11.11.2014 Views

Dhanbad Municipal Corporation i - JnNURM

Dhanbad Municipal Corporation i - JnNURM

Dhanbad Municipal Corporation i - JnNURM

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong><br />

i


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong><br />

ii


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

SECTION I: INTRODUCTION<br />

Table of Contents<br />

I. BACKGROUND....................................................................................................... 1<br />

A. Introduction.................................................................................................................................1<br />

B. Outcomes of JNNURM...............................................................................................................1<br />

C. Admissible Component under JNNURM.....................................................................................2<br />

D. Scope of Work .........................................................................................................................2<br />

E. Approach Methodology ...............................................................................................................3<br />

1. Stage 1- Preparatory Phase ............................................................................................................3<br />

2. Stage II – Consensus-building / Visioning Phase...............................................................................3<br />

3. Stage III – Strategy Formulation Phase............................................................................................4<br />

F. Report Structure...........................................................................................................................7<br />

SECTION II: CITY ASSESSMENT<br />

II. CITY PROFILE.................................................................................................... 8<br />

A. Overview .....................................................................................................................................8<br />

B. Population Trends and Urbanization..........................................................................................15<br />

Growth Trends and Projections .............................................................................................................20<br />

C. Socio-Economic Profile .............................................................................................................21<br />

1. Health .....................................................................................................................................21<br />

2. Education Facility......................................................................................................................22<br />

III. ECONOMIC BASE ............................................................................................ 23<br />

A. Overview ...................................................................................................................................23<br />

Value of Coal Production ....................................................................................................................28<br />

Coal Acts and Notification..................................................................................................................28<br />

New Government Policy for the Coal Sector.............................................................................................28<br />

Manpower ........................................................................................................................................29<br />

1. Sectoral Growth.........................................................................................................................29<br />

2. Industrial Development................................................................................................................30<br />

B. Tourism Development ...............................................................................................................34<br />

C. Urban Economy - SWOT Analysis.............................................................................................35<br />

IV. MUNICIPAL FINANCIAL MANAGEMENT................................................... 37<br />

A. Overview ...................................................................................................................................37<br />

B. Financial Status ..........................................................................................................................37<br />

C. Revenue Income ........................................................................................................................40<br />

D. Revenue Expenditure.............................................................................................................43<br />

E. Capital Account .........................................................................................................................45<br />

F. Financial Performance Indicators and Key Issues.......................................................................46<br />

MADA – Fund Assessment...............................................................................................................49<br />

G. <strong>Municipal</strong> Finance - SWOT Analysis......................................................................................53<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong><br />

i


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

V. EXISTING INFRASTRUCTURE ASSESSMENT............................................. 54<br />

A. Water Supply..............................................................................................................................54<br />

1. Overview ..................................................................................................................................54<br />

2. Sources of Water Supply..............................................................................................................55<br />

3. Distribution System....................................................................................................................57<br />

4. Water Supply - SWOT Analysis .................................................................................................62<br />

5. Performance Indicators and Key Issues............................................................................................63<br />

B. Sewerage and Sanitation .............................................................................................................65<br />

1. Overview ..................................................................................................................................65<br />

2. Sewerage & Sanitation - SOWT Analysis.....................................................................................65<br />

3. Performance Indicators and Key Issues............................................................................................66<br />

C. Storm Water Drainage and Primary Drainage.............................................................................66<br />

1. Overview ..................................................................................................................................66<br />

2. Natural/Primary Drainage System...............................................................................................67<br />

3. Performance Indicators and Key Issues............................................................................................67<br />

D. Preservation / Rejuvenation of Water Bodies.........................................................................69<br />

1. Overview ..................................................................................................................................69<br />

2. Key Issues.................................................................................................................................69<br />

E. Solid Waste Management ...........................................................................................................70<br />

1. Overview ..................................................................................................................................70<br />

2. Solid Waste Management - SOWT Analysis..................................................................................74<br />

3. Performance Indicators and Key Issues............................................................................................74<br />

F. Roads and Traffic Management..................................................................................................77<br />

1. Road Sector Overview .................................................................................................................77<br />

2. Performance Indicators and Key Issues............................................................................................78<br />

3. Traffic and Transportation Sector Overview.....................................................................................79<br />

4. Urban Roads - SOWT Analysis..................................................................................................82<br />

5. Key Issues.................................................................................................................................83<br />

G. Street Lighting........................................................................................................................85<br />

1. Overview ..................................................................................................................................85<br />

2. Performance Indicators and Key Issues............................................................................................85<br />

H. Fire Services...........................................................................................................................86<br />

VI. URBAN ENVIRONMENT................................................................................ 88<br />

A. Overview ...................................................................................................................................88<br />

B. Soil Types & Soil Erosion ..........................................................................................................88<br />

C. Mining Environment..................................................................................................................89<br />

D. Water Resource......................................................................................................................90<br />

E. River Water Quality....................................................................................................................92<br />

F. Air Environment........................................................................................................................92<br />

G. Study Findings .......................................................................................................................97<br />

H. Noise Quality.........................................................................................................................97<br />

I. Hot Spots...................................................................................................................................99<br />

J. Hazards....................................................................................................................................100<br />

VII. PHYSICAL PLANNING AND GROWTH MANAGEMENT .......................... 109<br />

A. Overview .................................................................................................................................109<br />

B. Planning Efforts in the Past .....................................................................................................109<br />

C. Land Use Management.............................................................................................................109<br />

D. Urban Sprawl .......................................................................................................................111<br />

E. Jharia Rehabilitation Plan .........................................................................................................113<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong><br />

ii


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

F. Key Developmental Issues .......................................................................................................115<br />

VIII. URBAN GOVERNANACE............................................................................ 116<br />

A. ULBs in the Context of 74th Constitutional Amendment.........................................................116<br />

1. Political Context......................................................................................................................116<br />

2. Administrative and Financial Context.........................................................................................116<br />

B. Institutions and Capacity..........................................................................................................119<br />

1. Institutional Framework............................................................................................................119<br />

2. Service Delivery and Performance of ULB.....................................................................................121<br />

C. Proposed Organization Structure of DMC ...............................................................................121<br />

1. Institutional Strengthening and Capacity Building...........................................................................127<br />

D. Urban Governance - SWOT Analysis...................................................................................127<br />

E. Key Issues................................................................................................................................127<br />

F. Key Initiatives ..........................................................................................................................127<br />

SECTION III: BASIC SERVICES TO THE URBAN POOR (BSUP)<br />

IX. BASIC SERVICES FOR URBAN POOR........................................................... 129<br />

A. Overview .................................................................................................................................129<br />

B. Infrastructure Provision in Slums .............................................................................................133<br />

C. Key Issues................................................................................................................................134<br />

SECTION IV: VISION, CAPITAL INVESTMENT PLAN & FINANCING<br />

STRATEGY<br />

X. VISION, GOALS AND SECTORAL STRATEGIES ......................................... 135<br />

A. Identification of Stakeholders...................................................................................................135<br />

B. Consultation Process................................................................................................................135<br />

C. Vision ......................................................................................................................................137<br />

1. Urban Planning & Growth Management.....................................................................................137<br />

2. Water Supply..........................................................................................................................140<br />

3. Sewerage and Sanitation............................................................................................................142<br />

4. Storm Water Drainage and Primary Drainage ..............................................................................143<br />

5. Preservation and Rejuvenation of Water Bodies ..............................................................................145<br />

6. Solid Waste Management ..........................................................................................................146<br />

6. Roads and Traffic Management ..................................................................................................148<br />

7. Street Lighting.........................................................................................................................150<br />

8. Basic Services for Urban Poor.....................................................................................................151<br />

9. Urban Environment .................................................................................................................153<br />

10. City Beautification and Tourism Development............................................................................155<br />

11. Disaster Preparedness and Response/Action Plan ......................................................................155<br />

XI. DEMAND, SUPPLY, GAP ASSESSMENT OF SERVICE DELIVERY............ 159<br />

A. Rationale, Need and Demand...................................................................................................159<br />

1. Water Supply..........................................................................................................................160<br />

2. Sewerage and Sanitation............................................................................................................161<br />

3. Storm Water Drainage .............................................................................................................164<br />

4. Solid Waste Management ..........................................................................................................164<br />

5. Urban Transport .....................................................................................................................166<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong><br />

iii


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

6. Street Lighting.........................................................................................................................168<br />

XII. CAPITAL INVESTMENT PLAN & FINANCING STRATEGY...................... 170<br />

A. Concept Plan for Proposed Investment....................................................................................170<br />

B. Capital Investment Plan ...........................................................................................................170<br />

1. Urban Planning & Growth Management.....................................................................................170<br />

2. Water Supply..........................................................................................................................170<br />

3. Sewerage and Sanitation............................................................................................................172<br />

4. Solid Waste Management ..........................................................................................................173<br />

5. Storm Water Drainage .............................................................................................................173<br />

6. Urban Transport .....................................................................................................................174<br />

7. Street Lighting.........................................................................................................................178<br />

8. Urban Environment, City Beautification and Tourism Development ..................................................178<br />

9. Preservation of Water Bodies ......................................................................................................179<br />

10. Other Developmental Projects .................................................................................................179<br />

11. Disaster Management pre-preparedness.....................................................................................180<br />

12. Urban Governance ...............................................................................................................181<br />

13. Basic Service for Urban Poor and Housing................................................................................181<br />

14. Summary of Investments ........................................................................................................181<br />

C. Investment Sustenance.............................................................................................................195<br />

1. Revenue Income Assumptions .....................................................................................................195<br />

2. Expenditure Considerations .......................................................................................................196<br />

3. Key Assumption for FOP..........................................................................................................196<br />

D. Public Private Sector Partnership .........................................................................................197<br />

1. Overview ................................................................................................................................197<br />

2. Parking Lots on Public Private Partnership ..................................................................................198<br />

3. Redevelopment of Existing Bus Terminus on PPP framework...........................................................199<br />

4. New Inter State Bus Terminus (ISBT) near Barwadda on PPP format..............................................199<br />

5. Transport Nagar at Pandukki on PPP format..............................................................................199<br />

6. New Ring Road/Elevated High Road on PPP format....................................................................200<br />

7. Redevelopment of Existing <strong>Municipal</strong> <strong>Corporation</strong> on PPP format.....................................................201<br />

8. Construction of New Sports Complex/ Stadium at Bhelatandh on PPP format ...................................201<br />

9. Development of Other Projects on PPP format................................................................................201<br />

10. Water Supply System – Operation and Maintenance on Management Contract................................201<br />

11. Solid Waste Management – Collection and Transportation Outsourcing..........................................202<br />

12. Solid Waste Management – Scientific Disposal Facility Development on BOT basis .........................202<br />

13. Construction and Maintenance of Sewerage Treatment Plant on BOT basis .....................................202<br />

14. Construction of Housing complex at Bhelatandh and Sugiadih & New Residential Township on BOT<br />

basis 203<br />

15. Development of Amusement Park at Rejili Bandh on BOT basis .................................................203<br />

E. Funding Pattern .......................................................................................................................207<br />

Annexure<br />

Annexure 1: Primary Stakeholders Consultation findings ...............................................................................208<br />

Annexure 2: Consultation Workshop -Group Discussion Findings..............................................................240<br />

Annexure 3: List of Participants attend for first day Consultation Workshop ............................................246<br />

Annexure 4: List of Participants attend for second day Consultation Workshop.......................................248<br />

Annexure 5: Reform Agenda................................................................................................................................250<br />

Annexure 6: List of Detailed Project Reports (DPRs) Available with the Local Authorities....................253<br />

Annexure 7: Financial Operating Plan for <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong>..............................................255<br />

Annexure 8: Zone wise proposed investment for major sectors with tentative phasing............................273<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong><br />

iv


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

List of Tables<br />

Table 1: Block wise Registered Rain fall during the Year 2005 in <strong>Dhanbad</strong> DMC .......................................13<br />

Table 2: Decadal Growth Rate and CAGR of <strong>Dhanbad</strong> Urban Agglomeration Population ......................15<br />

Table 3: Town wise Decadal Growth of Population in <strong>Dhanbad</strong> Urban Agglomeration ...........................17<br />

Table 4: Town wise Decadal Population Growth Rate of <strong>Dhanbad</strong> Urban Agglomeration.......................18<br />

Table 5: Projected Populated of <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> .................................................................21<br />

Table 6: Health Facilities in <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> Jurisdiction ...................................................21<br />

Table 7: Basic Health Indicators - <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong>..............................................................22<br />

Table 8: Disease Pattern - <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong>............................................................................22<br />

Table 9: Organization wise no Coal Mines Operated and its Production.......................................................23<br />

Table 10: Future Production Plan of BCCL.........................................................................................................25<br />

Table 11: Category wise Coal Reserves in Underground Blocks in JCF..........................................................26<br />

Table 12: Category wise Coal Reserves in Opencast Blocks in JCF.................................................................27<br />

Table 13: Work Force Participation Rate..............................................................................................................30<br />

Table 14: Category wise Registered SSI Units, Investments and Employment Generation in <strong>Dhanbad</strong><br />

District................................................................................................................................................................31<br />

Table 15: Month wise Domestic Tourist Inflow to <strong>Dhanbad</strong>...........................................................................34<br />

Table 16: Urban Economy – SWOT Analysis .....................................................................................................35<br />

Table 17: Abstract Financial Status of Erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity Account Statement.....................38<br />

Table 18: Abstract Financial Status of Erstwhile Sindri Notified Area Committee ......................................39<br />

Table 19: Details of Erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity Revenue Income ........................................................40<br />

Table 20: Details of Erstwhile Sindri NAC Revenue Income ..........................................................................41<br />

Table 21: Details of Erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity Revenue Expenditure................................................43<br />

Table 22: Details of Erstwhile Sindri NAC Revenue Expenditure..................................................................44<br />

Table 23: Details of Erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity Capital Account Statement ......................................45<br />

Table 24: Details of Erstwhile Sindri NAC Capital Account Statement.........................................................46<br />

Table 25: Key Financial Performance Indicators of Erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity................................46<br />

Table 26: Annual Receipt Statement of MADA..................................................................................................50<br />

Table 27: Annual Expenditure Statement of MADA.........................................................................................50<br />

Table 28: DCB Statement of Water Supply and Holding tax............................................................................52<br />

Table 29: <strong>Municipal</strong> Finance – SWOT Analysis..................................................................................................53<br />

Table 30: Water Supply Sources – <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong>..............................................................55<br />

Table 31: Water Supply Surface Sources Details .................................................................................................56<br />

Table 32: Treatment Plant wise Design and utilized Capacities........................................................................57<br />

Table 33: Rising Main Details.................................................................................................................................57<br />

Table 34: Type wise Location of Storage Reservoirs and its Capacity.............................................................58<br />

Table 35: Type wise Distribution Network Details ............................................................................................60<br />

Table 36: Storage Reservoir wise pumping capacity and Type .........................................................................62<br />

Table 37: Water Supply – SWOT Analysis...........................................................................................................62<br />

Table 38: Performance Indicator - Water Supply................................................................................................63<br />

Table 39: Sewerage and Sanitation – SWOT Analysis........................................................................................65<br />

Table 40: Performance Indicator – Sewerage & Sanitation...............................................................................66<br />

Table 41: Details of Road side Storm Water Drains...........................................................................................67<br />

Table 42: Performance Indicators - Road side Storm Water Drains ...............................................................67<br />

Table 43: Block wise area of the Water Bodies ...................................................................................................69<br />

Table 44: Source wise Distribution of waste Generated....................................................................................71<br />

Table 45: Solid Waste Transportation Vehicle Details.......................................................................................73<br />

Table 46: Solid Waste Management – SWOT Analysis......................................................................................74<br />

Table 47: Performance Indicators - Solid Waste Management.........................................................................75<br />

Table 48: Category wise Road Length...................................................................................................................77<br />

Table 49: Performance Indicators - Road Sector ................................................................................................79<br />

Table 50: Year on Year Registered Vehicles in <strong>Dhanbad</strong>..................................................................................80<br />

Table 51: Traffic and Transportation – SWOT Analysis ...................................................................................82<br />

Table 52: Street Lights Break-up............................................................................................................................85<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong><br />

v


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Table 53: Performance Indicator - Street Lights .................................................................................................86<br />

Table 54: Year wise no of case attended by the Fire Department....................................................................87<br />

Table 55: Details of Fire Service Equipments......................................................................................................87<br />

Table 56: Staffing Pattern in Fire Service Department.......................................................................................87<br />

Table 57: Ground Water Resources in <strong>Dhanbad</strong> ................................................................................................90<br />

Table 58: Ground Water Resources in <strong>Dhanbad</strong>................................................................................................91<br />

Table 59: Sewerage Quality Test Results at Damodar River .............................................................................91<br />

Table 60: Industrial Pollution Level ......................................................................................................................93<br />

Table 61: Ambient Air Quality in <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> Jurisdiction..........................................93<br />

Table 62: Industrial Pollution Level of SO 2 in Urban Areas of <strong>Dhanbad</strong> from year 1997 – 2005.............94<br />

Table 63: Industrial Pollution Level of NO 2 in Urban Areas of <strong>Dhanbad</strong> from year 1997 – 2005 ...........95<br />

Table 64: Industrial Pollution Level of SPM in Urban Areas of <strong>Dhanbad</strong> from year 1997 – 2005 ...........96<br />

Table 65: Noise Quality Results in Residential Area...........................................................................................98<br />

Table 66: Noise Quality in Commercial and Residential Areas ........................................................................98<br />

Table 67: Noise Quality in Commercial and Residential Areas ........................................................................98<br />

Table 68: List of Collieries affected by Mine Fires .............................................................................................99<br />

Table 69: List of Disaster Specific Proneness to Various Types of Hazards in <strong>Dhanbad</strong> .........................100<br />

Table 70: Significant Earthquakes in <strong>Dhanbad</strong> & Nearby Vicinities in Jharkhand.....................................102<br />

Table 71: Displacement of Tribe Families..........................................................................................................108<br />

Table 72: Proposed Land Used - 2011................................................................................................................111<br />

Table 73: Draft Jharia Rehabilitation Plan..........................................................................................................115<br />

Table 74: Institutional Responsibility in Service Delivery ...............................................................................120<br />

Table 75: Role of the Private Sectors in Urban Infrastructure Provision .....................................................120<br />

Table 76: Proposed Staffing Pattern for <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> .................................................122<br />

Table 77: Urban Governance – SWOT Analysis ..............................................................................................127<br />

Table 78: List of Slums ..........................................................................................................................................129<br />

Table 79: Strategy Time Frame – Planning & Growth Management.............................................................139<br />

Table 80: Goal and Service Outcome - Water Supply......................................................................................140<br />

Table 81: Strategy Time Frame - Water Supply .................................................................................................141<br />

Table 82: Goal and Service Outcome – Sewerage and Sanitation..................................................................142<br />

Table 83: Strategy Time Frame – Sewerage and Sanitation .............................................................................143<br />

Table 84: Goal and Service Outcome – Drainage............................................................................................144<br />

Table 85: Strategy and Time Frame – Storm Water Drainage ........................................................................145<br />

Table 86: Goal and Service Outcome – Preservation of Water Bodies.........................................................145<br />

Table 87: Strategy Time Frame – Preservation of Water Bodies....................................................................146<br />

Table 88: Goal and Service outcome – Solid Waste Management .................................................................146<br />

Table 89: Strategy Time Frame – Solid Waste Management...........................................................................148<br />

Table 90: Goal and Service Outcome – Roads and Traffic Management.....................................................149<br />

Table 91: Strategy Time Frame – Roads and Traffic Management................................................................150<br />

Table 92: Goal and Service Outcome – Street Lighting...................................................................................151<br />

Table 93: Goal and Service Outcome – Basic Services for Urban Poor .......................................................151<br />

Table 94: Water Demand for the <strong>Dhanbad</strong> .......................................................................................................160<br />

Table 95: Demand, Supply, Gap Assessment for Water Supply System - 2026 ..........................................160<br />

Table 96: Sewage Generation ...............................................................................................................................161<br />

Table 97: Demand, Supply, Gap Assessment for Sewerage System - 2026..................................................162<br />

Table 98: Comparison of various Sewage Technologies..................................................................................163<br />

Table 99: Drainage System Demand ...................................................................................................................164<br />

Table 100: Demand, Supply, Gap Assessment for Drainage System - 2016 ................................................164<br />

Table 101: Solid Waste system Demand..............................................................................................................165<br />

Table 102: Demand, Supply, Gap Assessment for Solid Waste Management System - 2026....................165<br />

Table 103: Demand, Supply, Gap Assessment for Roads - 2016 ...................................................................168<br />

Table 104: Demand, Supply, Gap Assessment for Street Lights - 2016........................................................169<br />

Table 105: Basic Infrastructure and Housing Requirement for Urban Poor................................................169<br />

Table 106: Identified Projects in Water Supply Sector.....................................................................................171<br />

Table 107: Identified Projects in Sewerage System Development Works.....................................................172<br />

Table 108: Proposed Projects in Solid Waste Management.............................................................................173<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong><br />

vi


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Table 109: Investment Proposed in Storm Water Drainage............................................................................173<br />

Table 110: Investment Proposed in Primary Drainage.....................................................................................174<br />

Table 111: Proposed Road Improvements..........................................................................................................174<br />

Table 112: Widening of Arterial Roads -Proposed Investment ......................................................................175<br />

Table 113: Proposed Junction Improvements ...................................................................................................175<br />

Table 114: Proposed Corridors for Under Ground Utility Ducts and Medians...........................................176<br />

Table 115: Proposed Pedestrian Subways & Pedestrian Crossings.................................................................176<br />

Table 116: Proposed Bridges and Elevated Highways & its Costing .............................................................177<br />

Table 117: Proposed Parking Locations..............................................................................................................177<br />

Table 118: Proposed Bypass and Ring Roads ....................................................................................................178<br />

Table 119: Proposed Bus Terminus and Transport Nagar Investments .......................................................178<br />

Table 120: Proposed Investments in Street Lighting Sector............................................................................178<br />

Table 121: Proposed Projects in Environmental Improvement, City Beautification and Tourism<br />

Development...................................................................................................................................................179<br />

Table 122: Proposed Investments in Preservation of Water Bodies..............................................................179<br />

Table 123: Other Developmental Projects.........................................................................................................180<br />

Table 124: Proposed Investments in Disaster Management Pre-Preparedness ...........................................180<br />

Table 125: Proposed Investments in Basic Services for Urban Poor & Housing........................................181<br />

Table 126: Summary of Proposed Investments.................................................................................................182<br />

Table 127: Component wise Investment Phasing (Base Cost)........................................................................183<br />

Table 128: Proposed Parking lots on Public Private Partnership...................................................................199<br />

Table 129: Proposed Other Developmental Projects on Public Private Partnership..................................201<br />

Table 130: Summary of proposed projects on Public Private Partnership ...................................................204<br />

Table 131: Financial Operating Plan (FOP) Results .........................................................................................205<br />

Table 132: Summary of Project Cash flow.........................................................................................................205<br />

Table 133: Proposed Funding Pattern (Base Cost) ...........................................................................................207<br />

List of Figures<br />

Figure 1: City Development Plan (CDP) Approach................................................................................... 5<br />

Figure 2: City Development Plan (CDP) Process........................................................................................ 6<br />

Figure 3: District Boundary Map of Jharkhand........................................................................................... 8<br />

Figure 4: Connectivity Map of <strong>Dhanbad</strong>........................................................................................................ 9<br />

Figure 5: <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> Map......................................................................................10<br />

Figure 6: Urban Agglomeration Population Growth Trend ................................................................15<br />

Figure 7: <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> –Urban Agglomeration Map......................................16<br />

Figure 8: Distribution of UG Blocks Coal Reserves .................................................................................26<br />

Figure 9: Distribution of Open Cast Blocks Coal Reserves...................................................................27<br />

Figure 10: SSI - Employment Generation Distribution...........................................................................32<br />

Figure 11: Revenue Income and Expenditure Trend – Erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity .......37<br />

Figure 12: Capital Income and Expenditure Trend – Erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity ..........38<br />

Figure 13: Revenue Income and Expenditure Trend- Erstwhile Sindri NAC ...............................38<br />

Figure 14: Capital Income and Expenditure Trend – Erstwhile Sindri NAC ................................39<br />

Figure 15: Composition of Average Revenue Income – Erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity.....40<br />

Figure 16: Composition of Average Revenue Income – Erstwhile Sindri NAC...........................41<br />

Figure 17: Composition of Average Revenue Expenditure..................................................................44<br />

Figure 18: Water Charge Collection Performance of MADA...............................................................52<br />

Figure 19: Property Tax Collection Performance of erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity .............52<br />

Figure 20: Erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity Water Supply Rising main and Distribution<br />

Main details ....................................................................................................................................................59<br />

Figure 21: Erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity Water Supply Mains ...................................................61<br />

Figure 22: Year wise Registered Vehicles in <strong>Dhanbad</strong> ...........................................................................80<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong><br />

vii


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Figure 23: Year wise Trend of Fire Accidents ............................................................................................86<br />

Figure 24: Comparison of <strong>Dhanbad</strong> So2 Levels with Standards with..............................................94<br />

Figure 25: Comparison of <strong>Dhanbad</strong> No2 Levels with Standards.......................................................95<br />

Figure 26: Comparison of Jharia SPM Levels with Standards.............................................................96<br />

Figure 27: Comparison of <strong>Dhanbad</strong> SPM Levels with Standards......................................................97<br />

Figure 28: Earthquake Zones in Jharkhand State ...................................................................................107<br />

Figure 29: Past Earthquake Occurrences in <strong>Dhanbad</strong> Region ...........................................................107<br />

Figure 30: Proposed Land Use .......................................................................................................................109<br />

Figure 31: Erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong> area proposed Landuse Map ......................................110<br />

Figure 32: <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> – Future Growth Direction.....................................112<br />

Figure 33: Proposed Jharia Rehabilitation Township Map on Jharia Coal field.........................114<br />

Figure 34: Proposed Organization Setup for New <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong>.............125<br />

Figure 35: Present Organization Setup of MADA..................................................................................126<br />

Figure 36: Sector wise priority based on Consultation findings.......................................................136<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong><br />

viii


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Abbreviation and Acronyms<br />

ARV : Annual Ratable Value<br />

BCCL : Bharat Cooking Coal Limited<br />

BIS : Bureau of Indian Standards<br />

BOLT : Built Own Lease and Transfer<br />

BOOT : Built Own Operate and Transfer<br />

BOT : Built Operate Transfer<br />

CAA : Constitutional Amendment Act<br />

CAGR : Compound Annual Growth Rate<br />

CBD : Central Business District<br />

CDP : City Development Plan<br />

CI : Cast Iron<br />

CIL : Coal India Limited<br />

CIP : City Investment Plan<br />

CMO : Chief Medical Officer<br />

CMRI : Centre for Mining and Research Institutions<br />

CPCB : Central Pollution Control Board<br />

CT : Census Towns<br />

DCB : Demand Collection Balance<br />

DGMS : Director General for Mining Safety<br />

DIC : District Industries Centres<br />

DLDP : Dual Load Dumper Placers<br />

DMC : <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong><br />

DO : Dissolved Oxygen<br />

DPR : Detailed Project Report<br />

DVC : Damodar Valley <strong>Corporation</strong><br />

EPIP : Export Promotion Industrial Park<br />

ESR : Elevated Service Reservoirs<br />

FCI : Fertilizer <strong>Corporation</strong> of India<br />

FY : Financial Year<br />

GIS : Geographical Information System<br />

GLSR : Ground Level Storage Reservoirs<br />

GoI : Government of India<br />

GoJ : Government of Jharkhand<br />

Ha : Hectare<br />

ISM : Indian School of Mining<br />

JCF : Jharia Coal Field<br />

JNNURM : Jawaharlal Nehru National Urban Renewal Mission<br />

JPCB : Jharkhand Pollution Control Board<br />

Kw : Killo Watts<br />

Lpcd : Liters percapita per day<br />

LPG : Liquid Petroleum Gas<br />

MADA : Mineral Area Development Authority<br />

MCM : Million Cubic Meter<br />

ML : Million Liters<br />

MLD : Million Liters per Day<br />

MoEF : Ministry of Environment and Forest<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong><br />

ix


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

MSL : Mean Sea Level<br />

MSW : <strong>Municipal</strong> Solid Waste<br />

MT : Metric Tonnes<br />

NAC : Notified Area Committee<br />

NGO : Non Governmental Organisation<br />

NH : National Highways<br />

NIC : National Informatics Centre<br />

O&M : Operations and Maintenance<br />

OC : Open Cast<br />

OHT : Over Head Tank<br />

PMC : Project Management Consultancy<br />

PSD : Private Sector Developer<br />

PSP : Public Stand Post<br />

PT : Property Tax<br />

PWD : Public Works Department<br />

RCD : Road Construction Department<br />

RE : Revenue Expenditure<br />

RI : Revenue Income<br />

ROB : Rail Over Bridge<br />

RUB : Rail Under Bridge<br />

SEZ : Special Economic Zone<br />

SSI : Small Scale Industries<br />

STP : Sewerage Treatment Plant<br />

SWOT : Strength – Weakness – Opportunities – Threat<br />

TDS : Total Dissolved Solids<br />

UA : Urban Agglomeration<br />

UDD : Urban Development Department<br />

UFW : Unaccounted for Water<br />

UG : Under Ground<br />

UGD : Under Ground Drainage<br />

ULB : Urban Local Body<br />

WPR : Workforce Participation Rate<br />

WS&SD : Water Supply & Sanitation Department<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong><br />

x


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

I. BACKGROUND<br />

A. Introduction<br />

In the present development paradigm, cities are considered “Engines of Growth”. The<br />

agglomeration of economic activities in the process of urbanization contributes to city and<br />

concomitantly to national growth through:<br />

(i.) Real sector: By leveraging productivity of output and employment;<br />

(ii.) Financial sector: By mobilizing savings; and<br />

(iii.) Fiscal flows: With cities providing the major proportion of a nation’s tax revenues.<br />

Development of cities is therefore critical in achieving national goals of improving living<br />

standards, equitability and sustainability - And Cities that understand their competitive<br />

position, and move wisely and quickly to capitalize on their comparative advantage, can<br />

expect significant economic returns.<br />

With a view to integrate the reform initiatives and scale up the effort to catalyse investment in<br />

urban infrastructure across States in the country and to provide reform linked assistance to<br />

State Governments and ULBs in the country, Government of India (GoI) has launched its<br />

very ambitious scheme “Jawaharlal Nehru National Urban Renewal Mission” (JNNURM).<br />

The thrust of JNNURM is to ensure improvement in urban governance and service delivery<br />

so that Urban Local Bodies become financially sound and sustainable for undertaking new<br />

projects. City Development Plan (CDP) is the first milestone of a project development cycle,<br />

which broadly identifies the urban needs and prioritizes projects to be taken up under<br />

JNNURM.<br />

From Jharkhand state, three cities viz. <strong>Dhanbad</strong>, Ranchi and Jamshedpur have been identified<br />

under JNNURM, for which funds would be available under the scheme. As stated before,<br />

these cities need to prepare a City Development Plan (CDP), further to which, projects for<br />

development would be undertaken. <strong>Dhanbad</strong> City Development Plan is prepared by IL&FS<br />

IDC.<br />

B. Outcomes of JNNURM<br />

Following outcomes are envisaged in the JNNURM programme;<br />

(iv.) Universal Access to a minimum level of services;<br />

(v.) Establishment of city-wide framework for planning and governance;<br />

(vi.) Modern and transparent budgeting, accounting, and financial management system at<br />

municipal levels;<br />

(vii.) Financial sustainability for municipalities and other service delivery institutions;<br />

(viii.) Introduction of e-governance in the core functions of municipal governments; and<br />

(ix.) Transparency and accountability in urban service delivery and management.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 1


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

C. Admissible Component under JNNURM<br />

1. Urban Renewal –<br />

Widening of narrow streets,<br />

Shifting of industrial/commercial establishments from nonconforming<br />

(inner-city) areas to ‘conforming’ (outer-city) areas to reduce congestion,<br />

Replacement of old and worn-out water pipes by new/higher capacity ones,<br />

Renewal of sewerage/ drainage/solid waste disposal systems, etc)<br />

2. Water Supply<br />

3. Sewerage<br />

4. Solid Waste Management<br />

5. Construction and Improvement of Drains/Storm Water Drains<br />

6. Urban Transport<br />

7. Laying /improvement/widening of arterial /sub-arterial roads and bridges to remove<br />

transport bottlenecks<br />

8. Parking lots on Public Private Partnership basis<br />

9. Laying of ring roads and bye-passes around metro and mega cities, provided certain<br />

cost recovery measures like toll charges are built in<br />

10. Construction and development of bus and truck terminals<br />

11. Environmental improvement and city beautification schemes<br />

12. Preservation of Water Bodies<br />

13. Development of Heritage Areas<br />

14. Construction of working women hostels, marriage halls, old age and destitute<br />

children’s home, nigh shelter with community toilets<br />

Inadmissible component under JNNURM<br />

1. Power<br />

2. Telecom<br />

3. Health<br />

4. Education<br />

5. Wage Employment Programme & Staff Component<br />

D. Scope of Work<br />

The scope of services for preparing City Development Plan for <strong>Dhanbad</strong> broadly covers the<br />

following areas:<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 2


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

i.) In depth analysis of the existing situation, covering the demographic, economic financial,<br />

infrastructural, physical, environmental and institutional aspects;<br />

ii.) Development of a perspective and vision of the city;<br />

iii.) Formulating a strategy for bridging the gap between where the city is and where it wishes to<br />

go;<br />

iv.) Preparing a City Investment Plan (CIP) and a financing strategy; and<br />

v.) To prioritize the schemes in order to prepare DPR for suitable schemes.<br />

E. Approach Methodology<br />

The approach to preparation of the City Development Plan (CDP) for <strong>Dhanbad</strong> <strong>Municipal</strong><br />

<strong>Corporation</strong> (DMC) area primarily focused on identifying and addressing issues with regards<br />

city development and city management through a consultative process involving various<br />

stakeholders in the city's development.<br />

The CDP shall be based on an assessment of the Strengths-Weakness-Opportunities-Threat<br />

(SWOT) of the city, with regards various elements of urban development and management,<br />

capitalizing on the strengths and opportunities and addressing weaknesses and threats. The<br />

following elements of city development and management shall be dealt with.<br />

(i.) Regional setting and demography;<br />

(ii.) Institutional framework for urban development and management;<br />

(iii.) Urban Economy;<br />

(iv.) Physical planning and growth management;<br />

(v.) Urban transport system and connectivity;<br />

(vi.) Land development and housing;<br />

(vii.) Urban basic service infrastructure / public utilities;<br />

(viii.) Poverty reduction and social development;<br />

(ix.) Environmental management;<br />

(x.) Organization development; and<br />

(xi.) Finances and Capital Investment Sustenance.<br />

The approach to the visioning exercise shall comprise of three basic stages, viz.:<br />

1. Stage 1- Preparatory Phase<br />

This phase shall focus on establishing the existing situation of the city, in terms of the various<br />

developmental elements listed above. The outcome of this phase shall be a “State of the City<br />

Report” elucidating the existing situation with regards the various developmental elements<br />

and identifying key issues and problems involved therein.<br />

This phase involves extensive data collection pertaining to the developmental elements from<br />

concerned stakeholder agencies and other secondary sources. The data shall be compiled and<br />

analyzed to establish the current situation presented in the State of the City Report.<br />

2. Stage II – Consensus-building / Visioning Phase<br />

This stage shall involve stakeholder consultations aimed at consensus building on city<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 3


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

developmental issues and priorities with the state of the city report as the primary basis for<br />

consultations. A shared vision shall be framed and adopted for development of the city of<br />

<strong>Dhanbad</strong> and developmental goals shall be set for achieving the vision. The outcome of this<br />

stage shall be a “shared vision statement” for the development of <strong>Dhanbad</strong> city, sectoral goals<br />

and optional strategies to achieve the goals and preliminary identification of thrust areas and<br />

associated projects. .<br />

3. Stage III – Strategy Formulation Phase<br />

This stage shall involve evaluating strategy options, analysis of strengths and weaknesses,<br />

identification of stakeholder roles, developing implementation and action plans and capacity<br />

building plan within a realistic financing framework.<br />

While carrying out the above, the strategic plan would focus on issues of priority local<br />

concerns for livability, and the implied requirements in terms of:<br />

(i.) Enhancing city productivity through enhanced economy and better quality of life;<br />

(ii.) Ensuring planned and integrated land, housing, infrastructure and other facilities<br />

development;<br />

(iii.) Reducing poverty through enhanced access of the poor to basic urban and social<br />

services;<br />

(iv.) Improving management through integrated approach to development issues;<br />

(v.) Organizational capacity building to meet the requirements of the strategic plan; and<br />

(vi.) Enhancing financial sustainability through improved/ innovative asset management and<br />

project development/ structuring mechanisms involving private-public participation.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 4


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Figure 1: City Development Plan (CDP) Approach<br />

Stage I- Preparatory Phase<br />

Pre-study stage:<br />

• Identification and Listing of Key Stakeholders<br />

• Collection of Primary and Secondary Data<br />

• Consensus building on city priorities<br />

• Finalizing key sectors/elements to be studied<br />

• Preparation of Base Map<br />

Review/ Analysis with regards to:<br />

• Regional setting and linkages;<br />

• Economic development;<br />

• Tourism development;<br />

• Physical planning and growth management;<br />

• Traffic & Transportation;<br />

• Urban infrastructure and public utilities;<br />

• Social infrastructure and facilities;<br />

• Poverty reduction and social development;<br />

• Environmental management;<br />

• Financial management, <strong>Municipal</strong> Acts; and<br />

• Institutional development.<br />

Stage III- Strategy Formulation & CIP Phase<br />

Stage II- Consultation & Visioning<br />

Phase<br />

Existing situation description, Demand-Supply Gap Assessment, Identification of<br />

key developmental and management issues, SWOT analysis and Strategy options<br />

Department of Local Self Government, GoJ<br />

Preliminary Report<br />

Working Groups on various elements<br />

Stakeholder Workshop<br />

Formulation of<br />

VISION STATEMENT and MISSION STATEMENT<br />

• Policy Reforms<br />

• Innovative Project Development<br />

• Private Sector Participation<br />

Agreed Vision, supported with Strategy options & Action<br />

• Revenue Enhancement & Resource<br />

Plans and Project identification under each element &<br />

Mobilization<br />

Preparation of Capital Investment Plan<br />

Defined Parameters Like:<br />

• Social and Economic Goals,<br />

Thrust Area Identification,<br />

• City Needs;<br />

Strategic Analysis & Prioritization<br />

• Financial Considerations,<br />

Project Cash Flow Analysis and<br />

• Project Structuring<br />

Parameters for Strategic Options<br />

• Stage of Implementation, etc.<br />

Growth Management Framework<br />

Investment Sustenance Assessment through Annual<br />

Financial and Operating Plan (FOP)<br />

Implementation Structure and Capacity Building Framework<br />

City Development Plan<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong><br />

5


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Figure 2: City Development Plan (CDP) Process<br />

Existing Situation Review & Defining City Vision<br />

Existing Situation Review & Defining City Vision<br />

and Goals<br />

and Goals<br />

Review of current service delivery levels from the<br />

Review of current service delivery levels from the<br />

citizens’ perspective through consultation between<br />

citizens’ perspective through consultation between<br />

councillors and technical staff of <strong>Corporation</strong><br />

councillors and technical staff of <strong>Corporation</strong><br />

Agenda Note Preparation on Visions and Goals of the<br />

Agenda Note Preparation on Visions and Goals of the<br />

CDP in Consultation with Planning Partners<br />

CDP in Consultation with Planning Partners<br />

Review of State and Local Organisations/ Institutional<br />

Agenda for the Future<br />

Review of State and Local Organisations/ Institutional<br />

Operations in Service Delivery<br />

Operations in Service Delivery<br />

Sectoral Strategies<br />

Sectoral Strategies<br />

Master Plan<br />

Master Plan<br />

Poverty Reduction Plan<br />

Poverty Reduction Plan<br />

Water Supply Augmentation Plan<br />

Water Supply Augmentation Plan<br />

Sewerage Master Plan<br />

Sewerage Master Plan<br />

Storm Water Master Plan<br />

Storm Water Master Plan<br />

Comprehensive Traffic & Transport Study<br />

Comprehensive Traffic & Transport Study<br />

City City Development Plan Plan Review<br />

Review<br />

Annual Annual Report Report and and Assessment Assessment of of Progress<br />

Progress<br />

Identification of of Shortcomings<br />

Areas Areas of of focus focus for for forthcoming forthcoming CDP<br />

CDP<br />

Draft CDP<br />

City Vision and Goals<br />

Draft Plan Formulation and<br />

Identification of Capital Improvement<br />

Program<br />

Address issues and identify future<br />

requirement within Plan Period<br />

Identify Tasks to address strategies<br />

formulated to cater to future requirement<br />

Identify Institutions involved in<br />

performing tasks<br />

Define sustainability indicators to Monitor<br />

and Evaluate the Plan<br />

Annual Progress Report<br />

City Development Plan<br />

Draft for Public Consultation<br />

CDP CDP Monitoring Monitoring and and Evaluation<br />

Evaluation<br />

Review Review of of Sustainability Indicators<br />

Indicators<br />

Identification of<br />

of<br />

Key Key Areas Areas of of deficiencies<br />

deficiencies<br />

Redressal Redressal of of issues issues and and accounted accounted for<br />

for<br />

Final CDP<br />

For Implementation<br />

Public Consultation, CDP Approval and<br />

Finalisation<br />

Critical Review and Approval of CDP by Citizen<br />

Groups/ Public Representatives, Elected<br />

Councillors and Planning Partners<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong><br />

6


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

F. Report Structure<br />

(i.)<br />

City Profile. The current section detailing the regional settings, urbanization trend,<br />

socio economic profile of the <strong>Municipal</strong> <strong>Corporation</strong>.<br />

(ii.) Economic Base. This section detailing the economic base of the city, SWOT Analysis<br />

and tourism development.<br />

(iii.) <strong>Municipal</strong> Financial Management. Financial Management of <strong>Dhanbad</strong> <strong>Municipal</strong><br />

<strong>Corporation</strong> is detailed in this section.<br />

(iv.) Existing Infrastructure Assessment. This section deals with Water Supply, Sewerage<br />

and Sanitation, Storm water Drainage and Water Bodies Rejuvenation, Solid Waste<br />

Management, Roads and Traffic Management and Street Lighting in the city, and assess<br />

current level of service delivery, system performance, key issues and SWOT Analysis.<br />

(v.) Urban Environment. This section deals with urban environment concerns like mining<br />

environment, river water quality, air environment, Noise quality and hotspots.<br />

(vi.) Physical Planning and Growth Management. This section describes the planning<br />

efforts excised in the past, issues related to physical planning and growth management.<br />

(vii.) Urban Governance. This section deals with the 74 th CAA, Institutional framework,<br />

proposed Organization Structure, SWOT analysis.<br />

(viii.) Basic Services for Urban Poor. This section deals with existing status of slums in the<br />

city and present infrastructure provision in slums, performance indicators and key<br />

issues.<br />

(ix.) Vision, Goals and Sectoral Strategies. This section deals with sectoral visions, goals<br />

and strategies to achieve the defined vision.<br />

(x.) Demand, Supply, Gap Assessment of Service Delivery. This section deals with<br />

sector wise demand, present supply and gap for the present and future designed period<br />

is arrived for the city.<br />

(xi.) Capital Investment Plan & Financing Strategy. This section details out the<br />

proposed capital investment for each sector based demand, supply, gap assessment and<br />

phasing of the proposed investments. Financing strategy also suggested to meet the<br />

fund requirement.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 7


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

II.<br />

CITY PROFILE<br />

A. Overview<br />

Figure 3: District Boundary Map of Jharkhand<br />

The district of <strong>Dhanbad</strong> in<br />

the country occupies a<br />

unique place as an important<br />

resource region which is a<br />

part of the South-East<br />

resource region. The<br />

resource is the coal, often<br />

termed as “Black Diamond”, a<br />

term which befits its<br />

importance as basic fuel in<br />

most industries. The<br />

<strong>Dhanbad</strong> district has the<br />

largest coal reserves, about<br />

13,000 million tons of<br />

metallurgical coal. The<br />

region is most commonly identified as “Jharia Coal Field (JCF)” which is the one single<br />

depository of coal spread over an area of about 480 sq.kms.<br />

This has influenced the location of many coal-oriented industries, such as fertilizers,<br />

washeries, coke plants, ceramic industry, pottery works, steel industries, lead and zinc smelting<br />

and numerous other engineering industries.<br />

In a relative perspective, the region could be linked to industrial zone of Asansol- Durgapur<br />

in the West Bengal and Jamshedpur – Chaibasa in the Jharkhand- the comparative elements<br />

being the Bokaro Steel Plant in the west, Sindri Fertilizer complex, Sulphuric Acid Plant and<br />

ACC Cement Factor in the south and a number of coal-based chemical industries scattered<br />

around the coal-belt.<br />

In this venture of coal mining, a number of new mining towns have sprung up in a chain,<br />

spreading from <strong>Dhanbad</strong> south-wards upto Sindri and westwards upto Katras. This<br />

development is mostly scattered, haphazard and unplanned.<br />

Mineral resource regions compel to scan one more aspect, i.e. limitation of urban growth, as<br />

also conservation and extraction of underground resources. Mineral resource regions and in<br />

particular resource regions based on coal area developed on economic activities of exhaustible<br />

resources. It is important, thus to take a long term view so that the mono-centric economic<br />

activity can be gradually shifted to other activities. Also, diversification of the economic base<br />

is of utmost importance for optimum utilization of the potentialities existing in the region in<br />

terms of basic materials, fuel, ample power resources, well developed and distributed<br />

communication network and proximity to large urban centres, etc.<br />

The <strong>Dhanbad</strong> District consist of eight blocks which include, <strong>Dhanbad</strong> Sadar, Jharia Block,<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 8


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Sindri Block, Baghmara Block, Baliapur Block, Gobindpur Block, Topchanchi Block and<br />

Tundi.<br />

For a balanced growth and improvement of conditions in the region, a preconceived strategy<br />

for the future needs to be spelt out, to control and regulated the urban growth and<br />

development of infrastructure.<br />

Location<br />

Figure 4: Connectivity Map of <strong>Dhanbad</strong><br />

<strong>Dhanbad</strong><br />

<strong>Municipal</strong><br />

<strong>Corporation</strong> is located in the<br />

Eastern part of the Country,<br />

from 85 0 45’ E longitude to 86 0<br />

30’ E longitude and from 23 0 32’<br />

N latitude to 24 0 5’latitude. The<br />

district headquarter, located at<br />

<strong>Dhanbad</strong> is about 170 km from<br />

State Capital of Ranchi and<br />

about 250 km from Kolkata the<br />

premier city of the country.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong><br />

New <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> was formed as per notification vide<br />

/Establishment/Formation – 101/5334/Urban Development Department, Ranchi, dated 01-<br />

02- 2006. The New <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> will consist of urban settlements namely<br />

erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity, Jharia NAC, Sindri NAC, Chhatandh NAC, Katras NAC<br />

and 27 census towns (as per 2001 census). Besides these urban settlements there are 258<br />

villages also form part of the new <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong>. The total population of<br />

new <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> as per Census 2001 is 13,33,719 out which 10,65,327<br />

persons constitutes from Urban Agglomeration (32 towns) and villages constitutes about<br />

268,392 persons. The total area of new <strong>Municipal</strong> <strong>Corporation</strong> is around 355.77 sq.km.<br />

Railways<br />

<strong>Dhanbad</strong> is well connected by the Rail route also. It is the divisional headquarter of Eastern<br />

Railway. The Grand chord line (Golden Quadrilateral – NH 2) which is the main line between<br />

Delhi and Calcutta passes through <strong>Dhanbad</strong>. Trains to Delhi, Calcutta, Bombay, Jammu,<br />

Kalka, Gorakhpur, Lucknow, Patna, Jodhpur etc. can be taken from <strong>Dhanbad</strong>. Important<br />

trains halting at <strong>Dhanbad</strong> are Calcutta Rajdhani Express, Bhubneshwar Rajdhani Express,<br />

Bokaro Calcutta Shatabdi Express. Poorva Express, Kalka Mail, Ludhiana Express., Jammu-<br />

Tawi Express., Howrah-Jodhpur Express and Shakti Punj Express.<br />

Gomoh is another important Railway Junction located in <strong>Dhanbad</strong> district. Neelanchal<br />

Express., Purushottam Express is the important trains halting at Gomoh.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 9


KUSBERIA<br />

RAJGANJ<br />

BHELATAND<br />

200<br />

40<br />

AMJHAR<br />

6<br />

7<br />

BHUDA<br />

3<br />

5<br />

GOLMARA<br />

4<br />

BERA<br />

DHOKHRA<br />

PALANI<br />

RAKHITPUR<br />

BAROMA<br />

DHAIYA<br />

BARADAHA<br />

HIRAPUR<br />

DHOWATANR<br />

CHANDUD<br />

GOTTOPA<br />

SAMAIDIH<br />

SABALPUR<br />

KOLAKUSMA<br />

SAPTA<br />

NARAINPUR<br />

AMAGHATA<br />

DHANGI<br />

9<br />

SAHARPURA<br />

KUSBERIA<br />

1<br />

GOLAKDIH<br />

OJHADIH<br />

BAGAGI<br />

JINAGORA<br />

GOPALICHAK<br />

202<br />

PETIA<br />

111<br />

PARASIA<br />

MUNIDIH<br />

KARITANR<br />

GANSADIH<br />

City Development Plan, <strong>Dhanbad</strong> Final Report<br />

Figure 5: <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> Map<br />

TO DELHI<br />

TO KOLKATA<br />

NH32<br />

NH2<br />

230<br />

NH33<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 10<br />

CITY DEVELOPMENT PLAN<br />

DHANBAD<br />

DHANBAD MUNICIPAL CORPORATION<br />

BOUNDRY MAP<br />

LEGEND<br />

MAJOR ROADS<br />

RAILWAY LINE<br />

MAJOR RIVER<br />

JHARIA NAC & RURAL + SINDRI<br />

BALIAPUR BLOCK (PART)<br />

DHANBAD RURAL + CHHATATAND<br />

NAC<br />

DHANBAD MUNICIPAL AREA<br />

GOVINDPUR BLOCK (PART)<br />

DHANBAD RURAL + CHHATATAND<br />

NAC<br />

BAGHMARA BLOCK (PART) + KATRAS<br />

NAC<br />

OTHER URBAN AREA<br />

CITY/ TOWN<br />

SINDRI<br />

N<br />

DHANBAD MUNICIPAL CORPORATION<br />

INFRASTRUCTURE DEVELOPMENT<br />

CORPORATION LIMITED<br />

FIGURE NO:<br />

DAMODAR RIVER<br />

192<br />

SINDRI<br />

186<br />

187<br />

189<br />

CHHIPATAND<br />

SOULAPUR<br />

183<br />

174<br />

ROHARABAND<br />

169<br />

DOMGARH<br />

TASRA<br />

168<br />

167<br />

174<br />

173 172<br />

129<br />

184<br />

JIALGORA<br />

VARANASI<br />

198<br />

201<br />

207<br />

212<br />

217<br />

215<br />

208<br />

207<br />

LALCHAK<br />

241<br />

237<br />

DUNGRI<br />

261<br />

288<br />

253<br />

220<br />

216<br />

BLAITANR<br />

BAGDAHA<br />

DALDALI<br />

PHATA MAHL<br />

BHUIAN RARARPUR<br />

SONDAHA<br />

SALDAHA<br />

TILATANR<br />

213<br />

BARWADI<br />

UDALBANI<br />

238<br />

232<br />

263<br />

KAILUDIH<br />

88<br />

8 15<br />

49<br />

151<br />

148<br />

36<br />

37<br />

34<br />

154<br />

35<br />

30<br />

152<br />

52<br />

50<br />

140<br />

139<br />

14<br />

94<br />

85<br />

86<br />

87<br />

48<br />

47<br />

46<br />

141<br />

49<br />

44<br />

45<br />

142<br />

131<br />

42<br />

BALGRIA<br />

143<br />

144<br />

150<br />

127<br />

146<br />

122<br />

144<br />

126<br />

147<br />

121<br />

153<br />

155<br />

177<br />

158<br />

156<br />

238<br />

231<br />

264<br />

282<br />

270<br />

271<br />

280<br />

68<br />

273<br />

69<br />

274<br />

67<br />

71<br />

66<br />

72<br />

80<br />

84<br />

81<br />

82<br />

61<br />

59<br />

93<br />

97<br />

99<br />

75<br />

100<br />

103<br />

104<br />

138<br />

137<br />

106<br />

136<br />

107<br />

135<br />

108<br />

112<br />

113<br />

114<br />

116<br />

160<br />

159<br />

SHYAMDIH<br />

260<br />

84<br />

BANDARCHUA<br />

221<br />

278<br />

86<br />

79<br />

85<br />

94<br />

256<br />

289<br />

226<br />

MUKUNDA<br />

MATKURIA<br />

RANGUNI<br />

224<br />

383<br />

272<br />

229<br />

225<br />

223<br />

284<br />

233<br />

235<br />

266<br />

267<br />

265<br />

269<br />

286<br />

228<br />

349<br />

276<br />

55<br />

65<br />

54<br />

53<br />

CHANDKUYIH<br />

BASTACOLA<br />

BANSMORI<br />

GONDUDIH<br />

CHHOTA<br />

KHARIKABAD<br />

KUJUMA<br />

NICHITPUR<br />

PARUTIA<br />

SURANGA<br />

PAHARPUR<br />

DAMODARPUR<br />

SUSNILEWA<br />

DAMKAR BRWA<br />

BISUNPUR<br />

ALAKHDIHA<br />

BHAGRAMPUR<br />

PANEARA<br />

MADHUBAN<br />

87<br />

73<br />

58<br />

PARASBANIA<br />

KUSUNDA<br />

ALKUSA<br />

JIALGORA<br />

SONARIA GORERIED EKRA<br />

77<br />

96<br />

88<br />

89<br />

92<br />

91<br />

102<br />

101<br />

105<br />

133<br />

ARULGRIA<br />

TETULMARI<br />

SIALGUDRI<br />

DHONDABAD<br />

DHOBANI<br />

GOPINATHDIH<br />

BARRAGARY<br />

GARBHUDIH<br />

BARADUBHI<br />

18<br />

181<br />

PARBAD<br />

157<br />

BHATDIH<br />

117<br />

GANDUBAD<br />

DHARJORI<br />

KURMIDIH<br />

PICHHARI<br />

BARA<br />

OR<br />

KARI TANR<br />

UDAYPUR<br />

GOVINDADIH<br />

CHHOT<br />

PICHHARI<br />

PARGHABAD<br />

163<br />

182<br />

RAGHUNATHPUR<br />

179<br />

MANAITAND<br />

RANGAMATIA<br />

175<br />

172<br />

MANOHARTANR<br />

171<br />

164<br />

133<br />

NAGRIKALA<br />

BAUOKALA<br />

SARAIDHELA<br />

DHANBAD<br />

51<br />

BHAGATDIH<br />

PATHRA KULHI<br />

JHARNA<br />

JHARIA<br />

TISRA<br />

CHHATABAD<br />

UPARKANDRA<br />

KUSTOR<br />

165<br />

CHASNALA<br />

PATHARDIH<br />

LOYABAD<br />

162<br />

PUTKI<br />

RAMPUR<br />

SARADHA<br />

MAJHILADIH<br />

LAKARKHAOARI<br />

BHAGABAND<br />

JITPUR<br />

KENDUADIH<br />

SIJUA<br />

SABALDIH<br />

RAJASDHRA<br />

BHOWRA<br />

JARMA<br />

DAMODAR RIVER<br />

JATUDIH<br />

TETENGABAD<br />

287<br />

299 300<br />

286<br />

301<br />

348<br />

90<br />

PATRA KULHI<br />

KUPURIA<br />

MALKERA<br />

BHULI<br />

GODHAR<br />

DHANSAR<br />

BASARIA<br />

CHANDRABAD<br />

PONDERKANLI<br />

KATRAS<br />

ANGARPATHRA<br />

JAMADOVA<br />

BALIHARI<br />

258<br />

122<br />

10<br />

KUSUMDAHA<br />

123<br />

11<br />

125<br />

126<br />

127<br />

128<br />

76<br />

13<br />

170 171<br />

16<br />

185<br />

KOLKATA<br />

17<br />

GOPINATHDIH<br />

SABIPUR<br />

12<br />

PRADHAN KHANTA<br />

89<br />

JORAPOKHAR<br />

32<br />

KARMATANR<br />

AMGHATA<br />

CHANDAUR<br />

KERKEND<br />

SUDAMDIH<br />

BANDHDIA<br />

TO RANCHI<br />

TO RANCHI


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Topography<br />

It is situated on the lower steps of Chota Nagpur plateau at an altitude of 750’ above Mean<br />

Sea Level (MSL).<br />

Geology<br />

Geologically, the major feature is the great coal basin of Jharia with intervening areas of<br />

crystalline rocks. The ancient rock types Dharwar and post dharwar period form the<br />

basement rock over which the lower Gondwana group of sedimentary strata consisting of<br />

coal seams and patches of sand stone is formed. The region is important for its large reserves<br />

of Lower Gondwana coal distributed in three fields, the Jharia and Chandrapura Coalfields<br />

and Barkar series which extends into the Raniganj Coalfield in West Bengal.<br />

The main axis of the synclinal Jharia Coalfield basin runs West-East – South-East and is<br />

pitching gently towards West and can be seen by the dips of the Raniganj strata along the<br />

Jamunia river.<br />

This line of axis is neither straight nor curved in simple manner, but is itself corrugated due to<br />

the forces probably coming from East to West. Though hardly a dozen minerals of economic<br />

importance occur in the region, it is one of the premier areas of India so far as the coal is<br />

concerned. The Jharia Coalfield reserves are estimated upto 12,815 million tones upto a depth<br />

of 600 meters out of which 5,640 million tones have been estimated as of prime coking coal<br />

variety, according to a BCCL report on estimates of coal reserves.<br />

Fireclay suitable for manufacture of firebricks as layers or thin beds in the coal bearing<br />

sedimentary formations at Nadkharki, Sonardih East, Kenduadih, Tisra and Patherdih are<br />

found.<br />

Silica is found in Dhangi hills, exploitation is done on a very small scale. Other economic<br />

minerals which are found in the region are building stones, kankar, steatite, soapstone, mica,<br />

iron-ore, chinaclay, graphite etc.<br />

Soil Characteristics<br />

Alluvial soil is found along river bed, which is used for agriculture. It is found in small patches<br />

especially in Baliapur block. Sandy soil is also found in the river beds, which is the<br />

characteristic of granitic rocks and sandstones. It is used for stowing and building purposes.<br />

Coarse gritty soil is predominant in coal basins. This type of soil mixed with big fragment of<br />

rocks is formed from the weathering of pegmatites, quartz and conglomeratic sandstones.<br />

Laterite or Kankar is found in the foot of hills which red soil is found further ahead. Some<br />

cultivation is practiced on red soil. Cultivable soils are found mainly in south eastern part of<br />

the region, near Sindri and North to North western part of the region in Gobindpur block.<br />

Climate and Rainfall.<br />

The climate of region is characterized by general dryness and hot summer except in the<br />

monsoon season. The cold weather prevails from November to February. The temperature<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 11


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

goes down as low as 6-7 0 C. The summer is hot with the temperature going to 47-48 0 C. The<br />

summer season is between March to June. The monsoon is from July to October. The rainfall<br />

is generally heavy accompanied of ten with stormy winds. The metrological observatory is at<br />

<strong>Dhanbad</strong>. Table 1 presents the block wise registered rainfalls during 2005 in DMC area.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 12


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Table 1: Block wise Registered Rain fall during the Year 2005 in <strong>Dhanbad</strong> DMC<br />

Months<br />

<strong>Dhanbad</strong> Jharia Balaiapur Baghmara Govindpur<br />

Rain fall<br />

(mm)<br />

No of Rainy<br />

Days<br />

Rain fall<br />

(mm)<br />

No of Rainy<br />

Days<br />

Rain fall<br />

(mm)<br />

No of Rainy<br />

Days<br />

Rain fall<br />

(mm)<br />

No of Rainy<br />

Days<br />

Rain fall<br />

(mm)<br />

No of Rainy<br />

Days<br />

2005<br />

January 26.8 3 31.3 3 37.2 3 18.6 1 103 7<br />

February 13.2 2 28 3 31.4 3 NA NA 20.6 3<br />

March 4 1 53 3 43 5 NA NA 22.6 1<br />

April 23 2 11.5 1 51 4 NA NA 22.2 3<br />

May 22.8 2 38.5 4 50.8 5 NA NA 40.4 2<br />

June 106.4 8 126.8 8 116.8 8 NA NA 204.8 8<br />

July 312.2 21 515.2 18 523.6 17 372.1 16 467.2 17<br />

August 131.8 10 75 7 90 8 213.2 12 200 9<br />

September 70.6 6 114.2 6 89.4 6 104 7 111.6 9<br />

October 92.6 8 136.8 7 146.8 5 85.2 5 104 5<br />

November - - 3.2 1 - - - - - -<br />

December 2.2 - 3.2 1 4.2 1 2.2 - 2.4 -<br />

Total 805.6 63 1,136.7 62 1,184.2 65 795.3 41 1,298.8 64<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 13


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

The climate of the district is characterized by general dryness. It is very pleasant during the<br />

cold weather from November to February. Thereafter the climate becomes warm. It remains<br />

hot until the monsoon breaks towards the middle of June. With the setting in of rains the<br />

temperature falls and humidity rises, July to October are the rainy months. July and August<br />

are the wettest months. The details of block wise rainfall and no of rainy days during the year<br />

2005 in <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> jurisdiction is presented in Table 1. The rainfall<br />

during (2005) July is varies from 312.2 mm in <strong>Dhanbad</strong> block to 523.6 mm in Baliapur Block.<br />

The average no of rainy days recorded in the year 2005 in DMC jurisdiction is 55 days.<br />

History<br />

<strong>Dhanbad</strong> district was constituted in 1956 by carving out the old <strong>Dhanbad</strong> subdivision, Chas<br />

and Chandankiyari police stations of the Sadar subdivision of the erstwhile Manbhum district.<br />

<strong>Dhanbad</strong> is Police district since 1928. The re-organisation of the districts in the State of Bihar<br />

which took place after 1971 did not affect the district of <strong>Dhanbad</strong>. Erstwhile <strong>Dhanbad</strong><br />

<strong>Municipal</strong>ity is the most urbanized in the district and the headquarters of the district. In the<br />

year 1991, Bokaro District was constituted by carving out Chas Sub-division of <strong>Dhanbad</strong><br />

district and Bermo Sub-division of Giridih District.<br />

The district is bounded on the west by Giridih and Bokaro on the north by Giridih and<br />

Dumka and on the east and south by Purulia district of West Bengal.<br />

The early history of the greater part of the Chotanagpur plateau is shrouded in mystery and<br />

that of <strong>Dhanbad</strong> district is particularly so. Details of even later periods are difficult to trace as<br />

the present district formed but a small and insignificant part of Manbhum. In the Settlement<br />

Report for Manbhum (1928) it has been stated that no rock inscriptions, copper plates or old<br />

coins were discovered and not a single document of copper plate or palm leaf was found in<br />

course of the Survey and Settlement operations. The oldest authentic documents produced<br />

were all on paper and barely even a hundred years old.<br />

In view of these circumstances the District Gazetteer for <strong>Dhanbad</strong> (1964) merely reproduces<br />

the chapter on history in the Settlement Report of 1928 which pertains to the entire district of<br />

Manbhum.<br />

It was a small village of the erstwhile district of Manbhum which had it’s headquarter in<br />

Purulia (now in West Bengal). Manbhum in turn, derived its name from Raja Man Singh who<br />

was gifted this territory by Emperor Akbar, following his victory in a certain battle. The<br />

district being extremely vast and far-flung soon got divided into Birbhum, Manbhum and<br />

Singhbhum, for administrative purposes.<br />

However, on 24.10.1956 <strong>Dhanbad</strong> was declared a District on the Recommendation of the<br />

State Reconstitution Commission vide notification 1911. Its geographical length, extending<br />

from North to South, was 43 miles and breadth, 47 miles, stretching across East to West. In<br />

1991 a part of <strong>Dhanbad</strong> was sliced away from Bokaro district, diminishing thereby its total<br />

area to 2,995 Sq.Kms.<br />

Earlier, the district was split into two sub – divisions – <strong>Dhanbad</strong> Sadar and Baghmara. The<br />

former incorporated 6 blocks, while the latter had four. The then vastness of the district<br />

called for two police headquarters, based at Bokaro and <strong>Dhanbad</strong> respectively. Meanwhile,<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 14


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

the district as its stands today, has only one sub-division called the <strong>Dhanbad</strong> Sadar. There are<br />

presently, 8 blocks here viz. Jharia, Baghmara, <strong>Dhanbad</strong>, Nirsa, Govindpur, Baliapur, Tundi,<br />

and Topchanchi.<br />

There are 100,850 acres of hillocks and 56,454 acres of forests. It is about 500-1,000 feet<br />

above Sea level. Its soil is, by and large lateritic in nature.<br />

B. Population Trends and Urbanization<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong>, covering about 355.77 sq. kms (include <strong>Dhanbad</strong> Urban<br />

Agglomeration Area and 158 villages), comprises of a total population of 13,33,719 persons<br />

(as per Census 2001), whereas the <strong>Dhanbad</strong> Urban Agglomeration comprising of erstwhile<br />

<strong>Dhanbad</strong> <strong>Municipal</strong>ity, Jharia NAC, Katras NAC, Sindri NAC, Chhatatanr NAC and 27<br />

census towns houses a population of 1,065,327 persons. The following table presents Urban<br />

Agglomeration growth trend in past decades.<br />

Table 2: Decadal Growth Rate and CAGR of <strong>Dhanbad</strong> Urban Agglomeration Population<br />

Year UA Population No of Towns<br />

in UA<br />

Decadal Growth<br />

Rate<br />

Compounded Annual<br />

Growth Rate (CAGR)<br />

1951 291,833 19 - -<br />

1961 272,503 19 -6.62 -0.68<br />

1971 472,980 19 73.57 5.67<br />

1981 689,460 19 45.77 3.84<br />

1991 821,058 24 19.09 1.76<br />

2001 1,065,327 32 29.75 2.64<br />

Source: Census Hand Book and Analysis.<br />

Figure 6: Urban Agglomeration Population Growth Trend<br />

The <strong>Dhanbad</strong> Urban<br />

Population Growth Trend of <strong>Dhanbad</strong> UA<br />

Agglomeration area<br />

witnessed growth rates in the<br />

12.00<br />

range of (–) 6.62 percent to<br />

10.00<br />

73.57 percent. Noteworthy 8.00<br />

surge in growth rate to 73.57<br />

percent, registered in 1961 –<br />

6.00<br />

1971, can be attributed to the 4.00<br />

industrialization and mining 2.00<br />

activities in the region. The<br />

0.00<br />

decline in the Urban<br />

1951 1961 1971 1981 1991 2001<br />

Agglomeration decadal<br />

Years<br />

growth rate in the past two<br />

decades can be attributed to the increasing trend of sick industries in the region and<br />

bifurcation of Bokaro district from <strong>Dhanbad</strong> and etc, The Compounded Annual Growth Rate<br />

(CAGR) has reduced from 3.84 percent during 1971-81 to 1.76 percent during 1981-1991.<br />

However, during the decadal year 1991 – 2001 the urban agglomeration population has<br />

witnessed increase in CAGR over previews decade, this may be attributing to the inclusion of<br />

eight more towns within Urban Agglomeration area. The Table 3 & Table 4 present the<br />

urbanization trend in <strong>Dhanbad</strong> region from 1951 to 2001.<br />

Population in Lakhs<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 15


CITY DEVELOPMENT PLAN<br />

DHANBAD<br />

DHANBAD MUNICIPAL CORPORATION<br />

URBAN SETTLEMENT<br />

9<br />

LEGEND<br />

8<br />

40<br />

MAJOR ROADS<br />

RAILWAY LINE<br />

6<br />

MAJOR RIVER<br />

7<br />

SETTLEMENT BOUNDARY<br />

3<br />

5<br />

CITY/ TOWN<br />

SINDRI<br />

4<br />

CITY/ TOWN -<br />

1<br />

Higher Annual Growth Rate<br />

over Average Growth Rate<br />

200<br />

JAMADOVA<br />

202<br />

LOYABAD<br />

111<br />

N<br />

DHANBAD MUNICIPAL CORPORATION<br />

INFRASTRUCTURE DEVELOPMENT<br />

CORPORATION LIMITED<br />

FIGURE NO:<br />

DAMODAR RIVER<br />

192<br />

SINDRI<br />

186<br />

187<br />

189<br />

183<br />

174<br />

169<br />

167<br />

168<br />

165<br />

182<br />

175<br />

133<br />

171<br />

164<br />

163<br />

City Development Plan, <strong>Dhanbad</strong> Final Report<br />

Figure 7: <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> –Urban Agglomeration Map<br />

174<br />

173<br />

172<br />

129<br />

184<br />

TO KOLKATA<br />

170 171<br />

125<br />

128<br />

185<br />

127<br />

126<br />

123<br />

KOLKATA<br />

18<br />

122<br />

10<br />

89<br />

NH32<br />

13<br />

17<br />

16<br />

12<br />

32<br />

15<br />

34<br />

88<br />

NH2<br />

49<br />

14<br />

42<br />

48<br />

49<br />

30<br />

37<br />

35<br />

36<br />

177<br />

148<br />

154<br />

153<br />

94<br />

152<br />

47<br />

50<br />

46 44<br />

45<br />

140<br />

151<br />

150<br />

146<br />

87<br />

86<br />

85<br />

144<br />

221 226<br />

217<br />

225<br />

223<br />

SARAIDHELA<br />

84<br />

220<br />

53<br />

181<br />

179<br />

PATHRA KULHI<br />

VARANASI<br />

51<br />

52<br />

139<br />

141<br />

142<br />

131<br />

143<br />

144<br />

127<br />

122<br />

147<br />

198<br />

126<br />

121<br />

155<br />

158<br />

156<br />

61<br />

59<br />

201<br />

67<br />

75<br />

138<br />

207<br />

212<br />

68<br />

137<br />

69<br />

136<br />

135<br />

108<br />

NH33<br />

113<br />

114<br />

TO DELHI<br />

112<br />

116<br />

160<br />

159<br />

207<br />

215<br />

241<br />

208<br />

237<br />

253<br />

238<br />

261<br />

216<br />

232<br />

238<br />

263<br />

256<br />

231<br />

284<br />

264<br />

260<br />

233<br />

235<br />

266<br />

267<br />

265<br />

289<br />

269<br />

224<br />

230<br />

383<br />

282<br />

272<br />

288<br />

229<br />

270<br />

271<br />

286<br />

228<br />

273<br />

280<br />

278<br />

274<br />

349<br />

71<br />

65<br />

66<br />

276<br />

55<br />

72<br />

80<br />

84<br />

54<br />

81<br />

86<br />

79<br />

82<br />

85<br />

87<br />

73<br />

58<br />

77<br />

96<br />

94<br />

88<br />

93<br />

97<br />

99<br />

100<br />

89<br />

103<br />

92<br />

91<br />

104<br />

102<br />

101<br />

105<br />

106<br />

107<br />

133<br />

157<br />

117<br />

172<br />

KUSTOR<br />

NAGRIKALA<br />

JHARIA<br />

TISRA<br />

PATHARDIH<br />

162<br />

PUTKI<br />

BHAGATDIH<br />

KENDUADIH<br />

TO RANCHI<br />

TO RANCHI<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 16<br />

ROHARABAND<br />

TO GOVINDPUR<br />

DHANBAD<br />

BHULI<br />

DHANSAR<br />

BAUOKALA<br />

BASARIA GODHAR<br />

213<br />

BALIHARI<br />

76<br />

JORAPOKHAR<br />

SIJUA<br />

PONDERKANLI<br />

BHOWRA<br />

258<br />

KERKEND<br />

DAMODAR RIVER<br />

KATRAS<br />

ANGARPATHRA<br />

KAILUDIH<br />

CHANDAUR<br />

287 286<br />

90<br />

348<br />

MALKERA<br />

299 300 301


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Table 3: Town wise Decadal Growth of Population in <strong>Dhanbad</strong> Urban Agglomeration<br />

Towns 1951 1961 1971 1981 1991 2001<br />

<strong>Dhanbad</strong> (M) 34,077 57,352 79,838 120,221 151,789 199,258<br />

Jharia (NAC) 26,480 33,683 45,236 57,496 69,641 81,983<br />

Sindri (NAC) 13,045 41,315 46,385 70,645 72,333 76,746<br />

Katras (NAC) 13,365 17,224 19,444 29,587 37,520 51,233<br />

Chhatatanr (NAC) 35,540 6498 51,314 75,186 28,420 32,173<br />

Kailudih (CT) - - - - 4,314 8,913<br />

Malkera (CT) 2,827 2,031 4,830 5,094 4,991 9,806<br />

Lakraka (CT) - - - - - 6,966<br />

Chandaur (CT) 2,471 3,721 5,271 6,297 9,690 13,761<br />

Nagri Kalan (CT) - - - - - 7,688<br />

Pondar Kanali (CT) - - - - 6,628 7,485<br />

Sijua (CT) 16,045 9,997 16,346 20,614 25,448 29,828<br />

Loyabad (CT) 22,909 11,553 19,287 26,475 31,297 32,721<br />

Kenduadih (CT) 5,979 5,542 4,220 5,470 6,740 8,359<br />

Baliari (CT) - - - - 10,501 11,536<br />

Chhotaputki (CT) - - - - - 6,727<br />

Basaria (CT) - - - - - 4,022<br />

Bhuli (CT) 4,956 11,299 20,876 40,832 56,774 89,534<br />

Godhar (CT) - - - - 7,200 9,552<br />

Dhaunsar (CT) - - - - - 9,214<br />

Kustai (CT) - - - - 11,830 12,280<br />

Saraidhela (CT) 2,208 2,879 6,603 11,956 16,393 24,189<br />

Jamadoba (CT) 23,245 6,568 16,646 25,171 31,761 34,092<br />

Jharia Khas (CT) - - - - - 19,831<br />

Tisra (CT) 27,390 7,470 33,891 46,930 55,677 53,572<br />

Jorapokhar (CT) 18,196 15,595 44,675 65,156 72,919 85,100<br />

Bhowrah (CT) 20,614 10,587 25,597 31,695 45,425 44,295<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 17


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Towns 1951 1961 1971 1981 1991 2001<br />

Pathardih (CT) 6,358 8,796 9,906 22,720 27,319 39,541<br />

Rohraband (CT) - - - - - 4,285<br />

Angarpathar (CT) 6,607 6,001 5,150 5,401 6,274 8,305<br />

Bhagatdih (CT) 9,521 14,392 17,465 22,514 30,174 33,507<br />

Baua Kalan (CT) 8,825<br />

Total Urban Agglomeration<br />

291,833 272,503 472,980 689,460 821,058 1,065,327<br />

Population<br />

No of Towns in UA 19 19 19 19 24 32<br />

Source: Census Hand Book.<br />

Table 4: Town wise Decadal Population Growth Rate of <strong>Dhanbad</strong> Urban Agglomeration<br />

Towns 1951-61 1961-71 1971-81 1981-91 1991-2001<br />

Percentage<br />

<strong>Dhanbad</strong> (M) 68.30 39.21 50.58 26.26 31.27<br />

Jharia (NAC) 27.20 34.30 27.10 21.12 17.72<br />

Sindri (NAC) 216.71 12.27 52.30 2.39 6.10<br />

Katras (NAC) 28.87 12.89 52.17 26.81 36.55<br />

Chhatatanr (NAC) -81.72 689.69 46.52 -62.20 13.21<br />

Kailudih (CT) - - - - 106.61<br />

Malkera (CT) -28.16 137.81 5.47 -2.02 96.47<br />

Lakraka (CT) - - - -<br />

Chandaur (CT) 50.59 41.66 19.46 53.88 42.01<br />

Nagri Kalan (CT) - - - - -<br />

Pondar Kanali (CT) - - - - 12.93<br />

Sijua (CT) -37.69 63.51 26.11 23.45 17.21<br />

Loyabad (CT) -49.57 66.94 37.27 18.21 4.55<br />

Kenduadih (CT) -7.31 -23.85 29.62 23.22 24.02<br />

Baliari (CT) - - - - 9.86<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 18


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Towns 1951-61 1961-71 1971-81 1981-91 1991-2001<br />

Percentage<br />

Chhotaputki (CT) - - - - -<br />

Basaria (CT) - - - - -<br />

Bhuli (CT) 127.99 84.76 95.59 39.04 57.70<br />

Godhar (CT) - - - - 32.67<br />

Dhaunsar (CT) - - - - -<br />

Kustai (CT) - - - - 3.80<br />

Saraidhela (CT) 30.39 129.35 81.07 37.11 47.56<br />

Jamadoba (CT) -71.74 153.44 51.21 26.18 7.34<br />

Jharia Khas (CT) - - - - -<br />

Tisra (CT) -72.73 353.69 38.47 18.64 -3.78<br />

Jorapokhar (CT) -14.29 186.47 45.84 11.91 16.70<br />

Bhowrah (CT) -48.64 141.78 23.82 43.32 -2.49<br />

Pathardih (CT) 38.35 12.62 129.36 20.24 44.74<br />

Rohraband (CT) - - - - -<br />

Angarpathar (CT) -9.17 -14.18 4.87 16.16 32.37<br />

Bhagatdih (CT) 51.16 21.35 28.91 34.02 11.05<br />

Baua Kalan (CT) - - - - -<br />

Total Urban Agglomeration -6.62 73.57 45.77 19.09 29.75<br />

Source: Census Hand Book and Analysis.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 19


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Sex Ratio<br />

The current (2001 census) sex ratio (female population per 1,000 male population) in<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> is 848, which is lower than the district figure of 874 and the<br />

state average of 941. Owing to the large number of male migrant workers in the region<br />

attributes to the lower sex ratio than other urban cities in the State.<br />

Literacy Rate<br />

In 2001, the literacy rate (percentage of literate population to the total population above six<br />

years of age) in the Urban Agglomeration (UA) area was 74.94 percent. The literacy rate of<br />

<strong>Dhanbad</strong> UA is higher than that of <strong>Dhanbad</strong> District (67.49 percent) and the State of<br />

