
91.58 91.58 - - - - -<br />
Katras Urban Water Supply – Phase III 1,354.00 677.00 677.00 - - - - -<br />
Raw Water Pumping Main 1,368.87 - 684.44 684.44 - - - -<br />
Raw Water Transmission 619.94 - 309.97 309.97 - - - -<br />
Augmentation of Water Treatment Plant 3,258.04 - - 1,629.02 1,629.02 - - -<br />
Clear Water Pumping 1,515.89 - - 757.94 757.94 - - -<br />
Clear Water Transmission 659.94 - - 329.97 329.97 - - -<br />
Construction of Storage Reservoirs 3,229.26 - - - 968.78 968.78 968.78 322.93<br />
Extension of Distribution Network<br />
System 17,786.29 3,557.26 3,557.26 3,557.26 3,557.26 3,557.26 - -<br />
24/7 Water Supply – Piloting Project 500.00 - - 250.00 250.00 - - -<br />
Preparation of DPR 700.00 700.00 - - - - - -<br />
Mapping and GIS 200.00 - 100.00 100.00 - - - -<br />
Asset Management Plan 100.00 - 50.00 50.00 - - - -<br />
Conducting Technical Feasibility Study<br />
for using abandoned mines as Storage<br />
tanks/Treatment plants/Reuse of Pit<br />
Water 100.00 100.00 - - - - - -<br />
Converting Abandoned Open Cast<br />
Mines for Drinking Water Storage Tanks 1,000.00 1,000.00 - - - - - -<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 184
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Description Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 2012-2013<br />
Rs. lakh<br />
Grand Total – Water Supply System 38,116.71<br />
9,237.90 7,899.51 7,668.59 7,492.97 4,526.04 968.78 322.93<br />
Sewerage and Sanitation<br />
System Augmentation<br />
Laying of Sewer Networks 19,432.35 - 3,886.47 3,886.47 3,886.47 3,886.47 3,886.47 -<br />
Construction of Sewerage Treatment<br />
Plant<br />
9,181.79<br />
- - 2,295.45 2,295.45 1,836.36 1,836.36 918.18<br />
Intermediate Pumping Stations 2,098.69 - - 524.67 524.67 419.74 419.74 209.87<br />
Road Overlay Cost 19,432.35 1,943.23 1,943.23 3,886.47 3,886.47 3,886.47 1,943.23 1,943.23<br />
Construction of Public Toilets 500.00 50.00 100.00 100.00 75.00 75.00 50.00 50.00<br />
DPRs 1,500.00 200.00 - - - - - -<br />
Asset Management Plan 100.00 - 50.00 50.00 - - - -<br />
Mapping and GIS 200.00 100.00 100.00 - - - - -<br />
Awareness Campaign 35.00 3.50 3.50 7.00 5.25 5.25 5.25 5.25<br />
Grand Total – Sewerage & Sanitation<br />
System<br />
52,480.18<br />
3,596.73 6,083.20 10,750.06 10,673.31 10,109.29 8,141.05 3,126.53<br />
Solid Waste Management<br />
System Augmentation<br />
Primary Collection Vehicles<br />
Additional Pushcarts 209.02 41.80 62.70 41.80 41.80 20.90 - -<br />
Containerized Tricycles 187.60 37.52 56.28 37.52 37.52 18.76 - -<br />
Secondary Collection<br />
Additional Dumber Bins 146.30 14.63 14.63 29.26 29.26 29.26 14.63 14.63<br />
Transportation Vehicles<br />
Dual Loaded Dumper Placers 340.00 34.00 34.00 68.00 68.00 68.00 34.00 34.00<br />
Disposal Facilities<br />
Land Fill Site Development 3,726.76 - 372.68 931.69 931.69 745.35 745.35 -<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 185
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Description Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 2012-2013<br />
Rs. lakh<br />
Compost Site Development 776.41 77.64 77.64 194.10 194.10 155.28 77.64 -<br />
Medical Waste Management<br />
Incineration Plants 25.00 2.50 3.75 3.75 3.75 3.75 3.75 3.75<br />
DPRs 150.00 150.00 - - - - - -<br />
IEC Activities 35.00 3.50 5.25 5.25 5.25 5.25 5.25 5.25<br />
Grand Total – Solid Waste 5,546.09<br />
Management<br />
361.59 626.93 1,311.38 1,311.38 1,046.56 880.62 57.63<br />
Storm Water Drainage<br />
Upgradation/Remodeling of Kutcha<br />
to Pucca Drains<br />
Kutcha to Pucca Open 1,200.00 240.00 360.00 360.00 240.00 - - -<br />
Kutcha to Pucca Closed 2,295.00 459.00 688.50 688.50 459.00 - - -<br />
Pucca Open to Pucca Closed 325.00 65.00 97.50 97.50 65.00 - - -<br />
New Formation<br />
New Pucca Open Drains 10,320.00 1,032.00 1,548.00 1,548.00 1,548.00 1,548.00 1,548.00 1,548.00<br />
New Pucca Closed Drains 21,930.00 2,193.00 3,289.50 3,289.50 3,289.50 3,289.50 3,289.50 3,289.50<br />
DPRs 1,000.00 1,000.00 - - - - - -<br />
Grand Total – Storm Water 37,070.00<br />
Drainage System<br />
4,989.00 5,983.50 5,983.50 5,601.50 4,837.50 4,837.50 4,837.50<br />
Strengthening of Natural Drains /<br />
Channels<br />
1,875.00 187.50 281.25 281.25 281.25 281.25 281.25 281.25<br />
DPRs 25.00 25.00<br />
Urban Transport<br />
Strengthening /Improvement to<br />
Existing Roads<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 186
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Description Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 2012-2013<br />
Rs. lakh<br />
Concrete Roads 750.00 150.00 150.00 225.00 112.50 112.50 - -<br />
Black Top (BT Roads) 1,365.00 273.00 273.00 409.50 204.75 204.75 - -<br />
WBM 175.00 35.00 35.00 52.50 26.25 26.25 - -<br />
Upgradation of Existing Roads<br />
BT to Concrete 4,950.00 742.50 990.00 990.00 990.00 742.50 495.00 -<br />
WBM to BT 375.00 56.25 75.00 75.00 75.00 56.25 37.50 -<br />
Earthen to BT 2,700.00 405.00 540.00 540.00 540.00 405.00 270.00 -<br />
Widening of Roads<br />
Widening of Sub arterial Roads 2,850.00 285.00 427.50 427.00 427.50 427.50 427.50 427.50<br />
New Formation of Roads in<br />
Extension areas<br />
Concrete 600.00 - 120.00 180.00 120.00 90.00 90.00 -<br />
Black Top 6,496.00 - 649.60 1,299.20 1,299.20 1,299.20 974.40 974.40<br />
WBM 360.00 - 36.00 72.00 72.00 72.00 54.00 54.00<br />
DPRs 5,000.00 2,500.00 2,500.00 - - - - -<br />
Grand Total – Road Improvement 25,621.00 4,446.75 5,796.10 4,270.70 3,867.20 3,435.95 2,348.40 1,455.90<br />
Widening of Arterial Roads<br />
NH 32 to 6 lanes from Mahuda to GT 6,000.00<br />
Road<br />
1,800.00 1,800.00 1,800.00 600.00 - - -<br />
JP Chawk to Sindri to 6 lanes 4,400.00 440.00 1,320.00 1,320.00 1,320.00 - - -<br />
Subhash Chawk to Bhuli township to 4<br />
lane<br />
2,000.00<br />
600.00 600.00 600.00 200.00 - - -<br />
Barmasia Phatan to Dhansar Road to 4<br />
lane<br />
1,400.00<br />
420.00 420.00 420.00 140.00 - - -<br />
Hatia to Barmasia Phatak to 4 lane 600.00 - 180.00 180.00 120.00 120.00 - -<br />
Grand Total – Widening of Arterial<br />
Roads<br />
14,400.00<br />
3,260.00 4,320.00 4,320.00 2,380.00 120.00 - -<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 187
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Description Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 2012-2013<br />
Rs. lakh<br />
Junction Improvements<br />
Major Junctions<br />
ISM Gate 25.00 25.00 - - - - - -<br />
Matkuria 25.00 25.00 - - - - - -<br />
Puja Talkies 25.00 25.00 - - - - - -<br />
Bank More 25.00 25.00 - - - - - -<br />
Near Rajkamal School on Jharia Road 25.00 25.00 - - - - - -<br />
Near <strong>Dhanbad</strong> Police Station on Bridge 25.00 25.00 - - - - - -<br />
Near RS College, Jharia 25.00 25.00 - - - - - -<br />
Uparkuli on Sindri Road 25.00 25.00 - - - - - -<br />
Kenduadih Road, Godhar 25.00 25.00 - - - - - -<br />
Kenduadih Petrol Pump 25.00 25.00 - - - - - -<br />
Putki Bridge 25.00 - 25.00 - - - - -<br />
Puja Talkies (Sahid Raju Chawk) 25.00 - 25.00 - - - - -<br />
Near Puja Talkies at Railway Station<br />
Road Intersection<br />
25.00<br />
- 25.00 - - - - -<br />
Steel Gate Intersection 25.00 - 25.00 - - - - -<br />
Katras – Main Market at Railway Station<br />
Intersection<br />
25.00<br />
- 25.00 - - - - -<br />
Jharkhand More – along NH-2 Towards<br />
Barwadda<br />
25.00<br />
- - 25.00 - - - -<br />
NH2 and NH 32 Intersection towards<br />
Bhuiphore Mandir<br />
25.00<br />
- - 25.00 - - - -<br />
NH 32 and SH Hirak Intersection 25.00 - - 25.00 - - - -<br />
Hirak Point 25.00 - - 25.00 - - - -<br />
Godhar More – Kusunda Rly. Station<br />
Intersection<br />
25.00<br />
- - - 25.00 - - -<br />
Karkend , Katras – <strong>Dhanbad</strong> – Bokaro<br />
Intersection<br />
25.00<br />
- - - 25.00 - - -<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 188
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Description Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 2012-2013<br />
Rs. lakh<br />
Karkend – Jharia Intersection 25.00 - - - - 25.00 - -<br />
Minor Junctions<br />
Improvement to Minor Junctions in<br />
DMC area<br />
375.00<br />
- - - - 150.00 112.50 112.50<br />
Grand Total – Junction 925.00<br />
Improvements<br />
250.00 125.00 100.00 50.00 175.00 112.50 112.50<br />
UG Utility ducts & Medians<br />
Railway Station to Sindri – Jharia Road 1,250.00 250.00 375.00 375.00 125.00 125.00 - -<br />
Railway Station to Gobindpur 650.00 130.00 195.00 195.00 130.00 - - -<br />
Shramilk Chawk to Sarbadda via 500.00<br />
Combined Building<br />
- 100.00 150.00 150.00 100.00 - -<br />
Randher Verma Chawk to Combined 75.00<br />
Building<br />
- 75.00 - - - - -<br />
JP Chawk to Madhuda 600.00 - 120.00 180.00 180.00 60.00 60.00 -<br />
Grand Total – UG Utility Ducts &<br />
Medians<br />
3,075.00<br />
380.00 865.00 900.00 585.00 285.00 60.00 -<br />
Pedestrian Subways & Crossings<br />
Near Kachehari 200.00 - - 200.00 - - - -<br />
Between Birsa Chawk and JP Chawk 200.00 200.00 - - - - - -<br />
Near JP Chawk on NH 2 100.00 - 100.00 - - - - -<br />
Near MADA Office 100.00 - 100.00 - - - - -<br />
Sindri Road Near Sri Ram Plaza 100.00 100.00 - - - - - -<br />
Grand Total – Pedestrian Subways &<br />
Pedestrian Crossing<br />
700.00<br />
300.00 200.00 200.00 - - - -<br />
Bridges & Elevated Highways<br />
ROB at Barmasia Phatak 1,250.00 - 625.00 625.00 - - - -<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 189
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Description Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 2012-2013<br />
Rs. lakh<br />
Widening of Gaya Pul RUB to 6 Lane 500 - - 250.00 250.00 - - -<br />
Elevated High Roads - 9,000.00 - - - 1,800.00 1,800.00 1,800.00 3,600.00<br />
Flyovers 5,500.00 - 1,650.00 1,650.00 1,650.00 550.00 - -<br />
Grand Total – Bridges and Elevated<br />
Highways<br />
16,250.00<br />
- 2,275.00 2,525.00 3,700.00 2,350.00 1,800.00 3,600.00<br />
Mass Transit System 50,000.00 - - - 10,000.00 10,000.00 10,000.00 20,000.00<br />
Parking Lots<br />
Purana Bazar 70.00 70.00 - - - - - -<br />
Bank More 100.00 100.00 - - - - - -<br />
On Katras Road – JP Chawk Towards<br />
Matkuria<br />
70.00<br />
70.00 - - - - - -<br />
On Katras Road – JP Chawk Towards<br />
Rajkamal School<br />
70.00<br />
- 70.00 - - - - -<br />
Naya Bazzar 70.00 - 70.00 - - - - -<br />
Park Market at Hirapur 70.00 70.00 - - - - - -<br />
Sharnik Chawk at Gaya Bridge 70.00 - 70.00 - - - - -<br />
Sharnik Chawk at Railway Station 70.00 - 70.00 - - - - -<br />
Near Textile Market 70.00 - - 70.00 - - - -<br />
Near Saridhela Market 70.00 - - 70.00 - - - -<br />
Near Petrol Pump Chawk to Bata More<br />
(Jharia)<br />
70.00<br />
- - - 70.00 - - -<br />
Bata More – Jharia Bus Stand 70.00 - - 70.00 - - - -<br />
Near Katras Market 70.00 - - - 70.00 - - -<br />
Near Katras Railway Station 60.00 - - - - 60.00 - -<br />
Grand Total – Parking Lots 1,000.00 310.00 280.00 210.00 140.00 60.00 - -<br />
By-pass & Ring Road<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 190
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Description Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 2012-2013<br />
Rs. lakh<br />
Bypass from Barbadda 1,800.00<br />
(<strong>Dhanbad</strong>)(@NH2, 399.00km) to<br />
Godhar(@NH32, 16.00km)<br />
540.00 540.00 720.00 - - - -<br />
Ring Road 15,000.00 - 4,500.00 4,500.00 4,500.00 1,500.00 - -<br />
Grand Total – By-pass & Ring Road 16,800.00 540.00 5,040.00 5,220.00 4,500.00 1,500.00 - -<br />
Bus Terminus & Truck Terminus<br />
Bus Terminus at Bartand (Existing) 5,000.00 5,000.00 - - - - - -<br />
New Bus Terminus at near Barwadda 5,000.00 - - - 2,500.00 2,500.00 - -<br />
Transport Nagar at Pandukki (along<br />
NH2)<br />
7,500.00<br />
- - 3,750.00 3,750.00 - - -<br />
Grand Total – Bus and Truck<br />
Terminus<br />
17,500.00<br />
5,000.00 - 3,750.00 6,250.00 2,500.00 - -<br />
Street Lighting<br />
Replacement of Existing Fixtures<br />
Tube Light 59.75 11.95 17.93 17.93 5.98 5.98 - -<br />
High Power 50.00 10.00 15.00 15.00 5.00 5.00 - -<br />
High Mast Lamps 71.00 14.20 21.30 21.30 7.10 7.10 - -<br />
Provision of New Fixtures - - - - - - -<br />
Tube Light 1,730.58 - 346.12 519.17 519.17 173.06 173.06 -<br />
High Power 2,310.00 - 462.00 693.00 693.00 231.00 231.00 -<br />
High Mast Lamps 1,135.24 - 227.05 340.57 340.57 113.52 113.52 -<br />
Power Saver Switches 300.00 - - 60.00 90.00 90.00 30.00 30.00<br />
Grand Total – Street Lighting 5,656.57 36.15 1,089.39 1,666.97 1,660.82 625.66 547.58 30.00<br />
Environmental Improvement<br />
Preparation of Environmental Master<br />
Plan<br />
50.00<br />
50.00 - - - - - -<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 191
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Description Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 2012-2013<br />
Rs. lakh<br />
Afforestration – in Lake/Pond 200.00<br />
Catchments Areas<br />
60.00 60.00 80.00 - - - -<br />
Reclamation of Degraded Land 1,000.00<br />
(abandoned Open Cast ) for Urban<br />
Forest and Creation of Green Belt<br />
- - 300.00 400.00 300.00 - -<br />
River Front Development - Damodar 15,000.00<br />
River<br />
- 4,500.00 4,500.00 6,000.00 - - -<br />
Green Belt Development for Noise 75.00<br />
Attenuation along major Transportation<br />
Corridor<br />
7.50 11.25 11.25 11.25 11.25 11.25 11.25<br />
Soil and Water Conservation Measures 100.00 10.00 15.00 15.00 15.00 15.00 15.00 15.00<br />
Biological Park at Dhangi Pahad 1,000.00 - - - - 500.00 500.00 -<br />
City Beautification & Tourism<br />
Development<br />
Topchanchi Lake – beautification, 500.00<br />
improvement to approach roads and<br />
development of parks<br />
500.00 - - - - - -<br />
Development of Amusement Park at 2,000.00<br />
Rejili Bondh<br />
2,000.00 - - - - - -<br />
Beautification and boating facility to 200.00<br />
Maithon Dam<br />
100.00 100.00 - - - - -<br />
Development of Parks 500.00 50.00 75.00 75.00 75.00 75.00 75.00 75.00<br />
Development of Picnic Spots – boating<br />
facilities to all major water bodies<br />
500.00<br />
50.00 75.00 75.00 75.00 75.00 75.00 75.00<br />
Provision of Public Facilities 100.00 10.00 15.00 15.00 15.00 15.00 15.00 15.00<br />
Grand Total – Env. and City 21,225.00<br />
Beautification and TD<br />
2,837.50 4,851.25 5,071.25 6,591.25 991.25 691.25 191.25<br />
Preservation of Water Bodies<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 192
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Description Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 2012-2013<br />
Rs. lakh<br />
Desilting and Fencing of Water<br />
Bodies<br />
Water Bodies in <strong>Dhanbad</strong> Block 142.3 14.23 42.69 28.46 42.69 14.23 - -<br />
Water Bodies in Jharia Block 91.4 9.14 27.42 18.28 27.42 9.14 - -<br />
Water Bodies in Baliapur Block 207.37 20.74 62.21 41.47 62.21 20.74 - -<br />
Water Bodies in Gobindpur Block 48.15 4.82 14.45 9.63 14.45 4.82 - -<br />
Water Bodies in Baghmara Block 65.67 6.57 19.70 13.13 19.70 6.57 - -<br />
Grand Total – Water Body 554.89<br />
Rejuvenation<br />
55.49 166.47 110.98 166.47 55.49 - -<br />
Other Developmental Projects<br />
Redevelopment of Existing <strong>Municipal</strong> 1,000.00<br />
<strong>Corporation</strong> Office (Office cum<br />
Commercial Complex)<br />
1,000.00 - - - - - -<br />
Construction of Working Women 30.00<br />
Hostel<br />
- 15.00 15.00 - - - -<br />
Construction of Night Shelters 20.00 - 10.00 10.00 - - - -<br />
Construction o Community Halls 100.00 - 50.00 50.00 - - - -<br />
Construction of New Sports Complex<br />
(Stadium)<br />
5,000.00<br />
3,750.00 1,250.00 - - - - -<br />
Renewal of Commercial Complexes 50.00 50.00 - - - - - -<br />
Construction of Slaughter Houses 100.00 50.00 50.00 - - - - -<br />
Construction of Electric Crematorium 40.00 - - 20.00 20.00 - - -<br />
Construction of Auditorium 50.00 - 25.00 25.00 - - - -<br />
Construction of Vegetable Markets 500.00 - 250.00 250.00 - - - -<br />
Development of Exhibition Ground 30.00 - - - 15.00 15.00 - -<br />
Construction of Old Age Home 20.00 10.00 10.00 - - - - -<br />
Construction of Destitute Children’s<br />
Home<br />
15.00<br />
- - - - 7.50 7.50 -<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 193
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Description Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 2012-2013<br />
Rs. lakh<br />
Grand Total – Other Development 6,955.00<br />
Projects<br />
4,860.00 1,660.00 370.00 35.00 22.50 7.50 -<br />
Basic Services for Urban Poor &<br />
Housing<br />
Housing for Urban Poor Population 50,000.00 5,000.00 5,000.00 7,500.00 12,500.00 15,000.00 5,000.00 -<br />
Water Distribution Network 375.00 37.50 93.75 93.75 75.00 75.00 - -<br />
No. of Public Taps/ Handpumps 70.00 7.00 17.50 17.50 14.00 14.00 - -<br />
Sewer Network 2,000.00 - 200.00 500.00 500.00 400.00 400.00 -<br />
No. of Public Toilet Seats 25.00 7.50 7.50 7.50 2.50 - - -<br />
No. of Public Urinals 17.00 5.10 5.10 5.10 1.70 - - -<br />
No. of Dustbins/ Temporary Waste<br />
Storage Points 0.76 0.23 0.23 0.23 0.08 - - -<br />
No. of Tricycle Bins 4.00 1.20 1.20 1.20 0.40 - - -<br />
No. of Push Carts 7.20 2.16 2.16 2.16 0.72 - - -<br />
Roads and Pavements 570.00 57.00 171.00 171.00 171.00 - - -<br />
Storm Water Drains 1,500.00 150.00 450.00 450.00 450.00 - - -<br />
Streetlights 80.00 8.00 8.00 16.00 24.00 24.00 - -<br />
Schools 1000.00 100.00 100.00 200.00 300.00 300.00 - -<br />
Hospitals 500.00 50.00 50.00 100.00 150.00 150.00 - -<br />
DPRs 2,000.00 1,500.00 500.00 - - - - -<br />
Livelihood Restoration and Social<br />
Security Schemes 6,000.00 600.00 600.00 600.00 600.00 1,800.00 900.00 900.00<br />
Grand Total – Urban Services for<br />
Poor & Housing 64,148.96 7,525.69 7,206.44 9,664.44 14,789.40 17,763.00 6,300.00 900.00<br />
Disaster Management 2,000.00 600.00 800.00 600.00 - - - 600.00<br />
Urban Governance 1,000.00 400.00 400.00 200.00 - - - -<br />
Grand Total Investment 383,274.40 49,349.31 56,099.04 65,174.12 80,075.54 60,684.47 36,976.44 34,915.49<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 194
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
C. Investment Sustenance<br />
In order to assess the investment sustaining capacity of <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong>, the<br />
municipal fiscal situation is forecasted through a Financial Operating Plan (FOP). The FOP is<br />
essentially a multi-year forecast of municipal finances for a term of 7 years (implementation<br />
period). It is used to forecast revenue income and revenue expenditure for the period<br />
between FY 2006-07 and FY 2013-14.<br />
Following are important assumptions towards simulating the municipal fiscal situation, and<br />
include both existing and new resources.<br />
1. Revenue Income Assumptions<br />
Property tax is the main source of own revenue for the <strong>Corporation</strong>. There are about<br />
215,750 (approx.) properties that can be charged under property tax item;<br />
About Rs. 1,500 per property has been assumed per annum for calculation rental value<br />
out of which 27% of ARV is proposed for property tax;<br />
Revision of property tax ARV by 30 percent in the FY 2007-08 and FY 2011-12 of the<br />
existing previous base;<br />
Annual growth rate of property is assumed at a rate of 2.50 percent per annum;<br />
Improving the arrears tax collection efficiency to at least 75 percent and current to 85<br />
percent;<br />
Growth in other revenue income items based on past performance and/ or likely growth<br />
(minimum of 5 percent and maximum of 15 percent);<br />
Any additional resources generated as part of proposed investments are taken into<br />
consideration;<br />
For Water Supply connection, at a nominal 2.50 percent per annum (proportionate to<br />
property tax assessment growth rate) regular connections are envisaged in the base case<br />
scenario and increase in water connections is a result of the availability of additional<br />
water for distribution – it is assumed that 90 percent of the property tax connections<br />
would have water connections by FY 2010-11; the current rate of water charge (flat rate<br />
of Rs. 100 for domestic and Rs. 150 for non domestic per month per connection, if it is<br />
metered then Rs. 5 per 1,000 liters) is maintained till 2006-07, and from 2007-08 a 15<br />
percent increase is assumed every 3 years; collection performance is assumed at 75<br />
percent against arrears demand and 85 percent against current demand; and new (onetime)<br />
connection charges are collected as per the current rate till 2006-07, and from<br />
2007-08 a 20 percent increase in every 3 years;<br />
For Sewer Connection, no new connections envisaged in base case scenario and sewer<br />
connections are provided under the with Project scenario – it is assumed that 100<br />
percent of the water supply connections would have sewer connections by FY 2011;<br />
