17.11.2014 Views

TESCO TOP DRIVES - TESCO Corporation

TESCO TOP DRIVES - TESCO Corporation

TESCO TOP DRIVES - TESCO Corporation

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

T E S C O T O P D R I V E S<br />

Delivering solutions that add real value, around the world<br />

THE DRILLING INNOVATION COMPANY TM


Technology for Today’s Drillers,<br />

<strong>TESCO</strong>’s Top Drive System<br />

Over a decade ago, Tesco <strong>Corporation</strong> pioneered a technology that made modern<br />

drilling procedures available to most rigs.<br />

With the ability to bring time and cost efficiencies to any drilling application,<br />

<strong>TESCO</strong>’s line of hydraulic and electric Top Drives has proven successful on rigs<br />

worldwide. In every location land-based or offshore, from the frigid Arctic to<br />

desert heat, urban locations to remote jungle, anywhere there is a well to be<br />

drilled, a <strong>TESCO</strong> Top Drive can improve operations.<br />

32<br />

33<br />

7<br />

9<br />

31<br />

34<br />

6<br />

5<br />

4 3<br />

2<br />

1<br />

37<br />

11<br />

35 36<br />

14<br />

12 13<br />

17 18<br />

15<br />

14<br />

30<br />

16<br />

19<br />

20<br />

38<br />

39<br />

29<br />

22<br />

21<br />

23<br />

24<br />

28<br />

40<br />

25<br />

41<br />

26<br />

27<br />

NORTH AMERICA<br />

8 10<br />

Grande Prairie, Alberta<br />

SOUTH AMERICA<br />

EUROPE<br />

MIDDLE EAST<br />

ASIA<br />

AUSTRALIA<br />

1 Houston, Texas<br />

8<br />

14 Quito, Ecuador<br />

23 Rio de Janeiro, Brazil<br />

31 Aberdeen, U.K.<br />

35 Doha, Qatar<br />

37 Beijing, China<br />

40 Perth, Australia<br />

2 Bryan, Texas<br />

9<br />

Nisku, Alberta<br />

15 Coca, Ecuador<br />

24 Salta, Argentina<br />

32 Stavanger, Norway<br />

36 Dubai, United Arab Emerites<br />

38 Singapore<br />

41 Te Puke, New Zealand<br />

3 Kilgore,Texas<br />

10 Red Deer, Alberta<br />

16 Bogotá, Colombia<br />

25 Buenos Aires, Argentina<br />

33 Bergen, Norway<br />

39 Jakarta, Indonesia<br />

4 Saginaw, Texas<br />

11 Reynosa, Mexico<br />

17 Maracaibo, Venezuela<br />

26 Neuquén, Argentina<br />

34 Moscow, Russia<br />

5 Conway, Arkansas<br />

12 Villahermosa, Mexico<br />

18 El Tigre, Venezuela<br />

27 Rio Gallegos, Argentina<br />

6 Grand Junction, Colorado<br />

13 Ciudad del Carmen, Mexico<br />

19 Mossoroó, Brazil<br />

28 Mendoza, Argentina<br />

7<br />

Calgary, Alberta<br />

14 Poza Rica, Mexico<br />

20 Macaé, Brazil<br />

29 Santa Cruz de la Sierra, Bolivia<br />

21 São Mateus, Brazil<br />

30 Talara, Perú<br />

22 Salvador, Brazil<br />

P A G E 2


Understanding the <strong>TESCO</strong> Difference<br />

With the widest selection and greatest number of exclusive features, <strong>TESCO</strong><br />

Top Drives represent the world standard in sales and rentals.<br />

Selection Like No Other<br />

From the largest offshore or conventional<br />

derrick styles down to small truck-mounted units,<br />

there’s a <strong>TESCO</strong> Top Drive to meet your needs.<br />

Hydraulic or electric units are available from 150<br />

ton to 750 ton, 400hp to 1350hp.<br />

Ease Of Installation<br />

Packed securely in three standard shipping<br />

containers, <strong>TESCO</strong> Top Drives can be transported easily and affordably by<br />

truck, rail or sea. They can also be broken down into smaller modules for<br />

easy delivery by helicopter or as air cargo. Once on location, <strong>TESCO</strong> Top<br />

