The feasibility, timing and cost implications for water supply and wastewater<br />

treatment infrastructure;<br />

The requirements for community services, such as schools and recreation facilities;<br />

The ability <strong>of</strong> the scenarios to meet a diversity <strong>of</strong> housing and service needs;<br />

Community form and land use compatibility;<br />

Fiscal and economic impacts; and<br />

Conformity to the <strong>Town</strong>’s Principles, Strategic Directions and Goals and other<br />

applicable <strong>Town</strong>, Regional and provincial policies.<br />

A Phase 2 Open House will be held to obtain public comments on the land use scenarios<br />

prior to completing the evaluation.<br />

Phase 2 will include the selection <strong>of</strong> a preferred land use scenario for the 2021 and 2031<br />

planning horizons and <strong>Caledon</strong> Council’s endorsement <strong>of</strong> a conceptual land use pattern.<br />

At this point, it is anticipated that sufficient study and analysis will have been completed<br />

in order to address the requirements set out in the Regional Official Plan in respect <strong>of</strong><br />

Rural Service Centre boundary expansions. This will allow <strong>Caledon</strong> to make an<br />

application in or before June 2009 to the Region <strong>of</strong> Peel to amend the Regional Official<br />

Plan to expand the Mayfield West Rural Service Centre settlement boundary; the<br />

secondary planning exercise will provide the analysis to determine if the application is for<br />

the 2021 or 2031 planning horizon.<br />

Phase 3: Draft Secondary Plan<br />

In Phase 3, the Comprehensive Environmental Impact Study & Management Plan: Part C<br />

(Implementation) will be completed which will include the following components:<br />

conclusions, recommendations, strategies and management measures; long term<br />

monitoring plan; comprehensive adaptive management plan; and guidelines for site<br />

specific environmental studies. In addition, to assist in the implementation <strong>of</strong> the<br />

planning objectives and policies contained in the Secondary Plan, a set <strong>of</strong><br />

implementation documents will be prepared including a Community Phasing Plan; a<br />

Transportation Management Plan; and a Community Design Plan.<br />

Phase 3 will culminate in the preparation <strong>of</strong> a draft Secondary Plan which will provide<br />

detailed planning objectives and policies for future development activities in an expanded<br />

Mayfield West Rural Service Centre. Accordingly, it is expected that an iterative<br />

relationship will exist between preparing the draft Secondary Plan and the<br />

implementation documents.<br />