monthly flat rate of Rs. 30 and Rs, 115 per connection for domestic and non domestic<br />
respectively, it is assumed for sewerage charge starts from 2007 - 08, and from then on a<br />
15 percent increase is assumed every 3 years; collection performance is assumed at 75<br />
percent against arrears demand and 85 percent against current demand.<br />
Solid Waste conservancy Fee is assumed that 70 percent of the residential property tax<br />
assessments and 100 percent of non domestic property assessments would have to be<br />
brought under the conservancy fee coverage net. Monthly conservancy fee of Rs. 10 &<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 195
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Rs, 50 per property assessments has been proposed for residential and non domestic<br />
properties respectively. It is assumed for conservancy fee starts from 2006-07, and from<br />
then on a 15 percent increase is assumed every 3 years; collection performance is<br />
assumed at 75 percent against arrears demand and 85 percent against current demand.<br />
2. Expenditure Considerations<br />
<br />
<br />
<br />
<br />
<br />
Establishment expenditure assumed to increase at rate of 8 percent per annum;<br />
O & M to grow based on past performance and/or likely growth (minimum of 5 percent<br />
to a maximum of 20 percent);<br />
Proposed capital expenditure and phasing based on investments recommended;<br />
Repayment commitments of all outstanding current debt & non debt liabilities;<br />
Additional O&M for new investments are also taken into account.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong>’s ability to sustain investment is assessed and determined<br />
based primarily upon the Operating surplus. Since the plan period is 2006-13 and funding<br />
mechanisms are identified for capital expenditure till FY 2013-14.<br />
3. Key Assumption for FOP<br />
In forecasting the income and expenditure following are the key assumptions and guiding<br />
principles:<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
Income or expenditure items, indicating high growth rate of over 20 percent, are capped<br />
at a maximum of 20 percent and those indicating a low/ negative growth rate have been<br />
considered to grow at a minimum rate of 5 percent per annum. The criterion for fixing<br />
the maximum limit is to maintain consistency with the overall growth of municipal<br />
finances and for a conservative estimate and the minimum limits is to provide for<br />
increased efficiencies;<br />
In case of inconsistency in income and expenditure during the review period, the base<br />
for projection is taken as average of the previous 5 years for projections;<br />
SFC devolution are expected to increase at 15% per annum (Presently no allocation for<br />
erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity);<br />
Overall establishment expenditure future projections have been considered at 8 percent;<br />
The total capital investments shall be funded by 50 percent from Central Government<br />
Grant, 20 percent from State Government Grant and balance through ULB<br />
contribution, public private sector participation and loan from financial institutions;<br />
A proportion of new capital investment is worked out to get the operations and<br />
maintenance cost of the proposed projects to maintain over its life cycle. For water<br />
supply projects it is assumed at 2 percent of the capital investment, sewerage and<br />
sanitation is 1.5 percent, solid waste management 8 percent, roads and traffic<br />
management 1 percent, storm water drainage 0.50 percent, slum improvement works and<br />
other projects it is assumed at 1 percent of the proposed capital investment;<br />
No regular capital income is envisaged other than grant component from Central and<br />
state government;<br />
New capital loans will be cleared over a period of 15 years with a moratorium of 7 years.<br />
The analysis on financial resources is worked out for the interventions to be carried out<br />
within the <strong>Municipal</strong> <strong>Corporation</strong>’s area. The sectors that are not in the domain of the<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 196
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
municipal corporation are not taken for financial analysis and they are considered to be taken<br />
by other line agencies. Majority of the investments have to come from the municipal<br />
corporation for the provision of water supply and sewerage and if these are not integrated<br />
with other interventions, the deficiencies in services still persist.<br />
Efforts should be directed to develop financially self-supporting projects, wherever possible<br />
and cost recovery should be the policy for such cases. The cost of services should be pegged<br />
with the level of services and the affordability of the population. Though some assistance can<br />
be anticipated in the form of subsidies and external grant, it would not be sufficient to attain<br />
the required standards and hence the real earnings have to be improved and this must be the<br />
priority of the economic policies and programs formulated for <strong>Dhanbad</strong>.<br />
The assessment of investment sustenance concludes that the current finances of <strong>Dhanbad</strong><br />
<strong>Municipal</strong> <strong>Corporation</strong> would not be in a position to match the proposed investments in<br />
infrastructure to achieve the desired vision unless the existing tax base and the resource<br />
mobilisation efforts are streamlined and strengthened. In order to augment/ enhance its<br />
financial resources <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> should identify alternate resources like<br />
user charges for the services for conservancy, parking fee and encourage Public private sector<br />
partnership etc.<br />
ULB should attempt levy of higher property tax rate (surcharge) in areas which have better<br />
infrastructure. Another innovative option of resource mobilization, which most of the local<br />
bodies are adopting is to change the lease right to free hold or review all the current lease<br />
agreement with respect market rents and take appropriate action.<br />
D. Public Private Sector Partnership<br />
1. Overview<br />
Rapid urbanisation and growing demand has increased the need for investment in<br />
infrastructure development. Inadequate availability of funds for the provision of<br />
infrastructure has widened the divide between demand and supply. The government therefore<br />
has been encouraging Public Private Partnerships (PPPs) to attract market investment,<br />
thereby leveraging government budgetary resources to meet the provisions for infrastructure.<br />
Different PPP structures could be explored based on the extent of funds that could be<br />
diverted from public sources and those required from the private sector, service levels<br />
targeted, willingness to pay and affordability of consumers, and rehabilitation of the existing<br />
systems etc. The choice of an option, however, depends on the extent to which the private<br />
sector is expected to take over and the sharing of risks associated with such a transfer of<br />
responsibility.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> doesn’t have the required resources to implement the entire<br />
identified projects. In order to mobilize the additional resources for <strong>Municipal</strong> <strong>Corporation</strong> to<br />
implement non commercial projects, it is necessary to encourage Private Sector Participation<br />
in service delivery and other commercial projects. Private sector participation is desirable in<br />
the Public Private Partnership (PPP) format in infrastructure sector so that there is a balance<br />
between the risk and responsibilities between the <strong>Municipal</strong> <strong>Corporation</strong> and private sector<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 197
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
developer.<br />
In view of the same, private sector participation shall be invited to leverage on the following<br />
benefits:<br />
<br />
<br />
<br />
<br />
Reduction of involvement of public finance or redirecting to them for urban poor;<br />
Induction of grater technical and management expertise;<br />
Provision of more responsive service to the customer; and<br />
Sourcing of additional finance.<br />
Following are the various options of Public Private Partnership in project development;<br />
Build Operate Transfer (BOT)/ and Concession Projects: Detailing of the basis of costs and<br />
assumptions is necessary although the risk of design and hence the responsibility for<br />
undertaking detailed design preparation is passed onto the private Sector.<br />
Design Build Operate (DBO) and Design Build Finance Operate (DBFO): As the risk of design is<br />
passed onto the private sector, detailed design may be avoided.<br />
Lease: Such a transaction may include augmentation and strengthening of the existing system<br />
and facilities. The detailing may be with regard to functioning or performance of the existing<br />
facilities, locational data etc., while detailed design risk and responsibility for this transaction<br />
may be with the private sector.<br />
Build Own Operate Sell: In the case of high-risk projects, the private sector’s perception of risks<br />
may be high and ULBs may finance, construct and operate the project for an initial period till<br />
the risk profile of the project is reduced or is lower. In such a case, as construction would be<br />
undertaken by the ULB, the project would have to be sufficiently detailed, including designing<br />
in the preparatory stage, to address quality and performance related issues as well as demand<br />
risk.<br />
Following are the list of projects identified under PPP format.<br />
2. Parking Lots on Public Private Partnership<br />
DMC shall built-up parking lots on public private partnership, the facilities can be operated<br />
on BOT basis. For the successful implementation of the project <strong>Municipal</strong> <strong>Corporation</strong><br />
should identify and acquire land for the parking facilities proposed for the city to decongest<br />
the traffic. The project can be implemented on PPP framework wherein the private sector<br />
party would be required to build a quality parking facilities (two wheelers and four wheelers<br />
parking) with adequate passenger amenities and undertake operations and maintenance<br />
activities of the assets created by the private developer for the specified number of years<br />
quoted by the concessionaire as the concession period. In order to make the project bankable,<br />
the private sector party would be allowed to exploit a portion of the land on a commercial<br />
framework. The private sector party recover the investments through commercial revenues<br />
(Parking fee, lease rentals, licence fee) and collection of various fees as specified for the<br />
concession period. The JNNURM funding shall have to project viable and it shall be the<br />
responsibilities of the PPP partners to ensure financial sustainability of the project. Following<br />
are the list of parking lots and its investment proposed for <strong>Dhanbad</strong>.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 198
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Table 128: Proposed Parking lots on Public Private Partnership<br />
Parking Location<br />
Amount (Rs. Lakh)<br />
Purana Bazar 70.00<br />
Bank More 100.00<br />
On Katras Road – JP Chawk Towards Matkuria 70.00<br />
On Katras Road – JP Chawk Towards Rajkamal School 70.00<br />
Naya Bazzar 70.00<br />
Park Market at Hirapur 70.00<br />
Sharnik Chawk at Gaya Bridge 70.00<br />
Sharnik Chawk at Railway Station 70.00<br />
Near Textile Market 70.00<br />
Near Saridhela Market 70.00<br />
Near Petrol Pump Chawk to Bata More (Jharia) 70.00<br />
Bata More – Jharia Bus Stand 70.00<br />
Near Katras Market 70.00<br />
Near Katras Railway Station 60.00<br />
Total Investment – Parking Lots 1,000.00<br />
3. Redevelopment of Existing Bus Terminus on PPP framework<br />
The Bartand Bus Terminus project has been conceived with the objective of developing<br />
existing bus terminal with modern and adequate passenger amenities and shall also help<br />
decongest the city, by restricting entry of long distance bus services in to central business<br />
district of the city in the process reduce air, noise pollution to substantial levels and thus<br />
improve micro environmental quality.<br />
The bus terminus project proposed to be implemented on public private partnership (PPP)<br />
format through a built, operate and transfer model (BOT). the private sector operated will be<br />
required to design, finance and construct bus terminus including infrastructure facilities<br />
boarding and alighting bays, signages, etc. provide required passenger amenities, commercial<br />
complex with office and retail shop/kiosks and maintain the project assets during the given<br />
concession period.<br />
4. New Inter State Bus Terminus (ISBT) near Barwadda on PPP format<br />
DMC shall built up new Inter State Bus Terminus (ISBT) near Barwadda on public private<br />
partnership, the facilities can be operated on BOT basis. The project can be implemented on<br />
PPP framework wherein the private sector party would be required to build a quality Bus<br />
Terminus with adequate passenger amenities and undertake operations and maintenance<br />
activities of bus terminal for the specified number of quoted by the concessionaire as the<br />
concession period. In order to make the project commercially viable, the private sector party<br />
would be allowed to exploit a portion of the land on a commercial framework. The private<br />
sector party recover the investments through commercial revenues (lease rentals, licence fee)<br />
and collection of various fees as specified for the concession period. For the successful<br />
implementation of New Bus Terminus near Barwadda, <strong>Municipal</strong> <strong>Corporation</strong> should identify<br />
and acquire require land for the same on time.<br />
5. Transport Nagar at Pandukki on PPP format<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 199
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
The Transport Nagar project has been envisaged with the objective of developing new<br />
Transport Nagar at Pandukki with a modern and adequate truck parking facilities, automobile<br />
workshops, weighbridge, boarding and lodging facilities, and telecommunication facilities.<br />
This project will help to decongest the city, by restricting entry and parking of trucks in to<br />
central business district of the <strong>Dhanbad</strong>. This process will reduce air, noise pollution to<br />
substantial levels and thus improve micro environmental quality of <strong>Dhanbad</strong> <strong>Municipal</strong><br />
<strong>Corporation</strong>.<br />
The transport nagar project proposed to be implemented on public private partnership (PPP)<br />
format through a built, operate and transfer model (BOT). the private sector operated will be<br />
required to design, finance and construct transport nagar at Pandukki which include truck<br />
parking amenities, necessary infrastructure facilities like boarding and lodging and etc,.<br />
provide required passenger amenities, commercial complex with office and retail shop/kiosks<br />
and maintain the project assets during the given concession period. The private developer<br />
recover the investments through commercial avenues like entry/parking fee, lease rentals,<br />
licence fee and etc., and collection various fees as specified for the concession period.<br />
6. New Ring Road/Elevated High Road on PPP format<br />
Following options can be explored to implement the proposed Ring Road/Elevated High<br />
Roads for <strong>Dhanbad</strong> on Public Private Partnership framework.<br />
Option I:<br />
Payment on an Annuity Basis followed by Tolling: A private developer shall be selected to carry out<br />
the projects on a Built Own Operate and Transfer (BOOT) basis. In this case the private<br />
developer will pay a certain amount of Annuity to the <strong>Municipal</strong> <strong>Corporation</strong> and then<br />
recover the cost through tolling/ advertisements and etc. They have to pay a share of profit<br />
to the <strong>Municipal</strong> <strong>Corporation</strong>, in addition to the annuity fee if the income (from tolling etc.)<br />
exceeds a particular amount. The separate stretches to the roads will be returned back to the<br />
<strong>Municipal</strong> <strong>Corporation</strong> after the lease period.<br />
Option II:<br />
Built Operate and Transfer: Bid out the project in full to a Private Developer to run on a BOT<br />
basis for a certain number of years as per concession agreement.<br />
Option III:<br />
Joint Venture Company: PPP form of the Joint Venture company can under take development<br />
and maintenance of proposed Ring Road/elevated roads. In this concept a project<br />
development fund can be created through equal contribution from both parties. This fund<br />
would form the equity of the Joint Venture company. The investment companies may<br />
support the Special Purpose Company (SPC) in raising finance in the form of debt. Any<br />
Viability Gap funding required for successful implementation of the project shall be filled<br />
through Subordinate Loan from the GoJ to the SPC. The SPC shall bid the different stages of<br />
the project to EPC contractors through a transparent process and these EPC contractors shall<br />
execute the work.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 200
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
7. Redevelopment of Existing <strong>Municipal</strong> <strong>Corporation</strong> on PPP format<br />
The present <strong>Municipal</strong> <strong>Corporation</strong> office is in dilapidated condition it requires rehabilitation<br />
or redevelopment intervention. Since <strong>Municipal</strong> <strong>Corporation</strong> do not have sufficient fund to<br />
redevelop the dilapidated/old office building, this can be developed on PPP format. Private<br />
sector developer would be investing on redevelopment of <strong>Municipal</strong> <strong>Corporation</strong> office<br />
building. The redevelopment of this office building project component consist of<br />
construction of <strong>Municipal</strong> <strong>Corporation</strong> Office building at ground floor with parking facility,<br />
commercial space for developer to generate revenue to construction and maintain the<br />
building during the concession period. <strong>Municipal</strong> <strong>Corporation</strong> would be getting an agreed<br />
upfront concession fee from the private sector developer.<br />
8. Construction of New Sports Complex/ Stadium at Bhelatandh on PPP format<br />
The proposed Sports Complex (10 Acres) at Bhelatandh along Hirak By-pass SH Stretch<br />
Bhuli can be developed on Built Operate and Transfer model. Private sector developer would<br />
invest the entire cost of creating and maintaining the sport complex. The private sector<br />
developer would be given on a specified concession period with a fixed concession fee to<br />
maintain the assets created. After the concession period the sport complex would be<br />
transferred to local authority for future maintenance.<br />
9. Development of Other Projects on PPP format<br />
The following listed projects can be implemented on PPP framework wherein the private<br />
sector party would be required to develop and maintain during the concession period. During<br />
the concession period <strong>Municipal</strong> <strong>Corporation</strong> would getting an agreed concession fee during<br />
the concession period, after the agreed concession period created assets would be transferred<br />
to <strong>Municipal</strong> <strong>Corporation</strong>. The proposed project list include, construction of working women<br />
hostel, construction of auditorium, construction of vegetable markets, development of<br />
exhibition ground, development parks and picnic spots.<br />
Table 129: Proposed Other Developmental Projects on Public Private Partnership<br />
Projects<br />
Amount<br />
Rs. Lakh<br />
Construction of Working Women Hostel 30.00<br />
Construction of Auditorium 50.00<br />
Construction of Vegetable Markets 500.00<br />
Development of Exhibition Ground 30.00<br />
Development of Amusement Park at Rejili Bondh 2,000.00<br />
Development of Parks 500.00<br />
Development of Picnic Spots – boating facilities to all major water<br />
bodies 500.00<br />
Total 3,610.00<br />
