25<br />

with the surrounding landscape. Details <strong>of</strong> such assessment are given in the Technical<br />

Memorandum on Environmental Impact Assessment Process (EPD, 1997).<br />

3.11 Post-Construction Moni<strong>to</strong>ring<br />

Post-construction moni<strong>to</strong>ring is normally necessary <strong>to</strong> investigate if the nourished beach<br />

behaves in the same way as that predicted in design. Details will be further discussed in<br />

Chapter 6 <strong>of</strong> this part <strong>of</strong> the Manual.