LEARJET 60 S/N 60 050 N924PS<br />

OWNER:<br />

ADDRESS:<br />

PHONE:<br />

FAX:<br />

CPA LAND COMPANY<br />

P.O.BOX 21470<br />

TULSA OK 74121<br />

918-582-4242<br />

OPERATOR:<br />

ADDRESS:<br />

PHONE:<br />

FAX:<br />

JET SELECT LLC<br />

4130 EAST FIFTH AVENUE<br />

COLUMBUS OH 43219<br />

614-338-4384<br />

614-338-0984<br />

ANALYST: KIRK WILLIAMS 1-866-581-2267 (OFFICE) 800-787-9749<br />

(EFAX-CARDS)<br />

EMAIL: KWILLIAMS@CAMPSYSTEMS.COM<br />

316-462-2442 (FAX) 631-980-4222<br />

(EFAX-CARDS)<br />

WWW.CAMPSYSTEMS.COM<br />

PROJECTED :<br />

12.2 MOS. to 22-JUL-2015<br />

AIRCRAFT SERIAL/REGNO: 60 050/N924PS MODEL: LEARJET 60<br />

MANUFACTURER: BOMBARDIER INCORPORATED<br />

DATES<br />

LAST ACTUALS<br />

CERTIFICATION DATE: 14-DEC-1994 9453.2 A/C HRS as of 22-JUL-2014 10041.9<br />

6297 AFL as of<br />

3304 ACH as of<br />

22-JUL-2014<br />

22-JUL-2014<br />

6885.71<br />

3598.35<br />

PROJECTED<br />

ENGINE NO. 1<br />

ENGINE NO. 2<br />

SERIAL/PART: PCE-305220/31B4067-04 MODEL: PW305/PW305A/PW305B (CIMMS) MANUFACTURER: PRATT & WHITNEY CANADA CORP.<br />

INSTALLED ON 24-AUG-2011<br />

LAST ACTUALS<br />

7746.9 ENG. HRS 8333.7 A/C HRS 8866.4 ENG. HRS as of<br />

5333 ENC 5946 ENC as of<br />

22-JUL-2014<br />

22-JUL-2014<br />

9455.1<br />

6534.71<br />

PROJECTED<br />

SERIAL/PART: PCE-305217/31B4067-04 MODEL: PW305/PW305A/PW305B (CIMMS) MANUFACTURER: PRATT & WHITNEY CANADA CORP.<br />

INSTALLED ON 18-AUG-2012<br />

LAST ACTUALS<br />

PROJECTED<br />

8446.1 ENG. HRS 0 A/C HRS 9274.9 ENG. HRS as of<br />

5739 ENC 6205 ENC as of<br />

22-JUL-2014<br />

22-JUL-2014<br />

9863.6<br />

6793.71<br />

BOMBARDIER¿ AND LEARJET¿ ARE TRADEMARKS OF BOMBARDIER, INC.<br />

22-JUL-2014<br />

Due List Report © CAMP SYSTEMS<br />

1 Of 17


Due List<br />

LEARJET 60 S/N 60 050 (N924PS): 9453.2 HRS, 6297 AFL as of 22-Jul-2014<br />

Operator: JET SELECT LLC<br />

Calendar Section<br />

Projected To: 12.2 MOS. to 22-JUL-2015<br />

Report Date: 22-JUL-2014<br />

H<br />

TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE<br />

SB 60-32-33 INSTALLATION OF THE MAIN LANDING GEAR SQUAT SWITCH SHIELDING IMPROVEMENTS, SERVICE BULLETIN RECOMMENDED<br />

( ENH ) AFH<br />

MAX LIMIT DISPOSITION EST. DUE<br />

TIME REMAINING<br />

REF<br />

:<br />

BULLETINS<br />

MOS 24<br />

HRS/MSC 600<br />

AFL<br />

(EFF)<br />

23-JUL-2014<br />

1 d<br />

9222.83 OVD<br />

05-P&W-730001 NO. 1 ENGINE - REPLACE ENGINE FUEL FILTER ELEMENT<br />

REF<br />

:<br />

See Workcard<br />

MOS 12<br />

HRS/MSC 1200<br />

ENC<br />

11-JUL-2013<br />

8416.80<br />

5688<br />

11-JUL-2014<br />

OVD<br />

9616.80 750.4<br />

05-10-29-L2812020 INSPECT L/R INNER WING, INBOARD OF WS 72 FOR CORROSION/CONDITION<br />

REF<br />

:<br />

See Workcard<br />

MOS 24 +14d/-14d<br />

19-JUL-2012<br />

HRS/MSC<br />

8620.50<br />

AFL<br />

5827<br />

19-JUL-2014<br />

02-AUG-2014<br />

TOL<br />

(+11 d)<br />

19-JUL-2014<br />

237021B REPLACE CVR UNDERWATER LOCATOR (ULB) BEACON BATTERY - 05-11-00-F2566000<br />

P/N: DK120<br />

S/N: DU7884<br />

REF CMM SECTION VI<br />

:<br />

MOS<br />

HRS/MSC DUE<br />

AFL<br />

13-MAY-2008<br />

7049.90<br />

4876<br />

31-JUL-2014<br />

M<br />

9 d<br />

31-JUL-2014<br />

H<br />

FAA 2013-13-09 (G) (1) LANDING GEAR - MODIFICATION AND INSTALLATION INSTALL NEW RIGID HYDRAULIC TUBE ASSEMBLIES TO THE<br />