10. Water Supply System – Operation and Maintenance on Management Contract<br />
To begin with outsourcing of operations and maintenance and some of the commercial<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 201
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
activities through management contracts through professional and reliable operator shall be<br />
done. From the identified long list of projects, bankable projects shall be developed through<br />
public private partnership format. This would greatly facilitate induction of technical land<br />
system knowledge and pave the way for future larger private sector involvement in project<br />
development. At the same time it is recognized that while private investment management<br />
shall play a growing role, the same must be coupled with a strong legal, contractual and<br />
regulatory framework which would be carried out simultaneously.<br />
Willingness of private sector participation is entirely dependent on financial viability of<br />
infrastructure projects the tariff structure charged from consumer are insignificant when<br />
compared to the capital expenditure and recurring expenditure incurred during the project life<br />
cycle. With the present set of rule, regulations, market determined tariff/structure in<br />
particular; the probability of attracting the private participation would remain very small. To<br />
encourage the private sector participation in service delivery it is necessary to amend / revise<br />
the rules and restructure the tariff plan so that project will be bankable on PPP format.<br />
However, distribution network laying and maintaining the same can be privatized, in this<br />
concept the private sector developer shall procure and lay of distribution network proposed<br />
for <strong>Dhanbad</strong> and do the operation and maintenance of the same. Structuring can be done in<br />
such a way that project become viable.<br />
11. Solid Waste Management – Collection and Transportation Outsourcing<br />
PPP form of the Joint venture company can under take waste management services to various<br />
industries, health care establishments and residents both present and prospective including<br />
levying and collection of service charges on user-pay principle by individual units in a<br />
professional manner. Each user compensates for the cost of waste management.<br />
12. Solid Waste Management – Scientific Disposal Facility Development on BOT basis<br />
Joint Venture Company can be formed to undertake scientific disposal of municipal solid<br />
waste generated in <strong>Dhanbad</strong>. Construction and maintenance of scientific landfill site<br />
development for inorganic waste and compost plant for organic waste collected from the city<br />
on built operate and transfer framework. The developer would be getting the tipping fee<br />
(based on tonnage of waste treated per day) from the <strong>Municipal</strong> <strong>Corporation</strong> for scientific<br />
disposal of municipal waste. <strong>Municipal</strong> <strong>Corporation</strong> can recover the tipping fee from<br />
consumer/citizens by introducing user charges/conservancy fee or door to door collection<br />
fee or solid waste tax and etc.<br />
13. Construction and Maintenance of Sewerage Treatment Plant on BOT basis<br />
It is proposed to develop initially one sewerage treatment plan on PPP basis. The operations<br />
shall expect to make capital investment for treatment plant and recover it over agreed<br />
concession period. Cost will be recovered through a combination of sewerage tax, sewerage<br />
charges, connection fee, local body general revenues and government subsidy. The needs of<br />
lower income groups can be taken care of by working out an innovative cross subside<br />
structure based on subsidy i) from one group to another ii) from one land use to another and<br />
iii) from one account to another.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 202
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
14. Construction of Housing complex at Bhelatandh and Sugiadih & New Residential Township on<br />
BOT basis<br />
To meet the growing housing demand in <strong>Dhanbad</strong>, two locations were identified for housing<br />
complexes and to avoid existing congested Central Business District (CBD) new residential<br />
township is proposed at Kurmidhi, Bada Pichdi, Chota Pichdi and Udaipur along NH 32.<br />
Since the <strong>Municipal</strong> <strong>Corporation</strong> itself cannot develop residential complexes and new<br />
townships therefore it is proposed on PPP format. <strong>Municipal</strong> <strong>Corporation</strong> shall identify and<br />
acquire suitable land in Bhelatandh (Govindpur block) and Sugiadih (<strong>Dhanbad</strong> block) village<br />
for housing complex and for new townships at Kurmidhi, Bada Pichdi, Chota Pichdi and<br />
Udaipur. It is proposed to develop residential complex in 150 to 200 acres of land and for<br />
new townships it envisaged 500 acres land, which needs to be acquired by <strong>Dhanbad</strong><br />
<strong>Municipal</strong> <strong>Corporation</strong>. Private sector developer would develop housing complexes and new<br />
townships on Built Operate and Transfer (BOT) framework on <strong>Municipal</strong> <strong>Corporation</strong> land.<br />
<strong>Municipal</strong> <strong>Corporation</strong> can get into concession agreement with private sector developer by<br />
this <strong>Corporation</strong> would be getting concession fees in the form of upfront lease amount as<br />
agreed in the concession agreement.<br />
15. Development of Amusement Park at Rejili Bandh on BOT basis<br />
Development of Amusement Park at Rejili Bandh could be developed on PPP framework<br />
wherein the private sector party would be required to develop and maintain the amusement<br />
park during the concession period. During the concession period <strong>Municipal</strong> <strong>Corporation</strong><br />
would getting an agreed concession fee during the concession period, after the agreed<br />
concession period created assets would be transferred to <strong>Municipal</strong> <strong>Corporation</strong>.<br />
The region recognizes the importance of PPP not only funding mechanism but also an<br />
important tool to bring in efficiencies as well as ensure proper operations and maintenance of<br />
the assets being created herein.<br />
A spectrum of PPP options ranging from agreeing frameworks to full privatization has been<br />
thought about and same has been discussed above in detail.<br />
However, the choice of option given situation will depend on factors such as degree of control<br />
desired by the ULBs, legal framework for private investment, regulatory mechanism and potential<br />
of attracting financial resources from both public and private sectors.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 203
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Table 130: Summary of proposed projects on Public Private Partnership<br />
Projects<br />
Amount<br />
Rs. Lakh<br />
Bus Terminus at Bartand (Existing) 5,000.00<br />
New Bus Terminus at near Barwadda 5,000.00<br />
Transport Nagar at Pandukki (along NH2) 7,500.00<br />
Ring Road 9,000.00<br />
Parking Lots 1,000.00<br />
Mass Transit System (Public Transport System) 12,500.00<br />
Redevelopment of Existing <strong>Municipal</strong> <strong>Corporation</strong> Office (Office<br />
cum Commercial Complex) 1,000.00<br />
Construction of Working Women Hostel 30.00<br />
Construction of New Sports Complex (Stadium) 5,000.00<br />
Construction of Auditorium 50.00<br />
Construction of Vegetable Markets 500.00<br />
Development of Exhibition Ground 30.00<br />
Development of Amusement Park at Rejili Bondh 2,000.00<br />
Development of Parks 500.00<br />
Development of Picnic Spots – boating facilities to all major water<br />
bodies 500.00<br />
Solid Waste Management – landfill 1,490.71<br />
Sewerage Treatment Plant 9,181.79<br />
Water Supply 9,143.14<br />
Total 69,425.64<br />
Following tables presents the FOP results after considering the above projects under PPP.<br />
The “do nothing scenario” is worked out considering only the revenue account transactions<br />
to assess the <strong>Corporation</strong> capacity to generate revenue surpluses that could be leveraged to<br />
undertake capital investments. Detailed cash flows are worked out for each of the subprojects<br />
based on the assumptions with regards investment phasing, financing pattern,<br />
additional O&M expenditure and additional income due to proposed capital investments,<br />
PPP project for the Full Project scenario. The net project cash flows are then loaded onto the<br />
base case scenario to test their impact on the overall <strong>Corporation</strong> fiscal situation.<br />
“Do nothing Scenario”. The do nothing scenario results indicate that under the past-trend<br />
based assumptions adopted, <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> would end up with a positive<br />
cumulative surplus of Rs. 11,884 lakh by the end of FY 2013-14. With reforms and additional<br />
resource mobilization initiatives like Private sector participation and parking fee, levying of<br />
new charges like conservancy fee <strong>Corporation</strong> can reach above said cumulative surplus.<br />
Full Project Sustenance Scenario. Table 132 presents a summary of total project cash flows<br />
due to the full project scenario. The total net project cash flows due to full project when<br />
loaded onto the base case Scenario FOP indicate that <strong>Dhanbad</strong> <strong>Corporation</strong> cannot sustain<br />
the proposed investment and hence <strong>Municipal</strong> <strong>Corporation</strong> requires O&M cost for<br />
management of assets which are created under the item of Basic services for Urban Poor<br />
during the mission period. Table 131 presents a summary of the <strong>Corporation</strong> fiscal status in<br />
the Full Project scenario. The full project investment proposed for <strong>Dhanbad</strong> is to the tune of<br />
Rs. 383,274.40 lakh, details of sector wise financing pattern is presented in the following table.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 204
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Table 131: Financial Operating Plan (FOP) Results<br />
Item Heads 2006 2007 2008 2009 2010 2011 2012 2013<br />
Rs. Lakh<br />
Opening Balance (422) (220) 1,322 2,836 4,378 6,015 7,937 9,850<br />
Revenue Income 1,122 1,829 1,907 2,042 2,154 2,599 2,770 2,961<br />
Additional Revenue Mobilization - 906 910 929 1,053 1,058 1,062 1,205<br />
Revenue from BOT Projects (from PSD)<br />
Total Revenue Income 1,122 2,735 2,817 2,971 3,208 3,657 3,833 4,166<br />
Revenue Expenditure 921 1,193 1,303 1,429 1,572 1,734 1,920 2,133<br />
Status 201 1,542 1,514 1,543 1,636 1,923 1,913 2,034<br />
Closing Balance (220) 1,322 2,836 4,378 6,015 7,937 9,850 11,884<br />
Total Net Project Cash Flow (after<br />
- 188 (401) (1,789) (2,849) (5,819) (9,942) (14,101)<br />
deducting ULB equity from cash flow)<br />
Overall Closing Balance (220) 1,510 2,435 2,590 3,166 2,119 (92) (2,217)<br />
Table 132: Summary of Project Cash flow<br />
Description 2007-08 2008-09 2009-10 2010-11 2011-12 2012-13 2013-14 2014-15<br />
Rs. Lakh<br />
1 Water Supply 1,185.5 2,414.6 4,335.7 7,654.7 10,026.3 11,074.7 12,453.4 13,311<br />
2 Sewerage 344.6 735.7 982.9 1,581.4 2,178.9 1,642.3 942.6 (839)<br />
3 Roads and Traffic Management (23.0) (163.4) (463.5) (972.4) (1,754.7) (2,553.5) (3,552.8) (5,082)<br />
4 Storm Water Drainage (126.2) (444.2) (970.6) (1,708.3) (2,642.1) (3,000.0) (3,569.6) (5,033)<br />
5 Solid Waste Management 238.1 398.4 507.8 557.2 474.4 267.5 15.7 (255)<br />
6 Street Lighting (0.9) (35.3) (308.0) (948.4) (1,958.8) (3,021.8) (4,256.4) (5,696)<br />
7 Urban Services for Poor (26.1) (121.1) (297.9) (598.7) (1,078.8) (1,497.7) (1,985.8) (2,741)<br />
8 Others 0.0 (50.0) (149.1) (292.0) (485.4) (693.5) (913.5) (1,144)<br />
Total Sub Project Cash Flow 1,592.1 2,734.7 3,637.3 5,273.6 4,759.8 2,217.8 (866.5) (7,480)<br />
Opening Balance - 1,592 2,735 3,637 5,274 4,760 2,218 (866)<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 205
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Description 2007-08 2008-09 2009-10 2010-11 2011-12 2012-13 2013-14 2014-15<br />
Rs. Lakh<br />
A Sources of Fund<br />
1 Debt Drawdown 1,404 1,732 2,291 2,696 2,456 1,582 1,074 -<br />
Equity from Private Developer 11,231 12,930 15,261 21,277 16,142 9,611 11,323 -<br />
2 Equity Drawdown 4,091 5,302 6,801 7,444 6,402 4,802 3,461 -<br />
3 Govt. Grant 39,026 46,582 56,823 73,306 58,332 37,320 37,002 -<br />
4 User Charges 238 1,163 2,056 3,787 5,004 5,300 6,439 6,740<br />
5 New Connection Fees 1,702 1,377 2,602 4,335 3,587 361 449 460<br />
Total- Inflow 57,691 69,086 85,833 112,845 91,922 58,975 59,748 7,199<br />
B Disposition of Funds<br />
1 Project Capital Expenditure 55,751 66,545 81,176 104,723 83,331 53,314 52,860 -<br />
2 O&M - 517 1,337 2,517 3,907 4,988 5,854 6,487<br />
3 Debt Servicing - 83 1,042 1,960 2,645 2,807 3,417 7,326<br />
4 IDC 348 798 1,376 2,009 2,553 408 702 -<br />
Total- Outflow 56,099 67,943 84,931 111,209 92,436 61,517 62,833 13,813<br />
Net Cash Flow 1,592 1,143 903 1,636 (514) (2,542) (3,084) (6,614)<br />
Closing Balance 1,592 2,735 3,637 5,274 4,760 2,218 (866) (7,480)<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 206
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
E. Funding Pattern<br />
As per the JNNURM guidelines, component wise funding pattern is presented in Table 133.<br />
Table 133: Proposed Funding Pattern (Base Cost)<br />
Description Central<br />
Government<br />
Grant<br />
State<br />
Government<br />
Grant<br />
ULB/PPP/FIs/<br />
Beneficiaries<br />
Total<br />
Rs. Lakh<br />
Water Supply 19,058.36 7,623.34 11,435.01 38,116.71<br />
Sewerage &<br />
Sanitation 26,240.09 10,496.04 15,744.05 52,480.18<br />
Road and Traffic<br />
Management 73,135.50 29,254.20 43,881.30 146,271.00<br />
Storm Water<br />
Drainage 19,762.45 7,904.98 11,857.47 39,524.89<br />
Solid Waste<br />
Management 2,798.04 1,119.22 1,678.83 5,596.09<br />
Street Lighting 2,828.28 1,131.31 1,696.97 5,656.57<br />
Basic Services for<br />
Urban Poor 32,074.48 12,829.79 19,244.69 64,148.96<br />
Others 15,740.00 6,296.00 9,444.00 31,480.00<br />
Total 191,637.20 76,654.88 114,982.32 383,274.40<br />
% Distribution 50% 20% 30% 100%<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 207
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Annexure 1: Primary Stakeholders Consultation findings<br />
Annexure: Primary Stakeholders Consultation findings<br />
Consultation is an inseparable part of any planning process, for opinion of those, who will be<br />
the beneficiaries of the development, is very important. In due course of the process,<br />
feedback from people from various hierarchies was collected. The feedback was collectively<br />
official and personal in nature so as to incorporate the needs for development from<br />
administrative as well as resident point of view. Although feedbacks given from various<br />
people were very subjective in nature, a comprehensive study of their inputs has brought out<br />
a few concrete results.<br />
Profile of the consulting Entity: Mr. Chandrasekhar Dube, MP, <strong>Dhanbad</strong><br />
Date of the consultation: 27 th of May, 2006<br />
Venue:<br />
Cottage in front of circuit house<br />
Issues raised/discussed/suggestions:<br />
1. He envisions <strong>Dhanbad</strong> to be a modern city.<br />
2. He feels drinking water is the first priority. Then water for irrigation purpose also is as<br />
important.<br />
3. Smooth roads and wide ranging roads network.<br />
4. Health care is also very important. Right now no medicines can be found in PHCs.<br />
5. Proper utilization of funds is warranted. Auditing system in place.<br />
6. Power supply for 24 hrs.<br />
7. Only Palamu and Giridih are the naxalites affected regions.<br />
8. For proper education, Universities, Medical colleges, Engineering Colleges should be there in<br />
enough numbers.<br />
9. He also felt the strong need that closed industries like FCI should be opened.<br />
Quality of service of current urban amenities:<br />
Urban Infrastructure<br />
Drainage and Sanitation<br />
Solid Waste Management<br />
Urban Transport<br />
Water Supply<br />
Street Light<br />
Storm Water Drainage<br />
Grading<br />
Poor<br />
Poor<br />
Poor<br />
Very Poor<br />
Ok<br />
Poor<br />
Prioritisation of sectors:<br />
Infrastructure Sector<br />
Priority wise Ranking<br />
Drainage and Sanitation 3<br />
Solid Waste Management 5<br />
Urban Transport 8<br />
Water Supply 1<br />
Sewerage 2<br />
Storm water drainage and Water Body Rejuvenation 6<br />
Street light 7<br />
Housing for Poor 4<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 208
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
SWOT Analysis:<br />
Strengths<br />
Coal reserves<br />
Recently explored methane reserves<br />
NTPC in Madandih<br />
Opportunity<br />
Creation of employment<br />
opportunities by efficient use of coal<br />
and methane reserves<br />
Weakness<br />
Naxalism, Corruption, Unemployment.<br />
TATA is not playing fair, it is not paying it’s<br />
workers according to 6 th payment commission.<br />
Money, not reaching the ground.<br />
Lack of teachers due to low salary packages.<br />
Threat<br />
Growing Naxalites threat<br />
Profile of the consulting Entity:<br />
Date of the consultation:<br />
Venue:<br />
Mrs. Kunti Singh, MLA, Jharia Constituency<br />
27 th of May<br />
Kunti Mansion, near Steel Gate<br />
Issues raised/discussed/suggestions:<br />
1. Explained the vital needs of the city, she confirmed that the city’s Airport should be revived,<br />
as it helps grow the business community.<br />
2. She told that bus stands need to be rehabilitated as there is very large traffic in <strong>Dhanbad</strong>, and<br />
due to lack of proper facilities, people suffer in all parts of <strong>Dhanbad</strong>.<br />
3. Much more emphasis should be put on design of a well engineered sewerage system as the<br />
water outflow from drainage spoils all the roads, and that’s is what spoils the road<br />
conditions, in spite of repeated rehabilitation.<br />
4. Coal in Jharia, which has caught fire, needs to be cut off from the intact portion, so that the<br />
valuable coal can be saved.<br />
5. Amusement parks are urgent need as there are no places right now, where on a holiday;<br />
parents can take their children for recreation.<br />
6. Slum housing needs a thrust, as basic facilities should be provided to all.<br />
7. A lots of people come to work in <strong>Dhanbad</strong>, there are no good arrangements, where they can<br />
spend their night. Steps should be taken in that direction also.<br />
8. Jharia should not be displaced. The ground should be improved for stability and mining to<br />
be abandoned in that zone, so that people stay where they are and do whatever they are<br />
doing.<br />
9. As far as Jharia is concerned, following needs to be done:<br />
a. Raja Talab beautification should be taken up and it can be developed into a tourist<br />
spot.<br />
b. Proper drainage system<br />
c. Water and power supply<br />
d. Rehabilitation of the labour, working there.<br />
e. Children’s parks for rejuvenation<br />
f. some roads are pathetic in condition, need to be maintained<br />
g. Good education for all the children.<br />
h. Better Employment opportunities.<br />
10. She told that Vidhayak fund is utilized for small roads, Drains, Samudayik bhavans,<br />
Ambulance.<br />
11. For future proposals for the projects to be taken up, she suggested the following things:<br />
a. Raja Talab beautification<br />
b. Children’s Park<br />
c. Stopped track should be shifted and laid at a different location<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 209
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
d. Kolanchal University for <strong>Dhanbad</strong>.<br />
12. Talking about the facilities provided by BCCL, she said that more is required to be done,<br />
some of them are:<br />
a. Timely payment to labourer.<br />
b. BCCL should also make arrangements for education of the poor.<br />
c. Drinking water is a problem in Collieries.<br />
d. Power distribution in the collieries.<br />
Quality of service of current urban amenities:<br />
Urban Infrastructure<br />
Drainage and Sanitation<br />
Solid Waste Management<br />
Urban Transport<br />
Water Supply<br />
Street Light<br />
Storm Water Drainage<br />
Grading<br />
Very Poor<br />
Poor<br />
Poor<br />
Very Poor<br />
Ok<br />
Poor<br />
Prioritisation of sectors:<br />
Infrastructure Sector<br />
Priority wise Ranking<br />
Drainage and Sanitation 1<br />
Solid Waste Management 3<br />
