13.11.2014 Views

Rural City of Wangaratta Annual Report 2009-2010 (4372 KB)

Rural City of Wangaratta Annual Report 2009-2010 (4372 KB)

Rural City of Wangaratta Annual Report 2009-2010 (4372 KB)

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Annual</strong> <strong>Report</strong><br />

<strong>2009</strong> - <strong>2010</strong><br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong><br />

“the Ultimate in Liveability”


<strong>Annual</strong> <strong>Report</strong><br />

<strong>2009</strong> - <strong>2010</strong><br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong><br />

“the Ultimate in Liveability”<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong>


Meet the <strong>Rural</strong> <strong>City</strong> Councillors<br />

The fifth Council <strong>of</strong> the <strong>Wangaratta</strong> <strong>Rural</strong> <strong>City</strong> Council was elected in November 2008, with seven Councillors elected<br />

for a four year term.<br />

Cr. Anthony Griffiths was elected Mayor <strong>of</strong> the <strong>Wangaratta</strong> <strong>Rural</strong> <strong>City</strong> Council on 3 December <strong>2009</strong> for a twelve<br />

month term.<br />

Cr Anthony Griffiths Mayor<br />

Councillor 2008 - present<br />

Councillor 1997 - 2003<br />

Mayor <strong>2009</strong> - present<br />

Ph: 0428 434 798<br />

Mayoral / Governance Portfolio<br />

Peechelba<br />

Springhurst<br />

Boorhaman<br />

Cr Lauren McCully<br />

Councillor 2008 - present<br />

Ph: 0448 087 122<br />

Community Wellbeing Portfolio<br />

<strong>Wangaratta</strong><br />

Glenrowan<br />

Oxley<br />

Eldorado<br />

Tarrawingee<br />

Markwood<br />

Milawa<br />

Murmungee<br />

Cr Lisa McInerney<br />

Councillor 2008 - present<br />

Ph: 0437 600 145<br />

Economic Development and Tourism Portfolio<br />

Greta<br />

Moyhu<br />

Edi<br />

Whorouly<br />

Carboor<br />

Cr Doug McPhie<br />

Councillor 2008 - present<br />

Ph: 0448 254 088<br />

Sport and Recreation Portfolio<br />

Cr Roberto Paino<br />

Councillor 2003 - present<br />

Mayor 2004 - 2005, 2007 - 2008<br />

Ph: 0407 148 050<br />

Infrastructure and Planning Portfolio<br />

Myrrhee<br />

Whitlands<br />

Tolmie<br />

King Valley<br />

Whitfield<br />

Cheshunt<br />

Cr Rozi Parisotto<br />

Councillor 2000 - present<br />

Ph: 0427 078 557<br />

Arts, Culture and Heritage Portfolio<br />

The <strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong><br />

“ the Ultimate in Liveability ”<br />

Cr Ron Webb<br />

Councillor 2007 - present<br />

Mayor 2008 - <strong>2009</strong><br />

Ph: 0448 284 734<br />

Environmental Sustainability Portfolio<br />

i<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong>


Our Vision, Mission and Values<br />

Our Vision<br />

The <strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> – “the Ultimate in Liveability”<br />

Our Mission<br />

We will provide the leadership necessary to …<br />

• ensure the long term financial security <strong>of</strong> the Council;<br />

• deliver quality Council services;<br />

• facilitate a growing and sustainable economy and employment base;<br />

• promote a cohesive, dynamic <strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> community;<br />

• maintain open communication and consultation;<br />

• preserve and enhance our heritage and the environment.<br />

Our Values<br />

Excellence<br />

We aim to achieve the highest standard in everything we do.<br />

Trust<br />

We have confidence in the ability and commitment <strong>of</strong> others and ourselves.<br />

Respect<br />

We see all people as being valuable acknowledging individuality, opinions, needs and abilities.<br />

Openness<br />

We foster an environment that encourages honest communication in all dealings.<br />

Fairness<br />

We treat all colleagues and customers fairly and consistently. We promote equality and<br />

ensure resources are allocated according to need.<br />

Enjoyment<br />

We promote a harmonious and productive workplace by celebrating achievement in an<br />

environment where everyone feels they belong.<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong><br />

ii


iii<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong>


Contents<br />

Contents<br />

Meet the <strong>Rural</strong> <strong>City</strong> Councillors ........................................................................................................................................................................................i<br />

Our Vision, Mission and Values ......................................................................................................................................................................................ii<br />

<strong>Rural</strong> <strong>City</strong> Pr<strong>of</strong>ile ..................................................................................................................................................................................................................................2<br />

Mayor’s <strong>Report</strong> <strong>2009</strong> - <strong>2010</strong> ...............................................................................................................................................................................................3<br />

Chief Executive Officer’s <strong>Report</strong> <strong>2009</strong> - <strong>2010</strong> ...........................................................................................................................................8<br />

Organisational Structure ........................................................................................................................................................................................................11<br />

Calendar <strong>of</strong> Events ........................................................................................................................................................................................................................12<br />

Sustainability <strong>Report</strong> .................................................................................................................................................................................................................13<br />

Governance .............................................................................................................................................................................................................................................18<br />

Arts, Culture and Heritage ................................................................................................................................................................................................23<br />

Community Wellbeing .............................................................................................................................................................................................................27<br />

Infrastructure and Planning ..........................................................................................................................................................................................32<br />

Economic Development and Tourism ..............................................................................................................................................................37<br />

Environmental Sustainability .........................................................................................................................................................................................41<br />

Sport and Recreation ..............................................................................................................................................................................................................45<br />

Human Resources .......................................................................................................................................................................................................................48<br />

Best Value ................................................................................................................................................................................................................................................50<br />

Access and Inclusion Plan ................................................................................................................................................................................................51<br />

Public Documents ........................................................................................................................................................................................................................57<br />

National Competition Policy Compliance: <strong>2009</strong>-10 .......................................................................................................................61<br />

Victorian Local Government Indicators .........................................................................................................................................................62<br />

Performance Statement .....................................................................................................................................................................................................63<br />

Financial <strong>Report</strong> ...............................................................................................................................................................................................................................73<br />

Standard Statements ..............................................................................................................................................................................................................111<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong><br />

1


<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> Pr<strong>of</strong>ile<br />

<strong>Wangaratta</strong> is located in the heart <strong>of</strong> North East Victoria - a bustling provincial centre in a region <strong>of</strong><br />

breathtaking beauty.<br />

One <strong>of</strong> Victoria’s most geographically diverse and scenic regions, the <strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> <strong>of</strong>fers a<br />

blend <strong>of</strong> city life, welcoming villages, native bushland, pastoral landscapes and snow capped peaks.<br />

Over 28,600 residents live in the <strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong>, 18,000 <strong>of</strong> whom live in urban <strong>Wangaratta</strong>.<br />

Prominent townships and villages include Boorahaman, Cheshunt, Eldorado, Everton, Glenrowan, Oxley,<br />

Milawa, Moyhu, Peechelba, Springhurst, Tarrawingee, Whitfield and Whorouly.<br />

The rich agricultural land surrounding <strong>Wangaratta</strong> yields gourmet produce and world-class wines,<br />

creating a regional paradise for food and wine lovers.<br />

The regional economy is exceptionally diverse. <strong>Wangaratta</strong> is home to major manufacturing, transport<br />

and distribution activities and is the regional headquarters for several state government agencies.<br />

Our small towns support industries such as viticulture, agriculture, horticulture and tourism.<br />

Opportunities within niche markets, based around these industries, abound throughout the <strong>Rural</strong> <strong>City</strong><br />

<strong>of</strong> <strong>Wangaratta</strong>.<br />

<strong>Wangaratta</strong> provides significant retail opportunities, an extensive range <strong>of</strong> health providers and<br />

excellent recreational facilities.<br />

Families can choose from a variety <strong>of</strong> educational opportunities including twenty-one primary schools,<br />

three secondary schools, a specialist school, a TAFE Institute including a <strong>Rural</strong> Studies Campus and<br />

Victoria’s first Technical Education Centre, many childcare and kindergarten facilities and a centre for<br />

continuing education.<br />

The world renowned <strong>Wangaratta</strong> Festival <strong>of</strong> Jazz and Blues is an annual highlight amidst a diverse<br />

calendar <strong>of</strong> events.<br />

The <strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> is proud <strong>of</strong> its cultural diversity and heritage. The legend surrounding<br />

Australia’s most renowned bushranger, Ned Kelly, is captured and preserved in and around the historic<br />

township <strong>of</strong> Glenrowan which has seen the “Siege Site” placed on the National Heritage List.<br />

The <strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> is widely recognised as <strong>of</strong>fering “the Ultimate in Liveability.” Here you can<br />

enjoy life at the perfect pace, balancing family and career aspirations in a vibrant, safe, progressive and<br />

caring community<br />

History<br />

The Shire <strong>of</strong> Milawa was created on 18 November 1994. It was formed by the merger <strong>of</strong> the <strong>City</strong> <strong>of</strong><br />

<strong>Wangaratta</strong>, the Shires <strong>of</strong> Oxley and <strong>Wangaratta</strong> and parts <strong>of</strong> the Shires <strong>of</strong> Beechworth, Benalla and<br />

Yarrawonga. The Shire <strong>of</strong> Milawa was renamed the <strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> on 29 June 1995.<br />

2<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong>


Mayor’s <strong>Report</strong> <strong>2009</strong> - <strong>2010</strong><br />

On behalf <strong>of</strong> my fellow Councillors, it is my pleasure to present the <strong>Wangaratta</strong><br />

<strong>Rural</strong> <strong>City</strong> Council <strong>2009</strong> – <strong>2010</strong> <strong>Annual</strong> <strong>Report</strong> which gives a detailed account<br />

<strong>of</strong> Council’s performance. It showcases our achievements and highlights,<br />

observes our challenges throughout the year and notes our future directions.<br />

<strong>2009</strong> – <strong>2010</strong> was a very positive period for Council. During the year we worked<br />

in partnership with the community and the state and federal governments to<br />

present a number <strong>of</strong> exciting projects as part <strong>of</strong> our commitment to achieving<br />

for the <strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> – “the Ultimate in Liveability”.<br />

The aspirations <strong>of</strong> our community, as documented in the 2030 Community<br />

Vision, continue to guide our strategic planning and were instrumental in<br />

developing our <strong>2009</strong> – 2013 Council Plan. As well as looking to the future we remain clearly focussed<br />

on providing excellent services to our community on a day-to-day basis.<br />

The single, most significant highlight for the community and one which truly evokes our aim <strong>of</strong> – “the<br />

Ultimate in Liveability” was the commissioning <strong>of</strong> the <strong>Wangaratta</strong> Performing Arts Centre. After many<br />

years <strong>of</strong> planning, the vision became a reality. Life in our <strong>Rural</strong> <strong>City</strong> was enhanced both artistically and<br />

culturally with the opening <strong>of</strong> the centre, by the Premier <strong>of</strong> Victoria, Mr John Brumby in September <strong>2009</strong>.<br />

This $8 million project has been one <strong>of</strong> the most ambitious, rewarding and successful in the <strong>Rural</strong> <strong>City</strong>’s<br />

history. The gala opening event will be remembered for many years to come.<br />

Other highlights from Council’s seven portfolio areas include:<br />

Governance<br />

“We recognise that good places to live do not just happen - they are built by vision, ideas and a<br />

commitment to work toward building a better place for a better future.” 2030 Community Vision<br />

To achieve this vision, Council continues to participate actively and effectively in a number <strong>of</strong> statewide<br />

and regional organisations including Regional Cities Victoria and the Hume Region Management<br />

Forum.<br />

Council now applies a triple bottom line approach that considers social, environmental and financial<br />

issue to all new initiatives. A sound, sustainable position underpins our achievements and I am pleased<br />

to report that Council has developed and adopted a set <strong>of</strong> sustainability performance measures to<br />

monitor our progress.<br />

For <strong>2009</strong> – <strong>2010</strong> Council reported an operating surplus <strong>of</strong> $5.4 million and in accordance with our long<br />

term financial plan borrowings <strong>of</strong> $0.9 million were undertaken for the upgrade <strong>of</strong> the <strong>Wangaratta</strong><br />

Government Centre. Total assets increased from $304 million to $318 million. Further enhancing Council’s<br />

position, the Auditor General’s report on Local Government sustainability for <strong>2009</strong> ranks <strong>Wangaratta</strong><br />

Council as low risk in relation to financial sustainability measures such as liquidity, indebtedness and<br />

self financing.<br />

The securing <strong>of</strong> full funding for the Showgrounds Redevelopment Project through a “whole <strong>of</strong><br />

government approach” and linking in with other stakeholders such as the Australian Football League,<br />

is a great example <strong>of</strong> Council’s commitment to meeting the community’s aspirations and to providing<br />

state-<strong>of</strong>-the-art facilities both for now and into the future.<br />

We are also conscious <strong>of</strong> our place in the global community. Council hosted ceremonies to welcome<br />

10 new Australians citizens. We also continue to build on our Friendship arrangements with Lacluta in<br />

East Timor and China. This year the focus <strong>of</strong> Council’s Friends <strong>of</strong> Lacluta Special Committee was on<br />

building strong relationships with other network groups across the state and extending the links with<br />

other <strong>Rural</strong> <strong>City</strong> organisations ahead <strong>of</strong> a further visit to East Timor in July <strong>2010</strong>. Council hosted a Civic<br />

Reception to welcome the Wuzhong District Delegation to Australia and in particular to <strong>Wangaratta</strong>.<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong><br />

3


Mayor’s <strong>Report</strong> <strong>2009</strong> - <strong>2010</strong><br />

Arts, Culture and Heritage<br />

“... the <strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> is renowned as the cultural centre <strong>of</strong> North East Victoria, with a rich<br />

diversity <strong>of</strong> arts, culture, music, and community events.” 2030 Community Vision<br />

Arts, culture and heritage activities continue to play an important role in bringing our community<br />

together. The <strong>Wangaratta</strong> Performing Arts Centre is the centrepiece <strong>of</strong> a dedicated arts precinct<br />

assisting us to achieve this goal.<br />

The exhibitions Gallery hosted a number <strong>of</strong> exhibitions during the year including ‘Flourish’ a significant<br />

exhibition <strong>of</strong> historic textiles from the Embroiderers Guild <strong>of</strong> Victoria collection which attracted a record<br />

2,245 visitors.<br />

Cliff Burtt’s welded corten steel sculpture ‘Pod Vessel’, the winning work <strong>of</strong> the Current Sculpture Biennial<br />

Award <strong>2010</strong> is now located in the Arts Precinct, adjacent to the Gallery and Performing Arts Centre.<br />

The <strong>Wangaratta</strong> Library continues to provide outstanding service to our community. A celebration was<br />

held in February <strong>2010</strong> to celebrate 3 years <strong>of</strong> <strong>Wangaratta</strong> Library operating as a public/TAFE library.<br />

Community Wellbeing<br />

“The <strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> has a strong community spirit and sense <strong>of</strong> place.” 2030 Community<br />

Vision<br />

This spirit is well represented by our community leaders including our Citizens <strong>of</strong> the Year. The <strong>2010</strong><br />

award recipients were Citizen <strong>of</strong> the Year, Mrs Patricia Stafford, Young Citizen <strong>of</strong> the Year, Ms Georgina<br />

Kazenwadel and Community Event <strong>of</strong> the Year, the <strong>Wangaratta</strong> High School Reunion.<br />

This spirit is also strong in our volunteers, community groups, event organisers and sporting<br />

organisations that play an important role in keeping us together and providing opportunities to engage<br />

with others. A hugely successful “men’s health night” was held at the <strong>Wangaratta</strong> Performing Arts<br />

Centre that attracted over 400 attendees. Guest speaker Merv Hughes encouraged the importance <strong>of</strong><br />

men looking after their health especially in stressful times such as drought.<br />

Our rural communities achieved a number <strong>of</strong> successes through the community planning program.<br />

Moyhu now has a BMX Track and website, Everton received funding for a heritage project, capturing<br />

the local pioneering families, Whitfield received funding for a playground, Springhurst gained two bus<br />

shelters and a cricket shed was turned into a youth meeting place. Glenrowan received funding for a<br />

walking track to Fosters Lake, just to name a few.<br />

Infrastructure and Planning<br />

“It is the diversity <strong>of</strong> localities that make the <strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> such an interesting, vibrant and<br />

enjoyable place to live and visit.” 2030 Community Vision<br />

I am proud to say that Council has facilitated a number <strong>of</strong> major projects during <strong>2009</strong> – <strong>2010</strong> which<br />

contribute to our vision including completion <strong>of</strong> the:<br />

• Phillipson Street Roundabout. The project was completed at a cost <strong>of</strong> $600,000.<br />

It provides a significant improvement to traffic flow and safety at this busy intersection;<br />

• <strong>Wangaratta</strong> Oxley Shared Pathway. Construction <strong>of</strong> the shared pathway has made<br />

substantial progress towards Oxley;<br />

• Roy Street Overpass. Significant improvements have taken place to improve user safety<br />

and amenity <strong>of</strong> this railway overpass;<br />

• Edwards Street Shared Path. The shared path from Phillipson Street to Rotary Park<br />

provides a much needed and safer <strong>of</strong>f-road link in this busy area, particularly for students;<br />

• 16km <strong>of</strong> rural road resealing;<br />

4<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong>


Mayor’s <strong>Report</strong> <strong>2009</strong> - <strong>2010</strong><br />

• $350,000 waste cell capping project at the former Bowser East landfill. This is part <strong>of</strong> a<br />

long term program designed to meet EPA requirements for rehabilitating closed landfills;<br />

• New playgrounds at Tarrawingee Recreation Reserve, John McAleese Park Milawa,<br />

Merriwa Park <strong>Wangaratta</strong> and shade sails were installed at Apex Park <strong>Wangaratta</strong> and<br />

the Springhurst Playground through the assistance <strong>of</strong> the Regional and Local Community<br />

Infrastructure Program funding;<br />

• Further upgrades <strong>of</strong> Edi Cheshunt Road. A 2.5km section <strong>of</strong> the Edi Cheshunt Road, from<br />

Black Range Road intersection to Cooks Gap Road, was reconstructed and sealed during<br />

the year; and<br />

• The <strong>Wangaratta</strong> Main Road Improvement Project. Initial median improvement works and<br />

landscaping at the Warby Street intersection have been completed.<br />

Economic Development and Tourism<br />

“... the <strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> is the destination <strong>of</strong> choice for businesses to invest and grow and for<br />

families to settle with secure employment.” 2030 Community Vision<br />

Driven by the strong desire to find replacement agrifood opportunities for growers previously committed<br />

to tobacco production, <strong>Wangaratta</strong> Unlimited established the Alpine Valleys Agrifood Project. This<br />

innovative “three pronged” strategic approach:<br />

• Supports and encourages existing leaders;<br />

• Stimulates a change in farming culture; and<br />

• Encourages the attraction <strong>of</strong> external investment and expertise.<br />

With a catch cry <strong>of</strong> “Growing at a higher level” the Ovens and King Valleys (Alpine Valleys) region now<br />

have an elevated pr<strong>of</strong>ile as a sustainable and competitive location for the production <strong>of</strong> high value<br />

agricultural production. Although the project is new, significant investment interest is being stimulated<br />

with the marketing prospectus and implementation strategy.<br />

Along with this new initiative Council has continued its support and encouragement for a sustainable<br />

tourism industry. A major highlight during the year was the 20th <strong>Annual</strong> <strong>Wangaratta</strong> Festival <strong>of</strong> Jazz<br />

held for the first time in the <strong>Wangaratta</strong> Performing Arts Centre. A second highlight was the development<br />

<strong>of</strong> the strategic partnership between <strong>Wangaratta</strong> <strong>Rural</strong> <strong>City</strong> Council and neighbouring councils which<br />

has proven integral in positioning the “Murray to Mountains” region as market leaders in Cycle Tourism<br />

development. Recognition <strong>of</strong> the Murray to Mountains as a must visit location within the cycle tourism<br />

sector culminated in the hosting <strong>of</strong> the first National Cycle Tourism Conference at the <strong>Wangaratta</strong><br />

Performing Arts Centre in February <strong>2010</strong>.<br />

Environmental Sustainability<br />

“Our environment remains our most valuable asset.” 2030 Community Vision<br />

Preserving and protecting our natural environment is a focus <strong>of</strong> both Council and the community.<br />

In conjunction with the Department <strong>of</strong> Sustainability and Environment, Council engaged with the<br />

community on the subject <strong>of</strong> changing climate through an innovative process – Deliberative Democracy.<br />

Launched in April <strong>of</strong> this year and branded as “Local Voices – Shaping Our Future,” this project differed<br />

from traditional methods <strong>of</strong> community engagement in that it involved randomly selecting participants.<br />

The selected participants formed a Citizens Jury to deliberate over the question “how can we work<br />

together to respond to a varying climate?” Their recommendations will be used to inform Council on its<br />

response to a varying climate, including the development <strong>of</strong> new environmental policies.<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong><br />

5


Mayor’s <strong>Report</strong> <strong>2009</strong> - <strong>2010</strong><br />

Council played a major support role with the sustainability expo held in February in the King George V<br />

Gardens. The expo was again a great success. This was an important community sustainability event,<br />

with an estimation <strong>of</strong> nearly 1,000 people attending learning about energy savers, solar hot water,<br />

sustainable gardening, water saving, composting waste reduction and much more. The expo attracted<br />

a range <strong>of</strong> local industries to showcase what <strong>Wangaratta</strong> businesses have available to assist the<br />

community to be more sustainable.<br />

Clean up Australia Day was again a great event. This year Council and the community focused on<br />

cleaning the entire One Mile Creek. Local schools, Council staff and the community were all involved.<br />

Similarly, on National Tree Day over 1500 trees were planted by School’s and volunteers along<br />

<strong>Wangaratta</strong>’s waterway reserves during the month <strong>of</strong> July, helping to improve the riparian areas along<br />

our rivers and creeks.<br />

In the 2008 - <strong>2009</strong> year the <strong>Rural</strong> <strong>City</strong> was runners-up in the “Excellence in Green Purchasing by a<br />

Regional Council”. This was an extremely tight result, placing second with only 0.19% less green<br />

purchasing than the winning regional council, <strong>City</strong> <strong>of</strong> Greater Bendigo. Green purchasing for the<br />

construction <strong>of</strong> the <strong>Wangaratta</strong> Performing Arts Centre played a large role within our green purchasing<br />

for that financial year.<br />

Sport and Recreation<br />

“the prominence and role <strong>of</strong> sport and active recreation remains ... central to the <strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong><br />

way <strong>of</strong> life.” 2030 Community Vision<br />

Assisting with the provision <strong>of</strong> suitable facilities for sporting clubs and their communities is an important<br />

role <strong>of</strong> Council. Council has worked with the State Government to secure funding for a number <strong>of</strong><br />

projects:<br />

• Football Netball Clubs receive funding each year through the Victorian State Government’s<br />

Country Football Netball program for facility upgrades and new developments. This year<br />

the Moyhu Football Netball Club was successful in obtaining $60,000 for an upgrade <strong>of</strong><br />

the netball court including lighting. The Club generated matching funds with volunteers<br />

also committing in-kind contributions towards the project.<br />

• The Tarrawingee Recreation Reserve Committee <strong>of</strong> Management was successful in receiving<br />

$60,000 towards the installation <strong>of</strong> a water bore. The bore will provide a reliable water source to the<br />

Reserve, CFA and local residents.<br />

• The <strong>Wangaratta</strong> Equestrian Centre (<strong>Wangaratta</strong> Adult Horse Riding Club and <strong>Wangaratta</strong> Pony Club)<br />

were successful in receiving $60,000 towards undertaking drainage works, construction <strong>of</strong> lighting<br />

on the main arena and the development <strong>of</strong> a cross country course. The volunteers <strong>of</strong> the Club are<br />

commended for the level <strong>of</strong> in-kind contributions generated towards this project.<br />

Council has undertaken a detailed community consultation process to provide input into the<br />

development <strong>of</strong> an Aquatic Strategy to guide future aquatic development in the <strong>Rural</strong> <strong>City</strong>. The process<br />

has included a community survey, stakeholder and public meetings and the publicly exhibited set<br />

<strong>of</strong> ‘Guiding Principles’ that are intended to ensure that the community input received through the<br />

consultation processes is considered with the future aquatic needs <strong>of</strong> the community.<br />

Thank You<br />

Council is extremely fortunate to have many volunteers and volunteer organisations that make a huge<br />

contribution to the community. I would like to acknowledge everyone who has volunteered this year<br />

and thank them for their commitment and their involvement.<br />

Thank you also to the members <strong>of</strong> Council’s Advisory and Special Committees, your dedication and<br />

support is integral to achieving the community’s and Council’s aspirations.<br />

6<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong>


Mayor’s <strong>Report</strong> <strong>2009</strong> - <strong>2010</strong><br />

I would like to take this opportunity to acknowledge and thank our Chief Executive Officer, the Corporate<br />

Management Team and Council staff for their important and valuable contribution to the successes we<br />

have enjoyed in the <strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> in <strong>2009</strong> - <strong>2010</strong>.<br />

In closing, to my fellow Councillors, thank you for your support, your teamwork and your leadership. I<br />

look forward to sharing with you the successes and the challenges <strong>of</strong> the year to come as we realise<br />

the vision for the <strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> – “the Ultimate in Liveability”.<br />

Cr Anthony Griffiths<br />

MAYOR<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong><br />

7


Chief Executive Officer’s <strong>Report</strong> <strong>2009</strong> - <strong>2010</strong><br />

Our major focus continues to be pursuing the 2030 Community Vision. This<br />

vision has among its key aims:<br />

• Growing the <strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong>’s population to 40,000 by 2030;<br />

• Positioning <strong>Wangaratta</strong> as a regional centre <strong>of</strong> choice and distinction;<br />

• Protecting and enhancing the rural amenity, rural landscape and<br />

agricultural sector;<br />

• Ensuring water security for <strong>Wangaratta</strong> and hinterland townships;<br />

• Using water closest to its source; and<br />

• Maintaining a compact Central Business District in <strong>Wangaratta</strong> as a key<br />

retail strength.<br />

An implementation action plan is now underway. This has the intent <strong>of</strong> breaking the span <strong>of</strong> the 2030<br />

Community Vision into bite-size chunks. The first <strong>of</strong> these chunks, and clearly the most detailed, has<br />

been picked up and placed in the <strong>2009</strong> - 2013 Council Plan.<br />

In order to achieve the desired population target <strong>of</strong> the 2030 Community Vision, an underlying growth<br />

rate <strong>of</strong> 1.5% would be required. Latest figures released by the Australian Bureau <strong>of</strong> Statistics in early<br />

<strong>2010</strong> put the growth rate for the <strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> at 1.7%.<br />

During the course <strong>of</strong> the year, two key documents were finalised that have direct relationship to, and<br />

further underpin, the importance <strong>of</strong> the 2030 Community Vision.<br />

At a regional level, the “Hume Strategy for Sustainable Communities” was completed. This is the<br />

Regional Plan for the Hume Region covering 12 Councils including the <strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong>.<br />

As one <strong>of</strong> the key drivers <strong>of</strong> this project, the <strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> invested significant energy and<br />

resources into its development. It has a direct correlation to Council’s 2030 Community Vision and<br />

identifies regional centres such as <strong>Wangaratta</strong> as being integral for growth and prosperity.<br />

At a state level, “Ready for Tomorrow, a Blueprint for Regional and <strong>Rural</strong> Development in Victoria” was<br />

released by the State Government. This blueprint provides for an expanded and more flexible regional<br />

infrastructure fund and a single point <strong>of</strong> entry for complex projects. This was a major plank <strong>of</strong> <strong>Rural</strong><br />

Cities Victoria through the experience and advocacy <strong>of</strong> <strong>Wangaratta</strong> and represents a clear victory for<br />

regional Victoria.<br />

The blueprint is directly tied to regional plans and will provide a source for significant funding<br />

opportunities.<br />

A number <strong>of</strong> projects are being pursued in response to the 2030 Community Vision that are aligned<br />

directly with the state and regional planning documents.<br />

Agricultural Land Strategy<br />

A land use blueprint <strong>of</strong> agriculture and rural amenity. Finalisation <strong>of</strong> the strategy was delayed pending<br />

the release <strong>of</strong> some critical State Government studies into water availability and future farming. Since<br />

the release <strong>of</strong> findings from these studies, it is now clear that the Agricultural Land Strategy being<br />

finalised is in alignment with them.<br />

Water Security Study<br />

A major study is nearing completion into the deep aquifer that sits about 130 metres below the Ovens<br />

Valley. Funded by the State and Federal Governments, the study is investigating the source <strong>of</strong> this<br />

large body <strong>of</strong> water and whether or not it can be used conjunctively with the river system as a possible<br />

major water source supporting agriculture and domestic use in the region. The study findings indicate<br />

that this is likely, particularly in the lower Ovens area, provided it is appropriately managed.<br />

8<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong>


Chief Executive Officer’s <strong>Report</strong> <strong>2009</strong> - <strong>2010</strong><br />

Alpine Valleys Agrifood Initiative<br />

Formerly known as the Alpine Valleys Foodbowl, this concept was developed out <strong>of</strong> a need to provide<br />

a productive use for former tobacco land, utilising water closest to its source, climate change impacts<br />

elsewhere and taking advantage <strong>of</strong> the current status <strong>of</strong> water security in the region.<br />

A prospectus was released in <strong>2010</strong> that both supports the concept and identifies a number <strong>of</strong><br />

competitive advantages for developing the Alpine Valleys as a centre for agrifood production. Already<br />

this has generated significant stakeholder interest.<br />

In response Council has dedicated resources to ensure that the early momentum generated by the<br />

release <strong>of</strong> the prospectus is maintained.<br />

Water Reticulation <strong>of</strong> Townships<br />

To achieve a 40,000 population figure it will be important for townships in proximity to <strong>Wangaratta</strong> to<br />

take some <strong>of</strong> the growth. This can be achieved by reticulating these townships and thus allowing more<br />

intensive development within them. Currently Milawa, Glenrowan and Oxley have been identified for<br />

this purpose with investigations ongoing as to the most suitable reticulation treatment for them.<br />

Showgrounds Redevelopment<br />

Funding was secured for the funding <strong>of</strong> an elite facility and centre <strong>of</strong> excellence for football with broad<br />

community use at the <strong>Wangaratta</strong> Showgrounds. This important outcome was in keeping with the<br />

aim <strong>of</strong> redeveloping the Showgrounds into a modern multipurpose precinct and thereby improving<br />

<strong>Wangaratta</strong>’s liveability.<br />

Works will involve installation <strong>of</strong> arena lighting to Australian Football League standard; a new<br />

multipurpose facility and football and administration complex; expanded viewing embankment and<br />

seating; and improvements to drainage and surrounds. Total cost is $2.9 million.<br />

The AFL has committed a significant funding package towards the project including an agreement<br />

to play 5 AFL practice games in the first 10 – 15 years <strong>of</strong> the upgraded facility. In addition to the AFL,<br />

funding partners with the Council include the State and Federal Governments and local community.<br />

Ovens Riverside Precinct<br />

This project is about repositioning the Central Business District <strong>of</strong> <strong>Wangaratta</strong> towards the Ovens River<br />

by providing improved access. Works include a public square and promenade on top <strong>of</strong> the southern<br />

bank <strong>of</strong> the river adjacent to the Central Business District and retail outlets. A detailed design was<br />

completed during the course <strong>of</strong> the year which has formed the basis <strong>of</strong>, as yet, unsuccessful funding<br />

applications to the Federal and State Government.<br />

Medical Centre <strong>of</strong> Excellence<br />

Through funding support from the State Government a feasibility study was completed into the concept<br />

<strong>of</strong> a Medical Centre <strong>of</strong> Excellence. This study confirmed the feasibility <strong>of</strong> a model for post graduate<br />

tertiary training and up skilling <strong>of</strong> medical practitioners based on <strong>Wangaratta</strong>. As a consequence <strong>of</strong><br />

these findings, stakeholder support is now being sought.<br />

In a regional context, Council signed a Memorandum <strong>of</strong> Understanding to establish the North East<br />

Regional Tourism Board covering the 6 municipalities <strong>of</strong> Alpine, Benalla, Indigo, Mansfield, Towong<br />

and <strong>Wangaratta</strong> and 3 Alpine Resort Boards. The purpose <strong>of</strong> the board if to provide an overarching<br />

approach to tourism in the north east focusing on 6 strategic pillars <strong>of</strong> cycle tourism, touring, food and<br />

wine, cultural heritage, snow adventure and nature based tourism. Again, it is supported by the Hume<br />

Strategy.<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong><br />

9


Chief Executive Officer’s <strong>Report</strong> <strong>2009</strong> - <strong>2010</strong><br />

Other projects at hand designed to achieve the 2030 Community Vision include a centralised car<br />

parking solution for <strong>Wangaratta</strong> in support <strong>of</strong> a compact Central Business District and expanding the<br />

capacity <strong>of</strong> the <strong>Wangaratta</strong> Government Centre to broaden employment and support regionalisation <strong>of</strong><br />

government services. Stage 2 <strong>of</strong> the latter was commenced this year, freeing up space to provide up<br />

to thirty new jobs to be located in the <strong>Wangaratta</strong> Government Centre.<br />

Our capacity to deliver projects that will add to the increasing liveability <strong>of</strong> the municipality was<br />

enhanced when the <strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> was a recipient <strong>of</strong> more than $870,000 under the Federal<br />

Government’s stimulus package. Projects benefiting from this funding source included a mix <strong>of</strong> urban<br />

and rural infrastructure.<br />

However, none <strong>of</strong> this can be achieved without maintaining a sound financial base. The Victorian<br />

Auditor-General’s most recent report on local government finances (<strong>2009</strong>) gives <strong>Wangaratta</strong> a green<br />

light for its financial position. The report examines liquidity, indebtedness, self financing and investment<br />

gap and ranks councils against traffic lights <strong>of</strong> green (low risk), amber (medium risk) and red (high risk).<br />

The <strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong>’s score was a green light overall with no high risk factors.<br />

In addition, the <strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong>’s financial position as measured at 30 June <strong>2010</strong> continues<br />

to reinforce this position. Financial statements show continuing and acceptable operating surplus,<br />

strong balance sheet and low debt exposure. It is our aim, <strong>of</strong> course, to continue in this fashion.<br />

Installation <strong>of</strong> a new corporate s<strong>of</strong>tware system continued during the year. This has been a major<br />

undertaking for the organisation but when completed will provide state <strong>of</strong> the art support for our<br />

operations.<br />

In response to a need for an improved approach to sustainability and customer service, an organisation<br />

review was undertaken. This resulted in a fundamental restructure providing for:<br />

• a new Department <strong>of</strong> Sustainability including Environment, Finance, Human Resources,<br />

Business Services and a combined Planning, Building and Customer Services Unit;<br />

• a refocused Infrastructure Services Department including 3 core components <strong>of</strong> Asset<br />

Planning, Works and Operations and Project/Contract Control; and<br />

• a Community Wellbeing Department with a focus on community planning, community<br />

services and a new Community Amenity Unit including Local Laws, Environmental Health<br />

and Emergency Management.<br />

Once again Council’s resources were called upon to respond to an emergency situation. A storm lashed<br />

the municipality in June <strong>2010</strong>, with winds <strong>of</strong> up to 90 kilometres per hour, causing widespread damage.<br />

Council staff responded immediately and worked tirelessly to clear roads and remove debris within<br />

hours. A decision was made to open refuse disposal sites near the worst hit areas free <strong>of</strong> charge to<br />

receive storm damage debris from private property and assist in the recovery.<br />

In summary, the <strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong>’s claim <strong>of</strong> providing “the Ultimate in Liveability” is well placed.<br />

Several significant projects have either been completed in the last year or are well in train to make a<br />

difference to the <strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> in support <strong>of</strong> the 2030 Community Vision. This in turn is<br />

being supported by strong population growth. Moreover, the <strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> has a financial<br />

capacity to continue to invest in improving its liveability thus reinforcing this direction and drive.<br />

In closing I would like to thank the Councillors and staff for their continuing support as we strive to<br />

maintain the momentum.<br />

Doug Sharp<br />

CHIEF EXECUTIVE OFFICER<br />

10<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong>


Organisational Structure<br />

• Community Representation<br />

• Governance<br />

• Performance Monitoring<br />

• Policy<br />

• Strategic Direction<br />

• Treasury<br />

COUNCIL<br />

CHIEF EXECUTIVE OFFICER<br />

Doug Sharp<br />

• Communications<br />

and Marketing<br />

• Economic Development<br />

and Tourism<br />

• Executive Services<br />

SUSTAINABILITY<br />

Director - Ray Park<br />

COMMUNITY WELLBEING<br />

Director - Ruth Tai<br />

INFRASTRUCTURE SERVICES<br />

Director - Andrew Close<br />

• Business Planning and<br />

Systems<br />

• Environment<br />

• Finance<br />

• Human Resources<br />

• Planning and Customer<br />

Services<br />

• Community and Recreation<br />

• Community, Health and<br />

Amenity<br />

• Human Services<br />

• Performing Arts<br />

• Visual Arts<br />

• Facilities and Open Spaces<br />

• Projects and Contracts<br />

• Technical Services<br />

• Works and Operations<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong><br />

11


Calendar <strong>of</strong> Events<br />

July <strong>2009</strong><br />

<strong>Wangaratta</strong> Contemporary Textile Award<br />

Stitched up Textile Festival<br />

National Tree Day<br />

Beat the Winter Blues ‘n’ Jazz<br />

August <strong>2009</strong><br />

Heritage Idol Festival <strong>2009</strong><br />

September <strong>2009</strong><br />

Opening <strong>of</strong> the <strong>Wangaratta</strong> Performing<br />

Arts Centre<br />

<strong>Wangaratta</strong> <strong>City</strong> 50th Jubilee<br />

celebrations<br />

King Valley Shed Wine Show<br />

Lions Club White Elephant Sale<br />

October <strong>2009</strong><br />

Senior’s Festival<br />

<strong>Wangaratta</strong> Show<br />

Water Week<br />

(community education activities)<br />

Australian Orienteering Championships<br />

November <strong>2009</strong><br />

<strong>Wangaratta</strong> Festival <strong>of</strong> Jazz<br />

2-24th Battalion Reunion<br />

Kelly Country Classic<br />

Kelly Country Festival<br />

La Dolce Vita Festival<br />

National Recycling Week<br />

My Backyard Rules –<br />

Sustainable Living Expo<br />

Australian Cycle Tourism Conference<br />

Funk Oars live music event – FreeZA<br />

Men’s Health Night<br />

December <strong>2009</strong><br />

Carols by Candlelight<br />

Christmas Festivities Program<br />

New Year’s Eve<br />

January <strong>2010</strong><br />

Summer in the Parks<br />

Moonlight Movies<br />

<strong>Wangaratta</strong> Sports Carnival<br />

<strong>Wangaratta</strong> CBD Cycling Criterium<br />

‘JAMuary’ Skate Event<br />

Outdoor Ball<br />

Australia Day<br />

<strong>Wangaratta</strong> Fishing, Camping and<br />

Outdoor Leisure Show and Fishing<br />

Competition<br />

February <strong>2010</strong><br />

3rd anniversary - opening <strong>of</strong> the<br />

<strong>Wangaratta</strong> Library<br />

Community Pride Awards<br />

Launch <strong>of</strong> <strong>Wangaratta</strong> Sustainability<br />

Network<br />

March <strong>2010</strong><br />

Viva Italia Festival<br />

Clean up Australia Day<br />

Pushover Music Festival – Creative Youth<br />

April <strong>2010</strong><br />

Current Sculpture Biennial Event<br />

Winsec <strong>Wangaratta</strong> Cup<br />

Skate Park Jam<br />

Australian Open Racquetball<br />

Championships<br />

Break Even live music event –<br />

Creative Youth<br />

National Youth Week Skate Park Jam<br />

May <strong>2010</strong><br />

Round 6 - V8 Supercar Series<br />

Wines <strong>of</strong> the King Valley Wine Expo<br />

(Canberra)<br />

June <strong>2010</strong><br />

Cool Heads Driver Awareness Program<br />

World Environment Day<br />

Trails, Tastings and Tales<br />

Weekend Fit for a King<br />

Business Networking Dinner<br />

Tuppal Station Drought Relief Day Out<br />

Rampfest Trip for young people<br />

12<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong>


Sustainability <strong>Report</strong><br />

Council and the community recognise that, “... good places to live do not just happen - they are built<br />

by vision, ideas and a commitment to work toward building a better place for a better future.” 2030<br />

Community Vision<br />

To monitor progress towards realising this aspiration, at their Council Meeting held 18 May <strong>2010</strong>, Council<br />

adopted a set <strong>of</strong> sustainability performance measures.<br />

Council’s approach to sustainability is based on understanding the interdependence <strong>of</strong> and the need<br />

to achieve a balance between social, environmental and economic outcomes.<br />

The reporting <strong>of</strong> sustainability performance requires consideration <strong>of</strong> all aspects <strong>of</strong> the triple bottom<br />

line, that is, economic, environmental and social matters.<br />

The measures were developed by a process that considered a range <strong>of</strong> material including:<br />