MLG STRUTS, INSTALL A NEW MLG SQUAT SWITCH BRACKET AND MODIFY THE MLG SQUAT SWITCH WIRE<br />

HARNESS, MODIFY THE MLG ANTISKID WHEEL TRANSDUCER ELECTRICAL WIRE HARNESSES, AND ROUTE AND<br />

SECURE THE ANTI-SKID WHEEL AND SQUAT SWITCH ELECTRICAL WIRE HARNESSES TO THE MLG STRUT<br />

ASSEMBLY<br />

MANDATORY<br />

REF<br />

:<br />

MOS 12<br />

HRS/MSC 600<br />

AFL<br />

(EFF)<br />

06-AUG-2014<br />

15 d<br />

9621.32 168.12<br />

06-AUG-2014<br />

(xEXT) - Extension incorporated in the next <strong>due</strong> (s) - Suppressed Requirement + - FAA manual flag is set (EBT) - Estimated Base Time (EFF) - Effective C/W<br />

* - Estimated Due (applies to New Requirement) H - Task also <strong>due</strong> in hours <strong>due</strong> list<br />

© CAMP SYSTEMS<br />

2 Of 17


Due List<br />

LEARJET 60 S/N 60 050 (N924PS): 9453.2 HRS, 6297 AFL as of 22-Jul-2014<br />

Operator: JET SELECT LLC<br />

Calendar Section<br />

Projected To: 12.2 MOS. to 22-JUL-2015<br />

Report Date: 22-JUL-2014<br />

H<br />

TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE<br />

( ENH ) AFH<br />

MAX LIMIT<br />

FAA 2013-13-09 (G) (2) LANDING GEAR - MODIFICATION AND INSTALLATION INSTALL OUTBOARD BRACKET ASSEMBLIES, ANTI-SKID<br />

SHIELD, FORWARD ELECTRICAL COVER ON THE FORWARD STIFFENER, UPPER AND LOWER INBOARD BRACKET<br />

ASSEMBLIES, AND CLAMPS THAT SUPPORT THE ELECTRICAL WIRE HARNESS; MODIFY THE AFT STIFFENER FOR<br />

THE NEW ELECTRICAL WIRE HARNESS SUPPORT; INSTALL THE AFT ELECTRICAL COVER AND STRAP ON THE AFT<br />

STIFFENER; AND INSTALL A NEW FLAT LANDING LIGHT LAMP<br />

DISPOSITION EST. DUE<br />

TIME REMAINING<br />

MANDATORY<br />

REF<br />

:<br />

MOS 12<br />

HRS/MSC 600<br />

AFL<br />

(EFF)<br />

06-AUG-2014<br />

15 d<br />

9621.32 168.12<br />

06-AUG-2014<br />

H<br />

FAA 2013-13-09 (G) (3) LANDING GEAR - MODIFICATION AND INSTALLATION INSTALL A NEW WHEEL SPEED DETECT BOX ASSEMBLY,<br />

NUTPLATES, BRACKETS, AND INTERFACE BOX; AND MODIFY THE WIRING FOR THE NEW THRUST REVERSER<br />

INTERFACE BOX<br />

MANDATORY<br />

REF<br />

:<br />

MOS 12<br />

HRS/MSC 600<br />

AFL<br />

(EFF)<br />

06-AUG-2014<br />

15 d<br />

9621.32 168.12<br />

06-AUG-2014<br />

120000 COMPLY WITH JET SELECT AIRCRAFT MAINTENANCE CHECKLIST CUSTOMER CODE<br />

REF<br />

:<br />

MOS<br />

HRS/MSC<br />

AFL<br />

1 14-JUL-2014<br />

9438.10<br />

6290<br />

14-AUG-2014<br />

23 d<br />

14-AUG-2014<br />

340010 PERFORM UNS-1E 28 DAY NAVIGATION DATABASE UPDATE (REF. DOC. ICA400014-34238, APP. B) - MX TASK - ICA<br />

REF<br />

:<br />

MOS<br />

HRS/MSC DUE<br />

AFL<br />

16-JUL-2014<br />

9438.10<br />

6290<br />

21-AUG-2014<br />

M<br />

30 d<br />

21-AUG-2014<br />

05-P&W-730001 NO. 2 ENGINE - REPLACE ENGINE FUEL FILTER ELEMENT<br />

REF<br />

:<br />

See Workcard<br />

MOS 12<br />

HRS/MSC 1200<br />

ENC<br />

27-AUG-2013<br />

8870.10<br />

5975<br />

27-AUG-2014<br />

36 d<br />

10070.10 795.2<br />

27-AUG-2014<br />

05-P&W-790001 NO. 2 ENGINE - REPLACE ENGINE OIL FILTER ELEMENT<br />

REF<br />

:<br />

See Workcard<br />

MOS 12<br />

HRS/MSC 1200<br />

ENC<br />

27-AUG-2013<br />

8870.10<br />

5975<br />

27-AUG-2014<br />

36 d<br />

10070.10 795.2<br />

27-AUG-2014<br />

(xEXT) - Extension incorporated in the next <strong>due</strong> (s) - Suppressed Requirement + - FAA manual flag is set (EBT) - Estimated Base Time (EFF) - Effective C/W<br />