Jharkhand (53.60 percent). The male and female literacy rate was 83.91 percent and 64.05<br />

percent, respectively. The main reason behind the high literacy rate is due to the presence of<br />

good number of educational and research institutions and other governmental offices in the<br />

<strong>Municipal</strong> <strong>Corporation</strong> jurisdiction.<br />

Household Size<br />

The total number of households in <strong>Dhanbad</strong> Urban Agglomeration area has increased from<br />

5.00 in 1991 to 5.54 in 2001. The household size for <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> is 5.57<br />

(as per census 2001), which is just below the district figure of 5.6 and well below the national<br />

average household size of 6.3 (as per Census 2001).<br />

Growth Trends and Projections<br />

The future population of <strong>Municipal</strong> <strong>Corporation</strong> is projected separately for the <strong>Dhanbad</strong><br />

Urban Agglomeration area and the 158 villages with in the <strong>Municipal</strong> <strong>Corporation</strong><br />

jurisdiction. To carry out the demand analysis of urban infrastructure facilities required for the<br />

<strong>Municipal</strong> <strong>Corporation</strong>, the different projection methods were analyzed. In case of <strong>Dhanbad</strong><br />

Urban Agglomeration, since decadal population figures are available from the Census for the<br />

period from 1951 to 2001, the trend line method is analyzed. However, owing to the<br />

inconsistency in growth rate (due addition of no of towns in to UA) average growth rate has<br />

been adopted based on five decadal figures. In case of the 158 villages with in the <strong>Municipal</strong><br />

<strong>Corporation</strong> jurisdiction, since population figures are available only for 1991 to 2001, the<br />

average growth rate during 1991 to 2001 is compared with the national average and the same<br />

is adopted to project the population. From different methods, constant growth rate of 2<br />

(average CAGR of last five decades) is assumed for <strong>Dhanbad</strong> Urban Agglomeration and for<br />

158 villages the national average figure of 2 percent annual growth rate has been assumed<br />

over the design period (2036). Table 5 presents the projected population of Urban<br />

Agglomeration and 158 villages for the year 2036. The present (2006) projected population<br />

for UA is 12.13 lakhs and for village areas it is 2.96 lakhs. As per the projection, the total<br />

projected population for <strong>Municipal</strong> <strong>Corporation</strong> jurisdiction is 30.83 lakhs in 2036.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 20


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Table 5: Projected Populated of <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong><br />

Year UA Area Other Villages Total<br />

2001(Census) 1,065,327 268,392 1,333,719<br />

2006 1,213,896 296,326 1,510,222<br />

2011 1,374,460 325,959 1,700,419<br />

2016 1,556,263 358,555 1,914,818<br />

2021 1,762,114 394,411 2,156,524<br />

2026 1,995,192 433,852 2,429,044<br />

2031 2,259,101 477,237 2,736,337<br />

2036 2,557,917 524,960 3,082,877<br />

Source: Analysis.<br />

C. Socio-Economic Profile<br />

1. Health<br />

The <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> has both government and private run hospitals and<br />

clinics. There are two Government Hospitals with about 500 bed strengths, 15 private<br />

hospitals and 33 doctors are working. Apart from this there are nine maternity centres, 135<br />

health centres and 47 dispensaries are functioning with the <strong>Municipal</strong> <strong>Corporation</strong><br />

jurisdiction. Population per health centers works out to around 6,400 persons per hospital<br />

and the no of persons per doctor ratio is comes around 12,230 persons to a doctor in the city.<br />

The command area per health center works out to 0.62 sq.km per hospital with in the<br />

Jurisdiction of <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong>. The Table 6 presents health facilities<br />

available with in <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> Jurisdiction.<br />

Table 6: Health Facilities in <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> Jurisdiction<br />

Health Centres Nos Number of<br />

Doctors<br />

No of<br />

Beds<br />

Average Patients per<br />

day<br />

Hospitals 17 33 3,042 1,000<br />

Maternity Centres 9 76 42 50<br />

Health Centres 135 - -<br />

Dispensaries 47<br />

- -<br />

Total 208 109 3,084 1,050<br />

Source: Compiled from various sources.<br />

The number of birth has increased from 6,704 to 21,858 from 2001 to 2004 and the number<br />

of death is also witnessed increasing trend from 120 to 651 for the same period. Table 7<br />

presents basic health indicators of the city.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 21


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Table 7: Basic Health Indicators - <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong><br />

Description 2000-01 2001-02 2002-03 2003-04 2004-05<br />

No of Birth 6,704 12,484 18,911 21,858 11,776<br />

No of Deaths 120 117 314 651 78<br />

Infant Mortality Rate (per 71% 71% 71% 71% 71%<br />

1,000)<br />

Child Mortality Rate (per 9.8% 9.8% 9.8% 9.8% 9.8%<br />

1,000)<br />

Maternity Mortality Rate<br />

(per lack)<br />

4.37% 4.37% 4.37% 4.37% 4.37%<br />

Source: CMO, <strong>Dhanbad</strong>.<br />

Disease Pattern<br />

In 2004-05, 2,397 malaria cases were registered, which has increased by 78 percent from<br />

2001-02 to 2004-05. The cholera cases have decreased from 1,332 in 2003-04 to 608 in 2004-<br />

05. Both these diseases could be attributed to the lack of proper sanitation systems, mixing of<br />

sewage with water, large quantity of on-street waste, allowing water stagnation and lack of<br />

awareness among the populace in terms of its health implications. Following table presents<br />

disease pattern recorded in <strong>Dhanbad</strong>.<br />

Table 8: Disease Pattern - <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong><br />

Disease Type 2000-01 2001-02 2002-03 2003-04 2004-05<br />

Cholera 680 289 836 1,332 608<br />

Malaria 2,253 1,347 1,918 2,068 2,397<br />

Source: CMO, <strong>Dhanbad</strong>.<br />

2. Education Facility<br />

<strong>Dhanbad</strong> houses government education and research institutions along with aided and private<br />

institutions. The literacy rate in the Urban Agglomeration is 74.94 percent and is high in<br />

comparison to the district figure of 67.49 percent. GoJ’s Education Department has control<br />

over administrative and financial aspects of the schools.<br />

<strong>Dhanbad</strong> city has Centre for Mining and Research Institutions (CMRI), ISM, Mining Institute<br />

at Bhaga, Rajkia Polytechnic Institution and PMCH. State Government and private sector<br />

impart education in <strong>Dhanbad</strong>. While, the State Government manages school education, the<br />

private sector provides higher education and manages colleges. The total number of students<br />

enrolled in schools is 43,764. The ratio between numbers of students per teacher in State<br />

Government run institutions is about one teacher for 60 students and the proportion varies in<br />

different hierarchy of institutions in the city.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 22


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

III.<br />

ECONOMIC BASE<br />

A. Overview<br />

<strong>Dhanbad</strong> – Jharia – Sindri region is situated at the epicentre of the rice mineral zone. The<br />

region’s mainstay in industrial production is coal and fertilizers, including a number of coal<br />

based chemical products. The region is well connected to other major centres by the G.T<br />

Road (NH 2) and other State Highways. The region is also situated close to a metropolitan<br />

marketing centre. Kolkata, provides all facilities for import and export trade by sea. By<br />

railways, the region is equally well linked with Delhi, Kolkata, Kanpur, Moghulsarai, Patna,<br />

Allahabad, Bombay and Southern India.<br />

The basic function of <strong>Dhanbad</strong> – Jharia – Sindri region is coal mining and this will continue<br />

for considerable span of time until the resources are depleted. The region has<br />

characteristically good potential for chemical industries based on coal by products. Even<br />

though the basic economy of the region is coal mining, the urban centres, such as <strong>Dhanbad</strong>,<br />

Jharia, Sindri, Katras, Karkend etc., have developed quite a diverse economic base. Industries<br />

of manufacturing, processing, servicing, repairing types and trade and commerce activities<br />

have come up in large numbers and even the “other service” sector contributes to a major<br />

extent in providing employment in the region.<br />

The coal mining activity will continue to guide the regional economy for many more years. At<br />

present, there are 112 coal mines operating in the district which totally produce 26.70 million<br />

metric tones of coal annually of a total value nearly Rs. 7,000 million. This activity directly<br />

employs nearly 180,000 workers in the district, which is as much as 25-30% of the total<br />

workers in the district.<br />

As described earlier coal mining is the predominant activities in the district of <strong>Dhanbad</strong>.<br />

There are 112 coal mines functioning with in the district, which are being operated four<br />

companies such as BCCL, ECL, TISCO and HSCO. Following table presents the details of<br />

organization wise no of mines operated and production per annum.<br />

Table 9: Organization wise no Coal Mines Operated and its Production<br />

Name of the Company No of Mines Production<br />

Thousand Tons<br />

BCCL 86 19,110.00<br />

ECL 17 338.49<br />

TISCO 6 763.66<br />

HSCO 3 242.40<br />

Total 112 20,454.55<br />

Source: NIC, <strong>Dhanbad</strong>.<br />

In larger interest of the Nation, the coal mining activity was nationalized in 1971 and all the<br />

mines were brought under Coal India Limited (CIL). The main objectives of the<br />

nationalization were:<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 23


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

(i.) To carry out systematic and scientific exploitation of coal;<br />

(ii.) To regulate the coal supply as per the country’s needs;<br />

(iii.) To create safe conditions in mines and achieve optimum exploitation of the resources<br />

by eliminating small individual lease holdings; and<br />

(iv.) To cater to the interest of the coal mine works who form a large part of the society.<br />

The coal production is expected to increase to 50 million tones, a nearly doubling of the<br />

present production. This would generate more employment in this activity. In elucidates the<br />

BCCL’s future projects or production plan up to 12 th Five Year Plan. The BCCL is planning<br />

to produce about 28.45 million tonnes of coal in 2016 -17. This would also provide impetus<br />

to the industrial growth in the region.<br />

The Jharia coalfields cover an area of about 448 sq. kms entirely situated within the district.<br />

The total reserve of this field is estimated at 5,000 million tonnes. The coal seams found here<br />

are, however, thinner and also fewer than in the Barakar field. A large part of the Jharia Coal<br />

Field is made up of Talchar rocks. The moisture content of the Barakar coals is comparatively<br />

low.<br />

Among other important minerals found in the district are fire clay for the manufacture of fire<br />

bricks and iron ore. Mica is found in the eastern portion of Baliapur. China clay and graphite<br />

are also available in certain pockets of the district.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 24


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Table 10: Future Production Plan of BCCL<br />

Name of Projects Type Capacity 06-07 07-08 08-09 09-10 10-11 11-12 12-13 13-14 14-15 15-16 16-17<br />

Million Tonnes<br />

Kharkharee/Maheshpur/ UG 1.00 0.10 0.20 0.30 0.40 0.50<br />

Dharmaband/Teturia<br />

Bhalgora UG 1.00 0.30 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00 1.00<br />

Mahuda T&B UG 0.40 0.10 0.15 0.20 0.25 0.30 0.35 0.40<br />

Bhowra-Sudamdih Re-org UG 0.40 0.10 0.15 0.20 0.25 0.30 0.40<br />

Moonidih PSLW UG 1.00 0.60 0.70 0.80 0.90 1.00 1.00 1.00 1.00 1.00<br />

Madhubad_Phularitand UG 0.40 0.10 0.20 0.25 0.35 0.35<br />

Amlabad UG 0.40 0.20 0.25 0.30<br />

Kapuria UG 1.00 0.10 0.20 0.30 0.40 0.50<br />

North-South Tisra OC 5.00 1.50 1.50 1.50 2.00 3.00 4.00 5.00 5.00 5.00 5.00 5.00<br />

Block –IV<br />

OC 5.00 2.00 2.00 3.00 4.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00<br />

(Incl.Akashkinaree)<br />

Block – III (incl. SOCP & OC 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00<br />

MOCP)<br />

Kalaneshwari OC 4.00 1.00 2.00 3.00 4.00 4.00 4.00 4.00<br />

Block – II OC 5.00 4.00 4.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00<br />

Total 29.60 12.50 12.80 15.40 17.10 20.40 22.75 25.35 26.85 27.50 28.05 28.45<br />

Source: BCCL, <strong>Dhanbad</strong>.<br />

Note: UG – Under Ground block, OC – Open Cast block<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 25


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Following table presents the Under<br />

Ground block wise net geological<br />

coal reserves in BCCL areas of Jharia<br />

Coal Field. The available/identified<br />

coal reserves have been classified in<br />

to three categories namely, prime<br />

coking, medium coking and non<br />

coking coals. Out of the total reserve<br />

of 11,066.73 million tonnes medium<br />

coking coal constitutes a maximum<br />

of 4,144.35 million tones (37 percent<br />

to total reserves) and prime coking<br />

coal contributes about 3,641.88<br />

million tones (33 percent of the total<br />

reserves).<br />

Figure 8: Distribution of UG Blocks Coal Reserves<br />

Prime Coking<br />

33%<br />

Coal Reserves (Underground Blocks)<br />

Medium Coking<br />

37%<br />

Non Coking<br />

30%<br />

Table 11: Category wise Coal Reserves in Underground Blocks in JCF<br />

Location Prime Coking Medium Non Coking Grand Total<br />

Coking<br />

Million Tonnes<br />

Madhuband 172.01 190.81 273.00 635.82<br />

Kharkharee – 162.80 222.20 349.00 734.00<br />

Dharmaband<br />

Katras-Choitudih 56.20 98.00 92.00 246.20<br />

Pootkee-Bulliary 275.70 123.20 533.00 931.90<br />

Bhutgoria 55.00 56.00 165.00 276.00<br />

Kustore 47.80 26.10 199.00 272.90<br />

Bhalgora 134.00 150.90 203.00 487.90<br />

Bhowrah 175.08 446.11 - 621.19<br />

Sitanala 100.41 20.50 - 120.91<br />

Amlabad 199.30 94.40 64.00 357.70<br />

Patherdih 63.30 185.50 - 248.80<br />

Tasra 30.58 254.13 - 284.71<br />

West Mohuda - 102.00 - 102.00<br />

South Mohuda - 68.40 - 68.40<br />

South Mohuda - 73.80 - 73.80<br />

East Mohuda - 50.80 - 50.80<br />

Sudamdih 213.60 407.00 - 620.60<br />

Moonidih 198.60 114.90 700.00 1013.50<br />

Kapuria 52.40 188.60 446.00 687.00<br />

Parbatpur 705.60 166.30 92.50 964.40<br />

Mahal 499.20 518.50 - 1017.70<br />

Damuda 33.30 36.20 35.00 104.50<br />

Pipratand – Singra 467.00 550.00 129.00 1146.00<br />

Total 3,641.88 4,144.35 3,280.50 11,066.73<br />

Source: BCCL, <strong>Dhanbad</strong>.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 26


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

BCCL has identified net<br />

geological coal reserves to the<br />

tune of 6,010 million tonnes in<br />

opencast blocks of Jharia Coal<br />

Field. The total coals reserves in<br />

the JCF are classified in to three<br />

categories namely prime coking,<br />

medium coking and non coking<br />

coals. The details of the same<br />

have been presented in the<br />

Table 12. From the figure and<br />

the table it is evident that the<br />

coal reserves available in the<br />

opencast blocks constitutes a<br />

maximum share of 59 percent<br />

from non coking coal.<br />

Figure 9: Distribution of Open Cast Blocks Coal Reserves<br />

Prime Coking<br />

17%<br />

Distribution of Coal Reserves (Opencast Blocks)<br />

Medium Coking<br />

24%<br />

Non Coking<br />

59%<br />

Table 12: Category wise Coal Reserves in Opencast Blocks in JCF<br />

Block Prime Coking Medium Non Coking Grand Total<br />

Coking<br />

Million Tonnes<br />

OCP – I 29.00 43.00 32.00 104.00<br />

OCP – II 61.00 40.00 285.00 386.00<br />

OCP – III 37.00 179.00 262.00 478.00<br />

OCP – IV 86.00 143.00 262.00 491.00<br />

OCP IV & VI 259.00 284.00 941.00 1,484.00<br />

OCP – VI 28.00 17.00 139.00 184.00<br />

OCP – VII 71.00 234.00 525.00 830.00<br />

OCP – VIII 134.00 204.00 493.00 831.00<br />

Mukunda OCP IX 313.00 275.00 634.00 1,222.00<br />

& U/G -9<br />

Total 1,018.00 1,419.00 3,573.00 6,010.00<br />

Source: BCCL, <strong>Dhanbad</strong>.<br />

<strong>Dhanbad</strong> district has estranged in to eight blocks of which five blocks are forming the part of<br />

the <strong>Municipal</strong> <strong>Corporation</strong> Area such as <strong>Dhanbad</strong> Sadar, Jharia, Baghbmara, Balaiapur and<br />

Gobindpur part. Major economic activities which are eminent in <strong>Dhanbad</strong> block is Mines,<br />

Hard Coke, Soft coke, Fire Bricks, Kil Bricks, Stone Crusher, Gate Grill Wooden, Furniture,<br />

Battery, automobiles, jwellery, cyber café, Pottery, Printing Press, Photo Studio, Flour Mills,<br />

Small Business and trading activities. In Jharia Block Mines, Hard Coke, Soft Coke,<br />

Refractories, Jwellery, Chemicals, Coal Briquettes are the predominant activities. Mines, Coal<br />

briquettes, Chemicals, Rolling mills, Small Business, Handicraft, Pottery, leather works are the<br />

main economic activities observed in Baghmara Block. In Baliapur Fertilizer Plants, Cement<br />

Plants, Chemicals, Soft-Coal, Agriculture and Handicraft are the important activities which<br />

are generating major work force. Gobindpur is known for its Soft Coal, Hard Coke,<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 27


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Washeries Chemicals, Crushers, Kiln Brick, Refractories, Rolling Mills, Agriculture Handicraft<br />

Pottery, Bamboo Crafts, and Weavers.<br />

Value of Coal Production<br />

The quality of the coal produced in this region are in different grades, based on the type and<br />

quality of the coal produced the value of the same will vary accordingly. As per discussion<br />

with BCCL official’s value of the coal produced in this region varies from Rs. 700 to Rs. 1,000<br />

per tones. The value of the production would be in the range of Rs. 22,750 Millions, this is<br />

worked out based on the BCCL’s production plan for 2016-17.<br />

Coal Acts and Notification<br />

Following acts and notifications are governs the Coal Mining activities in the country.<br />

(i.) Colliery Control Order, 2000<br />

(ii.) Notification Regarding Colliery Control Order<br />

(iii.) Mines & Minerals (Development & Regulation) Act, 1957 (as amended upto 20th<br />

December, 1999)<br />

(iv.) Mineral Concession Rules, 1960 (As Amended upto 18th January, 2000)<br />

(v.) The coal Mines (Nationalisation) Act (26 of 1973)<br />

(vi.) Coal Bearing Areas Acquisition & Development Act, 1957 (20 of 1957) as modified<br />

upto 1st December, 1976<br />

(vii.) Notification for Coal Bearing Areas Acquisition & Development Act<br />

(viii.) Coal Mines Provident Fund and Miscellaneous Provisions Act, 1948<br />

(ix.) Coal mines Provident Fund, Coal Mines Family Pension, coal Mines Deposit Linked<br />

Insurance Schemes (as modified upto 8th April, 1989)<br />

(x.) The Coking & Non Coking Coal Mines (Nationalization) Amendment Act, 1973<br />

(xi.) The Coal Mines (Nationalisation) Amendment Act, 1976<br />

(xii.) The Coal Mines Nationalisation Laws (Amendment) Act 1978<br />

(xiii.) The Coking Coal Mines (Nationalisation) Act, 1972<br />

(xiv.) The Coal Mines Nationalisation Law (Amendment) Act, 1986<br />

(xv.) The Coking Coal Mines (Emergency Provisions) Act , 1971<br />

(xvi.) The Coal Mines (Taking Over of Management) Act,1973<br />

(xvii.)Coal Mines (Conservation and Development) Rule , 1975<br />

(xviii.) Coal Mines (Conservation & Development) Act, 1974 No. 28 of 1974<br />

(xix.) Notifications related to Coal Mines Conservation & Development<br />

(xx.) Coal Mines Pension Scheme 1998<br />

New Government Policy for the Coal Sector<br />

Coal mining continues in the public sector except for captive mining purposes and a Bill,<br />

namely, the Coal Mines (Nationalisation) Amendment Bill, 2000, has already been introduced<br />

in Parliament to open up the coal sector to private investment. The Bill was referred to the<br />

Standing Committee on Energy for examination and report. The Standing Committee has<br />

since submitted its report, which was tabled on both the Houses of Parliament in August,<br />

2001. The Committee has recommended for adoption of the Bill subject to certain<br />

conditions. Meanwhile, a new policy dimension has been added by a policy decision taken by<br />

the Government. Under this decision, the State Government companies or undertakings are<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 28


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

allowed to do mining of coking and non-coking coal or lignite reserves, either by opencast or<br />

underground method, anywhere in the country, without the earlier restriction of isolated small<br />

pockets, subject to the following conditions:<br />

(i.)<br />

The State Government company or undertaking (referred to as the ‘company’ hereafter)<br />

is authorised to do coal or lignite mining by its Memorandum and Articles of<br />

Association.<br />

(ii.) The company will do coal or lignite mining in accordance with the provisions of the<br />

Coal Mines (Nationalisation) Act, 1973, the Mines & Minerals (Development &<br />

Regulation) Act, 1957, the Contract Labour (Regulation & Abolition) Act, 1970, and all<br />

other mineral, environmental and labour laws and other regulations governing the<br />

Indian coal industry.<br />

(iii.) For coal the company shall obtain a certificate from Coal India Limited to the effect<br />

that the latter has no plan or willingness to undertake mining operations for coal in the<br />

concerned area. For lignite, the company shall obtain a certificate from Neyveli Lignite<br />

<strong>Corporation</strong>.<br />

(iv.) The proposed mining area has not been allotted to a captive mining company under the<br />

provisions of Section 3(3)(a)(iii) of the Coal Mines (Nationalisation) Act, 1973.<br />

(v.) No financial assistance from the Central Government or Coal India Limited or Neyveli<br />

Lignite <strong>Corporation</strong> shall be provided to the company for coal or lignite mining in the<br />

concerned area.<br />

(vi.) None of the coal or lignite mines operated by the company will be taken over by the<br />

Central Government or Coal India Limited or Neyveli Lignite <strong>Corporation</strong> in the event<br />

of closure of such a mine or otherwise.<br />

(vii.) No employee of the company, engaged in a coal or lignite mine operated by it, will be<br />

absorbed in Coal India Limited or Neyveli Lignite <strong>Corporation</strong> at any point of time.<br />

Manpower<br />

Considering the value of coal mining activity in the district, indirect employment<br />

opportunities will arise. Since BCCL does’t have a manpower expansion plan for next 10<br />

years, they are planning achieve the production based on the effective usage of man and<br />

materials and resources available with BCCL. Indirect employment would be generated in the<br />

tune of 1.5 lakh to 2 lakh during the next 10 years period.<br />

1. Sectoral Growth<br />

As per Census 2001, the Workforce Participation Rate (WPR) in <strong>Dhanbad</strong> Urban<br />

Agglomeration area is only 24.83 percent. Owing to the absence of occupation pattern for<br />

villages only Urban Agglomeration occupation patter is discussed hereunder. Overall, the<br />

major workforce is concentrated in primary sector (other workers) like mining sector, which is<br />

about 85.91 percent of the total workforce in <strong>Dhanbad</strong> Urban Agglomeration. This may be<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 29


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

attributing to the large no of mining activity in the region. The occupational pattern of<br />

<strong>Dhanbad</strong> Urban Agglomeration in 2001 is presented in Table 13. From the following table it<br />

is evident that the female WPR is very low it is just 4.53 percent, while male WPR is 41.86<br />

percent. This attributes to the most of the male workers are engaged in mining and related<br />

activity in the <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> jurisdiction.<br />

Table 13: Work Force Participation Rate<br />

Description<br />

As per Census 2001<br />

Total % of Total Male Female<br />

Population 1,065,327 579,150 486,177<br />

Working Persons 2,64,479 2,42,457 22,022<br />

Workforce Participation Rate (%) 24.83 41.86 4.53<br />

Main Workers 234,616 88.71 217,878 16,738<br />

Main Workers – Cultivators 1,626 0.61 1,397 229<br />

Main Workers – Agricultural<br />

1,038 0.39 916 122<br />

Labourers<br />

Main Workers – House Holds<br />

4,733 1.79 4,007 726<br />

Industry<br />

Main Workers – Other Workers 227,219 85.91 211,558 15,661<br />

Marginal Workers 29,863 11.29 24,579 5,284<br />

Non Workers 800,848 75.17 336,693 464,155<br />

Source: Census, 2001.<br />

2. Industrial Development<br />

<strong>Dhanbad</strong> is the most industrialized district in the State of Jharkhand. The dominant industry<br />

of the district is coal mining and it is coal which has attracted and brought about a<br />

concentration of numerous other industries within its limits. The metallurgical coal of the<br />

Jharia coalfield within the district has given <strong>Dhanbad</strong> a very important place in the industrial<br />

map of the Nation.<br />

Next in importance among the industries in this district are the Fertilizers and Chemical<br />

industry at Sindri and the Bihar State Super phosphate Factory, a Govt. of Jharkhand (GoJ)<br />

undertaking. Another major industry in the district is the Refractory and Ceramic Industry.<br />

Among the few other large industrial establishments of the district, mention may be made of<br />

(i) Kumardhubi Fireclay and Silica Works Ltd., Kumardhubi, (ii) Reliance Firebricks &<br />

Pottery Co. Ltd., Chanch, Chirkunda, (iii) The Bihar Firebricks and Potteries Ltds., Mugma,<br />

(iv) Hindustan General Electrical <strong>Corporation</strong> Ltd., Karampura, (v) Khandelwal Glass Works,<br />

Ambona, (vi) Loyabad Coking Byproducts Recovery Plant, Bansjora, (vii) M/s. Shalimar Tar<br />

Products Ltd., Jharia (viii) The A.C.C. Ltd., Sindri Cement Works, Sindri, (ix) The Sijua<br />

(Jharia) Electric Supply Co. Ltd., Loyabad. (X) The Hindustan Malleable and Forgings Ltd.<br />

and (xi) McNally Bharat.<br />

The district is rich in coal deposit. In the present century the working in the vast coal<br />

resources of the district has gradually transformed it from comparatively a barren track the<br />

prosperous and industrialized area.<br />

Exploitation of rich mineral wealth of district has encouraged the growth of large number of<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 30


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

large and medium industrial units in this district. This has encouraged in its walk in<br />

development of small and ancillary industrial units around important centres like Govindpur,<br />

Sindri, Baghmara, Balliapur, Nirsa and <strong>Dhanbad</strong>.<br />

The existing industrial status of the district exposures that out of 37 number of large and<br />

medium. Industrial units 7 large and 16 medium scale industrial units are functioning in this<br />

district under public and private sector and 13 numbers of medium scale industrial units are<br />

closed in this district. The above medium scale industries are producing ziner, refractories<br />

items, high grade iron and steel casting, coal washeries plant, chemical and mining equipment.<br />

Small Scale Industries<br />

There are 5,177 Small Scale Industries (SSI) and Tiny scale industrial units are registered<br />

under district industries centre, <strong>Dhanbad</strong> from inception until 31 st March 2005, out of which<br />

381 SSI/Ancillary industrial units are engaged in producing B.H. Hard Cock, Soft cock, Coal<br />

Briquitte, Refrectories items, M.S. Roads, flates, Angle, Chemicals, flour, sujji, Bran, Rice, iron<br />

casting engineering and allied and 106 SSI units are closed/sick in this district. Despite of the<br />

facts that the region endowed with immense natural resources, the several small scale<br />

industrial units in particular have also been suffered in recent year from constraints on their<br />

operations resulting from raw materials demand to edit bottle-necks, water shortages during<br />

summer month have also hampered industrial activities in a few areas. A large proportion of<br />

credits sales and delayed payments in transactions with public sector units or other<br />

government agencies have strained the limited financial strength and thus very small scale<br />

units forcing them to be sick over a long period. Table 14 presents the registered SSI units,<br />

employment generation and investment in <strong>Dhanbad</strong> district.<br />

Table 14: Category wise Registered SSI Units, Investments and Employment Generation in<br />

<strong>Dhanbad</strong> District<br />

Categories Registered units Investment Employment<br />

Nos Rupees in Lakh Nos<br />

Agriculture and food<br />

287 141.61 1,935<br />

processing<br />

Forest Based 259 130.35 1,295<br />

Mineral & Ceramic Based 242 956.14 5,082<br />

Engineering & Allied Based 598 563.46 3,925<br />

Chemical Based 493 1,233.75 11,952<br />

Leather Based 68 65.95 252<br />

Textile based 345 145.59 1,035<br />

Electrical/Electronics & allied<br />

649 133.76 2,596<br />

based<br />

Repairers /servicing & other<br />

1,079 361.52 4,290<br />

Misc.<br />

Total 4,020 3,732.13 32,362<br />

Source: DIC, <strong>Dhanbad</strong>.<br />

The resulting impact of these constraints in the slow pace of industrial activities and the<br />

growing incidence of sickness in the district as many as 106 SSI units are closed and sick.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 31


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Figure 10: SSI - Employment Generation Distribution<br />

Any efforts in quickening the<br />

pace of industrial developments<br />

in the District has to take<br />

cognizance of the existing<br />

constraints on the operations of<br />

industrial units and top priority<br />

should be given to measures for<br />

strengthening infrastructure,<br />

where necessary and removing<br />

the other constraints that have<br />

come to notice. The basic<br />

objectives of industrial<br />

promotion in the district should<br />

be;<br />

Forest Based<br />

4%<br />

Agriculture and food<br />

processing<br />

6%<br />

Repairers /servicing &<br />

other Misc.<br />

13%<br />

Mineral & Ceramic<br />

Based<br />

16%<br />

Electrical/Electronics &<br />

Textile based<br />

allied based<br />

3%<br />

8%<br />

Employment Generation<br />

Leather Based<br />

1%<br />

Engineering & Allied<br />

Based<br />

12%<br />

Chemical Based<br />

37%<br />

(i.) To establish greater backward and forward linkages with large and medium industrial<br />

units in operations through;<br />

(ii.) The manufacture and supply of intermediate goods and other industrial products<br />

brought by them in large quantity regularly;<br />

(iii.) Utilization of their by-products and wastes for manufacture;<br />

(iv.) Promoting a wider dispersal of industrial activities in the district with particular attention<br />

to the rural area;<br />

(v.) The immense coal deposits of the districts should be used to greater advantage for<br />

development of coal based industries;<br />

(vi.) Integrated planning is necessary for re-settlement of man power and rehabilitation of<br />

displaced persons; and<br />

(vii.) To promote the development of industries for manufacture of selected consumer<br />

durables and consumer goods for which there is a large demand in the district this can<br />

be produced there at an economic cost largely with the skills available locally.<br />

Industrial Area Development<br />

The Bokaro Industrial Area Development Authority is functioning for the planned<br />

development of industrial areas with in the district. There are two industrial areas namely<br />

Kandra I/E with 186 sites (land) and developed plots to the total extent of 26.78 Ha and<br />

Sindri I/E which has 98 sites (land) and developed plots in a 55 Ha total area.<br />

Trade and Commerce<br />

Trade in <strong>Dhanbad</strong> is consists mainly of exporting coal, hides and skines, marble and stone,<br />

oil, fuel other mineral oils, gunnies, iron and steel, fireclay, firebricks, cement, sulphate of<br />

ammonia, importing of cotton piece goods, salt, grains and pulses, kerosene oil, petrol, lime,<br />

vegetable, mustard oil, shoes, fish, sugar, tobacco and chillies. There are four major retail<br />

centers are functioning with the <strong>Municipal</strong> <strong>Corporation</strong> jurisdiction, which are located at<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 32


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

<strong>Dhanbad</strong>, Jharia, Sindri and Gobindpur.<br />

Weekly Market<br />

Weekly Market/Haats are an important point of transaction between the producers and<br />

consumers of a variety of goods and animals. There are 28 markets in the district out of<br />

which 20 markets functioning with in the <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong>.<br />

Proposed Growth Centres<br />

The State Government has formulated an ambitious plan to setup and promote three tier<br />

growth centres, namely, Mega, Mini and Micro levels. The proposed mega growth centres are<br />

at Barhi and Hazaribagh. These two towns have been taken up for providing modern<br />

infrastructure facilities for rapid industrialization. Mini growth centres are being contemplated<br />

to be set up by the Government of Jharkhand (GoJ) at different location in the state where<br />

specific industrial activity needs to be boosted. Export Promotion Industrial Park (EPIP) is<br />

proposed to set up in <strong>Dhanbad</strong> District under the category of mini growth centre.<br />

Thrust Areas<br />

The potential for growth in mining and mineral based industries are immense. This sector has<br />

huge potential for attracting large investments to create employment and raise resources. It<br />

would be the endeavour of the State Government to expedite the granting of mining lease<br />

and simplify the procedures with respect to the grant of mining leases. In addition, the state<br />

government would also provide certain relief to make mining activities easier.<br />

(i.) Engineering, auto component, iron & steel and steel based down stream industries.<br />

(ii.) Chemical based industries<br />

(iii.) Power generating and allied industries<br />

(iv.) Industries based on non-conventional energy<br />

(v.) Industries based on recycling of wastes, eco friendly raw materials and processes.<br />

(vi.) Electronic and computers and IT based industries.<br />

(vii.) Promotion of Special Economic Zone (SEZ).<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 33


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

B. Tourism Development<br />

Shakti Mandir<br />

A much revered temple of goddess Durga in hear<br />

of the city, Shakti temple draws a large number of<br />

devotees.<br />

Kalyaneswari Madir<br />

Close to Maithan Dam, 46 km away from<br />

<strong>Dhanbad</strong>, is the famous temple presiding deity of<br />

which is Maa Kalyaneshwari. It draws a large<br />

number of devotees throughout the year. So<br />

famous is the temple that even the name Maithan is said to have been derived from Mai-kathan<br />

meaning abode of Goddess. There is also a deer park and a bird sanctuary in the vicinity.<br />

Sindri<br />

The famous fertilizer complex, 30 km away from <strong>Dhanbad</strong>, is located at Sindhi on the bank<br />

of Damodhar River. An engineering college, Bihar Institute of Engineering is also located<br />

here.<br />

Maithon Dam<br />

It has the biggest reservoir of the Damodar Valley <strong>Corporation</strong> India’s first multipurpose<br />

project. Stay in the lovely rest house on the island in the center of the 65 sq.km expanses of<br />

the lake.<br />

Panchet Dam<br />

Yet another dam to control the strong male rover Damodar. Panchet Hill overlooks the dam.<br />

Following table presents the monthly domestic tourist inflow to <strong>Dhanbad</strong> for a period of<br />

2002 to 2005.<br />

Table 15: Month wise Domestic Tourist Inflow to <strong>Dhanbad</strong><br />

Month/Year 2002 2003 2004 2005<br />

No of Domestic Tourists<br />

January - 1,707 1,617 5,115<br />

February - 1,421 2,912 6,225<br />

March 1,974 1,865 1,563 4,409<br />

April 2,056 2,846 2,068 5,342<br />

May 1,533 1,270 1,913 4,763<br />

June 1,781 2,093 5,670 5,312<br />

July 1,400 1,434 5,410 5,641<br />

August 1,346 1,222 6,140 4,949<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 34


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Month/Year 2002 2003 2004 2005<br />

No of Domestic Tourists<br />

September 2,395 1,551 4,613 5,551<br />

October 1,000 - 3,800 6,125<br />

November 5,243 2,656 3,395 7,614<br />

December 2,779 1,708 3,053 7,321<br />

Total 21,057 19,773 42,154 68,367<br />

C. Urban Economy - SWOT Analysis<br />

SWOT analysis has been undertaken to assess on the negative and positive aspects of the<br />

Urban Economy. It involves analyzing the internal positive (strengths) and negative<br />

(weakness) aspects of an organization and considering these in relation to aspects of the<br />

external environment – both the positive aspects (or opportunities) and negative aspects (or<br />

threats). The Table 16 gives the details of the SWOT analysis of Urban Economy.<br />

Table 16: Urban Economy – SWOT Analysis<br />

Strength<br />

<strong>Dhanbad</strong> is a “Commercial Capital” of Jharkhand;<br />

Abundant mineral (with a reserve of 6,000 MT coking coal) & human<br />

resources;<br />

More than 50 percent of the <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> area is under coal<br />

mining;<br />

Major industries like BCCL, TISCO, IISCO and ACC are accelerating city’s<br />

economy;<br />

BCCL is a subsidiary of CIL which creates employment opportunities<br />

(approx.75,000) for the citizens of <strong>Dhanbad</strong> and as well as drives the city’s<br />

economy;<br />

A high literacy rate of 74.94 in the District of <strong>Dhanbad</strong> and higher than the<br />

state of Jharkhand;<br />

Very Less unemployment;<br />

Highest rate of capital formation and a highly vibrant city of economic<br />

condition;<br />

Strategic location of <strong>Dhanbad</strong> geographically – ideal connectivity from Kolkata,<br />

Delhi and other parts of the country through road and rail;<br />

The location of city has helped to establish some consumer goods, engineering,<br />

plastic and chemical industries;<br />

Haldia is the nearest port, which is well connected with road and rail;<br />

<strong>Dhanbad</strong> district has 45 industrial units, which attributes to industrial and<br />

economic development for promoting future entrepreneurship;<br />

Most popular and top most research and training institutions like CMRI, ISM,<br />

DGMS, CMPDIL and BIT are functioning within the corporation limit, which<br />

not only impart training and research but also helps in to accelerate economic<br />

development; and<br />

Thermal power plants and DVC – hydro power generation unit also contributes<br />

to the economy of the state as well as the city.<br />

Weakness<br />

Widespread pollution leading to health related epidemics;<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 35


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Receding of the Water Table; and<br />

Poor mining techniques causing loss of life and property.<br />

Opportunities<br />

Coal and coal based industries can provide larger employment opportunities<br />

thereby giving a boost to a larger human resource the potential of which has<br />

not been tapped fully;<br />

Abundant reserves of Coal Bed Methane found in the district which can be<br />

used for LPG and also as on alternative to fuel for pollution free environment;<br />

To explore Tourism development and related tourism industry; and<br />

The diesel and EMU workshop at Gomoh junction has opened scope for small<br />

scale and ancillary units.<br />

Threats<br />

Underground fires in Jharia have led to the submission of the surface even in<br />

residential area;<br />

Two whole blocks of the district namely Tundi & Topchanchi and parts of<br />

other blocks i.e. Govindpur and Baghmara are naxalite affected further<br />

retarding the pace of development;<br />

The district is also prone to natural hazards. Like earthquake, cyclone. Drought,<br />

heat stroke, occasional floods and most prominently fire accident taking place<br />

in mining areas. The accident occurs any time causing loss of life stock<br />

infrastructure crops, animals, water, houses, etc. there by depleting the exiting<br />

strengths of the <strong>Dhanbad</strong>; and<br />

Large scale industrialization in the district has resulted in creating health hazards<br />

for general masses and giving rise to problem like tuberculosis, asthma,<br />

breathing problem, kidney problem, malnutrition and health related problems.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 36


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

IV.<br />

MUNICIPAL FINANCIAL MANAGEMENT<br />

A. Overview<br />

Presently only erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity and erstwhile Sindri NAC are getting revenue<br />

from there own sources, whereas in other erstwhile NACs and other local bodies and villages<br />

are getting scheme funds from central and state government towards implementation of<br />

scheme works and establishment grants for staffs salary purpose and hence, the above<br />

mentioned local bodies and villages are not maintaining accounts statements.<br />

This section contains a description of the erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity finances and<br />

erstwhile Sindri NACs finances, the sources and uses of funds, and an assessment of local<br />

body finances based on important financial indicators. The accounts of the local body<br />

account are maintained on a cash based single entry system. All recurring items of income and<br />

expenditure are included under the revenue account head. These include taxes, charges,<br />

salaries, maintenance expenditure, debt servicing etc. Income and expenditure items under<br />

this account are primarily non-recurring in nature are classified under capital account. Income<br />

items include loans, contributions by GoJ, other agencies and capital grants under various<br />

State and Central Government programs, revenue account transfer for capital works and<br />

income from sale of assets. Expenditure items include expenses booked under developmental<br />

works and purchase of capital assets.<br />

B. Financial Status<br />

Revenue income of<br />

erstwhile <strong>Dhanbad</strong><br />

<strong>Municipal</strong>ity has<br />

grown to Rs. 128.02<br />

Lakh in the FY<br />

2005-06 from Rs.<br />

101.89 Lakh in FY<br />

2001-02, at an<br />

annual growth of<br />

5.87 percent.<br />

Revenue<br />

expenditure<br />

decreased at an<br />

Figure 11: Revenue Income and Expenditure Trend –<br />

Erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity<br />

Amount in Rs. Lakh<br />

250.00<br />

200.00<br />

150.00<br />

100.00<br />

50.00<br />

-<br />

2001-02 2002-03 2003-04 2004-05 2005-06<br />

Year<br />

Revenue<br />

Income<br />

Revenue<br />

Expenditure<br />

average annual rate of 2.60 percent from Rs. 134.44 lakh to Rs. 120.98 lakh during the<br />

assessment period. The revenue account maintains deficit during the entire assessment period<br />

except during 2005-06. The trends for the revenue fund are presented in Table 17. The<br />

maximum revenue income during the FY 03-04 has attributed to non plan grant to the tune<br />

of Rs. 33.64 lakh. Revenue income and expenditure trend in presented in Figure 11.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 37


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Table 17: Abstract Financial Status of Erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity Account Statement<br />

Description 2001-02 2002-03 2003-04 2004-05 2005-06<br />

Rs. Lakh<br />

Revenue A/C<br />

Revenue Income 101.89 85.40 154.22 122.92 128.02<br />

Revenue<br />

Expenditure<br />

134.44 168.12 207.51 172.00 120.98<br />

Surplus/Deficit (32.55) (82.73) (53.29) (49.08) 7.04<br />

Capital A/C<br />

Capital Income 1,005.43 321.38 199.53 303.99 478.47<br />

Capital<br />

Expenditure<br />

397.23 248.33 70.34 337.40 23.79<br />

Surplus/Deficit 608.21 73.05 129.18 (33.42) 454.68<br />

Overall Status 575.66 (9.67) 75.89 (82.49) 461.72<br />

Capital income comprises of<br />

loans for plan, plan grants<br />

and contribution in the form<br />

of initial deposit for water<br />

supply connections. Majority<br />

of the capital income is in<br />

the form of grants and loans.<br />

The capital account has<br />

witnessed surplus except<br />

during FY 04-05 (refer<br />

Figure 12),<br />

implying loan drawn and<br />

Figure 12: Capital Income and Expenditure Trend –<br />

Erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity<br />

Amount in Rs. Lakh<br />

1,200.00<br />

1,000.00<br />

800.00<br />

600.00<br />

400.00<br />

200.00<br />

-<br />

2001-02 2002-03 2003-04 2004-05 2005-06<br />

grant received was utilized less for capital works. Fiscal status of revenue account and capital<br />

account status witnessed inconsistent in terms surplus during the entire assessment period.<br />

Year<br />

Capital<br />

Income<br />

Capital<br />

Expenditure<br />

Figure 13: Revenue Income and Expenditure Trend-<br />

Erstwhile Sindri NAC<br />

Revenue income of<br />

erstwhile Sindri<br />

120.00<br />

Notified Area<br />

Revenue<br />

Income<br />

100.00<br />

Committee (NAC)<br />

has grown to Rs.<br />

35.68 lakh in the FY<br />

80.00<br />

2005-06 from Rs.<br />

60.00<br />

33.39 lakh in FY<br />

40.00<br />

2001-02, at an<br />

annual growth of<br />

20.00<br />

1.67 percent.<br />

-<br />

Revenue expenditure<br />

2001-02 2002-03 2003-04 2004-05 2005-06<br />

decreased at an<br />

Year<br />

average annual rate of 1.79 percent from Rs. 62.86 lakh to Rs. 58.55 lakh during the<br />

Amount in Rs. Lakh<br />

Revenue<br />

Expenditure<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 38


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

assessment period. The revenue account maintains deficit during the entire assessment period.<br />

The trends for the revenue fund are presented in Table 18. Revenue income and expenditure<br />

trend in presented in Figure 13.<br />

Table 18: Abstract Financial Status of Erstwhile Sindri Notified Area Committee<br />

Description 2001-02 2002-03 2003-04 2004-05 2005-06<br />

Rs. Lakh<br />

Revenue A/C<br />

Revenue Income 33.39 35.60 68.53 42.40 35.68<br />

Revenue<br />

Expenditure<br />

58.55 35.60 100.18 51.07 62.86<br />

Surplus/Deficit (25.16) - (31.65) (8.67) (27.18)<br />

Capital A/C<br />

Capital Income 132.20 198.55 103.39 67.90 58.85<br />

Capital<br />

Expenditure<br />

101.89 193.66 58.80 14.49 14.00<br />

Surplus/Deficit 30.31 4.89 44.58 53.41 44.85<br />

Overall Status 5.15 4.89 12.93 44.74 17.67<br />

Figure 14: Capital Income and Expenditure Trend –<br />

Erstwhile Sindri NAC<br />

Capital income of erstwhile<br />

Sindri NAC comprises of<br />

loans for plan, plan grants<br />

and contribution in the form<br />

of initial deposit for water<br />

supply connections. Majority<br />

of the capital income is in<br />

the form of grants and loans.<br />

The capital account has<br />

witnessed surplus except<br />

during FY 04-05 (refer<br />

Figure 14), implying loan<br />

drawn and grant received<br />

was utilized less for capital<br />

Am ount in Rs. Lakh<br />

250.00<br />

200.00<br />

150.00<br />

100.00<br />

50.00<br />

-<br />

2001-02 2002-03 2003-04 2004-05 2005-06<br />

Year<br />

Capital<br />

Income<br />

Capital<br />

Expenditure<br />

works. Fiscal status of revenue account and capital account status witnessed inconsistent in<br />

terms surplus during the entire assessment period.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 39


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

C. Revenue Income<br />

The revenue sources of<br />

erstwhile <strong>Dhanbad</strong><br />

<strong>Municipal</strong>ity can be broadly<br />

categorized as own sources,<br />

assigned revenues and grants<br />

(refer<br />

Figure 15). The sourcewise<br />

income generated<br />

during the review period is<br />

presented in Table 19. The<br />

base and basis of each<br />

income source has been<br />

further elaborated in the<br />

following section. The<br />

Figure 15: Composition of Average Revenue Income –<br />

Erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity<br />

Revenue Grants<br />

12%<br />

Non Tax- Ow n<br />

Sources<br />

6%<br />

Assigned<br />

Revenues<br />

2%<br />

Tax- Ow n<br />

Sources<br />

80%<br />

revenue income of erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity has increased from Rs. 101.89 Lakh in<br />

2000-01 to Rs. 128.02 Lakh in 2005-06 – at a nominal Compound Annual Growth Rate<br />

(CAGR) of about 5.87 percent.<br />

Table 19: Details of Erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity Revenue Income<br />

Description 2001-02 2002-03 2003-04 2004-05 2005-06<br />

Rs. Lakh<br />

Tax – Own Sources<br />

Property Tax 77.51 77.65 97.62 103.36 100.87<br />

Professional Tax 1.00 1.50 1.25 1.60 1.60<br />

Total – Tax Own<br />

Sources<br />

78.51 79.15 98.87 104.96 102.47<br />

Assigned Revenue<br />

Surcharge on - - 14.51 - -<br />

Stamp Duty<br />

Total Assigned - - 14.51 - -<br />

Revenue<br />

Non – Tax Own<br />

Sources<br />

Income from<br />

<strong>Municipal</strong><br />

2.50 3.00 3.50 4.00 4.50<br />

Properties<br />

User Charges 1.93 2.00 2.20 2.71 3.00<br />

<strong>Municipal</strong> Fees and<br />

Fines<br />

1.00 1.25 1.50 1.75 2.00<br />

Total – Non Tax 5.43 6.25 7.20 8.46 9.50<br />

Revenue Grants<br />

Non Plan Grants 17.95 - 33.64 9.50 16.06<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 40


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Description 2001-02 2002-03 2003-04 2004-05 2005-06<br />

Rs. Lakh<br />

Total – Revenue<br />

Grants<br />

17.95 - 33.64 9.50 16.06<br />

Total Revenue<br />

Income<br />

101.89 85.40 154.22 122.92 128.02<br />

The revenue sources of<br />

erstwhile Sindri NAC can be<br />

broadly categorized as own<br />

sources, assigned revenues<br />

and grants (refer<br />

Figure 16). The<br />

source-wise income<br />

generated during the review<br />

period is presented in Table<br />

20. The base and basis of<br />

each income source has been<br />

further elaborated in the<br />

following section. The<br />

revenue income of erstwhile<br />

Figure 16: Composition of Average Revenue Income –<br />

Erstwhile Sindri NAC<br />

Non Tax- Ow n<br />

Sources<br />

5%<br />

Revenue Grants<br />

24%<br />

Tax- Ow n<br />

Sources<br />

71%<br />

<strong>Dhanbad</strong> <strong>Municipal</strong>ity has increased from Rs. 101.89 Lakh in 2000-01 to Rs. 128.02 Lakh in<br />

2005-06 – at a nominal Compound Annual Growth Rate (CAGR) of about 5.87 percent.<br />

Table 20: Details of Erstwhile Sindri NAC Revenue Income<br />

Description 2001-02 2002-03 2003-04 2004-05 2005-06<br />

Rs. Lakh<br />

Tax – Own Sources<br />

Property Tax 14.73 29.01 43.71 30.17 19.14<br />

Professional Tax 4.95 3.47 1.26 4.37 1.90<br />

Total – Tax Own<br />

Sources<br />

19.68 32.47 44.97 34.54 21.04<br />

Non – Tax Own<br />

Sources<br />

Income from<br />

<strong>Municipal</strong><br />

2.11 2.80 1.03 1.74 0.70<br />

Properties<br />

User Charges 0.27 0.32 0.13 0.11 0.22<br />

<strong>Municipal</strong> Fees and<br />

Fines<br />

- 0.01 0.00 - 0.01<br />

Total – Non Tax 2.38 3.13 1.17 1.85 0.93<br />

Revenue Grants<br />

Non Plan Grants 11.33 - 22.39 6.01 13.71<br />

Total – Revenue<br />

Grants<br />

11.33 - 22.39 6.01 13.71<br />

Total Revenue 33.39 35.60 68.53 42.40 35.68<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 41


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Description 2001-02 2002-03 2003-04 2004-05 2005-06<br />

Rs. Lakh<br />

Income<br />

Own-source income includes income from resource mobilization activities of erstwhile<br />

<strong>Dhanbad</strong> municipality and erstwhile Sindri NAC is in the form of taxes, income from<br />

municipal properties and markets (rent/lease), user charges and income from fees and fines,<br />

etc. Own revenue sources are further classified as tax revenue and non-tax sources that are<br />

generated by various sections of the ULB. The salient features of the revenue head is detailed<br />

below:<br />

(i)<br />

Own Sources/Tax. This item head comprises of income sourced primarily from<br />

property tax (General purpose tax, Lighting tax, Scavenging tax and Education tax,<br />

Water and Drainage tax), professional tax and other taxes. The property tax is the<br />

largest revenue-generating item for both erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity and<br />

erstwhile Sindri NAC. Own sources of erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity tax income is<br />

presented in Table 19 and own sources of erstwhile Sindri NAC tax income is given<br />

Table 20 Average income of erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity from own sources<br />

constituted 79.81 percent of the total revenue income during the review period and<br />

has increased at an average compounded annual growth rate of 5.93 percent. While<br />

average income of erstwhile Sindri NAC from own sources constituted 71.24 percent<br />

of the total revenue income during the same review period and has increased at n<br />

average CAGR of 1.68 percent. Tax sources of erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity<br />

contributed 79.81 percent of the revenue income and non-tax sources contribute<br />

6.05 percent of the revenue income. Whereas, erstwhile Sindri NAC tax sources<br />

contributed 71.24 percent of the revenue income and non- tax sources contribute<br />

only 4.92 percent of the revenue income.<br />

Property Tax is the most important category of own source income to the erstwhile<br />

<strong>Dhanbad</strong> <strong>Municipal</strong>ity it levies a consolidated property tax of 27 percent of the<br />

Annual Ratable Value (ARV). During the assessment period, the numbers of<br />

property tax assessments increased at an average growth rate of 1.76 percent per<br />

annum. Property tax current demand however has increased at a CAGR of about<br />

1.04 percent during the assessment period.<br />

(ii)<br />

(iii)<br />

Own Sources/Non Tax. This item head comprises of income from municipal<br />

properties, user charges and fees on municipal services. On an average, through the<br />

assessment period, own source/non tax income of erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity<br />

constitutes 6.32 percent of the total revenue income. However, incase of erstwhile<br />

Sindri NAC it is only 4.92 percent of the revenue income. Income from<br />

remunerative enterprises, income from user charges constitutes the major revenue<br />

sources under this item head. Income through non-tax own sources of the erstwhile<br />

<strong>Dhanbad</strong> <strong>Municipal</strong>ity has grown over the assessment period at a CAGR of about<br />

15.01 percent, while in case of erstwhile Sindri NAC the CAGR is negative growth<br />

of 20.99 percent.<br />

Assigned Revenues. This item head comprises of income from Government of<br />

Jharkhand (GoJ)/State transfers of erstwhile <strong>Municipal</strong>ity income collected by the<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 42


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

state line department. Transfers are in the form of municipality’s share of taxes levied<br />

and collected by GoJ from establishments/operations within the municipal limits.<br />

However, currently, surcharge on transfer of immovable properties are not<br />

transferred to erstwhile municipality. While, in case of erstwhile Sindri NAC no<br />

assigned revenue transfers to local body during the assessment period.<br />

(iv)<br />

Revenue Grants and Contribution. This item mainly comprises revenue grants<br />

and compensations from the State Government under various heads. The regular<br />

grants include the non plan for establishment purposes. Grants which are for specific<br />

purposes are ad-hoc in nature. In case of erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity, revenue<br />

grants and contributions constitute about 11.94 percent of the total revenue income<br />

and have registered an average annual negative growth rate of 2.76 percent. While in<br />

case of erstwhile Sindri NAC, revenue grants and contributions constitute about<br />

23.84 percent of the total revenue income and have witnessed an average CAGR of<br />

4.90 percent during the assessment period.<br />

D. Revenue Expenditure<br />

Revenue expenditure of erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity has been analyzed based on<br />

expenditure heads broadly classified under the following departments- General<br />

Administration, Public Works and Roads, Street Lighting, Public Health & Conservancy,<br />

drainage and etc. Revenue expenditure is further classified under Establishment, Operation &<br />

Maintenance and Debt Servicing.<br />

Table 21: Details of Erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity Revenue Expenditure<br />

Description 2001-02 2002-03 2003-04 2004-05 2005-06<br />

Rs. Lakh<br />

General<br />

Administration<br />

108.00 108.00 108.00 108.00 108.00<br />

Staff Salary and<br />

Employee Related 0.05 0.07 0.09 0.10 0.10<br />

Expenses<br />

Administration<br />

Expenditure<br />

0.05 0.10 0.15 0.15 0.15<br />

Total – General<br />

Administration<br />

108.10 108.17 108.24 108.25 108.25<br />

Operation and<br />

Maintenance<br />

Water Supply - - 21.92 - -<br />

Public Works and<br />

Roads<br />

- - - - -<br />

Public Health and<br />

Conservancy<br />

6.50 6.55 7.25 8.10 8.50<br />

Drainage<br />

Maintenance<br />

- 29.26 19.25 4.23<br />

Sanitation – Sulab 19.84 53.40 40.84 - -<br />

Ponds - - - 36.40 -<br />

Total – O&M 26.34 59.95 99.27 63.75 12.73<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 43


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Description 2001-02 2002-03 2003-04 2004-05 2005-06<br />

Rs. Lakh<br />

Debt Servicing - - - - -<br />

Total Revenue<br />

Expenditure<br />

134.44 168.12 207.51 172.00 120.98<br />

(a) Establishment<br />

Expenditure.<br />

Establishment<br />

expenditure alone<br />

accounts for about 80<br />

percent of revenue<br />

Figure 17: Composition of Average Revenue Expenditure<br />

& Operation<br />

Maintenance<br />

30%<br />

Establishments<br />

70%<br />

expenditure (refer<br />

Figure 17). About 69.86<br />

percent of the total<br />

revenue income is utilized<br />

for payment of salaries<br />

and other related<br />

expenses. Based on the<br />

annual account statement<br />

provide the ULB, debt servicing of the erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity is nil during the<br />

assessment period.<br />

(b) Operations & Maintenance. Operation and maintenance expenditure of all sections<br />

together accounts for 30.14 percent of revenue expenditure.<br />

Revenue expenditure details of the erstwhile Sindri NAC are presented in Table 22.<br />

Table 22: Details of Erstwhile Sindri NAC Revenue Expenditure<br />

Description 2001-02 2002-03 2003-04 2004-05 2005-06<br />

Rs. Lakh<br />

General<br />

Administration<br />

Staff Salary and<br />

Employee Related 43.37 33.96 98.51 48.59 60.97<br />

Expenses<br />

Administration<br />

Expenditure<br />

0.35 0.36 0.36 0.36 0.36<br />

Total – General<br />

Administration<br />

43.72 34.32 98.87 48.95 61.33<br />

Operation and<br />

Maintenance<br />

Water Supply 13.60 - - - -<br />

Public Works and<br />

Roads<br />

- - - 0.75 -<br />

Public Health and 0.65 0.67 0.70 0.73 0.89<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 44


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Description 2001-02 2002-03 2003-04 2004-05 2005-06<br />

Rs. Lakh<br />

Conservancy<br />

Drainage<br />

Maintenance<br />

- - - - -<br />

Sanitation – Sulab 0.25 0.27 0.27 0.27 0.28<br />

Ponds 0.02 0.04 0.03 0.05 0.01<br />

Miscellaneous 0.30 0.31 0.31 0.33 0.35<br />

Total – O&M 14.82 1.28 1.32 2.12 1.53<br />

Debt Servicing - - - - -<br />

Total Revenue<br />

Expenditure<br />

58.55 35.60 100.18 51.07 62.86<br />

E. Capital Account<br />

Capital Income. Capital income comprises of loans and grants. The detailed components of<br />

capital income are detailed in Table 23. An analysis of this account indicates that grants &<br />

contributions have contributed the maximum share of income under this account. While on<br />

an average 58.45 percent of the capital income is in the form of grants and contributions for<br />

(plan grant) creation of assets. Loans were acquired during the assessment period for public<br />

works and roads and other improvement works which contributes on an average 41.55<br />

percent of the total capital income during the assessment period.<br />

Table 23: Details of Erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity Capital Account Statement<br />

Description 2001-02 2002-03 2003-04 2004-05 2005-06<br />

Rs. Lakh<br />

Capital Income<br />

Loans 456.76 205.20 57.86 75.67 213.28<br />

Grants 548.67 116.18 141.67 228.31 265.19<br />

Total – Capital Income 1,005.43 321.38 199.53 303.99 478.47<br />

Capital Expenditure<br />

Water Supply 130.66 - - - -<br />

Public Works &<br />

Roads<br />

133.88 248.33 70.34 18.12 23.79<br />

Public Health & 132.68 - - - -<br />

conservancy<br />

Others - - - 319.28 -<br />

Capital Expenditure 397.23 248.33 70.34 337.40 23.79<br />

Surplus/ (Deficit ) 608.21 73.05 129.18 (33.42) 454.68<br />

Capital Expenditure. The majority of capital expenditure has been directed towards public<br />

works and roads, general purpose includes all item of works excluding water supply and<br />

drainage and public health & conservancy over the past five years.<br />

Capital income of erstwhile Sindri NAC is presented in Table 24. Loans form State<br />

Government constitutes about 61.24 percent and grants contributes 38.76 percent. Capital<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 45


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

account overall status is surplus during the entire review period.<br />

Table 24: Details of Erstwhile Sindri NAC Capital Account Statement<br />

Description 2001-02 2002-03 2003-04 2004-05 2005-06<br />

Rs. Lakh<br />

Capital Income<br />

Loans 78.71 128.87 64.87 35.36 39.39<br />

Grants 53.49 69.68 38.51 32.55 19.46<br />

Total – Capital Income 132.20 198.55 103.39 67.90 58.85<br />

Capital Expenditure<br />

Water Supply - - - - -<br />

Public Works &<br />

Roads<br />

53.04 172.68 30.16 - -<br />

Street Lighting - - - 7.27 14.00<br />

Construction of<br />

Drains<br />

33.85 - 12.39 1.75 -<br />

Others 15.00 20.98 16.25 5.47 -<br />

Capital Expenditure 101.89 193.66 58.80 14.49 14.00<br />

Surplus/ (Deficit ) 30.31 4.89 44.58 53.41 44.85<br />

F. Financial Performance Indicators and Key Issues<br />

A set of key financial performance indicators has been derived using the financial data<br />

procured from the erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity and Sindri NAC for the assessment<br />

period (5 yrs average). Table 25 presents these indicators. These indicators are used to assess<br />

the ULB’s performance with regards resource mobilization, fund utilization, financial<br />

performance and collection efficiencies<br />

Table 25: Key Financial Performance Indicators of Erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity<br />

Description <strong>Dhanbad</strong> NAC Unit<br />

A Resource Mobilization<br />

1 Per Capita Income 53 49 Rs. p.a<br />

2 Sources of Funds<br />

a Share of Own Sources in Total Revenue Income (RI) 85.86 79.81 %<br />

b Share of Property Tax in Total Revenue Income 78.60 65.13 %<br />

c Share of Revenue Grants & Subsidies in Total RI 11.79 20.19 %<br />

3 Growth in Revenue Income 5.87 1.67 % p.a<br />

4 Growth in Own Sources of Revenue Income 8.22 17.46 %<br />

5 Per Capita Own Income 45 37 Rs. P.a<br />

B Fund Application<br />

1 Per Capita Expenditure 73 70 Rs. p.a<br />

2 Uses of Funds<br />

a Share of Establishment Expenditure in Total RE 64.96 91.41 %<br />

b<br />

Share of O&M Expenditure in Total Revenue<br />

Expenditure 35.04 8.59 %<br />

c Share of Establishment Expenditure to Total RI 93.18 125.53 %<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 46


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Description <strong>Dhanbad</strong> NAC Unit<br />

3 Growth in Establishment Expenditure 0.03 28.27 %<br />

4 Growth in O&M Expenditure 15.48 (11.04) %<br />

5 Growth in Total Revenue Expenditure 0.48 29.07 % p.a<br />

C Liability Management<br />

1 Per Capita Liability (2005-06 estimated)<br />

a Outstanding Debt per Capita 466 388 Rs.<br />

As a Proportion of Property Tax Current Demand<br />

2 (2005-06 estimated)<br />

a Outstanding Debt as % of P.T Demand 11,312 3,762 %<br />

a Outstanding Debt as % of Own Revenue Sources 977 1,013 %<br />

3 Debt Servicing Ratio (D.S/ Revenue Income) - - %<br />

D Performance Indicators<br />

1 Operating Ratio 1.51 1.35 Ratio<br />

2 Growth in Per Capita Own Income 3.74 (3.58) % p.a<br />

3 Growth in Per Capita Grant (6.13) 1.25 % p.a<br />

4 Growth in Per Capita Total Revenue Income 2.20 1.86 % p.a<br />

5 Growth in Per Capita Establishment Expenditure (3.44) 5.05 % p.a<br />

6 Growth in Per Capita O&M Expenditure (19.52) (45.25) % p.a<br />

7 Growth in Per Capita Revenue Expenditure (5.99) (1.74) % p.a<br />

8 Capital Utilization Ratio 0.66 0.63 Ratio<br />

E Efficiency Indicators<br />

1 Tax Collection Performance<br />

a Property Tax 38 30 %<br />

b Water Charges 44 - %<br />

c Profession Tax 75 NA %<br />

6 Population per Residential P.T Assessment 19.34 9.12 Persons<br />

Resource Mobilization Indicators. These indicators summarize the performance of the<br />

ULBs with regards sources of funds. Erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity derives about 85.86<br />

percent of its revenue income from own sources and erstwhile Sindri NAC mobilizes own<br />

revenue to tune of 79.81 percent of the total revenue income, while grants account for just<br />

about 11.79 percent of the erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity revenue income and erstwhile<br />

Sindri NAC grants accounts for 20.19 percent of the total revenue income.<br />

Fund Application Indicators. These indicators are a measure to ascertain the utilization<br />

from the ULBs fund. In case of erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity, around 65 percent of the<br />

revenue expenditure is spent on establishment heads, about 35 percent for O&M of ULB<br />

assets and services. It should be noted that ULB did not repay during the review period.<br />

While, incase of erstwhile Sindri NAC spent 91.41 percent of the total revenue expenditure<br />

towards establishments expenditure and leaving only 8.59 percent of the total revenue<br />

expenditure towards maintenance of assets.<br />

Liability Management Indicators. These indicators are a measure to ascertain the<br />

utilization from the ULB fund regards to debt servicing. The ratio of debt servicing to<br />

revenue income is Nil during the assessment period for both erstwhile individual ULBs. The<br />

percapita average outstanding debt works out to 466 rupees for erstwhile <strong>Dhanbad</strong><br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 47


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

<strong>Municipal</strong>ity and erstwhile Sindri NAC is 388.<br />

Overall Financial Performance Indicators. These indicators are a measure to assess the<br />

overall financial performance of the ULB with regards operational performance and effective<br />

growth in revenue income and expenditure. The average operating ratio of the erstwhile<br />

<strong>Dhanbad</strong> <strong>Municipal</strong>ity and erstwhile Sindri NAC during the assessment period was vulnerable<br />

at 1.51 and 1.35 respectively. The capital utilization ratio of erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity<br />

and erstwhile Sindri NAC was low at 0.66 and 0.63 respectively, which indicating lower<br />

utilization of revenue account fund in asset creation. The indicators of growth in per capita<br />

income and expenditure item heads indicate the effective growth, giving a performance<br />

measure relative to the growing population. The erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity and<br />

erstwhile Sindri NAC has demonstrated 2.20 percent and 1.86 percent respectively annual<br />

growth in per capita revenue income during the assessment period, while the per capita<br />

revenue expenditure of erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity and erstwhile Sindri NAC has<br />

declined at a significantly lower 5.99 percent and 1.74 percent respectively during the<br />

corresponding period. Which indicates that as population increases revenue fund will be in<br />

surplus. However this reveals adequate fund was not utilized toward maintenance of the<br />

assets owned by ULB.<br />

Efficiency Indicators. These indicators are essentially a measure to assess ULBs efficiency<br />

with regards revenue base coverage and realization. The erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity has<br />

maintained an average collection performance with regard to property tax (38 percent) water<br />

charges (44 percent). The average no of persons per residential assessment for erstwhile<br />

<strong>Dhanbad</strong> <strong>Municipal</strong>ity is at 19.34 indicates that the property tax base has lesser coverage.<br />

Key issues and conclusions are based on the review and assessment ULB finances and<br />

discussions with relevant ULB officials.<br />

(i)<br />

(ii)<br />

(iii.)<br />

(iv.)<br />

(iv.)<br />

(v.)<br />

Maintenance and Reporting of Accounts. There is no proper accounting system,<br />

accounting code /manual to follow and the auditing system also poor. ULB don’t<br />

maintain abstract of account statement, it follows only in cash based accounting<br />

system. ULB’s do not maintain department/sector wise salary expenditure.<br />

Dearth of long term financial planning for want of perspective physical planning of<br />

huge capital outlays;<br />

Lack of diversity in the tax structure;<br />

Property/holding tax (including arrear and current) collection performance during the<br />

last 5 years is only 38 percent;<br />

Water charges demand collection during the last 5 years work out to only 44 percent;<br />

The property tax rates are already due for 2 increases, which needs to be revised soon;<br />

(vi.)<br />

(vii.)<br />

Need to adopt area based computation of property tax rather than value based;<br />

Need to increase the property tax net;<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 48


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

(viii.)<br />

Proper and transparent accounting system should be in place;<br />

MADA – Fund Assessment<br />

Overview. The fund of MADA is analyzed in detail based on its accounts statement for the<br />

last seven financial years (FY), i.e. FY 1997-98 to FY 2003-04. Table 26 presents a summary<br />

of MADA finances from FY 1997-98 to FY 2003-04. The total size of the MADA fund, in<br />

terms of income has increased from 1,592.95 lakh in 1999-00 to over Rs. 1,833.79 lakh in<br />

2003-04 – a compounded annual growth rate (CAGR) of about 2.03 percent. The detailed<br />

statement is presented in Table 26 & Table 27.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 49


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Table 26: Annual Receipt Statement of MADA<br />

Receipts 1997-98 1999-99 1999-2000 2000-01 2001-02 2002-03 2003-04<br />

Rs. Lakh<br />

Water Tax (Mining) 1,360.30 1,445.85 1,413.37 1,236.04 1,476.00 1,372.00 1,188.20<br />

Water Tax (Non –<br />

Mining) 7.23 7.12 19.58 84.05 95.00 97.00 46.95<br />

Land Use Tax 2.50 2.00 2.00 0.70 - - -<br />

Stamp Duty 110.40 92.00 220.00 187.75 337.50 280.39 464.10<br />

Holding (Latrine) Tax 22.40 15.87 18.00 18.87 16.68 21.32 32.75<br />

Loan (HUDCO) 50.90 14.90 - - - - -<br />

Grant (District<br />

Planning) 0.95 24.24 1.80 - 38.58 35.87 -<br />

Licence Fee 1.30 1.00 1.54 0.90 1.25 1.37 2.20<br />

Others 26.82 15.43 52.25 36.25 43.54 48.25 88.36<br />

Deposit 6.82 6.04 2.88 4.15 7.07 5.94 6.75<br />

Miscellaneous 3.33 2.35 12.41 0.40 0.50 0.55 4.48<br />

Over Draft - - - 135.00 - - -<br />

Other Revenues<br />

Total 1,592.95 1,626.80 1,743.83 1,704.11 2,016.12 1,862.69 1,833.79<br />

Table 27: Annual Expenditure Statement of MADA<br />

Expenditure 1997-98 1999-99 1999-2000 2000-01 2001-02 2002-03 2003-04<br />

Rs. Lakh<br />

Establishment 1,401.95 1,465.11 1,540.59 1,575.18 1,863.44 1,694.00 1,663.30<br />

Principle Construction<br />

Work 22.71 1.24 9.23 13.44 40.31 37.50 39.00<br />

Repair and<br />

Maintenance Work 118.59 119.76 80.88 107.25 80.04 90.19 100.02<br />

Central Purchase 5.69 9.05 5.58 0.86 8.21 4.12 -<br />

Medicine and<br />

Chemicals 0.12 0.21 0.32 0.69 14.29 11.61 22.35<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 50


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Expenditure 1997-98 1999-99 1999-2000 2000-01 2001-02 2002-03 2003-04<br />

Rs. Lakh<br />

Instruments and<br />

Furniture 0.03 - - - 1.21 1.20 -<br />

Return of Deposit 4.44 2.72 4.82 3.08 2.35 2.31 4.10<br />

Advance (Employees) 11.39 10.70 9.25 5.55 12.50 11.00 11.82<br />

Repayment of<br />

HUDCO Loan 53.70 24.21 90.70 5.96 - - -<br />

Miscellaneous 0.15 0.36 5.96 0.94 0.56 0.76 3.20<br />

Total 1,618.77 1,633.36 1,747.33 1,712.95 2,022.91 1,852.69 1,843.79<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 51


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Figure 18: Water Charge Collection Performance of MADA<br />

In Table 28 the average<br />

collection performance of<br />

Water Supply charges and<br />

Property Tax for the review<br />

period is 44 percent and 38<br />

percent respectively. It is<br />

observed that the <strong>Corporation</strong><br />

maintained a low arrear<br />

collection during the entire<br />

assessment period. The<br />

demand of water supply<br />

charges witnessed increasing<br />

Rs. Lakh<br />

3500<br />

3000<br />

2500<br />

2000<br />

1500<br />

1000<br />

500<br />

0<br />

Water Charge Collection Performance<br />

2000-01 2001-02 2002-03 2003-04<br />

Year<br />

Total-<br />

Demand<br />

Total-<br />

Collection<br />

trend, from Rs. 3,085 lakh to Rs. 3,181 lakh while total collection also has increased from Rs.<br />

1,282 lakh to Rs. 1,383 lakh.<br />

Figure 19: Property Tax Collection Performance of erstwhile<br />

<strong>Dhanbad</strong> <strong>Municipal</strong>ity<br />

In terms of Holding<br />

tax/property tax total demand<br />

has increased from Rs. 244.76<br />

lakh to Rs. 277.55 lakh during<br />

the review period. In chase of<br />

total collection, during the<br />

review period has increased<br />

from Rs. 82.75 lakh to Rs.<br />

110.71 lakh.<br />

Rs. Lakh<br />

300<br />

250<br />

200<br />

150<br />

100<br />

50<br />

0<br />

Property Tax Collection Performance<br />

2000-01 2001-02 2002-03 2003-04<br />

Total-<br />

Demand<br />

Total-<br />

Collection<br />

Year<br />

Table 28: DCB Statement of Water Supply and Holding tax<br />

Description 2000-01 2001-02 2002-03 2003-04 2004-05<br />

Rs. Lakh<br />

W/S DCB – MADA<br />

Arrear Demand 1,742.19 1,803.72 1,415.40 1,615.39 1,776.29<br />

Current Demand 1,343.57 1,289.61 1,496.84 1,330.35 1,405.42<br />

Total Demand 3,085.75 3,093.33 2,912.24 2,945.74 3,181.70<br />

Total Collection 1,282.03 1,639.97 1,296.85 1,169.45 1,383.92<br />

Coll. Performance 42% 53% 45% 40% 43%<br />

Erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity – Holding Tax DCB<br />

Arrear Demand 149.15 162.01 172.31 184.80 178.93<br />

Current Demand 95.62 96.24 96.88 9.80 98.62<br />

Total Demand 244.76 258.25 269.20 194.60 277.55<br />

Arrear Collection 56.26 57.87 56.89 74.77 81.56<br />

Current Collection 26.50 28.06 27.50 29.10 29.16<br />

Total Collection 82.75 85.93 84.40 103.87 110.71<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 52


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Description 2000-01 2001-02 2002-03 2003-04 2004-05<br />

Rs. Lakh<br />

Coll. Performance 34% 33% 31% 53% 40%<br />

Source: MADA, erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity.<br />

G. <strong>Municipal</strong> Finance - SWOT Analysis<br />

SWOT analysis has been undertaken to assess on the negative and positive aspects of the<br />

<strong>Municipal</strong> Finance. It involves analyzing the internal positive (strengths) and negative<br />

(weakness) aspects of an organization and considering these in relation to aspects of the<br />

external environment – both the positive aspects (or opportunities) and negative aspects (or<br />

threats). The Table 29 gives the details of the SWOT analysis.<br />

Table 29: <strong>Municipal</strong> Finance – SWOT Analysis<br />

Strength<br />

Power to tax as per 74th CAA; and<br />

Authority to collect taxes.<br />

Weakness<br />

Dearth of long term financial planning for want of perspective physical<br />

planning of huge capital outlays;<br />

Lack of initiatives in financial resource mobilization;<br />

Lack of proper co-ordination between the different line agencies and<br />

department in service delivery;<br />

Lack of propensity to pay land holding tax and water user charges;<br />

Lack of diversity in the tax structure; and<br />

Absence of auditing practice.<br />

Opportunities<br />

Emergence of new concepts such as BOT, BOOT, BOLT on a smaller scale;<br />

and<br />

Outsourcing project management.<br />

Threats<br />

Closed mind set among officials.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 53


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

V. EXISTING INFRASTRUCTURE ASSESSMENT<br />

A. Water Supply<br />

1. Overview<br />

<strong>Municipal</strong><br />

<strong>Corporation</strong> of<br />

<strong>Dhanbad</strong> meets its<br />

water requirement<br />

through surface<br />

sources, sub surface<br />

sources and ground<br />

water sources. The<br />

new <strong>Municipal</strong><br />

<strong>Corporation</strong> area<br />

includes five blocks<br />

namely <strong>Dhanbad</strong><br />

Sadar Block, Jharia<br />

Block, Baliapur Block,<br />

Baghmara Block and<br />

Gobindpur Block<br />

(partly). Major urban centres like erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity, Jharia NAC, Katras NAC,<br />

Sindri NAC and Chatanadh NAC are also form part of the new <strong>Corporation</strong> area.<br />

Following table presents the surface, sub surface sources and ground water sources of<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong>. For provision of water supply, three agencies are involved<br />

in the <strong>Municipal</strong> <strong>Corporation</strong> jurisdiction namely, MADA, PHED (WS&DB) and FCI. The<br />

entire mineral areas with in the district is being supplied by MADA (bulk water supply and<br />

distribution), FCI supplies protected piped water to the Sindri NAC alone and PHED does<br />

the distribution of water supply to erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong> area and also it covers other<br />

urban areas with in the jurisdiction of <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> (excluding MADA<br />

and FCI distribution areas) either through piped water or hand pumps to meet the growing<br />

demand. MADA supplies bulk water to BCCL for distribution and BCCL supplies water to<br />

their collieries. However, in some areas BCCL themselves extract and supplies water to their<br />

collieries.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 54


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Table 30: Water Supply Sources – <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong><br />

Description Surface/ Sub Surface Source Ground Water Source<br />

Source<br />

Dhamodar River, Topchanchi<br />

Lake<br />

No of Hand Pump/Tube<br />

- 2,753<br />

Wells<br />

No of High yield Bore<br />

- 9<br />

Wells<br />

No of Open Wells 367<br />

Supply (MLD) 89.81 9.47<br />

Source: MADA, PHED, FCI.<br />

The water supply system of <strong>Dhanbad</strong> <strong>Municipal</strong><br />

<strong>Corporation</strong> area is based on surface water of<br />

Topchanchi Lake and Damodar river which is<br />

treated at Topchanchi lake and Jamadoba water<br />

works respectively and having a total capacity of 108<br />

MLD. The Jamadoba water works is located at 20<br />

km from <strong>Dhanbad</strong> city. The Jamadoba water works<br />

is based on conventional treatment employing<br />

clarifloculator, rapid sand filtration followed by<br />

chlorination. The water works is under the<br />

jurisdiction of MADA and serves coal mines area of <strong>Dhanbad</strong> namely, Jharia, Putki,<br />

