<strong>Facilities</strong> <strong>Master</strong> <strong>Plan</strong> <strong>Update</strong><br />

<strong>June</strong> <strong>2010</strong>


<strong>Facilities</strong> <strong>Master</strong> <strong>Plan</strong> <strong>Update</strong><br />

Table of Contents<br />

Introduction ................................................................................................................ 1<br />

<strong>College</strong> <strong>Master</strong> <strong>Plan</strong> Objectives ....................................................................................... 1<br />

Fulfilling the 2004 <strong>Master</strong> <strong>Plan</strong>......................................................................................... 1<br />

Existing 2009 Campus <strong>Plan</strong> ........................................................................................ 2<br />

Future Campus Housing ........................................................................................... 3<br />

Housing Option A ........................................................................................................... 4<br />

Housing Option B ........................................................................................................... 5<br />

Housing Option C .......................................................................................................... 5<br />

Housing Option D .......................................................................................................... 6<br />

Housing Option E ........................................................................................................... 7<br />

Housing Option F ........................................................................................................... 8<br />

Housing Option G .......................................................................................................... 9<br />

Housing Option H .......................................................................................................... 9<br />

<strong>Castleton</strong> Hall Renovations .................................................................................... 10<br />

Huden Hall ............................................................................................................... 11<br />

Huden Dining Room Upgrades ...................................................................................... 11<br />

Schematic Huden Dining Hall <strong>Plan</strong><br />

The Huden Patio ........................................................................................................... 13<br />

Huden Loading Dock .................................................................................................... 14<br />

Huden Dining Hall Expansion ........................................................................................ 15<br />

Overall Campus Development <strong>Plan</strong> ...................................................................... 16<br />

Haskell-Adams Site Development ................................................................................... 16<br />

Physical <strong>Plan</strong>t Relocation ............................................................................................... 17<br />

Ellis Hall ....................................................................................................................... 18<br />

Spartan Plaza ............................................................................................................... 19<br />

Campus Circulation ...................................................................................................... 19<br />

The Campus Green ...................................................................................................... 20<br />

Greening the Campus Right-of-Way ............................................................................... 21<br />

The Seminary Street Entrance ........................................................................................ 22<br />

Campus Sculpture ......................................................................................................... 23<br />

Cost Spreadsheet .......................................................................................................... 24<br />

Implementation ............................................................................................................. 24<br />

Options Matrix<br />

Implementation <strong>Plan</strong><br />

<strong>Castleton</strong> <strong>State</strong> <strong>College</strong><br />

JMZ Architects and <strong>Plan</strong>ners, P.C.<br />

i


<strong>Facilities</strong> <strong>Master</strong> <strong>Plan</strong> <strong>Update</strong><br />

Appendices<br />

Appendices provide more detail about the information that was developed for the<br />

<strong>Facilities</strong> <strong>Master</strong> <strong>Plan</strong>.<br />

Appendix A<br />

<strong>Castleton</strong> <strong>State</strong> <strong>College</strong> Housing Analysis <strong>Update</strong> Addendum,<br />

February 2009<br />

Rickes Associates, Inc.<br />

Appendix B Short-term Housing Analysis, April 2009<br />

JMZ Architects and <strong>Plan</strong>ners, P.C.<br />

Appendix C<br />

Letters regarding the historic status and nature of Hope House and<br />

White House; Preservation Services, April 10, 2009<br />

ii<br />

<strong>Castleton</strong> <strong>State</strong> <strong>College</strong><br />

JMZ Architects and <strong>Plan</strong>ners, P.C.


<strong>Facilities</strong> <strong>Master</strong> <strong>Plan</strong> <strong>Update</strong><br />

Introduction<br />

Introduction<br />

Founded in 1787, <strong>Castleton</strong> <strong>State</strong> <strong>College</strong><br />

began its history as the Rutland County<br />

Grammar School. Over the years the institution<br />

has gone through several identities,<br />

including a seminary, the first medical college<br />

in Vermont, and a Normal School. In 1947<br />

the Normal School became the <strong>Castleton</strong><br />

Teacher’s <strong>College</strong>, and in 1962 became a<br />

member of the Vermont <strong>State</strong> <strong>College</strong>s.<br />

<strong>Castleton</strong> <strong>State</strong> <strong>College</strong>’s more recent history<br />

has been marked by tremendous growth.<br />

There are currently over 2,000 students and a 178-acre campus with more than<br />

25 buildings. These facilities reflect <strong>Castleton</strong>’s continued success and optimism<br />

for the future.<br />

<strong>College</strong> <strong>Master</strong> <strong>Plan</strong> Objectives<br />

In 2004 JMZ Architects completed a comprehensive <strong>Facilities</strong> <strong>Master</strong> <strong>Plan</strong> for<br />

<strong>Castleton</strong> <strong>State</strong> <strong>College</strong>. The objective of this update is to provide a focused look<br />

at the following areas:<br />

1. Evaluate the <strong>College</strong>’s current campus facilities and privately owned offcampus<br />

facilities for short-term housing opportunities.<br />

2. Provide concept alternatives for future residence hall(s) and dining facility<br />

upgrades.<br />

3. <strong>Update</strong> the existing campus site plan to incorporate recent changes.<br />

4. Provide a plan for improved pedestrian circulation.<br />

Woodruff Hall circa 1930<br />

Fulfilling the 2004 <strong>Master</strong> <strong>Plan</strong><br />

The 2004 <strong>Facilities</strong> <strong>Master</strong> <strong>Plan</strong> provided not only an evaluation of existing<br />

campus resources and needs, but a road map for the future based on the<br />

<strong>College</strong>’s projected growth. Many of the ambitious projects described in the 2004<br />

<strong>Master</strong> <strong>Plan</strong> have come to fruition including the Campus Center, the Spartan<br />

Athletic Complex, an addition to Leavenworth Hall, and the new athletic fields and<br />

Spartan Stadium. With the construction of <strong>Castleton</strong> Hall and North, Audet, and<br />

South Halls, the <strong>College</strong> has successfully brought approximately 246 beds on line<br />

since 2004. This growth has been in tandem with increased enrollment. Thus, the<br />

need for campus housing is still a priority, especially as the <strong>College</strong> attempts to<br />

recruit more out-of-state students.<br />

<strong>Castleton</strong> <strong>State</strong> <strong>College</strong><br />

JMZ Architects and <strong>Plan</strong>ners, P.C.<br />

1


Introduction<br />

<strong>Facilities</strong> <strong>Master</strong> <strong>Plan</strong> <strong>Update</strong><br />

Existing 2009 Campus <strong>Plan</strong><br />

2<br />

<strong>Castleton</strong> <strong>State</strong> <strong>College</strong><br />

JMZ Architects and <strong>Plan</strong>ners, P.C.


<strong>Facilities</strong> <strong>Master</strong> <strong>Plan</strong> <strong>Update</strong><br />

Future Campus Housing<br />

Future Campus Housing<br />

In February 2009 Rickes Associates updated their December 2008 housing study<br />

to incorporate the most recent admissions and housing data. They predicted that<br />

the <strong>College</strong> would need an additional 200 beds by the fall of <strong>2010</strong>. Because of<br />

funding constraints, the <strong>College</strong> asked JMZ to evaluate renovating several existing<br />

buildings to partially address the expected shortfall in available beds. The results<br />

of those investigations are included in Appendix B. In the long term, the highest<br />

priority for the <strong>College</strong> is the construction of another residence hall.<br />

The following housing scenarios illustrate several different plan options that would<br />

strengthen the campus spine and develop a vital housing zone north of <strong>College</strong><br />