* - Estimated Due (applies to New Requirement) H - Task also <strong>due</strong> in hours <strong>due</strong> list<br />

© CAMP SYSTEMS<br />

3 Of 17


Due List<br />

LEARJET 60 S/N 60 050 (N924PS): 9453.2 HRS, 6297 AFL as of 22-Jul-2014<br />

Operator: JET SELECT LLC<br />

Calendar Section<br />

Projected To: 12.2 MOS. to 22-JUL-2015<br />

Report Date: 22-JUL-2014<br />

H<br />

TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE<br />

05-P&W-790002 NO. 2 ENGINE - PERFORM ENGINE OIL CHANGE<br />

NEXT DUE<br />

( ENH ) AFH<br />

MAX LIMIT<br />

DISPOSITION EST. DUE<br />

TIME REMAINING<br />

REF<br />

:<br />

See Workcard<br />

MOS 12<br />

HRS/MSC 600<br />

ENC<br />

+50/-50<br />

27-AUG-2013<br />

8870.10<br />

5975<br />

27-AUG-2014<br />

36 d<br />

9470.10 9520.1<br />

195.2<br />

(+50)<br />

27-AUG-2014<br />

361038A PERFORM NO. 2 EMERGENCY AIR BOTTLE VISUAL INSPECTION AND HYDROSTATIC TEST<br />

P/N: 23111425<br />

S/N: 747<br />

REF See Workcard<br />

:<br />

MOS 36 01-SEP-2011<br />

HRS/MSC<br />

AFL<br />

01-SEP-2014<br />

41 d<br />

01-SEP-2014<br />

243049B CAPACITY CHECK UPPER / RIGHT / NO. 2 LEAD-ACID (CAPTIVE) BATTERY 05-10-29-G1222002 VENDOR RECOMMENDATION<br />

P/N: RG-380E/60L<br />

S/N: 40592995<br />

REF See Workcard<br />

:<br />

MOS 3 +1m/-1m<br />

16-JUL-2014<br />

HRS/MSC<br />

9438.10<br />

AFL<br />

6290<br />

20-SEP-2014<br />

20-OCT-2014<br />

60 d<br />

(+30)<br />

20-SEP-2014<br />

WO: N924PS 4-2013 DUE LIST<br />

243050B CAPACITY CHECK LOWER / LEFT / NO. 1 LEAD-ACID (CAPTIVE) BATTERY 05-10-29-G1222002 VENDOR RECOMMENDATION<br />

P/N: RG-380E/60L<br />

S/N: 40602511<br />

REF See Workcard<br />

:<br />

MOS 3 +1m/-1m<br />

16-JUL-2014<br />

HRS/MSC<br />

9438.10<br />

AFL<br />

6290<br />

20-SEP-2014<br />

20-OCT-2014<br />

60 d<br />

(+30)<br />

20-SEP-2014<br />

05-10-30-RVSM-T341101<br />

5<br />

PERFORM AIR DATA CERTIFICATION TESTING OF PRIMARY ALTITUDE SYSTEM (REFER TO 34-17-00)<br />

REF<br />

:<br />

See Workcard<br />

MOS 12 +14d/-14d<br />

30-OCT-2013<br />

HRS/MSC<br />

9093.80<br />

AFL<br />

6095<br />

10-OCT-2014<br />

24-OCT-2014<br />

80 d<br />

(+14)<br />

10-OCT-2014<br />

243062B DISCHARGE CHECK NO. 1 EMERGENCY POWER BATTERY 05-10-29-D1223015<br />

P/N: 501-1712-02<br />

S/N: 1191<br />

REF See Workcard<br />

:<br />

MOS 12 +14d/-14d<br />

30-OCT-2013<br />

HRS/MSC<br />

9093.80<br />

AFL<br />

6095<br />

17-OCT-2014<br />

31-OCT-2014<br />

87 d<br />

(+14)<br />

17-OCT-2014<br />

(xEXT) - Extension incorporated in the next <strong>due</strong> (s) - Suppressed Requirement + - FAA manual flag is set (EBT) - Estimated Base Time (EFF) - Effective C/W<br />