Urban Transport 6<br />
Water Supply 5<br />
Sewerage 4<br />
Storm water drainage and Water Body Rejuvenation 7<br />
Street light 8<br />
Housing for Poor 2<br />
SWOT Analysis:<br />
Strengths<br />
Potential tourism places<br />
Coal abundance<br />
Opportunity<br />
Coal based Industries<br />
Domestic as well as foreign tourism<br />
Weakness<br />
Transport Sector<br />
Bad sewerage conditions<br />
Large traffic<br />
Threat<br />
Jharia region instability<br />
Naxal movement<br />
Vision for <strong>Dhanbad</strong>:<br />
1. Safe and Prosperous <strong>Dhanbad</strong>.<br />
2. Habitat for all, especially for the poor.<br />
Profile of the consulting Entity: Mr. Narendra Kumar, Superintendent Engineer,<br />
JRDA<br />
Date of the consultation: 27 th of May, 2006<br />
Venue:<br />
JRDA Office, near circuit house<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 210
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Issues raised/discussed/suggestions:<br />
1. In Jharia zone, there is fire, there is subsidence, there are cracks, from which the fire comes<br />
into contact with air, and propagates.<br />
2. CMPDI has prepared master plan for Jharia rehabilitation. And it’s the authority form BCCL<br />
side to take care of rehabilitation plan.<br />
3. He told about proposed sites that they are tentatively selected, but final approval hasn’t yet<br />
come.<br />
4. He also suggested that all future development should be consistent with the mining activities<br />
and should incorporate the future mining plan.<br />
Quality of service of current urban amenities:<br />
Urban Infrastructure<br />
Drainage and Sanitation<br />
Solid Waste Management<br />
Urban Transport<br />
Water Supply<br />
Street Light<br />
Storm Water Drainage<br />
Grading<br />
Poor<br />
Poor<br />
Ok<br />
Poor<br />
Ok<br />
Poor<br />
Prioritisation of sectors:<br />
Infrastructure Sector<br />
Priority wise Ranking<br />
Drainage and Sanitation 2<br />
Solid Waste Management 3<br />
Urban Transport 7<br />
Water Supply 1<br />
Sewerage 6<br />
Storm water drainage and Water Body Rejuvenation 5<br />
Street light 8<br />
Housing for Poor 4<br />
Profile of the consulting Entity:<br />
Mr., Kamal Kishore Srivastava, DTO<br />
Date of the consultation: 27 th of May, 2006<br />
Venue:<br />
New DTO Office, near Court Complex<br />
Issues raised/discussed/suggestions:<br />
1. About the requirements of bypass road, he told that<br />
GT Road to Bokaro bypass is required.<br />
2. He also emphasized on Public awareness regarding<br />
traffic management.<br />
3. Imposition of fine, whenever rules are broken, has<br />
to come in place. And the rules need to be followed<br />
strictly.<br />
4. Currently, there is no internal transport facility for<br />
the city, leading to heaving traffic, as more and<br />
more people end up using four-wheelers. And for<br />
poor, there is no other way other than traveling on the roof of loaded buses, which can be<br />
counted on fingers. An example is shown is the picture:<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 211
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
5. He talked about need of solid waste management, as people end up throwing waste near<br />
roads, which eventually reduces the effective carriageway width and leaving the stretches<br />
prone to accident.<br />
Quality of service of current urban amenities:<br />
Urban Infrastructure<br />
Drainage and Sanitation<br />
Solid Waste Management<br />
Urban Transport<br />
Water Supply<br />
Street Light<br />
Storm Water Drainage<br />
Grading<br />
Poor<br />
Very Poor<br />
Very Poor<br />
Poor<br />
Poor<br />
Poor<br />
Prioritisation of sectors:<br />
Infrastructure Sector<br />
Priority wise Ranking<br />
Drainage and Sanitation 7<br />
Solid Waste Management 2<br />
Urban Transport 1<br />
Water Supply 3<br />
Sewerage 8<br />
Storm water drainage and Water Body Rejuvenation 5<br />
Street light 4<br />
Housing for Poor 6<br />
Profile of the consulting Entity: Mr. Pandey; Tourism Officer, Tourism Information<br />
Centre<br />
Date of the consultation: 27 th of May, 2006<br />
Venue:<br />
Tourism Information Centre, Hotel Ratna Vihar<br />
Issues raised/discussed/suggestions:<br />
1. He raised the concern that there is not enough thrust from government side to promote<br />
tourism in the region, in spite of having enormous potential.<br />
2. There is also a need to provide better connectivity to various important places of local as well<br />
as global importance.<br />
3. Tourist spots like Topchanchi Lake, Maithan Dam, and Lilori Temple need to be revived<br />
from tourism point of view.<br />
4. He has given a recommendation report to ministry, in which potential sites to be developed<br />
at tourism spots are mentioned.<br />
5. He also feels the need of buses at the information centre, which can take tourists to the spots<br />
and thus promote it.<br />
6. There is also a need to revive the water bodies within the city like Bekar Bandh, Pampu Talab<br />
etc., which are of very high local importance.<br />
Quality of service of current urban amenities:<br />
Urban Infrastructure<br />
Drainage and Sanitation<br />
Solid Waste Management<br />
Urban Transport<br />
Water Supply<br />
Street Light<br />
Grading<br />
Poor<br />
Poor<br />
Poor<br />
Ok<br />
Ok<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 212
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Storm Water Drainage<br />
Tourism development<br />
Poor<br />
Very Poor<br />
Prioritisation of sectors:<br />
Infrastructure Sector<br />
Priority wise Ranking<br />
Drainage and Sanitation 5<br />
Solid Waste Management 6<br />
Urban Transport 1<br />
Water Supply 7<br />
Sewerage 4<br />
Storm water drainage and Water Body Rejuvenation 3<br />
Street light 9<br />
Housing for Poor 8<br />
Tourism development 2<br />
SWOT Analysis:<br />
Strengths<br />
Potential tourism sites<br />
Religious places of great local importance<br />
Opportunity<br />
Domestic and international tourism<br />
Weakness<br />
Negligence of government towards<br />
tourism<br />
Threat<br />
Naxalites<br />
Profile of the consulting Entity:<br />
Mr. R K Thakur, Fire Station Officer<br />
Date of the consultation: 27 th of May, 2006<br />
Venue:<br />
Randheer Verma Stadium, Golf Ground<br />
Issues raised/discussed/suggestions:<br />
1. He has given fire accident data for Jharia and Sindri both, as he looks after both the places.<br />
2. He has emphasized on the need for having stringent building construction norms, to ensure<br />
safety from fire in long term.<br />
3. Right now there are various places in <strong>Dhanbad</strong>, where extinguisher van can’t at all reach.<br />
4. Almost all the hotels are not complying with the fire norms.<br />
Quality of service of current urban amenities:<br />
Urban Infrastructure<br />
Drainage and Sanitation<br />
Solid Waste Management<br />
Urban Transport<br />
Water Supply<br />
Street Light<br />
Storm Water Drainage<br />
Grading<br />
Poor<br />
Poor<br />
Ok<br />
Very Poor<br />
Poor<br />
Poor<br />
Prioritisation of sectors:<br />
Infrastructure Sector<br />
Priority wise Ranking<br />
Drainage and Sanitation 5<br />
Solid Waste Management 2<br />
Urban Transport 1<br />
Water Supply 3<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 213
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Sewerage 4<br />
Storm water drainage and Water Body Rejuvenation 6<br />
Street light 8<br />
Housing for Poor 7<br />
SWOT Analysis:<br />
Strengths<br />
Opportunity<br />
Weakness<br />
Non-compliance of building regulations<br />
Unplanned building construction<br />
Threat<br />
Profile of the consulting Entity: Mr. K K Sharma, Head Assistant, NAC Chhatatand<br />
Mr. Kamal Bahadur Verma, staff, Chhatatand NAC<br />
Date of the consultation: 29 th of May, 2006<br />
Venue:<br />
NAC Office, Chhatatand<br />
Issues raised/discussed/suggestions:<br />
1. They told that there is large number of people living below poverty line. A survey was<br />
conducted for BPL for census in 2001 on the basis of their amenities and infrastructure.<br />
2. Solid waste disposal is taken care by MADA, as they suffer from lack of staff. A tractor (and<br />
other assets) given by them is used by MADA (given in 2002) staff to function the same.<br />
3. He also noted that road density is better in <strong>Dhanbad</strong> as compared to other districts of<br />
Jharkhand.<br />
4. Lack of staff, infrastructure and revenue are the setbacks in developmental procedure.<br />
Quality of service of current urban amenities:<br />
Urban Infrastructure<br />
Drainage and Sanitation<br />
Solid Waste Management<br />
Urban Transport<br />
Water Supply<br />
Street Light<br />
Storm Water Drainage<br />
Grading<br />
Very Poor<br />
Poor<br />
Poor<br />
Very Poor<br />
Ok<br />
Poor<br />
Prioritisation of sectors:<br />
Infrastructure Sector<br />
Priority wise Ranking<br />
Drainage and Sanitation 2<br />
Solid Waste Management 5<br />
Urban Transport 7<br />
Water Supply 1<br />
Sewerage 4<br />
Storm water drainage and Water Body Rejuvenation 6<br />
Street light 8<br />
Housing for Poor 3<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 214
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Profile of the consulting Entity:<br />
Date of the consultation:<br />
Venue:<br />
Mr. Pawan Kumar: CO, Baghmara Circle<br />
29th of May<br />
CO Office, Baghmara<br />
Issues raised/discussed/suggestions:<br />
1. There is a major scarcity of staff. Lot of people here and there working on deputation, which<br />
leads to degradation of quality of work.<br />
2. Temporary staff is also not being provided.<br />
3. People follow the practice of dumping solid waste alongside the rivers, which creates bad<br />
look, pollutes the streams, and enhances the chance of pandemic.<br />
4. There are almost nil sources of revenue generation; No tax levied in Jharia, Chhatatand and<br />
Katras, leaving the government bodies weaker.<br />
5. He conformed that even part of Chatatand is fire affected, so rehabilitation is to be<br />
eventually done. So no Construction is allowed by BCCL, as all the land belongs to BCCL.<br />
For example “Sulabh Shauchalaya” construction was stopped by BCCL, even after getting a<br />
grant of 13 lacs.<br />
6. No committee formed like JRDA for rehabilitation for Chatatand.<br />
7. Salaries are pending, spreading havoc among employees. There was also shocking piece of<br />
information that there is no permanent staff in Chhatatand NAC Office, and volunteers<br />
working for last 11 years for no salary, in the hope that they will be absorbed by the system.<br />
Quality of service of current urban amenities:<br />
Urban Infrastructure<br />
Drainage and Sanitation<br />
Solid Waste Management<br />
Urban Transport<br />
Water Supply<br />
Street Light<br />
Storm Water Drainage<br />
Grading<br />
Very Poor<br />
Poor<br />
Poor<br />
Poor<br />
Poor<br />
Poor<br />
Prioritisation of sectors:<br />
Infrastructure Sector<br />
Priority wise Ranking<br />
Drainage and Sanitation 1<br />
Solid Waste Management 4<br />
Urban Transport 8<br />
Water Supply 3<br />
Sewerage 2<br />
Storm water drainage and Water Body Rejuvenation 6<br />
Street light 7<br />
Housing for Poor 5<br />
Profile of the consulting Entity:<br />
Mr. R N Sinha, CMO and Civil Surgeon<br />
Mr. U P Singh, RCH Officer, PMCH<br />
Date of the consultation: 30 th of May, 2006<br />
Venue:<br />
PMCH<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 215
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Issues raised/discussed/suggestions:<br />
1. Mr. Singh noted that air pollution is a major problem here. Skin Deceases are quite<br />
prevalent due to this. The reason being transportation of coal in open truck, which adds<br />
to the RSPM in a major way.<br />
2. He also told that bathing in polluted water promotes deceases. And this is quite<br />
prominent and traditional way.<br />
3. There are about 60 nursing homes.<br />
4. Private facilities like<br />
a. DBC<br />
b. ACC hospital<br />
c. TISCO Hospital<br />
d. BCCL Hospital<br />
5. Small Centres like<br />
a. CMRI<br />
b. CFRI<br />
c. ISM<br />
6. Major Health problems in the city<br />
a. Dust from Coal Mines<br />
b. Heavy traffic leading to pollution<br />
c. Problems like Tuberculosis, Gastestoritis,<br />
d. Due to alcohol consumption problems like Alcoholic Hepatitis<br />
e. STI<br />
7. There is a major need of:<br />
a. Sewerage system<br />
b. Solid waste management for<br />
c. Housing facilities for poor<br />
d. Nursing homes<br />
8. Right now in hospitals, for solid waste they burn it and burry in pits.<br />
9. There are no disposal facilities in nursing homes.<br />
10. He cited one or two instances where segregation is done into Paper, Iron and plastic<br />
types.<br />
Quality of service of current urban amenities:<br />
Urban Infrastructure<br />
Drainage and Sanitation<br />
Solid Waste Management<br />
Urban Transport<br />
Water Supply<br />
Street Light<br />
Storm Water Drainage<br />
Disposal of medical waste<br />
Grading<br />
Poor<br />
Very Poor<br />
Ok<br />
Poor<br />
Ok<br />
Poor<br />
Very Poor<br />
Prioritisation of sectors:<br />
Infrastructure Sector<br />
Priority wise Ranking<br />
Drainage and Sanitation 3<br />
Solid Waste Management 1<br />
Urban Transport 7<br />
Water Supply 6<br />
Sewerage 4<br />
Storm water drainage and Water Body Rejuvenation 5<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 216
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Street light 8<br />
Housing for Poor 2<br />
SWOT Analysis:<br />
Strengths<br />
Opportunity<br />
Weakness<br />
No disposal arrangements for<br />
biomedical waste<br />
Threat<br />
Fast growing population, but<br />
incompatible growth of facilities<br />
Profile of the consulting Entity: Mr. Gobardhan Ram, Assistant Administrator,<br />
Jharia<br />
Date of the consultation: 30 th of May, 2006<br />
Venue:<br />
NAC Office, Jharia<br />
Issues raised/discussed/suggestions:<br />
1. He informed that MADA takes care of sanitation<br />
and water supply in the area.<br />
2. Area wise Jharia is a small NAC, but has a large<br />
population comparatively; the reason is Jharia being<br />
prominent coal field of the country.<br />
3. The area of the NAC is about 1.125 sqKm. The<br />
area is densely populated and the population as per<br />
the 2001 census is 81979.<br />
4. But as compared to the need of the population,<br />
very little development has taken place due to<br />
political interference.<br />
5. Solid waste is not managed well, added Mr.<br />
Gobardhan Ram. A picture taken in the main<br />
market of Jharia show it all:<br />
6. They told that they are supposed to take care of<br />
a. Death and Birth registration<br />
b. Cleanliness and garbage management<br />
c. Water Supply (is taken care by MADA)<br />
d. Sanitation (is taken care by MADA)<br />
e. Roads and street lights.<br />
7. Water tax is also collected by MADA<br />
8. Holding tax is not yet fixed due to unauthorized holdings as if they are asked to pay tax, they<br />
will claim for that land, which actually belongs to BCCL.<br />
9. Right now, they get revenue from<br />
a. Taxation on rickshaw<br />
b. Bullock cart<br />
c. Push Cart<br />
d. Market toll collection<br />
10. They have proposed toll collection form bus stand.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 217
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Quality of service of current urban amenities:<br />
Urban Infrastructure<br />
Drainage and Sanitation<br />
Solid Waste Management<br />
Urban Transport<br />
Water Supply<br />
Street Light<br />
Storm Water Drainage<br />
Grading<br />
Poor<br />
Very Poor<br />
Poor<br />
Poor<br />
Poor<br />
Poor<br />
Prioritisation of sectors:<br />
Infrastructure Sector<br />
Priority wise Ranking<br />
Drainage and Sanitation 2<br />
Solid Waste Management 1<br />
Urban Transport 7<br />
Water Supply 4<br />
Sewerage 5<br />
Storm water drainage and Water Body Rejuvenation 6<br />
Street light 8<br />
Housing for Poor 3<br />
Profile of the consulting Entity:<br />
Mr. Vijay Babu: Head Clerk, Jharia NAC<br />
Date of the consultation: 30 th of May, 2006<br />
Venue:<br />
NAC Office, Jharia<br />
Issues raised/discussed/suggestions:<br />
1. They have bought water tanker and a tractor for Waste disposal, and planning to hand it over<br />
to MADA, but not yet done. The reason being lack of staff.<br />
2. Lots of Large size dust bins were also bought and have been handed over to MADA, but<br />
they are not being utilized efficiently and not serving the purpose to even half the extent.<br />
3. They also quoted that a few days back, Koyala Minister had come and said that Jharia<br />
necessarily has to be rehabilitated. The new located site is about 7 km away from Jharia.<br />
4. Just outside the city, all around, Ground Fire exists. But the city is not under fire.<br />
5. They also told the possibility that Raja Talab can be developed for amusement and other<br />
purposes and revenue can be generated.<br />
6. They feel the need of Bus stand, Roads, Sewerage system.<br />
7. Water supply is not adequate. Out of 12 wards, only 4 receive water.<br />
8. BCCL is not allowing any developments, they are even not allowed to dig and wells, and<br />
hand pumps.<br />
9. There is a need of connectivity of all the wards to the main road.<br />
10. They have proposed a bypass of length 18 km.<br />
11. Power supply is ok, and it is better than <strong>Dhanbad</strong>.<br />
12. Talking about subsidence in the region they told that because sand was not properly filled,<br />
where coal was dug, that’s why subsidence is the major concern.<br />
Quality of service of current urban amenities:<br />
Urban Infrastructure<br />
Drainage and Sanitation<br />
Solid Waste Management<br />
Urban Transport<br />
Water Supply<br />
Grading<br />
Very Poor<br />
Very Poor<br />
Poor<br />
Poor<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 218
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Street Light<br />
Storm Water Drainage<br />
Ok<br />
Poor<br />
Prioritisation of sectors:<br />
Infrastructure Sector<br />
Priority wise Ranking<br />
Drainage and Sanitation 3<br />
Solid Waste Management 4<br />
Urban Transport 7<br />
Water Supply 1<br />
Sewerage 6<br />
Storm water drainage and Water Body Rejuvenation 5<br />
Street light 8<br />
Housing for Poor 2<br />
SWOT Analysis:<br />
Strengths<br />
Mining activities<br />
Mineral abundance<br />
Opportunity<br />
Business opportunities<br />
Collection of holding taxes, income taxes and other<br />
taxes<br />
Weakness<br />
Subsidence<br />
Underground fire<br />
Threat<br />
Rehabilitation<br />
Profile of the consulting Entity: Mr. Vijay Singh Kushwaha, social worker, Member<br />
of Jharia Bachao Samiti, Jharia<br />
Date of the consultation: 30 th of May, 2006<br />
Venue:<br />
Near NAC Office, Jharia<br />
Issues raised/discussed/suggestions:<br />
1. Public is not of the view that Jharia should be rehabilitated. And they are opposing the move.<br />
2. They want government to stabilize the area and let them stay there only.<br />
3. There is a study done by CMRI about Jharia region regarding mining activities, ground fire<br />
and subsidence.<br />
4. Mr. Gopal Aggarwal is the head of Jharia Bachao Samiti, Jharia.<br />
Quality of service of current urban amenities:<br />
Urban Infrastructure<br />
Drainage and Sanitation<br />
Solid Waste Management<br />
Urban Transport<br />
Water Supply<br />
Street Light<br />
Storm Water Drainage<br />
Grading<br />
Poor<br />
Very Poor<br />
Very Poor<br />
Poor<br />
Ok<br />
Poor<br />
Prioritisation of sectors:<br />
Infrastructure Sector<br />
Priority wise Ranking<br />
Drainage and Sanitation 6<br />
Solid Waste Management 1<br />
Urban Transport 3<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 219
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Water Supply 4<br />
Sewerage 5<br />
Storm water drainage and Water Body Rejuvenation 7<br />
Street light 8<br />
Housing for Poor 2<br />
Profile of the consulting Entity:<br />
Mr. Kalim Ahamad Khan, Accounts Officer<br />
Mr. Ashok Kumar Thakur, Cashier,<br />
Accounts Department<br />
Date of the consultation: 30 th of May, 2006<br />
Venue:<br />
MADA Building<br />
Issues raised/discussed/suggestions:<br />
1. Financial health of MADA is not well and currently it’s in a total loss of about 450 crores.<br />
2. The figure of annual loss is approximately 15 crores.<br />
3. The major problem is collection of water charges.<br />
4. 1.4 crores are earned from holding taxes from Jharia, Katras and Chhatatand.<br />
Quality of service of current urban amenities:<br />
Urban Infrastructure<br />
Drainage and Sanitation<br />
Solid Waste Management<br />
Urban Transport<br />