• Suggested Performance Indicators for Public Agencies contained within the reporting<br />

model established by the Global <strong>Report</strong>ing Initiative;<br />

• Indicators published by Australian and overseas local governments; and<br />

• Publications <strong>of</strong> a number <strong>of</strong> Australian and overseas agencies.<br />

In addition, consideration was given to indicators that are already developed and reported for other<br />

purposes.<br />

It is envisaged that these indicators will provide the basis for longer term evaluation <strong>of</strong> the organisation’s<br />

performance and will be reported annually.<br />

The collection <strong>of</strong> data to enable these indictors to be produced is straightforward in some cases but<br />

will require significant research for others. As such, data is not yet available to measure some <strong>of</strong> the<br />

indicators.<br />

Economic<br />

Indicator Rationale/Explantion Measure<br />

Economic Performance Council as a net attracter <strong>of</strong> funds No data available to date.<br />

for local investment.<br />

Direct economic value generated and<br />

distributed, including grants from<br />

external agencies, local taxes, fees etc,<br />

operating costs, employee<br />

compensation, donations and other<br />

community investments, retained<br />

earnings and payments to capital<br />

providers and government.<br />

Financial solvency and sustainability<br />

Underlying result<br />

Operating deficits cannot be<br />

sustained in the long term A positive<br />

result indicates a surplus.<br />

$7,000,000<br />

$6,000,000<br />

$5,000,000<br />

$4,000,000<br />

$3,000,000<br />

$2,000,000<br />

$1,000,000<br />

$-<br />

Underlying Result $<br />

2006 2007 2008 <strong>2009</strong> <strong>2010</strong><br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong><br />

13


Sustainability <strong>Report</strong><br />

Indicator Rationale/Explantion Measure<br />

Financial solvency and sustainability (continued)<br />

Indebtedness<br />

Availability <strong>of</strong> own revenue necessary<br />

to meet non-current liabilities<br />

Comparison <strong>of</strong> non-current liabilities.<br />

60%<br />

50%<br />

40%<br />

30%<br />

20%<br />

10%<br />

0%<br />

Indebtedness<br />

2006 2007 2008 <strong>2009</strong> <strong>2010</strong><br />

Self financing ability<br />

Availability <strong>of</strong> own revenue necessary<br />

to meet non-current liabilities.<br />

The higher the percentage, the more<br />

effectively this can be done.<br />

40%<br />

30%<br />

Self financing<br />

20%<br />

10%<br />

0%<br />

2006 2007 2008 <strong>2009</strong> <strong>2010</strong><br />

Investment Gap<br />

Capital spending needs to at least<br />

match depreciation or overall asset<br />

stock is declining Comparison <strong>of</strong> the<br />

rate <strong>of</strong> spending on infrastructure with<br />

depreciation. Percentages higher than<br />

100% indicate that spending is faster<br />

than the depreciation rate.<br />

250%<br />

200%<br />

150%<br />

100%<br />

50%<br />

Investment gap<br />

0%<br />

2006 2007 2008 <strong>2009</strong> <strong>2010</strong><br />

Renewal Gap<br />

Capital spending needs to at least<br />

match depreciation or overall asset<br />

stock is declining. Percentages higher<br />

than 100% indicate that spending on<br />

existing assets is greater than the<br />

depreciation rate.<br />

80%<br />

70%<br />

60%<br />

50%<br />

40%<br />

30%<br />

20%<br />

10%<br />

0%<br />

Renewal gap<br />

2006 2007 2008 <strong>2009</strong> <strong>2010</strong><br />

14<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong>


Sustainability <strong>Report</strong><br />

Indicator Rationale/Explantion Measure<br />

Environmental<br />

Environmental and<br />

ethical purchasing<br />

Goods provided by environmentally<br />

and socially responsible providers<br />

preferred over those that are not.<br />

Percentage <strong>of</strong> spend through the<br />

Eco-Recycle Program.<br />

Green Purchasing<br />

$25,000,000<br />

$20,000,000<br />

$15,000,000<br />

$10,000,000<br />

$5,000,000<br />

4.76% 4.64% 3.31%<br />

$-<br />

07--08 08--09 09--10<br />

Green Purchasing Total Expenditure<br />

Recycling<br />

Recycling preferred to consumption<br />

<strong>of</strong> new resources. Waste and recycling<br />

at major Council site.<br />

Waste and Recycling at <strong>Wangaratta</strong><br />

Government Centre April <strong>2010</strong><br />

Compostables<br />

Confidential paper …<br />

Clean Paper and …<br />

Recycling (Co-mingled) 1%<br />

General Waste<br />

7.8%<br />

4.9%<br />

23.5%<br />

62.7%<br />

0 50 100 150 200 250<br />

Cubic Metres<br />

Energy Consumption<br />

Energy consumption, as major<br />

generator <strong>of</strong> GHG, to be minimised.<br />

Direct energy use by primary source.<br />

Include all energy sources used for<br />

own operations.<br />

Transport fuels unavailable.<br />

1,500,000<br />

1,000,000<br />

500,000<br />

Energy Consumption<br />

0<br />

20052006 2007 2008<strong>2009</strong> <strong>2010</strong><br />

Electricity KW<br />

Gas MJ<br />

Water Usage<br />

Limited resource, use to be minimised.<br />

Total water use<br />

Kilolitres<br />

200,000<br />

150,000<br />

100,000<br />

50,000<br />

Water Usage<br />

-<br />

2000-2001<br />

2002-2003<br />

2004-2005<br />

2006-2007<br />

2008-<strong>2009</strong><br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong><br />

15


Sustainability <strong>Report</strong><br />

Indicator Rationale/Explantion Measure<br />

Environmental (continued)<br />

Greenhouse gas (CO2, CH4, H2O, HFCs, PFCs, SF6) No data available to date.<br />

emissions<br />

<strong>Report</strong> separate subtotals for each<br />

gas in tonnes and in tonnes <strong>of</strong> CO2<br />

equivalent for the following:<br />

• direct emissions from sources<br />

owned or controlled by Council<br />

• indirect emissions from imported<br />

electricity heat or steam<br />

Hazardous chemicals Limit the use <strong>of</strong> hazardous herbicides, No data available to date.<br />

use<br />

fertilisers, pesticides and other<br />

chemicals.<br />

Total quantity <strong>of</strong> hazardous chemicals<br />

by use<br />

Total amount <strong>of</strong> waste Minimise output <strong>of</strong> non-recyclable No data available to date.<br />

by type and destination material.<br />

Total weight <strong>of</strong> waste by collection and<br />

disposal method.<br />

Total number and volume <strong>of</strong> significant<br />

dumpings and spills.<br />

Vegetation Balance<br />

Social<br />

Maintenance <strong>of</strong> vegetation is a<br />

protection for bi-diversity.<br />

Number/mass <strong>of</strong> trees removed or<br />

destroyed compared to new plantings.<br />

Vegetation removal and planting<br />

2008 - <strong>2010</strong><br />

4000<br />

3500<br />

3000<br />

3585<br />

2500<br />

2000<br />

1500<br />

1000<br />

500<br />

232<br />

0<br />

Removed<br />

Vegetation<br />

Planted<br />

Vegetation<br />

Labour Practices and<br />

Decent Work<br />

Full time preferred to part-time preferred<br />

to casual. Breakdown <strong>of</strong> workforce,<br />

employment type (full time/part time/<br />

casual), and by employment contract<br />

(indefinite or permanent/fixed term or<br />

temporary). Breakdown <strong>of</strong> working<br />

hours by full time part time or casual.<br />

150<br />

100<br />

50<br />

0<br />

Employees<br />

Employment type and gender<br />

FULL TIME PART TIME CASUAL<br />

MALE<br />

FEMALE<br />

16<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong>


Sustainability <strong>Report</strong><br />

Indicator Rationale/Explantion Measure<br />

Social (continued)<br />

Family friendly working<br />

arrangements<br />

Arrangements that enable a balancing<br />

<strong>of</strong> work and out <strong>of</strong> work commitments<br />

provides access to a potentially larger<br />

pool <strong>of</strong> skills and enables staff to fulfil<br />

family and community obligations.<br />

Describe flexible working arrangements<br />

<strong>of</strong> Enterprise Agreement.<br />

Number <strong>of</strong> staff using family friendly<br />

work arrangements<br />

25<br />

20<br />

15<br />

10<br />

5<br />

0<br />

MALE<br />

FULL TIME<br />

FEMALE<br />

PART TIME<br />

Council as a Good Compliance with legislation and codes No data available to date.<br />

Corporate Citizen <strong>of</strong> conduct is part <strong>of</strong> Council’s<br />

community leadership role<br />

Management <strong>of</strong> Effective transfer <strong>of</strong> corporate No data available to date.<br />

corporate knowledge knowledge is necessary for ongoing<br />

and memory<br />

efficient performance.<br />

Health and Safety Responsible employer. Hours lost as a percentage <strong>of</strong> total<br />

Standard injury, lost day and absentee hours - 0.065%<br />

rates and number <strong>of</strong> work-related<br />

fatalities (Including subcontracted<br />

workers).<br />

Training and Education Efficiency <strong>of</strong> workplace. Training hours per employee -<br />

Average hours <strong>of</strong> training per year per approximate average 8.45 hours per<br />

employee by category <strong>of</strong> employee employee per year<br />

Diversity and<br />

Opportunity<br />

Equal opportunity.<br />

Composition <strong>of</strong> senior management<br />

and corporate governance bodies<br />

(including the Council and Advisory<br />

Committees.<br />

Employees- occupation category<br />

70<br />

60<br />

50<br />

40<br />

30<br />

20<br />

10<br />

0<br />

Managers/Administrators<br />

Pr<strong>of</strong>essionals<br />

Associate Pr<strong>of</strong>essionals<br />

Tradespersons<br />

Advanced Clerical<br />

Sales and Service workers<br />

Intermediate Production<br />

Elementary Clerical<br />

Male<br />

Labourers<br />

Female<br />

Social Indicator for Organisational efficiency. No data available to date.<br />

Public Agencies<br />

Describe the results <strong>of</strong> assessments<br />

<strong>of</strong> the efficiency and effectiveness <strong>of</strong><br />

services provided by the public agency,<br />

including the actions taken to<br />

achieve improvements in service<br />

delivery. The objective is to allow<br />

readers to understand the organisation’s<br />

efforts to improve its use <strong>of</strong> inputs<br />

(human, financial, etc) to generate<br />

outputs and outcomes.<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong><br />

17


Governance<br />

“We recognise that good places to live do not just happen - they are built by vision, ideas and a<br />

commitment to work toward building a better place for a better future.”<br />

2030 Community Vision<br />

The <strong>Wangaratta</strong> <strong>Rural</strong> <strong>City</strong> Council will endeavour to achieve the best outcomes for the local community<br />

having regard to the long term and cumulative effects <strong>of</strong> decisions.<br />

Objectives<br />

1. Provide responsible financial practices ensuring Council’s financial viability;<br />

2. Provide community leadership through the provision <strong>of</strong> accessible, open and consultative<br />

government;<br />

3. Maintain a clear and effective short, medium and long-term planning framework; and<br />

4. Provide a healthy and productive workforce.<br />

Council’s results from the <strong>Annual</strong> Community Satisfaction Survey for Local Governments:<br />

Overall performance<br />

generally by Council<br />

Advocacy and community<br />

representation on key local issues<br />

Enforcement <strong>of</strong> By Laws<br />

80<br />

80<br />

80<br />

70<br />

70<br />

70<br />

60<br />

60<br />

60<br />

%<br />

%<br />

50<br />

40<br />

80<br />

70<br />

2006<br />

2007<br />

2008<br />

<strong>2009</strong><br />

<strong>2010</strong><br />

80<br />

70<br />

50<br />

40<br />

2006<br />

2007<br />

2008<br />

<strong>2009</strong><br />

<strong>2010</strong><br />

%<br />

60<br />

60<br />

%<br />

%<br />

Overall performance in key<br />

service areas and responsibilities<br />

50<br />

40<br />

2006<br />

2007<br />

2008<br />

<strong>2009</strong><br />

<strong>2010</strong><br />

Council’s engagement in decision<br />

making on key local issues<br />

80<br />

70<br />

Council’s interaction and responsiveness<br />

in dealing with the public<br />

60<br />

%<br />

50<br />

40<br />

2006<br />

2007<br />

2008<br />

<strong>2009</strong><br />

<strong>2010</strong><br />

50<br />

40<br />

2006<br />

2007<br />

2008<br />

<strong>2009</strong><br />

<strong>2010</strong><br />

50<br />

40<br />

2006<br />

2007<br />

2008<br />

<strong>2009</strong><br />

<strong>2010</strong><br />

18<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong>


Governance<br />

Highlights <strong>of</strong> the year<br />

<strong>Wangaratta</strong> Performing Arts Centre Opening<br />

Life in the <strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> was enhanced both artistically and culturally with opening <strong>of</strong> the<br />

<strong>Wangaratta</strong> Performing Arts Centre in September <strong>2009</strong>. This $8 million project has been one <strong>of</strong> the<br />

most ambitious, rewarding and successful in the municipality’s history. It has already attracted state<br />

conferences, events and major performances to sell-out crowds.<br />

Golden Jubilee Celebrations<br />

In September <strong>2009</strong> the <strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> celebrated a significant anniversary – the Golden<br />

Jubilee <strong>of</strong> the proclamation <strong>of</strong> <strong>Wangaratta</strong> as a <strong>City</strong>. The 50th anniversary celebrations honoured and<br />

acknowledge our history and diversity and were one <strong>of</strong> the municipality’s highlights for the year.<br />

Showgrounds Funding<br />

The securing <strong>of</strong> full funding for the Showgrounds Redevelopment Project through a “whole <strong>of</strong><br />

government approach” and linking in with other stakeholders such as the Australian Football League,<br />

is a great example <strong>of</strong> Council’s commitment to meeting the community’s aspirations and to providing<br />

state-<strong>of</strong>-the-art facilities both for now and into the future.<br />

Summer in the Parks Program<br />

The <strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong>’s liveability was enhanced during the <strong>2009</strong> - <strong>2010</strong> financial year with<br />

the delivery <strong>of</strong> an expanded and improved Summer in the Parks program. A diverse and interesting<br />

calendar <strong>of</strong> community events was delivered by Council’s events team, with increased attendances.<br />

Consolidation <strong>of</strong> Technology One corporate s<strong>of</strong>tware system<br />

This integrated s<strong>of</strong>tware solution has been successfully implemented and has evolved into a robust,<br />

flexible platform for recording financial, property and payroll transactions. Further modules for works and<br />

assets, human resources and regulatory services are currently well advanced in their implementation<br />

and will be operational prior to December <strong>2010</strong>. The integrated aspect <strong>of</strong> the s<strong>of</strong>tware has enabled<br />

centralised data management.<br />

Sustainable long term financial plan<br />

Council’s long term financial plan establishes a framework for ensuring future obligations for service<br />

delivery and infrastructure management are affordable within current funding streams, rating and<br />

borrowing strategies. Council’s annual budget is formulated within the parameters <strong>of</strong> the long term<br />

financial plan ensuring sustainable financial practices.<br />

Auditor General rates Council financially sustainable<br />

The Auditor General’s report on Local Government sustainability for <strong>2009</strong> ranks <strong>Wangaratta</strong> Council<br />

as low risk in relation to financial sustainability measures such as liquidity, indebtedness and self<br />

financing.<br />

Sound financial position<br />

For <strong>2009</strong> – <strong>2010</strong> Council reported an operating surplus <strong>of</strong> $5.4 million and in accordance with our long<br />

term financial plan borrowings <strong>of</strong> $0.9 million were undertaken for the upgrade <strong>of</strong> the <strong>Wangaratta</strong><br />

Government Centre. Total assets increased from $304 million to $318 million.<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong><br />

19


Governance<br />

Audit Committee<br />

Council’s Audit Advisory Committee, including three independent experts, provides advice to Council in<br />

relation to financial matters and risk. The committee also oversees the internal audit program.<br />

Customer Services Team<br />

The Customer Services team are a highly skilled, flexible team and are able to carry out many roles<br />

from receipting, reception, front <strong>of</strong> house and support to other units and agencies that reside in the<br />

Government Centre.<br />

Asset renewal needs met<br />

A review <strong>of</strong> our asset renewal programs showed that:<br />

• Asset renewal provision is in place;<br />

• Long term renewal plans are sustainable;<br />

• The actual renewal performance reflects what we plan to do;<br />

• The actual trend in renewal provision is consistently positive;<br />

• We are in a better position than most <strong>of</strong> our peers; and<br />

• Our processes are solid.<br />

Procurement Policy developed and implemented<br />

An updated Procurement Policy was adopted by Council to ensure that corporate and statutory needs<br />

are properly met.<br />

Challenges<br />

Community planning<br />

Managing expectations with the resources available.<br />

Community engagement<br />

Ensuring both our urban and rural communities have the opportunity to engage with Council.<br />

Council’s communications<br />

Ensuring Council’s communications reach both urban and rural residents.<br />

Consolidation <strong>of</strong> the Technology One s<strong>of</strong>tware solution<br />

Council’s new s<strong>of</strong>tware solution required adaptation and intensive staff training in order to capitalise<br />

on its functionality<br />

Technology and e-business<br />

Remaining pr<strong>of</strong>icient at communicating and transacting with all stakeholders as technology advances.<br />

Looking ahead<br />

• Implementation <strong>of</strong> further technology one modules <strong>of</strong> Human Resources, Works and<br />

Assets and Regulatory Services in <strong>2010</strong> - 2011 financial year followed by customer request<br />

management in the following year.<br />

• Continuing to expand Council’s community events program.<br />

• A continued focus on effective community engagement.<br />

• Updated Asset Management Policy adopted by Council.<br />

• Asset Management Plans for transport assets must be developed.<br />

20<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong>


Governance<br />

Meeting our strategic objectives<br />

Key strategic activity<br />

To engage the community in a<br />

strategic approach to decisionmaking<br />

and the development <strong>of</strong> the<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong>.<br />

To take a whole-<strong>of</strong>-government<br />

approach to the development and<br />

wellbeing <strong>of</strong> the <strong>Rural</strong> <strong>City</strong> <strong>of</strong><br />

<strong>Wangaratta</strong>.<br />

(a) To focus on core-business and<br />

non-core business.<br />

(b) To act as an advocate and<br />

facilitator in other functions.<br />

To minimise risk as a way <strong>of</strong><br />

providing a safer public and<br />

workplace environment.<br />

Outcome<br />

• Stage 1 <strong>of</strong> the 2030 Community Vision has been incorporated<br />

into the <strong>2009</strong> - 2013 Council Plan and is being actioned where<br />

appropriate;<br />

• There has been a focus on engaging the community through<br />

community planning and specific Council planning activities<br />

such as the development <strong>of</strong> the Community Wellbeing Plan and<br />

the Deliberative Democracy Project. A number <strong>of</strong> Community<br />

Plans have been presented to Council with more in the<br />

development stage and we have sought community input on a<br />

range <strong>of</strong> strategies and plans; and<br />

• Council continues to conduct Council Meetings across the<br />

municipality.<br />

• Council maintained its key involvement in the development <strong>of</strong><br />

the Regional Cities Plan, particularly in regard to supporting<br />

investment into regional Victoria as a means <strong>of</strong> alleviating<br />

Melbourne’s growth problems. This strategy has been endorsed<br />

by the State Government’s “Blueprint for Regional Victoria -<br />

Ready for Tomorrow”;<br />

• Council met with Government at all levels on issues and<br />

projects <strong>of</strong> interest. Deputations with Government included the<br />

Showgrounds Redevelopment, a Whole <strong>of</strong> Government approach<br />

to investment and service delivery, the Ovens Aquifer Study,<br />

Ovens Riverside, Whitfield Community Centre Project and the<br />

Deliberative Democracy Project; and<br />

• Council played an important role in the development <strong>of</strong> the<br />

recently released Hume Strategy for Sustainable Communities.<br />

• The Council Plan and Budget were adopted and implemented;<br />

• An Organisational Review was undertaken and outcomes were<br />

embedded into operations to further enhance Best Value and<br />

the Council Plan; and<br />

• Council continued its facilitatory role in water security and<br />

re-use projects, provision <strong>of</strong> community health, youth, ethnic<br />

and education services, river management and the like.<br />

• Internal Audit Work program reviewed by Audit Advisory<br />

Committee quarterly;<br />

• Key staff have been trained in climate change adaptation<br />

strategies; and<br />

• Council’s Municipal Fire Prevention Plan and Municipal<br />

Emergency Management Plan have been reviewed in line<br />

with Bushfires Royal Commission recommendations.<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong><br />

21


Governance<br />

Key strategic activity<br />

To invest in and deploy proven<br />

Information Management Systems to<br />

ensure effective access to<br />

information and services.<br />

To operate specific undertakings on<br />

a business basis with sufficient<br />

funding to meet agreed community<br />

benefit.<br />

To provide responsible financial<br />

practices ensuring Council’s ongoing<br />

financial viability.<br />

To apply a triple bottom line approach<br />

to the assessment <strong>of</strong> new initiatives.<br />

Outcome<br />

• The installation <strong>of</strong> the Technology One System is progressing<br />

well with Financials, property and rating complete. The<br />

implementation <strong>of</strong> the Human Resources, Planning Building and<br />

Health, Works and Assets and Customer Request management<br />

modules are underway; and<br />

• Council’s current web base technology is being reviewed with<br />

funding allocated to implement the upgrade. Council is trialling<br />

new technologies including Facebook to engage younger<br />

residents and community web sites for Moyhu, Oxley, Milawa,<br />

and Everton have been developed.<br />

Council’s various business undertakings remain self-sustaining<br />

and viable. Of note:<br />

• The <strong>Wangaratta</strong> Performing Arts Centre achieved better than<br />

budgeted results in its first nine months <strong>of</strong> operation; and<br />

• The <strong>Wangaratta</strong> Childcare Centre has improved its financial<br />

viability having increased the number <strong>of</strong> places to seventy.<br />

• Council’s <strong>2010</strong> - 2011 is framed within the 10 Year Financial Plan<br />

that incorporates financially sustainable strategies for<br />

borrowings, infrastructure renewal and rating.<br />

• Research into appropriate triple bottom line methodology that<br />

considers social, environmental and financial sustainability<br />

models is continuing; and<br />

• Council adopted a set <strong>of</strong> sustainability performance measures.<br />

22<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong>


Arts, Culture and Heritage<br />

“... the <strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> is renowned as the cultural centre <strong>of</strong> North East Victoria, with a rich<br />

diversity <strong>of</strong> arts, culture, music, and community events.” 2030 Community Vision<br />

The Arts, Culture and Heritage activities <strong>of</strong> Council incorporate:<br />

• A varied and stimulating performing arts program and cultural and community events;<br />

• Cultural development initiatives targeting community organisations and individuals;<br />

• Public art commissions;<br />

• A high quality visual arts program and collection management through the <strong>Wangaratta</strong><br />

exhibitions Gallery; and<br />

• Strategic and forward planning in relation to the support and development <strong>of</strong> arts and<br />

culture.<br />

Objectives<br />

1. Provide for a diverse range <strong>of</strong> arts, cultural<br />

and heritage experiences and opportunities<br />

utilising a variety <strong>of</strong> approaches and pathways.<br />

2. Make a significant contribution to the<br />

cultural, social and economic wellbeing <strong>of</strong> the<br />

community, and provide quality visual,<br />

performing, community arts, community cultural<br />

development initiatives and cultural events<br />

for the enjoyment, education and enrichment<br />

<strong>of</strong> the community.<br />

Visitors<br />

<strong>Wangaratta</strong> exhibtions Gallery<br />

attendance<br />

30,000<br />

25,000<br />

20,000<br />

15,000<br />

10,000<br />

5,000<br />

0<br />

05--06<br />

06--07<br />

07--08<br />

08--09<br />

09--10<br />

<strong>Annual</strong> attendance by visitors<br />

to the <strong>Wangaratta</strong> exhibitions<br />

Gallery.<br />

Highlights <strong>of</strong> the year<br />

<strong>Wangaratta</strong> Performing Arts Centre<br />

After many years <strong>of</strong> planning, vision became a reality when the state-<strong>of</strong> –the art <strong>Wangaratta</strong> Performing<br />

Arts Centre and conference venue was opened in the central business district <strong>of</strong> <strong>Wangaratta</strong>. From<br />

day one the venue was embraced and supported by community and commercial hirers alike and the<br />

result is a busy and vibrant venue that has created a strong and exciting heartbeat in the centre <strong>of</strong><br />

<strong>Wangaratta</strong> reaching out to all the outlying communities. To date, ticket sales, conference take-up,<br />

community engagement and revenue have exceeded expectations.<br />

A pr<strong>of</strong>essional and venue dedicated team was appointed<br />

A team <strong>of</strong> four permanent staff, 12 casual team members and over 20 volunteers was recruited and<br />

trained to deliver exceptional customer service and high quality technical services at the <strong>Wangaratta</strong><br />

Performing Arts Centre. The team brings a diverse and extensive range <strong>of</strong> experiences and skills and<br />

has <strong>of</strong>fered many people the dream <strong>of</strong> a lifetime to work in their chosen field in their hometown.<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong><br />

23


Arts, Culture and Heritage<br />

Gallery Textile Symposium, related exhibitions and programs<br />

‘Flourish,’ a significant exhibition <strong>of</strong> historic textiles from the Embroiderers Guild <strong>of</strong> Victoria collection,<br />

attracted record visitors [2,245]; ‘Petite,’ an exhibition <strong>of</strong> miniature textiles from across Australia was<br />

also very popular [890]; a selected exhibit <strong>of</strong> the Gallery textile collection presented diversity in textiles<br />

practice; the John Coburn major tapestry ‘Garden <strong>of</strong> Life’ demonstrated the impact <strong>of</strong> large textile works<br />

can hold; and Rodney Love’s evocative hair and sock weavings intrigued viewers. Workshops attracted<br />

participants from across the region; and the Textile Forum attracted locals and visitors from major cities<br />

and other regional locations.<br />

North East Victorian regional artists exhibit at <strong>Wangaratta</strong> exhibitions Gallery, the Workshop<br />

Space and <strong>Wangaratta</strong> Performing Arts Centre foyers<br />

North East Victorian artists exhibitions for <strong>2009</strong> - <strong>2010</strong> year included: Ron Bansgrove ‘Global Forces’;<br />

Anita Laurence ‘Prints and Paintings’; Susan Fell McLean ‘Multiplicity’; five north east Victorian sculptors<br />

‘Current Form’ [coincided with Sculpture Award]; Bob Caldwell and Pamela Florance ‘Brush in Hand’;<br />

North East Branch <strong>of</strong> the Embroiderers Guild Exhibition; Performing Fibres group show; a combined<br />

schools VCE exhibition ‘Emerge’; and the Linda Fish ‘The Bundle’ exhibition<br />

Touring exhibition<br />

The in-house curated exhibition ‘Light on the Landscape’ showcased works from both the Gallery and<br />

Council collections and was displayed in the Workshop Space from December <strong>2009</strong> through to the end<br />

<strong>of</strong> January <strong>2010</strong>. The exhibition was then toured in its entirety to Bright Art Gallery and Cultural Centre in<br />

the Alpine Shire in June <strong>2010</strong>.<br />

Anne Zahalka Photography and the ArtBUS Program<br />

A popular exhibition focusing on 20 years <strong>of</strong> the artist’s practice was exhibited in the Gallery in<br />

September - October <strong>2009</strong>. Students and school groups from across the region utilised the Gallery<br />

initiated ArtBUS program which was funded by Arts Victoria’s recurrent Local Partnerships funding.<br />

Current Sculpture Biennial Award <strong>2010</strong><br />

Cliff Burtt’s welded corten steel sculpture ‘Pod Vessel’, was the winning work <strong>of</strong> the Current Sculpture<br />

Biennial Award <strong>2010</strong>. It is now located in the Arts Precinct, adjacent to the Gallery and the <strong>Wangaratta</strong><br />

Performing Arts Centre.<br />

Third anniversary <strong>of</strong> joint use library<br />

A celebration was held in February <strong>2010</strong> to celebrate three years <strong>of</strong> <strong>Wangaratta</strong> Library operating as a<br />

public/TAFE library. Representatives from Council, Goulburn Ovens Institute <strong>of</strong> TAFE and the High County<br />

Library were in attendance. The guest speaker Dr. Alan Bundy, an expert on joint use libraries, placed<br />

the <strong>Wangaratta</strong> Library in a national and international context. Dr. Bundy further noted that <strong>Wangaratta</strong> is<br />

quite likely one <strong>of</strong> the top 100 successful joint use libraries in the world and one <strong>of</strong> the top ten in Australia.<br />

Library Community Partnerships<br />

Two partnerships were established with <strong>Wangaratta</strong> West and Yarrunga Primary Schools to conduct<br />

story times for pre-schoolers. Library staff, school staff and volunteers coordinate a story session<br />

every fortnight at the both <strong>of</strong> the schools.<br />

Living Libraries<br />

The Living Library is an innovative community based initiative which aims to bring people together in<br />

one-to-one conversation: to encourage understanding, challenge negative stereotypes and reduce<br />

prejudice. People with stories to tell about their life are encouraged to be a living book, where they can<br />

be “borrowed” for a half hour to talk to people about their experiences. The <strong>Wangaratta</strong> Living Library<br />

project created interest in the community and many <strong>of</strong> the living books were ‘read’. While the concept<br />

may have been slow to begin with, the last week saw many living books reserved well in advance.<br />

24<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong>


Arts, Culture and Heritage<br />

Challenges<br />

Re-establishing a performing arts programme<br />

After an absence <strong>of</strong> nearly three years, and little communication to previous patrons during that time,<br />

rebuilding a patron database was one <strong>of</strong> our main objectives. This was achieved through extensive<br />

marketing <strong>of</strong> the Opening Festival, opening the Box Office ahead <strong>of</strong> the venue opening, strong media<br />

support through press releases and advertising and a dedicated website. Within 4 months <strong>of</strong> opening<br />

a database <strong>of</strong> over 2,000 names was achieved. Internet bookings provide approximately 30% <strong>of</strong> ticket<br />

sales which makes the venue highly accessible to people living in the rural communities.<br />

Developing a conference market at the <strong>Wangaratta</strong> Performing Arts Centre<br />

In order to service the conference market, which was identified as being <strong>of</strong> strategic importance to<br />

<strong>Wangaratta</strong>, an on-site caterer was required who would provide exceptional food and beverage service<br />

to assist in securing bookings. The tender process had to be repeated several times in order for us to<br />

find the right operator. This meant that the successful operator was not announced until just before<br />

opening. Despite this forward conference bookings are strong and there have been many successful<br />

conferences since opening. The first was held in October <strong>2009</strong>, over 4 days and provided for 400 people.<br />

Looking ahead<br />

Outreach programme in 2011<br />

A ‘Small Towns Tour’ has been planned for October 2011 taking in six to seven rural venues. The<br />

benefits will be that the <strong>Wangaratta</strong> Performing Arts Centre will reach people who are unable to attend<br />

performances in town. It will provide a wonderful education process for the theatre technicians to<br />

experience touring a show and it will assist in bringing some <strong>of</strong> the more isolated communities together.<br />

After the assessment <strong>of</strong> this tour plans for future outreach programmes will be developed.<br />

Increase in performance related workshops<br />

Workshops are a wonderful way to build audiences through experiment; they also provide skills and<br />

knowledge that may not be available in the community and they connect people and organisations<br />

together. The aim is to present at least two performance related workshops with the 2011 season – the<br />

first starting in November <strong>2010</strong> with Melbourne Ballet providing classes and workshops for dancers.<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong><br />

25


Arts, Culture and Heritage<br />

Meeting our strategic objectives<br />

Key strategic activity<br />

To provide a diverse visual arts<br />

experience and opportunities for local<br />

and regional communities and<br />

visitors by the <strong>Wangaratta</strong> exhibitions<br />

Gallery.<br />

To promote the benefits <strong>of</strong> a culturally,<br />

linguistically and religiously diverse<br />

society and the social, cultural and<br />

economic opportunities this provides.<br />

To facilitate arts and cultural events<br />

and festivals.<br />

Outcome<br />

• A diverse mix <strong>of</strong> exhibitions were presented in the <strong>Wangaratta</strong><br />

exhibitions Gallery, the Workshop Space and <strong>Wangaratta</strong><br />

Performing Arts Centre foyer throughout the year; and<br />

• An exhibition <strong>of</strong> art works from the Gallery and Council art<br />

collections, toured to Bright Art Gallery.<br />

• Council has commenced the development <strong>of</strong> a Multicultural<br />

Strategic Plan.<br />

• The Generations Project was completed and strategies<br />

developed to ensure the continued use <strong>of</strong> resources and ideas<br />

generated by the project; and<br />

• Council’s <strong>2010</strong> - 2013 Tourism Industry Strategic Plan<br />

incorporates actions to enhance <strong>Wangaratta</strong>’s status as the<br />

Jazz Capital <strong>of</strong> Australia.<br />

To establish the <strong>Wangaratta</strong> • All genres <strong>of</strong> performance were represented in the <strong>2009</strong> - <strong>2010</strong><br />

Performing Arts Centre as a high programme;<br />

quality, and accessible facility. • Internet sales have stabilised at 30% and marketing into the<br />

outlying areas has increased which has seen a growth in<br />

patronage from areas other than urban <strong>Wangaratta</strong>; and<br />

• Commercial and community bookings are evenly distributed<br />

and cooperative marketing with user groups such as the<br />

<strong>Wangaratta</strong> Festival <strong>of</strong> Jazz has been successful.<br />

To integrate public art, design and<br />

cultural features into the planning<br />

<strong>of</strong> capital works projects and public<br />

space developments throughout the<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong>.<br />

To establish a preservation program<br />

for cultural and built heritage.<br />

To promote the library service as a<br />

community information resource that<br />

is accessible and responsive to<br />

community need.<br />

• The <strong>2010</strong> Sculpture Event was successfully completed;<br />

• Collaboration has commenced with the Architects<br />

commissioned to design the Ovens Riverside Project regarding<br />

Public Art and other Design elements; and<br />

• A Draft Public Art Strategy is being developed.<br />

• Funding has been secured to formulate a Project Brief to revise<br />

Council’s existing Heritage overlay;<br />

• Consultation with various community groups to identify and<br />

preserve local character continues; and<br />

• A three year implementation plan has been established to<br />

complete a heritage overlay in rural areas.<br />

Council continues to provide facility based and outreach library<br />

services that can be accessed by all residents through a range <strong>of</strong><br />

flexible service provision options and programs including:<br />

• External storytimes at child care centres and local kindergartens;<br />

• School holiday activities; and<br />

• Exhibition and related events from the State Library <strong>of</strong> Victoria.<br />

26<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong>


Community Wellbeing<br />

“The <strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> has a strong community spirit and sense <strong>of</strong> place.”<br />

2030 Community Vision<br />

The Community Services, Education and Youth activities <strong>of</strong> Council support the ongoing development<br />

<strong>of</strong> a local community which enhances the quality <strong>of</strong> life and wellbeing <strong>of</strong> all residents. This includes:<br />

• Working directly with local community groups to support their activities;<br />

• Creating partnerships with community groups, community agencies and other levels <strong>of</strong><br />

government to plan and develop facilities, services and activities to meet changing<br />

needs;<br />

• Providing community services to older people, families, young people and children;<br />

• Provision <strong>of</strong> library services through the High Country Library Corporation which includes<br />

book loans, internet services and community education; and<br />

• Strategic planning in partnership with education providers in order to support and develop<br />

education resource pathways within the <strong>Rural</strong> <strong>City</strong> at pre-school, primary, secondary and<br />

post secondary levels.<br />

Objectives<br />

1. Provide quality community services which meet<br />

the needs <strong>of</strong> residents.<br />

2. Improve opportunities for all residents to<br />

participate in a range <strong>of</strong> community activities.<br />

3. To advocate for the community to increase access<br />

to a range <strong>of</strong> learning opportunities throughout<br />

life.<br />

%<br />

Health and human services<br />

80<br />

70<br />

60<br />

50<br />

40<br />

2006<br />

2007<br />

2008<br />

<strong>2009</strong><br />

<strong>2010</strong><br />

Council results from the <strong>Annual</strong><br />

Community Satisfaction Survey<br />

for Local Government.<br />

Highlights <strong>of</strong> the year<br />

Nine <strong>Rural</strong> Community Plans presented to Council<br />

Community planning is strengthening the voice <strong>of</strong> our local residence through facilitated workshops<br />

across 18 rural communities in identifying their needs and future aspirations.<br />

Seven <strong>of</strong> these rural communities have workshopped their priorities into projects and established a<br />

community plan that has been presented to Council. Communities currently engaged in the community<br />

planning process at various stages are Boorhaman-North Boorhaman, Bowmans-Murmungee, Carboor,<br />

Cheshunt, Edi-Edi Upper, Eldorado, Everton-Everton Upper, Glenrowan-Hamilton Park, Greta-Hansonville,<br />

Milawa-Markwood, Moyhu, Myrrhee, Oxley, Peechelba, Springhurst, Whitfield, Whitlands and Whorouly.<br />

Projects achieved by the communities include:<br />

• Moyhu - BMX track and website;<br />

• Milawa established the Milawa and Markwood Development Association to drive their community<br />

plan;<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong><br />

27


Community Wellbeing<br />

• Everton received funding for a heritage project, capturing the local pioneering families;<br />

• Whitfield received funding for a playground;<br />

• Springhurst gained two bus shelters, a cricket shed turned into a youth meeting place,<br />

lighting at the hall, CFA shed is being relocated;<br />

• Carboor are investigating holding a farmers forum;<br />

• Bowmans Murmungee – old Murmungee hall upgrade and Heritage Grant application; and<br />

• Glenrowan received funding for a walking track to Fosters Lake.<br />

Yarrunga Hub Engagement Project<br />

4 community functions were held to identify Yarrunga community needs. This information has been<br />

incorporated into the Yarrunga Community Hub project.<br />

Drought Response<br />

A hugely successful “men’s health night” was held at the <strong>Wangaratta</strong> Performing Arts Centre that<br />

attracted over 400 attendees. Guest speaker Merv Hughes encouraged the importance <strong>of</strong> men looking<br />

after their health especially in stressful times such as drought. The format <strong>of</strong> the evening was a “pitstop”<br />

health check for all participants and sharing conversation over dinner.<br />

Several events were organised to assist community members affected by drought to cope with<br />

the stresses arising. C<strong>of</strong>fee and cake functions were organised for the women to engage in social<br />

interaction; Geelong visit for men to the Ford Museum and the Wool Museum; Tuppal Station bus trip to<br />

see the re-enactment <strong>of</strong> historical shearing.<br />

Community Pride Committee<br />

The Community Pride Committee conducted very successful Community Pride Awards in which<br />

businesses, groups and individuals were recognised for their achievements in environmental and<br />

community issues that impact upon the natural or built environment and promote environmental,<br />

beautification and community engagement opportunities within the community.<br />

Community Raffle<br />

YMCA Victoria administered the very successful Community Raffle in which $69,404 was raised by 90<br />

community organisations. The funds being retained by the groups for project fundraising.<br />

Community Grants<br />

Council received 70 grant applications from community groups seeking amounts up to $5,000 for their<br />

specific projects. Council distributed funds to 35 groups at a total budget <strong>of</strong> $108,000.<br />

Bushfire Recovery<br />

A Community Recovery Plan for the Bowmans- Murmungee fire affected area was successful in<br />

obtaining funds through Victorian Bushfire Reconstruction and Recovery Authority to upgrade the<br />

Bowmans-Murmungee Hall, conduct a community event and provide assistance to fire affected<br />

landowners.<br />

Child Care<br />

In November <strong>2009</strong> <strong>Wangaratta</strong> Child Care staff celebrated achieving accreditation with the National<br />

Childcare Accreditation Council. The results were <strong>of</strong> high quality and a wonderful outcome.<br />

There has also been an improvement in the financial status in the <strong>Wangaratta</strong> Child Care Centre and<br />

the <strong>Wangaratta</strong> Family Day Care Scheme. Both services managed to reduce a large deficit to a minor<br />

deficit. All staff are to be congratulated on their commitment to high quality sustainable child care for<br />

the <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong>.<br />

28<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong>


Community Wellbeing<br />

The staff have done a wonderful job in settling the children and families into our new building. All<br />

services are continuing to work together to form a Children’s services hub that is welcoming to the<br />

children and families <strong>of</strong> our community<br />

For the first time in approximately 5 years, the Family Day Care utilisation rate is beginning to improve.<br />

There has been a constant increase in children utilising Family Day Care with an average effective full<br />

time utilisation <strong>of</strong> 110 places. Our breakeven figure is 100 effective full time places.<br />

A planning project has been completed to determine the infrastructure and other resources required<br />

to accommodate the Children’s Services Centre. A final report has been provided to the Department <strong>of</strong><br />

Education and Early Childhood Development.<br />

Community Facilities Policy<br />

Council has endorsed a policy which provides an equitable approach to support for community<br />

facilities. This Policy includes financial support from Council to better support community groups who<br />

manage community facilities that are owned by Council or considered as community facilities. This<br />

policy recognises the valuable work that volunteers contribute to maintaining these facilities.<br />

