Site Protection in Action (4.4 MB) - Layher Scaffolding System
Site Protection in Action (4.4 MB) - Layher Scaffolding System
Site Protection in Action (4.4 MB) - Layher Scaffolding System
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Site</strong><br />
<strong>Protection</strong><br />
In action
Inhalt<br />
� Protect <strong>System</strong> 3<br />
Kaiser Wilhelm Memorial Church, Berl<strong>in</strong>, Germany 4<br />
St Denys Station, Southampton, England 4<br />
Mercedes Benz Arena, Stuttgart, Germany 5<br />
Lee Valley Park, London, England 5<br />
Gatwick Airport, London, England 6<br />
State Opera, Berl<strong>in</strong>, Germany 6<br />
Multi-storey car park, Schlossstrasse, Berl<strong>in</strong>, Germany 7<br />
Rh<strong>in</strong>e Bridge, Speyer, Germany 7<br />
� Cassette Roof <strong>System</strong> 9<br />
Haukilathi water tower, F<strong>in</strong>land 10<br />
Zw<strong>in</strong>ger, Dresden, Germany 10<br />
Truck Shop Project, Atacama Desert, Chile 11<br />
� Lightweight Cassette Roof <strong>System</strong> 13<br />
Residential build<strong>in</strong>g <strong>in</strong> Ma<strong>in</strong>zer Strasse, Berl<strong>in</strong>, Germany 14<br />
Excavation site, Pompeii, Italy 14<br />
Marylebone Station, London, England 15<br />
Residential build<strong>in</strong>g, Gügl<strong>in</strong>gen, Germany 15<br />
� Keder Roof <strong>System</strong> 17<br />
Stave Church, Borgund, Norway 18<br />
Church of the Holy Sepulchre, Jerusalem, Israel 19<br />
Melbourne Hall, Derbyshire, England 19<br />
� Keder Roof XL <strong>System</strong> 20<br />
NEW!<br />
2<br />
Industrial estate, Johannedal, Sweden 22<br />
K<strong>in</strong>dergarten, Södergård, Sweden 23
The <strong>Layher</strong> Protect-<strong>System</strong> optimally caters for the str<strong>in</strong>gent requirements of contemporary environmental protection,<br />
noise prevention, weather protection and pedestrian safety. Its dust-tight design makes it the obvious<br />
choice for asbestos clearance, façade cover<strong>in</strong>g and sandblast<strong>in</strong>g work. Thanks to its excellent noise <strong>in</strong>sulation<br />
properties, this system is also ideally suited for temporary noise protection walls, as used for example <strong>in</strong> <strong>in</strong>nercity<br />
construction sites or at major events.<br />
� Efficient system solution for <strong>in</strong>creas<strong>in</strong>gly str<strong>in</strong>gent environmental protection requirements.<br />
� Modular design, match<strong>in</strong>g both Allround and SpeedyScaf equipment.<br />
� Long life, no tarpaul<strong>in</strong> disposal, high profitability.<br />
� High fitt<strong>in</strong>g precision, low weight, easy handl<strong>in</strong>g.<br />
� Assembly height up to 90 m structurally verified.<br />
Protect <strong>System</strong><br />
3
Protect <strong>System</strong><br />
Kaiser Wilhelm Memorial Church, Berl<strong>in</strong>, Germany<br />
St Denys Station, Southampton, England<br />
4<br />
<strong>Layher</strong> Protect-<strong>System</strong> to prevent noise and<br />
dust and also to protect pedestrians dur<strong>in</strong>g refurbishment<br />
work on the build<strong>in</strong>g. In addition,<br />
the cityscape is beautified dur<strong>in</strong>g this work.<br />
Some 3,000 Protect cassettes were <strong>in</strong>stalled.<br />
Protect-<strong>System</strong> to protect pedestrians on<br />
a 31 meter long temporary footbridge and<br />
to prevent objects from dropp<strong>in</strong>g onto the<br />
tracks.
Mercedes Benz Arena, Stuttgart, Germany<br />
Lee Valley Park, London, England<br />
Protect <strong>System</strong><br />
44 meter long and 9 meter high dust<br />
prevention and sound <strong>in</strong>sulation wall for<br />
the Carl Benz Center plus hotel dur<strong>in</strong>g demolition<br />
of the adjacent football stadium‘s<br />
„Cannstatt Curve“.<br />
110 meter long structure to protect users<br />
of a cycle and pedestrian path from noise,<br />
dust and build<strong>in</strong>g rubble. The Protect cassettes<br />
also double as attractive advertis<strong>in</strong>g<br />
surfaces.<br />
5
Protect <strong>System</strong><br />
Gatwick Airport, London, England<br />
State Opera, Berl<strong>in</strong>, Germany<br />
6<br />
Protect<strong>in</strong>g people from noise and dust<br />
dur<strong>in</strong>g modernization work on Gatwick<br />
Airport.<br />
Pedestrian walkway above the renovation<br />
site of Berl<strong>in</strong>‘s State Opera house. The<br />
<strong>Layher</strong> Protect-<strong>System</strong> is used to protect<br />
pedestrians and to close off the site, and<br />
<strong>in</strong>cludes door elements.