* - Estimated Due (applies to New Requirement)<br />

© CAMP SYSTEMS<br />

4 Of 17


Due List<br />

LEARJET 60 S/N 60 050 (N924PS): 9453.2 HRS, 6297 AFL as of 22-Jul-2014<br />

Operator: JET SELECT LLC<br />

Calendar Section<br />

Projected To: 12.2 MOS. to 22-JUL-2015<br />

Report Date: 22-JUL-2014<br />

TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE<br />

256001A INSPECT AND PERFORM FUNCTIONAL TEST OF THE ELT SYSTEM (IF INSTALLED). FAR 91.207<br />

( ENH ) AFH<br />

MAX LIMIT<br />

DISPOSITION EST. DUE<br />

TIME REMAINING<br />

P/N: 455-0133-(366)<br />

S/N: 06378<br />

REF See Workcard<br />

:<br />

MOS<br />

HRS/MSC<br />

AFL<br />

12 30-OCT-2013<br />

9093.80<br />

6095<br />

30-OCT-2014<br />

100 d<br />

30-OCT-2014<br />

340005 PERFORM ANNUAL AVIONICS INSPECTION PER JET SELECT AAIP CUSTOMER CODE<br />

REF<br />

:<br />

MOS<br />

HRS/MSC<br />

AFL<br />

12 30-OCT-2013<br />

9093.80<br />

6095<br />

30-OCT-2014<br />

100 d<br />

30-OCT-2014<br />

120100 REPLACE FUEL TEST KIT<br />

REF<br />

:<br />

MOS<br />

HRS/MSC DUE<br />

AFL<br />

07-JAN-2014<br />

9220.20<br />

6159<br />

31-OCT-2014<br />

M<br />

101 d<br />

31-OCT-2014<br />

243062A OPERATIONAL CHECK NO. 1 EMERGENCY POWER BATTERY 05-10-29-F1223010<br />

P/N: 501-1712-02<br />

S/N: 1191<br />

REF See Workcard<br />

:<br />

MOS 6 +14d/-14d<br />

30-APR-2014<br />

HRS/MSC<br />

9322.50<br />

AFL<br />

6218<br />

31-OCT-2014<br />

14-NOV-2014<br />

101 d<br />

(+14)<br />

31-OCT-2014<br />

250000 FIRST AID KIT<br />

P/N: AFAK<br />

S/N: 081308024<br />

REF GENERIC NO REF<br />

:<br />

MOS<br />

HRS/MSC DUE<br />

AFL<br />

TSN:0<br />

TSN:0<br />

TSN:0<br />

31-OCT-2013<br />

31-OCT-2014<br />

M<br />

101 d<br />

31-OCT-2014<br />

262014A<br />

INSPECTION AFT FIRE EXTINGUISHER BOTTLE CHECK ENGINE FIRE EXTINGUISHER CONTAINER PRESSURE GAUGE<br />

FOR PROPER PRESSURE, AND PLUMBING FOR CONDITION AND SECURITY. (REF TO 26-21-00)<br />

P/N: 32700004-1<br />

S/N: 12923C1<br />

REF See Workcard<br />

:<br />

MOS 6 +14d/-14d<br />

21-MAY-2014<br />

HRS/MSC<br />

9354.30<br />

AFL<br />

6234<br />

06-NOV-2014<br />

20-NOV-2014<br />

107 d<br />

(+14)<br />

06-NOV-2014<br />

(xEXT) - Extension incorporated in the next <strong>due</strong> (s) - Suppressed Requirement + - FAA manual flag is set (EBT) - Estimated Base Time (EFF) - Effective C/W<br />

* - Estimated Due (applies to New Requirement) H - Task also <strong>due</strong> in hours <strong>due</strong> list<br />