Highly Successful H1N1 (Swine Flu) immunisation program<br />

227 Residents were vaccinated during the 15 day program including a session <strong>of</strong>fered in the rural area.<br />

Vaccine has since been incorporated into Council’s regular monthly immunisation schedule.<br />

Community Support North East<br />

Community Support North East is a unit <strong>of</strong> Council that provides a range <strong>of</strong> case management, care<br />

coordination, eligibility assessment and direct service delivery to the aged and people with disabilities.<br />

It provides services to assist people to live in the community and to maintain and enhance their<br />

independence and quality <strong>of</strong> life.<br />

Targets were met with an overall achievement greater than 95%. The successful implementation <strong>of</strong> one<br />

point entry via an intake <strong>of</strong>ficer has maximised response time to client needs.<br />

A recent survey has demonstrated that client satisfaction with Community Support North East is very<br />

high and complaints are received at a minimum.<br />

Formation <strong>of</strong> a Quality Committee resulting in the development <strong>of</strong> policies and procedures and<br />

continuation <strong>of</strong> improvements in both processes and practices in quality standards for Community<br />

Support North East.<br />

Challenges<br />

Reaching all our community<br />

A major challenge for community planning is the engagement <strong>of</strong> minority groups as it is important to<br />

ensure the input provided by each community is truly representative <strong>of</strong> the whole community.<br />

Children’s Services Centre Stage 2<br />

An application was submitted to construct Stage 2 but was unsuccessful. Further opportunities will be<br />

pursued to achieve this development.<br />

State wide food premises classification system<br />

Preparation and planning for the new state wide food premises classification system, with further<br />

changes to the Food Act to continue into 2011.<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong><br />

29


Community Wellbeing<br />

Looking ahead<br />

• Ongoing engagement with the community to support their planning, review existing plans and to<br />

source funding to implement appropriate projects.<br />

• Further expand the current community meals program, <strong>of</strong>fering it to four additional rural areas to<br />

improve the social participation <strong>of</strong> the local residents in <strong>of</strong>fering a social gathering by way <strong>of</strong> a<br />

community meal.<br />

• Review the current New Resident’s Kit to be more user friendly and include more information<br />

relevant to the <strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> and the surrounding region.<br />

• Kindergarten Universal Access - opportunities need to be pursued to increase the number<br />

<strong>of</strong> kindergarten places in <strong>Wangaratta</strong> to accommodate the increased requirements.<br />

• A review <strong>of</strong> <strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> Local Law is required.<br />

• Restructure <strong>of</strong> local laws/enforcement function including the provision <strong>of</strong> broader enforcement<br />

services spanning parking, animal control, litter, building regulations and illegal structures on<br />

public land.<br />

• Sustainability Project – a joint environment / Home and Community Care initiative to assist older<br />

people to implement sustainable household practices increasing water and energy efficiency.<br />

Meeting our strategic objectives<br />

Key strategic activity<br />

To support our community to<br />

be resilient.<br />

To foster and encourage:<br />

• community spirit;<br />

• volunteerism; and<br />

• community leadership.<br />

To promote a high level <strong>of</strong> community<br />

safety.<br />

Outcome<br />

• The development <strong>of</strong> a Community Wellbeing Advisory<br />

Committee has provided an opportunity to engage with service<br />

providers;<br />

• A five year plan <strong>of</strong> works to address the up-keep and<br />

maintenance <strong>of</strong> community halls has commenced;<br />

• The range <strong>of</strong> festive community events is being expanded to<br />

include a Mayoral Ball and <strong>Wangaratta</strong> Performing Arts Centre<br />

Anniversary Celebrations; and<br />

• The <strong>2009</strong> - <strong>2010</strong> raffle was completed very successfully.<br />

Planning, preparation and promotion has commenced for<br />

<strong>2010</strong> - 2011 with more community groups than last year<br />

applying to sell tickets.<br />

• The Deliberative Democracy project was a huge success,<br />

delivering a community think tank on climate change; and<br />

• Opportunities to attend leadership development sessions and<br />

attend events <strong>of</strong> recognition have been pursued.<br />

• A Community Safety Committee has been established led by<br />

Victoria Police. This Committee is working closely with<br />

Council’s Community Wellbeing Advisory Committee and a<br />

small collaborative forum on the potential problems<br />

associated with alcohol and drugs;<br />

• Attendance at Liquor Accord meetings is continuing;<br />

• Strong liaison and involvement <strong>of</strong> the police is occurring with<br />

youth activities; and<br />

• The development <strong>of</strong> a Community register for emergency events.<br />

30<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong>


Community Wellbeing<br />

Key strategic activity<br />

To support communities in times<br />

<strong>of</strong> crisis.<br />

To ensure the provision <strong>of</strong> affordable,<br />

accessible and high quality<br />

children’s services.<br />

To support the development <strong>of</strong><br />

integrated health provision to<br />

maximise the health and wellbeing<br />

outcomes for the community<br />

To support families, older people<br />

and people with disabilities to<br />

actively engage and participate<br />

in their community.<br />

To promote and support youth<br />

leadership by engaging young people<br />

and strengthening their involvement<br />

in the community.<br />

To work with education providers to<br />

enhance opportunities for life-long<br />

learning<br />

Outcome<br />

• Council continues its role in supporting people affected by<br />

crisis situations by liaising with appropriate agencies and<br />

authorities to provide support to assist the community in their<br />

recovery. Additional staff is undertaking specific training to<br />

increase Council’s capability;<br />

• The Municipal Emergency Planning Committee has formed a<br />

sub-committee, with representation <strong>of</strong> each <strong>of</strong> the emergency<br />

service organisations, to look at risks across the municipality;<br />

and<br />

• The Drought Response Strategy has been reviewed with a<br />

focus on rural resilience in the face <strong>of</strong> climate and economic<br />

change.<br />

• Council has maintained involvement in state, regional and local<br />

interagency groups. The Yarrunga Community Hub project has<br />

provided further opportunity to work closely with this sector; and<br />

• Council is continuing to pursue opportunities to fund Stage 2<br />

<strong>of</strong> the Children’s Services Centre.<br />

• The establishment <strong>of</strong> Council’s Community Wellbeing Advisory<br />

Committee has provided a platform to improve integrated<br />

planning opportunities with a local approach, being established<br />

involving local service providers;<br />

• Council is a partner in the Transport Connections project for<br />

Upper Hume and a local Transport Action Plan has been<br />

developed; and<br />

• Council convenes the monthly <strong>Wangaratta</strong> Youth Service<br />

Providers Network meetings and continues involvement at the<br />

North East Regional Youth Affairs Network, <strong>Wangaratta</strong> Blue Light<br />

Youth Group, Big Brothers Big Sisters and the Youth Health Service.<br />

• Council’s Access and Inclusion Plan was adopted and<br />

implementation has commenced;<br />

• As part <strong>of</strong> the Homelessness Network, Council has participated<br />

in community discussion on the impact and implementation <strong>of</strong><br />

the Victorian Housing Strategy; and<br />

• Home and Community Care staff are operating a self support<br />

program with clients to maintain or increase their independence.<br />

• The Creative Youth Committee (Formally Wang FReeZA) held<br />

several successful events throughout the year;<br />

• Youth Council supported the first <strong>Wangaratta</strong> Cool Heads driver<br />

awareness event and also supported North East Support and<br />

Action for Youth Inc to raise awareness <strong>of</strong> youth homelessness<br />

on National youth Homelessness Matters Day; and<br />

• Youth Councillors for <strong>2010</strong> - 2011 have been endorsed by Council.<br />

• The final report <strong>of</strong> the <strong>Wangaratta</strong> Centre for Medical Excellence<br />

Feasibility Study has been received;<br />

• The <strong>Wangaratta</strong> Learning Alliance is being developed with the<br />

goal <strong>of</strong> promoting all aspects <strong>of</strong> learning in the <strong>Rural</strong> <strong>City</strong>; and<br />

• An update <strong>of</strong> Council’s Education Strategy has been incorporated<br />

in the development <strong>of</strong> the Community Wellbeing Plan<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong><br />

31


Infrastructure and Planning<br />

“It is the diversity <strong>of</strong> localities that make the <strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> such an interesting, vibrant and<br />

enjoyable place to live and visit.” 2030 Community Vision<br />

Provision and maintenance <strong>of</strong> infrastructure is a core function <strong>of</strong> the <strong>Wangaratta</strong> <strong>Rural</strong> <strong>City</strong> Council.<br />

Specialist areas include town planning, building approvals, environmental health, engineering and<br />

design. A team <strong>of</strong> over 70 field services staff are responsible for the construction and maintenance <strong>of</strong><br />

roads, bridges, drainage, buildings, footpaths, parks and gardens.<br />

Objectives<br />

1. Provide infrastructure appropriate to the community’s needs, managed in a sustainable way.<br />

2. Plan developments and public spaces that take into account community needs and desires while<br />

being practical and responsive to longer term needs.<br />

3. Ensure the amenity <strong>of</strong> public and built environments is attractive, safe and practical.<br />

Council results from the <strong>Annual</strong> Community Satisfaction Survey for Local Government:<br />

Local roads and footpaths<br />

80<br />

70<br />

60<br />

80<br />

70<br />

60<br />

Town planning policy<br />

and approvals<br />

Appearance <strong>of</strong> public areas<br />

80<br />

70<br />

60<br />

%<br />

50<br />

40<br />

2006<br />

2007<br />

2008<br />

<strong>2009</strong><br />

<strong>2010</strong><br />

Traffic management and<br />

parking facilities<br />

%<br />

50<br />

40<br />

2006<br />

2007<br />

2008<br />

<strong>2009</strong><br />

<strong>2010</strong><br />

Waste management<br />

%<br />

50<br />

40<br />

2006<br />

2007<br />

2008<br />

<strong>2009</strong><br />

<strong>2010</strong><br />

80<br />

80<br />

70<br />

70<br />

60<br />

60<br />

%<br />

50<br />

%<br />

50<br />

40<br />

2006<br />

2007<br />

2008<br />

<strong>2009</strong><br />

<strong>2010</strong><br />

40<br />

2006<br />

2007<br />

2008<br />

<strong>2009</strong><br />

<strong>2010</strong><br />

32<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong>


Infrastructure and Planning<br />

Council’s building statistics:<br />

Building Permits by number<br />

Building Permits by value<br />

800<br />

700<br />

600<br />

500<br />

400<br />

300<br />

200<br />

100<br />

0<br />

2005/06<br />

2006/07<br />

2007/08<br />

2008/09<br />

<strong>2009</strong>/10<br />

Highlights <strong>of</strong> the year<br />

$90,000,000<br />

$80,000,000<br />

$70,000,000<br />

$60,000,000<br />

$50,000,000<br />

$40,000,000<br />

$30,000,000<br />

$20,000,000<br />

$10,000,000<br />

$-<br />

2005/06<br />

2006/07<br />

2007/08<br />

2008/09<br />

<strong>2009</strong>/10<br />

Phillipson Street Roundabout<br />

The project was completed during the year at a cost <strong>of</strong> $600,000. It provides a significant improvement<br />

to traffic flow and safety at this busy intersection. Improved lighting will be installed by SP AusNet in<br />

late <strong>2010</strong>.<br />

Rapid and effective response<br />

Council staff rapidly and effectively responded to the needs <strong>of</strong> the community after a savage windstorm<br />

buffeted the municipality on 17 June <strong>2010</strong>. Up to 1,000 trees and limbs were removed from Council road<br />

and shared path network thus ensuring the safety <strong>of</strong> all road users and minimising any inconvenience.<br />

<strong>Wangaratta</strong> Transport Study<br />

The study <strong>of</strong> <strong>Wangaratta</strong>’s road network needs to 2030 was completed and adopted by Council<br />

following public consultation. Implementation <strong>of</strong> the Study recommendations is to be progressed with<br />

VicRoads in the coming years.<br />

<strong>Wangaratta</strong> Oxley Shared Pathway<br />

Construction <strong>of</strong> the shared pathway has made substantial progress towards Oxley. Weather permitting,<br />

final completion will be in Spring <strong>2010</strong>.<br />

Roy Street Overpass<br />

Significant improvements have taken place to improve user safety and amenity <strong>of</strong> the Roy St railway<br />

overpass. Works involved slip lane extension, guard rail replacement, batter protection, and pavement<br />

improvements. Further works are planned for the <strong>2010</strong> - 2011 financial year.<br />

Edwards Street Shared Path<br />

The shared path from Phillipson Street to Rotary Park provides a much needed and safer <strong>of</strong>f-road link<br />

in this busy area, particularly for students.<br />

Commencement <strong>of</strong> the <strong>Wangaratta</strong> Main Road Improvement Project<br />

Initial median improvement works and landscaping at the Warby Street intersection have been<br />

completed, with further median works and tree planting along Parfitt Road to occur in the <strong>2010</strong> - 2011<br />

financial year.<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong><br />

33


Infrastructure and Planning<br />

Further Upgrade <strong>of</strong> Edi Cheshunt Road<br />

A 2.5km section <strong>of</strong> the Edi Cheshunt Road, from Black Range Road intersection to Cooks Gap Road, was<br />

reconstructed and sealed during the year.<br />

16km <strong>of</strong> rural roads resealed<br />

Council’s commitment to sound asset management practices ensured that 16km <strong>of</strong> rural roads were<br />

resealed during the year. This program sustains appropriate service levels and safety standards for<br />

these important regional assets.<br />

Final rehabilitation <strong>of</strong> the Bowser East landfill<br />

A $350,000 waste cell capping project at the former Bowser East landfill has been completed. This<br />

is part <strong>of</strong> a long-term program designed to meet Environment Protection Authority requirements for<br />

rehabilitating closed landfills.<br />

Playground upgrades<br />

Council through the assistance <strong>of</strong> the Regional and Local Community Infrastructure Program funding<br />

completed new playgrounds at Tarrawingee Recreation Reserve, John McAleese Park Milawa, Merriwa<br />

Park <strong>Wangaratta</strong> and installed shade sails at Apex Park <strong>Wangaratta</strong> and Springhurst Playground.<br />

Parks and gardens<br />

Highlights included the completion <strong>of</strong> the landscaping around the <strong>Wangaratta</strong> Performing Arts Centre<br />

and changes to the roundabout landscapes in the central business district with a focus on reducing<br />

water usage by selecting hardy plants and improving the irrigation systems.<br />

Bush regeneration<br />

Working with community members and groups to plant 6,400 trees and shrubs in riparian zones across<br />

<strong>Wangaratta</strong>, Wenhams Lane and Chick Road. Increasing community support for bush regeneration<br />

work.<br />

Waste management operations<br />

Purchase <strong>of</strong> a two new side-loading waste compaction units, in particular a unit to replace the rear<br />

loading unit. This has enabled more efficient collection <strong>of</strong> waste in the central business district and<br />

allowed the unit to be used to collect waste in other areas.<br />

Maintaining planning permit processing times<br />

Timeliness in processing planning applications is a goal <strong>of</strong> the department and throughout the last 12<br />

months the number <strong>of</strong> days to process an application has been monitored with Council consistently<br />

achieving a turn-around time less than the prescribed 60 days which puts us ahead <strong>of</strong> many other<br />

similar sized Councils.<br />

Completed Planning Scheme review<br />

In accordance with the Planning and Environment Act 1987, Council must review its planning scheme<br />

every 4 years. This review has been completed and generally demonstrated that the Scheme is<br />

performing well. There is further strategic work to be undertaken including completing the Agricultural<br />

Lands Study and reviewing structure plans for towns throughout the municipality.<br />

Regained a greater part <strong>of</strong> market share for building permits<br />

Over the last 12 months there has been a steady increase in the number <strong>of</strong> applications for building<br />

permits lodged with Council. The Building team has been active in marketing the services it <strong>of</strong>fers and<br />

providing a comprehensive building permit system with a focus on customer service and reducing<br />

processing times for new applications.<br />

34<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong>


Infrastructure and Planning<br />

Projects and Contracts Unit established<br />

The Infrastructure and Technical Services department was re-organised in March <strong>2010</strong> and the Projects<br />

and Contracts Unit was created. The new unit will assist with centralising the procurement <strong>of</strong> contracted<br />

works and services for all <strong>of</strong> Council. Its creation is also intended to improve the control and consistency<br />

<strong>of</strong> approach to purchase <strong>of</strong> goods and contracting <strong>of</strong> works and services.<br />

Standard documentation for tenders and contracts<br />

Commenced the implementation <strong>of</strong> standard terms and conditions for tendering and also implemented<br />

a suite <strong>of</strong> standard contract documentation for the procurement <strong>of</strong> goods, services and works. This<br />

documentation supports the implementation <strong>of</strong> Council’s Procurement Policy.<br />

Challenges<br />

Water usage<br />

Continuing to find ways <strong>of</strong> reducing water usage.<br />

Windstorm event<br />

Providing a timely and effective response to the windstorm event <strong>of</strong> 17 June <strong>2010</strong><br />

Wet start to <strong>2010</strong> winter<br />

A wet start to winter that reintroduced maintenance issues not seen for quite some time.<br />

Looking ahead<br />

• Implementation <strong>of</strong> Stage 1 <strong>of</strong> the recommendations <strong>of</strong> the Merriwa Park Master Plan;<br />

• A study <strong>of</strong> <strong>Wangaratta</strong>’s parking needs to 2030 has been completed and will be considered by<br />

Council in the early part <strong>of</strong> <strong>2010</strong> - 2011 financial year;<br />

• A number <strong>of</strong> additional pedestrian crossing locations in the central business district are currently<br />

being considered for implementation. Some <strong>of</strong> these were highlighted during the public consultation<br />

phase <strong>of</strong> the <strong>Wangaratta</strong> Transport Study;<br />

• Hosting the Environmental Law and Planning Institute <strong>of</strong> Australia (Victoria Chapter) and Victorian<br />

Planning annual conference in <strong>Wangaratta</strong>;<br />

• Finalising the Agricultural Lands Strategy with further community consultation in January and<br />

February, 2011 prior to preparation <strong>of</strong> planning scheme amendments;<br />

• Structure planning for growth <strong>of</strong> towns to ensure that there is a 15 year supply <strong>of</strong> land to<br />

accommodate growth;<br />

• Embracing e-technology for planning by signing on to “Streamlined Planning through Electronic<br />

Applications and Referrals” for electronic processing <strong>of</strong> subdivision applications and later for all<br />

planning applications to further reduce processing times and improve the delivery <strong>of</strong> our services;<br />

• Conducting swimming pool audits to ensure pool safety is a high priority within the community;<br />

• Launch <strong>of</strong> a quarterly building newsletter to keep customers abreast <strong>of</strong> changes to regulations and<br />

services;<br />

• Roll-out <strong>of</strong> the standard contract documentation for all <strong>of</strong> Council;<br />

• Community Hall upgrades;<br />

• Irrigation upgrades at major parks and sportsgrounds;<br />

• Playground replacement at Batchelors Green and King George V Gardens; and<br />

• Showgrounds redevelopment.<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong><br />

35


Infrastructure and Planning<br />

Meeting our strategic objectives<br />

Key strategic activity<br />

To implement asset management<br />

systems that ensure the sustainability<br />

<strong>of</strong> our community assets.<br />

To investigate and implement<br />

infrastructure opportunities that<br />

support community aspirations<br />

To undertake a strategic approach<br />

to land use planning to provide<br />

balanced outcomes for growth,<br />

existing land use, environment,<br />

heritage and community aspirations<br />

Outcome<br />

• Ongoing participation in the Municipal Association <strong>of</strong> Victoria’s<br />

Step Program;<br />

• Adoption <strong>of</strong> the Town Entries Landscape Strategy which sets<br />

out the proposed works along entries to <strong>Wangaratta</strong>; and<br />

• Participation in the asset management best practice program<br />

Regional Asset Management Program.<br />

• A number <strong>of</strong> path “missing links” have been constructed.<br />

The <strong>Wangaratta</strong> to Oxley shared path (Rail Trail) is under<br />

construction;<br />

• Advocating for an ultra fast train service between Melbourne<br />

and Sydney with a stop in <strong>Wangaratta</strong> and was successful in<br />

gaining approval as a regional priority in the Hume Strategy for<br />

Sustainable Communities; and<br />

• The <strong>Wangaratta</strong> Transport Study was completed, providing<br />

recommendations to improve <strong>Wangaratta</strong>’s traffic flow through<br />

to 2030.<br />

• The Agricultural Land Strategy is progressing;<br />

• Development <strong>of</strong> an overall housing/population growth strategy;<br />

and<br />

• Participation in a project to produce a Local Government<br />

Sustainable Buildings Toolkit.<br />

36<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong>


Economic Development and Tourism<br />

“the <strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> is the destination <strong>of</strong> choice for businesses to invest and grow and for<br />

families to settle with secure employment.” 2030 Community Vision<br />

The economic development and tourism activities <strong>of</strong> Council recognise that the city is a regional service<br />

centre with strong manufacturing, retail, agribusiness and service sectors.<br />

Objectives<br />

Improve employment opportunities and increase investment in the <strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong>.<br />

Council results from the <strong>Annual</strong> Community Satisfaction Survey for Local Government:<br />

Economic Development<br />

80<br />

70<br />

%<br />

60<br />

50<br />

40<br />

2006<br />

2007<br />

2008<br />

<strong>2009</strong><br />

<strong>2010</strong><br />

Contact with the <strong>Wangaratta</strong> Visitor Information Centre:<br />

<strong>Wangaratta</strong> Visitor Information<br />

Centre Visitor Numbers<br />

<strong>Wangaratta</strong> Visitor Information<br />

Centre Mail Outs<br />

<strong>Wangaratta</strong> Visitor Information<br />

Centre Emails<br />

Visitors<br />

70000<br />

60000<br />

50000<br />

40000<br />

30000<br />

20000<br />

10000<br />

0<br />

2005/06<br />

2006/07<br />

2007/08<br />

2008/09<br />

<strong>2009</strong>/10<br />

Mail Outs<br />

1500<br />

1000<br />

500<br />

0<br />

2005/06<br />

2006/07<br />

2007/08<br />

2008/09<br />

<strong>2009</strong>/10<br />

Emails<br />

8000<br />

7000<br />

6000<br />

5000<br />

4000<br />

3000<br />

2000<br />

1000<br />

0<br />

2005/06<br />

2006/07<br />

2007/08<br />

2008/09<br />

<strong>2009</strong>/10<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong><br />

37


Economic Development and Tourism<br />

Highlights <strong>of</strong> the year<br />

Alpine Valleys Agrifood Project<br />

Driven by the strong desire to find replacement agrifood opportunities for growers previously committed<br />

to tobacco production <strong>Wangaratta</strong> Unlimited established a “three pronged” strategic approach for this<br />

innovative project.<br />

• Support and encourage existing leaders<br />

• Stimulate a change in farming culture<br />

• Attraction <strong>of</strong> external investment and expertise<br />

Now under the established brand <strong>of</strong> Alpine Valleys Agrifood and with a catch cry <strong>of</strong> “Growing at a<br />

higher level” the compelling attributes <strong>of</strong> the Ovens and King Valleys (Alpine Valleys) region have an<br />

elevated pr<strong>of</strong>ile as a sustainable and competitive location for the production <strong>of</strong> high value agricultural<br />

production.<br />

Although still early into the project, significant investment interest is being stimulated with the marketing<br />

prospectus and implementation strategy.<br />

Strong Market demand for Sinclair Drive industrial lots<br />

Council’s commitment to provide “Investment Ready” industrial lots had been fully supported the<br />

outstanding sales results achieved for the 17 lot Sinclair Drive industrial subdivision. Listed to market at<br />

the height <strong>of</strong> the global economic downturn estimated 5 year sales targets have been exceeded within<br />

2 years. With four lots remaining, Council is now progressing to stage 3 <strong>of</strong> the Murrell Street Industrial<br />

estate with a further 14 lot development.<br />

Commencement <strong>of</strong> the $10 million Bunnings warehouse development<br />

Construction has commenced on the 1.9 hectare site at the corner <strong>of</strong> Tone Road and Newman Street<br />

South <strong>Wangaratta</strong> for the much anticipated $10 million Bunnings warehouse development.<br />

The site, plus adjoining land has the potential for additional bulky goods retailing to cluster around<br />

Bunnings creating a comprehensive regional homemaker precinct.<br />

Opening <strong>of</strong> the purpose built <strong>Wangaratta</strong> Technical Education Centre<br />

February <strong>2010</strong> saw the first student intake to the <strong>Wangaratta</strong> Technical Education Centre within the<br />

Goulburn Ovens Institute <strong>of</strong> TAFE campus site at Cusack Street. This innovative approach to vocational<br />

education provision has been established by a partnership approach between <strong>Wangaratta</strong> High School<br />

and Goulburn Ovens Institute <strong>of</strong> TAFE.<br />

As a national first this new facility provides a unique opportunity for young people to enhance their<br />

vocational education experience whilst also elevating the pr<strong>of</strong>ile <strong>of</strong> trades training as a viable option to<br />

a more academic education stream.<br />

Establishment <strong>of</strong> the Goulburn Ovens Institute <strong>of</strong> TAFE <strong>Rural</strong> Industries Campus<br />

Positioned on the high pr<strong>of</strong>ile 40 hectares site at the southern entry to <strong>Wangaratta</strong>, the Goulburn Ovens<br />

Institute <strong>of</strong> TAFE <strong>Rural</strong> Industries Campus will provide wide ranging education opportunities for a broad<br />

selection <strong>of</strong> rural industries. Already the home for the National Equine Education Centre the new facility<br />

is rapidly building its suite <strong>of</strong> primary industry study areas in response to industry demand.<br />

Collaboration with the <strong>Wangaratta</strong> Festival <strong>of</strong> Jazz Board to ensure a successful 20th birthday event<br />

Council worked in conjunction with Festival Board and staff to ensure a successful transition to<br />

utilisation <strong>of</strong> the new <strong>Wangaratta</strong> Performing Arts Centre as the premier Festival venue. Utilisation <strong>of</strong><br />

<strong>Wangaratta</strong> Visitor Centre as a call centre for Festival enquiries. Successful management <strong>of</strong> the Reid<br />

Street component <strong>of</strong> the Festival.<br />

38<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong>


Economic Development and Tourism<br />

Recognition <strong>of</strong> the “Murray to Mountains” as the pre-eminent Cycle Tourism Destination<br />

A strategic partnership between Council, Indigo and Alpine Shire has proven integral in positioning<br />

the “Murray to Mountains” region as market leaders in Cycle Tourism development. Building on the<br />

nationally renowned Murray to Mountains Rail Trail and implementation <strong>of</strong> a number <strong>of</strong> innovative<br />

marketing initiatives, the growth in cycle tourism across all cycling elements has been outstanding.<br />

Recognition <strong>of</strong> the “Murray to Mountains” as a must visit location within the cycle tourism sector<br />

culminated in the hosting <strong>of</strong> the first National Cycle Tourism Conference at the <strong>Wangaratta</strong> Performing<br />

Arts Centre in February <strong>2010</strong>.<br />

Support <strong>of</strong> niche tourism events<br />

Council recognises that events draw visitors to the municipality. To encourage new and existing events<br />

to prosper and grow, a funding program was established to provide financial support to event organisers.<br />

In <strong>2009</strong>/<strong>2010</strong> Council provided over $47,000 funding from the tourism event funding programs to 13<br />

events held in the municipality.<br />

Challenges<br />

A constrained economy<br />

A more credit constrained economy has delayed some commercial development.<br />

Skilled migration<br />

Reduced labour market demand specifically for skilled migrants.<br />

Supporting former tobacco growers<br />

Ongoing challenge <strong>of</strong> seeking out sustainable opportunities for former tobacco growers.<br />

Tourism Industry<br />

Increasing competition in the tourism industry and more sophisticated consumer demands and<br />

expectations.<br />

Looking ahead<br />

• Ovens Riverside / Connections Project;<br />

• <strong>Wangaratta</strong> Centre for Medical Excellence;<br />

• Realising the potential <strong>of</strong> a bulky goods / homemakers centre to cluster around the Bunnings<br />

Development;<br />

• Establishing the Yarra Valley to High Country Touring Route; and<br />

• Re-scoping the Ned Kelly Interpretive Centre<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong><br />

39


Economic Development and Tourism<br />

Meeting our strategic objectives<br />

Key strategic activity<br />

To define and market the liveability<br />

and lifestyle attributes <strong>of</strong> the <strong>Rural</strong><br />

<strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> as a preferred<br />

location to live, work and invest.<br />

To reinvigorate the inner urban areas<br />

<strong>of</strong> <strong>Wangaratta</strong> to maximise their<br />

potential.<br />

To buffer our economy against the<br />

impacts <strong>of</strong> the global economic<br />

downturn.<br />

In conjunction with relevant<br />

stakeholders, to realise the<br />

sustainable agricultural production<br />

potential <strong>of</strong> the Ovens and King<br />

Valleys region as a future food bowl.<br />

To support and encourage a<br />

sustainable, innovative and resilient<br />

tourism sector.<br />

To prepare for a carbon constrained<br />

economy through developing<br />

greenhouse friendly economic<br />

initiatives and capitalising on related<br />

opportunities.<br />

To further progress <strong>Wangaratta</strong> as<br />

the leading retail and service centre<br />

in North East Victoria.<br />

Outcome<br />

• Council continues to maintain an active involvement in the<br />

“Make It Happen in Provincial Victoria” marketing initiatives<br />

including fully redesigning and reinvigorating the North East<br />

Victoria website;<br />

• Council is maintaining a strong media pr<strong>of</strong>ile with Alpine Valleys<br />

Agrifood Initiative including media coverage and regional<br />

information sessions; and<br />

• Council had a presence at the <strong>2010</strong> Reinvent Your Career Expo<br />

in Melbourne<br />

• Council will develop an urban renewal program to revitalise the<br />

Newman Street and Vincent Road precinct.<br />

• All identified initiatives <strong>of</strong> the <strong>Wangaratta</strong> Unlimited Global<br />

Economic Downturn Response Strategy have been<br />

implemented with a significant proportion <strong>of</strong> these ongoing.<br />

• To support an innovative and sustainable agricultural sector<br />

within the Ovens and King Valley’s region, marketing initiatives<br />

continue to be progressed. A formal supply chain strategy and<br />

business plan is now being undertaken; and<br />

• Council continues to advocate to preserve the current<br />

protection <strong>of</strong> the Ovens and King River systems with respect to<br />

the trading <strong>of</strong> water.<br />

• The North East Valleys Food and Wine three year strategic plan<br />

and regional plan is complete;<br />

• Industry standard e commerce is being promoted to tourism<br />

operators through the Bookeasy online reservations system<br />

operated from the <strong>Wangaratta</strong> Visitor Information Centre; and<br />

• A draft brief to undertake the rescoping <strong>of</strong> the Ned Kelly<br />

Interpretive Centre proposal has been prepared.<br />

• Council has delayed implementation <strong>of</strong> projects and proposals<br />

in relation to preparing for a carbon constrained economy until<br />

clarity <strong>of</strong> a strategy from the Federal Government is evident.<br />

• Council continues to implement the actions <strong>of</strong> the 2008 Retail<br />

Audit and Development Plan including realising the potential <strong>of</strong><br />

a regional bulky goods/home maker centre to cluster around<br />

the planned Bunnings development; and<br />

• Pursuing the creation <strong>of</strong> the Ely Street mixed use precinct.<br />

40<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong>


Environmental Sustainability<br />

“Our environment remains our most valuable asset.” 2030 Community Vision<br />

Our natural resources are land, water, air, ecological systems and biodiversity. A sustainable environment<br />

will be achieved by careful and efficient use <strong>of</strong> these resources, taking into account current and future<br />

needs. Council’s commitment incorporates:<br />

• Conservation and enhancement <strong>of</strong> our local natural environment and the sustainable use <strong>of</strong> natural<br />

resources by the local community;<br />

• Ongoing collaboration with other authorities and<br />

• Ongoing public participation.<br />

Objectives<br />

1. Assist our community to experience, understand and value a healthy, diverse and exciting<br />

environment.<br />

2. Conserve and enhance the natural landscape, urban treescapes and to use natural resources<br />

responsibly.<br />

Highlights <strong>of</strong> the year<br />

Ecobuy Certificate – Excellence in Green Purchasing Regional Council<br />

The <strong>Rural</strong> <strong>City</strong> achieved runners up in “Excellence in Green Purchasing by a Regional Council”. The<br />

construction <strong>of</strong> the <strong>Wangaratta</strong> Performing Arts Centre substantially contributed to our green<br />

purchasing for the reporting period.<br />

Citizens Jury - Deliberative Democracy<br />

In conjunction with the Department <strong>of</strong> Sustainability and Environment a very successful public<br />

consultation, Deliberative Democracy, was held. With 20 volunteers undertaking a two day workshop <strong>of</strong><br />

consultation on Council’s proposed framework for Environmental Sustainability Strategy.<br />

Sustainability Expo - My Backyard Rules<br />

This sustainability expo was held on February 20, <strong>2010</strong> in King George V Gardens. This was an important<br />

community sustainability event, with an estimated 1,000 people attending to learn about energy savers,<br />

solar hot water, sustainable gardening, water saving, composting, waste reduction and much more.<br />

The expo attracted a range <strong>of</strong> local industries to showcase <strong>Wangaratta</strong> business products available to<br />

help the community become sustainable<br />

Glenrowan Firewood Depot launched<br />

The Glenrowan firewood depot opened in May as a joint initiative with the Department <strong>of</strong> Sustainability<br />

and Environment. The depot collects timber removed from Department <strong>of</strong> Sustainability and Environment<br />

and Council works. This reduces the stress not only on households, but also on important roadsides,<br />

where local environments are damaged by the continual removal <strong>of</strong> fallen timber. Fallen timber is<br />

important to provide insect and small animal food sources in these local ecosystems, as well as animal<br />

shelter, eventually replenishing the soil.<br />

National Tree Planting Day<br />

Over 1,500 trees were planted by schools and volunteers along <strong>Wangaratta</strong>’s waterway reserves during<br />

the month <strong>of</strong> July, helping to improve the riparian areas along our rivers and creeks.<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong><br />

41


Environmental Sustainability<br />

Roadside Partnership Program<br />

This project is a joint project between Council and the Indigo Shire Council and is a component <strong>of</strong><br />

updating both municipalitys’ roadside management documentation. The Roadside Landholder<br />

Engagement Program was created to assist landholders to learn about the value <strong>of</strong> roadside vegetation<br />

in our landscape and how roadsides can complement the management <strong>of</strong> properties. As part <strong>of</strong> the<br />

program an ecologist spent time with landholders on their roadside to identify the features <strong>of</strong> the<br />

roadside and the associated best practice management <strong>of</strong> these features. A behaviour change survey<br />

was conducted to gauge the level <strong>of</strong> engagement and uptake <strong>of</strong> management strategies.<br />

Council Environmental Calendar <strong>of</strong> Public Events<br />

A <strong>2010</strong> calendar was launched for environmental public events to give advance notice for: My Backyard<br />

Rules, Clean up Australia Day, World Environment Day, National Tree Day, Landcare Week, National Water<br />

Week and Recycling Week.<br />

Improvement <strong>of</strong> significant roadsides<br />

In many areas, roadsides are an important refuge for scarce remnant vegetation and preserve the<br />

natural characteristics <strong>of</strong> local areas. Council has been assisted by State and Federal funding to control<br />

weeds and pests on roadsides. This included work to help protect land from locust hatching, rabbits<br />

and other pests. Council is part <strong>of</strong> a project to protect the threatened Box Grassy Woodlands ecosystem<br />

in the municipality.<br />

Improvement <strong>of</strong> waterways in urban <strong>Wangaratta</strong><br />

Our waterways enhance the enjoyment <strong>of</strong> walking and riding in natural surroundings. Council works<br />

have improved these wonderful natural surroundings by controlling weeds and pests and planting<br />

local grasses and shrubs that are missing from these areas. Council and the North East Catchment<br />

Management Authority have been proactive in treating a new weed, Parrots Feather that threatened<br />

to choke areas <strong>of</strong> our creeks. This work is also a partnership with community members. The Restore<br />

Our Waterways group, launched in June, assists with water quality monitoring and tree planting.<br />

These waterway environments are also habitats to possums, gliders, water-rats, platypus, owls and<br />

many other birds. All these species recorded in these local areas, indicate the improvement in habitat<br />

condition.<br />

Clean Up Australia Day<br />

A Clean Up Australia Day events were focused on cleaning the entire One Mile Creek. Local schools<br />

participated and Council staff contributed by donating their time to clean up along North Beaches.<br />

Heritage Tree Walks<br />

A brochure was established for a self guided heritage tree walk aimed to highlight our local heritage<br />

trees, in particularly heritage trees surrounding our CBD area. Council staff hosted two successful<br />

community tree walks, both comprised <strong>of</strong> interested community members. Brochures are now available<br />

at the <strong>Wangaratta</strong> Government Centre and Visitor Information Centre.<br />

Streetscape bin updates<br />

Streetscape recycling bins have been ordered to complement existing bins and improve recycling.<br />

Installation <strong>of</strong> new Butt Bins throughout the CBD to prevent butt litter in our waterways was<br />

complemented by a street to stream campaign held in August.<br />

42<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong>


Environmental Sustainability<br />

Challenges<br />

Citizen’s Jury - Deliberative Democracy<br />

Incorporating the large number and wide ranging recommendations into council’s operations.<br />

North East Greenhouse Alliance<br />

Transitioning the North East Greenhouse Alliance to appropriate legal structure and governance<br />

arrangements.<br />

Roadside Management Plan<br />

Increasing concern in regard to fire prevention creates difficulties for conservation activities.<br />

Looking ahead<br />

• Roadside Management Plan;<br />

• Ecoliving Centre at Barr Community Centre; and<br />

• Improved household sustainability information facilitated by an education <strong>of</strong>ficer<br />

Meeting our strategic objectives<br />

Key strategic activity<br />

To responsibly manage the local<br />

environment.<br />

To enhance community understanding<br />

<strong>of</strong> conservation values and provide<br />

opportunities to experience and<br />

contribute to the environment.<br />

To reduce impact <strong>of</strong> Council’s<br />

activities and provide leadership in<br />

sustainability by demonstrating best<br />

practice<br />

Outcome<br />

• To provide protection for threatened remnant native vegetation,<br />

Council is currently reviewing the Roadside Management<br />

Strategy;<br />

• River Tender works to control weeds and pest animals and<br />

promote regeneration <strong>of</strong> vegetation at North Beaches, Kaluna<br />

Park and Walnut Grove is progressing well. All reserves are<br />

weed and vermin free and assessed as low fire risk; and<br />

• The conservation status <strong>of</strong> all high and some medium<br />

conservation roadsides in <strong>Wangaratta</strong> has been reviewed.<br />

• A Council calendar <strong>of</strong> environmental events has been<br />

implemented;<br />

• Glenrowan Firewood Depot was <strong>of</strong>ficially launched with<br />

promotion <strong>of</strong> values <strong>of</strong> roadsides and the importance <strong>of</strong><br />

sustainable firewood; and<br />

• Council is assisting the <strong>Wangaratta</strong> Sustainability Network to<br />

form a Water Action group to improve the condition <strong>of</strong> urban<br />

waterways<br />

• Council continues to monitor the North East Greenhouse<br />

Alliance project on the use <strong>of</strong> bio fuels;<br />

• An EcoLeaders team <strong>of</strong> representatives from council and other<br />

agencies at the <strong>Wangaratta</strong> Government Centre promote<br />

sustainability at the centre; and<br />

• The Framework for an Environment Strategy has been developed.<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong><br />

43


Environmental Sustainability<br />

Key strategic activity<br />

To develop initiatives for the<br />

community to reduce resource use<br />

and waste to achieve sustainable<br />

living.<br />

Outcome<br />

• Council continues to provide access to information on<br />

sustainable building development, waste disposal, energy and<br />

water use within the community through Council’s website and<br />

at public events including the Sustainable Living Expo and<br />

Clean up Australia Day;<br />

• Council continues to work with Landcare groups to provide<br />

funding for weed control; and<br />

• The Lower Ovens Floodplain project reducing WONS (Weeds <strong>of</strong><br />

National Significance, Chilean Needle Grass) and Box Grassy<br />

Woodland project (WONS, Chilean Needle Grass, Blackberry) are<br />

being implemented.<br />

44<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong>


Sport and Recreation<br />

“... the prominence and role <strong>of</strong> sport and active recreation remains ... central to the <strong>Rural</strong> <strong>City</strong> <strong>of</strong><br />

<strong>Wangaratta</strong> way <strong>of</strong> life.” 2030 Community Vision<br />

Sport and recreation activities continue to be an important ingredient in community life in the <strong>Rural</strong> <strong>City</strong><br />

