Lake Ozark/Osage Beach Joint Sewer Treatment Plant - Missouri ...
Lake Ozark/Osage Beach Joint Sewer Treatment Plant - Missouri ...
Lake Ozark/Osage Beach Joint Sewer Treatment Plant - Missouri ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Lake</strong> <strong>Ozark</strong>/<strong>Osage</strong> <strong>Beach</strong><br />
<strong>Joint</strong> <strong>Sewer</strong> <strong>Treatment</strong> <strong>Plant</strong><br />
Protecting Water Quality at<br />
The <strong>Lake</strong> of the <strong>Ozark</strong>s<br />
AN ENVIRONMENTAL ROAD MAP FOR THE FUTURE REGIONAL<br />
SOLUTIONS FOR PROTECTION OF WATER QUALITY<br />
Attorney General’s Symposium ~ August 18, 2010<br />
Presented by:<br />
Mayor Penny Lyons, City of <strong>Osage</strong> <strong>Beach</strong><br />
Chairman, <strong>Lake</strong> <strong>Ozark</strong>/<strong>Osage</strong> <strong>Beach</strong> <strong>Joint</strong> <strong>Sewer</strong> <strong>Plant</strong> Board
<strong>Lake</strong> <strong>Ozark</strong>/<strong>Osage</strong> <strong>Beach</strong> <strong>Joint</strong> <strong>Sewer</strong><br />
<strong>Treatment</strong> <strong>Plant</strong><br />
LOCATION<br />
<br />
<br />
<br />
<br />
Miller County<br />
Downstream from Bagnell Dam<br />
2,500 feet from the <strong>Osage</strong><br />
River<br />
45 Acre Site
<strong>Lake</strong> <strong>Ozark</strong>/<strong>Osage</strong> <strong>Beach</strong> <strong>Joint</strong> <strong>Sewer</strong><br />
<strong>Treatment</strong> <strong>Plant</strong><br />
◄ <strong>Osage</strong> River Bridge<br />
WWTP ►
<strong>Lake</strong> <strong>Ozark</strong>/<strong>Osage</strong> <strong>Beach</strong> <strong>Joint</strong> <strong>Sewer</strong><br />
<strong>Treatment</strong> <strong>Plant</strong><br />
Pre-<strong>Treatment</strong><br />
▼<br />
▼ Sludge<br />
UV ►<br />
▼Office/Lab<br />
Clarifiers ▲
<strong>Lake</strong> <strong>Ozark</strong>/<strong>Osage</strong> <strong>Beach</strong> <strong>Joint</strong> <strong>Sewer</strong><br />
<strong>Treatment</strong> <strong>Plant</strong><br />
FORMATION<br />
Organized March 9, 1984<br />
Two Cities -<br />
<br />
<br />
<br />
<br />
<br />
<br />
Four Members Each City<br />
<strong>Lake</strong> <strong>Ozark</strong> & <strong>Osage</strong><br />
<strong>Beach</strong><br />
Elected Officers<br />
Monthly Meetings<br />
Per City Fees - % of Flow<br />
Fees Cover 100% of<br />
Expenses, Equipment, &<br />
Debt Service
<strong>Lake</strong> <strong>Ozark</strong>/<strong>Osage</strong> <strong>Beach</strong> <strong>Joint</strong> <strong>Sewer</strong><br />
<strong>Treatment</strong> <strong>Plant</strong><br />
FACILITY and EQUIPMENT<br />
<br />
<br />
<br />
<br />
Office / Lab Building<br />
Three Concrete Clarifiers<br />
Two 300 Ft. Wells<br />
Ultraviolet Finishing<br />
System
Facility<br />
<strong>Lake</strong> <strong>Ozark</strong>/<strong>Osage</strong> <strong>Beach</strong> <strong>Joint</strong> <strong>Sewer</strong><br />
<strong>Treatment</strong> <strong>Plant</strong><br />
3 M. Gallon/Day <strong>Plant</strong><br />
Processes approx. 2 MILLION<br />
GALLONS of Sewage Per Day<br />
Peak Season = June - August<br />
Average Annual Flow in<br />
2008 = 560 MILLION Gal.<br />
2010 Expenditure Budget =<br />
$612,000<br />
