PIAZZA<br />
CREW<br />
Bump In & Out<br />
• As required including Loaders & Riggers<br />
• Current Rigging Licences will be required on site<br />
Labour - SHOW<br />
• FOH Operator<br />
• Stage Hand<br />
Additional Requirements & OHS<br />
• Note that the above labour requirements specify minimum crew allocation<br />
at any given time. It is the contractors responsibility to ensure staff do not<br />
work excessive hours and are given adequate breaks. A proposed crew<br />
schedule must be included with your quotation<br />
• The festival will provide a backdrop for this venue, the sucessful contractor<br />
is required to hang this backdrop<br />
• All contractors must comply with current ACT OHS legislation to provide<br />
safe work practices & instructions to their employees. Relevant<br />
documentation including (but not limited to): Safe Work Method Statements,<br />
Job Safety Analysis/ Risk Management Plan, Engineering Certificates for<br />
Structural works, EH&S Management System are required upon request<br />
• Relevant insurances including (but not limited to): Public Liability,<br />
Professional Indemnity and Workers Compensation are also required upon<br />
request.<br />
• Contractor to provide fire extinguisher in case of equipment electrical fire<br />
• All electical cords must be tagged and tested as per AS/NZS 3760:2010 Inservice<br />
safety inspection and testing of electrical equipment<br />