<strong>of</strong> <strong>Wangaratta</strong>. They provide opportunities for people to maintain physical wellbeing and strengthen<br />

social ties. Stakeholders include government, community and the private sector who directly contribute<br />

to the quality and diversity <strong>of</strong> sport and recreation opportunities throughout the <strong>Rural</strong> <strong>City</strong>. Council’s<br />

efforts are focused on partnerships, as well as supporting a balanced and sustainable mix <strong>of</strong> sport and<br />

recreation opportunities for all.<br />

Objectives<br />

1. Provide high quality passive and active<br />

recreational opportunities, together with<br />

significant sporting events.<br />

2. Improve access to both local and regional sport<br />

and recreation opportunities to improve health<br />

and wellbeing.<br />

Recreational facilities<br />

80<br />

70<br />

60<br />

%<br />

50<br />

40<br />

2006<br />

2007<br />

2008<br />

<strong>2009</strong><br />

<strong>2010</strong><br />

Council results from the <strong>Annual</strong><br />

Community Satisfaction Survey<br />

for Local Government.<br />

Highlights <strong>of</strong> the year<br />

Aquatic Strategy<br />

Council has undertaken a detailed community consultation process to provide input into the<br />

development <strong>of</strong> an Aquatic Strategy. The process has included a community survey, stakeholder and<br />

public meetings and a publicly exhibited set <strong>of</strong> ‘Guiding Principles’.<br />

Country Football Netball Program<br />

A number <strong>of</strong> Football Netball Clubs have received funding through the Victorian State Government’s<br />

Country Football Netball program for facility upgrades and new developments.<br />

The Moyhu Football Netball Club was successful in obtaining $60,000 in funding for an upgrade <strong>of</strong> the<br />

netball court including lighting. The Club generated matching funds with volunteers also committing<br />

in-kind contributions towards the project.<br />

Drought Relief for Community Sport and Recreation<br />

The Tarrawingee Recreation Reserve Committee <strong>of</strong> Management was successful in receiving $60,000<br />

towards the installation <strong>of</strong> a water bore. The bore will provide a reliable water source to the Reserve,<br />

CFA and local residents.<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong><br />

45


Sport and Recreation<br />

<strong>2010</strong> - 2011 Community Facilities Funding Program – Minor Facilities<br />

The <strong>Wangaratta</strong> Equestrian Centre (<strong>Wangaratta</strong> Adult Horse Riding Club and <strong>Wangaratta</strong> Pony Club)<br />

were successful in receiving $60,000 towards drainage works, construction <strong>of</strong> lighting on the main<br />

arena and the development <strong>of</strong> a cross-country course.<br />

<strong>Wangaratta</strong> Cycling Club Strategic Plan<br />

A Strategic Plan was developed by the <strong>Wangaratta</strong> Cycling Club to assess future priorities. As a result<br />

<strong>of</strong> a detailed “Strengths, Weaknesses, Opportunities and Threats” analysis and lengthy discussions,<br />

an action plan has been established with recommendations for works and programs to be undertaken<br />

particularly over the next five years.<br />

<strong>Wangaratta</strong> Show Society Strategic Plan<br />

As a result <strong>of</strong> planning with the <strong>Wangaratta</strong> Show Society a number <strong>of</strong> initiatives were successfully<br />

implemented:<br />

• Showcase dinner to better service current sponsors, attract new sponsors and showcase the<br />

event;<br />

• The development <strong>of</strong> a sponsorship package for promotion and marketing to potential sponsors;<br />

• An advisory group has been established enabling young people to have active input into the<br />

planning <strong>of</strong> the Show activities; and<br />

• Improved marketing and promotion strategies including the development <strong>of</strong> a website.<br />

Challenges<br />

• Balancing community expectations with Council’s principles in the delivery <strong>of</strong> the Aquatic Strategy<br />

outcomes;<br />

• Ensuring that the Showgrounds redevelopment is delivered on time, on budget and raises the<br />

standard <strong>of</strong> sporting facilities into the future.<br />

Looking ahead<br />

Planning:<br />

• Develop an Open Space Strategy;<br />

• Review 2005 Recreation Plan;<br />

• Support the ongoing development, implementation and review <strong>of</strong> strategic plans for rural recreation<br />

reserves and sporting groups; and<br />

• Continue progress with planning around the future <strong>of</strong> the three aquatic facilities.<br />

Capital Works:<br />

• <strong>Wangaratta</strong> Skate Park – complete the redevelopment works; and<br />

• Support the implementation <strong>of</strong> community projects funded under the Country Football, Community<br />

Facilities and Sustainable Sports Grounds Funding Programs.<br />

46<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong>


Sport and Recreation<br />

Meeting our strategic objectives<br />

Key strategic activity<br />

To undertake a planned approach<br />

to maintaining and improving quality<br />

and accessible recreation and<br />

sporting facilities and programs.<br />

To encourage the greater use <strong>of</strong><br />

recreation facilities including formal<br />

sports facilities, open spaces, shared<br />

paths and aquatic centres.<br />

Outcome<br />

• The <strong>Wangaratta</strong> Recreation Parklands Master Plan has been<br />

endorsed by Council;<br />

• Council has secured full funding for the Showgrounds<br />

Redevelopment Project; and<br />

• The review and update <strong>of</strong> Council’s Aquatic Strategy is continuing.<br />

• The role <strong>of</strong> Committees <strong>of</strong> Management and Council in the future<br />

management <strong>of</strong> community facilities has been determined with<br />

the development <strong>of</strong> a “Special Committees” Manual and Facilities<br />

Maintenance Policy;<br />

• Opportunities are being pursued through the Yarrunga<br />

Community Hub project to encourage collaborative use <strong>of</strong><br />

community and education facilities; and<br />

• Council continues to assist with the development <strong>of</strong> strategic<br />

plans for recreation reserve Committees <strong>of</strong> Management, with<br />

a number almost complete.<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong><br />

47


Human Resources<br />

Success in service provision is directly linked to Council’s ability to attract, retain, motivate and develop<br />

a diverse range <strong>of</strong> quality and skilled staff.<br />

As at 30 June <strong>2010</strong>, <strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> employed a staff <strong>of</strong> 249 effective full-time equivalent<br />

employees comprising 394 full-time, part-time and casual employees. 24 staff commenced permanent<br />

employment during <strong>2009</strong>-<strong>2010</strong>. Staff turnover is 7.86% for <strong>2009</strong>-<strong>2010</strong>, which is lower than turnover<br />

rates across the Local Government sector and represents an improvement on Council’s 2008-<strong>2009</strong><br />

reported rate <strong>of</strong> 10.22%.<br />

Council carefully reviews feedback from departing staff to identify any issues that may have contributed<br />

to their departure.<br />

Staff Pr<strong>of</strong>ile (as at 30 June <strong>2010</strong>)<br />

Employees by full time equivalent:<br />

Current employees:<br />

Male Female Total<br />

Full time 115 69 184<br />

Part time 3.34 46.39 49.73<br />

Casual 3.93 11.55 15.48<br />

Total 122.27 126.94 249.21<br />

Male Female Total<br />

Full time 115 69 184<br />

Part time 7 89 96<br />

Casual 36 78 114<br />

Total 158 236 394<br />

Employees by Australian Bureau <strong>of</strong> Statistics Occupation Category (major groups):<br />

Occupation category Male Female Total<br />

Managers and Administrators 10 13 23<br />

Pr<strong>of</strong>essionals 17 42 59<br />

Associate Pr<strong>of</strong>essionals 18 28 46<br />

Tradespersons and related workers 30 7 37<br />

Advanced Clerical and Service workers 4 49 53<br />

Intermediate Clerical, Sales and Service workers 6 66 72<br />

Intermediate Production and Transport workers 32 2 34<br />

Elementary Clerical, Sales and Service workers 8 28 36<br />

Labourers and Related workers 33 1 34<br />

Total 158 236 394<br />

Staff Turnover (full and part time):<br />

Permanent staff<br />

Rate<br />

Resigned 22 7.86%<br />

Commenced 24 8.57%<br />

How we develop our staff<br />

Staff development programs are an important part <strong>of</strong> attracting, retaining and developing our people.<br />

In <strong>2009</strong> - <strong>2010</strong> a range <strong>of</strong> training programs were conducted to meet the needs <strong>of</strong> the organisation<br />

including information technology, leadership, project management, traffic management, customer<br />

service, contract management, health and safety and risk management.<br />

48<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong>


Human Resources<br />

Council’s career building program continues to be a great success in attracting younger people to a<br />

career in Local Government and to help fill positions identified as skilled shortages. Five students are<br />

currently participating in the program. Three students are being supported in civil engineering, one in<br />

environment and one in child care.<br />

How we reward our staff<br />

An increased emphasis placed on managing staff performance led to the implementation <strong>of</strong> a revised<br />

<strong>Annual</strong> Review process for all staff in <strong>2009</strong>. The aim was to ensure that all full and part-time staff had<br />

a performance plan and a training plan. This process is continuously reviewed to ensure its ongoing<br />

success. It allows all employees the opportunity to receive either a one week or a two week salary<br />

bonus based on their performance.<br />

Milestones recognised<br />

1 July <strong>2009</strong> to 30 June <strong>2010</strong><br />

Staff Member<br />

Years <strong>of</strong> Service<br />

Staff Member<br />

Years <strong>of</strong> Service<br />

Peter Grunow 30<br />

Maxwell Brockwell 25<br />

Cameron Henshall 25<br />

Ross Cairns 20<br />

Margaret Dean 20<br />

Susanne Furlan 20<br />

Lorrene Harding 20<br />

Dean Woodberry 20<br />

Dorothy Baker 15<br />

Michael Davis 15<br />

Darren Gilbert 15<br />

Ann Kerr 15<br />

Graham Bickerdike 10<br />

Susan Bull 10<br />

Judith Fogarty 10<br />

Suzanne Gunn 10<br />

Jennifer Handley 10<br />

Jennifer Kerlin 10<br />

Christine Kilner 10<br />

Michael Lappin 10<br />

Patricia Mace 10<br />

Edwina Maiden 10<br />

Anthony Mannix 10<br />

Carol Shirley 10<br />

Maree Sullivan 10<br />

Karen Witherow 10<br />

Moving forward<br />

Enterprise Agreement<br />

Council’s Enterprise Agreement 2008 is due to expire on 31 December <strong>2010</strong>. Negotiations with employee<br />

representatives commence in August <strong>2010</strong> and will continue until agreement is reached on the new<br />

Enterprise Agreement.<br />

The Enterprise Agreement delivers certainty about future remuneration and also provides the basis for<br />

other workplace arrangements. It is an important tool and is the framework for how Council’s work gets<br />

done; delivering better service to the community, improving efficiency and providing a more enjoyable<br />

place to work.<br />

Human Resource Information System<br />

Council’s new Human Resource Information System will be implemented in the second half <strong>of</strong> <strong>2010</strong>. It<br />

will enable improved workforce analyses and planning and the identification and delivery <strong>of</strong> the training<br />

plan. Council is committed to ensuring that staff have the skills necessary to deliver services to meet<br />

the community’s expectations.<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong><br />

49


Best Value<br />

Features <strong>of</strong> the Best Value Program<br />

Benchmarking against both local government and private industry has enabled Council to compare<br />

like services with the best-on-<strong>of</strong>fer and has created an opportunity for the sharing <strong>of</strong> best practice<br />

strategies, skills, methods and information across the industry.<br />

The Best Value Service Review process has allowed for the identification <strong>of</strong> service linkages and a<br />

number <strong>of</strong> skills within the organisation that can lead to organisation-wide knowledge sharing and<br />

staff development.<br />

Accountability<br />

The <strong>Wangaratta</strong> <strong>Rural</strong> <strong>City</strong> Council continues be accountable to our community for the provision <strong>of</strong><br />

services and the performance <strong>of</strong> the organisation in accordance with Best Value Principles:<br />

• Whole-<strong>of</strong>-Organisation Response<br />

That a council’s implementation <strong>of</strong> the Best Value Principles be a whole-<strong>of</strong>-organisation response<br />

applied through its corporate planning responsibilities including all its services and functions.<br />

• Consultation on Performance<br />

That a council demonstrate its accountability for the implementation <strong>of</strong> the Best Value Principles by<br />

measuring and reporting on its performance to its community against objectives and targets that<br />

are set by the council after consultation with its community.<br />

• Best Value Outcomes<br />

That the Best Value Principles framework delivers enhanced service and organisational performance<br />

across the local government sector and that the sector be able to demonstrate to the state<br />

government that it has achieved these objectives.<br />

• Benefits, Not Costs<br />

That the implementation <strong>of</strong> the Best Value Principles framework does not incur costs that outweigh<br />

the benefits <strong>of</strong> applying the Best Value Principles framework, particularly in relation to small rural<br />

councils.<br />

• Encourage Innovation<br />

That the Best Value Principles framework encourages councils to adopt innovative and creative<br />

responses to service delivery, including a range <strong>of</strong> partnering relationships.<br />

Further Information<br />

Further information <strong>of</strong> the <strong>Wangaratta</strong> <strong>Rural</strong> <strong>City</strong> Council’s Best Value Service Review program can be<br />

obtained by contacting Mr Ray Park, Director – Sustainability at the <strong>Wangaratta</strong> Government Centre.<br />

50<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong>


Access and Inclusion Plan<br />

Evaluation <strong>of</strong> implementation<br />

The federal Disability Discrimination Act (1992) requires all government agencies, including councils, to<br />

actively remove discrimination on the basis <strong>of</strong> disability. One <strong>of</strong> the strategies used to achieve this is<br />

the development and implementation <strong>of</strong> a Disability Action Plan (or its equivalent).<br />

In 2006, the Victorian Government enacted the Disability Act 2006. This Act made the development<br />

<strong>of</strong> a Disability Action Plan (or its equivalent) mandatory. The Disability Action Plan is prepared for the<br />

purpose <strong>of</strong>:<br />

• Reducing barriers to persons with a disability accessing services, facilities or goods;<br />

• Reducing barriers to persons with a disability obtaining and maintaining employment;<br />

• Promoting the inclusion and participation <strong>of</strong> persons with a disability in the community: and<br />

• Achieving tangible changes in attitudes and practices which discriminate against persons with a<br />

disability.<br />

The Plan is required to be registered with the Human Rights and Equal Opportunity Commission and its<br />

implementation reported on in Council’s annual report.<br />

The <strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> Access and Inclusion Policy was adopted by Council at the Ordinary<br />

Meeting <strong>of</strong> Council held 20 April <strong>2010</strong> in accordance with Section 38 <strong>of</strong> the Disability Act 2006.<br />

Also in accordance with Section 38 <strong>of</strong> the Disability Act 2006 Council provides the following report on<br />

the implementation <strong>of</strong> the <strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> Access and Inclusion Policy as it relates to those<br />

actions scheduled for completion during the <strong>2009</strong> - <strong>2010</strong> reporting period.<br />

Council<br />

No. Action Timeline Performance Measures Comment<br />

1.1 Ensure all new and existing Council December All new plans, strategies, policies Council’s new plans, strategies<br />

plans, strategies, policies and <strong>2009</strong> and and contracts ensure access and policies and contracts will identify<br />

contracts include formal ongoing inclusion issues have been identified and address access and inclusion<br />

consideration <strong>of</strong> access and and addressed prior to adoption by issues prior to adoption by Council.<br />

inclusion issues. Council. Access and inclusion issues in<br />

All existing plans, strategies and existing plans, strategies and<br />

policies have been reviewed. policies will be addressed as<br />

part <strong>of</strong> the regular review process.<br />

1.2 Ensure all new councillors, employees December Councillor, staff and volunteer All new employees receive information<br />

and volunteers receive information <strong>2009</strong> and induction includes reference to on Council’s Access and Inclusion<br />

on Council’s Access and Inclusion ongoing Council’s Access and Inclusion Policy Policy and the requirements <strong>of</strong> the<br />

Policy and the requirements <strong>of</strong> the and the requirements <strong>of</strong> the Disability Disability Discrimination Act 1992 and<br />

Disability Discrimination Act 1992 Discrimination Act 1992. the Disability Act 2006 (Victoria).<br />

and the Disability Act 2006 (Victoria)<br />

Resources are made available to<br />

and resources available to them as<br />

them as part <strong>of</strong> their induction kit.<br />

part <strong>of</strong> their induction.<br />

1.3 Ensure an integrated approach to February Policy adopted by Council. The <strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> Access<br />

access and inclusion issues <strong>2010</strong> and Inclusion Policy was adopted by<br />

throughout Council including: January Responsible <strong>of</strong>ficer nominated and Council held 20 April <strong>2010</strong>.<br />

• Development and adoption <strong>of</strong> an <strong>2010</strong> and reporting mechanism developed. Council’s Manager Community Health<br />

access and inclusion policy; ongoing and Amenity is charged with overall<br />

• Nomination <strong>of</strong> an <strong>of</strong>ficer to take<br />

responsibility for coordinating Council’s<br />

overall responsibility for<br />

response and promoting access and<br />

coordinating Council’s response<br />

inclusion to staff and the community.<br />

and promoting access and inclusion<br />

to staff and the community.<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong><br />

51


Access and Inclusion Plan<br />

No. Action Timeline Performance Measures Comment<br />

1.4 Each department to nominate an February Staff responsible for disseminating Council’s team <strong>of</strong> Directorate<br />

<strong>of</strong>ficer who will take responsibility for: <strong>2010</strong> disability and inclusion related Executive Assistants are charged<br />

• promoting disability and inclusion information are clearly identified and responsibility for disseminating<br />

information within the department; undertaking their role. disability and inclusion related<br />

• updating staff on disability and<br />

information.<br />

inclusion issues on a regular basis;<br />

Disability and inclusion related<br />

• Ensuring disability and inclusion<br />

information is included on the agenda<br />

issues are reported to senior<br />

<strong>of</strong> all at departmental meetings on a<br />

managers for further<br />

regular basis and actions recorded.<br />

consideration/action.<br />

Built Environment<br />

Development and Building<br />

No. Action Timeline Performance Measures Comment<br />

2.1 Ensure all plans for the development January Works consistently meet or exceed Future contract documentation to<br />

or upgrading <strong>of</strong> community <strong>2010</strong> and access standards as determined by: consider disability access<br />

infrastructure, including parks and ongoing • Australian Standards for Access requirements. Review internally<br />

open spaces, are audited for and Mobility; carried out works for disability<br />

disability access prior to works • Independent access audit; access requirements prior to<br />

commencing; This may occur through: • Council’s agreed practice. commencement. Merriwa Park<br />

• Being identified as a requirement<br />

Master Plan reviewed and requires<br />

in the tender process; All plans are signed <strong>of</strong>f for disability reconfiguration to meet new<br />

• Appointment <strong>of</strong> an access auditor access prior to works commencing. disability access requirements.<br />

to review plans for all significant<br />

works;<br />

• Ensuring staff are appropriately<br />

trained to undertake access audits<br />

for minor works.<br />

2.2 Ensure a minimum <strong>of</strong> two staff from September Staff able to undertake access Council’s Building Management<br />

appropriate areas <strong>of</strong> the organisation <strong>2009</strong> and audits are available within the Officer and Technical Officer<br />

undertake accredited training in ongoing organisation. Buildings have received this training.<br />

identifying access issues and<br />

<strong>Rural</strong> Access program have identified<br />

auditing buildings. These staff will An ongoing strategy to retain this the need for development services<br />

have the role <strong>of</strong> auditing minor works knowledge within the organisation staff to undergo training to enhance<br />

and promoting physical access is identified and implemented. promotion <strong>of</strong> accessibility to builders/<br />

information to other staff.<br />

developers.<br />

Footpaths and Roads<br />

No. Action Timeline Performance Measures Comment<br />

3.1 Review the status <strong>of</strong> the works listed June <strong>2010</strong> Implementation Plan prepared and Council’s current Disability Access<br />

in the existing Disability Access reported to Council for action. Audit was completed in 2002. Some<br />

Audit <strong>of</strong> the Central Business<br />

recommended works have been<br />

District (CBD).<br />

undertaken. Some recommended<br />

Develop a plan to address any<br />

works are no longer applicable, for<br />

outstanding issues.<br />

example, as a result <strong>of</strong> changes to<br />

buildings including the <strong>Wangaratta</strong><br />

Government Centre.<br />

52<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong>


Access and Inclusion Plan<br />

No. Action Timeline Performance Measures Comment<br />

3.2 Review the footpath hierarchy to June <strong>2010</strong> Priority pathways identified, There is an ongoing budget<br />

ensure priority pathways link the including the works needed to allocation and further improvements<br />

CBD, community hubs, key address any access issues. will be made this financial year.<br />

community facilities and any areas<br />

where there is a higher<br />

concentration <strong>of</strong> older adults.<br />

3.3 Work in partnership with the March <strong>2010</strong> Publicity prepared and information Hazards identified and addressed<br />

community to address hazards or and ongoing circulated to appropriate staff and through customer requests, footpath<br />

barriers to mobility for people with the wider community. and road inspections.<br />

disabilities within Council’s ongoing<br />

maintenance program. This includes:<br />

• Foliage at roundabouts and<br />

intersections;<br />

• Branches overhanging footpaths;<br />

• Uneven surfaces on footpaths.<br />

3.8 Develop information for the public February Information prepared and strategy Attended local peak body groups<br />

on the need to report issues and <strong>2010</strong> and available. and advised <strong>of</strong> Council processes<br />

hazards, including a strategy for ongoing for raising issues.<br />

ongoing circulation and awareness<br />

<strong>of</strong> Council’s Customer Action<br />

Request System.<br />

Buildings and Facilities<br />

No. Action Timeline Performance Measures Comment<br />

4.4 Identify all Council buildings and May <strong>2010</strong> Buildings identified. All Council buildings and facilities<br />

facilities (including toilet blocks)<br />

(including toilet blocks) without<br />

without designated accessible toilets.<br />

designated accessible toilets have<br />

been identified.<br />

Environment<br />

Parks and Open Spaces<br />

No. Action Timeline Performance Measures Comment<br />

6.1 Review status <strong>of</strong> the works listed in March <strong>2010</strong> Implementation Plan prepared and Access audits will be reviewed as<br />

the existing access audits <strong>of</strong> reported to Council for action. part <strong>of</strong> the Merriwa Park masterplan<br />

Merriwa Park and King George V<br />

and masterplan will be reviewed<br />

Memorial Gardens.<br />

against Disability Discrimination Act.<br />

Develop a plan to address any<br />

outstanding issues.<br />

6.3 Ensure all new picnic tables/facilities January All picnic tables/facilities installed All new picnic tables provided by the<br />

comply with accessibility standards <strong>2010</strong> and comply with accessibility standards facilities unit will comply with<br />

ongoing<br />

accessibility standards. Facilities<br />

staff have been trained.<br />

6.4 Ensure a focus on accessibility is Ongoing Regional playground strategy Council has yet to make a decision<br />

included in any proposal to develop reviewed and future options whether to proceed with the regional<br />

a regional playground. considered. playground.<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong><br />

53


Access and Inclusion Plan<br />

Community and People<br />

Accessible Parking and Transport<br />

No. Action Timeline Performance Measures Comment<br />

7.1 Monitor and report on the operation February <strong>Annual</strong> report to Council. A Parking Scheme, issues paper<br />

<strong>of</strong> the Disabled Persons Parking <strong>2010</strong> and was developed and distributed for<br />

Scheme on a regular basis including: ongoing comment and responded to by<br />

• Distribution <strong>of</strong> permits<br />

Council’s Social Planner.<br />

• Usage <strong>of</strong> or demand for specific<br />

parking bays<br />

• Need for additional parking bays.<br />

Provide regular information to the May <strong>2010</strong> Information circulated annually.<br />

public on the impact <strong>of</strong> non-permit and ongoing<br />

holders using designated accessible<br />

parking bays.<br />

7.4 Work with VicRoads to ensure bus Ongoing All new bus stops comply with the Upgrading <strong>of</strong> town bus route bus<br />

stops on public transport routes in standards. stops has been completed. A re audit<br />

the municipality comply with the<br />

has just been completed with some<br />

Disability Standards for Accessible<br />

minor additional improvements<br />

Public Transport (2002) and<br />

required. Bus stops in rural areas are<br />

amendments.<br />

yet to be audited.<br />

7.5 Work with V/Line to enhance access, June <strong>2010</strong> Access issues identified and a plan Access issues are currently being<br />

mobility and safety around the and ongoing developed to address these. identified. A plan will be developed to<br />

station area including<br />

address these issues.<br />

• reviewing the development <strong>of</strong> a<br />

bike and scooter path between the<br />

station, the CBD and the rail trail<br />

• explore opportunities to establish<br />

end <strong>of</strong> trip facilities and make<br />

recommendations to Council.<br />

7.8 Work with other agencies to ensure May <strong>2010</strong> Record <strong>of</strong> information provided. Mobility Scooters On the Move was a<br />

residents have access to information and ongoing free event, based at the King<br />

on safe mobility scooter use,<br />

George Gardens, <strong>Wangaratta</strong>.<br />

including provision <strong>of</strong> a kit and/or<br />

It included:<br />

regular information sessions.<br />

• a Scooter Challenge <strong>of</strong> 2 teams to<br />

provide community leaders and<br />

decision makers with an<br />

opportunity to experience firsthand<br />

what it is like to travel on a mobility<br />

scooter<br />

• a “come and try” scooter session<br />

to provide an opportunity for<br />

people <strong>of</strong> all ages to try out a<br />

mobility scooter<br />

• a free BBQ Lunch for the mobility<br />

scooter users and the public to<br />

enjoy.<br />

Subsequently a scooter users group,<br />

MUG’s has been set up.<br />

54<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong>


Access and Inclusion Plan<br />

Communication and Community Engagement<br />

No. Action Timeline Performance Measures Comment<br />

8.1 Develop a strategy and materials to December Resource kit developed and Kit is being developed.<br />

promote the <strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> <strong>2009</strong> and promoted to residents.<br />

as an inclusive and accessible ongoing<br />

community including:<br />

• Provide simple information on<br />

access standards and guidelines<br />

for circulation to planning permit<br />

applicants and potential developers<br />

8.4 Develop a resource kit and a list <strong>of</strong> March <strong>2010</strong> Resource kit developed and requests Resource Kit researched, developed<br />

contacts to ensure Council and ongoing for information in other formats and implemented. Information in<br />

information is available in other provided in a timely manner. other formats, including audio and<br />

formats and languages as required,<br />

large print, provided in a timely<br />

that a clear process is available to<br />

manner. Investigating merits <strong>of</strong> text<br />

access this and that the availability<br />

to voice opportunities.<br />

<strong>of</strong> this information is promoted to<br />

staff and the community.<br />

8.8 Investigate installation <strong>of</strong> a Personal April <strong>2010</strong> Investigation undertaken and report Research has identified that<br />

Relay Service Telephone/National to Council. Council’s technology is compatible<br />

Relay Service.<br />

with the National Relay Service and<br />

that installation would be at no cost<br />

to Council.<br />

8.9 Establish a dedicated mobile phone April <strong>2010</strong> Mobile phone contact established. A comparable service is available<br />

number for people with<br />

through the National Relay Service.<br />

communication difficulties to text in.<br />

Promote email/internet site where April <strong>2010</strong> Internet and email access promoted. Council’s email contact is promoted<br />

people can type in questions for<br />

through the majority <strong>of</strong> Council’s<br />

staff to respond to<br />

communication mediums including<br />

letterhead, community newsletters,<br />

local newspapers and corporate<br />

documents. A more interactive<br />

website access will be considered<br />

when Council’s proposed new<br />

website is implemented.<br />

Business and Tourism<br />

No. Action Timeline Performance Measures Comment<br />

9.3 Work with tourism and business March <strong>2010</strong> Tourism and business operators are Promotional materials are being<br />

operators to ensure local and ongoing made aware <strong>of</strong> access and inclusion developed.<br />

promotional material contains<br />

issues.<br />

information on accessibility and<br />

Promotional materials developed<br />

inclusion.<br />

which publicise the <strong>Rural</strong> <strong>City</strong> as an<br />

accessible and inclusive community.<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong><br />

55


Access and Inclusion Plan<br />

Service Delivery<br />

No. Action Timeline Performance Measures Comment<br />

10.1 Ensure all contracts include October All contracts require compliance with All contract documents are currently<br />

reference to compliance with <strong>2009</strong> and Council’s Access and Inclusion being reviewed and reference to<br />

Council’s Access and Inclusion ongoing Policy, the Disability Discrimination Councils Access and Inclusion Policy,<br />

Policy, the Disability Discrimination Act 1992, Disability Act 2006 (Victoria) the Disability Act 2006 (Victoria) and<br />

Act 1992, Disability Act 2006 (Victoria) and Australian Standards for Access the Australian Standards for Access<br />

and Australian Standards for Access and Mobility. and Mobility will be included where<br />

and Mobility.<br />

appropriate.<br />

10.2 Display Better Hearing Counter Cards December Counter cards displayed. Counter cards are displayed on all<br />

on all customer service counters. <strong>2009</strong> and Council’s customer service counters.<br />

ongoing<br />

Advocacy<br />

No. Action Timeline Performance Measures Comment<br />

11.1. Work in partnership with the January Record <strong>of</strong> advocacy and service Council works closely with North East<br />

community to advocate for <strong>2010</strong> and enhancement. Transport Connections. This project<br />

enhanced services, including public ongoing aims to help develop an effective,<br />

transport, education and employment<br />

efficient and sustainable transport<br />

opportunities.<br />

service system in North East Victoria.<br />

11.3 Information on access and inclusion December Information on disability access and Working in collaboration with the<br />

to be developed and awareness <strong>of</strong> <strong>2009</strong> social inclusion developed and <strong>Rural</strong> Access worker to develop a<br />

disability and equity issues to be circulated. To community groups and proposed strategy.<br />

promoted within the community<br />

wider community.<br />

Sport and Recreation<br />

No. Action Timeline Performance Measures Comment<br />

13.1 Work in partnership with contractors, February Increased participation in sport and • Council encourages links between<br />

sporting groups and other agencies <strong>2010</strong> and recreation by people with disabilities, Clubs and the Access for All<br />

to promote and develop sporting ongoing older people, people from culturally Abilities program.<br />

and recreational opportunities, diverse backgrounds and other • Through the development <strong>of</strong><br />

including modified competitions, for identified groups. strategic plans, Council has<br />

people with special needs.<br />

encouraged Committees to be<br />

aware <strong>of</strong> the need to cater for the<br />

needs <strong>of</strong> people with disabilities<br />

and older people<br />

• Council submitted a funding<br />

application on behalf <strong>of</strong> the Jubilee<br />

golf Club to establish pathways<br />

between greens, catering for the<br />

needs <strong>of</strong> older adults and people<br />

with a disability.<br />

56<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong>


Public Documents<br />

In accordance with the Local Government Act 1989 and Local Government (General) Regulations 2004,<br />

the following prescribed information is available for public inspection at the <strong>Wangaratta</strong> Government<br />

Centre:<br />

Accounts<br />

• Income Statement • Notes to the Financial <strong>Report</strong><br />

• Balance Sheet • Standard Statements<br />

• Cash Flows Statement • Performance Statement<br />

Other Documents<br />

(a) details <strong>of</strong> current allowances fixed for the Mayor, and Councillors under section 74 or 74A <strong>of</strong> the Act<br />

(b) details <strong>of</strong> senior <strong>of</strong>ficers’ total salary packages for the current financial year and the previous year<br />

including the gross salary, the amount <strong>of</strong> the Council or employer contribution to superannuation,<br />

the value <strong>of</strong> any motor vehicle provided by the Council and the total value <strong>of</strong> any other benefits and<br />

allowances provided by the Council<br />

(c) details <strong>of</strong> overseas or interstate travel (with the exception <strong>of</strong> interstate travel by land for less than<br />

3 days) undertaken in an <strong>of</strong>ficial capacity by Councillors or any member <strong>of</strong> Council staff in the<br />

previous 12 months, including the names <strong>of</strong> the Councillors or members <strong>of</strong> Council staff and the<br />

date, destination, purpose and total cost <strong>of</strong> the overseas or interstate travel<br />

(d) names <strong>of</strong> Council <strong>of</strong>ficers who were required to submit a return <strong>of</strong> interest during the financial year<br />

and the dates the returns were submitted<br />

(e) names <strong>of</strong> Councillors who submitted returns <strong>of</strong> interest during the financial year and the dates the<br />

returns were submitted<br />

(f) agendas for and minutes <strong>of</strong> ordinary and special meetings held in the previous 12 months kept<br />

under section 93 <strong>of</strong> the Act except if the minutes relate to parts <strong>of</strong> meetings which have been<br />

closed to members <strong>of</strong> the public under section 89 <strong>of</strong> the Act<br />

(g) a list <strong>of</strong> all special committees established by Council and the purpose for which each committee<br />

was established<br />

(h) a list <strong>of</strong> all special committees established by the Council which were abolished or ceased to<br />

function during the financial year<br />

(i) minutes <strong>of</strong> meetings <strong>of</strong> special committees established under section 86 <strong>of</strong> the Act and held in the<br />

previous 12 months except if the minutes relate to parts <strong>of</strong> meetings which have been closed to<br />

members <strong>of</strong> the public under section 89 <strong>of</strong> the Act<br />

(j) a register <strong>of</strong> delegations kept under sections 87, 88 and 98 <strong>of</strong> the Act, including the date on which<br />

the last review under section 98(6) <strong>of</strong> the Act took place<br />

(k) submissions received in accordance with section 223 <strong>of</strong> the Act during the previous 12 months<br />

(l) agreements to establish regional libraries under section 196 <strong>of</strong> the Act;<br />

(m) details <strong>of</strong> all property, finance and operating leases involving land, buildings, plant, computer<br />

equipment or vehicles entered into by the Council as lessor or lessee, including the name <strong>of</strong> the<br />

other party to the lease and the terms and the value <strong>of</strong> the lease<br />

(n) a register <strong>of</strong> authorised <strong>of</strong>ficers appointed under section 224 <strong>of</strong> the Act<br />

(o) a list <strong>of</strong> donations and grants made by the Council during the financial year, including the<br />

names <strong>of</strong> persons or bodies which have received a donation or grant and the amount <strong>of</strong> each<br />

donation or grant<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong><br />

57


Public Documents<br />

(p) a list <strong>of</strong> the names <strong>of</strong> the organisations <strong>of</strong> which the Council was a member during the financial<br />

year and details <strong>of</strong> all membership fees and other amounts and services provided during that year<br />

to each organisation by the Council<br />

(q) a list <strong>of</strong> contracts valued at $100,000 or more which the Council entered into during the financial<br />

year without first engaging in a competitive process and which are not contracts referred to in<br />

section 186(5) <strong>of</strong> the Act.<br />

(r) Councillor Code <strong>of</strong> conduct<br />

(s) Councillor Reimbursement Policy<br />

(t) Procurement Policy<br />

(u) Written records <strong>of</strong> Assemblies <strong>of</strong> councillors<br />

(v) Local Laws<br />

(w) Council Plan<br />

(x) Strategic Resource Plan<br />

(y) Council Budget<br />

(z) <strong>Annual</strong> <strong>Report</strong><br />

Freedom <strong>of</strong> Information<br />

The Freedom <strong>of</strong> Information Act 1982 gives members <strong>of</strong> the public a legal right <strong>of</strong> access to documents<br />

(created or received after 1 January 1989) which are held by the Council and legal rights in relation to<br />

documents relating to their own personal affairs regardless <strong>of</strong> the age <strong>of</strong> the documents.<br />

Details <strong>of</strong> requests received by Council under the Freedom <strong>of</strong> Information Act 1982 in the period 1 July<br />

<strong>2009</strong> to 30 June <strong>2010</strong> are as follows:<br />

Requests Received<br />

Total number <strong>of</strong> requests received 2<br />

Access granted in full 1<br />

Access granted in part 0<br />

Access denied in full 0<br />

Requests not proceeded with 1<br />

Internal Reviews<br />

Number <strong>of</strong> internal reviews sought 1<br />

Original decision confirmed s.33(6) was used in 1 review 1<br />

VCAT Appeals<br />

Number <strong>of</strong> appeals lodged with VCAT 0<br />

Charges collected $44.40<br />

Local Laws<br />

A Council may make Local Laws under the Local Government Act 1989 (the Act), for any matters for<br />

which the Council has a function or power under the Act.<br />

Local Laws are made principally to regulate environmental and amenity issues in the municipal district<br />

and to regulate the use <strong>of</strong> Council facilities.<br />

58<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong>


Public Documents<br />

<strong>Wangaratta</strong> <strong>Rural</strong> <strong>City</strong> Council Local Laws operational as at 30 June <strong>2010</strong> are:<br />

• Local Law No. 1 Community Amenity<br />

• Local Law No. 2 Meeting Procedures<br />

• Local Law No. 3 Murray to the Mountains Rail Trail<br />

Copies <strong>of</strong> the Local Laws are available at the <strong>Wangaratta</strong> Government Centre.<br />

Service Charters<br />

In 2003 a single Customer Service Charter (Charter) was developed to replace the fourteen service<br />

charters which had been developed for individual Council services.<br />

The Charter makes a commitment to our customers that Council staff will comply with specified<br />

standards when contacted by the public. It outlines the processes used for recording and following-up<br />

requests from the public and Council’s grievance resolution process. Contact details, details <strong>of</strong> Council<br />

meetings and opportunities to meet with Councillors are also clearly set out.<br />

The Charter is on display in the <strong>Wangaratta</strong> Government Centre foyer and copies are freely available for<br />

the public.<br />

Whistleblowers Protection<br />

The <strong>Wangaratta</strong> <strong>Rural</strong> <strong>City</strong> Council recognises the value <strong>of</strong> transparency and accountability in its<br />

administrative and management practices, and supports the making <strong>of</strong> disclosures that reveal corrupt<br />

conduct, conduct involving a substantial risk to public health and safety or the environment.<br />

Council has developed a comprehensive policy and procedure under the Whistleblowers Protection Act<br />

2001 to protect people who make such disclosures from any detrimental action or in reprisal for making<br />

the disclosure. Council will also afford natural justice to the person who is the subject <strong>of</strong> the disclosure.<br />

Council has established a system for reporting disclosure <strong>of</strong> improper conduct or detrimental action by<br />

Councillors, <strong>of</strong>ficers or employees. The system enables such disclosures to be made to the protected<br />

disclosure co-ordinator (Director – Sustainability) or to the ombudsman. Disclosure may be made by<br />

employees, <strong>of</strong>ficers, Councillors or by members <strong>of</strong> the public.<br />

Council is not aware <strong>of</strong> any activity which involves improper conduct or detrimental action nor has<br />

Council received any disclosures under the Whistleblowers Protection Act 2001 during the reporting<br />

period.<br />

Further details on making a complaint about improper or corrupt conduct can be obtained by contacting<br />

the Director – Sustainability at the <strong>Wangaratta</strong> Government Centre.<br />

Information Privacy<br />

The <strong>Wangaratta</strong> <strong>Rural</strong> <strong>City</strong> Council actively ensures that personal information provided to Council is<br />

managed in accordance with the requirements <strong>of</strong> the Information Privacy Act 2000 (the Act).<br />

The information privacy guidelines that Council abide by include:<br />

• Council will not collect personal information from an individual or organisation unless it is necessary;<br />

• Council will only collect personal information in a lawful way and will not be unreasonably<br />

intrusive during collection;<br />

• Any person who provides personal information to Council about himself or herself is able to<br />

gain access to that information upon written request;<br />

• All personal information is collected solely for purposes specified by the Council representative at<br />

the time <strong>of</strong> collection. If personal information is required for a function not directly connected to the<br />

initial reason for collection and the individual would be able to be identified by the provision <strong>of</strong> the<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong><br />

59


Public Documents<br />

personal information, then permission from the individual will be sought prior to disclosure unless<br />

the Act stipulates otherwise;<br />

• Council will only allow access to the information by relevant staff and third parties that require the<br />

information to effectively complete functions on Council’s behalf. When access is granted to a third<br />

party, they will be bound by the requirements <strong>of</strong> the Act;<br />

• If there are any laws that require the collection <strong>of</strong> personal information, these will be made known<br />

to the individual at the time <strong>of</strong> collection; and<br />

• There may be instances where a product or service cannot be provided without collecting certain<br />

pieces <strong>of</strong> personal information. This will be explained to the individual at the time <strong>of</strong> collection.<br />

Council has adopted a policy on Information Privacy. A copy <strong>of</strong> the policy can be obtained from Council’s<br />

Customer Services Unit at the <strong>Wangaratta</strong> Government Centre.<br />

Council’s Pr<strong>of</strong>essional Service Providers<br />

Details <strong>of</strong> Council’s major pr<strong>of</strong>essional service providers are disclosed to assist readers and evaluators<br />

<strong>of</strong> the annual report.<br />

Audit Services<br />

Banking Services<br />

Auditor-General <strong>of</strong> Victoria<br />

Westpac Banking Corporation<br />

Level 24<br />

94 Murphy Street<br />

35 Collins Street WANGARATTA VIC 3677<br />

MELBOURNE VIC 3000<br />

www.audit.vic.gov.au<br />

Legal Services<br />

Valuation Services<br />

McSwineys Solicitors<br />

Valpac P/L<br />

57 Reid Street P.O. Box 469<br />

WANGARATTA VIC 3677 WANGARATTA VIC 3676<br />

60<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong>


National Competition Policy Compliance: <strong>2009</strong> - <strong>2010</strong><br />

Certification by Chief Executive Officer<br />

<strong>Wangaratta</strong> <strong>Rural</strong> <strong>City</strong> Council has complied with the requirements <strong>of</strong> the National Competition Policy<br />

(NCP) for the period 1 July <strong>2009</strong> to 30 June <strong>2010</strong>, in accordance with the requirements outlined in<br />

