PORT WORKS DESIGN MANUAL PART 5 Guide to Design of ...
PORT WORKS DESIGN MANUAL PART 5 Guide to Design of ...
PORT WORKS DESIGN MANUAL PART 5 Guide to Design of ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
6<br />
3.11 Post Construction Moni<strong>to</strong>ring 25<br />
4. COLLECTION OF INFORMATION 27<br />
Page<br />
No.<br />
4.1 General 27<br />
4.2 Desk Study 27<br />
4.3 Site Inspections 28<br />
4.4 Ground Investigation and Field Measurements 29<br />
4.5 Mathematical Modelling 30<br />
5. <strong>DESIGN</strong> METHODOLOGY 31<br />
5.1 General 31<br />
5.2 Fill Quantity 31<br />
5.2.1 Equilibrium Pr<strong>of</strong>ile Method 31<br />
5.2.2 Equilibrium Slope Method 32<br />
5.2.3 Overfill Ratio Methods 32<br />
5.3 Construction Pr<strong>of</strong>ile 32<br />
5.4 Equilibrium Beach Pr<strong>of</strong>ile 33<br />
5.5 Equilibrium Plan Form 34<br />
5.5.1 Coordinate System 35<br />
5.5.2 Longshore Transport Rates and Directions 35<br />
5.5.3 Equilibrium Shoreline Orientation 36<br />
5.5.4 Shoreline Stability 37<br />
5.5.5 Sand Retaining Structures 38<br />
5.6 Mathematical Modelling Report 40<br />
6. POST-CONSTRUCTION MONITORING 43<br />
6.1 General 43<br />
6.2 Frequency and Extent <strong>of</strong> Moni<strong>to</strong>ring 43<br />
6.3 Moni<strong>to</strong>ring Items 43<br />
REFERENCES<br />
TABLES<br />
List <strong>of</strong> Tables<br />
Tables<br />
47<br />
49<br />
51<br />
53