I installed my microgeneration technology<br />

before 15 July 2009. Why do I not benefit<br />

from the higher FiTs?<br />

The Government designed FiTs to stimulate the growth of<br />

the microgeneration market beyond its current level. Those<br />

that are being transferred from the Renewables Obligation<br />

to FiTs will still be supported to a similar level under the<br />

existing microgenerators tariff (see Generation <strong>Tariffs</strong> table<br />

on page 6). Many of the installations prior to July 2009 will<br />

also have benefited from LCBP grants.<br />

Why is it better to use the generated<br />

electricity than to export it?<br />

Due to the export tariff level being set at 3.2p for all<br />

renewable technologies, excluding Solar PV that will be<br />

4.5p per unit, it is more financially viable for you to use<br />

your generated electricity on site as this avoids the need to<br />

purchase electricity from your supplier at around 13p per<br />

unit (see the explanatory diagrams on page 6).<br />

What if I want to add more<br />

microgeneration?<br />

Please let us know, so that we can update your details and<br />

payments. It is important you check with your supplier as<br />

your payments can be affected by several factors when<br />

installing additional capacity.<br />

What if my microgeneration scheme<br />

produces more than 50kW?<br />

Please contact Ofgem for details on accreditation.<br />

I have 25 or more installations,<br />

what rates apply to me?<br />

What happens if I change suppliers?<br />

You must inform us and ask your new supplier to pay<br />

your FiT payments.<br />

Can I choose who receives my<br />

cashback payments?<br />

Yes. You must inform us by stating this on the application<br />

form. However you must also tell us if these details change.<br />

Who is eligible to join the<br />

<strong>npower</strong> scheme?<br />

You must either be an <strong>npower</strong> customer, use a supplier<br />

not offering FiTs or be off-grid. If your system is less than<br />

50kW, it must have been installed by an MCS accredited<br />

installer using MCS-accredited products. If it is more than<br />

50kW, please contact Ofgem for accreditation. You will<br />

also need to meet the energy efficiency requirement before<br />

contacting us.<br />

What is the energy efficiency requirement?<br />

This is requirement for all new installations from 1st April<br />

2012 to have a valid Energy Performance Certificate (EPC)<br />

at a rating of level D or above. The EPC must be submitted<br />

with your initial <strong>Feed</strong> <strong>In</strong> Tariff Application, and cannot be<br />

submitted afterwards. Any installation without an EPC will<br />

receive a reduced rate of 7.1p/kWh.<br />

How do I apply?<br />

It’s simple <strong>–</strong> just complete, sign and return the enclosed<br />

application form. We will then contact you with the<br />

next steps.<br />

If you have 25 or more PV installations, your tariff<br />

will reduce. Please see the tariff tables on page 6 for<br />

further information.<br />