Kenduam Chhatatand etc. besides erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong> Area. Jadmadoba water<br />

works never work on full capacity due to operational problems as well as due to old/out lived<br />

mechanical and electrical equipments as well as old civil structures. With the existing system,<br />

the Jamadoba water works can deliver 72 MLD of water on an average. MADA supplies<br />

water to Jharia NAC area and coal mining area of Putki, Kendua, Kerkend etc. from its<br />

Jamaboda water works.<br />

The treated water from Jamadoba is pumped to Jharia pumping station from where water is<br />

pumped to distribution system of <strong>Dhanbad</strong> city. The Jamadoba water works and Jharia<br />

Pumping station are operated and maintained by PHED and erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity<br />

collects revenue.<br />

2. Sources of Water Supply<br />

The first protected water supply was provided during<br />

the year 1914-24 to coal mining areas from<br />

Topchanchi Lake which is located at a distance of 20<br />

km from the city with a total production capacity of<br />

13.50 MLD and is being supplied through gravity.<br />

The second protected water supply scheme was<br />

commissioned during the year 1955-60 for the<br />

mineral areas in the region to meet the rapidly<br />

growing population. The second water supply<br />

scheme depends on damodar river (Jamadoba water works) which is located at a distance of<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 55


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

22 km from the city of <strong>Dhanbad</strong>. The total extraction capacity of Jamadoba water works is<br />

about 94.50 MLD out of which presently around 72 MLD of water is supplied daily through<br />

pumping to Mineral areas in the district. The following table presents the details of existing<br />

water supply scheme details. The total extracted water from the Damodar river and<br />

Topchanchi lake is around 89.81 MLD which include FCI’s supply amount of 6.81 MLD to<br />

Sindri NAC area. Besides this PHED also supplies waster from ground water sources through<br />

high yield bore wells to urban settlements with in the <strong>Municipal</strong> <strong>Corporation</strong> jurisdiction.<br />

Table 31 presents the each surface source wise details and its treatment capacity.<br />

Table 31: Water Supply Surface Sources Details<br />

Surface Source Details Unit Source 1 Source 2 Source 3<br />

MADA<br />

FCI- Sindri<br />

Name of the River / Tank Damodar Topchanchi Damodar<br />

Lake<br />

Water produced / extracted MLD 94.50 13.50 9.08<br />

Water transmitted MLD 72.00 11.00 6.81<br />

Distance from Source to<br />

M 80 50 3,000<br />

Treatment Plant<br />

Distance from source to town Km 22 20 6,000<br />

Transmission type Pumping Gravity Pumping<br />

Estimated transmission loss % of the<br />

15 20 30<br />

total<br />

supply<br />

Year of commissioning of scheme 1955-60 1914 – 24 1950<br />

Project cost Rs. Lakh 70.00 20.00 -<br />

Status of water supply lines Repaired Repaired Repaired<br />

Source: MADA, PHED and FCI.<br />

Treatment Plant<br />

There are three treatment plants presently used to<br />

treat and supply 89.81 MLD of water to the entire<br />

<strong>Municipal</strong> <strong>Corporation</strong> area. Two treatment plants<br />

are located at Jamadoba and one at Topchanchi with<br />

a total design capacity of 143.40 MLD. However,<br />

present utilization capacity of treatment plant is only<br />

89.80 MLD (around 62 percent of the total design<br />

capacity). All the three treatment plants are very old<br />

and ranging form 45 years to 81 years. Owning to<br />

the age oldness of the treatment plants, it is not taking up its full capacity to treat the water.<br />

The following table gives the location wise details of treatment plants.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 56


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Table 32: Treatment Plant wise Design and utilized Capacities<br />

Treatment Details Unit Jamadoba Topchanchi FCI<br />

Design capacity of Treatment MLD 94.50 13.50 35.40<br />

Plant<br />

Utilized capacity of plant MLD 72.00 11.00 6.80<br />

Age Years 45 81 56<br />

Operation & Maintenance Regular Regular Regular<br />

Status Repaired Repaired Repaired<br />

Source: MADA and FCI.<br />

3. Distribution System<br />

The total length of the rising mains laid with in the jurisdiction of MADA is 62.31 km, with<br />

pipe materials of CI and lime mortar. The age of the rising main which are presently used to<br />

carry water to <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> various from 25 years to 81 years. Water from<br />

MADA owned Jharia Pumping Station is pumped to raising main of 350 mm dia and 700 m<br />

dia (laid under reorganization scheme) CI pipes and water is distributed by PHED to<br />

erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong> area through overhead service reservoirs, underground sumps<br />

and distribution network. The following table presents the details of rising main used to<br />

transmit the water from the treatment plant to storage reservoirs.<br />

Table 33: Rising Main Details<br />

Rising Main Details Pipe Material Pipe Length Age<br />

mm dia Km Years<br />

750 C.I 2.74 45<br />

900 C.I 2.13 45<br />

1000 C.I 3.04 45<br />

450 C.I 18.00 27<br />

400 C.I 13.00 81<br />

350/300 C.I 9.00 25<br />

450 (Conduct main) Lime mortar 9.40 81<br />

525 C.I 5.00 81<br />

Total 62.31<br />

Source: MADA, PHED and FCI.<br />

In <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> Jurisdiction three types of service reservoirs are used to<br />

store and supply the water to entire area. As discussed earlier, three agencies are involved in<br />

distribution of water to the citizens of <strong>Dhanbad</strong>. The total storage capacities available with all<br />

the three agencies are works out to 44.86 MLD which include Elevated Service Reservoirs<br />

(ESR/OHT), Ground Level Storage Reservoirs (GLSR) and Under Ground Sumps. The<br />

details of the location of service reservoirs are presented in the Table 34.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 57


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Table 34: Type wise Location of Storage Reservoirs and its Capacity<br />

Location<br />

Capacity<br />

ML<br />

Elevated Service Reservoirs<br />

MADA<br />

Jharia 2.250<br />

Patherdeh 0.225<br />

Putki 0.225<br />

Kirkend 0.450<br />

Godhar 0.450<br />

Chaitudih (Katras) 0.675<br />

Sub Total (MADA) 4.275<br />

PHED<br />

Dhansar 0.681<br />

Purana Bazar 0.454<br />

Manaitand 0.681<br />

Hirapur 0.454<br />

Hospital 0.114<br />

Matkuria 0.681<br />

Chiragorah 0.454<br />

Sub Total (PHED) 3.519<br />

FCI<br />

Saharpura 0.454<br />

Rohrabandh 0.454<br />

Rangamati 0.901<br />

Church 0.901<br />

SL- 2 0.454<br />

Domgarh 0.901<br />

FCIL 0.250<br />

PDIL 0.454<br />

Sub Total (FCI) 4.769<br />

Sub Total (Elevated Service Reservoirs) 12.563<br />

Underground Sumps/Ground Level Storage Reservoirs<br />

MADA<br />

Jharia 6.30<br />

Putkee 1.35<br />

Godhar 1.35<br />

Kusunda 1.35<br />

Tilatand 18.00<br />

Sub Total (MADA) 28.35<br />

PHED<br />

<strong>Municipal</strong> Office Campus 2.00<br />

Hirapur Panitanki Campus 1.50<br />

Sub Total (PHED) 3.50<br />

FCI<br />

Mandhartand 0.45<br />

Sub Total (FCI) 0.45<br />

Sub Total 32.30<br />

Grand Total 44.86<br />

Source: MADA, PHED and FCI.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 58


CITY DEVELOPMENT PLAN<br />

DHANBAD<br />

DHANBAD WATER SUPPLY SCHEME<br />

BY PHED<br />

120<br />

137<br />

119<br />

121<br />

151<br />

PWD<br />

127<br />

131<br />

153<br />

ADRAS<br />

NAGAR<br />

P . W . D .<br />

149<br />

126<br />

LEGEND<br />

154<br />

152<br />

136<br />

125<br />

130<br />

123<br />

150<br />

148<br />

150 Ø<br />

300 m<br />

135<br />

100 Ø<br />

400 m<br />

129<br />

124<br />

122<br />

118<br />

147<br />

144<br />

146<br />

100 Ø<br />

300 m 140<br />

134<br />

185<br />

133<br />

132<br />

128<br />

184<br />

113<br />

138<br />

114<br />

RAILWAY TRACK<br />

200 Ø115<br />

120m<br />

117<br />

112<br />

116<br />

145<br />

143<br />

139<br />

111<br />

ROAD<br />

142<br />

156<br />

141<br />

RISING PIPE LINE<br />

OLD<br />

155<br />

NEW<br />

157<br />

174<br />

DISTRIBUITION MAIN<br />

158<br />

163<br />

A. RE USED PIPE LINE<br />

160<br />

159<br />

168<br />

161<br />

166<br />

82<br />

162<br />

B. TO BE TAKEN OUT PIPE LINE<br />

81<br />

100 Ø<br />

300 m<br />

C. NOT TO BETAKEN OUT PIPE LINE<br />

175<br />

165<br />

176<br />

WATER TOWER<br />

80<br />

164<br />

177<br />

83 79<br />

169<br />

167<br />

76<br />

188<br />

78<br />

190<br />

180<br />

178<br />

75<br />

69<br />

179<br />

77<br />

171<br />

170<br />

70<br />

68<br />

172<br />

74<br />

300 Ø<br />

120m.<br />

65<br />

72<br />

71<br />

150Ø<br />

80m.<br />

64<br />

73<br />

67<br />

150 Ø<br />

200 m<br />

173<br />

150 Ø<br />

80 m.<br />

300 Ø<br />

1307.25 m.<br />

66<br />

100 Ø<br />

400 m.<br />

100 Ø<br />

190 m.<br />

62<br />

63<br />

180m<br />

61<br />

91<br />

250 m.<br />

60<br />

City Development Plan, <strong>Dhanbad</strong> Final Report<br />

Figure 20: Erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity Water Supply Rising main and Distribution Main details<br />

80 Ø<br />

600 m<br />

80 Ø<br />

350 m<br />

100 Ø<br />

SARAIDHELA<br />

57<br />

KOLYLA NAGAR<br />

194<br />

195<br />

196<br />

191<br />

193<br />

400 m<br />

80 Ø<br />

320 m<br />

100 Ø<br />

SADAR HOSPITAL<br />

192<br />

189<br />

650 m<br />

150 Ø<br />

100 Ø<br />

300 m<br />

150 Ø<br />

200 m<br />

250 Ø<br />

200 m<br />

250 Ø<br />

400 m<br />

350 m<br />

100 Ø<br />

250 m<br />

100 Ø<br />

100 Ø<br />

350 m<br />

42<br />

30 m<br />

150 Ø<br />

100 Ø<br />

300 m<br />

600 m<br />

250 Ø<br />

181<br />

100 Ø<br />

200 m<br />

187<br />

87<br />

150 m<br />

80 Ø<br />

90<br />

100 Ø<br />

300 m<br />

58<br />

100Ø<br />

100 Ø 59<br />

220m<br />

200 m. 100Ø<br />

100m<br />

250 mm.<br />

75.0 m<br />

100 Ø<br />

320 m<br />

50 m<br />

100 Ø 186<br />

200m<br />

200 Ø<br />

150 m<br />

100 Ø<br />

150Ø<br />

200 m<br />

56<br />

100 Ø<br />

200 m<br />

200 Ø<br />

250m<br />

50 m<br />

100 Ø<br />

80 Ø<br />

150 m<br />

100 Ø 100 Ø<br />

160 m. 54 80 m.<br />

100 Ø<br />

600 m<br />

43<br />

100 Ø<br />

100 m<br />

86<br />

100 Ø<br />

200 m<br />

100 Ø<br />

200 m<br />

100 Ø<br />

55<br />

180 m.<br />

100 Ø<br />

150 m<br />

41<br />

650 m<br />

100 Ø<br />

93<br />

89<br />

200 m<br />

200 Ø<br />

95<br />

200 Ø<br />

130m<br />

84<br />

200 Ø<br />

100 m<br />

97<br />

85<br />

48<br />

39<br />

98<br />

47<br />

88<br />

90 m.<br />

150 Ø<br />

46<br />

44<br />

29.<br />

92<br />

80Ø<br />

150m<br />

110<br />

94<br />

170 m.<br />

37<br />

200 Ø<br />

800 m.<br />

800 m.<br />

200 Ø<br />

150 Ø<br />

100 m.<br />

96<br />

60 m.<br />

200 Ø<br />

100 Ø<br />

40<br />

35<br />

38<br />

36<br />

106<br />

99<br />

545 m.<br />

104<br />

150 Ø<br />

103<br />

300 m<br />

250 Ø<br />

300m.<br />

150 Ø<br />

80 Ø 27.<br />

300 m.<br />

100 Ø 28.<br />

100 m.<br />

30<br />

34<br />

11.<br />

101<br />

26.<br />

31<br />

10.<br />

182<br />

105<br />

183<br />

32<br />

33<br />

6.<br />

14. 13.<br />

12.<br />

25.<br />

9.<br />

7.<br />

1.5 LAC.GALLAN<br />

MATKURIA<br />

108<br />

3.<br />

250Ø<br />

120 m.<br />

8.<br />

15.<br />

NALA<br />

107<br />

16.<br />

80Ø<br />

18. 250 m<br />

21.<br />

17.<br />

22.<br />

24.<br />

23.<br />

C H A S R O A D<br />

TO K A T R A S<br />

JHARIA WATER<br />

BOARD<br />

RESERVOIR<br />

P. W. D.<br />

P A T H R A K U L H I<br />

A S N S O A L<br />

B H U D A<br />

D A M O D A R P U R<br />

D H A N B A D G O V I N D P U R R O A D<br />

DAMODARPUR<br />

D H A N B A D B A L I A P U R R O A D<br />

DEVIPARA<br />

CHIRA GORA<br />

CENTRAL<br />

HOSPITAL<br />

300 M<br />

CHIRA GORA<br />

200Ø<br />

J.C. MALLICK ROAD<br />

D U H A T A N D<br />

J. C. MALLIC<br />

C.M.P.F. COLONY<br />

HIRAPUR<br />

I . S . M . CAMPUS<br />

B A R M A S I A<br />

A<br />

100 Ø<br />

250 m<br />

190 m<br />

100 Ø<br />

100 Ø<br />

500 m<br />

102<br />

100m<br />

100 Ø<br />

300 m<br />

100 Ø<br />

120m<br />

100 Ø<br />

100 Ø<br />

275 m<br />

100 Ø<br />

300 m<br />

100 Ø<br />

150 m<br />

100 Ø<br />

180 m<br />

250 Ø<br />

75 m.<br />

250 Ø<br />

75 m.<br />

110 m.<br />

150 Ø<br />

150 Ø<br />

150 m.<br />

150 Ø<br />

120 m.<br />

200m.<br />

150 Ø<br />

650 m.<br />

100 Ø<br />

100Ø<br />

245m.<br />

100 Ø<br />

200 m.<br />

170m.<br />

150Ø<br />

200 Ø<br />

150m.<br />

150m.<br />

300 Ø<br />

150 Ø<br />

90 m.<br />

100 Ø<br />

70m.<br />

100 Ø<br />

120 m.<br />

100Ø<br />

130m<br />

100Ø<br />

100 Ø<br />

400 m.<br />

100 Ø<br />

230 m.<br />

SHIV MANDIR<br />

109<br />

G A N D H I N A G A R<br />

80 Ø<br />

300 m<br />

60 m.<br />

150 Ø<br />

100<br />

100m<br />

80Ø<br />

100 M<br />

80 Ø<br />

300 m.<br />

250 Ø<br />

80Ø<br />

110m<br />

30m<br />

80Ø<br />

100 Ø<br />

250 m<br />

G A N D H I R O A D.<br />

B E R A C 0 L L I E R Y R O A D<br />

80 Ø<br />

150 M<br />

300 Ø<br />

110 m.<br />

200 Ø<br />

10 m.<br />

100 Ø<br />

50 M<br />

100 M<br />

80 Ø<br />

100 Ø<br />

110 m.<br />

150 M<br />

80 Ø<br />

TELEPHONE EXCHANGE ROAD<br />

POLYTECHNIC<br />

DHANBAD<br />

200 Ø<br />

600 m.<br />

200Ø<br />

350 m.<br />

370m.<br />

250Ø<br />

100 m<br />

100 Ø<br />

250Ø<br />

240 m<br />

150 m<br />

150 Ø<br />

80 Ø<br />

300 m100 Ø<br />

250 m<br />

70 m<br />

250Ø<br />

100 m<br />

250Ø<br />

100 m<br />

150Ø<br />

ZILA SCHOOL<br />

MATKURIA<br />

GAJUA TAND<br />

KUMBHAR PATTI<br />

MARIGODAM<br />

D U H A T A N D<br />

BARMASIA<br />

L. XING<br />

AJANTAPARA<br />

HOUSING COLONY<br />

I. S. M.<br />

D H A I Y A<br />

H.E. SCHOOL<br />

GIRLS<br />

SCHOOL<br />

ROAD<br />

I. 5 LAC. GALL.<br />

CAPACITY WT.<br />

AT BLOCK<br />

CAMPUS<br />

CHIRAGORA<br />

POLICE LINE<br />

COLONY<br />

VISTIPARA<br />

D.C. OFFICE<br />

I . S . M R O A D.<br />

H.E. SCHOOL ROAD<br />

HOUSING COLONY ROAD<br />

BARTAND MUHALLA<br />

D H A I Y A<br />

C. M. R. I. COLONY<br />

D H A I Y A<br />

JHARUDIH<br />

JAIPRAKASH<br />

NAGAR<br />

B U S S T A N D.<br />

CIRCUIT<br />

HOUSE<br />

D.C.<br />

BUNGL.<br />

DIST. BOND<br />

OFFICER<br />

COLONY 200 Ø<br />

100 M<br />

GOLF GROUND<br />

D.S. OFFICE<br />

RLY.<br />

BEKAR BANDH<br />

D H A N B A D<br />

14"Ø<br />

4225 mts.<br />

300Ø<br />

400 m.<br />

300Ø<br />

1000 m.<br />

1.<br />

2.<br />

4.<br />

5.<br />

450 Ø<br />

400 m.<br />

1.00 Lac Gallan<br />

PURANA BAZAR<br />

WATER TOWER<br />

Rising main 700 mm.<br />

4275 mts.<br />

T E L I P A R A R O A D<br />

1.5 LAC. GALLAN<br />

MANAITARND<br />

WATER TOWER<br />

PUJA TAKIES<br />

1.5 LAC. GALLAN<br />

DANSAR E. S.R.<br />

2.0 LAC.GALLAN SUMP<br />

DHANBAD MUNICIPALITY<br />

D H O B A T A N D<br />

20<br />

19.<br />

80Ø<br />

300 m.<br />

65 Ø<br />

300 m.<br />

100 Ø<br />

1200 m<br />

250 Ø<br />

350 m<br />

80 Ø<br />

200 m<br />

200 Ø<br />

300 m.<br />

250 Ø<br />

200 m<br />

100 Ø<br />

800 m<br />

DHANSAR<br />

150 m<br />

80 Ø<br />

100 Ø<br />

500 m<br />

80 Ø<br />

300 m<br />

100 Ø<br />

300 m<br />

275 m<br />

100 Ø<br />

100 Ø<br />

300 m<br />

150 Ø<br />

200 m<br />

150 Ø<br />

150m.<br />

150 Ø<br />

80 m.<br />

150 Ø<br />

270 m<br />

100 Ø<br />

180 m<br />

100 Ø<br />

400 m.<br />

GAYA BRIDGE<br />

100 Ø<br />

110 m.<br />

80 Ø<br />

200 m<br />

80 Ø<br />

200 m<br />

500 m.<br />

100 Ø<br />

80 Ø<br />

400 m.<br />

100 Ø<br />

200 m.<br />

100 Ø<br />

150 m.<br />

100 Ø<br />

300 m.<br />

300 m.<br />

80 Ø<br />

100 Ø<br />

500 m.<br />

500 m.<br />

100 Ø<br />

840 m.<br />

100 Ø<br />

CHHATH TALAB ROAD<br />

200 Ø<br />

200 m.<br />

80 Ø<br />

300 m.<br />

225 m.<br />

100 Ø<br />

BANDH<br />

BEKAR<br />

M U N I C I P A L<br />

R O A D<br />

D. A. V<br />

R A N G A T A N D<br />

150 m.<br />

200 Ø<br />

100 Ø<br />

900 m.<br />

300 m.<br />

80 Ø<br />

450 Ø<br />

450 m<br />

H O W A R A<br />

MOTORS<br />

R O A D<br />

GURUNANAK DUARA<br />

150 Ø<br />

400 m<br />

N A G A R E A S T<br />

S H A S T R I<br />

WEST<br />

GOMOH<br />

GAYA<br />

ASHOK MOTERS<br />

POST OFFICE<br />

BANK MORE<br />

RAY TALKIES<br />

KABARI PATTI<br />

L A R O A D<br />

300 m<br />

100 Ø<br />

80 Ø<br />

150 m<br />

150 Ø<br />

30 m<br />

150 m<br />

100 Ø<br />

100 Ø<br />

200 m<br />

150 Ø<br />

650 m<br />

100 Ø<br />

1300 m<br />

450 Ø<br />

250 m<br />

300 Ø<br />

450 m<br />

100 Ø<br />

500 m<br />

945 m<br />

80 Ø<br />

230 m<br />

450 Ø<br />

500 m<br />

80 Ø<br />

450 Ø<br />

970 m<br />

80 Ø<br />

200 m<br />

250 Ø<br />

220 m<br />

300 Ø<br />

400 m<br />

200 m<br />

150 Ø<br />

300 m<br />

80 Ø<br />

100 Ø<br />

320 m<br />

300 Ø<br />

750 m<br />

100 Ø<br />

400 m<br />

120 m<br />

250 Ø<br />

100 Ø<br />

200 m<br />

100 Ø<br />

600 m<br />

150 Ø<br />

1200 m<br />

175 m<br />

250 Ø<br />

80 Ø<br />

200 m<br />

80 Ø<br />

800 m<br />

400 m<br />

100 Ø<br />

100 m<br />

250 Ø<br />

100 Ø<br />

300 m<br />

100 Ø<br />

150 m<br />

300 m<br />

100 Ø<br />

250 Ø<br />

110 m 150 Ø<br />

175 m<br />

250 Ø<br />

75 m<br />

50 m<br />

250 Ø<br />

300 m<br />

100 Ø<br />

80 Ø<br />

600 m<br />

400 m<br />

150 Ø<br />

400 m<br />

100 Ø<br />

300 m<br />

80 Ø<br />

300 m<br />

100 Ø<br />

100 Ø<br />

625 m<br />

80 Ø<br />

200 m<br />

150 Ø<br />

300 m<br />

80 Ø<br />

300 m<br />

100 Ø<br />

300m<br />

100 Ø<br />

200 m<br />

150 M<br />

100 Ø<br />

80 Ø<br />

600 m<br />

100 Ø<br />

350 m<br />

100 Ø<br />

950 m<br />

500 m<br />

80 Ø<br />

250 m<br />

100 Ø<br />

300 m<br />

100 Ø<br />

100 m<br />

100 Ø<br />

150 m<br />

100 Ø<br />

230 m<br />

150Ø<br />

VILLAGE ROAD<br />

D H A I Y A<br />

LINK TO G. T. ROAD.<br />

B A R W A<br />

C . M. R . I.<br />

MOUNT<br />

CARMEL<br />

100 Ø<br />

100 m.<br />

150 Ø<br />

125 m.<br />

53<br />

52<br />

51<br />

49<br />

50<br />

45<br />

N<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 59<br />

DHANBAD MUNICIPAL CORPORATION<br />

INFRASTRUCTURE DEVELOPMENT<br />

CORPORATION LIMITED<br />

FIGURE NO:<br />

100Ø<br />

600 m<br />

230 m<br />

100Ø<br />

K A R W A


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

The existing diameter of distribution network provided by the MADA in coal mining area<br />

various from 900 mm diameter to 75 mm diameter. The total length of distribution network<br />

provided by MADA is 104.56 km and age of the pipe varies from 27 years to 81 years. The<br />

existing distribution system is pretty old and suffers from leakages etc. thus reducing its<br />

carrying capacity. The existing distribution network need complete overhauling by replacing<br />

old defunct and inadequate piping system by proper distribution network. The existing<br />

distribution network is inadequate in its capacity and improper. The main problem with the<br />

existing water supply system is non-uniform supply in different areas. Many of the areas are<br />

either having scanty or no water supply at all. Many new colonies and areas adjoining to the<br />

<strong>Dhanbad</strong> town have been developed without having piped water supply system.<br />

PHED has 21.85 km length of distribution network within the <strong>Dhanbad</strong> <strong>Municipal</strong><br />

<strong>Corporation</strong> Jurisdiction. PHED also distributing water to erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong> area,<br />

Rohrabadh, Baliapur, Chatti Gobinpur, Kola Kushma and Munidi. The Table 35 presents the<br />

details of distribution network by type, diameter, length and age.<br />

Table 35: Type wise Distribution Network Details<br />

Distribution Main Details Pipe Material Pipe Length Age<br />

Mm dia. KM Year<br />

MADA<br />

900/750 C.I 2.43 33<br />

600 C.I 14.41 33<br />

525 C.I 9.14 81<br />

450 C.I 4.06 27&81<br />

400 C.I 7.76 27<br />

375 C.I 4.51 27<br />

350 C.I 1.31 27<br />

300 C.I 11.51 27<br />

250 C.I 6.32 27<br />

225 C.I 2.16 27<br />

200 C.I 8.96 27<br />

175 C.I 11.33 27<br />

150 C.I 6.93 27<br />

125 C.I 10.78 27<br />

75 C.I 2.95 27<br />

Sub Total 104.56<br />

PHED<br />

200 CI 1.635<br />

150 CI/AC/PVC 3.150<br />

100 CI/PVC/HDPE 13.010<br />

80 CI 1.087<br />

80 PVC 2.465<br />

75 PVC 0.500<br />

Sub Total 21.847<br />

Grand Total 126.41<br />

Source: MADA and PHED.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 60


CITY DEVELOPMENT PLAN<br />

DHANBAD<br />

DHANBAD MUNICIPAL CORPORATION<br />

WATER SUPPLY NETWORK<br />

BAHARAT FIRE BRICKS<br />

LEGEND<br />

PIPE LINE<br />

RIVER / JORIA<br />

RAILWAY LINE<br />

MAJOR ROADS<br />

TOWER & RESERVOIR<br />

SHOW THUS<br />

BAZAR<br />

2"Ø<br />

650'0"<br />

SURATAND<br />

MORE<br />

ROAD<br />

TO PATHERDIH<br />

JEENAGORA SIDINGY<br />

City Development Plan, <strong>Dhanbad</strong> Final Report<br />

Figure 21: Erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity Water Supply Mains<br />

JEENAGORA<br />

DESPANSARY<br />

TO JAIRAMPUR<br />

JAIRAMPUR MORE<br />

TO CHANDKUAN<br />

HOSPITAL<br />

GOLOKDIH OPEN<br />

CAST PROJECT WORK<br />

TO LODNA BAZAR JAIRAMPUR WATER TANK<br />

LODNA BAZAR<br />

SINDRI ROAD<br />

SHAMSHIR NAGAR ROAD<br />

TO BALIAPUR<br />

SHOP<br />

GOLAKDIH<br />

OPEN CAST PROJECT<br />

To Kujama Coliery<br />

JARIA (R.5)<br />

To Patherdih<br />

TO DOBARI<br />

TO BARH COLIERY<br />

NAYAKANALI HALT<br />

BALUHA ROAD<br />

FATEHPUR<br />

NAIDUNIA ROAD<br />

DESHBANDHU<br />

CINEMA HALL<br />

FATEHPUR ROAD<br />

BATA MORE<br />

EKKA STAND<br />

BUS<br />

STAND<br />

PUNCHADEV<br />

MANDIR<br />

TO PANI TANKI<br />

KELA PATTI<br />

DHANSAR<br />

MANDIR<br />

TO DHANBAD<br />

4"Ø<br />

430<br />

TO SINDRI ROAD<br />

AGARSEI<br />

BHAWAN<br />

DARAMSHALA ROAD<br />

LAL<br />

DHANSAR RLY. OVER BRIDGE<br />

BHAWAN<br />

ANAND<br />

M A N B A D<br />

M.A.D.A<br />

OFFICE<br />

UPPER<br />

KULI<br />

UPPER KULI<br />

TELEPHONE<br />

EXCHANGE<br />

PARK<br />

CHILDREN<br />

APPALO<br />

CHOWK<br />

NICHE KULI<br />

M A N B A D<br />

THANA<br />

MORE<br />

JHARIA<br />

THANA<br />

VIHAR CINEMA<br />

BANDH<br />

RANI<br />

TO BATA MORE<br />

RAJA<br />

TALAB<br />

MORE<br />

LAXMANIA<br />

K<br />

8' WIDE<br />

LANE<br />

Q I R I B A N D H<br />

D.B OFFICE<br />

ROAD<br />

RAJBARI<br />

KATRAS<br />

MORE<br />

SATH<br />

MORE<br />

TO ENA PROJECT<br />

PHULARITAND ROAD<br />

SINDRI ROAD<br />

CHOUTHAIKULI ROAD<br />

KHAS COLLIERY JHARIA<br />

TO HUSSANABAD<br />

BANIAHIR No. 10<br />

TO BANK MORE<br />

MANJHLI BASTI<br />

TO GODHAR RESERVOIR<br />

INDUSTRY COLIERY<br />

Fly Over Bridge<br />

HARIMANDIR<br />

SIMLA BAHAL BASTI<br />

TO KARKEND<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 61<br />

TOPCHANCHI LAKE<br />

SHOWN THUS<br />

N<br />

DHANBAD MUNICIPAL CORPORATION<br />

INFRASTRUCTURE DEVELOPMENT<br />

CORPORATION LIMITED<br />

FIGURE NO:<br />

TOPCHANCHI LAKE<br />

TILATAND RESERVOIR<br />

CAP- 311.5 LAKH GALLONS.<br />

GODHARRESERVOIR<br />

CAP. 40 LAKH GALLONS.<br />

PUTKI SUMP<br />

CAP- 3.0 LAKH<br />

DAMODAR HEAD WORKS<br />

I.M.G.D PLANT<br />

CONMSTRUCTED - 1960<br />

DAMODAR HEAD WORKS<br />

I.M.G.D PLANT<br />

CONMSTRUCTED - 1990<br />

INTAKE WELL<br />

INTAKE WELL


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Following table presents the details of storage reservoirs owned by MADA. There are five<br />

ground level service reservoirs and six elevated reservoirs with a total capacity of 32.63 MLD.<br />

The details of pumping capacity and pumping hours are also detailed out in the table.<br />

Table 36: Storage Reservoir wise pumping capacity and Type<br />

Water Supply<br />

Zone<br />

Pumpin<br />

g Hours<br />

Pumping Capacity Ground Level Service<br />

Reservoir (GLSR)<br />

Elevated Storage<br />

Reservoir (OHT)<br />

Hrs HP No Nos. ML Nos. ML<br />

Jharia 20 120 & 175 2 & 1 1 6.3 1 2.250<br />

Patherdeh - - - - 1 0.225<br />

Putkee 20 200 & 175 1 & 1 1 1.35 1 0.225<br />

Kirkend 8 55 1 - 0 1 0.450<br />

Godhar Gravity - 1 1.35 1 0.450<br />

Kusunda 10 175, 200 & 1, 1 1 1.35 - -<br />

60 &1<br />

Tilatand Gravity - 1 18.00 - -<br />

Chaitudih<br />

3 150 1 - - 1 0.675<br />

(Katras)<br />

Total 5 28.35 6 4.28<br />

Source: MADA.<br />

4. Water Supply - SWOT Analysis<br />

SWOT analysis has been undertaken to assess on the negative and positive aspects of the<br />

present Water Supply System of <strong>Dhanbad</strong>. It involves analyzing the internal positive<br />

(strengths) and negative (weakness) aspects of an organization and considering these in<br />

relation to aspects of the external environment – both the positive aspects (or opportunities)<br />

and negative aspects (or threats). The Table 37 gives the details of the SWOT analysis.<br />

Table 37: Water Supply – SWOT Analysis<br />

Strength<br />

Damodar river is a perennial source for the city <strong>Dhanbad</strong> is a commercial<br />

capital of Jharkhand; and<br />

MADA meets the BCCL’s water requirements for their collieries, through<br />

which it fetches maximum revenue.<br />

Weakness<br />

Low pressure in supply is developed in some part of city owing to the old pipe<br />

line/worn-out network and to cater the increasing population demand;<br />

Inadequate house service coverage;<br />

Inadequate distribution network coverage;<br />

Many parts of the corporation area does not have potable piped water supply<br />

system;<br />

Water supply asset creation and maintenance are being carried out by three<br />

different departments which leads to lack of coordination and clash of<br />

responsibilities;<br />

Ground water pollution by industrial effluents; and<br />

Lack of awareness in people to use water efficiently.<br />

Opportunities<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 62


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

<br />

<br />

<br />

<br />

<br />

Threats<br />

<br />

Use of UCPs as water lakes to store water as well as to develop tourism;<br />

New scheme will cater to the needs of domestic and industries;<br />

Financial assistance will help in asset creation and to cater the needs of public;<br />

Private Sector Participation in service delivery; and<br />

Open cast mines can be used as storage thanks.<br />

Lack of interest in getting house service connection and willingness to pay for<br />

the same.<br />

5. Performance Indicators and Key Issues<br />

The performance indicators and key issues have been identified based on the information<br />

collected and field visits and the same is presented in this section. Key performance indicators<br />

are used to assess service adequacy of <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong>. Table 38 exhibits the<br />

performance indicators of <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> in water supply system and<br />

subsequently the key issues have been presented.<br />

Table 38: Performance Indicator - Water Supply<br />

Description Units Present Status Norms<br />

Installed Capacity MLD 143.40 -<br />

Gross Percapita Supply Lpcd 66 150<br />

Population Covered Percent 30 100<br />

Properties covered by house service Percent 15-20 90<br />

connections<br />

Road Coverage by Distribution Percent 13 95<br />

Network – DMC area<br />

Total Storage Capacity to Supply Percent 49 33<br />

Treatment Capacity to Supply Percent 158 100<br />

Frequency of Supply Daily Daily<br />

Duration of Supply Hrs 2 2<br />

Source: Analysis.<br />

(i.)<br />

(ii.)<br />

Low Supply Levels. Low per Capita supply is noticed; the situation becomes worse in<br />

Summer Season with Per Capita Supply coming to as low as 40 - 50 lpcd. The present<br />

gross percapita supply is 74 in Urban Agglomeration areas and 66 lpcd in entire DMC<br />

area. The frequency of supply in the city is daily in normal season, which deteriorates to<br />

once in three or seven days in Summer Season.<br />

Age old Distribution Network System. The existing distribution system is pretty old<br />

and suffers from leakages etc. thus reducing its carrying capacity. The existing distribution<br />

network need complete overhauling by replacing old defunct and inadequate piping<br />

system by proper distribution network. The existing distribution network is inadequate in<br />

its capacity and improper. The main problem with the existing water supply system is<br />

non-uniform supply in different areas. The system needs a comprehensive rehabilitation<br />

measure based on detail study.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 63


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

(iii.) Inadequate and age old Treatment<br />

Capacity/ Plant. However, the present<br />

treatment capacity is surplus, in respect of<br />

increasing demand in the future, the treatment<br />

capacity needs augmentation. The existing<br />

treatment plants are very which needs<br />

rehabilitation works.<br />

(iv.)<br />

(v.)<br />

Inadequate Service Coverage. Only 30 percent of the population is served with<br />

protected piped water supply system. Also only 15-20 percent of the PT Assessment is<br />

provided with House Service Connections. Besides, demand for water supply has not<br />

taken into account the requirements of water supply to the peripheral areas.<br />

Inadequate Network Coverage. Distribution<br />

network runs approximately 21 percent of the<br />

road length in Urban Agglomeration areas while<br />

for entire DMC distribution network reach is<br />

only 13 percent. Considering the high<br />

population density within the <strong>Municipal</strong><br />

<strong>Corporation</strong> jurisdiction, the network adequacy<br />

demand, as a percent of road length, is high.<br />

(vi.)<br />

(vii.)<br />

(viii.)<br />

(ix.)<br />

(x.)<br />

Inadequate Summer Storage. The pattern of rainfall is erratic. There is no scope for<br />

storing rainwater for recharging, as most of the water bodies are encroached, silted and<br />

used as sewerage outlets.<br />

Need for Source Augmentation. The present source of water is not adequate to meet<br />

out the requirements of the people, and augmentation is required to meet future<br />

requirements.<br />

Desilting of Topchanchi Lake. Topchanchi Lake is the first water supply source for the<br />

city, desilting of Topchanchi Lake is must for the city meet the water demand.<br />

Need for Asset Management Action Plan. It is required to maintain an O & M<br />

Schedule, for Water Supply Assets, for regular maintenance and energy consumption<br />

optimization.<br />

System (Transmission & Distribution) Losses<br />

and Unaccounted for Water. The gross<br />

average supply in the DMC area is 66 lpcd and<br />

in Urban Agglomeration area is 74 lpcd. It is<br />

estimated that transmission and distribution<br />

losses account for 20- 30 percent of the total<br />

supply. Studies are needed to be carried out to<br />

block the amount of Unaccounted for Water<br />

(UFW).<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 64


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

(xi.)<br />

Leakage and contamination of water at household connections apart from low<br />

Pressure in Water Supply. Though rehabilitation of the old pipe lines has been taken up<br />

during the past five years, the problem of low pressure in water supply persists due to the<br />

usage and existence of aged network especially in old city. Increasing population has also<br />

added to the already existing woes. Apart from this the usage of GI pipes for household<br />

connections is leading to leakage and contamination of water in several areas of the<br />

corporation increasing the maintenance costs.<br />

B. Sewerage and Sanitation<br />

1. Overview<br />

<strong>Municipal</strong> <strong>Corporation</strong> does not have sewerage system to dispose sewage generated with from<br />

the city. <strong>Municipal</strong> <strong>Corporation</strong> has 38,000 individual septic tanks, which serves as one of the<br />

major means of safe disposal of human waste. The septic tanks serve about 20 percent of<br />

Urban Agglomeration population (since in most of the villages doesn’t have septic tank<br />

facilities urban agglomeration population were considered for comparison). In addition, the<br />

<strong>Corporation</strong> has provided about 1,025 low cost sanitation units, which serves less than one<br />

percent of the total population. Overall, about 21 percent of Urban Agglomeration<br />

population has safe disposal facilities and the remaining either opt for community toilets or<br />

go for open defecation, which is an area of major concern as the coverage of safe disposal<br />

facilities is very low.<br />

2. Sewerage & Sanitation - SOWT Analysis<br />

SWOT analysis has been undertaken to assess on the negative and positive aspects of the<br />

present Sewerage and Sanitation System of <strong>Dhanbad</strong>. It involves analyzing the internal<br />

positive (strengths) and negative (weakness) aspects of an organization and considering these<br />

in relation to aspects of the external environment – both the positive aspects (or<br />

opportunities) and negative aspects (or threats). The Table 39 gives the details of the SWOT<br />

analysis.<br />

Table 39: Sewerage and Sanitation – SWOT Analysis<br />

Strength<br />

Weakness<br />

Absence of under ground drainage system;<br />

Septic tank is the major mode of disposal which may leads to shallow ground<br />

water pollution;<br />

Inadequate Public convenience facilities; and<br />

Unhygienic dry latrines and open defecation.<br />

Opportunities<br />

Reuse of treated waste water for irrigation purpose;<br />

Private sector can monitor the sewerage/effluent treatment;<br />

Financial resource generation from sewage (e.g. selling of sludge to farmers);<br />

and<br />

To create civic sense among the citizen’s of <strong>Dhanbad</strong>.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 65


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Threats<br />

<br />

<br />

Environmental degradation; and<br />

Topography of the corporation does not permit single treatment plant, and<br />

hence multiple treatment plants have to be developed to cover the entire area.<br />

This leads to high capital cost for the creation the same.<br />

3. Performance Indicators and Key Issues<br />

The performance indicators and key issues have been identified based on the information<br />

collected and field visits and the same is presented in this section. Key performance indicators<br />

are used to assess service adequacy of <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong>. Table 40 exhibits the<br />

performance indicators of <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> in Sewerage and Sanitation<br />

system and subsequently the key issues have been presented.<br />

Table 40: Performance Indicator – Sewerage & Sanitation<br />

Description Units Present Status<br />

UGD System<br />

Absent<br />

Households to Septic Tanks – UA Percent 20<br />

Households to Septic Tanks – DMC area Percent 1.43<br />

Source: Analysis.<br />

(i.)<br />

(ii.)<br />

(iii.)<br />

Absence of Safe Disposal System. In addition to the dearth in sanitary units, sullage and<br />

night soil is disposed into roadside/storm water drains. The problem needs immediate<br />

attention as it pollutes the watercourses (storm water drains lead sullage/wastewater to<br />

the natural drain/stream).<br />

Dearth of Safe Sanitation Facilities. Only 21 percent of residential properties are<br />

served with sanitation facilities in Urban Agglomeration area, whereas in DMC area only<br />

1.43 percent properties have access to safe sanitation facilities. With rapid population<br />

growth, it is important that the DMC should provide for a comprehensive sewerage<br />

system.<br />

Inadequate and Ill-maintained Public Sanitation. There is a high dependency by<br />

slum population on public conveniences, the seat per person is limited and most slum<br />

dwellers resort to open defecation; public awareness regarding safe sanitation is very poor.<br />

C. Storm Water Drainage and Primary Drainage<br />

1. Overview<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> does not have an effective network of storm water drains to<br />

dispose waste water generated in the city. The total length of drains in the <strong>Dhanbad</strong><br />

<strong>Municipal</strong> <strong>Corporation</strong> jurisdiction is about 581.62 km, which covers about 41.09 of the total<br />

road network in the <strong>Corporation</strong> area. In the absence of closed drainage system in the city,<br />

silting and uncontrolled solid waste dumping causes blockages and stagnation of waste water<br />

flow. The drainage system in the city carries the wastewater as well as storm water from the<br />

entire municipal corporation area and finally discharges into nallahs. The following table<br />

provides further details regarding the type of storm water drains in the city.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 66


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Table 41: Details of Road side Storm Water Drains<br />

Description Length Proportion<br />

Pucca Open Drains 260.94 44.86<br />

Kutcha Open Drains 195.29 33.58<br />

Pucca Closed Drains 125.39 21.56<br />

Total 581.62 100.00<br />

Source: Analysis.<br />

Topography. <strong>Dhanbad</strong> city is situated on lower steps of Chota Nagpur Plateau. The<br />

maximum ground elevation is 750 above Men Sea Level (MSL). The overall ground slope is<br />

gradual and from south to north.<br />

2. Natural/Primary Drainage System<br />

Since the <strong>Dhanbad</strong> doesn’t have sewerage and storm<br />

water drainage system, the waste water generated<br />

with in the city are being collected from various<br />

primary nallahs which are passing with in the<br />

<strong>Corporation</strong> jurisdiction. The major natural drainage<br />

channels which are carrying waste water from the<br />

city are Matkuria Nallah, Kantra Nallah (Jharia<br />

Nallah), Manitind Nallah, Katri Nadhi, Jamunia<br />

Nadi and Kodhiya Nadhi. Matkuria Nallah is the<br />

longest nallah among the all nallahs in the city, the<br />

total length primary drainage system in the city is approximately 75 km. Finally, the waste<br />

water collected from all these nallash is disposing it to Damodar River.<br />

The total rain fall in <strong>Dhanbad</strong> is varies from 800 mm to 1,300 mm per annum and the average<br />

no of rainy days in a year is about 55 days. Rainy months are June, July, August and<br />

September.<br />

3. Performance Indicators and Key Issues<br />

The performance indicators and key issues have been identified based on the information<br />

collected and field visits and the same is presented in this section. Key performance indicators<br />

are used to assess service adequacy of <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong>. Table 42 exhibits the<br />

performance indicators of <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> in Storm Water Drainage system<br />

and subsequently the key issues have been presented.<br />

Table 42: Performance Indicators - Road side Storm Water Drains<br />

Description Units Present Status Norms<br />

Pucca Drains Percent 42 -<br />

Total Drains to Road Length Percent 63 150<br />

Source: Analysis.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 67


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

(i.)<br />

(ii.)<br />

Inadequate Closed Drainage System. Owing to the<br />

inadequate closed drainage system in the <strong>Municipal</strong><br />

<strong>Corporation</strong> area leads to overflow of waste water during<br />

the rainy season.<br />

Disposal of Domestic Sewage. In the absence of a<br />

sewerage system covering the entire <strong>Municipal</strong><br />

<strong>Corporation</strong> area and inadequate sanitation facilities, a<br />

large amount of the domestic sewage is let into storm<br />

water drains. This is resulting in pollution of the public<br />

water bodies such as river and nallahs /canals, as the<br />

waste runoff leads to these watercourses.<br />

(iii.)<br />

Inadequate Coverage. Only 41 percent roads<br />

have built up drains. Unhygienic conditions<br />

prevail in areas, which do not have surface<br />

drains.<br />

(iv.)<br />

Absence of Comprehensive Storm Water<br />

Drainage System. Owing to the absence of<br />

continues waste water carrying system leads to<br />

unhealthy environment. Most of the drainage<br />

network in the city does not design to carry the<br />

entire storm water as well as waste water<br />

generated in the city.<br />

(v.)<br />

Silting and Solid Waste Accumulation. Silting and uncontrolled solid waste dumping<br />

cause blockage and stagnate storm water/wastewater runoff. Consequently, storm water<br />

drains and primary channels like, nallahs choke and may overflow into neighboring areas.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 68


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

D. Preservation / Rejuvenation of Water Bodies<br />

1. Overview<br />

In <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> jurisdiction<br />

more than 125 small, medium and large ponds/lakes<br />

are there, which are spared out in different parts of<br />

the city. The total area of the water bodies are to<br />

tune of 342.63 acres. Summary of block wise area<br />

under water are presented in Table 43. Some of the<br />

important water bodies are Bekar Bandh, Rejili<br />

Bandh, Raja Talab, Rohra Pond, Chota Pichiri<br />

Talab, Suranga Bandh, Baghmara Talab and Ranguni<br />

Bandh. Bekar Bandh and Rejili Bandh both are<br />

maintained by district Zila Parisad and all other water bodies are maintained by the<br />

Government of Jharkhand Fisheries Department.<br />

Table 43: Block wise area of the Water Bodies<br />

Description<br />

Area (acres)<br />

Water Bodies in <strong>Dhanbad</strong> Block 87.87<br />

Water Bodies in Jharia Block 56.44<br />

Water Bodies in Baliapur Block 128.04<br />

Water Bodies in Gobindpur Block 29.73<br />

Water Bodies in Baghmara Block 40.55<br />

Grand Total 342.63<br />

2. Key Issues<br />

(i.)<br />

Low level of Utilization of Water Bodies.<br />

More than 125 water bodies available with in<br />

<strong>Municipal</strong> <strong>Corporation</strong> jurisdiction, which are<br />

not utilized in a productive manner. Presently,<br />

the water bodies are in dilapidated condition and<br />

are only being used for recharge purpose.<br />

Misuse of Water Bodies is also noticed in terms<br />

of uncontrolled solid waste dumping in some<br />

places.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 69


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

(ii.)<br />

(iii.)<br />

(iv.)<br />

Pollution of Water Bodies. Chemical waste from industries and domestic sewers flows<br />

directly in to ponds/lakes which lead to polluting the water bodies in the city.<br />

Lack of Institutional set. Due to the lack of<br />

institutional framework and funds to maintain<br />

the water bodies.<br />

Encroachments on Lake/ponds. In the<br />

absence of proper fencing/compound wall<br />

around water bodies, most of the lakes/ponds<br />

are encroached by the inhabitant<br />

E. Solid Waste Management<br />

1. Overview<br />

As per the definition provided by the <strong>Municipal</strong> Solid Waste (Management and Handling)<br />

Rules, 2000 of Government of India, municipal solid waste (MSW) includes commercial and<br />

residential wastes generated in municipal or notified areas in either solid or semi-solid form<br />

excluding industrial hazardous wastes but including treated bio-medical wastes. The present<br />

section elucidates the status of municipal solid waste management in <strong>Dhanbad</strong> <strong>Municipal</strong><br />

<strong>Corporation</strong>. The collection, transportation and disposal of municipal solid waste, is an<br />

obligatory function of the <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> (DMC). However, the <strong>Dhanbad</strong><br />

<strong>Municipal</strong> <strong>Corporation</strong> is recently formed by including erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity,<br />

Sindri NAC, Jharia NAC, Gobindpur NAC, Katras NACs, Chhatatand NAC, 27 census<br />

towns and 158 villages in blocks like <strong>Dhanbad</strong>, Baliapur, Jharia, Baghmara and Gobindpur<br />

part in <strong>Dhanbad</strong> district. Currently erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity, Sindri Notified Area<br />

Committee and MADA are responsible for the municipal waste collection and transportation.<br />

The municipal solid waste mainly comprises waste from households, markets, commercial<br />

establishments, hotels, hospitals and industries in the <strong>Municipal</strong> <strong>Corporation</strong>. The health<br />

department of the MADA, headed by Chief Medical Officer (CMO), is responsible for the<br />

solid waste management of the Mineral Areas excluding <strong>Dhanbad</strong> <strong>Municipal</strong>ity and Sindri<br />

NAC. For the efficient administration and for day-to-day operational purposes, the <strong>Dhanbad</strong><br />

<strong>Municipal</strong> <strong>Corporation</strong> (excluding areas of Sindri and <strong>Dhanbad</strong>) is divided into eight sanitary<br />

zones covering entire <strong>Corporation</strong> area.<br />

Solid Waste Generation<br />

The major waste generating sources are households and other bulk waste generation sources<br />

such as markets, hotels, restaurants, shops and function halls. The other waste generating<br />

sources include hospital and health institutions that generate hazardous biomedical waste.<br />

There is no quantification of waste generated in the <strong>Municipal</strong> <strong>Corporation</strong>. The estimates of<br />

the erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity, Sindri NAC and MADA indicated that around 440 tons<br />

of waste is generated every day in the <strong>Municipal</strong> <strong>Corporation</strong> jurisdiction and the responsible<br />

agencies are collecting about 165 tons (about 37 percent of the total waste generated) through<br />

its solid waste collection system. Since, there is no estimates are available with the DMC, the<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 70


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

per capita waste generation from the DMC is assumed as 300 gm per capita per day as per<br />

CPHEEO norms. Table 44 presents the total waste generated in <strong>Municipal</strong> <strong>Corporation</strong> area.<br />

Table 44: Source wise Distribution of waste Generated<br />

Description Quantity Proportion<br />

MT/Day<br />

Percentage<br />

Domestic Waste 286 65<br />

Commercial and Hotel Waste 110 25<br />

Market Waste 44 10<br />

Waste Generated 440 100.00<br />

Waste Collected 165 37.50<br />

Source: Discussion with officials.<br />

Household Waste: In <strong>Dhanbad</strong>, major source of waste generation, as in any typical Indian<br />

city, has been the household. The quantum of waste generated from households is about 286<br />

tons per day, which is 65 percent of the total waste generated in the city. The household waste<br />

mainly consists of organic waste such as vegetable waste, food etc. Significant quantities of<br />

paper and plastic are also present in the waste.<br />

Commercial and Hotel Waste: Owing to the large number of commercial establishments<br />

like hotels and restaurants, <strong>Dhanbad</strong> generates about 110 tons of solid waste every day. The<br />

city also houses number of small and medium size hotels to cater to the needs of floating<br />

population. Being the industrial, commercial and trade centre in the region, wholesale and<br />

retail trade activities are dominant, these however, are confined to certain parts of the city.<br />

The total commercial and hotel waste thus constitutes about 25 percent of the total waste<br />

generated in the city.<br />

Market Waste: <strong>Dhanbad</strong> city has no of wholesale vegetable markets and retail markets in the<br />

<strong>Corporation</strong> area which generally cater to the daily needs of residence of <strong>Dhanbad</strong>. The total<br />

waste generated from these markets is about 44 tons per day constituting 10 percent of the<br />

total waste. The waste is mainly organic in nature.<br />

Biomedical Waste: <strong>Dhanbad</strong>, being the district head quarter and important centre in this<br />

region, there are a total of more than 3,000 beds available with in the <strong>Municipal</strong> <strong>Corporation</strong><br />

area. However, many of these are first aid centres and clinics. As there are no scientific<br />

biomedical waste disposal facilities in the city, many a times hazardous and infectious<br />

biomedical waste is also mixed with the municipal solid waste and some times it is burnt by<br />

the hospital authorities.<br />

Other Sources. The other sources of waste generation in the city are construction activities,<br />

marriage and function halls, and the floating population. Another important issue with regard<br />

to the solid waste generation in <strong>Dhanbad</strong> is that though the quantity of waste generated from<br />

street sweeping and drain desilting activities is significant, there was no estimate available on<br />

total quantity of waste generation. However, the discussion with local authority reveals that<br />

this waste is added into the categories such as households, commercial and construction<br />

waste.<br />

Composition of Waste: Owing to absence of waste characterization study conducted by local<br />

authority, through the discussion it was understood that organic waste is about 45 percent of<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 71


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

the total waste generated it the city. The remaining waste mainly paper, plastics agricultural<br />

dry wastes, construction waste and waste from street sweepings and drain desiltings are<br />

mainly inorganic.<br />

Waste Collection<br />

Primary Collection: At present, in <strong>Dhanbad</strong><br />

doesn’t have any primary collection system. The<br />

individual households dispose their waste in the<br />

street dustbins by their own means. Local<br />

authorities have provided 210 bins at various<br />

locations with in the <strong>Municipal</strong> <strong>Corporation</strong> limit. In<br />

addition, there are around 50 open points all over<br />

the <strong>Corporation</strong> area. Dustbins are provided mainly<br />

on major roads and important localities in the city.<br />

In majority of areas, there are no dustbins and<br />

people dump their waste at a point in the vicinity from where the local authority collects the<br />

waste.<br />

The reconnaissance survey conducted in the city and discussion with the local authorities<br />

reveals that many of the households, shops and commercial establishments throw the waste<br />

on to the streets, drains and open spaces within the locality creating unhygienic conditions.<br />

Further, the waste thrown into the open drains leads to choking and consequently the<br />

wastewater flows on the streets rather than in drains and forms wastewater pools at some<br />

places.<br />

Due to insufficient number and capacity of bins solid waste often spills over on the ground.<br />

Further, due to lack of maintenance, many bins are not in usable condition making the<br />

situation worse. The average distance between dustbins varies from 1,500 m to as high as<br />

2,000 m in some localities.<br />

Street Sweeping: One of the major activities in the solid waste management is the street<br />

sweeping activity, which is time consuming, and labour intensive. In addition to street<br />

sweeping, due to the open drain system of waste water collection, drain desilting is also<br />

essential. Local authorities carry out street sweeping and drain desilting in all sanitary circles<br />

covering all wards. The total road length in the city is 940 Km, of which around 100 Km are<br />

high density roads, around 250 Km are medium and balance are low density roads.<br />

Due to lack of sufficient manpower with the local authorities, frequency of the street<br />

sweeping and desilting activities is not uniform all over the <strong>Municipal</strong> <strong>Corporation</strong><br />

jurisdiction. Depending on the locality and necessity, street sweeping is taken up on priority<br />

basis. In all, only 25-30 percent of the streets are swept daily. The street sweeping frequency<br />

of other roads ranges from weekly once to monthly once. Further, some of the streets are<br />

cleaned occasionally. In addition, local authorities also takes up drain desilting works based on<br />

the necessity. Total length of pucca drains in <strong>Dhanbad</strong> is about 386 Km.<br />

Four hundred and ninety sanitary working are engaged in street sweeping and as well as drain<br />

desilting operations in <strong>Dhanbad</strong>. Sweepers use long handle brooms for sweeping and make<br />

heaps at regular intervals along the streets. The street sweeping waste is collected and<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 72


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

transported to the nearest community dustbins.<br />

Secondary Collection. The secondary collection refers to collection of waste from<br />

community dustbins and intermediate collection points or transit points. However, in<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> area, there are no intermediate collection or transit points<br />

and the waste is directly transported to the disposal site from dustbins. Waste is collected<br />

from dustbins and open dumping sites in the city and manually loaded into the transportation<br />

vehicles. The local authorities collect from about 210 locations including 100 open collection<br />

points.<br />

Frequency of Collection: The frequency of waste collection from the dust bins and other<br />

dumping points in the <strong>Municipal</strong> <strong>Corporation</strong> area varies from weekly once to monthly once,<br />

depending on the quantity of waste accumulation and the locality. The waste from prime<br />

residential locations, commercial areas, public places like markets, bus stand etc is collected<br />

regularly.<br />

Transportation of Wastes<br />

In <strong>Dhanbad</strong>, solid waste transportation is being carried out using open vehicles. The local<br />

authorities have a total of 38 vehicles for solid waste transportation excluding handcarts, of<br />

which, 17 tractors, 15 tipper, 5 loaders / excavators and 129 handcarts/wheel borrows. The<br />

total carrying capacity of all transportation vehicles work out of 165.40 tons per day. The total<br />

carrying capacity of transportation vehicles in <strong>Dhanbad</strong> is worked out by multiplying by no of<br />

vehicles, no of trips made per day, rated capacity and bulk density of 0.40 kg per cu.m. Based<br />

on the information available from local authorities and discussions with the local officials on<br />

an average tractors make 6 trips per day and mini lorry makes 2 trips per day.<br />

It is observed that vehicles used in the areas of high waste generation undertake more number<br />

of trips. It is mainly because of reduction in loading time. Vehicle repairs also reduce the total<br />

number of trips performed per day. The total waste transported per day is about 165.40 tons.<br />

The following table illustrates the details of solid waste transportation vehicles used in<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> jurisdiction.<br />

Table 45: Solid Waste Transportation Vehicle Details<br />

Description Nos Capacity Trip/Day Total carrying<br />

Capacity<br />

Tons Nos Tons/Day<br />

Mini Lorry 1 2.50 2 2.00<br />

Tractors 17 2.00 6 81.60<br />

Tippers 15 2.00 4 48.00<br />

Loaders/excavator 5 2.00 2 8.00<br />

Hand Carts/Wheel 129 0.05 10 25.80<br />

Borrows<br />

Total 167 8.55 24 165.40<br />

Disposal of Solid Waste<br />

Currently, <strong>Dhanbad</strong> does not practicing any scientific method of solid waste disposal. The<br />

waste collected from various localities in the <strong>Municipal</strong> <strong>Corporation</strong> is directly disposed off by<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 73


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

open dumping on the low-lying area in the city. Solid wastes generated from all sanitary circles<br />

are disposed off at different localities.<br />

Institutional Arrangements<br />

As detailed out in the earlier segment, municipal solid waste management is an obligatory<br />

function of the local body. MADA’s public health department, headed by Chief Medical<br />

Officer (CMO), is responsible for the solid waste management in the Mining Area. The CMO<br />

is supported by one Medical Officer for sanitation and 16 Sanitary Inspector to manage 16<br />

circles within the mining area. Sanitary Inspectors are responsible for street sweeping, drain<br />

desilting, collection, transportation and disposal of waste in their sanitary circle.<br />

2. Solid Waste Management - SOWT Analysis<br />

SWOT analysis has been undertaken to assess on the negative and positive aspects of the<br />

present Solid Waste Management System of <strong>Dhanbad</strong>. It involves analyzing the internal<br />

positive (strengths) and negative (weakness) aspects of an organization and considering these<br />

in relation to aspects of the external environment – both the positive aspects (or<br />

opportunities) and negative aspects (or threats). The Table 46 gives the details of the SWOT<br />

analysis.<br />

Table 46: Solid Waste Management – SWOT Analysis<br />

Strength<br />

Weakness<br />

Inadequate dust bins;<br />

Non- civic practice of throwing garbage on public places and roads;<br />

Absence of door to door primary collection;<br />

Existing system of loading the waste in open transport vehicle;<br />

Lack of an effective technology for scientific disposal of bio-medical waste;<br />

Inadequate secondary collection vehicles; and<br />

Lack of scientific disposal system.<br />

Opportunities<br />

To improve the system of primary collection of solid ;<br />

To device more efficient system of day to day cleaning of street and public<br />

places;<br />

To devise innovative scientific method to curb incidences of public nuisance;<br />

To modernize secondary storage system;<br />

To have an efficient systematic method of segregating solid waste at source;<br />

To develop scientific landfill and compost for disposal arrangements; and<br />

Solid Waste to energy.<br />

Threats<br />

Increasing population of <strong>Dhanbad</strong> will lead to large solid waste; and<br />

Liberal legal framework inhibits stringent purities measure to the offender of<br />

industrial waste.<br />

3. Performance Indicators and Key Issues<br />

The performance indicators and key issues have been identified based on the information<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 74


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

collected and field visits and the same is presented in this section. Key performance indicators<br />

are used to assess service adequacy of <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong>. Table 47 exhibits the<br />

performance indicators of <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> in solid Waste Management and<br />

subsequently the key issues have been presented.<br />

Table 47: Performance Indicators - Solid Waste Management<br />

Description Unit Present<br />

Status<br />

Benchmarks/<br />

Norms<br />

Percapita Waste Generation Grams/Day 300<br />

Waste Collection Performance Percent 37 100<br />

Spacing Between Dustbins M 1,500 – 2,000 100<br />

Road Length /Conservancy Staff M 1,900 400 - 600<br />

Conservancy staff /1,000 Population Nos 0.40 3<br />

Source: Analysis.<br />

(i)<br />

Dearth of Effective Primary Collection Mechanism: The absence of door-todoor<br />

waste collection system in the <strong>Municipal</strong> <strong>Corporation</strong> area is leading to<br />

unhygienic conditions in the city. The practice of throwing waste onto the streets is<br />

exaggerating the problem. Segregation of waste is not practiced in the city.<br />

(ii) Inadequate Number of Dustbins:<br />

Average spacing of dustbins is around<br />

1,500 – 2,000 m, which is much higher than<br />

the specified spacing of 100 m. More than<br />

50 percent of the <strong>Municipal</strong> <strong>Corporation</strong><br />

area is not adequately provided with<br />

dustbins. As specified earlier, there are 210<br />

open temporary storage points in the city<br />

reveals the need for dustbins.<br />

(iii)<br />

(iv)<br />

Irregular Street Sweeping. The frequency of street sweeping varies from week<br />

once to monthly once. Considering the total manpower with local authorities the<br />

actual length of street per sweeper is around 1,900 m. hence, owing to the lack of<br />

manpower only 20-30 percent area is swept daily.<br />

Poor Collection Performance. At present<br />

the collection performance is only about 37<br />

percent. As the analysis reveals around 275<br />

tons of waste is not collected daily. This<br />

creates unhygienic conditions in the city<br />

and some percentage of this residual waste<br />

adds to the accumulation day by day that<br />

forming the heaps of wastes in the town.<br />

Hence, there is a need to increase the<br />

collection performance of the city to keep the <strong>Municipal</strong> <strong>Corporation</strong> clean and<br />

healthy.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 75


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

(v)<br />

(vi)<br />

(vii)<br />

(viii)<br />

Absence of Covered Vehicles for Transportation of Waste. At present waste is<br />

being transported in open vehicles to the<br />

disposal site. The spillage of waste all along<br />

the route and odour from the waste is a<br />

common problem associated with open<br />

transportation of waste in <strong>Dhanbad</strong><br />

<strong>Municipal</strong> <strong>Corporation</strong>. As per the analysis,<br />

the existing fleet strength can transport<br />

only 165.40 tons of waste<br />

Absence of Scientific Disposal of Waste:<br />

Since, there is no safe disposal facility in the city, the waste is being disposed through<br />

open dumping on low-lying areas. The waste is disposed improperly forming heaps<br />

of waste at the site and the waste finds its way onto the roads and surrounding areas<br />

due to blowing wind, making the whole area around the site unhygienic, posing<br />

problem to environment and health of the local people. The effect of odour nuisance<br />

can be seen up to 100 to 200 m around the dumping sites. There is a probability of<br />

ground water contamination due to leaching.<br />

Mixing of Biomedical Waste with <strong>Municipal</strong> Solid Waste. The biomedical waste<br />

is mixed with the other municipal waste and dumped at the disposal sites with out<br />

any treatment. This may create serious health and contamination problems due to<br />

hazardous nature of waste. As per the <strong>Municipal</strong> Solid Waste (Management &<br />

Handling) Rules, 2000 bio medical waste should be treated separately and the same<br />

should not be mixed with municipal solid wastes.<br />

Inadequacy in Manpower. The total available conservancy staff strength with local<br />

authorities is 490 workers. Considering the norm of 3 conservancy staff per 1,000<br />

population, in existing situation, the local authorities have 0.40 conservancy staff per<br />

1,000 population showing inadequate staff strength. Owing to this, the street<br />

sweeping has not been done daily, only 20 -30 percent of the streets are swept daily,<br />

leaving the other areas leading to unhealthy conditions.<br />

(ix)<br />

Occupation Health Hazards. The waste<br />

collection, loading and unloading operations<br />

have been done manually. The sanitary<br />

workers have not provided with any<br />

protective equipment posing heath hazards.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 76


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

F. Roads and Traffic Management<br />

1. Road Sector Overview<br />

<strong>Dhanbad</strong> has good connectivity by road and rail to other parts of the country. Two important<br />

arterial roads namely NH 2 and NH 32 are traversing city. NH 2 connects <strong>Dhanbad</strong> to Delhi,<br />

Agra, Kanpur, Varanasi and Kolkata and NH 32 connects <strong>Dhanbad</strong> to Bokaro and Ranchi.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong>’s role in road sector comprises construction of corporation<br />

roads and maintenance of all corporation roads in its jurisdiction, except roads belonging to<br />

National Highways/Public Works Department and other departments such as Zilla Parisad.<br />

In new extension areas within corporation limits, where the land belongs to the corporation,<br />

the internal roads are developed and maintained by the <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong>. The<br />

corporation is also responsible for implementing Master Plan/CDP proposals with regards to<br />

new major/minor roads and road widening activities.<br />

Development of <strong>Dhanbad</strong> is governed by the Master Plan prepared by the Mineral Area<br />

Development Authority (MADA). However, there are essential issues associated with the<br />

city’s development and in particular the circulation pattern and road networks. The broad<br />

issues comprise a poor network of roads, poor surface condition of existing roads, poor<br />

facilities to pedestrians and vehicles, poor safety management, road surface condition exhibits<br />

distress such as cracks, potholes, undulations, poorly maintained earthen shoulders, and<br />

excess soil/earth on the carriage-way and shoulders.<br />

Following table presents the category wise road length maintained by local body and other<br />

agencies.<br />

Table 48: Category wise Road Length<br />

Surface Type Length Proportion<br />

Km<br />

Percentage<br />

Local Body Roads<br />

Concrete (P.C.C) 298.48 42.22<br />

Black Topped/Bituminous Topped 86.80 12.28<br />

Water Bound Macadam 61.25 8.66<br />

Earthen 192.35 27.21<br />

Others 68.00 9.63<br />

Total Length of Local Body Roads 706.88 100.00<br />

National Highways 85.75<br />

State Highways/ PWD Roads 147.50<br />

Total 940.13<br />

Roads in old areas of the <strong>Municipal</strong> <strong>Corporation</strong> area are narrow and have a width ranging<br />

from around 2 to 6 m including drain. Mostly the surface is concrete / bituminous in nature,<br />

all along. Of the 940.13 km of roads in corporation limit, 75 percent is maintained by local<br />

bodies and the PWD, Rural Roads and National Highways maintain the remaining 233.25 km.<br />

Cement concrete roads constitute about 42 percent of total roads in the <strong>Corporation</strong> limit;<br />

bitumen roads constitute 12.28 percent of total roads maintained by the local body.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 77


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

The density of roads in the <strong>Corporation</strong> is 2.81 km/sq. km. According to the land use plan<br />

for 2011, transportation and circulation occupies around 20 percent of the total developable<br />

area in <strong>Dhanbad</strong>.<br />

The condition of major and minor roads is poor. Concrete roads that were laid recent years<br />

are in satisfactory condition. Footpaths and parking facilities are the major problems faced.<br />

Since the shoulders are not paved, the roads surface gets covered with the soil, making it<br />

dangerous to ride.<br />

The per-capita road length in the corporation area is only 0.62 m, which is less than the<br />

standard of 1.75 m.<br />

Following are the list of the roads which are maintained by PWD;<br />

<strong>Dhanbad</strong>-Patherdih-Sindri Road<br />

Jharia-Baliapur Road<br />

Baliapur-Sindri Agricultural Road<br />

Govindpur-Baliapur-Sindri Road<br />

Baliapur-Patlabadi-Chirkunda Road<br />

Mugma Chirkunda Road<br />

Chirkunda-Panchet Road<br />

Kanko-Tetulmari-Bhuli-<strong>Dhanbad</strong> Road<br />

Patherdih-Chandankiyari Road (Partly)<br />

Rajganj-Katras-Jamdiha Road<br />

Katras-Panchgadhi-Kerkend Road<br />

Dumra-Jagrahi-Katras Road<br />

Kenduadih Link Road<br />

Jharia-Kenduadihdih Road<br />

Sijua-Rajganj Road<br />

Dumra-Keshargadh Road<br />

Putki-Bhaga-Bhaura-Sudamdih Road<br />

Chirkunda Link Road<br />

Link Road <strong>Dhanbad</strong><br />

Bus Stand-Sarweshri Aasham and Jaiprakashnagar<br />

Shramik Road to Barwadda Road<br />

(including Link Road 0.5 + 1.00)<br />

Bank More – Purana Bazar Pani Tanki- Joraphatak Road<br />

Hatia More Hiraput - Barmasia Howrah Motor Road<br />

2. Performance Indicators and Key Issues<br />

The performance indicators and key issues have been identified based on the information<br />

collected and field visits and the same is presented in this section. Key performance indicators<br />

are used to assess service adequacy of <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong>. Table 49 exhibits the<br />

performance indicators of <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> in roads sector and subsequently<br />

the key issues have been presented.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 78


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Table 49: Performance Indicators - Road Sector<br />

Description Unit Present Status Benchmarks<br />

Percapita Road Length M 0.62 1.75<br />

Road Density Km/sq.km 2.81 -<br />

B.T Roads to Total Road Length Percent 34 -<br />

Source: Analysis.<br />

(i)<br />

(ii)<br />

(iii)<br />

High Density and Congested Lanes.<br />

Central areas of the city are narrow and<br />

surrounded by heavily built-up areas. These<br />

roads also carry large volumes of traffic that<br />

cater to heavy moving vehicles carrying<br />

coal, commercial trading in the area. These<br />

factors make the lanes highly susceptible to<br />

distress development, air pollution and<br />

delayed travel times.<br />

Improper Connectivity in Peripheral Areas. Recent developments were towards<br />

the peripheral areas of the city towards the north, south and southeast. While the<br />

growth in these areas has been considerable, the connectivity of these roads with the<br />

main corridors is inadequate.<br />

Encroachment. The margins of roads are<br />

encroached upon in several sections of<br />

major roads of the city small time street<br />

vendors, illegal parking and other informal<br />

activities. With no margins left on the<br />

roads, the effective carriageway of the road<br />

is reduced drastically leading to traffic<br />

congestion and accidents.<br />

(iv) Inadequate Surfaced Roads. Total<br />

municipal roads that are surfaced constitute<br />

around 54 percent of total local body roads;<br />

the rest are unsurfaced. Poor road<br />

maintenance results in further deterioration<br />

due to traffic and monsoon. The ingress of<br />

water into the black cotton soil beneath<br />

creates severe pavement failures.<br />

(v)<br />

Absence of Street Furniture/Signage’s.<br />

The roads lack signals, signage’s, and footpaths. Improper road sweeping on most of<br />

the roads results in dust nuisance.<br />

3. Traffic and Transportation Sector Overview<br />

Regional Connectivity. <strong>Dhanbad</strong> is well connected by road to other parts of the country. NH 2<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 79


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

which connects <strong>Dhanbad</strong> to Kolkatta, NH 32 connects to Bokaro also traverses the city.<br />

<strong>Dhanbad</strong> is well connected by the Rail route also. It is the divisional headquarter of Eastern<br />

Railway. The Grand chord line which is the main line between Delhi and Calcutta passes<br />

through <strong>Dhanbad</strong>. Trains to Delhi, Calcutta, Bombay, Jammu, Kalka, Gorakhpur, Lucknow,<br />

Patna, Jodhpur etc. can be taken from <strong>Dhanbad</strong>. Important trains halting at <strong>Dhanbad</strong> are<br />

Calcutta Rajdhani Express, Bhubneshwar Rajdhani Express, Bokaro Calcutta Shatabdi<br />

Express, Poorva Express, Kalka Mail, Ludhiana Express, Jammu-Tawi Express, Howrah-<br />

Jodhpur Express and Shakti Punj Express.<br />

City’s Transport Scenario. Major activities in <strong>Dhanbad</strong> include industrial activities like coal<br />

mining and its ancillary industrial activities, trade and commerce, education institution and<br />

public administration. Administrative offices are located on <strong>Dhanbad</strong> – Gobindpur road,<br />

Jharia road, Katras road. Public transport i.e. buses currently operated by Bihar Road<br />

Transport <strong>Corporation</strong> has very little patronage due to unreliable and inadequate services.<br />

Due to small trip-length activities in the city, cycle ricksaw, cycling and walk form the<br />

preferred mode of non-motorised transport. With very little pedestrian facilities in the<br />

<strong>Municipal</strong> <strong>Corporation</strong> area, large volumes of pedestrian traffic can be observed on city roads<br />

especially near Bank more, Railway Station, Hirapur, Bus stand, Main Bazaar, Purana Bazaar,<br />

Sindri SBI bank circle, Kerkend and market areas. Unauthorized parking of private and<br />

commercial vehicles was observed along most of the roads and open spaces located in the<br />

CBD and along NH-32. There is no authorized parking infrastructure provided in the city.<br />

Parking of cycle rickshaws, vans, auto-rickshaws parked near major junctions is a common<br />

phenomenon in the city.<br />

Figure 22: Year wise Registered Vehicles in <strong>Dhanbad</strong><br />

In Table 50 presents the<br />

20000<br />

year wise registered<br />

18000<br />

vehicles in <strong>Dhanbad</strong> for<br />

16000<br />

last five years and this<br />

2005-06<br />

14000<br />

table reveals that the total<br />

2004-05<br />

12000<br />

registered vehicles are<br />

2003-04<br />

10000<br />

2002-03<br />

almost become doubled in<br />

2001-02<br />

the year 2005-06.<br />

8000<br />

Maximum no of vehicles<br />

6000<br />

registered during the last<br />

4000<br />

five years are two wheelers<br />

2000<br />

and it has increased from<br />

0<br />

9,796 to 20,575 in 2001 -02<br />

to 2005-06. Besides the<br />

two wheelers vehicle population, private four wheelers have increased from 1,514 to 1,947<br />

during the same period. Interestingly, Trucks and three wheelers have grown 5.74 times and<br />

5.48 times respectively from 2001-02 to 2005-06.<br />

No of Vehicles<br />

Truck<br />

Bus<br />

Privat<br />

Taxi<br />

Zeep<br />

Three<br />

Two<br />

Tract<br />

Traile<br />

Table 50: Year on Year Registered Vehicles in <strong>Dhanbad</strong><br />

Description 2001-02 2002-03 2003-04 2004-05 2005-06<br />

Trucks 112 95 177 317 643<br />

Bus 35 25 20 9 67<br />

Private<br />

Taxi/cars<br />

1,514 1,295 1,551 1,729 1,947<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 80


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Taxi 166 108 93 134 69<br />

Jeep 371 129 116 124 583<br />

3 Wheelers 162 362 254 348 888<br />

2 Wheelers 9,796 12,450 13,641 17,996 20,575<br />

Tractors 371 171 188 125 198<br />

Trailers 123 126 153 102 130<br />

Total 12,650 14,761 16,193 20,884 25,100<br />

Freight Traffic: Commercial vehicle traffic on NH-32 & NH-2, and other major district roads<br />

passing through the <strong>Municipal</strong> <strong>Corporation</strong>, occupy majority of the city road space. Large<br />

volumes of truck traffic transport coal from Jharia Coal Field mines to other parts of the<br />

country. The bulk of this traffic passes through the Jharia, Bank more area, causing traffic<br />

congestion and pollution. Presently, heavy vehicles are not allowed during daytime in to the<br />

city. Since the bypass road is only partially complete and not in good condition, commercial<br />

vehicles are forced to use city roads creating huge congestion, noise pollution, and affecting<br />

the safety of the road users predominantly pedestrians in the city.<br />

Major Traffic Bottlenecks<br />

Major bottlenecks include railway level crossings, poorly designed intersections. There are<br />

many no of railway level crossings with in the jurisdiction which cause inordinate delay in<br />

road users. The main cause if bottlenecks are encroachment by the retail shops, hoardings,<br />

containers & display along the streets, varying carriage way of roads in the major arterial roads<br />

and mining areas, unauthorized parking along the roads, restricting the smooth traffic flow<br />

and absence of clear defined pedestrian footpaths, results in consumption of carriage way.<br />

Accident prone spots<br />

As per the discussion with the <strong>Dhanbad</strong> Traffic<br />

Police department and District Transport Officers<br />

records reveals that on an average every year about<br />

450 to 500 accidents are occurring with in the<br />

<strong>Municipal</strong> <strong>Corporation</strong>. Following are the some of<br />

the important accident prone zones/spot in the<br />

corporation limit, which needs to be addressed<br />

through proper geometric design and providing<br />

street furniture.<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

ISM Gate<br />

Matkuria<br />

Puja Talkies<br />

NH2 near Gobindpur – <strong>Dhanbad</strong> Junction<br />

Bank More ( JP Chawk and BM Chawk)<br />

Near Rajkamal School, Jharia Road<br />

Near <strong>Dhanbad</strong> Police Station on Bridge<br />

Near R.S College, Jharia<br />

Uparkuli, Sindri Road<br />

Kenduadih Road, Godhar<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 81


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

<br />

<br />

Kenduadih Petrol Pump<br />

Putki Bridge<br />

Parking Demand<br />

Land Use and Economic Activities in the City drive the Parking demand in the City. Here, the<br />

City is a major regional center for coal mining industry, Trade and Commerce in Jharkhand,<br />

which drives the heavy influx of floating population. Consequently, heavy movement of<br />

Vehicular Traffic has increased congestion and induced Parking demand within the<br />

<strong>Corporation</strong> jurisdiction. High parking demand areas are listed below;<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