Drives can be installed on most drilling rigs with little or no modification to<br />

the rig.<br />

Ease Of Operation<br />

The <strong>TESCO</strong> Top Drive control panel is designed to be easily understood<br />

and operated by the driller. On-site <strong>TESCO</strong> technicians are available to<br />

help achieve maximum Top Drive drilling performance. Specially trained<br />

technicians know drilling processes as well as <strong>TESCO</strong>’s equipment, and<br />

provide both maintenance and training for the drilling crew. In addition,<br />

advanced factory training is also available.<br />

Versatility At Its Best<br />

In extremely cold climates, a one-piece skid building is available to<br />

enable maintenance and operation of the power unit in temperatures<br />

below minus 40°C. Units have been operated to 56°C with optional high<br />

temperature packages. For offshore platforms or other locations where<br />

space is at a premium, the power unit can be split and stacked with a<br />

<strong>TESCO</strong> stacking kit. If ambient noise is a consideration, various soundproof<br />

buildings are available to significantly decrease the sound of diesel powered<br />

hydraulic systems.<br />

P E R<br />

C E N<br />

T<br />

•<br />

U P<br />

T I M<br />

E<br />

Our top drive systems are<br />

easily transported via truck,<br />

ship, helicopter or airplane.<br />

P E R<br />

C E N<br />

T<br />

•<br />

U P<br />

T I M<br />

<strong>TESCO</strong> top drive systems’ innovative design<br />

and worldwide availability of parts<br />

and support services have resulted in<br />

a remarkable record of 99.3% uptime.<br />

LESS<br />

CONNECTIONS<br />

Double and triple stands of pipe can<br />

be made up in advance and drilled in,<br />

reducing the number of necessary<br />

connections by 50 percent or more.<br />

E<br />

L<br />

On-site supervision<br />

and user training ensures<br />

maximum drilling performance.<br />

P A G E 3


Using the Top Drive Practically<br />

Whether your specific drilling operation calls for directional, horizontal,<br />

underbalanced, air or gas drilling, reaming, running casing, well control,<br />

or fishing, the <strong>TESCO</strong> Top Drive can contribute in ways that will save time<br />

and money. Here are some practical examples of what a <strong>TESCO</strong> Top Drive is<br />

capable of and what that means to you.<br />

A <strong>TESCO</strong> Top Drive can connect to the drill string at any height in<br />

the derrick and provide simultaneous reciprocation, rotation and<br />

circulation of drilling fluids.<br />

• The ability to ream and backream with full stands.<br />

• Eliminates the need to pick up the kelly to begin circulation and rotation,<br />

thereby decreasing the risk of becoming stuck.<br />

• No need to break stands into singles for reaming.<br />

• No requirement to pump out singles with the resulting hole problems.<br />

The Top Drive can rotate the drill string both clockwise and<br />

counter clockwise with highly controlled torque.<br />

• Ability to “rock” the drill string in order to break the static friction while<br />

“slide drilling”. This allows the drilling of extended horizontal sections in<br />

shallow wells.<br />

• Capable of making “on bottom” connections with the drill string,<br />

eliminating the need to re-orient the drill string in “slide drilling”.<br />

• Facilitates free-point and back-off operations during fishing.<br />

Double or triple stands of pipe can be made up in advance and<br />

drilled in with the <strong>TESCO</strong> Top Drive, thereby reducing the number<br />

of necessary connections by 50% or more.<br />

• In air or gas drilling, decreases the number of connections and thus the<br />

“blow down” time.<br />

• Decreases the amount of time that the hole is not underbalanced in UBD<br />

operations.<br />

• Allows 20 or 30 meter core barrels to be drilled without a connection,<br />

decreasing the chances of a “jam-off”.<br />

The <strong>TESCO</strong> Top Drive allows for continuous fill up and/or<br />

circulation while running casing.<br />

• Saves time filling casing.<br />

• Allows circulation, rotation, and reciprocation of casing.<br />

• Decreases circulating time and stuck casing risk.<br />

“Link Tilt” and “Extend” robotics assist in casing handling.<br />

• Increases safety and speed when running casing.<br />

• Reduces need for specialized casing running equipment.<br />

In the event of a kick, the well can be secured with the double<br />

ball valve.<br />

• Provides a second alternative to traditional “stabbing valve” well control<br />

