15.11.2014 Views

Ediel/EAN project for the downstream electrical power market

Ediel/EAN project for the downstream electrical power market

Ediel/EAN project for the downstream electrical power market

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Ediel</strong>/<strong>EAN</strong> <strong>project</strong><br />

<strong>for</strong> <strong>the</strong> <strong>downstream</strong><br />

<strong>electrical</strong> <strong>power</strong><br />

<strong>market</strong><br />

Status: Proposal<br />

Version: 0.3<br />

Date: February 24, 2000<br />

EdiSys AS Page: 1


1. Introduction<br />

<strong>Ediel</strong> and <strong>the</strong> <strong>EAN</strong> organisations in Denmark, Finland, Germany, Holland, Norway<br />

and Sweden have agreed to establish a common <strong>project</strong> <strong>for</strong> making common<br />

Implementation Guidelines (IG) <strong>for</strong> <strong>the</strong> <strong>downstream</strong> <strong>electrical</strong> <strong>power</strong> <strong>market</strong>. This<br />

includes IG’s <strong>for</strong> <strong>the</strong> EDIFACT messages INVOIC and MSCONS, and also a<br />

specification of <strong>the</strong> use of <strong>EAN</strong> codes <strong>for</strong> identification purposes in <strong>the</strong> <strong>electrical</strong><br />

<strong>power</strong> <strong>market</strong>. The meaning of <strong>the</strong> term “<strong>downstream</strong> <strong>electrical</strong> <strong>power</strong> <strong>market</strong>” is<br />

communication towards <strong>the</strong> end users.<br />

<strong>Ediel</strong> has today made common IG’s <strong>for</strong> <strong>the</strong> upstream <strong>electrical</strong> <strong>power</strong> <strong>market</strong>. These<br />

IG’s is specially designed <strong>for</strong> <strong>the</strong> specialities needed <strong>for</strong> in<strong>for</strong>mation between<br />

different participants in <strong>the</strong> <strong>electrical</strong> <strong>power</strong> <strong>market</strong>. When <strong>the</strong>se <strong>power</strong> companies are<br />

going to communicate towards <strong>the</strong> end users <strong>the</strong>re is a need to harmonise with <strong>the</strong><br />

standards used in o<strong>the</strong>r <strong>market</strong>s or branches today.<br />

Today <strong>EAN</strong>COM based IG’s are used in most of <strong>the</strong> European countries and<br />

branches, but <strong>the</strong>re are still differences between <strong>the</strong>se IG’s. The main goal <strong>for</strong> this<br />

<strong>project</strong> is to make a common set of IG’s that can be used in <strong>the</strong> same way in all<br />

Western European countries between <strong>the</strong> <strong>electrical</strong> <strong>power</strong> sector and end users in<br />

different <strong>market</strong>s or branches.<br />

On a later stage (i.e. as a phase 2 or 3) <strong>the</strong> IG’s may be extended:<br />

- To cover <strong>the</strong> needs in o<strong>the</strong>r energy sectors such as gas and hot water.<br />

- To cover <strong>the</strong> needs o<strong>the</strong>r sectors dealing with metered in<strong>for</strong>mation, such as<br />

telephone companies.<br />

- To cover <strong>the</strong> needs <strong>for</strong> an international (global) standard.<br />

2. Organisation<br />

The <strong>project</strong> will be organised with a Steering Group and a Work Group, and assisted<br />

by national user groups.<br />

The Steering Group should have participants from <strong>the</strong> <strong>EAN</strong> organisation and <strong>Ediel</strong><br />

(<strong>electrical</strong> <strong>power</strong> <strong>market</strong>) from <strong>the</strong> participating countries Denmark, Finland,<br />

Germany, Holland, Norway and Sweden. O<strong>the</strong>r countries may participate if <strong>the</strong>re is<br />

interest from both <strong>EAN</strong> and <strong>the</strong> <strong>electrical</strong> <strong>power</strong> <strong>market</strong> in this country. There should<br />

not be any limitation on <strong>the</strong> number of participants. The main activity <strong>for</strong> <strong>the</strong> Steering<br />

Group is to approve <strong>the</strong> work done by <strong>the</strong> Work Group and give directions <strong>for</strong> <strong>the</strong><br />

future work. The Steering Group should have a limited number of meetings (3).<br />

The Work Group should have a limited number of participants and should carry out<br />

<strong>the</strong> practical work in <strong>the</strong> <strong>project</strong>. It is advised that each country participate with a<br />

maximum of 2 persons (one from <strong>EAN</strong> and one from <strong>Ediel</strong>). The participants should<br />

have knowledge from <strong>the</strong> <strong>power</strong> <strong>market</strong>, EDIFACT and/or <strong>the</strong> invoicing process. It is<br />

estimated that <strong>the</strong> Work Group needs 2 to 3 meetings be<strong>for</strong>e each meeting in <strong>the</strong><br />

Steering Group. The <strong>project</strong> leader should be from <strong>Ediel</strong>. The development and<br />

maintenance of <strong>the</strong> IG-documents made in <strong>the</strong> <strong>project</strong> should be carried out by <strong>EAN</strong>.<br />