Purana Bazar<br />

Bank More<br />

On Katras Road – JP Chawk towards Matkuria<br />

On Katras Road – JP Chawk towards Rajkamal School<br />

Naya Bazar<br />

Park Market Heerapur<br />

Shranik Chawk – Gaya Bridge<br />

Shranik Chawk – Railway Station<br />

Near Textile Market<br />

Saraidhela Maket<br />

Near Petrol Pump Chawk to Bata More (Jharia)<br />

Bata More – Jharia Bus stand<br />

Near Katras Market<br />

Near Katras Railway Station<br />

4. Urban Roads - SOWT Analysis<br />

SWOT analysis has been undertaken to assess on the negative and positive aspects of the<br />

present Traffic and Transportation System of <strong>Dhanbad</strong>. It involves analyzing the internal<br />

positive (strengths) and negative (weakness) aspects of an organization and considering these<br />

in relation to aspects of the external environment – both the positive aspects (or<br />

opportunities) and negative aspects (or threats). The Table 51 gives the details of the SWOT<br />

analysis.<br />

Table 51: Traffic and Transportation – SWOT Analysis<br />

Strength<br />

NH-32 & NH 2;<br />

Strategic location of <strong>Dhanbad</strong> DRM connects city with other parts of the<br />

country;<br />

Airport Facility available.<br />

Weakness<br />

Absence of planned and narrow road network;<br />

Encroachment on major roads and important junctions;<br />

Mixed traffic on arterial roads;<br />

Lack of parking lots;<br />

Absence of organized Bus terminals and truck terminals;<br />

Absence of bye-bass road to take care of the through truck traffic;<br />

Lack of mass transport system;<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 82


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Inadequate parking lots in Railway Station premises; and<br />

Existing airport is not in use.<br />

Opportunities<br />

Private sector partnership is possible in mass transport system;<br />

Private sector partnership in developing parking lots; and<br />

Private Sector Partnership in maintaining air port.<br />

Threats<br />

Unauthorized private transport system and passengers are traveling over the<br />

roof of the three wheeler vehicles which leads to unsecured to life; and<br />

Noise Pollution.<br />

5. Key Issues<br />

The key issues have been identified based on the information collected and field visits and the<br />

same is presented in this section.<br />

(i)<br />

(ii)<br />

(iii)<br />

Traffic Congestion. Major roads leading to<br />

other important urban centers of the State<br />

follow radial pattern and converge towards<br />

the central area of the city resulting in over<br />

accumulation of traffic in the central area<br />

(Bank more etc). Because of the inadequate<br />

widths especially in the central area and<br />

railway crossings, radial roads and ring<br />

roads suffer from bottlenecks and<br />

congestion. Presence of no of mining activities also induces more congestion and<br />

pressure on the exiting core area roads. Two – wheelers and increasing volumes of<br />

three wheeled auto rickshaws, the most widely used personalized mode of transport,<br />

increase the traffic density, and owing to the high maneuverability they add to<br />

indiscipline and occasional traffic blockages.<br />

Absence of Mass Transit System. As per the ministry of Urban Development, GoI,<br />

Guidelines, the total share of public transport to be desired minimum of 80 percent.<br />

Ineffective Intermediate Public Transport System (IPTs). Most of the passengers<br />

found that the existing transport system is in<br />

effective and efficient to cater the needs of<br />

the growing demand. This can be attributing<br />

to high cost, poor service, discomfort<br />

caused by over loading of passengers, slow<br />

speed, discrimininate stoppages.<br />

(iv)<br />

Absence of Peripheral Ring Road. In absence of a complete peripheral Ring Road,<br />

regional traffic is directed into the City thus causing congestion and delay due to<br />

Heavy Moving Vehicles.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 83


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

(v)<br />

Traffic Bottlenecks. Absence of Rail Over Bridges and narrow width of existing<br />

Bridges and Culverts, causes traffic bottlenecks and congestion in the City. Absence<br />

of Sub-ways at important junctions is also noticed as a cause of congestion.<br />

(vi) Inadequate Parking Areas. Heavy<br />

congestion is created by high vehicular<br />

density in the City (freight traffic and<br />

floating traffic), especially in the core areas,<br />

which is not adequately served with<br />

infrastructure facilities like Parking area.<br />

Traffic management measure, like One Way<br />

System, has been implemented but fails to<br />

address the Problem effectively.<br />

(vii)<br />

Absence of Proper Bus Terminus and Truck Terminus. City does not have a<br />

decentralized bus terminus. The existing bus<br />

terminus also not sufficient to meet the<br />

vehicle growth rate. Although, being a<br />

center mining activity in the region, the city<br />

is not provided with a proper truck terminal<br />

and ancillary facilities, which induces<br />

congestion due to inflow of Goods Carriage<br />

Vehicles within the City Area.<br />

(viii)<br />

(ix)<br />

Absence of Street Furniture. None of the roads have road line painting, zebra<br />

crossings resulting in unguided crossing pedestrian & leverage to violate traffic rules.<br />

Absence of Signals. There are no signalized<br />

traffic intersections in the city, the traffic<br />

department does the monitoring of traffic.<br />

(x) Un organized and hap hazardous<br />

movement of rickshaw. Weaving of<br />

rickshaw heterogeneous traffic, traffic rule<br />

violation & bottlenecks result in congestions<br />

and traffic jams.<br />

(xi)<br />

Overlapping of Responsibilities. No single agency is solely responsible and<br />

accountable for traffic and transportation management. Results to overlapping of<br />

functions and spatial and functional fragmentation.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 84


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

G. Street Lighting<br />

1. Overview<br />

The provision and maintenance of streetlights is an<br />

obligatory function of <strong>Dhanbad</strong> <strong>Corporation</strong>.<br />

However, at presently erstwhile <strong>Dhanbad</strong><br />

municipality, Sindri NAC is maintaining the<br />

streetlight in their respective towns jurisdiction rest<br />

all maintained by Electricity Department of<br />

Jharkhand. Streetlights operation and maintenance is<br />

privatized in erstwhile <strong>Dhanbad</strong> municipality area<br />

alone.<br />

There are 3,561 streetlight poles in <strong>Dhanbad</strong> <strong>Corporation</strong> jurisdiction. The average spacing of<br />

streetlight pole is 264 m, which is lower than the preferred spacing of 25 to 30 m. Larger<br />

spacing of light poles leads to inadequate illumination and thereby results in darkness in most<br />

part of the city. Table 52 below summarizes the street light composition of the <strong>Dhanbad</strong><br />

<strong>Municipal</strong> <strong>Corporation</strong>.<br />

Table 52: Street Lights Break-up<br />

Description Units Proportion<br />

Nos<br />

Percent<br />

High Mast Lamps 20 0.56<br />

Halogen Lamps 180 5.05<br />

Mercury Vapor Lamps 252 7.08<br />

Sodium Vapor Lamps 477 13.40<br />

Tube Lights 2381 66.86<br />

Others 251 7.05<br />

Total 3,561 100.00<br />

Tube lights constitute almost 67 percent of the total lighting fixtures; tube lights are of poor<br />

lighting quality and have a shorter life in comparison to high power fixtures. About 13.40<br />

percent fixtures are sodium vapor lamps and 7 percent fixtures are mercury vapor lamps.<br />

Conventional fluorescent tube lights (4’, 40 W), which have a relatively longer life and are<br />

economical in terms of their power consumption compared to bulbs, account for about 67<br />

percent of total streetlights.<br />

2. Performance Indicators and Key Issues<br />

The performance indicators and key issues have been identified based on the information<br />

collected and field visits and the same is presented in this section. Key performance indicators<br />

are used to assess service adequacy of <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong>. Table 53 exhibits the<br />

performance indicators of <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> in street lighting and<br />

subsequently the key issues have been presented.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 85


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Table 53: Performance Indicator - Street Lights<br />

Description Unit Present Status Benchmarks<br />

Spacing between Lamp Posts M 264 25-30<br />

Area Coverage Percent 10 100<br />

Tube Lights to Total Lights Percent 66.86 -<br />

High Power fixtures to Total Lights Percent 26.09 -<br />

Source: Analysis.<br />

(i)<br />

(ii)<br />

(iii)<br />

Low Coverage and High Spacing between Lamp Posts. As per the norms the<br />

spacing between the lamp post should not be more than 30 m, whereas in <strong>Dhanbad</strong><br />

<strong>Municipal</strong> <strong>Corporation</strong> the spacing between the lamp post is at average of 264 m. this<br />

higher than adopted norms, which leads to low coverage in the city.<br />

Large Number of Vacant Poles. Large number of vacant poles and low<br />

performance of existing lighting fixtures result in high recurring expenditure.<br />

Power Fluctuation and Short Circuit Problems. This leads to low carrying<br />

capacity of the cables and improper street lighting in the newly formed extension<br />

areas and major junctions.<br />

H. Fire Services<br />

The Fire Department is responsible for fire-related services and support during calamities.<br />

The Fire Department provides services to entire <strong>Dhanbad</strong> district. The department also<br />

serves the hinterland and nearby areas. It is also responsible for attending to;<br />

<br />

<br />

<br />

Emergency calls,<br />

For rescue operations in accidents like drowning; and<br />

Disposal of dangerous stray animals that are a nuisance to society.<br />

Figure 23: Year wise Trend of Fire Accidents<br />

Operations. The fire station<br />

attends to both direct and<br />

140<br />

indirect calls. The indirect calls<br />

120<br />

are assistance needed calls made<br />

100<br />

by the fire station office of some<br />

80<br />

other location if they need<br />

60<br />

assistance from the <strong>Dhanbad</strong> fire<br />

40<br />

20<br />

station office. The last five years<br />

0<br />

data from 2002 to 2006 (up to<br />

2002 2003 2004 2005 2006<br />

31- 05-06) data indicates that the<br />

Year<br />

total fire cases attended were in<br />

the range of 75 to 128. In 2005, the total fire accidents recorded were 128 in which the<br />

estimated loss of property was to the tune of Rs.71.85 however during 2002 there are 75 fire<br />

accidents were attended in which as high as Rs. 842.82 lakh loss was recorded. Table 54<br />

exhibits the year wise no of cases attended by the fire department, estimated loss.<br />

N o of A c cide nts<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 86


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Table 54: Year wise no of case attended by the Fire Department<br />

Description Unit 2002 2003 2004 2005 2006<br />

Fire accidents No 75 80 110 128 98<br />

Estimated loss Rs. Lakh 842.82 446.39 397.43 71.85 35.07<br />

Source: Fire Service Department.<br />

Vehicles and Equipments. The Fire Department owns and operates four water tenders for fire<br />

fighting, water tenders have a capacity of 4,500 liters each and the age of the water tenders<br />

varies from two years to four years. The Department has one foam tender with a water<br />

capacity of 4,000 liters and foam capacity of 600 liters. The fire station also has one mini<br />

water tender with a capacity of 750 liters and one emergency & rescue tender for emergency<br />

purpose. After the purchase of water tenders (2002 & 2004) the property damages due to the<br />

fire accident has come down significantly.<br />

Table 55: Details of Fire Service Equipments<br />

Type of Fire Tender No Water Capacity Foam Capacity Year of<br />

Purchase<br />

Litres Litres Year<br />

Water Tender 4 4,500 2002 & 2004<br />

Foam Tender 1 4,000 600<br />

Emergency &Rescue 1 - - -<br />

Tender<br />

Mini Water Tender 1 750 - -<br />

Source: Fire Service Department.<br />

The department does not possess any specialized equipment like hydraulic platform, portable<br />

pump and trailer pump that is required for fire fighting and rescue operations.<br />

Staffing Pattern. The following table provides the staffing pattern at the fire service station;<br />

almost eighty two percent of posts remain unfilled.<br />

Table 56: Staffing Pattern in Fire Service Department<br />

Designation Sanctioned Staff Existing Staff Vacant<br />

Fire Station Officer 1 1 -<br />

Sub – Officer 1 - 1<br />

Leading Firemen 4 3 1<br />

Driver 4 3 1<br />

Fireman 40 2 38<br />

Total 50 9 41<br />

Source: Fire Service Department.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 87


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

VI.<br />

URBAN ENVIRONMENT<br />

A. Overview<br />

Jharkhand is one of the few states in the country endowed with rich deposits of several<br />

principal minerals and occupies unique position in mineral productions and mineral based<br />

industries. Mining and mineral based industries have important economic, environmental and<br />

social effects in the region where it is carried out and beyond. Jharkhand witnessed prolific<br />

mining and industrial activities leading to serious environmental degradation. In the absence<br />

of effective implementation of mining and reclamation policies, urban planning and industrial<br />

siting policies by the concerned regulatory authorities caused widespread growth of polluting<br />

industries. The development of any region can only be sustained if it is within the carrying<br />

capacity of the region. If the mining and industrial activities are followed in a well integrated<br />

planned, environmentally benign way by continuous monitoring and taking effective<br />

mitigative measures in a timely manner then it will definitely prove to be economically<br />

beneficial in a sustainable manner.<br />

The Jharkhand is dotted with several major deposits of principal minerals and is now one of<br />

the leading producers of minerals in the country viz. apatite, bauxite, barytes, chineclay,<br />

chromite, coal, copper, feldspar, hematite, limestone, manganese, quartz, etc. Almost all the<br />

major mining projects, processing units, mineral based industries are in this region. If the rich<br />

mineral assets are properly exploited and utilized, the mining sector will contribute<br />

significantly to the economy of the new State.<br />

Presently, mining of major minerals is reported from almost all the districts of Jharkhand but<br />

extensive mining is carried out in Singhbhum East and West, Palamau, Lohardaga, Gumla,<br />

Hazaribagh, <strong>Dhanbad</strong>, Giridih, Koderma, Ranchi and Sahebganj districts.<br />

The complex environmental matrix, large scale mining activity, huge mineral resource<br />

available and ever depleting environmental quality along with flora and fauna, has attracted<br />

attention at both national as well as international level.<br />

The industries here includes thermal power stations, coal washeries, metal smelting plants,<br />

cement mills, coke oven and by-product plants, beehive coke over and allied briquette plants,<br />

metal casting and steel rolling plants, refractories and engineering industries, store crushes,<br />

line kiln, brick kilns etc.<br />

B. Soil Types & Soil Erosion<br />

Most part of the DMC Area is under granite landscape. Alluvial soil is found usually along<br />

river bed, particularly in Baliapur Block. Sandy soil is also found in the river beds, which is the<br />

characteristic of granitic rocks and sandstones. It is used for stowing & building purposes.<br />

Coarse gritty soil is predominant in coal basins. This type of soil mixed with big fragment of<br />

rocks is formed from the weathering of pegmatites, quartz and conglomeratic sandstones.<br />

Laterite is found in the foot of hills, followed by red soil further ahead. Some cultivation is<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 88


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

practiced on read soil. Cultivable soils are found mainly in the south eastern part of the<br />

Region, near sindri and north to north western part of the region in Gobindpur Block.<br />

Soil Erosion. Erosion is the prime process, which is responsible for the variation in the<br />

topography. It is aggravated due to human intervention through indiscrimination cutting of<br />

tress, mining, overburden dumping etc., thus affecting natural ecosystem. Based on the field<br />

studies done by Central Mining Research Station, <strong>Dhanbad</strong>, the whole study area is affected<br />

by Moderate to Severe soil erosion. Such area need immediate attention for soil conservation<br />

measures like bunding, contour farming, gully, farm forestry, water harvesting, etc.<br />

C. Mining Environment<br />

Jharia Coalfield is one of the oldest coalfields in the Country. Located in the north of<br />

Damodar river in <strong>Dhanbad</strong>, the sickle shaped Jharia Coalfield with an area of 450 sq.km<br />

(total) is the only source of prime cocking coal in India. This coalfield belongs to Gondwana<br />

group of Permian age. It has a reserve of about 19,000 million tones, of which 5,000 million<br />

tones coal is of prime cocking quality. Nearly 58% of this reserve proved. This Coalfield has<br />

got one of the world’s densest concentration of thick coal seems at relatively shallow depths<br />

with 40 seams of 0.5 to 20 m thickness, out of which 18 seams including the split ones, are<br />

workable.<br />

Inspite of its favorable physical characteristics, long history of unscientific mining and rapid<br />

growth of human settlements has lead to a situation where ecological balance has been<br />

disturbed in the region.<br />

The history of mining coal here can be traced back to the late Eighteen centaury.<br />

Predominately underground mining methods were adopted in the past and due to inherently<br />

complex geological nature of these coalfields coupled with not so scientific mining practices<br />

these coalfields are faced with many serious problems like subsidence, mine fire, danger of<br />

inundation etc. These problems slowly grew to a significant proportion and had been drawing<br />

attention of all stakeholders. Post nationalization era of coal mining in these coalfield saw a<br />

rise in small opencast workings to liquidate easily available coal near surface. These opencast<br />

working could not be planned in a scientific manner due to pressure of global market<br />

competence and rapid growth of human habitation in and around the coal bearing area. Many<br />

of these opencast workings were made to already develop pillars at shallow depths.<br />

Opencast and Underground Coal Mining: Jharkhand is rich in mineral resources and BCCL<br />

and CCL extensively carry out coal mining. Apart from coal mining other mining activities<br />

also exist. Opencast and underground mining methods are used for winning the minerals.<br />

Dust is the major pollutant from these mines.<br />

Jharia Coalfield with its excellent quality of coal become the hub of coal mining activities in<br />

the country during the end of 19th century and urbanization of Jharia and around started<br />

around 1890s. Industrial growth in the area resulted in the concentrated growth of dwellings<br />

and rapid escalation of population. After the nationalization of coal mines in the years 1973<br />

& 1975 urbanization takes place Jharia coalfield measures around 450 sq.kms. with multiple<br />

seams of coal occurring within its ambit. Three major coal mining companies operate in this<br />

area. These companies are M/s. Bharat Cocking Coal Limited, M/s. Tata Steel and M/s.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 89


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

IISCO. Majority of the area falls under the jurisdiction of M/s. BCCL which controls an area<br />

of about 270 Sq. kms. within its leasehold.<br />

D. Water Resource<br />

Surface Water availability<br />

DMC Area falls under the Damodar River Basin, comprises of Damodar & Barakar Rivers as<br />

major source of Surface Water. River of the region have the usual characteristics of hill<br />

streams. Due to hilly characteristics, the river is not navigable. All the rivers have an easterly<br />

or south easterly course. The catchments of Damodar river is primarily divided into three<br />

prominent watersheds under the study area. Jamunia Nadi is the another major tributary of<br />

Damodar. Katri nadi dissects the Jharia Coal field North-South through a number of<br />

tributaries, such as Khudiya Nadi ,Bans Jhor, Kamari Jhor etc., meeting katri at different<br />

levels. By constructing weirs on Katri at 2-3 places, it is used for water supply to Railway<br />

Colony, Katras.<br />

Khas Jor is the another tributaries of Damodar flowing N-S and merging into the Damodar<br />

west of Bhowra, touching <strong>Dhanbad</strong>, Jamadoba, Jorapokhar, Bhowra on its way. It s a<br />

seasonal nallah. Domohani Nadi marks the boundary of Sindri NAC. It flows from north to<br />

East merging into Damodar River near Chasnala. There are number of Ponds/tanks scattered<br />

throughout the region.<br />

Some Import lakes also exist to provide surface water for drinking and industrial purpose.<br />

Topchanchi lake, having catchments area of serves as source of drinking water for Katras &<br />

adjacent regions.<br />

Ground Water Resources<br />

At present the ground water is being exploited through tube as well as open wells. The<br />

Ground water level is varying from 150 Meter in east to 250 Meter in the west to 250. The<br />

Dug well are 10-15 m deep below ground level in fissured formations. The ground water yield<br />

is 1-5 liter/sec in larger northern half of the <strong>Corporation</strong> from ground water restricted to<br />

weathered residuum and fractured zones having secondary porosity, whereas yield is 25-40<br />

litre/sec in Southern half along river Damodar from moderately thick confined/unconfined<br />

aquifer river of the Large scale ground water withdrawal through deep tube wells (heavy as<br />

well as low duty) has gained momentum in the areas other than hard core mining regions.<br />

Table 57: Ground Water Resources in <strong>Dhanbad</strong><br />

Description<br />

<strong>Dhanbad</strong><br />

Utilizable GW resources for irrigation (MCM/yr) 180.28<br />

Net annual GW Draft (MCM/Yr) 2.77<br />

GW Balance (MCM/Yr) 177.51<br />

Status of GW Development 1.53<br />

Surface Water Quality is one of the significant indicator of environment status of the city.<br />

Jharkhand Pollution Control Board is responsible for monitoring water and air quality<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 90


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

samples at various locations in the city on a regular basis. Samples of Nallah & sewerage at<br />

different locations along with CPCB Standards are described below:<br />

Table 58: Ground Water Resources in <strong>Dhanbad</strong><br />

Designated-Best-Use Class<br />

Criteria<br />

of<br />

water<br />

Total Coliforms OrganismMPN/100ml<br />

Drinking Water Source<br />

shall be 50 or less<br />

without conventional<br />

pH between 6.5 and 8.5<br />

A<br />

treatment but after<br />

Dissolved Oxygen 6mg/l or more<br />

disinfection<br />

Biochemical Oxygen Demand 5 days<br />

20oC 2mg/l or less<br />

Total Coliforms Organism MPN/100ml<br />

shall be 500 or less<br />

pH between 6.5 and 8.5<br />

Outdoor bathing (Organised) B<br />

Dissolved Oxygen 5mg/l or more<br />

Biochemical Oxygen Demand 5 days<br />

20oC 3mg/l or less<br />

Total Coliforms Organism MPN/100ml<br />

shall be 5000 or less<br />

Drinking water source after<br />

pH between 6 to 9<br />

conventional treatment and C<br />

Dissolved Oxygen 4mg/l or more<br />

disinfection<br />

Biochemical Oxygen Demand 5 days<br />

20oC 3mg/l or less<br />

Propagation of Wild life and<br />

Fisheries<br />

Irrigation, Industrial Cooling,<br />

Controlled Waste disposal<br />

D<br />

E<br />

Below-<br />

E<br />

pH between 6.5 to 8.5<br />

Dissolved Oxygen 4mg/l or more<br />

Free Ammonia (as N) 1.2 mg/l or less<br />

pH between 6.0 to 8.5<br />

Electrical Conductivity at 25oC micro<br />

mhos/cm Max.2250<br />

Sodium absorption Ratio Max. 26<br />

Boron Max. 2mg/l<br />

Not Meeting A, B, C, D & E Criteria<br />

Table 59: Sewerage Quality Test Results at Damodar River<br />

Particulars Limit Sudam Sudam Jamado Jamado Sudam Remark<br />

dih at dih at ba U/S ba D/S dih s<br />

U/S D/S<br />

Temp A/W 35/32 32/27 38/28 36/28 32/28<br />

PH 6.5-8.5 6.5 7.5 7.3 7.7 7.2 Within<br />

Limit<br />

BOD 3 mg/L


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Particulars Limit Sudam<br />

dih at<br />

U/S<br />

Sudam<br />

dih at<br />

D/S<br />

Jamado<br />

ba U/S<br />

Jamado<br />

ba D/S<br />

Sudam<br />

dih<br />

COD mg/L 20.0 20 18 8 40<br />

T.S. mg/L 491.0 363.0 793 292 5162<br />

T.S.S. mg/L 25 20 81 15 23<br />

T.D.S mg/L 1,500 466 343 712 277 5139<br />

D.O >4 7.00 5.00 2.6 2.8 5.5<br />

Calcium 33.0 38.0 105.6 44.0 83.2<br />

Magnesium 44.0 13.66 4.37 10.248<br />

Free<br />

0.30 0.5 0.09 0.08 0.48<br />

Chlorine<br />

Total<br />

94.0 108 320.0 28.0 250<br />

Hardness<br />

Chloride 600 36.0 46.0 28.0 22.0 48.0<br />

Phosphate 0.38 0.77 0.80 0.42 0.66<br />

Remark<br />

s<br />

Sudam<br />

dih<br />

Dissolved Oxygen. As per Designated-Best-Use of surface Water by CPCB, Delhi, it can not be<br />

used as Drinking Water Source without conventional treatment in Damodar River at U/S &<br />

D/S on River Damodar at Jamadoba & D/S in River Damodar at Sudamdih. Whereas after<br />

conventional treatment and disinfection it can be used for Drinking water supply, propagation<br />

of Wild life and Fisheries and for organized bathing purposes.<br />

E. River Water Quality<br />

Industrial development & related increase in air pollution emissions/ wastewater discharge,<br />

population growth and the resultant increase in domestic wastewater discharges, mining<br />

activities and the associated increase in fugitive emissions and wastewater discharges and non<br />

point sources of pollution from other sources are likely to affect Damodar river water quality.<br />

In addition there will be an increase in water demand from different sectors. A number of<br />

new industries and new human settlements are likely to come up in years ahead. The<br />

population is likely to increase manifolds at the present growth rate. The current picture<br />

shows that the Dissolved Oxygen levels are very low and BOD levels are high in Damodar<br />

River.<br />

F. Air Environment<br />

Mining and allied industries, domestic fuel combustion and transportation network sources<br />

are the main sources of air pollution. Mining is carried out both by opencast and underground<br />

methods. . Air Quality is very low due to coal dust and gases coming out from the cracks<br />

formed on the surface.<br />

Major air polluting industries in the state include thermal power plants, integrated steel plants,<br />

coke ovens, fertilizer plants, cement plants, refractories and other miscellaneous industries.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 92


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Besides these, there are several small-scale industries. Among the steel plants, Bokaro steel<br />

plant recorded the highest emission load of 6.5 MT. Thermal power station and fertilizer<br />

plants did not have any ESP installed. The emission from hard and beehive coke oven plants<br />

are about 5.96 MT/ year while cement plants contribute about 1.2 MT/year.<br />

Table 60: Industrial Pollution Level<br />

Description SO 2 &NO 2 SPM<br />

µg/m 3 µg/m 3<br />

Low (L) 0-40 0-180<br />

Moderate (M) 40-80 180-360<br />

High (H) 80-120 360-540<br />

Critical (C) >120 >540<br />

Table 61: Ambient Air Quality in <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> Jurisdiction<br />

Pollutants Time Weighted Concentration in Ambient Air Method<br />

Average Industrial<br />

Areas<br />

Residential<br />

Rural &<br />

Other<br />

Areas<br />

Sensitive<br />

Areas<br />

Measurement<br />

Sulphur<br />

Dioxide<br />

(So 2 )<br />

Annual<br />

Average<br />

80 µg/m3 60 µg/m3 15<br />

µg/m3<br />

24 hours 120 µg/m3 80 µg/m3 30<br />

µg/m3<br />

-Improved West<br />

and Geake Method<br />

- Ultraviolet<br />

Fluorescence<br />

of<br />

Oxides<br />

Nitrogen<br />

as (NOx)<br />

Annual<br />

Average<br />

80 µg/m3 60 µg/m3 15<br />

µg/m3<br />

- Jacob &<br />

Hochheiser<br />

Modified<br />

(Na-Arsenite)<br />

Method<br />

24<br />

hours<br />

120 µg/m3 80 µg/m3 30<br />

µg/m3<br />

- Gas Phase<br />

Chemiluminescence<br />

Suspended<br />

Particulate<br />

Matter<br />

(SPM)<br />

Annual<br />

Average<br />

360 µg/m3 140<br />

µg/m3<br />

70<br />

µg/m3<br />

- High Volume<br />

Sampling,<br />

(Average flow rate<br />

not less than<br />

1.1 m3/minute).<br />

24<br />

hours<br />

500 µg/m3 200<br />

µg/m3<br />

100<br />

µg/m3<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 93


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Table 62: Industrial Pollution Level of SO 2 in Urban Areas of <strong>Dhanbad</strong> from year 1997 –<br />

2005<br />

Location 1997 1998 1999 2000 2001 2002 2003 2004 2005<br />

Jharia 45.00 76.40 80.10 22.30 16.30 16.50 16.10 13.40 17.80<br />

(R.P<br />

College)<br />

Sindri 41.00 64.50 69.30 21.00 17.10 15.60 14.50 11.20 17.40<br />

BIT<br />

(Near<br />

FCI Main<br />

Hospital)<br />

<strong>Dhanbad</strong><br />

(R.O<br />

<strong>Dhanbad</strong>)<br />

37.30 65.60 84.40 16.50 17.30 15.40 15.90 11.10 16.00<br />

The Selected stations for conducting ambient air quality monitoring are available in Jharia,<br />

Sindri and <strong>Dhanbad</strong>. As evident in<br />

Figure 24, SO2 levels were above the<br />

national standards (60 microgram/cu.m) in 1998 & 1999. The levels are still in increasing<br />

trend since 2004 as shown in all the three National Ambient Air Quality Monitoring stations<br />

of the city.<br />

Figure 24: Comparison of <strong>Dhanbad</strong> So2 Levels with Standards with<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 94


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Table 63: Industrial Pollution Level of NO2 in Urban Areas of <strong>Dhanbad</strong> from year 1997 –<br />

2005<br />

Location 1997 1998 1999 2000 2001 2002 2003 2004 2005<br />

Jharia<br />

(R.P<br />

College)<br />

Sindri<br />

BIT<br />

(Near<br />

FCI Main<br />

Hospital)<br />

<strong>Dhanbad</strong><br />

(R.O<br />

<strong>Dhanbad</strong>)<br />

57.00 53.70 51.30 18.50 35.90 69.50 63.40 58.60 44.40<br />

54.40 58.40 46.10 17.80 38.40 56.90 62.00 61.00 46.00<br />

47.50 57.50 53.60 17.60 32.30 48.40 65.90 66.50 47.70<br />

Figure 25: Comparison of <strong>Dhanbad</strong> No2 Levels with Standards<br />

As figures depicts in Table 63 Nox levels were above the national standards (60 microgram/<br />

cu.m) in years 2002 to 2004. The current trend is showing reduced NOx levels since 2004.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 95


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Table 64: Industrial Pollution Level of SPM in Urban Areas of <strong>Dhanbad</strong> from year 1997 –<br />

2005<br />

Location 1997 1998 1999 2000 2001 2002 2003 2004 2005<br />

Jharia (R.P<br />

College)<br />

408 454 458 373 357 368 284 339 354<br />

Sindri BIT<br />

(Near FCI<br />

Main<br />

Hospital)<br />

<strong>Dhanbad</strong><br />

(R.O<br />

<strong>Dhanbad</strong>)<br />

212 177 174 204 220 301 244 - -<br />

181 238 228 274 270 263 275 - -<br />

As evident in<br />

Figure 26, SPM levels were stayed high above the national<br />

standards (360 microgram /cu.m) for more than a decade from 1991 to 2002. The present<br />

SPM levels are at moderate level since 2004 in all three stations of the district.<br />

Figure 26: Comparison of Jharia SPM Levels with Standards<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 96


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Figure 27: Comparison of <strong>Dhanbad</strong> SPM Levels with Standards<br />

G. Study Findings<br />

High observed concentration was due to sources located in and around the city, which<br />

include Jamadoba TPS, Mining sources. High SPM values, which were in excess of the<br />

prescribed standards, were due to contribution from area sources as SO2 and NOx<br />

concentration could be attributed to industrial point sources. TPS, Beehives coke oven plants,<br />

hard coke ovens, refractories. Jharia, Sindri, Jamadoba and Baliapur were the major areas of<br />

concerns from the pollution point of view.<br />

As per the combined study of MoEF, Delhi & CMRI <strong>Dhanbad</strong>, the Air Quality status<br />

decreased from Bad & Poor in 1997 to Dangerous in 2021. as per the present prevailing rates<br />

of the pollution.<br />

H. Noise Quality<br />

Noise is among most pervasive pollutants today. But it is an inescapable by product of<br />

urbanization and industrialization. CPCB set standards for noise pollution in 1989 and the<br />

Ministry of Environment & Forest (MoEF ) formulated Noise Pollution Rules only in 2000.<br />

Noise Levels was monitored last year with coordination with CPCB, New Delhi by <strong>Dhanbad</strong><br />

Regional Office of Jharkhand State Pollution Control Board. The location of the Noise<br />

Monitoring stations and their associated noise levels are given in Table 65.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 97


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Table 65: Noise Quality Results in Residential Area<br />

Time of<br />

Residential Area<br />

Monitoring D.S.Colony MADA Colony Bhisti Para Limit<br />

1 ST Jan ‘05<br />

10:30 68.4 69.7 64.2 55<br />

12:30 86.4 75.2 77.00 55<br />

2:30 87.3 78.5 78.1 55<br />

4:30 82.1 77.4 78.6 55<br />

6:30 79.2 82.3 88.6 55<br />

8:30 98.7 94.6 92.6 55<br />

10:30 1oo.2 99.4 100.0 45<br />

Table 66: Noise Quality in Commercial and Residential Areas<br />

Commercial / Residential Area<br />

Time of Monitoring<br />

1 ST November ‘05<br />

R.O Office<br />

Near Bus Stand<br />

Near MIG Colony<br />

Near<br />

LIG<br />

Colony<br />

Limit (in<br />

dB)<br />

10:00 AM 60.8 58.8 60.3 65<br />

12:00 Noon 82.1 72.2 78.3 65<br />

4:00 PM 92.1 74.7 73.2 65<br />

6:00 PM 97.4 78.8 75.8 65<br />

8:00 PM 99.8 97.5 102.5 65<br />

9: 00 PM 82.3 74.6 76.1 65<br />

10:00 PM 79.00 101.2 101.5 65<br />

Source: Jharkhand State Pollution Control Board, Regional Office, <strong>Dhanbad</strong><br />

Table 67: Noise Quality in Commercial and Residential Areas<br />

Residential / Commercial Area<br />

Time of Monitoring<br />

Shastri Nagar Bank More Gujrat Mohalla Limit<br />

1 ST November‘05<br />

TRD Colony<br />

(in dB)<br />

11:00 AM 67.5 67.7 66.2 65<br />

1:00 PM 82.4 83.4 78.4 65<br />

3:00 PM 82.5 82.9 79.1 65<br />

5:00 PM 82.4 81.5 80.4 65<br />

7:00 PM 88.4 94.9 88.4 65<br />

9: 00 PM 92.6 94.6 91.5 65<br />

11:00 PM 100.4 99.7 99.6 65<br />

It is evident from the above tables that almost in all land uses areas, the permissible noise<br />

levels are exceeding both during Day & night at Commercial as well as in Residential area.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 98


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

I. Hot Spots<br />

Land Environment<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> suffers from<br />

various categories of land degradation. Land<br />

gets degraded here due to variety of reasons<br />

(erosion, mining, overburden dumping and<br />

abandoned mines, mine fire & subsidence).<br />

Degraded land need to be appropriately<br />

treated to make them suitable for the<br />

designated usage.<br />

Mine Fire<br />

Jharia is facing the burnt of mine fire and subsidence. It has more than 70 mine fires spread<br />

over an area of about 17 sq.km.<br />

Table 68: List of Collieries affected by Mine Fires<br />

S.No Colliery Affected Sl.No Colliery Affected<br />

1 East Katras Colliery 19 Alkusa<br />

2 Katras Choitudih 20 Kustore<br />

3 Gaslitandh 21 Ena Industry<br />

4 Mudlidih 22 East Bhuggatdih<br />

5 Jogta 23 Bhalgora Simlabahal<br />

6 Kankanee 24 Rajapur<br />

7 Loyabad 25 Kujama<br />

8 Sendra Bansjora 26 Lodna<br />

9 Tetulmari 27 Jealgora<br />

10 Bansdeopur 28 Bagdigi<br />

11 East Basuriya 29 Bararee<br />

12 Basuriya 30 Bhulan Bararee<br />

13 Kusunda 31 North Tisra/GOCP<br />

14 Industry 32 South Tisra<br />

15 Gopalichak 33 Jeenagora<br />

16 Kendwadih 34 Joyrampur<br />

17 Bhagabandh 35 Bhowra North & South<br />

18 Kachhi Balihari 36 Sudamdih & Patherdigh<br />

37 Amlabad<br />

From the early days mining has been carried out herewith disregard towards safety, health<br />

and environment. According to the Environment Management Plan (EMP) of the Coalfield<br />

prepared by Norwest Mine Services Limited in 1997, the entire coalfield has been disturbed<br />

by human activities for a long period of over 100 years. Most of the core & buffer zones of<br />

the coalfield suffer from excessive soil erosion as initial forest cover over them has been<br />

denuded due to mining activities. Air Quality is very low due to coal dust and gases coming<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 99


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

out from the cracks formed on the surface. Reclamation of degraded land due to mining and<br />

other human activities are ignored.<br />

This Coalfield has large number of water bodies, i.e. rivers, jorias, nallahs, ponds and lakes.<br />

They are seasonal & shallow and often dry up in summer, resulting in water scarcity at places.<br />

However in rainy season, they carry much water and in case of excess downpour, they<br />

sometime get flooded. Moreover there are many abandoned underground waterlogged mine<br />

workings, whether developed or worked out, which form subsurface water bodies.<br />

An area of about 35 sq. km. has subsided in JCF due to mining activities damaging the natural<br />

surface drainage pattern in and around the coalfield. More than 100 km of the first and<br />

second order streams have been lost and aquifers upto a depth of about 120-140 m have been<br />

affected. While rainfall has gone up here in the recent years, groundwater yield has reduced<br />

considerably over the years, especially during the summer months.<br />

J. Hazards<br />

The District of <strong>Dhanbad</strong>, situated on the eastern side of Jharkhand is vulnerable to various<br />

kind of hazard like earthquake, fire subsidence in mining areas, fire hazard, drought, flood,<br />

railway accidents, chemical hazard, communal violence, epidemics etc.<br />

Disaster Specific proneness to Various Types of Hazards in <strong>Dhanbad</strong><br />

The following table depicts about the various type of natural hazard that are prone in<br />

<strong>Dhanbad</strong>, its period of occurrence, potential impacts and the vulnerable areas of <strong>Dhanbad</strong><br />

District.<br />

Table 69: List of Disaster Specific Proneness to Various Types of Hazards in <strong>Dhanbad</strong><br />

Type of Hazards Time of<br />

Occurrence<br />

Potential Impact Vulnerable Areas<br />

Earth Quake Any Time Loss of Life,<br />

Livestock and<br />

Infrastructure<br />

Entire Region<br />

Cyclone<br />

June – October<br />

Loss of life, crop,<br />

infrastructure and<br />

animals<br />

Eastern portion of<br />

the District, mainly<br />

in Nirsa and Tundi<br />

Block<br />

Drought July – October Crop Loss, Water<br />

scarcity<br />

Entire District<br />

Heat Stoke April – June Loss of Life -do-<br />

Epidemics Any Time Loss to human life -do-<br />

Fire Accidents March – May Human Loss and<br />

house damage<br />

-do-<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 100


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Type of Hazards<br />

Time of<br />

Occurrence<br />

Potential Impact<br />

Vulnerable Areas<br />

Flood<br />

June - September<br />

Loss of life,<br />

livestock, crop and<br />

infrastructure<br />

Eastern and<br />

southern portion of<br />

the District, mainly<br />

in Nirsa, Baliapur<br />

and Tundi Block<br />

From the above table it is evident that, it becomes pertinent to say that <strong>Dhanbad</strong> is also<br />

vulnerable to various kind of hazards, which may cause severe damage to lives and properties.<br />

Further the Multi-hazard map of Jharkhand (Figure 28) also shows that the eastern portion<br />

of <strong>Dhanbad</strong> is more prone to the hazards especially, the wind, cyclone, earthquake and flood<br />

hazards.<br />

Natural Hazards<br />

In recent years, much of the seismic activity in the state of Jharkhand has been in the north, at<br />

the Himalayan foot hill zone of Ganga-Damodar region lying at northern side of Jharkhand.<br />

The state of Jharkhand lies in the Tatapani Fault. As per their categorization <strong>Dhanbad</strong> city lies<br />

in zone III same as Ahmedabad (which faced massive disaster during last Bhuj earthquake<br />

happened on 26th January 2001.) and having population of more than 13 lakhs, any<br />

earthquakes striking this city will turn into a major disaster. Regional Earthquakes that<br />

affected city in the past occurred in 1868, 1881, 1892, 1918, 1927, 1930, 1935, 1934, 1943,<br />

1953, 1963, 1969, 1970, 1971, 1979, 1985, 2003.<br />

The list of earthquakes those were notable either due to their location or due to their effects<br />

are given below. Time is reported as Indian Standard Time (IST).<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 101


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Table 70: Significant Earthquakes in <strong>Dhanbad</strong> & Nearby Vicinities in Jharkhand<br />

Date Time Magnitude Intensity Latitude Longitude Location & Comments<br />

15 January<br />

1934<br />

14:13:25 8.1 IX 26.500 86.500<br />

Close to 10,700 people killed in North Bihar and Nepal.<br />

Buildings developed cracks at Deogarh, Dumka, Hazaribagh,<br />

Giridh, Koderma, Jhumri Telaiya, Palamau and Ranchi. At<br />

Hazaribagh, walls of many buildings developed cracks and<br />

the turret of a local college collapsed. At Deogarh, portions<br />

of some buildings collapsed. At the village of Singra, near<br />

Daltonganj, the earth on the banks of the Amanat and<br />

Gursote rivers were cracked. Water “shot out up to five feet<br />

in height” at the junction of the Amanat and Koel rivers.<br />

23 October<br />

1943<br />

22 May<br />

1953<br />

09 April<br />

1963<br />

10 May<br />

1969<br />

29 July<br />

1970<br />

27 January<br />

1971<br />

05 August<br />

1979<br />

22:53:17 7.0 VIII 26.000 93.000 Damage at Dimapur in Assam. Felt as far as <strong>Dhanbad</strong> and<br />

Hazaribagh.<br />

- - III - - Felt at Jamshedpur.<br />

05:33:32 4.5 III 22.000 85.700 Felt at Baripada, Cuttack, Jamshedpur, Kolkata and Rourkela.<br />

- - IV - - Felt at Jamshedpur, accompanied by a rumbling noise.<br />

People rushed onto the streets in panic.<br />

15:46:19 6.5 - 26.000 95.400 Epicentre along the Nagaland-Myanmar border. Felt as far as<br />

Jamshedpur, Kolkata, Krishnagar, Kishanganj, Munger and<br />

Ranchi.<br />

- - IV - - Felt at Jamshedpur for 3 seconds. Doors and windows rattled<br />

and people ran outdoors.<br />

06:48:37 4.7 - 22.100 84.900 Epicentre along the Jharkhand-Orissa border, near<br />

Dublabera.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 102


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Date Time Magnitude Intensity Latitude Longitude Location & Comments<br />

18 Feb<br />

1985<br />

20 October<br />

2003<br />

04:36:55 4.7 - 24.670 85.480 Epicentre along the Bihar-Jharkhand border, near Rajauli.<br />

06:09:52 4.0 VI 23.730 86.580 Felt at <strong>Dhanbad</strong> and Koylanchal for 30 seconds. Doors and<br />

windows rattled and people ran outdoors. Also felt At<br />

Bokaro and Ranchi. A few cracks in buildings were reported<br />

from Bokaro where it was felt for 15-20 seconds.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 103


DAMIDA OCP<br />

DAMUDA<br />

W.MOHUDA(NORTH)<br />

W.MOHUDA(NORTH)<br />

LAHAPATI<br />

KALYANPUR<br />

BLOCK-III(NC)<br />

N.MAHUDA<br />

MURAIDIH<br />

KHUDIA NALA<br />

SHATARI<br />

20<br />

21 PITS<br />

ALUARA<br />

ALUARA<br />

RAJGANJ<br />

City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

TO DELHI<br />

CITY DEVELOPMENT PLAN<br />

DHANBAD<br />

G.T.ROAD<br />

UNSTABLE SITES OF DEVELOPMENT<br />

IN DMC, DHANBAD<br />

GOVINDPUR<br />

GOMOH STN.<br />

KOYLACITY II<br />

HAQARIKALAN<br />

KOYLACITY I<br />

14<br />

TO GORAH<br />

BARAPANDIYDIH<br />

KESSURGARH NUD<br />

KHURKI<br />

BARORA<br />

NUD<br />

BENEDIH<br />

AREA<br />

JAMUNIA KHURKI<br />

OCP<br />

OCP<br />

BLOCK-I OCP<br />

COKING<br />

23 MADHUBAND 1<br />

PHULARITAND<br />

MADHUBAND<br />

DAMUDA<br />

24<br />

PIPRATAND-RADHANAGAR<br />

14A<br />

DAMODAR RIVER<br />

16<br />

(PHULARITAND<br />

OCP$SECT)<br />

PHULARITAND<br />

15<br />

MURAIDIH<br />

OCP<br />

BHURANGIA<br />

DARIDA<br />

2<br />

DHARWABAND<br />

E.MAHUDA<br />

17<br />

KOUMURNA<br />

SALAN<br />

JOGIDIH<br />

AKASKINARI PUR<br />

KOORIDIH BLOCK-IV<br />

OCP(NC)<br />

GOVINDPUR<br />

AKASKINARI<br />

OCP<br />

DCP<br />

E.KATRAS<br />

KHARKHAREE<br />

EXLENSION DHARMABAND-EXTENSION<br />

25 26<br />

BHATDIH<br />

MURULIDIH<br />

MURULIDIH<br />

20<br />

KATRI<br />

NALA<br />

KHUDIA<br />

NALA<br />

KESHALPUR<br />

RAMKANALI<br />

W.MUDIDIH<br />

NT OCP<br />

SIJUA<br />

AREA<br />

RAMKANALI<br />

W.MUDIDIH<br />

OCP<br />

KESHALPUR TETULMARI<br />

OCP<br />

NICHITPUR<br />

TETULMARI<br />

SENDRABANSJORA<br />

OCP<br />

OCP EAST<br />

ANGARPATHRA<br />

BASURIA<br />

BUSSURIYA<br />

KATRAS<br />

SENDRABANSJORA<br />

OCP<br />

AREA<br />

BUSSURIYA KHAS<br />

TO<br />

KUSUNDA<br />

DHANBAD<br />

STN.<br />

LOYABAD<br />

KHASKUSUNDA<br />

S.POOTKEE<br />

OCP<br />

LOYABAD<br />

VI<br />

GODHUR<br />

DHANSAR<br />

BANSDEOPUR<br />

4<br />

KENDW GODHUR<br />

ADIH<br />

OCP<br />

KOCP<br />

GOPALI<br />

KUSUNDA<br />

ARE VII<br />

BAS<br />

BHAGABAND<br />

CHUCK<br />

ACOLLA<br />

BHAGABAND<br />

KUSUNDA<br />

DHANSAR<br />

OCP<br />

OCP<br />

5<br />

PUTKI-BALIHARI<br />

KUSUNDA<br />

VII<br />

KAPURIA<br />

INDUSTRY<br />

MOONIDIH<br />

7<br />

KUSTORE<br />

ENA OCP<br />

27<br />

SINGRA<br />

DAMODAR RIVER<br />

EASTERN<br />

JHARIA<br />

AREA<br />

SINGRA<br />

ADRA-GOMOH<br />

RLY. LINE<br />

JARMA<br />

19<br />

BHUTGARIA<br />

6<br />

6<br />

BHUT<br />

GORIA<br />

BIJRA<br />

GARH<br />

ISSCO<br />

BHULI<br />

SINLA<br />

BAHAL<br />

27<br />

HURRIDIH<br />

SAPTA<br />

LODHA<br />

LODHA<br />

ROCP<br />

S.JHARIA<br />

ROCP<br />

IX<br />

BERA<br />

DOBARI<br />

KUYA<br />

GANOODIH<br />

GANOODI<br />

OCPH<br />

BASTACOLLA<br />

AREA<br />

KUJAMA<br />

GOLUCKDIH<br />

NORTH<br />

TISRA<br />

SOUTH<br />

TISRA<br />

PATRAKULI<br />

JHARNA<br />

BHAGRAMPUR<br />

AMTAL<br />

GOLUCKDIH<br />

OCP<br />

DHANBAD PATHARDIH RLY<br />

N.TISRACP<br />

GOLMORA<br />

BIJOYDIH<br />

BELGARIA<br />

LUPANIA<br />

TO HOWRAH<br />

PALANI<br />

SABAIGARHA<br />

GOVINDPUR<br />

TO CALCUTTA<br />

SAPTA<br />

LEGEND<br />

II<br />

REHABILITATION SITE<br />

FOR HIGH INCOME GROUP<br />

REHABILITATION SITE<br />

FOR MEDIUM INCOME GROUP<br />

REHABILITATION SITE<br />

FOR LOW INCOME GROUP<br />

AREA BOUNDRY<br />

COLLIERY BOUNDARY<br />

RIVER / JORIA<br />

RAILWAY LINE<br />

OPERATING OCP<br />

MAJOR ROADS<br />

UNDERGROUND BLOCKS<br />

OPENCAST BLOCKS (ORIGINAL)<br />

OPENCAST BLOCKS (REVISED)<br />

TISCO<br />

JEAL<br />

GORA<br />

BAG<br />

DIG<br />

JOYRAMPUR<br />

JEENAGORA<br />

OCP<br />

5.TISRA OCP & AUGN<br />

UNSTABLE UNCONTROLLABLE SITES<br />

28<br />

PARBATPUR<br />

21<br />

PARBATPUR<br />

AMLABAD<br />

PROJECT<br />

9<br />

JEALGORA<br />

BARAREE<br />

10<br />

BHAWRAH BHAWRAH NORTH<br />

BHAWRAH OCP<br />

NORTH<br />

JEENAGORA<br />

SULANGA<br />

AMLABAD<br />

11<br />

EASTERN<br />

JHARIA<br />

AREA<br />

BHAWRAH<br />

SOUTH<br />

BHAWRAH SOUTH<br />

OCP<br />

PATHAR<br />

DIH<br />

SUDAMDIH 12<br />

INC.<br />

E.RLY PRADMANKHANTA<br />

PATHARDIH CHORD<br />

MAHAL<br />

SITAHAL<br />

SAPTA<br />

SUDAMDIH<br />

22<br />

28 SHAFT<br />

18<br />

IISCO<br />

SUDAMDIH<br />

MOHAL<br />

30 23<br />

SAPTA<br />

GOURIGRAH<br />

GOURDGRAM<br />

TASRA<br />

TO ADRA<br />

DHANBAD MUNICIPAL CORPORATION<br />

INFRASTRUCTURE DEVELOPMENT<br />

CORPORATION LIMITED<br />

FIGURE NO:<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 104


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

It can be easily assessed from the Table 70, that the region is only 200-250 km far away from<br />

zone 4 and 5 which are most earthquake vulnerable zones. A single high intensity earthquake<br />

having magnitude of more than six occurred in zone 4 or 5 will cause a massive disaster as<br />

happened in Ahemedabad during 2001.<br />

Further <strong>Dhanbad</strong> is surrounded by large reservoirs of Damodar Valley <strong>Corporation</strong>s. Major<br />

faults of the region lie in and around DVC reservoirs with huge amount of water reserve load.<br />

This aspect may increase the chances of any local earthquakes by widening or displacing the<br />

faults in the interior. Over last 40 years, DVC area near <strong>Dhanbad</strong> has received many minor<br />

and major earthquakes.<br />

Thus Keeping in mind this possible disasters, there is a critical need to adopt earthquake<br />

hazard-reduction measures and adopt proper guidelines for construction of buildings as it is<br />

not the earthquake that kills people but unsafe structures do. Beside that awareness,<br />

preparedness, capacity building, education are all necessary and important for the city’s<br />

residents to equip themselves for any upcoming disasters.<br />

Cyclone<br />

As the district lies on eastern side facing Bay of Bengal, it is vulnerable to cyclonic storms.<br />

Cyclones ordinarily bring in their trail of heavy rains causing floods.<br />

According to the multi-hazard maps of Jharkhand the CD-Blocks like Nirsa and Tundi of<br />

<strong>Dhanbad</strong> District have been identified as cyclone prone blocks.<br />

Fire Accidents<br />

Fire accident happen due to several causes like: Housing Pattern, Lose circuit of electricity etc.<br />

In Jharkhand due to peculiar housing patterns maximum fire accident cases takes place. The<br />

city of <strong>Dhanbad</strong> is quite prone to fire accidents. This is mostly because of the unplanned &<br />

haphazard, housing development within the city. Even in adverse cases in most parts of the<br />

cities, fire extinguisher vehicle can’t approach the accident site due to narrow allies even in<br />

commercial places.<br />

Draught<br />

Occurrence of drought is also frequent in <strong>Dhanbad</strong> district as it little differs from monsoon<br />

corridor. Many of its regions lie in the leeward side of monsoon corridor, due to presence of<br />

mountain ranges oppositely facing to monsoon winds. Past occurrences show that the entire<br />

district is prone to draught.<br />

Mining Hazards<br />

Mining is the hazardous operation against the force of nature. Unless adequate safeguards are<br />

taken while operating mines, safety of persons working may become the first causality.<br />

Unscientific and irregular development, extraction and abandonment of mine workings in the<br />

area of Jharia Coalfield have led to mine fire and subsidence problem in this region. On the<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 105


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

other hand, as the natural outcome of industrial growth, the township of Jharia started<br />

coming with concentrated growth of dwellings. Impact of mine fire and subsidence has led to<br />

grave socioeconomic problems for the people residing and/or working here.<br />

Unplanned civil construction and spread of populace over coal bearing areas have<br />

compounded problems of coal theft. In the past, growth of habitation over coal bearing areas<br />

remained unchecked and associated human activities which grow with population continued<br />

to flourished. Now initiatives must be taken to stop and reduce the pressure of population<br />

from mining operated areas.<br />

Abandoned Mines<br />

The Region is full of small abandoned mines, many of them a legacy of unscientific mining by<br />

the erstwhile private owners. A very complex geotechnical nature of seams in Jharia Coalfield<br />

had forced abandonment of the operation before complete extraction of coal, in many cases<br />

large scale urbanization over coal bearing areas had forced mine operators to stop mining.<br />

Moreover, due to multiple seam situations and for lack of a proper mine closure plan<br />

subsistence takes place even in some habitation areas.<br />

Protective works like fencing off abandoned quarries, filling up of voids etc. should be<br />

completed by the lessee before abandonment of workings. Numbers of statuary orders have<br />

been issued by Director General of Mines Safety (Authority Body for granting consent for<br />

lease mining) under regulation 112 of the CMR, 1957 in this regard. The time frames for<br />

completion of these jobs need to be attached to it.<br />

Seismic Hazard<br />

The seismic hazard map of India was updated in 2000 by the Bureau of Indian Standards<br />

(BIS). According to the new map, the state of Jharkhand lies in Zones II , III and IV. The<br />

northwestern part of the State adjacent to West Bengal falling in Goda and Sahibganj district<br />

comes under zone 4, where a maximum MSK intensity of VIII can be expected. The districts<br />

of Gharwa, Palamu, Chatra, Hazaribag, Koderma, Girdidih, Deoghar, Bokaro, <strong>Dhanbad</strong>,<br />

Dumka, Pakur , Lohkardaga lie in Zone III, where a maximum<br />

MSK intensity of VII can be expected. The remaining districts of Gumia, Ranchi, West<br />

Singhbhum and East Singhbhum lie in Zone II.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 106


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Figure 28: Earthquake Zones in Jharkhand State<br />

Figure 29: Past Earthquake Occurrences in <strong>Dhanbad</strong> Region<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 107


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

(i.) <strong>Dhanbad</strong> lies in a Moderate Damage Risk Zone as per the latest seismic zone map of<br />

India.<br />

(ii.) The population is concentrated in the area of earthquake hazard.<br />

(iii.) The building and lifelines have low earthquake resistance.<br />

There is a critical need to adopt earthquake hazard-reduction measures and adopt proper<br />

guidelines for construction of buildings as it’s not the earthquake that kills people but unsafe<br />

structures do. Awareness, preparedness, capacity building, education are all necessary and<br />

important for the city’s residents.<br />

Displacement of Schedule Tribe Families from Major Projects in DMC Area.<br />

Table 71: Displacement of Tribe Families<br />

Project<br />

No of Families<br />

Displaced<br />

Area from which<br />

the families<br />

Displaced<br />

No. of<br />

Families<br />

Resettled<br />

Sindri Fertilizer 597 1,228 973<br />

Maithon Dam<br />

3,296 13,138 484<br />

(Jharkhand & W.Bengal)<br />

Panchet Dam<br />

(Jharkhand & W.Bengal)<br />

1,916 1951<br />

There is also very sharp decline in the relative share of tribal population from these areas. In<br />

<strong>Dhanbad</strong> Region alone the decline is from 15.7% in 1951 to 8.5% in 1991in 2001 attracts<br />

concerns of the administrative authorities.<br />

Limitations<br />

Since the available environmental data is meager, findings were arrived at based on past data<br />

and qualitative data analysis.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 108


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

VII. PHYSICAL PLANNING AND GROWTH MANAGEMENT<br />

A. Overview<br />

The structure of the city is determined by physical planning. Physical planning gives blueprint<br />

of the growth pattern and means to regulate and manage it. The settlement pattern of<br />

<strong>Dhanbad</strong> has some typical characteristics of most of the Indian cities including, it being<br />

situated on near by Damodar riverbank. Besides this, <strong>Dhanbad</strong> has got special character<br />

owing to the large coal mining activity and allied industrial development leads to unplanned<br />

developments and unsafe to reside in Jharia Coal Field (JCF) area in the <strong>Dhanbad</strong> <strong>Municipal</strong><br />

<strong>Corporation</strong> jurisdiction. Though town planning is an age-old presence in India, most of the<br />

cities here have grown in parts without substantial level of regulations and planning. Similarly,<br />

<strong>Dhanbad</strong> has also seen organic growth accelerating much faster than and different from the<br />

planned growth.<br />

B. Planning Efforts in the Past<br />

Mineral Area Development Authority (MADA) prepared the first Master Plan for <strong>Dhanbad</strong><br />

in 1989. To ensure orderly development of <strong>Dhanbad</strong> mineral areas in the region, the first<br />

Master Plan was envisaged the land use plan for the year 2011. The area demarcated for the<br />

preparation of Master Plan study was 5,600 Hectares, which is actually the erstwhile <strong>Dhanbad</strong><br />

<strong>Municipal</strong> area.<br />

C. Land Use Management<br />

The Master Plan envisages out<br />

of the total area of 5,600<br />

hectares, 5,415 hectares will be<br />

developed in 2011. The<br />

residential areas in <strong>Dhanbad</strong><br />

constitute about 44.32 percent<br />

of the future developable land.<br />

Reasonable land was proposed<br />

for circulation pattern in<br />

<strong>Dhanbad</strong> for the year 2011.<br />

Next to the circulation pattern,<br />

industrial activity occupies a<br />

share of 12.74 percent and<br />

institutional & Housing activity<br />

occupies a share of 9.23<br />

percent. Detail breakup of the<br />

Residential<br />

45%<br />

Figure 30: Proposed Land Use<br />

Proposed Land Use<br />

Industrial<br />

13%<br />

Circulation<br />

20%<br />

Commercial<br />

5%<br />

Institutional & Housing<br />

9%<br />

Recreational<br />

6%<br />

Public & Semi Public<br />

2%<br />

proposed land use is presented in Table 72. Since there is no master plan for entire area of<br />

the <strong>Corporation</strong> conceptual master plan has been presented in Figure 31.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 109


S<br />

PG<br />

PG<br />

PG<br />

S<br />

S<br />

TETULIATAND<br />

PG<br />

S<br />

GOSAI DI<br />

PG<br />

PG<br />

S<br />

PG<br />

PG<br />

PG<br />

S<br />

S<br />

S<br />

BS<br />

PG<br />

S<br />

S<br />

COL.<br />

S<br />

S<br />

City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Figure 31: Erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong> area proposed Landuse Map<br />

S<br />

S<br />

CITY DEVELOPMENT PLAN<br />

DHANBAD<br />

PROPOSED LAND USE<br />

S<br />

MASTER PLLAN FOR DHANBAD<br />

COL<br />

LEGEND<br />

RESIDENTIAL<br />

COMMERCIAL<br />

WHOLE SALE<br />

RANGADI<br />

RETAIL<br />

INDUSTRIAL<br />

LIGHT AND MEDIUM<br />

KHILKNALI<br />

SERVICE<br />

RIVER, NALLA<br />

PONDS<br />

RECREATIONAL<br />

PLANTATIONS<br />

KANDRA<br />

NH2<br />

PG<br />

S<br />

NARAYANPUR<br />

TO CALCUTTA<br />

BALIAPUR<br />

PUBLIC UTILITIES & SOCIAL AMENITIES<br />

POLICE STATION<br />

HEALTH CENTRE<br />

BANK<br />

POST OFFICE<br />

COMMUNITY CENTRE<br />

PG<br />

S<br />

PG<br />

PLAY GROUND / PARK<br />

KASITAND<br />

BS<br />

PG<br />

S<br />

SECONDARY SCHOOL<br />

TUMBAHA<br />

SIMLA BERA<br />

SABALPUR<br />

COL<br />

HOSP<br />

KOYALA NAGAR<br />

DAMODARPUR<br />

PG<br />

DHOKHARA<br />

COL<br />

HOSP<br />

PRIMARY SCHOOL<br />

TREKKER STAND<br />

CYCLE, RICKSHAW STAND<br />

PUBLIC INSTITUTION AND HOUSING<br />

COLLEGE<br />

HOSITAL<br />

SIMLATAND<br />

KISITAND<br />

BARWA<br />

ADDA<br />

SAHARJORI<br />

TRUCK<br />

TERMINAL<br />

PANDUKI<br />

APMC<br />

BHELATAND<br />

AIRSTRIP<br />

S<br />

SUSNIL EWA<br />

PG<br />

PG<br />

S<br />

PG<br />

DHAIYA<br />

PG<br />

S<br />

PG<br />

I S M<br />

S<br />

C M R I<br />

JAGJIVAN NAGAR<br />

S<br />

PG<br />

COL<br />

LIBR<br />

HIRAPUR<br />

S<br />

PG<br />

BHUDA<br />

DHANBAD<br />

RLY. STN.<br />

BS<br />

BARMASIA<br />

DHANBAD<br />

MANAITAND<br />

DHUHATAND<br />

s<br />

BS/RS<br />

BUS / RAILWAY STATION<br />

AIR STRIP<br />

RAILWAY LINE<br />

PROPOSED ROADS<br />

250'- 00" R/W ROAD<br />

200'- 00" "<br />

150'- 00" "<br />

100'- 00" "<br />

80'- 00" "<br />

60'- 00" "<br />

40'- 00" "<br />

30'- 00" "<br />

20'- 00" "<br />

EXISTING ROADS<br />

250'- 00" "<br />

200'- 00" "<br />

150'- 00" "<br />

100'- 00" "<br />

80'- 00" "<br />

PARKING AREA<br />

SL NO. ELEMENT<br />

Area in hec<br />

PLANNING AREA<br />

BOUNDARY<br />

VILLAGE BOUNDARY<br />

Percentage of total land use<br />

BADA JAMUA<br />

DAMKARA BARWA<br />

S<br />

PG<br />

NATIONAL HIGH WAY BY PASS<br />

KURUMIDI<br />

CITY<br />

PARK<br />

PG<br />

BAROMURI<br />

BISHUNPUR<br />

POLYTECH<br />

PANDERPALHA<br />

MATKURIA<br />

BANK MORE<br />

1. Residential<br />

2400 42.56<br />

2. Industrial 690 12.86<br />

3. Commercial 270 4.82<br />

4. Circulation(Road & Railway) 1100<br />

19.64<br />

5. Water bodies 185 3.30<br />

6. Institutinal & housing<br />

500<br />

8.93<br />

7. Public adminstrtion &<br />

120 2.14<br />

services<br />

8. Social amentities &<br />

335<br />

5.98<br />

recreativ<br />

TO DELHI<br />

NAWADIH<br />

PG<br />

SPORTS<br />

STADIUM<br />

PG<br />

Total land use 5600 100<br />

TO BHULI<br />

NH 32<br />

N<br />

TO BOKARO<br />

DHANBAD MUNICIPAL CORPORATION<br />

SOURCE : KIRLOSKAR CONSULTANTS FOR MADA<br />

TO NEW DELHI<br />

FIGURE NO:<br />

INFRASTRUCTURE DEVELOPMENT<br />

CORPORATION LIMITED<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 110


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Table 72: Proposed Land Used - 2011<br />

Land Use 2011 Distribution<br />

Hectare %<br />

Developed Area<br />

Residential 2,400 44.32<br />

Industrial 690 12.74<br />

Commercial 270 4.99<br />

Institutional & Housing 500 9.23<br />

Recreational 335 6.19<br />

Public & Semi Public 120 2.22<br />

Circulation 1,100 20.31<br />

Sub Total Developed Area 5,415 100.00<br />

Water Bodies 185<br />

Urbanized Area 5,600<br />

Source: Master Plan Report, 1989.<br />

D. Urban Sprawl<br />

The present outline of the new <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> has grown by development<br />

in parts like, <strong>Dhanbad</strong>, Sindri, Jharia, Kataras, Chattantand and etc. At different periods, the<br />

urban settlements grew in different directions. When the development reached some physical<br />

barrier in one direction, then the direction for development changed for next best option.<br />

Initially, the <strong>Municipal</strong> <strong>Corporation</strong> area grew Sindri, Jharia and <strong>Dhanbad</strong> because of the coal<br />

mining and industrial developments. A no of mining settlements have sprung up along two<br />

major arterial roads in the <strong>Corporation</strong> Jurisdiction. Jharia, Jorapokhar, Tisra, Bowra,<br />

Jamadoba, Pathardih, Chasnala, Sindri and Bhagatdih have come up along <strong>Dhanbad</strong> – Jharia-<br />

Sindri road. Urban Settlements like, Chaitudih, Sijua, Angarpathar, Katras- Salanpur, Malkera,<br />

Chandur are developed along <strong>Dhanbad</strong> –Karkend – Katras road. Thus, <strong>Dhanbad</strong> Urban<br />

Agglomeration is one of the most urbanized regions in the Country.<br />

Future growth directions (Figure 32), owing to the implementation of Jharia Rehabilitation<br />

Plan development will be directed towards the proposed townships. High potential areas<br />

available for future developments are anticipated between railway track (Kolkata – Delhi) and<br />

NH 2 Road towards Gobindpur.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 111


CITY DEVELOPMENT PLAN<br />

DHANBAD<br />

DHANBAD MUNICIPAL CORPORATION<br />

GOTTOPA<br />

FUTURE POTENTIAL AREA AND<br />

PROPOSED CONCEPTUAL LANDUSE<br />

CHANDUD<br />

AMAGHATA<br />

SAMAIDIH<br />

SABALPUR<br />

DHANGI<br />

KOLAKUSMA<br />

SAPTA<br />

NARAINPUR<br />

9<br />

LEGEND<br />

8<br />

BHELATAND<br />

PALANI<br />

MAJOR ROADS<br />

40<br />

RAILWAY LINE<br />

RAKHITPUR<br />

MAJOR RIVERS<br />

AMJHAR<br />

6<br />

DHAIYA<br />

CITY/ TOWN<br />

SINDRI<br />

BARADAHA<br />

HIRAPUR<br />

7<br />

DHOKHRA<br />

BHUDA<br />

FUTURE AREA OF GROTH<br />

3<br />

UNSUITABLE SITE FOR DEVELOPMENT<br />

BAROMA<br />

5<br />

DHOWATANR<br />

PROPOSED BCCL TOWNSHIPS<br />

GOLMARA<br />

KUSBERIA<br />

Environmentally Sensitive Area<br />

4<br />

RESIDENTIAL<br />

SAHARPURA<br />

BERA<br />

1<br />

COMMERCIAL<br />

GOLAKDIH<br />

RAJGANJ<br />

MIXED LAND USE<br />

OJHADIH<br />

AGRICULTURAL<br />

200<br />

JINAGORA<br />

BAGAGI<br />

GOPALICHAK<br />

UPARKANDRA<br />

BHATDIH<br />

202<br />

JAMADOVA<br />

LOYABAD<br />

ARULGRIA<br />

PETIA<br />

111<br />

GANSADIH<br />

PARASIA<br />

MUNIDIH<br />

KARITANR<br />

N<br />

DHANBAD MUNICIPAL CORPORATION<br />

INFRASTRUCTURE DEVELOPMENT<br />

CORPORATION LIMITED<br />

FIGURE NO:<br />

DAMODAR RIVER<br />

192<br />

SINDRI<br />

186<br />

187<br />

189<br />

CHHIPATAND<br />

SOULAPUR<br />

183<br />

174<br />

169<br />

DOMGARH<br />

TASRA<br />

168<br />

167<br />

City Development Plan, <strong>Dhanbad</strong> Final Report<br />

Figure 32: <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> – Future Growth Direction<br />

174<br />

173 172<br />

129<br />

184<br />

JIALGORA<br />

TO KOLKATA<br />

122<br />

11<br />

185<br />

18<br />

32<br />

towards Baliapur<br />

towards Govindpur<br />

10<br />

123<br />

125<br />

126<br />

127<br />

128<br />

NH32<br />

34<br />

30<br />

NH2<br />

35<br />

towards Barwadda & Bhuli<br />

151<br />

36<br />

37<br />

DHANBAD<br />

49<br />

13<br />

152<br />

140<br />

170 171<br />

14<br />

141<br />

16<br />

15<br />

142<br />

131<br />

144<br />

17<br />

12<br />

88<br />

89<br />

94<br />

52<br />

50<br />

139<br />

48<br />

47<br />

46<br />

49<br />

44<br />

45<br />

42<br />

85<br />

86<br />

87<br />

143<br />

150<br />

127<br />

146<br />

122<br />

144<br />

126<br />

147<br />

148<br />

153<br />

121<br />

154<br />

155<br />

177<br />

198<br />

158<br />

156<br />

61<br />

59<br />

201<br />

67<br />

75<br />

138<br />

207<br />

68<br />

137<br />

69<br />

136<br />

135<br />

108<br />

114<br />

116<br />

160<br />

159<br />

207<br />

217<br />

215<br />

208<br />

270<br />

271<br />

71<br />

66<br />

72<br />

100<br />

NH33<br />

237<br />

273<br />

113<br />

241<br />

274<br />

80<br />

81<br />

82<br />

99<br />

107<br />

TO DELHI<br />

280<br />

97<br />

103<br />

106<br />

112<br />

253<br />

238<br />

261<br />

220<br />

216<br />

238<br />

263<br />

256<br />

231<br />

264<br />

260<br />

84<br />

VARANASI<br />

KOLKATA<br />

PRADHAN KHANTA<br />

BALGRIA<br />

BANDARCHUA<br />

221<br />

230<br />

289<br />

226<br />

MUKUNDA<br />

MATKURIA<br />

224<br />

383<br />

282<br />

272<br />

288<br />

229<br />

287<br />

225<br />

223<br />

212<br />

232<br />

284<br />

233<br />

235<br />

266<br />

267<br />

265<br />

269<br />

299 300<br />

286<br />

228<br />

286<br />

301<br />

278<br />

349<br />

348<br />

276<br />

55<br />

65<br />

84<br />

54<br />

86<br />

53<br />

DALDALI<br />

79<br />

85<br />

87<br />

73<br />

58<br />

77<br />

96<br />

94<br />

88<br />

93<br />

89<br />

92<br />

91<br />

104<br />

102<br />

90<br />

101<br />

105<br />

133<br />

SHYAMDIH<br />

RANGUNI<br />

CHANDKUYIH<br />

BASTACOLA<br />

BANSMORI<br />

GONDUDIH<br />

CHHOTA<br />

KHARIKABAD<br />

KUJUMA<br />

NICHITPUR<br />

PARUTIA<br />

SURANGA<br />

PAHARPUR<br />

ALAKHDIHA<br />

BHAGRAMPUR<br />

MADHUBAN<br />

PARASBANIA<br />

KUSUNDA<br />

ALKUSA<br />

JIALGORA<br />

SONARIA GORERIED EKRA<br />

TETULMARI<br />

SIALGUDRI<br />

DHONDABAD<br />

DHOBANI<br />

GOPINATHDIH<br />

BARRAGARY<br />

GARBHUDIH<br />

BARADUBHI<br />

PARBAD<br />

157<br />

117<br />

PHATA MAHL<br />

LALCHAK<br />

TILATANR<br />

UDALBANI<br />

GANDUBAD<br />

BARWADI<br />

GOPINATHDIH<br />

SABIPUR<br />

KUSUMDAHA<br />

KARMATANR<br />

AMGHATA<br />

BISUNPUR<br />

PANEARA<br />

DAMODARPUR<br />

SUSNILEWA<br />

DAMKAR BRWA<br />

SONDAHA<br />

DHARJORI<br />

KURMIDIH<br />

PICHHARI<br />

BARA<br />

OR<br />

KARI TANR<br />

181<br />

BLAITANR<br />

BAGDAHA<br />

UDAYPUR<br />

GOVINDADIH<br />

BHUIAN RARARPUR<br />

CHHOT<br />

PICHHARI<br />

SALDAHA<br />

164<br />

165<br />

CHASNALA<br />

PARGHABAD<br />

163<br />

182<br />

RAGHUNATHPUR<br />

179<br />

MANAITAND<br />

RANGAMATIA<br />

175<br />

51<br />

JHARNA<br />

172<br />

MANOHARTANR<br />

133<br />

NAGRIKALA<br />

162<br />

171<br />

KUSTOR<br />

PUTKI<br />

SARAIDHELA<br />

BHAGATDIH<br />

PATHRA KULHI<br />

JHARIA<br />

TISRA<br />

PATHARDIH<br />

RAMPUR<br />

SARADHA<br />

MAJHILADIH<br />

LAKARKHAOARI<br />

BHAGABAND<br />

JITPUR<br />

KENDUADIH<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 112<br />

ROHARABAND<br />

BAUOKALA<br />

DHANBAD<br />

BHULI<br />

DHANSAR<br />

GODHAR<br />

CHHATABAD<br />

BASARIA<br />

213<br />

KERKEND<br />

CHANDRABAD<br />

JORAPOKHAR<br />

BALIHARI<br />

76<br />

SUDAMDIH<br />

SABALDIH<br />

RAJASDHRA<br />

DUNGRI<br />

BHOWRA<br />

JARMA<br />

DAMODAR RIVER<br />

JATUDIH<br />

TETENGABAD<br />

PATRA KULHI<br />

KUPURIA<br />

MALKERA<br />

SIJUA<br />

PONDERKANLI<br />

KATRAS<br />

ANGARPATHRA<br />

KAILUDIH<br />

CHANDAUR<br />

258<br />

BANDHDIA<br />

TO RANCHI<br />

TO RANCHI


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

E. Jharia Rehabilitation Plan<br />

Owing to the Jharia under ground fire and subsidence issues in Jharia Coal Field, the Standing<br />

Sub-committee of SSRC on Environment and Ecology has directed CMPDI on 30 th June<br />

1999 to prepare a Master Plan for dealing with problems of fire and subsidence and<br />

rehabilitation in the lease hold of BCCL. Draft Master Plan has been prepared on the basis of.<br />

World Bank funded reports for development of Fire Fighting Programme in JCF (1996),<br />

Identification of Subsidence Prone Habitated Areas (Phase -I) prepared by CMPDI (1998)<br />

and Technological measures for subsidence Control/Rehabilitation of the Habitated Areas<br />

(Phase –II) prepared by CMPDI (1991).<br />

Main tasks and the objectives of the Jharia Rehabilitation Plan are as follows;<br />

<br />

<br />

<br />

<br />

To identify people of the BCCL and Non-BCCL houses and other buildings which are<br />

situated over unstable old underground workings/fire and subsidence affected areas in<br />

BCCL /ECL leasehold areas falling in <strong>Dhanbad</strong> District;<br />

To draw a plan or schemes and rehabilitation packages for shifting and rehabilitation for<br />

the families identified;<br />

Draw a plan for welfare of the person identified who are to be shifted to risk free area;<br />

and<br />

Review the progress in the execution of these activates as well as effectiveness for the<br />

benefits directed towards the persons shifted and rehabilitated from unsafe areas.<br />

As per the draft Jharia Rehabilitation Plan, the rehabilitation scheme was planed to implement<br />

in four phases for a span of 20 years. The Table 73 presents the abstract of draft Jharia<br />

Rehabilitation Action Plan prepared by CMPDI for BCCL. As per the discussion with the<br />

BCCL and CMPDI officials, the draft master plan yet to be approved by the central<br />

government. The Central Government has suggested to rework on the implementation period<br />

(10+2 years) instead of 20 years and also to include the increasing no of affected persons in<br />

the region, since estimates of affected persons figures are outdated. Hence the master plan is<br />

under preparation. We were told that unless and until government approves the Master Plan<br />

BCCL cannot share for public / study purposes.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 113


I<br />

DAMIDA OCP<br />

DAMUDA<br />

W.MOHUDA(NORTH)<br />

W.MOHUDA(NORTH)<br />

LAHAPATI<br />

14A<br />

KALYANPUR<br />

BLOCK-III(NC)<br />

N.MAHUDA<br />

MURAIDIH<br />

KHUDIA NALA<br />

SHATARI<br />

20<br />

21 PITS<br />

ALUARA<br />

G.T.ROAD<br />

ALUARA<br />

RAJGANJ<br />

City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Figure 33: Proposed Jharia Rehabilitation Township Map on Jharia Coal field<br />