procedures.<br />

• Driller can shut-in the well without drill floor crew – even while<br />

tripping.<br />

We at <strong>TESCO</strong> can make your rig more efficient, and a safer<br />

environment to work.<br />

• Automation of the rigs.<br />

• Safety improvements for rig floor crew.<br />

• Elimination of manual tongs to make up connections.<br />

• Quicker connections.<br />

• Ability to close the safety valve remotely at any height in the derrick.<br />

• Possibility to add Stabbing arm.<br />

• With the addition of Power slips, back up tongs are virtually eliminated.<br />

P A G E 4


Electric or Hydraulic –<br />

The Choice is Yours<br />

Electric Top Drives<br />

Available from 400hp to 1350hp, <strong>TESCO</strong> permanent magnet or<br />

AC electric Top Drives are the ideal choice for modern rigs (land or<br />

offshore) with sufficient electric power.<br />

Hydraulic Top Drives<br />

Available from 475hp to 1205hp with self-contained AC over<br />

hyraulic or diesel prime movers, these units are the traditional choice<br />

for portable installation or for re-powering older mechanical rigs.<br />

<strong>TESCO</strong> rental Top Drives are available from our International Service<br />

Divisions. These units can be economically shipped and quickly<br />

installed in almost any rig worldwide. An experienced <strong>TESCO</strong> Top Drive<br />

technician is supplied with every rental unit to ensure the customer<br />

receives maximum benefit from the Top Drive. Both hydraulic and<br />

electric Top Drives are available for sale in new rig construction,<br />

rig upgrades and permanent installations. A selection of models,<br />

combined with accessories, on-site Installation supervision and factory<br />

training ensure that the customer receives real value for their <strong>TESCO</strong><br />

Top Drive investment.<br />

Top Drives – Types and Models<br />

Hydraulic<br />

150 HMI 475<br />

250 HMI 475<br />

250 HXI 700<br />

500 HS 750/1100<br />

500 HCI 1205<br />

650 HCI 1205<br />

Electric<br />

150 EMI 400<br />

250 EMI 400<br />

350 EXI 600<br />

500 ECI 900/1350<br />

650 ECI 900/1350<br />

750 ECIX 1350<br />

<strong>TESCO</strong>’s Hydraulic Top Drive<br />

operating in Brazil.<br />

P A G E 5


<strong>TESCO</strong> Electric Top Drives<br />

250 EMI 400 Top Drive<br />

The 250 EMI 400 provides the performance and pipe handling features<br />

required for drilling and workover applications. The 250 EMI 400<br />

employs an AC induction motor and drive system. The 250 EMI 400<br />

can be operated from a self-contained generator, or can be connected<br />

directly to the rig’s AC Bus. The EMI 400 is also available in a 150 Ton<br />

configuration and can be integrated with an existing, dedicated VFD<br />

on the rig.<br />

350 EXI 600 Top Drive<br />

The 350 EXI 600 Extreme electric top drive system is a compact,full<br />

featured, top drive with horizontal drilling in mind for smaller<br />

narrow mast drilling rigs. The EXI 600 is also available in a 400 Ton<br />

configuration and can be integrated with an existing, dedicated VFD<br />

on the rig.<br />

Top Drives – Types and Models 250 EMI 400 350 EXI 600 500/650 ECI 900 500/650 ECI 1350 750 ECIX 1350<br />