National Competition Policy and Local Government - A Revised Statement <strong>of</strong> Victorian Government<br />

Policy, December 2008 (2008 Statement) as set out below:<br />

A. Trade Practices Compliance Compliant<br />

B. Local Laws Compliance Compliant<br />

C. Competitive Neutrality Compliance Compliant<br />

I certify that:<br />

a) this statement has been prepared in accordance with the <strong>2009</strong>-<strong>2010</strong> National Competition Policy<br />

reporting guidelines, which is pursuant to the 2008 Statement; and<br />

b) this statement presents fairly the Council’s implementation <strong>of</strong> the National Competition Policy.<br />

Signed:<br />

(Chief Executive Officer)<br />

Date:<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong><br />

61


Victorian Local Government Indicators<br />

<strong>Wangaratta</strong> <strong>Rural</strong> <strong>City</strong> Council<br />

2008/09 <strong>2009</strong>/10 Change<br />

Community Satisfaction Ratings<br />

Overall Performance generally <strong>of</strong> the Council 65 65 -<br />

Advocacy and community representation on key local issues 65 66 1.5%<br />

Engagement in decision making on key local issues 57 59 3.5%<br />

Financial Indicators<br />

All Rates - average rates and charges per assessment $1,290 $1,338 3.7%<br />

Residential Rates - average rates and charges per residential<br />

assessment $1,124 $1,165 3.6%<br />

Operating Costs - average operating expenditure per assessment $2,813 $3,013 7.1%<br />

Capital Expenditure 1 - average capital expenditure per assessment $1,385 $781 (44%)<br />

Infrastructure - infrastructure renewal % 73% 65% (11%)<br />

Infrastructure - infrastructure renewal and maintenance % 80% 80% -<br />

Debts - average liabilities per assessment $1,489 $1,480 (0.6%)<br />

Operating Result 2 - operating result per assessment $414 $385 (0.07%)<br />

Customer Satisfaction Ratings<br />

Indexed mean <strong>of</strong> 350 respondents’ answers in a survey conducted by the independent strategic<br />

research consultants Wallis Consulting Group, asking them to rate Council’s performance. The indexed<br />

mean is a weighted score across five performance ratings being 100 - for an excellent/outstanding<br />

performance, 80 - a good/high standard, 60 - adequate/acceptable, 40 - needs some improvement<br />

and 20 - needs a lot <strong>of</strong> improvement.<br />

Assessments<br />

Are rate notices.<br />

Infrastructure renewal %<br />

Ratio <strong>of</strong> current spending on capital renewal <strong>of</strong> existing infrastructure assets which returns the service<br />

potential or the life <strong>of</strong> the assets up to that which it had originally, to the amount <strong>of</strong> Council’s asset base<br />

consumed during a year.<br />

Notes:<br />

1. Capital Expenditure for 2008 - <strong>2009</strong> included $10.5 million for building projects such as the<br />

<strong>Wangaratta</strong> Performing Arts Centre and community facilities.<br />

2. Operating Result for 2008 - <strong>2009</strong> included non-recurrent grants for capital projects such as the<br />

<strong>Wangaratta</strong> Performing Arts Centre ($3.1 million) and community facilities ($1.17 million).<br />

62<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong>


Performance Statement<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong>


Performance Statement<br />

For the year ending 30 June <strong>2010</strong><br />

Key Strategic Activity<br />

Governance<br />

Performance How Data is Performance Actual<br />

Measure reported Target <strong>2009</strong> - <strong>2010</strong><br />

Comment<br />

To engage the community Community Local Community 59% Council has maintained a consistent<br />

in a strategic approach to Satisfaction Government Engagement result compared with 08/09. The<br />

decision-making and the Survey Community 63% community identified the need for<br />

development <strong>of</strong> the <strong>Rural</strong> Satisfaction Council to listen/take more notice <strong>of</strong><br />

<strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong>. Survey community’s wishes as the main<br />

concern.<br />

To take a whole-<strong>of</strong>- Community Local Advocacy 67% 66% Council has maintained a consistent<br />

government approach to the Satisfaction Government result compared with 08/09. The<br />

development and wellbeing Survey Community community identified the need for<br />

<strong>of</strong> the <strong>Rural</strong> <strong>City</strong> <strong>of</strong> Satisfaction Council to represent the interests <strong>of</strong><br />

<strong>Wangaratta</strong>. Survey the community as the main concern.<br />

(a) To focus on core-business Community Local Overall 65% Council has maintained a consistent<br />

and non-core business. Satisfaction Government Performance result compared with 08/09. The<br />

(b) To act as an advocate and Survey Community 68% community noted that Council makes<br />

facilitator in other Satisfaction decisions despite community<br />

functions. Survey consultation and doesn’t listen to the<br />

community as the main concern.<br />

To minimise risk as a way <strong>of</strong> Civic Mutal Civic Mutal 85% 88% Target exceeded<br />

providing a safer public and Plus Target Plus Target<br />

work place environment.<br />

To invest in and deploy Council Macquarie 10% increase 1,796 Target exceeded<br />

proven Information website Bank <strong>Report</strong> (41% increase)<br />

Management Systems to Transactions<br />

ensure effective access to<br />

information and services. Council eyemedia. 10% increase 160,638 Council’s website format has not<br />

website Hits com.au/www. (1% increase) changed significantly in the last 4<br />

wangaratta.<br />

years. Council has budgeted in the<br />

vic.gov.au<br />

10/11 financial year for more dynamic,<br />

statistics<br />

user friendly and up to date website.<br />

Visitor www.visit 10% increase 63,398 Target exceeded<br />

Information wangaratta. (154% increase)<br />

Centre com.au<br />

website Hits statistics<br />

To operate specific Operate within Budget Operate within Specific Council Target achieved<br />

undertakings on a business self-contained Comparison budget undertakings<br />

basis with sufficient funding business unit <strong>Report</strong> have operated<br />

to meet agreed community budget within selfbenefit.<br />

contained<br />

business unit<br />

budget<br />

To provide responsible Victorian Auditor Victorian Auditor Low Risk Rating Low Risk Target achieved<br />

financial practices ensuring General’s General’s<br />

Council’s ongoing financial Overall <strong>Report</strong><br />

viability.<br />

Sustainability<br />

Risk Rating<br />

64<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong>


Performance Statement<br />

Key Strategic Activity<br />

Performance How Data is Performance Actual<br />

Measure reported Target <strong>2009</strong> - <strong>2010</strong><br />

Comment<br />

To apply a triple bottom line Community Local Community 59% Council has maintained a consistent<br />

approach to the assessment Satisfaction Government Engagement 63% result compared with 08/09. The<br />

<strong>of</strong> new initiatives. Survey Community community identified the need for<br />

Arts, Culture and Heritage<br />

Satisfaction<br />

Survey<br />

To provide a diverse visual Exhibits Exhibition 22 33 Target exceeded<br />

arts experience and provided Program<br />

opportunities for local and<br />

regional communities and<br />

visitors by the <strong>Wangaratta</strong><br />

exhibitions Gallery.<br />

Council to listen/take more notice <strong>of</strong><br />

community’s wishes as the main<br />

concern.<br />

To promote the benefits <strong>of</strong> Community Local Engagement 59% Council has maintained a consistent<br />

a culturally, linguistically and Satisfaction Government 63% result compared with 08/09. The<br />

religiously diverse society Survey Community community identified the need for<br />

and the social, cultural and Satisfaction Council to listen/take more notice <strong>of</strong><br />

economic opportunities this Survey the community’s wishes as the<br />

provides.<br />

main concern.<br />

To facilitate arts and cultural Community Local Engagement 59%<br />

events and festivals. Satisfaction Government 63%<br />

Survey Community<br />

Satisfaction<br />

Survey<br />

To establish the <strong>Wangaratta</strong> Facility open <strong>Report</strong> to Program in place Program in place Target achieved<br />

Performing Arts Centre as a and operational Council. Budget set Budget has been<br />

high quality, and accessible Performing Arts set for 10/11<br />

facility.<br />

Program.<br />

Council Budget.<br />

To integrate public art, design Community Local Appearance <strong>of</strong> 75% Target exceeded<br />

and cultural features into Satisfaction Government Public Areas<br />

the planning <strong>of</strong> capital works Survey Community 74%<br />

projects and public space<br />

Satisfaction<br />

developments throughout<br />

Survey<br />

the <strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong>.<br />

To establish a preservation Community Local Engagement 59% Council has maintained a consistent<br />

program for cultural and Satisfaction Government 63% result compared with 08/09. The<br />

built heritage. Survey Community community identified the need for<br />

Satisfaction<br />

Survey<br />

Council to listen/take more notice <strong>of</strong><br />

the community’s wishes as the main<br />

concern.<br />

To promote the library Number <strong>of</strong> High Country Increase by 5% 11,751 The implementation <strong>of</strong> a new<br />

service as a community members Library (-1.2%) information management system<br />

information resource that is Corporation generated membership anomalies<br />

accessible and responsive Monthly <strong>Report</strong> that created an unusually high number<br />

to community need.<br />

<strong>of</strong> inactive users who were<br />

subsequently removed from the<br />

membership database during the<br />

09/10 reporting period.<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong><br />

65


Performance Statement<br />

Key Strategic Activity<br />

Community Wellbeing<br />

Performance How Data is Performance Actual<br />

Measure reported Target <strong>2009</strong> - <strong>2010</strong><br />

Comment<br />

To support our community Community Local Community 76% Target achieved<br />

to be resilient. Satisfaction Government Resilience<br />

Survey Community Establish a<br />

Satisfaction base figure<br />

Survey<br />

To foster and encourage: Australian Australian Overall satisfaction Australian Unity Not available<br />

• community spirit; Unity Unity rating 78.57% Wellbeing Index<br />

• volunteerism; and Wellbeing Index Wellbeing Index Survey not<br />

• community leadership.<br />

undertaken<br />

To promote a high level <strong>of</strong> Community Local Enforcement <strong>of</strong> 66% The community identified the need for<br />

community safety. Satisfaction Government By Laws 69% greater enforcement <strong>of</strong> animal local<br />

Survey Community laws as the main concern.<br />

Satisfaction<br />

Survey<br />

To support communities Drought Review <strong>of</strong> 95% <strong>of</strong> actions 95% Target achieved<br />

in times <strong>of</strong> crisis. Strategy Drought achieved<br />

Strategy<br />

To ensure the provision <strong>of</strong> <strong>Wangaratta</strong> Childcare 96% utilised 91% There was a reduced demand for<br />

affordable, accessible and Community Centre childcare places in the 4-5 year old<br />

high quality children’s Childcare utilisation data range than anticipated.<br />

services.<br />

Centre places<br />

To support the development Community Local Advocacy 67% 66% Council has maintained a consistent<br />

<strong>of</strong> integrated health provision Satisfaction Government result compared with 08/09. The<br />

to maximise the health and Survey Community community identified the need for<br />

wellbeing outcomes for the Satisfaction Council to represent the interests <strong>of</strong><br />

community Survey the community as the main concern.<br />

To support families, older Community Local Health and Human 74% Council has maintained a consistent<br />

people and people with Satisfaction Government Services 75% result compared with 08/09. The<br />

disabilities to actively engage Survey Community community identified the need for<br />

and participate in their Satisfaction more facilities / resources for Aged<br />

community. Survey Care and better nursing homes as<br />

the main concern.<br />

To promote and support Community Local Health and Human 74%<br />

youth leadership by engaging Satisfaction Government Services 75%<br />

young people and Survey Community<br />

strengthening their<br />

Satisfaction<br />

involvement in the community.<br />

Survey<br />

To work with education Community Local Advocacy 67% 66% Council has maintained a consistent<br />

providers to enhance Satisfaction Government result compared with 08/09. The<br />

opportunities for life-long Survey Community community identified the need for<br />

learning Satisfaction Council to represent the interests <strong>of</strong><br />

Survey<br />

the community as the main concern.<br />

66<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong>


Performance Statement<br />

Key Strategic Activity<br />

Infrastructure and Planning<br />

Performance How Data is Performance Actual<br />

Measure reported Target <strong>2009</strong> - <strong>2010</strong><br />

Comment<br />

To implement asset Community Local Local Roads and 56% Council has maintained a consistent<br />

management systems that Satisfaction Government Footpaths 58% result compared with 08/09. The<br />

ensure the sustainability Survey Community community identified the need to<br />

<strong>of</strong> our community assets. Satisfaction improve/ fix / repair the uneven<br />

Survey<br />

surface <strong>of</strong> footpaths as the main<br />

concern.<br />

To investigate and implement Community Local Traffic 50% The community identified the need<br />

infrastructure opportunities Satisfaction Government Management and for more parking facilities adjacent<br />

that support community Survey Community Parking Facilities to shopping and business centres<br />

aspirations Satisfaction 59% as the main concern.<br />

Survey<br />

Community Local Advocacy 67% 66% Council has maintained a consistent<br />

Satisfaction Government result compared with 08/09. The<br />

Survey Community community identified the need for<br />

Satisfaction<br />

Council to represent the interests <strong>of</strong><br />

Survey<br />

the community as the main concern.<br />

Community Local Recreational 71% The community identified the need for<br />

Satisfaction Government Facilities 74% more/better sporting complexes<br />

Survey Community (excluding pools) as the main concern.<br />

Satisfaction<br />

Survey<br />

Community Local Appearance <strong>of</strong> 75% Target exceeded<br />

Satisfaction Government Public Areas 74%<br />

Survey Community<br />

Satisfaction<br />

Survey<br />

To undertake a strategic Community Local Town Planning 61% Target exceeded<br />

approach to land use Satisfaction Government Policy and<br />

planning to provide Survey Community Approvals 59%<br />

balanced outcomes for<br />

Satisfaction<br />

growth, existing land use,<br />

Survey<br />

environment, heritage and<br />

community aspirations<br />

Economic Development and Tourism<br />

To define and market the Community Local Economic 61% Council has maintained a consistent<br />

liveability and lifestyle Satisfaction Government Development 66% result compared with 08/09. The<br />

attributes <strong>of</strong> the <strong>Rural</strong> <strong>City</strong> Survey Community community identified the need for<br />

<strong>of</strong> <strong>Wangaratta</strong> as a Satisfaction more/better job creation programs/<br />

preferred location to live, Survey employment opportunities as the<br />

work and invest.<br />

main concern.<br />

To reinvigorate the inner Community Local Economic 61%<br />

urban areas <strong>of</strong> <strong>Wangaratta</strong> Satisfaction Government Development 66%<br />

to maximize their potential. Survey Community<br />

Satisfaction<br />

Survey<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong><br />

67


Performance Statement<br />

Key Strategic Activity<br />

Performance How Data is Performance Actual<br />

Measure reported Target <strong>2009</strong> - <strong>2010</strong><br />

Comment<br />

Economic Development and Tourism (continued)<br />

To buffer our economy Community Local Economic 61% Council has maintained a consistent<br />

against the impacts <strong>of</strong> the Satisfaction Government Development 66% result compared with 08/09. The<br />

global economic downtown Survey Community community identified the need for<br />

Satisfaction<br />

Survey<br />

In conjunction with relevant Community Local Economic 61%<br />

stakeholders, to realise the Satisfaction Government Development 66%<br />

sustainable agricultural Survey Community<br />

production potential <strong>of</strong> the<br />

Satisfaction<br />

Ovens and King Valleys<br />

Survey<br />

region as a future food bowl.<br />

To support and encourage a Community Local Economic 61%<br />

sustainable, innovative and Satisfaction Government Development 66%<br />

resilient tourism sector. Survey Community<br />

Satisfaction<br />

Survey<br />

more/better job creation programs/<br />

employment opportunities as the<br />

main concern.<br />

To prepare for a carbon Community Local Advocacy 67% 66% Council has maintained a consistent<br />

constrained economy Satisfaction Government result compared with 08/09. The<br />

through developing Survey Community community identified the need for<br />

greenhouse friendly Satisfaction Council to represent the interests <strong>of</strong><br />

economic initiatives and Survey the community as the main concern.<br />

capitalising on related<br />

opportunities.<br />

To further progress Community Local Economic 61% Council has maintained a consistent<br />

<strong>Wangaratta</strong> as the leading Satisfaction Government Development 66% result compared with 08/09. The<br />

retail and service centre in Survey Community community identified the need for<br />

North East Victoria. Satisfaction more/better job creation programs /<br />

Survey<br />

employment opportunities as the<br />

main concern.<br />

Environmental Sustainability<br />

To responsibly manage the Community Local Appearance <strong>of</strong> 75% Target exceeded<br />

local environment. Satisfaction Government Public Areas 74%<br />

Survey Community<br />

Satisfaction<br />

Survey<br />

To enhance community Community Local Recreational 71% The community identified the need<br />

understanding <strong>of</strong> Satisfaction Government Facilities 74% for more/better sporting complexes<br />

conservation values and Survey Community (excluding pools) as the main concern.<br />

provide opportunities to<br />

Satisfaction<br />

experience and contribute<br />

Survey<br />

to the environment.<br />

Community Local Community 59% Council has maintained a consistent<br />

Satisfaction Government Engagement 63% result compared with 08/09. The<br />

Survey Community community identified the need for<br />

Satisfaction<br />

Survey<br />

Council to listen/take more notice <strong>of</strong><br />

the community’s wishes as the<br />

main concern.<br />

68<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong>


Performance Statement<br />

Key Strategic Activity<br />

Performance How Data is Performance Actual<br />

Measure reported Target <strong>2009</strong> - <strong>2010</strong><br />

Comment<br />

Environmental Sustainability (continued)<br />

To reduce impact <strong>of</strong> Council’s Community Local Community 59% Council has maintained a consistent<br />

activities and provide Satisfaction Government Engagement 63% result compared with 08/09. The<br />

leadership in sustainability Survey Community community identified the need for<br />

by demonstrating best Satisfaction Council to listen/take more notice <strong>of</strong><br />

practice Survey the community’s wishes as the main<br />

concern.<br />

To develop initiatives for the Community Local Waste 71% Council has maintained a consistent<br />

community to reduce Satisfaction Government Management 74% result compared with 08/09. The<br />

resource use and waste to Survey Community community identified the need for<br />

achieve sustainable living. Satisfaction more consistent/lower fees for tips<br />

Survey<br />

(reintroduce vouchers) as the main<br />

concern.<br />

Sport and Recreation<br />

Community Local Town Planning 61% Target exceeded<br />

Satisfaction Government Policy and<br />

Survey Community Approvals 59%<br />

Satisfaction<br />

Survey<br />

To undertake a planned Community Local Recreational 71% The community identified the need<br />

approach to maintaining and Satisfaction Government Facilities 74% for more / better sporting complexes<br />

improving quality and Survey Community (excluding pools) as the main concern.<br />

accessible recreation and<br />

Satisfaction<br />

sporting facilities and<br />

Survey<br />

programs.<br />

To encourage the greater Community Local Recreational 71%<br />

use <strong>of</strong> recreation facilities Satisfaction Government Facilities 74%<br />

including formal sports Survey Community<br />

facilities, open spaces,<br />

Satisfaction<br />

shared paths and aquatic<br />

Survey<br />

centres.<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong><br />

69


Council Approval <strong>of</strong> the Performance Statement<br />

For the year ending 30 June <strong>2010</strong><br />

In our opinion, the accompanying performance statement <strong>of</strong> the <strong>Wangaratta</strong> <strong>Rural</strong> <strong>City</strong> Council in<br />

respect <strong>of</strong> <strong>2009</strong>/10 financial year is presented fairly in accordance with the Local Government Act 1989.<br />

The statement outlines the performance targets and measures set out in relation to the achievement<br />

<strong>of</strong> the business plan in respect <strong>of</strong> that year described in Council’s budget and describes the extent to<br />

which the business plan was met in that year having regard to those targets and measures.<br />

As at the time <strong>of</strong> signing, we are not aware <strong>of</strong> any circumstance which would render any particular in<br />

that statement to be misleading or inaccurate.<br />

We have been authorised by the Council on 21 September <strong>2010</strong> to certify the Performance Statement<br />

in its final form.<br />

Anthony Griffiths 21 September <strong>2010</strong><br />

Mayor<br />

<strong>Wangaratta</strong><br />

Ron Webb 21 September <strong>2010</strong><br />

Councillor<br />

<strong>Wangaratta</strong><br />

Doug Sharp 21 September <strong>2010</strong><br />

Chief Executive Officer<br />

<strong>Wangaratta</strong><br />

70<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong>


<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong> 71


72<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong>


Financial <strong>Report</strong><br />

<strong>2009</strong>-<strong>2010</strong><br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong>


Comprehensive Income Statement<br />

For the year ended 30 June <strong>2010</strong><br />

Income<br />

Note <strong>2010</strong> <strong>2009</strong><br />

$ $<br />

Rates and charges 3 19,052,712 18,032,206<br />

Statutory fees and fines 4 547,230 583,301<br />

User fees 5 5,443,799 5,091,605<br />

Contributions - cash 6 719,112 498,020<br />

Contributions - non-monetary assets 6 1,799,359 95,698<br />

Grants - recurrent 7 13,356,608 13,342,636<br />

Grants - non-recurrent 7 3,853,863 5,535,507<br />

Reimbursements 8 166,345 170,900<br />

Net gain/(loss) on sale/disposal <strong>of</strong> property,<br />

infrastucture, plant and equipment 9 1,213,748 370,685<br />

Other revenue 10 602,483 825,950<br />

Share <strong>of</strong> net pr<strong>of</strong>its/(losses) <strong>of</strong> associates and joint<br />

ventures accounted for by the equity method 11 8,457 30,101<br />

Total income 46,763,716 44,576,609<br />

Expenses<br />

Employee benefits 12 16,778,382 14,058,102<br />

Materials and services 13 14,421,951 14,815,452<br />

Depreciation and amortisation 14 9,430,779 9,209,373<br />

Finance costs 15 680,152 613,240<br />

Other expenses 16 15,988 19,028<br />

Total expenses 41,327,252 38,715,195<br />

Pr<strong>of</strong>it 5,436,464 5,861,414<br />

Other comprehensive income<br />

Fair value adjustment for financial assets at fair value 18 149,962 -<br />

Available for sale revaluation reserve<br />

- Gain/(loss) taken to equity 17 - (106,047)<br />

- Transferred to pr<strong>of</strong>it or loss for the period 18 - (74,005)<br />

Net asset revaluation increment/(decrement) 30 7,237,653 5,335,473<br />

Share <strong>of</strong> other comprehensive income <strong>of</strong> associates and<br />

joint ventures accounted for by the equity method 11 (73,070) 94,607<br />

Comprehensive result 12,751,009 11,111,442<br />

The above comprehensive income statement shoud be read with the accompanying notes<br />

74<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong>


Balance Sheet<br />

As at 30 June <strong>2010</strong><br />

Assets<br />

Current assets<br />

Note <strong>2010</strong> <strong>2009</strong><br />

$ $<br />

Cash and cash equivalents 19 12,235,146 11,181,864<br />

Trade and other receivables 20 3,752,515 4,054,520<br />

Inventories 21 78,441 83,502<br />

Other assets 22 159,540 150,136<br />

Non-current assets classified as held for sale 23 1,449,457 1,338,603<br />

Total current assets 17,675,099 16,808,625<br />

Non-current assets<br />

Receivables 20 167,027 32,500<br />

Financial assets 24 10,000 10,000<br />

Investment in associates accounted for by using the equity<br />

method 11 886,797 951,410<br />

Property, infrastructure, plant and equipment 25 299,094,109 286,695,540<br />

Total non-current assets 300,157,933 287,689,450<br />

Total assets 317,833,032 304,498,075<br />

Liabilities<br />

Current liabilities<br />

Trade and other payables 26 3,405,715 4,829,947<br />

Trust funds and deposits 27 429,564 359,515<br />

Provisions 28 4,914,576 4,425,060<br />

Interest bearing loans and borrowings 29 1,496,328 1,486,237<br />

Total current liabilities 10,246,183 11,100,759<br />

Non-current liabilities<br />

Provisions 28 2,944,824 2,044,830<br />

Interest bearing loans and borrowings 29 8,142,289 8,738,617<br />

Total non-current liabilities 11,087,113 10,783,447<br />

Total liabilities 21,333,296 21,884,206<br />

Net assets 296,499,736 282,613,869<br />

Equity<br />

Accumulated surplus 130,517,925 124,109,425<br />

Asset revaluation reserve 30(a) 162,150,916 154,913,263<br />

Other reserves 30(b) 3,830,895 3,591,181<br />

Total Equity 296,499,736 282,613,869<br />

The above balance sheet shoud be read with the accompanying notes<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong><br />

75


Cash Flow Statement<br />

For the year ended 30 June <strong>2010</strong><br />

<strong>2010</strong> <strong>2009</strong><br />

Inflows/<br />

Inflows/<br />

Note (Outflows) (Outflows)<br />

$ $<br />

Cash flows from operating activities<br />

Rates 18,876,469 17,944,185<br />

Statutory fees and fines 547,230 583,301<br />

User fees (inclusive <strong>of</strong> GST) 6,355,928 4,721,284<br />

Contributions (inclusive <strong>of</strong> GST) 791,023 547,822<br />

Grants (inclusive <strong>of</strong> GST) 17,715,380 19,471,191<br />

Reimbursements (inclusive <strong>of</strong> GST) 182,980 187,990<br />

Interest 597,649 809,496<br />

Other receipts (inclusive <strong>of</strong> GST) 4,834 16,454<br />

Net GST refund 1,277,795 2,044,624<br />

Payments to suppliers (inclusive <strong>of</strong> GST) (18,236,124) (16,337,445)<br />

Payments to employees (including redundancies) (16,738,316) (13,850,379)<br />

Net cash provided by operating activities 32 11,374,848 16,138,523<br />

Cash flows from investing activities<br />

Payments for property, infrastructure, plant and equipment 45 (11,021,531) (19,243,578)<br />

Proceeds from sale <strong>of</strong> property, infrastructure, plant and equipment 9 1,816,392 1,058,905<br />

Payments for other financial assets 18 149,962 (74,005)<br />

Net cash used in investing activities (9,055,177) (18,258,678)<br />

Cash flows from financing activities<br />

Proceeds from interest bearing loans and borrowings 900,000 858,376<br />

Finance costs (680,152) (613,240)<br />

Finance lease payments - (106,075)<br />

Repayment <strong>of</strong> interest bearing loans and borrowings (1,486,237) (1,546,595)<br />

Net cash used in financing activities (1,266,389) (1,407,534)<br />

Net increase (decrease) in cash & cash equivalents 1,053,282 (3,527,689)<br />

Cash & cash equivalents at the beginning <strong>of</strong> the financial year 11,181,864 14,709,553<br />

Cash and cash equivalents at the end <strong>of</strong> the year 33 12,235,146 11,181,864<br />

Financing arrangements 34<br />

Restrictions on cash assets 35<br />

The above cash flow statement should be read with the accompanying notes.<br />

76<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong>


Statement <strong>of</strong> Changes in Equity<br />

For the year ended 30 June <strong>2010</strong><br />

Accumulated Asset Other<br />

Total Surplus Revaluation Reserves<br />

Reserve<br />

<strong>2010</strong> Note <strong>2010</strong> <strong>2010</strong> <strong>2010</strong> <strong>2010</strong><br />

$ $ $ $<br />

Balance at the beginning <strong>of</strong> the<br />

financial year 282,613,869 124,109,425 154,913,263 3,591,181<br />

Correction <strong>of</strong> errors 47 (c) 1,134,858 1,134,858 - -<br />

Pr<strong>of</strong>it 5,436,464 5,436,464 - -<br />

Gain (losses) from remeasuring available-for- sale<br />

financial assets to fair value taken to Reserve<br />

18 149,962 149,962 - -<br />

Share <strong>of</strong> other comprehensive income <strong>of</strong> associates<br />

and joint ventures accounted for by the equity method<br />

(73,070) (73,070) - -<br />

Net asset revaluation increment/(decrement) 30(a) 7,237,653 - 7,237,653 -<br />

Transfers to other reserves 30(b) - (2,217,099) - 2,217,099<br />

Transfers from other reserves 30(b) - 1,977,385 - (1,977,385)<br />

Balance at the end <strong>of</strong> the financial year 296,499,736 130,517,925 162,150,916 3,830,895<br />

Accumulated Asset Other<br />

Total Surplus Revaluation Reserves<br />

Reserve<br />

<strong>2009</strong> <strong>2009</strong> <strong>2009</strong> <strong>2009</strong> <strong>2009</strong><br />

$ $ $ $<br />

Balance at the beginning <strong>of</strong> the<br />

financial year 271,396,380 118,635,912 149,471,743 3,288,725<br />

Correction <strong>of</strong> errors 47(a,b) 18,000 - 18,000 -<br />

Pr<strong>of</strong>it 5,861,414 5,861,414 - -<br />

Gain (losses) from remeasuring available-for-sale<br />

financial assets to fair value recognised during the<br />

year<br />

30(a) - (106,047) 106,047 -<br />

Removed and recognised in pr<strong>of</strong>it/loss (74,005) (74,005) - -<br />

Share <strong>of</strong> other comprehensive income <strong>of</strong> associates<br />

and joint ventures accounted for by the equity method<br />

94,607 94,607 - -<br />

Net asset revaluation increment/(decrement) 30(a) 5,317,473 - 5,317,473 -<br />

Transfers to other reserves 30(b) - (1,777,802) - 1,777,802<br />

Transfers from other reserves 30(b) - 1,475,346 - (1,475,346)<br />

Balance at the end <strong>of</strong> the financial year 282,613,869 124,109,425 154,913,263 3,591,181<br />

The above statement <strong>of</strong> changes in equity should be read with the accompanying notes.<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong><br />

77


Notes to the Financial <strong>Report</strong><br />

For the year ended 30 June <strong>2010</strong><br />

Introduction<br />

(a) The <strong>Wangaratta</strong> <strong>Rural</strong> <strong>City</strong> Council was established by an Order <strong>of</strong> the Governor in Council on 18 November 1994 and is a body corporate. The<br />

Council's main <strong>of</strong>fice is located at 62-68 Ovens Street, <strong>Wangaratta</strong>.<br />

(b) Our Mission:<br />

We will provide the leadership necessary to:<br />

- ensure the long term financial security <strong>of</strong> the Council;<br />

- deliver quality Council services;<br />

- facilitate a growing and sustainable economy and employment base;<br />

- promote a cohesive, dynamic <strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> community;<br />

- maintain open communication and consultation;<br />

- preserve and enhance our heritage and the environment.<br />

External Auditor: Auditor General <strong>of</strong> Victoria<br />

Internal Auditor : Johnsons MME, Chartered Accountants, Albury<br />

Solicitors: McSwiney's - <strong>Wangaratta</strong>, Maddocks - Melbourne<br />

Bankers: Westpac Banking Corporation<br />

Website Address: www.wangaratta.vic.gov.au<br />

This financial report is a general purpose financial report that consists <strong>of</strong> a Comprehensive Income Statement, Balance Sheet, Statement <strong>of</strong> Changes in<br />

Equity, Cash Flow Statement, and notes accompanying these financial statements. The general purpose financial report complies with Australian<br />

Accounting Standards, other authoritative pronouncements <strong>of</strong> the Australian Accounting Standards Board, the Local Government Act 1989 and the<br />

Local Government (Financial and <strong>Report</strong>ing) Regulations 2004.<br />

1 Significant accounting policies<br />

(a) Basis <strong>of</strong> accounting<br />

This financial report has been prepared on the accrual and going concern basis.<br />

This financial report has been prepared under the historical cost convention, except where specifically stated in note 1(f), 1(i), 1(q), 1(s) and 1(t).<br />

Unless otherwise stated, all accounting policies are consistent with those applied in the prior year. Where appropriate, comparative figures have been<br />

amended to accord with current presentation, and disclosure made <strong>of</strong> any material changes to comparatives.<br />

All entities controlled by Council that have material assets or liabilities, such as Special Committees <strong>of</strong> Management, have been included in this financial<br />

report. All transactions between these entities and the Council have been eliminated in full. Details <strong>of</strong> entities not included in this financial report based<br />

on their materiality are detailed in note 31.<br />

(b) Revenue recognition<br />

Rates, grants and contributions<br />

Rates, grants and contributions (including developer contributions) are recognised as revenues when the Council obtains control over the assets<br />

comprising these receipts.<br />

Control over assets acquired from rates is obtained at the commencement <strong>of</strong> the rating year as it is an enforceable debt linked to the rateable property<br />

or, where earlier, upon receipt <strong>of</strong> the rates.<br />

A provision for doubtful debts on rates has not been established as unpaid rates represents a charge against the rateable property that will be recovered<br />

when the property is next sold.<br />

Control over granted assets is normally obtained upon their receipt (or acquittal) or upon earlier notification that a grant has been secured, and are<br />

valued at their fair value at the date <strong>of</strong> transfer.<br />

Income is recognised when the Council obtains control <strong>of</strong> the contribution or the right to receive the contribution, it is probable that the economic benefits<br />

comprising the contribution will flow to the Council and the amount <strong>of</strong> the contribution can be measured reliably.<br />

Where grants or contributions recognised as revenues during the financial year were obtained on condition that they be expended in a particular manner<br />

or used over a particular period, and those conditions were undischarged at balance date, the unused grant or contribution is disclosed in note 7(b). The<br />

note also discloses the amount <strong>of</strong> unused grant or contribution from prior years that was expended on Council's operations during the current year.<br />

A liability is recognised in respect <strong>of</strong> revenue that is reciprocal in nature to the extent that the requisite service has not been provided at balance date.<br />

User fees and fines<br />

User fees and fines (including parking fees and fines) are recognised as revenue when the service has been provided, the payment is received, or when<br />

the penalty has been applied, whichever first occurs.<br />

A provision for doubtful debts is recognised when collection in full is no longer probable.<br />

Sale <strong>of</strong> property, plant and equipment, infrastructure<br />

The pr<strong>of</strong>it or loss on sale <strong>of</strong> an asset is determined when control <strong>of</strong> the asset has irrevocably passed to the buyer.<br />

Trade and other receivables<br />

Receivables are carried at amortised cost using the effective interest rate method. A provision for doubtful debts is recognised when there is objective<br />

evidence that an impairment loss has occurred.<br />

Interest and rents<br />

Interest and rents are recognised as revenue on a proportional basis when the payment is due, the value <strong>of</strong> the payment is notified, or the payment is<br />

received, whichever first occurs.<br />

Dividends<br />

Dividend revenue is recognised when the Council's right to receive payment is established.<br />

78<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong>


Notes to the Financial <strong>Report</strong><br />

For the year ended 30 June <strong>2010</strong><br />

1 Significant accounting policies (cont.)<br />

(c) Depreciation and amortisation <strong>of</strong> property, plant and equipment and infrastructure.<br />

All non-current assets having limited useful lives are systematically depreciated over their useful lives to the Council in a manner which reflects<br />

consumption <strong>of</strong> the service potential embodied in those assets. Estimates <strong>of</strong> remaining useful lives and residual values are made on a regular basis with<br />

major asset classes reassessed annually. Depreciation rates and methods are reviewed annually.<br />

Where infrastructure assets have separate identifiable components that are subject to regular replacement, these components are assigned distinct<br />

useful lives and residual values and a separate depreciation rate is determined for each component.<br />

Artworks are not depreciated.<br />

Straight line depreciation is charged based on the residual useful life as determined each year.<br />

Major depreciation periods used are listed below and are consistent with the prior year unless otherwise stated:<br />

Period<br />

Property<br />

Land improvements<br />

20-90 Years<br />

Land fill assets<br />

1-7 Years<br />

Buildings<br />

20-90 Years<br />

Plant and equipment<br />

Plant and equipment<br />

5-20 Years<br />

Furniture and fittings<br />

2-33 Years<br />

Infrastructure<br />

Roads<br />

- Footpaths 87 Years<br />

- Kerbing 79 Years<br />

- Pavement 19-77 Years<br />

-Surface<br />

13 Years<br />

- Formation 200 Years<br />

Bike paths<br />

15-200 Years<br />

Bridges<br />

50-80 Years<br />

Parks and gardens<br />

10-100 Years<br />

Drainage<br />

60-100 Years<br />

(d) Repairs and maintenance<br />

Routine maintenance, repair costs and minor renewals are expensed as incurred. Where the repair relates to the replacement <strong>of</strong> a component <strong>of</strong> an<br />

asset and the cost exceeds the capitalisation threshold the cost is capitalised and depreciated. The carrying value <strong>of</strong> the replaced asset is expensed.<br />

(e) Borrowing costs<br />

Borrowing costs are recognised as an expense in the period in which they are incurred, except where they are capitalised as part <strong>of</strong> a qualifying asset<br />

constructed by Council. Except where specific borrowings are obtained for the purpose <strong>of</strong> specific asset acquisition, the weighted average interest rate<br />

applicable to borrowings at balance date, excluding borrowings associated with superannuation, is used to determine the borrowing costs to be<br />

capitalised.<br />

Borrowing costs include interest on bank overdrafts, interest on borrowings, and finance lease charges.<br />

(f) Recognition and measurement <strong>of</strong> assets<br />

Acquisition<br />

The purchase method <strong>of</strong> accounting is used for all acquisitions <strong>of</strong> assets, being the fair value <strong>of</strong> assets provided as consideration at the date <strong>of</strong><br />

acquisition plus any incidental costs attributable to the acquisition. Fair value is the amount for which the asset could be exchanged between<br />

knowledgeable willing parties in an arm's length transaction.<br />

Where assets are constructed by Council, cost includes all materials used in construction, direct labour, borrowing costs incurred during construction<br />

and an appropriate share <strong>of</strong> directly attributable variable and fixed overheads.<br />

The following classes <strong>of</strong> assets have been recognised in Note 25. In accordance with Council's policy, the threshold limits detailed below have been<br />

applied when recognising assets within each applicable asset class and unless otherwise stated are consistent with the prior year:<br />

Threshold<br />

Property $<br />

Land 10,000<br />

Land under roads 10,000<br />

Land improvements 10,000<br />

Landfill assets 10,000<br />

Buildings 10,000<br />

Plant and equipment<br />

Plant and equipment 1,800<br />

Furniture and fittings 500<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong><br />

79


Notes to the Financial <strong>Report</strong><br />

For the year ended 30 June <strong>2010</strong><br />

1 Significant accounting policies (cont.) Threshold<br />

(f) Recognition and measurement <strong>of</strong> assets (cont.) $<br />

Infrastructure<br />

Roads<br />

- Footpaths 10,000<br />

- Kerbing 10,000<br />

- Pavement 10,000<br />

-Surface 10,000<br />

- Formation 10,000<br />

Bike paths 10,000<br />

Bridges 5,000<br />

Parks and gardens 5,000<br />

Drainage 5,000<br />

Revaluation<br />

Subsequent to the initial recognition <strong>of</strong> assets, non-current physical assets, other than plant and equipment and furniture and fittings, are measured at<br />

their fair value, being the amount for which the assets could be exchanged between knowledgeable willing parties in an arm's length transaction. At<br />

balance date, the Council reviewed the carrying value <strong>of</strong> the individual classes <strong>of</strong> assets measured at fair value to ensure that each asset materially<br />

approximated its fair value. Where the carrying value materially differed from the fair value at balance date the class <strong>of</strong> asset was revalued.<br />

In addition, Council undertakes a formal revaluation <strong>of</strong> land, buildings and infrastructure assets on a regular basis ranging from 1 to 3 years. The<br />

valuation is performed either by experienced council <strong>of</strong>ficers or independent experts.<br />

Where the assets are revalued, the revaluation increments are credited directly to the asset revaluation reserve except to the extent that an increment<br />

reverses a prior year decrement for that class <strong>of</strong> asset that had been recognised as an expense in which case the increment is recognised as revenue<br />

up to the amount <strong>of</strong> the expense. Revaluation decrements are recognised as an expense except where prior increments are included in the asset<br />

revaluation reserve for that class <strong>of</strong> asset in which case the decrement is taken to the reserve to the extent <strong>of</strong> the remaining increments. Within the<br />

same class <strong>of</strong> assets, revaluation increments and decrements within the year are <strong>of</strong>fset.<br />

Land under roads<br />

Land under roads acquired after 30 June 2008 is brought to account using the fair value basis. Council does not recognise land under roads that it<br />

controlled prior to that period in its financial report.<br />

Inventories<br />

Inventories are measured at the lower <strong>of</strong> cost and net realisable value.<br />

(g) Cash and cash equivalents<br />

For the purposes <strong>of</strong> the cash flow statement, cash and cash equivalents include cash on hand, deposits at call, and other highly liquid investments with<br />

original maturities <strong>of</strong> three months or less, net <strong>of</strong> outstanding bank overdrafts.<br />

(h) Investment<br />

Investments, other than investments in associates, are measured at cost.<br />

(i) Accounting for investments in associates<br />

Council's investment in associates is accounted for by the equity method as the Council has the ability to influence rather than control the operations <strong>of</strong><br />

the entities. The investment is initially recorded at the cost <strong>of</strong> acquisition and adjusted thereafter for post-acquisition changes in the Council's share <strong>of</strong><br />

the net assets <strong>of</strong> the entities. The Council's share <strong>of</strong> the financial result <strong>of</strong> the entities is recognised in the income statement.<br />