Multi-storey car park, Schlossstrasse, Berl<strong>in</strong>, Germany<br />
Rh<strong>in</strong>e Bridge, Speyer, Germany<br />
Protect <strong>System</strong><br />
Noise protection enclosure of a car park<br />
entrance for ensur<strong>in</strong>g quieter user dur<strong>in</strong>g<br />
nights, pend<strong>in</strong>g the completion of the new<br />
car park. The use of light cassettes means<br />
that energy can be saved dur<strong>in</strong>g the day<br />
and daylight can be exploited. Enclosed<br />
surface: 1475 m²<br />
Use of 87 tons of Protect cassettes to<br />
protect the heavily used motorway from<br />
blast<strong>in</strong>g materials dur<strong>in</strong>g corrosion prevention<br />
work on the bridge pylon.<br />
7
Cassette Roof<br />
<strong>Layher</strong> cassette roofs have established themselves as a firm favourite at construction sites for conversion, renovation<br />
and restoration. The structure itself and all the equipment rema<strong>in</strong> well protected dur<strong>in</strong>g the conversion<br />
or roof repair and normal bus<strong>in</strong>ess operations can cont<strong>in</strong>ue under a secure roof.<br />
� Economical and persuasive technology with extremely sturdy components designed for frequent assembly<br />
and dismantl<strong>in</strong>g.<br />
� <strong>System</strong>-<strong>in</strong>dependent – the cassette roof can be fitted onto almost all conventional scaffold<strong>in</strong>g systems..<br />
� Wide spans – up to 27 meters depend<strong>in</strong>g on structural analysis. Larger spans of up to about 39 meters are<br />
possible <strong>in</strong> <strong>in</strong>dividual cases subject to verification<br />
� Material supplied to the site at any po<strong>in</strong>t; daylight thanks to light cassettes.<br />
� Outstand<strong>in</strong>g safety assured by the <strong>in</strong>novative and practical cable harness system.<br />
9
Cassette Roof<br />
Espoo water tower, F<strong>in</strong>land<br />
Zw<strong>in</strong>ger, Dresden, Germany<br />
10<br />
Temporary weather protection roof dur<strong>in</strong>g<br />
roof repairs on the Haukilahti water tower<br />
and the Haikaranoesä („stork‘s nest“)<br />
restaurant on top of it.<br />
800 m² sized temporary weather protection<br />
roof to keep off ra<strong>in</strong> and snow dur<strong>in</strong>g<br />
roof repair work.
Truck Shop Project, Atacama Desert, Chile<br />
Stadtschloss, Berl<strong>in</strong>, Germany<br />
Cassette Roof<br />
Cassette roof as a hall roof over a temporary<br />
ma<strong>in</strong>tenance build<strong>in</strong>g for m<strong>in</strong><strong>in</strong>g<br />
trucks.<br />
Temporary weather protection roof<br />
with a span of 24 meters to protect the<br />
excavation work on the rema<strong>in</strong>s of the<br />
cellars below the former city palace, the<br />
Stadtschloss.<br />
11
Lightweight Cassette Roof<br />
The <strong>Layher</strong> lightweight cassette roof is a very light and visually attractive roof system that can be assembled<br />
largely without tools. Thanks to the low weight of these components, even very large roof surfaces can be<br />
assembled without a crane.<br />
� Lightweight and economical roof solution for practically any scaffold<strong>in</strong>g system with a roof cover<strong>in</strong>g of alum<strong>in</strong>ium<br />
and PVC roof cassettes, and a surface weight of only 13 kg/m²<br />
� Speedy, safe and simple assembly with only a few additional parts.<br />
� Translucent roof cassettes permit work<strong>in</strong>g <strong>in</strong> daylight conditions.<br />
� High flexibility thanks to problem-free removal of <strong>in</strong>dividual cassettes.<br />
� Ideal for applications <strong>in</strong> <strong>in</strong>ner-city areas thanks to its attractive appearance.<br />
13
Lightweight Cassette Roof<br />
Residential build<strong>in</strong>g <strong>in</strong> Ma<strong>in</strong>zer Strasse, Berl<strong>in</strong>, Germany<br />
Excavation site, Pompeii, Italy<br />
14<br />
1200 m² sized weather protection roof dur<strong>in</strong>g<br />
addition of a new storey - on Allround<br />
STAR Frames as the support scaffold<strong>in</strong>g.<br />
Temporary pedestrian path through the<br />
excavation site <strong>in</strong> ancient Pompeii, with<br />
310 m² sized lightweight cassette roof for<br />
protection from the weather.