EdiSys AS Page: 2


Practical work, such as writing minutes and call to meetings, will be done equally by<br />

<strong>the</strong> participating organisations.<br />

In addition to <strong>the</strong> Steering Group and <strong>the</strong> Work Group <strong>the</strong>re should be national user<br />

groups that give input to <strong>the</strong> <strong>project</strong> and that verify <strong>the</strong> work according to national<br />

rules and requirements. The national user group should be a reference group <strong>for</strong> <strong>the</strong><br />

participants in <strong>the</strong> Work Group and should be responsible <strong>for</strong> appointing members to<br />

<strong>the</strong> Steering Group..<br />

<strong>EAN</strong><br />

<strong>Ediel</strong><br />

Steering Group<br />

National user groups<br />

Work Group<br />

3. Deliverables<br />

The <strong>project</strong> will have <strong>the</strong> following deliverables:<br />

• A document describing <strong>the</strong> <strong>EAN</strong> identification system to be used within <strong>the</strong><br />

<strong>electrical</strong> <strong>power</strong> <strong>market</strong>. This includes:<br />

! Identification of companies<br />

! Product codes<br />

! Identification of Connecting points to <strong>the</strong> grid or metering points<br />

! Meter identifications (to be discussed)<br />

! Etc.<br />

• International INVOIC Implementation Guidelines <strong>for</strong> <strong>the</strong> <strong>downstream</strong> <strong>electrical</strong><br />

<strong>power</strong> <strong>market</strong>, covering <strong>the</strong> common parts of <strong>the</strong> invoicing process. This IG<br />

may need national user guides to cover national legislation and specialities.<br />

• International MSCONS Implementation Guidelines <strong>for</strong> <strong>the</strong> <strong>downstream</strong><br />

<strong>electrical</strong> <strong>power</strong> <strong>market</strong><br />

• A dDocuments describing:<br />

• The routines <strong>for</strong> maintenance of <strong>the</strong> Implementation Guidelines<br />

• The organisation of <strong>the</strong> co-operation between <strong>EAN</strong> and <strong>Ediel</strong> after <strong>the</strong><br />

<strong>project</strong> is finished.<br />

• A plan <strong>for</strong> establishing a <strong>project</strong> <strong>for</strong> exchange of products and prices<br />

(PRICAT), if found necessary.<br />

EdiSys AS Page: 3


4. Conditions<br />

The <strong>project</strong> will be based on <strong>the</strong> following conditions:<br />

• Each organisation (<strong>EAN</strong> and <strong>Ediel</strong>) will cover own expenses. If <strong>the</strong> need <strong>for</strong><br />

common expenses should arise, <strong>the</strong> Steering Group should resolve this.<br />

• The Implementation Guidelines should be as simple as possible <strong>for</strong> <strong>the</strong><br />

<strong>downstream</strong> <strong>electrical</strong> <strong>power</strong> <strong>market</strong>.<br />

• The Implementation Guidelines should be based on common European<br />

principles.<br />

• The INVOIC IG should, if possible without much extra work, also be suitable<br />

<strong>for</strong> <strong>the</strong> upstream <strong>electrical</strong> <strong>power</strong> <strong>market</strong>.<br />

• Development of XML specifications will be decided during <strong>the</strong> <strong>project</strong> if user<br />

requirements demand it.<br />

• The business process model should, if possible, be based on UML (Unified<br />

Modelling Language).<br />

• The members of <strong>the</strong> Work Group from each country (<strong>EAN</strong> and <strong>Ediel</strong>) should be<br />

responsible <strong>for</strong> <strong>the</strong> co-ordination of <strong>the</strong> link to <strong>the</strong> national user groups.<br />

• Each country should make national user guidelines <strong>for</strong> specification of national<br />

requirements (legislation), if needed.<br />

5. Project plan<br />

EdiSys AS Page: 4


ID<br />

Task Name<br />

1 Activities<br />

Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr<br />

2 Identification system<br />

3 Business process model<br />

4 Implementation Guidelines<br />

5 Marketing (European <strong>EAN</strong> and <strong>power</strong> organisations)<br />

6 Follow up of national user groups<br />

7 Document (maintenance and fur<strong>the</strong>r work)<br />

8<br />

9 Mile stones<br />

10 Presentation in WENOMM<br />

11 Work Groop meeting 1<br />

12 Identificatin system v. 0.1<br />

14.02<br />

21.02<br />

01.03<br />

13 Business process modell v. 0.1<br />

14 Identificatin system v. 0.2<br />

15 Steering Groop meeting 1<br />

16 Identification system v. 1.0<br />

17 Business process modell v. 1.0<br />

18 Implementation Guidelines v. 0.1<br />

28.04<br />

28.04<br />

15.05<br />

01.06<br />

01.06<br />

15.06<br />

19 Steering Groop meeting 2<br />

30.08<br />

20 Implementation Guidelines v. 0.2<br />

21 Steering Groop meeting 3<br />

15.11<br />

04.12<br />

22 Implementation Guidelines v. 1.0<br />

23 Document (maintenance and fur<strong>the</strong>r work)<br />

01.01<br />

01.01<br />

EdiSys AS Page: 5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!