CERTIFICATE<br />

This is to be certified that the proposed Project (<strong>IWMP</strong>-<strong>VIII</strong> ) comprising nine micro-watersheds of district <strong>Jhansi</strong>, Uttar Pradesh has<br />

been selected for its sustainable development on watershed basis under Integrated Watershed Management Programme. The land is physically<br />

available for proposed interventions and is not overlapping with any other schemes. It will be developed as per Common Guidelines for Watershed<br />

Development Project-2008, GOI, and New Delhi. The significant results will be achieved through proposed interventions on soil and water<br />

conservation, ground water recharge, availability of drinking and irrigation water, agricultural production systems, live stock, fodder availability,<br />

livelihoods of asset less, capacity building, etc. The proposed Detailed Project Report of <strong>IWMP</strong>-<strong>VIII</strong>, <strong>2010</strong>-<strong>11</strong> is submitted for its approval.<br />

Soil Conservation Officer<br />

<strong>IWMP</strong>-<strong>VIII</strong><br />

Dept. of LDWR, Tahrauli-I, <strong>Jhansi</strong>, UP<br />

Deputy Director<br />

LDWR, <strong>Jhansi</strong> UP<br />

Project Director<br />

DRDA, <strong>Jhansi</strong>, UP<br />

Chief Development Officer<br />

Distt.-<strong>Jhansi</strong>, UP<br />

1


EXECUTIVE SUMMARY<br />

All the micro-watersheds of <strong>IWMP</strong>-<strong>VIII</strong>, <strong>2010</strong>-<strong>11</strong> are situated in Bamor & Gursarain Block of District <strong>Jhansi</strong>, Uttar Pradesh. The project consists of<br />

Nine micro-watersheds namely Rampura-I (2C2B1m2e), Rampura -II (2C2B1m2d), Bikrampura (2C2B1m2b), Rudra Garautha (2C2B1l2b), Kedar Tai -I<br />

(2C2B1l2e), Markuan (2C2B1l2f), Pasaura (2C2B1k2a), Kedar Tai-II (2C2B1l2d) and Turk Lahchura (2C2B1l1g). Watershed project is situated in Bamor and<br />

Gursarain block of District <strong>Jhansi</strong> and spread over in 24 villages of 18 Gram Panchayat. The total geographical area of the <strong>IWMP</strong>-<strong>VIII</strong> is 6608.46 ha, out of<br />

which 5600.00 ha is treatable under Integrated Watershed Management Programme <strong>IWMP</strong>-<strong>VIII</strong>.<br />

All micro-watershed falls in Bundelkhand Zone representing semi-arid ecological sub-region. <strong>IWMP</strong>-<strong>VIII</strong> s situated at an elevation of some 139 to 190 m.<br />

above mean sea level and have relief from 20 to 39 m. The watershed has a general slope of less than 1.42 per cent. General topography of the watershed is<br />

mild to gentle. Elevation range and relief are given in Table 2.3.<br />

Spatial distribution of different slope classes was prepared using Arc GIS. Slope was divided into five classes’ viz. 0-0.5, 0.5-1.0, 1-3, 3-5, and more than 5 per<br />

cent. Per cent areal extent of different slope classes in <strong>IWMP</strong>-<strong>VIII</strong> micro-watershed is shown in Table 2.4. The dominant slope category in the micro-watershed<br />

were 1-3 per cent (39.89%) followed by 3-5 per cent (21.42%).<br />

On an average 31 per cent of the population is scheduled caste. Population details of the <strong>IWMP</strong>-<strong>VIII</strong> are depited in Table 3.1. In general 8 per cent<br />

population migrate from the project area due to drought and earn more money, however, migration was more than 50 per cent during 2007-08 due to continuous<br />

drought from 2004 to 2007 in the region.<br />

Major crops of the watershed are urd, mung, sorghum, til and arhar during kharif and lentil, chickpea, field pea, wheat, linseed and mustard during rabi.<br />

The productivity of these crops is significantly lower than the district and state average. The cropping intensity during kharif is significantly lower than the rabi.<br />

The pre-dominant tree species are Neem (Azadirachta indica), Babool (Acacia nilotica), Palas and Ber (Zizyphus spp.).<br />

Participatory Rural Appraisal (PRA) exercise was conducted to understand the people’s needs and problems. The exercise brought out pressing needs<br />

and preferences of people for water harvesting structures through pucca checkdams on ephemeral streams, earthen bunding to protect soil erosion from<br />

agricultural fields along with field drainage structure, crop varieties with improved package of practices, agro forestry interventions and improved cultivation of<br />

fodder production, etc.<br />

The Watershed Committee (WC) User Groups and SHGs have been constituted; active participation and co-operation of community will be ensured by<br />

building their capacities through exposures and trainings.<br />

2


CONTENTS<br />

CHAPTER PARTICULARS PAGE NO.<br />

EXECUTIVE SUMMARY 002<br />

1. INTRODUCTION AND BACKGROUND 004<br />

2. GENERAL DESCRIPTION OF PROJECT AREA 009<br />

3. BASELINE SURVEY AND PARTICIPATORY RURAL APPRAISAL 018<br />

4. INSTITUTIONAL BUILDING AND PROJECT MANAGEMENT 059<br />

5. MANAGEMENT / ACTION PLAN 090<br />

6. CAPACITY BUILDING PLAN 167<br />

7. PHASING OF PROGRAMME AND BUDGETING 170<br />

8. CONSOLIDATION AND WITHDRAWAL STRATEGY 172<br />

9. EXPECTED PROJECT OUTCOME 173<br />

ANNEXURE-I 175<br />

ANNEXURE-II 262<br />

ANNEXURE-III 265<br />

MAPS 281<br />

3


CHAPTER - 1<br />

INTRODUCTION AND BACKGROUND<br />

Status of watershed programme and approved plan by Steering committee, Govt. of India and status of previous Detailed Project Reports<br />

for <strong>Jhansi</strong> district of Uttar Pradesh is given in following Tables 1.1, 1.2 and 1.3.<br />

Table 1.1: Status of watershed programme<br />

District- <strong>Jhansi</strong><br />

Details No. Area (ha.)<br />

Total Micro watersheds in the district 747 502400<br />

Workable Micro Watersheds 610 410561<br />

Micro Watersheds already treated by LDWR & other Agencies Uttar Pradesh 421 282980<br />

Micro Watersheds (MWS) available for treatment (At the time of start of <strong>IWMP</strong> in the district) 189 127581<br />

Table 1.2: Approved plan (PPRs) by Steering Committee (SC)/Govt. of India,<br />

<strong>Year</strong> Project MWS Area Project<br />

(Treatable) Cost<br />

(ha) (Rs. Lakh)<br />

Name of<br />

PIA<br />

District- <strong>Jhansi</strong><br />

Date of Sanction by<br />

S.C. Got. Of India<br />

<strong>2010</strong>-<strong>11</strong> <strong>IWMP</strong>-IV 09 5800.00 696.00 LDWR, <strong>Jhansi</strong>-II, U.P. 28-09-<strong>2010</strong><br />

<strong>2010</strong>-<strong>11</strong> <strong>IWMP</strong>-V 09 5970.00 716.40 LDWR, Moth <strong>Jhansi</strong>, U.P. 28-09-<strong>2010</strong><br />

<strong>2010</strong>-<strong>11</strong> <strong>IWMP</strong>-VI 10 5530.00 663.60 LDWR, <strong>Jhansi</strong>-I, U.P. 28-09-<strong>2010</strong><br />

<strong>2010</strong>-<strong>11</strong> <strong>IWMP</strong>-<strong>VIII</strong> 09 6070.00 728.40 LDWR, Tahrauli-I, <strong>Jhansi</strong>. U.P. 28-09-<strong>2010</strong><br />

<strong>2010</strong>-<strong>11</strong> <strong>IWMP</strong>-<strong>VIII</strong> 09 5600.00 672.00 LDWR, Tahrauli-I, <strong>Jhansi</strong>. U.P. 28-09-<strong>2010</strong><br />

<strong>2010</strong>-<strong>11</strong> <strong>IWMP</strong>-IX 08 5600.00 672.00 LDWR, Mauranipur, <strong>Jhansi</strong>.U.P. 28-09-<strong>2010</strong><br />

<strong>2010</strong>-<strong>11</strong> <strong>IWMP</strong>-X 09 5530.00 663.60 LDWR, Moth <strong>Jhansi</strong>, U.P. 28-09-<strong>2010</strong><br />

Total 63 40100.00 4812.00<br />

4


Table 1.3: Status of previous <strong>DPR</strong>s<br />

S. No. Approved Status of <strong>DPR</strong><br />

Project under preparation/<br />

prepared/approved by<br />

Treatable<br />

Area ha<br />

Project<br />

Area<br />

(Geograph<br />

ical) ha<br />

Project<br />

cost<br />

Rs.(Lakh)<br />

Project<br />

period<br />

(Fin. <strong>Year</strong> from.......q<br />

......)<br />

District- <strong>Jhansi</strong><br />

PIA<br />

SLNA with date<br />

1 <strong>IWMP</strong>-IV Prepared / under revision 5800.00 696.00 <strong>2010</strong>-<strong>11</strong> to 2013-14 LDWR, <strong>Jhansi</strong>-II, U.P.<br />

2 <strong>IWMP</strong>-V Prepared / under revision 5970.00 716.40 <strong>2010</strong>-<strong>11</strong> to 2013-14 LDWR, Moth <strong>Jhansi</strong>, U.P.<br />

3 <strong>IWMP</strong>-VI Prepared / under revision 5530.00 663.60 <strong>2010</strong>-<strong>11</strong> to 2013-14 LDWR, <strong>Jhansi</strong>-I, U.P.<br />

4 <strong>IWMP</strong>-<strong>VIII</strong> Prepared / under revision 6070.00 728.40 <strong>2010</strong>-<strong>11</strong> to 2013-14 LDWR, Tahrauli-I, <strong>Jhansi</strong>. U.P.<br />

5 <strong>IWMP</strong>-<strong>VIII</strong> Prepared / under revision 5600.00 672.00 <strong>2010</strong>-<strong>11</strong> to 2013-14 LDWR, Tahrauli-I, <strong>Jhansi</strong>. U.P.<br />

6 <strong>IWMP</strong>-IX Prepared / under revision 5600.00 672.00 <strong>2010</strong>-<strong>11</strong> to 2013-14 LDWR, Mauranipur, <strong>Jhansi</strong>.U.P.<br />

7 <strong>IWMP</strong>-X Prepared / under revision 5530.00 663.60 <strong>2010</strong>-<strong>11</strong> to 2013-14 LDWR, Moth <strong>Jhansi</strong>, U.P.<br />

Total 40100.00 4812.00 - -<br />

1.1 Project Background<br />

Integrated Watershed Management Programme-<strong>VIII</strong> comprises nine micro-watershed namely Rampura-I (2C2B1m2e), Rampura-II (2C2B1m2d),<br />

Bikrampura (2C2B1m2b), Rudra Garautha (2C2B1l2b), Kedar Tai-I (2C2B1l2e), Markuan (2C2B1l2f), Pasaura (2C2B1k2a), Kedar Tai -II<br />

(2C2B1l2d) and Turk Lahchura (2C2B1l1g). Watershed project is situated in Bamor and Gursarain block of District <strong>Jhansi</strong> and spread over in 24<br />

villages of 18 Gram Panchayat. The total geographical area of the <strong>IWMP</strong>-<strong>VIII</strong> 6608.46 ha, out of which 5600.00 ha is treatable under Integrated<br />

Watershed Management Programme (<strong>IWMP</strong>-<strong>VIII</strong>).<br />

Table 1.4: Details of <strong>IWMP</strong>-<strong>VIII</strong> for which this <strong>DPR</strong> is Prepared<br />

Watershed project Micro Watersheds<br />

(MWS) detail<br />

Micro watersheds<br />

code<br />

Treatable Area (ha)<br />

Name of Watershed in which<br />

MWS is falling (River / Nala<br />

name)<br />

<strong>IWMP</strong>-<strong>VIII</strong> Rampura-I 2C2B1m2e 670.00 Betwa River<br />

<strong>IWMP</strong>-<strong>VIII</strong> Rampura-II 2C2B1m2d 600.00 Betwa River<br />

<strong>IWMP</strong>-<strong>VIII</strong> Bikrampura 2C2B1m2b 990.00 Betwa River<br />

<strong>IWMP</strong>-<strong>VIII</strong> Rund Garautha 2C2B1l2b 615.00 Betwa River<br />

<strong>IWMP</strong>-<strong>VIII</strong> Kedar Tai-I 2C2B1l2e 495.00 Betwa River<br />

<strong>IWMP</strong>-<strong>VIII</strong> Markuan 2C2B1l2f 575.00 Betwa River<br />

<strong>IWMP</strong>-<strong>VIII</strong> Pasaura 2C2B1k2a 665.00 Betwa River<br />

<strong>IWMP</strong>-<strong>VIII</strong> Kedar Tai-II 2C2B1l2d 490.00 Betwa River<br />

5


<strong>IWMP</strong>-<strong>VIII</strong> Turk Lahchura 2C2B1l1g 500.00 Betwa River<br />

5600.00<br />

1.2 Need and Scope for Watershed Development<br />

The District <strong>Jhansi</strong> was in a grip of severe drought continuously from 2003 to 2007. In the district, more than 90 per cent of open wells<br />

were dried up due to deficit rainfall during drought. Cattle were abandoned due to shortage of water and fodder. Most part of the district is<br />

dependent on drinking water supply through tanker. Therefore, management of natural resources on watershed basis is urgent need of the district.<br />

Watershed project was selected with following objectives:<br />

Long Term Objectives:<br />

• To optimize productivity of the land<br />

• To restore ecological balance in degraded and fragile eco-system<br />

• To narrow down the disparity between rainfed and irrigated areas<br />

• To create sustained employment opportunities<br />

1.3 Weightage for selection of Watershed<br />

Watershed project was selected on the basis of criteria mentioned in Table 1.5 and composite ranking was developed on the basis of these parameters.<br />

The seventeen criteria were taken with total of 205 weightage points. The criterion taken are availability of drinking water, irrigation, degree of soil erosion,<br />

water holding capacity, area under rainfed agriculture, status of field bund/contour bund / graded bund, presence of hard rock below the land, options for<br />

livelihood, percentage of small and marginal farmers, degraded land, ground water status, status of technical knowledge for improved farming systems, weather<br />

conditions, poverty index (% of poor population), virginity of land, productivity potential of land and soil organic carbon status. The weightage for project is<br />

about 96.58 per cent (Table 1.6).<br />

Table 1.5: Criteria and weightage for selection of watershed<br />

S. No. Criteria Maximum<br />

Score<br />

1 Drinking water 15 Very poor<br />

Dependence on water supply<br />

through tanker (15)<br />

Range & Score<br />

Poor<br />

Partial availability<br />

within the periphery<br />

of 3-4 km<br />

(10)<br />

Good<br />

Round the year<br />

availability within the<br />

periphery of 3-4 km<br />

(5)<br />

Partial life saving<br />

irrigation (5)<br />

Very Good<br />

Round the year<br />

availability in<br />

watershed<br />

(0)<br />

Fully covered<br />

(0)<br />

2 Irrigation 10 No irrigation (10) Life saving irrigation<br />

(7.5)<br />

3 Degree of soil erosion 10 Severe (10) Medium (7.5) Low (5) No erosion (0)<br />

6


4 Water holding capacity 10 Very poor (10) Poor (7.5) Good (5) Very Good (0)<br />

5 Area under rainfed<br />

15 More than 90% (15) 80 to 90 % (10) 70 to 80 % (5) Below 70%<br />

agriculture<br />

(Reject)<br />

6 Status of field<br />

bund/contour bund /<br />

graded bund<br />

7 Presence of hard rock<br />

below the land<br />

10 Below 20 % (10) 50 to 20 % (7.5) 80 to 50<br />

(5)<br />

(0)<br />

Above 80%<br />

(2.5)<br />

15 Hard rock starts from 5 to 20<br />

feet (15)<br />

Hard rock starts from<br />

21 to 50 feet (10)<br />

Hard rock starts from<br />

51 to 100 feet (5)<br />

Deep soil depth<br />

(0)<br />

8 Options for livelihood 10 Very poor (10) Poor (7.5) Good (5) Very Good (0)<br />

9 % of small and<br />

marginal farmers<br />

10 More than 80%<br />

(10)<br />

50 to 80 %<br />

(5)<br />

Less than 50%<br />

(3)<br />

10 Degraded land 15 High<br />

above 50% (15)<br />

Medium<br />

25 to 50% (10)<br />

Low<br />

less than 10 – 25 % (5)<br />

Very low Less<br />

than 10% (0)<br />

<strong>11</strong> Ground water status 10 Very poor (10) Poor (7.5) Good (5) Very Good (0)<br />

12 Status of Technical<br />

Knowledge for<br />

improved farming<br />

systems<br />

10 Very poor<br />

(10)<br />

Poor<br />

(7.5)<br />

Good<br />

(5)<br />

Very Good<br />

(0)<br />

13 Weather condition 15 Uncertain weather condition /<br />

Continuous drought for three<br />

years (15)<br />

14 Poverty index (% of<br />

poor population)<br />

15 Virginity (No treatment<br />

/intervention in last<br />

five years)<br />

16 Productivity potential<br />

of land<br />

Drought comes one in<br />

five years<br />

(10)<br />

Drought comes one in<br />

ten years (5)<br />

Normal weather<br />

condition (0)<br />

10 Above 80% (10) 80 to 50 (7.5) 50 to 20 % (5) Below 20 %<br />

(2.5)<br />

10 Above 80% (10) 80 to 50 (7.5) 50 to 20 % (5) Below 20 %<br />

( (2.5)<br />

15 Lands with low production &<br />

where productivity can be<br />

significantly enhanced with<br />

reasonable efforts (15)<br />

Lands with moderate<br />

production & where<br />

productivity can be<br />

enhanced with<br />

reasonable efforts<br />

(10)<br />

Lands with high<br />

production & where<br />

productivity can be<br />

marginally enhanced<br />

with reasonable efforts<br />

(5)<br />

17 Organic carbon status 15 Very low (15) Low (10) Medium (5) Normal (0)<br />

-<br />

7


Table 1.6: Weightage of the project<br />

S. No. Criteria Weightage points<br />

1 Drinking water 15<br />

2 Irrigation 10<br />

3 Degree of soil erosion 12<br />

4 Water holding capacity 10<br />

5 Area under rainfed agriculture 12<br />

6 Status of field bund/contour bund / graded bund 10<br />

7 Presence of hard rock below the land 10<br />

8 Options for livelihood 10<br />

9 % of small and marginal farmers 15<br />

10 Degraded land 15<br />

<strong>11</strong> Ground water status 10<br />

12 Status of Technical Knowledge for improved farming systems 10<br />

13 Weather condition 15<br />

14 Poverty index (% of poor population) <strong>11</strong><br />

15 Virginity 10<br />

16 Productivity potential of land 10<br />

17 Organic carbon status 15<br />

Total Weightage (Out of total 205) 200<br />

Weightage Percentage 97.56<br />

1.4 Details of ongoing watershed programme<br />

Presently, no watershed development programme is going on in the micro-watershed.<br />

8


CHAPTER - 2<br />

GENERAL DESCRIPTION OF PROJECT AREA<br />

2.1 Location:<br />

The micro-watersheds of <strong>IWMP</strong>-<strong>VIII</strong> are located in Bamor and Gursarany block of <strong>Jhansi</strong> district. It is about 95 km. from <strong>Jhansi</strong> on <strong>Jhansi</strong><br />

to Gursarain & Arach road and other approach from <strong>Jhansi</strong> to Project area is about 95 Km. from <strong>Jhansi</strong> to Chirgaon, Punchh and Arach road.<br />

Location (lat/long), Gram Panchayat, villages and its geographical area for each micro-watershed are depicted in Table 2.1. Total area of the<br />

project is 7337.41 ha, out of which 6070.00 ha is treatable. The geographical area of micro-watershed varied in the range of 534.17 to <strong>11</strong>09.10 ha.<br />

Table 2.1: Micro-watershed wise details of location, Gram Panchayat, villages and geographical area of <strong>IWMP</strong>-<strong>VIII</strong><br />

S.<br />

N<br />

o.<br />

Name of micro<br />

watershed with<br />

Code<br />

Latitude /<br />

Longitude<br />

Name of<br />

GP<br />

Names of villages Name of Block Area of village<br />

included in<br />

MWS<br />

Details of important<br />

/approach road with<br />

distance km<br />

1 Rampura-I<br />

(2C2B1m2e)<br />

2 Rampura-II<br />

(2C2B1m2d)<br />

3 Bikrampura<br />

(2C2B1m2b)<br />

Dhipkai<br />

Rampura<br />

Nipan<br />

Tola<br />

Sikrodha Bamhori<br />

Rampura<br />

Nipan<br />

(Treatable)<br />

Bamor 94.601<br />

10.602<br />

129.056<br />

435.741<br />

Total 670.000<br />

Jashwantpura Jashwantpura<br />

Bamor 43.247<br />

Dhipkai Dhipkai<br />

105.882<br />

Simardha Sikrodha Bamhori<br />

39.534<br />

Rampura Simardha<br />

246.012<br />

Rampura<br />

165.325<br />

Total 600.00<br />

Nimgahna Nimgahna<br />

Bamor 323.313<br />

Simardha Simardha<br />

83.688<br />

Dhipkai Dhipkai<br />

269.934<br />

Bangra Sikrodha Bamhori<br />

69.757<br />

Bikrampura<br />

202.867<br />

From <strong>Jhansi</strong> to Tahrauli to<br />

Gursarain to Garautha 85<br />

km.Garautha to Rampura-I 8<br />

km<br />

From <strong>Jhansi</strong> to Tahrauli to<br />

Gursarain to Garautha 85<br />

km.Garautha to Rampura-II 10<br />

km<br />

From <strong>Jhansi</strong> to Tahrauli to<br />

Gursarain to Garautha 85<br />

km.Garautha to Bikrampura 6<br />

km<br />

Bangra<br />

40.432<br />

Total 990.000<br />

4 Rudra Garautha Dhurkhuru Rund Garautha Bamor 45.691 From <strong>Jhansi</strong> to Tahrauli to<br />

9


(2C2B1l2b)<br />

5 Kedar Tai-I<br />

(2C2B1l2e)<br />

Birona<br />

Bikrampura<br />

Dhipkai<br />

Bangra<br />

Gohana<br />

Birona<br />

Bikrampura<br />

Sikrodha Bamhori<br />

Bangra<br />

28.518<br />

467.937<br />

63.823<br />

3.399<br />

5.632<br />

Total 615.000<br />

Gorpura Gorpura<br />

92.141<br />

Chaturtai Kedar Tai<br />

220.622<br />

Markuan Chatur Tai<br />

163.943<br />

Markuan<br />

18.294<br />

Total 495.000<br />

6 Markuan (2C2B1l2f) Markuan Markuan<br />

Gursarain 308.123<br />

Emlota<br />

Barota<br />

99.907<br />

Aivani<br />

Emlota<br />

60.093<br />

Aivani<br />

106.877<br />

Total 575.000<br />

7 Pasaura (2C2B1k2a) Pasaura Pasaura<br />

Gursarain 206.984<br />

Gorpura Gorpura<br />

224.309<br />

Chatur Tai Chatur Tai<br />

120.961<br />

Punchhi Ghatkuan<br />

<strong>11</strong>2.746<br />

Total 665.000<br />

8 Kedar Tai-II<br />

Pasaura Pasaura<br />

Gursarain 99.109<br />

(2C2B1l2d)<br />

Gorpura Gorpura<br />

390.891<br />

9 Turk Lahchura<br />

(2C2B1l1g)<br />

Turk<br />

Lahchura<br />

Pasaura<br />

Garha<br />

Turk Lahchura<br />

Pasaura<br />

Garha<br />

490.000<br />

Gursarain 399.223<br />

43.544<br />

57.233<br />

500.000<br />

Grand Total 5600.00<br />

Gursarain to Garautha 85<br />

km.Garautha to Rudra<br />

Garautha 4 km<br />

From <strong>Jhansi</strong> to Tahrauli to<br />

Gursarain to Garautha 85<br />

km.Garautha to Kedar Tai-I 20<br />

km<br />

From <strong>Jhansi</strong> to Tahrauli to<br />

Gursarain to Garautha 85<br />

km.Garautha to Markuan 16<br />

km<br />

From <strong>Jhansi</strong> to Tahrauli to<br />

Gursarain to Garautha 85<br />

km.Garautha to Pasaura 18 km<br />

From <strong>Jhansi</strong> to Tahrauli to<br />

Gursarain to Garautha 85<br />

km.Garautha to Kedar Tai-II<br />

21 km<br />

From <strong>Jhansi</strong> to Tahrauli to<br />

Gursarain to Garautha 85<br />

km.Garautha to Turk Lahchura<br />

36 km<br />

10


2.2 Area and Landuse: Village wise detailed information on type of land is depicted in Table 2.2. The total culturable land of the project is<br />

7069.69 ha, out of which 339.74 (5.00%) ha land is under assured irrigation mainly by means of open shallow dug wells. The cultivable rainfed,<br />

temporary and permanent wastelands are about 6730.25, 176.06 and 22.86 per cent, respectively, of cultivable land of the project.<br />

1<br />

Table 2.2: Details of land resources in <strong>IWMP</strong>-<strong>VIII</strong> of <strong>Jhansi</strong> district<br />

MWS with<br />

S.N code<br />

Rampura-I<br />

2C2B1m2e)<br />

Gram<br />

Panchaya<br />

t<br />

Village<br />

Tola<br />

Cultivat<br />

ed<br />

rainfed<br />

area<br />

Cultiv<br />

ated<br />

irrigat<br />

ed<br />

area<br />

Uncultivated<br />

wasteland/<br />

fallow<br />

Temp<br />

Pvt. Agri. Land<br />

Perm<br />

anent Gen SC OBC Total<br />

Forest<br />

Land<br />

Com<br />

muni<br />

ty<br />

land<br />

Others<br />

(Habita<br />

t, Road.<br />

Etc.<br />

Total area<br />

(ha)<br />

(Geographic<br />

al)<br />

102.70 5.58 1.75 0.00 8.80 34.<strong>11</strong> 67.12 <strong>11</strong>0.03 0.00 0.15 1.45 <strong>11</strong>1.631<br />

Sikrodha<br />

Bamhori 12.51 0.00 0.00 0.00 1.00 3.88 7.63 12.51 0.00 0.00 0.00 12.510<br />

Rampura<br />

140.<strong>11</strong> 7.61 1.98 0.45 12.01 46.55 91.59 150.15 0.00 0.25 1.89 152.291<br />

Nipan<br />

478.09 25.71 4.52 1.75 40.81 158.12 3<strong>11</strong>.14 510.07 0.00 0.95 3.15 514.170<br />

Total 733.41 38.90 8.25 2.20 62.62 242.66 477.48 782.76 0.00 1.35 6.49 790.60<br />

2<br />

Rampura-II<br />

(2C2B1m2d)<br />

Dhipkai<br />

Rampura<br />

Jaswantpu<br />

ra<br />

Dhipkai<br />

<strong>11</strong>4.94 6.25 2.02 0.35 9.88 38.30 75.37 123.56 0.00 0.32 1.06 124.942<br />

Sikrodha<br />

Bamhori 43.57 2.33 0.00 0.00 3.67 14.23 28.00 45.90 0.00 0.00 0.75 46.653<br />

Rampura<br />

179.47 9.75 3.24 0.95 15.47 59.96 <strong>11</strong>7.98 193.42 0.00 0.41 1.25 195.078<br />

Jaswantpur<br />

a 48.48 2.55 0.00 0.00 4.08 15.82 31.13 51.03 0.00 0.00 0.00 51.032<br />

Simardha Simardha 267.07 14.51 5.26 0.98 23.03 89.22 175.57 287.82 0.00 0.48 1.989 290.290<br />

Total 653.54 35.40 10.52 2.28 56.14 217.54 428.06 701.73 0.00 1.21 5.05 707.99<br />

3<br />

Vikrampura<br />

(2C2B1m2b)<br />

Dhipkai<br />

Dhipkai<br />

Sikrodha<br />

296.36 15.93 2.95 0.46 25.26 97.87 192.57 315.70 0.00 0.48 2.35 318.525<br />

76.17 4.12 1.08 0.00 6.51 25.22 49.63 81.36 0.00 0.00 0.95 82.315<br />

12


Simardha<br />

Nimgahna<br />

Bangra<br />

Bamhori<br />

Vikrampur<br />

a 218.20 <strong>11</strong>.97 5.45 1.25 18.95 73.43 144.49 236.87 0.00 0.58 1.93 239.38<br />

Simardh<br />

90.85 4.94 1.31 0.00 7.77 30.10 59.23 97.10 0.00 0.00 1.65 98.75<br />

Nimgahna<br />

351.03 19.08 5.68 2.05 30.23 <strong>11</strong>7.13 230.48 377.84 0.00 0.72 2.95 381.51<br />

Bangra<br />

45.32 2.39 0.00 0.00 3.82 14.79 29.10 47.71 0.00 0.00 0 47.71<br />

Total 1077.93 58.41 16.47 3.76 92.53 358.54 705.51 <strong>11</strong>56.57 0.00 1.78 9.83 <strong>11</strong>68.18<br />

4<br />

Rudra<br />

Garautha<br />

(2C2B1l2b) Dhipkai Bikrampura 71.71 3.78 0.00 0.00 6.04 23.40 46.05 75.49 0.00 0.00 0.15 75.64<br />

Sikraudha<br />

Bamhori 4.01 0 0.00 0.00 0.32 1.24 2.45 4.01 0.00 0.00 0.00 4.01<br />

Bangra Bangra 6.65 0.00 0.00 0.00 0.53 2.06 4.06 6.65 0.00 0.00 0.00 6.65<br />

Rund<br />

Durkhuru Garautha 51.22 2.70 0.00 0.00 4.31 16.72 32.89 53.92 0.00 0.00 0.00 53.92<br />

Birona<br />

Gohna 33.65 0.00 0.00 0.00 2.69 10.43 20.53 33.65 0.00 0.00 0.00 33.65<br />

Birona<br />

509.59 27.61 8.35 1.92 43.80 169.72 333.96 547.47 0.00 0.75 3.95 552.17<br />

Total<br />

676.83 34.09 8.35 1.92 57.70 223.57 439.93 721.19 0.00 0.75 4.10 726.04<br />

5<br />

Kedar Tai-I<br />

(2C2B1l2e)<br />

Gorpura<br />

Chatur Tai<br />

Gorpura<br />

Chatur Tai<br />

100.03 5.44 1.95 0.18 8.61 33.36 65.63 107.60 0.00 0.12 1.01 108.73<br />

177.97 9.67 2.25 0.68 15.25 59.08 <strong>11</strong>6.25 190.58 0.00 0.49 2.38 193.45<br />

Kedar Tai 239.62 13.02 3.15 1.04 20.55 79.62 156.66 256.83 0.00 0.55 2.95 260.33<br />

Markuan Markuan 21.59 0.00 0.00 0.00 1.73 6.69 13.17 21.59 0.00 0.00 0.00 21.59<br />

Total<br />

539.22 28.13 7.35 1.90 46.13 178.74 351.72 576.59 0.00 1.16 6.34 584.09<br />

6<br />

Markuan<br />

(2C2B1l2f) Markuan Markuan 334.90 18.18 5.56 1.25 28.79 <strong>11</strong>1.57 219.53 359.89 0.00 0.45 3.25 363.590<br />

Emlota Emlota 0.00 0.00 1.85 0.00 0.15 0.57 1.13 1.85 0.00 0.21 1.48 <strong>11</strong>7.89<br />

Baraota<br />

66.66 3.55 0.00 0.00 5.62 21.76 42.82 70.20 0.00 0.00 0.71 70.91<br />

13


Aivani<br />

Aivani<br />

<strong>11</strong>6.46 6.75 1.25 0.00 9.96 38.58 75.92 124.46 0.00 0.00 1.65 126.<strong>11</strong><br />

Total 518.02 28.48 8.66 1.25 44.51 172.48 339.40 556.40 0.00 0.66 7.09 678.50<br />

7<br />

Pasaura<br />

(2C2B1k2a)<br />

Gorpura<br />

Chatur Tai<br />

Pasaura<br />

Punchhi<br />

Gorpura<br />

244.91 13.23 2.58 0.69 20.91 81.04 159.46 261.41 0.00 0.45 2.82 264.68<br />

Chatur Tai<br />

131.312 7.1365 1.95 0.39 <strong>11</strong>.26 43.64 85.88 140.79 0.00 0.19 1.75 142.73<br />

Pasaura<br />

225.70 12.21 2.68 0.95 19.32 74.88 147.34 241.54 0.00 0.56 2.14 244.24<br />

Punchhi<br />

122.41 6.65 2.35 0.85 10.58 41.00 80.68 132.26 0.00 0.14 0.65 133.05<br />

Total 724.328 39.235 9.560 2.880 62.080 240.561 473.362 776.003 0.000 1.340 7.360 784.703<br />

8<br />

Kedar Tai-II<br />

(2C2B1l2d) Gorpura Gorpura 424.77 25.39 5.98 2.35 36.68 142.13 279.68 458.50 0.00 0.85 2.36 461.71<br />

Pasaura Pasaura 107.32 5.83 1.85 0.25 9.22 35.73 70.30 <strong>11</strong>5.25 0.00 0.13 1.27 <strong>11</strong>6.65<br />

Total 532.09 31.23 7.83 2.60 45.90 177.86 349.99 573.75 0.00 0.98 3.63 578.36<br />

9<br />

Turk Lahchura<br />

(2C2B1l1g)<br />

Turk<br />

Lahchura<br />

Turk<br />

Lahchura 435.93 23.55 5.35 2.05 37.35 144.73 284.80 466.88 0.00 0.55 3.65 471.08<br />

Pasaura Pasaura 48.46 2.92 0.00 0.00 4.<strong>11</strong> 15.93 31.34 51.38 0.00 0.00 0.00 51.38<br />

Garha Garha 64.15 3.38 0.00 0.00 5.40 20.93 41.19 67.53 0.00 0.00 0.00 67.53<br />

10 Total<br />

548.54 29.85 5.35 2.05 46.86 181.60 357.33 585.79 0.00 0.55 3.65 589.99<br />

G. Total<br />

6003.90 323.71 82.34 20.84 514.46 1993.54 3922.78 6430.79 0.00 9.78 53.54 6608.46<br />

(Source: LDWR, Tahrauli-I, <strong>Jhansi</strong>, U.P.)<br />

2.2<br />

2.3 Physiography<br />

The micro-watersheds of <strong>IWMP</strong>-<strong>VIII</strong> are situated at an elevation of some 139 to 190 m above mean sea level and have relief from 20 to 39 m. The watershed has a<br />

general slope of less than 1.42 per cent. General topography of the watershed is mild to gentle. Elevation range and relief are given in Table 2.3.<br />

Table 2.3: Micro-watershed wise elevation range and relief<br />

Name of MWS Minimum Maximum Relief<br />

Rampura-I (2C2B1m2e) 139 178 39<br />

Rampura-II (2C2B1m2d) 148 178 30<br />

Bikrampura (2C2B1m2b) 148 185 37<br />

14


Rudra Garautha (2C2B1l2b) 147 172 25<br />

Kedar Tai-I (2C2B1l2e) 163 185 22<br />

Markuan (2C2B1l2f) 167 190 23<br />

Pasaura (2C2B1k2a) 153 180 27<br />

Kedar Tai-II (2C2B1l2d) 158 184 26<br />

Turk Lahchura (2C2B1l1g) 152 172 20<br />

Slope: Spatial distribution of different slope classes was prepared using Arc GIS. Slope was divided into five classes’ viz. 0-0.5, 0.5-1.0, 1-3, 3-5,<br />

and more than 5 per cent. Per cent areal extent of different slope classes in <strong>IWMP</strong>-<strong>VIII</strong> micro-watershed is shown in Table 2.4. The dominant slope<br />

category in the micro-watershed were 1-3 per cent (39.89%) followed by 3-5 per cent (21.42%).<br />

Table 2.4: Areal extent of various slope classes in the micro-watershed of <strong>IWMP</strong>-<strong>VIII</strong><br />

Sl. No. Name of MWS & code Slope range wise area (ha) Total Project<br />

0-0.5% 0.5-1.0% 1-3% 3-5% >5%<br />

Area (ha)<br />

Undulating Terraced<br />

1 Rampura-I (2C2B1m2e) 54.16 86.25 344.62 182.94 122.62 790.60<br />

2 Rampura-II (2C2B1m2d) 60.82 108.75 275.84 152.79 109.81 708.00<br />

3 Bikrampura (2C2B1m2b) 100.35 179.44 455.13 252.10 181.19 <strong>11</strong>68.20<br />

4 Rudra Garautha (2C2B1l2b) 62.34 104.21 284.33 162.27 <strong>11</strong>2.56 725.70<br />

5 Kedar Tai-I (2C2B1l2e) 40.01 63.73 254.61 135.16 90.59 584.10<br />

6 Markuan (2C2B1l2f) 58.28 97.43 272.42 145.13 105.24 678.50<br />

7 Pasaura (2C2B1k2a) 80.51 127.98 283.67 143.29 149.25 784.70<br />

8 Kedar Tai-II (2C2B1l2d) 39.61 63.08 252.04 133.80 89.68 578.20<br />

9 Turk Lahchura (2C2B1l1g) 60.58 96.30 213.45 107.82 <strong>11</strong>2.31 590.46<br />

Total 556.66 927.17 2636.<strong>11</strong> 1415.3 1073.25 6608.46<br />

2.5 Climate<br />

The annual rainfall of the District varies from 385.30 to 13<strong>11</strong>.50 mm, the major part of the rainfall is received during the month of July and<br />

August. The length of growing season in the district ranges between 90 to 150 days depending upon rainfall and temperature regimes. The winter<br />

rains are erratic, occasional, meager and uncertain. The total rainy days/year vary from 32-48 in the region with an average of 36. The distribution<br />

of rainfall is very erratic. Low rainfall and drought are common features. Long dry spells during rainy season are also experienced often, which<br />

adversely affect the crops.<br />

15


The climate of <strong>Jhansi</strong> is characterized by a hot dry summer and cold winter and is marked for high variability of rainfall year to year. There<br />

are primarily four seasons: – Dry Summer season – from March to May i.e. before advent of monsoon, moist summer season – from June to<br />

September (Monsoon) transition period - in October and November, which is the post monsoon period, and winter season – from December to<br />

February The coldest months in the year are December and January. Average monthly rainfall and temperature is presented in Table 2.5:<br />

Table 2.5: Average monthly rainfall and temperature at <strong>IWMP</strong>-IV, <strong>Jhansi</strong><br />

2005 2006 2007 2008 2009 <strong>2010</strong> 20<strong>11</strong> Average<br />

Months Temperature Rainfall Temperature Rainfall Temperature Rainfall Temperature Rainfall Temperature Rainfall Temperature Rainfall Temperature Rainfall Temperature Rainfall<br />

Max. Mini. (mm) Max. Mini. (mm) Max. Mini. (mm) Max. Mini. (mm) Max. Mini. (mm) Max. Mini. (mm) Max. Mini. (mm) Max. Mini. (mm)<br />

Jan. 21.88 7.01 2.40 24.28 5.84 0.00 21.33 5.55 2.20 21.60 6.96 0.00 20.20 8.80 6.00 19.00 6.40 2.60 19.90 6.65 0.00 21.17 6.74 1.89<br />

Feb. 25.80 <strong>11</strong>.20 0.00 31.28 <strong>11</strong>.32 0.00 24.61 8.56 28.10 24.45 7.84 0.00 25.20 8.70 0.00 25.20 9.20 14.80 24.81 <strong>11</strong>.48 2.20 25.91 9.76 6.44<br />

March 31.10 14.80 37.60 31.00 13.69 24.20 31.46 12.26 6.00 39.74 16.13 0.00 32.60 14.30 0.00 34.70 15.10 0.00 32.30 16.80 0.00 33.27 14.73 9.69<br />

April 37.60 16.50 0.00 38.67 20.98 0.00 39.81 21.19 1.20 38.53 21.79 0.00 38.90 18.90 0.60 40.95 21.90 3.60 36.90 21.90 2.00 38.77 20.45 1.06<br />

May 41.80 22.90 8.20 41.76 26.01 20.60 42.35 26.58 14.30 41.49 26.69 6.40 43.40 24.10 10.00 42.90 26.60 0.00 41.80 26.70 22.00 42.21 25.65 <strong>11</strong>.64<br />

June 40.70 25.30 14.20 38.29 26.63 77.73 39.46 28.10 <strong>11</strong>5.30 33.50 25.40 612.20 42.10 26.60 14.60 40.60 26.70 43.50 35.90 25.80 361.50 38.65 26.36 177.00<br />

July 32.70 25.20 174.30 33.05 24.96 132.30 33.32 26.30 136.00 32.40 24.70 234.90 33.70 25.60 217.60 34.80 25.90 264.00 32.90 26.20 240.50 33.27 25.55 199.94<br />

August 33.50 24.50 25.80 31.46 23.20 44.40 33.20 25.04 109.20 31.97 24.30 314.50 33.40 24.90 144.80 32.10 24.80 196.00 32.40 25.70 166.40 32.58 24.63 143.01<br />

September 33.70 24.10 121.00 33.92 23.18 37.50 34.02 23.78 152.00 33.20 22.30 <strong>11</strong>5.50 34.60 23.40 95.80 32.30 23.30 167.40 32.20 24.30 128.80 33.42 23.48 <strong>11</strong>6.86<br />

October 34.40 16.20 1.80 34.23 19.78 2.30 35.00 13.90 10.40 33.40 18.10 0.00 32.20 19.40 68.20 33.36 18.75 6.40 33.90 19.00 0.00 33.78 17.88 12.73<br />

November 30.38 10.22 0.00 27.73 13.62 0.00 30.80 10.40 0.00 28.00 12.10 28.00 27.00 12.90 9.40 26.70 16.50 12.20 29.80 15.70 0.00 28.63 13.06 7.09<br />

December 23.52 6.58 0.00 25.81 8.49 2.30 24.34 9.06 16.20 24.20 12.80 0.00 23.20 8.68 16.00 23.50 7.50 2.00 23.63 8.86 0.00 24.03 8.85 5.21<br />

Total 385.30 341.33 590.90 13<strong>11</strong>.50 583.00 712.50 923.40 692.56<br />

Source: Regional Research Station, Bharari, <strong>Jhansi</strong> (C.S.A. University of Ag. & Tech., Kanpur)<br />

16


The open pan evaporation varied in the range of 0.65 to 25 mm/day during the year with average of about 5.4 mm/day. Average relative<br />

humidity varied in the range of 24 to 96 per cent; however the range of wind speed is 0.75 to 24 kmph. The details of flood and drought in the<br />

project area are showed in Table 2.6.<br />

Table 2.6: Details of flood and drought in the project area (<strong>IWMP</strong>-<strong>VIII</strong> , <strong>Jhansi</strong>) Project <strong>IWMP</strong>-<strong>VIII</strong><br />

Name of Micro Watershed Particulars Villages Periodicity Not affected<br />

Karokhar, Durkhuru-I,<br />

Durkhuru-II, Gohna,<br />

Nipan-I,<br />

Nipan-II, Garautha Khas,<br />

Birona,<br />

Rudra Garautha<br />

Annual<br />

Any other<br />

(please specify)<br />

Flood No. of villages - - -<br />

Name(s) of villages - - -<br />

Drought No. of villages- 29<br />

- -<br />

Name of Village:- Tola, Sikrodha The district <strong>Jhansi</strong> is continuously in drought -<br />

Bamhori, Dhipkai, Bikrampura, from the year 2003 to 2007, while in the year<br />

Rampura, Nipan, Jaswantpura, 2008 rains are normal. In the year 2009 rains<br />

Simardha, Nimgahna, Bangra, Rund occurs in deficit. The project area needs to<br />

Garautha, Gohna, Birona, Gorpura,<br />

conserve every drop of rain.<br />

Charur Tai, Kedar Tai, Markuan,<br />

Emlota, Barauta, Aivani, Turk<br />

Lahchura, Pasaura, Garha and<br />

Punchhi<br />

17


CHAPTER – 3<br />

BASELINE SURVEY AND PARTICIPATORY RURAL APPRAISAL<br />

Participatory rural appraisal (PRA) is a tool to appraise the socio-economic conditions along with all kind of resources available in the<br />

watershed through the active participation of the villagers. The PRA including house hold survey of Rampura-I, Rampura-II, Bikrampura, Rund<br />

Garautha, Kedar Tai-I, Markuan, Pasaura, Kedar Tai-II and Turk Lahchura, micro-watershed is done by PIA and described in the subsequent sections.<br />

3.1. Social-Economic Analysis<br />

It is apparent from the social profile that the micro-watershed is inhabited by different caste and class. About 31 per cent of the population<br />

is scheduled caste. Population details of the <strong>IWMP</strong>-<strong>VIII</strong> are depited in Table 3.1. In general 8 per cent population migrate from the project area<br />

due to drought and earn more money, however, migration was more than 46 per cent during 2007-08 due to continuous drought from 2004 to 2007<br />

in the District. Majority of population migrate to New Delhi, Haryana and Punjab during drought.The scenario of migration, infrastructure and<br />

common properties resources available in the project is analysed through house hold survey and is depicted in Table 3.2, 3.3 and 3.4, respectively.<br />

Table 3.1: Demographic Features in the project area (<strong>IWMP</strong>-<strong>VIII</strong>, <strong>Jhansi</strong>)<br />

Total Population<br />

Population of SC/ST<br />

Name of Micro Watershed with code Total Male Female Total Male Female<br />

Rampura-I (2C2B1m2e) 926 490 436 285 147 138<br />

Rampura-II (2C2B1m2d) 620 328 292 190 98 92<br />

Bikrampura (2C2B1m2b) 979 514 465 323 168 155<br />

Rudra Garautha (2C2B1l2b) 220 123 97 51 27 24<br />

Kedar Tai-I (2C2B1l2e) 900 477 423 279 145 134<br />

Markuan (2C2B1l2f) 700 371 329 217 <strong>11</strong>3 104<br />

Pasaura (2C2B1k2a) 1230 652 578 381 198 183<br />

Kedar Tai-II (2C2B1l2d) 600 318 282 186 97 89<br />

Turk Lahchura (2C2B1l1g) 945 501 444 293 152 141<br />

Total 7120 3774 3346 2205 <strong>11</strong>45 1060<br />

18


Table 3.2: Details of land holding pattern in <strong>IWMP</strong>-<strong>VIII</strong>, <strong>Jhansi</strong><br />

Names MWS with code Type of Farmer No. of households No. of BPL<br />

households<br />

Rampura-I (2C2B1m2e)<br />

Rampura-II (2C2B1m2d)<br />

Bikrampura (2C2B1m2b)<br />

Rudra Garautha (2C2B1l2b)<br />

Kedar Tai-I (2C2B1l2e)<br />

Land holding (ha)<br />

Irrigated Rainfed Total<br />

(i) Big (above 4 ha.) 12<br />

(ii) Medium (2-4 ha.) 32<br />

(iii) Small (1-2 ha.) 49<br />

(iv) Marginal (0-1ha.) 74 74<br />

(v) Landless 3 3<br />

Total 170 77 38.90 733.41 772.31<br />

(i) Big (above 4 ha.) 10<br />

(ii) Medium (2-4 ha.) 27<br />

(iii) Small (1-2 ha.) 40<br />

(iv) Marginal (0-1ha.) 61 61<br />

(v) Landless 3 3<br />

Total 140 64 35.40 653.54 688.94<br />

(i) Big (above 4 ha.) <strong>11</strong><br />

(ii) Medium (2-4 ha.) 30<br />

(iii) Small (1-2 ha.) 46<br />

(iv) Marginal (0-1ha.) 69 69<br />

(v) Landless 3 3<br />

Total 159 72 58.41 1077.93 <strong>11</strong>36.34<br />

(i) Big (above 4 ha.) 3<br />

(ii) Medium (2-4 ha.) 8<br />

(iii) Small (1-2 ha.) 12<br />

(iv) Marginal (0-1ha.) 19 19<br />

(v) Landless 1 1<br />

Total 43 20 34.09 676.83 710.92<br />

(i) Big (above 4 ha.) 18<br />

(ii) Medium (2-4 ha.) 51<br />

(iii) Small (1-2 ha.) 78<br />

(iv) Marginal (0-1ha.) <strong>11</strong>8 <strong>11</strong>8<br />

(v) Landless 5 5<br />

19


Total 270 123 28.13 539.22 567.35<br />

(i) Big (above 4 ha.) <strong>11</strong><br />

(ii) Medium (2-4 ha.) 30<br />

Markuan (2C2B1l2f<br />

(iii) Small (1-2 ha.) 46<br />

(iv) Marginal (0-1ha.) 70 70<br />

(v) Landless 3 3<br />

Total 160 73 28.48 518.02 546.50<br />

Pasaura (2C2B1k2a) (i) Big (above 4 ha.) 15<br />

(ii) Medium (2-4 ha.) 42<br />

(iii) Small (1-2 ha.) 63<br />

(iv) Marginal (0-1ha.) 97 97<br />

(v) Landless 3 3<br />

Total 220 100 39.235 724.328 763.563<br />

(i) Big (above 4 ha.) 12<br />

(ii) Medium (2-4 ha.) 34<br />

Kedar Tai-II (2C2B1l2d)<br />

(iii) Small (1-2 ha.) 52<br />

(iv) Marginal (0-1ha.) 79 79<br />

(v) Landless 3 3<br />

Total 180 82 31.23 532.09 563.32<br />

(i) Big (above 4 ha.) 13<br />

Turk Lahchura (2C2B1l1g)<br />

(ii) Medium (2-4 ha.) 35<br />

(iii) Small (1-2 ha.) 53<br />

(iv) Marginal (0-1ha.) 81 81<br />

(v) Landless 3 3<br />

Total 185 84 29.85 548.54 578.39<br />

G. Total 1527 695 323.71 6003.90 6327.61<br />

20


Table 3.3: Details of migration from Project area (<strong>IWMP</strong>-<strong>VIII</strong>, <strong>Jhansi</strong>): Pre-project status<br />

Names of Watershed<br />

No. of persons<br />

migrating<br />

No. of days<br />

per year of<br />

migration<br />

Major reason(s) for<br />

migrating<br />

Distance of<br />

destination of<br />

migration from<br />

the village (km)<br />

Occupation<br />

during<br />

migration<br />

Income<br />

from such<br />

occupation<br />

(Rs. in<br />

lakh)<br />

Rampura-I (2C2B1m2e) 93 120-180 Drought / Earn money 500-<strong>11</strong>00 Km Labour 0.25-0.40<br />

Rampura-II (2C2B1m2d) 62 120-180 Drought / Earn money 500-<strong>11</strong>00 Km Labour 0.25-0.40<br />

Bikrampura (2C2B1m2b) 98 120-180 Drought / Earn money 500-<strong>11</strong>00 Km Labour 0.25-0.40<br />

Rudra Garautha (2C2B1l2b) 22 120-180 Drought / Earn money 500-<strong>11</strong>00 Km Labour 0.25-0.40<br />

Kedar Tai-I (2C2B1l2e) 90 120-180 Drought / Earn money 500-<strong>11</strong>00 Km Labour 0.25-0.40<br />

Markuan (2C2B1l2f) 70 120-180 Drought / Earn money 500-<strong>11</strong>00 Km Labour 0.25-0.40<br />

Pasaura (2C2B1k2a) 123 120-180 Drought / Earn money 500-<strong>11</strong>00 Km Labour 0.25-0.40<br />

Kedar Tai-II (2C2B1l2d) 60 120-180 Drought / Earn money 500-<strong>11</strong>00 Km Labour 0.25-0.40<br />

Turk Lahchura (2C2B1l1g) 95 120-180 Drought / Earn money 500-<strong>11</strong>00 Km Labour 0.25-0.40<br />

Total <strong>IWMP</strong>–IV 713<br />

Table 3.4: Details of infrastructure in <strong>IWMP</strong>-<strong>VIII</strong>, <strong>Jhansi</strong><br />

S. Name of Micro<br />

Parameters<br />

No. Watershed<br />

Name of villages connected to the main road by an all-weather road<br />

1 Rampura-I<br />

Status<br />

From <strong>Jhansi</strong> to Tahrauli to Gursarain to<br />

Garautha 85 km.Garautha to Rampura-I<br />

8 km<br />

Village's Name provided with electricity -<br />

No. of households without access to drinking water -<br />

No. of educational institutions :<br />

Primary(P)/ Secondary(S)/ Higher Secondary(HS)/ vocational institution(VI)<br />

(P)<br />

01<br />

(S)<br />

01<br />

(HS)<br />

-<br />

Names of villages with access to Primary Health Centre Available -01<br />

Names of villages with access to Veterinary Dispensary<br />

N.A<br />

Names of villages with access to Post Office<br />

N.A<br />

Names of villages with access to Banks<br />

N.A<br />

Names of villages with access to Markets/ mandis<br />

N.A<br />

(VI)<br />

-<br />

21


Names of villages with access to Agro-industries<br />

N.A<br />

Total quantity of surplus milk deficit<br />

No. of milk collection centres<br />

(e.g. Union(U)/ Society(S)/ Private agency(PA)/ others (O))<br />

(U)<br />

-<br />

NIL<br />

(S)<br />

-<br />

(PA)<br />

-<br />

(O)<br />

03<br />

Name of villages with access to Anganwadi Centre<br />

Available<br />

Cummunity centre, Panchayat Ghar<br />

Available<br />

S.<br />

No.<br />

Name of Micro<br />

Watershed<br />

2 Rampura-II<br />

Parameters<br />

Name of villages connected to the main road by an all-weather road<br />

Status<br />

From <strong>Jhansi</strong> to Tahrauli to Gursarain to<br />

Garautha 85 km.Garautha to Rampura-II 10<br />

km<br />

Village's Name provided with electricity<br />

No. of households without access to drinking water 28/544<br />

No. of educational institutions :<br />

Primary(P)/ Secondary(S)/ Higher Secondary(HS)/ vocational institution(VI)<br />

(P)<br />

01<br />

(S)<br />

01<br />

Names of villages with access to Primary Health Centre<br />

N.A<br />

Names of villages with access to Veterinary Dispensary<br />

N.A<br />

Names of villages with access to Post Office<br />

N.A<br />

Names of villages with access to Banks<br />

N.A<br />

Names of villages with access to Markets/ mandis<br />

N.A<br />

Names of villages with access to Agro-industries<br />

N.A<br />

Total quantity of surplus milk deficit<br />

NIL<br />

No. of milk collection centres<br />

(U) (S)<br />

(e.g. Union(U)/ Society(S)/ Private agency(PA)/ others (O))<br />

- -<br />

Name of villages with access to Anganwadi Centre<br />

Available<br />

Cummunity centre, Panchayat Ghar<br />

Available<br />

(HS)<br />

-<br />

(PA)<br />

-<br />

(VI)<br />

-<br />

(O)<br />

03<br />

22


S.<br />

No.<br />

Name of Micro<br />

Watershed<br />

3 Vikrampura<br />

Parameters<br />

Name of villages connected to the main road by an all-weather road<br />

Status<br />

From <strong>Jhansi</strong> to Tahrauli to Gursarain to<br />

Garautha 85 km.Garautha to Bikrampura 6<br />

km<br />

NA<br />

Village's Name provided with electricity<br />

No. of households without access to drinking water -<br />

No. of educational institutions :<br />

(P) (S)<br />

Primary(P)/ Secondary(S)/ Higher Secondary(HS)/ vocational institution(VI) 01 01<br />

Names of villages with access to Primary Health Centre<br />

N.A<br />

Names of villages with access to Veterinary Dispensary<br />

N.A<br />

Names of villages with access to Post Office<br />

N.A<br />

Names of villages with access to Banks<br />

N.A<br />

Names of villages with access to Markets/ mandis<br />

N.A<br />

Names of villages with access to Agro-industries<br />

N.A<br />

Total quantity of surplus milk deficit<br />

N.A<br />

No. of milk collection centres<br />

(U) (S)<br />

(e.g. Union(U)/ Society(S)/ Private agency(PA)/ others (O))<br />

- -<br />

Name of villages with access to Anganwadi Centre<br />

Available<br />

Cummunity centre, Panchayat Ghar<br />

N.A<br />

(HS)<br />

-<br />

(PA)<br />

-<br />

(VI)<br />

-<br />

(O)<br />

03<br />

23


S.<br />

No.<br />

Name of Micro<br />

Watershed<br />

4 Rund Garautha<br />

Parameters<br />

Name of villages connected to the main road by an all-weather road<br />

Status<br />

From <strong>Jhansi</strong> to Tahrauli to Gursarain to<br />

Garautha 85 km.Garautha to Rudra Garautha<br />

4 km<br />

Village's Name provided with electricity<br />

No. of households without access to drinking water -<br />

No. of educational institutions :<br />

Primary(P)/ Secondary(S)/ Higher Secondary(HS)/ vocational institution(VI)<br />

(P)<br />

01<br />

(S)<br />

01<br />

(HS)<br />

-<br />

Names of villages with access to Primary Health Centre Available -01<br />

Names of villages with access to Veterinary Dispensary<br />

Available<br />

Names of villages with access to Post Office<br />

N.A<br />

Names of villages with access to Banks<br />

N.A<br />

Names of villages with access to Markets/ mandis<br />

N.A<br />

Names of villages with access to Agro-industries<br />

N.A<br />

Total quantity of surplus milk deficit<br />

NIL<br />

No. of milk collection centres<br />

(U) (S) (PA)<br />

(e.g. Union(U)/ Society(S)/ Private agency(PA)/ others (O))<br />

- - -<br />

Name of villages with access to Anganwadi Centre<br />

Available<br />

Cummunity centre, Panchayat Ghar<br />

N.A<br />

(VI)<br />

-<br />

(O)<br />

02<br />

24


S.<br />

No.<br />

Name of Micro<br />

Watershed<br />

5 Kedar Tai-I<br />

Parameters<br />

Status<br />

From <strong>Jhansi</strong> to Tahrauli to Gursarain to<br />

Name of villages connected to the main road by an all-weather road<br />

Garautha 85 km.Garautha to Kedar Tai-I 20<br />

km<br />

Village's Name provided with electricity -<br />

No. of households without access to drinking water -<br />

No. of educational institutions :<br />

Primary(P)/ Secondary(S)/ Higher Secondary(HS)/ vocational institution(VI)<br />

(P)<br />

01<br />

(S)<br />

01<br />

Names of villages with access to Primary Health Centre<br />

N.A<br />

Names of villages with access to Veterinary Dispensary<br />

N.A<br />

Names of villages with access to Post Office<br />

N.A<br />

Names of villages with access to Banks<br />

N.A<br />

Names of villages with access to Markets/ mandis<br />

N.A<br />

Names of villages with access to Agro-industries<br />

N.A<br />

Total quantity of surplus milk deficit<br />

NIL<br />

No. of milk collection centres<br />

(U) (S)<br />

(e.g. Union(U)/ Society(S)/ Private agency(PA)/ others (O))<br />

- -<br />

Name of villages with access to Anganwadi Centre 01<br />

Cummunity centre, Panchayat Ghar<br />

N.A<br />

(HS)<br />

-<br />

(PA)<br />

-<br />

(VI)<br />

-<br />

(O)<br />

02<br />

25


S.<br />

No.<br />

Name of Micro<br />

Watershed<br />

6 Markuan<br />

Parameters<br />

Name of villages connected to the main road by an all-weather road<br />

Status<br />

From <strong>Jhansi</strong> to Tahrauli to Gursarain to<br />

Garautha 85 km.Garautha to Markuan 16 km<br />

Village's Name provided with electricity<br />

No. of households without access to drinking water -<br />

No. of educational institutions :<br />

Primary(P)/ Secondary(S)/ Higher Secondary(HS)/ vocational institution(VI)<br />

(P)<br />

02<br />

(S)<br />

01<br />

(HS)<br />

-<br />

Names of villages with access to Primary Health Centre Available -01<br />

Names of villages with access to Veterinary Dispensary<br />

N.A<br />

Names of villages with access to Post Office 01<br />

Names of villages with access to Banks<br />

N.A<br />

Names of villages with access to Markets/ mandis<br />

N.A<br />

Names of villages with access to Agro-industries<br />

N.A<br />

Total quantity of surplus milk deficit<br />

NIL<br />

No. of milk collection centres<br />

(U) (S) (PA)<br />

(e.g. Union(U)/ Society(S)/ Private agency(PA)/ others (O))<br />

- - -<br />

Name of villages with access to Anganwadi Centre<br />

Available<br />

Cummunity centre, Panchayat Ghar<br />

Available<br />

(VI)<br />

-<br />

(O)<br />

03<br />

26


S.<br />

No.<br />

Name of Micro<br />

Watershed<br />

7 Pasaura<br />

Parameters<br />

Status<br />

Name of villages connected to the main road by an all-weather road<br />

From <strong>Jhansi</strong> to Tahrauli to Gursarain to<br />

Garautha 85 km.Garautha to Pasaura 18 km<br />

Village's Name provided with electricity -<br />

No. of households without access to drinking water -<br />

No. of educational institutions :<br />

Primary(P)/ Secondary(S)/ Higher Secondary(HS)/ vocational institution(VI)<br />

(P)<br />

02<br />

(S)<br />

01<br />

(HS)<br />

-<br />

Names of villages with access to Primary Health Centre Available -01<br />

Names of villages with access to Veterinary Dispensary<br />

N.A<br />

Names of villages with access to Post Office<br />

N.A<br />

Names of villages with access to Banks<br />

N.A<br />

Names of villages with access to Markets/ mandis<br />

N.A<br />

Names of villages with access to Agro-industries<br />

N.A<br />

Total quantity of surplus milk deficit<br />

NIL<br />

No. of milk collection centres<br />

(U) (S) (PA)<br />

(e.g. Union(U)/ Society(S)/ Private agency(PA)/ others (O))<br />

- - -<br />

Name of villages with access to Anganwadi Centre<br />

available<br />

Cummunity centre, Panchayat Ghar<br />

Available<br />

(VI)<br />

-<br />

(O)<br />

03<br />

27


S.<br />

No.<br />

Name of Micro<br />

Watershed<br />

8 Kedar Tai-II<br />

Parameters<br />

Name of villages connected to the main road by an all-weather road<br />

Status<br />

From <strong>Jhansi</strong> to Tahrauli to Gursarain to<br />

Garautha 85 km.Garautha to Kedar Tai-II 21<br />

km<br />

Village's Name provided with electricity<br />

No. of households without access to drinking water 20/690<br />

No. of educational institutions :<br />

Primary(P)/ Secondary(S)/ Higher Secondary(HS)/ vocational institution(VI)<br />

(P)<br />

01<br />

(S)<br />

02<br />

Names of villages with access to Primary Health Centre<br />

N.A<br />

Names of villages with access to Veterinary Dispensary<br />

N.A<br />

Names of villages with access to Post Office<br />

N.A<br />

Names of villages with access to Banks<br />

N.A<br />

Names of villages with access to Markets/ mandis<br />

N.A<br />

Names of villages with access to Agro-industries<br />

N.A<br />

Total quantity of surplus milk deficit<br />

NIL<br />

No. of milk collection centres<br />

(U) (S)<br />

(e.g. Union(U)/ Society(S)/ Private agency(PA)/ others (O))<br />

- -<br />

Name of villages with access to Anganwadi Centre<br />

Avilable<br />

Cummunity centre, Panchayat Ghar<br />

N.A<br />

(HS)<br />

01<br />

(PA)<br />

-<br />

(VI)<br />

-<br />

(O)<br />

03<br />

28


S.<br />

No.<br />

Name of Micro<br />

Watershed<br />

9 Turk Lahchura<br />

Parameters<br />

Status<br />

From <strong>Jhansi</strong> to Tahrauli to Gursarain to<br />

Name of villages connected to the main road by an all-weather road<br />

Garautha 85 km.Garautha to Turk Lahchura<br />

36 km<br />

Village's Name provided with electricity -<br />

No. of households without access to drinking water -<br />

No. of educational institutions :<br />

Primary(P)/ Secondary(S)/ Higher Secondary(HS)/ vocational institution(VI)<br />

(P)<br />

01<br />

(S)<br />

01<br />

Names of villages with access to Primary Health Centre<br />

N.A<br />

Names of villages with access to Veterinary Dispensary<br />

N.A<br />

Names of villages with access to Post Office<br />

N.A<br />

Names of villages with access to Banks<br />

N.A<br />

Names of villages with access to Markets/ mandis<br />

N.A<br />

Names of villages with access to Agro-industries<br />

N.A<br />

Total quantity of surplus milk deficit<br />

NIL<br />

No. of milk collection centres<br />

(U) (S)<br />

(e.g. Union(U)/ Society(S)/ Private agency(PA)/ others (O))<br />

- -<br />

Name of villages with access to Anganwadi Centre<br />

Available<br />

Cummunity centre, Panchayat Ghar<br />

Available<br />

(HS)<br />

-<br />

(PA)<br />

-<br />

(VI)<br />

-<br />

(O)<br />

02<br />

29


Table 3.5: Details of common property resources In <strong>IWMP</strong>-<strong>VIII</strong> , <strong>Jhansi</strong><br />

Sr.<br />

No.<br />

Names of<br />

MWS with<br />

code<br />

CPR<br />

Particulars<br />

Pvt.<br />

persons<br />

Total Area (ha)<br />

Area owned/ In possession of<br />

Govt.<br />

Revanue<br />

PRI Other Pvt.<br />

persons<br />

Area available for treatment (ha)<br />

Govt.<br />

(Specify<br />

dept.)<br />

1 Rampura- (i) Wasteland/ degraded land 10.45 - - 10.45 - -<br />

I(2C2B1m2e) (ii) Pastures - - - - - - - -<br />

(iii) Orchards - - - - - - - -<br />

(iv) Village Woodlot - 1.10 - - - - -<br />

(v) Forest - - - - - - - -<br />

(vi) Village Ponds/ Tanks - - - - - - - -<br />

(vii) Community Buildings - - - - - -<br />

(viii) Weekly Markets -- -- - -- -- -- -- --<br />

(ix) Permanent markets -- -- -- -- -- -- -- --<br />

(x) Temples/ Places of worship 0.25 -- -- -- -- --<br />

(xi) Habitat, Chakmarg, Sector, Road etc - 6.49 - - - - - -<br />

Total 10.45 6.49 1.35 10.45 -<br />

PRI<br />

Other<br />

30


Sr.<br />

No.<br />

Names of<br />

MWS with<br />

code<br />

CPR<br />

Particulars<br />

Pvt.<br />

persons<br />

Total Area (ha)<br />

Area owned/ In possession of<br />

Govt. PRI<br />

Revanue<br />

Any other<br />

(Pl.<br />

Specify)<br />

Pvt.<br />

persons<br />

Area available for treatment (ha)<br />

Govt.<br />

(specify<br />

dept.)<br />

PRI<br />

Any other (Pl.<br />

Specify)<br />

2 Rampura-II(i) Wasteland/ degraded land 12.80 - - - 12.80 - - -<br />

(2C2B1m2d) (ii) Pastures - - - - - - - -<br />

(iii) Orchards - - - - - - - -<br />

(iv) Village Woodlot - - 0.91 - - - - -<br />

(v) Forest - - - - - - - -<br />

(vi) Village Ponds/ Tanks - - - - - - - -<br />

(vii) Community Buildings - - - - - - - -<br />

(viii) Weekly Markets -- -- - -- -- -- -- --<br />

(ix) Permanent markets -- -- - -- -- -- -- --<br />

(x) Temples/ Places of worship 0.30 -- -- -- -- --<br />

(xi) Habitat, Chakmarg, Sector, Road etc - 5.05 - - - - - -<br />

Total 12.80 5.05 1.21 12.80 -<br />

31


Sr.<br />

No.<br />

3<br />

Names of<br />

MWS with<br />

code<br />

CPR<br />

Particulars<br />

Pvt.<br />

persons<br />

Total Area (ha)<br />

Area owned/ In possession of<br />

Govt.<br />

Revenue<br />

PRI<br />

Any other<br />

(Pl.<br />

Specify)<br />

Pvt.<br />

persons<br />

Area available for treatment (ha)<br />

Govt.<br />

(specify<br />

dept.)<br />

PRI<br />

Any other (Pl.<br />

Specify)<br />

(i) Wasteland/ degraded land 20.23 - 20.23 - -<br />

(ii) Pastures - - - - - - - -<br />

(iii) Orchards - - - - - - - -<br />

(iv) Village Woodlot - - 1.43 - - - - -<br />

Vikrampura (v) Forest - - - - - - - -<br />

(2C2B1m2b) (vi) Village Ponds/ Tanks - - - - - - - -<br />

(vii) Community Buildings - - - - - - - -<br />

(viii) Weekly Markets -- -- - -- -- -- -- --<br />

(ix) Permanent markets -- -- - -- -- -- -- --<br />

(x) Temples/ Places of worship 0.35 -- -- -- -- --<br />

(xi) Habitat, Chakmarg, Sector, Road etc - 9.83 - - - - - -<br />

Total 20.23 9.83 1.78 - 20.23 - -<br />

32


Sr.<br />

No.<br />

4<br />

Names of<br />

MWS with<br />

code<br />

CPR<br />

Particulars<br />

Pvt.<br />

persons<br />

Total Area (ha)<br />

Area owned/ In possession of<br />

Govt.<br />

Revenue<br />

PRI<br />

Any other<br />

(Pl. Specify)<br />

Pvt.<br />

persons<br />

Area available for treatment (ha)<br />

Govt.<br />

(specify<br />

dept.)<br />

PRI<br />

Any other (Pl.<br />

Specify)<br />

(i) Wasteland/ degraded land 10.27 - 10.27 -<br />

(ii) Pastures - - - - - - - -<br />

(iii) Orchards - - - - - - - -<br />

(iv) Village Woodlot - - 0.60 - - - - -<br />

Rudra<br />

(v) Forest - - - - - - - -<br />

Garautha<br />

(vi) Village Ponds/ Tanks - - - - - - - -<br />

(2C2B1l2b)<br />

(vii) Community Buildings - - - - - - - -<br />

(viii) Weekly Markets -- -- - -- -- -- -- --<br />

(ix) Permanent markets -- -- - -- -- -- -- --<br />

(x) Temples/ Places of worship 0.15 -- -- -- -- --<br />

(xi) Habitat, Chakmarg, Sector, Road etc - 4.10 - - - - - -<br />

Total 10.27 4.10 0.75 10.27 -<br />

33


Sr.<br />

No.<br />

5<br />

Names of<br />

MWS with<br />

code<br />

CPR<br />

Particulars<br />

Pvt.<br />

persons<br />

Total Area (ha)<br />

Area owned/ In possession of<br />

Govt.<br />

Revenue<br />

PRI<br />

Any other<br />

(Pl. Specify)<br />

Pvt.<br />

persons<br />

Area available for treatment (ha)<br />

Govt.<br />

(specify<br />

dept.)<br />

PRI<br />

Any other (Pl.<br />

Specify)<br />

(i) Wasteland/ degraded land 9.25 - - 9.25 - -<br />

(ii) Pastures - - - - - - - -<br />

(iii) Orchards - - - - - - - -<br />

(iv) Village Woodlot - - 0.90 - - - - -<br />

Kedar Tai-I (v) Forest - - - - - - - -<br />

(2C2B1l2e) (vi) Village Ponds/ Tanks - - - - - - - -<br />

(vii) Community Buildings - - - - - - - -<br />

(viii) Weekly Markets -- -- - -- -- -- -- --<br />

(ix) Permanent markets -- -- - -- -- -- -- --<br />

(x) Temples/ Places of worship 0.26 -- -- -- -- --<br />

(xi) Habitat, Chakmarg, Sector, Road etc - 6.34 - - - - - -<br />

Total 9.25 6.34 1.16 9.25 -<br />

34


S.<br />

No.<br />

6<br />

Names of<br />

MWS with<br />

code<br />

CPR<br />

Particulars<br />

Pvt.<br />

persons<br />

Total Area (ha)<br />

Area owned/ In possession of<br />

Govt.<br />

Revenue<br />

PRI<br />

Any other<br />

(Pl. Specify)<br />

Pvt.<br />

persons<br />

Area available for treatment (ha)<br />

Govt.<br />

(specify<br />

dept.)<br />

PRI<br />

Any other (Pl.<br />

Specify)<br />

(i) Wasteland/ degraded land 9.91 - - 9.91 - -<br />

(ii) Pastures - - - - - - - -<br />

(iii) Orchards - - - - - - - -<br />

(iv) Village Woodlot - - 0.51 - - - - -<br />

Markuan(v) Forest - - - - - - - -<br />

(2C2B1l2f) (vi) Village Ponds/ Tanks - - - - - - - -<br />

(vii) Community Buildings - - - - - - - -<br />

(viii) Weekly Markets -- -- - -- -- -- -- --<br />

(ix) Permanent markets -- -- -- -- -- -- -- --<br />

(x) Temples/ Places of worship 0.15 -- -- -- -- --<br />

(xi) Habitat, Chakmarg, Sector, Road etc - 7.09 - - - - - -<br />

Total 9.91 7.09 0.66 9.91 -<br />

35


S.<br />

No.<br />

Names of<br />

MWS with<br />

code<br />

CPR<br />

Particulars<br />

Pvt.<br />

persons<br />

Total Area (ha)<br />

Area owned/ In possession of<br />

Govt. PRI<br />

Revenue<br />

Any other<br />

(Pl. Specify)<br />

Pvt.<br />

persons<br />

Area available for treatment (ha)<br />

Govt.<br />

(specify<br />

dept.)<br />

PRI<br />

Any other (Pl.<br />

Specify)<br />

7 Pasaura (i) Wasteland/ degraded land 12.44 - - 12.44 - -<br />

(2C2B1k2a) (ii) Pastures - - - - - - - -<br />

(iii) Orchards - - - - - - - -<br />

(iv) Village Woodlot - - 0.99 - - - - -<br />

(v) Forest - - - - - - - -<br />

(vi) Village Ponds/ Tanks - - - - - - - -<br />

(vii) Community Buildings - - - - - - - -<br />

(viii) Weekly Markets -- -- - -- -- -- -- --<br />

(ix) Permanent markets -- -- -- -- -- -- -- --<br />

(x) Temples/ Places of worship 0.35 -- -- -- -- --<br />

(xi) Habitat, Chakmarg, Sector, Road etc - 7.36 - - - - - -<br />

Total 12.44 7.36 1.34 12.44 -<br />

36


S.<br />

No.<br />

Names of<br />

MWS with<br />

code<br />

CPR<br />

Particulars<br />

Pvt.<br />

persons<br />

Total Area (ha)<br />

Area owned/ In possession of<br />

Govt.<br />

Revenue<br />

PRI<br />

Any other<br />

(Pl. Specify)<br />

Pvt.<br />

persons<br />

Area available for treatment (ha)<br />

Govt.<br />

(specify<br />

dept.)<br />

PRI<br />

Any other (Pl.<br />

Specify)<br />

8 Kedar Tai-II Wasteland/ degraded land 10.43 - - 10.43 - -<br />

(2C2B1l2d)(xii) Pastures - - - - - - - -<br />

(xiii) Orchards - - - - - - - -<br />

(xiv) Village Woodlot - - 0.70 - - - - -<br />

(xv) Forest - - - - - - - -<br />

(xvi) Village Ponds/ Tanks - - - - - - - -<br />

Community Buildings - - - - - - - -<br />

Weekly Markets -- -- - -- -- -- -- --<br />

Permanent markets -- -- -- -- -- -- -- --<br />

Temples/ Places of worship 0.28 -- -- -- -- --<br />

Habitat, Chakmarg, Sector, Road etc - 3.63 - - - - - -<br />

Total 10.43 3.63 0.98 10.43 -<br />

37


S.<br />

No.<br />

Names of<br />

MWS with<br />

code<br />

9 Turk<br />

Lahchura<br />

(2C2B1l1g)<br />

CPR<br />

Particulars<br />

Pvt.<br />

persons<br />

Total Area (ha)<br />

Area owned/ In possession of<br />

Govt.<br />

Revenue<br />

PRI<br />

Any other<br />

(Pl. Specify)<br />

Pvt.<br />

persons<br />

Area available for treatment (ha)<br />

Govt.<br />

(specify<br />

dept.)<br />

PRI<br />

Any other (Pl.<br />

Specify)<br />

(i) Wasteland/ degraded land 7.40 - 7.40 - -<br />

(ii) Pastures - - - - - - - -<br />

(iii) Orchards - - - - - - - -<br />

(iv) Village Woodlot - - 0.40 - - - - -<br />

(v) Forest - - - - - - - -<br />

(vi) Village Ponds/ Tanks - - - - - - - -<br />

(vii) Community Buildings - - 0.15 - - - - -<br />

(viii) Weekly Markets -- -- - -- -- -- -- --<br />

(ix) Permanent markets -- -- -- -- -- -- -- --<br />

(x) Temples/ Places of worship - -- -- -- -- --<br />

(xi) Habitat, Chakmarg, Sector, Road etc - 3.65 - - - - - -<br />

Total 7.40 3.65 0.55 7.40 -<br />

GT for <strong>IWMP</strong>-<strong>VIII</strong> 103.18 53.54 9.78 103.18 - -<br />

38


3.2 Soil and Land Holding Pattern<br />

Majority of the land of the project is medium textured soil. Category wise details of farmer and their irrigated area are described in Table 3.6.<br />

Table 3.6: Details of Soil texture in <strong>IWMP</strong>-<strong>VIII</strong> , <strong>Jhansi</strong><br />

S.<br />

MWS Project<br />

Area in different Soil Group (ha)<br />

No.<br />

Light textured soil Medium textured soil (Sandy loam, Heavy textured soil Details<br />

(sand, loamy sand)<br />

loam, silt loam)<br />

(Clayey)<br />

1 Rampura-I (2C2B1m2e) 120.15 482.15 67.70 670<br />

2 Rampura-II (2C2B1m2d) 120.00 425.15 54.85 600<br />

3 Bikrampura (2C2B1m2b) 178.20 712.80 99.00 990<br />

4 Rudra Garautha (2C2B1l2b) 92.25 467.40 55.35 615<br />

5 Kedar Tai-I (2C2B1l2e) 89.10 356.40 49.50 495<br />

6 Markuan (2C2B1l2f) 97.85 448.55 28.60 575<br />

7 Pasaura (2C2B1k2a) <strong>11</strong>9.70 478.80 66.50 665<br />

8 Kedar Tai-II (2C2B1l2d) 98.00 347.90 44.10 490<br />

9 Turk Lahchura (2C2B1l1g) 90.00 360.00 50.00 500<br />

Total <strong>IWMP</strong>-<strong>VIII</strong> 1005.25 4079.15 515.60 5600<br />

3.3 Major Crops, its Productivity and Production<br />

Micro-watershed wise grown crops, their productivity and production under irrigated and rainfed condition is given in Table 3.7. As far as productivity<br />

of crops is concerned, it is significantly lower than the district, state and national average. Micro-watershed wise cropping intensity varied from 124.39 to<br />

131.52 per cent with 128.37 per cent for the project.<br />

39


Table 3.7: Micro-watershed wise details of Crops, their Productivity and Production in <strong>IWMP</strong>-<strong>VIII</strong> , <strong>Jhansi</strong><br />

