14.11.2014 Views

Festival Hydro's Notice of Application for Electrical Distribution Change

Festival Hydro's Notice of Application for Electrical Distribution Change

Festival Hydro's Notice of Application for Electrical Distribution Change

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Festival</strong> Hydro Inc.<br />

EB-2009-0263<br />

Exhibit 2<br />

Tab 2<br />

Schedule 3<br />

Page 19 <strong>of</strong> 31<br />

Filed: August 28, 2009<br />

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

7<br />

8<br />

9<br />

10<br />

11<br />

12<br />

13<br />

14<br />

15<br />

16<br />

17<br />

18<br />

19<br />

20<br />

21<br />

22<br />

23<br />

24<br />

25<br />

26<br />

27<br />

Hardware Upgrades (Computer)<br />

This line item represents various computer upgrades required during the year to replace<br />

existing units at end <strong>of</strong> life or that have failed beyond repair. This includes the<br />

replacement <strong>of</strong> the telephone system at end <strong>of</strong> life (1996 vintage) <strong>for</strong> $85,000, with a new<br />

system that integrates with the computer system and <strong>of</strong>fers interactive voice response<br />

(IVR).<br />

S<strong>of</strong>tware Upgrades<br />

This line item represents various computer s<strong>of</strong>tware upgrades required during the year as<br />

part <strong>of</strong> maintenance agreements (e.g. AutoCad) or to update to newer versions <strong>of</strong> existing<br />

s<strong>of</strong>tware that <strong>of</strong>fer greater flexibility and improved per<strong>for</strong>mance.<br />

Load Management<br />

This line item represents the new load controllers added to the system to control electric<br />

water heaters and central air conditioners as part <strong>of</strong> the CDM program.<br />

Capitalized Subdivision Asset Transfers<br />

This represents the transfer <strong>of</strong> assets provided by the customer which were assumed by<br />

<strong>Festival</strong> Hydro upon the completion <strong>of</strong> the economic evaluation. During the year,<br />

<strong>Festival</strong> Hydro assumed the assets associated with one residential subdivision in the City<br />

<strong>of</strong> Strat<strong>for</strong>d and one residential subdivision in the Town <strong>of</strong> St. Marys <strong>for</strong> a total <strong>of</strong><br />

$304,294.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!