Drive. The housing model used in all of the options is a modified four-person<br />

suite, with two doubles that share a common entry area and a full bath. The units<br />

would be arranged on a double-loaded corridor, with varying circulation and<br />

lounge space arrangements.<br />

After reviewing the merits of the<br />

designs, option A was identified as<br />

the preferred option. Notably, this<br />

design includes a pavilion ajacent<br />

to Spartan Stadium.<br />

The next three options (B, C, & D)<br />

show how housing could be<br />

constructed with little or no disruption<br />

of the current tennis<br />

courts. Options B and C would<br />

create gateways between the<br />

Stadium and the rest of campus<br />

where the pedestrian way passes<br />

through the buildings. Options E<br />

and F would take advantage of the existing steep slope and have been designed<br />

as either three full stories or three-and-a-half, with a partial fourth level opening at<br />

grade on the west side. This would require a variance from the local zoning code<br />

that limits building heights to three stories.<br />

View of Ellis Hall and Tennis Courts from Athletic Fields<br />

Options F and G would incorporate the existing Physical <strong>Plan</strong>t building, while<br />

option H would be an addition to Ellis Hall.<br />

Housing options E through H were presented to the college on August 11, 2009.<br />

Following the presentation, an updated schematic design for option E was<br />

developed and presented to the college on October 20, 2009. Options B through<br />

D were presented to the <strong>College</strong> on February 8, <strong>2010</strong>.<br />

<strong>Castleton</strong> <strong>State</strong> <strong>College</strong><br />

JMZ Architects and <strong>Plan</strong>ners, P.C.<br />

3


Future Campus Housing<br />

<strong>Facilities</strong> <strong>Master</strong> <strong>Plan</strong> <strong>Update</strong><br />

Housing Option A shows the<br />

development of a new residence hall<br />

along the north-south pedestrian<br />

spine leading to Spartan Stadium.<br />

This option would be built as a<br />

single phase and would require<br />

relocation of the tennis courts and<br />

demolition of the existing Physical<br />

<strong>Plan</strong>t. The Physical <strong>Plan</strong>t facility and<br />

yard, as well as the tennis courts,<br />

would be moved to the east side of<br />

South Street (see Implementation<br />

<strong>Plan</strong> <strong>2010</strong>-2015). The space thus<br />

created to the south of the new<br />

residence hall would enable the<br />

<strong>College</strong> to construct a large openair<br />

pavilion. The permanently<br />

covered, 17,000 square foot<br />

pavilion would provide a multipurpose<br />

venue that could be used<br />

for graduation, as a gathering space<br />

for vendors during football games,<br />

and for a variety of student and<br />

community activities.<br />

4<br />

<strong>Castleton</strong> <strong>State</strong> <strong>College</strong><br />

JMZ Architects and <strong>Plan</strong>ners, P.C.


<strong>Facilities</strong> <strong>Master</strong> <strong>Plan</strong> <strong>Update</strong><br />

Future Campus Housing<br />

Housing Option B shows the<br />

development of campus housing<br />

along the north-south pedestrian<br />

spine on the site of the existing<br />

Physical <strong>Plan</strong>t.<br />

While once on the periphery of<br />

campus, the Physical <strong>Plan</strong>t now<br />

occupies a key location between<br />

Spartan Stadium and the rest of the<br />

campus. This option would relocate<br />

all of the Physical <strong>Plan</strong>t services to<br />

the east side of South Street. The<br />

connection between the two housing<br />

wings would serve as a gateway to<br />

the Stadium.<br />

Housing Option C shows the<br />

development of campus housing<br />

along the north-south pedestrian<br />

spine as an extension of Ellis Hall’s<br />

south wing. The U-shaped plan<br />

would create a campus green space<br />

that would engage Ellis and the new<br />

housing with Wheeler and Morrill to<br />

the north.<br />

Again, the pedestrian spine would<br />

pass through a “gateway” connection<br />

between the wings of the<br />

addition. The Physical <strong>Plan</strong>t would<br />

be removed to create an open<br />

approach to the stadium. Two tennis<br />

courts would be relocated to the<br />

current Physical <strong>Plan</strong>t site to make<br />

way for the new housing.<br />

<strong>Castleton</strong> <strong>State</strong> <strong>College</strong><br />

JMZ Architects and <strong>Plan</strong>ners, P.C.<br />

5


Future Campus Housing<br />

<strong>Facilities</strong> <strong>Master</strong> <strong>Plan</strong> <strong>Update</strong><br />

Housing Option D also shows the<br />

development of campus housing along<br />

the pedestrian spine. However, unlike<br />

option B, the building would lie entirely<br />

on the west side of the walkway, across<br />

from Ellis Hall. The L-shaped plan<br />

would create a campus green space<br />

that would connect the new building to<br />

the existing residence halls nearby.<br />

Similar to option B, two tennis courts<br />

would be relocated to the south,<br />

replacing the Physical <strong>Plan</strong>t and<br />

opening the approach to the Stadium.<br />

Housing Option E shows the<br />

phased development of campus housing<br />

along the stadium path, originating<br />

at a new outdoor gathering space (see<br />

Spartan Plaza below). A new location<br />

for the tennis courts would be<br />

necessary.<br />

Phase 1:<br />

84 beds at three-and-one-half stories<br />

Phase 2:<br />

112 beds at three-and-one-half stories<br />

Total: 196 beds including Phase 1<br />

Phase 3:<br />

72 beds at three stories<br />

Total: 268 beds including Phases 1 & 2<br />

6<br />

<strong>Castleton</strong> <strong>State</strong> <strong>College</strong><br />

JMZ Architects and <strong>Plan</strong>ners, P.C.


<strong>Facilities</strong> <strong>Master</strong> <strong>Plan</strong> <strong>Update</strong><br />

Future Campus Housing<br />

Schematic Housing Design – Option E<br />

The rendering below shows the full build-out of housing option E.<br />

Phase 1:<br />

268 beds at three and one-half stories<br />

<strong>Castleton</strong> <strong>State</strong> <strong>College</strong><br />

JMZ Architects and <strong>Plan</strong>ners, P.C.<br />

7


Future Campus Housing<br />

<strong>Facilities</strong> <strong>Master</strong> <strong>Plan</strong> <strong>Update</strong><br />

Housing Option F incorporates<br />

the existing Physical <strong>Plan</strong>t building.<br />

The existing 12,000 square foot<br />

building straddles two zones:<br />

residential and athletic. In Option B,<br />

three-quarters of the existing Physical<br />

<strong>Plan</strong>t would be converted to athletic<br />

support space and the remaining<br />

would become lounge and support<br />

space for the new residence hall.<br />

Plazas on either side of the building<br />

and a public corridor would create a<br />

gateway that would bring the<br />

pedestrian spine through the building<br />

instead of around it.<br />

Phase 1:<br />

96 beds at three stories<br />

Phase 2:<br />

72 beds at three stories<br />

Total: 168 beds including Phase 1<br />

Phase 3:<br />

84 beds with 16 additional beds at a lower level<br />

Total: 252 beds with Phases 1 & 2<br />

8<br />

<strong>Castleton</strong> <strong>State</strong> <strong>College</strong><br />

JMZ Architects and <strong>Plan</strong>ners, P.C.


<strong>Facilities</strong> <strong>Master</strong> <strong>Plan</strong> <strong>Update</strong><br />

Future Campus Housing<br />

Housing Option G also uses the<br />

concept of dividing the existing<br />

Physical <strong>Plan</strong>t building between<br />

housing and athletics. A portion of<br />

the existing parking lot would be used<br />

for one wing of the new residence hall<br />

and a courtyard and campus gateway<br />

would bisect the building. Athletic<br />

space would occupy the west side of<br />

this axis, toward the Stadium. Two of<br />

the existing tennis courts would be<br />

removed.<br />

Phase 1:<br />

192 beds at three stories<br />

Housing Option H calls for both<br />

the renovation of Ellis Hall and the<br />

addition of a new wing of approximately<br />

130 beds with a new vertical<br />

circulation core.<br />

As with housing options B and C, this<br />

plan shows the pedestrian spine going<br />

through the building. On many<br />

campuses there is a legacy of campus<br />

quads and zones bounded by<br />

gateways that are often part of the<br />

surrounding buildings. These gateways<br />

can be interior or exterior, and<br />

help to define adjacent campus zones.<br />

The required security would occur<br />

within a public corridor instead of at<br />

the exterior doors.<br />

<strong>Castleton</strong> <strong>State</strong> <strong>College</strong><br />

JMZ Architects and <strong>Plan</strong>ners, P.C.<br />

9


Future Campus Housing<br />

<strong>Facilities</strong> <strong>Master</strong> <strong>Plan</strong> <strong>Update</strong><br />

<strong>Castleton</strong> Hall Renovations<br />

<strong>Castleton</strong> Hall, which opened in January of 2005, provides students with suite-style<br />

living that includes a common area and a small kitchenette. In February of <strong>2010</strong><br />

JMZ conducted a study to renovate these suites. The aim was to provide students<br />

with an apartment option on campus with minimal construction and disruption.<br />

Each renovation added a partition wall, increased the counter space, and included<br />

a cooking range. The kitchens were designed to be ADA-compliant. JMZ<br />

estimated the total cost of the work at approximately $77,000. These renovations<br />

would allow the college to charge a higher rate for these rooms and alleviate<br />

some of the pressure on Huden Dining Hall. The sketches below depict the<br />

renovations in both types of existing suites.<br />

Kitchen Renovation – Typical Unit<br />

Kitchen Renovation – Corner Unit<br />

10<br />

<strong>Castleton</strong> <strong>State</strong> <strong>College</strong><br />

JMZ Architects and <strong>Plan</strong>ners, P.C.