Name of MWS - Rampura-I (2C2B1m2e)<br />

Production (Q)<br />

Area in (Ha.)<br />

Productivity Q/Ha<br />

Grain/Main product<br />

Fodder/Fuel /Other product.<br />

S.N.<br />

crop<br />

Irrigated Rainfed Irrigated Rainfed Irrigated Rainfed Irrigated Rainfed<br />

A Khaif<br />

1 Urd 99.26 4.7 466.522 326.57<br />

2 Moong 52.14 4.5 234.63 164.24<br />

3 Arhar 55.98 4.3 240.714 361.07<br />

4 Sorghum 10.02 3.7 37.074 38.56<br />

5 Til 63.22 1.69 106.8418 144.24<br />

B<br />

Total 280.62 1085.782 1034.67<br />

Rabi<br />

1 Wheat 38.90 67.25 20.45 14.1 795.505 948.225 994.38 <strong>11</strong>85.28<br />

2 Barley 8.24 12.7 104.648 130.81<br />

3 Masoor 202.45 7.3 1477.885 1034.52<br />

4 Gram 187.24 8.5 1591.54 1002.67<br />

5 Pea 127.05 6.5 825.825 520.27<br />

6 Linseed 15.26 4.9 74.774 52.34<br />

7 Mustard 33.65 4.2 141.33 138.50<br />

Total 38.90 641.14 795.505 5164.227 994.38 4064.40<br />

Cultiable Area 772.31 Cropping Intensity 124.39<br />

40


Name of MWS Rampura-II (2C2B1m2d)<br />

Area in (Ha.)<br />

Productivity Q/Ha<br />

Grain/Main product<br />

Production (Q)<br />

Fodder/Fuel /Other product.<br />

S.N.<br />

A<br />

crop<br />

Khaif<br />

Irrigated Rainfed Irrigated Rainfed Irrigated Rainfed Irrigated Rainfed<br />

1 Urd 80.25 4.9 393.225 275.26<br />

2 Moong 30.26 4.7 142.222 99.56<br />

3 Arhar 60.29 4.5 271.305 406.96<br />

4 Sorghum 15.26 3.9 59.514 61.89<br />

5 Til 72.56 1.8 130.608 176.32<br />

B<br />

Total 258.62 996.874 1019.99<br />

Rabi<br />

1 Wheat 35.40 60.25 21.45 14.3 759.330 861.575 949.16 1076.97<br />

2 Barley 8.05 12.9 103.845 129.81<br />

3 Masoor 195.27 7.5 1464.525 1025.17<br />

4 Gram 165.06 8.8 1452.528 915.09<br />

5 Pea 140.65 6.8 956.42 602.54<br />

6 Linseed 12.56 4.9 61.544 43.08<br />

7 Mustard 30.26 4.4 133.144 130.48<br />

Total 35.40 612.10 759.330 5033.581 949.16 3923.14<br />

Cultiable Area 688.94 Cropping Intensity 131.52<br />

41


Name of MWS Bikrampura (2C2B1m2b)<br />

Area in (Ha.)<br />

Productivity Q/Ha<br />

Grain/Main product<br />

Production (Q)<br />

Fodder/Fuel /Other product.<br />

S.N.<br />

A<br />

crop<br />

Khaif<br />

Irrigated Rainfed Irrigated Rainfed Irrigated Rainfed Irrigated Rainfed<br />

1 Urd 152.05 4.9 745.045 521.53<br />

2 Moong 71.65 4.7 336.755 235.73<br />

3 Arhar 91.48 4.6 420.808 631.21<br />

4 Sorghum 18.57 3.9 72.423 75.32<br />

5 Til 105.68 1.75 184.94 249.67<br />

B<br />

Total 439.43 1759.971 1713.46<br />

Rabi<br />

1 Wheat 58.41 92.56 22.15 14.3 1293.782 1323.608 1617.23 1654.51<br />

2 Barley 12.65 12.9 163.185 203.98<br />

3 Masoor 325.68 7.5 2442.6 1709.82<br />

4 Gram 275.68 8.7 2398.416 15<strong>11</strong>.00<br />

5 Pea 220.48 6.8 1499.264 944.54<br />

6 Linseed 17.98 4.6 82.708 57.90<br />

7 Mustard 35.69 4.5 160.605 157.39<br />

Total 58.41 980.72 1293.782 8070.386 1617.23 6239.14<br />

Cultiable Area <strong>11</strong>36.34 Cropping Intensity 130.12<br />

42


Name of MWS Rudra Garautha (2C2B1l2b)<br />

Area in (Ha.)<br />

Productivity Q/Ha<br />

Grain/Main product<br />

Production (Q)<br />

Fodder/Fuel /Other product.<br />

S.N.<br />

A<br />

crop<br />

Khaif<br />

Irrigated Rainfed Irrigated Rainfed Irrigated Rainfed Irrigated Rainfed<br />

1 Urd 85.26 4.7 400.722 280.51<br />

2 Moong 40.26 4.5 181.17 126.82<br />

3 Arhar 65.29 4.3 280.747 421.12<br />

4 Sorghum 10.25 3.7 37.925 39.44<br />

5 Til 55.26 1.69 93.3894 126.08<br />

B<br />

Total 256.32 993.9534 993.96<br />

Rabi<br />

1 Wheat 34.09 70.26 22.5 14.1 767.025 990.666 958.78 1238.33<br />

2 Barley <strong>11</strong>.02 12.7 139.954 174.94<br />

3 Masoor 180.24 7.3 1315.752 921.03<br />

4 Gram 160.25 8.5 1362.125 858.14<br />

5 Pea 140.36 6.5 912.34 574.77<br />

6 Linseed 15.06 4.9 73.794 51.66<br />

7 Mustard 40.98 4.2 172.<strong>11</strong>6 168.67<br />

Total 34.09 618.17 767.025 4966.747 958.78 3987.54<br />

Cultiable Area 710.92 Cropping Intensity 127.80<br />

43


Name of MWS Kedar Tai-I (2C2B1l2e)<br />

Area in (Ha.)<br />

Productivity Q/Ha<br />

Grain/Main product<br />

Production (Q)<br />

Fodder/Fuel /Other product.<br />

S.N.<br />

A<br />

crop<br />

Khaif<br />

Irrigated Rainfed Irrigated Rainfed Irrigated Rainfed Irrigated Rainfed<br />

1 Urd 60.25 4.7 283.175 198.22<br />

2 Moong 35.06 4.5 157.77 <strong>11</strong>0.44<br />

3 Arhar 45.36 4.3 195.048 292.57<br />

4 Sorghum <strong>11</strong>.65 3.7 43.105 44.83<br />

5 Til 55.26 1.69 93.3894 126.08<br />

B<br />

Total 207.58 772.4874 772.14<br />

Rabi<br />

1 Wheat 28.13 42.65 19.4 14.1 545.722 601.365 682.15 751.71<br />

2 Barley 6.48 12.7 82.296 102.87<br />

3 Masoor 170.65 7.3 1245.745 872.02<br />

4 Gram 132.26 8.5 <strong>11</strong>24.21 708.25<br />

5 Pea <strong>11</strong>0.25 6.5 716.625 451.47<br />

6 Linseed <strong>11</strong>.59 4.9 56.791 39.75<br />

7 Mustard 19.58 4.2 82.236 80.59<br />

Total 28.13 493.46 545.722 3909.268 682.15 3006.67<br />

Cultiable Area 567.35 Cropping Intensity 128.52<br />

44


Name of MWS Markuan (2C2B1l2f)<br />

Area in (Ha.)<br />

Productivity Q/Ha<br />

Grain/Main product<br />

Production (Q)<br />

Fodder/Fuel /Other product.<br />

S.N. crop Irrigated Rainfed Irrigated Rainfed Irrigated Rainfed Irrigated Rainfed<br />

A Khaif<br />

1 Urd 60.25 4.9 295.225 206.66<br />

2 Moong 40.26 5.7 229.482 160.64<br />

3 Arhar 45.02 4.6 207.092 310.64<br />

4 Sorghum 7.05 4.1 28.905 30.06<br />

5 Til 55.26 1.7 93.942 126.82<br />

Total 207.84 854.646 834.82<br />

B Rabi<br />

1 Wheat 28.48 45.26 22.10 15.02 629.408 679.8052 786.76 849.76<br />

2 Barley 6.25 13.05 81.5625 101.95<br />

3 Masoor 142.36 7.9 <strong>11</strong>24.644 787.25<br />

4 Gram 125.06 8.9 <strong>11</strong>13.034 701.21<br />

5 Pea <strong>11</strong>0.25 6.7 738.675 465.37<br />

6 Linseed 12.05 5.1 61.455 43.02<br />

7 Mustard 25.64 4.5 <strong>11</strong>5.38 <strong>11</strong>3.07<br />

Total 28.48 466.87 629.408 3914.556 786.76 3061.63<br />

Cultiable Area 546.50 Cropping Intensity 128.67<br />

45


Name of MWS Pasaura (2C2B1k2a)<br />

Production (Q)<br />

Area in (Ha.)<br />

Productivity Q/Ha Grain/Main product Fodder/Fuel /Other product.<br />

S.N. crop Irrigated Rainfed Irrigated Rainfed Irrigated Rainfed Irrigated Rainfed<br />

A Khaif<br />

1 Urd 82.06 4.8 393.888 275.72<br />

2 Moong 45.06 4.8 216.288 151.40<br />

3 Arhar 65.29 4.7 306.863 460.29<br />

4 Sorghum 10.25 3.9 39.975 41.57<br />

5 Til 85.26 1.69 144.0894 194.52<br />

Total 287.92 <strong>11</strong>01.103 <strong>11</strong>23.51<br />

B Rabi<br />

1 Wheat 39.235 75.65 22.5 14.6 882.788 <strong>11</strong>04.49 <strong>11</strong>03.48 1380.61<br />

2 Barley 9.98 12.9 128.742 160.93<br />

3 Masoor 190.28 7.8 1484.184 1038.93<br />

4 Gram 165.56 8.9 1473.484 928.29<br />

5 Pea 140.85 6.8 957.78 603.40<br />

6 Linseed 15.06 4.95 74.547 52.18<br />

7 Mustard 32.05 4.4 141.02 138.20<br />

Total 39.235 629.43 882.788 5364.247 <strong>11</strong>03.48 4302.55<br />

Cultiable Area 763.563 Cropping Intensity 125.28<br />

46


Name of MWS Kedar Tai-II (2C2B1l2d)<br />

Area in (Ha.)<br />

Productivity Q/Ha<br />

Grain/Main product<br />

Production (Q)<br />

Fodder/Fuel /Other product.<br />

S.N. crop Irrigated Rainfed Irrigated Rainfed Irrigated Rainfed Irrigated Rainfed<br />

A Khaif<br />

1 Urd 60.25 4.7 283.175 198.22<br />

2 Moong 35.29 4.5 158.805 <strong>11</strong>1.16<br />

3 Arhar 50.26 4.3 216.<strong>11</strong>8 324.18<br />

4 Sorghum 8.04 3.7 29.748 30.94<br />

5 Til 55.26 1.69 93.3894 126.08<br />

Total 209.10 781.2354 790.58<br />

B Rabi<br />

1 Wheat 31.23 48.025 19.4 14.1 605.862 677.1525 757.33 846.44<br />

2 Barley 6.28 12.7 79.756 99.70<br />

3 Masoor 160.25 7.3 <strong>11</strong>69.825 818.88<br />

4 Gram 135.26 8.5 <strong>11</strong>49.71 724.32<br />

5 Pea <strong>11</strong>0.28 6.5 716.82 451.60<br />

6 Linseed 8.26 4.9 40.474 28.33<br />

7 Mustard 20.57 4.2 86.394 84.67<br />

Total 31.23 488.925 605.862 3920.132 757.33 3053.92<br />

Cultiable Area 563.32 Cropping Intensity 129.46<br />

47


Name of MWS Turk Lahchura (2C2B1l1g)<br />

Area in (Ha.)<br />

Productivity Q/Ha<br />

Grain/Main product<br />

Production (Q)<br />

Fodder/Fuel /Other product.<br />

S.N. crop Irrigated Rainfed Irrigated Rainfed Irrigated Rainfed Irrigated Rainfed<br />

A Khaif<br />

1 Urd 70.25 4.75 333.6875 233.58<br />

2 Moong 30.26 4.55 137.683 96.38<br />

3 Arhar 42.36 4.35 184.266 276.40<br />

4 Sorghum 10.02 3.74 37.4748 38.97<br />

5 Til 60.26 1.71 103.0446 139.<strong>11</strong><br />

Total 213.15 796.1559 784.44<br />

B Rabi<br />

1 Wheat 29.85 44.65 20.09 14.45 599.687 645.1925 749.61 806.49<br />

2 Barley 5.68 12.72 72.2496 90.31<br />

3 Masoor 170.36 7.35 1252.146 876.50<br />

4 Gram 140.36 8.55 1200.078 756.05<br />

5 Pea <strong>11</strong>5.06 6.55 753.643 474.80<br />

6 Linseed 12.36 4.95 61.182 42.83<br />

7 Mustard 17.87 4.26 76.1262 74.60<br />

Total 29.85 506.34 599.687 4060.617 749.61 3121.58<br />

Cultiable Area 578.39 Cropping Intensity 129.56<br />

48


3.4 Agroforestry and Horticulture<br />

There is no systematic agroforestry and orchard in the project area, however, few scattered trees of desi ber, aonla, guava, citrus spp. etc. is<br />

presentin the micro-watersheds which is consumed locally (Table 3.7).<br />

Table 3.8: Horticulture Status<br />

S.<br />

Name of Important horticultural crop<br />

N. Name of micro watershed with<br />

Orchard<br />

Scattered Fruit Crop<br />

Name of village<br />

code<br />

Productivity Production<br />

Productivity Production<br />

Name Area ha.<br />

No.<br />

qtl/ha qtls<br />

qtl/No. qtls<br />

1<br />

42 1.30 54.60<br />

Rampura-I (2C2B1m2e) Nil Nil Nil Nil<br />

2<br />

Rampura-II (2C2B1m2d) Nil Nil<br />

Nil<br />

Nil<br />

34 1.40 47.60<br />

3<br />

4<br />

Bikrampura (2C2B1m2b)<br />

Rudra Garautha (2C2B1l2b)<br />

Nil Nil Nil Nil 35 1.50 52.50<br />

Nil Nil Nil Nil 55 1.45 79.75<br />

5<br />

Kedar Tai-I (2C2B1l2e)<br />

Nil Nil Nil Nil<br />

50 1.35 67.50<br />

6<br />

Markuan (2C2B1l2f)<br />

Nil Nil Nil Nil 40 1.32 52.80<br />

7<br />

Pasaura (2C2B1k2a)<br />

Nil Nil Nil Nil<br />

38 1.40 53.20<br />

8 Kedar Tai-II (2C2B1l2d) Nil Nil Nil Nil 48 1.30 62.40<br />

49


Nil Nil Nil Nil 50 1.60 80.00<br />

9 Turk Lahchura (2C2B1l1g)<br />

Total for <strong>IWMP</strong>-<strong>VIII</strong> 392 12.62 550.35<br />

( Scattered fruit plant of Papaya, Kathal, Ber, Aonla, Guava, etc)<br />

50


3.5 Livestock and Fisheries<br />

In the name of cattle mainly desi cow are found in the project which productivity is significantly lower than the average productivity of the<br />

state. The Details of livestock and its productivity are available in Table 3.8 and 3.9, respectively.<br />

Table 3.9: Livestock Population in <strong>IWMP</strong>-<strong>VIII</strong>, <strong>Jhansi</strong><br />

(All Figures are in No.)<br />

Name of Micro watershed<br />

Cow Buffalo Ox/Bull Goat Sheep Piggeries Poultry Other<br />

with code<br />

Desi Crossed Desi Murrah Broiler Layers Total specify<br />

Rampura-I (2C2B1m2e) 145 8 180 8 33 220 10 0 10 12 22<br />

Rampura-II (2C2B1m2d) 100 6 150 7 15 150 8 0 6 8 14<br />

Bikrampura (2C2B1m2b) 325 28 225 14 63 355 15 0 12 15 27<br />

Rudra Garautha (2C2B1l2b) 165 10 135 6 8 185 8 0 6 8 14<br />

Kedar Tai-I (2C2B1l2e) 185 12 140 8 39 205 17 0 7 12 19<br />

Markuan (2C2B1l2f) 195 13 175 6 17 215 13 0 6 10 16<br />

Pasaura (2C2B1k2a) 250 15 195 9 35 275 15 0 4 12 16<br />

Kedar Tai-II (2C2B1l2d) 140 10 120 8 30 100 12 0 3 5 8<br />

Turk Lahchura (2C2B1l1g) 195 9 <strong>11</strong>5 4 6 210 19 0 6 8 14<br />

Total 1700 <strong>11</strong>1 1435 70 246 1915 <strong>11</strong>7 0 54 <strong>11</strong>3 167<br />

Table 3.10: Productivity of livestock in <strong>IWMP</strong>-<strong>VIII</strong>, <strong>Jhansi</strong><br />

Name of Micro watershed<br />

with code<br />

Milk Production (Liter Per day) Goatry Poultry Piggeries weight<br />

Kg/Pig<br />

Cows Buffalos Weight in Broiler Weight Layers No. of<br />

Desi Crossed Desi Murrah<br />

Kg/goat in Kg/ Brl eggs/day<br />

Rampura-I (2C2B1m2e) 2.60 4.50 3.75 5.60 25 1.25 135 -<br />

Rampura-II (2C2B1m2d) 1.85 3.95 3.20 5.75 27 1.45 138 -<br />

Bikrampura (2C2B1m2b) 2.00 4.20 3.50 5.40 24 1.35 128 -<br />

Rudra Garautha (2C2B1l2b) 1.60 3.10 3.80 5.60 22 1.22 136 -<br />

Kedar Tai-I (2C2B1l2e) 1.90 3.60 3.70 5.40 25 1.32 137 -<br />

Markuan (2C2B1l2f) 1.80 3.80 3.60 5.50 28 1.40 134 -<br />

Pasaura (2C2B1k2a) 2.25 4.70 3.40 5.40 25 1.38 126 -<br />

51


Kedar Tai-II (2C2B1l2d) 2.55 4.30 3.70 5.20 29 1.42 142 -<br />

Turk Lahchura (2C2B1l1g) 1.76 3.75 3.55 5.35 24 1.35 144 -<br />

Average for <strong>IWMP</strong>-<strong>VIII</strong> 2.03 3.99 3.58 5.47 25.44 1.35 136<br />

3.6 Forest and Grassland<br />

There is no grassland available in the project area; however, information on naturally generated/grown degraded forest is given in Table 3.10.<br />

Table 3.12: Forest, vegetative cover/grassland in <strong>IWMP</strong>-<strong>VIII</strong>, <strong>Jhansi</strong><br />

Name & Code of Micro watershed Forest (Area ha) Grassland (Area ha) Other vegetative cover (Area<br />

ha)<br />

Reserve Gram Total Gram Samaj Private Gram Samaj Private<br />

Samaj<br />

(Natural<br />

/Planted)<br />

Rampura-I (2C2B1m2e) - - - - - - 4.25<br />

Rampura-II (2C2B1m2d) - - - - - - 3.25<br />

Bikrampura (2C2B1m2b) - - - - - - 5.26<br />

Rudra Garautha (2C2B1l2b) 3.58<br />

Kedar Tai-I (2C2B1l2e) - - - - - - 4.25<br />

Markuan (2C2B1l2f) - - - - - - 5.89<br />

Pasaura (2C2B1k2a) - - - - - - 3.45<br />

Kedar Tai-II (2C2B1l2d) - - - - - - 3.25<br />

Turk Lahchura (2C2B1l1g) - - - 2.55<br />

Total for Project <strong>IWMP</strong>-<strong>VIII</strong> 35.73<br />

3.7 Livelihood Status<br />

Assestless/landless people earn their livelihood mainly from labour and batai. They are earning about Rs. 2800/per month. It is expected<br />

that their income will enhance due to watershed management as it will generate sustained employment opportunity. Intervention based on<br />

piggeries, fisheries, black smithy and carpentery are not in practice. Livelihood status of landless, farmers and interventions based livelihood<br />

status are shown in Table 3.13, 3.14 and 3.15, respectively.<br />

52


Table 3.13: Livelihood Status of Landless People<br />

Name & Code of micro watershed<br />

Name of<br />

Livelihood<br />

Activity<br />

No. of house hold engaged<br />

Sc St Other Women Total<br />

Pre project<br />

Average<br />

Income/<br />

<strong>Year</strong><br />

Desired<br />

Activities<br />

Rampura-I (2C2B1m2e) Labour/ Batai 1 - 2 - 3 18500 Goatary<br />

Poultry<br />

Rampura-II (2C2B1m2d) Labour/ Batai 1 - 1 1 3 7500 Goatary<br />

Poultry<br />

Bikrampura (2C2B1m2b)<br />

Rudra Garautha (2C2B1l2b)<br />

Kedar Tai-I (2C2B1l2e)<br />

Markuan (2C2B1l2f)<br />

Pasaura (2C2B1k2a)<br />

Kedar Tai-II (2C2B1l2d)<br />

Turk Lahchura (2C2B1l1g)<br />

Labour/ Batai<br />

Labour/ Batai<br />

Labour/ Batai<br />

Labour/ Batai<br />

Labour/ Batai<br />

Labour/ Batai<br />

Labour/ Batai<br />

Labour/ Batai<br />

Labour/ Batai<br />

Labour/ Batai<br />

Labour/ Batai<br />

Labour/ Batai<br />

Labour/ Batai<br />

Labour/ Batai<br />

1 - 2 - 3 16500 Goatary<br />

Poultry<br />

Ropemaking<br />

- - 1 - 1 5000 Goatary<br />

Poultry<br />

Ropemaking<br />

1 - 3 1 5 16200 Goatary<br />

Poultry<br />

1 - 2 - 3 5200 Goatary<br />

Poultry<br />

1 - 2 - 3 17900 Goatary<br />

Poultry<br />

1 - 2 - 3 5800 Goatary<br />

Poultry<br />

Ropemaking<br />

1 - 2 - 3 20000 Goatary<br />

Poultry<br />

Total 8 - 17 2 27<br />

Expected Remarks<br />

Income<br />

from<br />

desired<br />

activities<br />

Rs/<strong>Year</strong><br />

21500 With Investment<br />

work i.e extra income<br />

in SHG<br />

10000 With Investment<br />

work i.e extra income<br />

in SHG<br />

20000 With Investment<br />

work i.e extra income<br />

in SHG<br />

8000 With Investment<br />

work i.e extra income<br />

in SHG<br />

20500 With Investment<br />

work i.e extra income<br />

in SHG<br />

8000 With Investment<br />

work i.e extra income<br />

in SHG<br />

19900 With Investment<br />

work i.e extra income<br />

in SHG<br />

7500 With Investment<br />

work i.e extra income<br />

in SHG<br />

23000 With Investment<br />

work i.e extra income<br />

in SHG<br />

53


Table 3.14: Details of Livelihood Status of the Farmers<br />

Name & Code of micro<br />

watershed<br />

Name of<br />

Livelihood<br />

Activity<br />

No. of House hold engaged<br />

Sc St Other Women Total<br />

Rampura-I (2C2B1m2e)<br />

Agriculture +<br />

A.H., Labour,<br />

Batai<br />

Rampura-II (2C2B1m2d) Agriculture +<br />

A.H. ., Labour,<br />

Batai<br />

Bikrampura (2C2B1m2b) Agriculture +<br />

A.H. ., Labour,<br />

Batai<br />

Rudra Garautha (2C2B1l2b) Agriculture +<br />

A.H. ., Labour,<br />

Batai<br />

52 - 109 6<br />

43 - 89 5<br />

48 - 102 6<br />

13 - 27 2<br />

167<br />

137<br />

156<br />

42<br />

Pre<br />

project<br />

Average<br />

Income<br />

35000-<br />

45000<br />

35000-<br />

45000<br />

35000-<br />

45000<br />

35000-<br />

45000<br />

Desired<br />

Activities<br />

Improvement<br />

of agri.prod.<br />

Improvement<br />

of animal<br />

husbandry<br />

NRM,<br />

Livelihood<br />

activities<br />

Expected Income<br />

from desired<br />

activities<br />

55000-65000<br />

55000-65000<br />

55000-65000<br />

55000-65000<br />

Remarks<br />

Kedar Tai-I (2C2B1l2e)<br />

Markuan (2C2B1l2f)<br />

Pasaura (2C2B1k2a)<br />

Kedar Tai-II (2C2B1l2d)<br />

Agriculture +<br />

A.H., Labour,<br />

Batai<br />

Agriculture +<br />

A.H. ., Labour,<br />

Batai<br />

Agriculture +<br />

A.H. ., Labour,<br />

Batai<br />

Agriculture +<br />

A.H. ., Labour,<br />

Batai<br />

82 - 168 15<br />

49 - 100 8<br />

65 - 140 12<br />

54 - <strong>11</strong>3 10<br />

265<br />

157<br />

217<br />

177<br />

35000-<br />

45000<br />

35000-<br />

45000<br />

35000-<br />

45000<br />

35000-<br />

45000<br />

Improvement<br />

of agri.prod.<br />

Improvement<br />

of animal<br />

husbandry<br />

NRM activities<br />

Livelihood<br />

55000-65000<br />

55000-65000<br />

55000-65000<br />

55000-65000<br />

54


Turk Lahchura (2C2B1l1g)<br />

Agriculture +<br />

A.H. ., Labour,<br />

Batai 55 - <strong>11</strong>6 <strong>11</strong><br />

182<br />

Total 461 - 964 75 1500<br />

35000-<br />

45000<br />

Improvement<br />

of agri.prod.<br />

Improvement<br />

of animal<br />

husbandry<br />

NRM activities<br />

55000-65000<br />

55


Table 3.15: Present Livelihood Status (No. of households/Income per year) in <strong>IWMP</strong>-<strong>VIII</strong> , <strong>Jhansi</strong><br />

Rs<br />

Name of MWS<br />

with code<br />

Rampura-I<br />

(2C2B1m2e)<br />

Rampura-II<br />

(2C2B1m2d)<br />

Bikrampura<br />

(2C2B1m2b)<br />

Rudra<br />

Garautha<br />

(2C2B1l2b)<br />

Kedar Tai-I<br />

(2C2B1l2e)<br />

Markuan<br />

(2C2B1l2f)<br />

Pasaura<br />

(2C2B1k2a)<br />

Kedar Tai-II<br />

(2C2B1l2d)<br />

Turk<br />

Lahchura<br />

(2C2B1l1g)<br />

Activities<br />

Dairy Poultry Goatry Piggeries Fisheries Black Smithy Carpentry Stitching/<br />

knitting<br />

No Av. No Av. No Av. No Av. No Av. No Av. No Av. No Av.<br />

income income income income income income income income<br />

No<br />

Wages<br />

Av.<br />

income<br />

‘Income in<br />

Agriculture<br />

53 13500 15 22000 20 25600 - - 2 15000 1 4000 2 7000 - - 75 12000 240 24000<br />

32 12200 08 16500 12 19000 - - 1 14800 2 4000 1 7000 - - 65 12000 210 26000<br />

53 13500 08 22000 28 25600 - - 1 14900 1 4000 1 7000 - - 75 12000 120 24000<br />

36 12500 17 15400 25 21000 - - 2 15000 1 4000 2 7000 - - 62 12000 324 22500<br />

46 13200 13 22000 22 25000 - - 2 15000 2 4000 2 7000 - - 67 12000 142 20000<br />

33 <strong>11</strong>000 <strong>11</strong> 22000 23 16000 - - 1 14000 1 4000 2 7000 - - 62 12000 79 20000<br />

42 12000 14 <strong>11</strong>500 18 22000 - - 1 14500 1 4000 2 7000 - - 72 12000 <strong>11</strong>5 18000<br />

50 13300 13 22000 30 26800 - - 2 15000 1 4000 2 7000 74 12000 <strong>11</strong>8 21000<br />

35 <strong>11</strong>700 16 15400 32 21500 - - 1 15000 1 4000 2 7000 - - 66 12000 <strong>11</strong>0 27500<br />

380 12544 107 19038 210 22500 13 14800 <strong>11</strong> 4000 16 7000 618 12000 1458 22556<br />

3.8 Hydrology, Water resources and Soil and moisture Conservation<br />

Open shallow dug wells are the only means of irrigation in the area and these wells support only for life saving irrigation. In general,<br />

irrigation interval is low due to low water holding capacity of the soils. In the name of soil and moisture conservation only field bund Use of<br />

micro-irrigation is almost nil in the area. Groundwater status, irrigation status and source are given in Table 3.14, 3.15 and 3.16, respectively.<br />

No<br />

Av.<br />

income<br />

56


Table 3.16: Ground Water Status in <strong>IWMP</strong>-<strong>VIII</strong> , <strong>Jhansi</strong><br />

Depth of Ground Water Table<br />

Name & Code of Micro watershed<br />

(Below Ground level) in Meter No. of Observation well Remarks<br />

Before Monsoon<br />

After Monsoon<br />

Rampura-I (2C2B1m2e) Avrg.14.60 Avrg.<strong>11</strong>.40 13 -<br />

Rampura-II (2C2B1m2d) Avrg.14.50 Avrg.<strong>11</strong>.50 12<br />

Bikrampura (2C2B1m2b) Avrg.14.65 Avrg.<strong>11</strong>.20 22<br />

Rudra Garautha (2C2B1l2b) Avrg.14.25 Avrg.<strong>11</strong>.30 12 -<br />

Kedar Tai-I (2C2B1l2e) Avrg.14.50 Avrg.<strong>11</strong>.35 <strong>11</strong><br />

Markuan (2C2B1l2f) Avrg.14.55 Avrg.<strong>11</strong>.25 10<br />

Pasaura (2C2B1k2a) Avrg.14.35 Avrg.<strong>11</strong>.65 15 -<br />

Kedar Tai-II (2C2B1l2d) Avrg.14.10 Avrg.<strong>11</strong>.75 12<br />

Turk Lahchura (2C2B1l1g) Avrg.14.20 Avrg.<strong>11</strong>.30 <strong>11</strong> -<br />

Average 14.41 <strong>11</strong>.41 <strong>11</strong>8<br />

Depth of water table in open shallow dug wells in the project area was about 14 to 15 m during pre monsoon; however it was in the range of <strong>11</strong>-12<br />

m during post monsoon season.<br />

57


Table 3.17: Irrigation Status in <strong>IWMP</strong>-<strong>VIII</strong>, <strong>Jhansi</strong><br />

Sr. Name & Micro Watershed<br />

Gross Cultivated Area<br />

Net<br />

Gross Irrigated Area<br />

Net Rainfe<br />

No. with code<br />

Kharif Rabi Zaid Total Cultivat Khari Rabi Zaid Total Irrigated d<br />

ed Area f<br />

Area Area<br />

1 Rampura-I (2C2B1m2e) 280.62 641.14 - 921.76 772.31 - 38.90 - 38.90 38.90 733.41<br />

2 Rampura-II (2C2B1m2d) 258.62 612.10 - 870.72 688.94 - 35.40 - 35.40 35.40 653.54<br />

3 Bikrampura (2C2B1m2b) 439.43 980.72 - 1420.15 <strong>11</strong>36.34 - 58.41 - 58.41 58.41 1077.93<br />

4 Rudra Garautha (2C2B1l2b) 256.32 618.17 - 874.49 710.92 - 34.09 - 34.09 34.09 676.83<br />

5 Kedar Tai-I (2C2B1l2e) 207.58 493.46 - 701.04 567.35 - 28.13 - 28.13 28.13 539.22<br />

6 Markuan (2C2B1l2f) 207.84 466.87 - 674.71 546.50 - 28.48 - 28.48 28.48 518.02<br />

7 Pasaura (2C2B1k2a) 287.92 629.43 - 917.35 763.563 - 39.235 - 39.235 39.235 724.328<br />

8 Kedar Tai-II (2C2B1l2d) 209.10 488.925 - 698.025 563.32 - 31.23 - 31.23 31.23 532.09<br />

9 Turk Lahchura (2C2B1l1g) 213.15 506.34 - 719.49 578.39 - 29.85 - 29.85 29.85 548.54<br />

Total 2360.58 5437.155 7797.735 6327.62 323.72 323.72 323.72 6003.90<br />

Table 3.18: Source wise Area Irrigated in <strong>IWMP</strong>-<strong>VIII</strong> , <strong>Jhansi</strong> (area in ha)<br />

Sr. Name &Micro watershed Canal State Tube Tanks Open well Bore wells Lift Others Total Rem.<br />

No.<br />

with code<br />

Area wells<br />

irrigation (Specify) Irrigated<br />

No. Area No. Area No. Area No Area No. Area No. Area Area<br />

1 Karokhar (2C2B1p2f) - - - - - 14 38.90 - - - - - - 38.90 -<br />

2 Durkhuru-I (2C2B1n2c) - - - - - 13 35.40 - - - - - - 35.40 -<br />

3 Durkhuru-II (2C2B1m2d) - - - - - 12 58.41 - - - - - - 58.41 -<br />

4 Garautha Khas (2C2B1l1a) - - - - - 13 34.09 - - - - - - 34.09 -<br />

5 Gohna (2C2B1l1b) - - - - - <strong>11</strong> 28.13 - - - - - - 28.13 -<br />

6 Nipan-I (2C2B1m1c) - - - - - <strong>11</strong> 28.48 - - - - - - 28.48 -<br />

7 Nipan-II (2C2B1m1d) - - - - - 15 39.235 - - - - - - 39.235 -<br />

8 Birona (2C2B1l2a) - - - - - 12 31.23 - - - - - - 31.23 -<br />

9 Rudra Garautha (2C2B1m2a) <strong>11</strong> 29.85 29.85<br />

Total <strong>11</strong>2 323.72 323.72<br />

58


CHAPTER – 4<br />

INSTITUTIONAL BUILDING AND PROJECT MANAGEMENT<br />

4.1 Project Implementing Agency<br />

The Project Implementing Agency (PIA) is Soil Conservation Officer, Department of Land Development and Water Resources, <strong>IWMP</strong>-<br />

<strong>VIII</strong>, Tahrauli-I, <strong>Jhansi</strong>, Uttar Pradesh. The PIA was given responsibility to develop the micro-watershed by District Watershed Development Unit<br />

(DWDU) and State Level Nodal Agency (SLNA) considering its vast experiences in handling land and water management issues in the region.<br />

The PIA has well experienced trained and sufficient staff to handle the watershed management programme efficiently. Most of the staff of PIA has<br />

exposure of several watershed projects. In addition the PIA has access for technical backstopping from the ICAR viz. IGFRI and NRCAF, and<br />

KVK located at <strong>Jhansi</strong>. Details of PIA are presented in subsequent section.<br />

Table 4.1: Details of Project Implementing Agency (PIA), <strong>IWMP</strong>-<strong>VIII</strong> , <strong>Jhansi</strong><br />

Particulars of PIA<br />

Date of selection of PIA 16-04-<strong>2010</strong><br />

Type of organization<br />

State Govt. Agency<br />

Name of organization<br />

Department of Land Development and Water Resources, Uttar Pradesh<br />

Designation & Address<br />

Bhoomi Sanrakshan Adhikari, Land Development and Water Resources, Tahrauli-I, District -<strong>Jhansi</strong><br />

Telephone<br />

JE-09415138168<br />

Fax -<br />

E-mail -<br />

59


Table 4.2: Details of Staff at PIA, <strong>IWMP</strong>-<strong>VIII</strong>, <strong>Jhansi</strong><br />

s.n. Name of PIA Designetion Qqalification experience(<strong>Year</strong>)<br />

1 Shri S.K. Verma BSA<br />

2 Shri Rajesh Kumar Shrivastav JE Intermediate,Engg.Diploma 10<br />

3 Shri Uttam kumar mishra JE Intermediate,Engg.Diploma 10<br />

4 Shri Talat Afroj DM Intermediate,D.M. Diploma 10<br />

5 Shri Rajkumar Verma ASCI B.Sc (Ag) Hons. 10<br />

6 Shri Kuldeep Singh ASCI B.Sc(Ag) 1<br />

7 Shri Rohit Kumar Mishra Assistent Lekhakar B.com 5<br />

8 Shri Jageswar Dayal Juniear Clark B.A. 7<br />

9 Shri Shiv Kumar Jiledar High School 5<br />

10 Shri Kripa Shankar Bajpei Supervisor B.com 5<br />

<strong>11</strong> Shri Raamaotar Singh Supervisor B.A. 5<br />

12 Shri Vijaye Singh Supervisor High School 5<br />

13 Shri Om Prakash Verma Supervisor High School 5<br />

14 Shri Shudhar Singh Supervisor Intermediate 5<br />

15 Shri Rajkumar Sharma Supervisor Intermediate 5<br />

16 Shri Om Prakash Rahi Seenchpal Intermediate 5<br />

17 Shri Shantosh Kumar Seenchpal Intermediate 5<br />

18 Shri Puttu Lal Seenchpal B.com 5<br />

19 Shri Kamlesh Kumar Seenchpal High School 5<br />

20 Shri Shyam Singh Seenchpal Greduate 5<br />

21 Shri Raam Naresh Dubey Seenchpal Greduate 5<br />

22 Shri Naresh Chandra Yadav Seenchpal Greduate 5<br />

23 Shri Naresh Kumar Shukla Munsi Greduate 5<br />

24 Shri Dheerendra Kumar Munsi Greduate 3<br />

25 Shri Rakesh Kumar Pal Tresher Greduate 4<br />

26 Shri Shudhar Singh C.S. High School 5<br />

27 Shri Lala Ram Driver High School 5<br />

28 Shri Lajjaram Driver Greduate 5<br />

60


Table 4.3: Details of Watershed Development Team (WDT) in the project area<br />

Project- <strong>IWMP</strong> <strong>VIII</strong> PIA- BSA, LDWR, Tahrauli-I, <strong>Jhansi</strong> District – <strong>Jhansi</strong><br />

Sr.<br />

No.<br />

Name of WDT<br />

member<br />

M/F Age Qualification /<br />

Experience<br />

Description of professional training Role/ Function Date of appointment<br />

of WDT member<br />

1. Amrendra Singh<br />

2. Ratan Singh Dangi<br />

3. Santram Singh<br />

4 Ranjeeta Varma<br />

M 26 Yr. M.Sc. (Ag.)<br />

M 44 Yr. B.sc. (Ag.)<br />

M 26 Yr. B.sc. (Ag.)<br />

F 24 Yr. B.A. Sociology<br />

Deen Dayal Upadyay (Locknow) & Grass Land<br />

(<strong>Jhansi</strong>)<br />

Deen Dayal Upadyay (Locknow) & Grass Land<br />

(<strong>Jhansi</strong>)<br />

Deen Dayal Upadyay (Locknow) & Grass Land<br />

(<strong>Jhansi</strong>)<br />

Deen Dayal Upadyay (Locknow) & Grass Land<br />

(<strong>Jhansi</strong>)<br />

Agronomy 05-09-20<strong>11</strong><br />

Animal<br />

Husbendry<br />

S&W<br />

Congervation<br />

01-09-20<strong>11</strong><br />

06-09-20<strong>11</strong><br />

Social Work 01-09-20<strong>11</strong><br />

Table 4.4: Details of Watershed Committee (WC)<br />

Jal Sanrakshan Samiti Dhipkai, Gram Panchayat: Dhipkai Name of Project: - <strong>IWMP</strong>-<strong>VIII</strong> District- <strong>Jhansi</strong><br />

Sl.<br />

No.<br />

Designation M/F SC ST OBC/Gen SF MF LF Landless<br />

1<br />

Name<br />

of<br />

Gram<br />

Sabha/<br />

GP<br />

Date of<br />

Constitution/<br />

Registration as<br />

a Society<br />

(dd/mm/ yyyy)<br />

UG SHG GP Educational<br />

qualification<br />

Function(s)<br />

assigned<br />

President M √ - - - - √ - √ - - Literate Implementation<br />

Secretary M - - √ √ - - - - - - Intermediate of Watershed<br />

programme<br />

Member M - - √ √ - - - √ - - 8 th<br />

under the<br />

Member F √ - - √ - - - √ - - 8 th<br />

supervision of<br />

Member M - - √ - √ - - √ - - 10 th PIA (as per<br />

Member M - - √ - √ - - √ - - 5 th common guide<br />

Member<br />

lines)<br />

F √ - - √ - - - - √ - 5 th<br />

Member F - - √ √ - - - - √ - 8 th<br />

Member M √ - - - - - √ - - - 8 th<br />

Member M √ - - √ - - - - - - 12 th<br />

61


Jal Sanrakshan Samiti Rampura, Gram Panchayat: Rampura Name of Project: - <strong>IWMP</strong> <strong>VIII</strong> District- <strong>Jhansi</strong><br />

Sl.<br />

No.<br />

Designatio<br />

n<br />

M/<br />

F<br />

SC ST OBC/Ge<br />

n<br />

SF M<br />

F<br />

LF Land<br />

-less<br />

UG SH<br />

G<br />

G<br />

P<br />

2<br />

Name of<br />

Gram Sabha/<br />

GP<br />

Date of<br />

Constituti<br />

on/<br />

Registratio<br />

n as a<br />

Society<br />

(dd/mm/<br />

yyyy)<br />

Educational<br />

qualificatio<br />

n<br />

Function(s)<br />

assigned<br />

President M √ - - - - - - √ - - Literate Implementatio<br />

Secretary M - - √ - √ - - √ - - B.Sc. n of Watershed<br />

programme<br />

Member M - - √ √ - - - - - - High School<br />

under the<br />

Member M √ - - - - - √ - - - 8 th<br />

supervision of<br />

Member M - - √ - √ - - √ - - Inter PIA (as per<br />

Member M - - √ √ - - - - √ - 8 th common guide<br />

Member<br />

lines)<br />

F - - √ - - - - - √ - -<br />

Member M √ - - √ - - - - √ - 5 th<br />

Member M - - √ - - - - - - √ 5 th<br />

Member F - - √ √ - - - - - - -<br />

Member M - - √ - - - - - √ - 5 th<br />

62


Jal Sanrakshan Samiti Nipan, Gram Panchayat: Nipan Name of Project: - <strong>IWMP</strong> <strong>VIII</strong><br />

Sl.<br />

Designation M/F SC ST OBC/Gen SF MF LF Landless<br />

No.<br />

3<br />

Name of<br />

Gram<br />

Sabha/<br />

GP<br />

Date of<br />

Constitution/<br />

Registration<br />

as a Society<br />

(dd/mm/<br />

yyyy)<br />

District- <strong>Jhansi</strong><br />

UG SHG GP Educational<br />

qualification<br />

Function (s)<br />

assigned<br />

President M - - √ √ - - - √ - - 8 th Implementation<br />

Secretary M - - √ - √ - - √ - - Inter of Watershed<br />

programme<br />

Member M - - √ √ - - - √ - - 8 th<br />

under the<br />

Member F - - √ - - - - √ - - 8 th<br />

supervision of<br />

Member M √ - - √ - - - - - √ 8 th PIA (as per<br />

Member M - - √ - - - - - - √ 9 th common guide<br />

Member<br />

lines)<br />

F - - √ - √ - - - √ - 8 th<br />

Member M - - √ √ - - - - √ - 8 th<br />

Member F - - √ - - - - - - √ 5 th<br />

Member M - - √ - - - √ - - - Literate<br />

63


Jal Sanrakshan Samiti Jaswant pura, Gram Panchayat: Jaswant pura Name of Project:- <strong>IWMP</strong> <strong>VIII</strong> District- <strong>Jhansi</strong><br />

Sr.<br />

No<br />

.<br />

Name of<br />

Gram Sabha/<br />

GP<br />

Designatio<br />

n<br />

M/<br />

F<br />

S<br />

C<br />

S<br />

T<br />

OBC/Ge<br />

n<br />

S<br />

F<br />

M<br />

F<br />

L<br />

F<br />

Land<br />

-less<br />

U<br />

G<br />

SH<br />

G<br />

G<br />

P<br />

4<br />

Date of<br />

Constitutio<br />

n/<br />

Registratio<br />

n as a<br />

Society<br />

(dd/mm/<br />

yyyy)<br />

Educational<br />

qualificatio<br />

n<br />

Function(s)<br />

assigned<br />

President M - - √ - √ - - √ - - Literate Implementatio<br />

Secretary M - - √ √ - - - - - √ B.A. n of Watershed<br />

programme<br />

Member M - - √ √ - - - √ - - 5 th<br />

under the<br />

Member M - √ √ - - - √ - - Literate supervision of<br />

Member M √ - - - √ - - √ - - Literate PIA (as per<br />

Member F - - √ - √ - - - √ - 8 th common guide<br />

Member<br />

lines)<br />

M - - √ - - - - - √ - 8 th<br />

Member F - - √ - - - - - √ - Literate<br />

Member M - - √ - - - √ - - - Inter<br />

Member F - - √ - - - - - - √ -<br />

64


Jal Sanrakshan Samiti Simardha, Gram Panchayat: Simardha Name of Project:- <strong>IWMP</strong> <strong>VIII</strong> District- <strong>Jhansi</strong><br />

Sl.<br />

No.<br />

Designation M/F SC ST OBC/Gen SF MF LF Landless<br />

5<br />

Name of<br />

Gram<br />

Sabha/<br />

GP<br />

Date of<br />

Constitution/<br />

Registration<br />

as a Society<br />

(dd/mm/<br />

yyyy)<br />

UG SHG GP Educational<br />

qualification<br />

Function(s)<br />

assigned<br />

President M - - √ - √ - - - - √ High School Implementation<br />

Secretary M - - √ √ - - - - - √ Inter of Watershed<br />

programme<br />

Member M - - √ √ - - - √ - - High School<br />

under the<br />

Member M - - √ - √ - - √ - - 8 th<br />

supervision of<br />

Member M √ - - - √ - - - - √ 8 th PIA (as per<br />

Member M - - √ - √ - - - - √ High School common guide<br />

Member<br />

lines)<br />

M - - √ - - - - - √ - Literate<br />

Member F - - √ - - - - - √ - Literate<br />

Member M - - √ √ - - - √ - - Literate<br />

Member M - - √ - √ - - √ - - Literate<br />

65


Jal Sanrakshan Samiti Nimgahna, Gram Panchayat: Nimgahna Name of Project: - <strong>IWMP</strong> <strong>VIII</strong> District-<strong>Jhansi</strong><br />

Sl.<br />

No.<br />

Designation M/F SC ST OBC/Gen SF MF LF Landless<br />

6<br />

Name of<br />

Gram<br />

Sabha/<br />

GP<br />

Date of<br />

Constitution/<br />

Registration<br />

as a Society<br />

(dd/mm/<br />

yyyy)<br />

UG SHG GP Educational<br />

qualification<br />

Function(s)<br />

assigned<br />

President M - - √ - √ - - √ - - B Sc. Implementation<br />

Secretary M - - √ √ - - - - √ - M.A of Watershed<br />

programme<br />

Member F - - √ √ - - - √ - - 8th<br />

under the<br />

Member M - - √ √ - - - √ - - 8 th<br />

supervision of<br />

Member M √ - - √ - - - - - √ 8 th PIA (as per<br />

Member M √ - - - √ - - - - √ 10 th common guide<br />

Member<br />

lines)<br />

F - - √ √ - - - - √ - 5 th<br />

Member F - - √ - - - - - √ - 8 th<br />

Member M √ - - √ - - - √ - - 8 th<br />

Jal Sanrakshan Samiti Bangra, Gram Panchayat: Bangra Name of Project: - <strong>IWMP</strong> <strong>VIII</strong> District-<strong>Jhansi</strong><br />

Sl.<br />

No.<br />

Designation M/F SC ST OBC/Gen SF MF LF Landless<br />

7<br />

Name of<br />

Gram<br />

Sabha/<br />

GP<br />

Date of<br />

Constitution/<br />

Registration<br />

as a Society<br />

(dd/mm/<br />

yyyy)<br />

UG SHG GP Educational<br />

qualification<br />

Function(s)<br />

assigned<br />

President M - - √ - √ - - √ - - Literate Implementation<br />

Secretary M - - √ √ - - - - √ - Intermediate of Watershed<br />

programme<br />

Member F - - √ √ - - - √ - - 8th<br />

under the<br />

Member M - - √ √ - - - √ - - Literate supervision of<br />

Member M √ - - √ - - - - - √ Literate PIA (as per<br />

Member M - - √ - √ - - - - √ 10 th common guide<br />

Member<br />

lines)<br />

F - - √ √ - - - - √ - Literate<br />

66


Member F - - √ - - - - - √ - Literate<br />

Member M - - √ √ - - - √ - - Literate<br />

Jal Sanrakshan Samiti Dhurkhuru, Gram Panchayat: Dhurkhuru Name of Project: - <strong>IWMP</strong> <strong>VIII</strong> District-<strong>Jhansi</strong><br />

Sl.<br />

No.<br />

Designation M/F SC ST OBC/Gen SF MF LF Landless<br />

8<br />

Name of<br />

Gram<br />

Sabha/<br />

GP<br />

Date of<br />

Constitution/<br />

Registration<br />

as a Society<br />

(dd/mm/<br />

yyyy)<br />

UG SHG GP Educational<br />

qualification<br />

Function(s)<br />

assigned<br />

President M - - √ - √ - - √ - - Literate Implementation<br />

Secretary M - - √ √ - - - - √ - B.A. of Watershed<br />

programme<br />

Member F - - √ √ - - - √ - - 8th<br />

under the<br />

Member M - - √ √ - - - √ - - Literate supervision of<br />

Member M √ - - √ - - - - - √ Literate PIA (as per<br />

Member M - - √ - √ - - - - √ High School common guide<br />

Member<br />

lines)<br />

F - - √ √ - - - - √ - High School<br />

Member F - - √ - - - - - √ - Literate<br />

Member M - - √ √ - - - √ - - Literate<br />

67


Jal Sanrakshan Samiti Birona, Gram Panchayat: Birona Name of Project: - <strong>IWMP</strong> <strong>VIII</strong> District-<strong>Jhansi</strong><br />

Sl.<br />

No.<br />

Designation M/F SC ST OBC/Gen SF MF LF Landless<br />

9<br />

Name of<br />

Gram<br />

Sabha/<br />

GP<br />

Date of<br />

Constitution/<br />

Registration<br />

as a Society<br />

(dd/mm/<br />

yyyy)<br />

UG SHG GP Educational<br />

qualification<br />

Function(s)<br />

assigned<br />

President M - - √ - √ - - √ - - Literate Implementation<br />

Secretary M - - √ √ - - - - √ - High School of Watershed<br />

programme<br />

Member F - - √ √ - - - √ - - 8th<br />

under the<br />

Member M - - √ - √ - - √ - - Literate supervision of<br />

Member M √ - - √ - - - - - √ Literate PIA (as per<br />

Member M - - √ - √ - - - - √ High School common guide<br />

Member<br />

lines)<br />

F - - √ √ - - - - √ - High School<br />

Member F - - √ - - - - - √ - Literate<br />

Member M - - √ √ - - - √ - - Literate<br />

68


Jal Sanrakshan Samiti Gorpura, Gram Panchayat: Gorpura Name of Project: - <strong>IWMP</strong> <strong>VIII</strong> District-<strong>Jhansi</strong><br />

Sl.<br />

No.<br />

Designation M/F SC ST OBC/Gen SF MF LF Landless<br />

10<br />

Name of<br />

Gram<br />

Sabha/<br />

GP<br />

Date of<br />

Constitution/<br />

Registration<br />

as a Society<br />

(dd/mm/<br />

yyyy)<br />

UG SHG GP Educational<br />

qualification<br />

Function(s)<br />

assigned<br />

President M √ - - - √ - - √ - - Literate Implementation<br />

Secretary M √ - - √ - - - - √ - intermediate of Watershed<br />

programme<br />

Member F - - √ √ - - - √ - - 8th<br />

under the<br />

Member M - - √ - √ - - √ - - Literate supervision of<br />

Member M √ - - √ - - - - - √ Literate PIA (as per<br />

Member M √ - - - √ - - - - √ High School common guide<br />

Member<br />

lines)<br />

M √ - - √ - - - - √ - High School<br />

Member F - - √ - - - - - √ - Literate<br />

Member M - - √ √ - - - √ - - Literate<br />

Member M - - √ Literate<br />

Member M - - √ Literate<br />

69


Jal Sanrakshan Samiti Chtur Tai, Gram Panchayat: Chtur Tai Name of Project: - <strong>IWMP</strong> <strong>VIII</strong> District-<strong>Jhansi</strong><br />

Sl.<br />

No.<br />

Designation M/F SC ST OBC/Gen SF MF LF Landless<br />

<strong>11</strong><br />

Name of<br />

Gram<br />

Sabha/<br />

GP<br />

Date of<br />

Constitution/<br />

Registration<br />

as a Society<br />

(dd/mm/<br />

yyyy)<br />

UG SHG GP Educational<br />

qualification<br />

Function(s)<br />

assigned<br />

President M - - √ - √ - - √ - - Literate Implementation<br />

Secretary M - - √ √ - - - - √ - High School of Watershed<br />

programme<br />

Member F - - √ √ - - - √ - - 8th<br />

under the<br />

Member M - - √ - √ - - √ - - Literate supervision of<br />

Member M - - √ √ - - - - - √ Literate PIA (as per<br />

Member M - - √ - √ - - - - √ High School common guide<br />

Member<br />

lines)<br />

M - - √ √ - - - - √ - High School<br />

Member F - - √ - - - - - √ - Literate<br />

Member M - - √ √ - - - √ - - Literate<br />

Member M - - √ Literate<br />

Member M - - √ Literate<br />

70


Jal Sanrakshan Samiti Markuan, Gram Panchayat: Markuan Name of Project: - <strong>IWMP</strong> <strong>VIII</strong> District-<strong>Jhansi</strong><br />

Sl.<br />

No.<br />

Designation M/F SC ST OBC/Gen SF MF LF Landless<br />

12<br />

Name of<br />

Gram<br />

Sabha/<br />

GP<br />

Date of<br />

Constitution/<br />

Registration<br />

as a Society<br />

(dd/mm/<br />

yyyy)<br />

UG SHG GP Educational<br />

qualification<br />

Function(s)<br />

assigned<br />

President M - - √ - √ - - √ - - High School Implementation<br />

Secretary M - - √ √ - - - - √ - Literate of Watershed<br />

programme<br />

Member F √ - √ √ - - - √ - - 8th<br />

under the<br />

Member M √ - - - √ - - √ - - Literate supervision of<br />

Member M - - - √ - - - - - √ Literate PIA (as per<br />

Member M - - √ - √ - - - - √ High School common guide<br />

Member<br />

lines)<br />

M - - √ √ - - - - √ - High School<br />

Member F - - √ - - - - - √ - Literate<br />

Member M - - √ √ - - - √ - - Literate<br />

Member M - - √ Literate<br />

Member M - - √ Literate<br />

71


Jal Sanrakshan Samiti Emlota, Gram Panchayat: Emlota Name of Project: - <strong>IWMP</strong> <strong>VIII</strong> District-<strong>Jhansi</strong><br />

Sl.<br />

No.<br />

Designation M/F SC ST OBC/Gen SF MF LF Landless<br />

13<br />

Name of<br />

Gram<br />

Sabha/<br />

GP<br />

Date of<br />

Constitution/<br />

Registration<br />

as a Society<br />

(dd/mm/<br />

yyyy)<br />

UG SHG GP Educational<br />

qualification<br />

Function(s)<br />

assigned<br />

President M - - √ - √ - - √ - - High School Implementation<br />

Secretary M - - √ √ - - - - √ - Literate of Watershed<br />

programme<br />

Member M √ - √ - - - √ - - 8th<br />

under the<br />

Member M √ - - - √ - - √ - - Literate supervision of<br />

Member M - - √ √ - - - - - √ Literate PIA (as per<br />

Member M - - √ - √ - - - - √ High School common guide<br />

Member<br />

lines)<br />

M - - √ √ - - - - √ - High School<br />

Member F - - √ - - - - - √ - Literate<br />

Member M - - √ √ - - - √ - - Literate<br />

Member M - - √ Literate<br />

Member M √ - - √ - - - - - - Literate<br />

Member M √ - - √ - - - - - - High School<br />

Member M √ - - - √ - - - - - High School<br />

72


Jal Sanrakshan Samiti Aivani, Gram Panchayat: Aivani Name of Project: - <strong>IWMP</strong> <strong>VIII</strong> District-<strong>Jhansi</strong><br />

Sl.<br />

No.<br />

Designation M/F SC ST OBC/Gen SF MF LF Landless<br />

14<br />

Name of<br />

Gram<br />

Sabha/<br />

GP<br />

Date of<br />

Constitution/<br />

Registration<br />

as a Society<br />

(dd/mm/<br />

yyyy)<br />

UG SHG GP Educational<br />

qualification<br />

Function(s)<br />

assigned<br />

President M - - √ - √ - - √ - - High School Implementation<br />

Secretary M - - √ √ - - - - √ - Literate of Watershed<br />

programme<br />

Member M √ - √ - - - √ - - 8th<br />

under the<br />

Member F √ - - - √ - - √ - - Literate supervision of<br />

Member M - - √ √ - - - - - √ Literate PIA (as per<br />

Member M - - √ - √ - - - - √ High School common guide<br />

Member<br />

lines)<br />

M - - √ √ - - - - √ - High School<br />

Member F - - √ - - - - - √ - Literate<br />

Member M - - √ √ - - - √ - - Literate<br />

Member M - - √ Literate<br />

Member M √ - - √ - - - - - - Literate<br />

73


Jal Sanrakshan Samiti Turk Lahchura, Gram Panchayat: Turk Lahchura Name of Project: - <strong>IWMP</strong> <strong>VIII</strong> District-<strong>Jhansi</strong><br />

Sl.<br />

No.<br />

Designation M/F SC ST OBC/Gen SF MF LF Landless<br />

15<br />

Name of<br />

Gram<br />

Sabha/<br />

GP<br />

Date of<br />

Constitution/<br />

Registration<br />

as a Society<br />

(dd/mm/<br />

yyyy)<br />

UG SHG GP Educational<br />

qualification<br />

Function(s)<br />

assigned<br />

President M √ - - - √ - - √ - - Literate Implementation<br />

Secretary M - - √ √ - - - - √ - High School of Watershed<br />

programme<br />

Member M √ - √ - - - √ - - 8th<br />

under the<br />

Member M √ - - - √ - - √ - - Literate supervision of<br />

Member M - - √ √ - - - - - √ Literate PIA (as per<br />

Member M - - √ - √ - - - - √ High School common guide<br />

Member<br />

lines)<br />

M - - √ √ - - - - √ - High School<br />

Member F - - √ - - - - - √ - Literate<br />

Member M - - √ √ - - - √ - - Literate<br />

Member M - - √ Literate<br />

Member M - - √ √ - - - - - - Literate<br />

74


Jal Sanrakshan Samiti Turk Lahchura, Gram Panchayat: Turk Lahchura Name of Project: - <strong>IWMP</strong> <strong>VIII</strong> District-<strong>Jhansi</strong><br />

Sl.<br />

No.<br />

Designation M/F SC ST OBC/Gen SF MF LF Landless<br />

16<br />

Name of<br />

Gram<br />

Sabha/<br />

GP<br />

Date of<br />

Constitution/<br />

Registration<br />

as a Society<br />

(dd/mm/<br />

yyyy)<br />

UG SHG GP Educational<br />

qualification<br />

Function(s)<br />

assigned<br />

President M √ - - - √ - - √ - - Literate Implementation<br />

Secretary M - - √ √ - - - - √ - High School of Watershed<br />

programme<br />

Member M √ - √ - - - √ - - 8th<br />

under the<br />

Member M √ - - - √ - - √ - - Literate supervision of<br />

Member M - - √ √ - - - - - √ Literate PIA (as per<br />

Member M - - √ - √ - - - - √ High School common guide<br />

Member<br />

lines)<br />

M - - √ √ - - - - √ - High School<br />

Member F - - √ - - - - - √ - Literate<br />

Member M - - √ √ - - - √ - - Literate<br />

Member M - - √ Literate<br />

Member M - - √ √ - - - - - - Literate<br />

75


Jal Sanrakshan Samiti Garha, Gram Panchayat: Garha Name of Project: - <strong>IWMP</strong> <strong>VIII</strong> District-<strong>Jhansi</strong><br />

Sl.<br />

No.<br />

Designation M/F SC ST OBC/Gen SF MF LF Landless<br />

17<br />

Name of<br />

Gram<br />

Sabha/<br />

GP<br />

Date of<br />

Constitution/<br />

Registration<br />

as a Society<br />

(dd/mm/<br />

yyyy)<br />

UG SHG GP Educational<br />

qualification<br />

Function(s)<br />

assigned<br />

President M - - √ - √ - - √ - - High School Implementation<br />

Secretary M - - √ √ - - - - √ - Intermediate of Watershed<br />

programme<br />

Member M √ - √ - - - √ - - 8th<br />

under the<br />

Member M √ - - - √ - - √ - - Literate supervision of<br />

Member M - - √ √ - - - - - √ Literate PIA (as per<br />

Member M - - √ - √ - - - - √ High School common guide<br />

Member<br />

lines)<br />

M - - √ √ - - - - √ - High School<br />

Member F - - √ - - - - - √ - Literate<br />

Member M - - √ √ - - - √ - - High School<br />

Member M - - √ Literate<br />

Member M - - √ √ - - - - - - Literate<br />

76


Jal Sanrakshan Samiti Punchhi, Gram Panchayat: Punchhi Name of Project: - <strong>IWMP</strong> <strong>VIII</strong> District-<strong>Jhansi</strong><br />

Sl.<br />

No.<br />

Designation M/F SC ST OBC/Gen SF MF LF Landless<br />

18<br />

Name of<br />

Gram<br />

Sabha/<br />

GP<br />

Date of<br />

Constitution/<br />

Registration<br />

as a Society<br />

(dd/mm/<br />

yyyy)<br />

UG SHG GP Educational<br />

qualification<br />

Function(s)<br />

assigned<br />

President M - - √ - √ - - √ - - High School Implementation<br />

Secretary M - - √ √ - - - - √ - Intermediate of Watershed<br />

programme<br />

Member M √ - √ - - - √ - - 8th<br />

under the<br />

Member M √ - - - √ - - √ - - Literate supervision of<br />

Member M - - √ √ - - - - - √ Literate PIA (as per<br />

Member F - - √ - √ - - - - √ Literate common guide<br />

Member<br />

lines)<br />

F - - √ √ - - - - √ - High School<br />

Member F √ - - - - - - √ - Literate<br />

Member M - - √ √ - - - √ - - High School<br />

Member M - - √ Literate<br />

Member M - - √ √ - - - - - - Literate<br />

77


Table 4.5: Details of Self Help Groups (SHGs) in the project area<br />

Table 4.5.1: Gram Panchyat/Gram Sabha/ village- Dhipkai Project <strong>IWMP</strong>-<strong>VIII</strong> District- <strong>Jhansi</strong><br />

S.No SHGs<br />

name<br />

No. of<br />

members<br />

Activity<br />

Proposed<br />

Date of<br />

formation<br />

SHG<br />

Share<br />

Total for Gram panchyat<br />

Bank<br />

Account<br />

no.<br />

Amount<br />

of Saving<br />

by each<br />

member/<br />

month Rs.<br />

Saving<br />

Up to<br />

date<br />

May<br />

2012<br />

Back Yard Poultry,Goat Keeping,Dairy,Stiching<br />

Masala Making,Dal Making,Rope making<br />

Bidi Making<br />

Total<br />

cost of<br />

Activity<br />

Rs.<br />

Amount<br />

from<br />

Project<br />

Fund Rs.<br />

Proposed<br />

Date of<br />

Start of<br />

activity<br />

Remarks<br />

In the Gram Panchayat Total 35 SHGs will be constituted,<br />

out of them 05 is under running. The assistance to the<br />

SHGs will be provided in rotation under the availability of<br />

Rs 9.29 lacs. The remaining SHGs will be constructed in<br />

this year.<br />

Total for MWS Choolhi 9.29<br />

Table 4.5.2: Gram Panchyat/Gram Sabha/ village- Rampura Project <strong>IWMP</strong>-<strong>VIII</strong> District- <strong>Jhansi</strong><br />

S.No SHGs<br />

name<br />

No. of<br />

members<br />

Activity<br />

Proposed<br />

Date of<br />

formation<br />

SHG<br />

Share<br />

Total for Gram panchyat<br />

Bank<br />

Account<br />

no.<br />

Amount<br />

of Saving<br />

by each<br />

member/<br />

month Rs.<br />

Saving<br />

Up to<br />

date<br />

May<br />

2012<br />

Back Yard Poultry,Goat Keeping,Dairy,Stiching<br />

Masala Making,Dal Making,Rope making<br />

Bidi Making<br />

Total<br />

cost of<br />

Activity<br />

Rs.<br />

Amount<br />

from<br />

Project<br />

Fund Rs.<br />

Proposed<br />

Date of<br />

Start of<br />

activity<br />

Remarks<br />

In the Gram Panchayat Total 13 SHGs will be constituted,<br />

out of them 03 is under running. The assistance to the<br />

SHGs will be provided in rotation under the availability of<br />

Rs 3.18 lacs. The remaining SHGs will be constructed in<br />

this year.<br />

Total for MWS Choolhi 3.18<br />

78


Table 4.5.3: Gram Panchyat/Gram Sabha/ village- Nipan Project <strong>IWMP</strong>-<strong>VIII</strong> District- <strong>Jhansi</strong><br />

S.No SHGs<br />

name<br />

No. of<br />

members<br />

Activity<br />

Proposed<br />

Date of<br />

formation<br />

SHG<br />

Share<br />

Total for Gram panchyat<br />

Bank<br />

Account<br />

no.<br />

Amount<br />

of Saving<br />

by each<br />

member/<br />

month Rs.<br />

Saving<br />

Up to<br />

date<br />

May<br />

2012<br />

Back Yard Poultry,Goat Keeping,Dairy,Stiching<br />

Masala Making,Dal Making,Rope making<br />

Bidi Making<br />

Total<br />

cost of<br />

Activity<br />

Rs.<br />

Amount<br />

from<br />

Project<br />

Fund Rs.<br />

Proposed<br />

Date of<br />

Start of<br />

activity<br />

Remarks<br />

In the Gram Panchayat Total 17 SHGs will be constituted,<br />

out of them 03 is under running. The assistance to the<br />

SHGs will be provided in rotation under the availability of<br />

Rs 4.71 lacs. The remaining SHGs will be constructed in<br />

this year.<br />

Total for MWS Choolhi 4.71<br />

Table 4.5.4: Gram Panchyat/Gram Sabha/ village- Jashwantpura Project <strong>IWMP</strong>-<strong>VIII</strong> District- <strong>Jhansi</strong><br />

S.No SHGs<br />

name<br />

No. of<br />

members<br />

Activity<br />

Proposed<br />

Date of<br />

formation<br />

SHG<br />

Share<br />

Remarks<br />

Total for Gram panchyat<br />

Bank<br />

Account<br />

no.<br />

Amount<br />

of Saving<br />

by each<br />

member/<br />

month Rs.<br />

Saving<br />

Up to<br />

date<br />

May<br />

2012<br />

Back Yard Poultry,Goat Keeping,Dairy,Stiching<br />

Masala Making,Dal Making,Rope making<br />

Bidi Making<br />

Total<br />

cost of<br />

Activity<br />

Rs.<br />

Amount<br />

from<br />

Project<br />

Fund Rs.<br />

Proposed<br />

Date of<br />

Start of<br />

activity<br />

In the Gram Panchayat Total 02 SHGs will be constituted,<br />

out of them 01 is under running. The assistance to the<br />

SHGs will be provided in rotation under the availability of<br />

Rs 0.47 lacs. The remaining SHGs will be constructed in<br />

this year.<br />

Total for MWS Choolhi 0.47<br />

79


Table 4.5.5: Gram Panchyat/Gram Sabha/ village- Simardha Project <strong>IWMP</strong>-<strong>VIII</strong> District- <strong>Jhansi</strong><br />

S.No SHGs<br />

name<br />

No. of<br />

members<br />

Activity<br />

Proposed<br />

Date of<br />

formation<br />

SHG<br />

Share<br />

Total for Gram panchyat<br />

Bank<br />

Account<br />

no.<br />

Amount<br />

of Saving<br />

by each<br />

member/<br />

month Rs.<br />

Saving<br />

Up to<br />

date<br />

May<br />

2012<br />

Back Yard Poultry,Goat Keeping,Dairy,Stiching<br />

Masala Making,Dal Making,Rope making<br />

Bidi Making<br />

Total<br />

cost of<br />

Activity<br />

Rs.<br />

Amount<br />

from<br />

Project<br />

Fund Rs.<br />

Proposed<br />

Date of<br />

Start of<br />

activity<br />

Remarks<br />

In the Gram Panchayat Total 14 SHGs will be constituted,<br />

out of them 03 is under running. The assistance to the<br />

SHGs will be provided in rotation under the availability of<br />

Rs 3.56 lacs. The remaining SHGs will be constructed in<br />

this year.<br />

Total for MWS Choolhi 3.56<br />

Table 4.5.6: Gram Panchyat/Gram Sabha/ village- Nimgahna Project <strong>IWMP</strong>-<strong>VIII</strong> District- <strong>Jhansi</strong><br />

S.No SHGs<br />

name<br />

No. of<br />

members<br />

Activity<br />

Proposed<br />

Date of<br />

formation<br />

SHG<br />

Share<br />

Total for Gram panchyat<br />

Bank<br />

Account<br />

no.<br />

Amount<br />

of Saving<br />

by each<br />

member/<br />

month Rs.<br />

Saving<br />

Up to<br />

date<br />

May<br />

2012<br />

Back Yard Poultry,Goat Keeping,Dairy,Stiching<br />

Masala Making,Dal Making,Rope making<br />

Bidi Making<br />

Total<br />

cost of<br />

Activity<br />

Rs.<br />

Amount<br />

from<br />

Project<br />

Fund Rs.<br />

Proposed<br />

Date of<br />

Start of<br />

activity<br />

Remarks<br />

In the Gram Panchayat Total 14 SHGs will be constituted,<br />

out of them 02 is under running. The assistance to the<br />

SHGs will be provided in rotation under the availability of<br />

Rs 3.49 lacs. The remaining SHGs will be constructed in<br />

this year.<br />

Total for MWS Choolhi 3.49<br />

80


Table 4.5.7: Gram Panchyat/Gram Sabha/ village- Bangra Project <strong>IWMP</strong>-<strong>VIII</strong> District- <strong>Jhansi</strong><br />

S.No SHGs<br />

name<br />

No. of<br />

members<br />

Activity<br />

Proposed<br />

Date of<br />

formation<br />

SHG<br />

Share<br />

Total for Gram panchyat<br />

Bank<br />

Account<br />

no.<br />

Amount<br />

of Saving<br />

by each<br />

member/<br />

month Rs.<br />

Saving<br />

Up to<br />

date<br />

May<br />

2012<br />

Back Yard Poultry,Goat Keeping,Dairy,Stiching<br />

Masala Making,Dal Making,Rope making<br />

Bidi Making<br />

Total<br />

cost of<br />

Activity<br />

Rs.<br />

Amount<br />

from<br />

Project<br />

Fund Rs.<br />

Proposed<br />

Date of<br />

Start of<br />

activity<br />

Remarks<br />

In the Gram Panchayat Total 02 SHGs will be constituted,<br />

out of them 01 is under running. The assistance to the<br />

SHGs will be provided in rotation under the availability of<br />

Rs 0.50 lacs. The remaining SHGs will be constructed in<br />

this year.<br />

Total for MWS Choolhi 0.50<br />

Table 4.5.8: Gram Panchyat/Gram Sabha/ village- Durkhuru Project <strong>IWMP</strong>-<strong>VIII</strong> District- <strong>Jhansi</strong><br />

S.No SHGs<br />

name<br />

No. of<br />

members<br />

Activity<br />

Proposed<br />

Date of<br />

formation<br />

SHG<br />

Share<br />

Total for Gram panchyat<br />

Bank<br />

Account<br />

no.<br />

Amount<br />

of Saving<br />

by each<br />

member/<br />

month Rs.<br />

Saving<br />

Up to<br />

date<br />

May<br />

2012<br />

Back Yard Poultry,Goat Keeping,Dairy,Stiching<br />

Masala Making,Dal Making,Rope making<br />

Bidi Making<br />

Total<br />

cost of<br />

Activity<br />

Rs.<br />

Amount<br />

from<br />

Project<br />

Fund Rs.<br />

Proposed<br />

Date of<br />

Start of<br />

activity<br />

Remarks<br />

In the Gram Panchayat Total 03 SHGs will be constituted,<br />

out of them 01 is under running. The assistance to the<br />

SHGs will be provided in rotation under the availability of<br />

Rs 0.80 lacs. The remaining SHGs will be constructed in<br />

this year.<br />

Total for MWS Choolhi 0.80<br />

81


Table 4.5.9: Gram Panchyat/Gram Sabha/ village- Birona Project <strong>IWMP</strong>-<strong>VIII</strong> District- <strong>Jhansi</strong><br />

S.No SHGs<br />

name<br />

No. of<br />

members<br />

Activity<br />

Proposed<br />

Date of<br />

formation<br />

SHG<br />

Share<br />

Total for Gram panchyat<br />

Bank<br />

Account<br />

no.<br />

Amount<br />

of Saving<br />

by each<br />

member/<br />

month Rs.<br />

Saving<br />

Up to<br />

date<br />

May<br />

2012<br />

Back Yard Poultry,Goat Keeping,Dairy,Stiching<br />

Masala Making,Dal Making,Rope making<br />

Bidi Making<br />

Total<br />

cost of<br />

Activity<br />

Rs.<br />

Amount<br />

from<br />

Project<br />

Fund Rs.<br />

Proposed<br />

Date of<br />

Start of<br />

activity<br />

Remarks<br />

In the Gram Panchayat Total 20 SHGs will be constituted,<br />

out of them 04 is under running. The assistance to the<br />

SHGs will be provided in rotation under the availability of<br />

Rs 5.05 lacs. The remaining SHGs will be constructed in<br />

this year.<br />

Total for MWS Choolhi 5.05<br />

Table 4.5.10: Gram Panchyat/Gram Sabha/ village- Gorpura Project <strong>IWMP</strong>-<strong>VIII</strong> District- <strong>Jhansi</strong><br />

S.No SHGs<br />

name<br />

No. of<br />

members<br />

Activity<br />

Proposed<br />

Date of<br />

formation<br />

SHG<br />

Share<br />

Total for Gram panchyat<br />

Bank<br />

Account<br />

no.<br />

Amount<br />

of Saving<br />

by each<br />

member/<br />

month Rs.<br />

Saving<br />

Up to<br />

date<br />

May<br />

2012<br />

Back Yard Poultry,Goat Keeping,Dairy,Stiching<br />

Masala Making,Dal Making,Rope making<br />

Bidi Making<br />

Total<br />

cost of<br />

Activity<br />

Rs.<br />

Amount<br />

from<br />

Project<br />

Fund Rs.<br />

Proposed<br />

Date of<br />

Start of<br />

activity<br />

Remarks<br />

In the Gram Panchayat Total 28 SHGs will be constituted,<br />

out of them 05 is under running. The assistance to the<br />

SHGs will be provided in rotation under the availability of<br />

Rs 7.64 lacs. The remaining SHGs will be constructed in<br />

this year.<br />

Total for MWS Choolhi 7.64<br />

82


Table 4.5.<strong>11</strong>: Gram Panchyat/Gram Sabha/ village- Chatur Tai Project <strong>IWMP</strong>-<strong>VIII</strong> District- <strong>Jhansi</strong><br />

S.No SHGs<br />

name<br />

No. of<br />

members<br />

Activity<br />

Proposed<br />

Date of<br />

formation<br />

SHG<br />

Share<br />

Total for Gram panchyat<br />

Bank<br />

Account<br />

no.<br />

Amount<br />

of Saving<br />

by each<br />

member/<br />

month Rs.<br />

Saving<br />

Up to<br />

date<br />

May<br />

2012<br />

Back Yard Poultry,Goat Keeping,Dairy,Stiching<br />

Masala Making,Dal Making,Rope making<br />

Bidi Making<br />

Total<br />

cost of<br />

Activity<br />

Rs.<br />

Amount<br />

from<br />

Project<br />

Fund Rs.<br />

Proposed<br />

Date of<br />

Start of<br />

activity<br />

Remarks<br />

In the Gram Panchayat Total 18 SHGs will be constituted,<br />

out of them 04 is under running. The assistance to the<br />

SHGs will be provided in rotation under the availability of<br />

Rs 5.46 lacs. The remaining SHGs will be constructed in<br />

this year.<br />

Total for MWS Choolhi 5.46<br />

Table 4.5.12: Gram Panchyat/Gram Sabha/ village- Markuan Project <strong>IWMP</strong>-<strong>VIII</strong> District- <strong>Jhansi</strong><br />

S.No SHGs<br />

name<br />

No. of<br />

members<br />

Activity<br />

Proposed<br />

Date of<br />

formation<br />

SHG<br />

Share<br />

Total for Gram panchyat<br />

Bank<br />

Account<br />

no.<br />

Amount<br />

of Saving<br />

by each<br />

member/<br />

month Rs.<br />

Saving<br />

Up to<br />

date<br />

May<br />

2012<br />

Back Yard Poultry,Goat Keeping,Dairy,Stiching<br />

Masala Making,Dal Making,Rope making<br />

Bidi Making<br />

Total<br />

cost of<br />

Activity<br />

Rs.<br />

Amount<br />

from<br />

Project<br />

Fund Rs.<br />

Proposed<br />

Date of<br />

Start of<br />

activity<br />

Remarks<br />

In the Gram Panchayat Total 14 SHGs will be constituted,<br />

out of them 02 is under running. The assistance to the<br />

SHGs will be provided in rotation under the availability of<br />

Rs 3.53 lacs. The remaining SHGs will be constructed in<br />

this year.<br />

Total for MWS Choolhi 3.53<br />

83


Table 4.5.13: Gram Panchyat/Gram Sabha/ village- Emlota Project <strong>IWMP</strong>-<strong>VIII</strong> District- <strong>Jhansi</strong><br />

S.No SHGs<br />

name<br />

No. of<br />

members<br />

Activity<br />

Proposed<br />

Date of<br />

formation<br />

SHG<br />

Share<br />

Total for Gram panchyat<br />

Bank<br />

Account<br />

no.<br />

Amount<br />

of Saving<br />

by each<br />

member/<br />

month Rs.<br />

Saving<br />

Up to<br />

date<br />

May<br />

2012<br />

Back Yard Poultry,Goat Keeping,Dairy,Stiching<br />

Masala Making,Dal Making,Rope making<br />

Bidi Making<br />

Total<br />

cost of<br />

Activity<br />

Rs.<br />

Amount<br />

from<br />

Project<br />

Fund Rs.<br />

Proposed<br />

Date of<br />

Start of<br />

activity<br />

Remarks<br />

In the Gram Panchayat Total 07 SHGs will be constituted,<br />

out of them 02 is under running. The assistance to the<br />

SHGs will be provided in rotation under the availability of<br />

Rs 1.73 lacs. The remaining SHGs will be constructed in<br />

this year.<br />

Total for MWS Choolhi 1.73<br />

Table 4.5.14: Gram Panchyat/Gram Sabha/ village- Aivani Project <strong>IWMP</strong>-<strong>VIII</strong> District- <strong>Jhansi</strong><br />

S.No SHGs<br />

name<br />

No. of<br />

members<br />

Activity<br />

Proposed<br />

Date of<br />

formation<br />

SHG<br />

Share<br />

Total for Gram panchyat<br />

Bank<br />

Account<br />

no.<br />

Amount<br />

of Saving<br />

by each<br />

member/<br />

month Rs.<br />

Saving<br />

Up to<br />

date<br />

May<br />

2012<br />

Back Yard Poultry,Goat Keeping,Dairy,Stiching<br />

Masala Making,Dal Making,Rope making<br />

Bidi Making<br />

Total<br />

cost of<br />

Activity<br />

Rs.<br />

Amount<br />

from<br />

Project<br />

Fund Rs.<br />

Proposed<br />

Date of<br />

Start of<br />

activity<br />

Remarks<br />

In the Gram Panchayat Total 04 SHGs will be constituted,<br />

out of them 01 is under running. The assistance to the<br />

SHGs will be provided in rotation under the availability of<br />

Rs 1.15 lacs. The remaining SHGs will be constructed in<br />

this year.<br />

Total for MWS Choolhi 1.15<br />

84


Table 4.5.15: Gram Panchyat/Gram Sabha/ village- Turk Lahchura Project <strong>IWMP</strong>-<strong>VIII</strong> District- <strong>Jhansi</strong><br />

