23.11.2014 Views

3. Infrastructure Plan Overview Port and Rail Network - Transnet

3. Infrastructure Plan Overview Port and Rail Network - Transnet

3. Infrastructure Plan Overview Port and Rail Network - Transnet

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>3.</strong> <strong>Infrastructure</strong> <strong>Plan</strong> <strong>Overview</strong><br />

Mega Projects: <strong>Overview</strong> <strong>and</strong> Progress to date<br />

Project<br />

5. Ngqura Container<br />

Termina<br />

6. Durban Harbour<br />

Entrance Channel<br />

Widening <strong>and</strong><br />

Deepening<br />

7. DCT<br />

Reengineering<br />

8. New Multi-product<br />

Pipeline<br />

Progress<br />

Objective<br />

to date<br />

84% • Provision of a full service container terminal with 2 berths<br />

in the first phase which will provide 750 000 TEUs/a<br />

capacity.<br />

• The terminal commenced operations in October 2009<br />

<strong>and</strong> plans are in place to utilise Ngqura Container<br />

87% • To widen <strong>and</strong> deepen the entrance channel of the <strong>Port</strong> of<br />

Terminal as a transshipment hub.<br />

Durban to enable safe navigation <strong>and</strong> to accommodate<br />

the trend of increasing vessel sizes.<br />

Dredging works <strong>and</strong> construction of a fixed s<strong>and</strong> bypass<br />

52% • To increase the capacity of the Durban Container<br />

system are the main components of the project.<br />

Terminal from 1.98 million TEUs/annum to 2.3 million<br />

TEUs/annum <strong>and</strong> ultimately to 2.9 million TEUs/annum.<br />

• The project will also replace equipment that has<br />

deteriorated over a working life of more than 20 years to<br />

23% •<br />

improve<br />

To build a<br />

operational<br />

550 kilometre<br />

efficiencies<br />

long new 24 inch trunkline from<br />

Durban to Jameson Park (Gauteng) to address the<br />

increased dem<strong>and</strong> for fuel in Gauteng <strong>and</strong> surrounding<br />

areas.<br />

• The trunk line will connect an inl<strong>and</strong> <strong>and</strong> coastal terminal<br />

with significant storage capacity.<br />

• Construction of the trunkline commenced in February<br />

2008 <strong>and</strong> is considered a strategic project of national<br />

importance.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!