<strong>Facilities</strong> <strong>Master</strong> <strong>Plan</strong> <strong>Update</strong><br />

Huden Hall<br />

Huden Hall<br />

Huden Hall has served as the<br />

<strong>College</strong>’s primary dining facility since<br />

its construction in 1965. The Fireside<br />

Café in the newly expanded Campus<br />

Center provides another dining venue<br />

for students, and the Coffee Cottage<br />

in Moriarty serves light fare on the<br />

east side of campus. Food for both of<br />

these facilities is prepared in Huden’s<br />

kitchen.<br />

Through the years the campus food<br />

service industry has evolved from the<br />

Huden Dining Hall<br />

traditional cafeteria line to “RFOC”<br />

style dining (Real Food On Campus), which resembles a mall food court. Two<br />

important components that make this system successful are a single point of entry<br />

and a layout that enables students to see all of their choices shortly after passing<br />

through the checkpoint. As is the case with many college dining facilities, the<br />

layout of Huden must be modified to support this type of food service.<br />

<strong>Castleton</strong> currently still serves most hot entrees from the food service room but has<br />

also set up serving stations around the main dining room. However, the RFOC<br />

service style, as well as the efficiency of seating space, could be improved. JMZ<br />

met with the Dean of Students, Dennis Proulx, and Michael Williams of Aramark<br />

Food Services Inc. to discuss short-term and long-term strategies to upgrade<br />

Huden.<br />

Huden Dining Room Upgrades<br />

The current seating capacity for Huden is 385, including the Alumni and Spartan<br />

dining rooms, which seat 60 and 80 respectively. The Spartan Dining Room has<br />

recently been renovated. It has pubstyle<br />

furniture, two televisions, and is<br />

very popular for groups of three or<br />

four. The Alumni room is often reserved<br />

for campus groups at meal times, which<br />

takes 60 seats off line, regardless of the<br />

group size.<br />

The existing seating in Huden’s two<br />

main dining areas is a combination of<br />

long tables that seat eight, round fourtops,<br />

and stool-height four-tops against<br />

the walls. During a typical busy lunch<br />

hour JMZ observed students sitting in<br />

large groups of six or more, small<br />

groups of three or four, or alone.<br />

Main Dining Room, Huden Dining Hall<br />

<strong>Castleton</strong> <strong>State</strong> <strong>College</strong><br />

JMZ Architects and <strong>Plan</strong>ners, P.C.<br />

11


Huden Hall<br />

<strong>Facilities</strong> <strong>Master</strong> <strong>Plan</strong> <strong>Update</strong><br />

Where students sat alone or in a small group at a large table, the rest of the table<br />

tended to remain unoccupied. A variety of carefully laid out seating options in the<br />

main dining areas could greatly increase<br />

seating efficiency. This could include<br />

booths, tables and banquettes, counter<br />

seating, and tables for medium and large<br />

groups.<br />

New finishes and an improved visual<br />

connection from the entrances across the<br />

dining area would make Huden more<br />

inviting and showcase the RFOC serving<br />

stations.<br />

The following short-term recommendations<br />

would improve the atmosphere and<br />

efficiency of Huden:<br />

Existing seating and partition wall, Huden Dining Hall<br />

1. Provide a single entrance on the east façade of Huden. Coordinate with site<br />

work associated with the Campus Green (see below). Existing entrances would<br />

become exits only.<br />

2. Remove the partition walls between the exiting entrance corridor and the main<br />

dining area. Provide a variety of flexible seating options, including banquettes,<br />

booths, and counters.<br />

3. Remove the lenses on the existing light fixtures and provide curved acrylic<br />

panels or perforated metal for a more updated look. The ballasts were<br />

upgraded approximately four years ago and can remain in place. Consider<br />

additional accent lighting such as wall sconces.<br />

4. Provide sound baffles at the ceiling and high on the walls to moderate the<br />

noise levels.<br />

5. Repaint the dining areas. Consider using strong colors on accent walls to<br />

enliven the space.<br />

6. Conduct a complete evaluation of the building mechanical system, with an<br />

emphasis on air circulation in the main dining room.<br />

7. Evaluate and upgrade the existing kitchen. This should be done in conjunction<br />

with a kitchen consultant and the food service provider.<br />

12<br />

<strong>Castleton</strong> <strong>State</strong> <strong>College</strong><br />

JMZ Architects and <strong>Plan</strong>ners, P.C.


Huden Dining Hall:<br />

· Existing: 385 seats<br />

· Proposed Renovation:<br />

453 seats, not including patio<br />

· Increase of 18%<br />

EXISTING SITE PLAN<br />

Scale - 1” = 16’<br />

Schematic Huden Dining Hall <strong>Plan</strong>


<strong>Facilities</strong> <strong>Master</strong> <strong>Plan</strong> <strong>Update</strong><br />

Huden Hall<br />

Existing Huden Dining Hall<br />

The Huden Patio<br />

Huden Hall has no “front door.” While<br />

the proposed internal configuration of<br />

Huden would still function with the two<br />

existing side entrances, the atrium<br />

dining area facing the campus green<br />

space has untapped potential. It would<br />

be possible to add a new entrance<br />

vestibule through the glass wall on the<br />

east side of Huden and provide an<br />

attractive exterior patio. The patio<br />

would provide an alternative eating<br />

area in warm weather and an outdoor<br />

event venue that would further engage<br />

the green space. A single entrance<br />

would create one point of control for<br />

the dining hall and would reduce<br />

staffing costs.<br />

Proposed patio seating, entrance, and walkway<br />

<strong>Castleton</strong> <strong>State</strong> <strong>College</strong><br />

JMZ Architects and <strong>Plan</strong>ners, P.C.<br />

13


Huden Hall<br />

<strong>Facilities</strong> <strong>Master</strong> <strong>Plan</strong> <strong>Update</strong><br />

Huden Loading Dock<br />

Loading docks are a necessary part of any<br />

food service building and are typically<br />

relegated to the rear. In the case of Huden,<br />

the campus has developed around it and the<br />

main entrance of the new Spartan Athletic<br />

Complex now faces the Huden loading dock.<br />

The drawing below illustrates improvements<br />

to the loading dock area that would screen<br />

the back of Huden and improve the<br />

efficiency of the loading dock.<br />

Existing Huden Loading Dock<br />

Proposed Huden Loading Dock<br />

14<br />

<strong>Castleton</strong> <strong>State</strong> <strong>College</strong><br />

JMZ Architects and <strong>Plan</strong>ners, P.C.