S.No SHGs<br />

name<br />

No. of<br />

members<br />

Activity<br />

Proposed<br />

Date of<br />

formation<br />

SHG<br />

Share<br />

Remarks<br />

Total for Gram panchyat<br />

Bank<br />

Account<br />

no.<br />

Amount<br />

of Saving<br />

by each<br />

member/<br />

month Rs.<br />

Saving<br />

Up to<br />

date<br />

May<br />

2012<br />

Back Yard Poultry,Goat Keeping,Dairy,Stiching<br />

Masala Making,Dal Making,Rope making<br />

Bidi Making<br />

Total<br />

cost of<br />

Activity<br />

Rs.<br />

Amount<br />

from<br />

Project<br />

Fund Rs.<br />

Proposed<br />

Date of<br />

Start of<br />

activity<br />

In the Gram Panchayat Total 15 SHGs will be constituted,<br />

out of them 03 is under running. The assistance to the<br />

SHGs will be provided in rotation under the availability of<br />

Rs 4.31 lacs. The remaining SHGs will be constructed in<br />

this year.<br />

Total for MWS Choolhi 4.31<br />

Table 4.5.16: Gram Panchyat/Gram Sabha/ village- Pasaura Project <strong>IWMP</strong>-<strong>VIII</strong> District- <strong>Jhansi</strong><br />

S.No SHGs<br />

name<br />

No. of<br />

members<br />

Activity<br />

Proposed<br />

Date of<br />

formation<br />

SHG<br />

Share<br />

Total for Gram panchyat<br />

Bank<br />

Account<br />

no.<br />

Amount<br />

of Saving<br />

by each<br />

member/<br />

month Rs.<br />

Saving<br />

Up to<br />

date<br />

May<br />

2012<br />

Back Yard Poultry,Goat Keeping,Dairy,Stiching<br />

Masala Making,Dal Making,Rope making<br />

Bidi Making<br />

Total<br />

cost of<br />

Activity<br />

Rs.<br />

Amount<br />

from<br />

Project<br />

Fund Rs.<br />

Proposed<br />

Date of<br />

Start of<br />

activity<br />

Remarks<br />

In the Gram Panchayat Total 12 SHGs will be constituted,<br />

out of them 02 is under running. The assistance to the<br />

SHGs will be provided in rotation under the availability of<br />

Rs 3.78 lacs. The remaining SHGs will be constructed in<br />

this year.<br />

Total for MWS Choolhi 3.78<br />

85


Table 4.5.17: Gram Panchyat/Gram Sabha/ village- Garha Project <strong>IWMP</strong>-<strong>VIII</strong> District- <strong>Jhansi</strong><br />

S.No SHGs<br />

name<br />

No. of<br />

members<br />

Activity<br />

Proposed<br />

Date of<br />

formation<br />

SHG<br />

Share<br />

Total for Gram panchyat<br />

Bank<br />

Account<br />

no.<br />

Amount<br />

of Saving<br />

by each<br />

member/<br />

month Rs.<br />

Saving<br />

Up to<br />

date<br />

May<br />

2012<br />

Back Yard Poultry,Goat Keeping,Dairy,Stiching<br />

Masala Making,Dal Making,Rope making<br />

Bidi Making<br />

Total<br />

cost of<br />

Activity<br />

Rs.<br />

Amount<br />

from<br />

Project<br />

Fund Rs.<br />

Proposed<br />

Date of<br />

Start of<br />

activity<br />

Remarks<br />

In the Gram Panchayat Total 03 SHGs will be constituted,<br />

out of them 01 is under running. The assistance to the<br />

SHGs will be provided in rotation under the availability of<br />

Rs 0.62 lacs. The remaining SHGs will be constructed in<br />

this year.<br />

Total for MWS Choolhi 0.62<br />

Table 4.5.18: Gram Panchyat/Gram Sabha/ village- Punchhi Project <strong>IWMP</strong>-<strong>VIII</strong> District- <strong>Jhansi</strong><br />

S.No SHGs<br />

name<br />

No. of<br />

members<br />

Activity<br />

Proposed<br />

Date of<br />

formation<br />

SHG<br />

Share<br />

Total for Gram panchyat<br />

Bank<br />

Account<br />

no.<br />

Amount<br />

of Saving<br />

by each<br />

member/<br />

month Rs.<br />

Saving<br />

Up to<br />

date<br />

May<br />

2012<br />

Back Yard Poultry,Goat Keeping,Dairy,Stiching<br />

Masala Making,Dal Making,Rope making<br />

Bidi Making<br />

Total<br />

cost of<br />

Activity<br />

Rs.<br />

Amount<br />

from<br />

Project<br />

Fund Rs.<br />

Proposed<br />

Date of<br />

Start of<br />

activity<br />

Remarks<br />

In the Gram Panchayat Total 05 SHGs will be constituted,<br />

out of them 01 is under running. The assistance to the<br />

SHGs will be provided in rotation under the availability of<br />

Rs 1.22 lacs. The remaining SHGs will be constructed in<br />

this year.<br />

Total for MWS Choolhi 1.22<br />

Note: Total 226 Self Help Groups will be constructed in the <strong>IWMP</strong>-<strong>VIII</strong> project, out this 44 Self Help Groups is already formed. Remaining SHGs<br />

will be formed in current year. The help by the project to the SHGs is available Rs 60.48 lacs.<br />

86


4.2: Details of Formation of User Groups (UGs)<br />

User Groups were formed on the basis of beneficiaries of different natural resource conservation activities to be constructed in the<br />

watershed. The location of the activities/group mentioned in Table 4.8 can be seen on the proposed plan available in the map section.<br />

Table 4.6: User Group wise details of Proposed / Planned Watershed Development Activities (Community)<br />

W/S Project - Tahrauli-I, <strong>IWMP</strong>-<strong>VIII</strong><br />

District- <strong>Jhansi</strong><br />

S. No No. of User Groups Activity<br />

Proposed<br />

Total Cost of the<br />

activity<br />

(Rs)<br />

Water storage in<br />

cum<br />

Area Proposed<br />

for irrigation<br />

(ha)<br />

1 12 ECD/WHB 154060.00 4560 4.15<br />

2 10 ECD/WHB 183448.00 4250 4.65<br />

3 12 ECD/WHB 193654.00 4230 4.80<br />

4 18 ECD/WHB 124060.00 3650 3.20<br />

5 13 ECD/WHB 267496.00 4350 3.50<br />

6 16 ECD/WHB 186496.00 4860 4.80<br />

7 17 ECD/WHB 266496.00 4840 4.70<br />

8 13 ECD/WHB 206496.00 4850 4.60<br />

9 15 ECD/WHB 197524.00 3250 3.20<br />

1779730 38840 37.60<br />

Note: Rest User groups details kept in the respective project file of Micro watershed.<br />

87


4.3 Convergence in <strong>IWMP</strong>-<strong>VIII</strong>, <strong>Jhansi</strong><br />

Several programmes are running in the area which are sponsored by Central and State Govt. and could be converged with watershed<br />

programmes. Some of them are listed in Table 4.10. The details of the activities to be carried out under convergence in the project are mentioned in<br />

Chapter 5. However, micro-watershed wise amount of convergence is mentioned in Table 4.<strong>11</strong>.<br />

Table 4.7: List of Central/State sponsored schemes<br />

S.No. Name of Programme Implementing Agency Objectives of the Programme<br />

1 Seed Distribution Programme (Pulse Development<br />

& ISOPAM)<br />

U.P. Agriculture Deptt.<br />

To increase seed replacement ratio for higher<br />

productivity<br />

2 Pump set Distribution (Food Security Mission) Agriculture Deptt. Providing irrigation<br />

3 Training Programme Agriculture Deptt. KVK Capacity building of the farmers<br />

4 HDPE pipe Agriculture Deptt.<br />

5 National Horticulture Mission (NHM) Horticulture Deptt. Increasing the area under fruits and vegetables<br />

6 Sanitation Programme Gram Vikash To make hygienic condition in the rural areas<br />

7 MGNERGA (Bunding, Farm Pond, Adarsh<br />

Jalashay, Blast well, Chakroad, etc.)<br />

Gram Panchayat<br />

To provide work to the all village personnel<br />

under the rojgar guarantee yojana<br />

8 Dept. of Animal Husbandry U.P. Animal Husbandry To improve the productivity of livestock<br />

9 Afforestation Deptt. of Forest U.P.<br />

10 NABARD (Agriculture & SMC) Deptt. Of Agriculture<br />

88


Table 4.8: Details of Convergence of <strong>IWMP</strong> with other Schemes in <strong>IWMP</strong>-<strong>VIII</strong> , <strong>Jhansi</strong> (Rs. In Lakh)<br />

S. No. Name of Micro Watershed Names of<br />

Departments with<br />

Schemes<br />

converging with<br />

<strong>IWMP</strong><br />

Fund made<br />

available to<br />

convergence<br />

(Rs. in lakh)<br />

Was this fund included in<br />

Rs?<br />

12, 000/ 15,000 per ha.<br />

Name of<br />

activity/task/struct<br />

ure undertaken<br />

with converged<br />

funds<br />

Reference no. of<br />

activity/ task/<br />

structure in<br />

<strong>DPR</strong> @<br />

Level at<br />

which<br />

decision for<br />

convergence<br />

was taken $<br />

1 Rampura-I MGNREGA 91.<strong>11</strong><br />

2 Rampura-II MGNREGA 76.50<br />

3 Bikrampura MGNREGA 2.80<br />

4 Rudra Garautha MGNREGA 34.23<br />

5 Kedar Tai-I MGNREGA 37.55<br />

6 Markuan MGNREGA 62.84<br />

7 Pasaura MGNREGA 26.02<br />

8 Kedar Tai-II MGNREGA 21.34<br />

9 Turk Lahchura MGNREGA 49.10<br />

Total for project 401.49<br />

Yes No (a) Structures<br />

(b) livelihoods<br />

(c ) Any other (pl.<br />

specify) #<br />

Additional to the cost of Rs.<br />

6720/ha<br />

Natural Resource<br />

Management (Soil<br />

and water<br />

conservation<br />

Structures)<br />

Included in <strong>DPR</strong><br />

Distrct Level<br />

89


CHAPTER - 5<br />

MANAGEMENT/ACTION PLAN<br />

The details of Preparatory Phase, Works Phase and Convergence planning are described in subsequent section<br />

5.1 Entry Point Activities (EPA)<br />

Entry point activities were executed with the consent of stake holders and it helped in winning the confidence of the villagers for moving ahead the<br />

other programmes of watershed. In total 14 EPA activities were executed in the project area which costed Rs. 26,88,000.00 Photographs of entry<br />

point activities done in the project are given below:<br />

Name of<br />

PIA<br />

LDWR<br />

Tahrauli-I<br />

<strong>Jhansi</strong><br />

Name of<br />

Project<br />

<strong>IWMP</strong>-<br />

<strong>VIII</strong><br />

<strong>Year</strong><br />

<strong>2010</strong>-<strong>11</strong><br />

Name of<br />

Block<br />

Bamor<br />

and<br />

Gursarain<br />

Name of project/<br />

Name of village<br />

Code of<br />

project<br />

E.P.A cost<br />

in lakh<br />

EPA Work<br />

Cost in<br />

lakh<br />

Rampura-I (2C2B1m2e) 3.22 Drop Spill Way 3.22 -<br />

Rampura-II (2C2B1m2d) 2.88 Drop Spill Way 2.88 -<br />

Bikrampura (2C2B1m2b) 4.75 Boundary Wall, Floor Formation and Toilet Maintanance 4.75 -<br />

Rudra Garautha (2C2B1l2b) 2.95 Construction of Road. 2.95 -<br />

Kedar Tai-I (2C2B1l2e) 2.38 Boundary of well, Road and Tap Connection. 2.38 -<br />

Markuan (2C2B1l2f) 2.76 Drop Spill Way 2.76 -<br />

Pasaura<br />

(2C2B1k2a) 3.19 Construction of Road and maintenance of Ghat and<br />

Well<br />

3.19 -<br />

Kedar Tai-II<br />

(2C2B1l2d) 2.35 Construction of Road and formation of Ghat and Well,<br />

Chabootara formation<br />

2.35 -<br />

Turk Lahchura (2C2B1l1g) 2.40 Road Formation. 2.40<br />

Total 26.88 26.88 -<br />

90


EPA PHOTOGRAPH OF MWS-<strong>VIII</strong>, Tahrauli-I, <strong>Jhansi</strong><br />

91


5.2 Works Phase<br />

Following are the major problems of the watersheds<br />

• Water scarcity both for drinking as well as irrigation<br />

• Excess runoff and soil loss<br />

• Low water holding capacity of the soil<br />

• Low productivity of crops<br />

• Low fertility of soil<br />

• Low cropping intensity<br />

• Lack of technical knowledge<br />

• Anna Pratha (let loose system of cattle)<br />

• Poor vegetative cover<br />

• Poor/low productive breeds of miltch animals<br />

• Lack of feed & fodder availability<br />

• Non availability of wood/fuel<br />

• Lack of proper market facilities<br />

• Low income of the households<br />

• Lack of employment opportunity.<br />

5.3:Estimation of Runoff from the Watershed<br />

Runoff from the watershed is estimated by Curve Number method of the Soil Conservation Service of the USDA using 18 years data<br />

(1990-2009) with a gap of 2005 and 2006). It is estimated that runoff potential of the project area is 330.78 mm, equivalent to 17 per cent of<br />

average annual rainfall. Expected runoff and soil loss from the project area are depicted Table 5.1.<br />

97


Table 5.1: Runoff and soil erosion in the project area (<strong>IWMP</strong>-<strong>VIII</strong>, <strong>Jhansi</strong>)<br />

Name of Micro<br />

Sr. No.<br />

Watershed<br />

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

Rampura-I<br />

(2C2B1m2e)<br />

Rampura-II<br />

(2C2B1m2d)<br />

Bikrampura<br />

(2C2B1m2b)<br />

Rudra Garautha<br />

(2C2B1l2b)<br />

Kedar Tai-I<br />

(2C2B1l2e)<br />

Markuan<br />

(2C2B1l2f)<br />

Cause Type of erosion Area affected (ha)<br />

Run off<br />

(mm/ year)<br />

Average Soil Loss<br />

(Tonnes/ ha/ year)<br />

Water erosion<br />

a Sheet 167.50 328 26-29<br />

b Rill 321.60<br />

c Gully 180.90<br />

Total 670.00<br />

Water erosion<br />

a Sheet 150.00 332 26-29<br />

b Rill 288.00<br />

c Gully 162.00<br />

Total 600.00<br />

Water erosion<br />

a Sheet 247.50 335 26-29<br />

b Rill 475.20<br />

c Gully 267.30<br />

Total 990.00<br />

Water erosion<br />

a Sheet 153.75 326 26-29<br />

b Rill 295.20<br />

c Gully 166.05<br />

Total 615.00<br />

Water erosion<br />

a Sheet 123.75 334 26-29<br />

b Rill 237.60<br />

c Gully 133.65<br />

Total 495.00<br />

Water erosion<br />

a Sheet 143.75 332 26-29<br />

b Rill 276.00<br />

98


7<br />

8<br />

9<br />

Pasaura<br />

(2C2B1k2a)<br />

Kedar Tai-II<br />

(2C2B1l2d)<br />

Turk Lahchura<br />

(2C2B1l1g)<br />

Total for <strong>IWMP</strong>-<strong>VIII</strong><br />

c Gully 155.25<br />

Total 575.00<br />

Water erosion<br />

a Sheet 166.25 329 26-29<br />

b Rill 319.20<br />

c Gully 179.55<br />

Total 665.00<br />

Water erosion<br />

a Sheet 122.50 326 26-29<br />

b Rill 235.20<br />

c Gully 132.30<br />

Total 490.00<br />

Water erosion<br />

a Sheet 125.00 329 26-29<br />

b Rill 240.00<br />

c Gully 135.00<br />

Total 500.00<br />

Water erosion<br />

a Sheet 1400.00 330.78 26-29<br />

b Rill 2688.00<br />

c Gully 1512.00<br />

Total 5600.00 330.<strong>11</strong> 26-29<br />

99


Table 5.2: <strong>Year</strong> Wise Action Plan for <strong>IWMP</strong>-<strong>VIII</strong>, Tarauli-I, Dist. <strong>Jhansi</strong>.<br />

Table 5.2.1:<strong>Year</strong> Wise Physical Action Plan<br />

Project: <strong>IWMP</strong>-<strong>VIII</strong>, Tahauri-I, District- <strong>Jhansi</strong><br />

<strong>DPR</strong> Status: Prepared<br />

Project: <strong>IWMP</strong>-VII<br />

Financial year: <strong>2010</strong>-<strong>11</strong>, 20<strong>11</strong>-12, 2012-13 & 2013-14<br />

Name of Head Name of Activity Name of Subactivity Target<br />

Unit<br />

<strong>2010</strong>- 20<strong>11</strong>- 2012- 2013-<br />

<strong>11</strong> 12 13 14<br />

1 2 3 4 5 6 7<br />

1.Watershed<br />

Development Works<br />

1.1 Land<br />

Development<br />

(Productive use)<br />

1.2 Soil & Moisture<br />

Conservation<br />

1.1.1 Afforestation (on wasteland) ha 0 7.5 3.75 3.75 15<br />

1.1.2 Afforestation (on total land) ha <strong>11</strong> 22 13.75 8.25 55<br />

1.1.3 Horticulture(on wasteland) ha 2.8 5.6 3.5 2.1 14<br />

1.1.4 Horticulture(on total land) ha 9.8 19.6 12.25 7.35 49<br />

1.1.5 Agriculture (on wasteland) ha 0 0 0 0 0<br />

1.1.6 Agriculture(on total land) ha 100 200 125 75 500<br />

1.1.7 Pasture (on wasteland) ha 10.436 20.872 13.045 7.827 52.18<br />

1.1.8 Pasture(on total land) ha 48.964 97.928 61.205 36.723 244.82<br />

1.1.9 Agroforesty(on wasteland) nos 4.4 8.8 5.5 3.3 22<br />

1.1.10 Agroforesty (on total land) nos 36.8 73.6 46 27.6 184<br />

1.2.1 Straggred trecnching ha - - - -<br />

1.2.2 Countour Bunding Cubic meter 52654 85908 96993 41569 277124<br />

1.2.3 Graded Bunding ha - - - -<br />

1.2.4 Bench Terracing ha - - - -<br />

1.2.5 Peripheral Bund Cubic meter 50705 70022 84509 36218 241454<br />

1.2.6 Marginal Bunds Cubic meter 42846 59168 71410 30604 204029<br />

1.2.7 Submergence Bunds Cubic meter 59655 82381 99425 426<strong>11</strong> 284072<br />

100


1.3 Vegetative and<br />

Engineering<br />

Structure<br />

1.4 Water Harvesting<br />

Structure (New<br />

created)<br />

1.5 Water Harvesting<br />

Structure<br />

(Renovated)<br />

1.6 Water Harvesting<br />

Structure ( Storage<br />

capacity of New<br />

structures)<br />

1.3.1 Earthen Checks Cubic meter 12538 17315 20897 8956 59706<br />

1.3.2 Brushwood Checks Rmt - - - -<br />

1.3.3 Gully plugs Cubic meter 9587 13239 15978 6848 45652<br />

1.3.4 Loose bolder Cubic meter - - - -<br />

1.3.5 Gabian structure Cubic meter - - - -<br />

1.3.6 WHB Cubic meter 13458 18584 22429 9613 64084<br />

1.4.1 Farm ponds nos - - - -<br />

1.4.2 Check dams nos 0 6 10 6 16<br />

1.4.3 Nallah Bunds nos 0 5 8 5 18<br />

1.4.4 Percolation tanks nos - - - -<br />

1.4.5 Ground Water recharge structure nos - - - -<br />

1.4.6 Others nos - - - -<br />

1.5.1 Farm ponds nos - - - -<br />

1.5.2 Check dams nos 4 6 7 2 19<br />

1.5.3 Nallah Bunds nos - - - -<br />

1.5.4 Percolation tanks nos - - - -<br />

1.5.5 Ground Water recharge structure nos - - - -<br />

1.5.6 Others nos - - - -<br />

1.6.1 Farm ponds Cubic meter - - - -<br />

1.6.2 Check dams Cubic meter 14650 <strong>11</strong>260 6840 32750<br />

1.6.3 Nallah Bunds Cubic meter 8560 7560 5460 21580<br />

1.6.4 Percolation tanks Cubic meter - - - -<br />

1.6.5 Ground Water recharge structure Cubic meter - - - -<br />

1.6.6 Others Cubic meter - - - -<br />

101


2.EPA<br />

3.Institution &<br />

Capacity Building<br />

1.7 Water Harvesting<br />

Structure ( Storage<br />

capacity of<br />

Renovated<br />

structures)<br />

1.7.2 Check dams Cubic meter - - - -<br />

1.7.3 Nallah Bunds Cubic meter - - - -<br />

1.7.4 Percolation tanks Cubic meter - - - -<br />

1.7.5 Ground Water recharge structure Cubic meter - - - -<br />

1.7.6 Others Cubic meter - - - -<br />

2.1 No. of EPA<br />

activities nos 12 8 - - 20<br />

2.2 No. of water<br />

extracting unit<br />

created nos 3 - - - 3<br />

3.1 SHG Formation<br />

(Newly created)<br />

3.1.1 No. of SHG nos 20 89 76 0 185<br />

3.1.2 Total No. of SHGs members nos 204 888 759 0 1850<br />

3.2 Existing SHG 3.2.1 No. of SHG assisted nos 3 64 0 0 67<br />

3.2.2 Total No. of SHGs members nos 35 668 0 0 704<br />

3.3 UG Formation 3.3.1 No. of UG nos 10 46 29 36 120<br />

3.3.2 Total No. of members of UGs nos <strong>11</strong>5 547 346 432 1440<br />

3.4 Formation of<br />

Federation<br />

3.4.1 No. of Federation nos - - 4 - 4<br />

3.4.2 Total No. of members of<br />

Federation nos - - 1440 -<br />

3.5 Capacity building 3.5.1 No. of Training nos 1 5 4 0 10<br />

3.5.2 No. of Persons trained nos 149 648 135 419 1350<br />

102


Table 5.2.2:<strong>Year</strong> wise Financial Action Plan<br />

Project: <strong>IWMP</strong>-<strong>VIII</strong>, Tahrauli-I<br />

District <strong>Jhansi</strong><br />

Financial year: <strong>2010</strong>-<strong>11</strong>, 20<strong>11</strong>-12, 2012-13 & 2013-14<br />

Rs. in Lakh.<br />

Name of<br />

Head<br />

Name of Activity Name of Subactivity Target (Rs. in Lacs.) Under<br />

MNREGA<br />

Convergence<br />

Total<br />

for the<br />

Project<br />

<strong>2010</strong>-<br />

<strong>11</strong><br />

20<strong>11</strong>-<br />

12<br />

2012-<br />

13<br />

2013-<br />

14<br />

1 2 3 4 5 6 7 8 9 10<br />

1.1 Land Development<br />

(Productive use)<br />

1.1.1 Afforestation 1.72 3.45 2.16 1.29 0 8.620 8.620<br />

1.Watershed<br />

Development<br />

Works<br />

1.2 Soil & Moisture<br />

Conservation<br />

1.3 Vegetative and<br />

Engineering Structure<br />

Total<br />

for the<br />

Plan<br />

1.1.2 Horticulture 1.54 3.08 1.93 1.16 0 7.712 7.712<br />

1.1.3 Agriculture 4.36 8.71 5.45 3.27 0 21.780 21.780<br />

1.1.4 Pasture 2.72 5.44 3.40 2.04 13.59 0 13.59<br />

1.1.5 Agroforesty 2.47 4.94 3.09 1.85 12.350 12.35<br />

1.2.1 Straggred trecnching - - - - - -<br />

1.2.2 Countour Bunding 28.78 39.74 47.96 20.56 69.89 67.15 137.04<br />

1.2.3 Graded Bunding - - - - - -<br />

1.2.4 Bench Terracing - - - - - -<br />

1.2.5 Others (PB,SB,MB) 78.77 108.77 131.28 56.26 197.74 177.34 375.08<br />

1.3.1 Earthen Checks 6.74 9.31 <strong>11</strong>.24 4.82 20.38 <strong>11</strong>.73 32.<strong>11</strong><br />

1.3.2 Brushwood Checks - - - - - -<br />

1.3.3 Gully plugs 4.85 6.69 8.08 3.46 <strong>11</strong>.77 <strong>11</strong>.31 23.08<br />

103


1.3.4 Loose bolder - - - - - -<br />

1.3.5 Gabian structure - - - - - -<br />

1.3.6 Others (WHB) 7.03 9.71 <strong>11</strong>.72 5.02 17.07 16.41 33.48<br />

1.4 Water Harvesting<br />

Structure (New Created)<br />

1.4.1 Farm ponds - - - -<br />

1.4.2 Check dams 14.29 19.74 23.82 10.21 34.71 33.35 68.06<br />

1.4.3 Nallah Bunds 5.07 6.99 8.44 3.62 0 24.12 24.12<br />

1.4.4 Percolation tanks - - - -<br />

1.4.5 Ground Water<br />

recharge structure<br />

1.4.6 Others<br />

1.5 Water Harvesting<br />

Structure (Renovated)<br />

1.5.1 Farm ponds<br />

1.5.2 Check dams 14.96 20.66 24.94 10.69 36.34 34.91 71.25<br />

1.5.3 Nallah Bunds<br />

1.5.4 Percolation tanks<br />

1.5.5 Ground Water<br />

recharge structure<br />

1.5.6 Others<br />

2.EPA 2.1 EPA activities 17.472 9.408 26.88<br />

3.Institution 3.1 SHG Formation (Newly<br />

& Capacity created)<br />

3.1 SHG<br />

7.26 14.51 14.51 36.28<br />

Building 3.2 Existing SHG 3.2 SHG assisted 4.84 9.68 9.68 24.20<br />

3.3 UG Formation 3.3 UG 23.85 47.70 47.70 <strong>11</strong>9.26<br />

3.4 Formation of Federation 3.4 Federation 4.00 4.00<br />

104


Table 5.2.3:Annaual Action Plan for Livelihood (Physical & Financial)<br />

Activities of SHGs<br />

(1) Activity Goatary<br />

(a) No. of SHG’s<br />

(b) No. of members<br />

(c) Estimated income per year<br />

(2) Activity- Back Yard Poultry<br />

(a) No. of SHG’s<br />

(b) No. of members<br />

(c) Estimated income per year<br />

(3) Activity- Poultry , Broiler<br />

(a) No. of SHG’s<br />

(b) No. of members<br />

(c) Estimated income per year<br />

(4) Black Smithy<br />

(a) No. of SHG’s<br />

(b) No. of members<br />

(c) Estimated income per year<br />

(5) Rope making<br />

(a) No. of SHG’s<br />

(b) No. of members<br />

(c) Estimated income per year<br />

(6) Tailoring<br />

First <strong>Year</strong> Second <strong>Year</strong> Third <strong>Year</strong> Fourth <strong>Year</strong><br />

unit <strong>2010</strong>-<strong>11</strong> 20<strong>11</strong>-12 2012-13 2013-14 Total Project<br />

Physical Financial Physical Financial Physical Financial Physical Financial Physical Financial<br />

No. 7 1.632 14 3.26 14 3.26 0 0 34 8.160<br />

No. 68 136 136 0 0 340<br />

Rs. 8.16 16.3 16.3 0 0 40.8<br />

0 0<br />

No. 4 1.056 9 2.<strong>11</strong> 9 2.<strong>11</strong> 0 0 22 5.280<br />

No. 44 88 88 0 0 220<br />

Rs. 2.499 4.998 4.998 0 0 12.496<br />

0 0<br />

No. 4 0.956 8 1.91 8 1.91 0 0 20 4.780<br />

No. 40 80 80 0 0 200<br />

Rs. 3.760 7.520 7.520 0 0 18.800<br />

0 0<br />

No. 4 0.906 8 1.81 8 1.81 0 0 19 4.530<br />

No. 38 76 76 0 0 0 190<br />

Rs. 3.724 0 7.448 0 7.448 0 0 0 18.62<br />

0 0<br />

No. 4 0.908 8 1.82 8 1.82 0 0 19 4.540<br />

No. 38 76 76 0 0 0 190 0<br />

Rs. 3.724 0 7.448 0 7.448 0 0 0 18.62<br />

0 0<br />

105


(a) No. of SHG’s<br />

(b) No. of members<br />

(c) Estimated income per year<br />

(7) Implements repair<br />

(a) No. of SHG’s<br />

(b) No. of members<br />

(c) Estimated income per year<br />

(8) Vermi Composting<br />

(a) No. of SHG’s<br />

(b) No. of members<br />

(c) Estimated income per year<br />

(9) Fruit processing<br />

(a) No. of SHG’s<br />

(b) No. of members<br />

(c) Estimated income per year<br />

(10) Mini Dal Mill<br />

(a) No. of SHG’s<br />

(b) No. of members<br />

(c) Estimated income per year<br />

(<strong>11</strong>) Mini Flour Mill<br />

(a) No. of SHG’s<br />

(b) No. of members<br />

(c) Estimated income per year<br />

(12) Mini Oil Expeller<br />

(a) No. of SHG’s<br />

(b) No. of members<br />

No. 4 0.912 8 1.82 8 1.82 0 0 19 4.560<br />

No. 38 76 76 0 0 0 190<br />

Rs. 3.724 0 7.448 0 7.448 0 0 0 18.62<br />

0 0<br />

No. 3 0.498 7 1.00 7 1.00 0 0 17 2.490<br />

No. 3 0 7 0 7 0 0 0 17<br />

Rs. 3.332 0 6.664 0 6.664 0 0 0 16.66<br />

0 0<br />

No. 4 0.858 7 1.72 7 1.72 0 0 18 4.29<br />

No. 36 72 72 0 0 180<br />

Rs. 3.528 0.000 7.056 0.000 7.056 0.000 0 0 17.640<br />

0 0<br />

No. 4 0.912 8 1.82 8 1.82 0 0 19 4.560<br />

No. 38 76 76 0 0 0 190<br />

Rs. 3.724 0 7.448 0 7.448 0 0 0 18.62<br />

0 0<br />

No. 4 0.958 8 1.92 8 1.92 0 0 20 4.790<br />

No. 40 80 80 0 0 0 200<br />

Rs. 3.92 0 7.84 0 7.84 0 0 0 19.6<br />

0 0<br />

No. 3 0.770 6 1.54 6 1.54 0 0 16 3.850<br />

No. 32 64 64 0 0 0 160<br />

Rs. 3.136 0 6.272 0 6.272 0 0 0 15.68<br />

0 0<br />

No. 4 0.912 8 1.82 8 1.82 0 0 19 4.560<br />

No. 38 76 76 0 0 0 190<br />

106


(c) Estimated income per year<br />

(13) Carpentry<br />

(a) No. of SHG’s<br />

(b) No. of members<br />

(c) Estimated income per year<br />

Total<br />

Rs. 3.724 0 7.448 0 7.448 0 0 0 18.62<br />

0 0<br />

No. 3 0.818 7 1.64 7 1.64 0 0 17 4.090<br />

No. 34 68 68 0 0 0 170<br />

Rs. 3.332 0 6.664 0 6.664 0 0 0 16.66<br />

0 0 60.48<br />

107


Table 5.2.4:Annaual Action Plan for Agriculture Production System (Physical & Financial)<br />

Physical & Financial<br />

Outlay/ Target Financial <strong>2010</strong>-<strong>11</strong> 20<strong>11</strong>-12 2012-13 2013-14 Total<br />

(1) Agriculture<br />

(a)<br />

Crop demonstration<br />

(1) No. of dem.<br />

(2) Area<br />

(b)<br />

Seed Production<br />

(1) No. of dem.<br />

(2) Area<br />

(2) Agro-forestry / Agri-<br />

Horticulture<br />

Physical Financial Physical Financial Physical Financial Physical Financial Physical Financial<br />

No. 66 2.583 132 5.166 132 5.166 329 12.915<br />

Ha. 33 65.8 2<strong>11</strong>.2<br />

No. 34 1.773 68 3.546 68 3.546 171 8.865<br />

Ha. 17.1 34.2 34.2 184<br />

(a) Area<br />

Ha. 25 2.996 50 5.993 50 5.993 124 14.982<br />

(b) No. of Plants<br />

No.<br />

(3) Afforestation<br />

No. 7494 1.724 14988 3.448 14988 3.448 37470 8.620<br />

(a) Scattered Plantation No 4640 1.016 9280 2.032 9280 2.032 23200 5.080<br />

(4) Animal husbandry<br />

(a)<br />

Green fodder (ha)<br />

(b) Rearing of milch<br />

cattle<br />

(i) Cow<br />

(ii) Buffalows<br />

(c)<br />

(d)<br />

Goatary<br />

Broiler/Layer<br />

7 0.600 15 0.900 7 0.900 7 0.600 37 3.000<br />

No. of<br />

unit/<br />

farmer no. 186 0.056 372 0.084 186 0.084 186 0.056 929 0.280<br />

No. of unit 2 0.264 4 0.396 2 0.396 2 0.264 <strong>11</strong> 1.320<br />

,, 437 0.035 874 0.052 437 0.052 437 0.035 2185 0.175<br />

,, 12 0.744 25 1.<strong>11</strong>6 12 1.<strong>11</strong>6 12 0.744 62 3.720<br />

108


(e) Fisheries<br />

6000 0.090 12000 0.135 6000 0.135 6000 0.090 30000 0.450<br />

(f) Dairy<br />

3367 0.842 6734 1.263 3367 1.263 3367 0.842 16836 4.209<br />

(g) Health camps<br />

No. 2712 0.136 5424 0.203 2712 0.203 2712 0.136 13560 0.678<br />

(h) Artificial<br />

No. of<br />

insemination<br />

animals 375 0.150 750 0.225 375 0.225 375 0.150 1875 0.750<br />

(i) Natural service bull<br />

No. 2 0.432 4 0.648 2 0.648 2 0.432 9 2.160<br />

(5) Micro Interprises 0.000 0.000<br />

(a)<br />

(b)<br />

(c)<br />

No. of units<br />

No. of beneficiaries<br />

Income per year<br />

No. 0 0 4 6.87 0 0 0 0.000 0 0.000<br />

No. 25<br />

Rs. 2.5 67.20<br />

109


5.4:Watershed Development Activities Proposed<br />

The details of the activities of watershed works (natural resource conservation) are marked on individual field in the micro-watershed wise<br />

proposed plan (Map Section). Individual beneficiary wise estimate has been prepared for each village comes under each micro -watershed.<br />

Information of individual beneficiaries is kept in respective project file available with PIA. Beneficiary wise information was summerised and<br />

prepared for each micro-watershed and gram panchayat wise (Table 5.2 and 5.4). Similar exercise was also done for participatory crop trials.<br />

Location of these trials is marked on proposed plan of participatory crop demonstration (available in map section).<br />

Table 5.3: Micro-watershed wise details of Watershed Development Activities proposed in <strong>IWMP</strong>-<strong>VIII</strong>, <strong>Jhansi</strong><br />

Unit Rampura-I Rampura-II<br />

Rudra Garautha<br />

Sr<br />

Bikrampura<br />

(2C2B1m2e) (2C2B1m2d)<br />

. Particular of<br />

No.,<br />

(2C2B1m2b)<br />

(2C2B1l2b)<br />

N Measures/Activities<br />

Length/<br />

o.<br />

ha,<br />

Volume<br />

Soil & Water<br />

Conservation<br />

I Measures<br />

A- Moisture<br />

Conservation<br />

Measures<br />

Kedar Tai-<br />

I(2C2B1l2e)<br />

Qanty. Cost Qanty. Cost Qanty. Cost Qnty Est. Cost Qnty Est. Cost<br />

1. Field Bund - - - - - - - - - - -<br />

2. Contour Bund<br />

56019 27.71 34512 17.07 34229 16.93 25402 12.56 24498 12.10<br />

cum<br />

(with Sodding)<br />

3. Peripheral Bund<br />

48377 23.93 28397 14.04 12710 6.28 20589 10.18 25903 12.80<br />

cum<br />

(with Sodding)<br />

4. Marginal Bund<br />

34386 17.01 13676 24.59 21940 6.21 17738 8.77 18864 9.30<br />

cum<br />

(with Sodding)<br />

5.Submergence<br />

57850 28.62 41909 20.73 35240 17.43 23587 <strong>11</strong>.66 25184 12.40<br />

Bundhi (with<br />

cum<br />

Sodding)<br />

B- Water Resource<br />

Development<br />

1. Tank/Pond No<br />

<strong>11</strong>0


B<br />

2- Water Harvesting<br />

3191 1.67 8539 4.46 - - 12161 6.36 7676 4.00<br />

cum<br />

Bundhi/<br />

3-GP - - - - - - - - - -<br />

4. Field Drainage<br />

- - - - - - - - - -<br />

Structure/ Drop Spill No<br />

Way<br />

5-ECD<br />

cum<br />

66326 35.68 63998 34.42 38985 20.97 45590 24.52 34845 18.70<br />

Total 134.62 <strong>11</strong>5.31 67.82 74.05 69.30<br />

Total for <strong>IWMP</strong> 45.02 40.32 66.53 41.33 33.26<br />

Convergence<br />

MNREGA<br />

89.60 74.99 1.29 32.72 36.04<br />

Silvi-postoral<br />

System<br />

A. Trees + Grasses<br />

1. Sirash - Stylo<br />

hamata & Cencrush<br />

(1:1) ha 2 0.40 2 0.40 2 0.40 2 0.40 2 0.40<br />

3. Subabul - Stylo<br />

hamata & Cencrush<br />

(1:1) 1 0.21 1 0.21 1 0.21 1 0.21 1 0.21<br />

B. Grasses species<br />

1. Hetropogon /<br />

Crysopogon (On<br />

bund) ha 10 0.30 10 0.30 10 0.30 10 0.30 10 0.30<br />

2. Cencrush (On<br />

bund) ha 10 0.30 10 0.30 10 0.30 10 0.30 10 0.30<br />

3. Dina Nath grass<br />

(On bund) ha 10 0.30 10 0.30 10 0.30 10 0.30 10 0.30<br />

Total 33 1.510 33 1.510 33 1.510 33 1.510 33 1.510<br />

Convergence<br />

MNREGA<br />

(Including Silvipostoral<br />

Syst) 91.<strong>11</strong> 76.50 2.80 34.23 37.55<br />

<strong>11</strong>1


II<br />

III<br />

Livelihood for<br />

landless People<br />

No SHGs 5/50 1.20 4/40 0.95 5/50 1.22 4/40 0.95 3/30 0.73<br />

1. Goatary<br />

/Member<br />

No SHGs 4/40 0.96 2/20 0.48 4/40 0.98 2/20 0.48 2/20 0.48<br />

2. Back Yard Poultry /Member<br />

No SHGs 2/20 0.48 2/20 0.47 3/30 0.72 2/20 0.47 2/20 0.48<br />

3. Poultry (Broiler) /Member<br />

No SHGs 2/20 0.47 2/20 0.48 3/30 0.72 2/20 0.48 2/20 0.48<br />

4. Black Smithy /Member<br />

5. Rope Making No SHGs 2/20 0.48 2/20 0.47 3/30 0.72 2/20 0.47 1/10 0.24<br />

(Linseed)<br />

/Member<br />

No SHGs 2/20 0.47 2/20 0.48 3/30 0.72 2/20 0.48 3/30 0.73<br />

6. Tailoring<br />

/Member<br />

7. Repairing of Diesel No SHGs 2/2 0.30 2/2 0.28 2/2 0.30 3/3 0.44 2/2 0.29<br />

Engine / Implements /Member<br />

No SHGs 2/20 0.48 2/20 0.47 4/40 0.96 2/20 0.47 1/10 0.24<br />

8. Vermi composting /Member<br />

No SHGs 2/20 0.48 2/20 0.48 3/30 0.73 2/20 0.48 2/20 0.48<br />

9. Fruit Processing /Member<br />

No SHGs 2/20 0.48 2/20 0.48 4/40 0.96 2/20 0.48 2/20 0.48<br />

10. Mini Dal Mill /Member<br />

No SHGs 2/20 0.48 2/20 0.48 3/30 0.73 2/20 0.48 1/10 0.24<br />

<strong>11</strong>. Mini flour Mill /Member<br />

No SHGs 2/20 0.48 2/20 0.48 4/40 0.96 2/20 0.48 1/10 0.24<br />

12. Mini Oil Expeller /Member<br />

No SHGs 2/20 0.48 2/20 0.48 4/40 0.97 2/20 0.48 1/10 0.24<br />

13. Carpentry /Member<br />

Total 31/292 7.24 28/262 6.48 45/432 10.69 29/263 6.64 23/212 5.35<br />

Agriculture<br />

Production System<br />

A- Crop<br />

Demonstrations-<br />

(Crop Wise)<br />

<strong>11</strong>2


(1)SMC Area:<br />

1. Lentil (ICM)<br />

2. Chickpea (ICM)<br />

3. Field Pea (ICM)<br />

4. Linseed (ICM)<br />

5. Mustard (ICM)<br />

6. Til (IPNM)<br />

7. Urd (ICM)<br />

8. Sorghum (ICM)<br />

9. Arhar (ICM)<br />

10. Wheat<br />

B- Production of<br />

seeds<br />

No. of<br />

farmers<br />

/Area<br />

(ha) 10/5 0.235 10/5 0.235 10/5 0.235 10/5 0.235 10/5 0.235<br />

No. of<br />

farmers<br />

/Area 2/1 0.055 2/1 0.055 2/1 0.055 2/1 0.055 2/1 0.055<br />

No. of<br />

farmers<br />

/Area 8/4 0.23 8/4 0.23 8/4 0.23 8/4 0.23 8/4 0.23<br />

No. of<br />

farmers<br />

/Area 6/3 0.09 6/3 0.09 6/3 0.09 6/3 0.09 6/3 0.09<br />

No. of<br />

farmers<br />

/Area 10/5 0.14 10/5 0.14 10/5 0.14 10/5 0.14 10/5 0.14<br />

No. of<br />

farmers<br />

/Area 10/5 0.18 10/5 0.18 10/5 0.18 10/5 0.18 10/5 0.18<br />

No. of<br />

farmers<br />

/Area 6/3 0.<strong>11</strong>5 6/3 0.<strong>11</strong>5 6/3 0.<strong>11</strong>5 6/3 0.<strong>11</strong>5 6/3 0.<strong>11</strong>5<br />

No. of<br />

farmers<br />

/Area 10/5 0.18 10/5 0.18 10/5 0.18 10/5 0.18 10/5 0.18<br />

No. of<br />

farmers<br />

/Area 6/3 0.09 6/3 0.09 6/3 0.09 6/3 0.09 6/3 0.09<br />

No. of<br />

farmers<br />

/Area 5/2.5 0.12 5/2.5 0.12 5/2.5 0.12 5/2.5 0.12 5/2.5 0.12<br />

<strong>11</strong>3


No. of 10/5 0.30 10/5 0.30 10/5 0.30 10/5 0.30 10/5 0.30<br />

farmers<br />

1. Lentil<br />

/Area<br />

No. of 6/3 0.20 6/3 0.20 6/3 0.20 6/3 0.20 6/3 0.20<br />

farmers<br />

2. Chickpea<br />

/Area<br />

No. of 2/1 0.08 2/1 0.08 2/1 0.08 2/1 0.08 2/1 0.08<br />

farmers<br />

3. Field Pea<br />

/Area<br />

No. of 4/2 0.075 4/2 0.075 4/2 0.075 4/2 0.075 4/2 0.075<br />

farmers<br />

4. Linseed<br />

/Area<br />

No. of 4/2 0.02 4/2 0.02 4/2 0.02 4/2 0.02 4/2 0.02<br />

farmers<br />

5. Mustard<br />

/Area<br />

No. of 4/2 0.05 4/2 0.05 4/2 0.05 4/2 0.05 4/2 0.05<br />

farmers<br />

6. Wheat<br />

/Area<br />

No. of 4/2 0.01 4/2 0.01 4/2 0.01 4/2 0.01 4/2 0.01<br />

farmers<br />

7. Til<br />

/Area<br />

No. of 4/2 0.25 4/2 0.25 4/2 0.25 4/2 0.25 4/2 0.25<br />

farmers<br />

8. Urd<br />

/Area<br />

Agro forestry:-<br />

A. Scattered<br />

Plantation<br />

Species…..<br />

1- Aonla (@Rs. No. of<br />

25/Plant)<br />

Plants<br />

480 0.12 480 0.12 1400 0.35 480 0.12 240 0.06<br />

2- Ber (@Rs. No. of<br />

20/Plant)<br />

Plants<br />

500 0.10 500 0.10 1400 0.28 500 0.10 250 0.05<br />

3- Bael (@Rs. No. of<br />

20/Plant)<br />

Plants<br />

600 0.12 600 0.12 1400 0.28 600 0.12 300 0.06<br />

4 - Citrus spp.. No. of 500 0.10 500 0.10 1400 0.28 500 0.10 300 0.06<br />

<strong>11</strong>4


(@Rs. 20/Plant)<br />

5. Guava (@Rs.<br />

25/Plant)<br />

B. Agri-<br />

Horticultural<br />

System<br />

Species<br />

1- Aonla<br />

2- Ber<br />

5. Guava<br />

C Block Plantation/<br />

Orchard<br />

Species…..<br />

1- Guava (Spacing 8<br />

X 6 M)<br />

2- Ber (Sapcing 8 X 5<br />

M)<br />

3- Aonla (Spacing 8<br />

X 8 M )<br />

D. Afforestation on<br />

Private Land<br />

Species<br />

1- Teak (@Rs.<br />

25/Plant)<br />

2- Shisham (@Rs.<br />

25/Plant)<br />

3. Bael (@Rs.<br />

20/Plant)<br />

4. Jamun (Scattered<br />

plantation) (@Rs.<br />

20/Plant)<br />

Plants<br />

No. of<br />

Plants<br />

Area in<br />

ha<br />

Area in<br />

ha<br />

Area in<br />

ha<br />

Area in<br />

ha<br />

Area in<br />

ha<br />

Area in<br />

ha<br />

No<br />

No<br />

No<br />

No<br />

480 0.12 480 0.12 1400 0.35 480 0.12 240 0.06<br />

2.5 0.30 2.5 0.30 4.0 0.48 2.5 0.30 2.0 0.24<br />

2.0 0.24 2.0 0.24 3.5 0.42 2.0 0.24 1.0 0.<strong>11</strong>5<br />

1.0 0.12 1.0 0.12 1.5 0.19 1.0 0.12 0.50 0.073<br />

2.5 0.30 2.5 0.30 4.0 0.48 2.5 0.30 2.50 0.312<br />

2.0 0.24 2.0 0.24 3.5 0.42 2.0 0.24 3.50 0.438<br />

1.0 0.12 1.0 0.12 2.0 0.24 1.0 0.12 2.00 0.234<br />

1000 0.25 1000 0.25 1400 0.35 1000 0.25 440 0.<strong>11</strong><br />

1000 0.25 1000 0.25 1400 0.35 1000 0.25 400 0.10<br />

1000 0.20 1000 0.20 1500 0.30 1000 0.20 400 0.08<br />

1000 0.20 1000 0.20 1500 0.30 1000 0.20 500 0.10<br />

<strong>11</strong>5


5. Phalsa (On Bund) No<br />

(@Rs. 25/Plant)<br />

1000 0.25 1000 0.25 1400 0.35 1000 0.25 480 0.12<br />

Live Stock<br />

Management<br />

A. Rearing of Milch<br />

cattle-<br />

1- Cow- (Castration- No. of<br />

@30 Rs./ Animal) Animal<br />

66 0.02 66 0.02 166 0.05 66 0.02 33 0.01<br />

2- Buffalloes- No. of<br />

(He-buffallo Young) Animal<br />

1 0.12 1 0.12 2 0.24 1 0.12 1 0.12<br />

3- Goatry- (@ Rs. No. of<br />

8/Animal)<br />

Animal<br />

250 0.02 250 0.02 250 0.02 250 0.02 250 0.02<br />

5- Broiler-<br />

No. of<br />

(@Rs.6000/Unit) Unit<br />

8 0.48 2 0.12 8 0.48 2 0.12 1 0.06<br />

6- Layers-<br />

No. of<br />

(@Rs.6000/Unit) Unit<br />

8 0.48 3 0.18 16 0.96 3 0.18 1 0.06<br />

6- Fisheries - (@Rs.<br />

1500/1000<br />

No. of<br />

Fingerlin 6000 0.09 - - 6000 0.09 6000 0.09 - -<br />

Fingerlings)<br />

gs<br />

7- Dairy - (Sanitation,<br />

Cleaning and Mineral No. of<br />

Mixture-@ Rs. 250/ Animals<br />

240 0.60 204 0.51 360 0.90 240 0.60 183 0.458<br />

Animal)<br />

8- Green Fodder<br />

(@Rs.1600/demo.are ha/farmer 5/25 0.40 5/25 0.40 10/50 0.80 5/25 0.40 2.4/12 0.20<br />

a-0.2 ha)<br />

B. Veterinary<br />

Services/<br />

1-<br />

Vaccination/Medicati<br />

on (@ Rs.<br />

5/Animal/AH Deptt.<br />

600 0.03 600 0.03 800 0.04 600 0.03 600 0.03<br />

Levi rate @ Rs. 2/<br />

Animal)<br />

No. of<br />

Animals<br />

2- Infertility No. of 600 0.03 600 0.03 800 0.04 600 0.03 600 0.03<br />

<strong>11</strong>6


Management (@ Rs.<br />

5/Animal/AH Deptt.<br />

Levi rate @ Rs. 2/<br />

Animal)<br />

Animals<br />

No. of<br />

Animals<br />

3- Others<br />

- - - - - - - - - -<br />

C. Live stock<br />

Improvement<br />

Measures<br />

1- Artificial<br />

Insemination (@ Rs. No. of 200 0.08 200 0.08 450 0.18 200 0.08 200 0.08<br />

40/ Animal)<br />

Animals<br />

He<br />

2- Natural Service. Buffalo<br />

1 0.24 1 0.24 1 0.24 1 0.24 1 0.24<br />

Total for Ag. Production System 8.04 7.20 <strong>11</strong>.88 7.38 5.94<br />

<strong>11</strong>7


Sr<br />

.<br />

N<br />

o.<br />

I<br />

Particular of<br />

Measures/Activities<br />

Unit<br />

No., Length/<br />

ha, Volume<br />

Markuan<br />

(2C2B1l2f)<br />

Pasaura<br />

(2C2B1k2a)<br />

Kedar Tai-II<br />

(2C2B1l2d)<br />

Qanty. Cost Qanty. Cost Qanty. Cost Qnty<br />

Turk Lahchura<br />

(2C2B1l1g)<br />

Soil & Water<br />

Conservation Measures<br />

A- Moisture<br />

Conservation Measures<br />

1. Field Bund - - - - - - - - - - -<br />

2. Contour Bund (with<br />

Sodding)<br />

cum<br />

3. Peripheral Bund (with<br />

Sodding)<br />

cum<br />

4. Marginal Bund (with<br />

Sodding)<br />

cum<br />

5.Submergence Bundhi<br />

(with Sodding)<br />

cum<br />

B- Water Resource<br />

Development<br />

1. Tank/Pond No<br />

2- Water Harvesting<br />

Bundhi/<br />

3-GP<br />

4. Field Drainage<br />

Structure/ Drop Spill Way<br />

5-ECD<br />

cum<br />

No<br />

Est.<br />

Cost<br />

41536 20.54 20271 10.02 18562 9.18 22095 10.93<br />

16158 7.99 34565 17.09 34457 17.04 20298 10.04<br />

34688 17.71 18235 9.02 23784 <strong>11</strong>.76 20718 10.24<br />

38538 19.06 21386 <strong>11</strong>.22 16515 8.16 23863 <strong>11</strong>.80<br />

13973 7.30 5089 2.66 3795 1.98 9660 5.05<br />

50888<br />

27.37 35789 19.19<br />

8625<br />

4.64<br />

61583<br />

Qnty<br />

Total<br />

Est.<br />

Cost<br />

277124 137.04<br />

241454 <strong>11</strong>9.39<br />

204029 <strong>11</strong>4.61<br />

284072 141.08<br />

64.084 33.48<br />

33.13 406629 218.62<br />

Total 99.97 69.20 52.76 81.19 764.22<br />

Total for <strong>IWMP</strong> 38.64 44.69 32.93 33.60 376.32<br />

Convergence MNREGA 61.33 24.51 19.83 47.59 387.90<br />

<strong>11</strong>8


B<br />

II<br />

Silvi-postoral System<br />

A. Trees + Grasses<br />

1. Sirash - Stylo hamata &<br />

Cencrush (1:1)<br />

ha 2 0.40 2 0.40 2 0.40 2 0.40<br />

3. Subabul - Stylo hamata<br />

& Cencrush (1:1)<br />

1 0.21 1 0.21 1 0.21 1 0.21<br />

B. Grasses species<br />

1. Hetropogon /<br />

Crysopogon (On bund)<br />

ha 10 0.30 10 0.30 10 0.30 10 0.30<br />

2. Cencrush (On bund) ha 10 0.30 10 0.30 10 0.30 10 0.30<br />

3. Dina Nath grass (On<br />

bund)<br />

ha 10 0.30 10 0.30 10 0.30 10 0.30<br />

Total 33 1.510 33 1.510 33 1.510 33 1.510 13.59<br />

Convergence MNREGA<br />

(Including Silvi-postoral<br />

Syst)<br />

62.84 26.02 21.34 49.10 401.49<br />

Livelihood for landless<br />

People<br />

1. Goatary<br />

No<br />

SHGs/Member<br />

3/30 0.74 4/40 0.95 3/30 0.71 3/30 0.71 34/340 8.16<br />

2. Back Yard Poultry<br />

No<br />

SHGs/Member<br />

2/20 0.49 2/20 0.47 2/20 0.47 2/20 0.47 22/220 5.28<br />

3. Poultry (Broiler)<br />

No<br />

SHGs/Member<br />

2/20 0.49 3/30 0.71 2/20 0.48 2/20 0.48 20/200 4.78<br />

4. Black Smithy<br />

No<br />

SHGs/Member<br />

2/20 0.49 2/20 0.47 2/20 0.47 2/20 0.47 19/190 4.53<br />

5. Rope Making (Linseed)<br />

No<br />

SHGs/Member<br />

2/20 0.49 2/20 0.47 2/20 0.48 3/30 0.72 19/190 4.54<br />

6. Tailoring<br />

No<br />

2/20 0.48 3/30 0.72 1/10 0.24 1/10 0.24 19/190 4.56<br />

7. Repairing of Diesel<br />

Engine / Implements<br />

8. Vermi composting<br />

SHGs/Member<br />

No<br />

SHGs/Member<br />

No<br />

SHGs/Member<br />

1/1 0.15 2/2 0.30 2/2 0.28 1/1 0.15 17/17 2.49<br />

2/20 0.48 3/30 0.71 1/10 0.24 1/10 0.24 18/180 4.29<br />

<strong>11</strong>9


III<br />

9. Fruit Processing<br />

No<br />

SHGs/Member<br />

2/20 0.48 2/20 0.47 2/20 0.48 2/20 0.48 19/190 4.56<br />

10. Mini Dal Mill<br />

No<br />

SHGs/Member<br />

2/20 0.48 2/20 0.47 2/20 0.48 2/20 0.48 20/200 4.79<br />

<strong>11</strong>. Mini flour Mill<br />

No<br />

SHGs/Member<br />

2/20 0.48 2/20 0.48 1/10 0.24 1/10 0.24 16/160 3.85<br />

12. Mini Oil Expeller<br />

No<br />

SHGs/Member<br />

2/20 0.48 2/20 0.48 2/20 0.48 2/20 0.48 19/190 4.56<br />

13. Carpentry<br />

No<br />

SHGs/Member<br />

2/20 0.48 2/20 0.48 1/10 0.24 1/10 0.24 17/170 4.09<br />

Total 26/251 6.21 31/292 7.18 23/210 5.29 23/221 5.40 259/2437 60.48<br />

Agriculture Production<br />

System<br />

A- Crop<br />

Demonstrations- (Crop<br />

Wise)<br />

(1)SMC Area:<br />

1. Lentil (ICM)<br />

No. of farmers<br />

/Area (ha) 10/5 0.235 10/5 0.235 10/5 0.235 10/5 0.235<br />

2. Chickpea (ICM)<br />

No. of farmers<br />

/Area 2/1 0.055 2/1 0.055 2/1 0.055 2/1 0.055<br />

3. Field Pea (ICM)<br />

No. of farmers<br />

/Area 8/4 0.23 8/4 0.23 8/4 0.23 8/4 0.23<br />

4. Linseed (ICM)<br />

No. of farmers<br />

/Area 6/3 0.09 6/3 0.09 6/3 0.09 6/3 0.09<br />

5. Mustard (ICM)<br />

No. of farmers<br />

6. Til (IPNM)<br />

7. Urd (ICM)<br />

8. Sorghum (ICM)<br />

9. Arhar (ICM) No. of farmers<br />

/Area 10/5 0.14 10/5 0.14 10/5 0.14 10/5 0.14<br />

No. of farmers<br />

/Area 10/5 0.18 10/5 0.18 10/5 0.18 10/5 0.18<br />

No. of farmers<br />

/Area 6/3 0.<strong>11</strong>5 6/3 0.<strong>11</strong>5 6/3 0.<strong>11</strong>5 6/3 0.<strong>11</strong>5<br />

No. of farmers<br />

/Area 10/5 0.18 10/5 0.18 10/5 0.18 10/5 0.18<br />

6/3 0.09 6/3 0.09 6/3 0.09 6/3 0.09<br />

120


10. Wheat<br />

B- Production of seeds<br />

1. Lentil<br />

2. Chickpea<br />

3. Field Pea<br />

4. Linseed<br />

5. Mustard<br />

6. Wheat<br />

7. Til<br />

8. Urd<br />

Agro forestry:-<br />

A. Scattered Plantation<br />

Species…..<br />

/Area<br />

No. of farmers<br />

/Area 5/2.5 0.12 5/2.5 0.12 5/2.5 0.12 5/2.5 0.12<br />

No. of farmers<br />

/Area<br />

No. of farmers<br />

/Area<br />

No. of farmers<br />

/Area<br />

No. of farmers<br />

/Area<br />

No. of farmers<br />

/Area<br />

No. of farmers<br />

/Area<br />

No. of farmers<br />

/Area<br />

No. of farmers<br />

/Area<br />

10/5 0.30 10/5 0.30 10/5 0.30 10/5 0.30<br />

6/3 0.20 6/3 0.20 6/3 0.20 6/3 0.20<br />

2/1 0.08 2/1 0.08 2/1 0.08 2/1 0.08<br />

4/2 0.075 4/2 0.075 4/2 0.075 4/2 0.075<br />

4/2 0.02 4/2 0.02 4/2 0.02 4/2 0.02<br />

4/2 0.05 4/2 0.05 4/2 0.05 4/2 0.05<br />

4/2 0.01 4/2 0.01 4/2 0.01 4/2 0.01<br />

4/2 0.25 4/2 0.25 4/2 0.25 4/2 0.25<br />

657/328.5 12.915<br />

342/171 8.865<br />

1- Aonla (@Rs. 25/Plant) No. of Plants 480 0.12 480 0.120 240 0.06 240 0.06 4520 1.13<br />

2- Ber (@Rs. 20/Plant) No. of Plants 500 0.10 500 0.100 250 0.05 250 0.05 4650 0.93<br />

3- Bael (@Rs. 20/Plant) No. of Plants 500 0.10 600 0.120 300 0.06 300 0.06 5200 1.04<br />

4 - Citrus spp.. (@Rs.<br />

20/Plant)<br />

No. of Plants 500 0.10 250 0.050 300 0.06 300 0.06 4550 0.91<br />

5. Guava (@Rs. 25/Plant) No. of Plants 480 0.12 240 0.060 240 0.06 240 0.06 4280 1.07<br />

B. Agri-Horticultural<br />

System<br />

Species<br />

1- Aonla Area in ha 3.00 0.36 3.00 0.338 3.0 0.35 3.0 0.35 25.50 3.018<br />

121


2- Ber Area in ha 3.00 0.35 3.00 0.315 2.0 0.23 2.0 0.23 20.50 2.38<br />

5. Guava Area in ha 2.00 0.24 3.50 0.423 2.25 0.293 2.25 0.293 15.00 1.872<br />

C Block Plantation/<br />

Orchard<br />

Species…..<br />

1- Guava (Spacing 8 X 6<br />

M)<br />

Area in ha 3.00 0.36 2.50 0.312 2.50 0.312 2.50 0.312 24.50 2.988<br />

2- Ber (Sapcing 8 X 5 M) Area in ha 3.00 0.35 3.50 0.438 2.5 0.338 2.5 0.338 24.50 3.042<br />

3- Aonla (Spacing 8 X 8<br />

M )<br />

Area in ha 2.00 0.24 2.0 0.234 1.5 0.187 1.5 0.187 14.00 1.682<br />

D. Afforestation on<br />

Private Land<br />

Species<br />

1- Teak (@Rs. 25/Plant) No 600 0.15 <strong>11</strong>60 0.29 440 0.<strong>11</strong> 440 0.<strong>11</strong> 7480 1.87<br />

2- Shisham<br />

No<br />

(@Rs.25/Plant)<br />

600 0.15 160 0.04 400 0.10 400 0.10 6360 1.59<br />

3. Bael (@Rs. 20/Plant) No 600 0.12 350 0.07 500 0.10 500 0.10 6850 1.37<br />

4. Jamun (Scattered<br />

plantation)<br />

No<br />

600 0.12 1500 0.30 500 0.10 500 0.10 8100 1.62<br />

(@Rs. 20/Plant)<br />

5. Phalsa (On Bund)<br />

No<br />

(@Rs. 25/Plant)<br />

600 0.15 1600 0.40 800 0.20 800 0.20 8680 2.17<br />

Live Stock Management<br />

A. Rearing of Milch<br />

cattle-<br />

1- Cow- (Castration-@30<br />

Rs./ Animal)<br />

No. of Animals 66 0.02 400 0.12 33 0.01 33 0.01 929 0.28<br />

2- Buffalloes- (He-buffallo<br />

Young)<br />

No. of Animals 1 0.12 2 0.24 1 0.12 1 0.12 <strong>11</strong> 1.32<br />

3- Goatry- (@ Rs.<br />

8/Animal)<br />

No. of Animals 250 0.02 185 0.0148 250 0.02 250 0.02 2185 0.1748<br />

4- Broiler-<br />

(@Rs.6000/Unit)<br />

No. of Unit 1 0.06 1 0.06 1 0.06 1 0.06 25 1.50<br />

122


5- Layers-<br />

(@Rs.6000/Unit)<br />

No. of Unit 1 0.06 1 0.06 1 0.06 1 0.18 37 2.22<br />

6- Fisheries – (@Rs. No. of<br />

1500/1000 Fingerlings) Fingerlings<br />

- - 12000 0.18 - - - - 30000 0.45<br />

7- Dairy – (Sanitation,<br />

Cleaning and Mineral<br />

Mixture-@ Rs. 250/<br />

No. of Animals 200 0.501 176 0.440 40 0.10 40 0.10 16836 4.209<br />

Animal)<br />

8- Green Fodder<br />

(@Rs.1600/demo.area-0.2 ha/farmer 2.4/12 0.20 5/25 0.400 1.2/6 0.10 1.2/6 0.10 37.2/186 3.00<br />

ha)<br />

B. Veterinary Services/<br />

1- Vaccination/Medication<br />

(@ Rs. 5/Animal/AH<br />

Deptt. Levi rate @ Rs. 2/<br />

880 0.044 880 0.044 1000 0.05 1000 0.05 6960 0.348<br />

Animal)<br />

No. of Animals<br />

2- Infertility Management<br />

(@ Rs. 5/Animal/AH<br />

Deptt. Levi rate @ Rs. 2/<br />

700 0.035 700 0.035 1000 0.05 1000 0.05 6600 0.33<br />

Animal)<br />

No. of Animals<br />

3- Others No. of Animals<br />

C. Live stock<br />

Improvement Measures<br />

1- Artificial Insemination<br />

(@ Rs. 40/ Animal) No. of Animals<br />

125 0.05 300 0.12 100 0.04 100 0.04 1875 0.75<br />

He Buffalo/<br />

2- Natural Service. Bull<br />

1 0.24 1 0.24 1 0.24 1 0.24 9 2.16<br />

Total for Ag. Production System 6.90 7.98 5.88 6.00 67.20<br />

Note: The budget available under <strong>IWMP</strong>-<strong>VIII</strong> Rs. 376.32 lakh; however, the activities are planned for the Rs. 777.81 the deficit of Rs. 401.49 will be<br />

making up through convergence of MGNERAGA.<br />

123


Table 5.4: Gram Panchayat wise details of Watershed Development Activities proposed in <strong>IWMP</strong>-<strong>VIII</strong>, <strong>Jhansi</strong><br />

Unit Dhipkai Rampura Nipan Jashwantpura Simardha<br />

S.<br />

Particular of<br />

N<br />

No., Length/ ha,<br />

Measures/Activities<br />

o.<br />

Volume Qanty. Cost Qanty. Cost Qanty. Cost Qnty<br />

Qnty<br />

I<br />

B<br />

Soil & Water<br />

Conservation Measures<br />

A- Moisture Conservation<br />

Measures<br />

1. Field Bund - - - - - - - - - - -<br />

2. Contour Bund (with<br />

Sodding)<br />

cum<br />

3. Peripheral Bund (with<br />

Sodding)<br />

cum<br />

4. Marginal Bund (with<br />

Sodding)<br />

cum<br />

5.Submergence Bundhi<br />

(with Sodding)<br />

cum<br />

B- Water Resource<br />

Development<br />

1. Tank/Pond No<br />

2- Water Harvesting<br />

Bundhi/<br />

3-GP<br />

4. Field Drainage Structure/<br />

Drop Spill Way<br />

5-ECD<br />

cum<br />

No<br />

Cum<br />

38936<br />

30896<br />

3205<br />

24796<br />

1725<br />

73485<br />

19.26<br />

15.28<br />

1.59<br />

12.27<br />

0.90<br />

39.53<br />

15826<br />

13670<br />

16008<br />

5744<br />

24668<br />

7.83<br />

6.76<br />

7.92<br />

2.84<br />

29500<br />

24606<br />

18378<br />

47262<br />

3191<br />

Est.<br />

Cost<br />

14.60 - -<br />

12.17 - -<br />

9.09 - -<br />

23.38 - -<br />

Total 173042 88.83 75916 38.62 76.92 2.98 63.41<br />

Total for <strong>IWMP</strong> 57.82 19.78 29.28 2.91 22.16<br />

Convergence MNREGA 3071 18.84 47.64 0.07 41.25<br />

Silvi-postoral System<br />

A. Trees + Grasses<br />

13.27<br />

30274<br />

1.67<br />

16.29<br />

5693<br />

-<br />

2.98<br />

-<br />

<strong>11</strong>10<br />

9129<br />

<strong>11</strong>002<br />

41541<br />

-<br />

26996<br />

Est.<br />

Cost<br />

0.55<br />

4.52<br />

23.27<br />

20.55<br />

-<br />

14.52<br />

124


II<br />

1. Sirash - Stylo hamata &<br />

Cencrush (1:1) ha 2 0.40 2 0.40 2 0.40 2 0.40 2 0.40<br />

3. Subabul - Stylo hamata<br />

& Cencrush (1:1) 1 0.21 1 0.21 1 0.21 1 0.21 1 0.21<br />

B. Grasses species<br />

1. Hetropogon /<br />

Crysopogon (On bund) ha 10 0.30 10 0.30 10 0.30 10 0.30 10 0.30<br />

2. Cencrush (On bund) ha 10 0.30 10 0.30 10 0.30 10 0.30 10 0.30<br />

3. Dina Nath grass (On<br />

bund) ha 10 0.30 10 0.30 10 0.30 10 0.30 10 0.30<br />

Total 33 1.510 33 1.510 33 1.510 33 1.510 33 1.510<br />

Convergence MNREGA<br />

(Including Silvi-postoral<br />

Syst)<br />

Livelihood for landless<br />

People<br />

No<br />

5/50 1.22<br />

3/30 0.72 1/10 0.24 2/20 0.49<br />

2/20 0.46<br />

1. Goatary<br />

SHGs/Member<br />

No<br />

4/40 0.98<br />

2/20 0.48 1/10 0.23 1/10 0.25<br />

1/10 0.23<br />

2. Back Yard Poultry SHGs/Member<br />

No<br />

3/30 0.73<br />

2/20 0.48 - - 1/10 0.25<br />

1/10 0.23<br />

3. Poultry (Broiler) SHGs/Member<br />

No<br />

3/30 0.73<br />

2/20 0.48 - - 1/10 0.25<br />

1/10 0.24<br />

4. Black Smithy<br />

SHGs/Member<br />

No<br />

3/30 0.73<br />

2/20 0.48 - - 2/20 0.49<br />

1/10 0.23<br />

5. Rope Making (Linseed) SHGs/Member<br />

No<br />

3/30 0.73<br />

1/10 0.23<br />

2/20 0.48 - - 1/10 0.24<br />

6. Tailoring<br />

7. Repairing of Diesel<br />

Engine / Implements<br />

8. Vermi composting<br />

9. Fruit Processing<br />

SHGs/Member<br />

No<br />

SHGs/Member<br />

No<br />

SHGs/Member<br />

No<br />

SHGs/Member<br />

2/2 0.30<br />

3/30 0.73<br />

3/30 0.73<br />

1/1 0.15<br />

1/10 0.23 1/10 0.24<br />

1/10 0.23 1/10 0.24<br />

1/1 0.15 - - 1/1 0.15<br />

- - 1/10 0.24<br />

- - 1/10 0.24<br />

125


III<br />

No<br />

3/30 0.73<br />

- - 1/10 0.24<br />

1/10 0.23 1/10 0.24<br />

10. Mini Dal Mill<br />

SHGs/Member<br />

No<br />

2/20 0.48<br />

- - 1/10 0.24<br />

1/10 0.24 1/10 0.24<br />

<strong>11</strong>. Mini flour Mill SHGs/Member<br />

No<br />

3/30 0.72<br />

- - 1/10 0.24<br />

1/10 0.24 1/10 0.24<br />

12. Mini Oil Expeller SHGs/Member<br />

No<br />

2/20 0.48<br />

- - 1/10 0.24<br />

1/10 0.24 1/10 0.24<br />

13. Carpentry<br />

SHGs/Member<br />

Total 39/372 9.29 14/131 3.18 20/191 4.71 2/20 0.47 15/141 3.56<br />

Agriculture Production<br />

System<br />

A- Crop<br />

Demonstrations- (Crop<br />

Wise)<br />

(1)SMC Area:<br />

1. Lentil (ICM)<br />

2. Chickpea (ICM)<br />

3. Field Pea (ICM)<br />

4. Linseed (ICM)<br />

5. Mustard (ICM)<br />

6. Til (IPNM)<br />

7. Urd (ICM)<br />

8. Sorghum (ICM)<br />

9. Arhar (ICM)<br />

No. of farmers<br />

/Area (ha) 10/5 0.235 10/5 0.235 10/5 0.235 10/5 0.235 10/5 0.235<br />

No. of farmers<br />

/Area 2/1 0.055 2/1 0.055 2/1 0.055 2/1 0.055 2/1 0.055<br />

No. of farmers<br />

/Area 8/4 0.23 8/4 0.23 8/4 0.23 8/4 0.23 8/4 0.23<br />

No. of farmers<br />

/Area 6/3 0.09 6/3 0.09 6/3 0.09 - - 6/3 0.09<br />

No. of farmers<br />

/Area 10/5 0.14 10/5 0.14 10/5 0.14 - - 10/5 0.14<br />

No. of farmers<br />

/Area 10/5 0.18 10/5 0.18 10/5 0.18 - - 10/5 0.18<br />

No. of farmers<br />

/Area 6/3 0.<strong>11</strong>5 6/3 0.<strong>11</strong>5 6/3 0.<strong>11</strong>5 - - 6/3 0.<strong>11</strong>5<br />

No. of farmers<br />

/Area 10/5 0.18 10/5 0.18 10/5 0.18 - - 10/5 0.18<br />

No. of farmers<br />

/Area 6/3 0.09 6/3 0.09 6/3 0.09 - - 6/3 0.09<br />

126


10. Wheat<br />

B- Production of seeds<br />

1. Lentil<br />

2. Chickpea<br />

3. Field Pea<br />

4. Linseed<br />

5. Mustard<br />

6. Wheat<br />

7. Til<br />

No. of farmers<br />

/Area 5/2.5 0.12 5/2.5 0.12 5/2.5 0.12 - - 5/2.5 0.12<br />

No. of farmers<br />

/Area<br />

No. of farmers<br />

/Area<br />

No. of farmers<br />

/Area<br />

No. of farmers<br />

/Area<br />

No. of farmers<br />

/Area<br />

No. of farmers<br />

/Area<br />

No. of farmers<br />

/Area<br />

No. of farmers<br />

/Area<br />

10/5 0.30 10/5 0.30 10/5 0.30<br />

6/3 0.20 6/3 0.20 6/3 0.20<br />

2/1 0.08 2/1 0.08 2/1 0.08<br />

4/2 0.075 4/2 0.075 4/2 0.075<br />

4/2 0.02 4/2 0.02 4/2 0.02<br />

4/2 0.05 4/2 0.05 4/2 0.05<br />

4/2 0.01 4/2 0.01 4/2 0.01<br />

4/2 0.25 4/2 0.25 4/2 0.25<br />

- -<br />

- -<br />

- -<br />

- -<br />

- -<br />

- -<br />

- -<br />

10/5 0.30<br />

6/3 0.20<br />

2/1 0.08<br />

4/2 0.075<br />

4/2 0.02<br />

4/2 0.05<br />

4/2 0.01<br />

4/2 0.25<br />

8. Urd<br />

- -<br />

Agro forestry:-<br />

A. Scattered Plantation<br />

Species…..<br />

1- Aonla (@Rs.25/Plant) No. of Plants 480 0.12 240 0.06 480 0.12 - - 680 0.17<br />

2- Ber (@Rs.20/Plant) No. of Plants 500 0.10 250 0.05 500 0.10 - - 600 0.12<br />

3- Bael (@Rs.20/Plant) No. of Plants 600 0.12 300 0.06 600 0.12 - - 700 0.14<br />

4 - Citrus spp..<br />

500 0.10 300 0.06 500 0.10<br />

700 0.14<br />

(@Rs.20/Plant)<br />

No. of Plants<br />

- -<br />

5. Guava (@Rs.25/Plant) No. of Plants 480 0.12 240 0.06 480 0.12 - - 600 0.15<br />

B. Agri-Horticultural<br />

System<br />

Species<br />

1- Aonla Area in ha 4.5 0.54 2.0 0.24 2.0 0.25 - - 2.0 0.24<br />

2- Ber Area in ha 2.0 0.24 1.0 0.<strong>11</strong>5 2.0 0.25 - - 1.0 0.<strong>11</strong>5<br />

5. Guava Area in ha 3.50 0.42 0.50 0.055 1.5 0.17 - - 0.50 0.055<br />

127


C Block Plantation/<br />

Orchard<br />

Species…..<br />

1- Guava (Spacing 8 X 6<br />

6.0 0.72 2.0 0.24 2.0 0.24<br />

M) Area in ha<br />

- -<br />

2.0 0.24<br />

2- Ber (Sapcing 8 X 5 M) Area in ha 3.0 0.36 1.0 0.<strong>11</strong>5 2.0 0.23 - - 1.0 0.<strong>11</strong>5<br />