Rated Capacity 250ton 350ton 500/650ton 500/650ton 750ton<br />

Rated Power 400hp 600hp 900hp 1350hp 1350hp<br />

Hook Weight 13,684lbs. 25,000lbs.<br />

13,000lbs.<br />

(not including optional swivel)<br />

13,800lbs<br />

(not including optional swivel)<br />

28,000lbs.<br />

Operating Length (including links & elevators) 230in. 237in.<br />

172in.<br />

(not including optional swivel)<br />

171in.<br />

(not including optional swivel)<br />

307in.<br />

Width 44.5in. 48.5in. 62in. 62in. 64.5in.<br />

Max. Continuous Drill Torque 21,000ft-lb. 30,000ft-lb. 36,700ft-lb. 58,000ft-lb. 58,000ft-lb.<br />

Make-up / Breakout Torque 32,000ft-lb. 45,000ft-lb. 45,000ft-lb./56,000ft-lb. 68,000ft-lb./84,000ft-lb. 68,000ft-lb./84,000ft-lb.<br />

Max Speed 200RPM 220RPM 193RPM 193RPM 193RPM<br />

Quill ID 2.5in. 3.0in. 2.5in. 2.5in. 3.5in.<br />

Quill Connection NC50 NC61 *NC61 *NC61 NC70<br />

* NC 50 available with reduced capacity<br />

P A G E 6


500/650 ECI 900/1350 Top Drive<br />

The ECI top drive system represents a significant advance in electric top<br />

drive technology. Traditional induction or brush style DC motors have<br />

been replaced with liquid cooled, permanent magnet synchronous<br />

motors. Compact enough to fit into any triple mast, the ECI provides<br />

the performance and pipe handling features required for medium and<br />

deep drilling applications. The modular ECI is available in 900 and<br />

1350hp configurations.<br />

750 ECIX 1350 Top Drive<br />

The 750 ECIX 1350 top drive system has a rated lifting capacity of<br />

750 tons, making it ideally suited for many off shore applications,<br />

yet in the <strong>TESCO</strong> tradition, this ECIX is compact enough that it can<br />

also be installed on many land rigs where high performance drilling<br />

requirements exist. The ECIX Top Drive is designed to be installed on<br />

existing guide rail torque arrest systems and utilizes an adaptor dolly,<br />

minimizing rig modifications in a retrofit application.<br />

DERRICK<br />

20’<br />

10’ 8’ 6’ 6’<br />

LARGE<br />

TRIPLE<br />

MAST<br />

SMALL<br />

TRIPLE<br />

MAST<br />

WORKOVER<br />

MAST<br />

DOUBLE<br />

MAST<br />

SINGLE<br />

MAST<br />

500 / 650 ECI<br />

Approximate Working clearance w/Top Drive Installed<br />

750ECIX<br />

350 EXI<br />

250 EMI<br />

P A G E 7


<strong>TESCO</strong> Hydraulic Top Drives<br />

250 HMIS 475 Top Drive<br />

The HMIS top drive system is the most compact offering in the <strong>TESCO</strong><br />

top drive line. Designed to fit into small masts, the HMIS provides the<br />

performance and pipe handling features required for shallow drilling<br />

and workover applications.<br />

250 HXI 700 Top Drive<br />

The 250 HXI 700 top drive system is designed for use on offshore and<br />

land based drilling rigs. The 250 HXI 700 provides the performance and<br />

pipe handling features required for drilling and workover applications.<br />

Top Drives – Types and Models 250 HMIS 475 250 HXI 700 Top Drive 500/650 HS 750/1100 Top Drive 500/650 HCI 750/1205 Top Drive<br />

Rated Capacity 250ton 250ton 500/650ton 500/650ton<br />

Rated Power 475hp 700hp 750/1100hp 750/1205hp<br />

Hook Weight 8,000lbs. 16,000lbs.<br />

13,300lbs.<br />

(not including optional swivel)<br />

Operating Length (including links & elevators) 173in. 199in. 148in.<br />

19,300lbs./12,300lbs.<br />

(with/without optional swivel)<br />

172in.<br />

(not including optional swivel)<br />

Width 33in. 47.5in. 64in. 47.25n.<br />

Max. Continuous Drill Torque 21,000ft-lb. 24,000ft-lb. 39,400ft-lb. 52,800ft-lb.<br />