Water Supply<br />
Street Light<br />
Storm Water Drainage<br />
Grading<br />
Poor<br />
Poor<br />
Ok<br />
Poor<br />
Ok<br />
Poor<br />
Prioritisation of sectors:<br />
Infrastructure Sector<br />
Priority wise Ranking<br />
Drainage and Sanitation 1<br />
Solid Waste Management 3<br />
Urban Transport 7<br />
Water Supply 2<br />
Sewerage 5<br />
Storm water drainage and Water Body Rejuvenation 6<br />
Street light 8<br />
Housing for Poor 4<br />
Profile of the consulting Entity:<br />
Mr. Acharya, Mr. N C Pal, Mr. Ravindra,<br />
Mr. Bhagat, <strong>Dhanbad</strong> Municiple<br />
<strong>Corporation</strong><br />
Date of the consultation: 31 st of May, 2006<br />
Venue:<br />
DMC Office<br />
Issues raised/discussed/suggestions:<br />
1. Talking about the conditions of streetlights, they told that Streetlights are being maintained<br />
by private people.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 220
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
2. There was a tender notice and now exists a contract between two private advertisers and<br />
DMC that they will be allowed to place 50 hoardings and 100 kiosks (Small hoardings), each,<br />
and in return they will maintain 400 street lights in the city.<br />
3. Rs. 25,000/- was the security deposit for that contract and the contract started on 31/01/06.<br />
4. Staff strength is currently very weak, and prominently inadequate to deliver the services,<br />
required, said Mr. Bhagat.<br />
5. There is also dearth of trained staff to use<br />
sophisticated instruments, which are lying unused<br />
in the DMC premise.<br />
6. They also recognize the need of an independent<br />
and powerful <strong>Municipal</strong> body to perform the task<br />
and manage its assets well.<br />
7. It’s also lack of staff and efficient management<br />
structure that they are not a sustainable body, and<br />
are not able to deliver the services to the city.<br />
Quality of service of current urban amenities:<br />
Urban Infrastructure<br />
Drainage and Sanitation<br />
Solid Waste Management<br />
Urban Transport<br />
Water Supply<br />
Street Light<br />
Storm Water Drainage<br />
Grading<br />
Poor<br />
Poor<br />
Ok<br />
Very Poor<br />
Ok<br />
Poor<br />
Prioritisation of sectors:<br />
Infrastructure Sector<br />
Priority wise Ranking<br />
Drainage and Sanitation 1<br />
Solid Waste Management 2<br />
Urban Transport 7<br />
Water Supply 3<br />
Sewerage 4<br />
Storm water drainage and Water Body Rejuvenation 6<br />
Street light 8<br />
Housing for Poor 5<br />
SWOT Analysis:<br />
Strengths<br />
Buoyant economy<br />
Purchasing power<br />
Opportunity<br />
Weakness<br />
Lack of staff in municipal<br />
corporation<br />
Lack of civic sense in people.<br />
Threat<br />
Rapidly and haphazardly growing<br />
population<br />
Profile of the consulting Entity:<br />
Mr. Vibhudev: Ex. Engineer, NH deptt<br />
Date of the consultation: 31 st of May, 2006<br />
Venue:<br />
NH Building, Behind, Combined Building<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 221
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Issues raised/discussed/suggestions:<br />
1. He very prominently talked about the need of roads.<br />
2. About the current status of NH network in <strong>Dhanbad</strong>, he told that there are two stretches of<br />
NH: NH32 and NH2. Chas to Ramgarh is NH32, which is taken care by NH Department<br />
only.<br />
3. Govindpur to Mahuda (Telmachchu Bridge) is NH32, with a stretch of 39 km, carriage way<br />
width of 7m, and right of way of 12m.<br />
4. He told NHAI was the authority, which maintains NH2, as it is a part of Golden<br />
Quadrilateral.<br />
5. There is a proposed bypass from Barbadda (<strong>Dhanbad</strong>)(@NH2, 399.00km) to<br />
Godhar(@NH32, 16.00km), 4.6 km of which already exists with 7 m carriageway width.<br />
Quality of service of current urban amenities:<br />
Urban Infrastructure<br />
Drainage and Sanitation<br />
Solid Waste Management<br />
Road Network<br />
Quality of Road<br />
Street Light<br />
Storm Water Drainage<br />
Water Supply<br />
Grading<br />
Poor<br />
Poor<br />
Poor<br />
Very Poor<br />
Ok<br />
Poor<br />
Very Poor<br />
Prioritisation of sectors:<br />
Infrastructure Sector<br />
Priority wise Ranking<br />
Drainage and Sanitation 4<br />
Solid Waste Management 5<br />
Urban Transport 1<br />
Water Supply 2<br />
Sewerage 6<br />
Storm water drainage 3<br />
Street light 8<br />
Housing for Poor 7<br />
Profile of the consulting Entity:<br />
Mr. Satyanand Sinha: Executive Engineer,<br />
PWD, Combined building<br />
Mr. Ajay Rajat: SDO, PWD<br />
Mr. Sunil Kumar: Estimating Officer, PWD<br />
Date of the consultation: 31 st of May, 2006<br />
Venue:<br />
PWD Office, Combined Building<br />
Issues raised/discussed/suggestions:<br />
1. There is a good road network in <strong>Dhanbad</strong>, but the roads need to be widened, repaired and<br />
maintained as the traffic has grown up very rapidly.<br />
2. The agency looks after<br />
a. PWD roads<br />
b. MDR<br />
c. ODR<br />
d. SH<br />
3. Mr. Rajat said that road widening can be taken up in the following places:<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 222
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
a. “<strong>Dhanbad</strong>” to “Kapuria”<br />
b. “Bank More” to “Jharia” over dead railway line.<br />
4. <strong>Dhanbad</strong> to Jharia bypass is approximately going to be 6km.<br />
5. People here own four-wheeler in very large ratios.<br />
6. Govindpur to Tundi one SH of 3km stretch exists.<br />
7. Talking about other agencies, which take care of road construction in <strong>Dhanbad</strong>, he told us<br />
one among various is NREP, which was set up in 1972.<br />
8. He also added that maximum roads are developed by BDO, where 90% of the money flows.<br />
9. Other agencies beside PWD, involved in construction and management of roads<br />
a. NH<br />
b. Special Division<br />
c. NREP<br />
d. Block Administration<br />
e. Jila Parishad<br />
f. REO (Rural Engineering Organisation)<br />
g. <strong>Dhanbad</strong> Nagar Nigam<br />
h. PWD<br />
10. <strong>Dhanbad</strong> to Sindri stretch needs to be rehabilitated, which is about 25.5 km.<br />
11. Emphasizing on sustainability measures, he told that maintenance of the roads as well as<br />
proper drainage facility is very much important; otherwise all the new construction doesn’t<br />
stay for more than six months.<br />
12. Sewerage and storm water flows over the road and destroys all the bitumen roads, as<br />
bitumen and water are technically not compatible.<br />
13. REU (Rural engineering unit) is another agency, which is involved in road construction.<br />
14. Right now most of the drains are open, so people also dump solid waste nearby them and<br />
then drainage get flocked and thus water flows over road, leaving them to ruins.<br />
15. He also jovially shared about the reasons behind it. As the pay is quite less in govt<br />
organizations as compared to the private ones, so not many interested people join govt ones,<br />
and thus the ones, who join don’t care much about maintenance and all.<br />
16. 281 km is the total length of roads exists in <strong>Dhanbad</strong> district. Out of this about 142km is the<br />
length, which come within the purview of new DMC. This was approximate figure and it was<br />
repeatedly mentioned that there is a need to do the primary survey.<br />
17. Mentioning the need of bypass, he told us that Bank More to Jharia bypass is needed, but as<br />
Jharia is going to be rehabilitated, so this can be<br />
lower in the priority.<br />
18. Priority wise bypasses to<br />
a. Sindri<br />
b. Katras<br />
c. Govindpur<br />
d. Baliapur, which is an agriculture belt.<br />
Are important.<br />
19. Sindri is quite old (1945) and is quite important<br />
because of FCI and other important industries.<br />
20. He stressed a lot on cleanliness of the city as well as<br />
of the roads.<br />
21. They repeatedly told about the importance of<br />
drainage and sewerage system.<br />
22. Jamshedpur is the best city of Jharkhand district,<br />
because it’s quite planned and is mostly maintained<br />
by TATA.<br />
23. Even over bridges and railway bridges are places, where ‘Peepal’, ‘Vat’, and some other kind<br />
of trees have grown up due to not being maintained properly.<br />
24. Some other stretches, which can be proposed are as follows:<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 223
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
a. “Labour Chauk”(NH32) to “Barbadda”(NH2).<br />
b. “Bank More” to “Jodha Phatak”<br />
c. “Bank More” to “Parthidih”<br />
d. “Heerapur Park Market” to “Barbasia Phatak”<br />
e. “Barmasia Phatak” to “Howra Motors”<br />
25. Citing as an example of current status of roads he asked to look around “Kamdhenu Petrol<br />
Pump” and observe the condition of roads. The reason for the dilapidated conditions of the<br />
roads are lack of maintenance, indifference of municipality regarding drainage, and also the<br />
local people sometimes, who due to their vested interests offer resistance for the<br />
developmental works. The picture is shown.<br />
Quality of service of current urban amenities:<br />
Urban Infrastructure<br />
Drainage and Sanitation<br />
Solid Waste Management<br />
Road Network<br />
Roads Condition<br />
Water Supply<br />
Street Light<br />
Storm Water Drainage<br />
Grading<br />
Very Poor<br />
Ok<br />
Ok<br />
Poor<br />
Poor<br />
Ok<br />
Very Poor<br />
Prioritisation of sectors:<br />
Infrastructure Sector<br />
Priority wise Ranking<br />
Drainage and Sanitation 1<br />
Solid Waste Management 6<br />
Urban Transport 5<br />
Water Supply 4<br />
Sewerage 3<br />
Storm water drainage 2<br />
Street light 8<br />
Housing for Poor 7<br />
Profile of the consulting Entity:<br />
Mr. Avtar Krishan, GM, Environmental<br />
Department, BCCL<br />
Date of the consultation: 31 st of May, 2006<br />
Venue:<br />
Koyala Bhavan<br />
Issues raised/discussed/suggestions:<br />
1. Talking about the Burning of coal, he said that Open fire can be quenched, dug and cooled.<br />
2. The reason of fire is that there is air entrapped and coal catches fire and continues to burn.<br />
3. Jharia has cocking coal, which is used for steel industry.<br />
4. He also shared that the issue of this rehabilitation is quite old.<br />
5. Rehabilitation is quite costly affair and is being done only in places, where there is an issue of<br />
safety. Thus the reason is people’s safety and not getting the area cleared for mining activity.<br />
6. Currently 8.9sqkm of area is under fire, earlier it was about 16sqkm.<br />
7. The railway track, which was removed, was because of fire reaching near the track, and there<br />
was a protest for removing the track, as passenger trains used to run on that track.<br />
8. He emphasised that Coal is very important for India, as it runs our economy. For power<br />
production and running various other industries, we necessarily need coal, whereas other<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 224
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
countries like Germany are depending on other sources of power, as its costly affair for<br />
them.<br />
9. They produced 330 M tones of coal last year.<br />
10. There were two new locations found by them for coal mining, but they are given to private<br />
players.<br />
11. Sharing the technicalities, he said that washing improves the quality of coal, quite a bit.<br />
12. He acquainted with some facts that Indonesia’s coal is cheaper. China is self sufficient in<br />
coal. But we are not because the potential available here is not being fully tapped.<br />
13. GOI wants private entrepreneurs in this field.<br />
14. Lack of capital investment is the reason for production being less than demand.<br />
Quality of service of current urban amenities:<br />
Urban Infrastructure<br />
Drainage and Sanitation<br />
Solid Waste Management<br />
Urban Transport<br />
Water Supply<br />
Street Light<br />
Storm Water Drainage<br />
Grading<br />
Ok<br />
Poor<br />
Ok<br />
Ok<br />
Ok<br />
Poor<br />
Prioritisation of sectors:<br />
Infrastructure Sector<br />
Priority wise Ranking<br />
Drainage and Sanitation 6<br />
Solid Waste Management 2<br />
Urban Transport 5<br />
Water Supply 1<br />
Sewerage 4<br />
Storm water drainage and Water Body Rejuvenation 3<br />
Street light 8<br />
Housing for Poor 7<br />
SWOT Analysis:<br />
Strengths<br />
Huge coal Reserves<br />
Mineral Availabilities<br />
Opportunity<br />
Coal dependent Industries<br />
Employment opportunities<br />
Weakness<br />
Political setbacks in rehabilitation<br />
issue<br />
Air Pollution<br />
Very large Traffics<br />
Threat<br />
Jharia Fire, Subsidence<br />
Profile of the consulting Entity:<br />
Mr. Mratryunjaya Kumar, Environmental<br />
Engineer, BCCL<br />
Date of the consultation: 31 st of May, 2006<br />
Venue:<br />
Koyala Bhavan<br />
Issues raised/discussed/suggestions:<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 225
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
1. Open cast mining is done only up to 130 m max, after that underground mining is<br />
economical. Jharia coalfield belt contains several seams of coal, starting from very shallow<br />
depths at many points. And that’s the reason Open Cast Mining is also quite prominent here.<br />
2. Talking about the effluent pollution from coal washeries, he shared that all washeries are<br />
closed cycled, so there is no problem of effluent wastewater.<br />
3. Right now pit water is supplied to people for domestic purpose. Its quality is ok.<br />
4. There have been studies on possibility of converting mine water into potable water in ISM.<br />
Quality of service of current urban amenities:<br />
Urban Infrastructure<br />
Drainage and Sanitation<br />
Solid Waste Management<br />
Urban Transport<br />
Water Supply<br />
Street Light<br />
Storm Water Drainage<br />
Grading<br />
Poor<br />
Poor<br />
Ok<br />
Very Poor<br />
Ok<br />
Poor<br />
Prioritisation of sectors:<br />
Infrastructure Sector<br />
Priority wise Ranking<br />
Drainage and Sanitation 4<br />
Solid Waste Management 3<br />
Urban Transport 7<br />
Water Supply 1<br />
Sewerage 5<br />
Storm water drainage and Water Body Rejuvenation 6<br />
Street light 8<br />
Housing for Poor 2<br />
SWOT Analysis:<br />
Strengths<br />
Tourism Spots<br />
Coal Reserves<br />
Opportunity<br />
Development of Coal based industries<br />
Employment opportunities<br />
Weakness<br />
Unplanned establishments<br />
Large social divide<br />
Threat<br />
Haphazard development<br />
Underground Fire<br />
Profile of the consulting Entity:<br />
Mr. Shamshul Hoda: Regional officer, JPCB<br />
Date of the consultation: 1 st of June, 2006<br />
Venue:<br />
JPCB Office, Officers Colony<br />
Issues raised/discussed/suggestions:<br />
1. Sharing the hiccups in the developments, he told that there is lot of transfers in the<br />
department, so people don’t come to know about the region.<br />
2. There is very large pollution due to dust around the city, which eventually effects health of<br />
the residents in long terms.<br />
3. He also gave a hint that overall health of the city as far as pollution is concerned is not very<br />
good.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 226
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Quality of service of current urban amenities:<br />
Urban Infrastructure<br />
Drainage and Sanitation<br />
Solid Waste Management<br />
Urban Transport<br />
Water Supply<br />
Street Light<br />
Storm Water Drainage<br />
Grading<br />
Poor<br />
Poor<br />
Very Poor<br />
Very Poor<br />
Ok<br />
Poor<br />
Profile of the consulting Entity:<br />
Date of the consultation:<br />
Venue:<br />
Mr. A K Singh: Assistant Mining Officer,<br />
Department of Mines<br />
2 nd of June, 2006 Friday<br />
Combined Building<br />
Issues raised/discussed/suggestions:<br />
1. Mentioning about their work, they confirmed their involvement in collecting mining<br />
revenues.<br />
2. 34% of the minerals come from Jharkhand.<br />
3. One thousand crore of the revenue is collected from the Jharkhand only. This year the figure<br />
was 1008 crore. Out of which 330 crore was only from <strong>Dhanbad</strong>. This clearly establishes the<br />
importance of <strong>Dhanbad</strong> in the national economy.<br />
4. His also gave a feedback about the options to collect better revenue:<br />
a. 14(State Govt.) + 3(BCCL) check Nakas/weight bridge on BOT basis have been<br />
facilitated by the govt. to generate more revenues from minerals extracted from the<br />
district.<br />
b. Chalan authentication process started from the department from 1/1/06<br />
c. From 17/06/05 land/surface rate has converted on the basis of commercial rate.<br />
Earlier land/surface rate was only 13 rupees per acre. 5% of the new revenue<br />
generated comes to this department.<br />
d. 1996 onwards, BCCL has taken the initiative of not to provide raw coal top it’s<br />
employees for their domestic use, otherwise they will have to pay one third of the<br />
cost of that coal.<br />
e. Road and building materials need to be checked and verified from the department of<br />
mines and geology, govt. of Jharkhand. In the case of discrepancy, they will have to<br />
pay double the cost of the material as revenue to the department.<br />
5. Every year a report is sent to Indian Bureau of Mines, Nagpur, about minerals production<br />
and other details.<br />
Quality of service of current urban amenities:<br />
Urban Infrastructure<br />
Drainage and Sanitation<br />
Solid Waste Management<br />
Urban Transport<br />
Water Supply<br />
Street Light<br />
Storm Water Drainage<br />
SWOT Analysis:<br />
Strengths<br />
Coal availability<br />
Purchasing Power of People<br />
Grading<br />
Poor<br />
Poor<br />
Poor<br />
Very Poor<br />
Poor<br />
Very Poor<br />
Weakness<br />
Poor Drainage and sewerage<br />
Dilapidated water supply system<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 227
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Opportunity<br />
Coal based Industry<br />
Threat<br />
Naxalites<br />
Prioritization of sectors:<br />
Infrastructure Sector<br />
Priority wise Ranking<br />
Drainage and Sanitation 4<br />
Solid Waste Management 6<br />
Urban Transport 2<br />
Water Supply 1<br />
Sewerage 5<br />
Storm water drainage and Water Body Rejuvenation 3<br />
Street light 8<br />
Housing for Poor 7<br />
Profile of the consulting Entity:<br />
Mr. Ravindra Kumar Pandey, Ex- MP<br />
Date of the consultation: 3 rd of June, 2006<br />
Venue:<br />
Phusro, Bokaro<br />
Issues raised/discussed/suggestions:<br />
1. Two areas Katras and Baghmara of our purview fall in his constituency.<br />
2. He told that Water supply system is going through a major crisis. In Katras, sometimes,<br />
supply is for only 2 hours from deep boring.<br />
3. He talked about the possibility of pit water being stored as raw water and to be made potable<br />
by processing.<br />
4. Emphasis was given on long term planning for everything. Money shouldn’t be a concern for<br />
it, as he said.<br />
5. Water connection for all is very important.<br />
6. Quoting as an example He said that in Kolkata, Water supply arrangements were made by<br />
British, and it’s still working. With the same network, they provide both potable and<br />
domestic water alternatively.<br />
7. Next priority should be given for Drainage system. Currently there are no good<br />
arrangements for drainage. But he quoted again that long term planning is important for<br />
drainage also. So that provisions for future growth are embedded in the design.<br />
8. Easy connection for drinking water should be made available.<br />
9. Any design should be well engineered, and he attributed failure of any project to bad design<br />
only.<br />
10. Underground electricity supply need to be encouraged, by phase wise implementation. So<br />
that safety is enhanced and steeling of power can also be checked in a major form. In the<br />
current system the electric poles should be on the median. Because those on the sides of the<br />
road hinder the widening of the road.<br />
11. There is also a need of Sulabh Shauchalaya at regular intervals, so that visitors to the city find<br />
it convenient and the city cleanliness is maintained.<br />
12. There are large encroachments right now is DMC, which need to be removed. They should<br />
be nipped in the bud; otherwise it becomes a political matter at a later stage and creates<br />
problem for any expansion projects.<br />
13. Public drinking water facilities should be maintained at main chauks to help commuters.<br />
14. Maintenance of street lights is important.<br />