3- Aonla (Spacing 8 X 8 M<br />

3.0 0.36 0.50 0.055 1.5 0.17<br />

) Area in ha<br />

- -<br />

0.50 0.055<br />

D. Afforestation on<br />

Private Land<br />

Species<br />

1- Teak (@Rs.25/Plant) No 880 0.22 - - 800 0.20 - - - -<br />

2- Shisham (@Rs.25/Plant) No 1250 0.25 - - 800 0.20 - - - -<br />

3. Bael (@Rs.20/Plant) No 1000 0.20 - - 850 0.17 - - - -<br />

4. Jamun (Scattered<br />

No<br />

2000 0.40 - - 850 0.17<br />

plantation) (@Rs.20/Plant)<br />

- - - -<br />

5. Phalsa (On Bund)<br />

No<br />

1680 0.42 - - 800 0.20<br />

(@Rs.25/Plant)<br />

- - - -<br />

Live Stock Management<br />

A. Rearing of Milch<br />

cattle-<br />

1- Cow- (Castration-@30<br />

No. of Animals 66 0.02 - - - -<br />

Rs./ Animal)<br />

- - - -<br />

2- Buffalloes- (He-buffallo<br />

No. of Animals 3 0.36 - - - -<br />

Young)<br />

- - - -<br />

3- Goatry- (@ Rs.<br />

No. of Animals 250 0.02 - - - -<br />

8/Animal)<br />

- - - -<br />

4- Broiler-<br />

No. of Unit 8 0.48 - - - -<br />

(@Rs.6000/Unit)<br />

- - - -<br />

5- Layers-<br />

No. of Unit 8 0.48 - - - -<br />

(@Rs.6000/Unit)<br />

6- Fisheries – (@Rs.<br />

1500/1000 Fingerlings)<br />

No. of<br />

Fingerlings<br />

12000 0.18 - - - -<br />

- - - -<br />

- - - -<br />

128


7- Dairy – (Sanitation,<br />

Cleaning and Mineral<br />

Mixture-@ Rs. 250/<br />

Animal)<br />

8- Green Fodder<br />

(@Rs.1600/demo.area-0.2<br />

ha)<br />

B. Veterinary Services/<br />

1- Vaccination/Medication<br />

(@ Rs. 5/Animal/AH<br />

Deptt. Levi rate @ Rs. 2/<br />

Animal)<br />

2- Infertility Management<br />

(@ Rs. 5/Animal/AH<br />

Deptt. Levi rate @ Rs. 2/<br />

No. of Animals 320 0.80 - - - -<br />

ha/farmer 5/25 0.40 - - - -<br />

No. of Animals<br />

Animal)<br />

No. of Animals<br />

3- Others No. of Animals<br />

C. Live stock<br />

Improvement Measures<br />

1- Artificial Insemination<br />

(@ Rs. 40/ Animal)<br />

2- Natural Service.<br />

No. of Animals<br />

He Buffalo/<br />

Bull<br />

1200 0.06 - - - -<br />

1200 0.06 - - - -<br />

275 0.<strong>11</strong> - - - -<br />

1 0.24 - - - -<br />

- - - -<br />

- - - -<br />

- - - -<br />

- - - -<br />

- - - -<br />

- - - -<br />

Total for Ag. Production System 10.32 3.53 5.23 0.52 3.96<br />

129


S.<br />

N<br />

o.<br />

I<br />

B<br />

Particular of<br />

Measures/Activities<br />

Unit Nimgahna Bangra Durkhuru Birona Gorpura<br />

No., Length/ ha,<br />

Volume Qanty. Cost Qanty. Cost Qanty. Cost Qnty<br />

Soil & Water<br />

Conservation Measures<br />

A- Moisture Conservation<br />

Measures<br />

1. Field Bund - - - - - - - - - - -<br />

2. Contour Bund (with<br />

cum<br />

Sodding)<br />

3. Peripheral Bund (with<br />

cum<br />

Sodding)<br />

4. Marginal Bund (with<br />

cum<br />

Sodding)<br />

5.Submergence Bundhi<br />

cum<br />

(with Sodding)<br />

B- Water Resource<br />

Development<br />

1. Tank/Pond No<br />

2- Water Harvesting<br />

cum<br />

Bundhi/<br />

3-GP<br />

4. Field Drainage Structure/<br />

Drop Spill Way<br />

5-ECD<br />

13283<br />

10641<br />

6519<br />

-<br />

-<br />

6.58<br />

5.26<br />

3.22<br />

-<br />

-<br />

-<br />

12618<br />

-<br />

-<br />

6.24<br />

- -<br />

No - -<br />

16733<br />

-<br />

9.00<br />

Total 24.06 6.24 41.72 39.34 65.54<br />

Total for <strong>IWMP</strong> 21.73 3.10 4.99 31.45 47.53<br />

Convergence MNREGA 2.33 3.14 36.73 7.89 18.01<br />

Silvi-postoral System<br />

A. Trees + Grasses<br />

1. Sirash - Stylo hamata &<br />

Cencrush (1:1) ha 2 0.40 2 0.40 2 0.40 2 0.40 2 0.40<br />

-<br />

-<br />

-<br />

-<br />

12569<br />

14262<br />

2650<br />

16321<br />

8021<br />

25494<br />

6.22<br />

7.06<br />

1.31<br />

9.23<br />

4.20<br />

13.72<br />

<strong>11</strong>134<br />

6179<br />

17738<br />

16269<br />

7245<br />

18889<br />

Est.<br />

Cost<br />

5.51<br />

3.06<br />

8.78<br />

8.05<br />

3.79<br />

10.16<br />

Qnty<br />

17047<br />

25269<br />

38421<br />

28089<br />

5175<br />

16733<br />

Est.<br />

Cost<br />

8.43<br />

12.50<br />

19.01<br />

13.90<br />

2.71<br />

9.00<br />

130


II<br />

3. Subabul - Stylo hamata<br />

& Cencrush (1:1) 1 0.21 1 0.21 1 0.21 1 0.21 1 0.21<br />

B. Grasses species<br />

1. Hetropogon /<br />

Crysopogon (On bund) ha 10 0.30 10 0.30 10 0.30 10 0.30 10 0.30<br />

2. Cencrush (On bund) ha 10 0.30 10 0.30 10 0.30 10 0.30 10 0.30<br />

3. Dina Nath grass (On<br />

bund) ha 10 0.30 10 0.30 10 0.30 10 0.30 10 0.30<br />

Total 33 1.510 33 1.510 33 1.510 33 1.510 33 1.510<br />

Convergence MNREGA<br />

(Including Silvi-postoral<br />

Syst)<br />

Livelihood for landless<br />

People<br />

No<br />

3/30 0.70<br />

2/20 0.50 5/50 1.22<br />

1/10 0.25 2/20 0.55<br />

1. Goatary<br />

SHGs/Member<br />

No<br />

1/10 0.24<br />

2/20 0.50 4/40 0.95<br />

1/10 0.25 1/10 0.25<br />

2. Back Yard Poultry SHGs/Member<br />

No<br />

1/10 0.24<br />

1/10 0.24 3/30 0.72<br />

- - - -<br />

3. Poultry (Broiler) SHGs/Member<br />

No<br />

1/10 0.24<br />

2/20 0.50 2/20 0.49<br />

- - - -<br />

4. Black Smithy<br />

SHGs/Member<br />

No<br />

1/10 0.24<br />

2/20 0.49 2/20 0.48<br />

- - - -<br />

5. Rope Making (Linseed) SHGs/Member<br />

No<br />

1/10 0.24<br />

- - - -<br />

2/20 0.49 2/20 0.48<br />

6. Tailoring<br />

7. Repairing of Diesel<br />

Engine / Implements<br />

8. Vermi composting<br />

9. Fruit Processing<br />

10. Mini Dal Mill<br />

SHGs/Member<br />

No<br />

SHGs/Member<br />

No<br />

SHGs/Member<br />

No<br />

SHGs/Member<br />

No<br />

SHGs/Member<br />

1/1 0.15<br />

1/10 0.24<br />

1/10 0.24<br />

1/10 0.24<br />

- - - -<br />

- - - -<br />

- - - -<br />

- - - -<br />

1/1 0.15 1/1 0.15<br />

2/20 0.49 3/30 0.72<br />

1/10 0.24 2/20 0.48<br />

2/20 0.49 2/20 0.49<br />

131


III<br />

No<br />

1/10 0.24<br />

1/10 0.24 2/20 0.49<br />

- - - -<br />

<strong>11</strong>. Mini flour Mill SHGs/Member<br />

No<br />

1/10 0.24<br />

2/20 0.48 2/20 0.49<br />

- - - -<br />

12. Mini Oil Expeller SHGs/Member<br />

No<br />

1/10 0.24<br />

1/10 0.24 2/20 0.48<br />

- - - -<br />

13. Carpentry<br />

SHGs/Member<br />

Total 15/141 3.49 2/20 0.50 3/30 0.80 21/201 5.05 32/3<strong>11</strong> 7.64<br />

Agriculture Production<br />

System<br />

A- Crop<br />

Demonstrations- (Crop<br />

Wise)<br />

(1)SMC Area:<br />

1. Lentil (ICM)<br />

2. Chickpea (ICM)<br />

3. Field Pea (ICM)<br />

4. Linseed (ICM)<br />

5. Mustard (ICM)<br />

6. Til (IPNM)<br />

7. Urd (ICM)<br />

8. Sorghum (ICM)<br />

9. Arhar (ICM)<br />

10. Wheat<br />

B- Production of seeds<br />

No. of farmers<br />

/Area (ha) 10/5 0.235 10/5 0.235 10/5 0.24 10/5 0.235 10/5 0.235<br />

No. of farmers<br />

/Area 2/1 0.055 2/1 0.055 - - 2/1 0.055 2/1 0.055<br />

No. of farmers<br />

/Area 8/4 0.23 8/4 0.23 8/4 0.235 8/4 0.23 8/4 0.23<br />

No. of farmers<br />

/Area 6/3 0.09 2/1 0.03 6/3 0.095 6/3 0.09 6/3 0.09<br />

No. of farmers<br />

/Area 10/5 0.14 - - 10/5 0.14 10/5 0.14 10/5 0.14<br />

No. of farmers<br />

/Area 10/5 0.18 - - 10/5 0.18 10/5 0.18 10/5 0.18<br />

No. of farmers<br />

/Area 6/3 0.<strong>11</strong>5 - - - - 6/3 0.<strong>11</strong>5 6/3 0.<strong>11</strong>5<br />

No. of farmers<br />

/Area 10/5 0.18 - - - - 10/5 0.18 10/5 0.18<br />

No. of farmers<br />

/Area 6/3 0.09 - - - - 6/3 0.09 6/3 0.09<br />

No. of farmers<br />

/Area 5/2.5 0.12 - - - - 5/2.5 0.12 5/2.5 0.12<br />

132


No. of farmers 10/5 0.30<br />

10/5 0.30 10/5 0.30<br />

1. Lentil<br />

/Area<br />

- - - -<br />

No. of farmers 6/3 0.20<br />

6/3 0.20 6/3 0.20<br />

2. Chickpea<br />

/Area<br />

- - - -<br />

No. of farmers 2/1 0.08<br />

2/1 0.08 2/1 0.08<br />

3. Field Pea<br />

/Area<br />

- - - -<br />

No. of farmers 4/2 0.075<br />

4/2 0.075 4/2 0.075<br />

4. Linseed<br />

/Area<br />

- - - -<br />

No. of farmers 4/2 0.02<br />

4/2 0.02 4/2 0.02<br />

5. Mustard<br />

/Area<br />

- - - -<br />

No. of farmers 4/2 0.05<br />

4/2 0.05 4/2 0.05<br />

6. Wheat<br />

/Area<br />

- - - -<br />

No. of farmers 4/2 0.01<br />

4/2 0.01 4/2 0.01<br />

7. Til<br />

/Area<br />

- - - -<br />

No. of farmers 4/2 0.25<br />

4/2 0.25 4/2 0.25<br />

8. Urd<br />

/Area<br />

- - - -<br />

Agro forestry:-<br />

A. Scattered Plantation<br />

Species…..<br />

1- Aonla (@Rs.25/Plant) No. of Plants 480 0.12 - - - - 480 0.12 480 0.12<br />

2- Ber (@Rs.20/Plant) No. of Plants 600 0.12 - - - - 500 0.10 500 0.10<br />

3- Bael (@Rs.20/Plant) No. of Plants 700 0.14 - - - - 600 0.12 600 0.12<br />

4 - Citrus spp..<br />

700 0.14<br />

(@Rs.20/Plant)<br />

No. of Plants<br />

- - - -<br />

500 0.10 500 0.10<br />

5. Guava (@Rs.25/Plant) No. of Plants 480 0.12 - - - - 480 0.12 480 0.12<br />

B. Agri-Horticultural<br />

System<br />

Species<br />

1- Aonla Area in ha 2.0 0.24 - - - - 3.0 0.36 4.5 0.54<br />

2- Ber Area in ha 1.0 0.<strong>11</strong>5 - - - - 2.5 0.29 3.0 0.35<br />

5. Guava Area in ha 0.50 0.055 - - - - 1.5 0.17 2.0 0.23<br />

C Block Plantation/<br />

Orchard<br />

Species…..<br />

133


1- Guava (Spacing 8 X 6<br />

2.0 0.24<br />

M) Area in ha<br />

- - - -<br />

3.0 0.36 5.0 0.60<br />

2- Ber (Sapcing 8 X 5 M) Area in ha 1.0 0.<strong>11</strong>5 - - - - 2.5 0.29 4.0 0.46<br />

3- Aonla (Spacing 8 X 8 M<br />

0.50 0.055<br />

) Area in ha<br />

- - - -<br />

2.0 0.23 2.5 0.29<br />

D. Afforestation on<br />

Private Land<br />

Species<br />

1- Teak (@Rs.25/Plant) No - - - - - - 800 0.20 800 0.20<br />

2- Shisham (@Rs.25/Plant) No - - - - - - 800 0.20 800 0.20<br />

3. Bael (@Rs.20/Plant) No - - - - - - 850 0.17 800 0.16<br />

4. Jamun (Scattered<br />

No<br />

- -<br />

plantation) (@Rs.20/Plant)<br />

- - - -<br />

850 0.17 800 0.16<br />

5. Phalsa (On Bund)<br />

No<br />

- -<br />

(@Rs.25/Plant)<br />

- - - -<br />

800 0.20 800 0.20<br />

Live Stock Management<br />

A. Rearing of Milch<br />

cattle-<br />

1- Cow- (Castration-@30<br />

No. of Animals - -<br />

Rs./ Animal)<br />

- - - - - -<br />

66 0.02<br />

2- Buffalloes- (He-buffallo<br />

No. of Animals - -<br />

Young)<br />

- - - - - -<br />

1 0.12<br />

3- Goatry- (@ Rs.<br />

No. of Animals - -<br />

8/Animal)<br />

- - - - - -<br />

250 0.02<br />

4- Broiler-<br />

No. of Unit - -<br />

(@Rs.6000/Unit)<br />

- - - - - -<br />

2 0.12<br />

5- Layers-<br />

No. of Unit - -<br />

(@Rs.6000/Unit)<br />

- - - - - -<br />

4 0.24<br />

6- Fisheries – (@Rs. No. of<br />

- -<br />

1500/1000 Fingerlings) Fingerlings<br />

- - - - - -<br />

7- Dairy – (Sanitation,<br />

Cleaning and Mineral<br />

Mixture-@ Rs. 250/<br />

No. of Animals - -<br />

296 0.74<br />

Animal)<br />

- - - - - -<br />

134


8- Green Fodder<br />

(@Rs.1600/demo.area-0.2<br />

ha)<br />

B. Veterinary Services/<br />

1- Vaccination/Medication<br />

(@ Rs. 5/Animal/AH<br />

Deptt. Levi rate @ Rs. 2/<br />

Animal)<br />

2- Infertility Management<br />

(@ Rs. 5/Animal/AH<br />

Deptt. Levi rate @ Rs. 2/<br />

Animal)<br />

ha/farmer - -<br />

No. of Animals<br />

- -<br />

- -<br />

- - - - - -<br />

- - - - - -<br />

No. of Animals<br />

- - - - - -<br />

3- Others No. of Animals - - - - - - - -<br />

C. Live stock<br />

Improvement Measures<br />

1- Artificial Insemination<br />

(@ Rs. 40/ Animal)<br />

2- Natural Service.<br />

No. of Animals<br />

He Buffalo/<br />

Bull<br />

- -<br />

- -<br />

- - - - - -<br />

- - - - - -<br />

5/25 0.40<br />

1200 0.06<br />

1200 0.06<br />

250 0.10<br />

1 0.24<br />

Total for Ag. Production System 3.88 0.55 0.89 5.62 8.49<br />

135


S.<br />

N<br />

o.<br />

I<br />

B<br />

Particular of<br />

Measures/Activities<br />

Unit Chatur Tai Markuan Emlota Aivani Turk Lahchura<br />

No., Length/ ha,<br />

Volume Qanty. Cost Qanty. Cost Qanty. Cost Qnty<br />

Soil & Water<br />

Conservation Measures<br />

A- Moisture Conservation<br />

Measures<br />

1. Field Bund - - - - - - - - - - -<br />

2. Contour Bund (with<br />

Sodding)<br />

cum<br />

3. Peripheral Bund (with<br />

Sodding)<br />

cum<br />

4. Marginal Bund (with<br />

Sodding)<br />

cum<br />

5.Submergence Bundhi<br />

(with Sodding)<br />

cum<br />

B- Water Resource<br />

Development<br />

1. Tank/Pond No<br />

2- Water Harvesting<br />

Bundhi/<br />

3-GP<br />

4. Field Drainage Structure/<br />

Drop Spill Way<br />

5-ECD<br />

cum<br />

No<br />

Cum<br />

18458<br />

19575<br />

1940<br />

9057<br />

5003<br />

187<strong>11</strong><br />

9.13<br />

9.68<br />

0.96<br />

3.97<br />

2.62<br />

10.02<br />

31612<br />

19160<br />

14033<br />

20200<br />

10695<br />

22943<br />

Total 36.38 59.99 14.62 10.17 81.96<br />

Total for <strong>IWMP</strong> 33.97 21.94 10.75 7.18 26.83<br />

Convergence MNREGA 2.41 38.05 3.87 2.99 55.13<br />

Silvi-postoral System<br />

A. Trees + Grasses<br />

15.64<br />

9.48<br />

6.94<br />

9.99<br />

5.59<br />

12.34<br />

16661<br />

1090<br />

15489<br />

3680<br />

1898<br />

-<br />

8.24<br />

0.54<br />

3.03<br />

1.82<br />

0.99<br />

-<br />

-<br />

770<br />

1030<br />

470<br />

-<br />

16819<br />

Est.<br />

Cost<br />

-<br />

0.38<br />

0.51<br />

0.23<br />

-<br />

9.05<br />

Qnty<br />

14572<br />

33481<br />

32554<br />

21850<br />

12506<br />

45971<br />

Est.<br />

Cost<br />

7.21<br />

16.56<br />

16.10<br />

10.81<br />

6.54<br />

24.73<br />

136


II<br />

1. Sirash - Stylo hamata &<br />

Cencrush (1:1) ha 2 0.40 2 0.40 2 0.40 2 0.40 2 0.40<br />

3. Subabul - Stylo hamata<br />

& Cencrush (1:1) 1 0.21 1 0.21 1 0.21 1 0.21 1 0.21<br />

B. Grasses species<br />

1. Hetropogon /<br />

Crysopogon (On bund) ha 10 0.30 10 0.30 10 0.30 10 0.30 10 0.30<br />

2. Cencrush (On bund) ha 10 0.30 10 0.30 10 0.30 10 0.30 10 0.30<br />

3. Dina Nath grass (On<br />

bund) ha 10 0.30 10 0.30 10 0.30 10 0.30 10 0.30<br />

Total 33 1.510 33 1.510 33 1.510 33 1.510 33 1.510<br />

Convergence MNREGA<br />

(Including Silvi-postoral<br />

Syst)<br />

Livelihood for landless<br />

People<br />

No<br />

4/40 0.97<br />

1/10 0.25 1/10 0.23 2/20 0.48<br />

3/30 0.74<br />

1. Goatary<br />

SHGs/Member<br />

No<br />

2/20 0.49<br />

1/10 0.25 1/10 0.23 2/20 0.48<br />

1/10 0.24<br />

2. Back Yard Poultry SHGs/Member<br />

No<br />

2/20 0.49<br />

1/10 0.25 1/10 0.23 2/20 0.48<br />

1/10 0.24<br />

3. Poultry (Broiler) SHGs/Member<br />

No<br />

2/20 0.48<br />

1/10 0.25 1/10 0.23 2/20 0.47<br />

1/10 0.24<br />

4. Black Smithy<br />

SHGs/Member<br />

No<br />

2/20 0.48<br />

1/10 0.25 1/10 0.23 1/10 0.24<br />

1/10 0.24<br />

5. Rope Making (Linseed) SHGs/Member<br />

No<br />

2/20 0.48<br />

1/10 0.24<br />

1/10 0.24 - - 1/10 0.24<br />

6. Tailoring<br />

7. Repairing of Diesel<br />

Engine / Implements<br />

8. Vermi composting<br />

9. Fruit Processing<br />

SHGs/Member<br />

No<br />

SHGs/Member<br />

No<br />

SHGs/Member<br />

No<br />

SHGs/Member<br />

1/1 0.15<br />

2/20 0.48<br />

1/10 0.24<br />

1/1 0.15<br />

1/10 0.24<br />

1/10 0.24<br />

- - - - - -<br />

1/10 0.24 - - 1/10 0.24<br />

- - - - 2/20 0.48<br />

137


III<br />

No<br />

2/20 0.48<br />

- - - - 2/20 0.48<br />

1/10 0.24<br />

10. Mini Dal Mill<br />

SHGs/Member<br />

No<br />

1/10 0.24<br />

- - - - 1/10 0.24<br />

1/10 0.24<br />

<strong>11</strong>. Mini flour Mill SHGs/Member<br />

No<br />

1/10 0.24<br />

- - - - 1/10 0.24<br />

1/10 0.24<br />

12. Mini Oil Expeller SHGs/Member<br />

No<br />

1/10 0.24<br />

- - - - 1/10 0.24<br />

1/10 0.24<br />

13. Carpentry<br />

SHGs/Member<br />

Total 23/221 5.46 15/141 3.53 7/70 1.73 5/50 1.15 12/120 4.31<br />

Agriculture Production<br />

System<br />

A- Crop<br />

Demonstrations- (Crop<br />

Wise)<br />

(1)SMC Area:<br />

1. Lentil (ICM)<br />

2. Chickpea (ICM)<br />

3. Field Pea (ICM)<br />

4. Linseed (ICM)<br />

5. Mustard (ICM)<br />

6. Til (IPNM)<br />

7. Urd (ICM)<br />

8. Sorghum (ICM)<br />

9. Arhar (ICM)<br />

No. of farmers<br />

/Area (ha) 10/5 0.235 10/5 0.235 10/5 0.235 10/5 0.23 10/5 0.235<br />

No. of farmers<br />

/Area 2/1 0.055 2/1 0.055 2/1 0.055 2/1 0.05 2/1 0.055<br />

No. of farmers<br />

/Area 8/4 0.23 8/4 0.23 8/4 0.23 8/4 0.23 8/4 0.23<br />

No. of farmers<br />

/Area 6/3 0.09 6/3 0.09 6/3 0.09 6/3 0.09 6/3 0.09<br />

No. of farmers<br />

/Area 10/5 0.14 10/5 0.14 10/5 0.14 - - 10/5 0.14<br />

No. of farmers<br />

/Area 10/5 0.18 10/5 0.18 10/5 0.18 10/5 0.18 10/5 0.18<br />

No. of farmers<br />

/Area 6/3 0.<strong>11</strong>5 6/3 0.<strong>11</strong>5 6/3 0.<strong>11</strong>5 6/3 0.<strong>11</strong> 6/3 0.<strong>11</strong>5<br />

No. of farmers<br />

/Area 10/5 0.18 10/5 0.18 10/5 0.18 10/5 0.18 10/5 0.18<br />

No. of farmers<br />

/Area 6/3 0.09 6/3 0.09 6/3 0.09 6/3 0.09 6/3 0.09<br />

138


10. Wheat<br />

B- Production of seeds<br />

1. Lentil<br />

2. Chickpea<br />

3. Field Pea<br />

4. Linseed<br />

5. Mustard<br />

6. Wheat<br />

7. Til<br />

No. of farmers<br />

/Area 5/2.5 0.12 5/2.5 0.12 5/2.5 0.12 5/2.5 0.12 5/2.5 0.12<br />

No. of farmers<br />

/Area<br />

No. of farmers<br />

/Area<br />

No. of farmers<br />

/Area<br />

No. of farmers<br />

/Area<br />

No. of farmers<br />

/Area<br />

No. of farmers<br />

/Area<br />

No. of farmers<br />

/Area<br />

No. of farmers<br />

/Area<br />

10/5 0.30 10/5 0.30 10/5 0.30<br />

6/3 0.20 6/3 0.20<br />

2/1 0.08 2/1 0.08 2/1 0.08<br />

4/2 0.075 4/2 0.075 4/2 0.075<br />

4/2 0.02 4/2 0.02 4/2 0.02<br />

4/2 0.05 4/2 0.05 - -<br />

4/2 0.01 4/2 0.01 4/2 0.01<br />

4/2 0.25 4/2 0.25 - -<br />

- -<br />

- - - -<br />

- -<br />

- -<br />

- -<br />

- -<br />

- -<br />

10/5 0.30<br />

6/3 0.20<br />

2/1 0.08<br />

4/2 0.075<br />

4/2 0.02<br />

4/2 0.05<br />

4/2 0.01<br />

4/2 0.25<br />

8. Urd<br />

- -<br />

Agro forestry:-<br />

A. Scattered Plantation<br />

Species…..<br />

1- Aonla (@Rs.25/Plant) No. of Plants 480 0.12 680 0.17 - - - - 320 0.08<br />

2- Ber (@Rs.20/Plant) No. of Plants 500 0.10 600 0.12 - - - - 300 0.06<br />

3- Bael (@Rs.20/Plant) No. of Plants 500 0.10 600 0.12 - - - - 300 0.06<br />

4 - Citrus spp..<br />

- -<br />

500 0.10 600 0.12<br />

(@Rs.20/Plant)<br />

No. of Plants<br />

- -<br />

300 0.06<br />

5. Guava (@Rs.25/Plant) No. of Plants 480 0.12 600 0.15 - - - - 320 0.08<br />

B. Agri-Horticultural<br />

System<br />

Species<br />

1- Aonla Area in ha 2.5 0.30 2.0 0.24 - - - - 2.0 0.25<br />

2- Ber Area in ha 2.0 0.23 1.0 0.<strong>11</strong>5 - - - - 2.0 0.25<br />

5. Guava Area in ha 1.0 0.<strong>11</strong>5 0.50 0.055 - - - - 1.5 0.17<br />

139


C Block Plantation/<br />

Orchard<br />

Species…..<br />

1- Guava (Spacing 8 X 6<br />

- -<br />

3.0 0.36 2.0 0.24<br />

M) Area in ha<br />

- -<br />

2.0 0.24<br />

2- Ber (Sapcing 8 X 5 M) Area in ha 2.5 0.29 1.0 0.<strong>11</strong>5 - - - - 2.0 0.23<br />

3- Aonla (Spacing 8 X 8 M<br />

- -<br />

2.0 0.23 0.50 0.055<br />

) Area in ha<br />

- -<br />

1.5 0.17<br />

D. Afforestation on<br />

Private Land<br />

Species<br />

1- Teak (@Rs.25/Plant) No 400 0.10 - - - - - - 720 0.18<br />

2- Shisham (@Rs.25/Plant) No 400 0.10 - - - - - - 600 0.15<br />

3. Bael (@Rs.20/Plant) No 400 0.08 - - - - - - 600 0.12<br />

4. Jamun (Scattered<br />

No<br />

- -<br />

400 0.08 - -<br />

plantation) (@Rs.20/Plant)<br />

- -<br />

600 0.12<br />

5. Phalsa (On Bund)<br />

No<br />

- -<br />

400 0.10 - -<br />

(@Rs.25/Plant)<br />

- -<br />

600 0.15<br />

Live Stock Management<br />

A. Rearing of Milch<br />

cattle-<br />

1- Cow- (Castration-@30<br />

- -<br />

No. of Animals 33 0.01 - -<br />

Rs./ Animal)<br />

- - - -<br />

2- Buffalloes- (He-buffallo<br />

- -<br />

No. of Animals 1 0.12 - -<br />

Young)<br />

- - - -<br />

3- Goatry- (@ Rs.<br />

- -<br />

No. of Animals 500 0.04 - -<br />

8/Animal)<br />

- - - -<br />

4- Broiler-<br />

- -<br />

No. of Unit 2 0.12 - -<br />

(@Rs.6000/Unit)<br />

- - - -<br />

5- Layers-<br />

No. of Unit 4 0.24 - -<br />

- -<br />

(@Rs.6000/Unit)<br />

6- Fisheries – (@Rs.<br />

1500/1000 Fingerlings)<br />

No. of<br />

Fingerlings<br />

- - - -<br />

- -<br />

- - - -<br />

- - - -<br />

140


7- Dairy – (Sanitation,<br />

Cleaning and Mineral<br />

Mixture-@ Rs. 250/<br />

Animal)<br />

8- Green Fodder<br />

(@Rs.1600/demo.area-0.2<br />

ha)<br />

B. Veterinary Services/<br />

1- Vaccination/Medication<br />

(@ Rs. 5/Animal/AH<br />

Deptt. Levi rate @ Rs. 2/<br />

Animal)<br />

2- Infertility Management<br />

(@ Rs. 5/Animal/AH<br />

Deptt. Levi rate @ Rs. 2/<br />

No. of Animals 126 0.315 - -<br />

ha/farmer 2.4/12 0.20 - -<br />

No. of Animals<br />

400 0.02 - -<br />

400 0.02 - -<br />

- -<br />

- -<br />

- -<br />

- -<br />

- - - -<br />

- - - -<br />

- - - -<br />

Animal)<br />

No. of Animals<br />

- - - -<br />

3- Others No. of Animals - - - - - - - - - -<br />

C. Live stock<br />

Improvement Measures<br />

1- Artificial Insemination<br />

(@ Rs. 40/ Animal)<br />

2- Natural Service.<br />

No. of Animals<br />

He Buffalo/<br />

Bull<br />

100 0.04 - -<br />

- -<br />

- -<br />

- -<br />

- - - -<br />

- - - -<br />

Total for Ag. Production System 6.07 3.92 1.92 1.28 4.79<br />

141


S.<br />

N<br />

o.<br />

I<br />

B<br />

Particular of<br />

Measures/Activities<br />

Unit Pasaura Garha Punchhi Tatal<br />

No., Length/ ha,<br />

Volume Qanty. Cost Qanty. Cost Qanty. Cost Qnty Est. Cost<br />

Soil & Water<br />

Conservation Measures<br />

A- Moisture Conservation<br />

Measures<br />

1. Field Bund - - - - - - - - -<br />

2. Contour Bund (with<br />

Sodding)<br />

cum<br />

3. Peripheral Bund (with<br />

Sodding)<br />

cum<br />

4. Marginal Bund (with<br />

Sodding)<br />

cum<br />

5.Submergence Bundhi<br />

(with Sodding)<br />

cum<br />

B- Water Resource<br />

Development<br />

1. Tank/Pond No<br />

2- Water Harvesting<br />

Bundhi/<br />

3-GP<br />

4. Field Drainage Structure/<br />

Drop Spill Way<br />

5-ECD<br />

cum<br />

No<br />

40550<br />

31646<br />

25062<br />

28388<br />

8<strong>11</strong><br />

27686<br />

20.06<br />

15.66<br />

12.40<br />

14.04<br />

0.95<br />

14.90<br />

Total 78.00 10.78 9.01 764.22<br />

Total for <strong>IWMP</strong> 23.50 3.85 7.58 376.32<br />

Convergence MNREGA 54.50 6.93 1.43 387.90<br />

Silvi-postoral System<br />

A. Trees + Grasses<br />

1. Sirash - Stylo hamata &<br />

Cencrush (1:1) ha 2 0.40 2 0.40 2 0.40 2 0.40<br />

15865<br />

1082<br />

-<br />

4844<br />

-<br />

7.85<br />

0.54<br />

-<br />

2.40<br />

-<br />

-<br />

-<br />

<strong>11</strong>30<br />

2948<br />

1639<br />

<strong>11</strong>385<br />

-<br />

-<br />

0.56<br />

1.46<br />

0.86<br />

6.13<br />

142


II<br />

3. Subabul - Stylo hamata<br />

& Cencrush (1:1) 1 0.21 1 0.21 1 0.21 1 0.21<br />

B. Grasses species<br />

1. Hetropogon /<br />

Crysopogon (On bund) ha 10 0.30 10 0.30 10 0.30 10 0.30<br />

2. Cencrush (On bund) ha 10 0.30 10 0.30 10 0.30 10 0.30<br />

3. Dina Nath grass (On<br />

bund) ha 10 0.30 10 0.30 10 0.30 10 0.30<br />

Total 33 1.510 33 1.510 33 1.510 33 1.510<br />

Convergence MNREGA<br />

(Including Silvi-postoral<br />

Syst)<br />

Livelihood for landless<br />

People<br />

No<br />

3/30 0.74 1/10 0.24 1/10 0.25 42/420 10.25<br />

1. Goatary<br />

SHGs/Member<br />

No<br />

1/10 0.24 1/10 0.24 1/10 0.25 28/280 6.78<br />

2. Back Yard Poultry SHGs/Member<br />

No<br />

2/20 0.49<br />

1/10 0.24 22/220 5.30<br />

- -<br />

3. Poultry (Broiler) SHGs/Member<br />

No<br />

1/10 0.24<br />

1/10 0.24 21/210 5.08<br />

- -<br />

4. Black Smithy<br />

SHGs/Member<br />

No<br />

1/10 0.24<br />

1/10 0.24 21/210 5.06<br />

- -<br />

5. Rope Making (Linseed) SHGs/Member<br />

No<br />

1/10 0.24<br />

- - - -<br />

18/180 4.33<br />

6. Tailoring<br />

7. Repairing of Diesel<br />

Engine / Implements<br />

8. Vermi composting<br />

9. Fruit Processing<br />

10. Mini Dal Mill<br />

SHGs/Member<br />

No<br />

SHGs/Member<br />

No<br />

SHGs/Member<br />

No<br />

SHGs/Member<br />

No<br />

SHGs/Member<br />

1/1 0.15<br />

1/10 0.24<br />

1/10 0.24<br />

1/10 0.24<br />

1/1 0.14 - -<br />

- - - -<br />

- - - -<br />

- - - -<br />

12/12 1.79<br />

18/180 4.33<br />

15/150 3.60<br />

17/170 4.10<br />

143


III<br />

No<br />

1/10 0.24<br />

13/130 3.13<br />

- - - -<br />

<strong>11</strong>. Mini flour Mill SHGs/Member<br />

No<br />

1/10 0.24<br />

15/150 3.61<br />

- - - -<br />

12. Mini Oil Expeller SHGs/Member<br />

No<br />

1/10 0.24<br />

13/130 3.12<br />

- - - -<br />

13. Carpentry<br />

SHGs/Member<br />

Total 16/151 3.78 3/21 0.62 5/50 1.22 255/2442 60.48<br />

Agriculture Production<br />

System<br />

A- Crop<br />

Demonstrations- (Crop<br />

Wise)<br />

(1)SMC Area:<br />

1. Lentil (ICM)<br />

2. Chickpea (ICM)<br />

3. Field Pea (ICM)<br />

4. Linseed (ICM)<br />

5. Mustard (ICM)<br />

6. Til (IPNM)<br />

7. Urd (ICM)<br />

8. Sorghum (ICM)<br />

9. Arhar (ICM)<br />

10. Wheat<br />

B- Production of seeds<br />

No. of farmers<br />

/Area (ha) 10/5 0.235 10/5 0.23 10/5 0.235<br />

No. of farmers<br />

/Area 2/1 0.055 2/1 0.05 2/1 0.055<br />

No. of farmers<br />

/Area 8/4 0.23 8/4 0.23 8/4 0.23<br />

No. of farmers<br />

/Area 6/3 0.09 6/3 0.09 - -<br />

No. of farmers<br />

/Area 10/5 0.14 - - 10/5 0.14<br />

No. of farmers<br />

/Area 10/5 0.18 - - 10/5 0.185<br />

No. of farmers<br />

/Area 6/3 0.<strong>11</strong>5 - - 6/3 0.<strong>11</strong>5<br />

No. of farmers<br />

/Area 10/5 0.18 - - 10/5 0.18<br />

No. of farmers<br />

/Area 6/3 0.09 6/3 0.09 6/3 0.09<br />

No. of farmers<br />

/Area 5/2.5 0.12 - - 5/2.5 0.12<br />

144


No. of farmers 10/5 0.30<br />

1. Lentil<br />

/Area<br />

- - - -<br />

No. of farmers 6/3 0.20<br />

2. Chickpea<br />

/Area<br />

- - - -<br />

No. of farmers 2/1 0.08<br />

3. Field Pea<br />

/Area<br />

- - - -<br />

No. of farmers 4/2 0.075<br />

4. Linseed<br />

/Area<br />

- - - -<br />

No. of farmers 4/2 0.02<br />

5. Mustard<br />

/Area<br />

- - - -<br />

No. of farmers 4/2 0.05<br />

6. Wheat<br />

/Area<br />

- - - -<br />

No. of farmers 4/2 0.01<br />

7. Til<br />

/Area<br />

- - - -<br />

No. of farmers 4/2 0.25<br />

8. Urd<br />

/Area<br />

- - - -<br />

Agro forestry:-<br />

A. Scattered Plantation<br />

Species…..<br />

1- Aonla (@Rs.25/Plant) No. of Plants 680 0.17 - - - -<br />

2- Ber (@Rs.20/Plant) No. of Plants 600 0.12 - - - -<br />

3- Bael (@Rs.20/Plant) No. of Plants 700 0.14 - - - -<br />

4 - Citrus spp..<br />

700 0.14<br />

(@Rs.20/Plant)<br />

No. of Plants<br />

- - - -<br />

5. Guava (@Rs.25/Plant) No. of Plants 600 0.15 - - - -<br />

B. Agri-Horticultural<br />

System<br />

Species<br />

1- Aonla Area in ha 2.0 0.24 - - - -<br />

2- Ber Area in ha 1.0 0.<strong>11</strong>5 - - - -<br />

5. Guava Area in ha 0.50 0.055 - - - -<br />

C Block Plantation/<br />

Orchard<br />

Species…..<br />

145


1- Guava (Spacing 8 X 6<br />

2.0 0.24<br />

M) Area in ha<br />

- - - -<br />

2- Ber (Sapcing 8 X 5 M) Area in ha 1.0 0.<strong>11</strong>5 - - - -<br />

3- Aonla (Spacing 8 X 8 M<br />

0.50 0.055<br />

) Area in ha<br />

- - - -<br />

D. Afforestation on<br />

Private Land<br />

Species<br />

1- Teak (@Rs.25/Plant) No 200 0.05 - - - -<br />

2- Shisham (@Rs.25/Plant) No 200 0.05 - - - -<br />

3. Bael (@Rs.20/Plant) No 250 0.05 - - - -<br />

4. Jamun (Scattered<br />

No<br />

200 0.04<br />

plantation) (@Rs.20/Plant)<br />

- - - -<br />

5. Phalsa (On Bund)<br />

No<br />

200 0.05<br />

(@Rs.25/Plant)<br />

- - - -<br />

Live Stock Management<br />

A. Rearing of Milch<br />

cattle-<br />

1- Cow- (Castration-@30<br />

No. of Animals - -<br />

Rs./ Animal)<br />

- - - -<br />

2- Buffalloes- (He-buffallo<br />

No. of Animals - -<br />

Young)<br />

- - - -<br />

3- Goatry- (@ Rs.<br />

No. of Animals - -<br />

8/Animal)<br />

- - - -<br />

4- Broiler-<br />

No. of Unit - -<br />

(@Rs.6000/Unit)<br />

- - - -<br />

5- Layers-<br />

No. of Unit - -<br />

(@Rs.6000/Unit)<br />

- - - -<br />

6- Fisheries – (@Rs. No. of<br />

- -<br />

1500/1000 Fingerlings) Fingerlings<br />

- - - -<br />

7- Dairy – (Sanitation,<br />

Cleaning and Mineral<br />

No. of Animals - -<br />

Mixture-@ Rs. 250/<br />

Animal)<br />

- - - -<br />

146


8- Green Fodder<br />

(@Rs.1600/demo.area-0.2<br />

ha)<br />

B. Veterinary Services/<br />

1- Vaccination/Medication<br />

(@ Rs. 5/Animal/AH<br />

Deptt. Levi rate @ Rs. 2/<br />

Animal)<br />

2- Infertility Management<br />

(@ Rs. 5/Animal/AH<br />

Deptt. Levi rate @ Rs. 2/<br />

Animal)<br />

ha/farmer - -<br />

No. of Animals<br />

- -<br />

- -<br />

- - - -<br />

- - - -<br />

No. of Animals<br />

- - - -<br />

3- Others No. of Animals - - - - - -<br />

C. Live stock<br />

Improvement Measures<br />

1- Artificial Insemination<br />

(@ Rs. 40/ Animal)<br />

2- Natural Service.<br />

No. of Animals<br />

He Buffalo/<br />

Bull<br />

- -<br />

- -<br />

- - - -<br />

- - - -<br />

Total for Ag. Production System 4.20 0.69 1.35 67.20<br />

147


DESIGN AND ESTIMATES OF CHECKDAM<br />

Design of Drop Structure/Drop Spillway of 3 m crest<br />

HYDROLOGIC DESIGN<br />

Area<br />

(ha) 25<br />

slope 0.015<br />

K 7.47<br />

a 0.17<br />

b 0.75<br />

n 0.96<br />

Time of Concentration<br />

Le.77<br />

L (m) 200 59.12799<br />

Se-0.385<br />

S 0.015 5.0373818<br />

hour Tc + b (tc+b) power n<br />

Tc 5.7991 0.096652 0.8466524 0.852308737<br />

Intensity<br />

Tr power a<br />

Tr 15 1.584658<br />

I 13.88862<br />

Discharge<br />

Taken<br />

c 0.5 Coeff<br />

I 138.8862 mm/hr<br />

A 25 ha<br />

Q 4.822438 Cumec<br />

HYDRAULIC DESIGN<br />

148


Length of crest weir (m) 3<br />

Weir height (m)<br />

Q = 1.71*L*h power (3/2)<br />

h power 3/2 0.940046<br />

h<br />

h 0.95966 0.95 h1<br />

h + free board 1.055626 1<br />

Depth of gulley 2<br />

Height of water drop (H) 1 Say 1<br />

STABILITY ANALYSIS<br />

Let Top width (m) t 0.5<br />

Bottom width (m) T 1.1<br />

Weight of dam per unit length (kg) W 1760 W square 3097600<br />

Horizontzl water pressure (Kg) P 500 P square 250000<br />

Uplift pressure (kg) U (T*w*H)/2 550<br />

Net downword force (kg) Wn W-U 1210<br />

Wn<br />

Square 1464100<br />

Resultant (kg) R 1309.23642<br />

H 1<br />

Xbar 0.41875<br />

Z 0.1614153<br />

Point of Resultant (xbar+Z) 0.5801653<br />

EA 0.68125<br />

P*H/3 166.66667<br />

W*EA <strong>11</strong>99<br />

b/6 0.1833333<br />

b/2 0.55<br />

e = xbar+Z-b/2 e (OF) 0.0301653<br />

149


fmax = Wn/b(1+6*e/b) fmax 1280.9917<br />

A Safety against sliding<br />

(mu*W)/P 1.21<br />

B Safety against overturning (W*EA)/(P*H/3) 2.1049983<br />

C Safety against Tension e


Height of the sidewall at the weir end<br />

Length of Wing wall (WL)<br />

Depth of Toe Wall<br />

J (m) 1.5h1 1.425<br />

more than<br />

H/2 0.5 1.40<br />

Equal to gully depth 2 2.00<br />

M (m) 2(F+1.33h-J) 1.26 1.70<br />

K (m) Lb+.1-M 1.44 1.50<br />

WL = 2.25h 2.25 2.25<br />

h1+0.1 1.05 1.10<br />

WORK ABSTRACT<br />

Sl.<br />

No.<br />

Item<br />

Specification (m)<br />

Length Breadth Depth<br />

Clearing of site (Removal of trees, shrubs and<br />

1 bushes) 10.00 10.00<br />

2 Earth work<br />

Quantity<br />

(cum)<br />

a) in hard soil Headwall Foundation 3.00 1.90 1.00 5.70 Effective depth will be 0.75 m<br />

b) in hard soil RHS of Headwall extension 3.50 1.90 2.00 13.30 Effective depth will be 0.75 m<br />

c) in hard soil LHS of Headwall extension 3.50 1.90 2.00 13.30 Effective depth will be 0.75 m<br />

d) in hard soil cutoff wall 10.00 1.20 0.50 6.00<br />

e)in hard soil side wall on both side 6.40 1.60 3.00 30.72 Effective depth will be 0.8 m<br />

151


f) in hard soil Toe wall 3.00 1.40 1.20 5.04 Effective depth will be 1.10 m<br />

g) in hard soil Wing wall on both side 4.50 1.40 3.00 18.90 Effective depth will be 0.8 m<br />

h) Apron 2.60 3.00 0.40 3.12<br />

Total 96.08<br />

3 Cement concrete<br />

Cement Concrete (1:2:4)<br />

a) cutoff wall 10.00 0.50 0.50 2.50<br />

b) Head wall coping 3.00 0.50 0.05 0.08<br />

c) Apron 2.60 3.00 0.05 0.39<br />

d) Transverse sill coping 3.00 0.50 0.05 0.08<br />

Total 3.04<br />

Cement Concrete (1:4:8)<br />

e) Cutoff wall 10.00 0.80 0.15 1.20<br />

f) Toe wall 3.00 0.90 0.15 0.41<br />

g) Apron 2.60 3.00 0.15 1.17<br />

h) Side wall on both side 6.40 1.20 0.15 1.15<br />

i) Wing wall on both side 4.50 1.00 0.15 0.68<br />

j)Headwall and Headwall Extension 10.00 1.30 0.15 1.95<br />

Total 6.55<br />

4 Requirement of sand to nullify the impact of cracks<br />

a) Below cutoff wall 10.00 0.70 0.10 0.70<br />

b)Below Headwall and headwall extension 10.00 0.70 0.10 0.70<br />

c) Below side wall on both sides 6.40 1.20 0.10 0.77<br />

d) Below wing wall on both side 4.50 1.00 0.10 0.45<br />

e) Below apron 2.60 3.00 0.10 0.78<br />

152


f) Below Toe wall 3.00 0.90 0.10 0.27<br />

Total 3.67<br />

5 Stone Masonary in CM 1:4<br />

a) Headwall and Headwall Extension on both side-<br />

Foundation 10.00 1.10 0.75 8.25<br />

b) Headwall+ Headwall Extension on both side<br />

above gully bed-super structure 10.00 0.80 1.00 8.00 Width=(0.5+1.1)/2= 0.8 m<br />

c) Headwall Extension on both the side above crest 7.00 0.50 1.00 3.50<br />

d) Foundation for side wall on both side 6.40 1.00 0.80 5.12<br />

e) Side wall on both side -super structure (K Part)-I 3.00 0.80 1.40 3.36<br />

f) Side wall on both side-above part-I mentioned in<br />

(e): (K Part)-II 3.00 0.60 0.60 1.08<br />

g) Side wall on both side-Super structure (M Part)-I 3.40 0.80 1.40 3.81<br />

h) Side wall on both side above Part-I mentioned in<br />

(i): (M Part)-II 3.40 0.60 0.30 0.61<br />

i) Foundation for wing wall on both side 4.50 0.80 0.80 2.88<br />

j) Wing wall on both side-Super structure- Part- I 4.50 0.70 0.60 1.89<br />

k) Wing wall on both side-Above Part-I mentioned<br />

in (l): Part -II 4.50 0.60 0.40 1.08<br />

l) Toe wall: Part I 3.00 0.70 0.70 1.47<br />

m) Toe wall: Part II 3.00 0.60 0.40 0.72<br />

n) Transverse Sill 3.00 0.60 0.30 0.54<br />

o) Apron 2.60 3.00 0.40 3.12<br />

Total 45.43<br />

Avg. ht. of triangle<br />

portion= 0.30<br />

Avg. ht. of triangle<br />

portion= 0.40<br />

153


6 M S Bar (10 mm, q) 2.00<br />

7 Providing rough stone pitching in u/s (both side) 34.00 2.00 0.25 17.00<br />

8<br />

Cement pointing to stone masonary in CM 1:3<br />

(sqm)<br />

a) Headwall both side 6.00 1.00 6.00<br />

b) Side wall both side (RHS and LHS)-Part I 6.40 1.40 8.96<br />

c) Side wall both side (RHS and LHS)-Part II 3.00 0.60 1.80<br />

9<br />

d) Side wall both side (RHS and LHS)-Part-III<br />

3.40 0.30 1.02<br />

e) Wing wall both side-Part I 4.50 0.60 2.70<br />

f) Wing wall both side-Part I 6.00 0.40 2.40<br />

Total 22.88<br />

Filling of black clay soil in the up stream (free<br />

from any kind of gravel) 3.00 trolly<br />

Avg. ht. of triangle<br />

portion= 0.30<br />

Avg. ht. of triangle<br />

portion= 0.40<br />

MATERIAL ABSTRACT<br />

Required Quantiy<br />

Quantiy, cum Cement, bags Sand, cum Conc ,cum<br />

Khanda<br />

(cum) Boulder (cum) MS Bar (q)<br />

1<br />

Cement Concrete mix for cutoff<br />

wall (1:2:4): 12 mm conc. 3.04 19.46 1.37 2.74<br />

2<br />

Cement Concrete mix for cutoff<br />

wall (1:4:8); 20 mm conc. 6.55 22.28 3.08 6.16<br />

3 Stone Maspnary in CM 1:4 45.43 <strong>11</strong>3.58 15.45 45.43<br />

4 MS Bar for reinforcing 1.50<br />

5 Boulder for pitching 17.00 17.00<br />

Cement pointing to stone<br />

6 masonary in CM 1:3 (sqm) 22.88 1.42 0.14<br />

154


7 Black clay soil (gravel free) 3.00<br />

Requirement of sand to nullify<br />

the impact of cracks in black<br />

8 soil 3.67<br />

Total 156.73 23.71 8.89 45.43 17.00 1.50<br />

COST ABSTRACT<br />

Sl. No. Item Quantity Unit Rate (Rs./Unit) Amount (Rs.)<br />

A 1 Cement 157 Bag 250.00 39181.59<br />

B 9<br />

2 Sand 23.71 m 3 950.00 22520.49<br />

3 Concrete-12 mm 2.74 m 3 1500.00 4104.00<br />

4 Concrete-20 mm 6.16 m 3 1250.00 7698.60<br />

5 Khanda 45 m 3 1350.00 61330.50<br />

6 M S Bar (10 mm Saria) 2.00 q 4800.00 9600.00<br />

7 Boulder 17.00 m 3 900.00 15300.00<br />

8<br />

Filling of black clay soil in the<br />

up stream (free from any kind<br />

of gravel) 3.00 1800.00 5400.00<br />

Total 165135.18<br />

Water supply through tanker @<br />

3 % of material cost 4954.06<br />

C 9 Labour Charges @ 25% 41283.80<br />

Total (A+B+C) 2<strong>11</strong>373.04<br />

10 Misc. @ 3% 6341.19<br />

G. Total 217714.23<br />

Say Rs. 218000/- (Rs. Two lakh eighteen thousand only)<br />

155


Note: The cost of materials is inclusive of all taxes and transportation to site. It may vary with respect to place and time<br />

HYDROLOGIC DESIGN<br />

Area<br />

(ha) 40<br />

slope 0.008<br />

K 7.47<br />

a 0.17<br />

b 0.75<br />

n 0.96<br />

Time of Concentration<br />

Le.77 Se-0.385<br />

L (m) 500 <strong>11</strong>9.73<strong>11</strong><br />

S 0.008 6.4166796<br />

hour Tc + b (tc+b) power n<br />

Tc 14.958 0.249306 0.9993056 0.999333<br />

Intensity<br />

Tr power a<br />

Tr 15 1.584658<br />

I <strong>11</strong>.84529<br />

Discharge<br />

Taken<br />

c 0.5 Coeff<br />

I <strong>11</strong>8.4529 mm/hr<br />

A 40 ha<br />

Q 6.580717 Cumec<br />

HYDRAULIC DESIGN<br />

Length of crest weir (m) 4<br />

Weir height (m)<br />

h<br />

Q = 1.71*L*h power (3/2)<br />

h power 3/2 0.962093<br />

h 0.974591 0.95 h1<br />

h + free board 1.072051 1<br />

Depth of gulley 2<br />

Height of water drop (H) 1 Say 1<br />

STABILITY ANALYSIS<br />

Let Top width (m) t 0.5<br />

156


Bottom width (m) T 1.1<br />

Weight of dam per unit length (kg) W 1760 W square 3097600<br />

Horizontzl water pressure (Kg) P 500 P square 250000<br />

Uplift pressure (kg) U (T*w*H)/2 550<br />

Net downword force (kg) Wn W-U 1210 Wn Square 1464100<br />

Resultant (kg) R 1309.236419<br />

H 1<br />

Xbar 0.41875<br />

Z 0.16141529<br />

Point of Resultant (xbar+Z) 0.58016529<br />

EA 0.68125<br />

P*H/3 166.666667<br />

W*EA <strong>11</strong>99<br />

b/6 0.18333333<br />

b/2 0.55<br />

e = xbar+Z-b/2 e (OF) 0.03016529<br />

fmax = Wn/b(1+6*e/b) fmax 1280.99174<br />

A Safety against sliding<br />

(mu*W)/P 1.21<br />

B Safety against overturning (W*EA)/(P*H/3) 2.10499827<br />

C Safety against Tension e


St= height of transverse sill= h/3 0.33333333 0.30<br />

F (m) 0.7<br />

E (m) 3.6 or 1.05 say 3.50<br />

Length of Basin Lb<br />

Lb (m)= F(2.28*h/F+0.52) 2.644 say 2.60<br />

Height of the sidewall at end sill is taken to be minimum 1.5h1,but more than H/2<br />

J (m) 1.5h1 1.425 more than H/2 0.5 1.40<br />

Height of the sidewall at the weir end<br />

Equal to gully depth 2 2.00<br />

M (m) 2(F+1.33h-J) 1.26 1.70<br />

K (m) Lb+.1-M 1.44 1.50<br />

Length of Wing wall (WL)<br />

WL = 2.25h 2.25 2.25<br />

Depth of Toe Wall<br />

h1+0.1 1.05 1.10<br />

WORK ABSTRACT<br />

Sl. No.<br />

Item<br />

Specification (m)<br />

Length Breadth Depth<br />

Quantity<br />

(cum)<br />

1<br />

Clearing of site (Removal of trees, shrubs<br />

and bushes) 10.00 10.00<br />

2 Earth work<br />

a) in hard soil Headwall Foundation 4.00 1.90 1.00 7.60 Effective depth will be 0.70 m<br />

b) in hard soil RHS of Headwall extension 3.50 1.90 2.00 13.30 Effective depth will be 0.75 m<br />

c) in hard soil LHS of Headwall extension 3.50 1.90 2.00 13.30 Effective depth will be 0.75 m<br />

d) in hard soil cutoff wall <strong>11</strong>.00 1.20 0.75 9.90<br />

e)in hard soil side wall on both side 6.40 1.60 3.00 30.72 Effective depth will be 1 m<br />

f) in hard soil Toe wall 4.00 1.40 1.20 6.72 Effective depth will be 1.10 m<br />

g) in hard soil Wing wall on both side 4.50 1.40 3.00 18.90 Effective depth will be 1 m<br />

h) Apron 2.60 4.00 0.40 4.16<br />

Total 104.60<br />

3 Cement concrete<br />

Cement Concrete (1:2:4)<br />

158


4<br />

a) cutoff wall <strong>11</strong>.00 0.50 0.70 3.85<br />

b) Head wall coping 4.00 0.50 0.05 0.10<br />

c) Apron 2.60 4.00 0.05 0.52<br />

d) Transverse sill coping 4.00 0.50 0.05 0.10<br />

Total 4.57<br />

Cement Concrete (1:4:8)<br />

e) Cutoff wall <strong>11</strong>.00 0.70 0.15 1.16<br />

f) Toe wall 4.00 0.90 0.15 0.54<br />

g) Apron 2.60 4.00 0.15 1.56<br />

h) Side wall on both side 6.40 1.20 0.15 1.15<br />

i) Wing wall on both side 4.50 1.00 0.15 0.68<br />

j)Headwall and Headwall Extension 10.00 1.30 0.15 1.95<br />

Total 7.03<br />

Requirement of sand to nullify the impact of<br />

cracks<br />

a) Below cutoff wall <strong>11</strong>.00 0.70 0.10 0.77<br />

b)Below Headwall and headwall extension <strong>11</strong>.00 0.70 0.10 0.77<br />

c) Below side wall on both sides 6.40 1.20 0.10 0.77<br />

d) Below wing wall on both side 4.50 1.00 0.10 0.45<br />

e) Below apron 2.60 4.00 0.10 1.04<br />

f) Below Toe wall 4.00 0.90 0.10 0.36<br />

Total 4.16<br />

5 Stone Masonary in CM 1:4<br />

a) Headwall and Headwall Extension on both<br />

side-Foundation <strong>11</strong>.00 1.10 0.70 8.47<br />

b) Headwall+ Headwall Extension on both side<br />

above gully bed-super structure <strong>11</strong>.00 0.80 1.00 8.80<br />

c) Headwall Extension on both the side above<br />

crest 7.00 0.50 1.00 3.50<br />

d) Foundation for side wall on both side 6.40 1.00 1.00 6.40<br />

e) Side wall on both side -super structure (K 3.00 0.80 1.40 3.36<br />

Width=(0.5+1.1)/2=<br />

0.8 m<br />

159


Part)-I<br />

f) Side wall on both side-above part-I<br />

mentioned in (e): (K Part)-II 3.00 0.60 0.60 1.08<br />

g) Side wall on both side-Super structure (M<br />

Part)-I 3.40 0.80 1.40 3.81<br />

h) Side wall on both side above Part-I<br />

mentioned in (i): (M Part)-II 3.40 0.60 0.30 0.61<br />

i) Foundation for wing wall on both side 4.50 0.80 1.00 3.60<br />

j) Wing wall on both side-Super structure- Part-<br />

I 4.50 0.70 0.60 1.89<br />

k) Wing wall on both side-Above Part-I<br />

mentioned in (l): Part -II 4.50 0.60 0.40 1.08<br />

l) Toe wall: Part I 4.00 0.70 0.70 1.96<br />

m) Toe wall: Part II 4.00 0.60 0.40 0.96<br />

n) Transverse Sill 4.00 0.60 0.30 0.72<br />

o) Apron 2.60 4.00 0.40 4.16<br />

Total 50.40<br />

6 M S Bar (10 mm, q) 2.00<br />

Providing rough stone pitching in u/s (both<br />

7 side) 34.00 2.00 0.25 17.00<br />

Cement pointing to stone masonary in CM<br />

8 1:3 (sqm)<br />

a) Headwall both side 8.00 1.00 8.00<br />

b) Side wall both side (RHS and LHS)-Part I 6.40 1.40 8.96<br />

c) Side wall both side (RHS and LHS)-Part II 3.00 0.60 1.80<br />

d) Side wall both side (RHS and LHS)-Part-III<br />

3.40 0.30 1.02<br />

e) Wing wall both side-Part I 4.50 0.60 2.70<br />

f) Wing wall both side-Part I 6.00 0.40 2.40<br />

Avg. ht. of triangle<br />

portion= 0.30<br />

Avg. ht. of triangle<br />

portion= 0.40<br />

Avg. ht. of triangle<br />

portion= 0.30<br />

Avg. ht. of triangle<br />

portion= 0.40<br />

160


9<br />

Total 24.88<br />

Filling of black clay soil in the up stream<br />

(free from any kind of gravel) 3.00 trolly<br />

MATERIAL ABSTRACT<br />

Required Quantiy<br />

1<br />

2<br />

Quantiy, cum Cement, bags Sand, cum Conc ,cum Khanda (cum) Boulder(cum) MS Bar (q)<br />

Cement Concrete mix<br />

for cut-off wall<br />

(1:2:4): 12 mm conc. 4.57 29.25 2.06 4.<strong>11</strong><br />

Cement Concrete mix<br />

for cut-off wall<br />

(1:4:8); 20 mm conc. 7.03 23.91 3.31 6.61<br />

Stone Maspnary in<br />

3 CM 1:4 50.40 126.00 17.14 50.40<br />

MS Bar for<br />

4 reinforcing 1.50<br />

5 Boulder for pitching 17.00 17.00<br />

6<br />

7<br />

8<br />

Cement pointing to<br />

stone masonary in<br />

CM 1:3 (sqm) 24.88 1.54 0.16<br />

Black clay soil<br />

(gravel free) 3.00<br />

Requirement of sand<br />

to nullify the impact<br />

of cracks in black soil 4.16<br />

Total 180.70 26.81 10.72 50.40 17.00 1.50<br />

COST ABSTRACT<br />

Sl. No. Item Quantity Unit Rate (Rs./Unit) Amount (Rs.)<br />

161


A 1 Cement 181 Bag 250.00 45174.84<br />

2 Sand 26.81 m 3 950.00 25471.67<br />

3 Concrete-12 mm 4.<strong>11</strong> m 3 1500.00 6169.50<br />

4 Concrete-20 mm 6.61 m 3 1250.00 8262.60<br />

5 Khanda 50 m 3 1350.00 68040.00<br />

6 M S Bar (10 mm Saria) 2.00 q 4800.00 9600.00<br />

7 Boulder 17.00 m 3 900.00 15300.00<br />

8<br />

Filling of black clay soil in the up<br />

stream (free from any kind of<br />

gravel) 3.00 1800.00 5400.00<br />

Total 183418.61<br />

Water supply through tanker @ 3 %<br />

of material cost 5502.56<br />

B 9<br />

C 9 Labour Charges @ 25% 45854.65<br />

Total (A+B+C) 234775.82<br />

10 Misc. @ 3% 7043.27<br />

G. Total 241819.10<br />

Say Rs. 242000/- (Rs. Two lakh rorty two thousand only)<br />

Note: The cost of materials is inclusive of all taxes and transportation to site. It may vary with respect to place and time<br />

162


163


164


165


166


CHAPTER - 6<br />

CAPACITY BUILDING PLAN<br />

The capacity building of various stake holders will be given very high priority as the watershed is to be developed in participatory mode.<br />

Capacity building initiative plays very important role in human resource development of model watershed to replicate and train other watershed<br />

resource persons. The capacity building initiatives include training to government officials, CBOs, farmers and PIAs through field days, hands-on<br />

trainings, and exposure visits to successful watersheds, training materials and etc. Need-based specialized training courses will be conducted. The<br />

details of the training institutes for capacity building and training to stake holders on participatory watershed management are summarized in Table<br />

6.1 and 6.2, respectively.<br />

Table 6.1: List of identified training institutes for capacity building<br />

Sr. No. Name of the<br />

Training<br />

Institute<br />

Full Address with<br />

contact no, website<br />

& e-mail<br />

Designation of<br />

the Head of<br />

Institute<br />

1. Krishi Vigyan<br />

Kendra<br />

2. National<br />

Research Center<br />

for Agro-<br />

Forestry<br />

3 District Gram<br />

Vikash Sansthan<br />

4 Indian Institute<br />

of Grass Land<br />

5 Deptt. Of<br />

Horticulture<br />

P.O. Bhojla, Unnao<br />

Bala ji Road,<br />

Bharari, <strong>Jhansi</strong>,<br />

Phne No<br />

05102792282<br />

Gwalior Road,<br />

<strong>Jhansi</strong><br />

Vikash Bhawan,<br />

<strong>Jhansi</strong><br />

Gwalior Road,<br />

<strong>Jhansi</strong><br />

Mision Compound,<br />

<strong>Jhansi</strong><br />

Programme<br />

Coordinator<br />

Director<br />

Type of<br />

Institute<br />

Agriculture<br />

University<br />

GOI,<br />

(ICAR)<br />

Area(s) of<br />

specialization<br />

Extension<br />

Agronomy<br />

Home<br />

Science<br />

Soil Science<br />

Agro-forestry<br />

and NRM on<br />

watershed<br />

basis<br />

No. of<br />

training<br />

assigned<br />

No. of<br />

persons to be<br />

trained<br />

Allocation<br />

to be made<br />

to the<br />

institute<br />

16 800 Proposal<br />

with budget<br />

will be<br />

received<br />

16 800 -do-<br />

Coordinator State Govt. Small scale 4 100 -do-<br />

Director, <strong>Jhansi</strong> GoI<br />

(ICAR)<br />

Grasses and<br />

fodder<br />

Deputy Director State Govt. Fruit and<br />

Vegetable<br />

Production<br />

4 100 -do-<br />

2 50 -do-<br />

167


1 st year 2 nd year 3 rd year 4 th year Total<br />

MD Physical Financial Physical Financial Physical Financial Physical Financial Physical Financial<br />

Capacity<br />

2915<br />

Building<br />

583 6.72 1792 13.440 1792 13.440 4167 33.60<br />

(a) SLNA level 583 <strong>11</strong>7 1.34 233 2.688 233 2.688 583 6.72<br />

(b) District<br />

875<br />

level<br />

175 1.34 350 2.688 350 2.688 875 6.72<br />

(c) WDT level 292 58 1.34 <strong>11</strong>7 2.688 <strong>11</strong>7 2.688 292 6.72<br />

(d) WC level <strong>11</strong>66 233 2.69 466 0.672 466 0.672 <strong>11</strong>66 13.44<br />

(2) No. of total<br />

persons trained 8400 1680 3360 3360<br />

(a) SLNA level 210 42 0.84 42 1.134 42 1.134 - - 126 3.<strong>11</strong><br />

(b) District<br />

level 840 17 0.084 252 <strong>11</strong>.844 252 <strong>11</strong>.844 - - 521 23.77<br />

(c) WDT level 210 4 0.029 84 0.302 84 0.302 - - 172 0.63<br />

(d) WC level 6720 134 0.712 2688 2.688 2688 2.688 - - 5510 6.09<br />

Total 33.60<br />

168


Table 6.2: Training to stakeholders on participatory watershed management<br />

Sl. Client Group<br />

No.<br />

Title of the<br />

Programme/Duration/<br />

Time<br />

Objectives Coverage/Topics Training<br />

Methodology<br />

Training Institutions<br />

1. Watershed<br />

Committee &<br />

WDT members<br />

2. User Group, SHGs<br />

members<br />

3 Watershed<br />

Committee &<br />

WDT members<br />

4 Secretaries of WC<br />

and WDT/PIA<br />

members<br />

5 PIA/WDT<br />

members<br />

6. PIA/WDT/WC<br />

members<br />

7 PIA/WDT<br />

members<br />

Planning and implementation of<br />

<strong>IWMP</strong> Project (3 day)<br />

Agriculture Production system<br />

and specialized training for<br />

SHGs (3 day)<br />

Management of natural<br />

resources on watershed basis<br />

and agroforestry<br />

Book keeping and record<br />

maintenance<br />

Cultivation of fodder in<br />

watershed<br />

Knowledge of market and<br />

pricing<br />

Design of SWC structures<br />

To Strengthen<br />

WC and WDT<br />

for planning and<br />

executing the<br />

Project<br />

To increase the<br />

Agriculture<br />

productivity and<br />

livelihood<br />

improvement<br />

Awareness and<br />

strengthening of<br />

knowledge and<br />

skills<br />

Maintenance of<br />

record and<br />

preparing budget<br />

Awareness and<br />

knowledge<br />

enhancement<br />

Awareness and<br />

knowledge<br />

enhancement<br />

Strengthening of<br />

knowledge<br />

Natural Resource<br />

Management Livelihood<br />

options for landless and<br />

marginal farmers.<br />

Improved Agriculture<br />

production system<br />

Integrated crop<br />

management in pulses,<br />

cereals, oilseeds,<br />

vegetables, orchards and<br />

small scale projects<br />

related to Agriculture.<br />

NRM, Production<br />

system and livelihood<br />

Cash book and ledger<br />

registers, preparing<br />

budget, maintenance of<br />

accounts<br />

Package of practices of<br />

fodder cultivation<br />

Market intelligence<br />

SWC structures<br />

Lectures, videos<br />

and visits to<br />

successful<br />

watershed<br />

Lectures, videos<br />

and visits<br />

Lectures, videos<br />

and visits to<br />

successful<br />

watershed<br />

Lectures and<br />

practical exercise<br />

Lectures, videos<br />

and visits to<br />

successful<br />

watershed<br />

Lectures, videos<br />

and visits<br />

Lectures, practical<br />

exercise and visits<br />

to successful<br />

watershed<br />

National Research Center for Agroforestry,<br />

Gwalior Road, <strong>Jhansi</strong><br />

Krishi Vigyan Kendra, Bharari,<br />

<strong>Jhansi</strong><br />

National Research Center for Agroforestry,<br />

Gwalior Road, <strong>Jhansi</strong><br />

National Research Center for Agroforestry,<br />

Gwalior Road, <strong>Jhansi</strong><br />

Indian Grassland and Fodder<br />

Research Institute, <strong>Jhansi</strong><br />

Agriculture Technology<br />

Management Agency (ATMA)<br />

NRCAF, <strong>Jhansi</strong> /<br />

CSWCRTI&RS, Datia, MP<br />

169


CHAPTER - 7<br />

7.1 Monitoring and Evaluation<br />

PHASING OF PROGRAMME AND BUDGETING<br />

Monitoring of the project will be done at each stage and it will be carried out for both, process and outcome. Some community members will be<br />

trained and will be involved in participatory monitoring of various parameters and processes and the crop yields. The interventions, expenditure<br />

and other information will be displayed in the micro-watershed through wall writings. Besides trained community members, PIA/DWDU will also<br />

monitor the physical and financial progress of watershed development programme. Frontier technologies viz. GIS and Remote Sensing techniques<br />

will be used by the PIA/DWDU for monitoring and evaluation. The PIA shall submit quarterly progress reports (countersigned by the Watershed<br />

Committee (WC) President) to the DWDU for further submission to the SLNA. Sustainable and unbiased monitoring will be ensured by involving<br />

an independent agency. About 1 per cent of the total budget will be used on this activity.<br />

Plan for Evaluation<br />

Watershed development activities bring about both tangible and intangible benefits. In order to quantify the benefits, impact analysis has been<br />

proposed.<br />

Theme<br />

It is presumed that as a consequence of watershed development activities there will be noticeable change in socio-economic status of inhabitants,<br />

cropping intensity, ground water recharge, crop diversification, fuel, fodder and small timber availability, livestock composition and milk<br />

production, etc. These indicators can be gauged over bench mark data both at the beginning and at the end of the project within the watershed.<br />

Observations<br />

The following indicators will be taken into account for quantitative and qualitative assessment. For the purpose, detailed questionnaires will be<br />

prepared and field observations will be carried out.<br />

• Duration of availability of drinking water/irrigation and groundwater recharge<br />

• Irrigation frequency and area under irrigation<br />

• Changes in cropping pattern and cropping systems in the farmers fields along with productivity and incomes<br />

• Soil health<br />

• Satellite monitoring for vegetation cover and other parameters<br />

170


• Fuel, fodder and small timber availability<br />

• Livestock composition and productivity<br />

• Periodic pest and disease monitoring will be done in major crops<br />

• Socio-economic aspects including resource inventory<br />

• Following indices will also be worked out as qualitative indicators of the watershed development:<br />

• Land Improvement Index (LII)<br />

• Crop Diversification Index (CDI)<br />

• Cultivated Land Utilization Index (CLUI)<br />

• Crop Fertilization Index (CFI)<br />

• Induced Watershed Eco-Index (IWEI)<br />

The concurrent and post-project monitoring and evaluation would be conducted to assess the status of watershed related interventions. It will be<br />

done by an independent agency having similar experiences. About 1 per cent of the total budget will also be used on evaluation.<br />

Table 7.1: <strong>Year</strong> wise financial phasing (Rs in Lakh) Project <strong>IWMP</strong>-<strong>VIII</strong>, LDWR- Tahrauli-I, <strong>Jhansi</strong><br />

Sr. No. Particulars 1st <strong>Year</strong> 2nd <strong>Year</strong> 3rd <strong>Year</strong> 4th <strong>Year</strong> Total<br />

1 Administrative Cost-10% 16.80 16.80 16.80 16.80 67.20<br />

2 Monitering-1% 1.68 1.68 1.68 1.68 6.72<br />

3 Evalution-1% 1.68 1.68 1.68 1.68 6.72<br />

4 Entry Point Activity-4% 26.88 - - - 26.880<br />

5 Institution & Capacity Building-5% 13.44 13.44 6.72 - 33.60<br />

6 <strong>DPR</strong>-1% 6.72 - - - 6.72<br />

7 Watershed Dev. Work-56% 75.26 <strong>11</strong>2.90 <strong>11</strong>2.90 75.26 376.32<br />

8 Livelihood Activity-9% 48.38 6.05 6.05 - 60.48<br />

9<br />

Production System & Micro<br />

enterprises-10%<br />

13.44 40.32 13.44 - 67.20<br />

10 Consolidation-3% - 2.02 2.02 16.13 20.16<br />

Total 204.29 194.88 161.28 <strong>11</strong>1.55 672.00<br />

171


CHAPTER - 8<br />

CONSOLIDATION AND WITHDRAWAL STRATEGY<br />

8. Consolidation and Withdrawal Strategy<br />

Success of any program depends on sustainability of the various watershed interventions and sustainability can only be achieved through<br />

active participation of community. Active participation and cooperation of community can be ensured by building their capacities through<br />

exposures and trainings. From the beginning emphasis will be on capacity building and empowerment of stakeholders. The Watershed Committee,<br />

SHGs, Area Groups, Users Group and other CBOs will be established, trained, and strengthened to continue development after withdrawal of PIA.<br />

By building economic activities through CBOs community participation will be sustained. The PR&D approach along with demand driven<br />

interventions will reduce dependency on subsidies. Contributions from the community will be ensured for the entire activities to develop sense of<br />

belongingness and these contributions will be deposited to the account of Watershed Development Fund. Watershed Development Fund will also<br />

be strengthening through donations from the individual and institutions and the CBOs will be trained to run watershed as business model on<br />

sustainable basis. The tangible economic benefits along with empowerment and hand holding by PIA will empower the CBOs to develop and<br />

sustain the watershed activities after withdrawal of the PIA. Community organizations will withdraw the money from the WDF to maintain the<br />

asset created during the implementation phase. The consolidation phase will also include<br />

• Writing of project completion report<br />

• Documentation of success stories<br />

• Making films, leaflets, bulletins and the lessons learnt.<br />

The expenditure will be done as per the Common Guidelines for Watershed Development Projects 2008.<br />

The completion report will reflect the development on following aspects:<br />

• Productivity enhancement (increase in total productivity, seed replecment, farm mechanization, resources use and operational efficiency.<br />

• Nutritional security (Production of diverse food commodities)<br />

• Risk minimization (Integrated farming system, water harvesting and protected cultivation, value addition and improved markenting)<br />

• State of environment (Improvement in vegetative comver, hydrology and adoption of IPNM)<br />

• Profitability (Loss preventing and cost reducing measures, valu addition and agro-processing.)<br />

• Livelihood security (skill enhancement capacity building, increased employment in agriculture and allied enterprises. Reduction in<br />

drudgery of farm women and out migration)<br />

172


CHAPTER - 9<br />

EXPECTED PROJECT OUTCOME<br />

9.1 Employment Generation and Checking Migration<br />

There had been very heavy migration from Bundelkhand region. During drought years, it is as high as 40% against an average migration<br />

rate of <strong>11</strong>%, in other regions of Uttar Pradesh towards northern part of the country, specially the states of Delhi, Punjab and Haryana, as<br />

agriculture labours, factory workers, rickshaw pullers etc. The major reason attributed to high rate of migration is continuous drought in the region<br />

and absence of any other alternate livelihood opportunity, in spite of several anti-poverty programmes.<br />

Due to watershed management the cropping intensity will be increased by around 22 per cent, in turn acreage in agricultural activities will be<br />

increased by about 1050 ha. Therefore, an additional employment of about 105000 man days will be generated annually. Therefore, no migration<br />

in search of livelihoods is expected after implementation of watershed programme.<br />

9.2 Other Expected Outcome*<br />

The following tangible benefits are expected after implementation of the project:<br />

• Runoff will be reduced by about 32 per cent; however soil and nutrient loss may be reduced up to 40 per cent from the watershed.<br />

• Irrigation intensity may be increased to 40 per cent from present 3 per cent life saving irrigation.<br />

• Surface water in nallah may be available for more than 8 months against 4-5 months at present.<br />

• Average ground water recharge of about 4 m may be easily obtained after implementation of the programme<br />

• Productivity of crops may be increased by about 25 per cent<br />

• Significant saving of seeds may be obtained through crop demonstration with improved package of practices<br />

• During implementation phase about 1,50,000 mandays will be created through the soil and water conservation measures and crop/agroforestry<br />

interventions.<br />

173


9.3 Questions to be answered<br />

This project will answer the following questions:<br />

1. Will the measures taken for water harvesting sufficient enough to recharge the perched water table?<br />

2. Will the soil and water conservation practices be helpful in combating drought?<br />

3. Will alternate land use such as agroforestry land use system result in self reliance/prosperity in drought prone areas?<br />

4. Can the strategies based on watershed basis yield fruitful results?<br />

5. Response of the villagers towards the project and their participation in sustaining developed resources after withdrawal of the project?<br />

6. Will the formation of SHGs help in savings and generation of self employment?<br />

7. Will the watershed programmes improve the socio-economic conditions of the stake holders?<br />

8. Will the watershed programme helps in capacity building of the stake holders for dissemination of various activities of watershed<br />

Programme?<br />

9. Will it sustain after project withdrawal?<br />

9.4 Problems that could be solved as a results of this project/study<br />

Following problems can be tackled in the proposed watershed:<br />

1. Solving the problems of shortage of fuel, fodder, fruit and small timber requirement of villagers.<br />

2. Creating water resources for ground water recharge availability of surface water for animal drinking and nistar purposes.<br />

3. Increasing fertilizer consumption and improving NPK consumption ratio.<br />

4. Optimizing crop productivity by putting more area under HYV and irrigation.<br />

5. Increasing cropping intensity.<br />

6. Promoting dairying through increased fodder availability.<br />

7. Improving basic amenities and facilities like health, education, drinking water etc.<br />

8. Increasing per capita income and thereby standard of living of farming community.<br />

9. Increasing co-operative membership.<br />

10. Increasing self employment.<br />

<strong>11</strong>. Improving living standard of society.<br />

174


ANNEXURE-I<br />

BENEFICIARIES WISE DETAILS OF DEVELOPMENTAL ACTIVITIES<br />

MWS- Rampura-I(2C2B1m2e) <strong>IWMP</strong><strong>VIII</strong> Block- Dist. <strong>Jhansi</strong><br />