Make-up / Breakout Torque 21,000/23,500ft-lbs. 32,000ft-lbs. 39,400/45,042ft-lbs. 52,800/59,400ft-lbs.<br />

Max Speed 170RPM 200RPM 150RPM 210RPM<br />

Quill ID 2.25in. 2.5in. 2.5in 2.5in.<br />

Quill Connection NC40 NC50 *NC61 *NC61<br />

* NC 50 available with reduced capacity<br />

P A G E 8


500/650 HS 750/1100 Top Drive<br />

The 500 or 650 HS, the original portable hydraulic top drive drilling<br />

system is reliable and field proven. The HS top drive is rated for<br />

500 or 650 ton casing loads. The ability to drill with stands speeds<br />

oriented directional drilling and air, gas or underbalanced drilling. Pipe<br />

handling and robotic features decrease connection time and increase<br />

rig floor safety.<br />

500/650 HCI 750/1205 Top Drive<br />

The 500/650 HCI 750 or 1205hp top drive system is compact enough<br />

to fit into most double and triple masts for land based applications or<br />

offshore derricks, the HCI provides the performance and pipe handling<br />

features required for medium and deep drilling applications. The HCI<br />

top drive is available with an optional integrated swivel or can use the<br />

customer’s swivel. Casing load ratings of 500 or 650 tons are available.<br />

Performance (torque and speed) can be customized using optional<br />

gear ratios and power unit selection.<br />

DERRICK<br />

20’<br />

10’ 8’ 6’ 6’<br />

LARGE<br />

TRIPLE<br />

MAST<br />

SMALL<br />

TRIPLE<br />

MAST<br />

WORKOVER<br />

MAST<br />

DOUBLE<br />

MAST<br />

SINGLE<br />

MAST<br />

Approximate Working clearance w/Top Drive Installed<br />

500 / 650 HS/HCI<br />

250 HMIX<br />

250 HMI<br />

P A G E 9


<strong>TESCO</strong>’S Exclusive Features<br />

Torque Track – <strong>TESCO</strong>’s modular concept torque track is completely<br />

portable and can be adapted to fit different sizes and styles of rigs.<br />

Little or no rig modifications are required to install the Top Drive. For<br />

special rig designs or sizes, adapter pieces are available to allow the<br />

<strong>TESCO</strong> Top Drive to fit into almost any rig configuration.<br />

Speed and Torque Ranges – A selection of speed and torque<br />

ranges, gear ratios and other features provide optimization of<br />

available power for a variety of drilling programs<br />

Pipe Handler – <strong>TESCO</strong> Top Drives include pipe handling features<br />

that make the drilling operation safer, quicker and easier.<br />

Hydraulic Power Operated Elevators – All <strong>TESCO</strong> Top Drives are<br />

available with remote hydraulic elevators to fit all drill pipe sizes<br />

from 2-7/8” to 5-1/2”.<br />

Extend – <strong>TESCO</strong>’s extend feature moves the Top Drive out over<br />

the mouse hole allowing connections to be made at eye level,<br />

reducing cross threading and drill pipe damage.<br />

Integrated Swivel – <strong>TESCO</strong> Top Drive designs provide the option<br />

for an integrated swivel and a one-piece quill. The quill is a dry<br />

spline design that can be removed and replaced without draining<br />

oil from the gearbox. This operation can be performed in the shop,<br />

or if necessary, on the rig floor.<br />

Ball Valve – All <strong>TESCO</strong> Top Drives are equipped with a dual<br />

ball valve, located below the quill. The upper valve (hydraulically<br />

actuated by the driller) serves as a mud saver valve. The lower<br />

(manually activated) provides redundancy for well control.<br />

Generator Sets – A selection of diesel powered self-contained<br />

generator systems are available for electric Top Drives.<br />

A certified <strong>TESCO</strong> technician is<br />

adding value to operations in<br />

North America by rigging up<br />

<strong>TESCO</strong>’s Casing Drive System to<br />

the 500 Ton HCI 1205HP Top Drive.<br />

P A G E 1 0


<strong>TESCO</strong> Ultrex Lubricants<br />

<strong>TESCO</strong> distributes a full line of performance lubricants for oilfield applications.<br />