<strong>Facilities</strong> <strong>Master</strong> <strong>Plan</strong> <strong>Update</strong><br />

Huden Hall<br />

Huden Dining Hall Expansion<br />

Huden Hall will remain in its current location for the foreseeable future. As the<br />

campus grows and the housing capacity on campus increases, Huden’s role will<br />

become even more vital. Short-term interior improvements will alleviate the<br />

current pressures in Huden during the busiest times of the day; however the<br />

pressure of the campus’ primary dining hall will grow with additional housing.<br />

An overall expansion to Huden should take advantage of a site that is central to<br />

housing and student life. Besides expanding the current footprint to accommodate<br />

more students, the façade of the building should become more transparent and<br />

welcoming, emphasizing its role as an important social place on campus.<br />

There is enough land around Huden to build an addition to both north and south.<br />

A new energy-efficient skin can be designed to bring light into the dining areas<br />

while placing the main entrance the campus green. The core of the building can<br />

be maintained and updated to work with the expanded footprint.<br />

<strong>Castleton</strong> <strong>State</strong> <strong>College</strong><br />

JMZ Architects and <strong>Plan</strong>ners, P.C.<br />

15


Overall Campus Development <strong>Plan</strong><br />

<strong>Facilities</strong> <strong>Master</strong> <strong>Plan</strong> <strong>Update</strong><br />

Overall Campus Development <strong>Plan</strong><br />

Haskell-Adams Site Development<br />

The paved area between Haskell and Adams is a<br />

centrally located crossroads between Huden, Haskell,<br />

Adams, Babcock, with paths leading to <strong>Castleton</strong> Hall,<br />

the Spartan Athletic Complex, and the Campus Center.<br />

The space could be developed as a small plaza with a<br />

circular planting bed and paving, similar to the<br />

Senators’ Court on the east side of campus. The plaza<br />

could still accommodate cars on moving days without<br />

looking like a parking area during the rest of the year.<br />

New site lighting would further enhance the adjoining<br />

paths and maintain security.<br />

Concept Site <strong>Plan</strong><br />

16<br />

<strong>Castleton</strong> <strong>State</strong> <strong>College</strong><br />

JMZ Architects and <strong>Plan</strong>ners, P.C.


<strong>Facilities</strong> <strong>Master</strong> <strong>Plan</strong> <strong>Update</strong><br />

Overall Campus Development <strong>Plan</strong><br />

Physical <strong>Plan</strong>t Relocation<br />

With the completion of Spartan<br />

Stadium the location of the Physical<br />

<strong>Plan</strong>t and its yard, once at the edge of<br />

campus, has come to occupy a key<br />

location along a major pedestrian<br />

corridor. Relocating the Physical <strong>Plan</strong>t<br />

away from the existing developed area<br />

would allow the <strong>College</strong> to make<br />

better use of this valuable site.<br />

The property to the northeast of the<br />

South Street parking lot would be an<br />

appropriate new location for the<br />

Physical <strong>Plan</strong>t for three reasons:<br />

It would move the truck deliveries<br />

and site maintenance functions<br />

away from the pedestrian and<br />

athletic zones.<br />

It would provide easy access to<br />

South Street.<br />

It would create a presence near the<br />

remote lot, which will enhance<br />

security.<br />

New location of Physical <strong>Plan</strong>t<br />

To blend in with the character of the surrounding<br />

neighborhood, JMZ has proposed constructing a<br />

pre-engineered “maintenance barn” that would<br />

mimic the Vermont barn vernacular. It could<br />

provide high-bay spaces required for service<br />

functions as well as office and storage space. As<br />

a cost-saving measure, the program for the new<br />

maintenance barn could also be divided between<br />

two smaller structures so that unconditioned<br />

space could be utilized for some storage needs.<br />

Examples of pre-engineered buildings<br />

<strong>Castleton</strong> <strong>State</strong> <strong>College</strong><br />

JMZ Architects and <strong>Plan</strong>ners, P.C.<br />

17


Overall Campus Development <strong>Plan</strong><br />

<strong>Facilities</strong> <strong>Master</strong> <strong>Plan</strong> <strong>Update</strong><br />

Ellis Hall<br />

In response to campus housing<br />

pressures, Ellis Hall has been housing<br />

more students than the number for<br />

which it was originally designed. Two<br />

upper level lounges have been<br />

converted to quad rooms and five<br />

doubles are now triples. When another<br />

residence hall is completed it may be<br />

possible to reduce occupancy in Ellis<br />

and complete much-needed interior<br />

and exterior renovations. As noted in<br />

the 2004 <strong>Facilities</strong> <strong>Master</strong> <strong>Plan</strong>, the<br />

South Street orientation of Ellis tends to<br />

isolate it from the other campus<br />

residences. JMZ has proposed<br />

reorienting the entrance to Ellis Hall so<br />

that its “front” faces west, engaging it<br />

with the rest of campus.<br />

The diagram at right illustrates the site<br />

development opportunities that would<br />

capitalize on the already-built path to<br />

Spartan Stadium. As seen in many of<br />

the housing schemes presented above,<br />

the area in yellow is the ideal location<br />

for the construction of a new residence<br />

hall. This would set up a central open<br />

space between the existing housing and<br />

potential new construction. This open<br />

space was an integral part of many of<br />

the housing schemes presented in the<br />

earlier section, and is described below.<br />

Site <strong>Plan</strong> illustrating development around Ellis Hall<br />

18<br />

<strong>Castleton</strong> <strong>State</strong> <strong>College</strong><br />

JMZ Architects and <strong>Plan</strong>ners, P.C.


<strong>Facilities</strong> <strong>Master</strong> <strong>Plan</strong> <strong>Update</strong><br />

Overall Campus Development <strong>Plan</strong><br />

Spartan Plaza<br />

The conceptual site plan at right<br />

shows a formal plaza – the “Spartan<br />

Plaza.” In the rendering, Ellis would<br />

have a new vertical circulation core<br />

that would tie into the plaza, and a<br />

terraced hillside next to Wheeler<br />

would take advantage of views and<br />

western exposure. Regardless of<br />

whether the Spartan Plaza is built as a<br />

stand-alone project or in conjunction<br />

with new housing it would:<br />

Reinforce the axis from the Campus<br />

Center to Spartan Stadium while<br />

creating a destination along the<br />

way.<br />

Create a zone that would tie<br />

together the existing and new<br />

housing.<br />

Proposed Plaza along pedestrian corridor<br />

Re-orient Ellis, placing its “front<br />

door” on the west side, thereby<br />

improving its connection with the<br />

campus.<br />

Campus Circulation<br />

<strong>Castleton</strong> <strong>State</strong> <strong>College</strong> is fortunate in<br />

its beautiful setting and the pedestrian<br />

nature of the campus. And while the<br />

campus is crossed by many footpaths,<br />

the acquisition of Hope House and the<br />

extensive new construction over the past<br />

several years have changed the campus<br />

landscape. The west side of campus,<br />

particularly, has many new opportunities<br />

to develop outdoor spaces that would<br />

simplify the pedestrian circulation and<br />

create outdoor spaces that would<br />

enhance the siting of new and existing<br />

buildings.<br />

Existing Campus Pedestrian Circulation<br />

<strong>Castleton</strong> <strong>State</strong> <strong>College</strong><br />

JMZ Architects and <strong>Plan</strong>ners, P.C.<br />

19


Overall Campus Development <strong>Plan</strong><br />

<strong>Facilities</strong> <strong>Master</strong> <strong>Plan</strong> <strong>Update</strong><br />

The Campus Green<br />

The lawn between Hope House, Huden, Haskell<br />

and the Campus Center is a space whose<br />

potential has never been fully developed. The<br />

existing pedestrian paths still reflect the old<br />

property lines around Hope House. With the<br />

decision to keep Hope House in place, and with<br />

the completion of the Campus Center expansion,<br />

it has become even more important to develop<br />

the area between these buildings.<br />

This space is an ideal location for a Campus<br />

Green. An outdoor green would provide a<br />

“front yard” to the buildings that surround it,<br />

help to define the entrances to these buildings,<br />

and create a social space for the <strong>College</strong><br />

community. At present there is no formalized<br />

outdoor gathering place on the residential side<br />

of campus. The first two diagrams to the right<br />

show the primary (north-south) and secondary<br />

campus axes. The <strong>College</strong> has already begun<br />

to develop the primary axis as a pedestrian<br />

circulation spine from <strong>College</strong> Drive to the new<br />

stadium. This path can naturally continue south<br />

to the Campus Center.<br />

The final diagram at right illustrates how a<br />

pedestrian spine to the Campus Center and<br />

secondary paths connecting Huden Dining Hall<br />

and Hope House might look. This new path<br />

system will give structure to the exterior space<br />

and engage the surrounding buildings. In<br />

keeping with the existing campus vocabulary, the<br />

new pathways would be somewhat informal,<br />

yielding to topography, existing trees, and other<br />

site features.<br />

As described earlier, Huden would benefit from<br />

a single entrance which would tie directly into<br />

this proposed path system.<br />

20<br />

<strong>Castleton</strong> <strong>State</strong> <strong>College</strong><br />

JMZ Architects and <strong>Plan</strong>ners, P.C.