Name of<br />

Activity<br />

Khasara<br />

No<br />

Length Width * Height C.S. (Area) Work<br />

measurement<br />

Rate<br />

Total Cost<br />

(Rs.)<br />

Manday<br />

Contribution<br />

G/P-DHIPKAI<br />

VILL-TOLA<br />

WHB1 2<br />

PB22 15 210 ((3.50+0.50)/2)*1<br />

PB24 16 195 ((4.75+0.80)/2)*1.50<br />

PB34 162 180 ((4.75+0.80)/2)*1.50<br />

PB36 163 185 ((4.75+0.80)/2)*1.50<br />

PB39 163 180 ((3.50+0.50)/2)*1<br />

PB41 203 185 ((3.50+0.50)/2)*1<br />

PB44 202 190 ((3.50+0.50)/2)*1<br />

PB87 244 195 ((3.50+0.50)/2)*1<br />

PB88 261 195 ((3.50+0.50)/2)*1<br />

PB90 231 195 ((3.50+0.50)/2)*1<br />

PB91 16 195 ((3.50+0.50)/2)*1<br />

PB92 261 195 ((3.50+0.50)/2)*1<br />

PB93 162 195 ((3.50+0.50)/2)*1<br />

PB94 261 200 ((3.50+0.50)/2)*1<br />

PB95 192 200 ((3.50+0.50)/2)*1<br />

PB96 264 200 ((3.50+0.50)/2)*1<br />

PB97 261 205 ((3.50+0.50)/2)*1<br />

2.00 420.00 49.47 20777.40<br />

4.16 8<strong>11</strong>.69 49.47 40154.18<br />

4.16 749.25 49.47 37065.40<br />

4.16 770.06 49.47 38094.99<br />

2.00 360.00 49.47 17809.20<br />

2.00 370.00 49.47 18303.90<br />

2.00 380.00 49.47 18798.60<br />

2.00 390.00 49.47 19293.30<br />

2.00 390.00 49.47 19293.30<br />

2.00 390.00 49.47 19293.30<br />

2.00 390.00 49.47 19293.30<br />

2.00 390.00 49.47 19293.30<br />

2.00 390.00 49.47 19293.30<br />

2.00 400.00 49.47 19788.00<br />

2.00 400.00 49.47 19788.00<br />

2.00 400.00 49.47 19788.00<br />

2.00 410.00 49.47 20282.70<br />

173 1558.31<br />

335 30<strong>11</strong>.56<br />

309 2779.90<br />

317 2857.12<br />

148 1335.69<br />

153 1372.79<br />

157 1409.90<br />

161 1447.00<br />

161 1447.00<br />

161 1447.00<br />

161 1447.00<br />

161 1447.00<br />

161 1447.00<br />

165 1484.10<br />

165 1484.10<br />

165 1484.10<br />

169 1521.20<br />

175


PB98 159 205 ((3.50+0.50)/2)*1<br />

PB99 267 180 ((3.50+0.50)/2)*1<br />

PB100 180 ((4.75+0.80)/2)*1.50<br />

PB101 277 185 ((4.75+0.80)/2)*1.50<br />

2.00 410.00 49.47 20282.70<br />

2.00 360.00 49.47 17809.20<br />

4.16 749.25 49.47 37065.40<br />

4.16 770.06 49.47 38094.99<br />

169 1521.20<br />

148 1335.69<br />

309 2779.90<br />

317 2857.12<br />

CB81 244 185 ((4.75+0.80)/2)*1.50<br />

CB82 261 195 ((4.75+0.80)/2)*1.50<br />

CB83 123 185 ((4.75+0.80)/2)*1.50<br />

4.16 770.06 49.47 38094.99<br />

4.16 8<strong>11</strong>.69 49.47 40154.18<br />

4.16 770.06 49.47 38094.99<br />

317 2857.12<br />

335 30<strong>11</strong>.56<br />

317 2857.12<br />

Cost<br />

EW<br />

499662.46<br />

PB 10100.31<br />

2351.81 <strong>11</strong>6344.16<br />

CB<br />

G/P-GHADA<br />

VILL-GHADA<br />

CB84 126 205 ((4.75+0.80)/2)*1.50<br />

4.16 853.31 49.47 42213.37<br />

352 3166.00<br />

CB85 151 195 ((3.50+0.50)/2)*1<br />

CB86 290 195 ((3.50+0.50)/2)*1<br />

CB87 289 210 ((3.50+0.50)/2)*1<br />

CB88 147 210 ((3.50+0.50)/2)*1<br />

CB89 137 185 ((3.50+0.50)/2)*1<br />

CB90 275 180 ((4.75+0.80)/2)*1.50<br />

CB91 139 195 ((4.75+0.80)/2)*1.50<br />

CB92 464 210 ((4.75+0.80)/2)*1.50<br />

CB93 490 180 ((4.75+0.80)/2)*1.50<br />

2.00 390.00 49.47 19293.30<br />

2.00 390.00 49.47 19293.30<br />

2.00 420.00 49.47 20777.40<br />

2.00 420.00 49.47 20777.40<br />

2.00 370.00 49.47 18303.90<br />

4.16 749.25 49.47 37065.40<br />

4.16 8<strong>11</strong>.69 49.47 40154.18<br />

4.16 874.13 49.47 43242.96<br />

4.16 749.25 49.47 37065.40<br />

161 1447.00<br />

161 1447.00<br />

173 1558.31<br />

173 1558.31<br />

153 1372.79<br />

309 2779.90<br />

335 30<strong>11</strong>.56<br />

360 3243.22<br />

309 2779.90<br />

176


CB94 482 210 ((3.50+0.50)/2)*1<br />

CB95 495 205 ((4.75+0.80)/2)*1.50<br />

CB96 497 250 ((4.75+0.80)/2)*1.50<br />

2.00 420.00 49.47 20777.40<br />

4.16 853.31 49.47 42213.37<br />

4.16 1040.63 49.47 51479.72<br />

173 1558.31<br />

352 3166.00<br />

429 3860.98<br />

SB42 218 250 ((4.70+0.50)/2)*1.35<br />

SB43 199 245 ((4.70+0.50)/2)*1.35<br />

SB44 226 300 ((4.70+0.50)/2)*1.35<br />

SB45 231 300 ((4.70+0.50)/2)*1.35<br />

SB53 235 285 ((4.70+0.50)/2)*1.35<br />

3.51 877.50 49.47 43409.93<br />

3.51 859.95 49.47 42541.73<br />

3.51 1053.00 49.47 52091.91<br />

3.51 1053.00 49.47 52091.91<br />

3.51 1000.35 49.47 49487.31<br />

362 3255.74<br />

355 3190.63<br />

434 3906.89<br />

434 3906.89<br />

412 37<strong>11</strong>.55<br />

CD4 474 85<br />

CD5 162 85<br />

CD6 261 95<br />

CD7 267 90<br />

CD8 235 90<br />

CD15 203 <strong>11</strong>0<br />

CD16 202 105<br />

CB<br />

SB<br />

CD<br />

((12.50+1.3)/2)*2.5 17.25 1466.25 53.80 78884.25<br />

((12.50+1.3)/2)*2.5 17.25 1466.25 53.80 78884.25<br />

((12.50+1.3)/2)*2.5 17.25 1638.75 53.80 88164.75<br />

((12.50+1.3)/2)*2.5 17.25 1552.50 53.80 83524.50<br />

((12.50+1.3)/2)*2.5 17.25 1552.50 53.80 83524.50<br />

((12.50+1.3)/2)*2.5 17.25 1897.50 53.80 102085.50<br />

((12.50+1.3)/2)*2.5 17.25 18<strong>11</strong>.25 53.80 97445.25<br />

EW<br />

Cost<br />

8341.56 412657.10<br />

4843.80 239622.79<br />

<strong>11</strong>385.00 612513.00<br />

657 5916.32<br />

657 5916.32<br />

735 6612.36<br />

696 6264.34<br />

696 6264.34<br />

851 7656.41<br />

812 7308.39<br />

G/P-NIPAN<br />

VILL-NIPAN<br />

MB1 1768 300 ((4.75+0.80)/2)*1.50<br />

MB2 771 260 ((4.75+0.80)/2)*1.50<br />

MB3 8999 280 ((4.75+0.80)/2)*1.50<br />

4.16 1248.75 49.47 61775.66<br />

4.16 1082.25 49.47 53538.91<br />

4.16 <strong>11</strong>65.50 49.47 57657.29<br />

515 4633.17<br />

446 4015.42<br />

480 4324.30<br />

177


MB4 1807 280 ((4.75+0.80)/2)*1.50<br />

MB5 1795 285 ((4.75+0.80)/2)*1.50<br />

MB6 1841 300 ((4.75+0.80)/2)*1.50<br />

MB7 1813 300 ((4.75+0.80)/2)*1.50<br />

MB8 1812 260 ((4.75+0.80)/2)*1.50<br />

MB9 1824 280 ((3.50+0.50)/2)*1<br />

MB10 1824 280 ((3.50+0.50)/2)*1<br />

MB<strong>11</strong> 1928 285 ((3.50+0.50)/2)*1<br />

MB12 1866 300 ((3.50+0.50)/2)*1<br />

MB13 1893 300 ((3.50+0.50)/2)*1<br />

MB14 1899 265 ((3.50+0.50)/2)*1<br />

MB15 1883 260 ((3.50+0.50)/2)*1<br />

MB16 1878 255 ((3.50+0.50)/2)*1<br />

MB17 1874 250 ((3.50+0.50)/2)*1<br />

MB18 1871 250 ((3.50+0.50)/2)*1<br />

MB19 1890 250 ((3.50+0.50)/2)*1<br />

MB20 1881 250 ((3.50+0.50)/2)*1<br />

MB21 1847 250 ((3.50+0.50)/2)*1<br />

MB22 2197 250 ((3.50+0.50)/2)*1<br />

MB23 2298 250 ((3.50+0.50)/2)*1<br />

MB41 2226 250 ((3.50+0.50)/2)*1<br />

MB42 2204 250 ((3.50+0.50)/2)*1<br />

4.16 <strong>11</strong>65.50 49.47 57657.29<br />

4.16 <strong>11</strong>86.31 49.47 58686.88<br />

4.16 1248.75 49.47 61775.66<br />

4.16 1248.75 49.47 61775.66<br />

4.16 1082.25 49.47 53538.91<br />

2.00 560.00 49.47 27703.20<br />

2.00 560.00 49.47 27703.20<br />

2.00 570.00 49.47 28197.90<br />

2.00 600.00 49.47 29682.00<br />

2.00 600.00 49.47 29682.00<br />

2.00 530.00 49.47 26219.10<br />

2.00 520.00 49.47 25724.40<br />

2.00 510.00 49.47 25229.70<br />

2.00 500.00 49.47 24735.00<br />

2.00 500.00 49.47 24735.00<br />

2.00 500.00 49.47 24735.00<br />

2.00 500.00 49.47 24735.00<br />

2.00 500.00 49.47 24735.00<br />

2.00 500.00 49.47 24735.00<br />

2.00 500.00 49.47 24735.00<br />

2.00 500.00 49.47 24735.00<br />

2.00 500.00 49.47 24735.00<br />

480 4324.30<br />

489 4401.52<br />

515 4633.17<br />

515 4633.17<br />

446 4015.42<br />

231 2077.74<br />

231 2077.74<br />

235 2<strong>11</strong>4.84<br />

247 2226.15<br />

247 2226.15<br />

218 1966.43<br />

214 1929.33<br />

210 1892.23<br />

206 1855.13<br />

206 1855.13<br />

206 1855.13<br />

206 1855.13<br />

206 1855.13<br />

206 1855.13<br />

206 1855.13<br />

206 1855.13<br />

206 1855.13<br />

SB1 122 205 ((4.70+0.50)/2)*1.35<br />

SB2 29 245 ((4.70+0.50)/2)*1.35<br />

SB3 <strong>11</strong>7 245 ((4.70+0.50)/2)*1.35<br />

SB4 <strong>11</strong>3 245 ((4.70+0.50)/2)*1.35<br />

3.51 719.55 49.47 35596.14<br />

3.51 859.95 49.47 42541.73<br />

3.51 859.95 49.47 42541.73<br />

3.51 859.95 49.47 42541.73<br />

297 2669.71<br />

355 3190.63<br />

355 3190.63<br />

355 3190.63<br />

178


SB5 135 230 ((4.70+0.50)/2)*1.35<br />

SB6 131 240 ((4.70+0.50)/2)*1.35<br />

SB7 761 245 ((4.70+0.50)/2)*1.35<br />

SB8 256 245 ((4.70+0.50)/2)*1.35<br />

SB9 107 250 ((4.70+0.50)/2)*1.35<br />

SB10 813 250 ((4.70+0.50)/2)*1.35<br />

SB<strong>11</strong> 835 250 ((4.70+0.50)/2)*1.35<br />

SB12 837 215 ((4.70+0.50)/2)*1.35<br />

SB13 829 215 ((4.70+0.50)/2)*1.35<br />

SB14 831 215 ((4.70+0.50)/2)*1.35<br />

SB15 870 250 ((4.70+0.50)/2)*1.35<br />

SB16 768 245 ((4.70+0.50)/2)*1.35<br />

SB17 881 235 ((4.70+0.50)/2)*1.35<br />

SB18 882 230 ((4.70+0.50)/2)*1.35<br />

SB19 1636 230 ((4.70+0.50)/2)*1.35<br />

SB20 890 230 ((4.70+0.50)/2)*1.35<br />

SB21 955 235 ((4.70+0.50)/2)*1.35<br />

SB22 941 225 ((4.70+0.50)/2)*1.35<br />

SB23 937 220 ((4.70+0.50)/2)*1.35<br />

SB24 925 220 ((4.70+0.50)/2)*1.35<br />

SB25 930 205 ((4.70+0.50)/2)*1.35<br />

SB26 910 235 ((4.70+0.50)/2)*1.35<br />

SB27 1738 235 ((4.70+0.50)/2)*1.35<br />

SB28 1742 235 ((4.70+0.50)/2)*1.35<br />

SB29 1962 230 ((4.70+0.50)/2)*1.35<br />

SB30 1985 230 ((4.70+0.50)/2)*1.35<br />

SB31 2224 245 ((4.70+0.50)/2)*1.35<br />

3.51 807.30 49.47 39937.13<br />

3.51 842.40 49.47 41673.53<br />

3.51 859.95 49.47 42541.73<br />

3.51 859.95 49.47 42541.73<br />

3.51 877.50 49.47 43409.93<br />

3.51 877.50 49.47 43409.93<br />

3.51 877.50 49.47 43409.93<br />

3.51 754.65 49.47 37332.54<br />

3.51 754.65 49.47 37332.54<br />

3.51 754.65 49.47 37332.54<br />

3.51 877.50 49.47 43409.93<br />

3.51 859.95 49.47 42541.73<br />

3.51 824.85 49.47 40805.33<br />

3.51 807.30 49.47 39937.13<br />

3.51 807.30 49.47 39937.13<br />

3.51 807.30 49.47 39937.13<br />

3.51 824.85 49.47 40805.33<br />

3.51 789.75 49.47 39068.93<br />

3.51 772.20 49.47 38200.73<br />

3.51 772.20 49.47 38200.73<br />

3.51 719.55 49.47 35596.14<br />

3.51 824.85 49.47 40805.33<br />

3.51 824.85 49.47 40805.33<br />

3.51 824.85 49.47 40805.33<br />

3.51 807.30 49.47 39937.13<br />

3.51 807.30 49.47 39937.13<br />

3.51 859.95 49.47 42541.73<br />

333 2995.28<br />

347 3125.51<br />

355 3190.63<br />

355 3190.63<br />

362 3255.74<br />

362 3255.74<br />

362 3255.74<br />

3<strong>11</strong> 2799.94<br />

3<strong>11</strong> 2799.94<br />

3<strong>11</strong> 2799.94<br />

362 3255.74<br />

355 3190.63<br />

340 3060.40<br />

333 2995.28<br />

333 2995.28<br />

333 2995.28<br />

340 3060.40<br />

326 2930.17<br />

318 2865.06<br />

318 2865.06<br />

297 2669.71<br />

340 3060.40<br />

340 3060.40<br />

340 3060.40<br />

333 2995.28<br />

333 2995.28<br />

355 3190.63<br />

179


SB32 1965 245 ((4.70+0.50)/2)*1.35<br />

SB33 1994 235 ((4.70+0.50)/2)*1.35<br />

SB34 1996 235 ((4.70+0.50)/2)*1.35<br />

SB35 1903 235 ((4.70+0.50)/2)*1.35<br />

SB36 1953 230 ((4.70+0.50)/2)*1.35<br />

SB37 1941 230 ((4.70+0.50)/2)*1.35<br />

SB38 1936 245 ((4.70+0.50)/2)*1.35<br />

SB39 1928 245 ((4.70+0.50)/2)*1.35<br />

SB40 1956 205 ((4.70+0.50)/2)*1.35<br />

SB52 1224 205 ((4.70+0.50)/2)*1.35<br />

SB54 186 205 ((4.70+0.50)/2)*1.35<br />

SB55 190 205 ((4.70+0.50)/2)*1.35<br />

SB56 756 205 ((4.70+0.50)/2)*1.35<br />

SB57 97 235 ((4.70+0.50)/2)*1.35<br />

SB58 95 235 ((4.70+0.50)/2)*1.35<br />

SB59 85 235 ((4.70+0.50)/2)*1.35<br />

SB60 77 230 ((4.70+0.50)/2)*1.35<br />

SB61 77 230 ((4.70+0.50)/2)*1.35<br />

SB62 1076 245 ((4.70+0.50)/2)*1.35<br />

SB63 81 245 ((4.70+0.50)/2)*1.35<br />

SB64 1082 235 ((4.70+0.50)/2)*1.35<br />

SB65 1091 235 ((4.70+0.50)/2)*1.35<br />

SB66 1094 235 ((4.70+0.50)/2)*1.35<br />

SB67 <strong>11</strong>55 230 ((4.70+0.50)/2)*1.35<br />

SB68 1044 230 ((4.70+0.50)/2)*1.35<br />

SB69 1031 245 ((4.70+0.50)/2)*1.35<br />

SB70 <strong>11</strong>06 245 ((4.70+0.50)/2)*1.35<br />

3.51 859.95 49.47 42541.73<br />

3.51 824.85 49.47 40805.33<br />

3.51 824.85 49.47 40805.33<br />

3.51 824.85 49.47 40805.33<br />

3.51 807.30 49.47 39937.13<br />

3.51 807.30 49.47 39937.13<br />

3.51 859.95 49.47 42541.73<br />

3.51 859.95 49.47 42541.73<br />

3.51 719.55 49.47 35596.14<br />

3.51 719.55 49.47 35596.14<br />

3.51 719.55 49.47 35596.14<br />

3.51 719.55 49.47 35596.14<br />

3.51 719.55 49.47 35596.14<br />

3.51 824.85 49.47 40805.33<br />

3.51 824.85 49.47 40805.33<br />

3.51 824.85 49.47 40805.33<br />

3.51 807.30 49.47 39937.13<br />

3.51 807.30 49.47 39937.13<br />

3.51 859.95 49.47 42541.73<br />

3.51 859.95 49.47 42541.73<br />

3.51 824.85 49.47 40805.33<br />

3.51 824.85 49.47 40805.33<br />

3.51 824.85 49.47 40805.33<br />

3.51 807.30 49.47 39937.13<br />

3.51 807.30 49.47 39937.13<br />

3.51 859.95 49.47 42541.73<br />

3.51 859.95 49.47 42541.73<br />

355 3190.63<br />

340 3060.40<br />

340 3060.40<br />

340 3060.40<br />

333 2995.28<br />

333 2995.28<br />

355 3190.63<br />

355 3190.63<br />

297 2669.71<br />

297 2669.71<br />

297 2669.71<br />

297 2669.71<br />

297 2669.71<br />

340 3060.40<br />

340 3060.40<br />

340 3060.40<br />

333 2995.28<br />

333 2995.28<br />

355 3190.63<br />

355 3190.63<br />

340 3060.40<br />

340 3060.40<br />

340 3060.40<br />

333 2995.28<br />

333 2995.28<br />

355 3190.63<br />

355 3190.63<br />

180


CB1 1005 180 ((4.75+0.80)/2)*1.50<br />

CB2 1062 190 ((4.75+0.80)/2)*1.50<br />

CB3 1069 190 ((4.75+0.80)/2)*1.50<br />

CB4 1009 200 ((4.75+0.80)/2)*1.50<br />

CB5 995 210 ((4.75+0.80)/2)*1.50<br />

CB6 10<strong>11</strong> 210 ((4.75+0.80)/2)*1.50<br />

CB7 1018 190 ((4.75+0.80)/2)*1.50<br />

CB8 1016 195 ((4.75+0.80)/2)*1.50<br />

CB9 978 195 ((4.75+0.80)/2)*1.50<br />

CB10 962 210 ((4.75+0.80)/2)*1.50<br />

CB<strong>11</strong> 958 185 ((4.75+0.80)/2)*1.50<br />

CB12 961 180 ((4.75+0.80)/2)*1.50<br />

CB13 1069 190 ((4.75+0.80)/2)*1.50<br />

CB14 <strong>11</strong>63 190 ((4.75+0.80)/2)*1.50<br />

CB15 <strong>11</strong>71 200 ((4.75+0.80)/2)*1.50<br />

CB16 <strong>11</strong>74 210 ((4.75+0.80)/2)*1.50<br />

CB18 <strong>11</strong>67 210 ((4.75+0.80)/2)*1.50<br />

CB19 <strong>11</strong>81 190 ((4.75+0.80)/2)*1.50<br />

CB20 <strong>11</strong>68 195 ((3.50+0.50)/2)*1<br />

CB22 1269 195 ((3.50+0.50)/2)*1<br />

CB23 <strong>11</strong>58 210 ((3.50+0.50)/2)*1<br />

CB24 1559 185 ((3.50+0.50)/2)*1<br />

CB25 1208 180 ((3.50+0.50)/2)*1<br />

CB26 1213 195 ((3.50+0.50)/2)*1<br />

CB27 1258 210 ((3.50+0.50)/2)*1<br />

CB28 1250 180 ((4.75+0.80)/2)*1.50<br />

4.16 749.25 49.47 37065.40<br />

4.16 790.88 49.47 39124.59<br />

4.16 790.88 49.47 39124.59<br />

4.16 832.50 49.47 4<strong>11</strong>83.78<br />

4.16 874.13 49.47 43242.96<br />

4.16 874.13 49.47 43242.96<br />

4.16 790.88 49.47 39124.59<br />

4.16 8<strong>11</strong>.69 49.47 40154.18<br />

4.16 8<strong>11</strong>.69 49.47 40154.18<br />

4.16 874.13 49.47 43242.96<br />

4.16 770.06 49.47 38094.99<br />

4.16 749.25 49.47 37065.40<br />

4.16 790.88 49.47 39124.59<br />

4.16 790.88 49.47 39124.59<br />

4.16 832.50 49.47 4<strong>11</strong>83.78<br />

4.16 874.13 49.47 43242.96<br />

4.16 874.13 49.47 43242.96<br />

4.16 790.88 49.47 39124.59<br />

2.00 390.00 49.47 19293.30<br />

2.00 390.00 49.47 19293.30<br />

2.00 420.00 49.47 20777.40<br />

2.00 370.00 49.47 18303.90<br />

2.00 360.00 49.47 17809.20<br />

2.00 390.00 49.47 19293.30<br />

2.00 420.00 49.47 20777.40<br />

4.16 749.25 49.47 37065.40<br />

309 2779.90<br />

326 2934.34<br />

326 2934.34<br />

343 3088.78<br />

360 3243.22<br />

360 3243.22<br />

326 2934.34<br />

335 30<strong>11</strong>.56<br />

335 30<strong>11</strong>.56<br />

360 3243.22<br />

317 2857.12<br />

309 2779.90<br />

326 2934.34<br />

326 2934.34<br />

343 3088.78<br />

360 3243.22<br />

360 3243.22<br />

326 2934.34<br />

161 1447.00<br />

161 1447.00<br />

173 1558.31<br />

153 1372.79<br />

148 1335.69<br />

161 1447.00<br />

173 1558.31<br />

309 2779.90<br />

181


CB29 1256 190 ((3.50+0.50)/2)*1<br />

CB30 1252 190 ((3.50+0.50)/2)*1<br />

CB31 1236 200 ((3.50+0.50)/2)*1<br />

CB32 1247 210 ((3.50+0.50)/2)*1<br />

CB33 2048 210 ((3.50+0.50)/2)*1<br />

CB34 2054 180 ((3.50+0.50)/2)*1<br />

CB35 2161 190 ((3.50+0.50)/2)*1<br />

CB36 2066 190 ((3.50+0.50)/2)*1<br />

CB37 2148 200 ((3.50+0.50)/2)*1<br />

CB38 2077 210 ((3.50+0.50)/2)*1<br />

CB39 2159 210 ((3.50+0.50)/2)*1<br />

CB40 2065 190 ((3.50+0.50)/2)*1<br />

CB76 <strong>11</strong>09 195 ((4.75+0.80)/2)*1.50<br />

CB77 <strong>11</strong><strong>11</strong> 195 ((4.75+0.80)/2)*1.50<br />

CB78 <strong>11</strong>16 210 ((4.75+0.80)/2)*1.50<br />

CB79 <strong>11</strong>16 190 ((4.75+0.80)/2)*1.50<br />

CB80 <strong>11</strong>35 195 ((4.75+0.80)/2)*1.50<br />

CB98 2230 195 ((4.75+0.80)/2)*1.50<br />

CB99 2216 210 ((4.75+0.80)/2)*1.50<br />

CB100 2215 195 ((4.75+0.80)/2)*1.50<br />

2.00 380.00 49.47 18798.60<br />

2.00 380.00 49.47 18798.60<br />

2.00 400.00 49.47 19788.00<br />

2.00 420.00 49.47 20777.40<br />

2.00 420.00 49.47 20777.40<br />

2.00 360.00 49.47 17809.20<br />

2.00 380.00 49.47 18798.60<br />

2.00 380.00 49.47 18798.60<br />

2.00 400.00 49.47 19788.00<br />

2.00 420.00 49.47 20777.40<br />

2.00 420.00 49.47 20777.40<br />

2.00 380.00 49.47 18798.60<br />

4.16 8<strong>11</strong>.69 49.47 40154.18<br />

4.16 8<strong>11</strong>.69 49.47 40154.18<br />

4.16 874.13 49.47 43242.96<br />

4.16 790.88 49.47 39124.59<br />

4.16 8<strong>11</strong>.69 49.47 40154.18<br />

4.16 8<strong>11</strong>.69 49.47 40154.18<br />

4.16 874.13 49.47 43242.96<br />

4.16 8<strong>11</strong>.69 49.47 40154.18<br />

157 1409.90<br />

157 1409.90<br />

165 1484.10<br />

173 1558.31<br />

173 1558.31<br />

148 1335.69<br />

157 1409.90<br />

157 1409.90<br />

165 1484.10<br />

173 1558.31<br />

173 1558.31<br />

157 1409.90<br />

335 30<strong>11</strong>.56<br />

335 30<strong>11</strong>.56<br />

360 3243.22<br />

326 2934.34<br />

335 30<strong>11</strong>.56<br />

335 30<strong>11</strong>.56<br />

360 3243.22<br />

335 30<strong>11</strong>.56<br />

ECD1 2029 105<br />

ECD2 2256 100<br />

ECD3 2041 <strong>11</strong>0<br />

ECD4 2104 85<br />

ECD5 2154 95<br />

ECD6 90<br />

((12.50+1.3)/2)*2.5 17.25 18<strong>11</strong>.25 53.80 97445.25<br />

((12.50+1.3)/2)*2.5 17.25 1725.00 53.80 92805.00<br />

((12.50+1.3)/2)*2.5 17.25 1897.50 53.80 102085.50<br />

((12.50+1.3)/2)*2.5 17.25 1466.25 53.80 78884.25<br />

((12.50+1.3)/2)*2.5 17.25 1638.75 53.80 88164.75<br />

((12.50+1.3)/2)*2.5 17.25 1552.50 53.80 83524.50<br />

812 7308.39<br />

773 6960.38<br />

851 7656.41<br />

657 5916.32<br />

735 6612.36<br />

696 6264.34<br />

182


ECD7 1913 90<br />

ECD8 2127 90<br />

ECD9 2<strong>11</strong>7 95<br />

ECD10 2229 80<br />

ECD<strong>11</strong> 2861 80<br />

ECD12 1854 95<br />

ECD13 1858 90<br />

ECD14 1849 90<br />

ECD15 2238 90<br />

((12.50+1.3)/2)*2.5 17.25 1552.50 53.80 83524.50<br />

((12.50+1.3)/2)*2.5 17.25 1552.50 53.80 83524.50<br />

((12.50+1.3)/2)*2.5 17.25 1638.75 53.80 88164.75<br />

((12.50+1.3)/2)*2.5 17.25 1380.00 53.80 74244.00<br />

((12.50+1.3)/2)*2.5 17.25 1380.00 53.80 74244.00<br />

((12.50+1.3)/2)*2.5 17.25 1638.75 53.80 88164.75<br />

((12.50+1.3)/2)*2.5 17.25 1552.50 53.80 83524.50<br />

((12.50+1.3)/2)*2.5 17.25 1552.50 53.80 83524.50<br />

((12.50+1.3)/2)*2.5 17.25 1552.50 53.80 83524.50<br />

696 6264.34<br />

696 6264.34<br />

735 6612.36<br />

619 5568.30<br />

619 5568.30<br />

735 6612.36<br />

696 6264.34<br />

696 6264.34<br />

696 6264.34<br />

PB1 655 195 ((4.75+0.80)/2)*1.50<br />

PB2 106 180 ((4.75+0.80)/2)*1.50<br />

PB3 <strong>11</strong>5 180 ((4.75+0.80)/2)*1.50<br />

PB4 173 195 ((4.75+0.80)/2)*1.50<br />

PB5 1066 190 ((4.75+0.80)/2)*1.50<br />

PB6 817 195 ((4.75+0.80)/2)*1.50<br />

PB7 1067 195 ((4.75+0.80)/2)*1.50<br />

PB8 991 210 ((4.75+0.80)/2)*1.50<br />

PB9 846 185 ((4.75+0.80)/2)*1.50<br />

PB10 842 180 ((4.75+0.80)/2)*1.50<br />

PB<strong>11</strong> 769 190 ((4.75+0.80)/2)*1.50<br />

PB12 840 190 ((4.75+0.80)/2)*1.50<br />

PB13 857 200 ((4.75+0.80)/2)*1.50<br />

PB14 862 210 ((4.75+0.80)/2)*1.50<br />

PB15 866 210 ((4.75+0.80)/2)*1.50<br />

PB16 952 190 ((4.75+0.80)/2)*1.50<br />

PB17 865 195 ((4.75+0.80)/2)*1.50<br />

4.16 8<strong>11</strong>.69 49.47 40154.18<br />

4.16 749.25 49.47 37065.40<br />

4.16 749.25 49.47 37065.40<br />

4.16 8<strong>11</strong>.69 49.47 40154.18<br />

4.16 790.88 49.47 39124.59<br />

4.16 8<strong>11</strong>.69 49.47 40154.18<br />

4.16 8<strong>11</strong>.69 49.47 40154.18<br />

4.16 874.13 49.47 43242.96<br />

4.16 770.06 49.47 38094.99<br />

4.16 749.25 49.47 37065.40<br />

4.16 790.88 49.47 39124.59<br />

4.16 790.88 49.47 39124.59<br />

4.16 832.50 49.47 4<strong>11</strong>83.78<br />

4.16 874.13 49.47 43242.96<br />

4.16 874.13 49.47 43242.96<br />

4.16 790.88 49.47 39124.59<br />

4.16 8<strong>11</strong>.69 49.47 40154.18<br />

335 30<strong>11</strong>.56<br />

309 2779.90<br />

309 2779.90<br />

335 30<strong>11</strong>.56<br />

326 2934.34<br />

335 30<strong>11</strong>.56<br />

335 30<strong>11</strong>.56<br />

360 3243.22<br />

317 2857.12<br />

309 2779.90<br />

326 2934.34<br />

326 2934.34<br />

343 3088.78<br />

360 3243.22<br />

360 3243.22<br />

326 2934.34<br />

335 30<strong>11</strong>.56<br />

183


PB18 933 195 ((4.75+0.80)/2)*1.50<br />

PB19 78 210 ((3.50+0.50)/2)*1<br />

PB20 68 185 ((3.50+0.50)/2)*1<br />

PB21 82 180 ((3.50+0.50)/2)*1<br />

PB22 1096 195 ((3.50+0.50)/2)*1<br />

PB23 <strong>11</strong>09 210 ((3.50+0.50)/2)*1<br />

PB24 1039 180 ((3.50+0.50)/2)*1<br />

PB25 1024 190 ((3.50+0.50)/2)*1<br />

PB26 <strong>11</strong>39 190 ((3.50+0.50)/2)*1<br />

PB27 919 200 ((3.50+0.50)/2)*1<br />

PB28 <strong>11</strong>55 180 ((3.50+0.50)/2)*1<br />

PB29 912 180 ((3.50+0.50)/2)*1<br />

PB30 2007 190 ((3.50+0.50)/2)*1<br />

PB31 2009 190 ((3.50+0.50)/2)*1<br />

PB32 <strong>11</strong>15 190 ((3.50+0.50)/2)*1<br />

PB33 <strong>11</strong>29 190 ((3.50+0.50)/2)*1<br />

PB35 <strong>11</strong>82 195 ((3.50+0.50)/2)*1<br />

PB38 1280 200 ((3.50+0.50)/2)*1<br />

PB40 1248 200 ((3.50+0.50)/2)*1<br />

PB42 1280 205 ((3.50+0.50)/2)*1<br />

PB43 1291 195 ((3.50+0.50)/2)*1<br />

PB45 257 195 ((3.50+0.50)/2)*1<br />

PB47 2180 195 ((3.50+0.50)/2)*1<br />

PB49 180 ((3.50+0.50)/2)*1<br />

PB52 2159 205 ((3.50+0.50)/2)*1<br />

PB54 2169 210 ((3.50+0.50)/2)*1<br />

PB57 2202 210 ((3.50+0.50)/2)*1<br />

4.16 8<strong>11</strong>.69 49.47 40154.18<br />

2.00 420.00 49.47 20777.40<br />

2.00 370.00 49.47 18303.90<br />

2.00 360.00 49.47 17809.20<br />

2.00 390.00 49.47 19293.30<br />

2.00 420.00 49.47 20777.40<br />

2.00 360.00 49.47 17809.20<br />

2.00 380.00 49.47 18798.60<br />

2.00 380.00 49.47 18798.60<br />

2.00 400.00 49.47 19788.00<br />

2.00 360.00 49.47 17809.20<br />

2.00 360.00 49.47 17809.20<br />

2.00 380.00 49.47 18798.60<br />

2.00 380.00 49.47 18798.60<br />

2.00 380.00 49.47 18798.60<br />

2.00 380.00 49.47 18798.60<br />

2.00 390.00 49.47 19293.30<br />

2.00 400.00 49.47 19788.00<br />

2.00 400.00 49.47 19788.00<br />

2.00 410.00 49.47 20282.70<br />

2.00 390.00 49.47 19293.30<br />

2.00 390.00 49.47 19293.30<br />

2.00 390.00 49.47 19293.30<br />

2.00 360.00 49.47 17809.20<br />

2.00 410.00 49.47 20282.70<br />

2.00 420.00 49.47 20777.40<br />

2.00 420.00 49.47 20777.40<br />

335 30<strong>11</strong>.56<br />

173 1558.31<br />

153 1372.79<br />

148 1335.69<br />

161 1447.00<br />

173 1558.31<br />

148 1335.69<br />

157 1409.90<br />

157 1409.90<br />

165 1484.10<br />

148 1335.69<br />

148 1335.69<br />

157 1409.90<br />

157 1409.90<br />

157 1409.90<br />

157 1409.90<br />

161 1447.00<br />

165 1484.10<br />

165 1484.10<br />

169 1521.20<br />

161 1447.00<br />

161 1447.00<br />

161 1447.00<br />

148 1335.69<br />

169 1521.20<br />

173 1558.31<br />

173 1558.31<br />

184


WHB2 2103 100<br />

WHB3 1737 85<br />

CD1 78 95<br />

CD2 80 95<br />

CD3 16 95<br />

CD13 1038 85<br />

((12.50+1.3)/2)*2.5 17.25 1725.00 52.30 90217.50<br />

((12.50+1.3)/2)*2.5 17.25 1466.25 52.30 76684.88<br />

((12.50+1.3)/2)*2.5 17.25 1638.75 53.80 88164.75<br />

((12.50+1.3)/2)*2.5 17.25 1638.75 53.80 88164.75<br />

((12.50+1.3)/2)*2.5 17.25 1638.75 53.80 88164.75<br />

((12.50+1.3)/2)*2.5 17.25 1466.25 53.80 78884.25<br />

752 6766.31<br />

639 5751.37<br />

0 0.00<br />

735 6612.36<br />

735 6612.36<br />

735 6612.36<br />

657 5916.32<br />

EW<br />

Cost<br />

909162.75<br />

MB 18378.06<br />

SB 47262.15<br />

2338058.56<br />

29499.63 1459346.45<br />

CB<br />

1285349.25<br />

ECD 23891.25<br />

1217274.28<br />

PB 24606.31<br />

166902.38<br />

WHB 3191.25<br />

343378.50<br />

CD 6382.50<br />

G/P-RAMPURA<br />

VILL-RAMPURA<br />

SB41 520 230 ((4.75+0.80)/2)*1.50<br />

SB47 527 225 ((4.75+0.80)/2)*1.50<br />

SB48 45 225 ((4.75+0.80)/2)*1.50<br />

SB49 97 220 ((4.75+0.80)/2)*1.50<br />

SB50 3810 240 ((4.75+0.80)/2)*1.50<br />

SB51 374 240 ((4.75+0.80)/2)*1.50<br />

4.16 957.38 49.47 47361.34<br />

4.16 936.56 49.47 46331.75<br />

4.16 936.56 49.47 46331.75<br />

4.16 915.75 49.47 45302.15<br />

4.16 999.00 49.47 49420.53<br />

4.16 999.00 49.47 49420.53<br />

395 3552.10<br />

386 3474.88<br />

386 3474.88<br />

378 3397.66<br />

412 3706.54<br />

412 3706.54<br />

MB24 818 260 ((4.75+0.80)/2)*1.50<br />

4.16 1082.25 49.47 53538.91<br />

446 4015.42<br />

185


MB25 610 260 ((4.75+0.80)/2)*1.50<br />

MB26 642 270 ((4.75+0.80)/2)*1.50<br />

MB27 545 275 ((4.75+0.80)/2)*1.50<br />

MB28 457 275 ((3.50+0.50)/2)*1<br />

MB29 460 275 ((3.50+0.50)/2)*1<br />

MB30 676 275 ((3.50+0.50)/2)*1<br />

MB31 891 275 ((3.50+0.50)/2)*1<br />

MB32 604 260 ((3.50+0.50)/2)*1<br />

MB33 706 265 ((3.50+0.50)/2)*1<br />

MB34 7106 280 ((4.75+0.80)/2)*1.50<br />

MB35 639 280 ((4.75+0.80)/2)*1.50<br />

MB36 745 265 ((4.75+0.80)/2)*1.50<br />

MB37 745 285 ((4.75+0.80)/2)*1.50<br />

MB38 747 295 ((4.75+0.80)/2)*1.50<br />

MB39 742 295 ((4.75+0.80)/2)*1.50<br />

MB40 859 300 ((4.75+0.80)/2)*1.50<br />

4.16 1082.25 49.47 53538.91<br />

4.16 <strong>11</strong>23.88 49.47 55598.10<br />

4.16 <strong>11</strong>44.69 49.47 56627.69<br />

2.00 550.00 49.47 27208.50<br />

2.00 550.00 49.47 27208.50<br />

2.00 550.00 49.47 27208.50<br />

2.00 550.00 49.47 27208.50<br />

2.00 520.00 49.47 25724.40<br />

2.00 530.00 49.47 26219.10<br />

4.16 <strong>11</strong>65.50 49.47 57657.29<br />

4.16 <strong>11</strong>65.50 49.47 57657.29<br />

4.16 <strong>11</strong>03.06 49.47 54568.50<br />

4.16 <strong>11</strong>86.31 49.47 58686.88<br />

4.16 1227.94 49.47 60746.07<br />

4.16 1227.94 49.47 60746.07<br />

4.16 1248.75 49.47 61775.66<br />

446 4015.42<br />

463 4169.86<br />

472 4247.08<br />

227 2040.64<br />

227 2040.64<br />

227 2040.64<br />

227 2040.64<br />

214 1929.33<br />

218 1966.43<br />

480 4324.30<br />

480 4324.30<br />

455 4092.64<br />

489 4401.52<br />

506 4555.96<br />

506 4555.96<br />

515 4633.17<br />

CB41 264 195 ((4.75+0.80)/2)*1.50<br />

CB42 258 195 ((4.75+0.80)/2)*1.50<br />

CB43 524 180 ((4.75+0.80)/2)*1.50<br />

CB44 460 180 ((4.75+0.80)/2)*1.50<br />

CB45 513 195 ((4.75+0.80)/2)*1.50<br />

CB46 497 175 ((4.75+0.80)/2)*1.50<br />

CB47 507 205 ((4.75+0.80)/2)*1.50<br />

CB49 215 210 ((4.75+0.80)/2)*1.50<br />

CB50 314 205 ((4.75+0.80)/2)*1.50<br />

CB51 852 195 ((4.75+0.80)/2)*1.50<br />

4.16 8<strong>11</strong>.69 49.47 40154.18<br />

4.16 8<strong>11</strong>.69 49.47 40154.18<br />

4.16 749.25 49.47 37065.40<br />

4.16 749.25 49.47 37065.40<br />

4.16 8<strong>11</strong>.69 49.47 40154.18<br />

4.16 728.44 49.47 36035.80<br />

4.16 853.31 49.47 42213.37<br />

4.16 874.13 49.47 43242.96<br />

4.16 853.31 49.47 42213.37<br />

4.16 8<strong>11</strong>.69 49.47 40154.18<br />

335 30<strong>11</strong>.56<br />

335 30<strong>11</strong>.56<br />

309 2779.90<br />

309 2779.90<br />

335 30<strong>11</strong>.56<br />

300 2702.69<br />

352 3166.00<br />

360 3243.22<br />

352 3166.00<br />

335 30<strong>11</strong>.56<br />

186


CB52 848 190 ((4.75+0.80)/2)*1.50<br />

CB53 488 190 ((4.75+0.80)/2)*1.50<br />

CB54 625 185 ((4.75+0.80)/2)*1.50<br />

CB55 491 185 ((4.75+0.80)/2)*1.50<br />

CB56 517 185 ((4.75+0.80)/2)*1.50<br />

CB57 518 185 ((3.50+0.50)/2)*1<br />

CB58 509 180 ((3.50+0.50)/2)*1<br />

CB59 682 195 ((3.50+0.50)/2)*1<br />

CB60 578 200 ((3.50+0.50)/2)*1<br />

CB61 598 200 ((3.50+0.50)/2)*1<br />

CB62 578 205 ((3.50+0.50)/2)*1<br />

CB63 516 205 ((3.50+0.50)/2)*1<br />

CB64 545 195 ((3.50+0.50)/2)*1<br />

CB65 545 195 ((3.50+0.50)/2)*1<br />

CB97 20 180 ((3.50+0.50)/2)*1<br />

4.16 790.88 49.47 39124.59<br />

4.16 790.88 49.47 39124.59<br />

4.16 770.06 49.47 38094.99<br />

4.16 770.06 49.47 38094.99<br />

4.16 770.06 49.47 38094.99<br />

2.00 370.00 49.47 18303.90<br />

2.00 360.00 49.47 17809.20<br />

2.00 390.00 49.47 19293.30<br />

2.00 400.00 49.47 19788.00<br />

2.00 400.00 49.47 19788.00<br />

2.00 410.00 49.47 20282.70<br />

2.00 410.00 49.47 20282.70<br />

2.00 390.00 49.47 19293.30<br />

2.00 390.00 49.47 19293.30<br />

2.00 360.00 49.47 17809.20<br />

326 2934.34<br />

326 2934.34<br />

317 2857.12<br />

317 2857.12<br />

317 2857.12<br />

153 1372.79<br />

148 1335.69<br />

161 1447.00<br />

165 1484.10<br />

165 1484.10<br />

169 1521.20<br />

169 1521.20<br />

161 1447.00<br />

161 1447.00<br />

148 1335.69<br />

PB46 190 ((3.50+0.50)/2)*1<br />

PB48 97 195 ((3.50+0.50)/2)*1<br />

PB50 441 185 ((3.50+0.50)/2)*1<br />

PB51 244 180 ((3.50+0.50)/2)*1<br />

PB53 544 195 ((3.50+0.50)/2)*1<br />

PB55 482 180 ((3.50+0.50)/2)*1<br />

PB56 563 190 ((3.50+0.50)/2)*1<br />

PB58 268 190 ((3.50+0.50)/2)*1<br />

PB59 822 195 ((3.50+0.50)/2)*1<br />

PB61 636 200 ((3.50+0.50)/2)*1<br />

PB62 551 195 ((3.50+0.50)/2)*1<br />

2.00 380.00 49.47 18798.60<br />

2.00 390.00 49.47 19293.30<br />

2.00 370.00 49.47 18303.90<br />

2.00 360.00 49.47 17809.20<br />

2.00 390.00 49.47 19293.30<br />

2.00 360.00 49.47 17809.20<br />

2.00 380.00 49.47 18798.60<br />

2.00 380.00 49.47 18798.60<br />

2.00 390.00 49.47 19293.30<br />

2.00 400.00 49.47 19788.00<br />

2.00 390.00 49.47 19293.30<br />

157 1409.90<br />

161 1447.00<br />

153 1372.79<br />

148 1335.69<br />

161 1447.00<br />

148 1335.69<br />

157 1409.90<br />

157 1409.90<br />

161 1447.00<br />

165 1484.10<br />

161 1447.00<br />

187


PB63 366 200 ((3.50+0.50)/2)*1<br />

PB64 651 205 ((3.50+0.50)/2)*1<br />

PB65 522 205 ((3.50+0.50)/2)*1<br />

PB66 360 205 ((3.50+0.50)/2)*1<br />

PB67 364 205 ((3.50+0.50)/2)*1<br />

PB68 251 195 ((3.50+0.50)/2)*1<br />

PB69 376 190 ((3.50+0.50)/2)*1<br />

PB70 439 190 ((3.50+0.50)/2)*1<br />

PB71 377 190 ((3.50+0.50)/2)*1<br />

PB72 262 190 ((3.50+0.50)/2)*1<br />

PB73 232 190 ((3.50+0.50)/2)*1<br />

PB74 265 185 ((3.50+0.50)/2)*1<br />

PB75 220 180 ((3.50+0.50)/2)*1<br />

PB76 2094 200 ((3.50+0.50)/2)*1<br />

PB77 200 200 ((3.50+0.50)/2)*1<br />

PB78 13 200 ((3.50+0.50)/2)*1<br />

PB79 8 205 ((3.50+0.50)/2)*1<br />

PB80 42 205 ((3.50+0.50)/2)*1<br />

PB81 91 195 ((3.50+0.50)/2)*1<br />

PB82 51 200 ((3.50+0.50)/2)*1<br />

PB83 124 200 ((3.50+0.50)/2)*1<br />

PB84 101 205 ((3.50+0.50)/2)*1<br />

PB85 147 205 ((3.50+0.50)/2)*1<br />

PB86 107 195 ((3.50+0.50)/2)*1<br />

2.00 400.00 49.47 19788.00<br />

2.00 410.00 49.47 20282.70<br />

2.00 410.00 49.47 20282.70<br />

2.00 410.00 49.47 20282.70<br />

2.00 410.00 49.47 20282.70<br />

2.00 390.00 49.47 19293.30<br />

2.00 380.00 49.47 18798.60<br />

2.00 380.00 49.47 18798.60<br />

2.00 380.00 49.47 18798.60<br />

2.00 380.00 49.47 18798.60<br />

2.00 380.00 49.47 18798.60<br />

2.00 370.00 49.47 18303.90<br />

2.00 360.00 49.47 17809.20<br />

2.00 400.00 49.47 19788.00<br />

2.00 400.00 49.47 19788.00<br />

2.00 400.00 49.47 19788.00<br />

2.00 410.00 49.47 20282.70<br />

2.00 410.00 49.47 20282.70<br />

2.00 390.00 49.47 19293.30<br />

2.00 400.00 49.47 19788.00<br />

2.00 400.00 49.47 19788.00<br />

2.00 410.00 49.47 20282.70<br />

2.00 410.00 49.47 20282.70<br />

2.00 390.00 49.47 19293.30<br />

165 1484.10<br />

169 1521.20<br />

169 1521.20<br />

169 1521.20<br />

169 1521.20<br />

161 1447.00<br />

157 1409.90<br />

157 1409.90<br />

157 1409.90<br />

157 1409.90<br />

157 1409.90<br />

153 1372.79<br />

148 1335.69<br />

165 1484.10<br />

165 1484.10<br />

165 1484.10<br />

169 1521.20<br />

169 1521.20<br />

161 1447.00<br />

165 1484.10<br />

165 1484.10<br />

169 1521.20<br />

169 1521.20<br />

161 1447.00<br />

CD9 123 95<br />

CD10 50 80<br />

((12.50+1.3)/2)*2.5 17.25 1638.75 53.80 88164.75<br />

((12.50+1.3)/2)*2.5 17.25 1380.00 53.80 74244.00<br />

735 6612.36<br />

619 5568.30<br />

188


CD<strong>11</strong> 47 105<br />

CD12 <strong>11</strong> <strong>11</strong>0<br />

CD17 100<br />

CD19 255 105<br />

CD20 232 105<br />

CD21 216 <strong>11</strong>0<br />

CD22 544 95<br />

CD23 247 85<br />

CD24 376 85<br />

CD25 482 85<br />

CD26 542 95<br />

CD27 813 95<br />

CD28 629 80<br />

((12.50+1.3)/2)*2.5 17.25 18<strong>11</strong>.25 53.80 97445.25<br />

((12.50+1.3)/2)*2.5 17.25 1897.50 53.80 102085.50<br />

((12.50+1.3)/2)*2.5 17.25 1725.00 53.80 92805.00<br />

((12.50+1.3)/2)*2.5 17.25 18<strong>11</strong>.25 53.80 97445.25<br />

((12.50+1.3)/2)*2.5 17.25 18<strong>11</strong>.25 53.80 97445.25<br />

((12.50+1.3)/2)*2.5 17.25 1897.50 53.80 102085.50<br />

((12.50+1.3)/2)*2.5 17.25 1638.75 53.80 88164.75<br />

((12.50+1.3)/2)*2.5 17.25 1466.25 53.80 78884.25<br />

((12.50+1.3)/2)*2.5 17.25 1466.25 53.80 78884.25<br />

((12.50+1.3)/2)*2.5 17.25 1466.25 53.80 78884.25<br />

((12.50+1.3)/2)*2.5 17.25 1638.75 53.80 88164.75<br />

((12.50+1.3)/2)*2.5 17.25 1638.75 53.80 88164.75<br />

((12.50+1.3)/2)*2.5 17.25 1380.00 53.80 74244.00<br />

812 7308.39<br />

851 7656.41<br />

773 6960.38<br />

812 7308.39<br />

812 7308.39<br />

851 7656.41<br />

735 6612.36<br />

657 5916.32<br />

657 5916.32<br />

657 5916.32<br />

735 6612.36<br />

735 6612.36<br />

619 5568.30<br />

189


Rampura-II IWM- <strong>VIII</strong> Block- Dist. <strong>Jhansi</strong><br />

G/P-DHIPKAI<br />

Name of Activity<br />

Khasar<br />

a No<br />

Length Width * Height C.S. (Area) Work<br />

measurement<br />

VILL-DHIPKAI<br />

CB1 729 205 ((3.50+0.50)/2)*1<br />

CB2 726 205 ((3.50+0.50)/2)*1<br />

CB3 724 185 ((3.50+0.50)/2)*1<br />

CB4 723 190 ((3.50+0.50)/2)*1<br />

CB5 719 195 ((3.50+0.50)/2)*1<br />

CB6 726 180 ((3.50+0.50)/2)*1<br />

CB7 725 185 ((3.50+0.50)/2)*1<br />

CB8 703 185 ((3.50+0.50)/2)*1<br />

CB9 676 185 ((3.50+0.50)/2)*1<br />

CB10 690 200 ((4.75+0.80)/2)*1.50<br />

CB<strong>11</strong> 691 190 ((4.75+0.80)/2)*1.50<br />

CB12 685 210 ((4.75+0.80)/2)*1.50<br />

CB13 683 200 ((4.75+0.80)/2)*1.50<br />

CB14 678 210 ((4.75+0.80)/2)*1.50<br />

CB15 661 200 ((4.75+0.80)/2)*1.50<br />

CB16 441 190 ((4.75+0.80)/2)*1.50<br />

CB17 448 190 ((4.75+0.80)/2)*1.50<br />

CB18 304 180 ((3.50+0.50)/2)*1<br />

CB19 303 190 ((3.50+0.50)/2)*1<br />

CB20 478 195 ((3.50+0.50)/2)*1<br />

CB21 458 180 ((4.75+0.80)/2)*1.50<br />

Rate<br />

Total Cost<br />

(Rs.)<br />

2.00 410.00 49.47 20282.70<br />

2.00 410.00 49.47 20282.70<br />

2.00 370.00 49.47 18303.90<br />

2.00 380.00 49.47 18798.60<br />

2.00 390.00 49.47 19293.30<br />

2.00 360.00 49.47 17809.20<br />

2.00 370.00 49.47 18303.90<br />

2.00 370.00 49.47 18303.90<br />

2.00 370.00 49.47 18303.90<br />

4.16 832.50 49.47 4<strong>11</strong>83.78<br />

4.16 790.88 49.47 39124.59<br />

4.16 874.13 49.47 43242.96<br />

4.16 832.50 49.47 4<strong>11</strong>83.78<br />

4.16 874.13 49.47 43242.96<br />

4.16 832.50 49.47 4<strong>11</strong>83.78<br />

4.16<br />

790.88<br />

49.47 39124.59<br />

4.16<br />

790.88<br />

49.47 39124.59<br />

2.00 360.00 49.47 17809.20<br />

2.00 380.00 49.47 18798.60<br />

2.00 390.00 49.47 19293.30<br />

4.16 749.25 49.47 37065.40<br />

Manday<br />

Contribution<br />

169 1521.20<br />

169 1521.20<br />

153 1372.79<br />

157 1409.90<br />

161 1447.00<br />

148 1335.69<br />

153 1372.79<br />

153 1372.79<br />

153 1372.79<br />

343 3088.78<br />

326 2934.34<br />

360 3243.22<br />

343 3088.78<br />

360 3243.22<br />

343 3088.78<br />

326 2934.34<br />

326 2934.34<br />

148 1335.69<br />

157 1409.90<br />

161 1447.00<br />

309 2779.90<br />

190


CB22 561 185 ((4.75+0.80)/2)*1.50<br />

CB23 459 185 ((4.75+0.80)/2)*1.50<br />

CB24 594 185 ((4.75+0.80)/2)*1.50<br />

CB25 491 200 ((4.75+0.80)/2)*1.50<br />

CB26 597 190 ((4.75+0.80)/2)*1.50<br />

CB27 747 210 ((4.75+0.80)/2)*1.50<br />

CB28 597 200 ((3.50+0.50)/2)*1<br />

CB29 741 210 ((3.50+0.50)/2)*1<br />

CB30 768 200 ((3.50+0.50)/2)*1<br />

CB31 739 190 ((3.50+0.50)/2)*1<br />

CB32 739 190 ((3.50+0.50)/2)*1<br />

CB33 374 180 ((3.50+0.50)/2)*1<br />

CB34 769 200 ((4.75+0.80)/2)*1.50<br />

CB35 759 210 ((4.75+0.80)/2)*1.50<br />

CB36 773 210 ((4.75+0.80)/2)*1.50<br />

CB37 778 210 ((4.75+0.80)/2)*1.50<br />

CB38 774 210 ((4.75+0.80)/2)*1.50<br />

CB39 80 200 ((4.75+0.80)/2)*1.50<br />

CB40 789 200 ((4.75+0.80)/2)*1.50<br />

CB41 801 200 ((4.75+0.80)/2)*1.50<br />

CB42 8<strong>11</strong> 200 ((4.75+0.80)/2)*1.50<br />

CB43 813 195 ((3.50+0.50)/2)*1<br />

CB44 869 200 ((3.50+0.50)/2)*1<br />

CB45 827 195 ((3.50+0.50)/2)*1<br />

CB46 888 195 ((4.75+0.80)/2)*1.50<br />

4.16 770.06 49.47 38094.99<br />

4.16 770.06 49.47 38094.99<br />

4.16 770.06 49.47 38094.99<br />

4.16 832.50 49.47 4<strong>11</strong>83.78<br />

4.16 790.88 49.47 39124.59<br />

4.16 874.13 49.47 43242.96<br />

2.00 400.00 49.47 19788.00<br />

2.00 420.00 49.47 20777.40<br />

2.00 400.00 49.47 19788.00<br />

2.00 380.00 49.47 18798.60<br />

2.00 380.00 49.47 18798.60<br />

2.00 360.00 49.47 17809.20<br />

4.16 832.50 49.47 4<strong>11</strong>83.78<br />

4.16 874.13 49.47 43242.96<br />

4.16 874.13 49.47 43242.96<br />

4.16 874.13 49.47 43242.96<br />

4.16 874.13 49.47 43242.96<br />

4.16 832.50 49.47 4<strong>11</strong>83.78<br />

4.16 832.50 49.47 4<strong>11</strong>83.78<br />

4.16 832.50 49.47 4<strong>11</strong>83.78<br />

4.16 832.50 49.47 4<strong>11</strong>83.78<br />

2.00 390.00 49.47 19293.30<br />

2.00 400.00 49.47 19788.00<br />

2.00 390.00 49.47 19293.30<br />

4.16 8<strong>11</strong>.69 49.47 40154.18<br />

317 2857.12<br />

317 2857.12<br />

317 2857.12<br />

343 3088.78<br />

326 2934.34<br />

360 3243.22<br />

165 1484.10<br />

173 1558.31<br />

165 1484.10<br />

157 1409.90<br />

157 1409.90<br />

148 1335.69<br />

343 3088.78<br />

360 3243.22<br />

360 3243.22<br />

360 3243.22<br />

360 3243.22<br />

343 3088.78<br />

343 3088.78<br />

343 3088.78<br />

343 3088.78<br />

161 1447.00<br />

165 1484.10<br />

161 1447.00<br />

335 30<strong>11</strong>.56<br />

EW<br />

Cost<br />

191


CB 28726.00<br />

1421075.22<br />

G/P-MARKUAN<br />

VILL.MARKUAN<br />

CB47 732 195 ((4.75+0.80)/2)*1.50<br />

CB48 810 195 ((4.75+0.80)/2)*1.50<br />

CB49 789 200 ((4.75+0.80)/2)*1.50<br />

CB50 835 200 ((4.75+0.80)/2)*1.50<br />

CB51 829 200 ((4.75+0.80)/2)*1.50<br />

CB52 632 200 ((4.75+0.80)/2)*1.50<br />

CB53 841 200 ((4.75+0.80)/2)*1.50<br />

4.16 8<strong>11</strong>.69 49.47 40154.18<br />

4.16 8<strong>11</strong>.69 49.47 40154.18<br />

4.16 832.50 49.47 4<strong>11</strong>83.78<br />

4.16 832.50 49.47 4<strong>11</strong>83.78<br />

4.16 832.50 49.47 4<strong>11</strong>83.78<br />

4.16 832.50 49.47 4<strong>11</strong>83.78<br />

4.16 832.50 49.47 4<strong>11</strong>83.78<br />

335 30<strong>11</strong>.56<br />

335 30<strong>11</strong>.56<br />

343 3088.78<br />

343 3088.78<br />

343 3088.78<br />

343 3088.78<br />

343 3088.78<br />

PB1 412 205 ((4.70+0.50)/2)*1.35<br />

PB27 471 195 ((4.70+0.50)/2)*1.35<br />

PB29 479 195 ((4.70+0.50)/2)*1.35<br />

PB30 403/407 185 ((4.70+0.50)/2)*1.35<br />

PB32 753 185 ((4.70+0.50)/2)*1.35<br />

PB33 733 180 ((4.70+0.50)/2)*1.35<br />

PB37 395 180 ((4.70+0.50)/2)*1.35<br />

PB39 812 180 ((4.70+0.50)/2)*1.35<br />

PB42 842 200 ((4.70+0.50)/2)*1.35<br />

3.51 719.55 49.47 35596.14<br />

3.51 684.45 49.47 33859.74<br />

3.51 684.45 49.47 33859.74<br />

3.51 649.35 49.47 32123.34<br />

3.51 649.35 49.47 32123.34<br />

3.51 631.80 49.47 31255.15<br />

3.51 631.80 49.47 31255.15<br />

3.51 631.80 49.47 31255.15<br />

3.51 702.00 49.47 34727.94<br />

297 2669.71<br />

282 2539.48<br />

282 2539.48<br />

268 2409.25<br />

268 2409.25<br />

260 2344.14<br />

260 2344.14<br />

260 2344.14<br />

289 2604.60<br />

WHB1 79 95<br />

((12.50+1.3)/2)*2.5 17.25 1638.75 52.30 85706.63<br />

714 6428.00<br />

EW<br />

Cost<br />

CB<br />

PC<br />

5785.88 286227.24<br />

5984.55 296055.69<br />

192


WHB<br />

1638.75 85706.63<br />

G/P-DHIPKAI<br />

CD1 3<strong>11</strong> 95<br />

CD2 162 85<br />

CD3 456 80<br />

CD4 402 80<br />

CD5 412 80<br />

CD12 474 95<br />

CD13 465 95<br />

CD14 479 80<br />

CD15 443 80<br />

CD16 957 85<br />

CD21 532 <strong>11</strong>0<br />

CD22 942 <strong>11</strong>0<br />

CD23 1008 105<br />

CD24 857 105<br />

CD25 397 105<br />

VILL-SIKRODHA BAMHORI<br />

((12.50+1.3)/2)*2.5 17.25 1638.75 53.80 88164.75<br />

((12.50+1.3)/2)*2.5 17.25 1466.25 53.80 78884.25<br />

((12.50+1.3)/2)*2.5 17.25 1380.00 53.80 74244.00<br />

((12.50+1.3)/2)*2.5 17.25 1380.00 53.80 74244.00<br />

((12.50+1.3)/2)*2.5 17.25 1380.00 53.80 74244.00<br />

((12.50+1.3)/2)*2.5 17.25 1638.75 53.80 88164.75<br />

((12.50+1.3)/2)*2.5 17.25 1638.75 53.80 88164.75<br />

((12.50+1.3)/2)*2.5 17.25 1380.00 53.80 74244.00<br />

((12.50+1.3)/2)*2.5 17.25 1380.00 53.80 74244.00<br />

((12.50+1.3)/2)*2.5 17.25 1466.25 53.80 78884.25<br />

((12.50+1.3)/2)*2.5 17.25 1897.50 53.80 102085.50<br />

((12.50+1.3)/2)*2.5 17.25 1897.50 53.80 102085.50<br />

((12.50+1.3)/2)*2.5 17.25 18<strong>11</strong>.25 53.80 97445.25<br />

((12.50+1.3)/2)*2.5 17.25 18<strong>11</strong>.25 53.80 97445.25<br />

((12.50+1.3)/2)*2.5 17.25 18<strong>11</strong>.25 53.80 97445.25<br />

735 6612.36<br />

657 5916.32<br />

619 5568.30<br />

619 5568.30<br />

619 5568.30<br />

735 6612.36<br />

735 6612.36<br />

619 5568.30<br />

619 5568.30<br />

657 5916.32<br />

851 7656.41<br />

851 7656.41<br />

812 7308.39<br />

812 7308.39<br />

812 7308.39<br />

PB2 467 95 ((4.75+0.80)/2)*1.50<br />

PB3 461 210 ((4.75+0.80)/2)*1.50<br />

PB4 474 210 ((4.75+0.80)/2)*1.50<br />

PB5 461 205 ((4.75+0.80)/2)*1.50<br />

PB6 474 190 ((4.75+0.80)/2)*1.50<br />

PB7 526 190 ((4.75+0.80)/2)*1.50<br />

4.16 395.44 49.47 19562.29<br />

4.16 874.13 49.47 43242.96<br />

4.16 874.13 49.47 43242.96<br />

4.16 853.31 49.47 42213.37<br />

4.16 790.88 49.47 39124.59<br />

4.16 790.88 49.47 39124.59<br />

163 1467.17<br />

360 3243.22<br />

360 3243.22<br />

352 3166.00<br />

326 2934.34<br />

326 2934.34<br />

193


PB8 848 190 ((4.75+0.80)/2)*1.50<br />

PB9 1015 190 ((4.75+0.80)/2)*1.50<br />

PB10 1007 180 ((4.75+0.80)/2)*1.50<br />

PB<strong>11</strong> 1059 190 ((4.75+0.80)/2)*1.50<br />

PB12 1061 205 ((4.75+0.80)/2)*1.50<br />

PB13 1050 205 ((4.70+0.50)/2)*1.35<br />

PB14 1085 200 ((3.50+0.50)/2)*1<br />

PB15 942 205 ((3.50+0.50)/2)*1<br />

PB16 1010 205 ((3.50+0.50)/2)*1<br />

PB17 992 195 ((3.50+0.50)/2)*1<br />

PB18 463 195 ((3.50+0.50)/2)*1<br />

PB19 441 200 ((3.50+0.50)/2)*1<br />

PB20 430 185 ((3.50+0.50)/2)*1<br />

PB21 935 180 ((3.50+0.50)/2)*1<br />

PB22 425 180 ((3.50+0.50)/2)*1<br />

PB26 400 180 ((3.50+0.50)/2)*1<br />

PB28 456 180 ((3.50+0.50)/2)*1<br />

4.16 790.88 49.47 39124.59<br />

4.16 790.88 49.47 39124.59<br />

4.16 749.25 49.47 37065.40<br />

4.16 790.88 49.47 39124.59<br />

4.16 853.31 49.47 42213.37<br />

3.51 719.55 49.47 35596.14<br />

2.00 400.00 49.47 19788.00<br />

2.00 410.00 49.47 20282.70<br />

2.00 410.00 49.47 20282.70<br />

2.00 390.00 49.47 19293.30<br />

2.00 390.00 49.47 19293.30<br />

2.00 400.00 49.47 19788.00<br />

2.00 370.00 49.47 18303.90<br />

2.00 360.00 49.47 17809.20<br />

2.00 360.00 49.47 17809.20<br />

2.00 360.00 49.47 17809.20<br />

2.00 360.00 49.47 17809.20<br />

326 2934.34<br />

326 2934.34<br />

309 2779.90<br />

326 2934.34<br />

352 3166.00<br />

297 2669.71<br />

165 1484.10<br />

169 1521.20<br />

169 1521.20<br />

161 1447.00<br />

161 1447.00<br />

165 1484.10<br />

153 1372.79<br />

148 1335.69<br />

148 1335.69<br />

148 1335.69<br />

148 1335.69<br />

SB1 425 225 ((4.70+0.50)/2)*1.35<br />

SB2 442 240 ((4.70+0.50)/2)*1.35<br />

SB3 407 230 ((4.70+0.50)/2)*1.35<br />

SB4 434 235 ((4.70+0.50)/2)*1.35<br />

SB5 450 250 ((4.70+0.50)/2)*1.35<br />

SB6 449 250 ((4.70+0.50)/2)*1.35<br />

SB7 449 250 ((4.70+0.50)/2)*1.35<br />

SB8 414 230 ((4.70+0.50)/2)*1.35<br />

SB9 430 230 ((4.70+0.50)/2)*1.35<br />

3.51 789.75 49.47 39068.93<br />

3.51 842.40 49.47 41673.53<br />

3.51 807.30 49.47 39937.13<br />

3.51 824.85 49.47 40805.33<br />

3.51 877.50 49.47 43409.93<br />

3.51 877.50 49.47 43409.93<br />

3.51 877.50 49.47 43409.93<br />

3.51 807.30 49.47 39937.13<br />

3.51 807.30 49.47 39937.13<br />

326 2930.17<br />

347 3125.51<br />

333 2995.28<br />

340 3060.40<br />

362 3255.74<br />

362 3255.74<br />

362 3255.74<br />

333 2995.28<br />

333 2995.28<br />

194


SB43 420 235 ((4.70+0.50)/2)*1.35<br />

SB44 532 245 ((4.70+0.50)/2)*1.35<br />

SB45 526 245 ((4.70+0.50)/2)*1.35<br />

SB46 914 245 ((4.70+0.50)/2)*1.35<br />

SB47 912 245 ((4.70+0.50)/2)*1.35<br />

SB48 910 245 ((4.70+0.50)/2)*1.35<br />

SB49 915 230 ((4.70+0.50)/2)*1.35<br />

SB50 924 230 ((4.70+0.50)/2)*1.35<br />

3.51 824.85 49.47 40805.33<br />

3.51 859.95 49.47 42541.73<br />

3.51 859.95 49.47 42541.73<br />

3.51 859.95 49.47 42541.73<br />

3.51 859.95 49.47 42541.73<br />

3.51 859.95 49.47 42541.73<br />

3.51 807.30 49.47 39937.13<br />

3.51 807.30 49.47 39937.13<br />

340 3060.40<br />

355 3190.63<br />

355 3190.63<br />

355 3190.63<br />

355 3190.63<br />

355 3190.63<br />

333 2995.28<br />

333 2995.28<br />

ECD1 926 90<br />

ECD2 922 80<br />

ECD3 2002 80<br />

ECD4 1014 90<br />

ECD5 1014 <strong>11</strong>0<br />

ECD6 56 <strong>11</strong>0<br />

ECD7 1025 105<br />

ECD8 1005 100<br />

ECD9 1035 100<br />

ECD10 1046 100<br />

ECD<strong>11</strong> 1057 100<br />

ECD12 539 100<br />

ECD13 551 100<br />

((12.50+1.3)/2)*2.5 17.25 1552.50 53.80 83524.50<br />

((12.50+1.3)/2)*2.5 17.25 1380.00 53.80 74244.00<br />

((12.50+1.3)/2)*2.5 17.25 1380.00 53.80 74244.00<br />

((12.50+1.3)/2)*2.5 17.25 1552.50 53.80 83524.50<br />

((12.50+1.3)/2)*2.5 17.25 1897.50 53.80 102085.50<br />

((12.50+1.3)/2)*2.5 17.25 1897.50 53.80 102085.50<br />

((12.50+1.3)/2)*2.5 17.25 18<strong>11</strong>.25 53.80 97445.25<br />

((12.50+1.3)/2)*2.5 17.25 1725.00 53.80 92805.00<br />

((12.50+1.3)/2)*2.5 17.25 1725.00 53.80 92805.00<br />

((12.50+1.3)/2)*2.5 17.25 1725.00 53.80 92805.00<br />

((12.50+1.3)/2)*2.5 17.25 1725.00 53.80 92805.00<br />

((12.50+1.3)/2)*2.5 17.25 1725.00 53.80 92805.00<br />

((12.50+1.3)/2)*2.5 17.25 1725.00 53.80 92805.00<br />

696 6264.34<br />

619 5568.30<br />

619 5568.30<br />

696 6264.34<br />

851 7656.41<br />

851 7656.41<br />

812 7308.39<br />

773 6960.38<br />

773 6960.38<br />

773 6960.38<br />

773 6960.38<br />

773 6960.38<br />

773 6960.38<br />

WHB2 989 100<br />

((12.50+1.3)/2)*2.5 17.25 1725.00 52.30 90217.50<br />

752 6766.31<br />

EW<br />

Cost<br />

CD<br />

23977.50 1289989.50<br />

195


PB<br />

SB<br />

ECD<br />

WHB<br />

13483.49 667028.13<br />

14250.60 704977.18<br />

21821.25 <strong>11</strong>73983.25<br />

1725.00 90217.50<br />

G/P-JASWANTPURA<br />

WHB5 9 <strong>11</strong>0<br />

WHB3 69 <strong>11</strong>0<br />

WHB15 41 <strong>11</strong>0<br />

VILL-JASWANTPURA<br />

((12.50+1.3)/2)*2.5 17.25 1897.50 52.30 99239.25<br />

((12.50+1.3)/2)*2.5 17.25 1897.50 52.30 99239.25<br />

((12.50+1.3)/2)*2.5 17.25 1897.50 52.30 99239.25<br />

827 7442.94<br />

827 7442.94<br />

827 7442.94<br />

EW<br />

Cost<br />

WHB<br />

5692.50 297717.75<br />

G/P-DHIPKAI<br />

VILL-TOLA<br />

MB26 15 260 ((4.75+0.80)/2)*1.50<br />

MB27 16 260 ((4.75+0.80)/2)*1.50<br />

MB31 19 255 ((3.50+0.50)/2)*1<br />

4.16 1082.25 49.47 53538.91<br />

4.16 1082.25 49.47 53538.91<br />

2.00 510.00 49.47 25229.70<br />

446 4015.42<br />

446 4015.42<br />

210 1892.23<br />

EW<br />

Cost<br />

MB 2674.50<br />

132307.52<br />

G/P-SIMARDHA<br />

VILL-SIMARDHA<br />

196


CD5 642 100<br />

CD6 622 105<br />

CD7 616 95<br />

CD8 584 80<br />

CD9 517 85<br />

CD10 513 95<br />

CD<strong>11</strong> 441 100<br />

CD17 666 100<br />

CD18 596 105<br />

CD19 675 95<br />

CD20 95<br />

((12.50+1.3)/2)*2.5 17.25 1725.00 53.80 92805.00<br />

((12.50+1.3)/2)*2.5 17.25 18<strong>11</strong>.25 53.80 97445.25<br />

((12.50+1.3)/2)*2.5 17.25 1638.75 53.80 88164.75<br />

((12.50+1.3)/2)*2.5 17.25 1380.00 53.80 74244.00<br />

((12.50+1.3)/2)*2.5 17.25 1466.25 53.80 78884.25<br />

((12.50+1.3)/2)*2.5 17.25 1638.75 53.80 88164.75<br />

((12.50+1.3)/2)*2.5 17.25 1725.00 53.80 92805.00<br />

((12.50+1.3)/2)*2.5 17.25 1725.00 53.80 92805.00<br />

((12.50+1.3)/2)*2.5 17.25 18<strong>11</strong>.25 53.80 97445.25<br />

((12.50+1.3)/2)*2.5 17.25 1638.75 53.80 88164.75<br />

((12.50+1.3)/2)*2.5 17.25 1638.75 53.80 88164.75<br />

773 6960.38<br />

812 7308.39<br />

735 6612.36<br />

619 5568.30<br />

657 5916.32<br />

735 6612.36<br />

773 6960.38<br />

773 6960.38<br />

812 7308.39<br />

735 6612.36<br />

735 6612.36<br />

MB1 754 280 ((3.50+0.50)/2)*1<br />

MB2 668 280 ((3.50+0.50)/2)*1<br />

MB3 676 280 ((3.50+0.50)/2)*1<br />

MB4 728 275 ((3.50+0.50)/2)*1<br />

MB5 675 265 ((4.75+0.80)/2)*1.50<br />

MB6 630 265 ((4.75+0.80)/2)*1.50<br />

MB7 607 265 ((4.75+0.80)/2)*1.50<br />

MB8 651 260 ((4.75+0.80)/2)*1.50<br />

MB9 653 280 ((4.75+0.80)/2)*1.50<br />

MB10 745 300 ((4.75+0.80)/2)*1.50<br />

MB<strong>11</strong> 744 265 ((4.75+0.80)/2)*1.50<br />

MB12 760 300 ((4.75+0.80)/2)*1.50<br />

MB13 761 300 ((4.75+0.80)/2)*1.50<br />

MB14 762 300 ((4.75+0.80)/2)*1.50<br />

MB15 547 300 ((3.50+0.50)/2)*1<br />

2.00 560.00 49.47 27703.20<br />

2.00 560.00 49.47 27703.20<br />

2.00 560.00 49.47 27703.20<br />

2.00 550.00 49.47 27208.50<br />

4.16 <strong>11</strong>03.06 49.47 54568.50<br />

4.16 <strong>11</strong>03.06 49.47 54568.50<br />

4.16 <strong>11</strong>03.06 49.47 54568.50<br />

4.16 1082.25 49.47 53538.91<br />

4.16 <strong>11</strong>65.50 49.47 57657.29<br />

4.16 1248.75 49.47 61775.66<br />

4.16 <strong>11</strong>03.06 49.47 54568.50<br />

4.16 1248.75 49.47 61775.66<br />

4.16 1248.75 49.47 61775.66<br />

4.16 1248.75 49.47 61775.66<br />

2.00 600.00 49.47 29682.00<br />

231 2077.74<br />

231 2077.74<br />

231 2077.74<br />

227 2040.64<br />

455 4092.64<br />

455 4092.64<br />

455 4092.64<br />

446 4015.42<br />

480 4324.30<br />

515 4633.17<br />

455 4092.64<br />

515 4633.17<br />

515 4633.17<br />

515 4633.17<br />

247 2226.15<br />

197


MB16 540 250 ((3.50+0.50)/2)*1<br />

2.00 500.00 49.47 24735.00<br />

MB17 537 250 ((3.50+0.50)/2)*1<br />

2.00 500.00 49.47 24735.00<br />

MB18 534 255 ((3.50+0.50)/2)*1<br />

2.00 510.00 49.47 25229.70<br />

MB19 529 255 ((4.75+0.80)/2)*1.50<br />

4.16 1061.44 49.47 52509.31<br />

MB20 784 280<br />

((12.50+1.3)/2)*2.5 17.25 4830.00 49.47 238940.10<br />

MB21 787 275<br />

((12.50+1.3)/2)*2.5 17.25 4743.75 49.47 234673.31<br />

MB22 791 275<br />

((12.50+1.3)/2)*2.5 17.25 4743.75 49.47 234673.31<br />

MB23 783 270<br />

((12.50+1.3)/2)*2.5 17.25 4657.50 49.47 230406.53<br />

MB24 486 270 ((3.50+0.50)/2)*1<br />

2.00 540.00 49.47 26713.80<br />

MB25 813 280 ((3.50+0.50)/2)*1<br />

2.00 560.00 49.47 27703.20<br />

MB28 803 250 ((3.50+0.50)/2)*1<br />

2.00 500.00 49.47 24735.00<br />

MB29 804 295 ((3.50+0.50)/2)*1<br />

2.00 590.00 49.47 29187.30<br />

MB30 805 295 ((3.50+0.50)/2)*1<br />

2.00 590.00 49.47 29187.30<br />

MB32 813 295 ((3.50+0.50)/2)*1<br />

2.00 590.00 49.47 29187.30<br />

MB33 821 295 ((3.50+0.50)/2)*1<br />

2.00 590.00 49.47 29187.30<br />

MB34 477 295 ((3.50+0.50)/2)*1<br />

2.00 590.00 49.47 29187.30<br />

MB35 474 260 ((4.75+0.80)/2)*1.50<br />

4.16 1082.25 49.47 53538.91<br />

MB36 476 260 ((4.75+0.80)/2)*1.50<br />

4.16 1082.25 49.47 53538.91<br />

MB37 454 265 ((4.75+0.80)/2)*1.50<br />

4.16 <strong>11</strong>03.06 49.47 54568.50<br />

MB38 467 260 ((4.75+0.80)/2)*1.50<br />

4.16 1082.25 49.47 53538.91<br />

MB39 469 255 ((4.75+0.80)/2)*1.50<br />

4.16 1061.44 49.47 52509.31<br />

MB40 443 250 ((4.75+0.80)/2)*1.50<br />

4.16 1040.63 49.47 51479.72<br />

206 1855.13<br />

206 1855.13<br />

210 1892.23<br />

438 3938.20<br />

1991 17920.51<br />

1956 17600.50<br />

1956 17600.50<br />

1920 17280.49<br />

223 2003.54<br />

231 2077.74<br />

206 1855.13<br />

243 2189.05<br />

243 2189.05<br />

243 2189.05<br />

243 2189.05<br />

243 2189.05<br />

446 4015.42<br />

446 4015.42<br />

455 4092.64<br />

446 4015.42<br />

438 3938.20<br />

429 3860.98<br />

SB10 648 250 ((4.70+0.50)/2)*1.35<br />

SB<strong>11</strong> 652 245 ((4.70+0.50)/2)*1.35<br />

SB12 655 230 ((4.70+0.50)/2)*1.35<br />

SB13 639 230 ((4.70+0.50)/2)*1.35<br />

3.51 877.50 49.47 43409.93<br />

3.51 859.95 49.47 42541.73<br />

3.51 807.30 49.47 39937.13<br />

3.51 807.30 49.47 39937.13<br />

362 3255.74<br />

355 3190.63<br />

333 2995.28<br />

333 2995.28<br />

198


SB14 653 230 ((4.70+0.50)/2)*1.35<br />

SB15 637 230 ((4.70+0.50)/2)*1.35<br />

SB16 632 235 ((4.70+0.50)/2)*1.35<br />

SB17 634 240 ((4.70+0.50)/2)*1.35<br />

SB18 630 245 ((4.70+0.50)/2)*1.35<br />

SB19 624 245 ((4.70+0.50)/2)*1.35<br />

SB20 621 240 ((4.70+0.50)/2)*1.35<br />

SB21 625 250 ((4.70+0.50)/2)*1.35<br />

SB22 627 250 ((4.70+0.50)/2)*1.35<br />

SB23 628 230 ((4.70+0.50)/2)*1.35<br />

SB24 630 230 ((4.70+0.50)/2)*1.35<br />

SB25 612 230 ((4.70+0.50)/2)*1.35<br />

SB26 613 230 ((4.70+0.50)/2)*1.35<br />

SB27 603 230 ((4.70+0.50)/2)*1.35<br />

SB28 605 230 ((4.70+0.50)/2)*1.35<br />

SB29 601 235 ((4.70+0.50)/2)*1.35<br />

SB30 599 235 ((4.70+0.50)/2)*1.35<br />

SB31 560 245 ((4.70+0.50)/2)*1.35<br />

SB32 591 245 ((4.70+0.50)/2)*1.35<br />

SB33 568 250 ((4.70+0.50)/2)*1.35<br />

SB34 519 250 ((4.70+0.50)/2)*1.35<br />

SB35 520 250 ((4.70+0.50)/2)*1.35<br />

SB36 492 245 ((4.70+0.50)/2)*1.35<br />

SB37 493 240 ((4.70+0.50)/2)*1.35<br />

SB38 489 240 ((4.70+0.50)/2)*1.35<br />

SB39 506 230 ((4.70+0.50)/2)*1.35<br />

SB40 540 235 ((4.70+0.50)/2)*1.35<br />

3.51 807.30 49.47 39937.13<br />

3.51 807.30 49.47 39937.13<br />

3.51 824.85 49.47 40805.33<br />

3.51 842.40 49.47 41673.53<br />

3.51 859.95 49.47 42541.73<br />

3.51 859.95 49.47 42541.73<br />

3.51 842.40 49.47 41673.53<br />

3.51 877.50 49.47 43409.93<br />

3.51 877.50 49.47 43409.93<br />

3.51 807.30 49.47 39937.13<br />

3.51 807.30 49.47 39937.13<br />

3.51 807.30 49.47 39937.13<br />

3.51 807.30 49.47 39937.13<br />

3.51 807.30 49.47 39937.13<br />

3.51 807.30 49.47 39937.13<br />

3.51 824.85 49.47 40805.33<br />

3.51 824.85 49.47 40805.33<br />

3.51 859.95 49.47 42541.73<br />

3.51 859.95 49.47 42541.73<br />

3.51 877.50 49.47 43409.93<br />

3.51 877.50 49.47 43409.93<br />

3.51 877.50 49.47 43409.93<br />

3.51 859.95 49.47 42541.73<br />

3.51 842.40 49.47 41673.53<br />

3.51 842.40 49.47 41673.53<br />

3.51 807.30 49.47 39937.13<br />

3.51 824.85 49.47 40805.33<br />

333 2995.28<br />

333 2995.28<br />

340 3060.40<br />

347 3125.51<br />

355 3190.63<br />

355 3190.63<br />

347 3125.51<br />

362 3255.74<br />

362 3255.74<br />

333 2995.28<br />

333 2995.28<br />

333 2995.28<br />

333 2995.28<br />

333 2995.28<br />

333 2995.28<br />

340 3060.40<br />

340 3060.40<br />

355 3190.63<br />

355 3190.63<br />

362 3255.74<br />

362 3255.74<br />

362 3255.74<br />

355 3190.63<br />

347 3125.51<br />

347 3125.51<br />

333 2995.28<br />

340 3060.40<br />

199


SB41 446 235 ((4.70+0.50)/2)*1.35<br />

SB42 445 245 ((4.70+0.50)/2)*1.35<br />

3.51 824.85 49.47 40805.33<br />

3.51 859.95 49.47 42541.73<br />

340 3060.40<br />

355 3190.63<br />

PB23 692 205 ((4.75+0.80)/2)*1.50<br />

PB24 721 205 ((4.75+0.80)/2)*1.50<br />

PB25 740 205 ((4.75+0.80)/2)*1.50<br />

PB31 639 205 ((4.75+0.80)/2)*1.50<br />

PB34 615 215 ((4.75+0.80)/2)*1.50<br />

PB35 592 180 ((4.75+0.80)/2)*1.50<br />

PB36 584 180 ((4.75+0.80)/2)*1.50<br />

PB38 567 180 ((4.75+0.80)/2)*1.50<br />

PB40 518 195 ((4.75+0.80)/2)*1.50<br />

PB41 503 190 ((4.75+0.80)/2)*1.50<br />

PB42 443 185 ((4.75+0.80)/2)*1.50<br />

4.16 853.31 49.47 42213.37<br />

4.16 853.31 49.47 42213.37<br />

4.16 853.31 49.47 42213.37<br />

4.16 853.31 49.47 42213.37<br />

4.16 894.94 49.47 44272.56<br />

4.16 749.25 49.47 37065.40<br />

4.16 749.25 49.47 37065.40<br />

4.16 749.25 49.47 37065.40<br />

4.16 8<strong>11</strong>.69 49.47 40154.18<br />

4.16 790.88 49.47 39124.59<br />

4.16 770.06 49.47 38094.99<br />

352 3166.00<br />

352 3166.00<br />

352 3166.00<br />

352 3166.00<br />

369 3320.44<br />

309 2779.90<br />

309 2779.90<br />

309 2779.90<br />

335 30<strong>11</strong>.56<br />

326 2934.34<br />

317 2857.12<br />

EW<br />

Cost<br />

CD 18198.75 979092.75<br />

MB <strong>11</strong>001.88 2326737.97<br />

SB 27658.80 1368280.84<br />

PB 8928.56 441695.99<br />

BIKRAMPURA (2C2B1m2b) <strong>IWMP</strong>-<strong>VIII</strong> Block- Distt_ JHANSI<br />