15. Government money should be efficiently and transparently utilized.<br />
16. He also suggested to take any one sector and make it completely sustainable for long term,<br />
not that carrying all the sectors, and finally not achieving sustainability in any on them.<br />
17. He mentioned some places in <strong>Dhanbad</strong>, which don’t have water at all. He told a place<br />
‘Gandhinagar’ as an example.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 228
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
18. There are no parks in Katras. As such there is lot of encroached pieces of land, where it’s all<br />
possible. What is needed is a political will to give go ahead to the administration.<br />
19. Parking is a major concern in <strong>Dhanbad</strong>. Proper arrangements for this will solve a major<br />
problem for the city. It will also help in revenue generation.<br />
20. There should be specific places for Bus Stand, Subzi Mandi, and Taxi Stand.<br />
21. Currently there is no Call Taxi service in the whole DMC area, and it is a need for the<br />
residents of the city.<br />
22. He also realized the requirements of good schools to provide quality education.<br />
23. As of now, power supply system is in a bad shape.<br />
24. He repeatedly emphasized on systematic approach for any development.<br />
25. Giving some facts he told that 30% land in Katras and Baghmara is arable, rest is used for<br />
mining activities. Thus the main drive of the economy remains mining activity only.<br />
26. Market complex and super markets will be next steps towards modernization.<br />
27. In any projects, representatives from all the parties be made part of the process, so that when<br />
the government changes, there are no political issues for implementation of any ongoing<br />
projects.<br />
Quality of service of current urban amenities:<br />
Urban Infrastructure<br />
Drainage and Sanitation<br />
Solid Waste Management<br />
Urban Transport<br />
Water Supply<br />
Street Light<br />
Storm Water Drainage<br />
Grading<br />
Very Poor<br />
Poor<br />
Poor<br />
Very Poor<br />
Poor<br />
Very Poor<br />
Prioritisation of sectors:<br />
Infrastructure Sector<br />
Priority wise Ranking<br />
Drainage and Sanitation 2<br />
Solid Waste Management 7<br />
Urban Transport 5<br />
Water Supply 1<br />
Sewerage 6<br />
Storm water drainage and Water Body Rejuvenation 3<br />
Street light 8<br />
Housing for Poor 4<br />
SWOT Analysis:<br />
Strengths<br />
Mining area<br />
Pit water availability<br />
Opportunity<br />
Use of pit water for Irrigation.<br />
Weakness<br />
Very low supply of water<br />
Threat<br />
Lot of political interference<br />
Politicians, making rehabilitation an<br />
issue for their benefit<br />
Vision for <strong>Dhanbad</strong>:<br />
“Easy life in the city for everyone.”<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 229
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Profile of the consulting Entity:<br />
Mr. S K Rai, Chief Medical Officer, MADA<br />
Date of the consultation: 3 rd of June 2006<br />
Venue:<br />
MADA Office<br />
Issues raised/discussed/suggestions:<br />
1. The office only takes care of solid waste disposal.<br />
2. He was quite concerned about the current condition of solid waste department.<br />
3. Right now there is no good disposal system, they just collect solid waste and dump it in low<br />
lying areas.<br />
4. There is one factory in Govindpur, which produces hazardous waste.<br />
5. There are no specific disposal sites. The current practice is to dump the waste in low lying<br />
areas. No scientific practice is followed.<br />
6. Long back they had site for disposal in Aamjhar.<br />
7. There is a need for site selection.<br />
8. For sanitation, better underground drainage system in place in needed.<br />
9. Current dust bins are very badly designed. They don’t encourage people to throw waste into<br />
them, so place around dust bins become dumping site.<br />
10. Open bins will serve the purpose. And they are in the process of getting a different design<br />
for the dust bins.<br />
11. There is a severe lack of man power. Due to that it’s very difficult to maintain the required<br />
work. The need of staff is a lot more than what it is currently.<br />
Quality of service of current urban amenities:<br />
Urban Infrastructure<br />
Drainage and Sanitation<br />
Solid Waste Management<br />
Urban Transport<br />
Water Supply<br />
Street Light<br />
Storm Water Drainage<br />
Grading<br />
Poor<br />
Poor<br />
Ok<br />
Poor<br />
Ok<br />
Poor<br />
Prioritisation of sectors:<br />
Infrastructure Sector<br />
Priority wise Ranking<br />
Drainage and Sanitation 1<br />
Solid Waste Management 2<br />
Urban Transport 7<br />
Water Supply 2<br />
Sewerage 6<br />
Storm water drainage and Water Body Rejuvenation 4<br />
Street light 8<br />
Housing for Poor 5<br />
Profile of the consulting Entity: Mr. O P Lal, MLA<br />
Date of the consultation: 4 th of June, 2006<br />
Venue:<br />
Congress Office, in front of MADA’s Building<br />
Issues raised/discussed/suggestions:<br />
1. He was quite obsessed by the fact that <strong>Dhanbad</strong> has not got it’s fare share of representation<br />
economically and by other means.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 230
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
2. He told that there was a ring road around <strong>Dhanbad</strong>, going from airport to Baliapur, Sindri,<br />
beside Damodar river, LohaPatti (Mahuda), Chandrapura, Katras, Baghmara. It was called<br />
Diamond road. Its remaining part from Baliapur to Mahuda should be completed.<br />
3. He also informed about the need of another outer ring road.<br />
4. He was also concerned about the pollution levels in the city, and it needs to be checked to<br />
make <strong>Dhanbad</strong> a better place to live. Be it air pollution, be it water body pollution.<br />
5. He also gave the information about Damodar Action Plan (DAP). Water of Damodar is<br />
being polluted by industrial waste. Lubricants from Bokaro steel plant also add to that.<br />
Drainages culminate into the river. He told that 86 crores were sanctioned for DAP. There<br />
was allocation of 10 crores for beautification of TopChanchi lake, which has about 8 km<br />
radius. The purpose was to promote tourism. But nothing substantial has taken shape in<br />
both the cases.<br />
6. Topchanchi lake is a huge water source.<br />
7. He wanted to get the burning of coal stopped and stop rehabilitation. He also mentioned the<br />
incident when Hon’ble President Kalam visited Jharia, he quoted him saying said that the fire<br />
could be checked. He also suggests that loan from World Bank can be taken for this<br />
purpose, which is an issue pertaining to life of one lac people.<br />
8. He also realises that underground drainage system is required for the city.<br />
9. Pit water can be made potable and used.<br />
10. Encroachment should be controlled.<br />
11. He peeps into the future and considers the possibility of <strong>Dhanbad</strong> becoming a rich city by<br />
efficient extraction of coal. Scientific approach is to be followed for mining activities.<br />
12. Roads in <strong>Dhanbad</strong> are sufficient right now, but need to be maintained for future needs.<br />
13. Bekar Bandh beautification is needed, desiltation is required.<br />
14. Open caste mining should be discouraged.<br />
15. As he says coal steeling from Abandoned open pits has caught pace, which leads to<br />
environmental hazards in long terms.<br />
16. Subsidence should be stopped; scientific control measures should be taken for that.<br />
17. Reclamation of open caste pits is also warranted, he noted.<br />
18. Education for <strong>Dhanbad</strong> residents is equally important as long-term developmental measure.<br />
19. He also explored the possibility of developing Mining Observation as a tourism activity.<br />
20. Topchanchi as a picnic place is quite favourable but need a better connectivity.<br />
21. He also talked about Parasnath and Bodhgaya as a tourism centre. But incidentally that’s not<br />
in our purview.<br />
Quality of service of current urban amenities:<br />
Urban Infrastructure<br />
Drainage and Sanitation<br />
Solid Waste Management<br />
Urban Transport<br />
Water Supply<br />
Street Light<br />
Storm Water Drainage<br />
Grading<br />
Poor<br />
Very Poor<br />
Ok<br />
Very Poor<br />
Poor<br />
Poor<br />
Prioritisation of sectors:<br />
Infrastructure Sector<br />
Priority wise Ranking<br />
Drainage and Sanitation 5<br />
Solid Waste Management 8<br />
Urban Transport 4<br />
Water Supply 1<br />
Pollution 2<br />
Encroachment 3<br />
Sewerage 7<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 231
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Storm water drainage and Water Body<br />
6<br />
Rejuvenation<br />
Street light 9<br />
SWOT Analysis:<br />
Strengths<br />
Coal<br />
Tourism centres<br />
Water Bodies<br />
Opportunity<br />
Mining tourism<br />
Weakness<br />
Inefficient use of coal<br />
Coal steeling<br />
Threat<br />
Subsidence of Jharia<br />
Vanishing of Coal by fire.<br />
Vision for <strong>Dhanbad</strong>:<br />
1. Green <strong>Dhanbad</strong>. Forestation needed.<br />
2. A modern city with all amenities, and as a safe tourism centre.<br />
Profile of the consulting Entity: Mr. Ajay Shukla: DRM (ajay_shukla10@yahoo.com)<br />
Date of the consultation: 8 th of June, 2006<br />
Venue:<br />
DRM Office<br />
Issues raised/discussed/suggestions:<br />
1. On a question of what development plans railways<br />
have in or near <strong>Dhanbad</strong>, he confirmed that<br />
nothing major is planned to be executed as of now.<br />
But there are plans to make the existing assets look<br />
better. For example platforms are planned to be<br />
repaired in a way.<br />
2. Responding to the question of what there<br />
expectation from government, he told that Railways<br />
doesn’t need any funds for these small works, so<br />
there is no interest shown for PPP for these works.<br />
3. However railways can be interested in letting a<br />
private developer use their land and develop a<br />
commercial complex in returns of maintaining a<br />
parking facility and developing landscape and<br />
similar things.<br />
4. There is no proper road infrastructure to support<br />
the railways’ needs and is required to be developed.<br />
So roads adjacent to railways should be widened.<br />
5. In the south end, which is often referred as Purana<br />
Bazaar, there is lot of encroachments in about 5<br />
acres of land, which belongs to railways. The entry<br />
can be developed from this side, which is quite narrow right now.<br />
6. He declined the possibility of IL&FS playing the role of process manager for them to assist<br />
them in getting all these developments.<br />
7. There is an over bridge in Bhuli, and one in Pradhan Ghanta is going to come up in another<br />
two months. There is one under bridge and one over bridge (in Barmasia), existing right<br />
now.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 232
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
8. There is no need of speed corridor, as were the rumours, to be developed between <strong>Dhanbad</strong><br />
and Ranchi.<br />
9. If at all they need to run EMU, they need running stock only, nothing else is required. If that<br />
can be managed then, they will be willing to run it. This can be proposed for “Grand<br />
Chord”. EMU has the facility to accelerate and decelerate faster.<br />
10. Gomuh and <strong>Dhanbad</strong> are the major hubs in the region, situated in the route of many<br />
important trains. And there is a need to upgrade the capacity of <strong>Dhanbad</strong>-Gomuh route.<br />
11. There is a place of about 2 to 3 acres towards the main entrance, which is prominently<br />
occupied by unauthorised shops, intensifying the congestion. So this side, there can be a<br />
development of commercial complex, which will make the place look pleasant and decongest<br />
the whole area. And this will also help in widening of the road.<br />
12. Personally he keeps road infrastructure on highest priority and that only is required for<br />
internal transportation of the city.<br />
13. Due to haphazard developments, the population has grown in pockets and now there are<br />
needs of small markets in those small pockets to cater to their daily needs.<br />
14. Parking near Bank More is very much required as in spite of removal of encroachments,<br />
there is congestion due to unsystematic parking.<br />
Quality of service of current urban amenities:<br />
Urban Infrastructure<br />
Drainage and Sanitation<br />
Solid Waste Management<br />
Urban Transport<br />
Water Supply<br />
Street Light<br />
Storm Water Drainage<br />
Grading<br />
Poor<br />
Poor<br />
Very poor<br />
Poor<br />
Ok<br />
Poor<br />
Prioritisation of sectors:<br />
Infrastructure Sector<br />
Priority wise Ranking<br />
Drainage and Sanitation 3<br />
Solid Waste Management 4<br />
Urban Transport 1<br />
Water Supply 2<br />
Sewerage 6<br />
Storm water drainage and Water Body Rejuvenation 7<br />
Street light 8<br />
Housing for Poor 5<br />
SWOT Analysis:<br />
Strengths<br />
Very good connectivity from all the<br />
sides<br />
Purchasing Power parity of people<br />
Coal based Industry potential<br />
Opportunity<br />
Commercial complexes by public<br />
private partnership<br />
Weakness<br />
No proper facility of city’s internal transportation<br />
Encroachments<br />
Unpredictability of urban growth<br />
Bad condition of roads, no maintenance<br />
Threat<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 233
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Profile of the consulting Entity:<br />
Date of the consultation:<br />
Venue:<br />
Mr. A B Pati, MD, MADA<br />
19 th of June<br />
MADA Office<br />
Issues raised/discussed/suggestions:<br />
1. He was visioning the extension of <strong>Dhanbad</strong><br />
towards Nirsa. Rajganj, Topchanchi and their<br />
development as greater <strong>Dhanbad</strong> in long term,<br />
which will be well connected with the rest of the<br />
world by means of transport and communication.<br />
2. As this whole, he considers this region to be having<br />
clean air, healthy climate.<br />
3. <strong>Dhanbad</strong> should grow in all directions from<br />
Maithan to Rajganj.<br />
4. He attempts to look into the future by envisioning<br />
the expansion of <strong>Dhanbad</strong> in longer term towards<br />
Gomuh.<br />
5. He envisages the development of <strong>Dhanbad</strong> near the stretch along NH.<br />
6. Development of Main Bus Terminal near GT Road in Govindpur for easy accessibility from<br />
all over the country is on high priority.<br />
7. And there should be small bus terminals should be in the city catering to need of local people<br />
and connecting the whole city to the outside world.<br />
8. Looking at the congestion in the main city, there can be a possibility of an elevated corridor<br />
within the city, which ultimately connects them to NH stretch.<br />
9. He considers a need of DMC being the coordinating agency for the execution bodies for<br />
coordinated development.<br />
10. MADA could become the agency appointed by DMC to take care of water supply as a<br />
whole.<br />
11. There is also a need to preserve the Old heritage of <strong>Dhanbad</strong> as such.<br />
12. Development of local business centres to decongest Bank More to be emphasised.<br />
13. There is a need of thrust to separate the Coal mining and civic activities.<br />
14. MADA has been appointed as the nodal agency for Damodar Action Plan.<br />
15. Future expansion of the city should be in coordination with DGMS, and CMPDI, taking into<br />
consideration future mining activities.<br />
16. <strong>Dhanbad</strong> is a city of good research institution. It should be developed as a knowledge city<br />
and city of academic importance too.<br />
17. For different areas there should be local environment solutions.<br />
18. Localised treatment Plants in all the pockets, which will be developed in coordination.<br />
19. <strong>Dhanbad</strong> should be a centre of development due to geographical location like Calcutta is for<br />
Bihar, Jharkhand.<br />
20. DPRs for solid waste management have been prepared.<br />
21. On asking about the scope of tourism promotion by developing small ponds, he thinks they<br />
have less scope for tourism development, but they should be maintained clean.<br />
22. He also emphasised on stringent requirements on building regulations, as the zone is<br />
earthquake prone.<br />
23. Talking about the development of the city, he noted that there restrictions due to mining<br />
activity, as about 40 to 50% has got coal reserves.<br />
24. Although there is a threat posed by Naxal activities in the region, <strong>Dhanbad</strong> is comparatively<br />
safer, and he is quite hopeful that as the city develops economically, people will improve.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 234
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Quality of service of current urban amenities:<br />
Urban Infrastructure<br />
Drainage and Sanitation<br />
Solid Waste Management<br />
Urban Transport<br />
Water Supply<br />
Street Light<br />
Storm Water Drainage<br />
Grading<br />
Very Poor<br />
Poor<br />
Poor<br />
Poor<br />
Ok<br />
Poor<br />
Prioritisation of sectors:<br />
Infrastructure Sector<br />
Priority wise Ranking<br />
Drainage and Sanitation 1<br />
Solid Waste Management 4<br />
Urban Transport 5<br />
Water Supply 2<br />
Sewerage 7<br />
Storm water drainage and Water Body Rejuvenation 6<br />
Street light 8<br />
Housing for Poor 3<br />
SWOT Analysis<br />
Strengths<br />
Clean air and healthy climate<br />
Proximity to NH2, which is part of GQ<br />
Coal reserves.<br />
It has potential to act as a Business centre.<br />
It has got good rail connectivity.<br />
<strong>Dhanbad</strong> is a hub of Transport business.<br />
<strong>Dhanbad</strong> has good purchasing Power<br />
Opportunity<br />
Automobile Industry can flourish here.<br />
It can be developed as a National and international<br />
academic centre.<br />
Also as a business centre.<br />
Weakness<br />
Vulnerability to EQ<br />
Unpredictability due to mineral<br />
reserves.<br />
Restrictions on development, due<br />
to mining<br />
Pollution near OCPs.<br />
Threat<br />
Earthquake<br />
Naxalites<br />
Profile of the consulting Entity:<br />
Mr. Chawda, Chaairman, Bank More,<br />
Chamber of Commerce<br />
Date of the consultation: 27 th of June, 2006<br />
Venue:<br />
New Market, Bank More<br />
Issues raised/discussed/suggestions:<br />
1. They agreed with the fact that the whole economy of <strong>Dhanbad</strong> is dependent on coal.<br />
2. There are small factories, which are centered around coal only.<br />
3. The Chamber of Commerce is mostly consisted of Small shop owners only. And there are<br />
about five thousand big and small shops in Bank More.<br />
4. There is also a mall coming up in the Bank More area.<br />
5. Car parking is the immediate need in the Bank More area. Roads and Electricity are the<br />
sectors, getting the next priority, as far as the commercial community is concerned.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 235
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
6. In order of Preferences, Water, Electricity, Road,<br />
Footpath are the concerns.<br />
7. Underground electricity supply system is warranted<br />
in the Bank More area, as currently the poles create<br />
the hindrance in traffic and also make the area<br />
vulnerable to accidents. The position can be made<br />
clear from the photograph shown.<br />
Quality of service of current urban amenities:<br />
Urban Infrastructure<br />
Drainage and Sanitation<br />
Solid Waste Management<br />
Urban Transport<br />
Water Supply<br />
Street Light<br />
Storm Water Drainage<br />
Grading<br />
Very Poor<br />
Very Poor<br />
Very Poor<br />
Very Poor<br />
Poor<br />
Very Poor<br />
Prioritisation of sectors:<br />
Infrastructure Sector<br />
Priority wise Ranking<br />
Drainage and Sanitation 4<br />
Solid Waste Management 3<br />
Urban Transport 1<br />
Water Supply 2<br />
Sewerage 5<br />
Storm water drainage and Water Body Rejuvenation 6<br />
Street light 8<br />
Housing for Poor 7<br />
SWOT Analysis:<br />
Strengths<br />
Mineral wealth<br />
Opportunity<br />
Export industry potential<br />
Weakness<br />
No parking arrangements in Bank More<br />
Threat<br />
Profile of the consulting Entity:<br />
Members of Zila Chamber of Commerce<br />
Date of the consultation: 29 th of June, 2006<br />
Venue:<br />
New market, Bank More<br />
Issues raised/discussed/suggestions:<br />