Ultrex Lubricants are supplied with all <strong>TESCO</strong> equipment in gear cases, pump<br />

drives, hydraulic systems, engines, bearings and all friction points. Many<br />

Ultrex Lubricants are 100% synthetic and wont breakdown in extreme<br />

conditions. They meet or exceed all OEM specifications and the <strong>TESCO</strong><br />

standard of excellence. Ultrex provides superior protection from heavy loads,<br />

dirt, dust, water and heat. Its extended drain interval makes it the lubricant of choice for products used in severe<br />

duty applications.<br />

Tesco <strong>Corporation</strong> RIGSMART Wireless Anti-Collision System<br />

<strong>TESCO</strong> exclusive partner for anti-collision system. The RIGSMART wireless Top Drive Anti-Collision system is<br />

designed to eliminate collisions between the Top Drive, crown, floor,<br />

automatic pipe handlers, the racking board, and the derrick structure.<br />

Aftermarket Sales and Service<br />

<strong>TESCO</strong>’s team of dedicated service and repair technicians commissions new<br />

units and re-certifies working units including top drives, power units and other<br />

<strong>TESCO</strong> products. <strong>TESCO</strong> maintenance people are among the most well trained<br />

in the business. Through a series of apprenticeship programs, technical training<br />

and practical field experience, the <strong>TESCO</strong> team is on the job and ready to work.<br />

They have intimate experience with the operation and capabilities of all <strong>TESCO</strong><br />

equipment making them an invaluable member of your project. Field personnel<br />

provide rig-up and installation services as well as on-site training and Top Drive<br />

supervision. Maintenance contracts are also available. Across the street or around the world, <strong>TESCO</strong> service people<br />

are available 24/7/365 to meet the needs of your project.<br />

Service Commitment<br />

Our job doesn’t end after delivery of your <strong>TESCO</strong> Top Drive. At <strong>TESCO</strong> , our commitment to our customers extends<br />

for the life of the product. Our After Sales Service Division has locations in the Americas, Europe, Africa and the<br />

Orient to provide 24-hour support, parts shipment, and advice from specialized technicians.<br />

Delivering solutions that add real value. <strong>TESCO</strong> Top Drives represent the world standard in sales and rentals.<br />

Versatility at its best…<br />

P A G E 1 1


Tesco <strong>Corporation</strong> is an industry leader in the development<br />

and commercialization of drilling technology and services. The<br />

<strong>Corporation</strong>’s mission is to change the way wells are drilled.<br />

By reducing drilling risk and increasing operational efficiency,<br />

<strong>TESCO</strong> generates real value for its customers. <strong>TESCO</strong>’s powerful<br />

combination of engineering and service excellence is provided by<br />

experienced and dedicated field personnel. Coupled with a passion<br />

for innovation, <strong>TESCO</strong> offers a comprehensive toolbox of proven<br />

technologies and delivers superior solutions at the wellbore. With a<br />

vision spanning the crown to the bit, from the desert to deepwater,<br />

around the world <strong>TESCO</strong> is THE DRILLING INNOVATION COMPANY TM .<br />

Corporate Headquarters<br />

3993 W. Sam Houston Parkway N.<br />

Suite 100<br />

Houston, Texas 77043 USA<br />

Tel: 713-359-7000<br />

Fax: 713-359-7001<br />

Email: marketing@tescocorp.com<br />

www.tescocorp.com<br />

© 2011 Tesco <strong>Corporation</strong>. All rights reserved.<br />

<strong>TESCO</strong>® is a registered trademark in the United States and<br />

Canada. <strong>TESCO</strong> CASING DRILLING® is a registered mark in the<br />

United States. CASING DRILLING® is a registered mark in Canada<br />

and CASING DRILLING is a trademark in the United States.<br />

Casing Drive System, CDS, Multiple Control Line Running<br />

System and MCLRS are trademarks in the United States<br />

and Canada.<br />

20000e_RevD

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!