July 29, 2013 - Clinton Township School District
July 29, 2013 - Clinton Township School District
July 29, 2013 - Clinton Township School District
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
AGENDA<br />
7/<strong>29</strong>/13<br />
Triad Security Systems $179,900.00<br />
971 Lehigh Avenue<br />
Union NJ 07083<br />
AVS Inc. $185,679.00<br />
140 J Commerce Way<br />
Totowa NJ 07512<br />
Integrated Systems & Services $222,985.00<br />
541 Industrial Way<br />
Eatontown NJ 07724<br />
Action 14-FF-028:<br />
BE IT RESOLVED that the Board of Education awards the bid to the lowest bidder for the<br />
<strong>District</strong> wide Security Camera facility project to ASG Security, in the amount of $152,246.00.<br />
Action 14-FF-0<strong>29</strong>:<br />
BE IT RESOLVED that the Board of Education accepts the bids as follows for the Single<br />
Fixture Restroom and Air Conditioning Unit facility project at Round Valley <strong>School</strong>:<br />
Name of Contractor<br />
Bid Amount<br />
Coopersmith Brothers $120,000.00<br />
PO Box 391, 11 N. 4 th Street<br />
Phillipsburg NJ 08865<br />
De Sapio Construction Inc. $152.880.00<br />
280 Ridge Road<br />
Frenchtown NJ 08825<br />
Procomm Systems Inc. $139,180.00<br />
823 Uniontown Road<br />
Phillipsburg NJ 08865<br />
Action 14-FF-030:<br />
BE IT RESOLVED that the Board of Education awards the bid to the lowest bidder for the<br />
Single Fixture Restroom and Air Conditioning Unit facility project at Round Valley <strong>School</strong> to<br />
Coopersmith Brothers, in the amount of $120,000.00.<br />
Action 14-FF-031:<br />
BE IT RESOLVED that the Board of Education approves a contract with RK Environmental &<br />
Analysis Inc. for asbestos safety control monitoring services for the classroom bathroom project<br />
at Round Valley <strong>School</strong> in the amount of $2,875.<br />
Action 14-FF-032:<br />
BE IT RESOLVED that the Board of Education approves a contract with Bako Construction for<br />
nonfriable asbestos removal and disposal for the classroom bathroom project at Round Valley<br />
<strong>School</strong> in the amount of $7,500.