© CAMP SYSTEMS<br />

5 Of 17


Due List<br />

LEARJET 60 S/N 60 050 (N924PS): 9453.2 HRS, 6297 AFL as of 22-Jul-2014<br />

Operator: JET SELECT LLC<br />

Calendar Section<br />

Projected To: 12.2 MOS. to 22-JUL-2015<br />

Report Date: 22-JUL-2014<br />

H<br />

TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE<br />

05-P&W-790002 NO. 1 ENGINE - PERFORM ENGINE OIL CHANGE<br />

NEXT DUE<br />

( ENH ) AFH<br />

MAX LIMIT<br />

DISPOSITION EST. DUE<br />

TIME REMAINING<br />

REF<br />

:<br />

See Workcard<br />

MOS 12<br />

HRS/MSC 600<br />

ENC<br />

+50/-50<br />

13-NOV-2013<br />

8515.50<br />

5748<br />

13-NOV-2014<br />

114 d<br />

9115.50 9165.5<br />

249.1<br />

(+50)<br />

13-NOV-2014<br />

256075A INSPECT LIFE RAFT LIFE RAFT IAW MANUFACTURERS INSTRUCTIONS CUSTOMER CODE<br />

P/N: RAF1212-105T1<br />

S/N: 1217KV/1212KV<br />

REF<br />

:<br />

MOS 12 +14d/-14d<br />

02-DEC-2013<br />

HRS/MSC<br />

9133.10<br />

AFL<br />

6119<br />

21-NOV-2014<br />

05-DEC-2014<br />

122 d<br />

(+14)<br />

21-NOV-2014<br />

05-P&W-790001 NO. 1 ENGINE - REPLACE ENGINE OIL FILTER ELEMENT<br />

REF<br />

:<br />

See Workcard<br />

MOS 12<br />

HRS/MSC 1200<br />

ENC<br />

09-DEC-2013<br />

8558.50<br />

5772<br />

09-DEC-2014<br />

140 d<br />

9758.50 892.1<br />

09-DEC-2014<br />

H<br />

05001A PERFORM 12MOS/300HR A-PHASE INSPECTION<br />

REF<br />

:<br />

MOS 12<br />

HRS/MSC 300<br />

AFL<br />

+14d/-14d<br />

+25/-25<br />

18-JAN-2014<br />

9220.20<br />

6159<br />

18-JAN-2015 01-FEB-2015 180 d<br />

9497.50 44.3<br />

(+14)<br />

17-AUG-2014<br />

262013A<br />

INSPECTION FORWARD FIRE EXTINGUISHER BOTTLE CHECK ENGINE FIRE EXTINGUISHER CONTAINER PRESSURE<br />

GAUGE FOR PROPER PRESSURE, AND PLUMBING FOR CONDITION AND SECURITY. (REF TO 26-21-00)<br />

P/N: 32700004-1<br />

S/N: 13298C1<br />

REF See Workcard<br />

:<br />

MOS 6 +14d/-14d<br />

14-JUL-2014<br />

HRS/MSC<br />

9438.10<br />

AFL<br />

6290<br />

18-JAN-2015<br />

01-FEB-2015<br />

180 d<br />

(+14)<br />

18-JAN-2015<br />

05-10-29-B2432010 INSPECT MAIN AIRCRAFT BATTERY INSTALLATION<br />

REF<br />

:<br />

See Workcard<br />

MOS 6 +14d/-14d<br />

14-JUL-2014<br />

HRS/MSC<br />

9438.10<br />

AFL<br />

6290<br />

19-JAN-2015<br />

02-FEB-2015<br />

181 d<br />

(+14)<br />

19-JAN-2015<br />

(xEXT) - Extension incorporated in the next <strong>due</strong> (s) - Suppressed Requirement + - FAA manual flag is set (EBT) - Estimated Base Time (EFF) - Effective C/W<br />

* - Estimated Due (applies to New Requirement) H - Task also <strong>due</strong> in hours <strong>due</strong> list<br />

