16.11.2014 Views

Master Plan 2006 - Gold Coast Airport

Master Plan 2006 - Gold Coast Airport

Master Plan 2006 - Gold Coast Airport

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

5.0 NOISE EXPOSURE 36<br />

5.1 NOISE SENSITIVE DEVELOPMENTS 36<br />

6.0 ENVIRONMENT 42<br />

6.1 ENVIRONMENTAL ASSESSMENT 42<br />

6.1. Purpose of Environmental<br />

Assessment 42<br />

6.1. Approvals Framework 42<br />

6.1.3 Scope of Assessment 42<br />

6.2 DESCRIPTION OF THE ENVIRONMENT 42<br />

6.2. Native Flora 43<br />

6.2. Native Fauna 43<br />

6.2.3 Water Catchments and<br />

Major Drainage Systems 43<br />

6.2.4 Ground Water 43<br />

6.2.5 Soils 46<br />

6.2.6 Cultural Heritage 46<br />

6.2.7 Air Quality 47<br />

6.3 ENVIRONMENTAL MITIGATION 47<br />

6.3. Introduction 47<br />

6.3. Flora and Fauna 47<br />

6.3.3 Water Quality 48<br />

6.3.4 Soils 48<br />

6.3.5 Cultural Heritage 48<br />

6.3.6 Air Quality 48<br />

6.4 ENVIRONMENTAL MANAGEMENT 49<br />

6.4. <strong>Airport</strong> Environment Strategy 49<br />

LIST OF FIGURES<br />

Figure 1. Location of the <strong>Airport</strong> 3<br />

Figure 1. <strong>Airport</strong> Facilities 4<br />

Figure 2.1 2001 <strong>Master</strong> <strong>Plan</strong> Land<br />

Use <strong>Plan</strong><br />

7<br />

Figure 4.1 Land Use <strong>Plan</strong> for <strong>Gold</strong> <strong>Coast</strong> <strong>Airport</strong> 21<br />

Figure 4.2 <strong>Gold</strong> <strong>Coast</strong> <strong>Airport</strong> Obstacle<br />

Limitation Surface 33<br />

Figure 4.3 <strong>Gold</strong> <strong>Coast</strong> <strong>Airport</strong> Obstacle<br />

Limitation Surface 34<br />

Figure 4.4 Future PANS-OPS Surfaces<br />

for <strong>Gold</strong> <strong>Coast</strong> <strong>Airport</strong> 35<br />

Figure 5.1 <strong>Gold</strong> <strong>Coast</strong> <strong>Airport</strong> ANEF 38<br />

Figure 6.1 Significant Flora Species 44<br />

Figure 6.2 Significant Fauna Species 45<br />

LIST OF TABLES<br />

Table 1 Building Site Acceptability<br />

Based On Anef Zones 37<br />

Table 2 Indoor Design Sound Levels<br />

For Determination Of Aircraft<br />

Noise Reduction 40<br />

Table 3 Implementation Schedule 50<br />

7.0 IMPLEMENTATION 50<br />

7. PLANNING CYCLE 50<br />

<strong>Gold</strong> <strong>Coast</strong> <strong>Airport</strong> <strong>Master</strong> <strong>Plan</strong> <strong>2006</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!