PLANNING AND DEVELOPMENT ... - Town of Caledon
PLANNING AND DEVELOPMENT ... - Town of Caledon
PLANNING AND DEVELOPMENT ... - Town of Caledon
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
(d)<br />
(e)<br />
(f)<br />
(g)<br />
(h)<br />
(i)<br />
The feasibility, timing and cost implications for water supply and wastewater<br />
treatment infrastructure;<br />
The requirements for community services, such as schools and recreation facilities;<br />
The ability <strong>of</strong> the scenarios to meet a diversity <strong>of</strong> housing and service needs;<br />
Community form and land use compatibility;<br />
Fiscal and economic impacts; and<br />
Conformity to the <strong>Town</strong>’s Principles, Strategic Directions and Goals and other<br />
applicable <strong>Town</strong>, Regional and provincial policies.<br />
A Phase 2 Open House will be held to obtain public comments on the land use scenarios<br />
prior to completing the evaluation.<br />
Phase 2 will include the selection <strong>of</strong> a preferred land use scenario for the 2021 and 2031<br />
planning horizons and <strong>Caledon</strong> Council’s endorsement <strong>of</strong> a conceptual land use pattern.<br />
At this point, it is anticipated that sufficient study and analysis will have been completed<br />
in order to address the requirements set out in the Regional Official Plan in respect <strong>of</strong><br />
Rural Service Centre boundary expansions. This will allow <strong>Caledon</strong> to make an<br />
application in or before June 2009 to the Region <strong>of</strong> Peel to amend the Regional Official<br />
Plan to expand the Mayfield West Rural Service Centre settlement boundary; the<br />
secondary planning exercise will provide the analysis to determine if the application is for<br />
the 2021 or 2031 planning horizon.<br />
Phase 3: Draft Secondary Plan<br />
In Phase 3, the Comprehensive Environmental Impact Study & Management Plan: Part C<br />
(Implementation) will be completed which will include the following components:<br />
conclusions, recommendations, strategies and management measures; long term<br />
monitoring plan; comprehensive adaptive management plan; and guidelines for site<br />
specific environmental studies. In addition, to assist in the implementation <strong>of</strong> the<br />
planning objectives and policies contained in the Secondary Plan, a set <strong>of</strong><br />
implementation documents will be prepared including a Community Phasing Plan; a<br />
Transportation Management Plan; and a Community Design Plan.<br />
Phase 3 will culminate in the preparation <strong>of</strong> a draft Secondary Plan which will provide<br />
detailed planning objectives and policies for future development activities in an expanded<br />
Mayfield West Rural Service Centre. Accordingly, it is expected that an iterative<br />
relationship will exist between preparing the draft Secondary Plan and the<br />
implementation documents.<br />
Mayfield West Phase Two Secondary Plan - General Terms <strong>of</strong> Reference - June 10, 2008 14