© CAMP SYSTEMS<br />

6 Of 17


Due List<br />

LEARJET 60 S/N 60 050 (N924PS): 9453.2 HRS, 6297 AFL as of 22-Jul-2014<br />

Operator: JET SELECT LLC<br />

Calendar Section<br />

Projected To: 12.2 MOS. to 22-JUL-2015<br />

Report Date: 22-JUL-2014<br />

H<br />

TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE<br />

( ENH ) AFH<br />

346081 INSPECT DUAL UNS-1E FMS INSTALLATION (12MONTH / 600HR) ICA<br />

MAX LIMIT DISPOSITION EST. DUE<br />

TIME REMAINING<br />

REF<br />

:<br />

MOS 12<br />

HRS/MSC 600<br />

AFL<br />

20-MAR-2014<br />

9267.60<br />

6187<br />

20-MAR-2015<br />

241 d<br />

9867.60 414.4<br />

20-MAR-2015<br />

361038B PERFORM NO. 2 EMERGENCY AIR BOTTLE X-RAY INSPECTION<br />

P/N: 23111425<br />

S/N: 747<br />

REF See Workcard<br />

:<br />

MOS<br />

HRS/MSC<br />

AFL<br />

36 21-DEC-2011<br />

8386.80<br />

5712<br />

31-MAR-2015<br />

(x10<br />

)<br />

252 d<br />

31-MAR-2015<br />

720000 NO. 1 ENGINE - IN SERVICE LOW UTILIZATION INSPECTION<br />

REF<br />

:<br />

See Workcard<br />

MOS 24 +12m 11-DEC-2008 31-MAR-2015 M 31-MAR-2016 252 d (+366) 31-MAR-2015<br />

HRS/MSC<br />

7146.40<br />

ENC<br />

4941<br />

720000 NO. 2 ENGINE - IN SERVICE LOW UTILIZATION INSPECTION<br />

REF<br />

:<br />

See Workcard<br />

MOS 24 +12m 10-NOV-2003 31-MAR-2015 M 31-MAR-2016 252 d (+366) 31-MAR-2015<br />

HRS/MSC<br />

4928.80<br />

ENC<br />

3377<br />

774001A REPLACE ENGINE DIAGNOSTIC UNIT INTERNAL BATTERY<br />

P/N: 9-361-06<br />

S/N: 0102<br />

REF<br />

:<br />

MOS<br />

HRS/MSC<br />

AFL<br />

36 16-MAR-2013<br />

8897.50<br />

5983<br />

31-MAR-2015<br />

(x15<br />

)<br />

252 d<br />

31-MAR-2015<br />

262036 FORWARD ENGINE FIRE EXTINGUISHER FORWARD SQUIB SERVICE LIFE LIMIT<br />

P/N: 30903823<br />

S/N: UNK#1<br />

REF See Workcard<br />

:<br />

MOS<br />

HRS/MSC<br />

AFL<br />

72 +14d/-14d TSN:0<br />

TSN:0<br />

TSN:0<br />

24-APR-2009<br />

7416.20<br />

5112<br />

ACH<br />

30-APR-2015<br />

14-MAY-2015<br />

282 d<br />

(+14)<br />

30-APR-2015<br />

262037 AFT ENGINE FIRE EXTINGUISHER FORWARD SQUIB SERVICE LIFE LIMIT<br />

P/N: 30903823<br />

S/N: UNK#4<br />

REF See Workcard<br />

:<br />

MOS<br />

HRS/MSC<br />

AFL<br />

72 +14d/-14d TSN:0<br />

TSN:0<br />

TSN:0<br />

24-APR-2009<br />

7416.20<br />

5112<br />

ACH<br />

30-APR-2015<br />

14-MAY-2015<br />

282 d<br />

(+14)<br />

30-APR-2015<br />

(xEXT) - Extension incorporated in the next <strong>due</strong> (s) - Suppressed Requirement + - FAA manual flag is set (EBT) - Estimated Base Time (EFF) - Effective C/W<br />

* - Estimated Due (applies to New Requirement)<br />

© CAMP SYSTEMS<br />

7 Of 17


Due List<br />

LEARJET 60 S/N 60 050 (N924PS): 9453.2 HRS, 6297 AFL as of 22-Jul-2014<br />

Operator: JET SELECT LLC<br />

Calendar Section<br />

Projected To: 12.2 MOS. to 22-JUL-2015<br />

Report Date: 22-JUL-2014<br />

TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE<br />

262038 FORWARD ENGINE FIRE EXTINGUISHER AFT SQUIB SERVICE LIFE LIMIT<br />

( ENH ) AFH<br />

MAX LIMIT DISPOSITION EST. DUE<br />

TIME REMAINING<br />

P/N: 30903823<br />

S/N: UNK#2<br />

REF See Workcard<br />

:<br />

MOS<br />

HRS/MSC<br />

AFL<br />

72 +14d/-14d TSN:0<br />

TSN:0<br />

TSN:0<br />

24-APR-2009<br />

7416.20<br />

5112<br />

ACH<br />

30-APR-2015<br />

14-MAY-2015<br />

282 d<br />

(+14)<br />

30-APR-2015<br />

262039 AFT ENGINE FIRE EXTINGUISHER AFT SQUIB SERVICE LIFE LIMIT<br />

P/N: 30903823<br />

S/N: UNK#3<br />

REF See Workcard<br />

:<br />

MOS<br />

HRS/MSC<br />

AFL<br />

72 +14d/-14d TSN:0<br />

TSN:0<br />

TSN:0<br />

24-APR-2009<br />

7416.20<br />

5112<br />

ACH<br />

30-APR-2015<br />

14-MAY-2015<br />

282 d<br />

(+14)<br />

30-APR-2015<br />

312001A REPLACE PILOT CREW CLOCK BATTERY<br />

REF<br />

:<br />

See Workcard<br />

MOS<br />

HRS/MSC<br />

AFL<br />

24 03-MAY-2013<br />

8933<br />

6005<br />

03-MAY-2015<br />

285 d<br />

03-MAY-2015<br />

WO: N924PS 4-2013 DUE LIST<br />

312002A REPLACE COPILOT CREW CLOCK BATTERY<br />

REF<br />

:<br />

See Workcard<br />

MOS<br />

HRS/MSC<br />

AFL<br />

24 03-MAY-2013<br />

8933<br />

6005<br />

03-MAY-2015<br />

285 d<br />

03-MAY-2015<br />

WO: N924PS 4-2013 DUE LIST<br />

05-10-29-L2812002 INSPECT INNER WING STRUCTURE OUTBOARD OF WS 213.602<br />

REF<br />

:<br />

See Workcard<br />

MOS 24 +14d/-14d<br />

03-MAY-2013<br />

HRS/MSC<br />

8933<br />

AFL<br />

6005<br />

11-MAY-2015<br />

25-MAY-2015<br />

293 d<br />

(+14)<br />

11-MAY-2015<br />

WO: N924PS 4-2013 DUE LIST<br />

05-10-29-L2812010 INSPECT INNER WING BETWEEN WS 53.0 & 92.0 FOR CORROSION & BACTERIA<br />

REF<br />

:<br />

See Workcard<br />

MOS 24 +14d/-14d<br />

03-MAY-2013<br />

HRS/MSC<br />

8933<br />

AFL<br />

6005<br />

11-MAY-2015<br />

25-MAY-2015<br />

293 d<br />

(+14)<br />

11-MAY-2015<br />

WO: N924PS 4-2013 DUE LIST<br />

(xEXT) - Extension incorporated in the next <strong>due</strong> (s) - Suppressed Requirement + - FAA manual flag is set (EBT) - Estimated Base Time (EFF) - Effective C/W<br />

