PORT WORKS DESIGN MANUAL PART 5 Guide to Design of ...
PORT WORKS DESIGN MANUAL PART 5 Guide to Design of ...
PORT WORKS DESIGN MANUAL PART 5 Guide to Design of ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
25<br />
with the surrounding landscape. Details <strong>of</strong> such assessment are given in the Technical<br />
Memorandum on Environmental Impact Assessment Process (EPD, 1997).<br />
3.11 Post-Construction Moni<strong>to</strong>ring<br />
Post-construction moni<strong>to</strong>ring is normally necessary <strong>to</strong> investigate if the nourished beach<br />
behaves in the same way as that predicted in design. Details will be further discussed in<br />
Chapter 6 <strong>of</strong> this part <strong>of</strong> the Manual.