TO DELHI<br />

CITY DEVELOPMENT PLAN<br />

DHANBAD<br />

PROPOSED JHARIA<br />

REHABILITATION<br />

GOVINDPUR<br />

GOMOH STN.<br />

KOYLACITY<br />

II<br />

HAQARIKALAN<br />

KOYLACITY<br />

BARORA<br />

AREA<br />

23<br />

KESSURGARH NUD<br />

KHURKI<br />

NUD<br />

BENEDIH<br />

JAMUNIA KHURKI<br />

OCP<br />

OCP<br />

BLOCK-I OCP<br />

COKING<br />

MADHUBAND 1<br />

PHULARITAND<br />

MADHUBAND<br />

DAMUDA<br />

PIPRATAND-RADHANAGAR<br />

14<br />

TO GORAH<br />

DAMODAR RIVER<br />

BARAPANDIYDIH<br />

24<br />

16<br />

(PHULARITAND<br />

OCP$SECT)<br />

15<br />

PHULARITAND<br />

MURAIDIH<br />

OCP<br />

BHURANGIA<br />

DARIDA<br />

KHARKHAREE<br />

EXLENSION<br />

25<br />

BHATDIH<br />

SALAN<br />

JOGIDIH<br />

AKASKINARI PUR<br />

KOORIDIH BLOCK-IV<br />

OCP(NC)<br />

AKASKINARI<br />

GOVINDPUR<br />

OCP<br />

DCP<br />

E.KATRAS<br />

2<br />

DHARMABAND-EXTENSION<br />

MURULIDIH<br />

DHARWABAND<br />

E.MAHUDA<br />

17<br />

26<br />

KOUMURNA<br />

MURULIDIH<br />

20<br />

KATRI<br />

NALA<br />

KHUDIA<br />

NALA<br />

KESHALPUR<br />

RAMKANALI<br />

W.MUDIDIH<br />

NT OCP<br />

SIJUA<br />

AREA<br />

RAMKANALI<br />

W.MUDIDIH<br />

OCP<br />

KESHALPUR TETULMARI<br />

OCP<br />

NICHITPUR<br />

TETULMARI<br />

SENDRABANSJORA<br />

OCP<br />

OCP EAST<br />

ANGARPATHRA<br />

BASURIA<br />

BUSSURIYA OCP<br />

KATRAS<br />

SENDRABANSJORA<br />

AREA<br />

BUSSURIYA<br />

KHAS<br />

TO<br />

KUSUNDA<br />

DHANBAD<br />

STN.<br />

LOYABAD<br />

KHASKUSUNDA<br />

S.POOTKEE<br />

OCP<br />

LOYABAD<br />

VI<br />

GODHUR<br />

DHANSAR<br />

BANSDEOPUR<br />

4<br />

KENDW GODHUR<br />

ADIH<br />

OCP<br />

KOCP<br />

GOPALI<br />

KUSUNDA<br />

BAS<br />

BHAGABAND<br />

CHUCK<br />

ARE VII<br />

ACOLLA<br />

BHAGABAND<br />

KUSUNDA<br />

DHANSAR<br />

OCP<br />

OCP<br />

5 PUTKI-BALIHARI<br />

KUSUNDA<br />

VII<br />

KAPURIA<br />

INDUSTRY<br />

MOONIDIH<br />

7<br />

KUSTORE<br />

ENA OCP<br />

ROCP<br />

BHUTGARIA<br />

S.JHARIA<br />

6<br />

ROCP<br />

27<br />

SINGRA<br />

DAMODAR RIVER<br />

ADRA-GOMOH<br />

RLY. LINE 19<br />

EASTERN<br />

JHARIA<br />

AREA<br />

SINGRA<br />

JARMA<br />

6<br />

BHUT<br />

GORIA<br />

BIJRA<br />

GARH<br />

ISSCO<br />

27<br />

BHULI<br />

SINLA<br />

BAHAL<br />

HURRIDIH<br />

SAPTA<br />

LODHA<br />

LODHA<br />

IX<br />

BERA<br />

PATRAKULI<br />

JHARNA<br />

DOBARI<br />

BHAGRAMPUR<br />

KUYA<br />

GANOODIH<br />

AMTAL<br />

GOLMORA<br />

BIJOYDIH<br />

BELGARIA<br />

GANOODI<br />

OCPH<br />

GOLUCKDIH<br />

BASTACOLLA OCP<br />

AREA<br />

DHANBAD PATHARDIH RLY<br />

GOLUCKDIH<br />

KUJAMA<br />

NORTH N.TISRACP<br />

TISRA<br />

SOUTH<br />

LUPANIA<br />

TISRA<br />

TO HOWRAH<br />

PALANI<br />

SABAIGARHA<br />

GOVINDPUR<br />

TO CALCUTTA<br />

SAPTA<br />

LEGEND<br />

II<br />

REHABILITATION SITE<br />

FOR HIGH INCOME GROUP<br />

REHABILITATION SITE<br />

FOR MEDIUM INCOME GROUP<br />

REHABILITATION SITE<br />

FOR LOW INCOME GROUP<br />

AREA BOUNDRY<br />

COLLIERY BOUNDARY<br />

RIVER / JORIA<br />

RAILWAY LINE<br />

OPERATING OCP<br />

MAJOR ROADS<br />

UNDERGROUND BLOCKS<br />

OPENCAST BLOCKS (ORIGINAL)<br />

OPENCAST BLOCKS (REVISED)<br />

TISCO<br />

JEAL<br />

GORA<br />

BAG<br />

DIG<br />

JOYRAMPUR<br />

JEENAGORA<br />

OCP<br />

5.TISRA OCP & AUGN<br />

28<br />

21<br />

PARBATPUR<br />

PARBATPUR<br />

AMLABAD<br />

PROJECT<br />

9<br />

JEALGORA<br />

BARAREE<br />

10<br />

BHAWRAH BHAWRAH NORTH<br />

BHAWRAH OCP<br />

NORTH<br />

JEENAGORA<br />

SULANGA<br />

AMLABAD<br />

11<br />

EASTERN<br />

JHARIA<br />

AREA<br />

BHAWRAH<br />

SOUTH<br />

BHAWRAH SOUTH<br />

OCP<br />

PATHAR<br />

DIH<br />

SUDAMDIH 12<br />

INC.<br />

E.RLY PRADMANKHANTA<br />

PATHARDIH CHORD<br />

MAHAL<br />

SITAHAL<br />

SAPTA<br />

SUDAMDIH<br />

SHAFT<br />

22<br />

28 18<br />

IISCO<br />

SUDAMDIH<br />

MOHAL<br />

30<br />

GOURIGRAH<br />

GOURDGRAM<br />

TO ADRA<br />

23<br />

SAPTA<br />

TASRA<br />

DHANBAD MUNICIPAL CORPORATION<br />

INFRASTRUCTURE DEVELOPMENT<br />

CORPORATION LIMITED<br />

FIGURE NO:<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 114


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Table 73: Draft Jharia Rehabilitation Plan<br />

Description<br />

Phase – I<br />

(1 st -5 th yr)<br />

Phase – II<br />

(6 th -10 th<br />

yr)<br />

Phase –<br />

III (11 th -<br />

15 th yr)<br />

Phase –<br />

IV (16 th -<br />

20 th yr)<br />

Total<br />

No of Sites 119 124 143 146 532<br />

Rehabilitation of BCCL 8,634 11,750 9,101 5,223 34,708<br />

Houses<br />

Rehabilitation of 3,714 4,491 4,658 3,510 16,373<br />

Private Houses<br />

Rehabilitation of 3,036 2,620 2,562 1,401 9,619<br />

Encroachments<br />

Total 15,384 18,861 16,321 10,134 60,700<br />

Land Requirement 487.34 515.82 442.42 274.33 1,719.91<br />

(acres)<br />

Capital Cost (Crs) 548.45 671.68 650.30 421.47 2,291.90<br />

BCCL and CMPDI has initiated following activities like survey of non-BCCL families falling<br />

within first phase of Jharia Action Plan completed. In Belgoria village within Baliapur Anchal<br />

about 45.11 acres of land has been identified for rehabilitation of non –BCCL families. In<br />

addition about 408.72 acres of land to be acquired for that proposal is being prepared by<br />

CMPDI. Construction of 900 units houses for first phase in progress on demonstration<br />

model.<br />

F. Key Developmental Issues<br />

(i)<br />

(ii)<br />

(iii)<br />

(iv)<br />

(v)<br />

(vi)<br />

(vii)<br />

Absence of upto date or latest Master Plan/ Landuse Plan for the entire <strong>Municipal</strong><br />

<strong>Corporation</strong> leads to haphazard and uncontrolled development;<br />

Jharia Coal Field (JCF) covers significant area of the DMC , which ultimately leads to<br />

barrier for developments and hence future developments are restricted with in small<br />

portion of the <strong>Municipal</strong> <strong>Corporation</strong> Area;<br />

Absence of adequate implementation mechanism (like building by-laws and etc) and<br />

tools;<br />

Inadequate financial resources to implement schemes;<br />

Lack of private sector and community participation in development;<br />

Inadequate understanding and co-ordination between stakeholders agencies which are<br />

working for the city;<br />

Since, the <strong>Dhanbad</strong> is falling under seismic earthquake zone III, suitable construction<br />

technology and material are must for the guided and safe development.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 115


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

VIII. URBAN GOVERNANACE<br />

A. ULBs in the Context of 74th Constitutional Amendment<br />

In order to enable the urban local bodies “to perform effectively as vibrant democratic units<br />

of self government”, the 74th Constitutional Amendment was introduced in the Parliament<br />

and it became an Act in December 1992.<br />

This Act is a great reform act in the political context as well as in the administrative and<br />

financial aspects concerning the urban local bodies.<br />

1. Political Context<br />

As per Article 243-Q, every State has to constitute three types of urban local bodies - Nagar<br />

Panchayats (Town Panchayats) in the transitional area which is in the process of growth from<br />

rural to urban area; a <strong>Municipal</strong>ity for smaller urban area and a <strong>Corporation</strong> for a larger urban<br />

area. This article also lays down the broad parameters such as - population of the area, the<br />

density of the population therein, the revenue generated for local administration, the<br />

percentage of employment in non-agricultural activities, the economic importance or such<br />

other factors as the Governor may, by public notification specify- for formation of urban<br />

local bodies.<br />

As per Article 243R, every urban local body should comprise of elected councilors chosen by<br />

direct election from the territorial constituencies or wards as delimited for this purpose.<br />

Article 243-S provides for Constitution of Ward Committees consisting of one or more wards<br />

within the territorial area of the municipality having a population of three lakhs or more.<br />

As per Article 243-T seats have to be reserved for persons belonging to Scheduled Castes and<br />

Scheduled Tribes in every municipality and the number of seats reserved to be in the same<br />

proportion of their population to the total population. It also provides for reservation of the<br />

office of Chairman in all municipalities for persons belonging to Scheduled Castes/<br />

Scheduled Tribes and for women as the State Legislature may provide by law.<br />

Article 243-U provides for the continuance for five years from the date appointed for its first<br />

meeting, unless sooner dissolved under any law in force. It also provides that such dissolution<br />

can be done only after the municipality is given a reasonable opportunity of being heard.<br />

More importantly, this article stipulates that an election to constitute a municipality should be<br />

completed before expiry of its duration and before the expiration of a period of six months<br />

from the date of its dissolution.<br />

2. Administrative and Financial Context<br />

Article 243W lays that the State may endow municipalities with necessary powers and<br />

authority to enable them to function as institutions of local self government with respect to<br />

the preparation of plans for economic development and social justice and performance of<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 116


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

functions and the implementation of the schemes entrusted to them including the matter<br />

listed in the twelfth schedule.<br />

<strong>Municipal</strong> Finance and Taxes.<br />

The 74th Constitutional Amendment Act provides for the Constitution of a State Finance<br />

Commission to review the financial position of the municipalities (as well as the Panchayats)<br />

and make recommendations to the Governor as to the principles, which should govern:<br />

<br />

<br />

<br />

The distribution between the State and the municipalities of the net proceeds of the taxes,<br />

duties, tolls and fees leviable by the State, which may be divided between them under this<br />

part and the allocation between the municipalities at all levels of their respective shares of<br />

such proceeds.<br />

The determination of the taxes, duties, tolls and fees which may be assigned to or<br />

apportioned by the municipalities.<br />

The grants-in-aid to the municipalities from the consolidated fund of the state.<br />

Bihar <strong>Municipal</strong> Act authorizes a municipality to levy, collect and appropriate such taxes,<br />

duties, tolls and fees in accordance with the procedures subject to limits as specified by the<br />

legislature. Besides these, the ULBs are also empowered with certain other financial powers.<br />

It also provides for recommending the measures needed to improve the financial position of<br />

the municipalities.<br />

Article 243-X of the Constitution provides that the Legislature of a State may by law:<br />

<br />

<br />

<br />

<br />

Authorize a <strong>Municipal</strong>ity to levy, collect and appropriate such taxes, duties, tolls and fees<br />

in accordance with such procedure and subject to such limits.<br />

Assign to a municipality such taxes, duties, tolls and fees levied and collected by the State<br />

Government for such purposes and subject to such conditions and limits.<br />

Provide for making such grants-in-aid to the municipalities from the consolidated fund of<br />

the state and<br />

Provide for constitution of such funds for crediting all moneys received by or on behalf<br />

of the municipalities and also for the withdrawals of such moneys there from as may be<br />

specified in the law.<br />

Besides the above, the 74th Constitutional Amendment Act lays emphasis on Urban<br />

environment management and focusing on development planning and integration of rural and<br />

urban development plans in any district or metropolitan area. The Constitution provides for a<br />

District Planning Committee to consolidate the plans prepared by the Panchayats and the<br />

municipalities in the district and to prepare a draft development plan for the district as a<br />

whole.<br />

The 74 th Constitution Amendment Act (CAA), 1992 has imparted constitutional status on the<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 117


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Urban Local Bodies and assigned appropriate functions to them. A constitutional Backing is<br />

given to the relationship of the Urban Local Bodies (ULBs) with the State Government with<br />

respect to their functions and powers, ensuring of timely and regular elections, arrangements<br />

for revenue sharing etc. Urban Local Bodies are given additional powers including<br />

preparation of local development plans, programmes for ensuring social justice,<br />

environmental management making them responsive to the local needs. This is facilitated by<br />

Article 243 -W of the Constitutional Amendment (74th) Act, 1992. Following are the<br />

functions of the ULBs as per the 74 th CAA.<br />

(1) Urban planning including town planning.<br />

(2) Regulation of land-use and construction of buildings.<br />

(3) Planning for economic and social development.<br />

(4) Roads and bridges.<br />

(5) Water supply for domestic, industrial and commercial purposes.<br />

(6) Public health, sanitation conservancy and solid waste management.<br />

(7) Fire services.<br />

(8) Urban forestry, protection of the environment and promotion of ecological aspects.<br />

(9) Safeguarding the interests of weaker sections of society, including the handicapped<br />

and mentally retarded.<br />

(10) Slum improvement and up gradation.<br />

(11) Urban poverty alleviation.<br />

(12) Provision for urban amenities and facilities such as parks, gardens and playgrounds.<br />

(13) Promotion of cultural, educational and aesthetic aspects.<br />

(14) Burials and burial grounds; cremations, cremation grounds and electric crematoriums.<br />

(15) Cattle pounds; prevention of cruelty to animals.<br />

(16) Vital statistics including registration of births and deaths.<br />

(17) Public amenities including street lighting, parking lots, bus stops and public<br />

conveniences.<br />

(18) Regulation of slaughterhouses and tanneries.<br />

In conformity with the 74 th CAA, the Bihar <strong>Municipal</strong> Act, 1922 was amended and the ULBs<br />

are entrusted with the functions listed in the Twelfth Schedule of the constitution or Article<br />

243 -W of the Constitutional Amendment (74th) Act, 1992.<br />

The 74 th CAA also provides for the constitution of a State Finance Commission to review the<br />

financial position of the municipalities and make recommendation.<br />

The urban reforms resulting from the 74 th Constitution Amendment Act lays larger<br />

responsibility on the <strong>Municipal</strong> Bodies, in terms of development planning, service provision<br />

and fiscal affairs. The policy framework of the state and central government has provided the<br />

necessary impetus to the urban sector to play a pro-active role in the development process. In<br />

the recent developments, it is imperative for the ULBs to set their priorities and strategies<br />

right, designed to achieve a clear vision with an action plan.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 118


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

B. Institutions and Capacity<br />

There are various governmental agencies involved in the developmental works of any urban<br />

area and they are assigned different functions in their own respective jurisdictions. The<br />

integration and co-ordination between these agencies determine the efficiency of urban<br />

management and quality of life to the citizens.<br />

1. Institutional Framework<br />

(a) <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> (DMC). <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> is responsible<br />

for provision and services delivery with in its jurisdiction. However, <strong>Dhanbad</strong> <strong>Municipal</strong><br />

<strong>Corporation</strong> has been created very recently (01 st February 2006) and hence it is not yet<br />

involved in service delivery activity other than erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity<br />

jurisdiction.<br />

(b) Mineral Area Development Authority (MADA). The Mineral Area Development<br />

Authority in <strong>Dhanbad</strong> in currently responsible for creation of water and sewerage<br />

infrastructure asset creation and bulk water supply to the entire mineral area excluding<br />

<strong>Dhanbad</strong> and Shindri town. MADA is also responsible for preparation of master<br />

plan/land use plan for the entire mineral area. The Town Planning Department in<br />

MADA prepares the Master Plan and Comprehensive Development Plan (CDP) for the<br />

city/town, and the mandate of implementing the Master Plan /CDP lies with the MADA<br />

and ULB. MADA also responsible for sanitation and solid waste management with in its<br />

jurisdiction. Planning, land development and provision of city-level infrastructure in the<br />

<strong>Dhanbad</strong> urban area is the responsibility of the MADA and the operation and<br />

maintenance of infrastructure / facilities created are the responsibility of the<br />

MADA/<strong>Corporation</strong>.<br />

(c) Water Supply & Sanitation Department (WS&SD). The Jharkhand Water Supply and<br />

Sanitation Department is the responsible agency for maintenance of water supply<br />

distribution system excluding MADA distribution area in the <strong>Municipal</strong> <strong>Corporation</strong><br />

jurisdiction.<br />

(d) Fertilizer <strong>Corporation</strong> of India (FCI). The Fertilizer <strong>Corporation</strong> of India (FCI) provides<br />

water to entire Sindri town.<br />

(e) National Highways (NH). National Highway department is responsible for creation of<br />

National Highway roads with in the city and maintain the same with a specified<br />

standards.<br />

(f) Road Construction Department (RCD)/Public Works Department (PWD). The Road<br />

Construction Department (RCD) /Public Works Department (PWD) is responsible for<br />

creation and maintenance of PWD Roads passes through the city.<br />

(g) Jharkhand Pollution Control Board (JPCB). The Jharkhand Pollution Control Board<br />

(JPCB) is responsible for environmental protection and enforcement of rulings related to<br />

the same, passed by the competent authorities.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 119


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

In addition to involvement of various institutions in the development of local-level<br />

infrastructure, the Urban Development Department (UDD) controls local-level governance<br />

through the Deputy Commissioner of <strong>Dhanbad</strong>.<br />

Multiple Agencies such as State Highways, National Highways, Zila Parisad, and Jharkhand<br />

Housing Board are working for the provision of basic services and infrastructure in the<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> area, with their own budget allotments from the State<br />

Government. If there are deficiencies in their service sector the respective Agencies are<br />

responsible. As far as Basic Services such as WS & Drainages are concerned MADA or<br />

WS&DB are executing agencies and if there are any deficiencies in these services,<br />

responsibility lies with DMC only.<br />

Table 74: Institutional Responsibility in Service Delivery<br />

Urban<br />

Infrastructure<br />

Planning &<br />

Design<br />

Construction<br />

/Implementation<br />

Operation and<br />

Maintenance<br />

Landuse/Master MADA MADA MADA<br />

Plan/Building<br />

Byelaws<br />

Water Supply MADA, DMC, MADA, DMC, MADA, DMC,<br />

WS&DB,FCI WS&DB,FCI WS&DB,FCI<br />

Sewerage & MADA, DMC MADA, DMC MADA, DMC<br />

Sanitation<br />

Drainage DMC DMC DMC<br />

Storm Water DMC DMC DMC<br />

Drainage<br />

Solid Waste MADA, DMC MADA, DMC MADA, DMC<br />

Management<br />

<strong>Municipal</strong> Roads DMC DMC DMC<br />

(including Flyovers)<br />

Street lighting DMC DMC DMC<br />

MADA: Mineral Area Development Authority, DMC: <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong>, WS&DB: Water<br />

Supply and Drainage Board, FCI: Fertilizer <strong>Corporation</strong> of India.<br />

Table 75: Role of the Private Sectors in Urban Infrastructure Provision<br />

Urban<br />

Role of Private Sector<br />

Infrastructure<br />

Present Status<br />

Proposed<br />

Water Supply - Water Treatment & Pumping Machinery<br />

Operations ands Maintenance are proposed<br />

to let out to private Sector<br />

Sewerage - Sewerage Treatment Plant Operations and<br />

Maintenance are proposed let out to private<br />

sector<br />

Drainage - -<br />

Storm Water<br />

- -<br />

Drainage<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 120


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Urban<br />

Infrastructure<br />

Solid Waste<br />

Management<br />

<strong>Municipal</strong> Roads<br />

(including Flyovers)<br />

Street lighting<br />

Role of Private Sector<br />

- In a phased manner collection and disposal<br />

are planned to privatize<br />

- Only major by-pass or ring road proposed<br />

to be constructed under BOT<br />

Only in erstwhile It is proposed to provide Operations and<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> Maintenance to Private Sector<br />

area street lights are<br />

privatized<br />

Regulatory Frame work. The Bihar <strong>Municipal</strong> Act, 1922 and Patna <strong>Municipal</strong> <strong>Corporation</strong><br />

Act, 1951 governs the management of Urban Local Bodies of Jharkhand and the same is<br />

applicable to <strong>Dhanbad</strong>.<br />

2. Service Delivery and Performance of ULB<br />

The Bihar <strong>Municipal</strong> Act, 1922 and Patna <strong>Municipal</strong> <strong>Corporation</strong> Act, 1951, governs the<br />

management of the <strong>Municipal</strong> <strong>Corporation</strong>. The <strong>Corporation</strong> is responsible for provision of<br />

services and basic amenity to the citizens, which include:<br />

i.) Distribution of potable water;<br />

ii.) Operation and maintenance of drainage and sewerage systems;<br />

iii.) Public lighting;<br />

iv.) Sanitation and public hygiene;<br />

v.) Construction and maintenance of bus terminals, roads, culverts, and bridges;<br />

vi.) Maintenance of public parks and gardens;<br />

vii.) Ensuring systematic urban growth;<br />

viii.) Regulation of building construction; and<br />

ix.) Licensing of commercial activities, etc.<br />

C. Proposed Organization Structure of DMC<br />

The Administrator heads the executive wing of the <strong>Corporation</strong>, and various officers in<br />

charge of different departments or sections assist the Administrator in managing the DMC.<br />

The personnel include an Additional Administrator, Deputy Administrator, Assistant<br />

Administrator, Chief <strong>Municipal</strong> Engineer, Public Health Officer, Chief Assessment &<br />

Valuation Officer, Chief Accounts Officer, Chief Administrative Officer, Town Planner and<br />

Medical Officer. These officers are assisted in their work by junior officials. As per the<br />

Restructuring Urban Management in Jharkhand prepared by Regional Centre for Urban<br />

Environmental Studies, Lucknow University, Luknow, the proposed organization structure of<br />

the <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> is presented Figure 34.<br />

For senior positions, one or two officers for each of the departments are usually deputed<br />

from the State Government. The <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> has neither supervisory<br />

powers nor any control over them. At the junior level, there are several employees for jobs<br />

like bill collection, sweeping, etc.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 121


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Table 76: Proposed Staffing Pattern for <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong><br />

Proposed Staff Structure<br />

No of Staff<br />

Administration<br />

<strong>Municipal</strong> Commissioner/Administrator 1<br />

Additional <strong>Municipal</strong> Commissioner/Administrator 1<br />

Deputy <strong>Municipal</strong> Commissioner Administrator 3<br />

Assistant <strong>Municipal</strong> Commissioner /Administrator 4<br />

Engineering<br />

Chief <strong>Municipal</strong> Engineer 1<br />

Executive Engineer (Civil) 2<br />

Executive Engineer (Elec.) 1<br />

Assistant Engineer (Civil) 4<br />

Assistant Engineer (Elec.) 1<br />

Assistant Engineer (Mech.) 1<br />

Assistant Engineer (Transport) 1<br />

Jr. Engineer (Civil) 8<br />

Jr. Engineer (Elec.) 3<br />

Street Lighting Inspector 5<br />

Public Health<br />

Public Health Officer / Environmental Engineer 1<br />

Assistant Public Health Officer 3<br />

Chief Sanitary Inspector 1<br />

Sanitary & Food Inspector 5<br />

Sanitary Supervisor 50<br />

Revenue Department<br />

Chief Assessment & Valuation Officer 1<br />

Assessment & Valuation Officer 2<br />

Assistant Revenue Officer 2<br />

Assistant Valuation Officer 2<br />

Tax Superintendent 2<br />

Assistant Tax Superintendent 2<br />

Revenue Inspector 8<br />

Accounts<br />

Chief Accounts Officer 1<br />

Accounts Officer 1<br />

Assistant Accounts Officer 1<br />

Accountant – cum – cashier 3<br />

Accounts Clerk 3<br />

Horticulture<br />

Horticulture Officer 1<br />

Garden Superintendent 2<br />

Public Relations<br />

Public Relations Officer 1<br />

Public Assistant 1<br />

Legal<br />

Law Officer 1<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 122


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Assistant Law Officer<br />

Legal Assistant 1<br />

Office Management<br />

Chief Administrative Officer 1<br />

Administrative Officer 2<br />

Office Superintendent 2<br />

Section Officer 2<br />

Personal Secretary 4<br />

Personal Assistant/Stenographer 4<br />

Office Assistant 11<br />

Planning<br />

Town Planner 1<br />

Associate Town Planner 1<br />

Jr. Town Planner<br />

Assistant Traffic & Transport Planner 1<br />

Assistant Town Planner 2<br />

Surveyor 1<br />

Statistical Assistant 1<br />

Draftsman 1<br />

Tracer 1<br />

Blue Printer 1<br />

Social<br />

Assistant Project Officer 2<br />

Community Organizer 4<br />

Social Assistant 8<br />

Medical<br />

Medical Officer 1<br />

Assistant Medical Officer 1<br />

Veterinary Officer 1<br />

Source: Restructuring Urban Management in Jharkhand Report.<br />

Administrator. The Administrator is at the apex of this proposed structure and is responsible<br />

for all activities carried out by the <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong>. The Administrator is<br />

responsible for preparation and certification of all periodical records, returns and furnishes all<br />

information as may from time to time be required by the <strong>Municipal</strong> <strong>Corporation</strong>. He is also<br />

accountable for preparation of accounts.<br />

Additional Administrator. The Additional Administrator follows the Administrator in the<br />

hierarchy and is responsible for the daily functioning of the <strong>Corporation</strong>. The additional<br />

administrator provides necessary inputs to the administrator in day to day operations of the<br />

<strong>Corporation</strong>. In the absence of the administrator additional administrator may act as in charge<br />

administrator. Next to additional administrator deputy administrator will take charge of zonal<br />

level issues and administration of the same.<br />

Engineering Department (Water Supply). A Chief Water Supply Engineer heads the Engineering<br />

Department water supply and is assisted by executive engineers, assistant engineer, and junior<br />

engineers. To assist the engineering department functions supporting staffs are also deployed<br />

like, pipe line inspector, street lighting inspector, surveyor, meter reader, mechanic staff. The<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 123


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Executive Engineer has overall responsibility and supervises all the work taken up by the<br />

department. The junior engineers have ward-specific responsibilities. The major duties and<br />

responsibilities of the Engineering Section include construction and maintenance of roads,<br />

maintenance of the water supply infrastructure and maintenance of public buildings and<br />

structures.<br />

Chief Accounts Officer. The Chief Accounts Officer is head of the accounts department in<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong>. The Accounts Section a key department of the <strong>Municipal</strong><br />

<strong>Corporation</strong> manages ULB finances and monitors the use of allocated funds for different<br />

schemes. It plays a major role in the formulation of the budget. The Chief Accounts Officer<br />

is responsible for supervising all financial transactions related to the DMC, advising the<br />

Administrator and additional Administrator on all internal financial matters, updating financial<br />

receipts and expenditure details in accordance with the utilization of funds, reporting<br />

deviations in expenditure of funds in any of the allocated schemes, assisting preparation of<br />

the DMC budget, maintenance of accounts regarding stamp duty, Grants, MP Grants,<br />

maintenance of petty cash book and general cash book and attending to audit requirements<br />

and other such accounts-related duties.<br />

Revenue Department. The Revenue Department is another important department of the<br />

<strong>Corporation</strong>, consisting of a Chief Assessment and Valuation Officer, Assessment &<br />

Valuation Officer, assistant valuation and revenue officer and etc. Some of the major<br />

responsibilities of the Chief Assessment and Valuation Officer include responsibility for<br />

collecting taxes such as, trade tax, holding /property /holding tax, advertisement tax, and<br />

entertainment tax; development charges; collection of duty; issuing notices for recovery of<br />

tax; and monitoring revenue collections of the <strong>Corporation</strong>.<br />

Public Health Department. The Public Health Department is responsible for <strong>Corporation</strong><br />

services such as solid waste management, sanitation, environmental management etc., apart<br />

from other public health duties. The Public Health Officer / Environmental Officer has the<br />

overall responsibility for the department. One Medical Officer, Assistant Public Health<br />

Officer, Chief Sanitary Inspector, Head Sanitation Inspector and six Sanitary and Food<br />

Inspector and vaccinators, assist the Public Health Officer/Environmental Officer. Junior<br />

officers are in-charge of works execution at the field level, which includes monitoring and<br />

supervising the work of sanitary labourers in the wards under their charge and attending to<br />

specific local complaints.<br />

The present Organization setup of Mineral Area Development Authority (MADA) is<br />

presented in Figure 35.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 124


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Figure 34: Proposed Organization Setup for New <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong><br />

Administrator<br />

Deputy Administrator<br />

Assistant Assistant Administrator<br />

Administrator<br />

Chief Chief <strong>Municipal</strong> Engineer<br />

Public Public Health Health Officer Officer /CMO<br />

/CMO<br />

Chief Chief Assessment &<br />

Valuation Officer<br />

Officer<br />

Chief Chief Accounts<br />

Officer<br />

Officer<br />

Superintending<br />

Engineers<br />

Executive Engineers<br />

Town Town Planner<br />

Assistant Public<br />

Public<br />

Health Health Officer<br />

Officer<br />

Assessment &<br />

Valuation Officer<br />

Officer<br />

Accounts Officer<br />

Officer<br />

Assistant Engineer<br />

Associate Town<br />

Town<br />

Planner<br />

Chief Chief Sanitary<br />

Inspector<br />

Assistant Revenue<br />

Officer<br />

Officer<br />

Assistant Accounts<br />

Officer<br />

Officer<br />

Jr. Jr. Engineers<br />

Junior Junior Town Town Planner<br />

Sanitary Food<br />

Food<br />

Inspector<br />

Sanitary<br />

Supervisor<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 125


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Figure 35: Present Organization Setup of MADA<br />

Chairman<br />

Managing Director<br />

Technical Member<br />

Executive Engineer<br />

(Building Division)<br />

Executive Engineer<br />

(Water Supply)<br />

Executive Engineer<br />

(Town Planning)<br />

Secretary<br />

(Administration)<br />

Chief Medical Officer<br />

Horticulture<br />

Officer Garden &<br />

Environment<br />

H.Q H.Q Building<br />

AE<br />

AE<br />

Jharia<br />

Building AE<br />

AE<br />

Sub Sub Divisions<br />

<strong>Dhanbad</strong> AE<br />

AE<br />

Chas AE<br />

AE<br />

Water work<br />

work<br />

Accounts Section<br />

Medical Officer (H.Q)<br />

Superintend<br />

Administrative<br />

Medical Officer (I.O<br />

(I.O<br />

Section<br />

Jharia --I I AE<br />

Hospital)<br />

AE<br />

Water<br />

Jharia --II II AE<br />

Section<br />

Bacteriologist<br />

AE<br />

Holding Section<br />

Public Analyst<br />

Tetulmar AE<br />

AE<br />

Estate Section<br />

Kusunda AE<br />

AE<br />

Law Law Section<br />

Topchanchi AE<br />

AE<br />

Personal Officer<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 126<br />

Sanitary Inspectors<br />

<strong>Dhanbad</strong>,<br />

Baghmara, Katras,<br />

Jharia, Govindpur,<br />

Nirsa, Baliapur,<br />

Chirkunda, Chas,<br />

Mohuda,<br />

Chandankirari,<br />

Topchanchi,<br />

Bnojudih, Tundi,<br />

Gomoa,<br />

Bhulanbarari


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

1. Institutional Strengthening and Capacity Building<br />

Since the <strong>Municipal</strong> <strong>Corporation</strong> of <strong>Dhanbad</strong> has structured recently the proposed staff<br />

strength has to be recruited as per guidelines.<br />

D. Urban Governance - SWOT Analysis<br />

SWOT analysis has been undertaken to assess on the negative and positive aspects of the<br />

Urban Governance. It involves analyzing the internal positive (strengths) and negative<br />

(weakness) aspects of an organization and considering these in relation to aspects of the<br />

external environment – both the positive aspects (or opportunities) and negative aspects (or<br />

threats). The Table 77 gives the details of the SWOT analysis of Urban Governance.<br />

Table 77: Urban Governance – SWOT Analysis<br />

Strength<br />

Weakness<br />

Absence of elected body/ public representatives;<br />

Lack of sufficient staff strength for administration ;<br />

Lack of proper co-ordination between the different line agencies and<br />

department in service delivery;<br />

No predefined work norms, job description and specific personal liability;<br />

Lack of political will to revise upward the holding tax;<br />

Very low own resources base for the corporation;<br />

Implementation of the provision of the 74th amendment; and<br />

Low level of awareness and participation among general public.<br />

Opportunities<br />

Threats<br />

E. Key Issues<br />

(i.)<br />

(ii.)<br />

(iii.)<br />

(iv.)<br />

(v.)<br />

Absence of Elected Body at <strong>Municipal</strong> <strong>Corporation</strong> level;<br />

Lack of powers/functions to New <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong>;<br />

Lack of coordination between various service delivery agencies in <strong>Dhanbad</strong>;<br />

Overlapping of jurisdiction responsibilities among various service delivery agencies; and<br />

Lack of reforms initiatives.<br />

F. Key Initiatives<br />

(i.)<br />

(ii.)<br />

(iii.)<br />

(iv.)<br />

(v.)<br />

To avoid municipality of institutions/authorities, co ordination system along with detailed<br />

responsibility matrix to be prepared and enforced;<br />

New DMC should consist of elected body;<br />

Need to revamp the existing legal framework on the line of the Model <strong>Municipal</strong> Law;<br />

Devolution of powers and functions to New DMC;<br />

Need to strengthen the human resources by immediately filling the proposed staff<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 127


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

(vi.)<br />

(vii.)<br />

(viii.)<br />

(ix.)<br />

(x.)<br />

(xi.)<br />

(xii.)<br />

(xiii.)<br />

(xiv.)<br />

strength the DMC;<br />

Capacity Building to all levels of staffs in DMC and other local service delivery agencies<br />

As a part of reforms initiatives, e – governance by using IT applications and GIS mapping<br />

to wards documentation, complaint registration, logs and redressal system, upkeeping of<br />

centralized data base of citizens;<br />

As suggest in the JNNURM reforms are need to carried out;<br />

Outsourcing and Private Sector Partnership areas are needed to be explored and also to<br />

be encouraged;<br />

All assistants and clerks should have working knowledge of computer;<br />

The Tax Collection work may be outsourced by amending the <strong>Municipal</strong> acts;<br />

The services of Meter Reader, Tax Collectors, Admin, Electrician/Mechanic, Driver,<br />

Peon, Guard, Cleaner and Scavengers etc., should be contract basis;<br />

The number of scavengers should be minimum and the scavenging should be arranged<br />

under public private partnership; and<br />

Development and maintenance of parks, play grounds etc. should be outsourced or done<br />

under public private partnership.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 128


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

IX.<br />

BASIC SERVICES FOR URBAN POOR<br />

A. Overview<br />

Slums and squatter settlements are essentially products of urban poverty. Almost by<br />

definition, the population living in slums lack access to basic infrastructure services such as<br />

safe water, sanitation, solid waste collection and disposal, drainage, access roads, streetlights,<br />

neighborhood amenities (e.g., safe play areas for children and community facilities), and<br />

electricity.<br />

Owing to rapid urbanization in and around the city, large influx of the migrants has been<br />

observed, which has resulted in formation of slums. The city presents a wide range of<br />

activities in various Industrial, Institutional, Commercial and Tread sectors. Growth in such<br />

activities, possibilities of absorption in various service sectors, scope of employment in trade<br />

and business activities, hawking, retailing, carting etc. could have attracted rural poor to the<br />

city. There is no comprehensive estimated/surveyed slum population living in <strong>Dhanbad</strong><br />

<strong>Municipal</strong> <strong>Corporation</strong> jurisdiction and hence through discussion it was estimated that around<br />

three lakh population will reside in slum. Following table presents the detailed slum<br />

settlement wise population records available with local authority. Besides this there are many<br />

slums in the city, since the <strong>Municipal</strong> <strong>Corporation</strong> newly formed base line survey need to be<br />

carried out.<br />

Table 78: List of Slums<br />

Slum Location Population - 2001<br />

<strong>Dhanbad</strong><br />

Bauripara 294<br />

Dompara 283<br />

Maiyarapara 230<br />

Masterpara 188<br />

Simaldih 299<br />

Telipara 379<br />

Devipara 193<br />

Aitbarinagar 307<br />

Jharnapara 267<br />

Jharnapada Khatal 196<br />

Adivasi Tola 97<br />

Pampu Talab 126<br />

Hadipara 403<br />

Bhistipara 483<br />

VinodNagar JhapadPatti 911<br />

CheeraGora 82<br />

Hindu Mission Road PremNagar 407<br />

LaadBani 773<br />

KorangaPatti 3693<br />

Dompara Housing Collony 396<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 129


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Slum Location Population - 2001<br />

Pandit Clinic Road 101<br />

Mochi Basti 201<br />

BekarBandh Khataal 542<br />

RamNagar Collony 183<br />

Khatik Basti 61<br />

Kasturba Nagar 192<br />

Combined Building Area 99<br />

Shimla Beda 537<br />

Kali Mandir 132<br />

Jharudih 361<br />

Das Tola 97<br />

RangaTand 284<br />

Kabristan Road 163<br />

Kumhar Club 246<br />

Paryatan Collony 179<br />

Hill Collony 299<br />

Bhatta Muhalla 281<br />

Dhobi Muhalla 301<br />

Traction Collony RangaTand 191<br />

Dompara Naya Bazaar 99<br />

YatimKhana 335<br />

Gaddi Muhalla 377<br />

Diamond Crossing 694<br />

Bauripara 109<br />

Bhuli Mod Khataal 142<br />

Ghurni Juria 655<br />

Karbala Road 150<br />

Jain Mahaliya 189<br />

HadiPara 477<br />

Matkuria Khataal 277<br />

Gurudwara Khataal 368<br />

Mahavir Sthaan 517<br />

Bhiyan Ghoda, Dhansar 506<br />

Prem Nagar 577<br />

Anugrah Nagar 154<br />

Bank More Khataal 178<br />

ChandraVanshi Nagar 83<br />

Exchange Road Gali 315<br />

Dari Muhalla PuranaBazaar 408<br />

Shamshan Road Khataal 119<br />

SurendraNagar DhobiPara 175<br />

B P Sinha Smarak College Campus 2578<br />

Chhai Gadda 773<br />

DomPara 200<br />

KhatikPara 395<br />

Thathera Basti 265<br />

GandhiNagar 1465<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 130


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Slum Location Population - 2001<br />

Refugee Collony 54<br />

Refugee Market DomPara 825<br />

Bari 129<br />

TikiyaPara 580<br />

ImariyaTand 446<br />

S T C Compound 356<br />

D S Collony JhopadPatti 56<br />

Purana Station 771<br />

Dompara JhopadPatti 307<br />

KhatikBasti Goshala 231<br />

Dhobia Talab Kshetra 276<br />

Bhooda Basti 587<br />

Mahavir Nagar 530<br />

Barmasia Shankar Nagar 783<br />

BRTC Kushth Collony 132<br />

Gajua Tand 789<br />

Kumhar Patti Kshetra 560<br />

Gadi Godaam 267<br />

ManaiTand Basti 237<br />

Shanti Collony Kshetra 149<br />

Rajpati Sahu Collony 188<br />

Chhoti Maszid Kshetra 356<br />

Gadi Godaam SchoolKshetra 479<br />

SivaPara Talab Kshetra 338<br />

KurmiPara Kshetra, DomPara ManiTand 308<br />

Jahrkhand Office Kshetra 328<br />

Chhath Talab Kshetra 298<br />

Gopal Nagar Kshetra 126<br />

ManaiTand PaniTanki Area 217<br />

TaadBagaan Khsetra 469<br />

Rani Talab Kshetra 600<br />

DomPara Kshetra 478<br />

Sub Total – <strong>Dhanbad</strong> 39,287<br />

Jharia<br />

MalGarha<br />

6,600<br />

Husainabad Shivnagar<br />

Chauthaikulhi Dharmnagar<br />

Chauthaikulhi Husainabad<br />

Chauthaikulhi BauriMuhalla<br />

Chauthaikulhi AnandNagar<br />

Chauthaikulhi IndiraNagar<br />

Chauthaikulhi TabarBaghan<br />

Suratand<br />

4,000<br />

Baniaheer<br />

Shahnagar Jharia<br />

ShamsherNagar Ghaskapatti<br />

Santoshnagar 2,400<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 131


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Slum Location Population - 2001<br />

Sabzi Baghan<br />

Charnambar Jharia<br />

Nayi Dunia Kodiapatti<br />

Balugadda Kodiapatti<br />

2,400<br />

Cheenkodi<br />

Balugadda<br />

Balugadda Khadan<br />

KoyariBandh Razakpatti<br />

2,600<br />

KoyariBandh Balmiki Muhalla<br />

Kumharpatti<br />

Bakrihaat Jharia<br />

1,500<br />

KumharPatti KatrasMore<br />

PuranaRazaGarh<br />

Bauri Muhalla<br />

Sub Total – Jharia 19,500<br />

Katras<br />

Shakra Tand 198<br />

SalamPur 420<br />

Bhandaridih 258<br />

Chatabad 534<br />

Katras Bazar Handitola 378<br />

Sub Total – Katras 1,788<br />

Chattatand<br />

E B Section 1500<br />

Etwal 900<br />

Rajputi Basti (Muslim Patti) 1450<br />

Chhath Talab (Kali Mandir) 300<br />

Simariyan Tand 340<br />

Neemtalla 125<br />

Harizan Tola 230<br />

Keduahdih 5 no 250<br />

Gwala Patti 992<br />

Khatik Patti, Pasi Mullah, Sabzi Mandi 345<br />

Gwala Patti, Kendua Bazaar 350<br />

Bauri Tola, Kendua 569<br />

Kendua Kathgola 1870<br />

9 no. Chhatatand 240<br />

Munda, Babu Basa 800<br />

Pasi Tola, Ghuiyan Tola, Karkend 500<br />

Sub Total – Chattatand 10,761<br />

Sindhri<br />

Old Market Sindri 163<br />

At Roharabandh 115<br />

Domgarh Near DKN 17<br />

DL2 Sundar Nagar 253<br />

CT, Domgarh 68<br />

Behind Roharabandh P.O. 31<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 132


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Slum Location Population - 2001<br />

Anand Lake 223<br />

Badia Tola Chatatand 216<br />

Sub Total – Sindhri 1,086<br />

Grand Total 72,621<br />

B. Infrastructure Provision in Slums<br />

Slums in <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> lack proper infrastructure facilities, as like any<br />

other slum in the country. As per the discussion with the local authorities, the overall view<br />

about the existing infrastructure in the slums is understood and presented below. To improve<br />

the condition of slums and to make slum dwellers self-dependent, government is initiating<br />

various programs, which has been described in the following section.<br />

Housing. Hosing condition in <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> slums found very poor. A large<br />

proportion of households were found staying in kutcha houses and remaining households<br />

stay in pucca houses, where, percentage of households staying in R.C.C. is very less. Majority<br />

of households reside in houses with built area less than 100 Sq. ft. It was noticed that<br />

residential status of most of the Unapproved Slum households was temporary, where<br />

settlement have developed within the last 10 years due to growing migration in the City. As<br />

per the records almost 50,000 dwelling units are required to meet the demand.<br />

Water Supply. The main source of water supply in<br />

slums is met through hand pumps and public stand<br />

posts (PSPs). The local authorities have provided<br />

2,753 units of Water Tank Taps/Hand pumps/PSPs<br />

covering all the slums. Dependency on the hand<br />

pump is high, varies between a very high of<br />

approximately 500 persons per PSP to a low of<br />

approximately 50 persons per PSP in Slums.<br />

Average dependency is approximately 500 persons<br />

per PSP against the standard norm of 75 persons<br />

per hand pumps or PSPs.<br />

Sewerage and Sanitation. The most prevalent safe sanitation facility available in slum is public<br />

conveniences. However, existing sanitation facilities are inadequate to meet the requirement.<br />

The population in slums either use nearby public toilets or defecate on open lands.<br />

Solid Waste Management. There is no proper solid waste management mechanism exist in slums.<br />

As per the discussions with the slum dwellers, it was stated that only very few slums have<br />

dustbins, which are also in bad condition and need replacements. As a result, in most of the<br />

slums, the waste is disposed in nearby vacant areas creating unhygienic conditions.<br />

Roads. The local authorities have provided only un-surfaced roads in the slum areas in<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> area. As per discussion with the local authorities most of the<br />

slum area roads have to be resurfaced or strengthened.<br />

Storm Water Drains. As per discussions with local authorities, it was indicated that Slums in<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 133


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

<strong>Dhanbad</strong> city is not provided with pucca Storm<br />

water drains. Although, there are kutcha drains,<br />

which were often noticed to damaged or clogged due<br />

to solid waste dumping. Hence, there is a demand<br />

for new formation of drains along existing roads and<br />

new roads.<br />

Street Lights. It is noticed that several road junctions<br />

and street stretches are poorly lighting facility, and<br />

some of the slums are devoid of any facilities for street lighting.<br />

C. Key Issues<br />

The following are key issues pertaining to basic services for poor in <strong>Dhanbad</strong> <strong>Municipal</strong><br />

<strong>Corporation</strong>.<br />

(i.)<br />

(ii.)<br />

(iii.)<br />

(iv.)<br />

(v.)<br />

Lack of Basic Infrastructure Facilities. Although most of the slums are located in the<br />

core areas of the city, they are characterized by poor quality of life induced by inadequate<br />

basic infrastructure. Absence of dustbins, drains, surfaced roads and solid waste collection<br />

systems lead to poor quality of living.<br />

Inadequate Access to Sanitation. The poorest of poor households do not have the<br />

means to afford individual toilets. Non existence of public toilets and sanitation facilities,<br />

resulting in open defection and drains being used for sewer outlays. The issue is to devise<br />

strategies to ensure adequate access to toilets to all poor households in the city.<br />

Inadequate Public Stand Post. There obviously exists a high dependence of slum<br />

population on public stand post.<br />

Dearth of health and education facilities. Owing to the absence of health facilities,<br />

education institutions and community infrastructure facilities in the slum area has resulted<br />

unhygienic living conditions and lack of awareness amount community.<br />

Ineffective Poverty Alleviation Programs. The benefits of urban poverty alleviation<br />

programs (UPAPs) have not reached the city’s slum/urban poor households. Lack of<br />

community participation.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 134


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

X. VISION, GOALS AND SECTORAL STRATEGIES<br />

A. Identification of Stakeholders<br />

The stakeholders cover all the defined sectors and include NGOs, Government organisations<br />

(like DMC, MADA, PHED (WS&DB), <strong>Dhanbad</strong> Deputy Commissioner, Urban<br />

Development Department, District Collectorate, Public Works Department (PWD), Road<br />

Construction Department (RCD), Jharkhand Pollution Control Board, BCCL, TISCO, Block<br />

Development Officers (BDOs), Circle Officers (COs), District Mining Department, Railway<br />

Department, ISM, FCI, CMRI, CMPDI, District Industrial Centre, Police Department,<br />

Tourism Officer, Fire Station Officer, Jharia Rehabilitation Development Authority (JRDA)<br />

and District Development Commissioner and etc.), Commercial organisations, Industries and<br />

Trade Unions, Jharkhand State Urban Development Minister, M.P, MLAs, Ex-MLAs, Ex-<br />

MPs, eminent citizens, technocrats, social workers etc. All the stakeholders and the citizens of<br />

the City become the planning partners of the City Development Plan.<br />

All the stakeholders identified are a part of the City Development Planning Process and their<br />

identification of the various issues and suggestions for the improvement of the quality of life<br />

in the City are very much a part of the City Development Plan.<br />

B. Consultation Process<br />

This is a significant phase, involving consensus<br />

building through stakeholder consultations to<br />

identify key issues facing the particular city,<br />

establishing a vision for development and<br />

identifying specific goals, objectives and priorities.<br />

The focus of the City Development Plan<br />

preparation visioning exercise was on ensuring<br />

adequate stakeholder participation to arrive at a<br />

shared vision for the city, with regards economic<br />

development and quality of life.<br />

One day kick-off meeting was organized on 18 th of<br />

May 2006 to brief the City Development Plan<br />

process and approach at Deputy Commissioner<br />

Officer. Deputy Commissioner Chaired the meeting<br />

and key stakeholders were invited to participate in<br />

the planning process of CDP.<br />

Two -day consultation workshop was organized on<br />

10 th and 11 th of July 2006 at ISM Lecture Theatre<br />

and at CMRI Auditorium respectively. List of<br />

participants attended for consultation workshop are<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 135


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

presented in Annexure. The “State of City Report”<br />

was presented before the stakeholder, to arrive at a<br />

shared vision, goals and projects and its<br />

prioritization by involving all stakeholders. After the<br />

presentation in the second half of the first day,<br />

Focused group discussions was organized to<br />

deliberate on the various issues facing the city and to<br />

identify a long list of projects/broad strategies to<br />

address the issues. Four different groups were<br />

formed namely, Urban Infrastructure facilities &<br />

Urban Environment, Urban Planning & Growth Management, Urban Transport, Urban<br />

Governance and <strong>Municipal</strong> Finance. In the second day of the workshop out come of the first<br />

day workshop was presented and subsequently consensus were arrived. The outcome of the<br />

focused group discussions was establishing the key issues facing the city, and strategies to<br />

address them.<br />

Based on the outcomes of the focused group discussions and the SWOT analysis a vision<br />

regarding economic development and quality of life for the city was drafted so as to address<br />

the economic development and quality of life<br />

The City Development Plan process of <strong>Dhanbad</strong> has undergone extensive consultative<br />

process with its key stakeholders, including consultation workshops and individual<br />

consultation with key stake holders in prioritizing the key sectors for investments and reform<br />

initiatives. Existing status of infrastructure facilities is presented in Figure 36.<br />

Figure 36: Sector wise priority based on Consultation findings<br />

Storm Water Drainage<br />

Street Light<br />

Water Supply<br />

Urban Transport<br />

Solid Waste Management<br />

Drainage and Sanitation<br />

Ok<br />

Poor<br />

Very Poor<br />

0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%<br />

Quality of Service<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 136


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

C. Vision<br />

Vision of <strong>Dhanbad</strong> is:<br />

“To improve the quality of life,<br />

Develop Eco – friendly,<br />

Universal Services for all and Economically Vibrant City “<br />

1. Urban Planning & Growth Management<br />

The key issues emerging out of planning and growth management areas are absence of Master<br />

Plan/Landuse plan for the entire <strong>Municipal</strong> <strong>Corporation</strong> leads to unplanned haphazard<br />

development. Since, the Jharia Coal Field covers significant portion of DMC, which restrict<br />

the developments towards one single direction. Absence of implementation mechanism and<br />

tools, inadequate financial resources to implement the schemes and lack of private sector<br />

participation and community involvement in development process.<br />

Vision for Urban Planning & Growth Management: “Guided Urban Development with<br />

open spaces and recreational facilities for the City”<br />

Strategies and Action Plan<br />

Considering the present key issues emerged from the study, a robust strategy for Planning and<br />

Growth Management is adopted. Detailed strategy is furnished below which covers policy<br />

level planning, reforms, institutional strengthening, preparation of Master Plan/Landuse Plan<br />

and Land development mechanism.<br />

(i.)<br />

Preparation of Comprehensive Master Plan/Landuse Plan. Preparation of a<br />

comprehensive Master Plan and Landuse Plan that adopts the spirit of the final vision<br />

document / plan, covering various developmental elements including:<br />

a. Urban Economy;<br />

b. Urban Environment & Hazards Zones;<br />

c. Housing and land development;<br />

d. Urban Poor and Slum Infrastructure;<br />

e. Urban Infrastructure development;<br />

f. Transportation;<br />

g. Social Infrastructure; and<br />

h. Institutional development and organizational responsibilities.<br />

(ii.)<br />

Development of Implementation Mechanism. Devising and adopting appropriate<br />

implementation mechanisms to facilitate implementation of the master plan and Landuse<br />

plan proposals;<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 137


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

(iii.)<br />

(iv.)<br />

(v.)<br />

(vi.)<br />

Preparation of Resource Mobilization Plan. Preparation of a financial and operating<br />

plan that addresses the resource requirement for implementation and maintenance of the<br />

master plan proposals;<br />

Development of New areas through Town Planning Schemes. Development of new<br />

areas through implementation of Town Planning Schemes. Detailed development plan<br />

has to be prepared for the selected new areas with the guidance of master plan /land use<br />

plan for the city.<br />

Institutional Strengthening and Capacity Building. Preparation of an institutional<br />

action plan matrix that lists out and defines roles and responsibilities of various<br />

stakeholder agencies; and<br />

Encourage Private Sector Participation in Urban Development. Formulate<br />

guidelines that facilitate and encourage private investment in implementation and/or<br />

operation and maintenance of urban infrastructure projects.<br />

Land is the key resource in physical planning, growth management and housing development,<br />

and the success of any housing strategy depends largely on availability of land parcels of<br />

appropriate size and at appropriate locations. It would be very relevant for the MADA to<br />

garner large tracts of land and prepare zonal and local area plans earmarking and allocating<br />

land for master plan proposals.<br />

The simplest mechanism for procuring land for development is by way of acquisition against<br />

monetary compensation. But for this, the implementation agency would require significant<br />

financial capital resources upfront, which is not possible considering already constrained fiscal<br />

situation of governments. Also, land acquisition is a time-consuming and cumbersome<br />

process, involving several legal issues. Some of the mechanisms for land assembly or<br />

development that could be considered are:<br />

(i.) Land Sharing Mechanism<br />

(ii.) Mechanism of Transferable Development Rights<br />

(iii.) Mechanism of Accommodation Reservation<br />

(iv.) Concept of FAR Bank for Resource Mobilization<br />

(i.)<br />

(ii.)<br />

Land Sharing Mechanism. Under the land sharing mechanism, the implementing<br />

agency takes over for development a large area of land belonging to several owners. Land<br />

is organized into regular plots of standard size, after provision of land for roads, open<br />

spaces and social amenities. The organized plots are then returned to the original owners,<br />

so that the owners get back 40 to 50 per cent of their original land holding. By this<br />

mechanism, the implementing agency acquires 60 per cent of the total land, free of cost,<br />

to provide for the road network and other infrastructure and social amenities as per<br />

planning norms.<br />

Mechanism of Transferable Development Rights. This mechanism is aimed at<br />

procuring land for provision of social amenities. Under this mechanism, the<br />

implementing agency negotiates with the landowner to trade his/her land for additional<br />

development rights (in the form of additional FAR) elsewhere (in designated areas, which<br />

can take the pressure of higher FAR) in the city. In this process, the implementing agency<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 138


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

acquires land free of cost.<br />

(iii.)<br />

(iv.)<br />

Mechanism of Accommodation Recommendation. The mechanism of accommodation<br />

reservation is also aimed at procuring land for provision of social amenities. Here, the<br />

owner of the land where the social amenity is proposed to be developed is required to<br />

part with a part of his/her land (say 50 per cent), while he/she is allowed to develop the<br />

remaining part up to an extent equivalent to the full FAR achievable on the original plot<br />

size. In this process, the owner of the plot does not lose out on the achievable built-up<br />

area, while the implementing agency gets land free of cost. This mechanism also needs to<br />

be implemented in designated areas that have the capacity to service additional FAR.<br />

Concept of FAR Bank for Resource Mobilization. The concept of FAR bank can be<br />

an effective tool for resource mobilization, while ensuring controlled development. This<br />

concept entails establishing and applying a base FAR at say 0.75 to 1.0, which is<br />

permissible in all areas. The implementing agency designates certain prime areas like<br />

commercial centers and high-rise residential complexes, where extra FAR can be bought<br />

at a premium. The rate of premium is set depending upon market value and the demand<br />

for additional FAR in different areas. However, as in the case of other mechanisms<br />

involving trading of land for additional FAR, the concept of FAR bank would also require<br />

adequate provisions in the development plan that earmark locations/zones where<br />

additional FAR can be absorbed, based on available road-width and capacity of the<br />

infrastructure.<br />

Table 79: Strategy Time Frame – Planning & Growth Management<br />

Strategy 2007 2008 2009 2010 2011 2012 2013<br />

Preparation of Comprehensive<br />

Master Plan / Landuse Plan<br />

for DMC and integration of<br />

existing master plan erstwhile<br />

<strong>Dhanbad</strong> <strong>Municipal</strong>ity<br />

Preparation of Micro level<br />

plans to support the Master<br />

Plan / Landuse Plan (TP<br />

Schemes)<br />

Development of New<br />

Residential Township<br />

Development of Land through<br />

innovative mechanism for land<br />

acquisition and resource<br />

mobilization<br />

Decongest the existing CBD<br />

and development of alternative<br />

CBD<br />

Institutional Strengthening and<br />

Capacity Building<br />

Encourage Private Sector<br />

Participation in Urban<br />

Development<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 139


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

2. Water Supply<br />

Based on the review of the existing water supply scenario, the following key issues are<br />

identified. There is a low level of supply due to inadequate perennial source, owing to age old<br />

/worn-out distribution network leakages and low carrying capacity also noticed in the water<br />

supply system. Inadequate distribution network coverage and absence of summer storage tank<br />

also an importance factor in water supply system. There is a huge demand supply gap which is<br />

likely to widen drastically in future. No regulatory mechanism to oversee the functioning of<br />

the sector and to fix service standards as well as tariff to meet capital and operating<br />

expenditure is another problem.<br />

Vision for Water Supply: “Adequate supply of potable water within easy reach to each<br />

and every household”<br />

Goals and Service Outcome<br />

Considering the above key issues, the following goals for different horizon period have been<br />

identified.<br />

Table 80: Goal and Service Outcome - Water Supply<br />

Goal<br />

Current 2011 2013 2016 2026<br />

Status<br />

Network coverage to 15-20% 100% 100% 100% 100%<br />

households<br />

Per Capita Supply 66 lpcd 150 lpcd 150% 150 lpcd 150 lpcd<br />

24 / 7 Water Supply - 50% 60% 80% 100%<br />

Quality of Water Good Safe &<br />

Good<br />

Safe &<br />

Good<br />

Safe &<br />

Good<br />

Safe &<br />

Good<br />

Non Revenue Water 40% 30% 20% 20% 15%<br />

Consumer Metering 50% 75% 25% 100% 100%<br />

Cost Recovery<br />

(percent of O&M)<br />

- 80% 100% 100% 100%<br />

Strategies and Action Plan<br />

Considering the present key issues and identified goals, a robust strategy for water supply is<br />

adopted. Detailed strategy is furnished below which covers policy level planning, reforms,<br />

institutional strengthening, source augmentation and service delivery aspects.<br />

(i.)<br />

(ii.)<br />

Water Supply System Rehabilitation Plan. The existing distribution system is pretty<br />

old and suffers from leakages etc. thus reducing its carrying capacity. The existing<br />

distribution network need complete overhauling by replacing old defunct and inadequate<br />

piping system by proper distribution network.<br />

Comprehensive Water Supply Planning. While the current works shall focus on the<br />

source augmentation, yield increase, adequate storage, adequate distribution network<br />

reach and treatment facilities for future requirements, the programme shall be so designed<br />

to match the <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> needs. The entire system shall be<br />

augmented and structured in a sustained process.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 140


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

(iii.)<br />

(iv.)<br />

(v.)<br />

(vi.)<br />

(vii.)<br />

(viii.)<br />

Asset Management Plan. To address the condition assessment and the performance of<br />

the water supply assets, it is recommended that an asset management plan be prepared for<br />

the assets of water supply in <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong>.<br />

Water Supply Operation and Maintenance Plan. Adoption of an O&M Plan and<br />

Schedule, including options of using the private sector for O&M (e.g. management<br />

contract). The management contracts entered into by the corporation with private<br />

companies to improve the O&M facilities making the private company solely responsible<br />

for the entire O&M of the system, based on an agreed annual fee shall be continued<br />

vigorously added with inbuilt incentives for improved performance.<br />

Water Management Plan. Adoption of comprehensive strategy for water management<br />

through leak detection, conducting energy audit study for checking of Unaccounted for<br />

water and strategy for use of recycled water for non potable use, based on a pilot study<br />

for the <strong>Municipal</strong> <strong>Corporation</strong>.<br />

Mapping and Geographical Information System (GIS). To address the issue of<br />

system rehabilitation, mapping and establishing a GIS system is pertinent to detail out<br />

system location, characteristics, age and condition. This would enable identifying<br />

dilapidated sections of the network and those that require replacement.<br />

Performance Benchmarking and Monitoring. Developing key performance indicators<br />

to monitor and adopting best practices to improve the sustainable performance of the<br />

water supply system.<br />

Institutional Strengthening and Capacity Building. The proposed staff members of<br />

the Engineering department in DMC, existing staff members in MADA, PHED shall<br />

undergo training in project planning, implementation, monitoring and evaluation.<br />

Significance of peoples’ participation on water conservation shall also be realised.<br />

The time frame to achieve the above mentioned strategies are presented in the following<br />

table.<br />

Table 81: Strategy Time Frame - Water Supply<br />

Strategy 2007 2008 2009 2010 2011 2012 2013<br />

Water Supply Rehab. Plan<br />

Comprehensive W/S Planning<br />

Asset Management Plan<br />

Water Management Plan<br />

Mapping & GIS<br />

Piloting 24/7 water supply<br />

Source Augmentation<br />

Storage Capacity<br />

Augmentation<br />

Network coverage for general<br />

households<br />

Performance Benchmarking &<br />

monitoring<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 141


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Strategy 2007 2008 2009 2010 2011 2012 2013<br />

Institutional Strengthening and<br />

Capacity Building<br />

3. Sewerage and Sanitation<br />

The key issues pertaining to sewerage and sanitation is absence of safe disposal system, dearth<br />

of safe sanitation facilities and inadequate and ill maintained public sanitation facilities leads to<br />

unhygienic living environment in the city. Following goals and strategies are framed to<br />

overcome the deficiencies in the system.<br />

Vision for Sewerage and Sanitation: “To Develop a recyclable, cost effective<br />

environmental friendly sewerage system and safe sanitation facilities for all“<br />

Goals and Service Outcome<br />

Considering the above key issues in sewerage and sanitation sector, the following goals for<br />

different horizon years have been identified.<br />

Table 82: Goal and Service Outcome – Sewerage and Sanitation<br />

Goal<br />

Current 2011 2013 2016 2026<br />

Status<br />

Sewer Network<br />

Nil 80% 100% 100% 100%<br />

coverage to<br />

households<br />

Treatment and<br />

Nil 100% 100% 100% 100%<br />

Disposal arrangements<br />

Recycling and Reuse Nil 10% 15% 20% 50%<br />

Cost Recovery (as a Nil 50% 60% 85% 100%<br />

percent of O&M)<br />

Safe Sanitation<br />

Facilities<br />


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

(iii.)<br />

(iv.)<br />

(v.)<br />

(vi.)<br />

Awareness Campaign on Recycle and Reuse. An awareness campaign regarding the<br />

importance of recycling and reusing of waste water for various household purposes shall<br />

be taken up to tackle any unforeseen situation in future. A plan shall also be drawn to<br />

setup recycling plants in near future along with treatment plants.<br />

Asset Management Plan. To address the condition assessment and the performance of<br />

the sewerage system, it is recommended that an asset management plan be prepared for<br />

the assets of sewerage system in <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong>.<br />

Performance Benchmarking and Monitoring. Developing key performance indicators<br />

to monitor and adopting best practices to improve the sustainable performance of the<br />

water supply system.<br />

Institutional Strengthening and Capacity Building. The proposed staff members of<br />

the Engineering department in DMC and existing staff members in MADA shall undergo<br />

training in project planning, implementation, monitoring and evaluation.<br />

The time frame to achieve the above mentioned strategies are presented in the following<br />

table.<br />

Table 83: Strategy Time Frame – Sewerage and Sanitation<br />

Strategy 2007 2008 2009 2010 2011 2012 2013<br />

Comprehensive Sewerage<br />

System Plan<br />

Awareness Campaign on<br />

Recycle and Reuse<br />

Asset Management Plan<br />

Mapping & GIS<br />

Creation of STPs<br />

Network coverage for general<br />

households<br />

Performance Benchmarking &<br />

Monitoring<br />

Institutional Strengthening and<br />

Capacity Building<br />

4. Storm Water Drainage and Primary Drainage<br />

The key issues pertaining to storm water drainage and primary drainage is absence of safe<br />

disposal system, dearth of safe sanitation facilities and inadequate and ill maintained public<br />

sanitation facilities leads to unhygienic living environment in the city. Following goals and<br />

strategies are framed to overcome the deficiencies in the system.<br />

Vision for Drainage: “To develop an efficient drainage system to ensure cleanliness of<br />

city”<br />

Goals and Service Outcome<br />

Considering the above key issues in storm water drainage and primary drainage sector, the<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 143


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

following goals for different horizon years have been identified.<br />

Table 84: Goal and Service Outcome – Drainage<br />

Goal<br />

Current 2011 2013 2016 2026<br />

Status<br />

Storm Water Drainage 63 100% 100% 100% 100%<br />

Network coverage<br />

Rehabilitation of<br />

- 100% 100% 100% 100%<br />

Existing Pucca Drains<br />

Upgradation of<br />

- 10% 100% 100% 100%<br />

Existing Kutcha<br />

Drains to Pucca<br />

Drains<br />

Rehabilitation of<br />

existing primary<br />

nallahs and water<br />

bodies<br />

- 50% 100% 75% 100%<br />

Strategies and Action Plan<br />

(i.)<br />

(ii.)<br />

(iii.)<br />

(iv.)<br />

(v.)<br />

Storm Water Drainage Rehabilitation Programme. Under this programme a study<br />

shall be taken up to identify the flood spots within the <strong>Municipal</strong> <strong>Corporation</strong>. This shall<br />

be based on the past history of floods and contour survey of all the drains in the city and<br />

their conditions. Mere cleaning of the drains could drain most of the flood spots. In<br />

almost all the cases, strengthening of the drains and construction of leading drains will<br />

have to be taken up. Desilting exercise has to be taken up in all the natural and open<br />

drains. Based on the necessity that arises out of the study, the drains are to be remodeled<br />

from the origin to the outfall.<br />

Rehabilitation and Strengthening of Primary Drainage /Nallahs. The primary<br />

drains are inadequate to handle the flash floods as they are not systematically designed<br />

and are not fully constructed in some sections. Moreover, significant reduction in depth<br />

and width are noticed due to siltation and encroachment of drain bunds. To alleviate<br />

these, a rehabilitation and improvement program is recommended.<br />

Construction and Upgradation of Road side Storm Water Drains. The available road<br />

side storm water drainage is inadequate to meet the current and future requirements and<br />

hence construction and upgradation of road side storm water drains has been<br />

recommended.<br />

Rejuvenation of Water Bodies. Rejuvenation and Rehabilitation works for Water<br />

Bodies, through de-silting, bunding works and Intersection and Diversion of Sewage<br />

wherever required.<br />

Efficient and Effective Operation and Maintenance Plan. There shall be a separate<br />

operation and maintenance plan to be prepared to maintain the road side drains and water<br />

bodies that created or upgraded during the plan period.<br />

The time frame to achieve the above mentioned strategies are presented in the following<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 144


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

table.<br />

Table 85: Strategy and Time Frame – Storm Water Drainage<br />

Strategy 2007 2008 2009 2010 2011 2012 2013<br />

Storm Water Drainage<br />

Rehabilitation Programme<br />

Rehabilitation and<br />

strengthening of primary<br />

Nallahs<br />

Construction and Upgradation<br />

of Drains<br />

Efficient Operation and<br />

Maintenance Plan<br />

5. Preservation and Rejuvenation of Water Bodies<br />

The key issues pertaining to water Bodies preservation is low level of utilization of water<br />

bodies, polluting water bodies through direct let out of domestic sewage, industrial and<br />

chemical wastes. Encroachments of water bodies, lack of institutional framework and<br />

resources ultimately leads to unhygienic condition of lakes and ponds in the city. Following<br />

goals and strategies are framed to overcome the deficiencies in the preservation of water<br />

bodies.<br />

Vision for Preservation Water Bodies: “To develop pollution free water bodies and<br />

optimum utilization of lakes and ponds for recreational facilities in city”<br />

Goals and Service Outcome<br />

Considering the above key issues in preservation of lake and ponds, the following goals for<br />

different horizon years have been identified.<br />

Table 86: Goal and Service Outcome – Preservation of Water Bodies<br />

Goal<br />

Current 2011 2013 2016 2026<br />

Status<br />

Preservation Water<br />

- 100% 100% 100% 100%<br />

Bodies<br />

Rejuvenation of Lakes<br />

and Ponds<br />

- 70% 100% 100% 100%<br />

Strategies and Action Plan<br />

(i.)<br />

(ii.)<br />

Eviction of Encroachments. Under this programme, identify the lakes and ponds which<br />

are encroached and same should be evicted this should be taken as first priority.<br />

Preservation of Water Bodies. Under this programme a study shall be taken up to<br />

identify lakes and ponds which are polluted in the city and necessary actions shall be<br />

taken up to reroute the domestic sewage outfalls, nallahs and chemicals wastes which are<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 145


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

letting out to the water bodies. In almost all the cases, strengthening of the lakes and<br />

ponds desilting exercise has to be taken up in all the water bodies.<br />

(iii.)<br />

Rejuvenation of Water Bodies and Development of Water Parks. Rejuvenation and<br />

Rehabilitation works for Water Bodies, through de-silting, bunding works and<br />

Intersection and Diversion of Sewage wherever required. Development of boating<br />

facilities and other recreational facilities like amusement/water parks.<br />

The time frame to achieve the above mentioned strategies are presented in the following<br />

table.<br />

Table 87: Strategy Time Frame – Preservation of Water Bodies<br />

Strategy 2007 2008 2009 2010 2011 2012 2013<br />

Eviction of Encroachments<br />

Preservation of Water Bodies<br />

Rejuvenation of Water Bodies<br />

Development of Water Parks<br />

IEC Activities<br />

6. Solid Waste Management<br />

The key issues pertaining to solid Waste Management system is dearth of effective primary<br />

collection mechanism, inadequate no of dust bins, irregular street sweeping, poor waste<br />

collection performance and absence of safe and scientific disposal mechanism leads to<br />

unhygienic and unhealthy living environment in the city. Following goals and strategies are<br />

framed to overcome the deficiencies in the system.<br />

Vision for Solid Waste Management: “To achieve environmentally sustainable waste<br />

Management practice”<br />

Goals and Service Outcome<br />

Table 88: Goal and Service outcome – Solid Waste Management<br />

Goal<br />

Current 2011 2013 2016 2026<br />

Status<br />

Door to Door<br />

- 100% 100% 100% 100%<br />

Collection system<br />

Encourage Source - 100% 100% 100% 100%<br />

Segregation<br />

Improved Waste 37% 60% 100% 100% 100%<br />

Collection<br />

Efficiency<br />

Mechanized Waste - 50% 60% 75% 100%<br />

Handling<br />

Scientific Waste<br />

- 60% 75% 100% 100%<br />

Disposal<br />

Cost Recovery of<br />

O&M<br />

- 30% 50% 85% 100%<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 146


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Goal<br />

Private Sector<br />

Participation<br />

Current<br />

Status<br />

2011 2013 2016 2026<br />

- Primary Primary Complete Complete<br />

Waste Waste Collection Collection<br />

Collection Collection and and<br />

Disposal Disposal<br />

Strategies and Action Plan<br />

(i.)<br />

(ii.)<br />

(iii.)<br />

(iv.)<br />

(v.)<br />

Implementation of ‘Door-to-door collection’ through 100 percent privatization. In<br />

order to achieve the above objective, a ‘Bin system of Solid Waste Storage’ at source is<br />

being recommended. As per this system, each of the households shall be directed to keep<br />

separate bins/ containers for biodegradable and non-biodegradable waste generated<br />

within their premises. The segregated waste so stored in these bins will have to be<br />

transferred to the dumper placer provided for each area.<br />

Source Segregation and Collection of Commercial Waste, through privatization;<br />

and Source Segregation and Collection of Hotels and Market Waste. Construction<br />

waste has to be stored at the premises of the construction either in skips or suitable<br />

containers and has to be directly emptied to the notified disposal site by the generator.<br />

Meat and fish markets should store waste in non-corrosive bins of maximum 100-liter<br />

capacity each and transfer contents to large container to be kept at the market just before<br />

lifting of such large containers. Slaughterhouses should keep separate containers for<br />

animal waste and other wastes. It is also being recommended that this system of source<br />

segregation and storage is encouraged through community education and awareness<br />

campaigns and hence no capital investments are envisaged in this regard. Introduction of<br />

bio-medical waste management facility with support from Indian Medical Association, is<br />

also recommended.<br />

Street Sweeping and Mooping on Daily Basis. Since further areas and eventually the<br />

entire city is proposed to be brought under privatization, it is considered that there would<br />

not be any further requirement to induct conservancy workers. The existing street<br />

sweeping operations in <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> are satisfactory and to ensure<br />

operational efficiency of the system, the following measures are suggested. (a) Markets<br />

and other areas of the city shall be swept at least twice a day and sweeping should be done<br />

on Sundays and holidays in core areas and denser areas; (b) Sweepings shall be collected<br />

separately as degradable and non-biodegradable waste and deposit in containers kept at<br />

various locations and a separate crew equipped with appropriate implements may do desilting<br />

of larger drains.<br />

Community Participation and Enforcement of By-laws and Waste Collection and<br />

Handling Rules. It is recommended that the community be involved in primary<br />

collection through segregation at household level to minimize the number of waste<br />

handling operation. Non-biodegradable waste shall be collected separately from premises<br />

where door to door collections are organized. Present system of primary collection should<br />

be supplemented by introducing multi-bin carts (Push carts / Tricycles) covering the<br />

entire area of the city.<br />

Efficient Secondary Collection and Transportation System. It is also recommended<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 147


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

that Dual Loaded Dumper Placers (DLDPs) be introduced to improve the collection<br />

efficiency and to cover 80 percent area of the <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> area in<br />

phased manner. The introduction of Dual Loaded Dumper Placers shall eliminate the<br />

need of the Secondary Collection Points. Instead of these collection points, in the end,<br />

transfer stations with advanced segregation and recycling facilities may be introduced, in<br />

the future.<br />

(vi.)<br />

(vii.)<br />

(viii.)<br />

(vii.)<br />

Composting of Organic Waste. Approximately 60% of the waste generated in <strong>Dhanbad</strong><br />

is organic nature. The land requirement for compost facility will have to be<br />

accommodated Windrow Pads, Ancillaries and Circulation area.<br />

Sanitary Land Filling of Inorganic Waste and the Compost Rejects. Inorganic waste<br />

constitutes approximately 40 percent. Landfill facility design is based on CPHEEO design<br />

assumptions for Sanitary Landfills, wherein a landfill height of 5 m and a bulk density of<br />

0.85 Tons/ m3 are assumed. However, the actual height of landfill depends on the<br />

geological/ geographical conditions of the site and technology of landfill development.<br />

Educating the community on 4R strategy (Reduce, Reuse, Recycle and Recover).<br />

Institutional Strengthening and Capacity Building. The proposed staff members of<br />

the Sanitation department in DMC and existing staff members in MADA shall undergo<br />

training in project planning, implementation, monitoring and evaluation.<br />

The time frame to achieve the above mentioned strategies are presented in the following<br />

table.<br />

Table 89: Strategy Time Frame – Solid Waste Management<br />

Strategy 2007 2008 2009 2010 2011 2012 2013<br />

Source Segregation<br />

Door to Door Collection<br />

Twin bin system<br />

Mechanized Waste Handling<br />

Vehicle Fleet Management<br />

Composting of Organic Waste<br />

Sanitary Landfill Development<br />

Waste Minimization and<br />

Recycling<br />

IEC Activities<br />

Capacity Building<br />

6. Roads and Traffic Management<br />

The key issues pertaining to Road and Traffic Management is traffic congestion, absence of<br />

mass transit system, ineffective intermediate public transport system and etc. Following goals<br />

and strategies are framed to overcome the deficiencies in the system.<br />

Vision for Roads and Traffic Management: “To achieve a modern, self sustainable and<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 148


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

environmental friendly transportation system to facilitate timely access”<br />

Goals and Service Outcome<br />

Table 90: Goal and Service Outcome – Roads and Traffic Management<br />

Goal<br />

Current 2011 2013 2016 2026<br />

Status<br />

Percentage Reduction - 25% 30% 30% 30%<br />

in Travel Time<br />

Riding Comfort 30% 60% 70% 100% 100%<br />

Transport Safety ( to<br />

reduce accidents)<br />

- 80% 100% 100% 100%<br />

Strategies and Action Plan<br />

(i.)<br />

(ii.)<br />

(iii.)<br />

(iv.)<br />

(v.)<br />

(vi.)<br />

(vii.)<br />

(viii.)<br />

(ix.)<br />

(x.)<br />

(xi.)<br />

(xii.)<br />

(xiii.)<br />

(xiv.)<br />

(xv.)<br />

Strengthening and widening of pavement, provision of footpaths, median, railing, road<br />

signage and other street furniture;<br />

Provision of separate lane for slow moving vehicles to avoid congested streets;<br />

Increase the connectivity and improve the missing links in the city;<br />

To avoid the regular digging of roads for laying utilities, development of under ground<br />

utility ducts with the provision of all utility cables including water, sewer pipe lines,<br />

telephone cables and etc;<br />

Encourage shift towards a Mass Transit System;<br />

Junction improvement includes, proper geometric design of rotary, island and<br />

intersections and signalization;<br />

Construction of pedestrian subways and pedestrian crossings at selected heavy traffic<br />

locations in the city;<br />

Identifying potential areas parking and providing authorized parking lots;<br />

Road safety and pollution control checks including the inspection of fitness of vehicles as<br />

well as training and testing of the IPT drivers;<br />

Traffic management initiatives like, restricting usage of road space by heavy vehicles and<br />

private four wheelers in congested streets during the peak hours;<br />

Facilitating smooth flow of traffic through measures such as one-way routes, speed<br />

controls at necessary locations and emphasis on enforcement of traffic regulations;<br />

Construction of ROB/RUB and Elevated roads at selected locations/corridors to release<br />

the traffic congestion;<br />

Construction of By-passes and Ring Roads;<br />

Improvements to existing bus terminus on BOT basis; and<br />

Construction of Transport Nagar for trucks.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 149


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Table 91: Strategy Time Frame – Roads and Traffic Management<br />