<strong>Facilities</strong> <strong>Master</strong> <strong>Plan</strong> <strong>Update</strong><br />

Overall Campus Development <strong>Plan</strong><br />

Greening the Campus Right-of-Way<br />

The Delaware and Hudson Rail Trail bisects <strong>Castleton</strong><br />

<strong>State</strong> <strong>College</strong>. The former rail bed has been preserved<br />

for pedestrian and other recreational uses. It stretches<br />

nine miles from <strong>Castleton</strong> to Poultney.<br />

The <strong>College</strong> has the opportunity to be a better steward of<br />

the portion of the historic rail trail that runs through<br />

campus by planting trees and shrubs along the <strong>College</strong><br />

property line. This will enhance the campus and help to<br />

maintain the integrity of the trail. Recently, Amtrak<br />

announced that its existing train line will begin stopping at<br />

a restored station in downtown <strong>Castleton</strong>. The rail trail<br />

will provide a pedestrian connection from the campus to<br />

this station.<br />

Portion of the rail trail adjacent<br />

to the new stadium<br />

Restored Amtrak Station<br />

<strong>Castleton</strong> <strong>State</strong> <strong>College</strong><br />

JMZ Architects and <strong>Plan</strong>ners, P.C.<br />

21


Overall Campus Development <strong>Plan</strong><br />

<strong>Facilities</strong> <strong>Master</strong> <strong>Plan</strong> <strong>Update</strong><br />

The Seminary Street Entrance<br />

The 2004 <strong>Master</strong> <strong>Plan</strong> recognized that the Seminary<br />

Street entrance, while considered the main campus<br />

entryway, did not provide visitors to the campus with<br />

a “sense of arrival.” Expanding on the ideas first<br />

advanced in the 2004 <strong>Master</strong> <strong>Plan</strong>, JMZ<br />

recommends considering all of Seminary Street as<br />

part of the campus entry. Developing the Seminary<br />

Street corridor would make the <strong>College</strong> easier to<br />

find by bringing a <strong>Castleton</strong> presence to Main Street<br />

and would enhance the location of Admissions in<br />

Wright House.<br />

Existing view of Seminary Street<br />

Recommendations:<br />

1. Build a visible <strong>College</strong> sign on the<br />

corner of Seminary Street and Main<br />

Street.<br />

2. Develop the streetscape along<br />

Seminary Street by using the campus<br />

site vocabulary of light posts,<br />

banners, and crosswalk paving.<br />

3. Bury the utility lines on Seminary<br />

Street.<br />

4. Repair/improve the sidewalks and<br />

curbs.<br />

5. <strong>Plan</strong>t street trees.<br />

These changes need to be done in<br />

concert with the Town of <strong>Castleton</strong> and<br />

adjoining property owners; however, they<br />

are improvements that will benefit not just<br />

the <strong>College</strong> but the town itself, including<br />

the property owners along Seminary<br />

Street.<br />

Proposed Seminary Street improvements<br />

Proposed New Entrance Sign on Main Street<br />

22<br />

<strong>Castleton</strong> <strong>State</strong> <strong>College</strong><br />

JMZ Architects and <strong>Plan</strong>ners, P.C.


<strong>Facilities</strong> <strong>Master</strong> <strong>Plan</strong> <strong>Update</strong><br />

Overall Campus Development <strong>Plan</strong><br />

Campus Sculpture<br />

Recently, generous donors made it possible for the <strong>College</strong> to purchase a<br />

sculpture by Vermont artist Paul Calter. “Mandalla II” is eight feet square with a<br />

rotating marble disk in the center. JMZ participated in discussions relating to<br />

locating the sculpture, and presented the <strong>College</strong> with a site plan and rendering of<br />

the site on May 12, <strong>2010</strong>. It would be located on an existing knoll near the<br />

Campus Center and adjacent to the walkway that connects the lobby of the<br />

Jeffords Center to the west side of campus.<br />

Proposed site plan of the sculpture and stone wall formation<br />

Computer rendering of “Mandalla II” shown in front of the Campus Center<br />

<strong>Castleton</strong> <strong>State</strong> <strong>College</strong><br />

JMZ Architects and <strong>Plan</strong>ners, P.C.<br />

23


Overall Campus Development <strong>Plan</strong><br />

<strong>Facilities</strong> <strong>Master</strong> <strong>Plan</strong> <strong>Update</strong><br />

Cost Spreadsheet<br />

For a presentation on May 7, <strong>2010</strong>, JMZ created a cost Options Matrix of master<br />

plan level estimates. The <strong>College</strong> used this information to develop a number of<br />

scenarios where multiple options could be selected and evaluated based against<br />

an anticipated overall capital improvement budget. This spreadsheet is located on<br />

the following page.<br />

Implementation <strong>Plan</strong><br />

Following the spreadsheet is a site plan representing the implementation of the<br />

projects described in this report.<br />

24<br />

<strong>Castleton</strong> <strong>State</strong> <strong>College</strong><br />

JMZ Architects and <strong>Plan</strong>ners, P.C.


<strong>Castleton</strong> <strong>State</strong> <strong>College</strong><br />

Options Matrix<br />

JMZ Architects and <strong>Plan</strong>ners, P.C. 12 May <strong>2010</strong><br />

A B C D E<br />

Proposed<br />

Capacity Area/Bed Quantity Cost Total Cost<br />

New Residence Hall<br />

Student Rooms 150 300 45,000 SF $200 $9,000,000 $9,000,000 $9,000,000<br />

150 270 40,500 SF $190 7,695,000 $7,695,000 $7,695,000 $7,500,000 $7,695,000<br />

138 270 37,260 SF $190 7,079,400 $7,079,400 $7,000,000<br />

Common Areas in Conf./Event Center 1,800 SF $200 -360,000 -360,000 -360,000<br />

Furnishings 150 beds $2,000 300,000 300,000<br />

Huden Dining Hall<br />

General Upgrades 9,920 SF $100 $992,000<br />

Loading Dock 130,000<br />

Subtotal $1,122,000122 1,122,000122 1,122,000122 1,122,000122 1,122,000122 1,122,000122 1,000,000 1,000,000<br />

New Physical <strong>Plan</strong>t<br />

Office Space 5,500 SF $150 $825,000<br />

Unheated Storage 7,000 SF $120 840,000<br />

000<br />

Equipment 35,000<br />

Subtotal $1,700,000 1,700,000 1,700,000 1,700,000 1,700,000 1,700,000 1,500,000 1,500,000 1,700,000<br />

Existing Physical <strong>Plan</strong>t<br />

Conference/Event Center 12,500 SF $120 $1,500,000 1,500,000<br />

Expansion 8,100 SF $150 1,215,000<br />

Subtotal $2,715,000 2,715,000<br />

Demolition of Physical <strong>Plan</strong>t $250,000 250,000 250,000 250,000 250,000 250,000 250,000<br />

Pavilion at Spartan Stadium<br />

Freestanding Pavilion 1760 17,600 SF $30 $528,000 528,000 500,000 500,000<br />

1400 14,000 SF $30 420,000 420,000 420,000 400,000<br />

<strong>Castleton</strong> t Hall Kitchens<br />

Typical Units 13 Units $3,200 $41,600<br />

End Units 6 Units $4,025 24,150<br />

Subtotal $65,750 65,750 65,750 50,000 50,000 50,000<br />

Bricks Apartments<br />

Purchase 24 12 Apts $66,667 $800,000<br />

Renovation 36 12 Apts $7,000 84,000<br />

Subtotal $884,000 884,000 884,000 750,000<br />

Relocate Tennis Courts 6 $75,000 $450,000 450,000 450,000<br />

Total Construction Cost $15,576,750 $13,027,750 $11,295,000 $11,455,400 $11,187,000 $10,800,000 $10,950,000 $10,945,000<br />

Contingencies, Fees & Soft Costs (20%) 3,115,350 2,605,550 2,259,000 2,291,080 2,237,400 2,160,000 2,190,000 2,189,000<br />

Total Project Cost $18,692,100 $15,633,300 $13,554,000 $13,746,480 $13,424,400 $12,960,000 $13,140,000 $13,134,000<br />

F<br />

G


<strong>Facilities</strong> <strong>Master</strong> <strong>Plan</strong> <strong>Update</strong> Appendix A<br />

<strong>Castleton</strong> <strong>State</strong> <strong>College</strong> <strong>Master</strong> <strong>Plan</strong><br />

JMZ Architects and <strong>Plan</strong>ners, P.C.


