Master Plan 2006 - Gold Coast Airport
Master Plan 2006 - Gold Coast Airport
Master Plan 2006 - Gold Coast Airport
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
5.0 NOISE EXPOSURE 36<br />
5.1 NOISE SENSITIVE DEVELOPMENTS 36<br />
6.0 ENVIRONMENT 42<br />
6.1 ENVIRONMENTAL ASSESSMENT 42<br />
6.1. Purpose of Environmental<br />
Assessment 42<br />
6.1. Approvals Framework 42<br />
6.1.3 Scope of Assessment 42<br />
6.2 DESCRIPTION OF THE ENVIRONMENT 42<br />
6.2. Native Flora 43<br />
6.2. Native Fauna 43<br />
6.2.3 Water Catchments and<br />
Major Drainage Systems 43<br />
6.2.4 Ground Water 43<br />
6.2.5 Soils 46<br />
6.2.6 Cultural Heritage 46<br />
6.2.7 Air Quality 47<br />
6.3 ENVIRONMENTAL MITIGATION 47<br />
6.3. Introduction 47<br />
6.3. Flora and Fauna 47<br />
6.3.3 Water Quality 48<br />
6.3.4 Soils 48<br />
6.3.5 Cultural Heritage 48<br />
6.3.6 Air Quality 48<br />
6.4 ENVIRONMENTAL MANAGEMENT 49<br />
6.4. <strong>Airport</strong> Environment Strategy 49<br />
LIST OF FIGURES<br />
Figure 1. Location of the <strong>Airport</strong> 3<br />
Figure 1. <strong>Airport</strong> Facilities 4<br />
Figure 2.1 2001 <strong>Master</strong> <strong>Plan</strong> Land<br />
Use <strong>Plan</strong><br />
7<br />
Figure 4.1 Land Use <strong>Plan</strong> for <strong>Gold</strong> <strong>Coast</strong> <strong>Airport</strong> 21<br />
Figure 4.2 <strong>Gold</strong> <strong>Coast</strong> <strong>Airport</strong> Obstacle<br />
Limitation Surface 33<br />
Figure 4.3 <strong>Gold</strong> <strong>Coast</strong> <strong>Airport</strong> Obstacle<br />
Limitation Surface 34<br />
Figure 4.4 Future PANS-OPS Surfaces<br />
for <strong>Gold</strong> <strong>Coast</strong> <strong>Airport</strong> 35<br />
Figure 5.1 <strong>Gold</strong> <strong>Coast</strong> <strong>Airport</strong> ANEF 38<br />
Figure 6.1 Significant Flora Species 44<br />
Figure 6.2 Significant Fauna Species 45<br />
LIST OF TABLES<br />
Table 1 Building Site Acceptability<br />
Based On Anef Zones 37<br />
Table 2 Indoor Design Sound Levels<br />
For Determination Of Aircraft<br />
Noise Reduction 40<br />
Table 3 Implementation Schedule 50<br />
7.0 IMPLEMENTATION 50<br />
7. PLANNING CYCLE 50<br />
<strong>Gold</strong> <strong>Coast</strong> <strong>Airport</strong> <strong>Master</strong> <strong>Plan</strong> <strong>2006</strong>