Marylebone Station, London, England<br />
Residential build<strong>in</strong>g, Gügl<strong>in</strong>gen, Germany<br />
Lightweight Cassette Roof<br />
Temporary and mobile weather protection<br />
roof for section-by-section repair work on<br />
the station roof.<br />
Lightweight cassette roof for weather protection<br />
dur<strong>in</strong>g roof repair. Thanks to the<br />
attractive design, this roof is particularly<br />
ideal for use <strong>in</strong> <strong>in</strong>ner-city areas.<br />
15
Keder Roof<br />
With the <strong>Layher</strong> Keder Roof <strong>System</strong>, you can build quickly and easily a particularly lightweight and economical<br />
weather protection roof for a wide range of applications. So this system is often used for roof repairs or add<strong>in</strong>g<br />
extra storeys, for bridge and motorway sites or <strong>in</strong> the public events field – light and visually attractive.<br />
� Lightweight and quick-to-assembly weather protection roof for small and medium spans – of up to 18 meters<br />
– without crane.<br />
� Compatible with almost all scaffold<strong>in</strong>g systems.<br />
� Made of alum<strong>in</strong>ium with high-grade PVC tarpaul<strong>in</strong>s – small number of components.<br />
� One system. Two versions – for assembly as mono-pitch or as double-pitch roof.<br />
� Handsome and high-quality appearance<br />
17
Keder Roof<br />
Stave Church, Borgund, Norway<br />
18<br />
Temporary weather protection roof with a<br />
span of 14 meters for repair of the church<br />
roof. At the same time, the support scaffold<strong>in</strong>g<br />
built us<strong>in</strong>g Allround bridge support<br />
is opened to enable tourists to view the<br />
stave church.
Church of the Holy Sepulchre, Jerusalem, Israel<br />
Melbourne Hall, Derbyshire, England<br />
Keder Roof<br />
900 m² sized Keder roof as protection<br />
from the weather dur<strong>in</strong>g roof and façade<br />
repairs to the historic Church of the Holy<br />
Sepulchre <strong>in</strong> Jerusalem.<br />
Aesthetic weather protection roof dur<strong>in</strong>g<br />
roof repair work on the 800 year old<br />
country house.<br />
19
NEW!<br />
Keder Roof XL<br />
<strong>Layher</strong>‘s Keder Roof has long proven itself a great success. But with the Keder Roof XL, <strong>Layher</strong> is sett<strong>in</strong>g new<br />
standards for temporary roof<strong>in</strong>g over construction sites. Where roofs are often limited to a 20 meter span for<br />
structural strength reasons, the Keder Roof XL comes <strong>in</strong>to its own. Tak<strong>in</strong>g <strong>in</strong>to account requirements to cope<br />
with local weather conditions, it can be built with a span of up to 40 meters!<br />
� Lightweight and quick-to-assembly weather protection roof for small and large spans – of up to 40 meters.<br />
� Compatible with almost all scaffold<strong>in</strong>g systems.<br />
� High snow loads (up to about 1.0 kN/m²) with medium spans.<br />
� One system. Three versions – for assembly as mono-pitch, double-pitch or polygonal barrel roof.<br />
� Handsome and high-quality appearance.<br />
21
Keder Roof XL<br />
New build<strong>in</strong>g on <strong>in</strong>dustrial estate, Johannedal, Sweden<br />
22<br />
Mobile weather protection roof with<br />
a span of 21 meters for cover<strong>in</strong>g base<br />
concrete work for a new build<strong>in</strong>g on<br />
Johannedal <strong>in</strong>dustrial estate.
K<strong>in</strong>dergarten, Södergård, Sweden<br />
Keder Roof XL<br />
Mobile weather protection roof dur<strong>in</strong>g build<strong>in</strong>g<br />
of a new k<strong>in</strong>dergarten <strong>in</strong> Södergård<br />
23
Wilhelm <strong>Layher</strong> GmbH & Co. KG<br />
Scaffold<strong>in</strong>g Grandstands Ladders<br />
Ochsenbacher Strasse 56<br />
74363 Guegl<strong>in</strong>gen-Eibensbach<br />
Germany<br />
Post Box 40<br />
74361 Guegl<strong>in</strong>gen-Eibensbach<br />
Germany<br />
Telephone +49 (0) 71 35 70-0<br />
Telefax +49 (0) 71 35 70-2 65<br />
E-Mail <strong>in</strong>fo@layher.com<br />
www.layher.com Art.-No. 8101.231 Edition 20.01.2012