1. Mr. K K Ghosal of Barmasia CoC pointed out that<br />
after separation from Bihar, overall facilities have<br />
reduced. Citing an example, he said that drainage,<br />
roads and lighting arrangements have deteriorated<br />
due to non-cooperation and non-coordination of<br />
government.<br />
2. There are problems like bad drainage, choking of<br />
drains, non removal of solid waste<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 236
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
3. There is an essential need of parks, entertainment places and recreational facilities.<br />
4. Mr. Dilip from Katras CoC took up the issue of transport facilities. In spite of heavy<br />
pedestrian traffic, there are no footpaths in Bank More area.<br />
5. He also added that there are lots of encroachments along the roads, resulting in reduction of<br />
carriageway width. Furthermore due to lack of footpath, walking of people on the road cuts<br />
the width of road dangerously, leaving the zone prone to accidents.<br />
6. Mr. Surendra, Secretary, BM CoC mentioned the<br />
need of broadening of roads, divider, lack of which<br />
leads to traffic jams. He also cited the need of a<br />
bypass to reduce the load on internal roads of<br />
<strong>Dhanbad</strong>.<br />
7. He also talked about the bad conditions of the<br />
roads in whole of the city. High mast lamps also<br />
standing non-functional.<br />
8. Need of metered Taxi, and Parking arrangements<br />
were also felt by people. A view of haphazard<br />
parking practices in Bank More is shown in the picture below<br />
9. Other members also raised concerns about need of various stretches as<br />
a. From <strong>Dhanbad</strong> – Colliery – Jora Phatak to Howra Motors<br />
b. Outer ring road from Barmasia Phatak to Bhuiphod Mandir.<br />
10. They also suggested the possibility of a road over the abandoned railway line path in Jharia,<br />
as a bypass.<br />
11. Talking about industry potential in <strong>Dhanbad</strong>, there were inputs like input industries to coal<br />
and steel industries.<br />
12. But for all these industrial growth, they look for basic facilities like water, power supply, road<br />
connectivity, sanitation, law and order and safety. As the area is affected by Naxal<br />
movements, the growth of these industries might be hampered.<br />
13. They also talked about the changed response of BCCL, which is not really helping the city to<br />
grow.<br />
14. There was also a concern for revival of airport and air connectivity to Calcutta, Ranchi, and<br />
Patna etc. They accepted <strong>Dhanbad</strong> as the commercial capital of Jharkhand, with a<br />
tremendous potential of growth.<br />
15. Mr. Rajiv Sharma from <strong>Dhanbad</strong> Electric Traders Union also explored the possibility of<br />
SEZ, being nodal in the region. Barbadda area was suggested as the region for SEZ.<br />
16. To reduce congestion, requirement of public transport system was also warranted.<br />
17. <strong>Dhanbad</strong> also has potential for export industry. Mr. Rajiv suggested the development of a<br />
Dry Port.<br />
18. There is also a need of a sports complex in the city for recreational and other purposes.<br />
19. It was unanimous opinion of people that <strong>Dhanbad</strong> has got vast resources. And there is<br />
potential of<br />
a. Bamboo products<br />
b. Handicraft<br />
c. Soil products, as <strong>Dhanbad</strong> has coloured<br />
soil.<br />
d. Scientific use of stones, found abundantly<br />
in <strong>Dhanbad</strong>.<br />
20. Mr. Rajiv with great emphasis told that higher<br />
education facilities need to be improved more.<br />
21. It was also recognized that there is need of a central<br />
Truck Terminal and smaller truck terminals in the<br />
city.<br />
22. Discussing about the possibility of shifting the commercial places to outside the city, they<br />
told that it’s the development, which will make people feel the necessity to move.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 237
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
23. The point of a need of community centres with first class facilities for marriage and other<br />
celebrations.<br />
24. Talking about storm water drainage they told that with a moderate rain only, water starts<br />
flowing along the roads. The picture below makes it clear:<br />
Quality of service of current urban amenities:<br />
Urban Infrastructure<br />
Drainage and Sanitation<br />
Solid Waste Management<br />
Urban Transport<br />
Water Supply<br />
Street Light<br />
Storm Water Drainage<br />
Prioritisation of sectors:<br />
Infrastructure Sector<br />
Drainage and Sanitation<br />
Solid Waste Management<br />
Urban Transport<br />
Water Supply<br />
Sewerage<br />
Storm water drainage and Water Body Rejuvenation<br />
Street light<br />
Housing for Poor<br />
SWOT Analysis:<br />
Strengths<br />
Abundance of coal and iron ore<br />
Nodal location of the city<br />
Good connectivity to all sides.<br />
Opportunity<br />
Ancillary industries catering to the needs of large<br />
industries.<br />
Export industry<br />
Grading<br />
Poor<br />
Poor<br />
Very Poor<br />
Poor<br />
Poor<br />
Poor<br />
Priority wise Ranking<br />
Weakness<br />
Severe lack of recreational facilities<br />
Lack of internal transportation<br />
Unavailability of proper parking<br />
facilities<br />
Congestion in central; locations<br />
Threat<br />
Fast growing population with<br />
unmatched facilities.<br />
Vision for <strong>Dhanbad</strong>:<br />
“A beautiful city.”<br />
“A city with strong economy.”<br />
List of Participants attended the meeting:<br />
S No Name Designation<br />
1 Mr. Mani Shankar Kesari President, <strong>Dhanbad</strong> Zila CoC<br />
2 Mr. Surendra Thakkar General Secretary, <strong>Dhanbad</strong> Zila CoC<br />
3 Mr. Vinaya Mishra Vice President, <strong>Dhanbad</strong> Zila CoC<br />
4 Mr. Bunam Rao President, Station Road CoC, <strong>Dhanbad</strong><br />
5 Mr. Ashok Bhattacharya General Secretary, Park Market Heerapur CoC,<br />
<strong>Dhanbad</strong><br />
6 Mr. Kalyan Kumar Ghosal President, Barmasia CoC<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 238
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
7 Mr. Siddheshwar Ram Joint Secretary, Barmasia CoC<br />
8 Mr. Rajendra Kumar President, Bank More CoC, <strong>Dhanbad</strong><br />
Chawda<br />
9 Mr. Nayesh Kumar Joint Secretary, DCDA<br />
10 Mr. Bhagat Secretary, Manaitand CoC<br />
11 Mr. Bikash Kumar Secretary, Krishi Bazaar Samiti, Barbadda<br />
Chaudhary<br />
12 Mr. Surendra Arora Secretary, Bank More CoC<br />
13 Mr. Rajiv K Sharma Secretary, <strong>Dhanbad</strong> Electric Traders Association<br />
14 Mr. Suresh Treasurer, <strong>Dhanbad</strong> Zila CoC<br />
15 Mr. Dilip Subhikhi Vice President, Katras Road CoC<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 239
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Annexure 2: Consultation Workshop -Group Discussion Findings<br />
The out come of the two day consultation workshop is presented below. Four different focus<br />
groups were formed to discuss in detail about issues, strategy and projects.<br />
Group I- “Urban Land use Planning & Growth Management”<br />
1. The slum Population in <strong>Dhanbad</strong> is on the rise and is mainly due to migrants from<br />
adjoining villages. The issue needs to be immediately addressed by providing them<br />
affordable/free housing.<br />
2. The city needs recreation and open spaces. There are no parks & Play grounds for the<br />
children. This is having a strong impact on the Children’s growth – sporting activities<br />
is increasingly on the decline.<br />
3. There are also no good Cinema Halls, performance theatres.<br />
4. The consumer sector is not well developed. The city has a strong potential for the<br />
consumer market. There is a good demand for Malls, retail spaces.<br />
5. The living conditions within the erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity area is increasingly<br />
on the decline and needs immediate urban renewal. The condition of roads needs to<br />
be improved if not widened. A Good traffic Management plan has to be imposed.<br />
6. A low cost accommodation facility is required for the city for travelers who could not<br />
afford high cost restaurants. A yatri niwas is must near the bus stand. A Dharmshala<br />
could also be a proposition.<br />
7. Leaving the main roads the internal road network is poorly developed. This has led to<br />
no development happening on certain city pockets.<br />
8. The JCF area overlapping with the DMC area and the sub soil structure in most parts<br />
of JCF is not stable. It is therefore suggested that other later developments be located<br />
outside the JCF area or ensure the stability of the soil structure and must fall in the<br />
non coal bearing zone. Area around Bhuli and Sindri are potential sites for<br />
development as they fall in non coal bearing zones and is also sufficiently away from<br />
the erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity area where the actual concentration of the city is.<br />
9. Tree planting should be incorporated in the planning as it is useful in absorbing SPM<br />
of Carbon deposits.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 240
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Group – II “Infrastructure Service and Urban Environment Management”<br />
Water Supply<br />
1. Pit water, after treatment can be utilized for drinking water supply in adjacent coal<br />
bearing urban settlements. Some studies have been done by the pollution Control<br />
Board authorities. Study findings reveals that’s if pit water of Katras, Sijua, West<br />
Jharia, Lodna, Bastakola & Kusunda mining areas can be collected through pipe line at<br />
a common Place & after treatment, it can be supplied to the nearby needing people.<br />
2. Use open cast mines for storage purpose at different locations<br />
3. Main Source for Water is – Damodar, Maitthan and Open Cost mines (Jharia &<br />
<strong>Dhanbad</strong>)<br />
4. Like in Simla Bahal Colliery, from 1 to 10 seams, 600 GPM, 1,000 GPM Pumps are<br />
working for 18 hours per day. Whereas in seam no., 11 one 500 GPM pumps are<br />
working for 18 hr/Day. If it can be utilized for drinking purpose can be of much use.<br />
5. Several sources have to be identified to meet the scarcity of water in the city;<br />
Topchanchi Lake should be rehabilitated since it is old scheme<br />
6. New scheme should be developed to meet the future demand and additional pipe lines<br />
and treatment plants can be proposed at jamadoba itself.<br />
7. FCI Water Treatment Plant and system can be taken over by DMC<br />
8. Rehabilitation of Jamadoba Treatment Plant, Pumping machineries and Electrical<br />
fittings<br />
9. Katras Proposed Water Supply Scheme DPR was approved (technical sanction) and<br />
can be linked with JNNURM funding for CDP –<strong>Dhanbad</strong><br />
10. PHED would like to continue to execute the water supply project for DMC and DMC<br />
shall maintain the same<br />
11. Water and Drainage Board should be created in the new <strong>Dhanbad</strong> <strong>Municipal</strong><br />
<strong>Corporation</strong><br />
12. Rainwater Harvesting should be as mandatory before getting the building approval<br />
13. Deep Bore wells for residential/ commercial/industrial use should be allowed only on<br />
approval of city authorities<br />
14. Strict enforcement of bylaws<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 241
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Water Body Rejuvenation<br />
1. Water bodies like, lakes and pond should be maintained properly to store rainwater<br />
and it will be useful to meet drinking water supply and this should be ensured with the<br />
drinking water standard.<br />
2. Create Lakes and ponds<br />
3. Interlinking of all water bodies based on contour levels and topography<br />
Drainage<br />
1. Link all natural drains and dispose the waste water at one point for this proposal<br />
should address the rehabilitation of natural nallahs and channels with in the DMC area<br />
2. Both Sewerage and Drainage should be go in hand in hand<br />
3. Drainage may be disposed to natural water bodies after ensuring BOD & COD levels<br />
Sewerage<br />
1. Underground drainage is required for the city<br />
2. STP should be constructed 20 km away from city<br />
3. Suitable locations for STP – Matkuria , Jamadoba and Purana Bazzar<br />
Street Lighting<br />
1. Street Lighting should be provided in all locations<br />
Solid Waste / Hazardous Waste/ Bio Medical Waste Management<br />
1. Source Segregation: <strong>Municipal</strong> Solid waste should be segregated at the point of<br />
generation only. Organic waste should be composted and can be used as organic<br />
manure.<br />
2. In Jharia ‘Bania Hill site has already been identified for Solid Waste Disposal.<br />
3. In Baliapur, Aamjhar has been identified as disposal site, which can cater the areas of<br />
Sindri, Jamadoa, Chasnala & up to some extent to Jharia also.<br />
4. Some site can be proposed in Bhuli, which will cater areas of Katras, Chhatatandh,<br />
<strong>Dhanbad</strong> and Govindpur.<br />
5. Hazardous Waste should be incinerated by auto cleansing process. <strong>Dhanbad</strong> <strong>Municipal</strong><br />
<strong>Corporation</strong> should provide some land with the help of State government.<br />
6. To incinerate Bio Medical Waste per bed basis charges can be proposed<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 242
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
7. Plastics should be banned (above 20 microns) with in the municipal corporation area<br />
to avoid mixing of same with Solid Waste<br />
8. Some more plants can be set up in open site somewhere in Govindpur and Baliapur<br />
for solid waste disposal<br />
Air Pollution<br />
1. Bad road conditions are also aggravating air quality by scaling automobile exhaust.<br />
Usually all loaded truck of coal has been kept open. They are overloaded and during<br />
the jerks particulate matter contributes in SPM & RSPM.<br />
2. Hazardous Waste should be incinerated by auto cleansing process. <strong>Dhanbad</strong> <strong>Municipal</strong><br />
<strong>Corporation</strong> should provide some land with the help of State government.<br />
3. To incinerate Bio Medical Waste per bed basis charges can be collected<br />
4. Plastic should be banned (above 20 microns) with in the municipal corporation area to<br />
avoid mixing of same with Solid Waste<br />
Hazardous Waste:<br />
1. Mining and Industries in DMC area generating hazardous waste usually in form of<br />
Used Filter, Lead Battery, oiled soaked cotton.<br />
2. BCCL is usually having one automobile workshop at every mining area, where these<br />
wastes are being generated.<br />
3. The other source of hazardous waste generation is in the form of lead acid battery<br />
manufacturing at local level in the city area, which should be restricted as per “Battery<br />
Management and Handling Rules, 2000”.<br />
4. Plantation on both sides of the road can minimize the air pollution in the city.<br />
5. Residential area and mining and industrial area should be kept separate. Entire mines<br />
should be notified as industrial area, so that any habitation won’t come on that part<br />
Mines Reclamation:<br />
1. Mines land can be reclaimed by filling flyash in the bottom and overdue of open cast<br />
mines above that. At surface level, top soil plantation can be done, so that the region<br />
can be reclaimed for other landuse purposes.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 243
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Group – III “Urban Governance & <strong>Municipal</strong> finance”<br />
The main points that emerged out of the session are as follows:<br />
1. Holding Tax: Average Holding Tax is Rs. 5 per Sq ft. for commercial and Rs. 2.50 per<br />
sq. ft for residential areas. The collection rate is very poor i.e. 38% over the last 5<br />
years. The reason for this are:<br />
There are 32 wards and approximately 34000 households who are supposed to pay this<br />
tax. However, for 17000 of such households, the assessment has not taken place.<br />
There are 4 tax collectors to cover this entire population.<br />
There are certain Notified Areas like Katras, Chatatand and others where the holding<br />
tax rate has not been finalized in consultation with those Notified Area Committees.<br />
As a result no collection from such areas.<br />
Water Tax: Prevailing rate is Rs. 2.50 per year (last revision in 1932).<br />
A suggestion was made that this rate may be revised with separate rates for industrial,<br />
commercial and domestic consumers.<br />
There is a scarcity of “Water Tax Darogas” to collect such payment<br />
3. Pollution Control Board<br />
A suggestion was made to request the Pollution Control Board to be more strict and<br />
vigilant. The industrial units dispose their Solid Waste in a dangerous manner. Proper<br />
Solid Waste Management system should be implemented and the organizations/<br />
institutions which have such waste may be requested to pay a separate amount to<br />
maintain such facilities.<br />
4. Lack of diversity in the tax structure at <strong>Municipal</strong>ity level - Road tax at <strong>Municipal</strong>ity<br />
level may be considered.<br />
5. Implementation of Double Entry Accounting System to start immediately.<br />
6. There is a prevailing system of annual auction of markets to private contractors both<br />
at the <strong>Municipal</strong>ity level and also by Agricultural Marketing Boards. A maintenance<br />
charge may be collected from such contractors.<br />
7. Computerization of tax records may be implemented at the earliest.<br />
Apart from this there were some innovative ideas that emerged from the group. They are:<br />
8. The <strong>Municipal</strong>ity Office is located in prime plots in the city but not maintained in the<br />
best possible manner. The DMC may take up a PPP route with a private developer to<br />
build up new and modern structures in such areas and share some commercial space<br />
and done in several other parts of the country.<br />
9. Provide cooking gas connection directly to households through a proper revenue<br />
model.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 244
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Group – IV – “Traffic and Transportation Planning”<br />
1. The City needs atleast two bus stands. One bus stand shall be of ISBT nature and<br />
should be located outside the city and the other bus stand should be Intra city.<br />
2. The city desperately needs a proper public transport system through city buses.<br />
3. A bye pass road is required to relieve the city from heavy traffic. A alignment for bye<br />
pass road is suggested as under:<br />
Starting from bank more police station going parallel to Jharia road till barmasia<br />
phatak.<br />
4. New road proposed should be extended upto Dhansar.<br />
5. There is another proposal of bye pass starting from Barba-adda (@NH2, 399.00km),<br />
passing from Jharkhand More, Bhuli Township, Kusunda Yard upto<br />
Godhar(@NH32, 16.00km). 4.6 km of which already exists with 7 m carriageway<br />
width. But a substantial part of that is badly damaged.<br />
6. PUC certification should be strictly enforced as the pollution from vehicular traffic is<br />
on the increase.<br />
7. A truck terminal should be located outside <strong>Dhanbad</strong>.<br />
8. Call Taxi services required for the city<br />
9. A fly over is required from Dhansar to Hirapur via Railway station and Court more<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 245
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Annexure 3: List of Participants attend for first day Consultation Workshop<br />
Name Organization/Department Designation<br />
Mr. Raghubar Das Government of Jharkhand Minister of Urban Development,<br />
Jharkhand<br />
Mr. R K Srivastava UDD Secretary, Urban Development<br />
Dr. Smt. Beela Rajesh Government of Jharkhand DC, <strong>Dhanbad</strong><br />
Mr. S K Srivastava CFRI Director<br />
Mr. D D Haldar CFRI Senior Director<br />
Dr. D N Bhagat UCO Bank<br />
Mr. Pawan Kumar Chhatatand Assistant Administrator<br />
Mr. Heeralal Prasad MADA Technical Member<br />
Prof. K N Mittal<br />
Ex – Principle<br />
R N Prasad Bank LDM<br />
Dr. A K Singh IMA Member<br />
Mr. P Nayak NABARD AGM<br />
Dr. A K Singh MADA<br />
Dr. S K Rai MADA CMO<br />
Mr. Mahendra Singh NIC Information Officer<br />
Dr. T N Singh CMRI Ex- Director<br />
Mr. Sadhu Saran DW&SD<br />
Assistant Engineer<br />
Prasad<br />
Mr. K P Singh GM District Industry Centre<br />
Mr. R K Thakur Fire Service Fire Station Officer<br />