Strategy 2007 2008 2009 2010 2011 2012 2013<br />

Eviction of encroachments<br />

Preparation of comprehensive<br />

land use/master plan<br />

Preparation of Traffic<br />

Management Plan<br />

Upgradation of Roads<br />

Formation of New Roads<br />

Pedestrianization & Signages<br />

Parking Management<br />

Junction improvement &<br />

automatic Signalization<br />

Widening and Strengthening of<br />

Existing Roads<br />

Construction of Ring<br />

Road/bypass Road<br />

Bridges & Flyovers/Elevated<br />

Highways<br />

Inter city bus services<br />

connecting major ring road<br />

intersections and important<br />

urban areas<br />

ROB/RUB & Pedestrian<br />

Subways & Pedestrian Crossings<br />

Integration & upgradation of SH<br />

network with NH<br />

Provision of Bus shelters<br />

Transport Nagar, Bus Terminus,<br />

truck terminus and warehouse<br />

facilities<br />

Public Awareness Campaign<br />

Redevelopment of Airport<br />

Encourage CNG as alternate<br />

fuel<br />

Identification of potential<br />

parking areas and construction<br />

of multistoried parking facilities<br />

at selected locations<br />

7. Street Lighting<br />

The key issues pertaining to Street Lighting is low coverage and high spacing between lamp<br />

posts. Following goals and strategies are framed to overcome the deficiencies in the system.<br />

Vision for Street Lighting: “To achieve and maintain energy efficient and better lighting<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 150


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

facilities to entire DMC Jurisdiction”.<br />

Goals and Service Outcome<br />

Table 92: Goal and Service Outcome – Street Lighting<br />

Goal<br />

Current 2011 2013 2016 2026<br />

Status<br />

Improved Area<br />

10% 70% 100% 100% 100%<br />

Coverage<br />

Energy Savings - 10% 20% 30% 30%<br />

Strategies and Action Plan<br />

(i.)<br />

(ii.)<br />

(iii.)<br />

Replacement of Existing fixtures. Most of the existing street fixtures are not<br />

functioning due to improper maintenance and it is proposed to replace the non working<br />

fixtures to new fixtures for better lighting in the city.<br />

Provision of New Fixtures to Uncovered Areas. To increase the fixture spacing from<br />

the current level to meet the standards new lighting fixture are proposed in uncovered<br />

areas in the DMC area.<br />

Provision of Power Saver Switches. To control the energy consumption due to street<br />

lightings automatic on off switches have been proposed.<br />

8. Basic Services for Urban Poor<br />

The key issues pertaining to Basic Services for Urban Poor is lack of basic infrastructure<br />

facilities in slums like, in adequate access to sanitation facilities, public stand posts, dearth of<br />

health, social infrastructure facilities and education facilities, low coverage and high spacing<br />

between lamp posts. Following goals and strategies are framed to overcome the deficiencies<br />

in the slums.<br />

Vision for Basic Services for Urban Poor: “To achieve hygienic environment in slums<br />

and access to all basic services and quality housing for all slum households”.<br />

Goals and Service Outcome<br />

Table 93: Goal and Service Outcome – Basic Services for Urban Poor<br />

Goal<br />

Current 2011 2013 2016 2026<br />

Status<br />

Housing for Urban 50% 100% 100% 100% 100%<br />

Poor<br />

Increase the<br />

10% 70% 100% 100% 100%<br />

Distribution Network<br />

Reach to all Slums<br />

Access to Public 10% 90% 100% 100% 100%<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 151


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Goal<br />

Standposts/Tanks<br />

Provision of Sewer<br />

Lines to all Slums<br />

Access to Public<br />

Toilets and Urinal<br />

Facilities for all Slum<br />

Households<br />

Access to Dust Bins<br />

and Secondary<br />

Storage Points<br />

Upgradation of<br />

Kutcha roads to PCC<br />

Roads in Slums<br />

Improved Drainage<br />

System<br />

Adequate street<br />

Lighting Facilities<br />

Current<br />

Status<br />

2011 2013 2016 2026<br />

- 10% 50% 100% 100%<br />

20% 75% 100% 100% 100%<br />

5% 60% 100% 100% 100%<br />

- 70% 100% 100% 100%<br />

- 60% 100% 100% 100%<br />

- 70% 100% 100% 100%<br />

Education facilities - 50% 75% 100% 100%<br />

Adequate Social<br />

Infrastructure<br />

Facilities<br />

- 75% 100% 100% 100%<br />

Adequate Health<br />

facilities<br />

- 50% 75% 100% 100%<br />

Strategies and Action Plan<br />

(i.)<br />

(ii.)<br />

(iii.)<br />

(iv.)<br />

(v.)<br />

Integrated Development of Slums (Slum Networking). Slum networking is an<br />

integrated up-gradation of the entire city using slums, not as isolated islands but as an<br />

urban net. The spatial spread of slums over the city together with contiguity between<br />

informal settlements gives an opportunity to strengthen the city level infrastructure<br />

networks. There is always a close correlation between the slum locations and the natural<br />

drainage paths of the city which need to be tapped and improved upon with the<br />

infrastructure services. This approach shall help in building low cost service trunks,<br />

particularly for gravity based systems of sewerage and storm drainage.<br />

Rehabilitation of slums. Rehabilitation of existing infrastructure facilities in slums shall<br />

be taken up like replacement of water supply stand post, distribution network, renovation<br />

of septic tanks and other facilities.<br />

Redevelopment of slums. Redevelopment of slum settlement in the same area by<br />

constructing low raise housing schemes with basic infrastructure facilities.<br />

Construction of housing for urban poor. Nearly 50 percent of the urban poor in the<br />

city does not have proper shelter and hence housing schemes are proposed.<br />

Upgrading and Provision of Additional Facilities. In its drive to upgrade the living<br />

environment of the city the DMC has to take up the initiative of upgrading the facilities<br />

available in residential parks in neighborhoods. This includes frequent gardening and<br />

upkeep of facilities.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 152


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

(vi.)<br />

(vii.)<br />

Reduction of Health Risk. The DMC has to work towards the reduction of health risks<br />

and behaviors leading to chronic and infectious diseases and infant mortality, with<br />

particular emphasis on population disproportionately affected by these conditions. The<br />

<strong>Corporation</strong> should also improve the quality, access to health care, including physical and<br />

mental health, and emergency medical services.<br />

Livelihood Restoration and Social Security. Enhancement of livelihood opportunities<br />

through, enabling skill development, activity centers and micro financing. Providing social<br />

security through convergence of programmes on health insurance, asset protection and<br />

community policing.<br />

9. Urban Environment<br />

The key issues pertaining to Urban Environment is Jharia under ground fire, ambient air<br />

pollution, industrial pollution, vehicular pollution, Water Pollution, Noise Pollution, solid<br />

waste /Hazardous waste. Following goals and strategies are framed to overcome the<br />

environmental pollution in the city.<br />

Vision for Urban Environment: “To accomplish clean, green and safe living<br />

environment for all citizens”.<br />

Strategies and Action Plan<br />

Ambient Air Pollution:<br />

(i.) Implementation of air quality improvement Programme by Pollution Control Board<br />

with support of Giant Polluting units to upgrade ambient air quality status to fairs.<br />

(ii.) Water Sprinkling should be facilitated by DMC/Mining bodies on and besides road<br />

stretches to subside dust particles.<br />

(iii.) Use of Cleaner fuel (LPG) in lieu of Coal for domestic cooking.<br />

(iv.) Development of forest cover to meet the national norms for minimum forest cover<br />

(33% of the total land area)<br />

Industrial Pollution:<br />

(i.) Strict adherence to stack emission standards and emissions reduction from various<br />

processes through appropriate and technological feasible installation / modification of<br />

equipments.<br />

(ii.) Upgradation /improvement of the efficiency of exiting air, water and solid/hazardous<br />

waste treatment and disposal facilities.<br />

(iii.) Permission for discharge of treated effluents into rivers from industries only if they<br />

follow the prescribed effluent standards.<br />

(iv.) Strict adherence to stack emission standards and emissions reduction from various<br />

processes through appropriate and technologically feasible modifications.<br />

(v.) Installation of additional pollution control facilities and green belt development around<br />

the industrial emission sources.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 153


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Vehicular Pollution:<br />

(i.) Maintaining the road conditions to reduce the vehicular emission.<br />

(ii.) Adherence to vehicular emission Standards.<br />

(iii.) Promoting the use of clean fuels such as CNG in automobile sector<br />

(iv.) Promotion of stricter emission norms.<br />

(v.) Phasing out of old two stroke, two and three wheelers in a gradual manner.<br />

(vi.) Mass Transportation can be promoted for reducing the vehicle load.<br />

(vii.) Greenbelt development on either side of the road should be developed by the<br />

concerned agencies/NGOs to facilitated attenuation of pollutants.<br />

Water Pollution:<br />

(i.) Several low capacity Water treatment plants can be established as per units waste water<br />

generating capacity<br />

(ii.) Construction of new sewage treatment facilities.<br />

(iii.) Implementation of River Water quality improvement Programme to upgrade Damodar<br />

and other river water qualities to meet the requirements of designated usage (CPCB<br />

classification).<br />

(iv.) Improvement of assimilative/ dilution capacity of river waters by increasing the water<br />

releases from upstream reservoirs, wherever feasible<br />

Noise Pollution:<br />

(i.) Green belt development for noise attenuation<br />

(ii.) Plantation along transportation corridors.<br />

(iii.) Development of buffer zone between industries & residential areas.<br />

(iv.) Use of noise absorbers/barriers near the machinery from preventing hearing loss, in<br />

large noise generating units in the region.<br />

Solid/ Hazardous Waste Management:<br />

(i.) Identification of proper solid waste dumping site in lieu of temporary arrangements,<br />

with adequate land availability.<br />

(ii.) Organized execution of wastes.<br />

(iii.) Adoption of appropriate technology to facilitate recycle and reuse of solid waste for<br />

reducing waste generation.<br />

(iv.) Composting of domestic solid waste.<br />

(v.) Proper collection of waste and disposal in secure landfill.<br />

(vi.) Identification of sites for flyash disposal.<br />

(vii.) Regular monitoring of ground water quality and planning and implementation of<br />

measures to prevent contamination of ground water due to solid/hazardous waste<br />

dumping.<br />

These issues need to be addressed in order to attain clear waters, blue skies, green land,<br />

resource rich and better quality of life.<br />

(i.)<br />

Environmental Master Plan need to be prepared, where Siting of Industries based on<br />

Environmental Considerations need to be promoted.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 154


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

(ii.) Eco-friendly Mining methods and sustainable mineral extraction rates with built-in<br />

rehabilitation and mining area reclamation technology.<br />

(iii.) Reclamation of degraded land.<br />

(iv.) Afforestations need to be initiated at larger level.<br />

(v.) Indoor air pollution in urban household need to be curbed.<br />

(vi.) Wastewater from underground mines & industries need to be collected for recycling and<br />

reuse to save the scarce water resources to the extent possible.<br />

(vii.) From an environmental point of view, it is desirable to adopt a low growth path, so<br />

that further environmental degradation due to mining & industrial pollution can be<br />

minimized.<br />

10. City Beautification and Tourism Development<br />

(i.) Development parks and recreational facilities in the city;<br />

(ii.) Development of water parks /amusement parks; and<br />

(iii.) Exploring new areas for tourism development.<br />

11. Disaster Preparedness and Response/Action Plan<br />

Strategies and Action Plan<br />

Earthquake Preparedness plan<br />

<br />

<br />

<br />

<br />

<br />

<br />

Formation of City and Ward level Disaster Management Teams [DMT] including the<br />

concerned Government Depts. Senior citizens, National Cadet Corps (NCC)/National<br />

Social Service (NSS), Rotary and Lions Clubs, Resident Welfare Associations, Elected<br />

Members, NGOs and other civil society response groups;<br />

Development of city and ward level earthquake preparedness and response plans;<br />

Development of an inventory of resources at all levels for speedy response during<br />

emergencies and establishing linkages with the India Disaster Resources Network<br />

(IDRN);<br />

Development of response structure from ward to city level;<br />

Specialized training of Disaster Management Teams [DMTs] at ward and city levels; and<br />

Preparedness drills at city and ward levels.<br />

Disaster prevention is intrinsically linked to preventive planning. Some of the important steps<br />

in this regard are:<br />

(i.)<br />

Vulnerability Analysis. Introduction of a comprehensive process of vulnerability<br />

analysis and objective risk assessment. Vulnerability mapping should be prepared for<br />

<strong>Dhanbad</strong> in detail ;<br />

(ii.) Building a Robust and Sound Information Database: A comprehensive database of<br />

the land use, demography, various hazards, under ground fire, mining activities, urban<br />

environmental issues, infrastructure developed at the national, state and local levels<br />

along with current information on climate, weather and man-made structures is crucial<br />

in planning, warning and assessment of disasters. In addition, resource inventories of<br />

governmental and non-governmental systems including personnel and equipment help<br />

in efficient mobilisation and optimisation of response measures;<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 155


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

(iii.) Creating State-of-the-art Infrastructure. The entire disaster mitigation game plan<br />

must necessarily be anchored to frontline research and development in a holistic mode.<br />

State-of-the art technologies available worldwide need to be made available in <strong>Dhanbad</strong><br />

for upgradation of the disaster management system; at the same time, dedicated research<br />

activities should be encouraged, in all frontier areas related to disasters like biological,<br />

space applications, information technology, nuclear radiation etc., for a continuous flow<br />

of high quality basic information for sound disaster management planning;<br />

(iv.) Establishing Linkages between all Knowledge- based Institutions. A National<br />

Disaster Knowledge Network, tuned to the felt needs of a multitude of users like<br />

disaster managers, decision makers, community etc., must be developed as the network<br />

of networks to cover natural, manmade and biological disasters in all their varied<br />

dimensions,<br />

The goal of any disaster management initiative is to build a disaster resistant/resilient<br />

community equipped with safer living and sustainable livelihoods to serve its own<br />

development purposes. The community is also the first responder in any disaster situation,<br />

thereby emphasising the need for community level initiatives in managing disasters.<br />

To encourage such initiatives, the following are required:<br />

(i.) Education and Training and Information. Creating awareness through disaster<br />

education and training and information dissemination are necessary steps for<br />

empowering the community to cope with disasters.<br />

(ii.) Community Participation. Community based approach followed by most NGOs and<br />

Community Based Organisations (CBOs) should be incorporated in the disaster<br />

management system as an effective vehicle of community participation.<br />

(iii.) Identification of Vulnerable Groups. Within a vulnerable community, there exist<br />

groups that are more vulnerable like women and children, aged and infirm and<br />

physically challenged people who need special care and attention especially during<br />

disaster situations. Efforts are required for identifying such vulnerable groups and<br />

providing special assistance in terms of evacuation, relief, aid and medical attention to<br />

them in disaster situations. Management of disasters should therefore be an interface<br />

between a community effort to mitigate and prevent disasters as also an effort from the<br />

government machinery to buttress and support popular initiatives.<br />

(iv.) Personnel Training. Personnel involved in the exercise have to draw upon knowledge<br />

of best practices and resources available to them. Information and training on ways to<br />

better respond to and mitigate disasters to the responders go a long way in building the<br />

capacity and resilience of the country to reduce and prevent disasters. Training is an<br />

integral part of capacity building as trained personnel respond much better to different<br />

disasters and appreciate the need for preventive measures.<br />

The directions in this regard are:<br />

(i.)<br />

The multi-sectoral and multi-hazard prevention based approach to disaster management<br />

requires specific professional inputs. Professional training in disaster management<br />

should be built into the existing pedagogic research and education. Specialised courses<br />

for disaster management may be developed by universities and professional teaching<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 156


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

institutions, and disaster management should be treated as a distinct academic and<br />

professional discipline. In addition to separate diploma/degree courses in disaster<br />

management, the subject needs to be discussed and taught as a specific component in<br />

professional and specialised courses like medicine, nursing, engineering, environmental<br />

sciences, architecture, and town and country planning.<br />

(ii.) The focus towards preventive disaster management and development of a national<br />

ethos of prevention calls for an awareness generation at all levels. An appropriate<br />

component of disaster awareness at the school level will help increase awareness among<br />

children and, in many cases, parents and other family members through these children.<br />

Curriculum development with a focus towards dissemination of disaster related<br />

information on a sustained basis, covering junior, middle and high schools may be<br />

worked out by the different school boards in the country.<br />

Training and Capacity Building. Training facilities for government personnel involved in<br />

disaster management are conducted at the national level by the National Centre for Disaster<br />

Management (NCDM) at the Indian Institute of Public Administration, in New Delhi which<br />

functions as the nodal institution in the country for training, research and documentation of<br />

disasters. At the State level, disaster management cells operating within the State<br />

Administrative Training Institutes (ATIs) provide the necessary training. There is a need for<br />

strengthening specialised training, including training of personnel in disaster response.<br />

Capacity building should not be limited to professionals and personnel involved in disaster<br />

management but should also focus on building the knowledge, attitude and skills of a<br />

community to cope with the effects of disasters. Identification and training of volunteers<br />

from the community towards first response measures as well as mitigation measures is an<br />

urgent imperative. A programme of periodic drills should be introduced in vulnerable areas to<br />

enable prompt and appropriate community response in the event of a disaster, which can help<br />

save valuable lives. Capacity building for effective disaster management therefore needs to be<br />

grounded and linked to the community and local level responders on the one hand and also<br />

to the institutional mechanism of the State and the Nation on the other.<br />

Some of the areas where improvement is urgently needed are:<br />

<br />

<br />

<br />

<br />

Integrated planning for disasters, including the integration of relevant Armed Forces<br />

formations into disaster management planning at all levels from District to State and<br />

Central Government.<br />

Setting up of a modern, permanent national command centre or operations room, with<br />

redundant communications and data links to <strong>Dhanbad</strong>. The <strong>Dhanbad</strong> command centre<br />

or operations room needs to be manned on a 24-hour basis by professionals to cater for<br />

instant integrated response. There needs to be a properly equipped operations room at<br />

the State level as well.<br />

Establishment of a <strong>Municipal</strong> <strong>Corporation</strong> /District Level stand by, quick reaction team<br />

composed of experienced professionals. This team can be organized and run<br />

professionally on the same lines as the United Nations Disaster Assessment and<br />

Coordination (UNDAC) teams.<br />

Creation of urban search and rescue capacity at all levels, by establishing a fully equipped<br />

Search and Rescue unit, as part of the fire service in <strong>Dhanbad</strong>, with trained staff and<br />

modern equipment such as thermal imagers, acoustic detection devices etc. This is of<br />

immediate relevance since a major weakness exposed in the Gujarat earthquake was a<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 157


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

<br />

<br />

lack of specialised urban search and rescue capability in India.<br />

Media policy geared to handling the growing phenomenon of real time television<br />

reporting, which generates enormous political pressures on a government to respond<br />

rapidly and efficiently. This needs attention since the effect is going to increase, not<br />

decrease in future.<br />

Standard procedures for dealing with domestic humanitarian and relief assistance from<br />

non-government sources. Procedures and systems need to be set out to avoid confusion<br />

and ensure best utilisation of the assistance being offered, just as in the case of systems<br />

for international assistance.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 158


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

XI.<br />

DEMAND, SUPPLY, GAP ASSESSMENT OF SERVICE DELIVERY<br />

A. Rationale, Need and Demand<br />

Infrastructure Assessment of the <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> indicates inadequate<br />

Service levels, for current scenario which will further enhance given the future growth,<br />

<br />

<br />

<br />

<br />

<br />

Per Capita supply works out to be a low 66 lpcd for entire <strong>Municipal</strong> <strong>Corporation</strong><br />

area and in Urban Agglomeration area it is about 74 lpcd, based on Population figures<br />

for 2006, which is not ensured on continual basis. Owing to this, supply position<br />

within the <strong>Corporation</strong> is unpredictable;<br />

Absence of UGD system in the <strong>Corporation</strong> area leads to unhygienic living<br />

environment, dearth of sanitation facilities and inadequate and ill maintained public<br />

sanitation facilities in the city;<br />

ULB lacks scientific municipal solid waste treatment and disposal system catering to<br />

the waste collected;<br />

Surfaced roads within the ULB is approximately 54 percent; missing links, network<br />

deficiency and lack of traffic management systems causes congestion within the ULB<br />

area and reduces the Carrying Capacity of the roads;<br />

Drainage network of the city covers only 63 percent of the Road Length; which has<br />

been indicated as one of the major causes of water logging. The abysmal levels of<br />

Service therefore provide a strong basis and need for the Project.<br />

(i)<br />

Approach and Design Criteria.<br />

It is evident that, based on the above discussion there are inadequacy in service delivery to<br />

meet the current and future requirements. The <strong>Municipal</strong> <strong>Corporation</strong> should increase the<br />

level of coverage of all facilities, to meet the service norms based on CPHEEO Norms,<br />

UDPFI Norms or other applicable criteria. Based on this, considering the current deficits and<br />

the future requirements for the <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong>, strategies and action plan<br />

are suggested.<br />

(ii)<br />

Component Selection Criteria.<br />

The total investment in the ULB depends on several parameters like, the level of current basic<br />

needs, the city’s affordability, and the assessed implementation capacity of the city or its<br />

agencies. Overall, project component selection is Marjory influenced by affordability and<br />

implementation capacity. In the interest of integrated city development, another criterion<br />

considered in project component selection has been to ensure inter-sector linkages and<br />

optimization. For instance, water supply, sanitation and sewerage have been seen as a<br />

composite sector and not in isolation from each other.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 159


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

(iii)<br />

Least Cost Solutions and Component Selection.<br />

In formulating project components, the preferred option was developed based on least cost<br />

options, taking into account meeting service delivery targets, and whole-life costs, including<br />

considerations on achievable operation and maintenance arrangements, given available<br />

resources in terms of skills and facilities. Based on the considerations and screening referred<br />

to in the preceding section, priority components were selected and scrutinized and their<br />

financial, social and environmental impacts assessed to verify acceptability.<br />

1. Water Supply<br />

Considering the current deficits and the future requirements for water supply, the following<br />

design standards were adopted. For the provision of water supply the <strong>Dhanbad</strong> <strong>Municipal</strong><br />

<strong>Corporation</strong> should facilitate creation of capital assets so as to meet the future requirements.<br />

Design Standards. The <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> should increase the supply levels in<br />

terms of coverage, to achieve an average gross supply of 170 lpcd and to cater to 100 percent<br />

of the population. Assuming that distribution network is extended to more than 95 percent of<br />

the Roads within <strong>Corporation</strong> area, given very high population density within the <strong>Corporation</strong><br />

area, all the citizens will get a equitable supply.<br />

Table 94: Water Demand for the <strong>Dhanbad</strong><br />

Description Unit Norm Demand<br />

Projected Population (2026) Persons 24,29,044<br />

Percapita Supply Lpcd 170<br />

Total Water Requirement MLD 412.94<br />

Treatment Capacity Requirement MLD 100% 384.65<br />

Total Distribution Network km 95% 2,045.00<br />

Demand<br />

Source: Analysis.<br />

The total water demand and net surplus or deficit for the <strong>Municipal</strong> <strong>Corporation</strong> estimated<br />

for Base year (2006) and Ultimate Stage (2036) on standard gross water consumption rate of<br />

170 lpcd. Considering the ongoing maithon scheme demand gap has been worked out (77<br />

MLD and 230 km distribution network).<br />

Table 95: Demand, Supply, Gap Assessment for Water Supply System - 2026<br />

Description Unit Current<br />

Status<br />

Demand Surplus/(<br />

Deficit)<br />

Demand Surplus/(<br />

Deficit)<br />

2006 2026<br />

Raw Water MLD 189.60 256.74 (67.14) 412.94 (136.89)<br />

Pumping<br />

Raw Water MLD 189.60 248.72 (59.12) 400.04 (123.99)<br />

Transmission<br />

Water<br />

Treatment<br />

Plant<br />

MLD 189.60 239.15 (49.55) 384.65 (108.60)<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 160


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Description<br />

Clear Water<br />

Pumping<br />

Clear Water<br />

Transmission<br />

Service<br />

Storage<br />

Distribution<br />

System (1 km<br />

network Per<br />

2000 Persons)<br />

Road Overlay<br />

Cost<br />

Unit Current<br />

Status<br />

Demand Surplus/(<br />

Deficit)<br />

Demand Surplus/(<br />

Deficit)<br />

2006 2026<br />

MLD 189.60 234.46 (44.86) 377.11 (101.06)<br />

MLD 189.60 253.69 (64.09) 408.04 (131.99)<br />

ML 49.50 67.28 (17.78) 108.21 (131.99)<br />

Km 266.88 1,271.77 (1,004.88<br />

)<br />

2,045.51 (58.71)<br />

Km - 63.59 (63.59) 366.51 (1,778.63<br />

)<br />

2. Sewerage and Sanitation<br />

Contemplating the current deficiencies and the future requirements for Sewerage, the<br />

following strategies and action plan is suggested. For the provision of Under Ground<br />

Drainage system, the <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> should facilitate in creation of Capital<br />

Assets, so as to meet the future requirements.<br />

Design Standards. The DMC should increase the Service levels in terms of coverage, to achieve<br />

gross population coverage of 100 percent through protected Sewerage and Sanitation System<br />

with proper disposal facilities. Assuming that the Collection system is extended to more than<br />

100 percent of the Road Length, it is estimated that approximately 90 to 95 percent of the<br />

population will be covered under safe sewer system.<br />

Sewage Generation Demand. The total Sewage Generation in 2026 for a net water supply of 108<br />

lpcd is approximately 262.34 MLD (i.e., 80 percent of consumer end supply -135lpcd*0.80)<br />

indicating a creation of new system to cater the future requirements. The total Sewage<br />

Generation for 2026 is presented in Table 96.<br />

Table 96: Sewage Generation<br />

Description Units Sewage Generation<br />

Base year – 2006 MLD 163.10<br />

Intermediate stage – 2026 MLD 262.34<br />

Ultimate Stage – 2036 MLD 332.95<br />

Source: Analysis.<br />

The Project demand for 2026 is compared with the existing sewerage facilities in the city to<br />

verify the adequacy and need to augment the capacity of components. Proposed<br />

augmentation of required components of the system is indicated in Table 97.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 161


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Table 97: Demand, Supply, Gap Assessment for Sewerage System - 2026<br />

Description Unit Current<br />

Status<br />

Demand Surplus/(<br />

Deficit)<br />

Demand Surplus/(<br />

Deficit)<br />

2006 2026<br />

Sewage MLD - 163.10 (163.10) 262.34 (262.34)<br />

Treatment<br />

Plant<br />

Sewer<br />

Network<br />

Km - 1,208.18 (1,208.18<br />

)<br />

1,943.23 (1,943.23<br />

)<br />

Pumping MLD - 163.10 (163.10) 262.34 (262.34)<br />

Station<br />

Road Overlay<br />

Cost<br />

Km - 1,208.18 (1,208.18<br />

)<br />

1,943.23 (1,943.23<br />

)<br />

A comparison of various treatment technologies, their efficiencies with respect to cost is<br />

explained in the Table 98.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 162


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Table 98: Comparison of various Sewage Technologies<br />

Parameter Units TF ASP AL+MP OD Single Cell Multiple Cell UASP+MP<br />

WSP WSP<br />

Detention Time 1 Day 4 to 6 hr 3 to 5 hr 1 Day 20 to 30 Days 6 to 10 Days 2 to 4 Days<br />

Land Required Ha/MLD 0.3 0.25 0.5 0.3 2 to 3 1 to 2 0.6 to 1<br />

Method of Oxygen<br />

Atmospheric Mechanical Mechanical Mechanical Biological Biological Not Required<br />

Supply<br />

(Algae) (Algae)<br />

Power Required Kw/MLD 180 250 300 400 Nil Nil 120<br />

Ease of Operation Simple Difficult Simple Simple Very Simple Very Simple Simple<br />

Skill for O&M High High Moderate Moderate Low Low Moderate<br />

Capital Cost<br />

Rs. 30.0 35.0 20.0 20.0 6.0 8.0 20.0<br />

Lakh/MLD<br />

Annual O&M Cost Medium High High Medium Very Low Very Low Low<br />

Reliability Good Least Good Good Very Good Very Good Good<br />

FC Removal % 90-96% 90-96% 95-98% 95-98% 98-99% 98-99% 95-99%<br />

Note: TF – Trickling Filter, ASP – Activated Sludge Process, AL – Aerated Lagoon, OD – Oxidation Ditch, WSP – Waste Stabilization Pond, UASP – Upflow<br />

Anaerobic Sludge Blanket, MP – Maturation Pond<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 163


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

3. Storm Water Drainage<br />

Approach and Design Criteria. The <strong>Municipal</strong> <strong>Corporation</strong> should increase the Service levels in<br />

terms of coverage, to achieve coverage of 150 percent of Road Length, through built drains.<br />

The DMC is recommended to adopt strategy for rejuvenation of Lakes and Ponds, to be used<br />

as sources for re-charging and as Summer Storage, and through networking of Water Bodies,<br />

to increase Water Sustainability.<br />

The Drainage demand for 2016, based on 150 percent Road Length is approximately 1,957<br />

kms, as against a minimal Service level of 18 percent for 2005.<br />

Table 99: Drainage System Demand<br />

Description Units Demand<br />

Remodeling of Existing kutcha Drains Km 300<br />

Formation of New Drains Km 2,150<br />

Desilting of Primary Drains Km 75<br />

Source: Analysis.<br />

The Project demand for 2016 is compared with the existing storm water drainage facilities in<br />

the city to verify the adequacy and need to augment the capacity of components. Proposed<br />

augmentation of required components of the system is indicated in Table 100.<br />

Table 100: Demand, Supply, Gap Assessment for Drainage System - 2016<br />

Description Unit Current<br />

Status<br />

Demand Surplus/(<br />

Deficit)<br />

Demand Surplus/(<br />

Deficit)<br />

2006 2016<br />

Upgradation of Drains<br />

Kutcha to Km 100.00 (100.00)<br />

Pucca Open<br />

Kutcha to Km 135.00 (135.00)<br />

Pucca Closed<br />

Pucca Open to Km 65.00 (65.00)<br />

Pucca Closed<br />

New formation of Drains<br />

Pucca Open Km 260.94 755.94 (495.00) 1,120.94 (860.00)<br />

Drains<br />

Pucca Closed<br />

Drains<br />

Km 125.39 865.39 (740.00) 1,415.39 (1,290.00<br />

)<br />

Desilting of Primary Drains<br />

Desilting of Km 75.00 (75.00)<br />

Primary<br />

Drains<br />

4. Solid Waste Management<br />

Approach and Design Criteria. The DMC should increase the Service levels to meet the Norms<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 164


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

recommended by Solid Waste Handling Rules, 2000. The ULB should achieve 100 percent<br />

coverage, through Door-to-Door Collection and Segregation of Waste at Source.<br />

The total Solid Waste Generation in 2006 for a Per Capita Generation of approximately 300<br />

grams/day is estimated at 440 MT, indicating a priority need for Scientific Disposal of Waste.<br />

Since, the Population Density of the ULB is high, the Waste generation has been considered<br />

at 300 grams/day (assumed waste generation), against the generation and the demand for<br />

future is assessed. The total Solid Waste Generation for 2026 is estimated at 776 MT. The<br />

Present Disposal system is Open Waste Dumping, which is creating potential health and<br />

environment hazard considering the quantity of waste generation, location of disposal site and<br />

its environs, hence further option for Scientific Waste Disposal and Composting can be<br />

explored on priority basis. The details of Service Levels for future are presented in Table 101.<br />

Table 101: Solid Waste system Demand<br />

Description<br />

Unit<br />

Based on CPHEEO Norms<br />

2026<br />

Population In Lakh 24.29<br />

Per capita Waste Generation Grams/day 300<br />

Collection Type -<br />

Door-to-Door Collection and<br />

Segregation of Waste at Source<br />

Collection Demand Percent of Generation 100<br />

Vehicle Capacity Adequacy Percent of Rated Capacity 100<br />

Treatment Type -<br />

Composting of Waste &<br />

Sanitary Landfill<br />

Treatment Demand Percent of Generation 100<br />

Total Solid Waste Generation MT 776<br />

Source: Analysis.<br />

The Project demand for 2026 is compared with the existing solid waste management<br />

infrastructure, to verify the adequacy and need to augment the capacity of components.<br />

Proposed augmentation of required components of the system is indicated in Table 102.<br />

Table 102: Demand, Supply, Gap Assessment for Solid Waste Management System - 2026<br />

Description Unit Current<br />

Status<br />

Demand Surplus/(<br />

Deficit)<br />

Demand Surplus/(<br />

Deficit)<br />

2006 2026<br />

Primary Collection vehicles<br />

Push Carts Nos 129 1,267 (1,438) 3,239 (3,110)<br />

Requirement<br />

Containerized Nos 3 1,817 (1,814) 3,014 (3,011)<br />

Tricycle<br />

Secondary Collection<br />

Dumber Bins Nos - 203 (203) 349 (349)<br />

Requirement<br />

Transportation Vehicles<br />

Dual Load Nos 33 51 18 87 (54)<br />

Dumper<br />

Placer<br />

Disposal Site<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 165


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Description<br />

Landfill Site<br />

Development<br />

Compost<br />

Facility<br />

Development<br />

Unit Current<br />

Status<br />

Demand Surplus/(<br />

Deficit)<br />

Demand Surplus/(<br />

Deficit)<br />

2006 2026<br />

TPD 465.85 (465.85)<br />

TPD 310.56 (310.56)<br />

5. Urban Transport<br />

Traffic Management Plan. These shall focus of junction improvements, traffic management<br />

within core areas of the city, regional level proposals, parking and pedestrian facilities. It has<br />

been observed that, in most of the major roads in the city pedestrians are forced to use the<br />

carriageway due to the absence of footpaths. Footpaths of 1.5 m wide are proposed along the<br />

major roads where heavy pedestrian movements are observed. For traffic safety and<br />

convenience, appropriate signs, markings, lighting, guideposts are required to be provided on<br />

curves, intersections, public utility places, etc. Proposals for road furniture are made<br />

considering the importance of the road, safety and aesthetic. The design of the road furniture<br />

and quality proposed are of international standards. It is proposed to provide the following<br />

road furniture for the roadway;<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

Kilometer stones on the major roads<br />

200 m Furlong stones<br />

Road painting using reflectorized thermoplastic road painting<br />

High intensity grade informatory, regulatory and cautionary sign boards<br />

Street lights on all major roads within the municipal limits, which have been considered<br />

for improvement<br />

High mast lighting at all major junctions<br />

Stop signs<br />

Place identification signs<br />

Proposals under Traffic and Transportation focus at improving Citywide transportation<br />

network and linkages, and Provision of City and Regional Level Transport facilities.<br />

Improvement of Core City Areas is proposed in terms of Pedestrianisation, Signages and<br />

Strengthening. Traffic Network is strengthened through provision of Internal Ring Road<br />

within the ULB area, through widening and strengthening of existing alignment, connection<br />

of incomplete linkages, construction of Flyover, Bridges and ROB/RUB’s.<br />

Proposed Parking areas are as follows;<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

Purana Bazar<br />

Bank More<br />

On Katras Road – JP Chawk towards Matkuria<br />

On Katras Road – JP Chawk towards Rajkamal School<br />

Maya Bazar<br />

Park Market Heerapur<br />

Shranik Chawk – Gaya Bridge<br />

Shranik Chawk – Railway Station<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 166


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

<br />

<br />

Textile Market<br />

Saraidhela Market<br />

Road Widening Warrant<br />

<br />

<br />

<br />

<br />

<br />

NH 32 to 6 lanes from Mahuda to GT Road<br />

JP Chawk to Sindri to 6 lanes<br />

Subhash Chawk to Bhuli township to 4 lane<br />

Barmasia Phatan to Dhansar Road to 4 lane<br />

Hatia to Barmasia Phatak to 4 lane<br />

Bus and Truck parking warrant at;<br />

<br />

<br />

<br />

Improvement to existing bus terminus<br />

Near Gobinpur<br />

Jharia & Rajganj<br />

Following road requires medians;<br />

<br />

<br />

<br />

<br />

<br />

Median at Station to Sindri – Jahria Road<br />

Railway station to Gobinpur<br />

Shramik chawk to sarbadda via combined building<br />

Randher verma chawk to combined building<br />

JP Chawk to Mahuda<br />

Improvements to major and minor junctions are also proposed in terms of geometry, traffic<br />

management, lighting and signages. Some of the important junctions are as follows;<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

ISM Gate<br />

Matkuria<br />

Puja Talkies<br />

Bank More ( JP Chawk and BM Chawk)<br />

Near Rajkamal School, Jharia Road<br />

Near <strong>Dhanbad</strong> Police Station on Bridge<br />

Near R.S College, Jharia<br />

Uparkuli, Sindri Road<br />

Kenduadih Road, Godhar<br />

Kenduadih Petrol Pump<br />

Putki Bridge<br />

The Project demand for Roads for 2016 is compared with the existing Road Infrastructure, to<br />

verify the adequacy and need to augment the capacity of components. The future trend of<br />

road network development is envisaged based on population growth and land use; efficient<br />

system of road network; segregation of traffic; designalizing of junction; and Upgradation,<br />

widening and strengthening of major junctions and corridors. Projected road demand, for<br />

internal city roads, for 2016 is indicated in Table 103.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 167


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Table 103: Demand, Supply, Gap Assessment for Roads - 2016<br />

Description Unit Current<br />

Status<br />

Demand Surplus/(<br />

Deficit)<br />

Demand Surplus/(<br />

Deficit)<br />

2006 2016<br />

Total Road Length<br />

Concrete Km 298.48<br />

BT Road Km 320.05<br />

WBM Km 61.25<br />

Cut<br />

Km 260.35<br />

Stone/Earthen<br />

/Others<br />

Strengthening of Existing Roads<br />

Concrete Km (150) -<br />

BT Road Km (195) -<br />

WBM Km (35) -<br />

Upgradation of Existing Roads<br />

BT to Km - (165) -<br />

Concrete<br />

WBM to BT Km - (25) -<br />

Earthen to BT Km - (135) -<br />

New Formation of Roads<br />

Concrete Km (14) (45)<br />

BT Km (228) (750)<br />

WBM Km (27) (90)<br />

6. Street Lighting<br />

The ULB should increase the density of Street lights and the coverage along the roads<br />

depending upto usage and population density, to achieve an overall 100 percent of the Road<br />

Length. Given the high density of population within the ULB area, and also limited area for<br />

development, it is proposed to emphasize High Power Fixtures and Complete n to Tube<br />

Lights.<br />

The strategic intervention in this sector is in increasing the number of lamp posts in the wards<br />

identified to reduce the average spacing between lamp posts in the town to below 30 mt.<br />

Higher density area and commercial areas are proposed to be addressed to with specific<br />

interventions. Further, measures are also to minimize the power consumption charges which<br />

are observed to be on the higher side from the statement of accounts.<br />

Further, to improve upon the O&M of the street lighting it is recommended to mechanism<br />

the system and involve private sector in the same. The mechanization would be towards<br />

introducing dimming systems during non peak hours of operation to reduce the power<br />

consumption.<br />

The Project demand for 2016 is compared with the existing Streetlight Infrastructure, to<br />

verify the adequacy and need to augment the capacity of components. Proposed<br />

augmentation of required components of the system is indicated in Table 104.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 168


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Table 104: Demand, Supply, Gap Assessment for Street Lights - 2016<br />

Description Unit Current<br />

Status<br />

Demand Surplus/(<br />

Deficit)<br />

Demand Surplus/(<br />

Deficit)<br />

2006 2016<br />

Replacement of Existing Fixtures<br />

Tube Lights Nos 2,381 (1,195)<br />

High Power Nos 20 (10)<br />

fixtures<br />

High Mast Nos 909 (710)<br />

Lamps<br />

Others Nos 251 -<br />

Provision of New Fixtures<br />

Tube Lights Nos 23,190 (20,809) 35,632 (34,612)<br />

High Power Nos 313 (293) 482 (462)<br />

fixtures<br />

High Mast Nos 7,835 (6,926) 12,045 (11,352)<br />

Lamps<br />

Power Saver Nos 300 (300)<br />

Switches<br />

Table 105: Basic Infrastructure and Housing Requirement for Urban Poor<br />

Description Unit Surplus/(Deficit)<br />

Housing for Urban Poor Nos 50,000<br />

Water Distribution Network Km 150<br />

No of Public Stand Posts Nos 200<br />

New Sewer Network Km 200<br />

No of Public Toilets Nos 50<br />

No of Public Urinals Nos 100<br />

No of Storage points Nos 20<br />

No of Additional Tricycles Nos 50<br />

No of Push Carts Nos 100<br />

Road Improvement Nos 150<br />

Storm Water Drainage Nos 100<br />

Street Lighting Nos 1000<br />

Educational Facilities Nos 10<br />

Health Facilities Nos 25<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 169


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

XII. CAPITAL INVESTMENT PLAN & FINANCING STRATEGY<br />

A. Concept Plan for Proposed Investment<br />

Based on the population growth, demand gap assessment has been carried out for the entire<br />

city on a comprehensive framework. The proposed investment is phased out based on the<br />

demand for each infrastructure requirements for the city to reach the envisaged vision. Since<br />

some of the areas in the New <strong>Municipal</strong> <strong>Corporation</strong> area is growing faster than the average<br />

population growth of DMC and owing to the Jharia Rehabilitation proposals new areas are<br />

coming up towards proposed Jharia rehabilitation townships. Hence, considering the<br />

constrains for future developments due to the Jharia underground fire and mining activity in<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> area and based on the future growth potentials the entire<br />

<strong>Municipal</strong> <strong>Corporation</strong> area is divided into five Blocks/zones. The high potential zone for<br />

future development and as well as demand for infrastructure comprises of erstwhile <strong>Dhanbad</strong><br />

<strong>Municipal</strong>ity, <strong>Dhanbad</strong> Sadar Block and Govindpur Block part. In Jharia Block mainly<br />

rehabilitation of infrastructure facilities have been proposed (for Jharia NAC area) and for<br />

other areas in the same block like Sindri, Jamadoba, Tirsa and Bagatdih etc new investment is<br />

proposed (for new asset creation) since Jharia area has to be rehabilitated due the<br />

underground fire, unsuitable for future developments and mining activity for which BCCL is<br />

working on rehabilitation progrmme for entire Jharia Coal Field.<br />

Since the entire area of <strong>Municipal</strong> <strong>Corporation</strong> is fairly larger area, zoning concept has been<br />

adopted. For each zone/block separate water supply scheme/system, sewerage system has<br />

been proposed to take care of the zonal needs. Details of the zone wise proposed investment<br />

is given in annexure.<br />

B. Capital Investment Plan<br />

1. Urban Planning & Growth Management<br />

Proposed investment required in urban planning and growth management sector is Rs. 300<br />

lakh. This includes the preparation of Master Plan/ Land use plan for the entire new<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> Area and preparation of micro level development plans or<br />

town planning schemes for the city.<br />

2. Water Supply<br />

Proposed Project component for Water Supply to <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> broadly<br />

classified in to two categories namely, Existing System Refurbishment and System<br />

Augmentation works. The Detailed Project Reports (DPRs) for some of the components of<br />

refurbishment and augmentation works are available with DMC. Same has been adopted and<br />

besides that based on the demand supply gap analysis new projects were identified to meet<br />

the growing demand. In Table 106 identified projects under water supply sector is presented.<br />

Total cost of refurbishment is Rs. 2,102.80 lakh which include desilting of Topchanchi Lake,<br />

rehabilitation of water treatment plants, replacement of old and worn out clear water, raw<br />

water and distribution system. To control the leakage and unaccounted for Water (UFW),<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 170


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

detailed study is proposed at bulk water supply system and distribution system. To meet the<br />

future demand source augmentation, construction of treatment plants, extending the<br />

distribution network reach to un covered areas in the city and 24/7 water supply also<br />

proposed on pilot basis. Total investment proposed in system augmentation work is Rs.<br />

33,913.92 lakh and total project in water supply sector cost including preparation of Technical<br />

Assistance, Preparation of Detailed Project Reports & Project Management consultancy work,<br />

GIS Mapping, asset management plan, conducting technical study and recycle and use of<br />

abandoned mines in the city for storage purposes is Rs. 38,116.71 lakh.<br />

Table 106: Identified Projects in Water Supply Sector<br />

Description<br />

Unit Cost<br />

(Rs. Lakh)<br />

Gap Amount (Rs.<br />

Lakh)<br />

System Refurbishment<br />

De-silting of Topchanchi Lake DPR 827.80<br />

Rehabilitation of Jamadoba Water<br />

100.00 100.00<br />

Treatment Plant including Electrical and<br />

Pumping Machineries<br />

Rehabilitation of Topchanchi Water<br />

50.00 50.00<br />

Treatment Plant<br />

Replacement of old and worn-out Clear<br />

450.00<br />

Water & Raw Water Mains<br />

Replacement of Existing old<br />

380.00<br />

Distribution System<br />

Repair Works to Sindri Water Treatment 25.00 25.00<br />

Plant<br />

Leak Detection Survey and Reduction<br />

Measures<br />

Water Audit and Leak Detection of Bulk<br />

20.00<br />

Water supply System<br />

Water Audit and Leak Detection of<br />

250.00<br />

Distribution System<br />

Sub Total Water Supply System<br />

2,102.80<br />

Refurbishment<br />

System Augmentation<br />

Katras Urban Water Supply Scheme – DPR 870.90<br />

Phase I<br />

Katras Urban Water Supply Scheme – DPR 921.84<br />

Phase –II<br />

Improvement in Kusunda – Katras & DPR 48.50<br />

Bhuli Township<br />

Improvement of Water Supply – Jharia DPR 1,597.30<br />

coal fields including <strong>Dhanbad</strong> Town –<br />

Phase – I<br />

Improvement of Water Supply in Jharia DPR 183.15<br />

Coalfields including <strong>Dhanbad</strong> Town–<br />

Phase – II<br />

Katras Urban Water Supply – Phase III DPR 1,354.00<br />

Raw Water Pumping Main 10.00 136.89 1,368.87<br />

MLD<br />

Raw Water Transmission 5.00 124.00<br />

MLD<br />

619.94<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 171


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Description<br />

Unit Cost<br />

(Rs. Lakh)<br />

Gap Amount (Rs.<br />

Lakh)<br />

Augmentation of Water Treatment Plant 30.00 108.60 3,258.04<br />

MLD<br />

Clear Water Pumping 15.00 101.06 1,515.89<br />

MLD<br />

Clear Water Transmission 5.00 132.00 659.94<br />

MLD<br />

Construction of Storage Reservoirs 55.00 58.71 ML 3,229.26<br />

Extension of Distribution Network<br />

10.00 1,778.00 17,786.29<br />

System<br />

Km<br />

24/7 Water Supply – Piloting Project 500.00<br />

Sub Total – Water Supply System<br />

33,913.92<br />

Augmentation<br />

Preparation Technical Studies and DPRs<br />

700.00<br />

& Project Management Consultancy<br />

(PMC)<br />

Mapping and GIS 200.00<br />

Asset Management Plan 100.00<br />

Conducting Technical Feasibility Study<br />

100.00<br />

for using abandoned mines as Storage<br />

tanks/Treatment plants/Reuse of Pit<br />

Water<br />

Converting Abandoned Open Cast<br />

1,000.00<br />

Mines for Drinking Water Storage<br />

Tanks<br />

Grand Total – Water Supply System 38,116.71<br />

3. Sewerage and Sanitation<br />

Proposed projects in sewerage and sanitation sector were identified based on the future<br />

demand. In this sector proposals are to create new under ground sewerage system for<br />

<strong>Dhanbad</strong>, which include creation of treatment plant, laying of sewer networks, intermediate<br />

pumping stations and road over lay cost also has been considered for road restoration works<br />

after laying sewer networks. In sanitation sector it is proposed to construct 100 nos of public<br />

toilets across various locations in the city. Total proposed investment is Rs. 52,480.08 lakh,<br />

which also includes Preparation of DPRs & Project Management costs, GIS Mapping of<br />

proposed sewer system and awareness campaign.<br />

Table 107: Identified Projects in Sewerage System Development Works<br />

Description<br />

Unit Cost<br />

(Rs. Lakh)<br />

Gap Amount (Rs.<br />

Lakh)<br />

System Augmentation<br />

Laying of Sewer Networks 10.00 1,943 km 19,432.25<br />

Construction of Sewerage Treatment 35.00 262.34 MLD 9,181.79<br />

Plant<br />

Intermediate Pumping Stations 8.00 262.34 MLD 2,098.69<br />

Road Overlay Cost 10.00 1,943 km 19,432.35<br />

Sub Total – Sewerage System 50,145.08<br />

Construction of Public Toilets 5.00 100 Nos 500.00<br />

Preparation of DPRs & PMC 1,500.00<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 172


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Asset Management Plan 100.00<br />

Mapping and GIS 200.00<br />

Awareness Campaign 35.00<br />

Grand Total – Sewerage System 52,480.08<br />

4. Solid Waste Management<br />

Proposed projects identified in Solid water Management component consist of procurement<br />

of additional primary collection vehicles, secondary collection vehicles, and transportation<br />

vehicles like Dual loaded dumped placers. For scientific disposal of waste generated in city,<br />

development of Landfill sites for non-recyclable solid waste disposal and Compost site<br />

development for recyclable wastes. Total capital investment proposed in this component is<br />

Rs. 5,596.09, the detailed breakup is presented in Table 108.<br />

Table 108: Proposed Projects in Solid Waste Management<br />

Description<br />

Unit Cost<br />

(Rs. Lakh)<br />

Gap<br />

Amount (Rs.<br />

Lakh)<br />

System Augmentation<br />

Primary Collection Vehicles<br />

Additional Pushcarts 0.07 2,903 Nos 209.02<br />

Containerized Tricycles 0.08 2,345 Nos 187.60<br />

Secondary Collection<br />

Additional Dumber Bins 0.55 266 Nos 146.30<br />

Transportation Vehicles<br />

Dual Loaded Dumper Placers 10.00 34 Nos 340.00<br />

Disposal Facilities<br />

Land Fill Site Development 8.00 466 TPD 3,726.76<br />

Compost Site Development 2.50 311 TPD 776.41<br />

Medical Waste Management<br />

Incineration Plants 1 No 25.00<br />

Preparation of DPRs & PMC 150.00<br />

IEC Activities 35.00<br />

Grand Total – Solid Waste<br />

Management<br />

5. Storm Water Drainage<br />

5,596.09<br />

The proposed investment for storm water drainage sector includes upgradation and<br />

remodeling of kutcha to pucca drains, open drains to closed drains and formation new drains<br />

in uncovered areas in the city. The total investment proposed in this sector is Rs. 37,070.00<br />

lakh and the same is detailed out in Table 109.<br />

Table 109: Investment Proposed in Storm Water Drainage<br />

Description<br />

Unit Cost<br />

(Rs.<br />

Lakh)<br />

Gap<br />

Amount (Rs.<br />

Lakh)<br />

Upgradation/Remodeling of<br />

Kutcha to Pucca Drains<br />

Kutcha to Pucca Open 12.00 100 km 1,200.00<br />

Kutcha to Pucca Closed 17.00 135 km 2,295.00<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 173


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Description<br />

Unit Cost<br />

(Rs.<br />

Lakh)<br />

Gap<br />

Amount (Rs.<br />

Lakh)<br />

Pucca Open to Pucca Closed 5.00 65 km 325.00<br />

New Formation<br />

New Pucca Open Drains 12.00 860 km 10,320.00<br />

New Pucca Closed Drains 17.00 1,290 km 21,930.00<br />

Sub Total – Storm Water Drainage<br />

36,070.00<br />

System<br />

Preparation of DPRs & PMC 1,000.00<br />

Grand Total – SWD 37,070.00<br />

Primary Drainage<br />

For strengthening of primary drainages in the city Rs. 1,900.00 lakh is proposed. The details<br />

are presented in Table 110.<br />

Table 110: Investment Proposed in Primary Drainage<br />

Description<br />

Unit Cost<br />

(Rs. Lakh)<br />

Strengthening of Natural Drains<br />

/ Channels<br />

Matkuria Nallah<br />

Kantra Nallah (Jharia Nallah)<br />

Manitind Nallah<br />

Katri Nadhi<br />

Jamunia Nadhi<br />

Gap<br />

Amount (Rs.<br />

Lakh)<br />

25.00 75 km 1,875.00<br />

Kodhiya Nadhi<br />

Sub Total – Primary Drainage 1,875.00<br />

Preparation of DPRs 25.00<br />

Grand Total – Primary Drainage 1,900.00<br />

6. Urban Transport<br />

The proposed investments in road improvement works consist of strengthening<br />

/improvement to existing roads, upgradation of roads, widening of sub arterial roads in the<br />

city and new formation of roads in extension areas to maintain a better circulation pattern.<br />

The investment proposed in road improvement works is Rs. 25,621.00 lakh. The details are<br />

presented in Table 111.<br />

Table 111: Proposed Road Improvements<br />

Description<br />

Unit Cost<br />

(Rs. Lakh)<br />

Gap<br />

Amount (Rs.<br />

Lakh)<br />

Strengthening /Improvement to<br />

Existing Roads<br />

Concrete Roads 5.00 150 km 750.00<br />

Black Top (BT Roads) 7.00 193 km 1,365.00<br />

WBM 5.00 31 km 175.00<br />

Upgradation of Existing Roads<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 174


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

BT to Concrete 30.00 165 km 4,950.00<br />

WBM to BT 15.00 25 km 375.00<br />

Earthen to BT 20.00 135 km 2,700.00<br />

Widening of Roads<br />

Widening of Sub arterial Roads 10.00 285 km 2,850.00<br />

New Formation of Roads in<br />

Extension areas<br />

Concrete 50.00 45km 600.00<br />

Black Top 32.00 750 km 6,496.00<br />

WBM 15.00 90 km 360.00<br />

Sub Total – Road Improvement 20,621.00<br />

Preparation of all DPRs & PMC 5,000.00<br />

Grand Total – Road Improvement 25,621.00<br />

The proposed widening of arterial roads include widening of NH32, JP chawk to Sindri to 6<br />

lanes and roads from Subhash Chawk to Bhuli Township, Barmais Phatak to Dhansar Road<br />

and Hatia to Barmasia Phatak to 4 lanes. Total investment proposed in widening of arterial<br />

roads is Rs. 14,400.00 lakh.<br />

Table 112: Widening of Arterial Roads -Proposed Investment<br />

Description<br />

Unit Cost<br />

(Rs. Lakh)<br />

Widening of Arterial Roads<br />

NH 32 to 6 lanes from Mahuda to GT<br />

Road<br />

Gap<br />

Amount (Rs.<br />

Lakh)<br />

200.00 30 km 6,000.00<br />

JP Chawk to Sindri to 6 lanes 200.00 22 km 4,400.00<br />

Subhash Chawk to Bhuli township to 4 200.00 10 km 2,000.00<br />

lane<br />

Barmasia Phatak to Dhansar Road to 4 200.00 7 km 1,400.00<br />

lane<br />

Hatia to Barmasia Phatak to 4 lane 200.00 3 km 600.00<br />

Grand Total – Widening of Arterial<br />

Roads<br />

14,400.00<br />

There are 22 major and 25 minor junctions are proposed for improvements with automatic<br />

singanlization, improved geometric condition of junctions and other works with a total<br />

investment of Rs. 925.00 lakh, the same is given in Table 113.<br />

Table 113: Proposed Junction Improvements<br />

Description Gap Amount (Rs. Lakh)<br />

Junction Improvements<br />

Major Junctions<br />

ISM Gate 1 No 25.00<br />

Matkuria 1 No 25.00<br />

Puja Talkies 1 No 25.00<br />

Bank More 1 No 25.00<br />

Near Rajkamal School on Jharia Road 1 No 25.00<br />

Near <strong>Dhanbad</strong> Police Station on Bridge 1 No 25.00<br />

Near RS College, Jharia 1 No 25.00<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 175


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Description Gap Amount (Rs. Lakh)<br />

Uparkuli on Sindri Road 1 No 25.00<br />

Kenduadih Road, Godhar 1 No 25.00<br />

Kenduadih Petrol Pump 1 No 25.00<br />

Putki Bridge 1 No 25.00<br />

Puja Talkies (Sahid Raju Chawk) 1 No 25.00<br />

Near Puja Talkies at Railway Station Road<br />

1 No 25.00<br />

Intersection<br />

Steel Gate Intersection 1 No 25.00<br />

Katras – Main Market at Railway Station<br />

1 No 25.00<br />

Intersection<br />

Jharkhand More – along NH-2 Towards Barwadda 1 No 25.00<br />

NH2 and NH 32 Intersection towards Bhuiphore 1 No 25.00<br />

Mandir<br />

NH 32 and SH Hirak Intersection 1 No 25.00<br />

Hirak Point 1 No 25.00<br />

Godhar More – Kusunda Rly. Station Intersection 1 No 25.00<br />

Karkend , Katras – <strong>Dhanbad</strong> – Bokaro<br />

1 No 25.00<br />

Intersection<br />

Karkend – Jharia Intersection 1 No 25.00<br />

Minor Junctions<br />

Improvement to Minor Junctions in DMC area 25 Nos 375.00<br />

Grand Total – Junction Improvements 925.00<br />

The total investment proposed for under ground utility ducting and provision of medians<br />

along major traffic corridors in the city is Rs. 3,075.00 lakh.<br />

Table 114: Proposed Corridors for Under Ground Utility Ducts and Medians<br />

Description<br />

Unit Cost<br />

(Rs. Lakh)<br />

Requirement Amount (Rs.<br />

Lakh)<br />

Railway Station to Sindri – Jharia<br />

50.00 25 km 1,250.00<br />

Road<br />

Railway Station to Gobindpur 50.00 13 km 650.00<br />

Shramilk Chawk to Sarbadda via<br />

50.00 10 km 500.00<br />

Combined Building<br />

Randher Verma Chawk to Combined 50.00 1.50 km 75.00<br />

Building<br />

JP Chawk to Madhuda 50.00 12 km 600.00<br />

Grand Total – UG Utility Ducts &<br />

Medians<br />

3,075.00<br />

There are 5 locations identified for pedestrian subways and pedestrian crossing with a total<br />

investment of Rs. 700 lakh.<br />

Table 115: Proposed Pedestrian Subways & Pedestrian Crossings<br />

Description Requirement Amount (Rs. Lakh)<br />

Near Kachehari 1 No 200.00<br />

Between Birsa Chawk and JP Chawk 1 No 200.00<br />

Near JP Chawk on NH 2 1 No 100.00<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 176


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Description Requirement Amount (Rs. Lakh)<br />

Near MADA Office 1 No 100.00<br />

Sindri Road Near Sri Ram Plaza 1 No 100.00<br />

Grand Total – Pedestrian Subways &<br />

Pedestrian Crossing<br />

700.00<br />

The total investment proposed for construction of ROB, widening of ROB, Flyovers and<br />

elevated highways is to the tune of Rs. 16,250.00 Lakh. The elevated highway is proposed at<br />

Bank more and from railway station to ROB to decongest the core city.<br />

Table 116: Proposed Bridges and Elevated Highways & its Costing<br />

Description Requirement Amount (Rs. Lakh)<br />

ROB at Barmasia Phatak 1 No 1,250.00<br />

Widening of Gaya Pul RUB to 6 Lane 1 No 500.00<br />

Elevated Highways 3 km 9,000.00<br />

Flyovers 2 Nos 5,500.00<br />

Grand Total – Bridges and Elevated<br />

Highways<br />

16,250.00<br />

The following table presents the list of proposed parking lots and with a total investment of<br />

Rs. 1,000 lakh.<br />

Table 117: Proposed Parking Locations<br />

Description Gap Amount (Rs. Lakh)<br />

Parking Lots<br />

Purana Bazar 1 No 70.00<br />

Bank More 1 No 100.00<br />

On Katras Road – JP Chawk Towards<br />

1 No 70.00<br />

Matkuria<br />

On Katras Road – JP Chawk Towards<br />

1 No 70.00<br />

Rajkamal School<br />

Naya Bazzar 1 No 70.00<br />

Park Market at Hirapur 1 No 70.00<br />

Sharnik Chawk at Gaya Bridge 1 No 70.00<br />

Sharnik Chawk at Railway Station 1 No 70.00<br />

Near Textile Market 1 No 70.00<br />

Near Saridhela Market 1 No 70.00<br />

Near Petrol Pump Chawk to Bata More<br />

1 No 70.00<br />

(Jharia)<br />

Bata More – Jharia Bus Stand 1 No 70.00<br />

Near Katras Market 1 No 70.00<br />

Near Katras Railway Station 1 No 60.00<br />

Grand Total – Parking Lots 1,000.00<br />

To release the heavy moving trucks and through traffic which are presently using inner city<br />

roads, ring road and bypass road is proposed with a total investment of Rs. 16,800 lakh.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 177


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Table 118: Proposed Bypass and Ring Roads<br />

Description Gap Amount (Rs. Lakh)<br />

Bypass from Barbadda (<strong>Dhanbad</strong>)(@NH2, 6 km 1,800.00<br />

399.00km) to Godhar(@NH32, 16.00km)<br />

Ring Road 50 km 15,000.00<br />

Grand Total – Bypass & Ring Road 16,800.00<br />

Table 119: Proposed Bus Terminus and Transport Nagar Investments<br />

Description Requirement Amount (Rs. Lakh)<br />

Bus Terminus at Bartand (Existing) 1 No 5,000.00<br />

New Bus Terminus at near Barwadda 1 No 5,000.00<br />

Transport Nagar at Pandukki (along NH2) 1 No 7,500.00<br />

Grand Total – Bus and Truck Terminus 17,500.00<br />

7. Street Lighting<br />

The proposed projects in street lighting include replacement repaired and old tube fixtures<br />

and installation of new fixtures as per standards. To curtail the energy consumption in street<br />

lighting sector power saving switches has been proposed. Total investment in street lighting is<br />

Rs. 5,656.57 lakh.<br />

Table 120: Proposed Investments in Street Lighting Sector<br />

Description<br />

Unit Cost<br />

(Rs. Lakh)<br />

Gap<br />

Amount (Rs.<br />

Lakh)<br />

Replacement of Existing Fixtures<br />

Tube Light 0.05 1,195 Nos 59.75<br />

High Power 5.00 10 Nos 50.00<br />

High Mast Lamps 0.05 710 Nos 71.00<br />

Provision of New Fixtures<br />

Tube Light 0.05 34,612 Nos 1,730.58<br />

High Power 5.00 462 Nos 2,310.00<br />

High Mast Lamps 0.05 11,352 Nos 1,135.24<br />

Power Saver Switches 1.00 300 Nos 300.00<br />

Grand Total – Street Lighting 5,656.57<br />

8. Urban Environment, City Beautification and Tourism Development<br />

To improve the living environment in the city, list of projects have been proposed which<br />

include afforestration, river front development at Damodar River, developing green belt for<br />

Noise attenuation along major transportation corridors and development of biological parks<br />

at Dhangi Pahad. Total investment proposed for urban environmental improvement is Rs.<br />

4,850.00 lakh. For beautification of city and development of tourism Topchanchi lake<br />

beautification, development of parks at various locations in the city has been proposed. Total<br />

investment proposed under Urban Environment improvement, city Beautification and<br />

tourism development is to tune of Rs. 1,950.00 lakh. The details are presented in Table 121.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 178


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Table 121: Proposed Projects in Environmental Improvement, City Beautification and<br />

Tourism Development<br />

Description Requirement Amount (Rs. Lakh)<br />

Environmental Improvement<br />

Preparation of Environmental Master Plan 50.00<br />

Afforestration – in Lake/Pond Catchments<br />

200.00<br />

Areas<br />

Reclamation of Degraded Land (abandoned<br />

1,000.00<br />

Open Cast Mines) for Urban Forest and<br />

Creation of Green Belt<br />

River Front Development - Damodar River 15,000.00<br />

Green Belt Development for Noise<br />

Attenuation along major Transportation<br />

Corridor<br />

75.00<br />

Soil and Water Conservation Measures 100.00<br />

Biological Park at Dhangi Pahad 1,000.00<br />

City Beautification & Tourism<br />

Development<br />

Topchanchi Lake – beautification,<br />

improvement to approach roads and<br />

development of parks<br />

1 500.00<br />

Development of Amusement Park at Rejili<br />

1 2,000.00<br />

Bondh<br />

Beautification and boating facility for<br />

1 200.00<br />

Maithon Dam<br />

Development of Parks 25 Nos 500.00<br />

Development of Picnic Spots – boating<br />

500.00<br />

facilities to all major water bodies<br />

Provision of Public Facilities 25 Nos 100.00<br />

Grand Total – Env. and City<br />

Beautification and TD<br />

21,225.00<br />

9. Preservation of Water Bodies<br />

Total investment to the tune of Rs. 554.89 lakh is proposed to desilt and provision of fencing<br />

facilities to all water bodies in the city. The block wise total area under water and proposed<br />

investment is presented in Table 122.<br />

Table 122: Proposed Investments in Preservation of Water Bodies<br />

Description Requirement Amount (Rs. Lakh)<br />

Desilting and Fencing of Water Bodies<br />

Water Bodies in <strong>Dhanbad</strong> Block 87.87 acres 142.30<br />

Water Bodies in Jharia Block 56.44 acres 91.40<br />

Water Bodies in Baliapur Block 128.04 acres 207.37<br />

Water Bodies in Gobindpur Block 29.73 acres 48.15<br />

Water Bodies in Baghmara Block 40.55 acres 65.67<br />

Grand Total – Water Body Rejuvenation 554.89<br />

10. Other Developmental Projects<br />

Total investment proposed under this head is Rs. 6,955.00 lakh, which include redevelopment<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 179


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

of existing municipal corporation office at Bank more, construction of working women<br />

hostel, night shelters, community halls, sports complex, renewal of existing commercial<br />

establishments, construction of slaughter houses, electric crematorium, construction of<br />

auditorium, construction of vegetable markets and etc. The detailed cost estimates are<br />

presented in Table 123.<br />

Table 123: Other Developmental Projects<br />

Description Requirement Amount (Rs. Lakh)<br />

Redevelopment of Existing <strong>Municipal</strong><br />

1 1,000.00<br />

<strong>Corporation</strong> Office (Office cum<br />

Commercial Complex)<br />

Construction of Working Women Hostel 1 30.00<br />

Construction of Night Shelters 1 20.00<br />

Construction o Community Halls 2 100.00<br />

Construction of New Sports Complex<br />

1 5,000.00<br />

(Stadium)<br />

Renewal of Commercial Complexes 2 50.00<br />

Construction of Slaughter Houses 5 100.00<br />

Construction of Electric Crematorium 2 40.00<br />

Construction of Auditorium 1 50.00<br />

Construction of Vegetable Markets 5 500.00<br />

Development of Exhibition Ground 1 30.00<br />

Construction of Old Age Home 1 20.00<br />

Construction of Destitute Children’s Home 1 15.00<br />

Grand Total – Other Development<br />

Projects<br />

6,955.00<br />

11. Disaster Management pre-preparedness<br />

Following table presents the disaster management pre-preparedness and response activity<br />

investment required for <strong>Dhanbad</strong>.<br />

Table 124: Proposed Investments in Disaster Management Pre-Preparedness<br />

Description Requirement Amount (Rs. Lakh)<br />

Preparation of Vulnerability Map<br />

2,000.00<br />

Developing a Information Data Base - GIS<br />

Creating a state –of- the art Infrastructure<br />

Setting up modern operation centre<br />

Laptop Computers<br />

2 Nos<br />

Telefax machines<br />

2 Nos<br />

Satellite Phone with data Communication 2 Nos<br />

Generator (portable)<br />

1 No<br />

Video Phone<br />

1 No<br />

Ready Move Kits for the Response Team<br />

5 No<br />

Solar Panels & Extra Battery Packs<br />

Hydraulic Excavator<br />

2 Nos<br />

Training and Capacity Building<br />

Grand Total – Disaster Prepreparedness<br />

2,000.00<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 180


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

12. Urban Governance<br />

For efficient management of the increasing administrative responsibilities and the welfare<br />

activities it is proposed for e governance, restructuring of <strong>Municipal</strong> corporation (institutional<br />

strengthening) organization setup to takeup new responsibility, double entry accounting<br />

system, town planning and municipal information system (MIS), property Mapping – GIS for<br />

efficient collection performance. Besides this capacity building and periodic training also<br />

proposed with a total investment of Rs. 1,000.00 lakh.<br />

13. Basic Service for Urban Poor and Housing<br />

To improve the basic infrastructure facilities inside the slum area and for redevelopment,<br />

rehabilitation of slums following projects have been identified with a total investment of Rs.<br />

64,148.96 lakh.<br />

Table 125: Proposed Investments in Basic Services for Urban Poor & Housing<br />

Description Requirement Amount (Rs. Lakh)<br />

Houses at Affordable costs for Slum<br />

Dwellers/Urban poor /EWS/LIG Categories<br />

Housing for Urban Poor Population 50,000 Nos 50,000.00<br />

Slum Networking (for Infrastructure)<br />

Water Distribution Network 150 km 375.00<br />

No. of Public Taps/ Handpumps 200 Nos 70.00<br />

Sewer Network 200 km 2,000.00<br />

No. of Public Toilet Seats 50 Nos 25.00<br />

No. of Public Urinals 100 Nos 17.00<br />

No. of Dustbins/ Temporary Waste<br />

Storage Points 20 Nos 0.76<br />

No. of Tricycle Bins 50 Nos 4.00<br />

No. of Push Carts 100 Nos 7.20<br />

Roads and Pavements 150 km 570.00<br />

Storm Water Drains 100 km 1,500.00<br />

Streetlights 1,000 Nos 80.00<br />

Schools 10 Nos 1,000.00<br />

Hospitals 25 Nos 500.00<br />

Livelihood Restoration and Social Security Schemes<br />

For Livelihood Opportunity LS 5,000.00<br />

To Provide Social Security LS 1,000.00<br />

Sub Total – Urban Services for Poor &<br />

62,148.96<br />

Housing<br />

Preparation of DPRs LS 2,000.00<br />

Grand Total - Urban Services for Poor<br />

& Housing<br />

64,148.96<br />

14. Summary of Investments<br />

The summary of proposed investment is presented in Table 126. Total investment proposed<br />

is Rs. 383,274.30 lakh out of which Rs. 319,125.34 lakh is proposed for urban infrastructure<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 181


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

and governance and Rs. 64,148.96 lakh is proposed for basic services to the urban poor and<br />

housing for urban poor.<br />

Table 126: Summary of Proposed Investments<br />

Description<br />

Amount (Rs. Lakh)<br />

Urban Infrastructure and Governance<br />

Urban Planning and Growth Management - Master<br />

300.00<br />

plan/landuse plan and detailed development plan (micro plan)<br />

Water Supply 38,116.71<br />

Sewerage 52,480.08<br />

Solid Waste Management 5,596.09<br />

Construction and Improvement of Storm Water Drains 37,070.00<br />

Construction and Improvement of Drains/Nallahs 1,900.00<br />

Urban Transport<br />

Laying /improvement/widening of arterial /sub-arterial<br />

60,971.00<br />

roads and bridges<br />

Mass Transit System 50,000.00<br />

Parking Lots 1,000.00<br />

Laying of Ring Roads and Bye-Passes 16,800.00<br />

Construction and Development of Bus and Truck<br />

17,500.00<br />

Terminals<br />

Street Lighting 5,656.57<br />

Environmental Improvement and City Beautification<br />

21,225.00<br />

Schemes & Tourism Development<br />

Preservation of Water Bodies 554.89<br />

Other Development Projects 6,955.00<br />

Disaster Management 2,000.00<br />

Urban Governance 1,000.00<br />

Sub Total Urban Infrastructure and Governance 319,125.34<br />

Basic Services to the Urban Poor & Housing<br />

Infrastructure Facilities to Urban Poor – slum networking<br />

(infrastructure)<br />

6,148.96<br />

Housing for Urban Poor & DPRs, PMC 52,000.00<br />

Livelihood Restoration and Social Security Schemes 6,000.00<br />

Sub Total – Basic Services to the Urban Poor & Housing 64,148.96<br />

Grand Total 383,274.30<br />

Grand Total in Crores<br />

3,832.74 Crs<br />

The cost may increase at the rate of 5 percent per year, if the projects are not<br />

completed on the prescribed year.<br />

In Table 127 detailed component wise phasing is presented, which was arrived based on the<br />

discussion with the key stakeholders.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 182


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Table 127: Component wise Investment Phasing (Base Cost)<br />

Description Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 2012-2013<br />

Rs. lakh<br />

Urban Planning & Growth<br />

Management<br />

Preparation of Master Plan & Micro<br />

Level Planning<br />

300.00 150.00 150.00<br />

Water Supply Projects<br />

De-silting of Topchanchi Lake – MADA 827.80 827.80 - - - - - -<br />

Rehabilitation of Jamadoba Water 100.00<br />

Treatment Plant including Electrical and<br />

Pumping Machineries<br />

100.00 - - - - - -<br />

Rehabilitation of Topchanchi Water 50.00<br />

Treatment Plant<br />

50.00 - - - - - -<br />

Replacement of old and worn-out Clear 450.00<br />

Water & Raw Water Mains<br />

225.00 225.00 - - - - -<br />

Replacement of Existing old 380.00<br />

Distribution System<br />

190.00 190.00 - - - - -<br />

Repair Works to Sindri Water Treatment 25.00<br />

Plant<br />

- 25.00 - - - - -<br />

Leak Detection Survey and Reduction<br />

Measures - - - - - - -<br />

Water Audit and Leak Detection of Bulk 20.00<br />

Water supply System<br />

- 20.00 - - - - -<br />

Water Audit and Leak Detection of 250.00<br />

Distribution System<br />

- 250.00 - - - - -<br />

System Augmentation<br />

Katras Urban Water Supply Scheme – 870.90<br />

Phase I<br />

435.45 435.45 - - - - -<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 183


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Description Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 2012-2013<br />

Rs. lakh<br />

Katras Urban Water Supply Scheme – 921.84<br />

Phase –II<br />

460.92 460.92 - - - - -<br />

Improvement in Kusunda – Katras & 48.50<br />

Bhuli Township<br />

24.25 24.25 - - - - -<br />

Improvement of Water Supply – Jharia 1,597.30<br />

coal fields including <strong>Dhanbad</strong> Town –<br />

Phase – I<br />

798.65 798.65 - - - - -<br />

Improvement of Water Supply in Jharia 183.15<br />

Coalfields including <strong>Dhanbad</strong> Town–<br />

Phase – II<br />

91.58 91.58 - - - - -<br />

Katras Urban Water Supply – Phase III 1,354.00 677.00 677.00 - - - - -<br />

Raw Water Pumping Main 1,368.87 - 684.44 684.44 - - - -<br />

Raw Water Transmission 619.94 - 309.97 309.97 - - - -<br />

Augmentation of Water Treatment Plant 3,258.04 - - 1,629.02 1,629.02 - - -<br />

Clear Water Pumping 1,515.89 - - 757.94 757.94 - - -<br />

Clear Water Transmission 659.94 - - 329.97 329.97 - - -<br />

Construction of Storage Reservoirs 3,229.26 - - - 968.78 968.78 968.78 322.93<br />

Extension of Distribution Network<br />

System 17,786.29 3,557.26 3,557.26 3,557.26 3,557.26 3,557.26 - -<br />

24/7 Water Supply – Piloting Project 500.00 - - 250.00 250.00 - - -<br />

Preparation of DPR 700.00 700.00 - - - - - -<br />

Mapping and GIS 200.00 - 100.00 100.00 - - - -<br />

Asset Management Plan 100.00 - 50.00 50.00 - - - -<br />

Conducting Technical Feasibility Study<br />

for using abandoned mines as Storage<br />

tanks/Treatment plants/Reuse of Pit<br />

Water 100.00 100.00 - - - - - -<br />

Converting Abandoned Open Cast<br />

Mines for Drinking Water Storage Tanks 1,000.00 1,000.00 - - - - - -<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 184


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Description Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 2012-2013<br />

Rs. lakh<br />

Grand Total – Water Supply System 38,116.71<br />

9,237.90 7,899.51 7,668.59 7,492.97 4,526.04 968.78 322.93<br />

Sewerage and Sanitation<br />

System Augmentation<br />

Laying of Sewer Networks 19,432.35 - 3,886.47 3,886.47 3,886.47 3,886.47 3,886.47 -<br />

Construction of Sewerage Treatment<br />

Plant<br />

9,181.79<br />

- - 2,295.45 2,295.45 1,836.36 1,836.36 918.18<br />

Intermediate Pumping Stations 2,098.69 - - 524.67 524.67 419.74 419.74 209.87<br />

Road Overlay Cost 19,432.35 1,943.23 1,943.23 3,886.47 3,886.47 3,886.47 1,943.23 1,943.23<br />

Construction of Public Toilets 500.00 50.00 100.00 100.00 75.00 75.00 50.00 50.00<br />

DPRs 1,500.00 200.00 - - - - - -<br />

Asset Management Plan 100.00 - 50.00 50.00 - - - -<br />

Mapping and GIS 200.00 100.00 100.00 - - - - -<br />

Awareness Campaign 35.00 3.50 3.50 7.00 5.25 5.25 5.25 5.25<br />

Grand Total – Sewerage & Sanitation<br />

System<br />

52,480.18<br />

3,596.73 6,083.20 10,750.06 10,673.31 10,109.29 8,141.05 3,126.53<br />

Solid Waste Management<br />

System Augmentation<br />

Primary Collection Vehicles<br />

Additional Pushcarts 209.02 41.80 62.70 41.80 41.80 20.90 - -<br />

Containerized Tricycles 187.60 37.52 56.28 37.52 37.52 18.76 - -<br />

Secondary Collection<br />

Additional Dumber Bins 146.30 14.63 14.63 29.26 29.26 29.26 14.63 14.63<br />

Transportation Vehicles<br />

Dual Loaded Dumper Placers 340.00 34.00 34.00 68.00 68.00 68.00 34.00 34.00<br />

Disposal Facilities<br />

Land Fill Site Development 3,726.76 - 372.68 931.69 931.69 745.35 745.35 -<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 185


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Description Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 2012-2013<br />

Rs. lakh<br />

Compost Site Development 776.41 77.64 77.64 194.10 194.10 155.28 77.64 -<br />

Medical Waste Management<br />

Incineration Plants 25.00 2.50 3.75 3.75 3.75 3.75 3.75 3.75<br />

DPRs 150.00 150.00 - - - - - -<br />

IEC Activities 35.00 3.50 5.25 5.25 5.25 5.25 5.25 5.25<br />

Grand Total – Solid Waste 5,546.09<br />

Management<br />

361.59 626.93 1,311.38 1,311.38 1,046.56 880.62 57.63<br />

Storm Water Drainage<br />

Upgradation/Remodeling of Kutcha<br />

to Pucca Drains<br />

Kutcha to Pucca Open 1,200.00 240.00 360.00 360.00 240.00 - - -<br />

Kutcha to Pucca Closed 2,295.00 459.00 688.50 688.50 459.00 - - -<br />

Pucca Open to Pucca Closed 325.00 65.00 97.50 97.50 65.00 - - -<br />

New Formation<br />

New Pucca Open Drains 10,320.00 1,032.00 1,548.00 1,548.00 1,548.00 1,548.00 1,548.00 1,548.00<br />