(j) Tender deposits<br />

Amounts received as tender deposits and retention amounts controlled by Council are recognised as Trust funds until they are returned or forfeited (refer<br />

note 27).<br />

(k) Employee benefits<br />

Wages and Salaries<br />

Liabilities for wages and salaries and rostered days <strong>of</strong>f are recognised and measured as the amount unpaid at balance date and include appropriate<br />

oncosts such as workers compensation and payroll costs.<br />

<strong>Annual</strong> Leave<br />

<strong>Annual</strong> leave entitlements are accrued on a pro rata basis in respect <strong>of</strong> services provided by employees up to balance date. <strong>Annual</strong> leave expected to<br />

be paid within 12 months is measured at nominal value based on the amount, including appropriate oncosts, expected to be paid when settled. <strong>Annual</strong><br />

leave expected to be paid later than one year has been measured at the present value <strong>of</strong> the estimated future cash outflows to be made for these<br />

accrued entitlements. Commonwealth bond rates are used for discounting future cash flows.<br />

Long Service Leave<br />

Long service leave entitlements payable are assessed at balance date having regard to expected employee remuneration rates on settlement,<br />

employment related oncosts and other factors including accumulated years <strong>of</strong> employment, on settlement, and experience <strong>of</strong> employee departure per<br />

year <strong>of</strong> service. Long service leave expected to be paid within 12 months is measured at a nominal value based on the amount expected to be paid when<br />

settled. Long service leave expected to be paid later than one year has been measured at the present value <strong>of</strong> the estimated future cash outflows to be<br />

made for these accrued entitlements. Commonwealth bond rates are used for discounting future cash flows.<br />

Classification <strong>of</strong> employee benefits<br />

An employee benefit liability is classified as a current liability if the Council does not have an unconditional right to defer settlement <strong>of</strong> the liability for at<br />

least 12 months after the end <strong>of</strong> the period. This would include all annual leave and unconditional long service leave entitlements.<br />

Superannuation<br />

A liability is recognised in respect <strong>of</strong> Council's present obligation to meet the unfunded obligations <strong>of</strong> defined benefit superannuation schemes <strong>of</strong> which<br />

its employees are members. The liability is defined as the Council's share <strong>of</strong> the scheme's unfunded position, being the difference between the present<br />

value <strong>of</strong> employees' accrued benefits and the net market value <strong>of</strong> the scheme's assets at balance date. The liability also includes applicable contributions<br />

tax <strong>of</strong> 15%.<br />

80<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong>


Notes to the Financial <strong>Report</strong><br />

For the year ended 30 June <strong>2010</strong><br />

1 Significant accounting policies (cont.)<br />

The superannuation expense for the reporting year is the amount <strong>of</strong> statutory contribution the Council makes to the superannuation plan which provides<br />

benefits to its employees together with any movements (favourable/unfavourable) in the position <strong>of</strong> any defined benefits schemes. Details <strong>of</strong> those<br />

arrangements are set out in Note 36.<br />

(l) Leases<br />

Finance leases<br />

Leases <strong>of</strong> assets where substantially all the risks and benefits incidental to ownership <strong>of</strong> the asset, but not the legal ownership, are transferred to the<br />

Council are classified as finance leases. Finance leases are capitalised, recording an asset and a liability equal to the present value <strong>of</strong> the minimum<br />

lease payments, including any guaranteed residual value. Lease payments are allocated between the reduction <strong>of</strong> the lease liability and the interest<br />

expense. Leased assets are amortised on a straight line basis over their estimated useful lives to the Council where it is likely that the Council will<br />

obtain ownership <strong>of</strong> the asset or over the term <strong>of</strong> the lease, whichever is the shorter. Leased assets are currently being amortised over a 7 year period.<br />

Refer Note 29 for finance lease commitments.<br />

Operating leases<br />

Lease payments for operating leases are required by the accounting standard to be recognised on a straight line basis, rather than expensed in the<br />

years in which they are incurred.<br />

(m) Allocation between current and non-current<br />

In the determination <strong>of</strong> whether an asset or liability is current or non-current, consideration is given to the time when each asset or liability is expected to<br />

be settled. The asset or liability is classified as current if it is expected to be settled within the next 12 months, being the Council's operational cycle, or if<br />

the Council does not have an unconditional right to defer settlement <strong>of</strong> a liability for at least 12 months after the reporting date.<br />

(n) Agreements equally proportionately unperformed<br />

The Council does not recognise assets and liabilities arising from agreements that are equally proportionately unperformed in the balance sheet. Such<br />

agreements are recognised on an 'as incurred' basis.<br />

(o) Web site costs<br />

Costs in relation to websites are charged as an expense in the period in which they are incurred.<br />

(p) Goods and Services Tax (GST)<br />

Revenues, expenses and assets are recognised net <strong>of</strong> the amount <strong>of</strong> GST, except where the amount <strong>of</strong> GST incurred is not recoverable from the<br />

Australian Taxation Office. In these circumstances the GST is recognised as part <strong>of</strong> the cost <strong>of</strong> acquisition <strong>of</strong> the asset or as part <strong>of</strong> an item <strong>of</strong> expense.<br />

Receivables and payables in the balance sheet are shown inclusive <strong>of</strong> GST.<br />

Cash flows are represented in the cash flow statement on a gross basis, except for the GST component <strong>of</strong> investing and financing activities, which are<br />

disclosed as operating cash flows.<br />

(q) Impairment <strong>of</strong> assets<br />

At each reporting date, the Council reviews the carrying value <strong>of</strong> its assets to determine whether there is any indication that these assets have been<br />

impaired. If such an indication exists, the recoverable amount <strong>of</strong> the asset, being the higher <strong>of</strong> the asset's fair value less costs to sell and value in use, is<br />

compared to the asset's carrying value. Any excess <strong>of</strong> the asset's carrying value over its recoverable amount is expensed to the income statement,<br />

unless the asset is carried at the revalued amount in which case, the impairment loss is recognised directly against the revaluation surplus in respect <strong>of</strong><br />

the same class <strong>of</strong> asset to the extent that the impairment loss does not exceed the amount in the revaluation surplus for that same class <strong>of</strong> asset.<br />

(r) Rounding<br />

Unless otherwise stated, amounts in the financial report have been rounded to the nearest dollar.<br />

(s) Non-current assets held for sale<br />

A non-current asset held for sale (including disposal groups) is measured at the lower <strong>of</strong> its carrying amount and fair value less costs to sell, and are not<br />

subject to depreciation. Non current assets, disposal groups and related liabilities assets are treated as current and classified as held for sale if their<br />

carrying amount will be recovered through a sale transaction rather than through continuing use. This condition is regarded as met only when the sale is<br />

highly probable and the asset's sale (or disposal group sale) is expected to be completed within 12 months from the date <strong>of</strong> classification.<br />

(t) Investment property<br />

Investment property, comprising residential rental premises, is held to generate long-term rental yields. Investment property is measured initially at cost,<br />

including transaction costs.Costs incurred subsequent to initial acquisition are capitalised when it is probable that future economic benefit in excess <strong>of</strong><br />

the originally assessed performance <strong>of</strong> the asset will flow to the Council. Subsequent to initial recognition at cost, investment property is carried at fair<br />

value, determined annually by independent valuers. Changes to fair value are recorded in the comprehensive income statement in the period that they<br />

arise. Rental income from the leasing <strong>of</strong> investment properties is recognised in the comprehensive income statement on a straight line basis over the<br />

lease term.<br />

(u) Contingent assets and contingent liabilities and commitments<br />

Contingent assets and contingent liabilities are not recognised in the Balance Sheet, but are disclosed by way <strong>of</strong> a note and if quantifiable are measured<br />

at nominal value. Contingent assets and liabilities are presented inclusive <strong>of</strong> GST receivable or payable respectively. Commitments are not recognised<br />

in the Balance Sheet. Commitments are disclosed at their nominal value and inclusive <strong>of</strong> GST payable.<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong><br />

81


Notes to the Financial <strong>Report</strong><br />

For the year ended 30 June <strong>2010</strong><br />

2 Pending Accounting Standards<br />

The following Australian Accounting Standards have been issued or amended and are applicable to the Council but are not yet effective. They have not<br />

been adopted in preparation <strong>of</strong> the financial statements at reporting date.<br />

Standard / Interpretation<br />

Summary<br />

Applicable for annual<br />

reporting periods beginning<br />

or ending on<br />

Impact on Local Government financial<br />

statements<br />

AASB <strong>2009</strong>-5 Further Amendments to<br />

Australian Accounting Standards arising from<br />

the <strong>Annual</strong> Improvements Project. [AASB 5, 8,<br />

101, 107, 117, 118, 136 & 139]<br />

Some amendments will result in accounting<br />

changes for presentation, recognition or<br />

measurement purposes, while other<br />

amendments will relate to terminology and<br />

editorial changes.<br />

Beginning 1 Jan <strong>2010</strong><br />

Terminology and editorial changes.<br />

Impact minor.<br />

AASB <strong>2009</strong>-8 Amendments to Australian<br />

Accounting Standards – Group Cash-settled<br />

Share-based Payment Transactions. [AASB 2]<br />

The amendments clarify the scope <strong>of</strong> AASB 2. Beginning 1 Jan <strong>2010</strong><br />

No impact. AASB 2 does not apply to<br />

Local Government; consequently this<br />

Standard does not apply.<br />

AASB <strong>2009</strong>-9 Amendments to Australian<br />

Accounting Standards – Additional Exemptions<br />

for First-time Adopters [AASB 1}<br />

AASB <strong>2009</strong>-10 Amendments to Australian<br />

Accounting Standards – Classification <strong>of</strong> Rights<br />

Issues [AASB 132]<br />

Applies to entities adopting Australian<br />

Accounting Standards for the first time, to<br />

ensure entities will not face undue cost or<br />

effort in the transition process in particular<br />

situations.<br />

The Standard makes amendments to AASB<br />

132, stating that rights issues must now be<br />

classed as equity rather than derivative<br />

liabilities.<br />

Beginning 1 Jan <strong>2010</strong><br />

Beginning 1 Feb <strong>2010</strong><br />

No impact .Relates only to first time<br />

adopters <strong>of</strong> Australian Accounting<br />

Standards.<br />

No impact. Local Government do not<br />

issue rights, warrants and options,<br />

consequently the amendment does not<br />

impact on the statements.<br />

AASB 9 Financial Instruments<br />

This standard simplifies requirements for the<br />

classification and measurement <strong>of</strong> financial<br />

assets resulting from Phase 1 <strong>of</strong> the IASB’s<br />

project to replace IAS 39 Financial<br />

Instruments: Recognition and Measurement<br />

(AASB 139 Financial Instruments: Recognition<br />

and Measurement).<br />

Beginning 1 Jan 2013<br />

Detail <strong>of</strong> impact is still being assessed.<br />

AASB <strong>2009</strong>-11 Amendments to Australian<br />

Accounting Standards arising from AASB 9<br />

[AASB 1, 3, 4, 5, 7, 101, 102, 108, 112, 118,<br />

121, 127, 128, 131, 132, 136, 139, 1023 & 1038<br />

and Interpretations 10 & 12]<br />

This gives effect to consequential changes<br />

arising from the issuance <strong>of</strong> AASB 9.<br />

Beginning 1 Jan 2013<br />

Detail <strong>of</strong> impact is still being assessed.<br />

AASB <strong>2009</strong>-12 Amendments to Australian<br />

Accounting Standards [AASBs 5, 8, 108, 110,<br />

112, 119, 133, 137, 139, 1023 & 1031 and<br />

Interpretations 2, 4, 16, 1039 & 1052]<br />

This Standard amends AASB 8 to require an<br />

entity to exercise judgement in assessing<br />

whether a government and entities know to be<br />

under the control <strong>of</strong> that government are<br />

considered a single customer for purposes <strong>of</strong><br />

certain operating segment disclosures .This<br />

Standard also makes numerous editorial<br />

amendments to other AASs.<br />

Beginning 1 Jan 2011<br />

AASB 8 does not apply to Local<br />

Government therefore no impact<br />

expected. Otherwise, only editorial<br />

changes arsing from amendments to<br />

other standards, no major impact.<br />

Impacts <strong>of</strong> editorial amendments are not<br />

expected to be significant.<br />

AASB <strong>2009</strong>-13 Amendments to Australian Consequential amendment to AASB 1 arising<br />

Accounting Standards arising from Interpretation from publication <strong>of</strong> Interpretation 19<br />

19. [AASB 1]<br />

AASB <strong>2009</strong>-14 Amendments to Australian<br />

Interpretation – Prepayments <strong>of</strong> a Minimum<br />

Funding Requirement [AASB Interpretation 14]<br />

Amendment to Interpretation 14 arising from<br />

the issuance <strong>of</strong> Prepayments <strong>of</strong> a Minimum<br />

Funding Requirement<br />

Beginning 1 Jul <strong>2010</strong><br />

Beginning 1 Jan 2011<br />

Local Governments do not extinguish<br />

financial liabilities with equity instruments,<br />

therefore requirements <strong>of</strong> Interpretation<br />

19 and related amendments have no<br />

impact<br />

Expected to have no significant impact<br />

82<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong>


Notes to the Financial <strong>Report</strong><br />

For the year ended 30 June <strong>2010</strong><br />

3 Rates and charges <strong>2010</strong> <strong>2009</strong><br />

Council uses Capital Improved Value (CIV) as the basis <strong>of</strong> valuation <strong>of</strong> all properties within the<br />

$ $<br />

municipal district.<br />

The valuation base used to calculate general rates for <strong>2009</strong>/<strong>2010</strong> was $3,988,409,000 (2008/<strong>2009</strong><br />

$3,937,429,750).<br />

The <strong>2009</strong>/<strong>2010</strong> residential rate in the CIV dollar was 0.004138 (2008/<strong>2009</strong>, 0.003979)<br />

General 6,900,375 6,421,093<br />

<strong>Rural</strong> 3,851,159 3,696,078<br />

<strong>Rural</strong> residential 2,770,392 2,605,448<br />

Commercial/industrial 2,443,732 2,358,268<br />

Cultural and recreational 21,434 20,614<br />

Garbage 2,213,495 2,067,449<br />

Recycling 852,125 796,468<br />

Supplementary rates and rate adjustments - 66,788<br />

Total rates and charges 19,052,712 18,032,206<br />

The date <strong>of</strong> the latest general revaluation <strong>of</strong> land for rating purposes within the municipal district was<br />

1 January, <strong>2010</strong>, and the valuation first applied to the rating period commencing 1 July <strong>2010</strong>.<br />

The date <strong>of</strong> the previous general revaluation <strong>of</strong> land for rating purposes within the municipal district<br />

was 1 January 2008, and the valuation first applied to the rating year commencing 1 July 2008.<br />

4 Statutory fees and fines<br />

Animal Registrations 184,333 168,779<br />

Infringements and costs 84,950 174,681<br />

PERIN court recoveries 5,013 5,572<br />

Election fees 13,782 14,763<br />

Health fees 91,845 82,019<br />

Town planning fees 128,326 115,789<br />

Building fees 22,327 4,330<br />

Land information certificates 16,654 17,368<br />

Total statutory fees and fines 547,230 583,301<br />

5 User fees<br />

(a) Aged and disability services 691,027 620,736<br />

Building fees 164,228 166,685<br />

Cemetery 324,778 286,255<br />

Children's services 706,122 566,578<br />

Enforcement 339,112 367,949<br />

Engineering fees 61,890 50,879<br />

External private works 165,328 176,314<br />

Landfill and transfer station charges 1,279,301 1,664,617<br />

Livestock exchange fees 397,516 404,535<br />

Packaged Care 103,427 81,488<br />

Performing arts and culture 395,948 27,270<br />

Recreation facility hire 94,803 80,773<br />

Rental properties 401,889 400,071<br />

Tourism 58,615 89,783<br />

Valuation fees/supplementary charges 37,393 35,224<br />

Other 222,422 72,448<br />

Total user fees 5,443,799 5,091,605<br />

(b) Ageing analysis <strong>of</strong> contractual receivables<br />

Please refer to Note 40 for the ageing analysis <strong>of</strong> contractual receivables.<br />

6 Contributions<br />

(a) Cash<br />

Community facility upgrades 338,294 140,517<br />

Developer upgrades 202,303 134,191<br />

Labour market programs 86,586 22,500<br />

Intake and assessment 53,252 27,273<br />

North <strong>Wangaratta</strong> infrastructure - 76,610<br />

Street trees 5,450 -<br />

Subdivisions 11,868 -<br />

Traffic management 609 73,262<br />

Other 20,750 23,667<br />

Total 719,112 498,020<br />

(b) Non-monetary assets<br />

As a result <strong>of</strong> the provision <strong>of</strong> infrastructure requirements for new subdivisions, Council has acquired<br />

the following assets constructed by developers during the financial year<br />

Footpaths 247,293 -<br />

Kerbing 430,286 19,890<br />

Road seal and substructure 1,121,780 75,808<br />

Total 1,799,359 95,698<br />

Total contributions 2,518,471 593,718<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong><br />

83


Notes to the Financial <strong>Report</strong><br />

For the year ended 30 June <strong>2010</strong><br />

7Grants <strong>2010</strong> <strong>2009</strong><br />

$ $<br />

(a) Grants were received in respect <strong>of</strong> the following:<br />

Summary <strong>of</strong> Grants<br />

Federally Funded Grants 8,375,773 9,116,347<br />

State Funded Grants 8,834,698 9,761,796<br />

Total 17,210,471 18,878,143<br />

Recurrent<br />

Victoria Grants Commission 3,779,411 4,440,541<br />

Aged and disability 1,254,359 784,709<br />

Child care centre 512,855 407,664<br />

Community Support North East - Commonwealth funded programs 1,556,921 1,486,740<br />

Community Support North East - DHS funded programs 1,920,916 1,901,392<br />

Family day care 752,683 628,213<br />

Maternal and child health 216,600 219,592<br />

Planned activity group - 38,015<br />

Other 125,622 175,101<br />

Victoria Grants Commission - local roads 1,960,696 2,280,662<br />

Emergency 35,254 -<br />

Commonwealth Government - Roads to recovery 1,078,745 908,404<br />

Culture and recreation 115,000 25,000<br />

Environment 12,600 -<br />

Development 34,946 46,603<br />

Total recurrent 13,356,608 13,342,636<br />

Non-recurrent<br />

Children's services centre - 25,000<br />

Community facilities 359,441 554,894<br />

Community Support North East 151,470 -<br />

Cultural development 117,765 -<br />

Economic development 124,266 105,049<br />

Emergency and fire - 55,042<br />

Environmental enhancement 86,900 47,030<br />

Generations project - 130,000<br />

Global Skills project 52,000 130,000<br />

Other 144,249 77,819<br />

Performing Arts Centre 1,400,000 3,100,000<br />

Regional and Local Community Infrastructure Program - 620,000<br />

<strong>Rural</strong> skills conect 25,000 100,000<br />

Timber roads 192,211 142,730<br />

Tourism projects - 97,714<br />

Transport 1,200,561 350,229<br />

Total non-recurrent 3,853,863 5,535,507<br />

Total grant revenues 17,210,471 18,878,143<br />

(b) Conditions on grants<br />

Grants recognised as revenue during the year that were obtained on condition that they<br />

be expended in a specified manner that had not occurred at balance date were:<br />

Centre for medical excellence 59,000 -<br />

Commonwealth Government - Roads to Recovery - 74,279<br />

Family Day Care - Fee relief - 43,957<br />

Home and Community Care client capital improvements 49,775 -<br />

Home and Community Care sustainable households 28,000 -<br />

Moyhu netball court 57,540 -<br />

Murmungee Bushfire Recovery -fencing 23,000 -<br />

Regional and Local Community Infrastructure Program - 442,966<br />

<strong>Rural</strong> Skills Connect Phase II 16,284 -<br />

Tarrawingee Recreation Reserve bore 45,000 -<br />

Victoria Grants Commission - local roads 509,683 465,002<br />

Victoria Grants Commission - unallocated 983,131 895,951<br />

1,771,413 1,922,155<br />

Grants which were recognised as revenue in prior years and were expended<br />

during the current year in the manner specified by the grantor were:<br />

Children's Services Centre - (750,000)<br />

Commonwealth Government - Roads to recovery (74,279) (340,956)<br />

Family Day Care - Fee Relief (43,957) (52,451)<br />

Regional and Local Community Infrastructure Program (442,966) -<br />

Sound system - Arts Victoria - (19,000)<br />

Victoria Grants Commission - local roads (465,002) -<br />

Victoria Grants Commission - unallocated (895,951) -<br />

(1,922,155) (1,162,407)<br />

Net increase (decrease) in restricted assets resulting from grant revenues for the year:<br />

(150,742) 759,748<br />

84<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong>


Notes to the Financial <strong>Report</strong><br />

For the year ended 30 June <strong>2010</strong><br />

8 Reimbursements <strong>2010</strong> <strong>2009</strong><br />

$ $<br />

Bushfire assistance to neighbouring Councils - 100,225<br />

State Revenue Office - valuation contract 149,817 10,181<br />

Flexible support packages - 19,051<br />

Linkages - 31,775<br />

Planned Activity Group 15,041 6,499<br />

Other 1,487 3,169<br />

Total reimbursements 166,345 170,900<br />

9 Net gain/(loss) on sale/disposal <strong>of</strong> property, infrastructure, plant and equipment<br />

Proceeds from sale <strong>of</strong> assets<br />

Assets for resale - note 23 1,169,190 600,000<br />

Land at valuation <strong>2009</strong> 277,032 45,128<br />

Furniture and fittings - 310<br />

Plant and equipment 370,170 413,467<br />

1,816,392 1,058,905<br />

Less: Carrying amount <strong>of</strong> assets sold/disposed<br />

Assets for resale - note 23 240,121 462,273<br />

Land at valuation <strong>2009</strong> 200,000 52,000<br />

Land improvements 550 -<br />

Plant and equipment 161,973 173,947<br />

602,644 688,220<br />

Net pr<strong>of</strong>it /(loss) from sale/disposal <strong>of</strong> assets 1,213,748 370,685<br />

10 Other revenue<br />

Interest 597,649 809,496<br />

Other 4,834 16,454<br />

Total other revenue 602,483 825,950<br />

11 Investment in associates<br />

High Country Library Corporation was established on the 8th August, 1996. The <strong>Wangaratta</strong> <strong>Rural</strong><br />

<strong>City</strong> Council's share <strong>of</strong> audited assets and liabilities committed to this Corporation is 43%. They are<br />

included in the balance sheet as a non-current investment, and are represented as follows:-<br />

Council's share <strong>of</strong> accumulated surplus(deficit)<br />

Council's share <strong>of</strong> accumulated surplus(deficit) at start <strong>of</strong> year 579,008 548,907<br />

<strong>Report</strong>ed surplus(deficit) for year 2,387 30,101<br />

Council's share <strong>of</strong> accumulated surplus(deficit) at end <strong>of</strong> year 581,395 579,008<br />

Council's share <strong>of</strong> asset revaluation reserve<br />

Council's share <strong>of</strong> asset revaluation reserve at start <strong>of</strong> year 128,052 33,445<br />

Transfers (to) from reserves (73,070) 94,607<br />

Council's share <strong>of</strong> asset revaluation reserve at end <strong>of</strong> year 54,982 128,052<br />

Movement in carrying value <strong>of</strong> High Country Library<br />

Carrying value <strong>of</strong> investment at start <strong>of</strong> year 951,410 826,702<br />

Share <strong>of</strong> surplus(deficit) for year 8,457 30,101<br />

Share <strong>of</strong> asset revaluation (73,070) 94,607<br />

Movement in carrying value (64,613) 124,708<br />

Carrying value <strong>of</strong> investment at end <strong>of</strong> year 886,797 951,410<br />

Council's share <strong>of</strong> members capital 250,420 244,350<br />

Council's Share <strong>of</strong> total Equity 886,797 951,410<br />

Council's share <strong>of</strong> expenditure commitments<br />

Operating commitments 24,383 24,383<br />

Operating lease commitments 3,973 7,881<br />

28,356 32,264<br />

12 Employee benefits<br />

Wages and Salaries 12,686,812 11,477,294<br />

<strong>Annual</strong> leave and long service leave 1,489,839 1,066,015<br />

Workcover 456,424 302,343<br />

Superannuation 1,238,142 1,194,736<br />

Redundancy - 17,714<br />

Other employee benefits 907,165 -<br />

Total employee benefits 16,778,382 14,058,102<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong><br />

85


Notes to the Financial <strong>Report</strong><br />

For the year ended 30 June <strong>2010</strong><br />

13 Materials and services <strong>2010</strong> <strong>2009</strong><br />

$ $<br />

Other materials and services 7,349,673 10,125,792<br />

Packaged care brokerage 1,800,465 1,516,539<br />

Contract payments 2,841,932 1,147,244<br />

Utilities 583,747 461,973<br />

Building maintenance 341,818 423,068<br />

Consultants 421,541 375,757<br />

Insurance 395,578 195,736<br />

Printing and stationery 218,807 178,973<br />

Telephone 202,967 177,049<br />

Advertising and promotion 169,254 116,083<br />

Postage 83,491 67,474<br />

Plant and equipment maintenance 12,678 29,764<br />

Total materials and services 14,421,951 14,815,452<br />

14 Depreciation and amortisation<br />

Depreciation<br />

Property<br />

Land improvements 325,481 270,232<br />

Landfill assets 393,199 448,893<br />

Buildings 1,317,496 1,159,207<br />

Plant and equipment<br />

Plant and equipment 1,427,299 1,479,224<br />

Furniture and fittings 279,723 181,638<br />

Infrastructure<br />

Road seal and substructure 3,361,559 3,335,301<br />

Gravel roads and substructure 604,040 629,618<br />

Bridges 594,623 572,758<br />

Kerbing 196,202 192,871<br />

Drainage 304,630 304,131<br />

Footpaths 146,804 128,272<br />

Bike paths 320,786 252,326<br />

Parks and gardens 158,937 150,808<br />

9,430,779 9,105,279<br />

Amortisation<br />

Leased assets - plant and equipment - 104,094<br />

Total depreciation and amortisation 9,430,779 9,209,373<br />

15 Finance costs<br />

Interest - Borrowings 680,126 606,577<br />

Interest - Finance leases 26 6,663<br />

Total finance costs 680,152 613,240<br />

16 Other expenses<br />

Voters roll 2,579 2,510<br />

New industry rate assistance 13,409 16,518<br />

Total other expenses 15,988 19,028<br />

17 Available for sale revaluation reserve loss recognised<br />

During the 2008 financial year, council recognised a reduction in the market value <strong>of</strong> investments<br />

through an asset revaluation reserve. Refer note 31 (a). The balance <strong>of</strong> this revaluation reserve<br />

has now been recognised through the income statement.<br />

- (106,047)<br />

- (106,047)<br />

18 Impairment <strong>of</strong> financial assets<br />

Council holds marketable investments titled 'floating rate notes'. These investments were acquired<br />

at a cost <strong>of</strong> $2,500,000. These investments have been valued at their current market price and a<br />

reduction in value recognised as impairment for the <strong>2009</strong> financial year. During the <strong>2010</strong> financial<br />

year a number <strong>of</strong> these investments were sold and the reduction in impaired value is recognised<br />

accordingly.<br />

Financial Assets 149,962 (74,005)<br />

149,962 (74,005)<br />

86<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong>


Notes to the Financial <strong>Report</strong><br />

For the year ended 30 June <strong>2010</strong><br />

19 Cash and cash equivalents <strong>2010</strong> <strong>2009</strong><br />

$ $<br />

Cash on hand 6,600 6,350<br />

Cash at bank 287,094 335,520<br />

Money market call account 2,626,604 1,368,802<br />

Floating Rate Notes 469,910 2,309,599<br />

Term deposits 8,844,938 7,161,593<br />

Total cash and cash equivalents 12,235,146 11,181,864<br />

Users <strong>of</strong> the Financial <strong>Report</strong> should refer to Note 35 for details <strong>of</strong> restrictions on cash assets and<br />

note 37 for details <strong>of</strong> existing Council commitments.<br />

20 Trade and other receivables<br />

Current<br />

Rate and garbage receivables 1,219,467 1,043,224<br />

Government grants 420,800 353,121<br />

Other debtors 1,570,528 1,999,784<br />

Goods and services tax 233,722 541,355<br />

Parking and animal infringement debtors 129,948 110,506<br />

Less provision for doubtful debts (51,935) (46,511)<br />

Interest on rates and garbage receivable and investments 211,743 45,541<br />

Loans and advances to community organisations 18,242 7,500<br />

Other receivables 2,533,048 3,011,296<br />

Total current receivables 3,752,515 4,054,520<br />

Non-current<br />

Loans and advances to community organisations at Council valuation 167,027 32,500<br />

Total non-current receivables 167,027 32,500<br />

Total trade and other receivables 3,919,542 4,087,020<br />

21 Inventories<br />

Inventories for distribution 78,441 83,502<br />

Total inventories 78,441 83,502<br />

22 Other assets<br />

Prepayments 159,540 150,136<br />

Total other assets 159,540 150,136<br />

23 Assets held for sale<br />

Balance at start <strong>of</strong> year 1,338,603 1,800,876<br />

Transfer from property plant and equipment. 350,975 -<br />

Less assets disposed. (240,121) (462,273)<br />

Total assets held for sale 1,449,457 1,338,603<br />

24 Financial assets<br />

Municipal Association Purchasing Scheme (MAPS) shares at council valuation 2000.<br />

10,000 10,000<br />

25 Property, infrastructure, plant and equipment<br />

Summary<br />

At cost 34,648,074 32,647,040<br />

Less accumulated depreciation 11,637,606 10,125,874<br />

23,010,468 22,521,166<br />

At fair value as at 30 June <strong>2010</strong> 315,685,008 -<br />

Less accumulated depreciation 129,421,802 -<br />

At fair value as at 30 June <strong>2009</strong> 99,229,829 175,650,422<br />

Less accumulated depreciation 35,362,360 60,235,067<br />

At fair value as at 30 June 2008 45,506,967 249,492,061<br />

Less accumulated depreciation 21,498,139 102,795,296<br />

At fair value as at 30 June 2005 5,527,705 5,527,705<br />

Less accumulated depreciation 3,826,431 3,702,979<br />

At council valuation 2003 242,864 237,528<br />

276,083,641 264,174,374<br />

Total property, infrastructure, plant and equipment 299,094,109 286,695,540<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong><br />

87


Notes to the Financial <strong>Report</strong><br />

For the year ended 30 June <strong>2010</strong><br />

25 Property, plant and equipment and infrastructure (cont.) <strong>2010</strong> <strong>2009</strong><br />

Property: (cont.) $ $<br />

Property:<br />

Land<br />

At fair value as at 30 June <strong>2009</strong> 27,498,800 27,928,800<br />

Total land 27,498,800 27,928,800<br />

Land improvements<br />

At fair value as at 30 June <strong>2009</strong> 19,853,500 19,883,500<br />

Less accumulated depreciation 11,385,997 11,085,300<br />

8,467,503 8,798,200<br />

At cost 385,848 -<br />

Less accumulated depreciation 8,021 -<br />

377,827 -<br />

Total land improvements 8,845,330 8,798,200<br />

Landfill assets<br />

At cost 4,855,051 3,505,607<br />

Less accumulated depreciation 2,197,807 1,804,607<br />

Total landfill assets 2,657,244 1,701,000<br />

Buildings<br />

At fair value as at 30 June <strong>2009</strong> 71,731,029 71,948,029<br />

Less accumulated depreciation 35,362,360 34,299,529<br />

36,368,669 37,648,500<br />

At cost 9,612,252 -<br />

Less accumulated depreciation 145,952 -<br />

9,466,300 -<br />

Total buildings 45,834,969 37,648,500<br />

Total property 84,836,343 76,076,500<br />

Valuation <strong>of</strong> land and buildings was undertaken in <strong>2009</strong> by a qualified independent valuer - Valpac<br />

Pty Ltd. The valuation <strong>of</strong> buildings is at fair value based on current replacement cost less<br />

accumulated depreciation at the date <strong>of</strong> valuation. The valuation <strong>of</strong> land is at fair value, being<br />

market value based on highest and best use permitted by relevant land planning provisions.<br />

Plant and equipment:<br />

Plant and equipment<br />

At cost 12,348,911 10,895,097<br />

Less accumulated depreciation 7,107,446 6,439,064<br />

Total plant and equipment 5,241,465 4,456,033<br />

Leased plant and equipment<br />

At cost 700,000 700,000<br />

Less accumulated amortisation 700,000 700,000<br />

Total leased plant and equipment - -<br />

Furniture and fittings<br />

At cost 3,114,690 2,782,433<br />

Less accumulated depreciation 1,379,511 1,099,788<br />

Total furniture and fittings 1,735,179 1,682,645<br />

Art collection at council valuation <strong>of</strong> recoverable value 2003 242,864 237,528<br />

Total plant and equipment 7,219,508 6,376,206<br />

Valuation <strong>of</strong> council's art collection is based on council's estimate <strong>of</strong> recoverable value.<br />

Infrastructure:<br />

Road seal and substructure<br />

At council valuation <strong>of</strong> fair value <strong>2010</strong> 190,754,546 -<br />

Less Accumulated depreciation 96,759,207 -<br />

93,995,339 -<br />

At council valuation <strong>of</strong> fair value 2008 - 164,802,382<br />

Less accumulated depreciation - 76,549,941<br />

- 88,252,441<br />

At cost - 2,896,311<br />

Less accumulated depreciation - 8,764<br />

- 2,887,547<br />

Total road seal and substructure 93,995,339 91,139,988<br />

88<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong>


Notes to the Financial <strong>Report</strong><br />

For the year ended 30 June <strong>2010</strong><br />

25 Property, plant and equipment and infrastructure (cont.) <strong>2010</strong> <strong>2009</strong><br />

Infrastructure: (cont.) $ $<br />

Gravel roads and substructure<br />

At council valuation <strong>of</strong> fair value <strong>2010</strong> 39,191,780 -<br />

Less Accumulated depreciation 6,334,725 -<br />

32,857,055 -<br />

At council valuation <strong>of</strong> fair value 2008 - 36,675,744<br />

Less Accumulated depreciation - 6,076,962<br />

- 30,598,782<br />

At cost - 679,729<br />

Less accumulated depreciation - 2,624<br />

- 677,105<br />

Total gravel roads and substructure 32,857,055 31,275,887<br />

Bridges<br />

At council valuation <strong>of</strong> fair value <strong>2010</strong> 51,862,110 -<br />

Less accumulated depreciation 13,075,848 -<br />

38,786,262 -<br />

At council valuation <strong>of</strong> fair value <strong>2009</strong> - 48,376,780<br />

Less accumulated depreciation - 12,311,828<br />

- 36,064,952<br />

Total bridges 38,786,262 36,064,952<br />

Kerbing<br />

At council valuation <strong>of</strong> fair value <strong>2010</strong> 15,299,617 -<br />

Less accumulated depreciation 6,095,037 -<br />

9,204,580 -<br />

At council valuation <strong>of</strong> fair value 2008 - 14,799,678<br />

Less accumulated depreciation - 7,566,405<br />

- 7,233,273<br />

At cost - 697,127<br />

Less accumulated depreciation - 5,658<br />

- 691,469<br />

Total kerbing 9,204,580 7,924,742<br />

Drainage<br />

At council valuation <strong>of</strong> fair value 2008 25,653,467 25,653,467<br />

Less accumulated depreciation 10,112,142 9,812,595<br />

15,541,325 15,840,872<br />

At cost 536,899 501,264<br />

Less accumulated depreciation 9,667 4,584<br />

527,232 496,680<br />

Total drainage 16,068,557 16,337,552<br />

Footpaths<br />

At council valuation <strong>of</strong> fair value <strong>2010</strong> 9,406,412 -<br />

Less accumulated depreciation 3,774,675 -<br />

5,631,737 -<br />

At council valuation <strong>of</strong> fair value 2008 - 7,560,790<br />

Less accumulated depreciation - 2,789,393<br />

- 4,771,397<br />

At cost - 656,533<br />

Less accumulated depreciation - 7,068<br />

- 649,465<br />

Total footpaths 5,631,737 5,420,862<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong><br />

89


Notes to the Financial <strong>Report</strong><br />

For the year ended 30 June <strong>2010</strong><br />

25 Property, plant and equipment and infrastructure (cont.) <strong>2010</strong> <strong>2009</strong><br />

Infrastructure: (cont.) $ $<br />

Bike paths<br />

At council valuation <strong>of</strong> fair value <strong>2010</strong> 9,170,543 -<br />

Less accumulated depreciation 3,382,310 -<br />

5,788,233 -<br />

At council valuation <strong>of</strong> fair value <strong>2009</strong> - 7,513,313<br />

Less accumulated depreciation - 2,538,410<br />

- 4,974,903<br />

Total bike paths 5,788,233 4,974,903<br />

Parks and gardens<br />

At Council valuation <strong>of</strong> fair value 2005 5,527,705 5,527,705<br />

Less accumulated depreciation 3,826,431 3,702,979<br />

1,701,274 1,824,726<br />

At cost 682,028 442,529<br />

Less accumulated depreciation 89,202 53,717<br />

592,826 388,812<br />

Total parks and gardens 2,294,100 2,213,538<br />

Total infrastructure 204,625,863 195,352,424<br />

<strong>2010</strong> valuation <strong>of</strong> infrastructure assets has been determined in accordance with council valuation<br />

undertaken by Tony Raven - Manager Business Planning, Bachelor <strong>of</strong> Forest Science. The<br />

valuation is at a fair value based on replacement cost less accumulated depreciation as at the date<br />

<strong>of</strong> valuation.<br />

<strong>2009</strong> valuation <strong>of</strong> property assets was undertaken by independent valuer - Valpac Pty Ltd. The<br />

valuation is at a fair value based on replacement cost less accumulated depreciation as at the date<br />

<strong>of</strong> valuation.<br />

2008 valuation <strong>of</strong> infrastructure assets has been determined in accordance with council valuation<br />

undertaken by Russell Smith - Manager - Assets, Diploma <strong>of</strong> Engineering (Civil). The valuation is at<br />

a fair value based on replacement cost less accumulated depreciation as at the date <strong>of</strong> valuation.<br />

2005 valuation <strong>of</strong> infrastructure assets has been determined in accordance with a council valuation<br />

undertaken by Peter Waite, Director - Engineering and Operations. The valuation is at a fair value<br />

based on replacement cost less accumulated depreciation as at the date <strong>of</strong> valuation.<br />

Works in progress<br />

Bike paths at cost 403,458 78,702<br />

Bridges at cost - 73,468<br />

Buildings at cost 650,257 8,513,915<br />

Drainage at cost 185 -<br />

Footpaths at cost 15,164 18,253<br />

Land improvements at cost 337,036 144,533<br />

Parks and gardens at cost 112,493 40,631<br />

Road seal and substructure at cost 841,865 20,908<br />

Gravel roads and substructure at cost 33,742 -<br />

Landfill asset at cost 18,195 -<br />

Total work in progress 2,412,395 8,890,410<br />

Total property, infrastructure, plant and equipment 299,094,109 286,695,540<br />

90<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong>


Notes to the Financial <strong>Report</strong><br />

For the year ended 30 June <strong>2010</strong><br />

25 Property, infrastructure, plant and equipment, (cont.)<br />

Property<br />

<strong>2010</strong><br />

Balance at<br />

beginning <strong>of</strong><br />

financial year<br />

Acquisition<br />

<strong>of</strong> assets<br />

Revaluation<br />

increments<br />

(decrements)<br />

Assets<br />

recognised/<br />

contributed<br />

Depreciation<br />

and<br />

amortisation<br />

Transfers<br />

from assets<br />

under<br />

construction<br />

Transfers to<br />

non current<br />

assets<br />

classified as<br />

held for sale<br />

WDV <strong>of</strong><br />

disposals<br />

Balance at end<br />

<strong>of</strong> financial<br />

year<br />

$ $ $ $ $ $ $ $ $<br />

Land 27,928,800 - - - - (230,000) 200,000 27,498,800<br />

Land improvements 8,798,200 245,933 - - 325,481 139,915 (12,687) 550 8,845,330<br />

Landfill assets 1,701,000 - - 1,349,444 393,199 - - - 2,657,245<br />

Buildings 37,648,500 1,124,359 - - 1,317,496 8,487,893 (108,287) - 45,834,969<br />

Total property 76,076,500 1,370,292 - 1,349,444 2,036,176 8,627,808 (350,974) 200,550 84,836,344<br />

Plant and Equipment<br />

Plant and equipment 4,456,033 2,374,705 - - 1,427,299 - - 161,974 5,241,465<br />

Leased plant and equipment - - - - - - - - -<br />

Furniture and fittings 1,920,173 337,593 - - 279,723 - - - 1,978,043<br />

Total plant and equipment 6,376,206 2,712,298 - - 1,707,022 - - 161,974 7,219,508<br />

Infrastructure<br />

Road seal and substructure 91,139,988 2,607,714 2,481,506 1,121,780 3,361,559 5,910 - - 93,995,339<br />

Gravel roads and substructure 31,275,887 803,268 1,381,939 - 604,040 - - - 32,857,054<br />