Name of Activity<br />

Khasara<br />

No Length Width * Height C.S. (Area)<br />

Work<br />

measurement<br />

Rate<br />

Total Cost<br />

(Rs.) Manday Contribution<br />

G/P-PASORA<br />

VILL-PASORA<br />

200


CB43 1940 195 ((4.75+0.80)/2)*1.50 4.16 8<strong>11</strong>.69 49.47 40154.18 335 30<strong>11</strong>.56<br />

CB44 1941 210 ((4.75+0.80)/2)*1.50 4.16 874.13 49.47 43242.96 360 3243.22<br />

CB45 653 205 ((4.75+0.80)/2)*1.50 4.16 853.31 49.47 42213.37 352 3166.00<br />

CB46 654 185 ((4.75+0.80)/2)*1.50 4.16 770.06 49.47 38094.99 317 2857.12<br />

CB47 655 195 ((4.75+0.80)/2)*1.50 4.16 8<strong>11</strong>.69 49.47 40154.18 335 30<strong>11</strong>.56<br />

CB48 656 190 ((4.75+0.80)/2)*1.50 4.16 790.88 49.47 39124.59 326 2934.34<br />

CB49 657 200 ((3.50+0.50)/2)*1 2.00 400.00 49.47 19788.00 165 1484.10<br />

CB50 657 195 ((3.50+0.50)/2)*1 2.00 390.00 49.47 19293.30 161 1447.00<br />

CB51 666 185 ((3.50+0.50)/2)*1 2.00 370.00 49.47 18303.90 153 1372.79<br />

CB52 665 185 ((3.50+0.50)/2)*1 2.00 370.00 49.47 18303.90 153 1372.79<br />

MB12 1862 280 ((3.50+0.50)/2)*1 2.00 560.00 49.47 27703.20 231 2077.74<br />

MB13 1869 285 ((3.50+0.50)/2)*1 2.00 570.00 49.47 28197.90 235 2<strong>11</strong>4.84<br />

MB14 1902 290 ((3.50+0.50)/2)*1 2.00 580.00 49.47 28692.60 239 2151.95<br />

MB15 1893 250 ((3.50+0.50)/2)*1 2.00 500.00 49.47 24735.00 206 1855.13<br />

MB17 1886 255 ((3.50+0.50)/2)*1 2.00 510.00 49.47 25229.70 210 1892.23<br />

MB18 1885 255 ((4.75+0.80)/2)*1.50 4.16 1061.44 49.47 52509.31 438 3938.20<br />

MB19 1884 255 ((4.75+0.80)/2)*1.50 4.16 1061.44 49.47 52509.31 438 3938.20<br />

EW<br />

Cost<br />

CB 6441.75 318673.37<br />

MB 4842.88 239577.03<br />

G/P-EMLOTA<br />

VILL.BARAOTA<br />

MB<strong>11</strong> 6 290 ((4.75+0.80)/2)*1.50 4.16 1207.13 49.47 59716.47 498 4478.74<br />

CB21 9 195 ((4.75+0.80)/2)*1.50 4.16 8<strong>11</strong>.69 49.47 40154.18 335 30<strong>11</strong>.56<br />

CB22 19 210 ((4.75+0.80)/2)*1.50 4.16 874.13 49.47 43242.96 360 3243.22<br />

201


CB23 14 205 ((4.75+0.80)/2)*1.50 4.16 853.31 49.47 42213.37 352 3166.00<br />

CB24 13 185 ((4.75+0.80)/2)*1.50 4.16 770.06 49.47 38094.99 317 2857.12<br />

CB25 24 195 ((4.75+0.80)/2)*1.50 4.16 8<strong>11</strong>.69 49.47 40154.18 335 30<strong>11</strong>.56<br />

CB26 44 190 ((4.75+0.80)/2)*1.50 4.16 790.88 49.47 39124.59 326 2934.34<br />

CB27 42 200 ((3.50+0.50)/2)*1 2.00 400.00 49.47 19788.00 165 1484.10<br />

CB28 48 195 ((3.50+0.50)/2)*1 2.00 390.00 49.47 19293.30 161 1447.00<br />

CB29 59 185 ((4.75+0.80)/2)*1.50 4.16 770.06 49.47 38094.99 317 2857.12<br />

CB30 58 185 ((4.75+0.80)/2)*1.50 4.16 770.06 49.47 38094.99 317 2857.12<br />

CB31 75 195 ((4.75+0.80)/2)*1.50 4.16 8<strong>11</strong>.69 49.47 40154.18 335 30<strong>11</strong>.56<br />

CB32 76 185 ((4.75+0.80)/2)*1.50 4.16 770.06 49.47 38094.99 317 2857.12<br />

CB33 77 195 ((3.50+0.50)/2)*1 2.00 390.00 49.47 19293.30 161 1447.00<br />

CB34 79 190 ((3.50+0.50)/2)*1 2.00 380.00 49.47 18798.60 157 1409.90<br />

CB35 79A 200 ((3.50+0.50)/2)*1 2.00 400.00 49.47 19788.00 165 1484.10<br />

CB36 86 195 ((3.50+0.50)/2)*1 2.00 390.00 49.47 19293.30 161 1447.00<br />

CB37 85 185 ((3.50+0.50)/2)*1 2.00 370.00 49.47 18303.90 153 1372.79<br />

CB38 84 185 ((3.50+0.50)/2)*1 2.00 370.00 49.47 18303.90 153 1372.79<br />

CB39 <strong>11</strong>6 195 ((3.50+0.50)/2)*1 2.00 390.00 49.47 19293.30 161 1447.00<br />

CB40 <strong>11</strong>8 185 ((3.50+0.50)/2)*1 2.00 370.00 49.47 18303.90 153 1372.79<br />

CB53 668 185 ((3.50+0.50)/2)*1 2.00 370.00 49.47 18303.90 153 1372.79<br />

CB54 <strong>11</strong>4 185 ((3.50+0.50)/2)*1 2.00 370.00 49.47 18303.90 153 1372.79<br />

CB55 <strong>11</strong>5 185 ((4.75+0.80)/2)*1.50 4.16 770.06 49.47 38094.99 317 2857.12<br />

MB1 1297 265 ((3.50+0.50)/2)*1 2.00 530.00 49.47 26219.10 218 1966.43<br />

MB2 1386 260 ((3.50+0.50)/2)*1 2.00 520.00 49.47 25724.40 214 1929.33<br />

MB3 1327 280 ((3.50+0.50)/2)*1 2.00 560.00 49.47 27703.20 231 2077.74<br />

MB5 1334 280 ((3.50+0.50)/2)*1 2.00 560.00 49.47 27703.20 231 2077.74<br />

MB6 1352 285 ((3.50+0.50)/2)*1 2.00 570.00 49.47 28197.90 235 2<strong>11</strong>4.84<br />

MB7 1367 300 ((4.75+0.80)/2)*1.50 4.16 1248.75 49.47 61775.66 515 4633.17<br />

MB8 1390 300 ((4.75+0.80)/2)*1.50 4.16 1248.75 49.47 61775.66 515 4633.17<br />

202


MB9 1398 265 ((4.75+0.80)/2)*1.50 4.16 <strong>11</strong>03.06 49.47 54568.50 455 4092.64<br />

MB16 1287 260 ((3.50+0.50)/2)*1 2.00 520.00 49.47 25724.40 214 1929.33<br />

MB17 1266 255 ((3.50+0.50)/2)*1 2.00 510.00 49.47 25229.70 210 1892.23<br />

MB21 1253 250 ((3.50+0.50)/2)*1 2.00 500.00 49.47 24735.00 206 1855.13<br />

MB22 1242 250 ((3.50+0.50)/2)*1 2.00 500.00 49.47 24735.00 206 1855.13<br />

MB23 1232 250 ((3.50+0.50)/2)*1 2.00 500.00 49.47 24735.00 206 1855.13<br />

MB24 1889 250 ((3.50+0.50)/2)*1 2.00 500.00 49.47 24735.00 206 1855.13<br />

PB29 1356 180 ((3.50+0.50)/2)*1 2.00 360.00 49.47 17809.20 148 1335.69<br />

PB31 1361 180 ((3.50+0.50)/2)*1 2.00 360.00 49.47 17809.20 148 1335.69<br />

PB34 1391 185 ((3.50+0.50)/2)*1 2.00 370.00 49.47 18303.90 153 1372.79<br />

EW<br />

Cost<br />

MB 10577.69 59716.47<br />

CB 13393.69 662585.72<br />

PB 1090.00 53922.30<br />

G/P-DHIPKAI<br />

VILL.BIKRAMPURA<br />

SB31 467 205 ((4.70+0.50)/2)*1.35 3.51 719.55 49.47 35596.14 297 2669.71<br />

SB32 477 220 ((4.70+0.50)/2)*1.35 3.51 772.20 49.47 38200.73 318 2865.06<br />

SB33 427 225 ((4.70+0.50)/2)*1.35 3.51 789.75 49.47 39068.93 326 2930.17<br />

SB34 532 200 ((4.70+0.50)/2)*1.35 3.51 702.00 49.47 34727.94 289 2604.60<br />

SB35 563 205 ((4.70+0.50)/2)*1.35 3.51 719.55 49.47 35596.14 297 2669.71<br />

SB36 561 245 ((4.70+0.50)/2)*1.35 3.51 859.95 49.47 42541.73 355 3190.63<br />

SB37 559 240 ((4.70+0.50)/2)*1.35 3.51 842.40 49.47 41673.53 347 3125.51<br />

SB38 550 240 ((4.70+0.50)/2)*1.35 3.51 842.40 49.47 41673.53 347 3125.51<br />

SB39 581 240 ((4.70+0.50)/2)*1.35 3.51 842.40 49.47 41673.53 347 3125.51<br />

SB40 656 235 ((4.70+0.50)/2)*1.35 3.51 824.85 49.47 40805.33 340 3060.40<br />

SB41 585 235 ((4.70+0.50)/2)*1.35 3.51 824.85 49.47 40805.33 340 3060.40<br />

203


CD1 72 95 ((12.50+1.3)/2)*2.5 17.25 1638.75 53.80 88164.75 735 6612.36<br />

CD2 24 95 ((12.50+1.3)/2)*2.5 17.25 1638.75 53.80 88164.75 735 6612.36<br />

CD3 61 80 ((12.50+1.3)/2)*2.5 17.25 1380.00 53.80 74244.00 619 5568.30<br />

CD4 206 100 ((12.50+1.3)/2)*2.5 17.25 1725.00 53.80 92805.00 773 6960.38<br />

CD5 212 100 ((12.50+1.3)/2)*2.5 17.25 1725.00 53.80 92805.00 773 6960.38<br />

CD6 352 100 ((12.50+1.3)/2)*2.5 17.25 1725.00 53.80 92805.00 773 6960.38<br />

EW<br />

Cost<br />

SB 8739.90 432362.85<br />

CD 9832.50 528988.50<br />

G/P-BANGRA<br />

VILL-BANGRA<br />

PB<strong>11</strong> 71 195 ((3.50+0.50)/2)*1 2.00 390.00 49.47 19293.30 161 1447.00<br />

PB9 28 190 ((4.75+0.80)/2)*1.50 4.16 790.88 49.47 39124.59 326 2934.34<br />

PB10 15 185 ((4.75+0.80)/2)*1.50 4.16 770.06 49.47 38094.99 317 2857.12<br />

PB1 13 185 ((4.75+0.80)/2)*1.50 4.16 770.06 49.47 38094.99 317 2857.12<br />

PB4 209 190 ((4.75+0.80)/2)*1.50 4.16 790.88 49.47 39124.59 326 2934.34<br />

PB5 206 190 ((4.75+0.80)/2)*1.50 4.16 790.88 49.47 39124.59 326 2934.34<br />

PB6 217 195 ((4.75+0.80)/2)*1.50 4.16 8<strong>11</strong>.69 49.47 40154.18 335 30<strong>11</strong>.56<br />

PB7 264 205 ((4.75+0.80)/2)*1.50 4.16 853.31 49.47 42213.37 352 3166.00<br />

PB8 390 210 ((4.75+0.80)/2)*1.50 4.16 874.13 49.47 43242.96 360 3243.22<br />

SB1 106 200 ((4.70+0.50)/2)*1.35 3.51 702.00 49.47 34727.94 289 2604.60<br />

SB2 <strong>11</strong>8 245 ((4.70+0.50)/2)*1.35 3.51 859.95 49.47 42541.73 355 3190.63<br />

SB3 <strong>11</strong>5 240 ((4.70+0.50)/2)*1.35 3.51 842.40 49.47 41673.53 347 3125.51<br />

SB4 90 210 ((4.70+0.50)/2)*1.35 3.51 737.10 49.47 36464.34 304 2734.83<br />

204


SB5 76 210 ((4.70+0.50)/2)*1.35 3.51 737.10 49.47 36464.34 304 2734.83<br />

SB6 87 210 ((4.70+0.50)/2)*1.35 3.51 737.10 49.47 36464.34 304 2734.83<br />

SB7 78 210 ((4.70+0.50)/2)*1.35 3.51 737.10 49.47 36464.34 304 2734.83<br />

SB8 302 200 ((4.70+0.50)/2)*1.35 3.51 702.00 49.47 34727.94 289 2604.60<br />

SB9 306 240 ((4.70+0.50)/2)*1.35 3.51 842.40 49.47 41673.53 347 3125.51<br />

SB10 310 245 ((4.70+0.50)/2)*1.35 3.51 859.95 49.47 42541.73 355 3190.63<br />

SB<strong>11</strong> 412 235 ((4.70+0.50)/2)*1.35 3.51 824.85 49.47 40805.33 340 3060.40<br />

SB12 506 230 ((4.70+0.50)/2)*1.35 3.51 807.30 49.47 39937.13 333 2995.28<br />

SB13 509 230 ((4.70+0.50)/2)*1.35 3.51 807.30 49.47 39937.13 333 2995.28<br />

SB14 510 230 ((4.70+0.50)/2)*1.35 3.51 807.30 49.47 39937.13 333 2995.28<br />

SB15 571 230 ((4.70+0.50)/2)*1.35 3.51 807.30 49.47 39937.13 333 2995.28<br />

SB16 558 230 ((4.70+0.50)/2)*1.35 3.51 807.30 49.47 39937.13 333 2995.28<br />

CD22 42 <strong>11</strong>0 ((12.50+1.3)/2)*2.5 17.25 1897.50 53.80 102085.50 851 7656.41<br />

CD24 39 <strong>11</strong>0 ((12.50+1.3)/2)*2.5 17.25 1897.50 53.80 102085.50 851 7656.41<br />

CD25 55 105 ((12.50+1.3)/2)*2.5 17.25 18<strong>11</strong>.25 53.80 97445.25 812 7308.39<br />

CD26 344 105 ((12.50+1.3)/2)*2.5 17.25 18<strong>11</strong>.25 53.80 97445.25 812 7308.39<br />

CD27 369 95 ((12.50+1.3)/2)*2.5 17.25 1638.75 53.80 88164.75 735 6612.36<br />

CD28 468 90 ((12.50+1.3)/2)*2.5 17.25 1552.50 53.80 83524.50 696 6264.34<br />

CD29 493 90 ((12.50+1.3)/2)*2.5 17.25 1552.50 53.80 83524.50 696 6264.34<br />

CD46 496 90 ((12.50+1.3)/2)*2.5 17.25 1552.50 53.80 83524.50 696 6264.34<br />

CD32 1382 95 ((12.50+1.3)/2)*2.5 17.25 1638.75 53.80 88164.75 735 6612.36<br />

CD33 550 80 ((12.50+1.3)/2)*2.5 17.25 1380.00 53.80 74244.00 619 5568.30<br />

CD34 500 85<br />

CB1 491 185 ((4.75+0.80)/2)*1.50 4.16 770.06 49.47 38094.99 317 2857.12<br />

CB2 518 190 ((4.75+0.80)/2)*1.50 4.16 790.88 49.47 39124.59 326 2934.34<br />

CB3 596 200 ((4.75+0.80)/2)*1.50 4.16 832.50 49.47 4<strong>11</strong>83.78 343 3088.78<br />

CB4 593 205 ((4.75+0.80)/2)*1.50 4.16 853.31 49.47 42213.37 352 3166.00<br />

205


CB5 599 205 ((4.75+0.80)/2)*1.50 4.16 853.31 49.47 42213.37 352 3166.00<br />

CB6 520 205 ((4.75+0.80)/2)*1.50 4.16 853.31 49.47 42213.37 352 3166.00<br />

CB7 522 205 ((4.75+0.80)/2)*1.50 4.16 853.31 49.47 42213.37 352 3166.00<br />

CB8 528 205 ((4.75+0.80)/2)*1.50 4.16 853.31 49.47 42213.37 352 3166.00<br />

CB9 525 210 ((4.75+0.80)/2)*1.50 4.16 874.13 49.47 43242.96 360 3243.22<br />

CB10 606 205 ((4.75+0.80)/2)*1.50 4.16 853.31 49.47 42213.37 352 3166.00<br />

CB<strong>11</strong> 610 205 ((4.75+0.80)/2)*1.50 4.16 853.31 49.47 42213.37 352 3166.00<br />

CB13 700 200 ((4.75+0.80)/2)*1.50 4.16 832.50 49.47 4<strong>11</strong>83.78 343 3088.78<br />

CB14 676 200 ((3.50+0.50)/2)*1 2.00 400.00 49.47 19788.00 165 1484.10<br />

CB16 678 200 ((3.50+0.50)/2)*1 2.00 400.00 49.47 19788.00 165 1484.10<br />

CB17 707 205 ((3.50+0.50)/2)*1 2.00 410.00 49.47 20282.70 169 1521.20<br />

CB20 709 205 ((3.50+0.50)/2)*1 2.00 410.00 49.47 20282.70 169 1521.20<br />

CB18 624 195 ((3.50+0.50)/2)*1 2.00 390.00 49.47 19293.30 161 1447.00<br />

CB19 626 195 ((3.50+0.50)/2)*1 2.00 390.00 49.47 19293.30 161 1447.00<br />

CB41 448 195 ((3.50+0.50)/2)*1 2.00 390.00 49.47 19293.30 161 1447.00<br />

CB42 453 210 ((3.50+0.50)/2)*1 2.00 420.00 49.47 20777.40 173 1558.31<br />

PB24 446 180 ((4.75+0.80)/2)*1.50 4.16 749.25 49.47 37065.40 309 2779.90<br />

PB23 373 180 ((4.75+0.80)/2)*1.50 4.16 749.25 49.47 37065.40 309 2779.90<br />

PB25 457 180 ((3.50+0.50)/2)*1 2.00 360.00 49.47 17809.20 148 1335.69<br />

PB26 558 185 ((3.50+0.50)/2)*1 2.00 370.00 49.47 18303.90 153 1372.79<br />

PB27 592 195 ((3.50+0.50)/2)*1 2.00 390.00 49.47 19293.30 161 1447.00<br />

PB28 593 195 ((3.50+0.50)/2)*1 2.00 390.00 49.47 19293.30 161 1447.00<br />

PB30 531 200 ((3.50+0.50)/2)*1 2.00 400.00 49.47 19788.00 165 1484.10<br />

PB32 541 195 ((3.50+0.50)/2)*1 2.00 390.00 49.47 19293.30 161 1447.00<br />

MB10 569 255 ((4.75+0.80)/2)*1.50 4.16 1061.44 49.47 52509.31 438 3938.20<br />

MB4 515 265 ((4.75+0.80)/2)*1.50 4.16 <strong>11</strong>03.06 49.47 54568.50 455 4092.64<br />

MB30 95 250 ((4.75+0.80)/2)*1.50 4.16 1040.63 49.47 51479.72 429 3860.98<br />

206


MB25 44 270 ((4.75+0.80)/2)*1.50 4.16 <strong>11</strong>23.88 49.47 55598.10 463 4169.86<br />

MB26 418 270 ((3.50+0.50)/2)*1 2.00 540.00 49.47 26713.80 223 2003.54<br />

MB27 417 275 ((3.50+0.50)/2)*1 2.00 550.00 49.47 27208.50 227 2040.64<br />

MB28 421 275 ((3.50+0.50)/2)*1 2.00 550.00 49.47 27208.50 227 2040.64<br />

MB29 429 275 ((3.50+0.50)/2)*1 2.00 550.00 49.47 27208.50 227 2040.64<br />

EW<br />

Cost<br />

PB 6841.88 338467.56<br />

SB 12618.45 624234.72<br />

CD 16732.50 900208.50<br />

CB 13283.25 657122.38<br />

PB 3798.50 1879<strong>11</strong>.80<br />

MB 6519.00 322494.93<br />

G/P-DHIPKAI<br />

SIKRODHA BAMHORI<br />

PB2 273 195 ((3.50+0.50)/2)*1 2.00 390.00 49.47 19293.30 161 1447.00<br />

PB3 284 195 ((3.50+0.50)/2)*1 2.00 390.00 49.47 19293.30 161 1447.00<br />

CD3 270 100 ((12.50+1.3)/2)*2.5 17.25 1725.00 53.80 92805.00 773 6960.38<br />

CD4 296 <strong>11</strong>0 ((12.50+1.3)/2)*2.5 17.25 1897.50 53.80 102085.50 851 7656.41<br />

EW<br />

Cost<br />

PB 780.00 38586.60<br />

CD 3622.50 194890.50<br />

G/P-SIMARDHA<br />

VILL-SIMARDHA<br />

CB<strong>11</strong> 192 195 ((3.50+0.50)/2)*1 2.00 390.00 49.47 19293.30 161 1447.00<br />

CB12 193 180 ((3.50+0.50)/2)*1 2.00 360.00 49.47 17809.20 148 1335.69<br />

207


CB15 191 180 ((3.50+0.50)/2)*1 2.00 360.00 49.47 17809.20 148 1335.69<br />

SB18 190 220 ((4.70+0.50)/2)*1.35 3.51 772.20 49.47 38200.73 318 2865.06<br />

SB19 187 200 ((4.70+0.50)/2)*1.35 3.51 702.00 49.47 34727.94 289 2604.60<br />

SB20 180 220 ((4.70+0.50)/2)*1.35 3.51 772.20 49.47 38200.73 318 2865.06<br />

SB21 128 225 ((4.70+0.50)/2)*1.35 3.51 789.75 49.47 39068.93 326 2930.17<br />

SB22 151 225 ((4.70+0.50)/2)*1.35 3.51 789.75 49.47 39068.93 326 2930.17<br />

SB23 134 235 ((4.70+0.50)/2)*1.35 3.51 824.85 49.47 40805.33 340 3060.40<br />

SB24 136 235 ((4.70+0.50)/2)*1.35 3.51 824.85 49.47 40805.33 340 3060.40<br />

SB25 150 235 ((4.70+0.50)/2)*1.35 3.51 824.85 49.47 40805.33 340 3060.40<br />

SB26 152 235 ((4.70+0.50)/2)*1.35 3.51 824.85 49.47 40805.33 340 3060.40<br />

SB27 159 230 ((4.70+0.50)/2)*1.35 3.51 807.30 49.47 39937.13 333 2995.28<br />

SB28 163 235 ((4.70+0.50)/2)*1.35 3.51 824.85 49.47 40805.33 340 3060.40<br />

SB29 253 240 ((4.70+0.50)/2)*1.35 3.51 842.40 49.47 41673.53 347 3125.51<br />

SB30 257 240 ((4.70+0.50)/2)*1.35 3.51 842.40 49.47 41673.53 347 3125.51<br />

SB42 245 240 ((4.70+0.50)/2)*1.35 3.51 842.40 49.47 41673.53 347 3125.51<br />

SB43 238 240 ((4.70+0.50)/2)*1.35 3.51 842.40 49.47 41673.53 347 3125.51<br />

SB44 239 250 ((4.70+0.50)/2)*1.35 3.51 877.50 49.47 43409.93 362 3255.74<br />

SB45 219 250 ((4.70+0.50)/2)*1.35 3.51 877.50 49.47 43409.93 362 3255.74<br />

CD15 2 95 ((12.50+1.3)/2)*2.5 17.25 1638.75 53.80 88164.75 735 6612.36<br />

CD16 26 <strong>11</strong>0 ((12.50+1.3)/2)*2.5 17.25 1897.50 53.80 102085.50 851 7656.41<br />

CD17 82 105 ((12.50+1.3)/2)*2.5 17.25 18<strong>11</strong>.25 53.80 97445.25 812 7308.39<br />

CD18 95 100 ((12.50+1.3)/2)*2.5 17.25 1725.00 53.80 92805.00 773 6960.38<br />

CD19 80 100 ((12.50+1.3)/2)*2.5 17.25 1725.00 53.80 92805.00 773 6960.38<br />

PB20 32 100 ((3.50+0.50)/2)*1 2.00 200.00 49.47 9894.00 82 742.05<br />

EW<br />

Cost<br />

208


CB <strong>11</strong>10.00 549<strong>11</strong>.70<br />

SB 13882.05 686745.01<br />

CD 8797.50 473305.50<br />

PB 200.00 9894.00<br />

RUND GARUATHA (2C2B1l2b) <strong>IWMP</strong>-<strong>VIII</strong> Block- Distt_ JHANSI<br />

G/P-DURKHURA<br />

Name of<br />

Activity<br />

Khasara<br />

No<br />

Length Width * Height C.S. (Area) Work<br />

measurement<br />

VILL-GOHNA<br />

PB2 205 ((3.50+0.50)/2)*1<br />

PB4 190 ((4.75+0.80)/2)*1.50<br />

PB5 147 190 ((4.75+0.80)/2)*1.50<br />

Rate<br />

Total Cost<br />

(Rs.)<br />

2.00 410.00 49.47 20282.70<br />

4.16 790.88 49.47 39124.59<br />

4.16 790.88 49.47 39124.59<br />

Manday<br />

Contribution<br />

169 1521.20<br />

326 2934.34<br />

326 2934.34<br />

CD3 95 ((4.75+0.80)/2)*1.50<br />

4.16 395 53.80 21275<br />

177 1595.59<br />

EW<br />

PB 1991.75<br />

CD 395<br />

Cost<br />

98531.87<br />

21274.54<br />

G/P-BIRONA<br />

VILL.BIRONA<br />

CB1 789 205 ((4.75+0.80)/2)*1.50<br />

CB2 79 210 ((4.75+0.80)/2)*1.50<br />

CB3 818 205 ((4.75+0.80)/2)*1.50<br />

CB4 826 195 ((4.75+0.80)/2)*1.50<br />

CB5 820 190 ((4.75+0.80)/2)*1.50<br />

CB6 822 190 ((4.75+0.80)/2)*1.50<br />

4.16 853.31 49.47 42213.37<br />

4.16 874.13 49.47 43242.96<br />

4.16 853.31 49.47 42213.37<br />

4.16 8<strong>11</strong>.69 49.47 40154.18<br />

4.16 790.88 49.47 39124.59<br />

4.16 790.88 49.47 39124.59<br />

352 3166.00<br />

360 3243.22<br />

352 3166.00<br />

335 30<strong>11</strong>.56<br />

326 2934.34<br />

326 2934.34<br />

209


CB7 761 185 ((4.75+0.80)/2)*1.50<br />

CB8 825 185 ((4.75+0.80)/2)*1.50<br />

CB9 805 185 ((3.50+0.50)/2)*1<br />

CB10 852 185 ((3.50+0.50)/2)*1<br />

CB<strong>11</strong> 867 180 ((3.50+0.50)/2)*1<br />

CB12 896 195 ((3.50+0.50)/2)*1<br />

CB13 871 200 ((3.50+0.50)/2)*1<br />

CB14 898 200 ((3.50+0.50)/2)*1<br />

CB15 768 205 ((3.50+0.50)/2)*1<br />

CB17 162 205 ((3.50+0.50)/2)*1<br />

CB18 190 195 ((3.50+0.50)/2)*1<br />

CB19 224 195 ((3.50+0.50)/2)*1<br />

CB20 349 180 ((3.50+0.50)/2)*1<br />

CB21 340 185 ((3.50+0.50)/2)*1<br />

MB1 172 250 ((3.50+0.50)/2)*1<br />

MB2 166 250 ((3.50+0.50)/2)*1<br />

MB3 162 255 ((3.50+0.50)/2)*1<br />

MB4 158 265 ((3.50+0.50)/2)*1<br />

MB5 235 280 ((3.50+0.50)/2)*1<br />

MB6 234 280 ((4.75+0.80)/2)*1.50<br />

MB7 233 285 ((4.75+0.80)/2)*1.50<br />

MB8 247 300 ((4.75+0.80)/2)*1.50<br />

MB9 257 285 ((4.75+0.80)/2)*1.50<br />

MB10 252 280 ((4.75+0.80)/2)*1.50<br />

MB<strong>11</strong> 262 295 ((4.75+0.80)/2)*1.50<br />

MB12 288 290 ((4.75+0.80)/2)*1.50<br />

4.16 770.06 49.47 38094.99<br />

4.16 770.06 49.47 38094.99<br />

2.00 370.00 49.47 18303.90<br />

2.00 370.00 49.47 18303.90<br />

2.00 360.00 49.47 17809.20<br />

2.00 390.00 49.47 19293.30<br />

2.00 400.00 49.47 19788.00<br />

2.00 400.00 49.47 19788.00<br />

2.00 410.00 49.47 20282.70<br />

2.00 410.00 49.47 20282.70<br />

2.00 390.00 49.47 19293.30<br />

2.00 390.00 49.47 19293.30<br />

2.00 360.00 49.47 17809.20<br />

2.00 370.00 49.47 18303.90<br />

<strong>11</strong>134 550814<br />

2.00 500.00 49.47 24735.00<br />

2.00 500.00 49.47 24735.00<br />

2.00 510.00 49.47 25229.70<br />

2.00 530.00 49.47 26219.10<br />

2.00 560.00 49.47 27703.20<br />

4.16 <strong>11</strong>65.50 49.47 57657.29<br />

4.16 <strong>11</strong>86.31 49.47 58686.88<br />

4.16 1248.75 49.47 61775.66<br />

4.16 <strong>11</strong>86.31 49.47 58686.88<br />

4.16 <strong>11</strong>65.50 49.47 57657.29<br />

4.16 1227.94 49.47 60746.07<br />

4.16 1207.13 49.47 59716.47<br />

317 2857.12<br />

317 2857.12<br />

153 1372.79<br />

153 1372.79<br />

148 1335.69<br />

161 1447.00<br />

165 1484.10<br />

165 1484.10<br />

169 1521.20<br />

169 1521.20<br />

161 1447.00<br />

161 1447.00<br />

148 1335.69<br />

153 1372.79<br />

206 1855.13<br />

206 1855.13<br />

210 1892.23<br />

218 1966.43<br />

231 2077.74<br />

480 4324.30<br />

489 4401.52<br />

515 4633.17<br />

489 4401.52<br />

480 4324.30<br />

506 4555.96<br />

498 4478.74<br />

210


MB13 306 290 ((4.75+0.80)/2)*1.50<br />

MB14 268 265 ((4.75+0.80)/2)*1.50<br />

MB15 481 260 ((4.75+0.80)/2)*1.50<br />

MB16 894 270 ((4.75+0.80)/2)*1.50<br />

MB17 869 275 ((4.75+0.80)/2)*1.50<br />

MB18 809 275 ((3.50+0.50)/2)*1<br />

MB19 810 270 ((3.50+0.50)/2)*1<br />

SB10 599 245 ((4.70+0.50)/2)*1.35<br />

SB<strong>11</strong> 603 215 ((4.70+0.50)/2)*1.35<br />

SB12 607 225 ((4.70+0.50)/2)*1.35<br />

SB13 425 200 ((4.70+0.50)/2)*1.35<br />

SB14 420 225 ((4.70+0.50)/2)*1.35<br />

SB15 309 225 ((4.70+0.50)/2)*1.35<br />

SB16 483 220 ((4.70+0.50)/2)*1.35<br />

SB17 465 205 ((4.70+0.50)/2)*1.35<br />

SB18 392 215 ((4.70+0.50)/2)*1.35<br />

SB19 398 210 ((4.70+0.50)/2)*1.35<br />

SB20 308 210 ((4.70+0.50)/2)*1.35<br />

SB21 299 215 ((4.70+0.50)/2)*1.35<br />

SB22 327 215 ((4.70+0.50)/2)*1.35<br />

SB23 162 255 ((4.70+0.50)/2)*1.35<br />

SB24 209 205 ((4.70+0.50)/2)*1.35<br />

SB25 266 215 ((4.70+0.50)/2)*1.35<br />

SB26 225 215 ((4.70+0.50)/2)*1.35<br />

SB27 220 200 ((4.70+0.50)/2)*1.35<br />

SB28 247 235 ((4.70+0.50)/2)*1.35<br />

4.16 1207.13 49.47 59716.47<br />

4.16 <strong>11</strong>03.06 49.47 54568.50<br />

4.16 1082.25 49.47 53538.91<br />

4.16 <strong>11</strong>23.88 49.47 55598.10<br />

4.16 <strong>11</strong>44.69 49.47 56627.69<br />

2.00 550.00 49.47 27208.50<br />

2.00 540.00 49.47 26713.80<br />

17738 877521<br />

3.51 859.95 49.47 42541.73<br />

3.51 754.65 49.47 37332.54<br />

3.51 789.75 49.47 39068.93<br />

3.51 702.00 49.47 34727.94<br />

3.51 789.75 49.47 39068.93<br />

3.51 789.75 49.47 39068.93<br />

3.51 772.20 49.47 38200.73<br />

3.51 719.55 49.47 35596.14<br />

3.51 754.65 49.47 37332.54<br />

3.51 737.10 49.47 36464.34<br />

3.51 737.10 49.47 36464.34<br />

3.51 754.65 49.47 37332.54<br />

3.51 754.65 49.47 37332.54<br />

3.51 895.05 49.47 44278.12<br />

3.51 719.55 49.47 35596.14<br />

3.51 754.65 49.47 37332.54<br />

3.51 754.65 49.47 37332.54<br />

3.51 702.00 49.47 34727.94<br />

3.51 824.85 49.47 40805.33<br />

498 4478.74<br />

455 4092.64<br />

446 4015.42<br />

463 4169.86<br />

472 4247.08<br />

227 2040.64<br />

223 2003.54<br />

7313 65814.04<br />

355 3190.63<br />

3<strong>11</strong> 2799.94<br />

326 2930.17<br />

289 2604.60<br />

326 2930.17<br />

326 2930.17<br />

318 2865.06<br />

297 2669.71<br />

3<strong>11</strong> 2799.94<br />

304 2734.83<br />

304 2734.83<br />

3<strong>11</strong> 2799.94<br />

3<strong>11</strong> 2799.94<br />

369 3320.86<br />

297 2669.71<br />

3<strong>11</strong> 2799.94<br />

3<strong>11</strong> 2799.94<br />

289 2604.60<br />

340 3060.40<br />

2<strong>11</strong>


SB29 248 235 ((4.70+0.50)/2)*1.35<br />

SB30 263 250 ((4.70+0.50)/2)*1.35<br />

PB6 167 205 ((3.50+0.50)/2)*1<br />

PB7 667 200 ((3.50+0.50)/2)*1<br />

PB8 58 195 ((3.50+0.50)/2)*1<br />

PB9 230 185 ((4.75+0.80)/2)*1.50<br />

PB10 229 180 ((4.75+0.80)/2)*1.50<br />

PB<strong>11</strong> 345 180 ((4.75+0.80)/2)*1.50<br />

PB29 343 195 ((3.50+0.50)/2)*1<br />

PB30 368 190 ((3.50+0.50)/2)*1<br />

PB32 369 190 ((3.50+0.50)/2)*1<br />

PB36 426 190 ((3.50+0.50)/2)*1<br />

PB39 788 185 ((3.50+0.50)/2)*1<br />

PB41 785 200 ((3.50+0.50)/2)*1<br />

PB42 58 205 ((3.50+0.50)/2)*1<br />

3.51 824.85 49.47 40805.33<br />

3.51 877.50 49.47 43409.93<br />

16269 804820<br />

2.00 410.00 49.47 20282.70<br />

2.00 400.00 49.47 19788.00<br />

2.00 390.00 49.47 19293.30<br />

4.16 770.06 49.47 38094.99<br />

4.16 749.25 49.47 37065.40<br />

4.16 749.25 49.47 37065.40<br />

2.00 390.00 49.47 19293.30<br />

2.00 380.00 49.47 18798.60<br />

2.00 380.00 49.47 18798.60<br />

2.00 380.00 49.47 18798.60<br />

2.00 370.00 49.47 18303.90<br />

2.00 400.00 49.47 19788.00<br />

2.00 410.00 49.47 20282.70<br />

340 3060.40<br />

362 3255.74<br />

169 1521.20<br />

165 1484.10<br />

161 1447.00<br />

317 2857.12<br />

309 2779.90<br />

309 2779.90<br />

161 1447.00<br />

157 1409.90<br />

157 1409.90<br />

157 1409.90<br />

153 1372.79<br />

165 1484.10<br />

169 1521.20<br />

WHB3 836 95<br />

WHB5 610 <strong>11</strong>0<br />

WHB6 229 <strong>11</strong>0<br />

WHB7 58 105<br />

((12.50+1.3)/2)*2.5 17.25 1638.75 52.30 85706.63<br />

((12.50+1.3)/2)*2.5 17.25 1897.50 52.30 99239.25<br />

((12.50+1.3)/2)*2.5 17.25 1897.50 52.30 99239.25<br />

((12.50+1.3)/2)*2.5 17.25 18<strong>11</strong>.25 52.30 94728.38<br />

714 6428.00<br />

827 7442.94<br />

827 7442.94<br />

789 7104.63<br />

CD2 345 95<br />

CD4 343 95<br />

CD10 344 100<br />

CD<strong>11</strong> 346 100<br />

CD12 347 95<br />

((12.50+1.3)/2)*2.5 17.25 1638.75 53.80 88164.75<br />

((12.50+1.3)/2)*2.5 17.25 1638.75 53.80 88164.75<br />

((12.50+1.3)/2)*2.5 17.25 1725.00 53.80 92805.00<br />

((12.50+1.3)/2)*2.5 17.25 1725.00 53.80 92805.00<br />

((12.50+1.3)/2)*2.5 17.25 1638.75 53.80 88164.75<br />

735 6612.36<br />

735 6612.36<br />

773 6960.38<br />

773 6960.38<br />

735 6612.36<br />

212


CD14 377 85<br />

CD15 426 95<br />

CD16 785 85<br />

((12.50+1.3)/2)*2.5 17.25 1466.25 53.80 78884.25<br />

((12.50+1.3)/2)*2.5 17.25 1638.75 53.80 88164.75<br />

((12.50+1.3)/2)*2.5 17.25 1466.25 53.80 78884.25<br />

657 5916.32<br />

735 6612.36<br />

657 5916.32<br />

ECD7 760 85<br />

ECD10 803 85<br />

ECD<strong>11</strong> 833 80<br />

ECD12 844 95<br />

((12.50+1.3)/2)*2.5 17.25 1466.25 53.80 78884.25<br />

((12.50+1.3)/2)*2.5 17.25 1466.25 53.80 78884.25<br />

((12.50+1.3)/2)*2.5 17.25 1380.00 53.80 74244.00<br />

((12.50+1.3)/2)*2.5 17.25 1638.75 53.80 88164.75<br />

657 5916.32<br />

657 5916.32<br />

619 5568.30<br />

735 6612.36<br />

EW<br />

Cost<br />

CB<br />

MB<br />

PB<br />

SB<br />

WHB<br />

CD<br />

ECD<br />

<strong>11</strong>134.31 550814.44<br />

17738.44 877520.50<br />

6178.56 305653.49<br />

16268.85 804820.01<br />

7245.00 378913.50<br />

12937.50 696037.50<br />

5951.25 320177.25<br />

G/P-DURKHURA<br />

VILL-RUNDGARUATHA<br />

SB1 88 235 ((4.70+0.50)/2)*1.35<br />

SB2 64 250 ((4.70+0.50)/2)*1.35<br />

SB3 63 250 ((4.70+0.50)/2)*1.35<br />

SB4 87 250 ((4.70+0.50)/2)*1.35<br />

SB5 66 235 ((4.70+0.50)/2)*1.35<br />

SB6 22 235 ((4.70+0.50)/2)*1.35<br />

SB7 50 210 ((4.70+0.50)/2)*1.35<br />

SB8 43 210 ((4.70+0.50)/2)*1.35<br />

3.51 824.85 49.47 40805.33<br />

3.51 877.50 49.47 43409.93<br />

3.51 877.50 49.47 43409.93<br />

3.51 877.50 49.47 43409.93<br />

3.51 824.85 49.47 40805.33<br />

3.51 824.85 49.47 40805.33<br />

3.51 737.10 49.47 36464.34<br />

3.51 737.10 49.47 36464.34<br />

340 3060.40<br />

362 3255.74<br />

362 3255.74<br />

362 3255.74<br />

340 3060.40<br />

340 3060.40<br />

304 2734.83<br />

304 2734.83<br />

213


SB9 69 210 ((4.70+0.50)/2)*1.35<br />

3.51 737.10 49.47 36464.34<br />

304 2734.83<br />

CB22 78 205 ((3.50+0.50)/2)*1<br />

CB23 77 205 ((4.75+0.80)/2)*1.50<br />

CB26 60 210 ((4.75+0.80)/2)*1.50<br />

CB28 83 210 ((4.75+0.80)/2)*1.50<br />

CB32 38 210 ((4.75+0.80)/2)*1.50<br />

CB33 35 210 ((4.75+0.80)/2)*1.50<br />

CB34 33 205 ((4.75+0.80)/2)*1.50<br />

CB35 34 205 ((4.75+0.80)/2)*1.50<br />

CB36 50 100 ((4.75+0.80)/2)*1.50<br />

CB37 56 100 ((4.75+0.80)/2)*1.50<br />

CB38 59 205 ((4.75+0.80)/2)*1.50<br />

CB39 55/56 205 ((4.75+0.80)/2)*1.50<br />

CB40 46 210 ((4.75+0.80)/2)*1.50<br />

2.00 410.00 49.47 20282.70<br />

4.16 853.31 49.47 42213.37<br />

4.16 874.13 49.47 43242.96<br />

4.16 874.13 49.47 43242.96<br />

4.16 874.13 49.47 43242.96<br />

4.16 874.13 49.47 43242.96<br />

4.16 853.31 49.47 42213.37<br />

4.16 853.31 49.47 42213.37<br />

4.16 416.25 49.47 20591.89<br />

4.16 416.25 49.47 20591.89<br />

4.16 853.31 49.47 42213.37<br />

4.16 853.31 49.47 42213.37<br />

4.16 874.13 49.47 43242.96<br />

169 1521.20<br />

352 3166.00<br />

360 3243.22<br />

360 3243.22<br />

360 3243.22<br />

360 3243.22<br />

352 3166.00<br />

352 3166.00<br />

172 1544.39<br />

172 1544.39<br />

352 3166.00<br />

352 3166.00<br />

360 3243.22<br />

PB12 6 205 ((3.50+0.50)/2)*1<br />

PB13 4 205 ((3.50+0.50)/2)*1<br />

PB14 6 210 ((3.50+0.50)/2)*1<br />

PB15 4 210 ((3.50+0.50)/2)*1<br />

PB16 2 210 ((3.50+0.50)/2)*1<br />

PB17 36 210 ((3.50+0.50)/2)*1<br />

PB18 2 205 ((3.50+0.50)/2)*1<br />

PB19 36 205 ((3.50+0.50)/2)*1<br />

PB20 55 190 ((3.50+0.50)/2)*1<br />

PB21 36 190 ((3.50+0.50)/2)*1<br />

PB22 55 190 ((3.50+0.50)/2)*1<br />

2.00 410.00 49.47 20282.70<br />

2.00 410.00 49.47 20282.70<br />

2.00 420.00 49.47 20777.40<br />

2.00 420.00 49.47 20777.40<br />

2.00 420.00 49.47 20777.40<br />

2.00 420.00 49.47 20777.40<br />

2.00 410.00 49.47 20282.70<br />

2.00 410.00 49.47 20282.70<br />

2.00 380.00 49.47 18798.60<br />

2.00 380.00 49.47 18798.60<br />

2.00 380.00 49.47 18798.60<br />

169 1521.20<br />

169 1521.20<br />

173 1558.31<br />

173 1558.31<br />

173 1558.31<br />

173 1558.31<br />

169 1521.20<br />

169 1521.20<br />

157 1409.90<br />

157 1409.90<br />

157 1409.90<br />

214


PB23 36 180 ((3.50+0.50)/2)*1<br />

PB24 36 180 ((3.50+0.50)/2)*1<br />

PB25 32 210 ((3.50+0.50)/2)*1<br />

PB26 36 210 ((3.50+0.50)/2)*1<br />

PB27 36 200 ((3.50+0.50)/2)*1<br />

PB28 36 190 ((3.50+0.50)/2)*1<br />

PB31 343 190 ((3.50+0.50)/2)*1<br />

PB33 84 190 ((3.50+0.50)/2)*1<br />

PB1 2 180 ((3.50+0.50)/2)*1<br />

PB3 2 180 ((3.50+0.50)/2)*1<br />

PB5 2 185 ((3.50+0.50)/2)*1<br />

2.00 360.00 49.47 17809.20<br />

2.00 360.00 49.47 17809.20<br />

2.00 420.00 49.47 20777.40<br />

2.00 420.00 49.47 20777.40<br />

2.00 400.00 49.47 19788.00<br />

2.00 380.00 49.47 18798.60<br />

2.00 380.00 49.47 18798.60<br />

2.00 380.00 49.47 18798.60<br />

2.00 360.00 49.47 17809.20<br />

2.00 360.00 49.47 17809.20<br />

2.00 370.00 49.47 18303.90<br />

148 1335.69<br />

148 1335.69<br />

173 1558.31<br />

173 1558.31<br />

165 1484.10<br />

157 1409.90<br />

157 1409.90<br />

157 1409.90<br />

148 1335.69<br />

148 1335.69<br />

153 1372.79<br />

CD1 2 <strong>11</strong>0<br />

CD5 36 100<br />

CD6 55 100<br />

CD7 55 105<br />

CD8 36 95<br />

CD9 6 95<br />

CD17 2 95<br />

((12.50+1.3)/2)*2.5 17.25 1897.50 53.80 102086<br />

((12.50+1.3)/2)*2.5 17.25 1725.00 53.80 92805.00<br />

((12.50+1.3)/2)*2.5 17.25 1725.00 53.80 92805.00<br />

((12.50+1.3)/2)*2.5 17.25 18<strong>11</strong>.25 53.80 97445.25<br />

((12.50+1.3)/2)*2.5 17.25 1638.75 53.80 88164.75<br />

((12.50+1.3)/2)*2.5 17.25 1638.75 53.80 88164.75<br />

((12.50+1.3)/2)*2.5 17.25 1638.75 53.80 88164.75<br />

851 7656.41<br />

773 6960.38<br />

773 6960.38<br />

812 7308.39<br />

735 6612.36<br />

735 6612.36<br />

735 6612.36<br />

WHB1 55 <strong>11</strong>0<br />

WHB2 36 95<br />

WHB4 3 80<br />

((12.50+1.3)/2)*2.5 17.25 1897.50 52.30 99239.25<br />

((12.50+1.3)/2)*2.5 17.25 1638.75 52.30 85706.63<br />

((12.50+1.3)/2)*2.5 17.25 1380.00 52.30 72174.00<br />

827 7442.94<br />

714 6428.00<br />

601 5413.05<br />

EW<br />

Cost<br />

SB<br />

PB<br />

7318.35 362038.77<br />

8650.00 427915.50<br />

215


CD<br />

CB<br />

WHB<br />

12075.00 649635.00<br />

9879.69 488748.14<br />

4916 257<strong>11</strong>9.88<br />

G/P-DHIPKAI<br />

ECD1 43 85<br />

ECD2 41 80<br />

ECD3 44 80<br />

ECD4 59 90<br />

ECD5 57 90<br />

ECD6 47 95<br />

ECD8 47 <strong>11</strong>0<br />

ECD9 78 100<br />

VILL-BIKRAMPURA<br />

((12.50+1.3)/2)*2.5 17.25 1466.25 53.80 78884.25<br />

((12.50+1.3)/2)*2.5 17.25 1380.00 53.80 74244.00<br />

((12.50+1.3)/2)*2.5 17.25 1380.00 53.80 74244.00<br />

((12.50+1.3)/2)*2.5 17.25 1552.50 53.80 83524.50<br />

((12.50+1.3)/2)*2.5 17.25 1552.50 53.80 83524.50<br />

((12.50+1.3)/2)*2.5 17.25 1638.75 53.80 88164.75<br />

((12.50+1.3)/2)*2.5 17.25 1897.50 53.80 102085.50<br />

((12.50+1.3)/2)*2.5 17.25 1725.00 53.80 92805.00<br />

657 5916.32<br />

619 5568.30<br />

619 5568.30<br />

696 6264.34<br />

696 6264.34<br />

735 6612.36<br />

851 7656.41<br />

773 6960.38<br />

CB16 75 205 ((4.75+0.80)/2)*1.50<br />

CB24 74 205 ((4.75+0.80)/2)*1.50<br />

CB25 2 195 ((4.75+0.80)/2)*1.50<br />

CB27 10 185 ((4.75+0.80)/2)*1.50<br />

CB29 81 185 ((3.50+0.50)/2)*1<br />

CB30 22 185 ((3.50+0.50)/2)*1<br />

CB31 84 180 ((3.50+0.50)/2)*1<br />

PB34 24 205 ((3.50+0.50)/2)*1<br />

PB35 26 200 ((3.50+0.50)/2)*1<br />

PB37 46 200 ((4.75+0.80)/2)*1.50<br />

PB38 52 200 ((4.75+0.80)/2)*1.50<br />

PB40 28 210 ((4.75+0.80)/2)*1.50<br />

4.16 853.31 49.47 42213.37<br />

4.16 853.31 49.47 42213.37<br />

4.16 8<strong>11</strong>.69 49.47 40154.18<br />

4.16 770.06 49.47 38094.99<br />

2.00 370.00 49.47 18303.90<br />

2.00 370.00 49.47 18303.90<br />

2.00 360.00 49.47 17809.20<br />

2.00 410.00 49.47 20282.70<br />

2.00 400.00 49.47 19788.00<br />

4.16 832.50 49.47 4<strong>11</strong>83.78<br />

4.16 832.50 49.47 4<strong>11</strong>83.78<br />

4.16 874.13 49.47 43242.96<br />

352 3166.00<br />

352 3166.00<br />

335 30<strong>11</strong>.56<br />

317 2857.12<br />

153 1372.79<br />

153 1372.79<br />

148 1335.69<br />

169 1521.20<br />

165 1484.10<br />

343 3088.78<br />

343 3088.78<br />

360 3243.22<br />

216


PB41 72 210 ((3.50+0.50)/2)*1<br />

2.00 420.00 49.47 20777.40<br />

173 1558.31<br />

CD13 44 95<br />

((12.50+1.3)/2)*2.5 17.25 1639 53.80 88165<br />

735 6612.36<br />

EW<br />

Cost<br />

ECD 12592.50<br />

677476.50<br />

CB 4388.38 217092.91<br />

PB 3769.13<br />

186458.61<br />

CD 1639<br />

88164.75<br />

MWS-KEDAR TAI-I (2C2B1l2e) <strong>IWMP</strong>-<strong>VIII</strong> Block- Distt_ JHANSI<br />

G/P-GORPURA<br />

Name of<br />

Activity<br />

Khasara<br />

No<br />

CD1 325 95<br />

Length Width * Height C.S.<br />

(Area)<br />

Work<br />

measurement<br />

Rate<br />

Total Cost<br />

(Rs.)<br />

VILL-GORPURA<br />

((12.50+1.3)/2)*2.5 17.25 1638.75 53.80 88164.75<br />

Manday<br />

Contribution<br />

735 6612.36<br />

217


CD2 892 85<br />

CD3 889 100<br />

((12.50+1.3)/2)*2.5 17.25 1466.25 53.80 78884.25<br />

((12.50+1.3)/2)*2.5 17.25 1725.00 53.80 92805.00<br />

657 5916.32<br />

773 6960.38<br />

MB1 933 265 ((4.75+0.80)/2)*1.50<br />

MB2 935 260 ((3.50+0.50)/2)*1<br />

MB3 919 280 ((3.50+0.50)/2)*1<br />

MB4 915 280 ((3.50+0.50)/2)*1<br />

4.16 <strong>11</strong>03.06 49.47 54568.50<br />

2.00 520.00 49.47 25724.40<br />

2.00 560.00 49.47 27703.20<br />

2.00 560.00 49.47 27703.20<br />

455 4092.64<br />

214 1929.33<br />

231 2077.74<br />

231 2077.74<br />

PB43 927 185 ((3.50+0.50)/2)*1<br />

PB44 936 190 ((3.50+0.50)/2)*1<br />

PB45 944 185 ((3.50+0.50)/2)*1<br />

2.00 370.00 49.47 18303.90<br />

2.00 380.00 49.47 18798.60<br />

2.00 370.00 49.47 18303.90<br />

153 1372.79<br />

157 1409.90<br />

153 1372.79<br />

SB1 882 245 ((4.70+0.50)/2)*1.35<br />

SB2 883 200 ((4.70+0.50)/2)*1.35<br />

SB3 955 235 ((4.70+0.50)/2)*1.35<br />

SB4 975 230 ((4.70+0.50)/2)*1.35<br />

SB5 942 230 ((4.70+0.50)/2)*1.35<br />

SB6 956 225 ((4.70+0.50)/2)*1.35<br />

SB7 973 220 ((4.70+0.50)/2)*1.35<br />

SB8 979 210 ((4.70+0.50)/2)*1.35<br />

SB9 1009 215 ((4.70+0.50)/2)*1.35<br />

SB10 10<strong>11</strong> 210 ((4.70+0.50)/2)*1.35<br />

SB<strong>11</strong> 1022 210 ((4.70+0.50)/2)*1.35<br />

SB13 1032 240 ((4.70+0.50)/2)*1.35<br />

SB14 1037 250 ((4.70+0.50)/2)*1.35<br />

EW<br />

CD 4830.00<br />

3.51 859.95 49.47 42541.73<br />

3.51 702.00 49.47 34727.94<br />

3.51 824.85 49.47 40805.33<br />

3.51 807.30 49.47 39937.13<br />

3.51 807.30 49.47 39937.13<br />

3.51 789.75 49.47 39068.93<br />

3.51 772.20 49.47 38200.73<br />

3.51 737.10 49.47 36464.34<br />

3.51 754.65 49.47 37332.54<br />

3.51 737.10 49.47 36464.34<br />

3.51 737.10 49.47 36464.34<br />

3.51 842.40 49.47 41673.53<br />

3.51 877.50 49.47 43409.93<br />

Cost<br />

259854.00<br />

355 3190.63<br />

289 2604.60<br />

340 3060.40<br />

333 2995.28<br />

333 2995.28<br />

326 2930.17<br />

318 2865.06<br />

304 2734.83<br />

3<strong>11</strong> 2799.94<br />

304 2734.83<br />

304 2734.83<br />

347 3125.51<br />

362 3255.74<br />

218


MB 2743.06<br />

PB <strong>11</strong>20.00<br />

SB 10249.20<br />

135699.30<br />

55406.40<br />

507027.92<br />

G/P-GORPURA<br />

VILL-GORPURA<br />

CB2 66 190 ((3.50+0.50)/2)*1<br />

CB3 64 185 ((3.50+0.50)/2)*1<br />

CB4 58 210 ((3.50+0.50)/2)*1<br />

CB5 55 210 ((3.50+0.50)/2)*1<br />

EW<br />

CB 1590.00<br />

2.00 380.00 49.47 18798.60<br />

2.00 370.00 49.47 18303.90<br />

2.00 420.00 49.47 20777.40<br />

2.00 420.00 49.47 20777.40<br />

Cost<br />

78657.30<br />

157 1409.90<br />

153 1372.79<br />

173 1558.31<br />

173 1558.31<br />

G/P-CHATUR TAI<br />

VILL-KEDAR TAI<br />

CB6 710 185 ((3.50+0.50)/2)*1<br />

CB7 727 180 ((4.75+0.80)/2)*1.50<br />

CB8 720 195 ((4.75+0.80)/2)*1.50<br />

CB9 730 210 ((4.75+0.80)/2)*1.50<br />

CB10 738 180 ((3.50+0.50)/2)*1<br />

CB<strong>11</strong> 739 210 ((4.75+0.80)/2)*1.50<br />

CB12 740 205 ((4.75+0.80)/2)*1.50<br />

CB13 793 190 ((4.75+0.80)/2)*1.50<br />

CB14 830 190 ((3.50+0.50)/2)*1<br />

CB15 792 185 ((3.50+0.50)/2)*1<br />

CB16 825 185 ((3.50+0.50)/2)*1<br />

2.00 370.00 49.47 18303.90<br />

4.16 749.25 49.47 37065.40<br />

4.16 8<strong>11</strong>.69 49.47 40154.18<br />

4.16 874.13 49.47 43242.96<br />

2.00 360.00 49.47 17809.20<br />

4.16 874.13 49.47 43242.96<br />

4.16 853.31 49.47 42213.37<br />

4.16 790.88 49.47 39124.59<br />

2.00 380.00 49.47 18798.60<br />

2.00 370.00 49.47 18303.90<br />

2.00 370.00 49.47 18303.90<br />

153 1372.79<br />

309 2779.90<br />

335 30<strong>11</strong>.56<br />

360 3243.22<br />

148 1335.69<br />

360 3243.22<br />

352 3166.00<br />

326 2934.34<br />

157 1409.90<br />

153 1372.79<br />

153 1372.79<br />

CD4 248 90<br />

((12.50+1.3)/2)*2.5 17.25 1552.50 53.80 83524.50<br />

696 6264.34<br />

219


CD5 335 100<br />

CD6 284 90<br />

CD15 594 90<br />

CD16 601 80<br />

((12.50+1.3)/2)*2.5 17.25 1725.00 53.80 92805.00<br />

((12.50+1.3)/2)*2.5 17.25 1552.50 53.80 83524.50<br />

((12.50+1.3)/2)*2.5 17.25 1552.50 53.80 83524.50<br />

((12.50+1.3)/2)*2.5 17.25 1380.00 53.80 74244.00<br />

EW<br />

Cost<br />

773 6960.38<br />

696 6264.34<br />

696 6264.34<br />

619 5568.30<br />

CB<br />

CD<br />

6803.38 336562.96<br />

7762.50 417622.50<br />

G/P-TURKHLACHUR<br />

CD17 340 80<br />

CD19 316 85<br />

CD20 298 100<br />

VILL-TURKHLACHUR<br />

((12.50+1.3)/2)*2.5 17.25 1380.00 53.80 74244.00<br />

((12.50+1.3)/2)*2.5 17.25 1466.25 53.80 78884.25<br />

((12.50+1.3)/2)*2.5 17.25 1725.00 53.80 92805.00<br />

619 5568.30<br />

657 5916.32<br />

773 6960.38<br />

MB5 296 300 ((4.75+0.80)/2)*1.50<br />

MB6 358 300 ((4.75+0.80)/2)*1.50<br />

MB7 360 285 ((4.75+0.80)/2)*1.50<br />

MB8 361 285 ((4.75+0.80)/2)*1.50<br />

MB9 353 290 ((4.75+0.80)/2)*1.50<br />

MB10 386 290 ((3.50+0.50)/2)*1<br />

MB<strong>11</strong> 349 290 ((3.50+0.50)/2)*1<br />

MB12 342 260 ((3.50+0.50)/2)*1<br />

MB13 344 260 ((3.50+0.50)/2)*1<br />

MB14 374 265 ((3.50+0.50)/2)*1<br />

MB15 542 265 ((3.50+0.50)/2)*1<br />

4.16 1248.75 49.47 61775.66<br />

4.16 1248.75 49.47 61775.66<br />

4.16 <strong>11</strong>86.31 49.47 58686.88<br />

4.16 <strong>11</strong>86.31 49.47 58686.88<br />

4.16 1207.13 49.47 59716.47<br />

2.00 580.00 49.47 28692.60<br />

2.00 580.00 49.47 28692.60<br />

2.00 520.00 49.47 25724.40<br />

2.00 520.00 49.47 25724.40<br />

2.00 530.00 49.47 26219.10<br />

2.00 530.00 49.47 26219.10<br />

515 4633.17<br />

515 4633.17<br />

489 4401.52<br />

489 4401.52<br />

498 4478.74<br />

239 2151.95<br />

239 2151.95<br />

214 1929.33<br />

214 1929.33<br />

218 1966.43<br />

218 1966.43<br />

220


MB16 562 285 ((3.50+0.50)/2)*1<br />

MB17 865 245 ((3.50+0.50)/2)*1<br />

MB18 373 235 ((4.75+0.80)/2)*1.50<br />

MB19 515 230 ((4.75+0.80)/2)*1.50<br />

MB20 1233 230 ((4.75+0.80)/2)*1.50<br />

MB21 127 235 ((4.75+0.80)/2)*1.50<br />

MB22 <strong>11</strong>4 220 ((4.75+0.80)/2)*1.50<br />

MB23 128 225 ((4.75+0.80)/2)*1.50<br />

2.00 570.00 49.47 28197.90<br />

2.00 490.00 49.47 24240.30<br />

4.16 978.19 49.47 48390.94<br />

4.16 957.38 49.47 47361.34<br />

4.16 957.38 49.47 47361.34<br />

4.16 978.19 49.47 48390.94<br />

4.16 915.75 49.47 45302.15<br />

4.16 936.56 49.47 46331.75<br />

235 2<strong>11</strong>4.84<br />

202 1818.02<br />

403 3629.32<br />

395 3552.10<br />

395 3552.10<br />

403 3629.32<br />

378 3397.66<br />

386 3474.88<br />

PB1 124 185 ((3.50+0.50)/2)*1<br />

PB2 253 195 ((3.50+0.50)/2)*1<br />

PB3 246 185 ((3.50+0.50)/2)*1<br />

PB4 218 205 ((4.75+0.80)/2)*1.50<br />

PB5 281 195 ((4.75+0.80)/2)*1.50<br />

PB6 352 195 ((4.75+0.80)/2)*1.50<br />

PB7 301 180 ((3.50+0.50)/2)*1<br />

PB8 352 195 ((3.50+0.50)/2)*1<br />

PB9 969 200 ((3.50+0.50)/2)*1<br />

PB10 313 200 ((3.50+0.50)/2)*1<br />

PB<strong>11</strong> 309 200 ((3.50+0.50)/2)*1<br />

PB12 3<strong>11</strong> 205 ((3.50+0.50)/2)*1<br />

PB13 562 205 ((3.50+0.50)/2)*1<br />

PB14 556 180 ((4.75+0.80)/2)*1.50<br />

PB15 579 180 ((4.75+0.80)/2)*1.50<br />

PB16 600 185 ((4.75+0.80)/2)*1.50<br />

PB18 201 180 ((4.75+0.80)/2)*1.50<br />

PB19 229 185 ((4.75+0.80)/2)*1.50<br />

2.00 370.00 49.47 18303.90<br />

2.00 390.00 49.47 19293.30<br />

2.00 370.00 49.47 18303.90<br />

4.16 853.31 49.47 42213.37<br />

4.16 8<strong>11</strong>.69 49.47 40154.18<br />

4.16 8<strong>11</strong>.69 49.47 40154.18<br />

2.00 360.00 49.47 17809.20<br />

2.00 390.00 49.47 19293.30<br />

2.00 400.00 49.47 19788.00<br />

2.00 400.00 49.47 19788.00<br />

2.00 400.00 49.47 19788.00<br />

2.00 410.00 49.47 20282.70<br />

2.00 410.00 49.47 20282.70<br />

4.16 749.25 49.47 37065.40<br />

4.16 749.25 49.47 37065.40<br />

4.16 770.06 49.47 38094.99<br />

4.16 749.25 49.47 37065.40<br />

4.16 770.06 49.47 38094.99<br />

153 1372.79<br />

161 1447.00<br />

153 1372.79<br />

352 3166.00<br />

335 30<strong>11</strong>.56<br />

335 30<strong>11</strong>.56<br />

148 1335.69<br />

161 1447.00<br />

165 1484.10<br />

165 1484.10<br />

165 1484.10<br />

169 1521.20<br />

169 1521.20<br />

309 2779.90<br />

309 2779.90<br />

317 2857.12<br />

309 2779.90<br />

317 2857.12<br />

221


PB20 391 190 ((4.75+0.80)/2)*1.50<br />

PB22 377 195 ((4.75+0.80)/2)*1.50<br />

PB24 506 200 ((4.75+0.80)/2)*1.50<br />

PB26 624 210 ((4.75+0.80)/2)*1.50<br />

PB28 684 195 ((4.75+0.80)/2)*1.50<br />

PB29 666 180 ((3.50+0.50)/2)*1<br />

4.16 790.88 49.47 39124.59<br />

4.16 8<strong>11</strong>.69 49.47 40154.18<br />

4.16 832.50 49.47 4<strong>11</strong>83.78<br />

4.16 874.13 49.47 43242.96<br />

4.16 8<strong>11</strong>.69 49.47 40154.18<br />

2.00 360.00 49.47 17809.20<br />

326 2934.34<br />

335 30<strong>11</strong>.56<br />

343 3088.78<br />

360 3243.22<br />

335 30<strong>11</strong>.56<br />

148 1335.69<br />

SB12 551 230 ((4.70+0.50)/2)*1.35<br />

SB15 565 235 ((4.70+0.50)/2)*1.35<br />

SB16 587 235 ((4.70+0.50)/2)*1.35<br />

SB17 604 250 ((4.70+0.50)/2)*1.35<br />

SB18 624 240 ((4.70+0.50)/2)*1.35<br />

SB19 605 250 ((4.70+0.50)/2)*1.35<br />

SB26 171 230 ((4.70+0.50)/2)*1.35<br />

SB27 161 235 ((4.70+0.50)/2)*1.35<br />

SB28 156 245 ((4.70+0.50)/2)*1.35<br />

SB29 208 220 ((4.70+0.50)/2)*1.35<br />

SB30 144 225 ((4.70+0.50)/2)*1.35<br />

3.51 807.30 49.47 39937.13<br />

3.51 824.85 49.47 40805.33<br />

3.51 824.85 49.47 40805.33<br />

3.51 877.50 49.47 43409.93<br />

3.51 842.40 49.47 41673.53<br />

3.51 877.50 49.47 43409.93<br />

3.51 807.30 49.47 39937.13<br />

3.51 824.85 49.47 40805.33<br />

3.51 859.95 49.47 42541.73<br />

3.51 772.20 49.47 38200.73<br />

3.51 789.75 49.47 39068.93<br />

333 2995.28<br />

340 3060.40<br />

340 3060.40<br />

362 3255.74<br />

347 3125.51<br />

362 3255.74<br />

333 2995.28<br />

340 3060.40<br />

355 3190.63<br />

318 2865.06<br />

326 2930.17<br />

WHB1 258 85<br />

WHB2 606 80<br />

CD<br />

MB<br />

PB<br />

SB<br />

WHB<br />

((12.50+1.3)/2)*2.5 17.25 1466.25 52.20 76538.25<br />

((12.50+1.3)/2)*2.5 17.25 1380.00 52.30 72174.00<br />

EW<br />

Cost<br />

4571.25 245933.25<br />

16120.69 797490.41<br />

14645.44 724509.79<br />

9108.45 450595.02<br />

2846.25 148712.25<br />

638 5740.37<br />

601 5413.05<br />

222


G/P-PASORA<br />

ECD1 <strong>11</strong> 95<br />

ECD2 51 80<br />

ECD3 61 80<br />

ECD4 58 100<br />

ECD5 68 100<br />

ECD6 70 <strong>11</strong>0<br />

ECD7 73 95<br />

ECD8 106 85<br />

ECD9 93 80<br />

ECD10 <strong>11</strong>0 95<br />

VILL-PASORA<br />

((12.50+1.3)/2)*2.5 17.25 1638.75 53.80 88164.75<br />

((12.50+1.3)/2)*2.5 17.25 1380.00 53.80 74244.00<br />

((12.50+1.3)/2)*2.5 17.25 1380.00 53.80 74244.00<br />

((12.50+1.3)/2)*2.5 17.25 1725.00 53.80 92805.00<br />

((12.50+1.3)/2)*2.5 17.25 1725.00 53.80 92805.00<br />

((12.50+1.3)/2)*2.5 17.25 1897.50 53.80 102085.50<br />

((12.50+1.3)/2)*2.5 17.25 1638.75 53.80 88164.75<br />

((12.50+1.3)/2)*2.5 17.25 1466.25 53.80 78884.25<br />

((12.50+1.3)/2)*2.5 17.25 1380.00 53.80 74244.00<br />

((12.50+1.3)/2)*2.5 17.25 1638.75 53.80 88164.75<br />

735 6612.36<br />

619 5568.30<br />

619 5568.30<br />

773 6960.38<br />

773 6960.38<br />

851 7656.41<br />

735 6612.36<br />

657 5916.32<br />

619 5568.30<br />

735 6612.36<br />

EW<br />

Cost<br />

ECD<br />

15870.00 853806.00<br />

G/P-MARKUAN<br />

VILL-MARKUAN<br />

CB20 269 195 ((3.50+0.50)/2)*1<br />

CB21 381 180 ((3.50+0.50)/2)*1<br />

CB22 385 180 ((3.50+0.50)/2)*1<br />

CB27 44 195 ((3.50+0.50)/2)*1<br />

CB28 38 195 ((3.50+0.50)/2)*1<br />

CB29 35 200 ((4.75+0.80)/2)*1.50<br />

CB30 26 210 ((4.75+0.80)/2)*1.50<br />

2.00 390.00 49.47 19293.30<br />

2.00 360.00 49.47 17809.20<br />

2.00 360.00 49.47 17809.20<br />

2.00 390.00 49.47 19293.30<br />

2.00 390.00 49.47 19293.30<br />

4.16 832.50 49.47 4<strong>11</strong>83.78<br />

4.16 874.13 49.47 43242.96<br />

161 1447.00<br />

148 1335.69<br />

148 1335.69<br />

161 1447.00<br />

161 1447.00<br />

343 3088.78<br />

360 3243.22<br />

223


CB31 <strong>11</strong> 205 ((4.75+0.80)/2)*1.50<br />

4.16 853.31 49.47 42213.37<br />

352 3166.00<br />

CD<strong>11</strong> 54 105<br />

((12.50+1.3)/2)*2.5 17.25 18<strong>11</strong>.25 53.80 97445.25<br />

812 7308.39<br />

PB41 250 200 ((3.50+0.50)/2)*1<br />

PB42 56 185 ((3.50+0.50)/2)*1<br />

2.00 400.00 49.47 19788.00<br />

2.00 370.00 49.47 18303.90<br />

165 1484.10<br />

153 1372.79<br />

WHB3 43 85<br />

CB<br />

CD<br />

PB<br />

WHB<br />

((12.50+1.3)/2)*2.5 17.25 1466.25 52.30 76684.88<br />

EW<br />

Cost<br />

4449.94 220138.41<br />

18<strong>11</strong>.25 97445.25<br />

770.00 38091.90<br />

1466.25 76684.88<br />

639 5751.37<br />

G/P-CHATUR TAI<br />

VILL-CHARUR TAI<br />

CB14 6<strong>11</strong> 185 ((3.50+0.50)/2)*1<br />

CB15 668 190 ((3.50+0.50)/2)*1<br />

CB16 655 210 ((3.50+0.50)/2)*1<br />

CB17 715 210 ((3.50+0.50)/2)*1<br />

CB18 665 210 ((3.50+0.50)/2)*1<br />

CB19 647 200 ((3.50+0.50)/2)*1<br />

CB23 620 200 ((3.50+0.50)/2)*1<br />

CB24 5154 200 ((3.50+0.50)/2)*1<br />

CB25 593 195 ((4.75+0.80)/2)*1.50<br />

CB26 569 185 ((4.75+0.80)/2)*1.50<br />

CB32 547 185 ((4.75+0.80)/2)*1.50<br />

2.00 370.00 49.47 18303.90<br />

2.00 380.00 49.47 18798.60<br />

2.00 420.00 49.47 20777.40<br />

2.00 420.00 49.47 20777.40<br />

2.00 420.00 49.47 20777.40<br />

2.00 400.00 49.47 19788.00<br />

2.00 400.00 49.47 19788.00<br />

2.00 400.00 49.47 19788.00<br />

4.16 8<strong>11</strong>.69 49.47 40154.18<br />

4.16 770.06 49.47 38094.99<br />

4.16 770.06 49.47 38094.99<br />

153 1372.79<br />

157 1409.90<br />

173 1558.31<br />

173 1558.31<br />

173 1558.31<br />

165 1484.10<br />

165 1484.10<br />

165 1484.10<br />

335 30<strong>11</strong>.56<br />

317 2857.12<br />

317 2857.12<br />

224


CB33 758 180 ((4.75+0.80)/2)*1.50<br />

CB34 444 190 ((4.75+0.80)/2)*1.50<br />

CB35 424 190 ((4.75+0.80)/2)*1.50<br />

CB36 428 200 ((4.75+0.80)/2)*1.50<br />

CB37 440 210 ((4.75+0.80)/2)*1.50<br />

CB38 434 210 ((4.75+0.80)/2)*1.50<br />

CB39 37 190 ((4.75+0.80)/2)*1.50<br />

CB40 379 195 ((3.50+0.50)/2)*1<br />

4.16 749.25 49.47 37065.40<br />

4.16 790.88 49.47 39124.59<br />

4.16 790.88 49.47 39124.59<br />

4.16 832.50 49.47 4<strong>11</strong>83.78<br />

4.16 874.13 49.47 43242.96<br />

4.16 874.13 49.47 43242.96<br />

4.16 790.88 49.47 39124.59<br />

2.00 390.00 49.47 19293.30<br />

309 2779.90<br />

326 2934.34<br />

326 2934.34<br />

343 3088.78<br />

360 3243.22<br />

360 3243.22<br />

326 2934.34<br />

161 1447.00<br />

PB21 329 195 ((3.50+0.50)/2)*1<br />

PB23 464 210 ((3.50+0.50)/2)*1<br />

PB25 422 185 ((3.50+0.50)/2)*1<br />

PB27 623 180 ((3.50+0.50)/2)*1<br />

PB30 335 195 ((3.50+0.50)/2)*1<br />

PB31 333 210 ((3.50+0.50)/2)*1<br />

PB32 265 210 ((3.50+0.50)/2)*1<br />

PB33 547 210 ((4.75+0.80)/2)*1.50<br />

PB34 374 205 ((4.75+0.80)/2)*1.50<br />

PB35 555 205 ((4.75+0.80)/2)*1.50<br />

PB36 409 205 ((4.75+0.80)/2)*1.50<br />

PB37 566 205 ((4.75+0.80)/2)*1.50<br />

PB38 456 190 ((4.75+0.80)/2)*1.50<br />

PB39 656 185 ((4.75+0.80)/2)*1.50<br />

PB40 450 180 ((4.75+0.80)/2)*1.50<br />

2.00 390.00 49.47 19293.30<br />

2.00 420.00 49.47 20777.40<br />

2.00 370.00 49.47 18303.90<br />

2.00 360.00 49.47 17809.20<br />

2.00 390.00 49.47 19293.30<br />

2.00 420.00 49.47 20777.40<br />

2.00 420.00 49.47 20777.40<br />

4.16 874.13 49.47 43242.96<br />

4.16 853.31 49.47 42213.37<br />

4.16 853.31 49.47 42213.37<br />

4.16 853.31 49.47 42213.37<br />

4.16 853.31 49.47 42213.37<br />

4.16 790.88 49.47 39124.59<br />

4.16 770.06 49.47 38094.99<br />

4.16 749.25 49.47 37065.40<br />

161 1447.00<br />

173 1558.31<br />

153 1372.79<br />

148 1335.69<br />

161 1447.00<br />

173 1558.31<br />

173 1558.31<br />

360 3243.22<br />

352 3166.00<br />

352 3166.00<br />

352 3166.00<br />

352 3166.00<br />

326 2934.34<br />

317 2857.12<br />

309 2779.90<br />

SB19 293 230 ((4.70+0.50)/2)*1.35<br />

SB20 305 230 ((4.70+0.50)/2)*1.35<br />

3.51 807.30 49.47 39937.13<br />

3.51 807.30 49.47 39937.13<br />

333 2995.28<br />

333 2995.28<br />

225


SB21 255 245 ((4.70+0.50)/2)*1.35<br />

SB22 255 245 ((4.70+0.50)/2)*1.35<br />

SB23 354 240 ((4.70+0.50)/2)*1.35<br />

SB24 358 235 ((4.70+0.50)/2)*1.35<br />

SB25 370 235 ((4.70+0.50)/2)*1.35<br />

3.51 859.95 49.47 42541.73<br />

3.51 859.95 49.47 42541.73<br />

3.51 842.40 49.47 41673.53<br />

3.51 824.85 49.47 40805.33<br />

3.51 824.85 49.47 40805.33<br />

355 3190.63<br />

355 3190.63<br />

347 3125.51<br />

340 3060.40<br />

340 3060.40<br />

WHB4 536 <strong>11</strong>0<br />

WHB5 669 85<br />

((12.50+1.3)/2)*2.5 17.25 1897.50 52.30 99239.25<br />

((12.50+1.3)/2)*2.5 17.25 1466.25 52.30 76684.88<br />

827 7442.94<br />

639 5751.37<br />

EW<br />

Cost<br />

CB<br />

<strong>11</strong>654.44 576545.02<br />

PB<br />

9367.56 463413.32<br />

SB 5826.60<br />

288241.90<br />

WHB<br />

3363.75 175924.13<br />

MARKUAN (2C2B1l2f) <strong>IWMP</strong>-<strong>VIII</strong> Block- Distt_ JHANSI<br />