New Pucca Closed Drains 21,930.00 2,193.00 3,289.50 3,289.50 3,289.50 3,289.50 3,289.50 3,289.50<br />

DPRs 1,000.00 1,000.00 - - - - - -<br />

Grand Total – Storm Water 37,070.00<br />

Drainage System<br />

4,989.00 5,983.50 5,983.50 5,601.50 4,837.50 4,837.50 4,837.50<br />

Strengthening of Natural Drains /<br />

Channels<br />

1,875.00 187.50 281.25 281.25 281.25 281.25 281.25 281.25<br />

DPRs 25.00 25.00<br />

Urban Transport<br />

Strengthening /Improvement to<br />

Existing Roads<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 186


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Description Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 2012-2013<br />

Rs. lakh<br />

Concrete Roads 750.00 150.00 150.00 225.00 112.50 112.50 - -<br />

Black Top (BT Roads) 1,365.00 273.00 273.00 409.50 204.75 204.75 - -<br />

WBM 175.00 35.00 35.00 52.50 26.25 26.25 - -<br />

Upgradation of Existing Roads<br />

BT to Concrete 4,950.00 742.50 990.00 990.00 990.00 742.50 495.00 -<br />

WBM to BT 375.00 56.25 75.00 75.00 75.00 56.25 37.50 -<br />

Earthen to BT 2,700.00 405.00 540.00 540.00 540.00 405.00 270.00 -<br />

Widening of Roads<br />

Widening of Sub arterial Roads 2,850.00 285.00 427.50 427.00 427.50 427.50 427.50 427.50<br />

New Formation of Roads in<br />

Extension areas<br />

Concrete 600.00 - 120.00 180.00 120.00 90.00 90.00 -<br />

Black Top 6,496.00 - 649.60 1,299.20 1,299.20 1,299.20 974.40 974.40<br />

WBM 360.00 - 36.00 72.00 72.00 72.00 54.00 54.00<br />

DPRs 5,000.00 2,500.00 2,500.00 - - - - -<br />

Grand Total – Road Improvement 25,621.00 4,446.75 5,796.10 4,270.70 3,867.20 3,435.95 2,348.40 1,455.90<br />

Widening of Arterial Roads<br />

NH 32 to 6 lanes from Mahuda to GT 6,000.00<br />

Road<br />

1,800.00 1,800.00 1,800.00 600.00 - - -<br />

JP Chawk to Sindri to 6 lanes 4,400.00 440.00 1,320.00 1,320.00 1,320.00 - - -<br />

Subhash Chawk to Bhuli township to 4<br />

lane<br />

2,000.00<br />

600.00 600.00 600.00 200.00 - - -<br />

Barmasia Phatan to Dhansar Road to 4<br />

lane<br />

1,400.00<br />

420.00 420.00 420.00 140.00 - - -<br />

Hatia to Barmasia Phatak to 4 lane 600.00 - 180.00 180.00 120.00 120.00 - -<br />

Grand Total – Widening of Arterial<br />

Roads<br />

14,400.00<br />

3,260.00 4,320.00 4,320.00 2,380.00 120.00 - -<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 187


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Description Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 2012-2013<br />

Rs. lakh<br />

Junction Improvements<br />

Major Junctions<br />

ISM Gate 25.00 25.00 - - - - - -<br />

Matkuria 25.00 25.00 - - - - - -<br />

Puja Talkies 25.00 25.00 - - - - - -<br />

Bank More 25.00 25.00 - - - - - -<br />

Near Rajkamal School on Jharia Road 25.00 25.00 - - - - - -<br />

Near <strong>Dhanbad</strong> Police Station on Bridge 25.00 25.00 - - - - - -<br />

Near RS College, Jharia 25.00 25.00 - - - - - -<br />

Uparkuli on Sindri Road 25.00 25.00 - - - - - -<br />

Kenduadih Road, Godhar 25.00 25.00 - - - - - -<br />

Kenduadih Petrol Pump 25.00 25.00 - - - - - -<br />

Putki Bridge 25.00 - 25.00 - - - - -<br />

Puja Talkies (Sahid Raju Chawk) 25.00 - 25.00 - - - - -<br />

Near Puja Talkies at Railway Station<br />

Road Intersection<br />

25.00<br />

- 25.00 - - - - -<br />

Steel Gate Intersection 25.00 - 25.00 - - - - -<br />

Katras – Main Market at Railway Station<br />

Intersection<br />

25.00<br />

- 25.00 - - - - -<br />

Jharkhand More – along NH-2 Towards<br />

Barwadda<br />

25.00<br />

- - 25.00 - - - -<br />

NH2 and NH 32 Intersection towards<br />

Bhuiphore Mandir<br />

25.00<br />

- - 25.00 - - - -<br />

NH 32 and SH Hirak Intersection 25.00 - - 25.00 - - - -<br />

Hirak Point 25.00 - - 25.00 - - - -<br />

Godhar More – Kusunda Rly. Station<br />

Intersection<br />

25.00<br />

- - - 25.00 - - -<br />

Karkend , Katras – <strong>Dhanbad</strong> – Bokaro<br />

Intersection<br />

25.00<br />

- - - 25.00 - - -<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 188


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Description Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 2012-2013<br />

Rs. lakh<br />

Karkend – Jharia Intersection 25.00 - - - - 25.00 - -<br />

Minor Junctions<br />

Improvement to Minor Junctions in<br />

DMC area<br />

375.00<br />

- - - - 150.00 112.50 112.50<br />

Grand Total – Junction 925.00<br />

Improvements<br />

250.00 125.00 100.00 50.00 175.00 112.50 112.50<br />

UG Utility ducts & Medians<br />

Railway Station to Sindri – Jharia Road 1,250.00 250.00 375.00 375.00 125.00 125.00 - -<br />

Railway Station to Gobindpur 650.00 130.00 195.00 195.00 130.00 - - -<br />

Shramilk Chawk to Sarbadda via 500.00<br />

Combined Building<br />

- 100.00 150.00 150.00 100.00 - -<br />

Randher Verma Chawk to Combined 75.00<br />

Building<br />

- 75.00 - - - - -<br />

JP Chawk to Madhuda 600.00 - 120.00 180.00 180.00 60.00 60.00 -<br />

Grand Total – UG Utility Ducts &<br />

Medians<br />

3,075.00<br />

380.00 865.00 900.00 585.00 285.00 60.00 -<br />

Pedestrian Subways & Crossings<br />

Near Kachehari 200.00 - - 200.00 - - - -<br />

Between Birsa Chawk and JP Chawk 200.00 200.00 - - - - - -<br />

Near JP Chawk on NH 2 100.00 - 100.00 - - - - -<br />

Near MADA Office 100.00 - 100.00 - - - - -<br />

Sindri Road Near Sri Ram Plaza 100.00 100.00 - - - - - -<br />

Grand Total – Pedestrian Subways &<br />

Pedestrian Crossing<br />

700.00<br />

300.00 200.00 200.00 - - - -<br />

Bridges & Elevated Highways<br />

ROB at Barmasia Phatak 1,250.00 - 625.00 625.00 - - - -<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 189


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Description Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 2012-2013<br />

Rs. lakh<br />

Widening of Gaya Pul RUB to 6 Lane 500 - - 250.00 250.00 - - -<br />

Elevated High Roads - 9,000.00 - - - 1,800.00 1,800.00 1,800.00 3,600.00<br />

Flyovers 5,500.00 - 1,650.00 1,650.00 1,650.00 550.00 - -<br />

Grand Total – Bridges and Elevated<br />

Highways<br />

16,250.00<br />

- 2,275.00 2,525.00 3,700.00 2,350.00 1,800.00 3,600.00<br />

Mass Transit System 50,000.00 - - - 10,000.00 10,000.00 10,000.00 20,000.00<br />

Parking Lots<br />

Purana Bazar 70.00 70.00 - - - - - -<br />

Bank More 100.00 100.00 - - - - - -<br />

On Katras Road – JP Chawk Towards<br />

Matkuria<br />

70.00<br />

70.00 - - - - - -<br />

On Katras Road – JP Chawk Towards<br />

Rajkamal School<br />

70.00<br />

- 70.00 - - - - -<br />

Naya Bazzar 70.00 - 70.00 - - - - -<br />

Park Market at Hirapur 70.00 70.00 - - - - - -<br />

Sharnik Chawk at Gaya Bridge 70.00 - 70.00 - - - - -<br />

Sharnik Chawk at Railway Station 70.00 - 70.00 - - - - -<br />

Near Textile Market 70.00 - - 70.00 - - - -<br />

Near Saridhela Market 70.00 - - 70.00 - - - -<br />

Near Petrol Pump Chawk to Bata More<br />

(Jharia)<br />

70.00<br />

- - - 70.00 - - -<br />

Bata More – Jharia Bus Stand 70.00 - - 70.00 - - - -<br />

Near Katras Market 70.00 - - - 70.00 - - -<br />

Near Katras Railway Station 60.00 - - - - 60.00 - -<br />

Grand Total – Parking Lots 1,000.00 310.00 280.00 210.00 140.00 60.00 - -<br />

By-pass & Ring Road<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 190


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Description Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 2012-2013<br />

Rs. lakh<br />

Bypass from Barbadda 1,800.00<br />

(<strong>Dhanbad</strong>)(@NH2, 399.00km) to<br />

Godhar(@NH32, 16.00km)<br />

540.00 540.00 720.00 - - - -<br />

Ring Road 15,000.00 - 4,500.00 4,500.00 4,500.00 1,500.00 - -<br />

Grand Total – By-pass & Ring Road 16,800.00 540.00 5,040.00 5,220.00 4,500.00 1,500.00 - -<br />

Bus Terminus & Truck Terminus<br />

Bus Terminus at Bartand (Existing) 5,000.00 5,000.00 - - - - - -<br />

New Bus Terminus at near Barwadda 5,000.00 - - - 2,500.00 2,500.00 - -<br />

Transport Nagar at Pandukki (along<br />

NH2)<br />

7,500.00<br />

- - 3,750.00 3,750.00 - - -<br />

Grand Total – Bus and Truck<br />

Terminus<br />

17,500.00<br />

5,000.00 - 3,750.00 6,250.00 2,500.00 - -<br />

Street Lighting<br />

Replacement of Existing Fixtures<br />

Tube Light 59.75 11.95 17.93 17.93 5.98 5.98 - -<br />

High Power 50.00 10.00 15.00 15.00 5.00 5.00 - -<br />

High Mast Lamps 71.00 14.20 21.30 21.30 7.10 7.10 - -<br />

Provision of New Fixtures - - - - - - -<br />

Tube Light 1,730.58 - 346.12 519.17 519.17 173.06 173.06 -<br />

High Power 2,310.00 - 462.00 693.00 693.00 231.00 231.00 -<br />

High Mast Lamps 1,135.24 - 227.05 340.57 340.57 113.52 113.52 -<br />

Power Saver Switches 300.00 - - 60.00 90.00 90.00 30.00 30.00<br />

Grand Total – Street Lighting 5,656.57 36.15 1,089.39 1,666.97 1,660.82 625.66 547.58 30.00<br />

Environmental Improvement<br />

Preparation of Environmental Master<br />

Plan<br />

50.00<br />

50.00 - - - - - -<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 191


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Description Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 2012-2013<br />

Rs. lakh<br />

Afforestration – in Lake/Pond 200.00<br />

Catchments Areas<br />

60.00 60.00 80.00 - - - -<br />

Reclamation of Degraded Land 1,000.00<br />

(abandoned Open Cast ) for Urban<br />

Forest and Creation of Green Belt<br />

- - 300.00 400.00 300.00 - -<br />

River Front Development - Damodar 15,000.00<br />

River<br />

- 4,500.00 4,500.00 6,000.00 - - -<br />

Green Belt Development for Noise 75.00<br />

Attenuation along major Transportation<br />

Corridor<br />

7.50 11.25 11.25 11.25 11.25 11.25 11.25<br />

Soil and Water Conservation Measures 100.00 10.00 15.00 15.00 15.00 15.00 15.00 15.00<br />

Biological Park at Dhangi Pahad 1,000.00 - - - - 500.00 500.00 -<br />

City Beautification & Tourism<br />

Development<br />

Topchanchi Lake – beautification, 500.00<br />

improvement to approach roads and<br />

development of parks<br />

500.00 - - - - - -<br />

Development of Amusement Park at 2,000.00<br />

Rejili Bondh<br />

2,000.00 - - - - - -<br />

Beautification and boating facility to 200.00<br />

Maithon Dam<br />

100.00 100.00 - - - - -<br />

Development of Parks 500.00 50.00 75.00 75.00 75.00 75.00 75.00 75.00<br />

Development of Picnic Spots – boating<br />

facilities to all major water bodies<br />

500.00<br />

50.00 75.00 75.00 75.00 75.00 75.00 75.00<br />

Provision of Public Facilities 100.00 10.00 15.00 15.00 15.00 15.00 15.00 15.00<br />

Grand Total – Env. and City 21,225.00<br />

Beautification and TD<br />

2,837.50 4,851.25 5,071.25 6,591.25 991.25 691.25 191.25<br />

Preservation of Water Bodies<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 192


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Description Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 2012-2013<br />

Rs. lakh<br />

Desilting and Fencing of Water<br />

Bodies<br />

Water Bodies in <strong>Dhanbad</strong> Block 142.3 14.23 42.69 28.46 42.69 14.23 - -<br />

Water Bodies in Jharia Block 91.4 9.14 27.42 18.28 27.42 9.14 - -<br />

Water Bodies in Baliapur Block 207.37 20.74 62.21 41.47 62.21 20.74 - -<br />

Water Bodies in Gobindpur Block 48.15 4.82 14.45 9.63 14.45 4.82 - -<br />

Water Bodies in Baghmara Block 65.67 6.57 19.70 13.13 19.70 6.57 - -<br />

Grand Total – Water Body 554.89<br />

Rejuvenation<br />

55.49 166.47 110.98 166.47 55.49 - -<br />

Other Developmental Projects<br />

Redevelopment of Existing <strong>Municipal</strong> 1,000.00<br />

<strong>Corporation</strong> Office (Office cum<br />

Commercial Complex)<br />

1,000.00 - - - - - -<br />

Construction of Working Women 30.00<br />

Hostel<br />

- 15.00 15.00 - - - -<br />

Construction of Night Shelters 20.00 - 10.00 10.00 - - - -<br />

Construction o Community Halls 100.00 - 50.00 50.00 - - - -<br />

Construction of New Sports Complex<br />

(Stadium)<br />

5,000.00<br />

3,750.00 1,250.00 - - - - -<br />

Renewal of Commercial Complexes 50.00 50.00 - - - - - -<br />

Construction of Slaughter Houses 100.00 50.00 50.00 - - - - -<br />

Construction of Electric Crematorium 40.00 - - 20.00 20.00 - - -<br />

Construction of Auditorium 50.00 - 25.00 25.00 - - - -<br />

Construction of Vegetable Markets 500.00 - 250.00 250.00 - - - -<br />

Development of Exhibition Ground 30.00 - - - 15.00 15.00 - -<br />

Construction of Old Age Home 20.00 10.00 10.00 - - - - -<br />

Construction of Destitute Children’s<br />

Home<br />

15.00<br />

- - - - 7.50 7.50 -<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 193


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Description Total 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 2012-2013<br />

Rs. lakh<br />

Grand Total – Other Development 6,955.00<br />

Projects<br />

4,860.00 1,660.00 370.00 35.00 22.50 7.50 -<br />

Basic Services for Urban Poor &<br />

Housing<br />

Housing for Urban Poor Population 50,000.00 5,000.00 5,000.00 7,500.00 12,500.00 15,000.00 5,000.00 -<br />

Water Distribution Network 375.00 37.50 93.75 93.75 75.00 75.00 - -<br />

No. of Public Taps/ Handpumps 70.00 7.00 17.50 17.50 14.00 14.00 - -<br />

Sewer Network 2,000.00 - 200.00 500.00 500.00 400.00 400.00 -<br />

No. of Public Toilet Seats 25.00 7.50 7.50 7.50 2.50 - - -<br />

No. of Public Urinals 17.00 5.10 5.10 5.10 1.70 - - -<br />

No. of Dustbins/ Temporary Waste<br />

Storage Points 0.76 0.23 0.23 0.23 0.08 - - -<br />

No. of Tricycle Bins 4.00 1.20 1.20 1.20 0.40 - - -<br />

No. of Push Carts 7.20 2.16 2.16 2.16 0.72 - - -<br />

Roads and Pavements 570.00 57.00 171.00 171.00 171.00 - - -<br />

Storm Water Drains 1,500.00 150.00 450.00 450.00 450.00 - - -<br />

Streetlights 80.00 8.00 8.00 16.00 24.00 24.00 - -<br />

Schools 1000.00 100.00 100.00 200.00 300.00 300.00 - -<br />

Hospitals 500.00 50.00 50.00 100.00 150.00 150.00 - -<br />

DPRs 2,000.00 1,500.00 500.00 - - - - -<br />

Livelihood Restoration and Social<br />

Security Schemes 6,000.00 600.00 600.00 600.00 600.00 1,800.00 900.00 900.00<br />

Grand Total – Urban Services for<br />

Poor & Housing 64,148.96 7,525.69 7,206.44 9,664.44 14,789.40 17,763.00 6,300.00 900.00<br />

Disaster Management 2,000.00 600.00 800.00 600.00 - - - 600.00<br />

Urban Governance 1,000.00 400.00 400.00 200.00 - - - -<br />

Grand Total Investment 383,274.40 49,349.31 56,099.04 65,174.12 80,075.54 60,684.47 36,976.44 34,915.49<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 194


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

C. Investment Sustenance<br />

In order to assess the investment sustaining capacity of <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong>, the<br />

municipal fiscal situation is forecasted through a Financial Operating Plan (FOP). The FOP is<br />

essentially a multi-year forecast of municipal finances for a term of 7 years (implementation<br />

period). It is used to forecast revenue income and revenue expenditure for the period<br />

between FY 2006-07 and FY 2013-14.<br />

Following are important assumptions towards simulating the municipal fiscal situation, and<br />

include both existing and new resources.<br />

1. Revenue Income Assumptions<br />

Property tax is the main source of own revenue for the <strong>Corporation</strong>. There are about<br />

215,750 (approx.) properties that can be charged under property tax item;<br />

About Rs. 1,500 per property has been assumed per annum for calculation rental value<br />

out of which 27% of ARV is proposed for property tax;<br />

Revision of property tax ARV by 30 percent in the FY 2007-08 and FY 2011-12 of the<br />

existing previous base;<br />

Annual growth rate of property is assumed at a rate of 2.50 percent per annum;<br />

Improving the arrears tax collection efficiency to at least 75 percent and current to 85<br />

percent;<br />

Growth in other revenue income items based on past performance and/ or likely growth<br />

(minimum of 5 percent and maximum of 15 percent);<br />

Any additional resources generated as part of proposed investments are taken into<br />

consideration;<br />

For Water Supply connection, at a nominal 2.50 percent per annum (proportionate to<br />

property tax assessment growth rate) regular connections are envisaged in the base case<br />

scenario and increase in water connections is a result of the availability of additional<br />

water for distribution – it is assumed that 90 percent of the property tax connections<br />

would have water connections by FY 2010-11; the current rate of water charge (flat rate<br />

of Rs. 100 for domestic and Rs. 150 for non domestic per month per connection, if it is<br />

metered then Rs. 5 per 1,000 liters) is maintained till 2006-07, and from 2007-08 a 15<br />

percent increase is assumed every 3 years; collection performance is assumed at 75<br />

percent against arrears demand and 85 percent against current demand; and new (onetime)<br />

connection charges are collected as per the current rate till 2006-07, and from<br />

2007-08 a 20 percent increase in every 3 years;<br />

For Sewer Connection, no new connections envisaged in base case scenario and sewer<br />

connections are provided under the with Project scenario – it is assumed that 100<br />

percent of the water supply connections would have sewer connections by FY 2011;<br />

monthly flat rate of Rs. 30 and Rs, 115 per connection for domestic and non domestic<br />

respectively, it is assumed for sewerage charge starts from 2007 - 08, and from then on a<br />

15 percent increase is assumed every 3 years; collection performance is assumed at 75<br />

percent against arrears demand and 85 percent against current demand.<br />

Solid Waste conservancy Fee is assumed that 70 percent of the residential property tax<br />

assessments and 100 percent of non domestic property assessments would have to be<br />

brought under the conservancy fee coverage net. Monthly conservancy fee of Rs. 10 &<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 195


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Rs, 50 per property assessments has been proposed for residential and non domestic<br />

properties respectively. It is assumed for conservancy fee starts from 2006-07, and from<br />

then on a 15 percent increase is assumed every 3 years; collection performance is<br />

assumed at 75 percent against arrears demand and 85 percent against current demand.<br />

2. Expenditure Considerations<br />

<br />

<br />

<br />

<br />

<br />

Establishment expenditure assumed to increase at rate of 8 percent per annum;<br />

O & M to grow based on past performance and/or likely growth (minimum of 5 percent<br />

to a maximum of 20 percent);<br />

Proposed capital expenditure and phasing based on investments recommended;<br />

Repayment commitments of all outstanding current debt & non debt liabilities;<br />

Additional O&M for new investments are also taken into account.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong>’s ability to sustain investment is assessed and determined<br />

based primarily upon the Operating surplus. Since the plan period is 2006-13 and funding<br />

mechanisms are identified for capital expenditure till FY 2013-14.<br />

3. Key Assumption for FOP<br />

In forecasting the income and expenditure following are the key assumptions and guiding<br />

principles:<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

Income or expenditure items, indicating high growth rate of over 20 percent, are capped<br />

at a maximum of 20 percent and those indicating a low/ negative growth rate have been<br />

considered to grow at a minimum rate of 5 percent per annum. The criterion for fixing<br />

the maximum limit is to maintain consistency with the overall growth of municipal<br />

finances and for a conservative estimate and the minimum limits is to provide for<br />

increased efficiencies;<br />

In case of inconsistency in income and expenditure during the review period, the base<br />

for projection is taken as average of the previous 5 years for projections;<br />

SFC devolution are expected to increase at 15% per annum (Presently no allocation for<br />

erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity);<br />

Overall establishment expenditure future projections have been considered at 8 percent;<br />

The total capital investments shall be funded by 50 percent from Central Government<br />

Grant, 20 percent from State Government Grant and balance through ULB<br />

contribution, public private sector participation and loan from financial institutions;<br />

A proportion of new capital investment is worked out to get the operations and<br />

maintenance cost of the proposed projects to maintain over its life cycle. For water<br />

supply projects it is assumed at 2 percent of the capital investment, sewerage and<br />

sanitation is 1.5 percent, solid waste management 8 percent, roads and traffic<br />

management 1 percent, storm water drainage 0.50 percent, slum improvement works and<br />

other projects it is assumed at 1 percent of the proposed capital investment;<br />

No regular capital income is envisaged other than grant component from Central and<br />

state government;<br />

New capital loans will be cleared over a period of 15 years with a moratorium of 7 years.<br />

The analysis on financial resources is worked out for the interventions to be carried out<br />

within the <strong>Municipal</strong> <strong>Corporation</strong>’s area. The sectors that are not in the domain of the<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 196


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

municipal corporation are not taken for financial analysis and they are considered to be taken<br />

by other line agencies. Majority of the investments have to come from the municipal<br />

corporation for the provision of water supply and sewerage and if these are not integrated<br />

with other interventions, the deficiencies in services still persist.<br />

Efforts should be directed to develop financially self-supporting projects, wherever possible<br />

and cost recovery should be the policy for such cases. The cost of services should be pegged<br />

with the level of services and the affordability of the population. Though some assistance can<br />

be anticipated in the form of subsidies and external grant, it would not be sufficient to attain<br />

the required standards and hence the real earnings have to be improved and this must be the<br />

priority of the economic policies and programs formulated for <strong>Dhanbad</strong>.<br />

The assessment of investment sustenance concludes that the current finances of <strong>Dhanbad</strong><br />

<strong>Municipal</strong> <strong>Corporation</strong> would not be in a position to match the proposed investments in<br />

infrastructure to achieve the desired vision unless the existing tax base and the resource<br />

mobilisation efforts are streamlined and strengthened. In order to augment/ enhance its<br />

financial resources <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> should identify alternate resources like<br />

user charges for the services for conservancy, parking fee and encourage Public private sector<br />

partnership etc.<br />

ULB should attempt levy of higher property tax rate (surcharge) in areas which have better<br />

infrastructure. Another innovative option of resource mobilization, which most of the local<br />

bodies are adopting is to change the lease right to free hold or review all the current lease<br />

agreement with respect market rents and take appropriate action.<br />

D. Public Private Sector Partnership<br />

1. Overview<br />

Rapid urbanisation and growing demand has increased the need for investment in<br />

infrastructure development. Inadequate availability of funds for the provision of<br />

infrastructure has widened the divide between demand and supply. The government therefore<br />

has been encouraging Public Private Partnerships (PPPs) to attract market investment,<br />

thereby leveraging government budgetary resources to meet the provisions for infrastructure.<br />

Different PPP structures could be explored based on the extent of funds that could be<br />

diverted from public sources and those required from the private sector, service levels<br />

targeted, willingness to pay and affordability of consumers, and rehabilitation of the existing<br />

systems etc. The choice of an option, however, depends on the extent to which the private<br />

sector is expected to take over and the sharing of risks associated with such a transfer of<br />

responsibility.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> doesn’t have the required resources to implement the entire<br />

identified projects. In order to mobilize the additional resources for <strong>Municipal</strong> <strong>Corporation</strong> to<br />

implement non commercial projects, it is necessary to encourage Private Sector Participation<br />

in service delivery and other commercial projects. Private sector participation is desirable in<br />

the Public Private Partnership (PPP) format in infrastructure sector so that there is a balance<br />

between the risk and responsibilities between the <strong>Municipal</strong> <strong>Corporation</strong> and private sector<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 197


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

developer.<br />

In view of the same, private sector participation shall be invited to leverage on the following<br />

benefits:<br />

<br />

<br />

<br />

<br />

Reduction of involvement of public finance or redirecting to them for urban poor;<br />

Induction of grater technical and management expertise;<br />

Provision of more responsive service to the customer; and<br />

Sourcing of additional finance.<br />

Following are the various options of Public Private Partnership in project development;<br />

Build Operate Transfer (BOT)/ and Concession Projects: Detailing of the basis of costs and<br />

assumptions is necessary although the risk of design and hence the responsibility for<br />

undertaking detailed design preparation is passed onto the private Sector.<br />

Design Build Operate (DBO) and Design Build Finance Operate (DBFO): As the risk of design is<br />

passed onto the private sector, detailed design may be avoided.<br />

Lease: Such a transaction may include augmentation and strengthening of the existing system<br />

and facilities. The detailing may be with regard to functioning or performance of the existing<br />

facilities, locational data etc., while detailed design risk and responsibility for this transaction<br />

may be with the private sector.<br />

Build Own Operate Sell: In the case of high-risk projects, the private sector’s perception of risks<br />

may be high and ULBs may finance, construct and operate the project for an initial period till<br />

the risk profile of the project is reduced or is lower. In such a case, as construction would be<br />

undertaken by the ULB, the project would have to be sufficiently detailed, including designing<br />

in the preparatory stage, to address quality and performance related issues as well as demand<br />

risk.<br />

Following are the list of projects identified under PPP format.<br />

2. Parking Lots on Public Private Partnership<br />

DMC shall built-up parking lots on public private partnership, the facilities can be operated<br />

on BOT basis. For the successful implementation of the project <strong>Municipal</strong> <strong>Corporation</strong><br />

should identify and acquire land for the parking facilities proposed for the city to decongest<br />

the traffic. The project can be implemented on PPP framework wherein the private sector<br />

party would be required to build a quality parking facilities (two wheelers and four wheelers<br />

parking) with adequate passenger amenities and undertake operations and maintenance<br />

activities of the assets created by the private developer for the specified number of years<br />

quoted by the concessionaire as the concession period. In order to make the project bankable,<br />

the private sector party would be allowed to exploit a portion of the land on a commercial<br />

framework. The private sector party recover the investments through commercial revenues<br />

(Parking fee, lease rentals, licence fee) and collection of various fees as specified for the<br />

concession period. The JNNURM funding shall have to project viable and it shall be the<br />

responsibilities of the PPP partners to ensure financial sustainability of the project. Following<br />

are the list of parking lots and its investment proposed for <strong>Dhanbad</strong>.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 198


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Table 128: Proposed Parking lots on Public Private Partnership<br />

Parking Location<br />

Amount (Rs. Lakh)<br />

Purana Bazar 70.00<br />

Bank More 100.00<br />

On Katras Road – JP Chawk Towards Matkuria 70.00<br />

On Katras Road – JP Chawk Towards Rajkamal School 70.00<br />

Naya Bazzar 70.00<br />

Park Market at Hirapur 70.00<br />

Sharnik Chawk at Gaya Bridge 70.00<br />

Sharnik Chawk at Railway Station 70.00<br />

Near Textile Market 70.00<br />

Near Saridhela Market 70.00<br />

Near Petrol Pump Chawk to Bata More (Jharia) 70.00<br />

Bata More – Jharia Bus Stand 70.00<br />

Near Katras Market 70.00<br />

Near Katras Railway Station 60.00<br />

Total Investment – Parking Lots 1,000.00<br />

3. Redevelopment of Existing Bus Terminus on PPP framework<br />

The Bartand Bus Terminus project has been conceived with the objective of developing<br />

existing bus terminal with modern and adequate passenger amenities and shall also help<br />

decongest the city, by restricting entry of long distance bus services in to central business<br />

district of the city in the process reduce air, noise pollution to substantial levels and thus<br />

improve micro environmental quality.<br />

The bus terminus project proposed to be implemented on public private partnership (PPP)<br />

format through a built, operate and transfer model (BOT). the private sector operated will be<br />

required to design, finance and construct bus terminus including infrastructure facilities<br />

boarding and alighting bays, signages, etc. provide required passenger amenities, commercial<br />

complex with office and retail shop/kiosks and maintain the project assets during the given<br />

concession period.<br />

4. New Inter State Bus Terminus (ISBT) near Barwadda on PPP format<br />

DMC shall built up new Inter State Bus Terminus (ISBT) near Barwadda on public private<br />

partnership, the facilities can be operated on BOT basis. The project can be implemented on<br />

PPP framework wherein the private sector party would be required to build a quality Bus<br />

Terminus with adequate passenger amenities and undertake operations and maintenance<br />

activities of bus terminal for the specified number of quoted by the concessionaire as the<br />

concession period. In order to make the project commercially viable, the private sector party<br />

would be allowed to exploit a portion of the land on a commercial framework. The private<br />

sector party recover the investments through commercial revenues (lease rentals, licence fee)<br />

and collection of various fees as specified for the concession period. For the successful<br />

implementation of New Bus Terminus near Barwadda, <strong>Municipal</strong> <strong>Corporation</strong> should identify<br />

and acquire require land for the same on time.<br />

5. Transport Nagar at Pandukki on PPP format<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 199


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

The Transport Nagar project has been envisaged with the objective of developing new<br />

Transport Nagar at Pandukki with a modern and adequate truck parking facilities, automobile<br />

workshops, weighbridge, boarding and lodging facilities, and telecommunication facilities.<br />

This project will help to decongest the city, by restricting entry and parking of trucks in to<br />

central business district of the <strong>Dhanbad</strong>. This process will reduce air, noise pollution to<br />

substantial levels and thus improve micro environmental quality of <strong>Dhanbad</strong> <strong>Municipal</strong><br />

<strong>Corporation</strong>.<br />

The transport nagar project proposed to be implemented on public private partnership (PPP)<br />

format through a built, operate and transfer model (BOT). the private sector operated will be<br />

required to design, finance and construct transport nagar at Pandukki which include truck<br />

parking amenities, necessary infrastructure facilities like boarding and lodging and etc,.<br />

provide required passenger amenities, commercial complex with office and retail shop/kiosks<br />

and maintain the project assets during the given concession period. The private developer<br />

recover the investments through commercial avenues like entry/parking fee, lease rentals,<br />

licence fee and etc., and collection various fees as specified for the concession period.<br />

6. New Ring Road/Elevated High Road on PPP format<br />

Following options can be explored to implement the proposed Ring Road/Elevated High<br />

Roads for <strong>Dhanbad</strong> on Public Private Partnership framework.<br />

Option I:<br />

Payment on an Annuity Basis followed by Tolling: A private developer shall be selected to carry out<br />

the projects on a Built Own Operate and Transfer (BOOT) basis. In this case the private<br />

developer will pay a certain amount of Annuity to the <strong>Municipal</strong> <strong>Corporation</strong> and then<br />

recover the cost through tolling/ advertisements and etc. They have to pay a share of profit<br />

to the <strong>Municipal</strong> <strong>Corporation</strong>, in addition to the annuity fee if the income (from tolling etc.)<br />

exceeds a particular amount. The separate stretches to the roads will be returned back to the<br />

<strong>Municipal</strong> <strong>Corporation</strong> after the lease period.<br />

Option II:<br />

Built Operate and Transfer: Bid out the project in full to a Private Developer to run on a BOT<br />

basis for a certain number of years as per concession agreement.<br />

Option III:<br />

Joint Venture Company: PPP form of the Joint Venture company can under take development<br />

and maintenance of proposed Ring Road/elevated roads. In this concept a project<br />

development fund can be created through equal contribution from both parties. This fund<br />

would form the equity of the Joint Venture company. The investment companies may<br />

support the Special Purpose Company (SPC) in raising finance in the form of debt. Any<br />

Viability Gap funding required for successful implementation of the project shall be filled<br />

through Subordinate Loan from the GoJ to the SPC. The SPC shall bid the different stages of<br />

the project to EPC contractors through a transparent process and these EPC contractors shall<br />

execute the work.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 200


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

7. Redevelopment of Existing <strong>Municipal</strong> <strong>Corporation</strong> on PPP format<br />

The present <strong>Municipal</strong> <strong>Corporation</strong> office is in dilapidated condition it requires rehabilitation<br />

or redevelopment intervention. Since <strong>Municipal</strong> <strong>Corporation</strong> do not have sufficient fund to<br />

redevelop the dilapidated/old office building, this can be developed on PPP format. Private<br />

sector developer would be investing on redevelopment of <strong>Municipal</strong> <strong>Corporation</strong> office<br />

building. The redevelopment of this office building project component consist of<br />

construction of <strong>Municipal</strong> <strong>Corporation</strong> Office building at ground floor with parking facility,<br />

commercial space for developer to generate revenue to construction and maintain the<br />

building during the concession period. <strong>Municipal</strong> <strong>Corporation</strong> would be getting an agreed<br />

upfront concession fee from the private sector developer.<br />

8. Construction of New Sports Complex/ Stadium at Bhelatandh on PPP format<br />

The proposed Sports Complex (10 Acres) at Bhelatandh along Hirak By-pass SH Stretch<br />

Bhuli can be developed on Built Operate and Transfer model. Private sector developer would<br />

invest the entire cost of creating and maintaining the sport complex. The private sector<br />

developer would be given on a specified concession period with a fixed concession fee to<br />

maintain the assets created. After the concession period the sport complex would be<br />

transferred to local authority for future maintenance.<br />

9. Development of Other Projects on PPP format<br />

The following listed projects can be implemented on PPP framework wherein the private<br />

sector party would be required to develop and maintain during the concession period. During<br />

the concession period <strong>Municipal</strong> <strong>Corporation</strong> would getting an agreed concession fee during<br />

the concession period, after the agreed concession period created assets would be transferred<br />

to <strong>Municipal</strong> <strong>Corporation</strong>. The proposed project list include, construction of working women<br />

hostel, construction of auditorium, construction of vegetable markets, development of<br />

exhibition ground, development parks and picnic spots.<br />

Table 129: Proposed Other Developmental Projects on Public Private Partnership<br />

Projects<br />

Amount<br />

Rs. Lakh<br />

Construction of Working Women Hostel 30.00<br />

Construction of Auditorium 50.00<br />

Construction of Vegetable Markets 500.00<br />

Development of Exhibition Ground 30.00<br />

Development of Amusement Park at Rejili Bondh 2,000.00<br />

Development of Parks 500.00<br />

Development of Picnic Spots – boating facilities to all major water<br />

bodies 500.00<br />

Total 3,610.00<br />

10. Water Supply System – Operation and Maintenance on Management Contract<br />

To begin with outsourcing of operations and maintenance and some of the commercial<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 201


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

activities through management contracts through professional and reliable operator shall be<br />

done. From the identified long list of projects, bankable projects shall be developed through<br />

public private partnership format. This would greatly facilitate induction of technical land<br />

system knowledge and pave the way for future larger private sector involvement in project<br />

development. At the same time it is recognized that while private investment management<br />

shall play a growing role, the same must be coupled with a strong legal, contractual and<br />

regulatory framework which would be carried out simultaneously.<br />

Willingness of private sector participation is entirely dependent on financial viability of<br />

infrastructure projects the tariff structure charged from consumer are insignificant when<br />

compared to the capital expenditure and recurring expenditure incurred during the project life<br />

cycle. With the present set of rule, regulations, market determined tariff/structure in<br />

particular; the probability of attracting the private participation would remain very small. To<br />

encourage the private sector participation in service delivery it is necessary to amend / revise<br />

the rules and restructure the tariff plan so that project will be bankable on PPP format.<br />

However, distribution network laying and maintaining the same can be privatized, in this<br />

concept the private sector developer shall procure and lay of distribution network proposed<br />

for <strong>Dhanbad</strong> and do the operation and maintenance of the same. Structuring can be done in<br />

such a way that project become viable.<br />

11. Solid Waste Management – Collection and Transportation Outsourcing<br />

PPP form of the Joint venture company can under take waste management services to various<br />

industries, health care establishments and residents both present and prospective including<br />

levying and collection of service charges on user-pay principle by individual units in a<br />

professional manner. Each user compensates for the cost of waste management.<br />

12. Solid Waste Management – Scientific Disposal Facility Development on BOT basis<br />

Joint Venture Company can be formed to undertake scientific disposal of municipal solid<br />

waste generated in <strong>Dhanbad</strong>. Construction and maintenance of scientific landfill site<br />

development for inorganic waste and compost plant for organic waste collected from the city<br />

on built operate and transfer framework. The developer would be getting the tipping fee<br />

(based on tonnage of waste treated per day) from the <strong>Municipal</strong> <strong>Corporation</strong> for scientific<br />

disposal of municipal waste. <strong>Municipal</strong> <strong>Corporation</strong> can recover the tipping fee from<br />

consumer/citizens by introducing user charges/conservancy fee or door to door collection<br />

fee or solid waste tax and etc.<br />

13. Construction and Maintenance of Sewerage Treatment Plant on BOT basis<br />

It is proposed to develop initially one sewerage treatment plan on PPP basis. The operations<br />

shall expect to make capital investment for treatment plant and recover it over agreed<br />

concession period. Cost will be recovered through a combination of sewerage tax, sewerage<br />

charges, connection fee, local body general revenues and government subsidy. The needs of<br />

lower income groups can be taken care of by working out an innovative cross subside<br />

structure based on subsidy i) from one group to another ii) from one land use to another and<br />

iii) from one account to another.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 202


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

14. Construction of Housing complex at Bhelatandh and Sugiadih & New Residential Township on<br />

BOT basis<br />

To meet the growing housing demand in <strong>Dhanbad</strong>, two locations were identified for housing<br />

complexes and to avoid existing congested Central Business District (CBD) new residential<br />

township is proposed at Kurmidhi, Bada Pichdi, Chota Pichdi and Udaipur along NH 32.<br />

Since the <strong>Municipal</strong> <strong>Corporation</strong> itself cannot develop residential complexes and new<br />

townships therefore it is proposed on PPP format. <strong>Municipal</strong> <strong>Corporation</strong> shall identify and<br />

acquire suitable land in Bhelatandh (Govindpur block) and Sugiadih (<strong>Dhanbad</strong> block) village<br />

for housing complex and for new townships at Kurmidhi, Bada Pichdi, Chota Pichdi and<br />

Udaipur. It is proposed to develop residential complex in 150 to 200 acres of land and for<br />

new townships it envisaged 500 acres land, which needs to be acquired by <strong>Dhanbad</strong><br />

<strong>Municipal</strong> <strong>Corporation</strong>. Private sector developer would develop housing complexes and new<br />

townships on Built Operate and Transfer (BOT) framework on <strong>Municipal</strong> <strong>Corporation</strong> land.<br />

<strong>Municipal</strong> <strong>Corporation</strong> can get into concession agreement with private sector developer by<br />

this <strong>Corporation</strong> would be getting concession fees in the form of upfront lease amount as<br />

agreed in the concession agreement.<br />

15. Development of Amusement Park at Rejili Bandh on BOT basis<br />

Development of Amusement Park at Rejili Bandh could be developed on PPP framework<br />

wherein the private sector party would be required to develop and maintain the amusement<br />

park during the concession period. During the concession period <strong>Municipal</strong> <strong>Corporation</strong><br />

would getting an agreed concession fee during the concession period, after the agreed<br />

concession period created assets would be transferred to <strong>Municipal</strong> <strong>Corporation</strong>.<br />

The region recognizes the importance of PPP not only funding mechanism but also an<br />

important tool to bring in efficiencies as well as ensure proper operations and maintenance of<br />

the assets being created herein.<br />

A spectrum of PPP options ranging from agreeing frameworks to full privatization has been<br />

thought about and same has been discussed above in detail.<br />

However, the choice of option given situation will depend on factors such as degree of control<br />

desired by the ULBs, legal framework for private investment, regulatory mechanism and potential<br />

of attracting financial resources from both public and private sectors.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 203


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Table 130: Summary of proposed projects on Public Private Partnership<br />

Projects<br />

Amount<br />

Rs. Lakh<br />

Bus Terminus at Bartand (Existing) 5,000.00<br />

New Bus Terminus at near Barwadda 5,000.00<br />

Transport Nagar at Pandukki (along NH2) 7,500.00<br />

Ring Road 9,000.00<br />

Parking Lots 1,000.00<br />

Mass Transit System (Public Transport System) 12,500.00<br />

Redevelopment of Existing <strong>Municipal</strong> <strong>Corporation</strong> Office (Office<br />

cum Commercial Complex) 1,000.00<br />

Construction of Working Women Hostel 30.00<br />

Construction of New Sports Complex (Stadium) 5,000.00<br />

Construction of Auditorium 50.00<br />

Construction of Vegetable Markets 500.00<br />

Development of Exhibition Ground 30.00<br />

Development of Amusement Park at Rejili Bondh 2,000.00<br />

Development of Parks 500.00<br />

Development of Picnic Spots – boating facilities to all major water<br />

bodies 500.00<br />

Solid Waste Management – landfill 1,490.71<br />

Sewerage Treatment Plant 9,181.79<br />

Water Supply 9,143.14<br />

Total 69,425.64<br />

Following tables presents the FOP results after considering the above projects under PPP.<br />

The “do nothing scenario” is worked out considering only the revenue account transactions<br />

to assess the <strong>Corporation</strong> capacity to generate revenue surpluses that could be leveraged to<br />

undertake capital investments. Detailed cash flows are worked out for each of the subprojects<br />

based on the assumptions with regards investment phasing, financing pattern,<br />

additional O&M expenditure and additional income due to proposed capital investments,<br />

PPP project for the Full Project scenario. The net project cash flows are then loaded onto the<br />

base case scenario to test their impact on the overall <strong>Corporation</strong> fiscal situation.<br />

“Do nothing Scenario”. The do nothing scenario results indicate that under the past-trend<br />

based assumptions adopted, <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> would end up with a positive<br />

cumulative surplus of Rs. 11,884 lakh by the end of FY 2013-14. With reforms and additional<br />

resource mobilization initiatives like Private sector participation and parking fee, levying of<br />

new charges like conservancy fee <strong>Corporation</strong> can reach above said cumulative surplus.<br />

Full Project Sustenance Scenario. Table 132 presents a summary of total project cash flows<br />

due to the full project scenario. The total net project cash flows due to full project when<br />

loaded onto the base case Scenario FOP indicate that <strong>Dhanbad</strong> <strong>Corporation</strong> cannot sustain<br />

the proposed investment and hence <strong>Municipal</strong> <strong>Corporation</strong> requires O&M cost for<br />

management of assets which are created under the item of Basic services for Urban Poor<br />

during the mission period. Table 131 presents a summary of the <strong>Corporation</strong> fiscal status in<br />

the Full Project scenario. The full project investment proposed for <strong>Dhanbad</strong> is to the tune of<br />

Rs. 383,274.40 lakh, details of sector wise financing pattern is presented in the following table.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 204


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Table 131: Financial Operating Plan (FOP) Results<br />

Item Heads 2006 2007 2008 2009 2010 2011 2012 2013<br />

Rs. Lakh<br />

Opening Balance (422) (220) 1,322 2,836 4,378 6,015 7,937 9,850<br />

Revenue Income 1,122 1,829 1,907 2,042 2,154 2,599 2,770 2,961<br />

Additional Revenue Mobilization - 906 910 929 1,053 1,058 1,062 1,205<br />

Revenue from BOT Projects (from PSD)<br />

Total Revenue Income 1,122 2,735 2,817 2,971 3,208 3,657 3,833 4,166<br />

Revenue Expenditure 921 1,193 1,303 1,429 1,572 1,734 1,920 2,133<br />

Status 201 1,542 1,514 1,543 1,636 1,923 1,913 2,034<br />

Closing Balance (220) 1,322 2,836 4,378 6,015 7,937 9,850 11,884<br />

Total Net Project Cash Flow (after<br />

- 188 (401) (1,789) (2,849) (5,819) (9,942) (14,101)<br />

deducting ULB equity from cash flow)<br />

Overall Closing Balance (220) 1,510 2,435 2,590 3,166 2,119 (92) (2,217)<br />

Table 132: Summary of Project Cash flow<br />

Description 2007-08 2008-09 2009-10 2010-11 2011-12 2012-13 2013-14 2014-15<br />

Rs. Lakh<br />

1 Water Supply 1,185.5 2,414.6 4,335.7 7,654.7 10,026.3 11,074.7 12,453.4 13,311<br />

2 Sewerage 344.6 735.7 982.9 1,581.4 2,178.9 1,642.3 942.6 (839)<br />

3 Roads and Traffic Management (23.0) (163.4) (463.5) (972.4) (1,754.7) (2,553.5) (3,552.8) (5,082)<br />

4 Storm Water Drainage (126.2) (444.2) (970.6) (1,708.3) (2,642.1) (3,000.0) (3,569.6) (5,033)<br />

5 Solid Waste Management 238.1 398.4 507.8 557.2 474.4 267.5 15.7 (255)<br />

6 Street Lighting (0.9) (35.3) (308.0) (948.4) (1,958.8) (3,021.8) (4,256.4) (5,696)<br />

7 Urban Services for Poor (26.1) (121.1) (297.9) (598.7) (1,078.8) (1,497.7) (1,985.8) (2,741)<br />

8 Others 0.0 (50.0) (149.1) (292.0) (485.4) (693.5) (913.5) (1,144)<br />

Total Sub Project Cash Flow 1,592.1 2,734.7 3,637.3 5,273.6 4,759.8 2,217.8 (866.5) (7,480)<br />

Opening Balance - 1,592 2,735 3,637 5,274 4,760 2,218 (866)<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 205


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Description 2007-08 2008-09 2009-10 2010-11 2011-12 2012-13 2013-14 2014-15<br />

Rs. Lakh<br />

A Sources of Fund<br />

1 Debt Drawdown 1,404 1,732 2,291 2,696 2,456 1,582 1,074 -<br />

Equity from Private Developer 11,231 12,930 15,261 21,277 16,142 9,611 11,323 -<br />

2 Equity Drawdown 4,091 5,302 6,801 7,444 6,402 4,802 3,461 -<br />

3 Govt. Grant 39,026 46,582 56,823 73,306 58,332 37,320 37,002 -<br />

4 User Charges 238 1,163 2,056 3,787 5,004 5,300 6,439 6,740<br />

5 New Connection Fees 1,702 1,377 2,602 4,335 3,587 361 449 460<br />

Total- Inflow 57,691 69,086 85,833 112,845 91,922 58,975 59,748 7,199<br />

B Disposition of Funds<br />

1 Project Capital Expenditure 55,751 66,545 81,176 104,723 83,331 53,314 52,860 -<br />

2 O&M - 517 1,337 2,517 3,907 4,988 5,854 6,487<br />

3 Debt Servicing - 83 1,042 1,960 2,645 2,807 3,417 7,326<br />

4 IDC 348 798 1,376 2,009 2,553 408 702 -<br />

Total- Outflow 56,099 67,943 84,931 111,209 92,436 61,517 62,833 13,813<br />

Net Cash Flow 1,592 1,143 903 1,636 (514) (2,542) (3,084) (6,614)<br />

Closing Balance 1,592 2,735 3,637 5,274 4,760 2,218 (866) (7,480)<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 206


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

E. Funding Pattern<br />

As per the JNNURM guidelines, component wise funding pattern is presented in Table 133.<br />

Table 133: Proposed Funding Pattern (Base Cost)<br />

Description Central<br />

Government<br />

Grant<br />

State<br />

Government<br />

Grant<br />

ULB/PPP/FIs/<br />

Beneficiaries<br />

Total<br />

Rs. Lakh<br />

Water Supply 19,058.36 7,623.34 11,435.01 38,116.71<br />

Sewerage &<br />

Sanitation 26,240.09 10,496.04 15,744.05 52,480.18<br />

Road and Traffic<br />

Management 73,135.50 29,254.20 43,881.30 146,271.00<br />

Storm Water<br />

Drainage 19,762.45 7,904.98 11,857.47 39,524.89<br />

Solid Waste<br />

Management 2,798.04 1,119.22 1,678.83 5,596.09<br />

Street Lighting 2,828.28 1,131.31 1,696.97 5,656.57<br />

Basic Services for<br />

Urban Poor 32,074.48 12,829.79 19,244.69 64,148.96<br />

Others 15,740.00 6,296.00 9,444.00 31,480.00<br />

Total 191,637.20 76,654.88 114,982.32 383,274.40<br />

% Distribution 50% 20% 30% 100%<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 207


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Annexure 1: Primary Stakeholders Consultation findings<br />

Annexure: Primary Stakeholders Consultation findings<br />

Consultation is an inseparable part of any planning process, for opinion of those, who will be<br />

the beneficiaries of the development, is very important. In due course of the process,<br />

feedback from people from various hierarchies was collected. The feedback was collectively<br />

official and personal in nature so as to incorporate the needs for development from<br />

administrative as well as resident point of view. Although feedbacks given from various<br />

people were very subjective in nature, a comprehensive study of their inputs has brought out<br />

a few concrete results.<br />

Profile of the consulting Entity: Mr. Chandrasekhar Dube, MP, <strong>Dhanbad</strong><br />

Date of the consultation: 27 th of May, 2006<br />

Venue:<br />

Cottage in front of circuit house<br />

Issues raised/discussed/suggestions:<br />

1. He envisions <strong>Dhanbad</strong> to be a modern city.<br />

2. He feels drinking water is the first priority. Then water for irrigation purpose also is as<br />

important.<br />

3. Smooth roads and wide ranging roads network.<br />

4. Health care is also very important. Right now no medicines can be found in PHCs.<br />

5. Proper utilization of funds is warranted. Auditing system in place.<br />

6. Power supply for 24 hrs.<br />

7. Only Palamu and Giridih are the naxalites affected regions.<br />

8. For proper education, Universities, Medical colleges, Engineering Colleges should be there in<br />

enough numbers.<br />

9. He also felt the strong need that closed industries like FCI should be opened.<br />

Quality of service of current urban amenities:<br />

Urban Infrastructure<br />

Drainage and Sanitation<br />

Solid Waste Management<br />

Urban Transport<br />

Water Supply<br />

Street Light<br />

Storm Water Drainage<br />

Grading<br />

Poor<br />

Poor<br />

Poor<br />

Very Poor<br />

Ok<br />

Poor<br />

Prioritisation of sectors:<br />

Infrastructure Sector<br />

Priority wise Ranking<br />

Drainage and Sanitation 3<br />

Solid Waste Management 5<br />

Urban Transport 8<br />

Water Supply 1<br />

Sewerage 2<br />

Storm water drainage and Water Body Rejuvenation 6<br />

Street light 7<br />

Housing for Poor 4<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 208


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

SWOT Analysis:<br />

Strengths<br />

Coal reserves<br />

Recently explored methane reserves<br />

NTPC in Madandih<br />

Opportunity<br />

Creation of employment<br />

opportunities by efficient use of coal<br />

and methane reserves<br />

Weakness<br />

Naxalism, Corruption, Unemployment.<br />

TATA is not playing fair, it is not paying it’s<br />

workers according to 6 th payment commission.<br />

Money, not reaching the ground.<br />

Lack of teachers due to low salary packages.<br />

Threat<br />

Growing Naxalites threat<br />

Profile of the consulting Entity:<br />

Date of the consultation:<br />

Venue:<br />

Mrs. Kunti Singh, MLA, Jharia Constituency<br />

27 th of May<br />

Kunti Mansion, near Steel Gate<br />

Issues raised/discussed/suggestions:<br />

1. Explained the vital needs of the city, she confirmed that the city’s Airport should be revived,<br />

as it helps grow the business community.<br />

2. She told that bus stands need to be rehabilitated as there is very large traffic in <strong>Dhanbad</strong>, and<br />

due to lack of proper facilities, people suffer in all parts of <strong>Dhanbad</strong>.<br />

3. Much more emphasis should be put on design of a well engineered sewerage system as the<br />

water outflow from drainage spoils all the roads, and that’s is what spoils the road<br />

conditions, in spite of repeated rehabilitation.<br />

4. Coal in Jharia, which has caught fire, needs to be cut off from the intact portion, so that the<br />

valuable coal can be saved.<br />

5. Amusement parks are urgent need as there are no places right now, where on a holiday;<br />

parents can take their children for recreation.<br />

6. Slum housing needs a thrust, as basic facilities should be provided to all.<br />

7. A lots of people come to work in <strong>Dhanbad</strong>, there are no good arrangements, where they can<br />

spend their night. Steps should be taken in that direction also.<br />

8. Jharia should not be displaced. The ground should be improved for stability and mining to<br />

be abandoned in that zone, so that people stay where they are and do whatever they are<br />

doing.<br />

9. As far as Jharia is concerned, following needs to be done:<br />

a. Raja Talab beautification should be taken up and it can be developed into a tourist<br />

spot.<br />

b. Proper drainage system<br />

c. Water and power supply<br />

d. Rehabilitation of the labour, working there.<br />

e. Children’s parks for rejuvenation<br />

f. some roads are pathetic in condition, need to be maintained<br />

g. Good education for all the children.<br />

h. Better Employment opportunities.<br />

10. She told that Vidhayak fund is utilized for small roads, Drains, Samudayik bhavans,<br />

Ambulance.<br />

11. For future proposals for the projects to be taken up, she suggested the following things:<br />

a. Raja Talab beautification<br />

b. Children’s Park<br />

c. Stopped track should be shifted and laid at a different location<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 209


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

d. Kolanchal University for <strong>Dhanbad</strong>.<br />

12. Talking about the facilities provided by BCCL, she said that more is required to be done,<br />

some of them are:<br />

a. Timely payment to labourer.<br />

b. BCCL should also make arrangements for education of the poor.<br />

c. Drinking water is a problem in Collieries.<br />

d. Power distribution in the collieries.<br />

Quality of service of current urban amenities:<br />

Urban Infrastructure<br />

Drainage and Sanitation<br />

Solid Waste Management<br />

Urban Transport<br />

Water Supply<br />

Street Light<br />

Storm Water Drainage<br />

Grading<br />

Very Poor<br />

Poor<br />

Poor<br />

Very Poor<br />

Ok<br />

Poor<br />

Prioritisation of sectors:<br />

Infrastructure Sector<br />

Priority wise Ranking<br />

Drainage and Sanitation 1<br />

Solid Waste Management 3<br />

Urban Transport 6<br />

Water Supply 5<br />

Sewerage 4<br />

Storm water drainage and Water Body Rejuvenation 7<br />

Street light 8<br />

Housing for Poor 2<br />

SWOT Analysis:<br />

Strengths<br />

Potential tourism places<br />

Coal abundance<br />

Opportunity<br />

Coal based Industries<br />

Domestic as well as foreign tourism<br />

Weakness<br />

Transport Sector<br />

Bad sewerage conditions<br />

Large traffic<br />

Threat<br />

Jharia region instability<br />

Naxal movement<br />

Vision for <strong>Dhanbad</strong>:<br />

1. Safe and Prosperous <strong>Dhanbad</strong>.<br />

2. Habitat for all, especially for the poor.<br />

Profile of the consulting Entity: Mr. Narendra Kumar, Superintendent Engineer,<br />

JRDA<br />

Date of the consultation: 27 th of May, 2006<br />

Venue:<br />

JRDA Office, near circuit house<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 210


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Issues raised/discussed/suggestions:<br />

1. In Jharia zone, there is fire, there is subsidence, there are cracks, from which the fire comes<br />

into contact with air, and propagates.<br />

2. CMPDI has prepared master plan for Jharia rehabilitation. And it’s the authority form BCCL<br />

side to take care of rehabilitation plan.<br />

3. He told about proposed sites that they are tentatively selected, but final approval hasn’t yet<br />

come.<br />

4. He also suggested that all future development should be consistent with the mining activities<br />

and should incorporate the future mining plan.<br />

Quality of service of current urban amenities:<br />

Urban Infrastructure<br />

Drainage and Sanitation<br />

Solid Waste Management<br />

Urban Transport<br />

Water Supply<br />

Street Light<br />

Storm Water Drainage<br />

Grading<br />

Poor<br />

Poor<br />

Ok<br />

Poor<br />

Ok<br />

Poor<br />

Prioritisation of sectors:<br />

Infrastructure Sector<br />

Priority wise Ranking<br />

Drainage and Sanitation 2<br />

Solid Waste Management 3<br />

Urban Transport 7<br />

Water Supply 1<br />

Sewerage 6<br />

Storm water drainage and Water Body Rejuvenation 5<br />

Street light 8<br />

Housing for Poor 4<br />

Profile of the consulting Entity:<br />

Mr., Kamal Kishore Srivastava, DTO<br />

Date of the consultation: 27 th of May, 2006<br />

Venue:<br />

New DTO Office, near Court Complex<br />

Issues raised/discussed/suggestions:<br />

1. About the requirements of bypass road, he told that<br />

GT Road to Bokaro bypass is required.<br />

2. He also emphasized on Public awareness regarding<br />

traffic management.<br />

3. Imposition of fine, whenever rules are broken, has<br />

to come in place. And the rules need to be followed<br />

strictly.<br />

4. Currently, there is no internal transport facility for<br />

the city, leading to heaving traffic, as more and<br />

more people end up using four-wheelers. And for<br />

poor, there is no other way other than traveling on the roof of loaded buses, which can be<br />

counted on fingers. An example is shown is the picture:<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 211


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

5. He talked about need of solid waste management, as people end up throwing waste near<br />

roads, which eventually reduces the effective carriageway width and leaving the stretches<br />

prone to accident.<br />

Quality of service of current urban amenities:<br />

Urban Infrastructure<br />

Drainage and Sanitation<br />

Solid Waste Management<br />

Urban Transport<br />

Water Supply<br />

Street Light<br />

Storm Water Drainage<br />

Grading<br />

Poor<br />

Very Poor<br />

Very Poor<br />

Poor<br />

Poor<br />

Poor<br />

Prioritisation of sectors:<br />

Infrastructure Sector<br />

Priority wise Ranking<br />

Drainage and Sanitation 7<br />

Solid Waste Management 2<br />

Urban Transport 1<br />

Water Supply 3<br />

Sewerage 8<br />

Storm water drainage and Water Body Rejuvenation 5<br />

Street light 4<br />

Housing for Poor 6<br />

Profile of the consulting Entity: Mr. Pandey; Tourism Officer, Tourism Information<br />

Centre<br />

Date of the consultation: 27 th of May, 2006<br />

Venue:<br />

Tourism Information Centre, Hotel Ratna Vihar<br />

Issues raised/discussed/suggestions:<br />

1. He raised the concern that there is not enough thrust from government side to promote<br />

tourism in the region, in spite of having enormous potential.<br />

2. There is also a need to provide better connectivity to various important places of local as well<br />

as global importance.<br />

3. Tourist spots like Topchanchi Lake, Maithan Dam, and Lilori Temple need to be revived<br />

from tourism point of view.<br />

4. He has given a recommendation report to ministry, in which potential sites to be developed<br />

at tourism spots are mentioned.<br />

5. He also feels the need of buses at the information centre, which can take tourists to the spots<br />

and thus promote it.<br />

6. There is also a need to revive the water bodies within the city like Bekar Bandh, Pampu Talab<br />

etc., which are of very high local importance.<br />

Quality of service of current urban amenities:<br />

Urban Infrastructure<br />

Drainage and Sanitation<br />

Solid Waste Management<br />

Urban Transport<br />

Water Supply<br />

Street Light<br />

Grading<br />

Poor<br />

Poor<br />

Poor<br />

Ok<br />

Ok<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 212


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Storm Water Drainage<br />

Tourism development<br />

Poor<br />

Very Poor<br />

Prioritisation of sectors:<br />

Infrastructure Sector<br />

Priority wise Ranking<br />

Drainage and Sanitation 5<br />

Solid Waste Management 6<br />

Urban Transport 1<br />

Water Supply 7<br />

Sewerage 4<br />

Storm water drainage and Water Body Rejuvenation 3<br />

Street light 9<br />

Housing for Poor 8<br />

Tourism development 2<br />

SWOT Analysis:<br />

Strengths<br />

Potential tourism sites<br />

Religious places of great local importance<br />

Opportunity<br />

Domestic and international tourism<br />

Weakness<br />

Negligence of government towards<br />

tourism<br />

Threat<br />

Naxalites<br />

Profile of the consulting Entity:<br />

Mr. R K Thakur, Fire Station Officer<br />

Date of the consultation: 27 th of May, 2006<br />

Venue:<br />

Randheer Verma Stadium, Golf Ground<br />

Issues raised/discussed/suggestions:<br />

1. He has given fire accident data for Jharia and Sindri both, as he looks after both the places.<br />

2. He has emphasized on the need for having stringent building construction norms, to ensure<br />

safety from fire in long term.<br />

3. Right now there are various places in <strong>Dhanbad</strong>, where extinguisher van can’t at all reach.<br />

4. Almost all the hotels are not complying with the fire norms.<br />

Quality of service of current urban amenities:<br />

Urban Infrastructure<br />

Drainage and Sanitation<br />

Solid Waste Management<br />

Urban Transport<br />

Water Supply<br />

Street Light<br />

Storm Water Drainage<br />

Grading<br />

Poor<br />

Poor<br />

Ok<br />

Very Poor<br />

Poor<br />

Poor<br />

Prioritisation of sectors:<br />

Infrastructure Sector<br />

Priority wise Ranking<br />

Drainage and Sanitation 5<br />

Solid Waste Management 2<br />

Urban Transport 1<br />

Water Supply 3<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 213


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Sewerage 4<br />

Storm water drainage and Water Body Rejuvenation 6<br />

Street light 8<br />

Housing for Poor 7<br />

SWOT Analysis:<br />

Strengths<br />

Opportunity<br />

Weakness<br />

Non-compliance of building regulations<br />

Unplanned building construction<br />

Threat<br />

Profile of the consulting Entity: Mr. K K Sharma, Head Assistant, NAC Chhatatand<br />

Mr. Kamal Bahadur Verma, staff, Chhatatand NAC<br />

Date of the consultation: 29 th of May, 2006<br />

Venue:<br />

NAC Office, Chhatatand<br />

Issues raised/discussed/suggestions:<br />

1. They told that there is large number of people living below poverty line. A survey was<br />

conducted for BPL for census in 2001 on the basis of their amenities and infrastructure.<br />

2. Solid waste disposal is taken care by MADA, as they suffer from lack of staff. A tractor (and<br />

other assets) given by them is used by MADA (given in 2002) staff to function the same.<br />

3. He also noted that road density is better in <strong>Dhanbad</strong> as compared to other districts of<br />

Jharkhand.<br />

4. Lack of staff, infrastructure and revenue are the setbacks in developmental procedure.<br />

Quality of service of current urban amenities:<br />

Urban Infrastructure<br />

Drainage and Sanitation<br />

Solid Waste Management<br />

Urban Transport<br />

Water Supply<br />

Street Light<br />

Storm Water Drainage<br />

Grading<br />

Very Poor<br />

Poor<br />

Poor<br />

Very Poor<br />

Ok<br />

Poor<br />

Prioritisation of sectors:<br />

Infrastructure Sector<br />

Priority wise Ranking<br />

Drainage and Sanitation 2<br />

Solid Waste Management 5<br />

Urban Transport 7<br />

Water Supply 1<br />

Sewerage 4<br />

Storm water drainage and Water Body Rejuvenation 6<br />

Street light 8<br />

Housing for Poor 3<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 214


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Profile of the consulting Entity:<br />

Date of the consultation:<br />

Venue:<br />

Mr. Pawan Kumar: CO, Baghmara Circle<br />

29th of May<br />

CO Office, Baghmara<br />

Issues raised/discussed/suggestions:<br />

1. There is a major scarcity of staff. Lot of people here and there working on deputation, which<br />

leads to degradation of quality of work.<br />

2. Temporary staff is also not being provided.<br />

3. People follow the practice of dumping solid waste alongside the rivers, which creates bad<br />

look, pollutes the streams, and enhances the chance of pandemic.<br />

4. There are almost nil sources of revenue generation; No tax levied in Jharia, Chhatatand and<br />

Katras, leaving the government bodies weaker.<br />

5. He conformed that even part of Chatatand is fire affected, so rehabilitation is to be<br />

eventually done. So no Construction is allowed by BCCL, as all the land belongs to BCCL.<br />

For example “Sulabh Shauchalaya” construction was stopped by BCCL, even after getting a<br />

grant of 13 lacs.<br />

6. No committee formed like JRDA for rehabilitation for Chatatand.<br />

7. Salaries are pending, spreading havoc among employees. There was also shocking piece of<br />

information that there is no permanent staff in Chhatatand NAC Office, and volunteers<br />

working for last 11 years for no salary, in the hope that they will be absorbed by the system.<br />

Quality of service of current urban amenities:<br />

Urban Infrastructure<br />

Drainage and Sanitation<br />

Solid Waste Management<br />

Urban Transport<br />

Water Supply<br />

Street Light<br />

Storm Water Drainage<br />

Grading<br />

Very Poor<br />

Poor<br />

Poor<br />

Poor<br />

Poor<br />

Poor<br />

Prioritisation of sectors:<br />

Infrastructure Sector<br />

Priority wise Ranking<br />

Drainage and Sanitation 1<br />

Solid Waste Management 4<br />

Urban Transport 8<br />

Water Supply 3<br />

Sewerage 2<br />

Storm water drainage and Water Body Rejuvenation 6<br />

Street light 7<br />

Housing for Poor 5<br />

Profile of the consulting Entity:<br />

Mr. R N Sinha, CMO and Civil Surgeon<br />

Mr. U P Singh, RCH Officer, PMCH<br />

Date of the consultation: 30 th of May, 2006<br />

Venue:<br />

PMCH<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 215


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Issues raised/discussed/suggestions:<br />

1. Mr. Singh noted that air pollution is a major problem here. Skin Deceases are quite<br />

prevalent due to this. The reason being transportation of coal in open truck, which adds<br />

to the RSPM in a major way.<br />

2. He also told that bathing in polluted water promotes deceases. And this is quite<br />

prominent and traditional way.<br />

3. There are about 60 nursing homes.<br />

4. Private facilities like<br />

a. DBC<br />

b. ACC hospital<br />

c. TISCO Hospital<br />

d. BCCL Hospital<br />

5. Small Centres like<br />

a. CMRI<br />

b. CFRI<br />

c. ISM<br />

6. Major Health problems in the city<br />

a. Dust from Coal Mines<br />

b. Heavy traffic leading to pollution<br />

c. Problems like Tuberculosis, Gastestoritis,<br />

d. Due to alcohol consumption problems like Alcoholic Hepatitis<br />

e. STI<br />

7. There is a major need of:<br />

a. Sewerage system<br />

b. Solid waste management for<br />

c. Housing facilities for poor<br />

d. Nursing homes<br />

8. Right now in hospitals, for solid waste they burn it and burry in pits.<br />

9. There are no disposal facilities in nursing homes.<br />

10. He cited one or two instances where segregation is done into Paper, Iron and plastic<br />

types.<br />

Quality of service of current urban amenities:<br />

Urban Infrastructure<br />

Drainage and Sanitation<br />

Solid Waste Management<br />

Urban Transport<br />

Water Supply<br />

Street Light<br />

Storm Water Drainage<br />

Disposal of medical waste<br />

Grading<br />

Poor<br />

Very Poor<br />

Ok<br />

Poor<br />

Ok<br />

Poor<br />

Very Poor<br />

Prioritisation of sectors:<br />

Infrastructure Sector<br />

Priority wise Ranking<br />

Drainage and Sanitation 3<br />

Solid Waste Management 1<br />

Urban Transport 7<br />

Water Supply 6<br />

Sewerage 4<br />

Storm water drainage and Water Body Rejuvenation 5<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 216


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Street light 8<br />

Housing for Poor 2<br />

SWOT Analysis:<br />

Strengths<br />

Opportunity<br />

Weakness<br />

No disposal arrangements for<br />

biomedical waste<br />

Threat<br />

Fast growing population, but<br />

incompatible growth of facilities<br />

Profile of the consulting Entity: Mr. Gobardhan Ram, Assistant Administrator,<br />

Jharia<br />

Date of the consultation: 30 th of May, 2006<br />

Venue:<br />

NAC Office, Jharia<br />

Issues raised/discussed/suggestions:<br />

1. He informed that MADA takes care of sanitation<br />

and water supply in the area.<br />

2. Area wise Jharia is a small NAC, but has a large<br />

population comparatively; the reason is Jharia being<br />

prominent coal field of the country.<br />

3. The area of the NAC is about 1.125 sqKm. The<br />

area is densely populated and the population as per<br />

the 2001 census is 81979.<br />

4. But as compared to the need of the population,<br />

very little development has taken place due to<br />

political interference.<br />

5. Solid waste is not managed well, added Mr.<br />

Gobardhan Ram. A picture taken in the main<br />

market of Jharia show it all:<br />

6. They told that they are supposed to take care of<br />

a. Death and Birth registration<br />

b. Cleanliness and garbage management<br />

c. Water Supply (is taken care by MADA)<br />

d. Sanitation (is taken care by MADA)<br />

e. Roads and street lights.<br />

7. Water tax is also collected by MADA<br />

8. Holding tax is not yet fixed due to unauthorized holdings as if they are asked to pay tax, they<br />

will claim for that land, which actually belongs to BCCL.<br />

9. Right now, they get revenue from<br />

a. Taxation on rickshaw<br />

b. Bullock cart<br />

c. Push Cart<br />

d. Market toll collection<br />

10. They have proposed toll collection form bus stand.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 217


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Quality of service of current urban amenities:<br />

Urban Infrastructure<br />

Drainage and Sanitation<br />

Solid Waste Management<br />

Urban Transport<br />

Water Supply<br />

Street Light<br />

Storm Water Drainage<br />

Grading<br />

Poor<br />

Very Poor<br />

Poor<br />

Poor<br />

Poor<br />

Poor<br />

Prioritisation of sectors:<br />

Infrastructure Sector<br />

Priority wise Ranking<br />

Drainage and Sanitation 2<br />

Solid Waste Management 1<br />

Urban Transport 7<br />

Water Supply 4<br />

Sewerage 5<br />

Storm water drainage and Water Body Rejuvenation 6<br />

Street light 8<br />

Housing for Poor 3<br />

Profile of the consulting Entity:<br />

Mr. Vijay Babu: Head Clerk, Jharia NAC<br />

Date of the consultation: 30 th of May, 2006<br />

Venue:<br />

NAC Office, Jharia<br />

Issues raised/discussed/suggestions:<br />

1. They have bought water tanker and a tractor for Waste disposal, and planning to hand it over<br />

to MADA, but not yet done. The reason being lack of staff.<br />

2. Lots of Large size dust bins were also bought and have been handed over to MADA, but<br />

they are not being utilized efficiently and not serving the purpose to even half the extent.<br />

3. They also quoted that a few days back, Koyala Minister had come and said that Jharia<br />

necessarily has to be rehabilitated. The new located site is about 7 km away from Jharia.<br />

4. Just outside the city, all around, Ground Fire exists. But the city is not under fire.<br />

5. They also told the possibility that Raja Talab can be developed for amusement and other<br />

purposes and revenue can be generated.<br />

6. They feel the need of Bus stand, Roads, Sewerage system.<br />

7. Water supply is not adequate. Out of 12 wards, only 4 receive water.<br />

8. BCCL is not allowing any developments, they are even not allowed to dig and wells, and<br />

hand pumps.<br />

9. There is a need of connectivity of all the wards to the main road.<br />

10. They have proposed a bypass of length 18 km.<br />

11. Power supply is ok, and it is better than <strong>Dhanbad</strong>.<br />

12. Talking about subsidence in the region they told that because sand was not properly filled,<br />

where coal was dug, that’s why subsidence is the major concern.<br />

Quality of service of current urban amenities:<br />

Urban Infrastructure<br />

Drainage and Sanitation<br />

Solid Waste Management<br />

Urban Transport<br />

Water Supply<br />

Grading<br />

Very Poor<br />

Very Poor<br />

Poor<br />

Poor<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 218


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Street Light<br />

Storm Water Drainage<br />

Ok<br />

Poor<br />

Prioritisation of sectors:<br />

Infrastructure Sector<br />

Priority wise Ranking<br />

Drainage and Sanitation 3<br />

Solid Waste Management 4<br />

Urban Transport 7<br />

Water Supply 1<br />

Sewerage 6<br />

Storm water drainage and Water Body Rejuvenation 5<br />

Street light 8<br />

Housing for Poor 2<br />

SWOT Analysis:<br />

Strengths<br />

Mining activities<br />

Mineral abundance<br />

Opportunity<br />

Business opportunities<br />

Collection of holding taxes, income taxes and other<br />

taxes<br />

Weakness<br />

Subsidence<br />

Underground fire<br />

Threat<br />

Rehabilitation<br />

Profile of the consulting Entity: Mr. Vijay Singh Kushwaha, social worker, Member<br />

of Jharia Bachao Samiti, Jharia<br />

Date of the consultation: 30 th of May, 2006<br />

Venue:<br />

Near NAC Office, Jharia<br />

Issues raised/discussed/suggestions:<br />

1. Public is not of the view that Jharia should be rehabilitated. And they are opposing the move.<br />

2. They want government to stabilize the area and let them stay there only.<br />

3. There is a study done by CMRI about Jharia region regarding mining activities, ground fire<br />

and subsidence.<br />

4. Mr. Gopal Aggarwal is the head of Jharia Bachao Samiti, Jharia.<br />

Quality of service of current urban amenities:<br />

Urban Infrastructure<br />

Drainage and Sanitation<br />

Solid Waste Management<br />

Urban Transport<br />

Water Supply<br />

Street Light<br />

Storm Water Drainage<br />

Grading<br />

Poor<br />

Very Poor<br />

Very Poor<br />

Poor<br />

Ok<br />

Poor<br />

Prioritisation of sectors:<br />

Infrastructure Sector<br />

Priority wise Ranking<br />

Drainage and Sanitation 6<br />

Solid Waste Management 1<br />

Urban Transport 3<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 219


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Water Supply 4<br />

Sewerage 5<br />

Storm water drainage and Water Body Rejuvenation 7<br />

Street light 8<br />

Housing for Poor 2<br />

Profile of the consulting Entity:<br />

Mr. Kalim Ahamad Khan, Accounts Officer<br />

Mr. Ashok Kumar Thakur, Cashier,<br />

Accounts Department<br />

Date of the consultation: 30 th of May, 2006<br />

Venue:<br />

MADA Building<br />

Issues raised/discussed/suggestions:<br />

1. Financial health of MADA is not well and currently it’s in a total loss of about 450 crores.<br />

2. The figure of annual loss is approximately 15 crores.<br />

3. The major problem is collection of water charges.<br />

4. 1.4 crores are earned from holding taxes from Jharia, Katras and Chhatatand.<br />

Quality of service of current urban amenities:<br />

Urban Infrastructure<br />

Drainage and Sanitation<br />

Solid Waste Management<br />

Urban Transport<br />

Water Supply<br />

Street Light<br />

Storm Water Drainage<br />

Grading<br />

Poor<br />

Poor<br />

Ok<br />

Poor<br />

Ok<br />

Poor<br />

Prioritisation of sectors:<br />

Infrastructure Sector<br />

Priority wise Ranking<br />

Drainage and Sanitation 1<br />

Solid Waste Management 3<br />

Urban Transport 7<br />

Water Supply 2<br />

Sewerage 5<br />

Storm water drainage and Water Body Rejuvenation 6<br />

Street light 8<br />

Housing for Poor 4<br />

Profile of the consulting Entity:<br />

Mr. Acharya, Mr. N C Pal, Mr. Ravindra,<br />

Mr. Bhagat, <strong>Dhanbad</strong> Municiple<br />

<strong>Corporation</strong><br />

Date of the consultation: 31 st of May, 2006<br />

Venue:<br />

DMC Office<br />

Issues raised/discussed/suggestions:<br />

1. Talking about the conditions of streetlights, they told that Streetlights are being maintained<br />

by private people.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 220


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

2. There was a tender notice and now exists a contract between two private advertisers and<br />

DMC that they will be allowed to place 50 hoardings and 100 kiosks (Small hoardings), each,<br />

and in return they will maintain 400 street lights in the city.<br />

3. Rs. 25,000/- was the security deposit for that contract and the contract started on 31/01/06.<br />

4. Staff strength is currently very weak, and prominently inadequate to deliver the services,<br />

required, said Mr. Bhagat.<br />

5. There is also dearth of trained staff to use<br />

sophisticated instruments, which are lying unused<br />

in the DMC premise.<br />

6. They also recognize the need of an independent<br />

and powerful <strong>Municipal</strong> body to perform the task<br />

and manage its assets well.<br />

7. It’s also lack of staff and efficient management<br />

structure that they are not a sustainable body, and<br />

are not able to deliver the services to the city.<br />

Quality of service of current urban amenities:<br />

Urban Infrastructure<br />

Drainage and Sanitation<br />

Solid Waste Management<br />

Urban Transport<br />

Water Supply<br />

Street Light<br />

Storm Water Drainage<br />

Grading<br />

Poor<br />

Poor<br />

Ok<br />

Very Poor<br />

Ok<br />

Poor<br />

Prioritisation of sectors:<br />

Infrastructure Sector<br />

Priority wise Ranking<br />

Drainage and Sanitation 1<br />

Solid Waste Management 2<br />

Urban Transport 7<br />

Water Supply 3<br />

Sewerage 4<br />

Storm water drainage and Water Body Rejuvenation 6<br />

Street light 8<br />

Housing for Poor 5<br />

SWOT Analysis:<br />

Strengths<br />

Buoyant economy<br />

Purchasing power<br />

Opportunity<br />

Weakness<br />

Lack of staff in municipal<br />

corporation<br />

Lack of civic sense in people.<br />

Threat<br />

Rapidly and haphazardly growing<br />

population<br />

Profile of the consulting Entity:<br />

Mr. Vibhudev: Ex. Engineer, NH deptt<br />

Date of the consultation: 31 st of May, 2006<br />

Venue:<br />

NH Building, Behind, Combined Building<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 221