Bridges 36,064,952 353,466 2,888,999 - 594,623 73,468 - - 38,786,262<br />

Kerbing 7,924,742 92,232 953,521 430,286 196,202 - - - 9,204,579<br />

Drainage 16,337,552 35,635 - - 304,630 - - - 16,068,557<br />

Footpaths 5,420,862 445,048 (337,751) 247,293 146,804 3,089 - - 5,631,737<br />

Bikepaths 4,974,903 66,008 (130,561) 1,134,858 320,786 63,811 - - 5,788,233<br />

Parks and gardens 2,213,538 238,903 - - 158,937 596 - - 2,294,100<br />

Total infrastructure 195,352,424 4,642,274 7,237,653 2,934,217 5,687,581 146,874 - - 204,625,861<br />

Works in Progress<br />

Bikepaths 78,702 388,566 - - - (63,810) - - 403,458<br />

Bridges 73,468 - - - - (73,468) - - -<br />

Buildings 8,513,915 624,235 - - - (8,487,893) - - 650,257<br />

Drainage - 185 - - - - - - 185<br />

Footpaths 18,253 - - - - (3,089) - - 15,164<br />

Land improvements 144,533 332,419 - - - (139,916) - - 337,036<br />

Parks and gardens 40,631 72,458 - - - (596) - - 112,493<br />

Road seal and substructure 20,908 826,867 - - - (5,910) - - 841,865<br />

Gravel roads and substructure - 33,742 - - - - - - 33,742<br />

Landfill - 18,195 - - - - - - 18,195<br />

Total work in progress 8,890,410 2,296,667 - - - (8,774,682) - 2,412,395<br />

Total property, infrastructure, 286,695,540 11,021,531 7,237,653 4,283,661 9,430,779 0 (350,974) 362,524 299,094,108<br />

plant and equipment<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong><br />

91


Notes to the Financial <strong>Report</strong><br />

For the year ended 30 June <strong>2010</strong><br />

25 Property, infrastructure, plant and equipment, (cont.)<br />

Property<br />

<strong>2009</strong><br />

Balance at<br />

beginning <strong>of</strong><br />

financial year<br />

Acquisition<br />

<strong>of</strong> assets<br />

Revaluation<br />

increments<br />

(decrements)<br />

Assets<br />

recognised/<br />

contributed<br />

Depreciation<br />

and<br />

amortisation<br />

Transfers<br />

from assets<br />

under<br />

construction<br />

Transfers to<br />

non current<br />

assets<br />

classified as<br />

held for sale<br />

WDV <strong>of</strong><br />

disposals<br />

Balance at end<br />

<strong>of</strong> financial<br />

year<br />

$ $ $ $ $ $ $ $<br />

Land 25,408,836 172,903 2,399,061 - - - - 52,000 27,928,800<br />

Land improvements 4,787,513 847,264 196,913 - 270,232 3,236,742 - - 8,798,200<br />

Landfill assets 1,550,985 590,798 - - 448,893 8,110 - - 1,701,000<br />

Buildings 32,708,441 3,173,446 1,895,664 - 1,159,207 1,030,156 - - 37,648,500<br />

Total property 64,455,775 4,784,411 4,491,638 - 1,878,332 4,275,008 - 52,000 76,076,500<br />

Plant and Equipment<br />

Plant and equipment 4,261,555 1,847,649 - - 1,479,224 - - 173,947 4,456,033<br />

Leased plant and equipment 104,094 - - - 104,094 - - - -<br />

Furniture and fittings 1,006,778 1,095,033 - - 181,638 - - - 1,920,173<br />

Total plant and equipment 5,372,427 2,942,682 - - 1,764,956 - - 173,947 6,376,206<br />

Infrastructure<br />

Road seal and substructure 91,503,170 2,043,714 - 75,808 3,335,301 852,597 - - 91,139,988<br />

Gravel roads and substructure 31,225,776 662,925 - - 629,618 16,804 - - 31,275,887<br />

Bridges 35,053,165 520,285 707,731 - 572,758 356,529 - - 36,064,952<br />

Kerbing 7,400,596 333,713 - 19,890 192,871 363,414 - - 7,924,742<br />

Drainage 16,140,419 27,716 - - 304,131 473,548 - - 16,337,552<br />

Footpaths 4,892,601 152,412 - - 128,272 504,121 - - 5,420,862<br />

Bikepaths 4,674,358 48,289 356,104 - 252,326 148,478 - - 4,974,903<br />

Parks and gardens 2,248,169 31,364 - - 150,808 84,813 - - 2,213,538<br />

Total infrastructure 193,138,254 3,820,418 1,063,835 95,698 5,566,085 2,800,304 - - 195,352,424<br />

Works in Progress<br />

Bikepaths 160,346 66,834 - - - (148,478) - - 78,702<br />

Bridges 371,192 58,948 - - - (356,672) - - 73,468<br />

Buildings 2,182,829 7,361,262 - - - (1,030,176) - - 8,513,915<br />

Drainage 15,556 - - - - (15,556) - - -<br />

Footpaths 26,743 3,110 - - - (11,600) - - 18,253<br />

Land improvements 3,770,264 144,534 - - - (3,770,265) - - 144,533<br />

Parks and gardens 84,813 40,631 - - - (84,813) - - 40,631<br />

Road seal and substructure 1,657,912 20,748 - - - (1,657,752) - - 20,908<br />

Total work in progress 8,269,655 7,696,067 - - - (7,075,312) - - 8,890,410<br />

Total property, infrastructure, 271,236,111 19,243,578 5,555,473 95,698 9,209,373 - - 225,947 286,695,540<br />

plant and equipment<br />

92<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong>


Notes to the Financial <strong>Report</strong><br />

For the year ended 30 June <strong>2010</strong><br />

26 Trade and other payables <strong>2010</strong> <strong>2009</strong><br />

$ $<br />

Materials and contracts 3,134,599 4,553,340<br />

Employee costs 218,171 206,624<br />

Accrued expenses 52,945 69,983<br />

Total trade and other payables 3,405,715 4,829,947<br />

27 Trust funds and deposits<br />

Retention contract deposits 142,312 67,156<br />

Refundable subdivision securities 171,246 181,622<br />

Refundable crossings 24,424 21,232<br />

Refundable relocate dwellings 33,600 39,600<br />

Other 57,982 49,905<br />

Total trust funds and deposits 429,564 359,515<br />

28 Provisions<br />

<strong>Annual</strong> Leave<br />

Long Service<br />

Leave<br />

Other employee<br />

benefits<br />

Landfill<br />

rehabilitation Total<br />

<strong>2010</strong> $ $ $ $ $<br />

Balance at beginning <strong>of</strong> financial year 1,610,263 2,212,882 287,496 2,359,249 6,469,890<br />

Additional provisions 1,105,404 322,444 636,737 1,349,444 3,414,029<br />

Amounts used (893,600) (125,996) (602,276) (402,647) (2,024,519)<br />

Increase in the discounted amount<br />

arising because <strong>of</strong> time and the effect<br />

<strong>of</strong> any change in the discount rate<br />

- - - - -<br />

Balance at end <strong>of</strong> financial year 1,822,067 2,409,330 321,957 3,306,046 7,859,400<br />

<strong>2009</strong> $ $ $ $ $<br />

Balance at beginning <strong>of</strong> financial year 1,411,170 2,175,320 275,676 2,400,000 6,262,166<br />

Additional provisions 1,100,614 202,056 407,833 - 1,710,503<br />

Amounts used (901,521) (164,494) (396,013) (40,751) (1,502,779)<br />

Increase in the discounted amount<br />

arising because <strong>of</strong> time and the effect<br />

<strong>of</strong> any change in the discount rate<br />

- - - - -<br />

Balance at end <strong>of</strong> financial year 1,610,263 2,212,882 287,496 2,359,249 6,469,890<br />

<strong>2010</strong> <strong>2009</strong><br />

Aggregate carrying amount <strong>of</strong> provisions: $ $<br />

Current 4,914,576 4,425,060<br />

Non-current 2,944,824 2,044,830<br />

7,859,400 6,469,890<br />

(a) Employee benefits<br />

Current (i)<br />

<strong>Annual</strong> leave 1,822,067 1,610,263<br />

Long service leave 1,976,004 1,772,301<br />

Rostered Day Off 181,020 158,651<br />

Time Accrued 140,937 128,845<br />

4,120,028 3,670,060<br />

Non-current (ii)<br />

Long service leave 433,326 440,581<br />

433,326 440,581<br />

Aggregate carrying amount <strong>of</strong> employee benefits:<br />

Current 4,120,028 3,670,060<br />

Non-current 433,326 440,581<br />

4,553,354 4,110,641<br />

The following assumptions were adopted in measuring the present value <strong>of</strong> employee benefits:<br />

Weighted average increase in employee costs 0.00% 4.45%<br />

Weighted average discount rates 5.16% 5.48%<br />

Weighted average settlement period 12 12<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong><br />

93


Notes to the Financial <strong>Report</strong><br />

For the year ended 30 June <strong>2010</strong><br />

28 Provision (cont). <strong>2010</strong> <strong>2009</strong><br />

(i) Current $ $<br />

All annual leave and the long service leave entitlements representing 10 or more years<br />

<strong>of</strong> continuing service:<br />

- short-term employee benefits, that fall due within 12 months after the end <strong>of</strong> the period measured<br />

at nominal value<br />

- other long-term employee benefits that do not fall due within 12 months after the end <strong>of</strong> the period<br />

measured at present value<br />

(ii) Non-current<br />

Long service leave representing less than 10 year <strong>of</strong> continuous service measured at present value<br />

4,120,028 3,532,416<br />

- 137,644<br />

4,120,028 3,670,060<br />

433,326 440,581<br />

(b) Provision for landfill rehabilitation<br />

Under legislation, Council is obligated to restore Bowser and other closed rural landfill sites to a<br />

particular standard. Current engineering projections indicate that the current Bowser landfill cells<br />

will continue operating until 2026 with restoration work is expected to be undertaken progressively<br />

as cells are closed. The provision for landfill restoration has been calculated based on the present<br />

value <strong>of</strong> the expected cost <strong>of</strong> works to be undertaken. The expected cost <strong>of</strong> works has been<br />

estimated based on current understanding <strong>of</strong> work required to reinstate the site to a suitable<br />

standard and budgeted costs for that work. Accordingly, the estimation <strong>of</strong> the provision required is<br />

dependent on the accuracy <strong>of</strong> the forecast timing <strong>of</strong> the work, work required and related costs.<br />

Current<br />

Landfill rehabilitation 794,548 755,000<br />

Non-current<br />

Landfill rehabilitation 2,511,498 1,604,249<br />

Total provision for landfill rehabilitation 3,306,046 2,359,249<br />

29 Interest bearing loans and borrowings<br />

Current<br />

Borrowings - secured 1,496,328 1,463,923<br />

Finance leases - secured - 22,314<br />

1,496,328 1,486,237<br />

Non-current<br />

Borrowings - secured 8,142,289 8,738,617<br />

8,142,289 8,738,617<br />

Total borrowings 9,638,617 10,224,854<br />

The maturity pr<strong>of</strong>ile <strong>of</strong> Council's borrowings is:<br />

Borrowings<br />

Not later than one year 1,496,328 1,463,923<br />

Later than one year and not later than five years 5,551,750 6,683,437<br />

Later than five years 2,590,539 2,055,180<br />

Total 9,638,617 10,202,540<br />

Finance leases<br />

Council had the following obligations under finance leases for the lease <strong>of</strong> garbage bins (the sum <strong>of</strong><br />

which is recognised as a liability after deduction <strong>of</strong> future lease finance charges included in the<br />

obligation)<br />

Not later than one year - 22,399<br />

Later than one year and not later than five years - -<br />

Minimum lease payments - 22,399<br />

Less future finance charges - 85<br />

- 22,314<br />

Recognised in the Balance Sheet as:<br />

Current finance leases - 22,314<br />

Non-current finance leases - -<br />

Total - 22,314<br />

Aggregate carrying amount <strong>of</strong> interest bearing loans and borrowings:<br />

Current 1,496,328 1,486,237<br />

Non-current 8,142,289 8,738,617<br />

Total interest bearing loans and borrowings 9,638,617 10,224,854<br />

94<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong>


Notes to the Financial <strong>Report</strong><br />

For the year ended 30 June <strong>2010</strong><br />

30 Reserves<br />

Balance at<br />

Balance at<br />

beginning <strong>of</strong><br />

reporting period<br />

Increment<br />

(decrement)<br />

end <strong>of</strong><br />

reporting<br />

period<br />

(a) Asset revaluation reserves $ $ $<br />

<strong>2010</strong><br />

Property<br />

Land 21,479,338 - 21,479,338<br />

Land improvements 3,403,350 - 3,403,350<br />

Buildings 4,932,850 - 4,932,850<br />

Infrastructure<br />

Road seal and substructure 60,250,196 2,481,506 62,731,702<br />

Gravel roads and substructure 27,064,233 1,381,939 28,446,172<br />

Bridges 22,896,558 2,888,999 25,785,557<br />

Kerbing 801,325 953,521 1,754,846<br />

Drainage 8,057,971 - 8,057,971<br />

Footpaths 1,501,155 (337,751) 1,163,404<br />

Bike paths 2,946,366 (130,561) 2,815,805<br />

Parks and gardens 1,579,921 - 1,579,921<br />

154,913,263 7,237,653 162,150,916<br />

Total Asset revaluation reserves 154,913,263 7,237,653 162,150,916<br />

<strong>2009</strong><br />

Financial assets available-for-sale (106,047) 106,047 -<br />

Property<br />

Land 19,300,277 2,179,061 21,479,338<br />

Land improvements 3,206,437 196,913 3,403,350<br />

Buildings 3,037,186 1,895,664 4,932,850<br />

Infrastructure<br />

Road seal and substructure 60,250,196 - 60,250,196<br />

Gravel roads and substructure 27,064,233 27,064,233<br />

Bridges 22,188,827 707,731 22,896,558<br />

Kerbing 801,325 - 801,325<br />

Drainage 8,057,971 - 8,057,971<br />

Footpaths 1,501,155 - 1,501,155<br />

Bike paths 2,590,262 356,104 2,946,366<br />

Parks and gardens 1,579,921 - 1,579,921<br />

149,577,790 5,335,473 154,913,263<br />

Total Asset revaluation reserves 149,471,743 5,441,520 154,913,263<br />

Balance at<br />

beginning <strong>of</strong><br />

reporting period<br />

Transfer from<br />

accumulated<br />

surplus<br />

Transfer to<br />

accumulated<br />

surplus<br />

Balance at<br />

end <strong>of</strong><br />

reporting<br />

period<br />

$ $ $ $<br />

(b) Other reserves<br />

<strong>2010</strong><br />

Reserve for Barry Court area Improvement 3,635 - - 3,635<br />

Reserve for CivicNET 34,227 - - 34,227<br />

Reserve for developers' contributions 197,824 9,450 - 207,274<br />

Reserve for developers' contribution for recreation 213,258 87,114 - 300,372<br />

Reserve for vehicle PAG ADASS 40,000 - - 40,000<br />

Reserve for CoNECT integration 439,713 143,630 - 583,343<br />

Reserve for HACC - 74,000 - 74,000<br />

Reserve for industrial land - 191,049 - 191,049<br />

Reserve for insurance excess - 20,000 - 20,000<br />

Reserve for performing arts centre - 7,673 - 7,673<br />

Reserve for replacement <strong>of</strong> plant 741,446 1,417,997 1,674,347 485,096<br />

Reserve for replacement <strong>of</strong> plant - CSNE 242,967 36,150 96,719 182,398<br />

Reserve for regional playground 103,000 - - 103,000<br />

Reserve for landfill capital works 1,154,189 170,036 - 1,324,225<br />

Reserve for livestock selling complex - 60,000 - 60,000<br />

Reserve for waste operations 420,922 - 206,319 214,603<br />

Total other reserves 3,591,181 2,217,099 1,977,385 3,830,895<br />

<strong>2009</strong><br />

Reserve for Barry Court area Improvement 3,635 - - 3,635<br />

Reserve for CivicNET 120,000 - 85,773 34,227<br />

Reserve for developers' contributions 159,751 38,073 - 197,824<br />

Reserve for developers' contribution for recreation 142,939 96,119 25,800 213,258<br />

Reserve for council elections 50,000 - 50,000 -<br />

Reserve for vehicle PAG ADASS 30,000 10,000 - 40,000<br />

Reserve for CoNECT integration 238,477 201,236 - 439,713<br />

Reserve for replacement <strong>of</strong> plant 1,086,816 951,972 1,297,342 741,446<br />

Reserve for replacement <strong>of</strong> plant - CSNE 215,215 44,183 16,431 242,967<br />

Reserve for regional playground 103,000 - - 103,000<br />

Reserve for landfill capital works 1,138,892 15,297 - 1,154,189<br />

Reserve for waste operations - 420,922 - 420,922<br />

Total other reserves 3,288,725 1,777,802 1,475,346 3,591,181<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong><br />

95


Notes to the Financial <strong>Report</strong><br />

For the year ended 30 June <strong>2010</strong><br />

31 Special committees and other activities<br />

The assets and liabilities <strong>of</strong> the following committees and trusts have not been included in this financial report based on their materiality:<br />

The <strong>Wangaratta</strong> Showgrounds Special Committee<br />

Murray to Mountains Rail Trail Committee<br />

Special Committees <strong>of</strong> Council in relation to Public Halls and Recreation Reserves<br />

The operations <strong>of</strong> the <strong>Wangaratta</strong> Cemetery have been consolidated into these financial statements<br />

32 Reconciliation <strong>of</strong> cash flows from operating activities to surplus (deficit)<br />

<strong>2010</strong> <strong>2009</strong><br />

$ $<br />

Comprehensive result 12,751,009 11,111,442<br />

Depreciation and amortisation 9,430,779 9,209,373<br />

(Pr<strong>of</strong>it)/Loss on sale <strong>of</strong> property, plant and equipment. Refer Note 9 (1,213,748) (370,685)<br />

Finance Costs 680,152 613,240<br />

Contributions - non-monetary assets (1,799,359) (95,698)<br />

Share <strong>of</strong> High Country Library Corporation surplus. Refer note 11 (8,457) (30,101)<br />

Available for sale revaluation reserve loss recognised - 106,047<br />

Impairment <strong>of</strong> financial assets - 74,005<br />

Fair value adjustments for assets available for sale (149,962) -<br />

Net asset revaluation increment/(decrement) (7,237,653) (5,335,473)<br />

Change in assets and liabilities<br />

(Increase)/decrease in receivables 167,478 (1,133,166)<br />

(Increase)/decrease in prepayments (9,404) 209,598<br />

(Increase)/decrease in inventories 5,061 19,636<br />

Increase/(decrease) in payables (1,424,233) 1,614,812<br />

Increase/(decrease) in trust funds and deposits 70,049 32,377<br />

Recognition <strong>of</strong> Landfill rehabilitation (1,349,444) -<br />

Increase/(decrease) in provisions 1,389,510 207,723<br />

Net cash provided by operating activities 11,301,778 16,233,130<br />

33 Reconciliation <strong>of</strong> cash and cash equivalents<br />

Cash and cash equivalents. Refer Note 19 12,235,146 11,181,864<br />

Less bank overdraft - -<br />

12,235,146 11,181,864<br />

34 Financing arrangements<br />

Bank Overdraft 400,000 400,000<br />

Used at balance date - -<br />

Unused at balance date 400,000 400,000<br />

35 Restrictions on cash assets<br />

Council has cash and cash equivalents that are subject to restrictions. As at the reporting date,<br />

Council had legislative restrictions in relation to employee entitlements (LSL).<br />

Unrestricted 6,210,540 6,857,250<br />

Subject to external restrictions (i) 6,024,606 4,324,614<br />

12,235,146 11,181,864<br />

(i) The following restrictions have been imposed by regulations or other externally imposed requirements:<br />

Long service leave * 3,823,629 2,042,944<br />

Trust monies. Refer Note 27 429,564 359,515<br />

Grants. Refer Note 7(b). 1,771,413 1,922,155<br />

6,024,606 4,324,614<br />

*<br />

Restricted asset for LSL is based on the Local Government (LSL) Regulations 2002 and does not<br />

necessarily equate to the LSL liability disclosed in Note 28(a) due to a different basis <strong>of</strong> calculation<br />

prescribed by the regulation.<br />

96<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong>


Notes to the Financial <strong>Report</strong><br />

For the year ended 30 June <strong>2010</strong><br />

36 Superannuation<br />

Post-employment Benefit<br />

Council makes employer superannuation contributions in respect <strong>of</strong> its employees to the Local Authorities Superannuation Fund (the Fund). Obligations<br />

for contributions are recognised as an expense in pr<strong>of</strong>it or loss when they are due. The Fund has two categories <strong>of</strong> membership, accumulation and<br />

defined benefit, each <strong>of</strong> which is funded differently.<br />

The Fund's accumulation category, Vision Super Saver, receives both employer and employee contributions on a progressive basis. Council<br />

contributions are normally based on a fixed percentage <strong>of</strong> employee earnings (9% required under Superannuation Guarantee Legislation). No further<br />

liability accrues to the employer as the superannuation benefits accruing to employees are represented by their share <strong>of</strong> the net assets <strong>of</strong> the Fund.<br />

Defined Benefit Plan<br />

The Fund's Defined Benefit Plan is a multi-employer sponsored plan. As the Fund's assets and liabilities are pooled and are not allocated by employer,<br />

the Actuary is unable to reliably allocate benefit liabilities, assets and costs between employers. As provided under Paragraph 32 (b) <strong>of</strong> AASB 119,<br />

Council does not use defined benefit accounting for these contributions.<br />

Council makes employer contributions to the defined benefits category <strong>of</strong> the Fund at rates determined by the Trustee on the advice <strong>of</strong> the Fund's<br />

Actuary. On the basis <strong>of</strong> the results <strong>of</strong> the most recent full actuarial investigation conducted by the Fund's actuary as at 31 December 2008. Council<br />

makes the following contributions: -<br />

- 9.25% <strong>of</strong> members' salaries (same as previous year);<br />

- the difference between resignation and retrenchment benefits paid to its retrenched employees, plus contributions tax (same as previous year);<br />

The Fund surplus or deficit (ie the difference between fund assets and liabilities) is calculated differently for funding purposes (ie calculating required<br />

contributions) and for the calculation <strong>of</strong> accrued benefits as required in AAS 25 to provide the values needed for the AASB 119 disclosure in the council's<br />

financial statements. AAS 25 requires that the present value <strong>of</strong> the defined benefit liability to be calculated based on benefits that have accrued in<br />

respect <strong>of</strong> membership <strong>of</strong> the plan up to the measurement date, with no allowance for future benefits that may accrue. The actuarial investigation<br />

concluded that although the Net Market Value <strong>of</strong> Assets was in excess <strong>of</strong> Accrued Benefits at 31 December 2008, based on the assumptions adopted,<br />

there was a shortfall <strong>of</strong> $71 million when the funding <strong>of</strong> future benefits was also considered. However, Council was advised that no additional<br />

contributions are required for 30 June <strong>2010</strong>. The Actuary has commenced undertaking the next actuarial investigation to ascertain if additional<br />

contributions would be required. The Actuarial review will be as at 30 June <strong>2010</strong>.<br />

The result <strong>of</strong> the actuarial review is expected to be finalised during October <strong>2010</strong>. Should the review identify a funding shortfall requiring additional<br />

contributions, the Council will be notified <strong>of</strong> any amount payable by November <strong>2010</strong> for payment on 1 July 2011. A further actuarial review will be<br />

undertaken as at 30 June 2011. Based on the result <strong>of</strong> this further review, a detailed funding plan will be developed and implemented to achieve the<br />

target <strong>of</strong> fully funding the Fund by 31 December 2013.<br />

Accounting Standard Disclosure<br />

The Fund's liability for accrued benefits was determined by the Actuary at 31 December 2008 pursuant to the requirements <strong>of</strong> Australian Accounting<br />

Standard AAS 25 as follows:<br />

31-Dec-08<br />

$<br />

Net Market Value <strong>of</strong> Assets 3,630,432<br />

Accrued Benefits 3,616,422<br />

Difference between Assets and Accrued Benefits 14,010<br />

Vested Benefits (Minimum sum which must be paid to members when they leave the fund) 3,561,588<br />

The financial assumptions used to calculate the Accrued Benefits for the defined benefit category <strong>of</strong> the Fund were:<br />

Net investment return<br />

8.50% p.a.<br />

Salary inflation<br />

4.25% p.a.<br />

Price inflation<br />

2.75% p.a.<br />

Fund <strong>2010</strong> <strong>2009</strong><br />

$ $<br />

Defined benefits fund<br />

Employer contributions to Local Authorities Superannuation Fund (Vision Super) 226,072 200,616<br />

Employer contributions payable to Local Authorities Superannuation Fund (Vision Super) at reporting date -<br />

Accumulation funds<br />

Employer contributions to Local Authorities Superannuation Fund (Vision Super) 1,041,340 964,725<br />

Employer contributions to other superannuation funds 25,110 29,396<br />

1,066,450 994,121<br />

Employer contributions payable to Local Authorities Superannuation Fund at reporting date<br />

- -<br />

Employer contributions to other superannuation funds - -<br />

- -<br />

Contingent Liability<br />

Due to fluctuations in the value <strong>of</strong> assets underlying the fund and movements in the liabilities <strong>of</strong> the fund, Council may be required to<br />

make an additional contribution to the fund. At this point in time the amount, and the likelihood <strong>of</strong> payment is not certain. Further<br />

detail <strong>of</strong> this matter is disclosed at note 39 - Contingencies.<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong><br />

97


Notes to the Financial <strong>Report</strong><br />

For the year ended 30 June <strong>2010</strong><br />

37 Commitments<br />

The Council has entered into the following commitments<br />

<strong>2010</strong><br />

Not later than<br />

1 year<br />

Later than 1 year<br />

and not later than<br />

2 years<br />

Later than 2 years<br />

and not later than 5<br />

years<br />

Later than 5<br />

years Total<br />

$ $ $ $ $<br />

Operating<br />

Contribution to library 466,492 - - - 466,492<br />

Interest on borrowings 655,522 550,964 1,062,239 372,131 2,640,856<br />

Management <strong>of</strong> pools 324,713 - - - 324,713<br />

Maternal and child health contract 404,411 - - - 404,411<br />

Cleaning <strong>of</strong> Wang.Govt.Centre 276,000 - - - 276,000<br />

Transfer Station Recycling 175,100 - - - 175,100<br />

Recycling / green waste 605,000 - - - 605,000<br />

RSPCA Agreement 18,000 - - - 18,000<br />

Total 2,925,238 550,964 1,062,239 372,131 4,910,572<br />

Capital<br />

Bridge Construction - - - - -<br />

Corporate s<strong>of</strong>tware systems upgrade 40,000 - - - 40,000<br />

Upgrade Bowmans-Murmungee Hall 179,872 - - - 179,872<br />

Roy St over pass guardrail renewal 172,000 - - - 172,000<br />

Total 391,872 - - - 391,872<br />

<strong>2009</strong><br />

Not later than<br />

1 year<br />

Later than 1 year<br />

and not later than<br />

2 years<br />

Later than 2 years<br />

and not later than 5<br />

years<br />

Later than 5<br />

years Total<br />

$ $ $ $ $<br />

Operating<br />

Contribution to library 444,060 - - - 444,060<br />

Interest on borrowings 685,465 586,021 1,181,770 475,359 2,928,615<br />

Management <strong>of</strong> pools 326,434 - - - 326,434<br />

Maternal and child health contract 369,200 - - - 369,200<br />

Cleaning <strong>of</strong> Wang.Govt.Centre 162,000 - - - 162,000<br />

Transfer Station Recycling 80,000 - - - 80,000<br />

Recycling / green waste 585,000 - - - 585,000<br />

RSPCA Agreement 20,667 - - - 20,667<br />

Total 2,672,826 586,021 1,181,770 475,359 4,915,976<br />

Capital<br />

Bridge Construction 75,000 - - - 75,000<br />

Corporate S<strong>of</strong>tware Systems Upgrade 426,244 - - - 426,244<br />

Local Dairy Road Program 175,000 - - - 175,000<br />

Intersection Improvement Rowan &<br />

Phillipson<br />

800,000 - - - 800,000<br />

Total 1,476,244 - - - 1,476,244<br />

38 Operating lease commitments <strong>2010</strong> <strong>2009</strong><br />

$ $<br />

(a) Operating lease commitments<br />

At the reporting date, the Council had the following obligations under non-cancellable operating<br />

leases for the lease <strong>of</strong> IT equipment, postal equipment, and photocopiers for use within Council<br />

activities. (These obligations are not recognised as liabilities).<br />

Due:<br />

Not later than one year 167,052 127,825<br />

Later than one year and not later than five years 98,558 145,942<br />

Later than five years - -<br />

265,610 273,767<br />

(b) Operating lease receivables<br />

During the 2007 financial year, Council entered into commercial property leases for <strong>of</strong>fice floor<br />

space contained within its council building - The <strong>Wangaratta</strong> Government Centre. This floor space<br />

is rented under operating leases which contain non-cancellable lease terms <strong>of</strong> between 5 and 10<br />

years. All leases include a CPI based revision <strong>of</strong> the rental charge annually and market reviews at<br />

the commencement <strong>of</strong> each new lease term.<br />

Future minimum rentals receivable under non-cancellable operating leases are as follows:<br />

Due:<br />

Not later than one year 307,726 285,333<br />

Later than one year and not later than five years 1,280,788 1,198,963<br />

Later than five years 694,263 642,776<br />

2,282,777 2,127,072<br />

98<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong>


Notes to the Financial <strong>Report</strong><br />

For the year ended 30 June <strong>2010</strong><br />

39 Contingencies<br />

The Council is presently involved in several confidential legal matters, which are being conducted through Council's solicitors. As<br />

these matters are yet to be finalised, and the financial outcomes are unable to be reliably estimated, no allowance for these<br />

contingencies has been made in the financial report.<br />

Council has obligations under a defined benefit superannuation scheme that may result in the need to make additional contributions to<br />

the scheme to ensure that the liabilities <strong>of</strong> the fund are covered by the assets <strong>of</strong> the fund. As a result <strong>of</strong> the increased volatility in<br />

financial markets the likelihood <strong>of</strong> making such contributions in future periods has increased. At this point in time it is not known if<br />

additional contributions will be required, their timing or potential amount.<br />

Council has an obligation to rehabilitate landfill sites and has provided for known future costs as a provision for landfill remediation.<br />

Council is unable to guarantee that the amount provided will be sufficient to cover the full future costs <strong>of</strong> rehabilitation.<br />

40 Financial instruments<br />

(a) Accounting policy, terms and conditions<br />

recognised financial instruments Note Accounting policy Terms and conditions<br />

Financial assets<br />

Cash and cash equivalents 19<br />

Cash on hand and at bank and money<br />

market call account are valued at face<br />

value.<br />

Interest is recognised as it accrues.<br />

The interest rate at balance date was 4.25%<br />

(2.75% in 2008/<strong>2009</strong>)<br />

19<br />

Receivables 20<br />

Investments are valued at cost.<br />

Investments are held to maximise interest<br />

returns <strong>of</strong> surplus cash. Interest revenues<br />

are recognised as they accrue.<br />

Funds returned an average fixed interest rate <strong>of</strong><br />

6.10%. (4.25% in 2008/<strong>2009</strong>)<br />

Receivables are carried at nominal amounts General debtors are unsecured and arrears attract<br />

due less any provision for doubtful debts. A an interest rate <strong>of</strong> 10% (10% in 2008/<strong>2009</strong>). Credit<br />

provision for doubtful debts is recognised terms are based on 30 days.<br />

when there is objective evidence that an<br />

impairment loss has occurred. Collectability<br />

<strong>of</strong> overdue accounts is assessed on an<br />

ongoing basis.<br />

Financial liabilities<br />

Trade and other payables 27<br />

Interest bearing loans and borrowin 30<br />

Finance leases 30<br />

Liabilities are recognised for amounts to be General creditors are unsecured, not subject to<br />

paid in the future for goods and services interest charges and are normally settled within 30<br />

provided to Council as at balance date days <strong>of</strong> invoice receipt.<br />

whether or not invoices have been received.<br />

Loans are carried at their principal amounts,<br />

which represent the present value <strong>of</strong> future<br />

cash flows associated with servicing the<br />

debt. Interest is accrued over the period it<br />

becomes due and recognised as part <strong>of</strong><br />

payables.<br />

Finance leases are accounted for at their<br />

principal amount with lease payments<br />

discounted to present value using the<br />

interest rate implicit in the lease.<br />

Borrowings are secured by way <strong>of</strong> mortgages over<br />

the general rates <strong>of</strong> Council. The weighted<br />

average interest rate on borrowings is 7.12%<br />

(6.36% in 2008/<strong>2009</strong>).<br />

As at balance date, the Council has no finance<br />

lease. The weighted average rate implicit for the<br />

lease held in 2008/<strong>2009</strong> was 9.06%.<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong><br />

99


Notes to the Financial <strong>Report</strong><br />

For the year ended 30 June <strong>2010</strong><br />

40 Financial instruments (cont.)<br />

(b) Interest rate risk<br />

The exposure to interest rate risks and the effective interest rates <strong>of</strong> financial assets and financial liabilities, both recognised and unrecognised, at<br />

balance date are as follows:<br />

Fixed interest maturing in:<br />

<strong>2010</strong><br />

Floating<br />

interest rate 1 year or less Over 1 to 5 years<br />

More than 5<br />

years<br />

Non-interest<br />

bearing<br />

Total<br />

$ $ $ $ $ $<br />

Financial assets<br />

Cash and cash equivalents 2,626,604 9,314,848 - - 293,694 12,235,146<br />

Other financial assets - - - - - -<br />

Receivables - 1,343,243 167,027 - 1,189,805 2,700,075<br />

Other assets - - - - - -<br />

Total financial assets 2,626,604 10,658,091 167,027 - 1,483,499 14,935,221<br />

Weighted average interest rate 4.25% 6.45% 1.16%<br />

Financial liabilities<br />

Trade and other payables - - - - 3,405,715 3,405,715<br />

Trust funds and deposits - - - - - -<br />

Interest bearing loans and borrowings - 1,496,328 5,551,750 2,590,539 - 9,638,617<br />

Total financial liabilities - 1,496,328 5,551,750 2,590,539 3,405,715 13,044,332<br />

Weighted average interest rate 6.72% 7.11% 8.52%<br />

Net financial assets (liabilities) 2,626,604 9,161,763 (5,384,723) (2,590,539) (1,922,216) 1,890,889<br />

Fixed interest maturing in:<br />

<strong>2009</strong><br />

Floating<br />

interest rate 1 year or less Over 1 to 5 years<br />

More than 5<br />

years<br />

Non-interest<br />

bearing<br />

Total<br />

$ $ $ $ $ $<br />

Financial assets<br />

Cash and cash equivalents 1,368,802 9,471,192 - - 341,870 11,181,864<br />

Other financial assets - - - - - -<br />

Receivables - 1,559,374 32,500 - 1,444,422 3,036,296<br />

Other assets - - - - - -<br />

Total financial assets 1,368,802 11,030,566 32,500 - 1,786,292 14,218,160<br />

Weighted average interest rate 2.75% 4.20% 5.47%<br />

Financial liabilities<br />

Trade and other payables - - - - 4,829,947 4,829,947<br />

Trust funds and deposits - - - - 359,515 359,515<br />

Interest bearing loans and borrowings - 1,486,237 6,683,437 2,055,180 10,224,854<br />

Total financial liabilities - 1,486,237 6,683,437 2,055,180 5,189,462 15,414,316<br />

Weighted average interest rate 6.83% 6.85% 7.81%<br />

Net financial assets (liabilities) 1,368,802 9,544,329 (6,650,937) (2,055,180) (3,403,170) (1,196,156)<br />

(c) Net fair values<br />

The aggregate net fair values <strong>of</strong> financial assets and financial liabilities, both recognised and unrecognised, at balance date are as follows:<br />

Total carrying amount as per<br />

Financial instruments<br />

Balance Sheet<br />

Aggregate net fair value<br />

<strong>2010</strong> <strong>2009</strong> <strong>2010</strong> <strong>2009</strong><br />

$ $ $ $<br />

Financial assets<br />

Cash and cash equivalents 12,235,146 11,181,864 12,235,146 11,181,864<br />

Other financial assets - - - -<br />

Receivables 2,700,075 3,036,296 2,700,075 3,036,296<br />

Other assets - - - -<br />

14,935,221 14,218,160 14,935,221 14,218,160<br />

Financial liabilities<br />

Payables 3,405,715 4,829,947 3,405,715 4,829,947<br />

Trust funds and deposits 429,564 359,515 429,564 359,515<br />

Interest Bearing Liabilities 9,638,617 10,224,854 9,638,617 10,224,854<br />

13,473,896 15,414,316 13,473,896 15,414,316<br />

100<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong>


Notes to the Financial <strong>Report</strong><br />

For the year ended 30 June <strong>2010</strong><br />

40 Financial instruments (cont.)<br />

(d) Credit risk<br />

The maximum exposure to credit risk at balance date in relation to each class <strong>of</strong> recognised financial asset is represented by the<br />

carrying amount <strong>of</strong> those assets as indicated in the Balance Sheet.<br />

(e) Risks and mitigation<br />

The risks associated with our main financial instruments and our policies for minimising these risks are detailed below.<br />

Market risk<br />

Market risk is the risk that the fair value or future cash flows <strong>of</strong> your financial instruments will fluctuate because <strong>of</strong> changes in market<br />

prices. The Council's exposures to market risk are primarily through interest rate risk with only insignificant exposure to other price<br />

risks and no exposure to foreign currency risk. components <strong>of</strong> market risk to which we are exposed are discussed below.<br />

Interest rate risk<br />

Interest rate risk refers to the risk that the value <strong>of</strong> a financial instrument or cash flows associated with the instrument will fluctuate due<br />

to changes in market interest rates. Interest rate risk arises from interest bearing financial assets and liabilities that we use. Non<br />

derivative interest bearing assets are predominantly short term liquid assets. Our interest rate liability risk arises primarily from long<br />

term loans and borrowings at fixed rates which exposes us to fair value interest rate risk.<br />

Our loan borrowings are sourced from major Australian banks by a tender process. Finance leases are sourced from major Australian<br />

financial institutions. Overdrafts are arranged with major Australian banks. We manage interest rate risk on our net debt portfolio by:<br />

- ensuring access to diverse sources <strong>of</strong> funding;<br />

- reducing risks <strong>of</strong> refinancing by managing in accordance with target maturity pr<strong>of</strong>iles; and<br />

- setting prudential limits on interest repayments as a percentage <strong>of</strong> rate revenue.<br />

We manage the interest rate exposure on our net debt portfolio by appropriate budgeting strategies and obtaining approval for<br />

borrowings from the Department <strong>of</strong> Planning and Community Development each year.<br />

Investment <strong>of</strong> surplus funds is made with approved financial institutions under the Local Government Act 1989. We manage interest<br />

rate risk by adopting an investment policy that ensures:<br />

- conformity with State and Federal regulations and standards,<br />

- capital protection,<br />

-appropriate liquidity,<br />

- diversification by credit rating, financial institution and investment product,<br />

- monitoring <strong>of</strong> return on investment,<br />

- benchmarking <strong>of</strong> returns and comparison with budget.<br />

Maturity will be staggered to provide for interest rate variations and to minimise interest rate risk.<br />

Credit risk<br />

Credit risk is the risk that a contracting entity will not complete its obligations under a financial instrument and cause us to make a<br />

financial loss. We have exposure to credit risk on all financial assets included in our balance sheet. To help manage this risk:<br />

-wehaveapolicy for establishing credit limits for the entities we deal with;<br />

-wemay require collateral where appropriate; and<br />

-weonly invest surplus funds with financial institutions which have a recognised credit rating specified in our investment policy.<br />

Trade and other receivables consist <strong>of</strong> a large number <strong>of</strong> customers, spread across the consumer, business and government sectors.<br />

Credit risk associated with the Council's financial assets is minimal because the main debtor is the Victorian Government. Apart from<br />

the Victorian Government we do not have any significant credit risk exposure to a single customer or groups <strong>of</strong> customers. Ongoing<br />

credit evaluation is performed on the financial condition <strong>of</strong> our customers and, where appropriate, an allowance for doubtful debts is<br />

raised.<br />

We may also be subject to credit risk for transactions which are not included in the Balance Sheet, such as when we provide a<br />

guarantee for another party. Details <strong>of</strong> our contingent liabilities are disclosed in note 39<br />

Movement in Provision for Doubtful Debts <strong>2010</strong> <strong>2009</strong><br />

$ $<br />

Balance at the beginning <strong>of</strong> the year 46,511 44,706<br />

New Provisions recognised during the year 5,424 1,805<br />

Amounts already provided for and written <strong>of</strong>f as uncollectable - -<br />

Amounts provided for but recovered during the year - -<br />

Balance at end <strong>of</strong> year 51,935 46,511<br />

Ageing <strong>of</strong> Trade and Other Receivables<br />

At balance date other debtors representing financial assets were past due but not impaired. These amounts relate to a<br />

number <strong>of</strong> independent customers for whom there is no recent history <strong>of</strong> default. The ageing <strong>of</strong> the Council's Trade &<br />