Length Width * Height C.S. (Area) Work<br />

measurement<br />

Rate<br />

Total Cost<br />

(Rs.)<br />

Manday<br />

S.No. Name of Activity Khasara No<br />

Contribution<br />

G/P-PUCHHI<br />

VILL-PUCHHI<br />

SB5 957 210 ((4.70+0.50)/2)*1.35<br />

SB15 990 215 ((4.70+0.50)/2)*1.35<br />

SB16 992 200 ((4.70+0.50)/2)*1.35<br />

SB18 987 215 ((4.70+0.50)/2)*1.35<br />

3.51 737.10 49.47 36464.34<br />

3.51 754.65 49.47 37332.54<br />

3.51 702.00 49.47 34727.94<br />

3.51 754.65 49.47 37332.54<br />

304 2734.83<br />

3<strong>11</strong> 2799.94<br />

289 2604.60<br />

3<strong>11</strong> 2799.94<br />

MB12 10<strong>11</strong> 285 ((3.50+0.50)/2)*1<br />

MB13 1009 280 ((3.50+0.50)/2)*1<br />

2.00 570.00 49.47 28197.90<br />

2.00 560.00 49.47 27703.20<br />

235 2<strong>11</strong>4.84<br />

231 2077.74<br />

226


EW<br />

SB 2948.40<br />

MB <strong>11</strong>30.00<br />

COST<br />

145857.35<br />

55901.10<br />

G/P-AIVANI<br />

VILL-AIVANI<br />

MB14 2272 250 ((3.50+0.50)/2)*1<br />

MB35 2308 265 ((3.50+0.50)/2)*1<br />

2.00 500.00 49.47 24735.00<br />

2.00 530.00 49.47 26219.10<br />

206 1855.13<br />

218 1966.43<br />

SB17 2274 235 ((3.50+0.50)/2)*1<br />

2.00 470.00 49.47 23250.90<br />

0 0.00<br />

194 1743.82<br />

PB21 2313 195 ((3.50+0.50)/2)*1<br />

PB22 2509 190 ((3.50+0.50)/2)*1<br />

2.00 390.00 49.47 19293.30<br />

2.00 380.00 49.47 18798.60<br />

161 1447.00<br />

157 1409.90<br />

ECD10 25<strong>11</strong> 85<br />

ECD<strong>11</strong> 2506 95<br />

ECD12 2517 95<br />

ECD13 2407 95<br />

ECD14 24<strong>11</strong> 80<br />

ECD15 2412 <strong>11</strong>0<br />

ECD16 2400 <strong>11</strong>0<br />

ECD17 2396 100<br />

ECD18 2395 105<br />

ECD19 2288 100<br />

((12.50+1.3)/2)*2.5 17.25 1466.25 53.80 78884.25<br />

((12.50+1.3)/2)*2.5 17.25 1638.75 53.80 88164.75<br />

((12.50+1.3)/2)*2.5 17.25 1638.75 53.80 88164.75<br />

((12.50+1.3)/2)*2.5 17.25 1638.75 53.80 88164.75<br />

((12.50+1.3)/2)*2.5 17.25 1380.00 53.80 74244.00<br />

((12.50+1.3)/2)*2.5 17.25 1897.50 53.80 102085.50<br />

((12.50+1.3)/2)*2.5 17.25 1897.50 53.80 102085.50<br />

((12.50+1.3)/2)*2.5 17.25 1725.00 53.80 92805.00<br />

((12.50+1.3)/2)*2.5 17.25 18<strong>11</strong>.25 53.80 97445.25<br />

((12.50+1.3)/2)*2.5 17.25 1725.00 53.80 92805.00<br />

657 5916.32<br />

735 6612.36<br />

735 6612.36<br />

735 6612.36<br />

619 5568.30<br />

851 7656.41<br />

851 7656.41<br />

773 6960.38<br />

812 7308.39<br />

773 6960.38<br />

227


EW<br />

Cost<br />

MB<br />

SB<br />

PB<br />

ECD<br />

1030.00 50954.10<br />

470.00 23250.90<br />

770.00 38091.90<br />

16818.75 904848.75<br />

G/P-GORPURA<br />

WHB4 4 80<br />

VILL-GORPURA<br />

((12.50+1.3)/2)*2.5 17.25 1380.00 52.30 72174.00<br />

601 5413.05<br />

ECD8 391 80<br />

ECD9 392 <strong>11</strong>0<br />

((12.50+1.3)/2)*2.5 17.25 1380.00 53.80 74244.00<br />

((12.50+1.3)/2)*2.5 17.25 1897.50 53.80 102085.50<br />

619 5568.30<br />

851 7656.41<br />

PB27 434 <strong>11</strong>0 ((3.50+0.50)/2)*1<br />

2.00 220.00 49.47 10883.40<br />

91 816.26<br />

MB21 435 265 ((4.75+0.80)/2)*1.50<br />

MB22 436 265 ((4.75+0.80)/2)*1.50<br />

MB23 403 265 ((4.75+0.80)/2)*1.50<br />

MB24 412 260 ((4.75+0.80)/2)*1.50<br />

MB25 228 300 ((4.75+0.80)/2)*1.50<br />

MB26 425 265 ((4.75+0.80)/2)*1.50<br />

MB27 422 280 ((4.75+0.80)/2)*1.50<br />

MB28 413 280 ((4.75+0.80)/2)*1.50<br />

MB29 29 295 ((4.75+0.80)/2)*1.50<br />

MB31 390 255 ((4.75+0.80)/2)*1.50<br />

4.16 <strong>11</strong>03.06 49.47 54568.50<br />

4.16 <strong>11</strong>03.06 49.47 54568.50<br />

4.16 <strong>11</strong>03.06 49.47 54568.50<br />

4.16 1082.25 49.47 53538.91<br />

4.16 1248.75 49.47 61775.66<br />

4.16 <strong>11</strong>03.06 49.47 54568.50<br />

4.16 <strong>11</strong>65.50 49.47 57657.29<br />

4.16 <strong>11</strong>65.50 49.47 57657.29<br />

4.16 1227.94 49.47 60746.07<br />

4.16 1061.44 49.47 52509.31<br />

455 4092.64<br />

455 4092.64<br />

455 4092.64<br />

446 4015.42<br />

515 4633.17<br />

455 4092.64<br />

480 4324.30<br />

480 4324.30<br />

506 4555.96<br />

438 3938.20<br />

228


MB41 14 255 ((3.50+0.50)/2)*1<br />

MB42 18 255 ((4.75+0.80)/2)*1.50<br />

MB43 21 300 ((4.75+0.80)/2)*1.50<br />

2.00 510.00 49.47 25229.70<br />

4.16 1061.44 49.47 52509.31<br />

4.16 1248.75 49.47 61775.66<br />

210 1892.23<br />

438 3938.20<br />

515 4633.17<br />

CB33 38 195 ((4.75+0.80)/2)*1.50<br />

CB34 28 180 ((4.75+0.80)/2)*1.50<br />

CB35 225 210 ((3.50+0.50)/2)*1<br />

CB36 228 200 ((3.50+0.50)/2)*1<br />

CB37 434 195 ((3.50+0.50)/2)*1<br />

CB38 405 190 ((3.50+0.50)/2)*1<br />

CB39 507 185 ((3.50+0.50)/2)*1<br />

CB40 280 190 ((3.50+0.50)/2)*1<br />

CB41 230 190 ((3.50+0.50)/2)*1<br />

CB42 229 185 ((4.75+0.80)/2)*1.50<br />

CB43 215 200 ((4.75+0.80)/2)*1.50<br />

CB44 205 200 ((4.75+0.80)/2)*1.50<br />

CB45 207 200 ((4.75+0.80)/2)*1.50<br />

CB67 439 200 ((4.75+0.80)/2)*1.50<br />

CB68 437 195 ((4.75+0.80)/2)*1.50<br />

CB69 393 185 ((4.75+0.80)/2)*1.50<br />

CB70 389 185 ((4.75+0.80)/2)*1.50<br />

4.16 8<strong>11</strong>.69 49.47 40154.18<br />

4.16 749.25 49.47 37065.40<br />

2.00 420.00 49.47 20777.40<br />

2.00 400.00 49.47 19788.00<br />

2.00 390.00 49.47 19293.30<br />

2.00 380.00 49.47 18798.60<br />

2.00 370.00 49.47 18303.90<br />

2.00 380.00 49.47 18798.60<br />

2.00 380.00 49.47 18798.60<br />

4.16 770.06 49.47 38094.99<br />

4.16 832.50 49.47 4<strong>11</strong>83.78<br />

4.16 832.50 49.47 4<strong>11</strong>83.78<br />

4.16 832.50 49.47 4<strong>11</strong>83.78<br />

4.16 832.50 49.47 4<strong>11</strong>83.78<br />

4.16 8<strong>11</strong>.69 49.47 40154.18<br />

4.16 770.06 49.47 38094.99<br />

4.16 770.06 49.47 38094.99<br />

335 30<strong>11</strong>.56<br />

309 2779.90<br />

173 1558.31<br />

165 1484.10<br />

161 1447.00<br />

157 1409.90<br />

153 1372.79<br />

157 1409.90<br />

157 1409.90<br />

317 2857.12<br />

343 3088.78<br />

343 3088.78<br />

343 3088.78<br />

343 3088.78<br />

335 30<strong>11</strong>.56<br />

317 2857.12<br />

317 2857.12<br />

SB51 46 185 ((4.75+0.80)/2)*1.50<br />

SB52 45 185 ((4.75+0.80)/2)*1.50<br />

SB53 43 185 ((4.75+0.80)/2)*1.50<br />

SB54 42 185 ((4.75+0.80)/2)*1.50<br />

4.16 770.06 49.47 38094.99<br />

4.16 770.06 49.47 38094.99<br />

4.16 770.06 49.47 38094.99<br />

4.16 770.06 49.47 38094.99<br />

317 2857.12<br />

317 2857.12<br />

317 2857.12<br />

317 2857.12<br />

229


EW<br />

WHB 1380.00<br />

ECD 3277.50<br />

MB 14183.81<br />

PB 220.00<br />

CB 10732.81<br />

SB 3080<br />

Cost<br />

72174.00<br />

176329.50<br />

701673.20<br />

10883.40<br />

530952.23<br />

152379.97<br />

G/P-EMLOTA<br />

VILL-BARAOTA<br />

SB43 70A 250 ((3.50+0.50)/2)*1<br />

SB44 67 205 ((3.50+0.50)/2)*1<br />

SB45 42 205 ((3.50+0.50)/2)*1<br />

SB46 44 205 ((3.50+0.50)/2)*1<br />

SB47 61 250 ((3.50+0.50)/2)*1<br />

SB48 63 245 ((3.50+0.50)/2)*1<br />

SB49 70 245 ((3.50+0.50)/2)*1<br />

SB50 90 235 ((3.50+0.50)/2)*1<br />

2.00 500.00 49.47 24735.00<br />

2.00 410.00 49.47 20282.70<br />

2.00 410.00 49.47 20282.70<br />

2.00 410.00 49.47 20282.70<br />

2.00 500.00 49.47 24735.00<br />

2.00 490.00 49.47 24240.30<br />

2.00 490.00 49.47 24240.30<br />

2.00 470.00 49.47 23250.90<br />

206 1855.13<br />

169 1521.20<br />

169 1521.20<br />

169 1521.20<br />

206 1855.13<br />

202 1818.02<br />

202 1818.02<br />

194 1743.82<br />

SB55 60 235<br />

CB48 84 205 ((4.75+0.80)/2)*1.50<br />

CB66 87 180 ((4.75+0.80)/2)*1.50<br />

4.16 853.31 49.47 42213.37<br />

4.16 749.25 49.47 37065.40<br />

352 3166.00<br />

309 2779.90<br />

EW<br />

SB 3680.00<br />

CB 1602.56<br />

Cost<br />

182049.60<br />

79278.77<br />

G/P-EMLOTA<br />

VILL-EMLOTA<br />

230


WHB3 12 <strong>11</strong>0<br />

ECD1 14 105<br />

ECD2 136 95<br />

ECD3 17 95<br />

ECD4 <strong>11</strong> 95<br />

ECD5 26 90<br />

ECD6 37 80<br />

((12.50+1.3)/2)*2.5 17.25 1897.50 52.30 99239.25<br />

((12.50+1.3)/2)*2.5 17.25 18<strong>11</strong>.25 53.80 97445.25<br />

((12.50+1.3)/2)*2.5 17.25 1638.75 53.80 88164.75<br />

((12.50+1.3)/2)*2.5 17.25 1638.75 53.80 88164.75<br />

((12.50+1.3)/2)*2.5 17.25 1638.75 53.80 88164.75<br />

((12.50+1.3)/2)*2.5 17.25 1552.50 53.80 83524.50<br />

((12.50+1.3)/2)*2.5 17.25 1380.00 53.80 74244.00<br />

827 7442.94<br />

812 7308.39<br />

735 6612.36<br />

735 6612.36<br />

735 6612.36<br />

696 6264.34<br />

619 5568.30<br />

MB36 <strong>11</strong> 80 ((4.75+0.80)/2)*1.50<br />

MB37 25 255 ((4.75+0.80)/2)*1.50<br />

MB38 38 265 ((4.75+0.80)/2)*1.50<br />

MB39 36 280 ((4.75+0.80)/2)*1.50<br />

MB40 83 300 ((4.75+0.80)/2)*1.50<br />

4.16 333.00 49.47 16473.51<br />

4.16 1061.44 49.47 52509.31<br />

4.16 <strong>11</strong>03.06 49.47 54568.50<br />

4.16 <strong>11</strong>65.50 49.47 57657.29<br />

4.16 1248.75 49.47 61775.66<br />

137 1235.51<br />

438 3938.20<br />

455 4092.64<br />

480 4324.30<br />

515 4633.17<br />

CB46 991 205 ((4.75+0.80)/2)*1.50<br />

CB47 98 195 ((4.75+0.80)/2)*1.50<br />

4.16 853.31 49.47 42213.37<br />

4.16 8<strong>11</strong>.69 49.47 40154.18<br />

352 3166.00<br />

335 30<strong>11</strong>.56<br />

EW<br />

ECD 9660.00<br />

WHB 1897.50<br />

MB 49<strong>11</strong>.75<br />

CB 1665.00<br />

Cost<br />

519708.00<br />

99239.25<br />

242984.27<br />

82367.55<br />

G/P-DHIPKAI<br />

VILL.SIKRODHA BAMHORI<br />

SB34 19 220 ((4.75+0.80)/2)*1.50<br />

4.16 915.75 49.47 45302.15<br />

378 3397.66<br />

231


SB36 9 220 ((3.50+0.50)/2)*1<br />

SB37 7 225 ((3.50+0.50)/2)*1<br />

2.00 440.00 49.47 21766.80<br />

2.00 450.00 49.47 22261.50<br />

181 1632.51<br />

186 1669.61<br />

MB20 104 265 ((3.50+0.50)/2)*1<br />

2.00 530 49.47 26219<br />

218 1966.43<br />

CB49 91 195 ((3.50+0.50)/2)*1<br />

CB50 92 180 ((3.50+0.50)/2)*1<br />

CB51 93 180 ((3.50+0.50)/2)*1<br />

CB52 95 195 ((3.50+0.50)/2)*1<br />

CB53 93 180 ((3.50+0.50)/2)*1<br />

CB54 72 185 ((3.50+0.50)/2)*1<br />

CB55 71 210 ((3.50+0.50)/2)*1<br />

CB56 69 205 ((3.50+0.50)/2)*1<br />

CB57 47 205 ((3.50+0.50)/2)*1<br />

CB58 20 190<br />

2.00 390.00 49.47 19293.30<br />

2.00 360.00 49.47 17809.20<br />

2.00 360.00 49.47 17809.20<br />

2.00 390.00 49.47 19293.30<br />

2.00 360.00 49.47 17809.20<br />

2.00 370.00 49.47 18303.90<br />

2.00 420.00 49.47 20777.40<br />

2.00 410.00 49.47 20282.70<br />

2.00 410.00 49.47 20282.70<br />

161 1447.00<br />

148 1335.69<br />

148 1335.69<br />

161 1447.00<br />

148 1335.69<br />

153 1372.79<br />

173 1558.31<br />

169 1521.20<br />

169 1521.20<br />

PB23 81 195 ((4.75+0.80)/2)*1.50<br />

PB24 84 195 ((4.75+0.80)/2)*1.50<br />

PB25 86 195 ((3.50+0.50)/2)*1<br />

PB26 87 180 ((4.75+0.80)/2)*1.50<br />

4.16 8<strong>11</strong>.69 49.47 40154.18<br />

4.16 8<strong>11</strong>.69 49.47 40154.18<br />

2.00 390.00 49.47 19293.30<br />

4.16 749.25 49.47 37065.40<br />

335 30<strong>11</strong>.56<br />

335 30<strong>11</strong>.56<br />

161 1447.00<br />

309 2779.90<br />

EW<br />

SB 1805.75<br />

MB 530<br />

CB 3470.00<br />

PB 2762.63<br />

Cost<br />

89330.45<br />

26219.10<br />

171660.90<br />

136667.06<br />

232


G/P-DHURKHURU<br />

WHB1 51 85<br />

WHB2 <strong>11</strong>6 95<br />

VILL-GOHNA<br />

((12.50+1.3)/2)*2.5 17.25 1466.25 52.30 76684.88<br />

((12.50+1.3)/2)*2.5 17.25 1638.75 52.30 85706.63<br />

639 5751.37<br />

714 6428.00<br />

SB27 50 205 ((4.70+0.50)/2)*1.35<br />

SB28 49 220 ((4.70+0.50)/2)*1.35<br />

SB29 48 225 ((4.70+0.50)/2)*1.35<br />

SB30 47 225 ((4.70+0.50)/2)*1.35<br />

SB31 46 235 ((4.70+0.50)/2)*1.35<br />

SB32 123 230 ((4.70+0.50)/2)*1.35<br />

SB33 122 235 ((4.70+0.50)/2)*1.35<br />

SB35 <strong>11</strong>7 235 ((4.70+0.50)/2)*1.35<br />

3.51 719.55 49.47 35596.14<br />

3.51 772.20 49.47 38200.73<br />

3.51 789.75 49.47 39068.93<br />

3.51 789.75 49.47 39068.93<br />

3.51 824.85 49.47 40805.33<br />

3.51 807.30 49.47 39937.13<br />

3.51 824.85 49.47 40805.33<br />

3.51 824.85 49.47 40805.33<br />

297 2669.71<br />

318 2865.06<br />

326 2930.17<br />

326 2930.17<br />

340 3060.40<br />

333 2995.28<br />

340 3060.40<br />

340 3060.40<br />

CB59 124 205 ((3.50+0.50)/2)*1<br />

CB60 35 195 ((3.50+0.50)/2)*1<br />

CB61 54 185 ((3.50+0.50)/2)*1<br />

CB62 53 185 ((4.75+0.80)/2)*1.50<br />

CB63 58 180 ((4.75+0.80)/2)*1.50<br />

2.00 410.00 49.47 20282.70<br />

2.00 390.00 49.47 19293.30<br />

2.00 370.00 49.47 18303.90<br />

4.16 770.06 49.47 38094.99<br />

4.16 749.25 49.47 37065.40<br />

169 1521.20<br />

161 1447.00<br />

153 1372.79<br />

317 2857.12<br />

309 2779.90<br />

EW<br />

WHB 3105.00<br />

SB 6353.10<br />

CB 2689.31<br />

Cost<br />

162391.50<br />

314287.86<br />

133040.29<br />

233


G/P-MARKUAN<br />

VILL-MARKUAN<br />

MB1 89 250 ((4.75+0.80)/2)*1.50<br />

MB2 58 260 ((4.75+0.80)/2)*1.50<br />

MB3 130 260 ((4.75+0.80)/2)*1.50<br />

MB4 129 260 ((4.75+0.80)/2)*1.50<br />

MB5 125 260 ((3.50+0.50)/2)*1<br />

MB6 124 265 ((3.50+0.50)/2)*1<br />

MB7 642 280 ((4.75+0.80)/2)*1.50<br />

MB8 681 285 ((3.50+0.50)/2)*1<br />

MB9 679 300 ((3.50+0.50)/2)*1<br />

MB10 743 285 ((3.50+0.50)/2)*1<br />

MB<strong>11</strong> 742 300 ((3.50+0.50)/2)*1<br />

MB15 <strong>11</strong>06 285 ((3.50+0.50)/2)*1<br />

MB16 1044 295 ((3.50+0.50)/2)*1<br />

MB17 1043 290 ((3.50+0.50)/2)*1<br />

MB18 926 255 ((3.50+0.50)/2)*1<br />

MB19 925 300 ((3.50+0.50)/2)*1<br />

MB20 707 285 ((3.50+0.50)/2)*1<br />

MB32 <strong>11</strong>20 295 ((3.50+0.50)/2)*1<br />

MB33 <strong>11</strong>24 295 ((3.50+0.50)/2)*1<br />

MB34 <strong>11</strong>23 295 ((3.50+0.50)/2)*1<br />

4.16 1040.63 49.47 51479.72<br />

4.16 1082.25 49.47 53538.91<br />

4.16 1082.25 49.47 53538.91<br />

4.16 1082.25 49.47 53538.91<br />

2.00 520.00 49.47 25724.40<br />

2.00 530.00 49.47 26219.10<br />

4.16 <strong>11</strong>65.50 49.47 57657.29<br />

2.00 570.00 49.47 28197.90<br />

2.00 600.00 49.47 29682.00<br />

2.00 570.00 49.47 28197.90<br />

2.00 600.00 49.47 29682.00<br />

2.00 570.00 49.47 28197.90<br />

2.00 590.00 49.47 29187.30<br />

2.00 580.00 49.47 28692.60<br />

2.00 510.00 49.47 25229.70<br />

2.00 600.00 49.47 29682.00<br />

2.00 570.00 49.47 28197.90<br />

2.00 590.00 49.47 29187.30<br />

2.00 590.00 49.47 29187.30<br />

2.00 590.00 49.47 29187.30<br />

429 3860.98<br />

446 4015.42<br />

446 4015.42<br />

446 4015.42<br />

214 1929.33<br />

218 1966.43<br />

480 4324.30<br />

235 2<strong>11</strong>4.84<br />

247 2226.15<br />

235 2<strong>11</strong>4.84<br />

247 2226.15<br />

235 2<strong>11</strong>4.84<br />

243 2189.05<br />

239 2151.95<br />

210 1892.23<br />

247 2226.15<br />

235 2<strong>11</strong>4.84<br />

243 2189.05<br />

243 2189.05<br />

243 2189.05<br />

SB1 653 225 ((4.70+0.50)/2)*1.35<br />

SB2 654 235 ((4.70+0.50)/2)*1.35<br />

SB3 655 230 ((4.70+0.50)/2)*1.35<br />

3.51 789.75 49.47 39068.93<br />

3.51 824.85 49.47 40805.33<br />

3.51 807.30 49.47 39937.13<br />

326 2930.17<br />

340 3060.40<br />

333 2995.28<br />

234


SB4 643 240 ((4.70+0.50)/2)*1.35<br />

SB6 659 245 ((4.70+0.50)/2)*1.35<br />

SB7 660 245 ((4.70+0.50)/2)*1.35<br />

SB8 661 250 ((4.70+0.50)/2)*1.35<br />

SB10 705 250 ((4.70+0.50)/2)*1.35<br />

SB<strong>11</strong> 706 250 ((4.70+0.50)/2)*1.35<br />

SB12 768 215 ((4.70+0.50)/2)*1.35<br />

SB13 770 215 ((4.70+0.50)/2)*1.35<br />

SB14 764 215 ((4.70+0.50)/2)*1.35<br />

SB19 746 250 ((4.70+0.50)/2)*1.35<br />

SB20 445 245 ((4.70+0.50)/2)*1.35<br />

SB21 737 235 ((4.70+0.50)/2)*1.35<br />

SB22 736 230 ((4.70+0.50)/2)*1.35<br />

SB23 759 230 ((4.70+0.50)/2)*1.35<br />

SB24 1073 230 ((4.70+0.50)/2)*1.35<br />

SB25 1067 235 ((4.70+0.50)/2)*1.35<br />

SB26 1063 225 ((4.70+0.50)/2)*1.35<br />

SB38 955 220 ((4.70+0.50)/2)*1.35<br />

SB39 954 220 ((4.70+0.50)/2)*1.35<br />

SB40 951 220 ((4.70+0.50)/2)*1.35<br />

SB41 923 200 ((4.70+0.50)/2)*1.35<br />

SB42 930 200 ((4.70+0.50)/2)*1.35<br />

3.51 842.40 49.47 41673.53<br />

3.51 859.95 49.47 42541.73<br />

3.51 859.95 49.47 42541.73<br />

3.51 877.50 49.47 43409.93<br />

3.51 877.50 49.47 43409.93<br />

3.51 877.50 49.47 43409.93<br />

3.51 754.65 49.47 37332.54<br />

3.51 754.65 49.47 37332.54<br />

3.51 754.65 49.47 37332.54<br />

3.51 877.50 49.47 43409.93<br />

3.51 859.95 49.47 42541.73<br />

3.51 824.85 49.47 40805.33<br />

3.51 807.30 49.47 39937.13<br />

3.51 807.30 49.47 39937.13<br />

3.51 807.30 49.47 39937.13<br />

3.51 824.85 49.47 40805.33<br />

3.51 789.75 49.47 39068.93<br />

3.51 772.20 49.47 38200.73<br />

3.51 772.20 49.47 38200.73<br />

3.51 772.20 49.47 38200.73<br />

3.51 702.00 49.47 34727.94<br />

3.51 702.00 49.47 34727.94<br />

347 3125.51<br />

355 3190.63<br />

355 3190.63<br />

362 3255.74<br />

362 3255.74<br />

362 3255.74<br />

3<strong>11</strong> 2799.94<br />

3<strong>11</strong> 2799.94<br />

3<strong>11</strong> 2799.94<br />

362 3255.74<br />

355 3190.63<br />

340 3060.40<br />

333 2995.28<br />

333 2995.28<br />

333 2995.28<br />

340 3060.40<br />

326 2930.17<br />

318 2865.06<br />

318 2865.06<br />

318 2865.06<br />

289 2604.60<br />

289 2604.60<br />

CB1 509 205 ((3.50+0.50)/2)*1<br />

CB2 510 195 ((3.50+0.50)/2)*1<br />

CB3 500 200 ((3.50+0.50)/2)*1<br />

CB4 523 195 ((3.50+0.50)/2)*1<br />

2.00 410.00 49.47 20282.70<br />

2.00 390.00 49.47 19293.30<br />

2.00 400.00 49.47 19788.00<br />

2.00 390.00 49.47 19293.30<br />

169 1521.20<br />

161 1447.00<br />

165 1484.10<br />

161 1447.00<br />

235


CB5 145 205 ((3.50+0.50)/2)*1<br />

CB6 143 200 ((3.50+0.50)/2)*1<br />

CB7 142 185 ((3.50+0.50)/2)*1<br />

CB8 223 185 ((3.50+0.50)/2)*1<br />

CB9 224 185 ((3.50+0.50)/2)*1<br />

CB10 225 185 ((4.75+0.80)/2)*1.50<br />

CB<strong>11</strong> 66 180 ((3.50+0.50)/2)*1<br />

CB12 65 180 ((3.50+0.50)/2)*1<br />

CB13 68 195 ((4.75+0.80)/2)*1.50<br />

CB14 96 195 ((4.75+0.80)/2)*1.50<br />

CB15 95 185 ((4.75+0.80)/2)*1.50<br />

CB16 92 180 ((4.75+0.80)/2)*1.50<br />

CB17 91 200 ((4.75+0.80)/2)*1.50<br />

CB18 133 185 ((4.75+0.80)/2)*1.50<br />

CB19 134 205 ((4.75+0.80)/2)*1.50<br />

CB20 126 210 ((4.75+0.80)/2)*1.50<br />

CB21 125 215 ((4.75+0.80)/2)*1.50<br />

CB22 644 205 ((4.75+0.80)/2)*1.50<br />

CB23 649 200 ((4.75+0.80)/2)*1.50<br />

CB24 634 195 ((4.75+0.80)/2)*1.50<br />

CB25 154 190 ((4.75+0.80)/2)*1.50<br />

CB26 683 180 ((3.50+0.50)/2)*1<br />

CB27 684 185 ((3.50+0.50)/2)*1<br />

CB28 700 185 ((3.50+0.50)/2)*1<br />

CB29 701 185 ((4.75+0.80)/2)*1.50<br />

CB30 702 185 ((4.75+0.80)/2)*1.50<br />

CB31 703 185 ((4.75+0.80)/2)*1.50<br />

2.00 410.00 49.47 20282.70<br />

2.00 400.00 49.47 19788.00<br />

2.00 370.00 49.47 18303.90<br />

2.00 370.00 49.47 18303.90<br />

2.00 370.00 49.47 18303.90<br />

4.16 770.06 49.47 38094.99<br />

2.00 360.00 49.47 17809.20<br />

2.00 360.00 49.47 17809.20<br />

4.16 8<strong>11</strong>.69 49.47 40154.18<br />

4.16 8<strong>11</strong>.69 49.47 40154.18<br />

4.16 770.06 49.47 38094.99<br />

4.16 749.25 49.47 37065.40<br />

4.16 832.50 49.47 4<strong>11</strong>83.78<br />

4.16 770.06 49.47 38094.99<br />

4.16 853.31 49.47 42213.37<br />

4.16 874.13 49.47 43242.96<br />

4.16 894.94 49.47 44272.56<br />

4.16 853.31 49.47 42213.37<br />

4.16 832.50 49.47 4<strong>11</strong>83.78<br />

4.16 8<strong>11</strong>.69 49.47 40154.18<br />

4.16 790.88 49.47 39124.59<br />

2.00 360.00 49.47 17809.20<br />

2.00 370.00 49.47 18303.90<br />

2.00 370.00 49.47 18303.90<br />

4.16 770.06 49.47 38094.99<br />

4.16 770.06 49.47 38094.99<br />

4.16 770.06 49.47 38094.99<br />

169 1521.20<br />

165 1484.10<br />

153 1372.79<br />

153 1372.79<br />

153 1372.79<br />

317 2857.12<br />

148 1335.69<br />

148 1335.69<br />

335 30<strong>11</strong>.56<br />

335 30<strong>11</strong>.56<br />

317 2857.12<br />

309 2779.90<br />

343 3088.78<br />

317 2857.12<br />

352 3166.00<br />

360 3243.22<br />

369 3320.44<br />

352 3166.00<br />

343 3088.78<br />

335 30<strong>11</strong>.56<br />

326 2934.34<br />

148 1335.69<br />

153 1372.79<br />

153 1372.79<br />

317 2857.12<br />

317 2857.12<br />

317 2857.12<br />

236


CB32 704 180 ((4.75+0.80)/2)*1.50<br />

CB64 440 180 ((4.75+0.80)/2)*1.50<br />

CB65 467 195 ((4.75+0.80)/2)*1.50<br />

4.16 749.25 49.47 37065.40<br />

4.16 749.25 49.47 37065.40<br />

4.16 8<strong>11</strong>.69 49.47 40154.18<br />

309 2779.90<br />

309 2779.90<br />

335 30<strong>11</strong>.56<br />

CD1 6 85<br />

CD2 230 95<br />

CD3 359 90<br />

CD4 995 90<br />

CD5 843 90<br />

((12.50+1.3)/2)*2.5 17.25 1466.25 53.80 78884.25<br />

((12.50+1.3)/2)*2.5 17.25 1638.75 53.80 88164.75<br />

((12.50+1.3)/2)*2.5 17.25 1552.50 53.80 83524.50<br />

((12.50+1.3)/2)*2.5 17.25 1552.50 53.80 83524.50<br />

((12.50+1.3)/2)*2.5 17.25 1552.50 53.80 83524.50<br />

657 5916.32<br />

735 6612.36<br />

696 6264.34<br />

696 6264.34<br />

696 6264.34<br />

PB1 63 190 ((4.75+0.80)/2)*1.50<br />

PB2 325 195 ((4.75+0.80)/2)*1.50<br />

PB3 218 180 ((4.75+0.80)/2)*1.50<br />

PB4 216 205 ((4.75+0.80)/2)*1.50<br />

PB5 144 200 ((4.75+0.80)/2)*1.50<br />

PB6 205 200 ((4.75+0.80)/2)*1.50<br />

PB7 151 205 ((4.75+0.80)/2)*1.50<br />

PB8 147 210 ((4.75+0.80)/2)*1.50<br />

PB9 301 215 ((4.75+0.80)/2)*1.50<br />

PB10 604 200 ((4.75+0.80)/2)*1.50<br />

PB<strong>11</strong> 869 200 ((3.50+0.50)/2)*1<br />

PB12 190 ((3.50+0.50)/2)*1<br />

PB13 856 195 ((3.50+0.50)/2)*1<br />

PB14 852 185 ((3.50+0.50)/2)*1<br />

PB15 848 180 ((3.50+0.50)/2)*1<br />

PB16 843 180 ((3.50+0.50)/2)*1<br />

PB17 841 180 ((3.50+0.50)/2)*1<br />

4.16 790.88 49.47 39124.59<br />

4.16 8<strong>11</strong>.69 49.47 40154.18<br />

4.16 749.25 49.47 37065.40<br />

4.16 853.31 49.47 42213.37<br />

4.16 832.50 49.47 4<strong>11</strong>83.78<br />

4.16 832.50 49.47 4<strong>11</strong>83.78<br />

4.16 853.31 49.47 42213.37<br />

4.16 874.13 49.47 43242.96<br />

4.16 894.94 49.47 44272.56<br />

4.16 832.50 49.47 4<strong>11</strong>83.78<br />

2.00 400.00 49.47 19788.00<br />

2.00 380.00 49.47 18798.60<br />

2.00 390.00 49.47 19293.30<br />

2.00 370.00 49.47 18303.90<br />

2.00 360.00 49.47 17809.20<br />

2.00 360.00 49.47 17809.20<br />

2.00 360.00 49.47 17809.20<br />

326 2934.34<br />

335 30<strong>11</strong>.56<br />

309 2779.90<br />

352 3166.00<br />

343 3088.78<br />

343 3088.78<br />

352 3166.00<br />

360 3243.22<br />

369 3320.44<br />

343 3088.78<br />

165 1484.10<br />

157 1409.90<br />

161 1447.00<br />

153 1372.79<br />

148 1335.69<br />

148 1335.69<br />

148 1335.69<br />

237


PB18 1097 180 ((3.50+0.50)/2)*1<br />

PB19 838 180 ((3.50+0.50)/2)*1<br />

PB20 752 180 ((3.50+0.50)/2)*1<br />

PB27 148 190 ((3.50+0.50)/2)*1<br />

2.00 360.00 49.47 17809.20<br />

2.00 360.00 49.47 17809.20<br />

2.00 360.00 49.47 17809.20<br />

2.00 380.00 49.47 18798.60<br />

148 1335.69<br />

148 1335.69<br />

148 1335.69<br />

157 1409.90<br />

WHB5 557 95<br />

WHB6 929 95<br />

WHB7 715 90<br />

WHB8 772 80<br />

WHB9 1051 80<br />

((12.50+1.3)/2)*2.5 17.25 1638.75 52.30 85706.63<br />

((12.50+1.3)/2)*2.5 17.25 1638.75 52.30 85706.63<br />

((12.50+1.3)/2)*2.5 17.25 1552.50 52.30 8<strong>11</strong>95.75<br />

((12.50+1.3)/2)*2.5 17.25 1380.00 52.30 72174.00<br />

((12.50+1.3)/2)*2.5 17.25 1380.00 52.30 72174.00<br />

714 6428.00<br />

714 6428.00<br />

677 6089.68<br />

601 5413.05<br />

601 5413.05<br />

ECD7 <strong>11</strong>31 80<br />

ECD21 477 <strong>11</strong>0<br />

ECD22 472 105<br />

ECD23 1052 105<br />

ECD24 <strong>11</strong>09 105<br />

ECD25 757 95<br />

ECD26 740 95<br />

ECD27 756 80<br />

((12.50+1.3)/2)*2.5 17.25 1380.00 53.80 74244.00<br />

((12.50+1.3)/2)*2.5 17.25 1897.50 53.80 102085.50<br />

((12.50+1.3)/2)*2.5 17.25 18<strong>11</strong>.25 53.80 97445.25<br />

((12.50+1.3)/2)*2.5 17.25 18<strong>11</strong>.25 53.80 97445.25<br />

((12.50+1.3)/2)*2.5 17.25 18<strong>11</strong>.25 53.80 97445.25<br />

((12.50+1.3)/2)*2.5 17.25 1638.75 53.80 88164.75<br />

((12.50+1.3)/2)*2.5 17.25 1638.75 53.80 88164.75<br />

((12.50+1.3)/2)*2.5 17.25 1380.00 53.80 74244.00<br />

619 5568.30<br />

851 7656.41<br />

812 7308.39<br />

812 7308.39<br />

812 7308.39<br />

735 6612.36<br />

735 6612.36<br />

619 5568.30<br />

EW<br />

Cost<br />

MB 14032.88 694206.33<br />

SB 20200.05 999296.47<br />

CB 21376.44 1057492.36<br />

CD 7762.50 417622.50<br />

PB 12405.00 613675.35<br />

WHB 7590.00 396957.00<br />

ECD 13368.75 719238.75<br />

238


PASORA (2C2B1k2a) <strong>IWMP</strong>-<strong>VIII</strong> Block- Distt_ JHANSI<br />

Length Width * Height C.S. (Area) Work<br />

measurement<br />

Rate<br />

Total Cost<br />

(Rs.)<br />

Manday<br />

Name of Activity<br />

Khasara No<br />

Contribution<br />

G/P-PASORA<br />

VILL-PASORA<br />

CB1 59 200 ((3.50+0.50)/2)*1<br />

CB2 1309 190 ((3.50+0.50)/2)*1<br />

CB3 1393 195 ((3.50+0.50)/2)*1<br />

CB4 1392 185 ((3.50+0.50)/2)*1<br />

CB5 934 180 ((3.50+0.50)/2)*1<br />

CB6 922 195 ((3.50+0.50)/2)*1<br />

CB7 861 180 ((3.50+0.50)/2)*1<br />

CB8 865 190 ((3.50+0.50)/2)*1<br />

CB9 844 190 ((3.50+0.50)/2)*1<br />

CB10 846 195 ((3.50+0.50)/2)*1<br />

CB<strong>11</strong> 855 200 ((3.50+0.50)/2)*1<br />

CB12 1285 195 ((3.50+0.50)/2)*1<br />

CB13 1283 200 ((4.75+0.80)/2)*1.50<br />

CB14 1279 205 ((4.75+0.80)/2)*1.50<br />

CB15 579 205 ((4.75+0.80)/2)*1.50<br />

CB16 526 205 ((4.75+0.80)/2)*1.50<br />

CB17 509 205 ((4.75+0.80)/2)*1.50<br />

CB18 443 195 ((4.75+0.80)/2)*1.50<br />

CB19 489 190 ((4.75+0.80)/2)*1.50<br />

CB20 485 190 ((4.75+0.80)/2)*1.50<br />

CB21 477 190 ((4.75+0.80)/2)*1.50<br />

2.00 400.00 49.47 19788.00<br />

2.00 380.00 49.47 18798.60<br />

2.00 390.00 49.47 19293.30<br />

2.00 370.00 49.47 18303.90<br />

2.00 360.00 49.47 17809.20<br />

2.00 390.00 49.47 19293.30<br />

2.00 360.00 49.47 17809.20<br />

2.00 380.00 49.47 18798.60<br />

2.00 380.00 49.47 18798.60<br />

2.00 390.00 49.47 19293.30<br />

2.00 400.00 49.47 19788.00<br />

2.00 390.00 49.47 19293.30<br />

4.16 832.50 49.47 4<strong>11</strong>83.78<br />

4.16 853.31 49.47 42213.37<br />

4.16 853.31 49.47 42213.37<br />

4.16 853.31 49.47 42213.37<br />

4.16 853.31 49.47 42213.37<br />

4.16 8<strong>11</strong>.69 49.47 40154.18<br />

4.16 790.88 49.47 39124.59<br />

4.16 790.88 49.47 39124.59<br />

4.16 790.88 49.47 39124.59<br />

165 1484.10<br />

157 1409.90<br />

161 1447.00<br />

153 1372.79<br />

148 1335.69<br />

161 1447.00<br />

148 1335.69<br />

157 1409.90<br />

157 1409.90<br />

161 1447.00<br />

165 1484.10<br />

161 1447.00<br />

343 3088.78<br />

352 3166.00<br />

352 3166.00<br />

352 3166.00<br />

352 3166.00<br />

335 30<strong>11</strong>.56<br />

326 2934.34<br />

326 2934.34<br />

326 2934.34<br />

239


CB22 485 190 ((3.50+0.50)/2)*1<br />

CB23 474 190 ((3.50+0.50)/2)*1<br />

CB24 476 185 ((3.50+0.50)/2)*1<br />

CB25 463 180 ((3.50+0.50)/2)*1<br />

CB26 467 200 ((3.50+0.50)/2)*1<br />

CB27 465 200 ((3.50+0.50)/2)*1<br />

CB28 408 200 ((3.50+0.50)/2)*1<br />

CB29 474 205 ((3.50+0.50)/2)*1<br />

CB30 439 205 ((3.50+0.50)/2)*1<br />

CB31 461 205 ((3.50+0.50)/2)*1<br />

CB32 457 190 ((3.50+0.50)/2)*1<br />

CB33 730 185 ((4.75+0.80)/2)*1.50<br />

CB34 729 205 ((3.50+0.50)/2)*1<br />

CB35 736 200 ((3.50+0.50)/2)*1<br />

CB36 733 200 ((3.50+0.50)/2)*1<br />

CB37 726 200 ((3.50+0.50)/2)*1<br />

CB38 722 195 ((3.50+0.50)/2)*1<br />

CB39 754 195 ((3.50+0.50)/2)*1<br />

CB40 768 190 ((4.75+0.80)/2)*1.50<br />

2.00 380.00 49.47 18798.60<br />

2.00 380.00 49.47 18798.60<br />

2.00 370.00 49.47 18303.90<br />

2.00 360.00 49.47 17809.20<br />

2.00 400.00 49.47 19788.00<br />

2.00 400.00 49.47 19788.00<br />

2.00 400.00 49.47 19788.00<br />

2.00 410.00 49.47 20282.70<br />

2.00 410.00 49.47 20282.70<br />

2.00 410.00 49.47 20282.70<br />

2.00 380.00 49.47 18798.60<br />

4.16 770.06 49.47 38094.99<br />

2.00 410.00 49.47 20282.70<br />

2.00 400.00 49.47 19788.00<br />

2.00 400.00 49.47 19788.00<br />

2.00 400.00 49.47 19788.00<br />

2.00 390.00 49.47 19293.30<br />

2.00 390.00 49.47 19293.30<br />

4.16 790.88 49.47 39124.59<br />

157 1409.90<br />

157 1409.90<br />

153 1372.79<br />

148 1335.69<br />

165 1484.10<br />

165 1484.10<br />

165 1484.10<br />

169 1521.20<br />

169 1521.20<br />

169 1521.20<br />

157 1409.90<br />

317 2857.12<br />

169 1521.20<br />

165 1484.10<br />

165 1484.10<br />

165 1484.10<br />

161 1447.00<br />

161 1447.00<br />

326 2934.34<br />

SB1 702 245 ((4.70+0.50)/2)*1.35<br />

SB2 791 240 ((4.70+0.50)/2)*1.35<br />

SB3 792 235 ((4.70+0.50)/2)*1.35<br />

SB4 874 235 ((4.70+0.50)/2)*1.35<br />

SB5 781 230 ((4.70+0.50)/2)*1.35<br />

SB6 760 230 ((4.70+0.50)/2)*1.35<br />

SB7 <strong>11</strong> 230 ((4.70+0.50)/2)*1.35<br />

3.51 859.95 49.47 42541.73<br />

3.51 842.40 49.47 41673.53<br />

3.51 824.85 49.47 40805.33<br />

3.51 824.85 49.47 40805.33<br />

3.51 807.30 49.47 39937.13<br />

3.51 807.30 49.47 39937.13<br />

3.51 807.30 49.47 39937.13<br />

355 3190.63<br />

347 3125.51<br />

340 3060.40<br />

340 3060.40<br />

333 2995.28<br />

333 2995.28<br />

333 2995.28<br />

240


SB8 133 230 ((4.70+0.50)/2)*1.35<br />

SB9 91 220 ((4.70+0.50)/2)*1.35<br />

SB10 130 200 ((4.70+0.50)/2)*1.35<br />

SB<strong>11</strong> 106 210 ((4.70+0.50)/2)*1.35<br />

SB12 105 225 ((4.70+0.50)/2)*1.35<br />

SB13 120 225 ((4.70+0.50)/2)*1.35<br />

SB14 232 235 ((4.70+0.50)/2)*1.35<br />

SB15 239 245 ((4.70+0.50)/2)*1.35<br />

SB16 <strong>11</strong>9/3 250 ((4.70+0.50)/2)*1.35<br />

SB17 122 230 ((4.70+0.50)/2)*1.35<br />

SB18 245 230 ((4.70+0.50)/2)*1.35<br />

SB19 247 230 ((4.75+0.80)/2)*1.50<br />

3.51 807.30 49.47 39937.13<br />

3.51 772.20 49.47 38200.73<br />

3.51 702.00 49.47 34727.94<br />

3.51 737.10 49.47 36464.34<br />

3.51 789.75 49.47 39068.93<br />

3.51 789.75 49.47 39068.93<br />

3.51 824.85 49.47 40805.33<br />

3.51 859.95 49.47 42541.73<br />

3.51 877.50 49.47 43409.93<br />

3.51 807.30 49.47 39937.13<br />

3.51 807.30 49.47 39937.13<br />

4.16 957.38 49.47 47361.34<br />

333 2995.28<br />

318 2865.06<br />

289 2604.60<br />

304 2734.83<br />

326 2930.17<br />

326 2930.17<br />

340 3060.40<br />

355 3190.63<br />

362 3255.74<br />

333 2995.28<br />

333 2995.28<br />

395 3552.10<br />

PB1 574 210 ((4.75+0.80)/2)*1.50<br />

4.16 874.13 49.47 43242.96<br />

PB2 569 195 ((4.75+0.80)/2)*1.50<br />

4.16 8<strong>11</strong>.69 49.47 40154.18<br />

PB3 779 180 ((4.75+0.80)/2)*1.50<br />

4.16 749.25 49.47 37065.40<br />

PB4 814 180<br />

((12.50+1.3)/2)*2.5 17.25 3105.00 49.47 153604.35<br />

PB5 772 185<br />

((12.50+1.3)/2)*2.5 17.25 3191.25 49.47 157871.14<br />

PB6 1277 190 ((4.75+0.80)/2)*1.50<br />

4.16 790.88 49.47 39124.59<br />

PB7 5 185 ((3.50+0.50)/2)*1<br />

2.00 370.00 49.47 18303.90<br />

PB8 9 185 ((3.50+0.50)/2)*1<br />

2.00 370.00 49.47 18303.90<br />

PB9 1203 185 ((4.75+0.80)/2)*1.50<br />

4.16 770.06 49.47 38094.99<br />

PB10 14 195 ((4.75+0.80)/2)*1.50<br />

4.16 8<strong>11</strong>.69 49.47 40154.18<br />

PB<strong>11</strong> 39 195 ((4.75+0.80)/2)*1.50<br />

4.16 8<strong>11</strong>.69 49.47 40154.18<br />

PB12 14 190 ((4.75+0.80)/2)*1.50<br />

4.16 790.88 49.47 39124.59<br />

PB13 41 190 ((4.75+0.80)/2)*1.50<br />

4.16 790.88 49.47 39124.59<br />

PB14 1291 190 ((4.75+0.80)/2)*1.50<br />

4.16 790.88 49.47 39124.59<br />

360 3243.22<br />

335 30<strong>11</strong>.56<br />

309 2779.90<br />

1280 <strong>11</strong>520.33<br />

1316 <strong>11</strong>840.34<br />

326 2934.34<br />

153 1372.79<br />

153 1372.79<br />

317 2857.12<br />

335 30<strong>11</strong>.56<br />

335 30<strong>11</strong>.56<br />

326 2934.34<br />

326 2934.34<br />

326 2934.34<br />

241


PB15 49 200 ((3.50+0.50)/2)*1<br />

PB16 51 205 ((3.50+0.50)/2)*1<br />

PB17 1301 190 ((3.50+0.50)/2)*1<br />

PB18 55 195 ((3.50+0.50)/2)*1<br />

PB19 140 195 ((3.50+0.50)/2)*1<br />

PB20 142 190 ((3.50+0.50)/2)*1<br />

PB21 138 190 ((3.50+0.50)/2)*1<br />

PB22 144 180 ((3.50+0.50)/2)*1<br />

PB23 136 185 ((3.50+0.50)/2)*1<br />

PB24 198 190 ((3.50+0.50)/2)*1<br />

PB25 127 180 ((3.50+0.50)/2)*1<br />

PB26 198 185 ((3.50+0.50)/2)*1<br />

PB27 147 185 ((3.50+0.50)/2)*1<br />

PB28 145 185 ((4.75+0.80)/2)*1.50<br />

2.00 400.00 49.47 19788.00<br />

2.00 410.00 49.47 20282.70<br />

2.00 380.00 49.47 18798.60<br />

2.00 390.00 49.47 19293.30<br />

2.00 390.00 49.47 19293.30<br />

2.00 380.00 49.47 18798.60<br />

2.00 380.00 49.47 18798.60<br />

2.00 360.00 49.47 17809.20<br />

2.00 370.00 49.47 18303.90<br />

2.00 380.00 49.47 18798.60<br />

2.00 360.00 49.47 17809.20<br />

2.00 370.00 49.47 18303.90<br />

2.00 370.00 49.47 18303.90<br />

4.16 770.06 49.47 38094.99<br />

165 1484.10<br />

169 1521.20<br />

157 1409.90<br />

161 1447.00<br />

161 1447.00<br />

157 1409.90<br />

157 1409.90<br />

148 1335.69<br />

153 1372.79<br />

157 1409.90<br />

148 1335.69<br />

153 1372.79<br />

153 1372.79<br />

317 2857.12<br />

MB6 257 250 ((4.75+0.80)/2)*1.50<br />

MB7 256 260 ((4.75+0.80)/2)*1.50<br />

MB8 263 265 ((4.75+0.80)/2)*1.50<br />

MB9 261 265 ((4.75+0.80)/2)*1.50<br />

MB<strong>11</strong> 18 265 ((4.75+0.80)/2)*1.50<br />

MB12 20 265 ((4.75+0.80)/2)*1.50<br />

MB16 189 300 ((3.50+0.50)/2)*1<br />

MB17 191 300 ((3.50+0.50)/2)*1<br />

MB18 205 295 ((3.50+0.50)/2)*1<br />

MB19 201 265 ((3.50+0.50)/2)*1<br />

MB20 199 260 ((3.50+0.50)/2)*1<br />

MB21 200 260 ((3.50+0.50)/2)*1<br />

4.16 1040.63 49.47 51479.72<br />

4.16 1082.25 49.47 53538.91<br />

4.16 <strong>11</strong>03.06 49.47 54568.50<br />

4.16 <strong>11</strong>03.06 49.47 54568.50<br />

4.16 <strong>11</strong>03.06 49.47 54568.50<br />

4.16 <strong>11</strong>03.06 49.47 54568.50<br />

2.00 600.00 49.47 29682.00<br />

2.00 600.00 49.47 29682.00<br />

2.00 590.00 49.47 29187.30<br />

2.00 530.00 49.47 26219.10<br />

2.00 520.00 49.47 25724.40<br />

2.00 520.00 49.47 25724.40<br />

429 3860.98<br />

446 4015.42<br />

455 4092.64<br />

455 4092.64<br />

455 4092.64<br />

455 4092.64<br />

247 2226.15<br />

247 2226.15<br />

243 2189.05<br />

218 1966.43<br />

214 1929.33<br />

214 1929.33<br />

242


MB22 213 255 ((3.50+0.50)/2)*1<br />

MB23 217 255 ((3.50+0.50)/2)*1<br />

MB24 184 250 ((3.50+0.50)/2)*1<br />

MB25 182 300 ((3.50+0.50)/2)*1<br />

MB26 65 300 ((3.50+0.50)/2)*1<br />

MB27 71 250 ((3.50+0.50)/2)*1<br />

MB28 47 265 ((3.50+0.50)/2)*1<br />

2.00 510.00 49.47 25229.70<br />

2.00 510.00 49.47 25229.70<br />

2.00 500.00 49.47 24735.00<br />

2.00 600.00 49.47 29682.00<br />

2.00 600.00 49.47 29682.00<br />

2.00 500.00 49.47 24735.00<br />

2.00 530.00 49.47 26219.10<br />

210 1892.23<br />

210 1892.23<br />

206 1855.13<br />

247 2226.15<br />

247 2226.15<br />

206 1855.13<br />

218 1966.43<br />

CD1 127 95<br />

CD2 198 95<br />

CD3 136 95<br />

CD<strong>11</strong> 3 90<br />

CD12 14 90<br />

CD13 50 <strong>11</strong>0<br />

CD14 1300 <strong>11</strong>0<br />

WHB5 198 105<br />

((12.50+1.3)/2)*2.5 17.25 1638.75 53.80 88164.75<br />

((12.50+1.3)/2)*2.5 17.25 1638.75 53.80 88164.75<br />

((12.50+1.3)/2)*2.5 17.25 1638.75 53.80 88164.75<br />

((12.50+1.3)/2)*2.5 17.25 1552.50 53.80 83524.50<br />

((12.50+1.3)/2)*2.5 17.25 1552.50 53.80 83524.50<br />

((12.50+1.3)/2)*2.5 17.25 1897.50 53.80 102085.50<br />

((12.50+1.3)/2)*2.5 17.25 1897.50 53.80 102085.50<br />

((12.50+1.3)/2)*2.5 17.25 18<strong>11</strong>.25 52.30 94728.38<br />

735 6612.36<br />

735 6612.36<br />

735 6612.36<br />

696 6264.34<br />

696 6264.34<br />

851 7656.41<br />

851 7656.41<br />

789 7104.63<br />

CB<br />

SB<br />

PB<br />

MB<br />

CD<br />

WHB<br />

EW<br />

Cost<br />

20271.00 1002806.37<br />

15506.33 767097.90<br />

20738.31 1025924.32<br />

13645.13 675024.33<br />

<strong>11</strong>816.25 635714.25<br />

18<strong>11</strong>.25 94728.38<br />

G/P-CHATUR TAI<br />

VILL-KEDAR TAI<br />

243


MB<strong>11</strong> 18 205 ((3.50+0.50)/2)*1<br />

MB12 20 250 ((3.50+0.50)/2)*1<br />

2.00 410.00 49.47 20282.70<br />

2.00 500.00 49.47 24735.00<br />

169 1521.20<br />

206 1855.13<br />

EW<br />

MB 910.00<br />

Cost<br />

45017.70<br />

G/P-PUCHHI<br />

WHB2 781 95<br />

VILL-PUCHHI<br />

((12.50+1.3)/2)*2.5 17.25 1638.75 52.30 85706.63<br />

714 6428.00<br />

WHB<br />

EW<br />

Cost<br />

1638.75 85706.63<br />

G/P-CHATUR TAI<br />

VILL-CHARUR TAI<br />

PB29 3 95 ((3.50+0.50)/2)*1<br />

PB30 6 190 ((3.50+0.50)/2)*1<br />

PB31 9 190 ((3.50+0.50)/2)*1<br />

PB32 43 185 ((3.50+0.50)/2)*1<br />

PB33 44 185 ((4.75+0.80)/2)*1.50<br />

PB34 45 185 ((4.75+0.80)/2)*1.50<br />

PB35 52 185 ((4.75+0.80)/2)*1.50<br />

PB36 42 190 ((4.75+0.80)/2)*1.50<br />

PB37 52 190 ((4.75+0.80)/2)*1.50<br />

PB38 24 190 ((4.75+0.80)/2)*1.50<br />

PB39 52 190 ((4.75+0.80)/2)*1.50<br />

PB40 59 195 ((4.75+0.80)/2)*1.50<br />

PB48 161 210 ((4.75+0.80)/2)*1.50<br />

PB49 45 205 ((4.75+0.80)/2)*1.50<br />

2.00 190.00 49.47 9399.30<br />

2.00 380.00 49.47 18798.60<br />

2.00 380.00 49.47 18798.60<br />

2.00 370.00 49.47 18303.90<br />

4.16 770.06 49.47 38094.99<br />

4.16 770.06 49.47 38094.99<br />

4.16 770.06 49.47 38094.99<br />

4.16 790.88 49.47 39124.59<br />

4.16 790.88 49.47 39124.59<br />

4.16 790.88 49.47 39124.59<br />

4.16 790.88 49.47 39124.59<br />

4.16 8<strong>11</strong>.69 49.47 40154.18<br />

4.16 874.13 49.47 43242.96<br />

4.16 853.31 49.47 42213.37<br />

78 704.95<br />

157 1409.90<br />

157 1409.90<br />

153 1372.79<br />

317 2857.12<br />

317 2857.12<br />

317 2857.12<br />

326 2934.34<br />

326 2934.34<br />

326 2934.34<br />

326 2934.34<br />

335 30<strong>11</strong>.56<br />

360 3243.22<br />

352 3166.00<br />

244


PB51 226 210 ((4.75+0.80)/2)*1.50<br />

4.16 874.13 49.47 43242.96<br />

360 3243.22<br />

ECD6 62 105<br />

ECD7 59 105<br />

ECD8 36 100<br />

ECD9 28 105<br />

ECD10 35 100<br />

ECD<strong>11</strong> 16 100<br />

ECD12 22 105<br />

((12.50+1.3)/2)*2.5 17.25 18<strong>11</strong>.25 53.80 97445.25<br />

((12.50+1.3)/2)*2.5 17.25 18<strong>11</strong>.25 53.80 97445.25<br />

((12.50+1.3)/2)*2.5 17.25 1725.00 53.80 92805.00<br />

((12.50+1.3)/2)*2.5 17.25 18<strong>11</strong>.25 53.80 97445.25<br />

((12.50+1.3)/2)*2.5 17.25 1725.00 53.80 92805.00<br />

((12.50+1.3)/2)*2.5 17.25 1725.00 53.80 92805.00<br />

((12.50+1.3)/2)*2.5 17.25 18<strong>11</strong>.25 53.80 97445.25<br />

812 7308.39<br />

812 7308.39<br />

773 6960.38<br />

812 7308.39<br />

773 6960.38<br />

773 6960.38<br />

812 7308.39<br />

MB14 16 250 ((3.50+0.50)/2)*1<br />

MB15 <strong>11</strong> 265 ((3.50+0.50)/2)*1<br />

2.00 500.00 49.47 24735.00<br />

2.00 530.00 49.47 26219.10<br />

206 1855.13<br />

218 1966.43<br />

SB20 49 205 ((3.50+0.50)/2)*1<br />

SB21 51 200 ((3.50+0.50)/2)*1<br />

SB22 50 200 ((3.50+0.50)/2)*1<br />

SB23 53 250 ((3.50+0.50)/2)*1<br />

SB24 56 245 ((3.50+0.50)/2)*1<br />

2.00 410.00 49.47 20282.70<br />

2.00 400.00 49.47 19788.00<br />

2.00 400.00 49.47 19788.00<br />

2.00 500.00 49.47 24735.00<br />

2.00 490.00 49.47 24240.30<br />

169 1521.20<br />

165 1484.10<br />

165 1484.10<br />

206 1855.13<br />

202 1818.02<br />

WHB4 31 95<br />

((12.50+1.3)/2)*2.5 17.25 1638.75 52.30 85706.63<br />

714 6428.00<br />

CD6 3 95<br />

CD7 44 90<br />

CD8 32 90<br />

CD15 161 100<br />

CD17 162 100<br />

CD18 240 100<br />

((12.50+1.3)/2)*2.5 17.25 1638.75 53.80 88164.75<br />

((12.50+1.3)/2)*2.5 17.25 1552.50 53.80 83524.50<br />

((12.50+1.3)/2)*2.5 17.25 1552.50 53.80 83524.50<br />

((12.50+1.3)/2)*2.5 17.25 1725.00 53.80 92805.00<br />

((12.50+1.3)/2)*2.5 17.25 1725.00 53.80 92805.00<br />

((12.50+1.3)/2)*2.5 17.25 1725.00 53.80 92805.00<br />

735 6612.36<br />

696 6264.34<br />

696 6264.34<br />

773 6960.38<br />

773 6960.38<br />

773 6960.38<br />

245


PB<br />

ECD<br />

MB<br />

SB<br />

CD<br />

WHB<br />

EW<br />

Cost<br />

10206.94 504937.20<br />

1030.00 50954.10<br />

1030.00 50954.10<br />

3230.00 108834.00<br />

9918.75 533628.75<br />

1638.75 85706.63<br />

G/P-DHURKHURA<br />

ECD1 99 105<br />

ECD2 103 105<br />

ECD3 105 100<br />

ECD4 78 100<br />

ECD5 57 90<br />

VILL-GOHNA<br />

((12.50+1.3)/2)*2.5 17.25 18<strong>11</strong>.25 53.80 97445.25<br />

((12.50+1.3)/2)*2.5 17.25 18<strong>11</strong>.25 53.80 97445.25<br />

((12.50+1.3)/2)*2.5 17.25 1725.00 53.80 92805.00<br />

((12.50+1.3)/2)*2.5 17.25 1725.00 53.80 92805.00<br />

((12.50+1.3)/2)*2.5 17.25 1552.50 53.80 83524.50<br />

812 7308.39<br />

812 7308.39<br />

773 6960.38<br />

773 6960.38<br />

696 6264.34<br />

SB25 6 250 ((4.70+0.50)/2)*1.35<br />

SB26 8 245 ((4.70+0.50)/2)*1.35<br />

SB27 19 230 ((4.70+0.50)/2)*1.35<br />

SB28 26 230 ((4.70+0.50)/2)*1.35<br />

SB29 33 230 ((4.70+0.50)/2)*1.35<br />

SB30 15 235 ((4.70+0.50)/2)*1.35<br />

3.51 877.50 49.47 43409.93<br />

3.51 859.95 49.47 42541.73<br />

3.51 807.30 49.47 39937.13<br />

3.51 807.30 49.47 39937.13<br />

3.51 807.30 49.47 39937.13<br />

3.51 824.85 49.47 40805.33<br />

362 3255.74<br />

355 3190.63<br />

333 2995.28<br />

333 2995.28<br />

333 2995.28<br />

340 3060.40<br />

MB1 85 250 ((3.50+0.50)/2)*1<br />

MB2 43 260 ((3.50+0.50)/2)*1<br />

MB3 183 265 ((3.50+0.50)/2)*1<br />

MB4 25 275 ((3.50+0.50)/2)*1<br />

MB5 9 275 ((3.50+0.50)/2)*1<br />

2.00 500.00 49.47 24735.00<br />

2.00 520.00 49.47 25724.40<br />

2.00 530.00 49.47 26219.10<br />

2.00 550.00 49.47 27208.50<br />

2.00 550.00 49.47 27208.50<br />

206 1855.13<br />

214 1929.33<br />

218 1966.43<br />

227 2040.64<br />

227 2040.64<br />

246


PB41 36 205 ((3.50+0.50)/2)*1<br />

PB42 41 205 ((3.50+0.50)/2)*1<br />

PB43 163 205 ((3.50+0.50)/2)*1<br />

PB44 98 210 ((3.50+0.50)/2)*1<br />

PB45 156 210 ((3.50+0.50)/2)*1<br />

PB46 150 205 ((3.50+0.50)/2)*1<br />

PB47 171 195 ((3.50+0.50)/2)*1<br />

PB50 210 195 ((3.50+0.50)/2)*1<br />

PB52 9 180 ((3.50+0.50)/2)*1<br />

2.00 410.00 49.47 20282.70<br />

2.00 410.00 49.47 20282.70<br />

2.00 410.00 49.47 20282.70<br />

2.00 420.00 49.47 20777.40<br />

2.00 420.00 49.47 20777.40<br />

2.00 410.00 49.47 20282.70<br />

2.00 390.00 49.47 19293.30<br />

2.00 390.00 49.47 19293.30<br />

2.00 360.00 49.47 17809.20<br />

169 1521.20<br />

169 1521.20<br />

169 1521.20<br />

173 1558.31<br />

173 1558.31<br />

169 1521.20<br />

161 1447.00<br />

161 1447.00<br />

148 1335.69<br />

CD9 36 95<br />

CD10 157 80<br />

CD16 306 80<br />

((12.50+1.3)/2)*2.5 17.25 1638.75 53.80 88164.75<br />

((12.50+1.3)/2)*2.5 17.25 1380.00 53.80 74244.00<br />

((12.50+1.3)/2)*2.5 17.25 1380.00 53.80 74244.00<br />

735 6612.36<br />

619 5568.30<br />

619 5568.30<br />

EW<br />

Cost<br />

ECD 8625.00<br />

464025.00<br />

SB 2650.00 246568.37<br />

MB 2650.00<br />

131095.50<br />

PB 3620.00<br />

179081.40<br />

CD 4398.75<br />

236652.75<br />

247


KEDARTAI-II (2C2B1l2d) <strong>IWMP</strong>-<strong>VIII</strong> Block- Distt_ JHANSI<br />

Name of Activity<br />

Khasara<br />

No<br />

Length Width * Height C.S. (Area) Work<br />

measurement<br />

Rate<br />

Total Cost<br />

(Rs.)<br />

Manday<br />

Contribution<br />

G/P-PASORA<br />

MB27 24<br />

MB26 35<br />

300<br />

250<br />

VILL-PASORA<br />

((4.75+0.80)/2)*1.50<br />

((4.75+0.80)/2)*1.50<br />

4.16 1248.75 49.47 61775.66<br />

4.16 1040.63 49.47 51479.72<br />

515 4633.17<br />

429 3860.98<br />

CB1 1212 200 ((3.50+0.50)/2)*1<br />

CB2 1443 195 ((3.50+0.50)/2)*1<br />

CB3 1427 185 ((3.50+0.50)/2)*1<br />

CB4 1418 195 ((3.50+0.50)/2)*1<br />

CB5 1326 180 ((3.50+0.50)/2)*1<br />

CB6 1409 185 ((3.50+0.50)/2)*1<br />

CB7 1380 180 ((3.50+0.50)/2)*1<br />

CB8 1427 180 ((3.50+0.50)/2)*1<br />

CB9 1339 210 ((3.50+0.50)/2)*1<br />

CB10 1335 205 ((3.50+0.50)/2)*1<br />

CB<strong>11</strong> 1353 185 ((3.50+0.50)/2)*1<br />

CB12 1377 185 ((3.50+0.50)/2)*1<br />

CB13 1681 190 ((3.50+0.50)/2)*1<br />

CB14 1629 195 ((3.50+0.50)/2)*1<br />

CB15 1673 180 ((3.50+0.50)/2)*1<br />

CB16 1632 210 ((4.75+0.80)/2)*1.50<br />

CB17 1370 210 ((4.75+0.80)/2)*1.50<br />

CB18 1636 205 ((4.75+0.80)/2)*1.50<br />

2.00 400.00 49.47 19788.00<br />

2.00 390.00 49.47 19293.30<br />

2.00 370.00 49.47 18303.90<br />

2.00 390.00 49.47 19293.30<br />

2.00 360.00 49.47 17809.20<br />

2.00 370.00 49.47 18303.90<br />

2.00 360.00 49.47 17809.20<br />

2.00 360.00 49.47 17809.20<br />

2.00 420.00 49.47 20777.40<br />

2.00 410.00 49.47 20282.70<br />

2.00 370.00 49.47 18303.90<br />

2.00 370.00 49.47 18303.90<br />

2.00 380.00 49.47 18798.60<br />

2.00 390.00 49.47 19293.30<br />

2.00 360.00 49.47 17809.20<br />

4.16 874.13 49.47 43242.96<br />

4.16 874.13 49.47 43242.96<br />

4.16 853.31 49.47 42213.37<br />

165 1484.10<br />

161 1447.00<br />

153 1372.79<br />

161 1447.00<br />

148 1335.69<br />

153 1372.79<br />

148 1335.69<br />

148 1335.69<br />

173 1558.31<br />

169 1521.20<br />

153 1372.79<br />

153 1372.79<br />

157 1409.90<br />

161 1447.00<br />

148 1335.69<br />

360 3243.22<br />

360 3243.22<br />

352 3166.00<br />

248


CB19 1654 200 ((4.75+0.80)/2)*1.50<br />

CB20 1652 185 ((4.75+0.80)/2)*1.50<br />

CB21 1653 195 ((4.75+0.80)/2)*1.50<br />

CB22 1821 190 ((4.75+0.80)/2)*1.50<br />

CB23 1239 190 ((4.75+0.80)/2)*1.50<br />

CB24 1317 185 ((4.75+0.80)/2)*1.50<br />

CB25 1307 185 ((4.75+0.80)/2)*1.50<br />

4.16 832.50 49.47 4<strong>11</strong>83.78<br />

4.16 770.06 49.47 38094.99<br />

4.16 8<strong>11</strong>.69 49.47 40154.18<br />

4.16 790.88 49.47 39124.59<br />

4.16 790.88 49.47 39124.59<br />

4.16 770.06 49.47 38094.99<br />

4.16 770.06 49.47 38094.99<br />

343 3088.78<br />

317 2857.12<br />

335 30<strong>11</strong>.56<br />

326 2934.34<br />

326 2934.34<br />

317 2857.12<br />

317 2857.12<br />

PB1 1429 185 ((3.50+0.50)/2)*1<br />

PB2 1319 195 ((3.50+0.50)/2)*1<br />

PB3 1324 190 ((3.50+0.50)/2)*1<br />

PB4 1328 190 ((3.50+0.50)/2)*1<br />

PB5 1320 185 ((3.50+0.50)/2)*1<br />

PB6 1352 190 ((3.50+0.50)/2)*1<br />

PB7 1366 185 ((3.50+0.50)/2)*1<br />

PB8 487 195 ((4.75+0.80)/2)*1.50<br />

PB9 1648 180 ((4.75+0.80)/2)*1.50<br />

PB<strong>11</strong> 1656 190 ((4.75+0.80)/2)*1.50<br />

PB13 1660 180 ((4.75+0.80)/2)*1.50<br />

PB18 1701 185 ((4.75+0.80)/2)*1.50<br />

PB20 1235 185 ((4.75+0.80)/2)*1.50<br />

PB51 1270 185 ((4.75+0.80)/2)*1.50<br />

PB52 1266 185 ((4.75+0.80)/2)*1.50<br />

PB53 1267 205 ((4.75+0.80)/2)*1.50<br />

PB54 1613 205 ((4.75+0.80)/2)*1.50<br />

SB4 1747 250 ((4.70+0.50)/2)*1.35<br />

SB5 1762 250 ((4.70+0.50)/2)*1.35<br />

2.00 370.00 49.47 18303.90<br />

2.00 390.00 49.47 19293.30<br />

2.00 380.00 49.47 18798.60<br />

2.00 380.00 49.47 18798.60<br />

2.00 370.00 49.47 18303.90<br />

2.00 380.00 49.47 18798.60<br />

2.00 370.00 49.47 18303.90<br />

4.16 8<strong>11</strong>.69 49.47 40154.18<br />

4.16 749.25 49.47 37065.40<br />

4.16 790.88 49.47 39124.59<br />

4.16 749.25 49.47 37065.40<br />

4.16 770.06 49.47 38094.99<br />

4.16 770.06 49.47 38094.99<br />

4.16 770.06 49.47 38094.99<br />

4.16 770.06 49.47 38094.99<br />

4.16 853.31 49.47 42213.37<br />

4.16 853.31 49.47 42213.37<br />

3.51 877.50 49.47 43409.93<br />

3.51 877.50 49.47 43409.93<br />

153 1372.79<br />

161 1447.00<br />

157 1409.90<br />

157 1409.90<br />

153 1372.79<br />

157 1409.90<br />

153 1372.79<br />

335 30<strong>11</strong>.56<br />

309 2779.90<br />

326 2934.34<br />

309 2779.90<br />

317 2857.12<br />

317 2857.12<br />

317 2857.12<br />

317 2857.12<br />

352 3166.00<br />

352 3166.00<br />

362 3255.74<br />

362 3255.74<br />

249


EW<br />

MB 2289.38<br />

CB 13837.6875<br />

PB 10527.94<br />

SB 1755.00<br />

Cost<br />

<strong>11</strong>3255.38<br />

684550.40<br />

520817.07<br />

86819.85<br />

G/P-GORHPURA<br />

VILL-GORHPURA<br />

CB26 445 185 ((4.75+0.80)/2)*1.50<br />

CB27 443 185 ((4.75+0.80)/2)*1.50<br />

CB28 441 195 ((4.75+0.80)/2)*1.50<br />

CB29 424 195 ((4.75+0.80)/2)*1.50<br />

CB30 417 190 ((4.75+0.80)/2)*1.50<br />

CB31 266 185 ((4.75+0.80)/2)*1.50<br />

4.16 770.06 49.47 38094.99<br />

4.16 770.06 49.47 38094.99<br />

4.16 8<strong>11</strong>.69 49.47 40154.18<br />

4.16 8<strong>11</strong>.69 49.47 40154.18<br />

4.16 790.88 49.47 39124.59<br />

4.16 770.06 49.47 38094.99<br />

317 2857.12<br />

317 2857.12<br />

335 30<strong>11</strong>.56<br />

335 30<strong>11</strong>.56<br />

326 2934.34<br />

317 2857.12<br />

MB1 399 265 ((4.75+0.80)/2)*1.50<br />

MB2 408 260 ((3.50+0.50)/2)*1<br />

MB3 405 265 ((3.50+0.50)/2)*1<br />

MB4 396 275 ((3.50+0.50)/2)*1<br />

MB5 317 275 ((3.50+0.50)/2)*1<br />

MB6 315 270 ((3.50+0.50)/2)*1<br />

MB7 382 280 ((3.50+0.50)/2)*1<br />

MB8 383 290 ((3.50+0.50)/2)*1<br />

MB9 379 290 ((3.50+0.50)/2)*1<br />

MB10 300 265 ((3.50+0.50)/2)*1<br />

MB<strong>11</strong> 303 295 ((4.75+0.80)/2)*1.50<br />

MB12 293 290 ((4.75+0.80)/2)*1.50<br />

4.16 <strong>11</strong>03.06 49.47 54568.50<br />

2.00 520.00 49.47 25724.40<br />

2.00 530.00 49.47 26219.10<br />

2.00 550.00 49.47 27208.50<br />

2.00 550.00 49.47 27208.50<br />

2.00 540.00 49.47 26713.80<br />

2.00 560.00 49.47 27703.20<br />

2.00 580.00 49.47 28692.60<br />

2.00 580.00 49.47 28692.60<br />

2.00 530.00 49.47 26219.10<br />

4.16 1227.94 49.47 60746.07<br />

4.16 1207.13 49.47 59716.47<br />

455 4092.64<br />

214 1929.33<br />

218 1966.43<br />

227 2040.64<br />

227 2040.64<br />

223 2003.54<br />

231 2077.74<br />

239 2151.95<br />

239 2151.95<br />

218 1966.43<br />

506 4555.96<br />

498 4478.74<br />

250


MB13 361 295 ((4.75+0.80)/2)*1.50<br />

MB14 3309 290 ((4.75+0.80)/2)*1.50<br />

MB15 355 300 ((4.75+0.80)/2)*1.50<br />

MB16 3478 295 ((3.50+0.50)/2)*1<br />

MB17 349 295 ((3.50+0.50)/2)*1<br />

MB18 2218 295 ((3.50+0.50)/2)*1<br />

MB19 338 265 ((3.50+0.50)/2)*1<br />

MB20 303 260 ((3.50+0.50)/2)*1<br />

MB21 318/960 260 ((3.50+0.50)/2)*1<br />

MB22 313 260 ((3.50+0.50)/2)*1<br />

MB23 224 265 ((3.50+0.50)/2)*1<br />

MB24 220 265 ((3.50+0.50)/2)*1<br />

MB25 273 265 ((4.75+0.80)/2)*1.50<br />

MB26 270 265 ((4.75+0.80)/2)*1.50<br />

MB27 2808 265 ((4.75+0.80)/2)*1.50<br />

MB28 285 265 ((4.75+0.80)/2)*1.50<br />

PB7 479 195 ((4.75+0.80)/2)*1.50<br />

PB10 494 195 ((4.75+0.80)/2)*1.50<br />

PB12 597 210 ((4.75+0.80)/2)*1.50<br />

PB14 550 215 ((4.75+0.80)/2)*1.50<br />

PB15 540 205 ((4.75+0.80)/2)*1.50<br />

PB16 549 210 ((4.75+0.80)/2)*1.50<br />

PB17 552 205 ((4.75+0.80)/2)*1.50<br />

PB19 471 250 ((4.75+0.80)/2)*1.50<br />

PB21 466 250 ((4.75+0.80)/2)*1.50<br />

PB22 793 205 ((4.75+0.80)/2)*1.50<br />

PB23 436 205 ((4.75+0.80)/2)*1.50<br />

4.16 1227.94 49.47 60746.07<br />

4.16 1207.13 49.47 59716.47<br />

4.16 1248.75 49.47 61775.66<br />

2.00 590.00 49.47 29187.30<br />

2.00 590.00 49.47 29187.30<br />

2.00 590.00 49.47 29187.30<br />

2.00 530.00 49.47 26219.10<br />

2.00 520.00 49.47 25724.40<br />

2.00 520.00 49.47 25724.40<br />

2.00 520.00 49.47 25724.40<br />

2.00 530.00 49.47 26219.10<br />

2.00 530.00 49.47 26219.10<br />

4.16 <strong>11</strong>03.06 49.47 54568.50<br />

4.16 <strong>11</strong>03.06 49.47 54568.50<br />

4.16 <strong>11</strong>03.06 49.47 54568.50<br />

4.16 <strong>11</strong>03.06 49.47 54568.50<br />

4.16 8<strong>11</strong>.69 49.47 40154.18<br />

4.16 8<strong>11</strong>.69 49.47 40154.18<br />

4.16 874.13 49.47 43242.96<br />

4.16 894.94 49.47 44272.56<br />

4.16 853.31 49.47 42213.37<br />

4.16 874.13 49.47 43242.96<br />

4.16 853.31 49.47 42213.37<br />

4.16 1040.63 49.47 51479.72<br />

4.16 1040.63 49.47 51479.72<br />

4.16 853.31 49.47 42213.37<br />

4.16 853.31 49.47 42213.37<br />

506 4555.96<br />

498 4478.74<br />

515 4633.17<br />

243 2189.05<br />

243 2189.05<br />

243 2189.05<br />

218 1966.43<br />

214 1929.33<br />

214 1929.33<br />

214 1929.33<br />

218 1966.43<br />

218 1966.43<br />

455 4092.64<br />

455 4092.64<br />

455 4092.64<br />

455 4092.64<br />

335 30<strong>11</strong>.56<br />

335 30<strong>11</strong>.56<br />

360 3243.22<br />

369 3320.44<br />

352 3166.00<br />

360 3243.22<br />

352 3166.00<br />

429 3860.98<br />

429 3860.98<br />

352 3166.00<br />

352 3166.00<br />

251


PB24 414 215 ((3.50+0.50)/2)*1<br />

PB25 800 225 ((3.50+0.50)/2)*1<br />

PB26 813 225 ((3.50+0.50)/2)*1<br />

PB27 287 205 ((4.75+0.80)/2)*1.50<br />

PB28 814 195 ((4.75+0.80)/2)*1.50<br />

PB29 860 195 ((4.75+0.80)/2)*1.50<br />

PB30 820 180 ((4.75+0.80)/2)*1.50<br />

PB31 860 180 ((4.75+0.80)/2)*1.50<br />

PB32 853 180 ((4.75+0.80)/2)*1.50<br />

PB33 848 185 ((4.75+0.80)/2)*1.50<br />

PB34 844 185 ((4.75+0.80)/2)*1.50<br />

PB35 839 180 ((3.50+0.50)/2)*1<br />

PB36 772 180 ((3.50+0.50)/2)*1<br />

PB37 831 180 ((3.50+0.50)/2)*1<br />

PB38 837 200 ((3.50+0.50)/2)*1<br />

PB39 860 200 ((3.50+0.50)/2)*1<br />

PB40 386 200 ((3.50+0.50)/2)*1<br />

PB41 868 205 ((3.50+0.50)/2)*1<br />

PB42 356 190 ((3.50+0.50)/2)*1<br />

PB43 344 190 ((3.50+0.50)/2)*1<br />

PB44 878 195 ((3.50+0.50)/2)*1<br />

PB45 892 180 ((3.50+0.50)/2)*1<br />

PB46 895 190 ((3.50+0.50)/2)*1<br />

PB47 34 185 ((3.50+0.50)/2)*1<br />

PB48 497 195 ((4.75+0.80)/2)*1.50<br />

PB49 331 195 ((4.75+0.80)/2)*1.50<br />

SB1 553 250 ((4.70+0.50)/2)*1.35<br />

2.00 430.00 49.47 21272.10<br />

2.00 450.00 49.47 22261.50<br />

2.00 450.00 49.47 22261.50<br />

4.16 853.31 49.47 42213.37<br />

4.16 8<strong>11</strong>.69 49.47 40154.18<br />

4.16 8<strong>11</strong>.69 49.47 40154.18<br />

4.16 749.25 49.47 37065.40<br />

4.16 749.25 49.47 37065.40<br />

4.16 749.25 49.47 37065.40<br />

4.16 770.06 49.47 38094.99<br />

4.16 770.06 49.47 38094.99<br />

2.00 360.00 49.47 17809.20<br />

2.00 360.00 49.47 17809.20<br />

2.00 360.00 49.47 17809.20<br />

2.00 400.00 49.47 19788.00<br />

2.00 400.00 49.47 19788.00<br />

2.00 400.00 49.47 19788.00<br />

2.00 410.00 49.47 20282.70<br />

2.00 380.00 49.47 18798.60<br />

2.00 380.00 49.47 18798.60<br />

2.00 390.00 49.47 19293.30<br />

2.00 360.00 49.47 17809.20<br />

2.00 380.00 49.47 18798.60<br />

2.00 370.00 49.47 18303.90<br />

4.16 8<strong>11</strong>.69 49.47 40154.18<br />

4.16 8<strong>11</strong>.69 49.47 40154.18<br />

3.51 877.50 49.47 43409.93<br />

177 1595.41<br />

186 1669.61<br />

186 1669.61<br />

352 3166.00<br />

335 30<strong>11</strong>.56<br />

335 30<strong>11</strong>.56<br />

309 2779.90<br />

309 2779.90<br />

309 2779.90<br />

317 2857.12<br />

317 2857.12<br />

148 1335.69<br />

148 1335.69<br />

148 1335.69<br />

165 1484.10<br />

165 1484.10<br />

165 1484.10<br />

169 1521.20<br />

157 1409.90<br />

157 1409.90<br />

161 1447.00<br />

148 1335.69<br />

157 1409.90<br />

153 1372.79<br />

335 30<strong>11</strong>.56<br />

335 30<strong>11</strong>.56<br />

362 3255.74<br />

252


SB2 553 245 ((4.70+0.50)/2)*1.35<br />

SB3 600 205 ((4.70+0.50)/2)*1.35<br />

SB7 508 250 ((4.70+0.50)/2)*1.35<br />

SB8 505 235 ((4.70+0.50)/2)*1.35<br />

SB9 806 235 ((4.70+0.50)/2)*1.35<br />

SB10 505 230 ((4.70+0.50)/2)*1.35<br />

SB<strong>11</strong> 529 230 ((4.70+0.50)/2)*1.35<br />

SB12 533 230 ((4.70+0.50)/2)*1.35<br />

SB13 777 230 ((4.70+0.50)/2)*1.35<br />

SB14 537 230 ((4.70+0.50)/2)*1.35<br />

SB15 568 230 ((4.70+0.50)/2)*1.35<br />

SB16 578 230 ((4.70+0.50)/2)*1.35<br />

SB17 579 230 ((4.70+0.50)/2)*1.35<br />

SB18 585 230 ((4.70+0.50)/2)*1.35<br />

SB22 771 235 ((4.70+0.50)/2)*1.35<br />

SB23 762749 235 ((4.70+0.50)/2)*1.35<br />

SB24 744 245 ((4.70+0.50)/2)*1.35<br />

3.51 859.95 49.47 42541.73<br />

3.51 719.55 49.47 35596.14<br />

3.51 877.50 49.47 43409.93<br />

3.51 824.85 49.47 40805.33<br />

3.51 824.85 49.47 40805.33<br />

3.51 807.30 49.47 39937.13<br />

3.51 807.30 49.47 39937.13<br />

3.51 807.30 49.47 39937.13<br />

3.51 807.30 49.47 39937.13<br />

3.51 807.30 49.47 39937.13<br />

3.51 807.30 49.47 39937.13<br />

3.51 807.30 49.47 39937.13<br />

3.51 807.30 49.47 39937.13<br />

3.51 807.30 49.47 39937.13<br />

3.51 824.85 49.47 40805.33<br />

3.51 824.85 49.47 40805.33<br />

3.51 859.95 49.47 42541.73<br />

355 3190.63<br />

297 2669.71<br />

362 3255.74<br />

340 3060.40<br />

340 3060.40<br />

333 2995.28<br />

333 2995.28<br />

333 2995.28<br />

333 2995.28<br />

333 2995.28<br />

333 2995.28<br />

333 2995.28<br />

333 2995.28<br />

333 2995.28<br />

340 3060.40<br />

340 3060.40<br />

355 3190.63<br />

ECD1 704 95<br />

ECD6 706 80<br />

ECD7 694 80<br />

ECD8 999 80<br />

ECD9 996 80<br />

ECD10 727 85<br />

((12.50+1.3)/2)*2.5 17.25 1638.75 53.80 88164.75<br />

((12.50+1.3)/2)*2.5 17.25 1380.00 53.80 74244.00<br />

((12.50+1.3)/2)*2.5 17.25 1380.00 53.80 74244.00<br />

((12.50+1.3)/2)*2.5 17.25 1380.00 53.80 74244.00<br />

((12.50+1.3)/2)*2.5 17.25 1380.00 53.80 74244.00<br />

((12.50+1.3)/2)*2.5 17.25 1466.25 53.80 78884.25<br />

735 6612.36<br />

619 5568.30<br />

619 5568.30<br />

619 5568.30<br />

619 5568.30<br />

657 5916.32<br />

WHB1 631 <strong>11</strong>0<br />

WHB2 947 <strong>11</strong>0<br />

((12.50+1.3)/2)*2.5 17.25 1897.50 52.30 99239.25<br />

((12.50+1.3)/2)*2.5 17.25 1897.50 52.30 99239.25<br />

827 7442.94<br />

827 7442.94<br />

253


EW<br />

CB 4724.44<br />

MB 21494.19<br />

PB 23929.00<br />

SB 14759.55<br />

ECD 8625.00<br />

WHB 3795.00<br />

Cost<br />

233717.92<br />

1063317.46<br />

<strong>11</strong>83767.63<br />

730154.94<br />

464025.00<br />

198478.50<br />

MWS-TURK LAHCHURA (2C2B1l1g) <strong>IWMP</strong>-<strong>VIII</strong> Dist. <strong>Jhansi</strong><br />