* - Estimated Due (applies to New Requirement)<br />

© CAMP SYSTEMS<br />

8 Of 17


Due List<br />

LEARJET 60 S/N 60 050 (N924PS): 9453.2 HRS, 6297 AFL as of 22-Jul-2014<br />

Operator: JET SELECT LLC<br />

Calendar Section<br />

Projected To: 12.2 MOS. to 22-JUL-2015<br />

Report Date: 22-JUL-2014<br />

TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE<br />

05-10-29-L5210025 VISUAL INSPECTION EXTERIOR LWR DOOR STRUCTURE/HINGE FOR CORROSION<br />

( ENH ) AFH<br />

MAX LIMIT<br />

DISPOSITION EST. DUE<br />

TIME REMAINING<br />

REF<br />

:<br />

See Workcard<br />

MOS 24 +14d/-14d<br />

03-MAY-2013<br />

HRS/MSC<br />

8933<br />

AFL<br />

6005<br />

11-MAY-2015<br />

25-MAY-2015<br />

293 d<br />

(+14)<br />

11-MAY-2015<br />

WO: N924PS 4-2013 DUE LIST<br />

(xEXT) - Extension incorporated in the next <strong>due</strong> (s) - Suppressed Requirement + - FAA manual flag is set (EBT) - Estimated Base Time (EFF) - Effective C/W<br />

* - Estimated Due (applies to New Requirement)<br />

© CAMP SYSTEMS<br />

9 Of 17


Due List<br />

LEARJET 60 S/N 60 050 (N924PS): 9453.2 HRS, 6297 AFL as of 22-Jul-2014<br />

Operator: JET SELECT LLC<br />

Hours Section<br />

Report Date: 22-JUL-2014<br />

C<br />

TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE<br />

SB 60-32-33 INSTALLATION OF THE MAIN LANDING GEAR SQUAT SWITCH SHIELDING IMPROVEMENTS, SERVICE BULLETIN RECOMMENDED<br />

( ENH ) AFH<br />

MAX LIMIT DISPOSITION EST. DUE<br />

TIME REMAINING<br />

REF<br />

:<br />

BULLETINS<br />

MOS 24<br />

HRS/MSC 600<br />

AFL<br />

(EFF)<br />

23-JUL-2014<br />

1 d<br />

9222.83 OVD<br />

05-P&W-710019 NO. 1 ENGINE - REPLACE BLEED OFF VALVE SOLENOID<br />

REF<br />

:<br />

See Workcard<br />

MOS<br />

HRS/MSC 1500<br />

ENC<br />

+300/-300<br />

11-DEC-2008<br />

7146.40<br />

4941<br />

(8646.40) 9233.20 8946.4<br />

TOL<br />

(+80)<br />

10-MAR-2014<br />

C<br />

05001A PERFORM 12MOS/300HR A-PHASE INSPECTION<br />

REF<br />

:<br />

MOS 12<br />

HRS/MSC 300<br />

AFL<br />

+14d/-14d<br />

+25/-25<br />

18-JAN-2014<br />

9220.20<br />

6159<br />

18-JAN-2015 01-FEB-2015 180 d<br />

9497.50 44.3<br />

(+14)<br />

17-AUG-2014<br />

052000 NO. 1 ENGINE - MINOR INSPECTION ITEMS<br />

REF<br />

:<br />

See Workcard<br />

MOS<br />

HRS/MSC 300<br />

ENC<br />

+25/-25<br />

09-JAN-2014<br />

8633.40<br />

5808<br />

(8910.70) 9497.50 8935.7<br />

44.3<br />

(+25)<br />

17-AUG-2014<br />

052000 NO. 2 ENGINE - MINOR INSPECTION ITEMS<br />

REF<br />

:<br />

See Workcard<br />

MOS<br />

HRS/MSC 300<br />

ENC<br />

+25/-25<br />

09-JAN-2014<br />

9041.90<br />

6067<br />

(9319.20) 9497.50 9344.2<br />

44.3<br />

(+25)<br />

17-AUG-2014<br />

793000 NO. 1 ENGINE - SOAP CHECK CUSTOMER CODE<br />

REF<br />

:<br />

MOS<br />

HRS/MSC 250<br />

ENC<br />

11-MAR-2014<br />

8674.10<br />

5832<br />

(8924.10) 9510.90 57.7<br />

26-AUG-2014<br />

(xEXT) - Extension incorporated in the next <strong>due</strong> (s) - Suppressed Requirement + - FAA manual flag is set (EBT) - Estimated Base Time (EFF) - Effective C/W<br />

* - Estimated Due (applies to New Requirement) C - Task also <strong>due</strong> in calendar <strong>due</strong> list<br />

