17.11.2014 Views

KINGDOM OF CAMBODIA - CCOP

KINGDOM OF CAMBODIA - CCOP

KINGDOM OF CAMBODIA - CCOP

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>KINGDOM</strong> <strong>OF</strong> <strong>CAMBODIA</strong><br />

3 rd Workshop on the PPM-Case Study (Resource Assessment and<br />

Development Options) , March 29 to April 03, 2004, Angkor<br />

Hotel, Siem Reap, Cambodia<br />

Presented by Mr. Men Den<br />

Director<br />

Petroleum Exploration and Production Division of CNPA


TABLE <strong>OF</strong> CONTENT<br />

1. Introduction<br />

1. Type of Power in Cambodia<br />

2. Cambodia Power Development<br />

3. Energy Demanded in Cambodia<br />

4. National Gridline network<br />

5. Power Demanded of Cambodia in 2016<br />

6. Hydrocarbon and Hydro Power Sources in Cambodia<br />

7. Electricity Supply and Prices in Cambodia<br />

8. Fiscal Regime of Petroleum Resource in Cambodia<br />

9. Recommendation<br />

10.Conclusion


. Synergy sources<br />

INTRODUCTION<br />

. Potential and effective sources<br />

. National network gridline<br />

. Energy demand in Cambodia<br />

. Power development program<br />

. Fiscal system for petroleum exploration<br />

& production<br />

. CCGT in year 2010


POWER TYPE IN <strong>CAMBODIA</strong><br />

. Thermal (DO,FO) : 76 MW (PP)<br />

. Solar : testing<br />

. Coal : not<br />

. Hydro : 13 MW<br />

. Wind : not<br />

. Nuclear : not<br />

. Geothermal : not


Cambodia Power Development Program<br />

1999 to 2016<br />

Generation (Thermal/Hydro/CCGT/ Trade Options)<br />

Year<br />

1999-03<br />

Description<br />

IPP 2/Kir/Thai<br />

Capacity<br />

(MW)<br />

89<br />

Type<br />

Hydro/DO/FO<br />

Location<br />

PP/Kir<br />

Costs<br />

$MM<br />

109.4<br />

Energy<br />

(GWh)<br />

871<br />

2004-05<br />

IPP3,4. SC-SV/VN<br />

180<br />

CCGT/Trade<br />

SV/VN<br />

152.6<br />

1181<br />

2006-08<br />

Kamchay (KP)<br />

127<br />

Hydro/Trade<br />

K.Chay<br />

250<br />

1517<br />

2011<br />

Battambang 1,2<br />

60<br />

Hydro/Trade<br />

B.Bang<br />

122.9<br />

2073<br />

2012-14<br />

Atay/IPP-5 SV<br />

200<br />

Hy/CCGT/Tra<br />

At/SV/V<br />

249.6<br />

2646<br />

2015-16<br />

Russey Chrum. KK<br />

125<br />

hydro<br />

Mid .RC<br />

315.9<br />

3073<br />

Power Demanded in 2016 = 781 MW (without T/V Trade)<br />

Source: MIME


Energy Demanded in Cambodia<br />

GWH<br />

3500<br />

3000<br />

2500<br />

2000<br />

1500<br />

1000<br />

500<br />

0<br />

2003 2005 2008 2011 2014 2016<br />

Year


POWER DEMANED <strong>OF</strong> <strong>CAMBODIA</strong> IN 2016<br />

(Without Hotel, Restaurant and Factories)<br />

(Using for residental only)<br />

267 MW<br />

310 MW<br />

270 MW<br />

. Phnom Penh : 310 MW . Sihanoukville: 270 MW<br />

. West Province : 269 MW<br />

TOTAL: 849 MW


National Gridline Network in Cambodia


HYDROCARBON AND HYDRO POWER SOURCES IN <strong>CAMBODIA</strong><br />

I. Offshore Area : Undisputed & Disputed<br />

1. Undisputed Area : 2.7 Tcf (Recoverable Gas Reserves)<br />

2. Disputed Area : 12 Tcf<br />

II. Onshore Area<br />

: Under study (Gravity & Magnetic)<br />

III. Hydro-electricity (Total: 5,031MW)<br />

= (Costs: 7,145MM)<br />

1. Kirirom III &IV : 36 MW :85 MM<br />

2. Kamchay : 127 MW :25 MM<br />

3. Battambang I&II : 50 MW :114MM<br />

4. Stung Russey Chrum (UML) : 282 MW :470MM<br />

5. Stung Atay : 80 MW :215MM<br />

6. Stung Chhay Areng : 260 MW :502MM<br />

7. Sambor :3,767 MW :4,640MM<br />

8. Lower Sre Pok II : 222 MW :339MM<br />

9. Lower Sesan II : 207 MW :374MM


ELECTRICITY SUPPLY & PRICE<br />

I. CITY: Phnom Penh, Sihanoukville, Siem Reap & Battambang<br />

. Supply price : 0.07 to 0.12 US$/Kwh<br />

. End user : 0.13 – 0.17 US$/Kwh<br />

II. Other Provinces<br />

. End user : 0.16 – 0.25 US$/Kwh<br />

III. District & Rural<br />

. high price than provincal Center and cities


Fiscal Systems of the Petroleum in Cambodia<br />

Area<br />

Duration: Exploration, Development<br />

and Production<br />

Relinquishment<br />

Exploration Obligations<br />

Royalty<br />

Signature bonus<br />

Production bonus<br />

Cost Recovery<br />

Depreciation<br />

Profit Oil split<br />

Profit Gas split<br />

Taxation (income tax<br />

Ringfencing<br />

Domestic Market Obligation<br />

State Participation<br />

No restriction, designate blocks<br />

3 yrs+2 yrs ext., 2yrs+2 yrs extension<br />

25+yrs<br />

No interim relinquishment<br />

Seismic and mult-iwell commitments<br />

12.5%<br />

Negotiable (Older contracts had bonuses)<br />

Negotiable (Older contracts had bonuses)<br />

70% to 80% for Oil, Gas 80% to 90%<br />

5 yrs straight line<br />

25 to 50% on the profit extorted<br />

Each license rinfenced<br />

Negotiable<br />

Negotiable


1. Power Market<br />

RECOMENDATION<br />

. State own company of electricity should be analysis on<br />

the price elasticity of demands: Elastic, Inelastic and<br />

unitary elastic, that means low price but more demand.<br />

. Network gridline, Trade power, Developing own synergy<br />

sources as hydrocarbon, hydro-electricity & coal power.<br />

. Administration Management & Quality of HRM<br />

2. Market Segment<br />

. Integration market or Package Business<br />

.3. Strategy and Policy<br />

. Government’s strategy and policy on the energy sector


CONCLUSION<br />

. Electricity in Cambodia is high price<br />

. Electricity in Cambodia using for residential only<br />

. Hotel, Factories, Apartment, Restaurant, Central<br />

Market, Private School, Airport, and Ports their still<br />

use own generator.<br />

. At the end user, electricity price around 0.08 –0.11<br />

US$/kwh, 65 -70% increasing.<br />

. Network of national gridline (Cambodia,Thailand &Vietnam).


Thank you very<br />

much<br />

for your<br />

attention

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!