G/P-PASORA<br />

Name of Activity<br />

Khasara<br />

No<br />

Length Width * Height C.S. (Area) Work<br />

measurement<br />

VILL-PASORA<br />

MB1 8466 265 ((3.50+0.50)/2)*1<br />

MB2 332 190 ((4.75+0.80)/2)*1.50<br />

MB3 353 195 ((4.75+0.80)/2)*1.50<br />

MB4 351 195 ((4.75+0.80)/2)*1.50<br />

MB5 348 260 ((3.50+0.50)/2)*1<br />

MB6 384 210 ((3.50+0.50)/2)*1<br />

MB7 388 200 ((3.50+0.50)/2)*1<br />

PB2 215 190 ((3.50+0.50)/2)*1<br />

SB15 268 245 ((4.70+0.50)/2)*1.35<br />

SB16 365 200 ((4.70+0.50)/2)*1.35<br />

SB17 359 235 ((4.70+0.50)/2)*1.35<br />

SB18 238 230 ((4.70+0.50)/2)*1.35<br />

SB19 255 230 ((4.70+0.50)/2)*1.35<br />

Rate<br />

Total Cost<br />

(Rs.)<br />

2.00 530.00 49.47 26219.10<br />

4.16 790.88 49.47 39124.59<br />

4.16 8<strong>11</strong>.69 49.47 40154.18<br />

4.16 8<strong>11</strong>.69 49.47 40154.18<br />

2.00 520.00 49.47 25724.40<br />

2.00 420.00 49.47 20777.40<br />

2.00 400.00 49.47 19788.00<br />

2.00 380.00 49.47 18798.60<br />

3.51 859.95 49.47 42541.73<br />

3.51 702.00 49.47 34727.94<br />

3.51 824.85 49.47 40805.33<br />

3.51 807.30 49.47 39937.13<br />

3.51 807.30 49.47 39937.13<br />

Manday<br />

Contribution<br />

218 1966.43<br />

326 2934.34<br />

335 30<strong>11</strong>.56<br />

335 30<strong>11</strong>.56<br />

214 1929.33<br />

173 1558.31<br />

165 1484.10<br />

157 1409.90<br />

355 3190.63<br />

289 2604.60<br />

340 3060.40<br />

333 2995.28<br />

333 2995.28<br />

254


SB20 246 225 ((4.70+0.50)/2)*1.35<br />

SB21 252 220 ((4.70+0.50)/2)*1.35<br />

SB22 251 210 ((4.70+0.50)/2)*1.35<br />

SB23 300 215 ((4.70+0.50)/2)*1.35<br />

SB24 303 210 ((4.70+0.50)/2)*1.35<br />

SB27 305 210 ((4.70+0.50)/2)*1.35<br />

SB28 307 240 ((4.70+0.50)/2)*1.35<br />

SB29 329 250 ((4.70+0.50)/2)*1.35<br />

SB30 334 250 ((4.70+0.50)/2)*1.35<br />

3.51 789.75 49.47 39068.93<br />

3.51 772.20 49.47 38200.73<br />

3.51 737.10 49.47 36464.34<br />

3.51 754.65 49.47 37332.54<br />

3.51 737.10 49.47 36464.34<br />

3.51 737.10 49.47 36464.34<br />

3.51 842.40 49.47 41673.53<br />

3.51 877.50 49.47 43409.93<br />

3.51 877.50 49.47 43409.93<br />

326 2930.17<br />

318 2865.06<br />

304 2734.83<br />

3<strong>11</strong> 2799.94<br />

304 2734.83<br />

304 2734.83<br />

347 3125.51<br />

362 3255.74<br />

362 3255.74<br />

EW<br />

MB 4284.25<br />

PB 380.00<br />

SB <strong>11</strong>126.70<br />

Cost<br />

2<strong>11</strong>941.85<br />

18798.60<br />

550437.85<br />

G/P-GHADA<br />

VILL-GHADA<br />

CB26 738 190 ((3.50+0.50)/2)*1<br />

CB27 714 185 ((3.50+0.50)/2)*1<br />

CB28 743 210 ((3.50+0.50)/2)*1<br />

CB29 767 210 ((3.50+0.50)/2)*1<br />

CB30 748 185 ((3.50+0.50)/2)*1<br />

2.00 380.00 49.47 18798.60<br />

2.00 370.00 49.47 18303.90<br />

2.00 420.00 49.47 20777.40<br />

2.00 420.00 49.47 20777.40<br />

2.00 370.00 49.47 18303.90<br />

157 1409.90<br />

153 1372.79<br />

173 1558.31<br />

173 1558.31<br />

153 1372.79<br />

CB31 747<br />

CB32 752 180 ((4.75+0.80)/2)*1.50<br />

CB33 792 195 ((4.75+0.80)/2)*1.50<br />

CB34 816 210 ((4.75+0.80)/2)*1.50<br />

4.16 749.25 49.47 37065.40<br />

4.16 8<strong>11</strong>.69 49.47 40154.18<br />

4.16 874.13 49.47 43242.96<br />

309 2779.90<br />

335 30<strong>11</strong>.56<br />

360 3243.22<br />

255


CB35 814 180 ((3.50+0.50)/2)*1<br />

CB36 1823 210 ((4.75+0.80)/2)*1.50<br />

CB37 1827 205 ((4.75+0.80)/2)*1.50<br />

CB38 1833 250 ((4.75+0.80)/2)*1.50<br />

2.00 360.00 49.47 17809.20<br />

4.16 874.13 49.47 43242.96<br />

4.16 853.31 49.47 42213.37<br />

4.16 1040.63 49.47 51479.72<br />

148 1335.69<br />

360 3243.22<br />

352 3166.00<br />

429 3860.98<br />

CD14 796 300<br />

CD30 765 300<br />

CD32 775 285<br />

CD33 778 285<br />

((12.50+1.3)/2)*2.5 17.25 5175.00 53.80 278415.00<br />

((12.50+1.3)/2)*2.5 17.25 5175.00 53.80 278415.00<br />

((12.50+1.3)/2)*2.5 17.25 4916.25 53.80 264494.25<br />

((12.50+1.3)/2)*2.5 17.25 4916.25 53.80 264494.25<br />

2320 20881.13<br />

2320 20881.13<br />

2204 19837.07<br />

2204 19837.07<br />

PB34 780 260 ((4.75+0.80)/2)*1.50<br />

4.16 1082.25 49.47 53538.91<br />

446 4015.42<br />

EW<br />

CB 7523.13<br />

CD 20182.50<br />

PB 1082.25<br />

Cost<br />

372168.99<br />

1085818.50<br />

53538.91<br />

G/P-TURKHLACHUR<br />

VILL-TURKHLACHUR<br />

CB1 648 210 ((4.75+0.80)/2)*1.50<br />

CB2 649 195 ((4.75+0.80)/2)*1.50<br />

CB3 640 180 ((4.75+0.80)/2)*1.50<br />

CB4 623 185 ((4.75+0.80)/2)*1.50<br />

CB5 676 180 ((4.75+0.80)/2)*1.50<br />

CB6 688 185 ((4.75+0.80)/2)*1.50<br />

CB7 632 190 ((4.75+0.80)/2)*1.50<br />

4.16 874.13 49.47 43242.96<br />

4.16 8<strong>11</strong>.69 49.47 40154.18<br />

4.16 749.25 49.47 37065.40<br />

4.16 770.06 49.47 38094.99<br />

4.16 749.25 49.47 37065.40<br />

4.16 770.06 49.47 38094.99<br />

4.16 790.88 49.47 39124.59<br />

360 3243.22<br />

335 30<strong>11</strong>.56<br />

309 2779.90<br />

317 2857.12<br />

309 2779.90<br />

317 2857.12<br />

326 2934.34<br />

256


CB8 662 195 ((3.50+0.50)/2)*1<br />

2.00 390.00 49.47 19293.30<br />

CB9 674 195 ((3.50+0.50)/2)*1<br />

2.00 390.00 49.47 19293.30<br />

CB10 697 195 ((3.50+0.50)/2)*1<br />

2.00 390.00 49.47 19293.30<br />

CB<strong>11</strong> <strong>11</strong>93 195 ((3.50+0.50)/2)*1<br />

2.00 390.00 49.47 19293.30<br />

CB12 705 195 ((3.50+0.50)/2)*1<br />

2.00 390.00 49.47 19293.30<br />

CB13 <strong>11</strong>44 195 ((3.50+0.50)/2)*1<br />

2.00 390.00 49.47 19293.30<br />

CB14 <strong>11</strong>46 200 ((3.50+0.50)/2)*1<br />

2.00 400.00 49.47 19788.00<br />

CB15 <strong>11</strong>52 200 ((3.50+0.50)/2)*1<br />

2.00 400.00 49.47 19788.00<br />

CB16 <strong>11</strong>55 200 ((3.50+0.50)/2)*1<br />

2.00 400.00 49.47 19788.00<br />

CB17 <strong>11</strong>57 205 ((3.50+0.50)/2)*1<br />

2.00 410.00 49.47 20282.70<br />

CB18 1213 205 ((3.50+0.50)/2)*1<br />

2.00 410.00 49.47 20282.70<br />

CB19 1217 180 ((3.50+0.50)/2)*1<br />

2.00 360.00 49.47 17809.20<br />

CB20 1227 180 ((3.50+0.50)/2)*1<br />

2.00 360.00 49.47 17809.20<br />

CB21 1238 185 ((3.50+0.50)/2)*1<br />

2.00 370.00 49.47 18303.90<br />

CB22 1237 185 ((3.50+0.50)/2)*1<br />

2.00 370.00 49.47 18303.90<br />

CB23 1092 195 ((3.50+0.50)/2)*1<br />

2.00 390.00 49.47 19293.30<br />

CB24 1084 185 ((3.50+0.50)/2)*1<br />

2.00 370.00 49.47 18303.90<br />

CB25 1253 205 ((4.75+0.80)/2)*1.50<br />

4.16 853.31 49.47 42213.37<br />

CB39 1326 195 ((4.75+0.80)/2)*1.50<br />

4.16 8<strong>11</strong>.69 49.47 40154.18<br />

CB40 1294 195 ((4.75+0.80)/2)*1.50<br />

4.16 8<strong>11</strong>.69 49.47 40154.18<br />

CD1 565 95<br />

((12.50+1.3)/2)*2.5 17.25 1638.75 53.80 88164.75<br />

CD2 1487 <strong>11</strong>0<br />

((12.50+1.3)/2)*2.5 17.25 1897.50 53.80 102085.50<br />

CD3 1472 <strong>11</strong>0<br />

((12.50+1.3)/2)*2.5 17.25 1897.50 53.80 102085.50<br />

CD4 1507 100<br />

((12.50+1.3)/2)*2.5 17.25 1725.00 53.80 92805.00<br />

CD5 1654 105<br />

((12.50+1.3)/2)*2.5 17.25 18<strong>11</strong>.25 53.80 97445.25<br />

CD6 1424 95<br />

((12.50+1.3)/2)*2.5 17.25 1638.75 53.80 88164.75<br />

CD7 1421 90<br />

((12.50+1.3)/2)*2.5 17.25 1552.50 53.80 83524.50<br />

161 1447.00<br />

161 1447.00<br />

161 1447.00<br />

161 1447.00<br />

161 1447.00<br />

161 1447.00<br />

165 1484.10<br />

165 1484.10<br />

165 1484.10<br />

169 1521.20<br />

169 1521.20<br />

148 1335.69<br />

148 1335.69<br />

153 1372.79<br />

153 1372.79<br />

161 1447.00<br />

153 1372.79<br />

352 3166.00<br />

335 30<strong>11</strong>.56<br />

335 30<strong>11</strong>.56<br />

735 6612.36<br />

851 7656.41<br />

851 7656.41<br />

773 6960.38<br />

812 7308.39<br />

735 6612.36<br />

696 6264.34<br />

257


CD8 <strong>11</strong>37 95<br />

((12.50+1.3)/2)*2.5 17.25 1638.75 53.80 88164.75<br />

CD9 1376 80<br />

((12.50+1.3)/2)*2.5 17.25 1380.00 53.80 74244.00<br />

CD10 1345 80<br />

((12.50+1.3)/2)*2.5 17.25 1380.00 53.80 74244.00<br />

CD<strong>11</strong> 1331 80<br />

((12.50+1.3)/2)*2.5 17.25 1380.00 53.80 74244.00<br />

CD12 1266 85<br />

((12.50+1.3)/2)*2.5 17.25 1466.25 53.80 78884.25<br />

CD13 1698 85<br />

((12.50+1.3)/2)*2.5 17.25 1466.25 53.80 78884.25<br />

CD15 272 85<br />

((12.50+1.3)/2)*2.5 17.25 1466.25 53.80 78884.25<br />

MB8 1504 255 ((4.75+0.80)/2)*1.50<br />

4.16 1061.44 49.47 52509.31<br />

MB9 1381 260 ((3.50+0.50)/2)*1<br />

2.00 520.00 49.47 25724.40<br />

MB10 1351 260 ((3.50+0.50)/2)*1<br />

2.00 520.00 49.47 25724.40<br />

MB<strong>11</strong> 1358 285 ((3.50+0.50)/2)*1<br />

2.00 570.00 49.47 28197.90<br />

MB12 1364 285 ((3.50+0.50)/2)*1<br />

2.00 570.00 49.47 28197.90<br />

MB13 1368 290 ((3.50+0.50)/2)*1<br />

2.00 580.00 49.47 28692.60<br />

MB14 1377 290 ((3.50+0.50)/2)*1<br />

2.00 580.00 49.47 28692.60<br />

MB15 1386 290 ((3.50+0.50)/2)*1<br />

2.00 580.00 49.47 28692.60<br />

MB16 1986 260 ((4.75+0.80)/2)*1.50<br />

4.16 1082.25 49.47 53538.91<br />

MB17 1983 260 ((4.75+0.80)/2)*1.50<br />

4.16 1082.25 49.47 53538.91<br />

MB18 1379 265 ((4.75+0.80)/2)*1.50<br />

4.16 <strong>11</strong>03.06 49.47 54568.50<br />

MB19 1402 265 ((4.75+0.80)/2)*1.50<br />

4.16 <strong>11</strong>03.06 49.47 54568.50<br />

MB20 1399 285 ((4.75+0.80)/2)*1.50<br />

4.16 <strong>11</strong>86.31 49.47 58686.88<br />

MB21 1413 290 ((4.75+0.80)/2)*1.50<br />

4.16 1207.13 49.47 59716.47<br />

MB22 1450 295 ((4.75+0.80)/2)*1.50<br />

4.16 1227.94 49.47 60746.07<br />

MB23 1443 290 ((3.50+0.50)/2)*1<br />

2.00 580.00 49.47 28692.60<br />

MB24 1439 290 ((3.50+0.50)/2)*1<br />

2.00 580.00 49.47 28692.60<br />

MB25 565 285 ((3.50+0.50)/2)*1<br />

2.00 570.00 49.47 28197.90<br />

MB26 542 285 ((3.50+0.50)/2)*1<br />

2.00 570.00 49.47 28197.90<br />

MB27 539 280 ((3.50+0.50)/2)*1<br />

2.00 560.00 49.47 27703.20<br />

735 6612.36<br />

619 5568.30<br />

619 5568.30<br />

619 5568.30<br />

657 5916.32<br />

657 5916.32<br />

657 5916.32<br />

438 3938.20<br />

214 1929.33<br />

214 1929.33<br />

235 2<strong>11</strong>4.84<br />

235 2<strong>11</strong>4.84<br />

239 2151.95<br />

239 2151.95<br />

239 2151.95<br />

446 4015.42<br />

446 4015.42<br />

455 4092.64<br />

455 4092.64<br />

489 4401.52<br />

498 4478.74<br />

506 4555.96<br />

239 2151.95<br />

239 2151.95<br />

235 2<strong>11</strong>4.84<br />

235 2<strong>11</strong>4.84<br />

231 2077.74<br />

258


MB28 537 300 ((3.50+0.50)/2)*1<br />

2.00 600.00 49.47 29682.00<br />

247 2226.15<br />

ECD1 1549 100<br />

ECD2 1304 85<br />

ECD3 1284 95<br />

ECD4 1282 95<br />

ECD5 1721 80<br />

ECD6 1732 80<br />

ECD7 1735 100<br />

ECD8 1713 100<br />

ECD9 1738 <strong>11</strong>0<br />

ECD10 1583 95<br />

ECD<strong>11</strong> 1690 85<br />

ECD12 1530 80<br />

((12.50+1.3)/2)*2.5 17.25 1725.00 53.80 92805.00<br />

((12.50+1.3)/2)*2.5 17.25 1466.25 53.80 78884.25<br />

((12.50+1.3)/2)*2.5 17.25 1638.75 53.80 88164.75<br />

((12.50+1.3)/2)*2.5 17.25 1638.75 53.80 88164.75<br />

((12.50+1.3)/2)*2.5 17.25 1380.00 53.80 74244.00<br />

((12.50+1.3)/2)*2.5 17.25 1380.00 53.80 74244.00<br />

((12.50+1.3)/2)*2.5 17.25 1725.00 53.80 92805.00<br />

((12.50+1.3)/2)*2.5 17.25 1725.00 53.80 92805.00<br />

((12.50+1.3)/2)*2.5 17.25 1897.50 53.80 102085.50<br />

((12.50+1.3)/2)*2.5 17.25 1638.75 53.80 88164.75<br />

((12.50+1.3)/2)*2.5 17.25 1466.25 53.80 78884.25<br />

((12.50+1.3)/2)*2.5 17.25 1380.00 53.80 74244.00<br />

773 6960.38<br />

657 5916.32<br />

735 6612.36<br />

735 6612.36<br />

619 5568.30<br />

619 5568.30<br />

773 6960.38<br />

773 6960.38<br />

851 7656.41<br />

735 6612.36<br />

657 5916.32<br />

619 5568.30<br />

PB1 533 90 ((3.50+0.50)/2)*1<br />

PB3 567 95 ((3.50+0.50)/2)*1<br />

PB4 1481 <strong>11</strong>0 ((3.50+0.50)/2)*1<br />

PB5 574 185 ((4.75+0.80)/2)*1.50<br />

PB6 1496 185 ((4.75+0.80)/2)*1.50<br />

PB7 1494 190 ((4.75+0.80)/2)*1.50<br />

PB8 1466 210 ((4.75+0.80)/2)*1.50<br />

PB9 1643 210 ((4.75+0.80)/2)*1.50<br />

PB10 1630 210 ((4.75+0.80)/2)*1.50<br />

PB<strong>11</strong> 1656 200 ((4.75+0.80)/2)*1.50<br />

PB12 1619 200 ((4.75+0.80)/2)*1.50<br />

PB13 1432 200 ((4.75+0.80)/2)*1.50<br />

2.00 180.00 49.47 8904.60<br />

2.00 190.00 49.47 9399.30<br />

2.00 220.00 49.47 10883.40<br />

4.16 770.06 49.47 38094.99<br />

4.16 770.06 49.47 38094.99<br />

4.16 790.88 49.47 39124.59<br />

4.16 874.13 49.47 43242.96<br />

4.16 874.13 49.47 43242.96<br />

4.16 874.13 49.47 43242.96<br />

4.16 832.50 49.47 4<strong>11</strong>83.78<br />

4.16 832.50 49.47 4<strong>11</strong>83.78<br />

4.16 832.50 49.47 4<strong>11</strong>83.78<br />

74 667.85<br />

78 704.95<br />

91 816.26<br />

317 2857.12<br />

317 2857.12<br />

326 2934.34<br />

360 3243.22<br />

360 3243.22<br />

360 3243.22<br />

343 3088.78<br />

343 3088.78<br />

343 3088.78<br />

259


PB14 613 195 ((4.75+0.80)/2)*1.50<br />

PB15 633 185 ((4.75+0.80)/2)*1.50<br />

PB16 1447 185 ((4.75+0.80)/2)*1.50<br />

PB17 668 180 ((4.75+0.80)/2)*1.50<br />

PB18 1407 190 ((4.75+0.80)/2)*1.50<br />

PB19 1403 190 ((4.75+0.80)/2)*1.50<br />

PB20 <strong>11</strong>7 200 ((4.75+0.80)/2)*1.50<br />

PB21 <strong>11</strong>88 210 ((4.75+0.80)/2)*1.50<br />

PB22 1370 210 ((4.75+0.80)/2)*1.50<br />

PB23 1346 190 ((4.75+0.80)/2)*1.50<br />

PB24 1220 195 ((3.50+0.50)/2)*1<br />

PB25 1337 195 ((3.50+0.50)/2)*1<br />

PB27 1247 210 ((3.50+0.50)/2)*1<br />

PB28 262 185 ((3.50+0.50)/2)*1<br />

PB29 1269 180 ((3.50+0.50)/2)*1<br />

PB30 763 195 ((3.50+0.50)/2)*1<br />

PB31 1280 210 ((3.50+0.50)/2)*1<br />

4.16 8<strong>11</strong>.69 49.47 40154.18<br />

4.16 770.06 49.47 38094.99<br />

4.16 770.06 49.47 38094.99<br />

4.16 749.25 49.47 37065.40<br />

4.16 790.88 49.47 39124.59<br />

4.16 790.88 49.47 39124.59<br />

4.16 832.50 49.47 4<strong>11</strong>83.78<br />

4.16 874.13 49.47 43242.96<br />

4.16 874.13 49.47 43242.96<br />

4.16 790.88 49.47 39124.59<br />

2.00 390.00 49.47 19293.30<br />

2.00 390.00 49.47 19293.30<br />

2.00 420.00 49.47 20777.40<br />

2.00 370.00 49.47 18303.90<br />

2.00 360.00 49.47 17809.20<br />

2.00 390.00 49.47 19293.30<br />

2.00 420.00 49.47 20777.40<br />

335 30<strong>11</strong>.56<br />

317 2857.12<br />

317 2857.12<br />

309 2779.90<br />

326 2934.34<br />

326 2934.34<br />

343 3088.78<br />

360 3243.22<br />

360 3243.22<br />

326 2934.34<br />

161 1447.00<br />

161 1447.00<br />

173 1558.31<br />

153 1372.79<br />

148 1335.69<br />

161 1447.00<br />

173 1558.31<br />

SB1 505 210 ((4.70+0.50)/2)*1.35<br />

SB2 504 205 ((4.70+0.50)/2)*1.35<br />

SB3 518 205 ((4.70+0.50)/2)*1.35<br />

SB4 592 205 ((4.70+0.50)/2)*1.35<br />

SB5 587 205 ((4.70+0.50)/2)*1.35<br />

SB6 585 235 ((4.70+0.50)/2)*1.35<br />

SB7 1434 235 ((4.70+0.50)/2)*1.35<br />

SB8 1437 235 ((4.70+0.50)/2)*1.35<br />

SB9 510 230 ((4.70+0.50)/2)*1.35<br />

3.51 737.10 49.47 36464.34<br />

3.51 719.55 49.47 35596.14<br />

3.51 719.55 49.47 35596.14<br />

3.51 719.55 49.47 35596.14<br />

3.51 719.55 49.47 35596.14<br />

3.51 824.85 49.47 40805.33<br />

3.51 824.85 49.47 40805.33<br />

3.51 824.85 49.47 40805.33<br />

3.51 807.30 49.47 39937.13<br />

304 2734.83<br />

297 2669.71<br />

297 2669.71<br />

297 2669.71<br />

297 2669.71<br />

340 3060.40<br />

340 3060.40<br />

340 3060.40<br />

333 2995.28<br />

260


SB10 503 230 ((4.70+0.50)/2)*1.35<br />

SB<strong>11</strong> 502 245 ((4.70+0.50)/2)*1.35<br />

SB12 494 245 ((4.70+0.50)/2)*1.35<br />

SB13 497 240 ((4.70+0.50)/2)*1.35<br />

SB14 528 235 ((4.70+0.50)/2)*1.35<br />

SB25 1486 235 ((4.70+0.50)/2)*1.35<br />

SB26 1490 235 ((4.70+0.50)/2)*1.35<br />

3.51 807.30 49.47 39937.13<br />

3.51 859.95 49.47 42541.73<br />

3.51 859.95 49.47 42541.73<br />

3.51 842.40 49.47 41673.53<br />

3.51 824.85 49.47 40805.33<br />

3.51 824.85 49.47 40805.33<br />

3.51 824.85 49.47 40805.33<br />

333 2995.28<br />

355 3190.63<br />

355 3190.63<br />

347 3125.51<br />

340 3060.40<br />

340 3060.40<br />

340 3060.40<br />

WHB1 1042 <strong>11</strong>0<br />

WHB2 1698 85<br />

WHB3 1523 95<br />

WHB4 1989 90<br />

WHB5 960 90<br />

WHB6 1500 90<br />

((12.50+1.3)/2)*2.5 17.25 1897.50 52.30 99239.25<br />

((12.50+1.3)/2)*2.5 17.25 1466.25 52.30 76684.88<br />

((12.50+1.3)/2)*2.5 17.25 1638.75 52.30 85706.63<br />

((12.50+1.3)/2)*2.5 17.25 1552.50 52.30 8<strong>11</strong>95.75<br />

((12.50+1.3)/2)*2.5 17.25 1552.50 52.30 8<strong>11</strong>95.75<br />

((12.50+1.3)/2)*2.5 17.25 1552.50 52.30 8<strong>11</strong>95.75<br />

827 7442.94<br />

639 5751.37<br />

714 6428.00<br />

677 6089.68<br />

677 6089.68<br />

677 6089.68<br />

EW<br />

CB 14572.00<br />

CD 22338.75<br />

MB 16433.44<br />

ECD 19061.25<br />

PB 18835.31<br />

SB 12741.30<br />

WHB 9660.00<br />

Cost<br />

720876.84<br />

1201824.75<br />

812962.15<br />

1025495.25<br />

931782.91<br />

630312.<strong>11</strong><br />

505218.00<br />

261


ANNEXURE-II<br />

LIVELIHOOD ACTION PLAN<br />

1. Annaual Action Plan for Livelihood (Physical & Financial)<br />

Activities of SHGs<br />

(1) Activity Goatary<br />

(a) No. of SHG’s<br />

(b) No. of members<br />

(c) Estimated income per year<br />

(2) Activity- Back Yard Poultry<br />

(a) No. of SHG’s<br />

(b) No. of members<br />

(c) Estimated income per year<br />

(3) Activity- Poultry , Broiler<br />

(a) No. of SHG’s<br />

(b) No. of members<br />

(c) Estimated income per year<br />

(4) Black Smithy<br />

(a) No. of SHG’s<br />

(b) No. of members<br />

(c) Estimated income per year<br />

(5) Rope making<br />

(a) No. of SHG’s<br />

(b) No. of members<br />

(c) Estimated income per year<br />

First <strong>Year</strong> Second <strong>Year</strong> Third <strong>Year</strong> Fourth <strong>Year</strong><br />

unit <strong>2010</strong>-<strong>11</strong> 20<strong>11</strong>-12 2012-13 2013-14 Total Project<br />

Physical Financial Physical Financial Physical Financial Physical Financial Physical Financial<br />

No. 7 1.632 14 3.26 14 3.26 0 0 34 8.160<br />

No. 68 136 136 0 0 340<br />

Rs. 8.16 16.3 16.3 0 0 40.8<br />

0 0<br />

No. 4 1.056 9 2.<strong>11</strong> 9 2.<strong>11</strong> 0 0 22 5.280<br />

No. 44 88 88 0 0 220<br />

Rs. 2.499 4.998 4.998 0 0 12.496<br />

0 0<br />

No. 4 0.956 8 1.91 8 1.91 0 0 20 4.780<br />

No. 40 80 80 0 0 200<br />

Rs. 3.760 7.520 7.520 0 0 18.800<br />

0 0<br />

No. 4 0.906 8 1.81 8 1.81 0 0 19 4.530<br />

No. 38 76 76 0 0 0 190<br />

Rs. 3.724 0 7.448 0 7.448 0 0 0 18.62<br />

0 0<br />

No. 4 0.908 8 1.82 8 1.82 0 0 19 4.540<br />

No. 38 76 76 0 0 0 190 0<br />

Rs. 3.724 0 7.448 0 7.448 0 0 0 18.62<br />

262


(6) Tailoring<br />

(a) No. of SHG’s<br />

(b) No. of members<br />

(c) Estimated income per year<br />

(7) Implements repair<br />

(a) No. of SHG’s<br />

(b) No. of members<br />

(c) Estimated income per year<br />

(8) Vermi Composting<br />

(a) No. of SHG’s<br />

(b) No. of members<br />

(c) Estimated income per year<br />

(9) Fruit processing<br />

(a) No. of SHG’s<br />

(b) No. of members<br />

(c) Estimated income per year<br />

(10) Mini Dal Mill<br />

(a) No. of SHG’s<br />

(b) No. of members<br />

(c) Estimated income per year<br />

(<strong>11</strong>) Mini Flour Mill<br />

(a) No. of SHG’s<br />

(b) No. of members<br />

(c) Estimated income per year<br />

(12) Mini Oil Expeller<br />

(a) No. of SHG’s<br />

0 0<br />

No. 4 0.912 8 1.82 8 1.82 0 0 19 4.560<br />

No. 38 76 76 0 0 0 190<br />

Rs. 3.724 0 7.448 0 7.448 0 0 0 18.62<br />

0 0<br />

No. 3 0.498 7 1.00 7 1.00 0 0 17 2.490<br />

No. 3 0 7 0 7 0 0 0 17<br />

Rs. 3.332 0 6.664 0 6.664 0 0 0 16.66<br />

0 0<br />

No. 4 0.858 7 1.72 7 1.72 0 0 18 4.29<br />

No. 36 72 72 0 0 180<br />

Rs. 3.528 0.000 7.056 0.000 7.056 0.000 0 0 17.640<br />

0 0<br />

No. 4 0.912 8 1.82 8 1.82 0 0 19 4.560<br />

No. 38 76 76 0 0 0 190<br />

Rs. 3.724 0 7.448 0 7.448 0 0 0 18.62<br />

0 0<br />

No. 4 0.958 8 1.92 8 1.92 0 0 20 4.790<br />

No. 40 80 80 0 0 0 200<br />

Rs. 3.92 0 7.84 0 7.84 0 0 0 19.6<br />

0 0<br />

No. 3 0.770 6 1.54 6 1.54 0 0 16 3.850<br />

No. 32 64 64 0 0 0 160<br />

Rs. 3.136 0 6.272 0 6.272 0 0 0 15.68<br />

0 0<br />

No. 4 0.912 8 1.82 8 1.82 0 0 19 4.560<br />

263


(b)<br />

(c)<br />

No. of members<br />

Estimated income per year<br />

(13) Carpentry<br />

(a)<br />

(b)<br />

(c)<br />

Total<br />

No. of SHG’s<br />

No. of members<br />

Estimated income per year<br />

No. 38 76 76 0 0 0 190<br />

Rs. 3.724 0 7.448 0 7.448 0 0 0 18.62<br />

0 0<br />

No. 3 0.818 7 1.64 7 1.64 0 0 17 4.090<br />

No. 34 68 68 0 0 0 170<br />

Rs. 3.332 0 6.664 0 6.664 0 0 0 16.66<br />

2. Livelihood Option for Village Groups / Community<br />

Input supplied to Interested Groups/ SHGs<br />

Sr. No. Name of Activity * Name of input Quantity/ Rate No of IG /<br />

SHGs<br />

0 0 60.48<br />

Total Amount (Rs)<br />

1 Organic complex Red worms (Eisinia fetida) 2 q<br />

25000<br />

4<br />

100000.00<br />

NADEP<br />

10 Nos<br />

5000<br />

(40 FF)<br />

2 Goat kids Kids 40 Nos 1200 2 (20 FF) 48000.00<br />

Adult 02 2500 5000.00<br />

3 Goat rearing Female 10 Nos 3000 1 (10 FF) 30000.00<br />

Adult 01 3000 3000.00<br />

4 Motor / Diesel repairing Tool Kit All tools 25000 1 25000.00<br />

5 Masala Grinding Pulvelizer 02 37000 2 (20 FF) 74000.00<br />

6 Oil Expeller Oil Expeller 01 84000 1 (10 FF) 84000.00<br />

7 Poultry (Broiler) Chicks 1000 25 per chicks 1 (10 FF) 25000.00<br />

8 Wooden furniture Instruments 01 61000 1 (10 FF) 61000.00<br />

9 Mini Dal Mill Machine 01 42000 1 (10 FF) 42000.00<br />

10 Dairy Buffaloes / Cows 10 25000 1 (10 FF) 250000.00<br />

<strong>11</strong> Back yard Poultry Chicks 2000 18 2 (20 FF) 36000.00<br />

12 Linseed rope making Rope making machine 01 35000 1 (10 FF) 35000.00<br />

13 Organic production Registration 100 ha 6000 5 120000.00<br />

14 Tailoring Sieving Machine 5 in 01 SHG 25000 2 25000.00<br />

Note: Maximum Seed Money will be Rs 25000/- for one SHG / Individual. Repayment limit up to 18 months.<br />

264


ANNEXURE-III<br />

1. Annaual Action Plan for Agriculture Production System & Micro Enterprises (Physical & Financial)<br />

Physical & Financial<br />

Outlay/ Target Financial <strong>2010</strong>-<strong>11</strong> 20<strong>11</strong>-12 2012-13 2013-14 Total<br />

(1) Agriculture<br />

Physical Financial Physical Financial Physical Financial Physical Financial Physical Financial<br />

(a)<br />

Crop demonstration<br />

(1) No. of dem.<br />

(2) Area<br />

(b)<br />

Seed Production<br />

(1) No. of dem.<br />

(2) Area<br />

(2) Agro-forestry / Agri-<br />

Horticulture<br />

(a)<br />

(b)<br />

Area<br />

No. of Plants<br />

(3) Afforestation<br />

(a) Scattered Plantation<br />

(4) Animal husbandry<br />

No. 66 2.583 132 5.166 132 5.166 329 12.915<br />

Ha. 33 65.8 2<strong>11</strong>.2<br />

No. 34 1.773 68 3.546 68 3.546 171 8.865<br />

Ha. 17.1 34.2 34.2 184<br />

Ha. 25 2.996 50 5.993 50 5.993 124 14.982<br />

No.<br />

No. 7494 1.724 14988 3.448 14988 3.448 37470 8.620<br />

No 4640 1.016 9280 2.032 9280 2.032 23200 5.080<br />

(a)<br />

(b)<br />

Green fodder (ha)<br />

Rearing of milch cattle<br />

7 0.600 15 0.900 7 0.900 7 0.600 37 3.000<br />

(i) Cow<br />

(ii) Buffalows<br />

(c) Goatary<br />

(d) Broiler/Layer<br />

(e) Fisheries<br />

No. of unit/<br />

farmer no. 186 0.056 372 0.084 186 0.084 186 0.056 929 0.280<br />

No. of unit 2 0.264 4 0.396 2 0.396 2 0.264 <strong>11</strong> 1.320<br />

,, 437 0.035 874 0.052 437 0.052 437 0.035 2185 0.175<br />

,, 12 0.744 25 1.<strong>11</strong>6 12 1.<strong>11</strong>6 12 0.744 62 3.720<br />

6000 0.090 12000 0.135 6000 0.135 6000 0.090 30000 0.450<br />

265


(f) Dairy<br />

3367 0.842 6734 1.263 3367 1.263 3367 0.842 16836 4.209<br />

(g) Health camps<br />

No. 2712 0.136 5424 0.203 2712 0.203 2712 0.136 13560 0.678<br />

(h) Artificial insemination No. of<br />

animals 375 0.150 750 0.225 375 0.225 375 0.150 1875 0.750<br />

(i) Natural service bull<br />

No. 2 0.432 4 0.648 2 0.648 2 0.432 9 2.160<br />

(5) Micro Interprises 0.000 0.000<br />

(a)<br />

(b)<br />

(c)<br />

No. of units<br />

No. of beneficiaries<br />

Income per year<br />

No. 0 0 4 6.87 0 0 0 0.000 0 0.000<br />

No. 25<br />

Rs. 2.5 67.20<br />

2. ESTIMATES OF DIFFERENT PARTICIPATORY CROP TRIALS<br />

Estimates of different Participatory crop trials<br />

Pulses Rabi ICM Lentil<br />

Area of Demonstration - 0.50 ha<br />

Detail of Demonstration Intervention / Technology Adopted Organisations for obtaining Seed<br />

1. Name of Varieties<br />

Narendra Masoor-1, DPL-15, L-4076, Pusa Vaibhav C. S. A. Unversity of Ag. & Technology,<br />

Late- IPL-81, K-75<br />

Kanpur, Indian Institute of Pulse Research,<br />

2. Sowing Time IInd week of October<br />

Kalyanpur Kanpur. IARI, Pusa New Delhi<br />

Rate(Rs/kg/<br />

Pkt)<br />

Cost per<br />

ha (Rs)<br />

Demonstration<br />

Cost (Rs)<br />

3. Required Seed 50 kg / ha (F1,F2, Certified) 80 4000 2000.00<br />

Pendimethalin 3.3 li/ha 465 1535 767.25<br />

(Pre emergence)<br />

7. Use Weedicide<br />

<strong>11</strong>. Bio Fertilizers/Bio-agents<br />

i) Azatobactor + PSB -<br />

ii) Rhizobium + PSB 5 Pkt + 5 Pkt = 10 Pkt @ Rs 7.5 75 37.50<br />

iii) Trichoderma 1.50 kg /ha (Soil treatment) 136 204 102.00<br />

12. Recommended dose of fertilizers<br />

25:60:30 NPK<br />

i) DAP* 130 kg 15 1950 975.00<br />

ii) SSP* 375 kg 8 3000 1500.00<br />

iii) Urea In case of SSP 54 kg Urea applied 6 324 162.00<br />

266


iv) MOP 50 kg 7 350 175.00<br />

* Either one 40 kg /ha Sulphur added if SSP used<br />

13. IPM<br />

Spray of Neem Seed Kernal 10 30 300 150.00<br />

15 lit/kg Gobar+Neemleaf+water+Desi cow urine+2 kg 2 124 62.00<br />

Mataka Khad<br />

Insecticides/Fungicides<br />

Molasis mix & Deco<br />

If required One Dusting of Methyle Paratheon powder<br />

25 kg / ha 25 625 312.50<br />

Total (Less SSP) 4743.25<br />

Integrated Crop Management<br />

Chickpea<br />

Area of Demonstration - 0.50 ha<br />

Detail of Demonstration Intervention / Technology Adopted Organisations for obtaining Seed<br />

1. Name of Varieties<br />

KGD-<strong>11</strong>68, KWR-108, Pusa-256, Pusa-367<br />

C. S. A. Unversity of Ag. & Technology,<br />

Late- Udai<br />

Kanpur, Indian Institute of Pulse Research,<br />

1st week of October<br />

Kalyanpur Kanpur. IARI, Pusa New Delhi<br />

2. Sowing Time<br />

Rate(Rs/kg/<br />

Pkt)<br />

Cost per<br />

ha (Rs)<br />

3. Required Seed 80 kg / ha (F1,F2, Certified) 65 5200 2600.00<br />

Pendimethalin 3.3 li/ha 465 1535 767.25<br />

7. Use Weedicide<br />

(Pre emergence)<br />

Demonstration<br />

Cost (Rs)<br />

<strong>11</strong>. Bio Fertilizers/Bio-agents<br />

i) Azatobactor + PSB -<br />

ii) Rhizobium + PSB 5 Pkt + 5 Pkt = 10 Pkt @ Rs 7.5 75 37.50<br />

iii) Trichoderma 1.50 kg /ha (Soil treatment) 136 204 102.00<br />

12. Recommended dose of fertilizers<br />

25:60:30 NPK<br />

i) DAP* 130 kg 15 1950 975.00<br />

ii) SSP* 375 kg 8 3000 1500.00<br />

iii) Urea In case of SSP 54 kg Urea applied 6 324 162.00<br />

iv) MOP 50 kg 7 350 175.00<br />

* Either one 40 kg /ha Sulphur added if SSP used<br />

13. IPM<br />

Spray of Neem Seed Kernal 10 30 300 150.00<br />

267


15 lit/kg Gobar+Neemleaf+water+Desi cow urine+2 kg 2 124 62.00<br />

Mataka Khad<br />

Molasis mix & Deco<br />

NPV 250 LE /ha at the time pod formation 200 200 100.00<br />

Insecticides/Fungicides<br />

If required One Dusting of Methyle Paratheon powder<br />

25 kg / ha 25 625 312.50<br />

Total (Less SSP) 5443.25<br />

Integrated Crop Management<br />

Field Pea<br />

Area of Demonstration - 0.50 ha<br />

Detail of Demonstration Intervention / Technology Adopted Organisations for obtaining Seed<br />

1. Name of Varieties<br />

KMPR-400, KPMR-522, Rachna, Shikha<br />

C. S. A. Unversity of Ag. & Technology,<br />

Kanpur, Indian Institute of Pulse Research,<br />

IInd week of October<br />

Kalyanpur Kanpur. IARI, Pusa New Delhi<br />

2. Sowing Time<br />

Rate(Rs/kg/<br />

Pkt)<br />

Cost per<br />

ha (Rs)<br />

Demonstration<br />

Cost (Rs)<br />

3. Required Seed 100 kg / ha (F1,F2, Certified) 60 6000 3000.00<br />

Pendimethalin 3.3 li/ha 465 1535 767.25<br />

7. Use Weedicide<br />

(Pre emergence)<br />

<strong>11</strong>. Bio Fertilizers/Bio-agents<br />

i) Azatobactor + PSB -<br />

ii) Rhizobium + PSB 5 Pkt + 5 Pkt = 10 Pkt @ Rs 7.5 75 37.50<br />

iii) Trichoderma 1.50 kg /ha (Soil treatment) 136 204 102.00<br />

12. Recommended dose of fertilizers<br />

25:60:30 NPK<br />

i) DAP* 130 kg 15 1950 975.00<br />

ii) SSP* 375 kg 8 3000 1500.00<br />

iii) Urea In case of SSP 54 kg Urea applied 6 324 162.00<br />

iv) MOP 50 kg 7 350 175.00<br />

* Either one 40 kg /ha Sulphur added if SSP used<br />

13. IPM<br />

Spray of Neem Seed Kernal 10 30 300 150.00<br />

268


15 lit/kg Gobar+Neemleaf+water+Desi cow urine+2 kg 2 124 62.00<br />

Mataka Khad<br />

Molasis mix & Deco<br />

Insecticides/Fungicides<br />

If required One Dusting of Methyle Paratheon powder<br />

25 kg / ha 25 625 312.50<br />

Total (Less SSP) 5743.25<br />

Integrated Crop Management<br />

Urd<br />

Area of Demonstration - 0.50 ha<br />

Detail of Demonstration Intervention / Technology Adopted Organisations for obtaining Seed<br />

1. Name of Varieties<br />

Shekhar-2, Azad-1, PU-35, Narendra Urd-1<br />

C. S. A. Unversity of Ag. & Technology,<br />

Kanpur, Indian Institute of Pulse Research,<br />

2. Sowing Time Last week of July<br />

Kalyanpur Kanpur. IARI, Pusa New Delhi<br />

Rate(Rs/kg/<br />

Pkt)<br />

Cost per<br />

ha (Rs)<br />

Demonstration<br />

Cost (Rs)<br />

3. Required Seed 16 kg / ha (F1,F2, Certified) 100 1600 800.00<br />

Pendimethalin 3.3 li/ha 465 1535 767.25<br />

7. Use Weedicide<br />

(Pre emergence)<br />

<strong>11</strong>. Bio Fertilizers/Bio-agents<br />

i) Azatobactor + PSB -<br />

ii) Rhizobium + PSB 5 Pkt + 5 Pkt = 10 Pkt @ Rs 7.5 75 37.50<br />

iii) Trichoderma 1.50 kg /ha (Soil treatment) 136 204 102.00<br />

12. Recommended dose of fertilizers<br />

25:60:30 NPK<br />

i) DAP* 130 kg 15 1950 975.00<br />

ii) SSP* 375 kg 8 3000 1500.00<br />

iii) Urea In case of SSP 54 kg Urea applied 6 324 162.00<br />

iv) MOP 50 kg 7 350 175.00<br />

* Either one 40 kg /ha Sulphur added if SSP used<br />

13. IPM<br />

Spray of Neem Seed Kernal 10 30 300 150.00<br />

Mataka Khad<br />

15 lit/kg Gobar+Neemleaf+water+Desi cow urine+2 kg<br />

Molasis mix & Deco<br />

2 124 62.00<br />

269


Insecticides/Fungicides<br />

If required One Dusting of Methyle Paratheon powder<br />

25 kg / ha 25 625 312.50<br />

Total (Less SSP) 3543.25<br />

Integrated Crop Management<br />

Moong<br />

Area of Demonstration - 0.50 ha<br />

Detail of Demonstration Intervention / Technology Adopted Organisations for obtaining Seed<br />

C. S. A. Unversity of Ag. & Technology,<br />

1. Name of Varieties T.M-9937, Meha, Pant Moong-1,2<br />

Kanpur, Indian Institute of Pulse Research,<br />

Late- Type-44, Samrat<br />

Kalyanpur Kanpur. IARI, Pusa New Delhi<br />

Last week of June<br />

2. Sowing Time<br />

Rate(Rs/kg/<br />

Pkt)<br />

Cost per<br />

ha (Rs)<br />

Demonstration<br />

Cost (Rs)<br />

3. Required Seed 16 kg / ha (F1,F2, Certified) 100 1600 800.00<br />

Pendimethalin 3.3 li/ha 465 1535 767.25<br />

7. Use Weedicide<br />

(Pre emergence)<br />

<strong>11</strong>. Bio Fertilizers/Bio-agents<br />

i) Azatobactor + PSB -<br />

ii) Rhizobium + PSB 5 Pkt + 5 Pkt = 10 Pkt @ Rs 7.5 75 37.50<br />

iii) Trichoderma 1.50 kg /ha (Soil treatment) 136 204 102.00<br />

12. Recommended dose of fertilizers<br />

25:60:30 NPK<br />

i) DAP* 130 kg 15 1950 975.00<br />

ii) SSP* 375 kg 8 3000 1500.00<br />

iii) Urea In case of SSP 54 kg Urea applied 6 324 162.00<br />

iv) MOP 50 kg 7 350 175.00<br />

* Either one 40 kg /ha Sulphur added if SSP used<br />

13. IPM<br />

Spray of Neem Seed Kernal 10 30 300 150.00<br />

270


15 lit/kg Gobar+Neemleaf+water+Desi cow urine+2 kg 2 124 62.00<br />

Mataka Khad<br />

Molasis mix & Deco<br />

NPV 250 LE /ha at the time pod formation 200 200 100.00<br />

Insecticides/Fungicides<br />

If required One Dusting of Methyle Paratheon powder<br />

25 kg / ha 25 625 312.50<br />

Total (Less SSP) 3643.25<br />

Integrated Crop Management<br />

Arhar<br />

Area of Demonstration - 0.50 ha<br />

Detail of Demonstration Intervention / Technology Adopted Organisations for obtaining Seed<br />

1. Name of Varieties<br />

Paras, UPAS-120, Type-21, Pusa-992 (Wilt rest.)<br />

C. S. A. Unversity of Ag. & Technology,<br />

Late- Bahar, Narendra Arhar-1, Azad<br />

Kanpur, Indian Institute of Pulse Research,<br />

Kalyanpur Kanpur. IARI, Pusa New Delhi<br />

Late- Month July<br />

Early Last Week of June<br />

2. Sowing Time<br />

Rate(Rs/kg/ Cost per<br />

Pkt) ha (Rs)<br />

3. Required Seed 20 kg / ha (F1,F2, Certified) 120 2400 1200.00<br />

- - - -<br />

7. Use Weedicide<br />

Demonstration<br />

Cost (Rs)<br />

<strong>11</strong>. Bio Fertilizers/Bio-agents<br />

i) Azatobactor + PSB -<br />

ii) Rhizobium + PSB 5 Pkt + 5 Pkt = 10 Pkt @ Rs 7.5 75 37.50<br />

iii) Trichoderma 1.50 kg /ha (Soil treatment) 136 204 102.00<br />

12. Recommended dose of fertilizers<br />

15:45:20 NPK<br />

i) DAP* 100 kg 15 1500 750.00<br />

ii) SSP* 250 kg 8 2000 1000.00<br />

iii) Urea In case of SSP 54 kg Urea applied 6 324 162.00<br />

iv) MOP 50 kg 7 350 175.00<br />

271


* Either one 30 kg /ha Sulphur added if SSP used<br />

13. IPM<br />

Spray of Neem Seed Kernal 10 30 300 150.00<br />

15 lit/kg Gobar+Neemleaf+water+Desi cow urine+2 kg 2 124 62.00<br />

Mataka Khad<br />

Molasis mix & Deco<br />

Insecticides/Fungicides<br />

If required One Dusting of Methyle Paratheon powder<br />

25 kg / ha 25 625 312.50<br />

Total 2951.00<br />

Integrated Crop Management<br />

Linseed<br />

Area of Demonstration - 0.50 ha<br />

Detail of Demonstration Intervention / Technology Adopted Organisations for obtaining Seed<br />

1. Name of Varieties<br />

Sweta, Subhra, Garima, Shekhar, Parwati<br />

C. S. A. Unversity of Ag. & Technology,<br />

Late- Laxmi-27, Padmini<br />

Kanpur, Indian Institute of Pulse Research,<br />

Kalyanpur Kanpur. IARI, Pusa New Delhi<br />

2. Sowing Time Mid October Rate(Rs/kg/<br />

Pkt)<br />

Cost per<br />

ha (Rs)<br />

Demonstration<br />

Cost (Rs)<br />

3. Required Seed 30 kg / ha (F1,F2, Certified) 75 2250 <strong>11</strong>25.00<br />

- - - -<br />

7. Use Weedicide<br />

<strong>11</strong>. Bio Fertilizers/Bio-agents<br />

i) Azatobactor + PSB 5 Pkt + 5 Pkt = 10 Pkt @ Rs 7.5 75 37.50<br />

ii) Rhizobium + PSB - - - -<br />

iii) Trichoderma - - - -<br />

12. Recommended dose of fertilizers<br />

50:40:40 NPK<br />

i) DAP* 125 kg 15 1875 937.50<br />

272


ii) SSP* 275 kg 8 2200 <strong>11</strong>00.00<br />

iii) Urea 50 kg 6 300 150.00<br />

iv) MOP 50 kg 7 350 175.00<br />

* Either one 30 kg /ha Sulphur added if SSP used<br />

13. IPM<br />

Spray of Neem Seed Kernal 10 30 300 150.00<br />

15 lit/kg Gobar+Neemleaf+water+Desi cow urine+2 kg 2 124 62.00<br />

Mataka Khad<br />

Molasis mix & Deco<br />

Insecticides/Fungicides<br />

If required One Dusting of Methyle Paratheon powder<br />

Integrated Crop Management<br />

25 kg / ha 25 625 312.50<br />

Total (Less SSP) 2949.50<br />

Mustard<br />

Area of Demonstration - 0.50 ha<br />

Detail of Demonstration Intervention / Technology Adopted Organisations for obtaining Seed<br />

1. Name of Varieties<br />

Varuna, Kranti, Rohini, Vaibhav, Pusa Bold<br />

C. S. A. Unversity of Ag. & Technology,<br />

Late-Ashirvad, Vardan<br />

Kanpur, Indian Institute of Pulse Research,<br />

Kalyanpur Kanpur. IARI, Pusa New Delhi<br />

2. Sowing Time October first week Rate(Rs/kg/<br />

Pkt)<br />

Cost per<br />

ha (Rs)<br />

Demonstration<br />

Cost (Rs)<br />

3. Required Seed 6 kg / ha (F1,F2, Certified) 150 900 450.00<br />

- - - -<br />

7. Use Weedicide<br />

<strong>11</strong>. Bio Fertilizers/Bio-agents<br />

i) Azatobactor + PSB 5 Pkt + 5 Pkt = 10 Pkt @ Rs 7.5 75 37.50<br />

ii) Rhizobium + PSB - - - -<br />

iii) Trichoderma - - - -<br />

12. Recommended dose of fertilizers<br />

60:50:30 NPK<br />

273


i) DAP* 180 kg 15 2700 1350.00<br />

ii) SSP* 275 kg 8 2200 <strong>11</strong>00.00<br />

iii) Urea 75 kg 6 450 225.00<br />

iv) MOP 50 kg 7 350 175.00<br />

* Either one 30 kg /ha Sulphur added if SSP used<br />

13. IPM<br />

Spray of Neem Seed Kernal 10 30 300 150.00<br />

15 lit/kg Gobar+Neemleaf+water+Desi cow urine+2 kg 2 124 62.00<br />

Mataka Khad<br />

Molasis mix & Deco<br />

Insecticides/Fungicides<br />

If required One Dusting of Methyle Paratheon powder<br />

25 kg / ha 25 625 312.50<br />

Total (Less SSP) 2762.00<br />

Integrated Crop Management<br />

ToRudra Garautha<br />

Area of Demonstration - 0.50 ha<br />

Detail of Demonstration Intervention / Technology Adopted Organisations for obtaining Seed<br />

1. Name of Varieties<br />

Type-9, PT-303, PT-30<br />

C. S. A. Unversity of Ag. & Technology,<br />

Late-Bhawani<br />

Kanpur, Indian Institute of Pulse Research,<br />

Kalyanpur Kanpur. IARI, Pusa New Delhi<br />

2. Sowing Time First Fortnight of September Rate(Rs/kg/<br />

Pkt)<br />

Cost per<br />

ha (Rs)<br />

Demonstration<br />

Cost (Rs)<br />

3. Required Seed 4 kg / ha (F1,F2, Certified) 200 800 400.00<br />

- - - -<br />

7. Use Weedicide<br />

<strong>11</strong>. Bio Fertilizers/Bio-agents<br />

i) Azatobactor + PSB 5 Pkt + 5 Pkt = 10 Pkt @ Rs 7.5 75 37.50<br />

ii) Rhizobium + PSB - - - -<br />

iii) Trichoderma - - - -<br />

274


12. Recommended dose of fertilizers<br />

50:30:30 NPK<br />

i) DAP* 125 kg 15 1875 937.50<br />

ii) SSP* 275 kg 8 2200 <strong>11</strong>00.00<br />

iii) Urea 50 kg 6 300 150.00<br />

iv) MOP 50 kg 7 350 175.00<br />

* Either one 30 kg /ha Sulphur added if SSP used<br />

13. IPM<br />

Spray of Neem Seed Kernal 10 30 300 150.00<br />

15 lit/kg Gobar+Neemleaf+water+Desi cow urine+2 kg 2 124 62.00<br />

Mataka Khad<br />

Insecticides/Fungicides<br />

Molasis mix & Deco<br />

If required One Dusting of Methyle Paratheon powder<br />

25 kg / ha 25 625 312.50<br />

Total (Less SSP) 2224.50<br />

Integrated Crop Management Til (Sesamum)<br />

Area of Demonstration - 0.50 ha<br />

Detail of Demonstration Intervention / Technology Adopted Organisations for obtaining Seed<br />

1. Name of Varieties<br />

Type-4,12,13,78, Shekhar<br />

C. S. A. Unversity of Ag. & Technology,<br />

Late- Pragati, Tarun<br />

Kanpur, Indian Institute of Pulse Research,<br />

Kalyanpur Kanpur. IARI, Pusa New Delhi<br />

2. Sowing Time June last week to July 15 Rate(Rs/kg/<br />

Pkt)<br />

Cost per<br />

ha (Rs)<br />

Demonstration<br />

Cost (Rs)<br />

3. Required Seed 4 kg / ha (F1,F2, Certified) 150 600 300.00<br />

- - - -<br />

7. Use Weedicide<br />

<strong>11</strong>. Bio Fertilizers/Bio-agents<br />

i) Azatobactor + PSB 5 Pkt + 5 Pkt = 10 Pkt @ Rs 7.5 75 37.50<br />

ii) Rhizobium + PSB - - - -<br />

275


iii) Trichoderma - - - -<br />

12. Recommended dose of fertilizers<br />

30:15:25 NPK<br />

i) DAP* 80 kg 15 1200 600.00<br />

ii) SSP* 225 kg 8 1800 900.00<br />

iii) Urea 30 kg 6 180 90.00<br />

iv) MOP 40 kg 7 280 140.00<br />

* Either one 30 kg /ha Sulphur added if SSP used<br />

13. IPM<br />

Spray of Neem Seed Kernal 10 30 300 150.00<br />

15 lit/kg Gobar+Neemleaf+water+Desi cow urine+2 kg 2 124 62.00<br />

Mataka Khad<br />

Molasis mix & Deco<br />

Insecticides/Fungicides<br />

If required One Dusting of Methyle Paratheon powder<br />

25 kg / ha 25 625 312.50<br />

Total (Less SSP) 1692.00<br />

Integrated Crop Management<br />

Wheat<br />

Area of Demonstration - 0.50 ha<br />

Detail of Demonstration Intervention / Technology Adopted Organisations for obtaining Seed<br />

1. Name of Varieties<br />

UP-2338,WH-542,PBW-343,502,550,K-9006,307 C. S. A. Unversity of Ag. & Technology,<br />

Kanpur, Indian Institute of Pulse Research,<br />

Kalyanpur Kanpur. IARI, Pusa New Delhi<br />

2. Sowing Time Mid October to first week of Nov Rate(Rs/kg/<br />

Pkt)<br />

Cost per<br />

ha (Rs)<br />

Demonstration<br />

Cost (Rs)<br />

3. Required Seed 100 kg / ha (F1,F2, Certified) 25 2500 1250.00<br />

Total - at 28 to 32 at after sowing 950 950 475.00<br />

7. Use Weedicide<br />

<strong>11</strong>. Bio Fertilizers/Bio-agents<br />

276


i) Azatobactor + PSB 5 Pkt + 5 Pkt = 10 Pkt @ Rs 7.5 75 37.50<br />

ii) Rhizobium + PSB - - - -<br />

iii) Trichoderma 1.50 kg /ha (Soil treatment) 136 204 102.00<br />

12. Recommended dose of fertilizers<br />

120:60:40 NPK<br />

i) DAP* 325 kg 15 4875 2437.50<br />

ii) SSP* - - - 0.00<br />

iii) Urea 100 kg 6 600 300.00<br />

iv) MOP 80 kg 7 560 280.00<br />

v) Zinc 30 kg /ha 25 750 375.00<br />

13. IPM<br />

Spray of Neem Seed Kernal 10 30 300 150.00<br />

15 lit/kg Gobar+Neemleaf+water+Desi cow urine+2 kg 2 124 62.00<br />

Mataka Khad<br />

Molasis mix & Deco<br />

Insecticides/Fungicides<br />

If required One Dusting of Methyle Paratheon powder<br />

25 kg / ha 25 625 312.50<br />

Total (Less SSP) 5781.50<br />

Integrated Crop Management<br />

Maize<br />

Area of Demonstration - 0.50 ha<br />

Detail of Demonstration Intervention / Technology Adopted Organisations for obtaining Seed<br />

Hyb. Duccan-103, 105, Sankul- Dhawal, Shakti-1, C. S. A. Unversity of Ag. & Technology,<br />

1. Name of Varieties<br />

Popcorn- Amber, V.L. Amber, Perl popcorn<br />

Kanpur, Indian Institute of Pulse Research,<br />

Kalyanpur Kanpur. IARI, Pusa New Delhi<br />

2. Sowing Time 15 Oct. to 15 Nov. Rate(Rs/kg/<br />

Pkt)<br />

Cost per<br />

ha (Rs)<br />

Demonstration<br />

Cost (Rs)<br />

3. Required Seed 22 kg / ha (F1,F2, Certified) 60 1320 660.00<br />

277


Thirum & 25 ml Chloropiryphose 60 60 30.00<br />

4. Seed Treatement<br />

<strong>11</strong>. Bio Fertilizers/Bio-agents<br />

i) Azatobactor + PSB 5 Pkt + 5 Pkt = 10 Pkt @ Rs 7.5 75 37.50<br />

ii) Rhizobium + PSB - - - -<br />

iii) Trichoderma 1.50 kg /ha (Soil treatment) 136 204 102.00<br />

12. Recommended dose of fertilizers<br />

100:60:40 NPK<br />

i) DAP* 265 kg 15 3975 1987.50<br />

ii) SSP* - - - 0.00<br />

iii) Urea 80 kg 6 480 240.00<br />

iv) MOP 50 kg 7 350 175.00<br />

v) Zinc - - - 0.00<br />

13. IPM<br />

Spray of Neem Seed Kernal 10 30 300 150.00<br />

15 lit/kg Gobar+Neemleaf+water+Desi cow urine+2 kg 2 124 62.00<br />

Mataka Khad<br />

Molasis mix & Deco<br />

Insecticides/Fungicides<br />

If required One Dusting of Methyle Paratheon powder<br />

25 kg / ha 25 625 312.50<br />

Total (Less SSP) 3756.50<br />

Integrated Crop Management<br />

Maize<br />

Area of Demonstration - 0.50 ha<br />

Detail of Demonstration Intervention / Technology Adopted Organisations for obtaining Seed<br />

1. Name of Varieties<br />

Hybrid- Ganga-<strong>11</strong>, Sartaj, Prakash, Pusa Hybrid Maize5,<br />

Composite-Prabhat, Navjyoti, Pusa Composite-2,<br />

Naveen<br />

C. S. A. Unversity of Ag. & Technology,<br />

Kanpur, Indian Institute of Pulse Research,<br />

Kalyanpur Kanpur. IARI, Pusa New Delhi<br />

2. Sowing Time<br />

278


Mid June<br />

Rate(Rs/kg/<br />

Pkt)<br />

Cost per<br />

ha (Rs)<br />

Demonstration<br />

Cost (Rs)<br />

3. Required Seed 20 kg / ha (F1,F2, Certified) 40 800 400.00<br />

Thirum & 25 ml Chloropiryphose 60 60 30.00<br />

4. Seed Treatement<br />

<strong>11</strong>. Bio Fertilizers/Bio-agents<br />

i) Azatobactor + PSB 5 Pkt + 5 Pkt = 10 Pkt @ Rs 7.5 75 37.50<br />

ii) Rhizobium + PSB - - - -<br />

iii) Trichoderma 1.50 kg /ha (Soil treatment) 136 204 102.00<br />

12. Recommended dose of fertilizers<br />

100:60:40 NPK<br />

i) DAP* 265 kg 15 3975 1987.50<br />

ii) SSP* - - - 0.00<br />

iii) Urea 80 kg 6 480 240.00<br />

iv) MOP 50 kg 7 350 175.00<br />

v) Zinc - - - 0.00<br />

13. IPM<br />

Spray of Neem Seed Kernal 10 30 300 150.00<br />

15 lit/kg Gobar+Neemleaf+water+Desi cow urine+2 kg 2 124 62.00<br />

Mataka Khad<br />

Molasis mix & Deco<br />

Insecticides/Fungicides<br />

If required One Dusting of Methyle Paratheon powder<br />

25 kg / ha 25 625 312.50<br />

Total (Less SSP) 3496.50<br />

Integrated Crop Management<br />

Sorghum<br />

Area of Demonstration - 0.50 ha<br />

Detail of Demonstration Intervention / Technology Adopted Organisations for obtaining Seed<br />

1. Name of Varieties CSV-13, 15, 1616, Bundela. CSH-16 C. S. A. Unversity of Ag. & Technology,<br />

279


2. Sowing Time June last to July first week Rate(Rs/kg/<br />

Pkt)<br />

Kanpur, Indian Institute of Pulse Research,<br />

Kalyanpur Kanpur. IARI, Pusa New Delhi<br />

Cost per<br />

ha (Rs)<br />

Demonstration<br />

Cost (Rs)<br />

3. Required Seed 12 kg / ha (F1,F2, Certified) 40 480 240.00<br />

Thirum & 25 ml Chloropiryphose 60 60 30.00<br />

4. Seed Treatement<br />

<strong>11</strong>. Bio Fertilizers/Bio-agents<br />

i) Azatobactor + PSB 5 Pkt + 5 Pkt = 10 Pkt @ Rs 7.5 75 37.50<br />

ii) Rhizobium + PSB - - - -<br />

iii) Trichoderma 1.50 kg /ha (Soil treatment) 136 204 102.00<br />

12. Recommended dose of fertilizers<br />

80:40:20 NPK<br />

i) DAP* 280 kg 15 4200 2100.00<br />

ii) SSP* - - - 0.00<br />

iii) Urea 100 kg 6 600 300.00<br />

iv) MOP 80 kg 7 560 280.00<br />

v) Zinc - - - 0.00<br />

13. IPM<br />

Spray of Neem Seed Kernal 10 30 300 150.00<br />

15 lit/kg Gobar+Neemleaf+water+Desi cow urine+2 kg 2 124 62.00<br />

Mataka Khad<br />

Molasis mix & Deco<br />

Insecticides/Fungicides<br />

If required One Dusting of Methyle Paratheon powder<br />

25 kg / ha 25 625 312.50<br />

Total (Less SSP) 3614.00<br />

280


281


D:\HARIOM\TEHROLI <strong>DPR</strong>\TAHRAULI-10-<strong>11</strong>\JPG-TEHROLI\RAMPURA-I (1).jpg<br />

282


D:\HARIOM\TEHROLI <strong>DPR</strong>\TAHRAULI-10-<strong>11</strong>\JPG-TEHROLI\RAMPURA-I (4).jpg<br />

283


D:\HARIOM\TEHROLI <strong>DPR</strong>\TAHRAULI-10-<strong>11</strong>\JPG-TEHROLI\RAMPURA-I (3).jpg<br />

284


D:\HARIOM\TEHROLI <strong>DPR</strong>\TAHRAULI-10-<strong>11</strong>\JPG-TEHROLI\RAMPURA-I (5).jpg<br />

285


D:\HARIOM\TEHROLI <strong>DPR</strong>\TAHRAULI-10-<strong>11</strong>\JPG-TEHROLI\RAMPURA-I (7).jpg<br />

286


D:\HARIOM\TEHROLI <strong>DPR</strong>\TAHRAULI-10-<strong>11</strong>\JPG-TEHROLI\RAMPURA-I (2).jpg<br />

287


D:\HARIOM\TEHROLI <strong>DPR</strong>\TAHRAULI-10-<strong>11</strong>\JPG-TEHROLI\RAMPURA-I (6).jpg<br />

288


D:\HARIOM\TEHROLI <strong>DPR</strong>\TAHRAULI-10-<strong>11</strong>\JPG-TEHROLI\rampura-i copy.jpg<br />

289


D:\HARIOM\TEHROLI <strong>DPR</strong>\TAHRAULI-10-<strong>11</strong>\JPG-TEHROLI\RAMPURA-II (3).jpg<br />

290


D:\HARIOM\TEHROLI <strong>DPR</strong>\TAHRAULI-10-<strong>11</strong>\JPG-TEHROLI\RAMPURA-II (7).jpg<br />

291


D:\HARIOM\TEHROLI <strong>DPR</strong>\TAHRAULI-10-<strong>11</strong>\JPG-TEHROLI\RAMPURA-II (5).jpg<br />

292


D:\HARIOM\TEHROLI <strong>DPR</strong>\TAHRAULI-10-<strong>11</strong>\JPG-TEHROLI\RAMPURA-II (1).jpg<br />

293


D:\HARIOM\TEHROLI <strong>DPR</strong>\TAHRAULI-10-<strong>11</strong>\JPG-TEHROLI\RAMPURA-II (4).jpg<br />

294


D:\HARIOM\TEHROLI <strong>DPR</strong>\TAHRAULI-10-<strong>11</strong>\JPG-TEHROLI\RAMPURA-II (6).jpg<br />

295


D:\HARIOM\TEHROLI <strong>DPR</strong>\TAHRAULI-10-<strong>11</strong>\JPG-TEHROLI\RAMPURA-II (2).jpg<br />

296


297


D:\HARIOM\TEHROLI <strong>DPR</strong>\TAHRAULI-10-<strong>11</strong>\JPG-TEHROLI\BIKARAMPURA (3).jpg<br />

298


D:\HARIOM\TEHROLI <strong>DPR</strong>\TAHRAULI-10-<strong>11</strong>\JPG-TEHROLI\BIKARAMPURA (6).jpg<br />

299


D:\HARIOM\TEHROLI <strong>DPR</strong>\TAHRAULI-10-<strong>11</strong>\JPG-TEHROLI\BIKARAMPURA (4).jpg<br />

300


D:\HARIOM\TEHROLI <strong>DPR</strong>\TAHRAULI-10-<strong>11</strong>\JPG-TEHROLI\BIKARAMPURA (7).jpg<br />

301


D:\HARIOM\TEHROLI <strong>DPR</strong>\TAHRAULI-10-<strong>11</strong>\JPG-TEHROLI\BIKARAMPURA (2).jpg<br />

302


D:\HARIOM\TEHROLI <strong>DPR</strong>\TAHRAULI-10-<strong>11</strong>\JPG-TEHROLI\BIKARAMPURA (5).jpg<br />

303


D:\HARIOM\TEHROLI <strong>DPR</strong>\TAHRAULI-10-<strong>11</strong>\JPG-TEHROLI\BIKARAMPURA (1).jpg<br />

304


D:\HARIOM\TEHROLI <strong>DPR</strong>\TAHRAULI-10-<strong>11</strong>\JPG-TEHROLI\bikarampura copy.jpg<br />

305


D:\HARIOM\TEHROLI <strong>DPR</strong>\TAHRAULI-10-<strong>11</strong>\JPG-TEHROLI\RUDRA GARAUTHA (3).jpg<br />

306


D:\HARIOM\TEHROLI <strong>DPR</strong>\TAHRAULI-10-<strong>11</strong>\JPG-TEHROLI\RUDRA GARAUTHA (7).jpg<br />

307


D:\HARIOM\TEHROLI <strong>DPR</strong>\TAHRAULI-10-<strong>11</strong>\JPG-TEHROLI\RUDRA GARAUTHA (6).jpg<br />

308


D:\HARIOM\TEHROLI <strong>DPR</strong>\TAHRAULI-10-<strong>11</strong>\JPG-TEHROLI\RUDRA GARAUTHA (1).jpg<br />

309


D:\HARIOM\TEHROLI <strong>DPR</strong>\TAHRAULI-10-<strong>11</strong>\JPG-TEHROLI\RUDRA GARAUTHA (5).jpg<br />

310


D:\HARIOM\TEHROLI <strong>DPR</strong>\TAHRAULI-10-<strong>11</strong>\JPG-TEHROLI\RUDRA GARAUTHA (4).jpg<br />

3<strong>11</strong>


D:\HARIOM\TEHROLI <strong>DPR</strong>\TAHRAULI-10-<strong>11</strong>\JPG-TEHROLI\RUDRA GARAUTHA (2).jpg<br />

312


313


314


315


316


317


318


319


320


321


322


323


324


325


326


327


328


329


330


331


332


333


334


335


336


337


338


339


340


341


342


343


344


345


346


347


348


349


350


351


352


353