Appendix A <strong>Facilities</strong> <strong>Master</strong> <strong>Plan</strong> <strong>Update</strong><br />

<strong>Castleton</strong> <strong>State</strong> <strong>College</strong> <strong>Master</strong> <strong>Plan</strong><br />

JMZ Architects and <strong>Plan</strong>ners, P.C.


<strong>Facilities</strong> <strong>Master</strong> <strong>Plan</strong> <strong>Update</strong> Appendix A<br />

<strong>Castleton</strong> <strong>State</strong> <strong>College</strong> <strong>Master</strong> <strong>Plan</strong><br />

JMZ Architects and <strong>Plan</strong>ners, P.C.


Appendix A <strong>Facilities</strong> <strong>Master</strong> <strong>Plan</strong> <strong>Update</strong><br />

<strong>Castleton</strong> <strong>State</strong> <strong>College</strong> <strong>Master</strong> <strong>Plan</strong><br />

JMZ Architects and <strong>Plan</strong>ners, P.C.


<strong>Facilities</strong> <strong>Master</strong> <strong>Plan</strong> <strong>Update</strong><br />

Appendix B<br />

Short-term Housing Analysis<br />

Introduction<br />

In December of 2008, Rickes Associates, Inc., the authors of the 2003 Housing<br />

study referenced in the 2004 <strong>Facilities</strong> <strong>Master</strong> <strong>Plan</strong>, wrote a housing analysis<br />

update. This was followed by an Addendum in February 2009 (included at the<br />

end of this document). Once again,<br />

the study called for additional student<br />

housing. Based on admissions data<br />

the study predicted a 200-bed shortfall<br />

by fall of <strong>2010</strong>. It also anticipated a<br />

50-bed shortfall for the fall of 2009.<br />

Woodruff Hall, 2009<br />

To address this immediate housing<br />

need JMZ evaluated current college<br />

facilities for short-term housing<br />

opportunities.<br />

Short-term Housing Analysis<br />

The demand for student housing<br />

continues to outpace supply. Local<br />

off-campus housing opportunities are<br />

limited; many students now rent<br />

spaces as far away as Rutland,<br />

effectively making them commuter<br />

students. Bringing many of these<br />

students onto campus will not only<br />

provide additional housing revenue to<br />

the <strong>College</strong>, but will enhance the<br />

overall campus culture.<br />

JMZ explored several short-term<br />

housing options, which are detailed in the following sections. Most of these are<br />

former houses that currently accommodate <strong>College</strong> departments or, in the case of<br />

the Bricks apartments, are privately owned. Each of these was evaluated in terms<br />

of location, cost per bed, and number of potential beds that could be available for<br />

the start of the fall semester.<br />

One of the primary issues with converting former residences to student housing is<br />

fire exiting. Vermont code requires that all sleeping and living spaces have access<br />

to a primary and secondary means of egress. This can either be in the form of a<br />

second set of stairs to a remote exit or an escape window of a minimum size, not<br />

more than 20 feet above grade. Alternatively, the buildings can be fully<br />

sprinklered, however this is generally a more expensive and disruptive option and<br />

would only be considered if the site is established as long-term or permanent<br />

housing.<br />

<strong>Castleton</strong> <strong>State</strong> <strong>College</strong> <strong>Master</strong> <strong>Plan</strong><br />

JMZ Architects and <strong>Plan</strong>ners, P.C.


Appendix B<br />

<strong>Facilities</strong> <strong>Master</strong> <strong>Plan</strong> <strong>Update</strong><br />

The home of Campus Admissions<br />

Of the houses included in this study,<br />

Lynch House, Hope House, and White<br />

House could be converted without too<br />

much difficulty relocating their current<br />

occupants. For various reasons,<br />

however, none of these appears to be<br />

appropriate as a permanent or even<br />

long-term housing solution. The land<br />

on which Lynch House sits is more<br />

valuable as a potential building site<br />

than the structure itself. Hope House<br />

could be restored to its original<br />

historic character and become a real<br />

show-piece in its current location,<br />

which does not necessarily lend itself<br />

to student housing. The White house<br />

is small, off campus, and probably<br />

more appropriate for offices or,<br />

perhaps, graduate housing. However,<br />

each site could be utilized to meet the<br />

immediate housing shortfall with a<br />

minimal amount of renovations that<br />

would also benefit future users. Once<br />

additional new housing is brought on<br />

line these facilities could serve other<br />

<strong>College</strong> functions.<br />

Ironically, the house most easily converted to a residence is the one with the most<br />

fully established occupants. The Wright House could easily provide up to 15 beds<br />

with minimal improvement costs to the structure itself, but will require relocating<br />

Admissions. One option discussed was to put Admissions into the Hope House,<br />

which could be considered a very appropriate location. It is in the heart of the<br />

campus with easy access to the new Campus Center. It this case, the <strong>College</strong><br />

would probably need to undertake<br />

more extensive renovations and site<br />

improvements to Hope House than<br />

what would be required for housing.<br />

The individual sites are described in<br />

detail below and summarized on the<br />

table that follows.<br />

Lynch House prior to its removal<br />

Lynch House<br />

The Lynch House was the home to<br />

Campus Security. The <strong>College</strong>’s longterm<br />

objective was to use that building<br />

site for additional parking, however<br />

<strong>Castleton</strong> <strong>State</strong> <strong>College</strong> <strong>Master</strong> <strong>Plan</strong><br />

JMZ Architects and <strong>Plan</strong>ners, P.C.


<strong>Facilities</strong> <strong>Master</strong> <strong>Plan</strong> <strong>Update</strong><br />

Appendix B<br />

the urgency of the housing crunch warranted a second look at the house itself.<br />

JMZ’s investigation concluded that with modifications the structure could house up<br />

to seven students. Conceptual cost estimates put this work at approximately<br />

$12,000, or about $1,714 per bed.<br />

To accommodate students, the downstairs kitchen would have to be removed and<br />

the space used for a shower room, possibly separate from the existing half-bath.<br />

The remaining back room could become a single. In the front of the house a<br />

generous double and small common area could be built with the removal of the<br />

existing office and closet and construction of a new partition wall. The upstairs<br />

has a separate entrance leading to three bedrooms, a storage closet, and a full<br />

bath. The structure would require one new escape window in each bedroom. In<br />

general, new finishes would have to be provided throughout, including carpet,<br />

paint, and ceilings. The building is<br />

heated by a forced-air oil furnace and<br />

has no central air conditioning or<br />

sprinklers. Future alternative uses for<br />

the house include:<br />

• Re-use for other campus functions<br />

• Remove the building and use the<br />

site for new construction<br />

<strong>Update</strong>:<br />

The structure was razed and a parking<br />

area built in time for the start of the<br />

2009-<strong>2010</strong> school year.<br />

New parking lot on the site of the Lynch House<br />

Hope House<br />

Hope House was purchased by the <strong>College</strong> in 2005 and served as the Wellness<br />

Center until its relocation to the new Campus Center in the fall of 2009. As<br />

possible housing Hope House is relatively large, with the potential for up to 12<br />

beds. It is listed on the Vermont <strong>State</strong> Register of Historic Places and is an<br />

example of Gothic Revival architecture. The <strong>College</strong> had considered moving this<br />

historic structure to another location, thus creating a significant building site (refer<br />

to the letter dated April 10, 2009 from Preservation Services in the appendix).<br />

However, in the short term, a modest investment was considered to provide<br />

needed student housing.<br />

The main entrance to Hope House is handicap accessible. The existing windows<br />

are single-glazed, wood, with aluminum storm windows. The building has<br />

radiators, but no air-conditioning or sprinklers. Work on the first floor would entail<br />

removing the existing kitchen and providing a new full bath in its place. There is<br />

an existing full bath next to the examination room, but without access from the<br />

corridor. The first floor could be converted to three doubles and a common area.<br />

The upstairs could accommodate three doubles and a small single. There is an<br />

existing full bath on the second floor as well. The most significant work on the<br />

<strong>Castleton</strong> <strong>State</strong> <strong>College</strong> <strong>Master</strong> <strong>Plan</strong><br />

JMZ Architects and <strong>Plan</strong>ners, P.C.