1988 Expenditure Budget =<br />
$220,000
<strong>Lake</strong> <strong>Ozark</strong>/<strong>Osage</strong> <strong>Beach</strong> <strong>Joint</strong> <strong>Sewer</strong><br />
<strong>Treatment</strong> <strong>Plant</strong><br />
Office / Lab Building<br />
<br />
<br />
<br />
<br />
Alliance Water Resources -<br />
Contracted for <strong>Plant</strong><br />
Operations and Maintenance<br />
Sampling and Analysis for<br />
Process Control and<br />
Compliance<br />
DNR Monthly Reporting<br />
Effluent Monitored Daily
<strong>Lake</strong> <strong>Ozark</strong>/<strong>Osage</strong> <strong>Beach</strong> <strong>Joint</strong> <strong>Sewer</strong><br />
<strong>Treatment</strong> <strong>Plant</strong><br />
Three Concrete Clarifiers<br />
Used to settle solids prior<br />
to wasting for disposal<br />
Approximately 15 - 20<br />
Feet Deep<br />
Two @ 55 Feet Diameter<br />
One @ 86 Feet Diameter<br />
Cost for 86 ft. = $450,000
<strong>Lake</strong> <strong>Ozark</strong>/<strong>Osage</strong> <strong>Beach</strong> <strong>Joint</strong> <strong>Sewer</strong><br />
<strong>Treatment</strong> <strong>Plant</strong><br />
Two 300 Ft. Wells<br />
<br />
<br />
Potable Well for<br />
Office/Lab<br />
Non-potable Well for<br />
Fire Protection and<br />
Pump/Equipment<br />
Cooling
<strong>Lake</strong> <strong>Ozark</strong>/<strong>Osage</strong> <strong>Beach</strong> <strong>Joint</strong> <strong>Sewer</strong><br />
<strong>Treatment</strong> <strong>Plant</strong><br />
Ultraviolet Finishing System<br />
Ultraviolet Light Disinfects/Inactivates Waterborne<br />
Pathogens and Viruses<br />
Sensitive System<br />
An Environmentally Effective Alternative to Traditional<br />
Chemical or Ozone Disinfection<br />
Replaced original Chlorination System in 2009<br />
Replacement cost = $552,000
<strong>Lake</strong> <strong>Ozark</strong>/<strong>Osage</strong> <strong>Beach</strong> <strong>Joint</strong> <strong>Sewer</strong><br />
<strong>Treatment</strong> <strong>Plant</strong><br />
Ultraviolet Finishing System
<strong>Lake</strong> <strong>Ozark</strong>/<strong>Osage</strong> <strong>Beach</strong> <strong>Joint</strong> <strong>Sewer</strong><br />
<strong>Treatment</strong> <strong>Plant</strong><br />
QUALITY<br />
Septage Accepted from<br />
Community<br />
June 2010 = 60 Loads<br />
Regular Quality Reports<br />
from Alliance Water<br />
Resources<br />
Cascading Steps - The<br />
return to the Environment
<strong>Lake</strong> <strong>Ozark</strong>/<strong>Osage</strong> <strong>Beach</strong> <strong>Joint</strong> <strong>Sewer</strong><br />
<strong>Treatment</strong> <strong>Plant</strong><br />
Alliance Water Resource JUNE 2010 Reports<br />
The <strong>Joint</strong> <strong>Treatment</strong> <strong>Plant</strong>… “Produced Superior<br />
Effluent Quality Throughout the month and was in full<br />
compliance, no leaks, no spills, and no unauthorized<br />
releases.”<br />
BOD (Biochemical Oxygen Demand) was 99.5%<br />
A Common Gauge of the Effectiveness of the WWTP
<strong>Lake</strong> <strong>Ozark</strong>/<strong>Osage</strong> <strong>Beach</strong> <strong>Joint</strong> <strong>Sewer</strong><br />
<strong>Treatment</strong> <strong>Plant</strong><br />
Customers<br />