Mr. G N Ojha Collectorate DPO<br />
Mr. Swami Vibhudev NH Executive Engineer<br />
Mr. Ajay Rajak RCD EE<br />
Mr. C M P Sinha MADA Project Officer<br />
Mr. Satendra “Hindustan” daily Correspondent<br />
Mr. Amit Ranjan “Aaj” Daily Correspondent<br />
Mr. Sanjay Singh “Hindustan Times” Correspondent<br />
Mr. Sukhdev “Hindustan Times” Photographer<br />
Mr. Rajendra K Bank More CoC<br />
Secretary<br />
Chawda<br />
Arun Kumar Bhandari Bank More CoC<br />
Senior Joint Secretary<br />
Mr. Kamal Kishore Transport<br />
DTO<br />
Srivastava<br />
Mr. M S Kesari Zila CoC President<br />
S S Hoda JPCB Regional Officer<br />
Mr. Rajmohan Tiwari Law and Order ADM<br />
Mr. Avtar Krishnan BCCL GM, Environment<br />
Mr. T P Singh BCCL Environmental Engineer<br />
Mr. Mritunjaya Kumar BCCL<br />
Environmental Engineer<br />
Dr. S N Prasad<br />
DEO<br />
Dr. Prasad Singh PMCH Orthopeadic Surgeon<br />
Usha Sharma BSS Mahila College, <strong>Dhanbad</strong> Professor, Incharge<br />
Mr. M K Ajad Bahujan Samaj Party District President<br />
Mr. S Kumar Dudu BSP President<br />
Mr. N K Chanda<br />
Builder<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 246
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Name Organization/Department Designation<br />
MR. N D Baitha DMO, Office MI<br />
Mr. Jagjit Singh Welfare Department District Welfare Officer<br />
Mr. Ashok Kumar MADA<br />
AE<br />
Chankravarty<br />
Mr. Amit Watts<br />
DJ<br />
Mr. Ajit Kumar Sinha L&T Consultant<br />
Mr. M Kumar Mines Department Superintendent of Mines<br />
Dr. A I Khan P K Rai Memorial College Principle<br />
Pro. A K Singh P K Rai Memorial College HOD, Political Science<br />
Mr. Ajit Kumar P K Rai Memorial College Lecturer, Commerce<br />
Mr. S P Roy Bihar Govt. Ex – Min<br />
Mr. Tapas Banarjee Press<br />
Mr. Debashish Press, NDTV<br />
Mr. Vinod Tripathi “Aaj”Press<br />
Mr. Jyoti Ray “Eye View” Press<br />
Janta Party Representative President<br />
Mr. Kailash Gupta Janta Party<br />
Mr. Rajpal Mahto Janta Party<br />
Mr. Chandra Paul Editorial Division, “Prabhat<br />
Khabar”<br />
Mr. Gautam De “The Telegraph”<br />
Mr. Surendra Arora BM CoC Secretary<br />
Mr. Rajkumar BM CoC<br />
Mr. Krishna Aggarwal BJP State Vice- President<br />
Mr. Rajiv Singh “Veer Arjun” Press<br />
Mr. Bina Srivastava NEP <strong>Dhanbad</strong> Director<br />
Mr. Sachendra Kumar NREP EE<br />
Mr. Kalim Ahmad MADA<br />
Account Officer<br />
Khan<br />
Mr. Sashi Jharkhand State JP (U) General Secretary<br />
Mr. Braj Kishore BM CoC<br />
Senior Assistant<br />
Prasad<br />
Mr. Ram Swarup Political Party<br />
District President<br />
Yadav<br />
Representative “Awaj”<br />
Mr. Subhash Minority Commission Member<br />
Mr. Mathura Prasad<br />
MLA, Tundi<br />
Mahto<br />
Mr. Rajkumar Jharia Joint Secretary<br />
Mr. David Kujjur Town Planning, MADA EE<br />
Mr. Manikant <strong>Municipal</strong> <strong>Corporation</strong> Assistant Administrator<br />
Chaudhary<br />
Mr. Mahesh Chandra <strong>Municipal</strong> <strong>Corporation</strong> JE<br />
Bhagat<br />
Mr. Bablu Mishra “Hindustan”<br />
Mr. Prateek Popat Press<br />
Mr. Gopal Prasad “Eye View” Reporter<br />
Mhd. Khan MADA SLO<br />
Mr. Sudhakar Jha “Times of India” Reporter<br />
Mr. Rajendra Singh “Awaj” Correspondent<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 247
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Name Organization/Department Designation<br />
Mr. Priyesh Kumar “Prabhat Khabar” Correspondent<br />
Mr. Dilip Sinha “Prabhat Khabar” Correspondent<br />
Mr. Ashok Verma “Dainik Jagaran” Correspondent<br />
Mr. Sushil Kumar Smajvadi Party, Jharkhand General Secretary<br />
Dr. S K Singh<br />
Doctor<br />
Mr. Sanjay Kumar Pollution Control Board Junior Scientific Assistant<br />
Srivastava<br />
Mr. Swetabh Kumar PHED EE<br />
Mr. P Prasad MADA Assistant Engineer<br />
Mr. U N Singh Building Division, MADA EE<br />
Mr. Birendra Singh DMC<br />
Annexure 4: List of Participants attend for second day Consultation Workshop<br />
Name Organization/Department Designation<br />
Mr. R P Das<br />
MADA<br />
Mr. Sadhu Saran Prasad DW&SD Assistant Engineer<br />
Mr. B Thakur<br />
PRD<br />
Mr. Shivkant Singh MADA Collection Officer<br />
Mr. AK Karu DMC Account Officer<br />
K A Khan MADA Account Officer<br />
Mr. M S Chhawda<br />
ISM<br />
Mr. Upendra Kumar Sinha<br />
DMC<br />
Mr. Kailash Gupta Jharkhand Party Spokes Person<br />
Mr. Rati Lal Mahto Jharkhand Party Karyakari Adhyaksh<br />
Mr. M C Bhagat DMC JE<br />
Mr. Mani Kant Chaudhary DMC Asst. Administrator<br />
Representative MADA Tax Collector<br />
Mr. Manoj Singh BJP President<br />
Mr. Avdhesh Kumar<br />
MADA<br />
Mr. Santosh Kumar<br />
MADA<br />
Mr. Ashok Thakur<br />
Accounts Dept., MADA<br />
Mr. D P Singh<br />
MADA<br />
Mr. Arun Kumar Singh<br />
MADA<br />
Mr. Shiv Kumar Jha<br />
MADA<br />
Mr. A K Shukla MADA Assistant<br />
Mr. S N Singh<br />
MADA<br />
Mr. S D Singh PMCH Associate professor<br />
Mr. A K Chakravarty MADA Assistant Engineer<br />
Mr. Nirmal Sen<br />
MADA<br />
Mr. Uday Kumar<br />
MADA<br />
Mr. P Prasad MADA Assistant Engineer<br />
Mrs. Shobha Sinha<br />
House Wife<br />
Mr. Hohseen Khan MADA JE<br />
Md. Hannan Khan MADA Assistant Engineer<br />
Mr. R J Shah MADA Assistant Engineer<br />
Dr. G C Singh RSP College HoD, Chemistry<br />
Mr. Y P Keshav<br />
BCCL<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 248
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Mr. D K Soren DMC Office<br />
Superintendent<br />
Mr. R B Singh AIMPA President<br />
Mr. D N Bhagat Gobindpur Social Worker<br />
Mr. H Sharma MADA Public Analyst<br />
Mr. A K Srivastava MADA Assistant Analyst<br />
Mr. L N Prasad MADA Additional PA, Lab,<br />
MADA<br />
Mr. P D Singh MADA SSA<br />
Mr. S K Singh MADA Medical Officer<br />
Mr. Anil Chandra Mandal Lab. MADA M Maker<br />
Mr. Surendra Thakkar BM, CoC Secretary<br />
Mr. Durga Jha<br />
<strong>Dhanbad</strong> Chemist and<br />
Diagnostic Centre<br />
Mr. Nagendra Prasad DMC Assistant<br />
Mr. Birendra Kumar<br />
PO<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 249
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Annexure 5: Reform Agenda<br />
As a precondition to access the fund, DMC needs to undertake mandatory reforms; it has<br />
already initiated some of these. The timeline for achieving the same is elucidated below:<br />
Mandatory Reforms<br />
<br />
Adoption of the modern accrual-based double entry system of accounting in <strong>Dhanbad</strong><br />
<strong>Municipal</strong> <strong>Corporation</strong> just initiated the process.<br />
Target time frame – June 2007<br />
<br />
Introduction of a system of e-governance using IT applications, such as GIS and MIS for<br />
various services provided to ULBs<br />
Yet to be initiated by DMC<br />
Target time frame – March 2008<br />
<br />
Reform of Property Tax with GIS for effective implementation to ensure 85% collection<br />
efficiency within the next seven years<br />
.<br />
<br />
<br />
Current collection efficiency is only 38%. Presently property is levied only for erstwhile<br />
<strong>Dhanbad</strong> <strong>Municipal</strong>ity, erstwhile Sindri NAC, rest of the areas is also to be charged. DMC is<br />
in the process initiating this activity. Property Tax with GIS mapping are yet to be initiated.<br />
Target time frame – 2007<br />
Levy of reasonable User Charges by ULBs towards recovery of O&M or recurring cost over<br />
the next seven years<br />
MADA has revised the water tariff from Rs.50 per month to Rs.100 per month.<br />
Sewerage charge to be recovered upto 80%. DMC is planning to introduce a new tax i.e.<br />
street light tax to gradually recover 100% of the O&M cost. It has already proposed the same<br />
in the budget proposal of 2007-08.<br />
Target time frame – 2011-12<br />
Internal earmarking within local body’s budget for basic services to urban poor. In the capital<br />
Budget 2007-08, DMC will be earmarking a special provision for basic services to Urban<br />
Poor.<br />
Target time frame – 2007-08<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 250
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Optional Reforms<br />
<br />
Revision of bye laws to streamline the approval process for construction of buildings,<br />
development of site, etc;. Proposal has been prepared by MADA and yet to be approved.<br />
Target time frame – Already initiated<br />
<br />
<br />
Revision of byelaws to make rainwater harvesting mandatory in all buildings and adoption of<br />
water conservation measures. Need to be initiated by DMC.<br />
Control Regulation: Yet to be initiated<br />
Target time frame – 2008<br />
State Level Reforms<br />
Mandatory Reforms<br />
Transferring the Schedule 12 functions to the ULB will completed in 2 years (2007-08)<br />
Repealment of Urban Land (Ceiling and Regulation) Act, 1976 will be completed in 2006-07<br />
Reform of Rent Control Laws – time line 2009-10<br />
<br />
Stamp Duty Rationalisation – Reducing Stamp Duty Rates to 5% or less than 5% - time line<br />
2006-07<br />
Enactment of Public disclosure Participation Law or incorporation of Relevant Provision –<br />
time line 2010-11<br />
Time Schedule for Formal Association of ULB with city planning functions – 2009-10<br />
Transferring of Water Supply and Sewerage services provision to the ULB – time line 2009-10<br />
Transferring of public transport functions to the ULB – time line 2009-10<br />
Optional Reform Agenda<br />
Revision of Bye-laws to streamline the approval process for construction of buildings,<br />
development of site, etc. – time line 2006-07<br />
Simplification of legal and procedural frameworks for conversion of agricultural land for nonagricultural<br />
purpose – time line 2007-08<br />
Introduction of property title certification system in ULB – time line 2011-12<br />
Earmarking at least 20-25 % of developed land in all housing projects for EWS/LIG category<br />
with a system of cross subsisation – time line 2009-10<br />
Introduction of computerized process of registration of land and property – time line 2007-08<br />
Revision of bye-laws to make rain – water harvesting mandatory in all buildings to come up in<br />
future and for adoption of water conservation measures – time line 2006-07<br />
Bye-laws on reuse of reclaimed water time line – 2010 -11<br />
Administrative reforms i.e. reduction in establishment by introducing voluntary retirement<br />
schemes, non-filling up of posts falling vacant due to retirement etc., and achieving specified<br />
milestones in this regard – time line 2010-11<br />
Structural Reforms – time line 2010-11<br />
Encouraging Public Private Partnership – time line 2006 -07<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 251
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 252
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Annexure 6: List of Detailed Project Reports (DPRs) Available with the Local Authorities<br />
Description<br />
Amount (Rs. Lakh)<br />
Desilting of Topchanchi Lake<br />
Desilting cost 811.74<br />
Contingency (1%) 8.12<br />
Project Preparation Cost (1%) 8.12<br />
Total 827.98<br />
Katras Urban Water Supply Scheme –Phase – I<br />
Clear Water Rising Main 11 km 387.56<br />
Distribution Main Zone 1 59.26<br />
Construction of RCC Elevated Service Reservoirs of 0.75 ML 70.00<br />
Construction of RCC sumps of 5 lakh gallon capacity and 3 lakh<br />
130.00<br />
gallon capacity<br />
Clear Water Pumping sets 22.00<br />
Drawing power line transformer, cable, etc 8.00<br />
Construction of stand post, compound wall pump house etc 5.00<br />
Clear Water Rising Main 4 km from Jharia Reservoir to Kusunda<br />
140.46<br />
sump with inter connection with 350 m dia existing raising main<br />
Laying of 200 mm dia CI Distribution Main 2.5 km for shifting<br />
40.00<br />
connection<br />
Sub Total 862.28<br />
1% Contingency 8.62<br />
Grand Total 870.90<br />
Katars Urban Water Supply Scheme – Phase II<br />
Clear Water Rising main of 600 mm dia class “A” ductile CI<br />
912.71<br />
pipe from Kusanda Pumping Station to Tilatand Reservoir<br />
having storage capacity of 40 Lakhs gallons (10 km)<br />
Contingency (1%) 9.13<br />
Grand Total 921.84<br />
Improvement in Kusunda – Katras & Bhuli Township<br />
Construction of 3 lakh gallon capacity RCC reservoir at Putki<br />
45.73<br />
Pumping Station<br />
Price Escalation (5%) 2.29<br />
Sub Total 48.02<br />
Contingency 0.48<br />
Grand Total 48.50<br />
Improvement of Water Supply – Jharia coal fields<br />
including <strong>Dhanbad</strong> Town – Phase – I<br />
Supply and laying of 750 mm dia clear water rising main from<br />
1,506.18<br />
Damodar Head Works Jamadoba to Bastacolla (Jharia)<br />
Price Escalation (5%) 75.31<br />
Sub Total 1,581.49<br />
Contingency (1%) 15.81<br />
Grand Total 1,597.30<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 253
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Description<br />
Amount (Rs. Lakh)<br />
Improvement of Water Supply in Jharia Coalfields<br />
including <strong>Dhanbad</strong> Town– Phase – II<br />
Construction of 20 lakhs gallon capacity RCC Reservoir at<br />
172.70<br />
Jharia (Bastacolla)<br />
Price Escalation (15%) 8.64<br />
Sub Total 181.34<br />
Contingency (1%) 1.821<br />
Grand Total 183.15<br />
Katras Urban Water Supply – Phase - III<br />
Intake Well 13.72<br />
Infiltration Well with infiltration galleries 14.40<br />
Submersible Weir 32.01<br />
Raw Water Pumping Machinery 24.05<br />
Clear Water Pumping Machinery 70.25<br />
Raw Water & Clear Water Rising Main (300 & 400 mm dia) 741.19<br />
Clear Water Distribution (100 to 450 mm dia) 178.88<br />
Gangway (3 mts *15 mts) 2.95<br />
Water Treatment Plant (10 MLD) 120.00<br />
Elevated Storage Reservoirs (2.25 MLD) 81.22<br />
Sump 17.27<br />
Fencing 4.79<br />
Single mouth Stand post 1.98<br />
Staff Quarters (4 units of triple type) 15.40<br />
Brick Masonry Pillar 1.21<br />
Approach Road 19.27<br />
Land Acquisition 2.00<br />
Sub Total 1,340.59<br />
Contingency (1%) 13.41<br />
Grand Total 1,354.00<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 254
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Annexure 7: Financial Operating Plan for <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong><br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 255
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 256
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 257
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 258
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 259
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 260
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 261
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 262
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 263
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 264
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 265
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 266
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 267
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 268
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 269
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 270
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 271
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 272
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Annexure 8: Zone wise proposed investment for major sectors with tentative phasing<br />
Description Total 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 2012-13<br />
Rs. Lakh<br />
<strong>Dhanbad</strong> Sadar Block<br />
Water supply – Augmentation Works 13,430.64 1,422.90 1,593.08 3,759.30 3,746.48 2,263.02 484.39 161.46<br />
Sewerage – Augmentation Works 24,003.81 777.29 2,040.40 5,296.53 5,296.53 5,014.52 4,042.90 1,535.64<br />
Drainage<br />
Upgradation/Remodeling of Kutcha to<br />
Pucca Drains 1,661.70 305.60 401.10 573.00 382.00 - - -<br />
New Formation 11,297.50 655.00 1,209.38 967.50 1,209.38 2,418.75 2,418.75 2,418.75<br />
Urban Transport – only Road Works<br />
Strengthening /Improvement to Existing<br />
Roads 1,030.50 183.20 160.30 343.50 171.75 171.75 - -<br />
Upgradation of Existing Roads 3,651.38 481.50 561.75 1,203.75 802.50 601.88 - -<br />
Widening of Roads 1,332.38 114.00 149.63 213.75 213.75 213.75 213.75 213.75<br />
New Formation of Roads in Extension<br />
areas 3,607.16 - 281.96 775.60 745.60 730.60 559.20 514.20<br />
Sub Total –<strong>Dhanbad</strong> Sadar Block 60,015.06 3,939.50 6,397.59 13,132.93 12,567.99 11,414.26 7,718.99 4,843.80<br />
Jharia Block<br />
Water supply – Augmentation Works 3,654.99 889.31 682.75 751.86 749.30 452.60 96.88 32.29<br />
Sewerage – Augmentation Works 5,597.49 485.81 874.46 1,059.31 1,059.31 1,002.90 808.58 307.13<br />
Drainage<br />
Upgradation/Remodeling of Kutcha to<br />
Pucca Drains 553.90 191.00 171.90 114.60 76.40 - - -<br />
New Formation 3,479.38 818.75 725.63 483.75 725.63 241.88 241.88 241.88<br />
Urban Transport – only Road Works<br />
Strengthening /Improvement to Existing 320.60 114.50 68.70 68.70 34.35 34.35 - -<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 273
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Description Total 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 2012-13<br />
Rs. Lakh<br />
Roads<br />
Upgradation of Existing Roads 1,063.31 300.94 240.75 240.75 160.50 120.38 - -<br />
Widening of Roads 349.13 71.25 64.13 42.75 42.75 42.75 42.75 42.75<br />
New Formation of Roads in Extension<br />
areas 785.88 - 120.84 155.12 149.12 146.12 111.84 102.84<br />
Sub Total – Jharia Block 15,804.67 2,871.56 2,949.15 2,916.84 2,997.35 2,040.98 1,301.92 726.89<br />
Balaiapur Block<br />
Water supply – Augmentation Works 3,121.41 355.73 682.75 751.86 749.30 452.60 96.88 32.29<br />
Sewerage – Augmentation Works 5,306.00 194.32 874.46 1,059.31 1,059.31 1,002.90 808.58 307.13<br />
Drainage<br />
Upgradation/Remodeling of Kutcha to<br />
Pucca Drains 439.30 76.40 171.90 114.60 76.40 - - -<br />
New Formation 4,197.50 327.50 725.63 967.50 725.63 483.75 483.75 483.75<br />
Urban Transport – only Road Works<br />
Strengthening /Improvement to Existing<br />
Roads 251.90 45.80 68.70 68.70 34.35 34.35 - -<br />
Upgradation of Existing Roads 882.75 120.38 240.75 240.75 160.50 120.38 - -<br />
Widening of Roads 306.38 28.50 64.13 42.75 42.75 42.75 42.75 42.75<br />
New Formation of Roads in Extension<br />
areas 785.88 - 120.84 155.12 149.12 146.12 111.84 102.84<br />
Sub Total – Balaiapur Block 15,291.11 1,148.62 2,949.15 3,400.59 2,997.35 2,282.85 1,543.80 968.76<br />
Baghmara Block<br />
Water supply – Augmentation Works 5,659.50 355.73 1,137.92 1,503.72 1,498.59 905.21 193.76 64.59<br />
Sewerage – Augmentation Works 10,126.20 194.32 1,457.43 2,118.61 2,118.61 2,005.81 1,617.16 614.26<br />
Drainage<br />
Upgradation/Remodeling of Kutcha to<br />
Pucca Drains 744.90 76.40 286.50 229.20 152.80 - - -<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 274
City Development Plan, <strong>Dhanbad</strong><br />
Final Report<br />
Description Total 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 2012-13<br />
Rs. Lakh<br />
New Formation 8,964.38 982.50 1,693.13 1,451.25 1,209.38 1,209.38 1,209.38 1,209.38<br />
Urban Transport – only Road Works<br />
Strengthening /Improvement to Existing<br />
Roads 435.10 45.80 114.50 137.40 68.70 68.70 - -<br />
Upgradation of Existing Roads 1,564.88 120.38 401.25 481.50 321.00 240.75 - -<br />
Widening of Roads 562.88 28.50 106.88 85.50 85.50 85.50 85.50 85.50<br />
New Formation of Roads in Extension<br />
areas 1,531.48 - 201.40 310.24 298.24 292.24 223.68 205.68<br />
Sub Total – Baghmara Block 29,589.30 1,803.62 5,398.99 6,317.42 5,752.82 4,807.58 3,329.47 2,179.40<br />
Govindpur Block<br />
Water supply – Augmentation Works 3,071.69 533.59 455.17 751.86 749.30 452.60 96.88 32.29<br />
Sewerage – Augmentation Works 5,111.68 291.49 582.97 1,059.31 1,059.31 1,002.90 808.58 307.13<br />
Drainage<br />
Upgradation/Remodeling of Kutcha to<br />
Pucca Drains 420.20 114.60 114.60 114.60 76.40 - - -<br />
New Formation 4,361.25 491.25 483.75 967.50 967.50 483.75 483.75 483.75<br />
Urban Transport – only Road Works<br />
Strengthening /Improvement to Existing<br />
Roads 251.90 68.70 45.80 68.70 34.35 34.35 - -<br />
Upgradation of Existing Roads 862.69 180.56 160.50 240.75 160.50 120.38 - -<br />
Widening of Roads 299.25 42.75 42.75 42.75 42.75 42.75 42.75 42.75<br />
New Formation of Roads in Extension<br />
areas 745.60 - 80.56 155.12 149.12 146.12 111.84 102.84<br />
Sub Total – Govindpur Block 15,124.25 1,722.94 1,966.10 3,400.59 3,239.22 2,282.85 1,543.80 968.76<br />
Note: above mentioned investments are zone/block wise investment phasing for only major components, rest all need a comprehensive investment.<br />
<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 275