Appendix B<br />

<strong>Facilities</strong> <strong>Master</strong> <strong>Plan</strong> <strong>Update</strong><br />

second floor would be new escape<br />

windows in each bedroom. These<br />

need to be custom and should be<br />

designed to maintain the look of<br />

the existing historic windows. In<br />

addition, the entire house would<br />

benefit from updated interior<br />

finishes. Building improvements<br />

were estimated at $17,000, or<br />

about $1,417 per bed.<br />

<strong>Update</strong>:<br />

With the removal of Lynch House,<br />

<strong>Castleton</strong> is relocating Campus<br />

Security to the Hope House.<br />

Cosmetic upgrades were made to<br />

the interior, however the work was not as extensive as what would have been<br />

required to provide student housing. Exterior improvements were done, including<br />

landscaping along South Street, regarding the existing drive, exterior paint, and<br />

tree and shrub removal around the building itself. All of these improvements have<br />

greatly enhanced the appearance of Hope House, and, more importantly, help to<br />

integrate this once private piece of property with the campus. Additional<br />

improvements should still be considered including:<br />

Hope House after exterior paint & site improvements<br />

• Window replacement<br />

• Interior bathroom renovations<br />

• Mechanical upgrades<br />

• Building façade repair<br />

• Restoration of the existing east-facing terrace and the west porch<br />

White House<br />

The White House was recently bequeathed to the <strong>College</strong> by a former faculty<br />

member. It is located on South Street, with a deep back yard that is contiguous<br />

with the land behind Leavenworth Hall. The house is listed on the National<br />

Register of Historic Places (see letter dated April 10, 2009 from Preservation<br />

Services in the appendix). It was unoccupied at the time of our investigation.<br />

The house is heated by an oil furnace, and the exposed ductwork should be<br />

assessed by an engineer. In addition, there is evidence of structural deterioration<br />

that should be thoroughly evaluated.<br />

As an immediate, short-term housing solution, the first floor could accommodate<br />

two doubles, a small single, and common area. Work should include removing<br />

the existing kitchen and wood-burning stove, and installing new lighting and<br />

interior finishes. The second floor will require one replacement escape window in<br />

a small room off the hall, which can serve two single bedrooms. Currently the<br />

White house has two full bathrooms that are adequate but older and typically<br />

<strong>Castleton</strong> <strong>State</strong> <strong>College</strong> <strong>Master</strong> <strong>Plan</strong><br />

JMZ Architects and <strong>Plan</strong>ners, P.C.


<strong>Facilities</strong> <strong>Master</strong> <strong>Plan</strong> <strong>Update</strong><br />

Appendix B<br />

residential. The <strong>College</strong> should<br />

consider complete bathroom<br />

renovations, whether the house<br />

remains a residence or takes on<br />

another campus function.<br />

With modest work the house could<br />

accommodate a total of seven<br />

students. The estimate for this work is<br />

$10,000, or about $1,429 per bed.<br />

White House<br />

<strong>Update</strong>:<br />

The house will be used for paper<br />

supply and Physical <strong>Plan</strong>t storage in<br />

the near future. The <strong>College</strong> would<br />

like to explore the possibility of<br />

additional parking in the rear yard of<br />

the White House.<br />

Wright House<br />

The Wright House currently houses Campus Events and <strong>College</strong> Admissions. It is<br />

generally in excellent condition with updated bathrooms and finishes. The building<br />

has been used for housing in the past and already has adequate egress for the<br />

second floor rooms. If the downstairs parlor spaces are converted to double<br />

rooms, the Wright House can accommodate up to 15 students, with one common<br />

space in the existing computer area. To achieve this, Admissions and Events<br />

<strong>Plan</strong>ning would have to relocate. Currently, Admissions occupies approximately<br />

1,590 net assignable square feet (NASF) and Campus Events occupies 300 NASF,<br />

for a total of 1,890 NASF not including stairs, toilets, storage, mechanical space,<br />

and corridors.<br />

The estimated cost to prepare the Wright House for student housing is $7,000, or<br />

$466 per bed. The only renovation work required would be new locksets for the<br />

doors, new paint, and the addition of<br />

a partition wall between the parlor<br />

and the living room on the first floor.<br />

<strong>Update</strong>:<br />

The Wright House is currently seen as<br />

the most appropriate location for<br />

Admissions, and will remain there for<br />

the foreseeable future. The existing<br />

bathrooms will be updated.<br />

Wright House<br />

Future improvements along Seminary<br />

Street would further enhance<br />

Admissions’ location in Wright House<br />

<strong>Castleton</strong> <strong>State</strong> <strong>College</strong> <strong>Master</strong> <strong>Plan</strong><br />

JMZ Architects and <strong>Plan</strong>ners, P.C.


Appendix B<br />

<strong>Facilities</strong> <strong>Master</strong> <strong>Plan</strong> <strong>Update</strong><br />

(see below). Camps and Conferences will relocate to the basement of Haskell, in<br />

the space formerly occupied by the radio station.<br />

The Brick Apartments<br />

The Brick Apartments are located two miles off campus. The <strong>College</strong> has leased<br />

seven apartment units at $900 a month, or $75,600 annually, for the fall of<br />

2009. These are intended to house a total of 14 graduate students, which does<br />

not relieve the current undergraduate housing pressure.<br />

<strong>Castleton</strong> <strong>State</strong> <strong>College</strong> may take two<br />

different approaches to the Bricks. The<br />

Bricks could potentially help relieve the<br />

immediate need for undergraduate<br />

housing in the fall of 2009 if the graduate<br />

students could live elsewhere. If the<br />

<strong>College</strong> is able to negotiate an<br />

arrangement with the Owner so that a<br />

minimal level of temporary renovation can<br />

be done to the seven units already leased,<br />

they could be pushed to accommodate 3<br />

undergraduate students each, for a total<br />

of 21. That number represents almost<br />

half of the 50 beds needed by fall. The<br />

cost to the <strong>College</strong> would be reduced<br />

from $5,400 per bed (to house 14<br />

graduate students) to $3,600 per bed for<br />

21 undergraduate students. The cost of<br />

temporary improvements is estimated at<br />

$1,000 per apartment (see sketches at<br />

left).<br />

A second option would be for the <strong>College</strong><br />

to purchase the Brick Apartments. The<br />

current owner has offered to sell the entire<br />

complex of 12 units for $900,000. The<br />

existing units have two single-sized<br />

bedrooms apiece, but to maximize space<br />

the <strong>College</strong> could renovate each<br />

apartment to house four students, for a<br />

total of 48. At that point, the purchase<br />

price and improvements for the Brick<br />

Apartments would probably represent an<br />

investment of almost $25,000-30,000<br />

per bed. This is less than half of what<br />

new dorm construction would typically<br />

cost, but a substantial investment<br />

nonetheless.<br />

Proposed ground floor apartment plan<br />

Proposed upper level apartment plan<br />

<strong>Castleton</strong> <strong>State</strong> <strong>College</strong> <strong>Master</strong> <strong>Plan</strong><br />

JMZ Architects and <strong>Plan</strong>ners, P.C.