Other Receivables was:<br />

Current (not yet due) 3,369,515 3,060,636<br />

Past due by up to 30 days 118,233 420,805<br />

Past due between 31 and 180 days 240,226 619,590<br />

Past due between 181 and 365 days 13,762 -<br />

Past due by more than 1 year 229,741 32,500<br />

Total Trade & Other Receivables 3,971,477 4,133,531<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong><br />

101


Notes to the Financial <strong>Report</strong><br />

For the year ended 30 June <strong>2010</strong><br />

40 Financial instruments (cont.)<br />

Ageing <strong>of</strong> individually impaired Trade and Other Receivables -<br />

At balance date, other debtors representing financial assets with a nominal value <strong>of</strong> $51,935 (<strong>2009</strong> $46,511) were<br />

impaired. The amount <strong>of</strong> the provision raised against these debtors was $51,935 (<strong>2009</strong> $46,511). The individually<br />

impaired debtors relate to general and sundry debtor and have been impaired as a result <strong>of</strong> their doubtful collection.<br />

Many <strong>of</strong> the long outstanding past due amounts have been lodged with Council's debt collectors or are on payment<br />

arrangements.<br />

The ageing <strong>of</strong> Trade and Other Receivables that have been individually determined as impaired at reporting date was:<br />

<strong>2010</strong> 2,009<br />

$ $<br />

Current (not yet due) - -<br />

Past due by up to 30 days 1,504 2,113<br />

Past due between 31 and 180 days 2,402 3,197<br />

Past due between 181 and 365 days 4,129 5,347<br />

Past due by more than 1 year 43,900 35,854<br />

Total Trade & Other Receivables 51,935 46,511<br />

Liquidity risk<br />

Liquidity risk includes the risk that, as a result <strong>of</strong> our operational liquidity requirements:<br />

- we will not have sufficient funds to settle a transaction on the date;<br />

- we will be forced to sell financial assets at a value which is less than what they are worth; or<br />

-wemay be unable to settle or recover a financial assets at all.<br />

To help reduce these risks we:<br />

- have a liquidity policy which targets a minimum and average level <strong>of</strong> cash and cash equivalents to be maintained;<br />

- have readily accessible standby facilities and other funding arrangements in place;<br />

- have a liquidity portfolio structure that requires surplus funds to be invested within various bands <strong>of</strong> liquid instruments;<br />

- monitor budget to actual performance on a regular basis; and<br />

- set limits on borrowings relating to the percentage <strong>of</strong> loans to rate revenue and percentage <strong>of</strong> loan principal repayments to rate<br />

revenue.<br />

The Councils exposure to liquidity risk is deemed insignificant based on prior periods' data and current assessment <strong>of</strong> risk.<br />

The table below lists the contractual maturities for Financial Liabilities<br />

These amounts represent undiscounted gross payments including both principal and interest amounts<br />

<strong>2010</strong> 6 mths 6-12 1-2 2-5 >5 Contracted Carrying<br />

or less months years years years Cash Flow Amount<br />

$ $ $ $ $ $ $<br />

Trade and other<br />

payables<br />

3,405,715 - - - - 3,405,715 3,405,715<br />

Trust funds and<br />

deposits<br />

- 57,982 33,600 337,982 - 429,564 429,564<br />

Interest-bearing<br />

loans and<br />

- 2,151,850 2,086,202 5,078,749 2,962,670 12,279,471 12,279,471<br />

borrowings<br />

Total financial<br />

liabilities<br />

3,405,715 2,209,832 2,119,802 5,416,731 2,962,670 16,114,750 16,114,750<br />

<strong>2009</strong> 6 mths 6-12 1-2 2-5 >5 Contracted Carrying<br />

or less months years years years Cash Flow Amount<br />

$ $ $ $ $ $ $<br />

Trade and other<br />

payables<br />

4,829,947 - - - - 4,829,947 4,829,947<br />

Trust funds and<br />

deposits<br />

- 49,905 39,600 270,010 - 359,515 359,515<br />

Interest-bearing<br />

loans and<br />

- 2,171,702 2,022,070 5,280,303 3,679,393 13,153,468 13,153,468<br />

borrowings<br />

Total financial<br />

liabilities<br />

4,829,947 2,221,607 2,061,670 5,550,313 3,679,393 18,342,930 18,342,930<br />

102<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong>


Notes to the Financial <strong>Report</strong><br />

For the year ended 30 June <strong>2010</strong><br />

40 Financial instruments (cont.)<br />

(f) Sensitivity disclosure analysis<br />

Taking into account past performance, future expectations, economic forecasts, and management's knowledge and experience <strong>of</strong> the<br />

financial markets, the Council believes the following movements are 'reasonably possible' over the next 12 months (Base rates are<br />

sourced from Reserve Bank <strong>of</strong> Australia):<br />

-Aparallel shift <strong>of</strong> +1% and -2% in market interest rates (AUD) from year-end rates <strong>of</strong> 7%.<br />

The table below discloses the impact on net operating result and equity for each category <strong>of</strong> financial instruments held by the Council<br />

at year-end, if the above movements were to occur.<br />

Market risk<br />

exposure<br />

Carrying<br />

amount<br />

subject to<br />

Interest rate risk<br />

100 basis points -200 basis points<br />

Pr<strong>of</strong>it Equity Pr<strong>of</strong>it Equity<br />

interest<br />

<strong>2010</strong> $ $ $ $ $<br />

Financial<br />

assets:<br />

Cash and cash equivalents 11,941,452 119,415 119,415 (238,829) (238,829)<br />

Other financial<br />

assets - - - - -<br />

Receivables - - - - -<br />

Financial<br />

liabilities:<br />

Interest-bearing<br />

loans and<br />

borrowings 9,638,617 96,386 - (192,772) -<br />

<strong>2009</strong> $ $ $ $ $<br />

Financial<br />

assets:<br />

Cash and cash equivalents 10,839,994 108,400 108,400 (216,800) (216,800)<br />

Other financial<br />

assets - - - - -<br />

Receivables - - - - -<br />

Financial<br />

liabilities:<br />

Interest-bearing<br />

loans and<br />

borrowings 11,019,148 110,191 - (220,383) -<br />

+1%<br />

-2%<br />

41 Auditor's remuneration <strong>2010</strong> <strong>2009</strong><br />

$ $<br />

Audit fee to conduct external audit - Victorian Auditor-General 37,950 34,600<br />

Internal Audit Fees - Johnsons MME 30,488 22,625<br />

68,438 57,225<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong><br />

103


Notes to the Financial <strong>Report</strong><br />

For the year ended 30 June <strong>2010</strong><br />

42 Related parties transactions<br />

(a) Responsible persons<br />

Names <strong>of</strong> persons holding the position <strong>of</strong> a Responsible Person at Council during the year are:<br />

Councillors Mayor Anthony Griffiths (3/12/09 - 30/6/10)<br />

Former Mayor Ron Webb (1/7/09 - 30/6/10)<br />

Councillor Rozi Parisotto (1/7/09 - 30/6/10)<br />

Councillor Roberto Paino (1/7/09 - 30/6/10)<br />

Councillor Doug McPhie (1/7/09 - 30/6/10)<br />

Councillor Lauren McCully (1/7/09 - 30/6/10)<br />

Councillor Lisa McInerney (1/7/09 - 30/6/10)<br />

Chief Executive Officer CEO Doug Sharp (1/7/09 - 30/6/10)<br />

Acting CEO Ruth Tai (19/12/09 to 14/1/10)<br />

(b) Remuneration <strong>of</strong> responsible persons<br />

The number <strong>of</strong> Responsible Officers, whose total remuneration from Council and any related entities<br />

fall within the following bands:<br />

<strong>2010</strong> <strong>2009</strong><br />

Income range: No. No.<br />

$0 - $9,999 1 4<br />

$10,000 - $19,999 - 5<br />

$20,000 - $29,999 5 2<br />

$30,000 - $39,999 1 -<br />

$40,000 - $49,999 - 1<br />

$50,000 - $59,999 1 -<br />

$230,000 - $239,999 1 1<br />

9 13<br />

Total remuneration for the reporting period for Responsible Persons included above amounted to:<br />

$433,561 $421,959<br />

(c) No retirement benefits were paid by Council to a Responsible Person.<br />

(d) No loans have been made, guaranteed or secured by the Council to a Responsible Person <strong>of</strong> the Council during the reporting<br />

year.<br />

(e) Other Transactions<br />

No transactions other than remuneration payments or the reimbursement <strong>of</strong> approved expenses were entered into by Council with<br />

Responsible Persons, or Related Parties <strong>of</strong> such Responsible Persons during the reporting year.<br />

(f) Senior <strong>of</strong>ficer remuneration<br />

A senior <strong>of</strong>ficer other than a Responsible Person, is an <strong>of</strong>ficer <strong>of</strong> Council who has management<br />

responsibilities and reports directly to the Chief Executive Officer or whose total annual<br />

remuneration exceeds $120,000.<br />

The numbers <strong>of</strong> senior <strong>of</strong>ficers, other than Responsible Persons, are shown below in their relevant<br />

income bands:<br />

<strong>2010</strong> <strong>2009</strong><br />

Income range: No. No.<br />

Less than $120,000 3 4<br />

$120,000 - $129,999 1 -<br />

$130,000 - $139,999 2 2<br />

$140,000 - $149,999 - 1<br />

$230,000 - $239,999 1 -<br />

7 7<br />

Total remuneration for the reporting period for Senior Officers included above:<br />

$902,069 $798,128<br />

104<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong>


Notes to the Financial <strong>Report</strong><br />

For the year ended 30 June <strong>2010</strong><br />

43 Functions/activities <strong>of</strong> the municipality<br />

(a) Revenues, expenses and assets by function/activity<br />

Details <strong>of</strong> these functions/activities are set out in Note 43(c)<br />

<strong>2010</strong><br />

Function/Activity Revenue Revenue Revenue Total Expenses Surplus (Deficit) from Assets<br />

Grants Other Total Ordinary Activities<br />

$ $ $ $ $ $<br />

Executive Services 201,266 175,581 376,847 2,512,824 (2,135,977) -<br />

Sustainability 3,950,690 23,641,306 27,591,996 12,923,315 14,668,681 17,852,126<br />

Community Wellbeing 8,632,810 3,589,692 12,222,502 13,197,602 (975,100) 886,797<br />

Infrastructure Services 4,425,705 2,146,667 6,572,372 12,693,511 (6,121,139) 299,094,109<br />

Total 17,210,471 29,553,246 46,763,717 41,327,252 5,436,465 317,833,032<br />

<strong>2009</strong><br />

Function/Activity Revenue Revenue Revenue Total Expenses Surplus (Deficit) from Assets<br />

Grants Other Total Ordinary Activities<br />

$ $ $ $ $ $<br />

Executive Services 1,054,534 112,272 1,166,806 2,407,652 (1,240,846) -<br />

Business Services 4,509,733 20,149,724 24,659,457 12,061,551 12,597,906 17,071,125<br />

Human & Cultural Services 9,511,144 1,692,522 11,203,666 10,165,552 1,038,114 951,410<br />

Infrastructure Services 3,802,732 3,743,949 7,546,681 14,080,441 (6,533,760) 286,457,540<br />

Total 18,878,143 25,698,468 44,576,610 38,715,196 5,861,414 304,480,075<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong><br />

105


Notes to the Financial <strong>Report</strong><br />

For the year ended 30 June <strong>2010</strong><br />

43 Functions/activities <strong>of</strong> the municipality (cont.) <strong>2010</strong> <strong>2009</strong><br />

$ $<br />

(b) Total assets shown in note 44(a) are reconciled with the amounts<br />

shown for assets in the balance sheet as follows:<br />

Current assets 17,675,099 16,808,625<br />

Non-current assets 300,157,933 287,689,450<br />

317,833,032 304,498,075<br />

(c) The activities <strong>of</strong> the municipality are categorised into the following broad functions:<br />

Executive<br />

This department incorporates Executive Services, Council, economic development, tourism communications, marketing and events.<br />

Council expenditure comprises servicing <strong>of</strong> Council and its committees and carrying out the statutory functions <strong>of</strong> Council. The<br />

development function <strong>Wangaratta</strong> Unlimited.<br />

Sustainability<br />

The Business Services department is responsible for general administration, finance, information services, human resources, asset<br />

planning, environment, building and planning. This department provides a range <strong>of</strong> strategic, operational, financial and payroll<br />

services to business units, and to the Council as a whole.<br />

Community Wellbeing<br />

The Human and Cultural Services department is responsible for the provision <strong>of</strong> services such as employee relations, library services,<br />

maternal and child health, childcare, homecare, aged care, family day care, cultural development, library services, community and<br />

social planning.<br />

Infrastructure and technical services<br />

The Infrastructure and Planning department is responsible for road construction and maintenance, bridges, depots, swimming pools,<br />

design, drainage and traffic management. The engineerng unit is responsible for the provision <strong>of</strong> waste minimisation and landfill, street<br />

sweeping, parks and gardens.<br />

44 Financial ratios (Performance indicators)<br />

(a) Debt Servicing Ratio (to identify<br />

the capacity <strong>of</strong> Council to service its<br />

outstanding debt)<br />

<strong>2010</strong> <strong>2010</strong> <strong>2009</strong> <strong>2009</strong> 2008 2008<br />

$ % $ % $ %<br />

Debt Servicing Costs 680,152<br />

1.45%<br />

613,240<br />

1.38%<br />

552,729<br />

Total Revenue 46,763,716 44,576,609 39,311,610<br />

Debt servicing costs refer to the<br />

payment <strong>of</strong> interest on loan<br />

borrowings, finance lease and bank<br />

overdraft.<br />

The ratio expresses the amount <strong>of</strong><br />

interest paid as a percentage <strong>of</strong><br />

Council's total revenue.<br />

1.41%<br />

(b) Debt commitment ratio (to<br />

identify Council's debt redemption<br />

strategy)<br />

Debt servicing and redemption costs 2,166,389 2,265,910 1,889,952<br />

11.37%<br />

12.57%<br />

Rate revenue 19,052,712 18,032,206 16,782,028<br />

The strategy involves the payment <strong>of</strong><br />

loan principal and interest, finance<br />

lease principal and interest.<br />

11.26%<br />

The ratio express the percentage <strong>of</strong><br />

rate revenue utilised to pay interest<br />

and redeem debt principal<br />

(c) Revenue Ratio (to identify<br />

Council's dependence on non-rate<br />

income)<br />

Rate Revenue 19,052,712<br />

40.74%<br />

18,032,206<br />

40.45%<br />

16,782,028<br />

Total Revenue 46,763,716 44,576,609 39,311,610<br />

The level <strong>of</strong> Council's relianceonrate<br />

revenue is determined by assessing<br />

rate revenue as a proportion <strong>of</strong> the<br />

total revenue <strong>of</strong> Council.<br />

42.69%<br />

106<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong>


Notes to the Financial <strong>Report</strong><br />

For the year ended 30 June <strong>2010</strong><br />

44 Financial ratios (cont.) <strong>2010</strong> <strong>2010</strong> <strong>2009</strong> <strong>2009</strong> 2008 2008<br />

$ % $ % $ %<br />

(d) Debt Exposure Ratio (to identify<br />

Council's exposure to debt)<br />

Total Indebtedness 21,333,296<br />

20.07%<br />

21,884,206<br />

22.52%<br />

20,823,588<br />

Total Realisable Assets 106,293,756 97,175,387 86,582,823<br />

For the purposes <strong>of</strong> the calculation <strong>of</strong> financial ratios,<br />

realisable assets are those assets which can be sold<br />

and which are not subject to any restriction on<br />

realisation or use.<br />

Any liability represented by a restricted asset (note 35)<br />

is excluded from total indebtedness.<br />

24.05%<br />

The following assets are excluded from total assts<br />

when calculating Council's realisable assets:<br />

land and buildings on Crown land; restricted assets;<br />

heritage assets; total infrastructure assets; and<br />

Council's investment in associate.<br />

This ratio enables assessment <strong>of</strong> Council's solvency<br />

and exposure to debt. Total indebtedness refers to the<br />

total liabilities <strong>of</strong> Council. Total liabilities are compared<br />

to total realisable assets which are all Council assets<br />

not subject to any restriction and are able to be<br />

realised. The ratio expresses the multiple <strong>of</strong> total<br />

liabilities for each dollar <strong>of</strong> realisable assets.<br />

(e) Working Capital Ratio (to assess<br />

Council's ability to meet current<br />

commitments)<br />

Current Assets 17,675,099<br />

172.50%<br />

16,808,625<br />

151.42%<br />

19,914,155<br />

Current Liabilities 10,246,183 11,100,759 9,355,152<br />

The ratio expresses the level <strong>of</strong> current assets the<br />

Council has available to meet its current liabilities.<br />

(f) Adjusted Working Capital Ratio<br />

(to assess Council's ability to meet<br />

current commitments)<br />

Current Assets 17,675,099<br />

172.50%<br />

16,808,625<br />

151.42%<br />

19,914,155<br />

Current Liabilities 10,246,183 11,100,759 8,990,504<br />

The ratio expresses the level <strong>of</strong> current assets the<br />

Council has available to meet its current liabilities.<br />

212.87%<br />

221.50%<br />

Current liabilities have been reduced to reflect the long<br />

service leave that is shown as a current liability<br />

because Council does not have an unconditional right<br />

to defer settlement <strong>of</strong> the liability for at least twelve<br />

months after the reporting date, but is not likely to fall<br />

due within 12 months after the end <strong>of</strong> the period.<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong><br />

107


Notes to the Financial <strong>Report</strong><br />

For the year ended 30 June <strong>2010</strong><br />

45 Capital expenditure<br />

Capital expenditure areas Note <strong>2010</strong> <strong>2009</strong><br />

$ $<br />

Land 0 172,903<br />

Land improvements 578,352 991,798<br />

Landfill assets 18,195 590,798<br />

Buildings 1,748,594 10,534,708<br />

Plant and equipment 2,374,705 1,847,649<br />

Furniture and fittings 337,593 1,095,033<br />

Road seal and substructure 3,434,581 2,064,462<br />

Gravel roads and substructure 837,010 662,925<br />

Bridges 353,466 579,233<br />

Kerbing 92,232 333,713<br />

Drainage 35,820 27,716<br />

Footpaths 445,048 155,522<br />

Bike paths 454,574 115,123<br />

Parks and gardens 311,361 71,995<br />

Total capital works 11,021,531 19,243,578<br />

Represented by:<br />

Renewal (a) 6,106,533 6,766,142<br />

Upgrade (b) 2,720,121 2,896,073<br />

Expansion (c) 453,147 245,355<br />

New assets 1,741,730 9,336,008<br />

Total capital works 11,021,531 19,243,578<br />

Property, infrastructure, plant and equipment movement<br />

The movement between the previous year and the current year in property,<br />

plant and equipment, infrastructure as shown in the Balance Sheet links to<br />

the net <strong>of</strong> the following items:<br />

Total capital works 11,021,531 19,243,578<br />

Contributions - non-monetary assets 6(b) 1,799,359 95,698<br />

Recognition <strong>of</strong> rehabilitation <strong>of</strong> landfill 28(b) 1,349,444 -<br />

Asset revaluation movement 30(a) 7,237,653 5,335,473<br />

Depreciation/amortisation 14 (9,430,779) (9,209,373)<br />

Written down value <strong>of</strong> assets sold 25 (362,524) (225,947)<br />

Recognition <strong>of</strong> previously unrecognised assets 25 1,134,858 -<br />

Transfers <strong>of</strong> non current assets classified as held for sale<br />

25 (350,974) -<br />

Net movement in property, infrastructure, plant and equipment 25 12,398,568 15,239,429<br />

(a) Renewal<br />

Expenditure on an existing asset which returns the service potential or the life <strong>of</strong> the asset up to that which it had originally. It is<br />

periodically required expenditure, relatively large (material) in value compared with the value <strong>of</strong> the components or sub-components <strong>of</strong><br />

the asset being renewed. As it reinstates existing service potential, it has no impact on revenue, but may reduce future operating and<br />

maintenance expenditure if completed at the optimum time.<br />

(b) Upgrade<br />

Expenditure which enhances an existing asset to provide a higher level <strong>of</strong> service or expenditure that will increase the life <strong>of</strong> the asset<br />

beyond that which it had originally. Upgrade expenditure is discretional and <strong>of</strong>ten does not result in additional revenue unless direct<br />

user charges apply. It will increase operating and maintenance expenditure in the future because <strong>of</strong> the increase in the Council's<br />

asset base.<br />

(c) Expansion<br />

Expenditure which extends an existing asset, at the same standard as is currently enjoyed by residents, to a new group <strong>of</strong> user. It is<br />

discretional expenditure which increases future operating and maintenance costs, because it increases Council's asset base, but may<br />

be associated with additional revenue from the new user group.<br />

46 Events occurring after balance date<br />

In September <strong>2010</strong>, the <strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> was subject to flood damage. The emergency and restoration expenses are<br />

expected to be in excess <strong>of</strong> $1,700,000.<br />

47 Correction <strong>of</strong> errors<br />

The following errors are not considered material in relation to either the balance sheet or comprehensive income statement.<br />

47 (a) Omission <strong>of</strong> property assets<br />

Council has brought to account land, land improvements and buildings which were omitted previously.<br />

47 (b) Duplication <strong>of</strong> property assets<br />

Property has been included in Investment Property that was also included in Non-current assets classified as held for sale.<br />

47 (b)<br />

Duplication <strong>of</strong><br />

property<br />

assets<br />

Total<br />

correction <strong>of</strong><br />

errors<br />

47 (a) Omitted<br />

property assets<br />

Land 180,000 - 180,000<br />

Land improvements 20,000 - 20,000<br />

Less accumulated depreciation (12,000) - (12,000)<br />

Buildings 125,500 - 125,500<br />

Less accumulated depreciation (75,500) - (75,500)<br />

Investment Property - (220,000) (220,000)<br />

238,000 (220,000) 18,000<br />

108<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong>


Notes to the Financial <strong>Report</strong><br />

For the year ended 30 June <strong>2010</strong><br />

47 Correction <strong>of</strong> errors (cont.)<br />

The impact <strong>of</strong> this action on <strong>2009</strong> comparative figures is as follows:<br />

47 (a) Omitted<br />

property assets<br />

47 (b) Duplication <strong>of</strong><br />

property assets<br />

Total<br />

correction <strong>of</strong><br />

errors<br />

Adjusted<br />

<strong>2009</strong> Balance<br />

<strong>2009</strong> Balance<br />

Balance sheet:<br />

Land 27,748,800 180,000 - 180,000 27,928,800<br />

Land improvements 8,790,200 8,000 - 8,000 8,798,200<br />

Buildings 37,598,500 50,000 - 50,000 37,648,500<br />

Investment Property 220,000 (220,000) (220,000) -<br />

Asset revaluation reserve 154,895,263 238,000 (220,000) 18,000 154,913,263<br />

47 (c) New assets ex survey<br />

New infrastructure has been discovered as a result <strong>of</strong> councils regular infrastructure survey.<br />

48 (c) New<br />

assets ex<br />

survey<br />

Total<br />

correction <strong>of</strong><br />

errors<br />

Bikepaths 1,134,858 1,134,858<br />

1,134,858 1,134,858<br />

The impact <strong>of</strong> this action on <strong>2010</strong> figures is as follows:<br />

47 (c) New assets ex<br />

survey<br />

Total<br />

correction <strong>of</strong><br />

errors<br />

Adjusted<br />

<strong>2010</strong> Balance<br />

<strong>2010</strong> Balance<br />

Balance sheet:<br />

Bikepaths 4,653,375 1,134,858 1,134,858 5,788,233<br />

Accumulated surplus 129,383,070 1,134,858 1,134,858 130,517,928<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong><br />

109


Certification <strong>of</strong> the Financial <strong>Report</strong><br />

For the year ended 30 June <strong>2010</strong><br />

110<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong>


Standard Statements<br />

<strong>2009</strong>-<strong>2010</strong><br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong>


Standard Statements<br />

Introduction to the Standard Statements<br />

Basis <strong>of</strong> preparation <strong>of</strong> Standard Statements<br />

Council is required to prepare and include audited Standard Statements within its <strong>Annual</strong> <strong>Report</strong>.<br />

These statements and supporting notes form a special purpose financial report prepared to meet<br />

the requirements <strong>of</strong> the Local Government Act 1989 and Local Government (Finance and <strong>Report</strong>ing)<br />

Regulations 2004.<br />

The Standard Statements have been prepared on accounting bases consistent with those used for<br />

the General Purpose Financial <strong>Report</strong>s and the Budget. The results reported in these statements are<br />

consistent with those reported in the General Purpose Financial <strong>Report</strong>.<br />

The Standard Statements are not a substitute for the General Purpose Financial <strong>Report</strong>, which are<br />

included in the <strong>Annual</strong> <strong>Report</strong>. They have not been prepared in accordance with all Australian Accounting<br />

Standards or other authoritative pr<strong>of</strong>essional pronouncements.<br />

The Standard Statements compare Council’s financial plan, expressed through its budget, with actual<br />

performance. The Local Government Act 1989 requires explanation <strong>of</strong> any material variances. The<br />

Council adopted a materiality threshold <strong>of</strong> 10% and $200,000. Explanations have not been provided for<br />

variations below the materiality threshold unless the variance is considered to be material because <strong>of</strong><br />

its nature.<br />

The budget figures included in the Standard Statements are those adopted by Council on 19 June<br />

2007. The budget was based on assumptions that were relevant at the time <strong>of</strong> adoption <strong>of</strong> the budget.<br />

The Council set guidelines and parameters for revenue and expense targets in this budget in order to<br />

meet Council’s business plan and financial performance targets for both the short and long term. The<br />

budget did not reflect any changes to equity resulting from asset revaluations as their impacts were<br />

not considered predictable.<br />

Detailed information on the actual financial results are contained in the General Purpose Financial<br />

<strong>Report</strong>. The detailed budget can be obtained by contacting Council or through Council’s website. The<br />

Standard Statements must be read with reference to these documents.<br />

112<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong>


Standard Income Statement<br />

For the year ended 30 June <strong>2010</strong><br />

Income<br />

Actual Budget Variance Variance Notes<br />

$ $ $ %<br />

Rates and charges 19,052,712 18,938,000 114,712 0.6<br />

Statutory fees and fines 547,230 758,000 (210,770) (27.8) 1<br />

User fees 5,443,799 5,565,000 (121,201) (2.2)<br />

Contributions - Cash 719,112 77,000 642,112 833.9 2<br />

Contributions - non-monetary assets 1,799,359 - 1,799,359 100.0 3<br />

Grants - recurrent 13,356,608 11,959,000 1,397,608 11.7 4<br />

Grants - non-recurrent 3,853,863 6,400,000 (2,546,137) (39.8) 5<br />

Reimbursements 166,345 - 166,345 100.0<br />

Net gain/(loss) on sale/disposal <strong>of</strong> property,<br />

infrastucture, plant and equipment 1,213,748 146,000 1,067,748 731.3 8<br />

Other revenue 602,483 675,000 (72,517) (10.7)<br />

Share <strong>of</strong> other comprehensive income <strong>of</strong><br />

associates and joint ventures accounted for by<br />

the equity method 8,457 50000 (41,543) (83.1)<br />

Total income 46,763,716 44,568,000 2,195,716<br />

Expenses<br />

Employee benefits 16,778,382 14,181,000 (2,597,382) (18.3) 6<br />

Materials and services 14,421,951 16,656,000 2,234,049 13.4 7<br />

Depreciation and amortisation 9,430,779 8,940,000 (490,779) (5.5)<br />

Finance costs 680,152 675,000 (5,152) (0.8)<br />

Other expenses 15,988 12,000 (3,988) (33.2)<br />

Total expenses 41,327,252 40,464,000 (863,252)<br />

Surplus (deficit) for the period 5,436,464 4,104,000 1,332,464<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong><br />

113


Standard Balance Sheet<br />

As at 30 June <strong>2010</strong><br />

Actual Budget Variance Variance Notes<br />

Assets $ $ $ %<br />

Current assets<br />

Cash and cash equivalents 12,235,146 6,432,000 5,803,146 90.2 9<br />

Trade and other receivables 3,752,515 2,955,000 797,515 27.0 10<br />

Inventories 78,441 103,000 (24,559) (23.8)<br />

Other assets 159,540 360,000 (200,460) (55.7) 12<br />

Non-current assets classified as held for sale 1,449,457 1,800,000 (350,543) (19.5) 13<br />

Total current assets 17,675,099 11,650,000 6,025,099<br />

Non-current assets<br />

Receivables 167,027 11,000 156,027 1,418.4<br />

Financial assets 10,000 10,000<br />

Investment in associates accounted for by using<br />

the equity method 886,797 1,107,000 (220,203) (19.9)<br />

Property, infrastructure, plant and equipment 299,094,109 287,798,000 11,296,109 3.9<br />

Total non-current assets 300,157,933 288,916,000 11,241,933<br />

Total assets 317,833,032 300,566,000 17,267,032<br />

Liabilities<br />

Current liabilities<br />

Payables 3,405,715 1,823,000 1,582,715 86.8 14<br />

Trust funds and deposits 429,564 327,000 102,564 31.4<br />

Provisions 4,914,576 4,401,000 513,576 11.7 15<br />

Interest bearing liabilities 1,496,328 1,650,000 (153,672) (9.3)<br />

Total current liabilities 10,246,183 8,201,000 2,045,183<br />

Non-current liabilities<br />

Provisions 2,944,824 2,277,000 667,824 29.3 15<br />

Interest Bearing Liabilities 8,142,289 8,452,000 (309,711) (3.7)<br />

Total non-current liabilities 11,087,113 10,729,000 358,113<br />

Total liabilities 21,333,296 18,930,000 2,403,296<br />

Net assets 296,499,736 281,636,000 14,863,736<br />

Equity<br />

Accumulated Surplus 130,517,925 129,042,000 1,475,925 1.1<br />

Asset Revaluation Reserve 162,150,916 149,472,000 12,678,916 8.5<br />

Reserves 3,830,895 3,122,000 708,895 22.7 16<br />

Total equity 296,499,736 281,636,000 14,863,736<br />

The accompanying notes form part <strong>of</strong> these standard statements<br />

114<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong>


Standard Cash Flow Statement<br />

For the period ended 30 June <strong>2010</strong><br />

Actual Budget Variance Variance Notes<br />

$ $ $ %<br />

Cash flows from operating activities<br />

Rates 18,876,469 18,938,000 (61,531) (0.3)<br />

Statutory fees and fines 547,230 758,000 (210,770) (27.8) 1<br />

User fees (inclusive <strong>of</strong> GST) 6,355,928 5,565,000 790,928 14.2 17<br />

Contributions (inclusive <strong>of</strong> GST) 791,023 77,000 714,023 927.3 2<br />

Grants (inclusive <strong>of</strong> GST) 17,715,380 18,359,000 (643,620) (3.5)<br />

Reimbursements (inclusive <strong>of</strong> GST) 182,980 - 182,980 100.0<br />

Interest 597,649 625,000 (27,351) (4.4) 4<br />

Other receipts 4,834 50,000 (45,166) (90.3)<br />

Net GST refund 1,277,795 - 1,277,795 100.0 17<br />

Payments to suppliers (inclusive <strong>of</strong> GST) (18,236,124) (17,792,000) (444,124) 2.5<br />

Payments to employees (including reduncancies) (16,738,316) (13,966,000) (2,772,316) 19.9 6<br />

Net cash provided by operating activities 11,374,848 12,614,000 (1,239,152) (9.8)<br />

Cash flows from investing activities<br />

Payments for property, infrastructure, plant and equipment (11,021,531) (15,885,000) 4,863,469 (30.6) 19-23<br />

Proceeds from sale <strong>of</strong> assets 1,816,392 1,646,000 170,392 10.4 5<br />

Payments for investments 149,962 - 149,962 100<br />

Net cash used in investing activities (9,055,177) (14,239,000) 5,183,823 36.4<br />

Cash flows from financing activities<br />

Proceeds from borrowings 900,000 1,350,000 (450,000) (33.3) 18<br />

Finance costs (680,152) (675,000) (5,152) 0.8<br />

Repayment <strong>of</strong> borrowings (1,486,237) (1,484,000) (2,237) 0.2<br />

Net cash used in financing activities (1,266,389) (809,000) (457,389) 56.5<br />

Net increase (decrease) in cash held 1,053,282 (2,434,000) 3,487,282 143.3<br />

Cash at the beginning <strong>of</strong> the year 11,181,864 8,866,000 2,315,864 26.1<br />

Cash and cash equivalents at the end <strong>of</strong> year 12,235,146 6,432,000 5,803,146<br />

Reconciliation <strong>of</strong> Operating Result and Net Cash Flows from Operating Activities<br />

for the year ending 30th June <strong>2010</strong><br />

Net surplus (deficit) from operations 5,436,464 4,104,000 1,332,464 32.5 0<br />

Depreciation and amortisation 9,430,779 8,940,000 490,779 5.5<br />

Recognition <strong>of</strong> Landfill rehabilitation 96,719 - 96,719<br />

(Pr<strong>of</strong>it) loss on sale <strong>of</strong> property, plant and equipment 5,436,464 4,104,000 1,332,464 100.0 5<br />

Finance costs 680,152 675,000 5,152 0.8<br />

Contributions - non-monetary assets 1,799,359 - 1,799,359 100.0 3<br />

Share <strong>of</strong> High Country Library Corporation surplus 8,457 (50,000) 58,457 (116.9)<br />

Fair Value adjustments for assets available for sale - - -<br />

Net movement in current assets and liabilities (11,513,546) (5,159,000) (6,354,546) 123.2<br />

Net Cash inflow (outflow) from operating activities 11,374,848 12,614,000 (1,239,152)<br />

The accompanying notes form part <strong>of</strong> these standard statements<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong><br />

115


Standard Statement <strong>of</strong> Capital Works<br />

For the year ended 30 June <strong>2010</strong><br />

Capital Works Areas<br />

Actual Budget Variance Variance Notes<br />

$ $ $ %<br />

Bridges 353,466 376,000 (22,534) (6.0)<br />

Buildings 1,748,594 2,448,000 (699,406) (28.6) 19<br />

Drainage 35,820 31,000 4,820 15.5<br />

Furniture and fittings 337,593 557,000 (219,407) (39.4) 20<br />

Landfill assets 18,195 - 18,195 100.0<br />

Land improvements 578,352 4,987,000 (4,408,648) (88.4) 21<br />

Parks, gardens and recreation 311,361 75,000 236,361 315.1 22<br />

Plant and equipment 2,374,705 2,048,000 326,705 16.0 23<br />

Roads and infrastructure 5,263,445 5,363,000 (99,555) (1.9)<br />

Total capital works 11,021,531 15,885,000 (4,863,469)<br />

Represented by :-<br />

Renewal 6,106,533 7,346,000 (1,239,467) (16.9)<br />

Upgrade 2,720,121 3,605,000 (884,879) (24.5)<br />

Expansion 453,147 129,000 324,147 251.3<br />

New assets 1,741,730 4,805,000 (3,063,270) (63.8)<br />

Total Capital Works 11,021,531 15,885,000 (4,863,469)<br />

Property, infrastucture, plant and equipment movement<br />

reconciliation worksheet<br />

The movement between the previous year and the<br />

current year in property, infrastructure, plant and<br />

equipment and as shown in the Balance Sheet<br />

links to the net <strong>of</strong> the following items:<br />

Total capital works 11,021,531 15,885,000 (4,863,469) (30.6) 0<br />

Asset revaluation movement 7,237,653 - 7,237,653 100.0 24<br />

Contributions - non-monetary assets 1,799,359 - 1,799,359 100.0 3<br />

Recognition <strong>of</strong> rehabilitation <strong>of</strong> landfill 1,349,444 - 1,349,444 - 15<br />

Depreciation and amortisation (9,430,779) (8,940,000) (490,779) 5.5<br />

Written down value <strong>of</strong> assets sold (362,524) (1,500,000) 1,137,476 (75.8) 5<br />

Recognition <strong>of</strong> previously unrecognised assets 1,134,858 - 1,134,858 -<br />

Transfers <strong>of</strong> non current assets classified as held<br />

for sale (350,974)<br />

Net movement in property, infrastructure, plant<br />

and equipment 12,398,568 5,445,000 7,304,542<br />

The accompanying notes form part <strong>of</strong> these standard statements<br />

116<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong>


Notes to the Standard Statements<br />

For the year ended 30 June <strong>2010</strong><br />

1<br />

Budgeted building services income reclassified as user fees.<br />

2 Contributions received for recreation projects brought forward from 08/09 and unbudgeted contribution towards water<br />

relocation works associated with the intersection improvements at Rowan and Phillipson Streets.<br />

3 New infrastucture assets are recognised as subdivisions reach practical completion. During <strong>2009</strong>/10 these include<br />

Arlington Park, Casino Court, Collyndale Gardens Estate, Monash Park Estate, among others. These assets,<br />

constructed by developers, are not included in Council's budget.<br />

4 The first instalment <strong>of</strong> grants commission grants for <strong>2010</strong>/11 financial year was paid in advance, additional recurrent<br />

funding received for children's services and homecare services.<br />

5 Ovens River/Faithful St precinct project funding not received totalling $2.7million.<br />

6 Reclassification <strong>of</strong> packaged care advisor salaries transferred from materials and services, combined with reduced<br />

vacancies. Additionally, Council's workcover premium exceeded budget.<br />

7 Reclassification <strong>of</strong> packaged care advisor salaries transferred from materials and services. Additionally, a number <strong>of</strong><br />

operational projects carried forward to the <strong>2010</strong>/2011 financial year.<br />

8 Budgeted sales <strong>of</strong> land delayed from 2008/09 to <strong>2009</strong>/10 comprising Sinclair Drive allotments $160,000, Kerr Street<br />

$300,000 and aerodrome $495,000.<br />

9<br />

Cash assets significantly greater than budget primarily due to capital works program underspent.<br />

10 Rate receivables have increased by 17% over <strong>2009</strong>. This is partly due to an increase in rates raised <strong>of</strong> 4% and the<br />

remainder due to slower payment <strong>of</strong> rates by ratepayers. Other receivables include reimbursement by State Revenue<br />

Office for property valuations also increased accrued interest on investments compared to budget.<br />

11 Other assets comprises prepaid expenses. At 30 June, <strong>2010</strong> prepayments were reduced by delaying insurance<br />

premium payments until July.<br />

12 Property sales including Kerr Street and Sinclair Drive allotments have reduced this balance sheet item.<br />

13 Significant accounts payable balances at June <strong>2010</strong> include amounts owing for waste compaction units <strong>of</strong> $696K,<br />

Council's corporate s<strong>of</strong>tware solution - $89K, <strong>Wangaratta</strong> Government Centre stage II redevelopment - $98K, Roy<br />

Street guard rail - $108K, motor vehicle purchases $103, Ovens River/Failthful Street project - $65K, and resealing<br />

works $53K.<br />

14 Provisions include a further $1.3million provision for landfill rehabilitation which was not allowed for in Council's<br />

budget.<br />

15 Transfer to industrial land sales reserve budget for 2008/09 now undertaken for land sales brought forward and<br />

settled in <strong>2009</strong>/10.<br />

16<br />

Budget framed exclusive <strong>of</strong> GST.<br />

17 Borrowings for the Showgrounds redevelopment deferred to <strong>2010</strong>/2011 - $450K.<br />

18 Building projects carried forward to <strong>2010</strong>/11 financial year include the <strong>Wangaratta</strong> Government Centre redevelopment<br />

<strong>of</strong> $407K.<br />

19 Furniture and fittings capital expenditure includes a payment <strong>of</strong> $425,000 for Council's corporate s<strong>of</strong>tware system,<br />

which was budgeted for and paid for in July <strong>2009</strong>, however, included in 2008/09 capital expenditure.<br />

20 Ovens River/Faithful St precinct project funding not received for expenditure totalling $3 million. Additionally,<br />

expenditure at North <strong>Wangaratta</strong> industrial estate to be carried forward to <strong>2010</strong>/11 - $515K.<br />

21 Significant parks and gardens capital works brought forward from 2008/09 including <strong>Wangaratta</strong> Maint Rd landscape<br />

renovation and playground renewals.<br />

22 Significant plant and equipment purchases brought forward from 2008/09.<br />

23 Significant asset revaluations are represented by an increase in the Asset Revaluation Reserve <strong>of</strong> $8.4M. This<br />

movement was not known at budget preparation.<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong><br />

117


Certification <strong>of</strong> Standard Statements<br />

For the year ended 30 June <strong>2010</strong><br />

118<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong>


<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong> 119


120<br />

<strong>Rural</strong> <strong>City</strong> <strong>of</strong> <strong>Wangaratta</strong> ANNUAL REPORT <strong>2009</strong> - <strong>2010</strong>


<strong>Wangaratta</strong> Government Centre<br />

Corner <strong>of</strong> Ford and Ovens Streets<br />

<strong>Wangaratta</strong> 3677<br />

PO Box 238 <strong>Wangaratta</strong> 3676<br />

Telephone: 03 5722 0888 Facsimile: 03 5721 9526<br />

Email: council@wangaratta.vic.gov.au<br />

Web: www.wangaratta.vic.gov.au

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!