Serves <strong>Lake</strong> <strong>Ozark</strong> and <strong>Osage</strong> <strong>Beach</strong><br />
Over 800 Businesses<br />
Over 7,000 Residents<br />
2007 <strong>Lake</strong> <strong>Ozark</strong> and <strong>Osage</strong> <strong>Beach</strong> Businesses and<br />
Residents Contributed Over $26 MILLION in State<br />
Sales Tax
<strong>Lake</strong> <strong>Ozark</strong>/<strong>Osage</strong> <strong>Beach</strong> <strong>Joint</strong> <strong>Sewer</strong><br />
<strong>Treatment</strong> <strong>Plant</strong><br />
<br />
<strong>Lake</strong> <strong>Ozark</strong><br />
Average Annual 16%<br />
of WWTP Use Since<br />
2007<br />
7.8 sq. Miles<br />
Serves areas from<br />
Hwy W, connecting<br />
<strong>Lake</strong> Roads,<br />
Horseshoe Bend Area,<br />
and Business Hwy 54<br />
areas.<br />
<br />
<strong>Osage</strong> <strong>Beach</strong><br />
Average Annual 84%<br />
of WWTP Use Since<br />
2007<br />
10.1 sq. Miles<br />
Serves areas from<br />
Hwy KK, including Tan<br />
Tar A, Hwy 54 and<br />
connecting <strong>Lake</strong><br />
Roads, Hwy 42, and<br />
Hwy D areas
<strong>Lake</strong> <strong>Ozark</strong>/<strong>Osage</strong> <strong>Beach</strong> <strong>Joint</strong> <strong>Sewer</strong><br />
<strong>Treatment</strong> <strong>Plant</strong><br />
<strong>Lake</strong> <strong>Ozark</strong><br />
<strong>Osage</strong> <strong>Beach</strong>
<strong>Lake</strong> <strong>Ozark</strong>/<strong>Osage</strong> <strong>Beach</strong> <strong>Joint</strong> <strong>Sewer</strong><br />
<strong>Treatment</strong> <strong>Plant</strong><br />
Expansion and Growth<br />
Support Continuous Growth of the <strong>Lake</strong> Area<br />
<strong>Osage</strong> <strong>Beach</strong>’s s Turkey Bend (Hwy KK) Expansion<br />
<br />
Cost = $21 Million<br />
2010 Dollars<br />
$11,000 per Household<br />
Use of Existing Facility and Some Existing Lines<br />
New Customers = 1,929<br />
2010 Cost - New 3 M. Gal./Day <strong>Plant</strong> = Approx. $25 -<br />
$30+ Million
<strong>Lake</strong> <strong>Ozark</strong>/<strong>Osage</strong> <strong>Beach</strong> <strong>Joint</strong> <strong>Sewer</strong><br />
<strong>Treatment</strong> <strong>Plant</strong><br />
o <strong>Lake</strong> <strong>Ozark</strong>/<strong>Osage</strong> <strong>Beach</strong><br />
<strong>Joint</strong> <strong>Treatment</strong> <strong>Plant</strong> Most<br />
Valuable Resource at the<br />
<strong>Lake</strong><br />
No Breaches or Spills in 26<br />
Year History<br />
A Cooperative and<br />
Effective Operation for 26<br />
Years<br />
Insures a Clean and Safe<br />
Recreational Area<br />
Other organizations should<br />
mirror our best practices
<strong>Lake</strong> <strong>Ozark</strong>/<strong>Osage</strong> <strong>Beach</strong> <strong>Joint</strong> <strong>Sewer</strong><br />
<strong>Treatment</strong> <strong>Plant</strong><br />
Policy Statement<br />
o The <strong>Joint</strong> <strong>Sewer</strong> Board encourages<br />
environmentally responsible new development<br />
in the <strong>Lake</strong> region and takes very seriously its<br />
obligation to operate in an efficient,<br />
responsible, and professional manner for the<br />
benefit of our residents, visitors, and the <strong>Lake</strong><br />
environment.
Discussion