<strong>Facilities</strong> <strong>Master</strong> <strong>Plan</strong> <strong>Update</strong><br />

Appendix B<br />

A third option would be to enter into an agreement with a developer who could<br />

purchase the property, make the desired improvements, and lease it back to the<br />

<strong>College</strong> so that the capital investment costs are not borne by the <strong>College</strong>.<br />

However, the lease costs may prove to be significantly higher. It may also be<br />

undesirable to maintain a long-term lease arrangement on property so far from the<br />

campus.<br />

<strong>Update</strong>:<br />

The Brick Apartments will continue to be used to house graduate students. No<br />

long-term arrangements beyond the annual lease have been made with the Owner<br />

at this time.<br />

Wooldridge<br />

Wooldridge is a large house that will<br />

require a substantial investment to<br />

realize its full potential. It currently<br />

serves as art studios for the students<br />

and faculty. The structure itself has<br />

multiple exits and rear stairs that<br />

would satisfy the egress requirements<br />

of a residential facility, and the house<br />

is large enough to easily<br />

accommodate up to 16 students.<br />

The cost to renovate Wooldridge<br />

could be $750,000 or more, which is<br />

much more costly than any of the<br />

other options discussed here.<br />

Minimally, it will require a complete<br />

upgrade of interior finishes, plumbing,<br />

mechanical, and possibly electrical<br />

systems, plus new windows and doors.<br />

A structural evaluation is recommended.<br />

The breadth of work<br />

required to renovate Wooldridge<br />

could not be done easily in a summer,<br />

which makes it less of an immediate<br />

housing option. However, if the<br />

<strong>College</strong> is committed to keeping and<br />

improving the structure, using it for housing could be a mechanism for recouping<br />

the cost of the renovation over several years through fees. At that point the<br />

upgraded building could be devoted to another function. As housing, Wooldridge<br />

is located outside the campus residential “zone.”<br />

<strong>Update</strong>: Wooldridge will continue to be used by the Art Department at this time.<br />

Wooldridge House<br />

<strong>Castleton</strong> <strong>State</strong> <strong>College</strong> <strong>Master</strong> <strong>Plan</strong><br />

JMZ Architects and <strong>Plan</strong>ners, P.C.


Appendix B<br />

<strong>Facilities</strong> <strong>Master</strong> <strong>Plan</strong> <strong>Update</strong><br />

Grey House<br />

Grey House<br />

The Grey House is privately owned<br />

and located off campus, west of the<br />

Physical <strong>Plan</strong>t. The house has a full<br />

kitchen, one full bath, new insulated<br />

windows, electric baseboard heat, and<br />

could sleep up to four. The following<br />

upgrades are recommended prior to<br />

placing students there:<br />

Exterior<br />

1. Permanently cover the existing<br />

well.<br />

2. Repair the shingles and rail at the<br />

front porch.<br />

3. Paint the exterior siding and trim.<br />

4. The existing electric baseboard heat is both ineffective and expensive, reported<br />

to be $400 or more a month during the winter. One alternative could be to<br />

install a direct-vent kerosene house heater, such as ones made by Monitor or<br />

Toyotomi. A single unit could be purchased to heat the entire house, replacing<br />

the existing wood stove on the first floor. The existing oil tank should be<br />

inspected to determine if it can be used. The entire installation would require<br />

some plumbing, a lifter pump, possible purchase of a new oil tank, and the<br />

installation of a 2-1/2” to 3” direct vent flue through the exterior wall.<br />

Estimated installed cost is $3,600, with an additional $500-$800 if a new tank<br />

must be purchased.<br />

<strong>Update</strong>: Grey House has been leased by the <strong>College</strong> and will house graduate<br />

students starting in fall 2009.<br />

<strong>Castleton</strong> <strong>State</strong> <strong>College</strong> <strong>Master</strong> <strong>Plan</strong><br />

JMZ Architects and <strong>Plan</strong>ners, P.C.


<strong>Facilities</strong> <strong>Master</strong> <strong>Plan</strong> <strong>Update</strong><br />

Appendix B<br />

Looking west at Babcock on the right and Haskell on the<br />

left in the foreground<br />

Haskell Hall, Adams and Babcock<br />

Halls<br />

With the completion of the Campus<br />

Center the Post Office and Radio Station<br />

have moved out of the basements of<br />

Haskell and Adams Hall. These spaces<br />

are not well-suited for housing because<br />

natural light is limited and because they<br />

would represent a change in occupancy,<br />

triggering building code compliance.<br />

However, the <strong>College</strong> has the opportunity<br />

to renovate these spaces for use by other<br />

departments. Camps and Conferences<br />

are currently slated to move into Haskell.<br />

Below is a general scope of work for the<br />

lower levels of Haskell and Adams:<br />

1. Provide new dropped ceilings and lighting. The existing conditions preclude<br />

raising the ceiling any higher, unfortunately. It may make sense in some areas<br />

to leave the ceiling open and re-paint the exposed pipes, as in the lobby of the<br />

radio station.<br />

2. Reconfigure the electrical conduit in Haskell at the ceiling off the radio station<br />

lobby, so that it is above the dropped ceiling.<br />

3. Provide new carpet throughout.<br />

4. Replace the existing deteriorated baseboard heating units.<br />

5. Remove the oriented strand board partitions in Adams. Replace them with<br />

standard gypsum board partitions if the configuration is to stay the same.<br />

6. Provide new paint throughout.<br />

7. There appear to be ongoing moisture problems in both Adams and Haskell.<br />

We believe it is a foundation water issue, not a plumbing issue. It is possible<br />

that the solution can be undertaken from the outside of the building, and will<br />

probably involve a combination<br />

of measures to improve<br />

drainage at the foundation wall<br />

below grade and re-pitching<br />

water away from the perimeter<br />

of the building.<br />

The sketch at right illustrates a<br />

previous study by JMZ to convert the<br />

existing offices on the ground floor<br />

of Babcock back to housing. The<br />

current Academic Support Center<br />

could be relocated to Adams,<br />

making way for ten additional beds.<br />

Ground Floor Babcock Hall: Ten additional beds<br />

<strong>Castleton</strong> <strong>State</strong> <strong>College</strong> <strong>Master</strong> <strong>Plan</strong><br />

JMZ Architects and <strong>Plan</strong>ners, P.C.


<strong>Facilities</strong> <strong>Master</strong> <strong>Plan</strong> <strong>Update</strong> Appendix C<br />

<strong>Castleton</strong> <strong>State</strong> <strong>College</strong> <strong>Master</strong> <strong>Plan</strong><br />

JMZ Architects and <strong>Plan</strong>ners, P.C.


Appendix C <strong>Facilities</strong> <strong>Master</strong> <strong>Plan</strong> <strong>Update</strong><br />

<strong>Castleton</strong> <strong>State</strong> <strong>College</strong> <strong>Master</strong> <strong>Plan</strong><br />

JMZ Architects and <strong>Plan</strong>ners, P.C.


<strong>Facilities</strong> <strong>Master</strong> <strong>Plan</strong> <strong>Update</strong> Appendix C<br />

<strong>Castleton</strong> <strong>State</strong> <strong>College</strong> <strong>Master</strong> <strong>Plan</strong><br />

JMZ Architects and <strong>Plan</strong>ners, P.C.


Appendix C <strong>Facilities</strong> <strong>Master</strong> <strong>Plan</strong> <strong>Update</strong><br />

<strong>Castleton</strong> <strong>State</strong> <strong>College</strong> <strong>Master</strong> <strong>Plan</strong><br />

JMZ Architects and <strong>Plan</strong>ners, P.C.


<strong>Facilities</strong> <strong>Master</strong> <strong>Plan</strong> <strong>Update</strong> Appendix C<br />

<strong>Castleton</strong> <strong>State</strong> <strong>College</strong> <strong>Master</strong> <strong>Plan</strong><br />

JMZ Architects and <strong>Plan</strong>ners, P.C.