19.11.2014 Views

Name: Professor Dr. Aminuddin Ab. Ghani Date & Place of Birth: 4 ...

Name: Professor Dr. Aminuddin Ab. Ghani Date & Place of Birth: 4 ...

Name: Professor Dr. Aminuddin Ab. Ghani Date & Place of Birth: 4 ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Research Grants (Cont.)<br />

No. Project Title Sponsor Amount Duration<br />

(RM)<br />

14.<br />

Feasibility Study and Detailed Design <strong>of</strong> Flood<br />

Mitigation and <strong>Dr</strong>ainage Improvement in Perai<br />

Industrial Complex<br />

MPSP 149,128.75 1/08/04-<br />

1/05/04<br />

15.<br />

Feasibility Study on Flood Mitigation and <strong>Dr</strong>ainage for<br />

Kampung Tersusun, Juru.<br />

MPSP 86,030.50 1/08/04-<br />

1/01/04<br />

16.<br />

Ecological <strong>Dr</strong>ainage System for Forensic Ward at<br />

Bahagia Hospital, Ulu Kinta, Ipoh.<br />

Public Work<br />

Department<br />

30, 000.00 1/06/02 –<br />

1/09/03<br />

17.<br />

18.<br />

19.<br />

20.<br />

21.<br />

22.<br />

23.<br />

24.<br />

Rehabilitation <strong>of</strong> Existing Wetlands and Mining Ponds<br />

as an Ecological Park at DID’s Mechanical Section,<br />

Ipoh<br />

Ecological <strong>Dr</strong>ainage System for Taiping Town Clinic,<br />

Perak<br />

Accredit Checker for Urban <strong>Dr</strong>ainage System Design,<br />

Kolej Sains Kesihatan Bersekutu, Johor Bahru<br />

<strong>Dr</strong>ainage Master Plan for Tanjung Malim<br />

Design Options <strong>of</strong> the Flood Mitigation Plan <strong>of</strong> River<br />

Muda, Kedah<br />

Consultancy Services to Evaluate the Proposed Flood<br />

Preventive Works to be Taken Subsequent to the<br />

December 2006 – January 2007 Floods<br />

Stormwater Management and <strong>Dr</strong>ainage Master plan<br />

Study for the Town <strong>of</strong> Tanah Merah, Kelantan<br />

DID Malaysia<br />

Public Work<br />

Department<br />

Public Work<br />

Department<br />

Majlis Daerah<br />

Tanjung Malim<br />

DID Malaysia<br />

Economic<br />

Planning Unit,<br />

Prime Minister’s<br />

Department<br />

DID Malaysia<br />

209,000.00 14/03/05-<br />

14/07/05<br />

168,000.00 2005<br />

220, 000.00 2005<br />

430,548.70 2006<br />

200,000.00 2006<br />

205,717.47 2006<br />

1, 000,000.00 2007<br />

Study on River Sand Mining Capacity in Malaysia DID Malaysia 947, 000.00 2007<br />

25.<br />

Preparation <strong>of</strong> Design Guides for Erosion and<br />

Sediment Control in Malaysia<br />

DID Malaysia 1, 000,000.00 2008<br />

26.<br />

River Inventory and Monitoring Program (RIMP)<br />

Sarawak Rivers<br />

Board (SRB)<br />

300, 000.00 2008<br />

27.<br />

Digital Flood Mapping: Case Study <strong>of</strong> 2007 Sungai<br />

Pahang Flood<br />

USM 92, 000.00 2009<br />

28.<br />

Design <strong>of</strong> Sustainable Urban <strong>Dr</strong>ainage System for<br />

Universiti Malaysia Kelantan (UMK), Bachok.<br />

Public Work<br />

Department<br />

50 000.00 2009<br />

4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!