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Issues raised/discussed/suggestions:<br />

1. He very prominently talked about the need of roads.<br />

2. About the current status of NH network in <strong>Dhanbad</strong>, he told that there are two stretches of<br />

NH: NH32 and NH2. Chas to Ramgarh is NH32, which is taken care by NH Department<br />

only.<br />

3. Govindpur to Mahuda (Telmachchu Bridge) is NH32, with a stretch of 39 km, carriage way<br />

width of 7m, and right of way of 12m.<br />

4. He told NHAI was the authority, which maintains NH2, as it is a part of Golden<br />

Quadrilateral.<br />

5. There is a proposed bypass from Barbadda (<strong>Dhanbad</strong>)(@NH2, 399.00km) to<br />

Godhar(@NH32, 16.00km), 4.6 km of which already exists with 7 m carriageway width.<br />

Quality of service of current urban amenities:<br />

Urban Infrastructure<br />

Drainage and Sanitation<br />

Solid Waste Management<br />

Road Network<br />

Quality of Road<br />

Street Light<br />

Storm Water Drainage<br />

Water Supply<br />

Grading<br />

Poor<br />

Poor<br />

Poor<br />

Very Poor<br />

Ok<br />

Poor<br />

Very Poor<br />

Prioritisation of sectors:<br />

Infrastructure Sector<br />

Priority wise Ranking<br />

Drainage and Sanitation 4<br />

Solid Waste Management 5<br />

Urban Transport 1<br />

Water Supply 2<br />

Sewerage 6<br />

Storm water drainage 3<br />

Street light 8<br />

Housing for Poor 7<br />

Profile of the consulting Entity:<br />

Mr. Satyanand Sinha: Executive Engineer,<br />

PWD, Combined building<br />

Mr. Ajay Rajat: SDO, PWD<br />

Mr. Sunil Kumar: Estimating Officer, PWD<br />

Date of the consultation: 31 st of May, 2006<br />

Venue:<br />

PWD Office, Combined Building<br />

Issues raised/discussed/suggestions:<br />

1. There is a good road network in <strong>Dhanbad</strong>, but the roads need to be widened, repaired and<br />

maintained as the traffic has grown up very rapidly.<br />

2. The agency looks after<br />

a. PWD roads<br />

b. MDR<br />

c. ODR<br />

d. SH<br />

3. Mr. Rajat said that road widening can be taken up in the following places:<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 222


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

a. “<strong>Dhanbad</strong>” to “Kapuria”<br />

b. “Bank More” to “Jharia” over dead railway line.<br />

4. <strong>Dhanbad</strong> to Jharia bypass is approximately going to be 6km.<br />

5. People here own four-wheeler in very large ratios.<br />

6. Govindpur to Tundi one SH of 3km stretch exists.<br />

7. Talking about other agencies, which take care of road construction in <strong>Dhanbad</strong>, he told us<br />

one among various is NREP, which was set up in 1972.<br />

8. He also added that maximum roads are developed by BDO, where 90% of the money flows.<br />

9. Other agencies beside PWD, involved in construction and management of roads<br />

a. NH<br />

b. Special Division<br />

c. NREP<br />

d. Block Administration<br />

e. Jila Parishad<br />

f. REO (Rural Engineering Organisation)<br />

g. <strong>Dhanbad</strong> Nagar Nigam<br />

h. PWD<br />

10. <strong>Dhanbad</strong> to Sindri stretch needs to be rehabilitated, which is about 25.5 km.<br />

11. Emphasizing on sustainability measures, he told that maintenance of the roads as well as<br />

proper drainage facility is very much important; otherwise all the new construction doesn’t<br />

stay for more than six months.<br />

12. Sewerage and storm water flows over the road and destroys all the bitumen roads, as<br />

bitumen and water are technically not compatible.<br />

13. REU (Rural engineering unit) is another agency, which is involved in road construction.<br />

14. Right now most of the drains are open, so people also dump solid waste nearby them and<br />

then drainage get flocked and thus water flows over road, leaving them to ruins.<br />

15. He also jovially shared about the reasons behind it. As the pay is quite less in govt<br />

organizations as compared to the private ones, so not many interested people join govt ones,<br />

and thus the ones, who join don’t care much about maintenance and all.<br />

16. 281 km is the total length of roads exists in <strong>Dhanbad</strong> district. Out of this about 142km is the<br />

length, which come within the purview of new DMC. This was approximate figure and it was<br />

repeatedly mentioned that there is a need to do the primary survey.<br />

17. Mentioning the need of bypass, he told us that Bank More to Jharia bypass is needed, but as<br />

Jharia is going to be rehabilitated, so this can be<br />

lower in the priority.<br />

18. Priority wise bypasses to<br />

a. Sindri<br />

b. Katras<br />

c. Govindpur<br />

d. Baliapur, which is an agriculture belt.<br />

Are important.<br />

19. Sindri is quite old (1945) and is quite important<br />

because of FCI and other important industries.<br />

20. He stressed a lot on cleanliness of the city as well as<br />

of the roads.<br />

21. They repeatedly told about the importance of<br />

drainage and sewerage system.<br />

22. Jamshedpur is the best city of Jharkhand district,<br />

because it’s quite planned and is mostly maintained<br />

by TATA.<br />

23. Even over bridges and railway bridges are places, where ‘Peepal’, ‘Vat’, and some other kind<br />

of trees have grown up due to not being maintained properly.<br />

24. Some other stretches, which can be proposed are as follows:<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 223


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

a. “Labour Chauk”(NH32) to “Barbadda”(NH2).<br />

b. “Bank More” to “Jodha Phatak”<br />

c. “Bank More” to “Parthidih”<br />

d. “Heerapur Park Market” to “Barbasia Phatak”<br />

e. “Barmasia Phatak” to “Howra Motors”<br />

25. Citing as an example of current status of roads he asked to look around “Kamdhenu Petrol<br />

Pump” and observe the condition of roads. The reason for the dilapidated conditions of the<br />

roads are lack of maintenance, indifference of municipality regarding drainage, and also the<br />

local people sometimes, who due to their vested interests offer resistance for the<br />

developmental works. The picture is shown.<br />

Quality of service of current urban amenities:<br />

Urban Infrastructure<br />

Drainage and Sanitation<br />

Solid Waste Management<br />

Road Network<br />

Roads Condition<br />

Water Supply<br />

Street Light<br />

Storm Water Drainage<br />

Grading<br />

Very Poor<br />

Ok<br />

Ok<br />

Poor<br />

Poor<br />

Ok<br />

Very Poor<br />

Prioritisation of sectors:<br />

Infrastructure Sector<br />

Priority wise Ranking<br />

Drainage and Sanitation 1<br />

Solid Waste Management 6<br />

Urban Transport 5<br />

Water Supply 4<br />

Sewerage 3<br />

Storm water drainage 2<br />

Street light 8<br />

Housing for Poor 7<br />

Profile of the consulting Entity:<br />

Mr. Avtar Krishan, GM, Environmental<br />

Department, BCCL<br />

Date of the consultation: 31 st of May, 2006<br />

Venue:<br />

Koyala Bhavan<br />

Issues raised/discussed/suggestions:<br />

1. Talking about the Burning of coal, he said that Open fire can be quenched, dug and cooled.<br />

2. The reason of fire is that there is air entrapped and coal catches fire and continues to burn.<br />

3. Jharia has cocking coal, which is used for steel industry.<br />

4. He also shared that the issue of this rehabilitation is quite old.<br />

5. Rehabilitation is quite costly affair and is being done only in places, where there is an issue of<br />

safety. Thus the reason is people’s safety and not getting the area cleared for mining activity.<br />

6. Currently 8.9sqkm of area is under fire, earlier it was about 16sqkm.<br />

7. The railway track, which was removed, was because of fire reaching near the track, and there<br />

was a protest for removing the track, as passenger trains used to run on that track.<br />

8. He emphasised that Coal is very important for India, as it runs our economy. For power<br />

production and running various other industries, we necessarily need coal, whereas other<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 224


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

countries like Germany are depending on other sources of power, as its costly affair for<br />

them.<br />

9. They produced 330 M tones of coal last year.<br />

10. There were two new locations found by them for coal mining, but they are given to private<br />

players.<br />

11. Sharing the technicalities, he said that washing improves the quality of coal, quite a bit.<br />

12. He acquainted with some facts that Indonesia’s coal is cheaper. China is self sufficient in<br />

coal. But we are not because the potential available here is not being fully tapped.<br />

13. GOI wants private entrepreneurs in this field.<br />

14. Lack of capital investment is the reason for production being less than demand.<br />

Quality of service of current urban amenities:<br />

Urban Infrastructure<br />

Drainage and Sanitation<br />

Solid Waste Management<br />

Urban Transport<br />

Water Supply<br />

Street Light<br />

Storm Water Drainage<br />

Grading<br />

Ok<br />

Poor<br />

Ok<br />

Ok<br />

Ok<br />

Poor<br />

Prioritisation of sectors:<br />

Infrastructure Sector<br />

Priority wise Ranking<br />

Drainage and Sanitation 6<br />

Solid Waste Management 2<br />

Urban Transport 5<br />

Water Supply 1<br />

Sewerage 4<br />

Storm water drainage and Water Body Rejuvenation 3<br />

Street light 8<br />

Housing for Poor 7<br />

SWOT Analysis:<br />

Strengths<br />

Huge coal Reserves<br />

Mineral Availabilities<br />

Opportunity<br />

Coal dependent Industries<br />

Employment opportunities<br />

Weakness<br />

Political setbacks in rehabilitation<br />

issue<br />

Air Pollution<br />

Very large Traffics<br />

Threat<br />

Jharia Fire, Subsidence<br />

Profile of the consulting Entity:<br />

Mr. Mratryunjaya Kumar, Environmental<br />

Engineer, BCCL<br />

Date of the consultation: 31 st of May, 2006<br />

Venue:<br />

Koyala Bhavan<br />

Issues raised/discussed/suggestions:<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 225


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

1. Open cast mining is done only up to 130 m max, after that underground mining is<br />

economical. Jharia coalfield belt contains several seams of coal, starting from very shallow<br />

depths at many points. And that’s the reason Open Cast Mining is also quite prominent here.<br />

2. Talking about the effluent pollution from coal washeries, he shared that all washeries are<br />

closed cycled, so there is no problem of effluent wastewater.<br />

3. Right now pit water is supplied to people for domestic purpose. Its quality is ok.<br />

4. There have been studies on possibility of converting mine water into potable water in ISM.<br />

Quality of service of current urban amenities:<br />

Urban Infrastructure<br />

Drainage and Sanitation<br />

Solid Waste Management<br />

Urban Transport<br />

Water Supply<br />

Street Light<br />

Storm Water Drainage<br />

Grading<br />

Poor<br />

Poor<br />

Ok<br />

Very Poor<br />

Ok<br />

Poor<br />

Prioritisation of sectors:<br />

Infrastructure Sector<br />

Priority wise Ranking<br />

Drainage and Sanitation 4<br />

Solid Waste Management 3<br />

Urban Transport 7<br />

Water Supply 1<br />

Sewerage 5<br />

Storm water drainage and Water Body Rejuvenation 6<br />

Street light 8<br />

Housing for Poor 2<br />

SWOT Analysis:<br />

Strengths<br />

Tourism Spots<br />

Coal Reserves<br />

Opportunity<br />

Development of Coal based industries<br />

Employment opportunities<br />

Weakness<br />

Unplanned establishments<br />

Large social divide<br />

Threat<br />

Haphazard development<br />

Underground Fire<br />

Profile of the consulting Entity:<br />

Mr. Shamshul Hoda: Regional officer, JPCB<br />

Date of the consultation: 1 st of June, 2006<br />

Venue:<br />

JPCB Office, Officers Colony<br />

Issues raised/discussed/suggestions:<br />

1. Sharing the hiccups in the developments, he told that there is lot of transfers in the<br />

department, so people don’t come to know about the region.<br />

2. There is very large pollution due to dust around the city, which eventually effects health of<br />

the residents in long terms.<br />

3. He also gave a hint that overall health of the city as far as pollution is concerned is not very<br />

good.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 226


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Quality of service of current urban amenities:<br />

Urban Infrastructure<br />

Drainage and Sanitation<br />

Solid Waste Management<br />

Urban Transport<br />

Water Supply<br />

Street Light<br />

Storm Water Drainage<br />

Grading<br />

Poor<br />

Poor<br />

Very Poor<br />

Very Poor<br />

Ok<br />

Poor<br />

Profile of the consulting Entity:<br />

Date of the consultation:<br />

Venue:<br />

Mr. A K Singh: Assistant Mining Officer,<br />

Department of Mines<br />

2 nd of June, 2006 Friday<br />

Combined Building<br />

Issues raised/discussed/suggestions:<br />

1. Mentioning about their work, they confirmed their involvement in collecting mining<br />

revenues.<br />

2. 34% of the minerals come from Jharkhand.<br />

3. One thousand crore of the revenue is collected from the Jharkhand only. This year the figure<br />

was 1008 crore. Out of which 330 crore was only from <strong>Dhanbad</strong>. This clearly establishes the<br />

importance of <strong>Dhanbad</strong> in the national economy.<br />

4. His also gave a feedback about the options to collect better revenue:<br />

a. 14(State Govt.) + 3(BCCL) check Nakas/weight bridge on BOT basis have been<br />

facilitated by the govt. to generate more revenues from minerals extracted from the<br />

district.<br />

b. Chalan authentication process started from the department from 1/1/06<br />

c. From 17/06/05 land/surface rate has converted on the basis of commercial rate.<br />

Earlier land/surface rate was only 13 rupees per acre. 5% of the new revenue<br />

generated comes to this department.<br />

d. 1996 onwards, BCCL has taken the initiative of not to provide raw coal top it’s<br />

employees for their domestic use, otherwise they will have to pay one third of the<br />

cost of that coal.<br />

e. Road and building materials need to be checked and verified from the department of<br />

mines and geology, govt. of Jharkhand. In the case of discrepancy, they will have to<br />

pay double the cost of the material as revenue to the department.<br />

5. Every year a report is sent to Indian Bureau of Mines, Nagpur, about minerals production<br />

and other details.<br />

Quality of service of current urban amenities:<br />

Urban Infrastructure<br />

Drainage and Sanitation<br />

Solid Waste Management<br />

Urban Transport<br />

Water Supply<br />

Street Light<br />

Storm Water Drainage<br />

SWOT Analysis:<br />

Strengths<br />

Coal availability<br />

Purchasing Power of People<br />

Grading<br />

Poor<br />

Poor<br />

Poor<br />

Very Poor<br />

Poor<br />

Very Poor<br />

Weakness<br />

Poor Drainage and sewerage<br />

Dilapidated water supply system<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 227


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Opportunity<br />

Coal based Industry<br />

Threat<br />

Naxalites<br />

Prioritization of sectors:<br />

Infrastructure Sector<br />

Priority wise Ranking<br />

Drainage and Sanitation 4<br />

Solid Waste Management 6<br />

Urban Transport 2<br />

Water Supply 1<br />

Sewerage 5<br />

Storm water drainage and Water Body Rejuvenation 3<br />

Street light 8<br />

Housing for Poor 7<br />

Profile of the consulting Entity:<br />

Mr. Ravindra Kumar Pandey, Ex- MP<br />

Date of the consultation: 3 rd of June, 2006<br />

Venue:<br />

Phusro, Bokaro<br />

Issues raised/discussed/suggestions:<br />

1. Two areas Katras and Baghmara of our purview fall in his constituency.<br />

2. He told that Water supply system is going through a major crisis. In Katras, sometimes,<br />

supply is for only 2 hours from deep boring.<br />

3. He talked about the possibility of pit water being stored as raw water and to be made potable<br />

by processing.<br />

4. Emphasis was given on long term planning for everything. Money shouldn’t be a concern for<br />

it, as he said.<br />

5. Water connection for all is very important.<br />

6. Quoting as an example He said that in Kolkata, Water supply arrangements were made by<br />

British, and it’s still working. With the same network, they provide both potable and<br />

domestic water alternatively.<br />

7. Next priority should be given for Drainage system. Currently there are no good<br />

arrangements for drainage. But he quoted again that long term planning is important for<br />

drainage also. So that provisions for future growth are embedded in the design.<br />

8. Easy connection for drinking water should be made available.<br />

9. Any design should be well engineered, and he attributed failure of any project to bad design<br />

only.<br />

10. Underground electricity supply need to be encouraged, by phase wise implementation. So<br />

that safety is enhanced and steeling of power can also be checked in a major form. In the<br />

current system the electric poles should be on the median. Because those on the sides of the<br />

road hinder the widening of the road.<br />

11. There is also a need of Sulabh Shauchalaya at regular intervals, so that visitors to the city find<br />

it convenient and the city cleanliness is maintained.<br />

12. There are large encroachments right now is DMC, which need to be removed. They should<br />

be nipped in the bud; otherwise it becomes a political matter at a later stage and creates<br />

problem for any expansion projects.<br />

13. Public drinking water facilities should be maintained at main chauks to help commuters.<br />

14. Maintenance of street lights is important.<br />

15. Government money should be efficiently and transparently utilized.<br />

16. He also suggested to take any one sector and make it completely sustainable for long term,<br />

not that carrying all the sectors, and finally not achieving sustainability in any on them.<br />

17. He mentioned some places in <strong>Dhanbad</strong>, which don’t have water at all. He told a place<br />

‘Gandhinagar’ as an example.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 228


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

18. There are no parks in Katras. As such there is lot of encroached pieces of land, where it’s all<br />

possible. What is needed is a political will to give go ahead to the administration.<br />

19. Parking is a major concern in <strong>Dhanbad</strong>. Proper arrangements for this will solve a major<br />

problem for the city. It will also help in revenue generation.<br />

20. There should be specific places for Bus Stand, Subzi Mandi, and Taxi Stand.<br />

21. Currently there is no Call Taxi service in the whole DMC area, and it is a need for the<br />

residents of the city.<br />

22. He also realized the requirements of good schools to provide quality education.<br />

23. As of now, power supply system is in a bad shape.<br />

24. He repeatedly emphasized on systematic approach for any development.<br />

25. Giving some facts he told that 30% land in Katras and Baghmara is arable, rest is used for<br />

mining activities. Thus the main drive of the economy remains mining activity only.<br />

26. Market complex and super markets will be next steps towards modernization.<br />

27. In any projects, representatives from all the parties be made part of the process, so that when<br />

the government changes, there are no political issues for implementation of any ongoing<br />

projects.<br />

Quality of service of current urban amenities:<br />

Urban Infrastructure<br />

Drainage and Sanitation<br />

Solid Waste Management<br />

Urban Transport<br />

Water Supply<br />

Street Light<br />

Storm Water Drainage<br />

Grading<br />

Very Poor<br />

Poor<br />

Poor<br />

Very Poor<br />

Poor<br />

Very Poor<br />

Prioritisation of sectors:<br />

Infrastructure Sector<br />

Priority wise Ranking<br />

Drainage and Sanitation 2<br />

Solid Waste Management 7<br />

Urban Transport 5<br />

Water Supply 1<br />

Sewerage 6<br />

Storm water drainage and Water Body Rejuvenation 3<br />

Street light 8<br />

Housing for Poor 4<br />

SWOT Analysis:<br />

Strengths<br />

Mining area<br />

Pit water availability<br />

Opportunity<br />

Use of pit water for Irrigation.<br />

Weakness<br />

Very low supply of water<br />

Threat<br />

Lot of political interference<br />

Politicians, making rehabilitation an<br />

issue for their benefit<br />

Vision for <strong>Dhanbad</strong>:<br />

“Easy life in the city for everyone.”<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 229


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Profile of the consulting Entity:<br />

Mr. S K Rai, Chief Medical Officer, MADA<br />

Date of the consultation: 3 rd of June 2006<br />

Venue:<br />

MADA Office<br />

Issues raised/discussed/suggestions:<br />

1. The office only takes care of solid waste disposal.<br />

2. He was quite concerned about the current condition of solid waste department.<br />

3. Right now there is no good disposal system, they just collect solid waste and dump it in low<br />

lying areas.<br />

4. There is one factory in Govindpur, which produces hazardous waste.<br />

5. There are no specific disposal sites. The current practice is to dump the waste in low lying<br />

areas. No scientific practice is followed.<br />

6. Long back they had site for disposal in Aamjhar.<br />

7. There is a need for site selection.<br />

8. For sanitation, better underground drainage system in place in needed.<br />

9. Current dust bins are very badly designed. They don’t encourage people to throw waste into<br />

them, so place around dust bins become dumping site.<br />

10. Open bins will serve the purpose. And they are in the process of getting a different design<br />

for the dust bins.<br />

11. There is a severe lack of man power. Due to that it’s very difficult to maintain the required<br />

work. The need of staff is a lot more than what it is currently.<br />

Quality of service of current urban amenities:<br />

Urban Infrastructure<br />

Drainage and Sanitation<br />

Solid Waste Management<br />

Urban Transport<br />

Water Supply<br />

Street Light<br />

Storm Water Drainage<br />

Grading<br />

Poor<br />

Poor<br />

Ok<br />

Poor<br />

Ok<br />

Poor<br />

Prioritisation of sectors:<br />

Infrastructure Sector<br />

Priority wise Ranking<br />

Drainage and Sanitation 1<br />

Solid Waste Management 2<br />

Urban Transport 7<br />

Water Supply 2<br />

Sewerage 6<br />

Storm water drainage and Water Body Rejuvenation 4<br />

Street light 8<br />

Housing for Poor 5<br />

Profile of the consulting Entity: Mr. O P Lal, MLA<br />

Date of the consultation: 4 th of June, 2006<br />

Venue:<br />

Congress Office, in front of MADA’s Building<br />

Issues raised/discussed/suggestions:<br />

1. He was quite obsessed by the fact that <strong>Dhanbad</strong> has not got it’s fare share of representation<br />

economically and by other means.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 230


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

2. He told that there was a ring road around <strong>Dhanbad</strong>, going from airport to Baliapur, Sindri,<br />

beside Damodar river, LohaPatti (Mahuda), Chandrapura, Katras, Baghmara. It was called<br />

Diamond road. Its remaining part from Baliapur to Mahuda should be completed.<br />

3. He also informed about the need of another outer ring road.<br />

4. He was also concerned about the pollution levels in the city, and it needs to be checked to<br />

make <strong>Dhanbad</strong> a better place to live. Be it air pollution, be it water body pollution.<br />

5. He also gave the information about Damodar Action Plan (DAP). Water of Damodar is<br />

being polluted by industrial waste. Lubricants from Bokaro steel plant also add to that.<br />

Drainages culminate into the river. He told that 86 crores were sanctioned for DAP. There<br />

was allocation of 10 crores for beautification of TopChanchi lake, which has about 8 km<br />

radius. The purpose was to promote tourism. But nothing substantial has taken shape in<br />

both the cases.<br />

6. Topchanchi lake is a huge water source.<br />

7. He wanted to get the burning of coal stopped and stop rehabilitation. He also mentioned the<br />

incident when Hon’ble President Kalam visited Jharia, he quoted him saying said that the fire<br />

could be checked. He also suggests that loan from World Bank can be taken for this<br />

purpose, which is an issue pertaining to life of one lac people.<br />

8. He also realises that underground drainage system is required for the city.<br />

9. Pit water can be made potable and used.<br />

10. Encroachment should be controlled.<br />

11. He peeps into the future and considers the possibility of <strong>Dhanbad</strong> becoming a rich city by<br />

efficient extraction of coal. Scientific approach is to be followed for mining activities.<br />

12. Roads in <strong>Dhanbad</strong> are sufficient right now, but need to be maintained for future needs.<br />

13. Bekar Bandh beautification is needed, desiltation is required.<br />

14. Open caste mining should be discouraged.<br />

15. As he says coal steeling from Abandoned open pits has caught pace, which leads to<br />

environmental hazards in long terms.<br />

16. Subsidence should be stopped; scientific control measures should be taken for that.<br />

17. Reclamation of open caste pits is also warranted, he noted.<br />

18. Education for <strong>Dhanbad</strong> residents is equally important as long-term developmental measure.<br />

19. He also explored the possibility of developing Mining Observation as a tourism activity.<br />

20. Topchanchi as a picnic place is quite favourable but need a better connectivity.<br />

21. He also talked about Parasnath and Bodhgaya as a tourism centre. But incidentally that’s not<br />

in our purview.<br />

Quality of service of current urban amenities:<br />

Urban Infrastructure<br />

Drainage and Sanitation<br />

Solid Waste Management<br />

Urban Transport<br />

Water Supply<br />

Street Light<br />

Storm Water Drainage<br />

Grading<br />

Poor<br />

Very Poor<br />

Ok<br />

Very Poor<br />

Poor<br />

Poor<br />

Prioritisation of sectors:<br />

Infrastructure Sector<br />

Priority wise Ranking<br />

Drainage and Sanitation 5<br />

Solid Waste Management 8<br />

Urban Transport 4<br />

Water Supply 1<br />

Pollution 2<br />

Encroachment 3<br />

Sewerage 7<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 231


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Storm water drainage and Water Body<br />

6<br />

Rejuvenation<br />

Street light 9<br />

SWOT Analysis:<br />

Strengths<br />

Coal<br />

Tourism centres<br />

Water Bodies<br />

Opportunity<br />

Mining tourism<br />

Weakness<br />

Inefficient use of coal<br />

Coal steeling<br />

Threat<br />

Subsidence of Jharia<br />

Vanishing of Coal by fire.<br />

Vision for <strong>Dhanbad</strong>:<br />

1. Green <strong>Dhanbad</strong>. Forestation needed.<br />

2. A modern city with all amenities, and as a safe tourism centre.<br />

Profile of the consulting Entity: Mr. Ajay Shukla: DRM (ajay_shukla10@yahoo.com)<br />

Date of the consultation: 8 th of June, 2006<br />

Venue:<br />

DRM Office<br />

Issues raised/discussed/suggestions:<br />

1. On a question of what development plans railways<br />

have in or near <strong>Dhanbad</strong>, he confirmed that<br />

nothing major is planned to be executed as of now.<br />

But there are plans to make the existing assets look<br />

better. For example platforms are planned to be<br />

repaired in a way.<br />

2. Responding to the question of what there<br />

expectation from government, he told that Railways<br />

doesn’t need any funds for these small works, so<br />

there is no interest shown for PPP for these works.<br />

3. However railways can be interested in letting a<br />

private developer use their land and develop a<br />

commercial complex in returns of maintaining a<br />

parking facility and developing landscape and<br />

similar things.<br />

4. There is no proper road infrastructure to support<br />

the railways’ needs and is required to be developed.<br />

So roads adjacent to railways should be widened.<br />

5. In the south end, which is often referred as Purana<br />

Bazaar, there is lot of encroachments in about 5<br />

acres of land, which belongs to railways. The entry<br />

can be developed from this side, which is quite narrow right now.<br />

6. He declined the possibility of IL&FS playing the role of process manager for them to assist<br />

them in getting all these developments.<br />

7. There is an over bridge in Bhuli, and one in Pradhan Ghanta is going to come up in another<br />

two months. There is one under bridge and one over bridge (in Barmasia), existing right<br />

now.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 232


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

8. There is no need of speed corridor, as were the rumours, to be developed between <strong>Dhanbad</strong><br />

and Ranchi.<br />

9. If at all they need to run EMU, they need running stock only, nothing else is required. If that<br />

can be managed then, they will be willing to run it. This can be proposed for “Grand<br />

Chord”. EMU has the facility to accelerate and decelerate faster.<br />

10. Gomuh and <strong>Dhanbad</strong> are the major hubs in the region, situated in the route of many<br />

important trains. And there is a need to upgrade the capacity of <strong>Dhanbad</strong>-Gomuh route.<br />

11. There is a place of about 2 to 3 acres towards the main entrance, which is prominently<br />

occupied by unauthorised shops, intensifying the congestion. So this side, there can be a<br />

development of commercial complex, which will make the place look pleasant and decongest<br />

the whole area. And this will also help in widening of the road.<br />

12. Personally he keeps road infrastructure on highest priority and that only is required for<br />

internal transportation of the city.<br />

13. Due to haphazard developments, the population has grown in pockets and now there are<br />

needs of small markets in those small pockets to cater to their daily needs.<br />

14. Parking near Bank More is very much required as in spite of removal of encroachments,<br />

there is congestion due to unsystematic parking.<br />

Quality of service of current urban amenities:<br />

Urban Infrastructure<br />

Drainage and Sanitation<br />

Solid Waste Management<br />

Urban Transport<br />

Water Supply<br />

Street Light<br />

Storm Water Drainage<br />

Grading<br />

Poor<br />

Poor<br />

Very poor<br />

Poor<br />

Ok<br />

Poor<br />

Prioritisation of sectors:<br />

Infrastructure Sector<br />

Priority wise Ranking<br />

Drainage and Sanitation 3<br />

Solid Waste Management 4<br />

Urban Transport 1<br />

Water Supply 2<br />

Sewerage 6<br />

Storm water drainage and Water Body Rejuvenation 7<br />

Street light 8<br />

Housing for Poor 5<br />

SWOT Analysis:<br />

Strengths<br />

Very good connectivity from all the<br />

sides<br />

Purchasing Power parity of people<br />

Coal based Industry potential<br />

Opportunity<br />

Commercial complexes by public<br />

private partnership<br />

Weakness<br />

No proper facility of city’s internal transportation<br />

Encroachments<br />

Unpredictability of urban growth<br />

Bad condition of roads, no maintenance<br />

Threat<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 233


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Profile of the consulting Entity:<br />

Date of the consultation:<br />

Venue:<br />

Mr. A B Pati, MD, MADA<br />

19 th of June<br />

MADA Office<br />

Issues raised/discussed/suggestions:<br />

1. He was visioning the extension of <strong>Dhanbad</strong><br />

towards Nirsa. Rajganj, Topchanchi and their<br />

development as greater <strong>Dhanbad</strong> in long term,<br />

which will be well connected with the rest of the<br />

world by means of transport and communication.<br />

2. As this whole, he considers this region to be having<br />

clean air, healthy climate.<br />

3. <strong>Dhanbad</strong> should grow in all directions from<br />

Maithan to Rajganj.<br />

4. He attempts to look into the future by envisioning<br />

the expansion of <strong>Dhanbad</strong> in longer term towards<br />

Gomuh.<br />

5. He envisages the development of <strong>Dhanbad</strong> near the stretch along NH.<br />

6. Development of Main Bus Terminal near GT Road in Govindpur for easy accessibility from<br />

all over the country is on high priority.<br />

7. And there should be small bus terminals should be in the city catering to need of local people<br />

and connecting the whole city to the outside world.<br />

8. Looking at the congestion in the main city, there can be a possibility of an elevated corridor<br />

within the city, which ultimately connects them to NH stretch.<br />

9. He considers a need of DMC being the coordinating agency for the execution bodies for<br />

coordinated development.<br />

10. MADA could become the agency appointed by DMC to take care of water supply as a<br />

whole.<br />

11. There is also a need to preserve the Old heritage of <strong>Dhanbad</strong> as such.<br />

12. Development of local business centres to decongest Bank More to be emphasised.<br />

13. There is a need of thrust to separate the Coal mining and civic activities.<br />

14. MADA has been appointed as the nodal agency for Damodar Action Plan.<br />

15. Future expansion of the city should be in coordination with DGMS, and CMPDI, taking into<br />

consideration future mining activities.<br />

16. <strong>Dhanbad</strong> is a city of good research institution. It should be developed as a knowledge city<br />

and city of academic importance too.<br />

17. For different areas there should be local environment solutions.<br />

18. Localised treatment Plants in all the pockets, which will be developed in coordination.<br />

19. <strong>Dhanbad</strong> should be a centre of development due to geographical location like Calcutta is for<br />

Bihar, Jharkhand.<br />

20. DPRs for solid waste management have been prepared.<br />

21. On asking about the scope of tourism promotion by developing small ponds, he thinks they<br />

have less scope for tourism development, but they should be maintained clean.<br />

22. He also emphasised on stringent requirements on building regulations, as the zone is<br />

earthquake prone.<br />

23. Talking about the development of the city, he noted that there restrictions due to mining<br />

activity, as about 40 to 50% has got coal reserves.<br />

24. Although there is a threat posed by Naxal activities in the region, <strong>Dhanbad</strong> is comparatively<br />

safer, and he is quite hopeful that as the city develops economically, people will improve.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 234


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Quality of service of current urban amenities:<br />

Urban Infrastructure<br />

Drainage and Sanitation<br />

Solid Waste Management<br />

Urban Transport<br />

Water Supply<br />

Street Light<br />

Storm Water Drainage<br />

Grading<br />

Very Poor<br />

Poor<br />

Poor<br />

Poor<br />

Ok<br />

Poor<br />

Prioritisation of sectors:<br />

Infrastructure Sector<br />

Priority wise Ranking<br />

Drainage and Sanitation 1<br />

Solid Waste Management 4<br />

Urban Transport 5<br />

Water Supply 2<br />

Sewerage 7<br />

Storm water drainage and Water Body Rejuvenation 6<br />

Street light 8<br />

Housing for Poor 3<br />

SWOT Analysis<br />

Strengths<br />

Clean air and healthy climate<br />

Proximity to NH2, which is part of GQ<br />

Coal reserves.<br />

It has potential to act as a Business centre.<br />

It has got good rail connectivity.<br />

<strong>Dhanbad</strong> is a hub of Transport business.<br />

<strong>Dhanbad</strong> has good purchasing Power<br />

Opportunity<br />

Automobile Industry can flourish here.<br />

It can be developed as a National and international<br />

academic centre.<br />

Also as a business centre.<br />

Weakness<br />

Vulnerability to EQ<br />

Unpredictability due to mineral<br />

reserves.<br />

Restrictions on development, due<br />

to mining<br />

Pollution near OCPs.<br />

Threat<br />

Earthquake<br />

Naxalites<br />

Profile of the consulting Entity:<br />

Mr. Chawda, Chaairman, Bank More,<br />

Chamber of Commerce<br />

Date of the consultation: 27 th of June, 2006<br />

Venue:<br />

New Market, Bank More<br />

Issues raised/discussed/suggestions:<br />

1. They agreed with the fact that the whole economy of <strong>Dhanbad</strong> is dependent on coal.<br />

2. There are small factories, which are centered around coal only.<br />

3. The Chamber of Commerce is mostly consisted of Small shop owners only. And there are<br />

about five thousand big and small shops in Bank More.<br />

4. There is also a mall coming up in the Bank More area.<br />

5. Car parking is the immediate need in the Bank More area. Roads and Electricity are the<br />

sectors, getting the next priority, as far as the commercial community is concerned.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 235


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

6. In order of Preferences, Water, Electricity, Road,<br />

Footpath are the concerns.<br />

7. Underground electricity supply system is warranted<br />

in the Bank More area, as currently the poles create<br />

the hindrance in traffic and also make the area<br />

vulnerable to accidents. The position can be made<br />

clear from the photograph shown.<br />

Quality of service of current urban amenities:<br />

Urban Infrastructure<br />

Drainage and Sanitation<br />

Solid Waste Management<br />

Urban Transport<br />

Water Supply<br />

Street Light<br />

Storm Water Drainage<br />

Grading<br />

Very Poor<br />

Very Poor<br />

Very Poor<br />

Very Poor<br />

Poor<br />

Very Poor<br />

Prioritisation of sectors:<br />

Infrastructure Sector<br />

Priority wise Ranking<br />

Drainage and Sanitation 4<br />

Solid Waste Management 3<br />

Urban Transport 1<br />

Water Supply 2<br />

Sewerage 5<br />

Storm water drainage and Water Body Rejuvenation 6<br />

Street light 8<br />

Housing for Poor 7<br />

SWOT Analysis:<br />

Strengths<br />

Mineral wealth<br />

Opportunity<br />

Export industry potential<br />

Weakness<br />

No parking arrangements in Bank More<br />

Threat<br />

Profile of the consulting Entity:<br />

Members of Zila Chamber of Commerce<br />

Date of the consultation: 29 th of June, 2006<br />

Venue:<br />

New market, Bank More<br />

Issues raised/discussed/suggestions:<br />

1. Mr. K K Ghosal of Barmasia CoC pointed out that<br />

after separation from Bihar, overall facilities have<br />

reduced. Citing an example, he said that drainage,<br />

roads and lighting arrangements have deteriorated<br />

due to non-cooperation and non-coordination of<br />

government.<br />

2. There are problems like bad drainage, choking of<br />

drains, non removal of solid waste<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 236


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

3. There is an essential need of parks, entertainment places and recreational facilities.<br />

4. Mr. Dilip from Katras CoC took up the issue of transport facilities. In spite of heavy<br />

pedestrian traffic, there are no footpaths in Bank More area.<br />

5. He also added that there are lots of encroachments along the roads, resulting in reduction of<br />

carriageway width. Furthermore due to lack of footpath, walking of people on the road cuts<br />

the width of road dangerously, leaving the zone prone to accidents.<br />

6. Mr. Surendra, Secretary, BM CoC mentioned the<br />

need of broadening of roads, divider, lack of which<br />

leads to traffic jams. He also cited the need of a<br />

bypass to reduce the load on internal roads of<br />

<strong>Dhanbad</strong>.<br />

7. He also talked about the bad conditions of the<br />

roads in whole of the city. High mast lamps also<br />

standing non-functional.<br />

8. Need of metered Taxi, and Parking arrangements<br />

were also felt by people. A view of haphazard<br />

parking practices in Bank More is shown in the picture below<br />

9. Other members also raised concerns about need of various stretches as<br />

a. From <strong>Dhanbad</strong> – Colliery – Jora Phatak to Howra Motors<br />

b. Outer ring road from Barmasia Phatak to Bhuiphod Mandir.<br />

10. They also suggested the possibility of a road over the abandoned railway line path in Jharia,<br />

as a bypass.<br />

11. Talking about industry potential in <strong>Dhanbad</strong>, there were inputs like input industries to coal<br />

and steel industries.<br />

12. But for all these industrial growth, they look for basic facilities like water, power supply, road<br />

connectivity, sanitation, law and order and safety. As the area is affected by Naxal<br />

movements, the growth of these industries might be hampered.<br />

13. They also talked about the changed response of BCCL, which is not really helping the city to<br />

grow.<br />

14. There was also a concern for revival of airport and air connectivity to Calcutta, Ranchi, and<br />

Patna etc. They accepted <strong>Dhanbad</strong> as the commercial capital of Jharkhand, with a<br />

tremendous potential of growth.<br />

15. Mr. Rajiv Sharma from <strong>Dhanbad</strong> Electric Traders Union also explored the possibility of<br />

SEZ, being nodal in the region. Barbadda area was suggested as the region for SEZ.<br />

16. To reduce congestion, requirement of public transport system was also warranted.<br />

17. <strong>Dhanbad</strong> also has potential for export industry. Mr. Rajiv suggested the development of a<br />

Dry Port.<br />

18. There is also a need of a sports complex in the city for recreational and other purposes.<br />

19. It was unanimous opinion of people that <strong>Dhanbad</strong> has got vast resources. And there is<br />

potential of<br />

a. Bamboo products<br />

b. Handicraft<br />

c. Soil products, as <strong>Dhanbad</strong> has coloured<br />

soil.<br />

d. Scientific use of stones, found abundantly<br />

in <strong>Dhanbad</strong>.<br />

20. Mr. Rajiv with great emphasis told that higher<br />

education facilities need to be improved more.<br />

21. It was also recognized that there is need of a central<br />

Truck Terminal and smaller truck terminals in the<br />

city.<br />

22. Discussing about the possibility of shifting the commercial places to outside the city, they<br />

told that it’s the development, which will make people feel the necessity to move.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 237


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

23. The point of a need of community centres with first class facilities for marriage and other<br />

celebrations.<br />

24. Talking about storm water drainage they told that with a moderate rain only, water starts<br />

flowing along the roads. The picture below makes it clear:<br />

Quality of service of current urban amenities:<br />

Urban Infrastructure<br />

Drainage and Sanitation<br />

Solid Waste Management<br />

Urban Transport<br />

Water Supply<br />

Street Light<br />

Storm Water Drainage<br />

Prioritisation of sectors:<br />

Infrastructure Sector<br />

Drainage and Sanitation<br />

Solid Waste Management<br />

Urban Transport<br />

Water Supply<br />

Sewerage<br />

Storm water drainage and Water Body Rejuvenation<br />

Street light<br />

Housing for Poor<br />

SWOT Analysis:<br />

Strengths<br />

Abundance of coal and iron ore<br />

Nodal location of the city<br />

Good connectivity to all sides.<br />

Opportunity<br />

Ancillary industries catering to the needs of large<br />

industries.<br />

Export industry<br />

Grading<br />

Poor<br />

Poor<br />

Very Poor<br />

Poor<br />

Poor<br />

Poor<br />

Priority wise Ranking<br />

Weakness<br />

Severe lack of recreational facilities<br />

Lack of internal transportation<br />

Unavailability of proper parking<br />

facilities<br />

Congestion in central; locations<br />

Threat<br />

Fast growing population with<br />

unmatched facilities.<br />

Vision for <strong>Dhanbad</strong>:<br />

“A beautiful city.”<br />

“A city with strong economy.”<br />

List of Participants attended the meeting:<br />

S No Name Designation<br />

1 Mr. Mani Shankar Kesari President, <strong>Dhanbad</strong> Zila CoC<br />

2 Mr. Surendra Thakkar General Secretary, <strong>Dhanbad</strong> Zila CoC<br />

3 Mr. Vinaya Mishra Vice President, <strong>Dhanbad</strong> Zila CoC<br />

4 Mr. Bunam Rao President, Station Road CoC, <strong>Dhanbad</strong><br />

5 Mr. Ashok Bhattacharya General Secretary, Park Market Heerapur CoC,<br />

<strong>Dhanbad</strong><br />

6 Mr. Kalyan Kumar Ghosal President, Barmasia CoC<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 238


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

7 Mr. Siddheshwar Ram Joint Secretary, Barmasia CoC<br />

8 Mr. Rajendra Kumar President, Bank More CoC, <strong>Dhanbad</strong><br />

Chawda<br />

9 Mr. Nayesh Kumar Joint Secretary, DCDA<br />

10 Mr. Bhagat Secretary, Manaitand CoC<br />

11 Mr. Bikash Kumar Secretary, Krishi Bazaar Samiti, Barbadda<br />

Chaudhary<br />

12 Mr. Surendra Arora Secretary, Bank More CoC<br />

13 Mr. Rajiv K Sharma Secretary, <strong>Dhanbad</strong> Electric Traders Association<br />

14 Mr. Suresh Treasurer, <strong>Dhanbad</strong> Zila CoC<br />

15 Mr. Dilip Subhikhi Vice President, Katras Road CoC<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 239


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Annexure 2: Consultation Workshop -Group Discussion Findings<br />

The out come of the two day consultation workshop is presented below. Four different focus<br />

groups were formed to discuss in detail about issues, strategy and projects.<br />

Group I- “Urban Land use Planning & Growth Management”<br />

1. The slum Population in <strong>Dhanbad</strong> is on the rise and is mainly due to migrants from<br />

adjoining villages. The issue needs to be immediately addressed by providing them<br />

affordable/free housing.<br />

2. The city needs recreation and open spaces. There are no parks & Play grounds for the<br />

children. This is having a strong impact on the Children’s growth – sporting activities<br />

is increasingly on the decline.<br />

3. There are also no good Cinema Halls, performance theatres.<br />

4. The consumer sector is not well developed. The city has a strong potential for the<br />

consumer market. There is a good demand for Malls, retail spaces.<br />

5. The living conditions within the erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity area is increasingly<br />

on the decline and needs immediate urban renewal. The condition of roads needs to<br />

be improved if not widened. A Good traffic Management plan has to be imposed.<br />

6. A low cost accommodation facility is required for the city for travelers who could not<br />

afford high cost restaurants. A yatri niwas is must near the bus stand. A Dharmshala<br />

could also be a proposition.<br />

7. Leaving the main roads the internal road network is poorly developed. This has led to<br />

no development happening on certain city pockets.<br />

8. The JCF area overlapping with the DMC area and the sub soil structure in most parts<br />

of JCF is not stable. It is therefore suggested that other later developments be located<br />

outside the JCF area or ensure the stability of the soil structure and must fall in the<br />

non coal bearing zone. Area around Bhuli and Sindri are potential sites for<br />

development as they fall in non coal bearing zones and is also sufficiently away from<br />

the erstwhile <strong>Dhanbad</strong> <strong>Municipal</strong>ity area where the actual concentration of the city is.<br />

9. Tree planting should be incorporated in the planning as it is useful in absorbing SPM<br />

of Carbon deposits.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 240


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Group – II “Infrastructure Service and Urban Environment Management”<br />

Water Supply<br />

1. Pit water, after treatment can be utilized for drinking water supply in adjacent coal<br />

bearing urban settlements. Some studies have been done by the pollution Control<br />

Board authorities. Study findings reveals that’s if pit water of Katras, Sijua, West<br />

Jharia, Lodna, Bastakola & Kusunda mining areas can be collected through pipe line at<br />

a common Place & after treatment, it can be supplied to the nearby needing people.<br />

2. Use open cast mines for storage purpose at different locations<br />

3. Main Source for Water is – Damodar, Maitthan and Open Cost mines (Jharia &<br />

<strong>Dhanbad</strong>)<br />

4. Like in Simla Bahal Colliery, from 1 to 10 seams, 600 GPM, 1,000 GPM Pumps are<br />

working for 18 hours per day. Whereas in seam no., 11 one 500 GPM pumps are<br />

working for 18 hr/Day. If it can be utilized for drinking purpose can be of much use.<br />

5. Several sources have to be identified to meet the scarcity of water in the city;<br />

Topchanchi Lake should be rehabilitated since it is old scheme<br />

6. New scheme should be developed to meet the future demand and additional pipe lines<br />

and treatment plants can be proposed at jamadoba itself.<br />

7. FCI Water Treatment Plant and system can be taken over by DMC<br />

8. Rehabilitation of Jamadoba Treatment Plant, Pumping machineries and Electrical<br />

fittings<br />

9. Katras Proposed Water Supply Scheme DPR was approved (technical sanction) and<br />

can be linked with JNNURM funding for CDP –<strong>Dhanbad</strong><br />

10. PHED would like to continue to execute the water supply project for DMC and DMC<br />

shall maintain the same<br />

11. Water and Drainage Board should be created in the new <strong>Dhanbad</strong> <strong>Municipal</strong><br />

<strong>Corporation</strong><br />

12. Rainwater Harvesting should be as mandatory before getting the building approval<br />

13. Deep Bore wells for residential/ commercial/industrial use should be allowed only on<br />

approval of city authorities<br />

14. Strict enforcement of bylaws<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 241


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Water Body Rejuvenation<br />

1. Water bodies like, lakes and pond should be maintained properly to store rainwater<br />

and it will be useful to meet drinking water supply and this should be ensured with the<br />

drinking water standard.<br />

2. Create Lakes and ponds<br />

3. Interlinking of all water bodies based on contour levels and topography<br />

Drainage<br />

1. Link all natural drains and dispose the waste water at one point for this proposal<br />

should address the rehabilitation of natural nallahs and channels with in the DMC area<br />

2. Both Sewerage and Drainage should be go in hand in hand<br />

3. Drainage may be disposed to natural water bodies after ensuring BOD & COD levels<br />

Sewerage<br />

1. Underground drainage is required for the city<br />

2. STP should be constructed 20 km away from city<br />

3. Suitable locations for STP – Matkuria , Jamadoba and Purana Bazzar<br />

Street Lighting<br />

1. Street Lighting should be provided in all locations<br />

Solid Waste / Hazardous Waste/ Bio Medical Waste Management<br />

1. Source Segregation: <strong>Municipal</strong> Solid waste should be segregated at the point of<br />

generation only. Organic waste should be composted and can be used as organic<br />

manure.<br />

2. In Jharia ‘Bania Hill site has already been identified for Solid Waste Disposal.<br />

3. In Baliapur, Aamjhar has been identified as disposal site, which can cater the areas of<br />

Sindri, Jamadoa, Chasnala & up to some extent to Jharia also.<br />

4. Some site can be proposed in Bhuli, which will cater areas of Katras, Chhatatandh,<br />

<strong>Dhanbad</strong> and Govindpur.<br />

5. Hazardous Waste should be incinerated by auto cleansing process. <strong>Dhanbad</strong> <strong>Municipal</strong><br />

<strong>Corporation</strong> should provide some land with the help of State government.<br />

6. To incinerate Bio Medical Waste per bed basis charges can be proposed<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 242


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

7. Plastics should be banned (above 20 microns) with in the municipal corporation area<br />

to avoid mixing of same with Solid Waste<br />

8. Some more plants can be set up in open site somewhere in Govindpur and Baliapur<br />

for solid waste disposal<br />

Air Pollution<br />

1. Bad road conditions are also aggravating air quality by scaling automobile exhaust.<br />

Usually all loaded truck of coal has been kept open. They are overloaded and during<br />

the jerks particulate matter contributes in SPM & RSPM.<br />

2. Hazardous Waste should be incinerated by auto cleansing process. <strong>Dhanbad</strong> <strong>Municipal</strong><br />

<strong>Corporation</strong> should provide some land with the help of State government.<br />

3. To incinerate Bio Medical Waste per bed basis charges can be collected<br />

4. Plastic should be banned (above 20 microns) with in the municipal corporation area to<br />

avoid mixing of same with Solid Waste<br />

Hazardous Waste:<br />

1. Mining and Industries in DMC area generating hazardous waste usually in form of<br />

Used Filter, Lead Battery, oiled soaked cotton.<br />

2. BCCL is usually having one automobile workshop at every mining area, where these<br />

wastes are being generated.<br />

3. The other source of hazardous waste generation is in the form of lead acid battery<br />

manufacturing at local level in the city area, which should be restricted as per “Battery<br />

Management and Handling Rules, 2000”.<br />

4. Plantation on both sides of the road can minimize the air pollution in the city.<br />

5. Residential area and mining and industrial area should be kept separate. Entire mines<br />

should be notified as industrial area, so that any habitation won’t come on that part<br />

Mines Reclamation:<br />

1. Mines land can be reclaimed by filling flyash in the bottom and overdue of open cast<br />

mines above that. At surface level, top soil plantation can be done, so that the region<br />

can be reclaimed for other landuse purposes.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 243


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Group – III “Urban Governance & <strong>Municipal</strong> finance”<br />

The main points that emerged out of the session are as follows:<br />

1. Holding Tax: Average Holding Tax is Rs. 5 per Sq ft. for commercial and Rs. 2.50 per<br />

sq. ft for residential areas. The collection rate is very poor i.e. 38% over the last 5<br />

years. The reason for this are:<br />

There are 32 wards and approximately 34000 households who are supposed to pay this<br />

tax. However, for 17000 of such households, the assessment has not taken place.<br />

There are 4 tax collectors to cover this entire population.<br />

There are certain Notified Areas like Katras, Chatatand and others where the holding<br />

tax rate has not been finalized in consultation with those Notified Area Committees.<br />

As a result no collection from such areas.<br />

Water Tax: Prevailing rate is Rs. 2.50 per year (last revision in 1932).<br />

A suggestion was made that this rate may be revised with separate rates for industrial,<br />

commercial and domestic consumers.<br />

There is a scarcity of “Water Tax Darogas” to collect such payment<br />

3. Pollution Control Board<br />

A suggestion was made to request the Pollution Control Board to be more strict and<br />

vigilant. The industrial units dispose their Solid Waste in a dangerous manner. Proper<br />

Solid Waste Management system should be implemented and the organizations/<br />

institutions which have such waste may be requested to pay a separate amount to<br />

maintain such facilities.<br />

4. Lack of diversity in the tax structure at <strong>Municipal</strong>ity level - Road tax at <strong>Municipal</strong>ity<br />

level may be considered.<br />

5. Implementation of Double Entry Accounting System to start immediately.<br />

6. There is a prevailing system of annual auction of markets to private contractors both<br />

at the <strong>Municipal</strong>ity level and also by Agricultural Marketing Boards. A maintenance<br />

charge may be collected from such contractors.<br />

7. Computerization of tax records may be implemented at the earliest.<br />

Apart from this there were some innovative ideas that emerged from the group. They are:<br />

8. The <strong>Municipal</strong>ity Office is located in prime plots in the city but not maintained in the<br />

best possible manner. The DMC may take up a PPP route with a private developer to<br />

build up new and modern structures in such areas and share some commercial space<br />

and done in several other parts of the country.<br />

9. Provide cooking gas connection directly to households through a proper revenue<br />

model.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 244


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Group – IV – “Traffic and Transportation Planning”<br />

1. The City needs atleast two bus stands. One bus stand shall be of ISBT nature and<br />

should be located outside the city and the other bus stand should be Intra city.<br />

2. The city desperately needs a proper public transport system through city buses.<br />

3. A bye pass road is required to relieve the city from heavy traffic. A alignment for bye<br />

pass road is suggested as under:<br />

Starting from bank more police station going parallel to Jharia road till barmasia<br />

phatak.<br />

4. New road proposed should be extended upto Dhansar.<br />

5. There is another proposal of bye pass starting from Barba-adda (@NH2, 399.00km),<br />

passing from Jharkhand More, Bhuli Township, Kusunda Yard upto<br />

Godhar(@NH32, 16.00km). 4.6 km of which already exists with 7 m carriageway<br />

width. But a substantial part of that is badly damaged.<br />

6. PUC certification should be strictly enforced as the pollution from vehicular traffic is<br />

on the increase.<br />

7. A truck terminal should be located outside <strong>Dhanbad</strong>.<br />

8. Call Taxi services required for the city<br />

9. A fly over is required from Dhansar to Hirapur via Railway station and Court more<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 245


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Annexure 3: List of Participants attend for first day Consultation Workshop<br />

Name Organization/Department Designation<br />

Mr. Raghubar Das Government of Jharkhand Minister of Urban Development,<br />

Jharkhand<br />

Mr. R K Srivastava UDD Secretary, Urban Development<br />

Dr. Smt. Beela Rajesh Government of Jharkhand DC, <strong>Dhanbad</strong><br />

Mr. S K Srivastava CFRI Director<br />

Mr. D D Haldar CFRI Senior Director<br />

Dr. D N Bhagat UCO Bank<br />

Mr. Pawan Kumar Chhatatand Assistant Administrator<br />

Mr. Heeralal Prasad MADA Technical Member<br />

Prof. K N Mittal<br />

Ex – Principle<br />

R N Prasad Bank LDM<br />

Dr. A K Singh IMA Member<br />

Mr. P Nayak NABARD AGM<br />

Dr. A K Singh MADA<br />

Dr. S K Rai MADA CMO<br />

Mr. Mahendra Singh NIC Information Officer<br />

Dr. T N Singh CMRI Ex- Director<br />

Mr. Sadhu Saran DW&SD<br />

Assistant Engineer<br />

Prasad<br />

Mr. K P Singh GM District Industry Centre<br />

Mr. R K Thakur Fire Service Fire Station Officer<br />

Mr. G N Ojha Collectorate DPO<br />

Mr. Swami Vibhudev NH Executive Engineer<br />

Mr. Ajay Rajak RCD EE<br />

Mr. C M P Sinha MADA Project Officer<br />

Mr. Satendra “Hindustan” daily Correspondent<br />

Mr. Amit Ranjan “Aaj” Daily Correspondent<br />

Mr. Sanjay Singh “Hindustan Times” Correspondent<br />

Mr. Sukhdev “Hindustan Times” Photographer<br />

Mr. Rajendra K Bank More CoC<br />

Secretary<br />

Chawda<br />

Arun Kumar Bhandari Bank More CoC<br />

Senior Joint Secretary<br />

Mr. Kamal Kishore Transport<br />

DTO<br />

Srivastava<br />

Mr. M S Kesari Zila CoC President<br />

S S Hoda JPCB Regional Officer<br />

Mr. Rajmohan Tiwari Law and Order ADM<br />

Mr. Avtar Krishnan BCCL GM, Environment<br />

Mr. T P Singh BCCL Environmental Engineer<br />

Mr. Mritunjaya Kumar BCCL<br />

Environmental Engineer<br />

Dr. S N Prasad<br />

DEO<br />

Dr. Prasad Singh PMCH Orthopeadic Surgeon<br />

Usha Sharma BSS Mahila College, <strong>Dhanbad</strong> Professor, Incharge<br />

Mr. M K Ajad Bahujan Samaj Party District President<br />

Mr. S Kumar Dudu BSP President<br />

Mr. N K Chanda<br />

Builder<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 246


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Name Organization/Department Designation<br />

MR. N D Baitha DMO, Office MI<br />

Mr. Jagjit Singh Welfare Department District Welfare Officer<br />

Mr. Ashok Kumar MADA<br />

AE<br />

Chankravarty<br />

Mr. Amit Watts<br />

DJ<br />

Mr. Ajit Kumar Sinha L&T Consultant<br />

Mr. M Kumar Mines Department Superintendent of Mines<br />

Dr. A I Khan P K Rai Memorial College Principle<br />

Pro. A K Singh P K Rai Memorial College HOD, Political Science<br />

Mr. Ajit Kumar P K Rai Memorial College Lecturer, Commerce<br />

Mr. S P Roy Bihar Govt. Ex – Min<br />

Mr. Tapas Banarjee Press<br />

Mr. Debashish Press, NDTV<br />

Mr. Vinod Tripathi “Aaj”Press<br />

Mr. Jyoti Ray “Eye View” Press<br />

Janta Party Representative President<br />

Mr. Kailash Gupta Janta Party<br />

Mr. Rajpal Mahto Janta Party<br />

Mr. Chandra Paul Editorial Division, “Prabhat<br />

Khabar”<br />

Mr. Gautam De “The Telegraph”<br />

Mr. Surendra Arora BM CoC Secretary<br />

Mr. Rajkumar BM CoC<br />

Mr. Krishna Aggarwal BJP State Vice- President<br />

Mr. Rajiv Singh “Veer Arjun” Press<br />

Mr. Bina Srivastava NEP <strong>Dhanbad</strong> Director<br />

Mr. Sachendra Kumar NREP EE<br />

Mr. Kalim Ahmad MADA<br />

Account Officer<br />

Khan<br />

Mr. Sashi Jharkhand State JP (U) General Secretary<br />

Mr. Braj Kishore BM CoC<br />

Senior Assistant<br />

Prasad<br />

Mr. Ram Swarup Political Party<br />

District President<br />

Yadav<br />

Representative “Awaj”<br />

Mr. Subhash Minority Commission Member<br />

Mr. Mathura Prasad<br />

MLA, Tundi<br />

Mahto<br />

Mr. Rajkumar Jharia Joint Secretary<br />

Mr. David Kujjur Town Planning, MADA EE<br />

Mr. Manikant <strong>Municipal</strong> <strong>Corporation</strong> Assistant Administrator<br />

Chaudhary<br />

Mr. Mahesh Chandra <strong>Municipal</strong> <strong>Corporation</strong> JE<br />

Bhagat<br />

Mr. Bablu Mishra “Hindustan”<br />

Mr. Prateek Popat Press<br />

Mr. Gopal Prasad “Eye View” Reporter<br />

Mhd. Khan MADA SLO<br />

Mr. Sudhakar Jha “Times of India” Reporter<br />

Mr. Rajendra Singh “Awaj” Correspondent<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 247


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Name Organization/Department Designation<br />

Mr. Priyesh Kumar “Prabhat Khabar” Correspondent<br />

Mr. Dilip Sinha “Prabhat Khabar” Correspondent<br />

Mr. Ashok Verma “Dainik Jagaran” Correspondent<br />

Mr. Sushil Kumar Smajvadi Party, Jharkhand General Secretary<br />

Dr. S K Singh<br />

Doctor<br />

Mr. Sanjay Kumar Pollution Control Board Junior Scientific Assistant<br />

Srivastava<br />

Mr. Swetabh Kumar PHED EE<br />

Mr. P Prasad MADA Assistant Engineer<br />

Mr. U N Singh Building Division, MADA EE<br />

Mr. Birendra Singh DMC<br />

Annexure 4: List of Participants attend for second day Consultation Workshop<br />

Name Organization/Department Designation<br />

Mr. R P Das<br />

MADA<br />

Mr. Sadhu Saran Prasad DW&SD Assistant Engineer<br />

Mr. B Thakur<br />

PRD<br />

Mr. Shivkant Singh MADA Collection Officer<br />

Mr. AK Karu DMC Account Officer<br />

K A Khan MADA Account Officer<br />

Mr. M S Chhawda<br />

ISM<br />

Mr. Upendra Kumar Sinha<br />

DMC<br />

Mr. Kailash Gupta Jharkhand Party Spokes Person<br />

Mr. Rati Lal Mahto Jharkhand Party Karyakari Adhyaksh<br />

Mr. M C Bhagat DMC JE<br />

Mr. Mani Kant Chaudhary DMC Asst. Administrator<br />

Representative MADA Tax Collector<br />

Mr. Manoj Singh BJP President<br />

Mr. Avdhesh Kumar<br />

MADA<br />

Mr. Santosh Kumar<br />

MADA<br />

Mr. Ashok Thakur<br />

Accounts Dept., MADA<br />

Mr. D P Singh<br />

MADA<br />

Mr. Arun Kumar Singh<br />

MADA<br />

Mr. Shiv Kumar Jha<br />

MADA<br />

Mr. A K Shukla MADA Assistant<br />

Mr. S N Singh<br />

MADA<br />

Mr. S D Singh PMCH Associate professor<br />

Mr. A K Chakravarty MADA Assistant Engineer<br />

Mr. Nirmal Sen<br />

MADA<br />

Mr. Uday Kumar<br />

MADA<br />

Mr. P Prasad MADA Assistant Engineer<br />

Mrs. Shobha Sinha<br />

House Wife<br />

Mr. Hohseen Khan MADA JE<br />

Md. Hannan Khan MADA Assistant Engineer<br />

Mr. R J Shah MADA Assistant Engineer<br />

Dr. G C Singh RSP College HoD, Chemistry<br />

Mr. Y P Keshav<br />

BCCL<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 248


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Mr. D K Soren DMC Office<br />

Superintendent<br />

Mr. R B Singh AIMPA President<br />

Mr. D N Bhagat Gobindpur Social Worker<br />

Mr. H Sharma MADA Public Analyst<br />

Mr. A K Srivastava MADA Assistant Analyst<br />

Mr. L N Prasad MADA Additional PA, Lab,<br />

MADA<br />

Mr. P D Singh MADA SSA<br />

Mr. S K Singh MADA Medical Officer<br />

Mr. Anil Chandra Mandal Lab. MADA M Maker<br />

Mr. Surendra Thakkar BM, CoC Secretary<br />

Mr. Durga Jha<br />

<strong>Dhanbad</strong> Chemist and<br />

Diagnostic Centre<br />

Mr. Nagendra Prasad DMC Assistant<br />

Mr. Birendra Kumar<br />

PO<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 249


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Annexure 5: Reform Agenda<br />

As a precondition to access the fund, DMC needs to undertake mandatory reforms; it has<br />

already initiated some of these. The timeline for achieving the same is elucidated below:<br />

Mandatory Reforms<br />

<br />

Adoption of the modern accrual-based double entry system of accounting in <strong>Dhanbad</strong><br />

<strong>Municipal</strong> <strong>Corporation</strong> just initiated the process.<br />

Target time frame – June 2007<br />

<br />

Introduction of a system of e-governance using IT applications, such as GIS and MIS for<br />

various services provided to ULBs<br />

Yet to be initiated by DMC<br />

Target time frame – March 2008<br />

<br />

Reform of Property Tax with GIS for effective implementation to ensure 85% collection<br />

efficiency within the next seven years<br />

.<br />

<br />

<br />

Current collection efficiency is only 38%. Presently property is levied only for erstwhile<br />

<strong>Dhanbad</strong> <strong>Municipal</strong>ity, erstwhile Sindri NAC, rest of the areas is also to be charged. DMC is<br />

in the process initiating this activity. Property Tax with GIS mapping are yet to be initiated.<br />

Target time frame – 2007<br />

Levy of reasonable User Charges by ULBs towards recovery of O&M or recurring cost over<br />

the next seven years<br />

MADA has revised the water tariff from Rs.50 per month to Rs.100 per month.<br />

Sewerage charge to be recovered upto 80%. DMC is planning to introduce a new tax i.e.<br />

street light tax to gradually recover 100% of the O&M cost. It has already proposed the same<br />

in the budget proposal of 2007-08.<br />

Target time frame – 2011-12<br />

Internal earmarking within local body’s budget for basic services to urban poor. In the capital<br />

Budget 2007-08, DMC will be earmarking a special provision for basic services to Urban<br />

Poor.<br />

Target time frame – 2007-08<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 250


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Optional Reforms<br />

<br />

Revision of bye laws to streamline the approval process for construction of buildings,<br />

development of site, etc;. Proposal has been prepared by MADA and yet to be approved.<br />

Target time frame – Already initiated<br />

<br />

<br />

Revision of byelaws to make rainwater harvesting mandatory in all buildings and adoption of<br />

water conservation measures. Need to be initiated by DMC.<br />

Control Regulation: Yet to be initiated<br />

Target time frame – 2008<br />

State Level Reforms<br />

Mandatory Reforms<br />

Transferring the Schedule 12 functions to the ULB will completed in 2 years (2007-08)<br />

Repealment of Urban Land (Ceiling and Regulation) Act, 1976 will be completed in 2006-07<br />

Reform of Rent Control Laws – time line 2009-10<br />

<br />

Stamp Duty Rationalisation – Reducing Stamp Duty Rates to 5% or less than 5% - time line<br />

2006-07<br />

Enactment of Public disclosure Participation Law or incorporation of Relevant Provision –<br />

time line 2010-11<br />

Time Schedule for Formal Association of ULB with city planning functions – 2009-10<br />

Transferring of Water Supply and Sewerage services provision to the ULB – time line 2009-10<br />

Transferring of public transport functions to the ULB – time line 2009-10<br />

Optional Reform Agenda<br />

Revision of Bye-laws to streamline the approval process for construction of buildings,<br />

development of site, etc. – time line 2006-07<br />

Simplification of legal and procedural frameworks for conversion of agricultural land for nonagricultural<br />

purpose – time line 2007-08<br />

Introduction of property title certification system in ULB – time line 2011-12<br />

Earmarking at least 20-25 % of developed land in all housing projects for EWS/LIG category<br />

with a system of cross subsisation – time line 2009-10<br />

Introduction of computerized process of registration of land and property – time line 2007-08<br />

Revision of bye-laws to make rain – water harvesting mandatory in all buildings to come up in<br />

future and for adoption of water conservation measures – time line 2006-07<br />

Bye-laws on reuse of reclaimed water time line – 2010 -11<br />

Administrative reforms i.e. reduction in establishment by introducing voluntary retirement<br />

schemes, non-filling up of posts falling vacant due to retirement etc., and achieving specified<br />

milestones in this regard – time line 2010-11<br />

Structural Reforms – time line 2010-11<br />

Encouraging Public Private Partnership – time line 2006 -07<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 251


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 252


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Annexure 6: List of Detailed Project Reports (DPRs) Available with the Local Authorities<br />

Description<br />

Amount (Rs. Lakh)<br />

Desilting of Topchanchi Lake<br />

Desilting cost 811.74<br />

Contingency (1%) 8.12<br />

Project Preparation Cost (1%) 8.12<br />

Total 827.98<br />

Katras Urban Water Supply Scheme –Phase – I<br />

Clear Water Rising Main 11 km 387.56<br />

Distribution Main Zone 1 59.26<br />

Construction of RCC Elevated Service Reservoirs of 0.75 ML 70.00<br />

Construction of RCC sumps of 5 lakh gallon capacity and 3 lakh<br />

130.00<br />

gallon capacity<br />

Clear Water Pumping sets 22.00<br />

Drawing power line transformer, cable, etc 8.00<br />

Construction of stand post, compound wall pump house etc 5.00<br />

Clear Water Rising Main 4 km from Jharia Reservoir to Kusunda<br />

140.46<br />

sump with inter connection with 350 m dia existing raising main<br />

Laying of 200 mm dia CI Distribution Main 2.5 km for shifting<br />

40.00<br />

connection<br />

Sub Total 862.28<br />

1% Contingency 8.62<br />

Grand Total 870.90<br />

Katars Urban Water Supply Scheme – Phase II<br />

Clear Water Rising main of 600 mm dia class “A” ductile CI<br />

912.71<br />

pipe from Kusanda Pumping Station to Tilatand Reservoir<br />

having storage capacity of 40 Lakhs gallons (10 km)<br />

Contingency (1%) 9.13<br />

Grand Total 921.84<br />

Improvement in Kusunda – Katras & Bhuli Township<br />

Construction of 3 lakh gallon capacity RCC reservoir at Putki<br />

45.73<br />

Pumping Station<br />

Price Escalation (5%) 2.29<br />

Sub Total 48.02<br />

Contingency 0.48<br />

Grand Total 48.50<br />

Improvement of Water Supply – Jharia coal fields<br />

including <strong>Dhanbad</strong> Town – Phase – I<br />

Supply and laying of 750 mm dia clear water rising main from<br />

1,506.18<br />

Damodar Head Works Jamadoba to Bastacolla (Jharia)<br />

Price Escalation (5%) 75.31<br />

Sub Total 1,581.49<br />

Contingency (1%) 15.81<br />

Grand Total 1,597.30<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 253


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Description<br />

Amount (Rs. Lakh)<br />

Improvement of Water Supply in Jharia Coalfields<br />

including <strong>Dhanbad</strong> Town– Phase – II<br />

Construction of 20 lakhs gallon capacity RCC Reservoir at<br />

172.70<br />

Jharia (Bastacolla)<br />

Price Escalation (15%) 8.64<br />

Sub Total 181.34<br />

Contingency (1%) 1.821<br />

Grand Total 183.15<br />

Katras Urban Water Supply – Phase - III<br />

Intake Well 13.72<br />

Infiltration Well with infiltration galleries 14.40<br />

Submersible Weir 32.01<br />

Raw Water Pumping Machinery 24.05<br />

Clear Water Pumping Machinery 70.25<br />

Raw Water & Clear Water Rising Main (300 & 400 mm dia) 741.19<br />

Clear Water Distribution (100 to 450 mm dia) 178.88<br />

Gangway (3 mts *15 mts) 2.95<br />

Water Treatment Plant (10 MLD) 120.00<br />

Elevated Storage Reservoirs (2.25 MLD) 81.22<br />

Sump 17.27<br />

Fencing 4.79<br />

Single mouth Stand post 1.98<br />

Staff Quarters (4 units of triple type) 15.40<br />

Brick Masonry Pillar 1.21<br />

Approach Road 19.27<br />

Land Acquisition 2.00<br />

Sub Total 1,340.59<br />

Contingency (1%) 13.41<br />

Grand Total 1,354.00<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 254


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Annexure 7: Financial Operating Plan for <strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong><br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 255


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 256


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 257


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 258


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 259


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 260


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 261


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 262


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 263


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 264


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 265


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 266


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 267


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 268


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 269


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 270


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 271


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 272


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Annexure 8: Zone wise proposed investment for major sectors with tentative phasing<br />

Description Total 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 2012-13<br />

Rs. Lakh<br />

<strong>Dhanbad</strong> Sadar Block<br />

Water supply – Augmentation Works 13,430.64 1,422.90 1,593.08 3,759.30 3,746.48 2,263.02 484.39 161.46<br />

Sewerage – Augmentation Works 24,003.81 777.29 2,040.40 5,296.53 5,296.53 5,014.52 4,042.90 1,535.64<br />

Drainage<br />

Upgradation/Remodeling of Kutcha to<br />

Pucca Drains 1,661.70 305.60 401.10 573.00 382.00 - - -<br />

New Formation 11,297.50 655.00 1,209.38 967.50 1,209.38 2,418.75 2,418.75 2,418.75<br />

Urban Transport – only Road Works<br />

Strengthening /Improvement to Existing<br />

Roads 1,030.50 183.20 160.30 343.50 171.75 171.75 - -<br />

Upgradation of Existing Roads 3,651.38 481.50 561.75 1,203.75 802.50 601.88 - -<br />

Widening of Roads 1,332.38 114.00 149.63 213.75 213.75 213.75 213.75 213.75<br />

New Formation of Roads in Extension<br />

areas 3,607.16 - 281.96 775.60 745.60 730.60 559.20 514.20<br />

Sub Total –<strong>Dhanbad</strong> Sadar Block 60,015.06 3,939.50 6,397.59 13,132.93 12,567.99 11,414.26 7,718.99 4,843.80<br />

Jharia Block<br />

Water supply – Augmentation Works 3,654.99 889.31 682.75 751.86 749.30 452.60 96.88 32.29<br />

Sewerage – Augmentation Works 5,597.49 485.81 874.46 1,059.31 1,059.31 1,002.90 808.58 307.13<br />

Drainage<br />

Upgradation/Remodeling of Kutcha to<br />

Pucca Drains 553.90 191.00 171.90 114.60 76.40 - - -<br />

New Formation 3,479.38 818.75 725.63 483.75 725.63 241.88 241.88 241.88<br />

Urban Transport – only Road Works<br />

Strengthening /Improvement to Existing 320.60 114.50 68.70 68.70 34.35 34.35 - -<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 273


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Description Total 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 2012-13<br />

Rs. Lakh<br />

Roads<br />

Upgradation of Existing Roads 1,063.31 300.94 240.75 240.75 160.50 120.38 - -<br />

Widening of Roads 349.13 71.25 64.13 42.75 42.75 42.75 42.75 42.75<br />

New Formation of Roads in Extension<br />

areas 785.88 - 120.84 155.12 149.12 146.12 111.84 102.84<br />

Sub Total – Jharia Block 15,804.67 2,871.56 2,949.15 2,916.84 2,997.35 2,040.98 1,301.92 726.89<br />

Balaiapur Block<br />

Water supply – Augmentation Works 3,121.41 355.73 682.75 751.86 749.30 452.60 96.88 32.29<br />

Sewerage – Augmentation Works 5,306.00 194.32 874.46 1,059.31 1,059.31 1,002.90 808.58 307.13<br />

Drainage<br />

Upgradation/Remodeling of Kutcha to<br />

Pucca Drains 439.30 76.40 171.90 114.60 76.40 - - -<br />

New Formation 4,197.50 327.50 725.63 967.50 725.63 483.75 483.75 483.75<br />

Urban Transport – only Road Works<br />

Strengthening /Improvement to Existing<br />

Roads 251.90 45.80 68.70 68.70 34.35 34.35 - -<br />

Upgradation of Existing Roads 882.75 120.38 240.75 240.75 160.50 120.38 - -<br />

Widening of Roads 306.38 28.50 64.13 42.75 42.75 42.75 42.75 42.75<br />

New Formation of Roads in Extension<br />

areas 785.88 - 120.84 155.12 149.12 146.12 111.84 102.84<br />

Sub Total – Balaiapur Block 15,291.11 1,148.62 2,949.15 3,400.59 2,997.35 2,282.85 1,543.80 968.76<br />

Baghmara Block<br />

Water supply – Augmentation Works 5,659.50 355.73 1,137.92 1,503.72 1,498.59 905.21 193.76 64.59<br />

Sewerage – Augmentation Works 10,126.20 194.32 1,457.43 2,118.61 2,118.61 2,005.81 1,617.16 614.26<br />

Drainage<br />

Upgradation/Remodeling of Kutcha to<br />

Pucca Drains 744.90 76.40 286.50 229.20 152.80 - - -<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 274


City Development Plan, <strong>Dhanbad</strong><br />

Final Report<br />

Description Total 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 2012-13<br />

Rs. Lakh<br />

New Formation 8,964.38 982.50 1,693.13 1,451.25 1,209.38 1,209.38 1,209.38 1,209.38<br />

Urban Transport – only Road Works<br />

Strengthening /Improvement to Existing<br />

Roads 435.10 45.80 114.50 137.40 68.70 68.70 - -<br />

Upgradation of Existing Roads 1,564.88 120.38 401.25 481.50 321.00 240.75 - -<br />

Widening of Roads 562.88 28.50 106.88 85.50 85.50 85.50 85.50 85.50<br />

New Formation of Roads in Extension<br />

areas 1,531.48 - 201.40 310.24 298.24 292.24 223.68 205.68<br />

Sub Total – Baghmara Block 29,589.30 1,803.62 5,398.99 6,317.42 5,752.82 4,807.58 3,329.47 2,179.40<br />

Govindpur Block<br />

Water supply – Augmentation Works 3,071.69 533.59 455.17 751.86 749.30 452.60 96.88 32.29<br />

Sewerage – Augmentation Works 5,111.68 291.49 582.97 1,059.31 1,059.31 1,002.90 808.58 307.13<br />

Drainage<br />

Upgradation/Remodeling of Kutcha to<br />

Pucca Drains 420.20 114.60 114.60 114.60 76.40 - - -<br />

New Formation 4,361.25 491.25 483.75 967.50 967.50 483.75 483.75 483.75<br />

Urban Transport – only Road Works<br />

Strengthening /Improvement to Existing<br />

Roads 251.90 68.70 45.80 68.70 34.35 34.35 - -<br />

Upgradation of Existing Roads 862.69 180.56 160.50 240.75 160.50 120.38 - -<br />

Widening of Roads 299.25 42.75 42.75 42.75 42.75 42.75 42.75 42.75<br />

New Formation of Roads in Extension<br />

areas 745.60 - 80.56 155.12 149.12 146.12 111.84 102.84<br />

Sub Total – Govindpur Block 15,124.25 1,722.94 1,966.10 3,400.59 3,239.22 2,282.85 1,543.80 968.76<br />

Note: above mentioned investments are zone/block wise investment phasing for only major components, rest all need a comprehensive investment.<br />

<strong>Dhanbad</strong> <strong>Municipal</strong> <strong>Corporation</strong> 275

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!