© CAMP SYSTEMS<br />

10 Of 17


Due List<br />

LEARJET 60 S/N 60 050 (N924PS): 9453.2 HRS, 6297 AFL as of 22-Jul-2014<br />

Operator: JET SELECT LLC<br />

Hours Section<br />

Report Date: 22-JUL-2014<br />

TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE<br />

723005A NO. 1 ENGINE - EDDY CURRENT INSPECT STAGE 1 COMPRESSOR ROTOR<br />

NEXT DUE<br />

( ENH ) AFH<br />

MAX LIMIT<br />

DISPOSITION EST. DUE<br />

TIME REMAINING<br />

P/N: 30B6531-01<br />

S/N: TXA1B7631<br />

REF See Workcard<br />

:<br />

MOS<br />

HRS/MSC 300<br />

ENC<br />

+25<br />

09-JAN-2014<br />

8633.40<br />

5808<br />

(8933.40) 9520.20 8958.4<br />

67<br />

(+25)<br />

31-AUG-2014<br />

WO: N924PS 4-2013 DUE LIST<br />

05-10-29-H2431017 PERFORM BATTERY CABLES & RECEPTACLES - BATTERY CONNECTOR INSPECTION<br />

REF<br />

:<br />

See Workcard<br />

MOS<br />

HRS/MSC 300<br />

AFL<br />

+25/-25<br />

18-JAN-2014<br />

9220.20<br />

6159<br />

9520.50 9545.5<br />

67.3<br />

(+25)<br />

31-AUG-2014<br />

05-P&W-710017 NO. 1 ENGINE - INSPECT AND CLEAN P1/T1 SENSOR CONNECTOR<br />

REF<br />

:<br />

MOS<br />

HRS/MSC 600<br />

ENC<br />

03-MAY-2013<br />

8346.20<br />

5654<br />

(8946.20) 9533 79.8<br />

08-SEP-2014<br />

WO: N924PS 4-2013 DUE LIST<br />

05-P&W-710017 NO. 2 ENGINE - INSPECT AND CLEAN P1/T1 SENSOR CONNECTOR<br />

REF<br />

:<br />

MOS<br />

HRS/MSC 600<br />

ENC<br />

03-MAY-2013<br />

8754.70<br />

5913<br />

(9354.70) 9533 79.8<br />

08-SEP-2014<br />

WO: N924PS 4-2013 DUE LIST<br />

05-P&W-730005 NO. 1 ENGINE - CLEAN PRIMARY FUEL NOZZLES<br />

REF<br />

:<br />

See Workcard<br />

MOS<br />

HRS/MSC 1800<br />

ENC<br />

+600/-600<br />

11-DEC-2008<br />

7146.40<br />

4941<br />

(8946.40) 9533.20 9546.4<br />

80<br />

(+600)<br />

08-SEP-2014<br />

274013 HORIZONTAL STABILIZER ACTUATOR OVERHAUL<br />

P/N: 5435005-024<br />

S/N: 139<br />

REF See Workcard<br />

:<br />

MOS<br />

HRS/MSC 600<br />

AFL<br />

+25/-25<br />

TSO:0<br />

TSO:0<br />

TSO:0<br />

03-MAY-2013<br />

8933<br />

6005<br />

9544.20 9569.2<br />

91<br />

(+25)<br />

15-SEP-2014<br />

WO: N924PS 4-2013 DUE LIST<br />

(xEXT) - Extension incorporated in the next <strong>due</strong> (s) - Suppressed Requirement + - FAA manual flag is set (EBT) - Estimated Base Time (EFF) - Effective C/W<br />

* - Estimated Due (applies to New Requirement) C - Task also <strong>due</strong> in calendar <strong>due</strong> list<br />

© CAMP SYSTEMS<br />

11 Of 17


Due List<br />

LEARJET 60 S/N 60 050 (N924PS): 9453.2 HRS, 6297 AFL as of 22-Jul-2014<br />

Operator: JET SELECT LLC<br />

Hours Section<br />

Report Date: 22-JUL-2014<br />

C<br />

TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE<br />

( ENH ) AFH<br />

MAX LIMIT<br />

FAA 2013-13-09 (G) (1) LANDING GEAR - MODIFICATION AND INSTALLATION INSTALL NEW RIGID HYDRAULIC TUBE ASSEMBLIES TO THE<br />

MLG STRUTS, INSTALL A NEW MLG SQUAT SWITCH BRACKET AND MODIFY THE MLG SQUAT SWITCH WIRE<br />

HARNESS, MODIFY THE MLG ANTISKID WHEEL TRANSDUCER ELECTRICAL WIRE HARNESSES, AND ROUTE AND<br />

SECURE THE ANTI-SKID WHEEL AND SQUAT SWITCH ELECTRICAL WIRE HARNESSES TO THE MLG STRUT<br />

ASSEMBLY<br />

DISPOSITION EST. DUE<br />

TIME REMAINING<br />

MANDATORY<br />

REF<br />

:<br />

MOS 12<br />

HRS/MSC 600<br />

AFL<br />

(EFF)<br />

06-AUG-2014<br />

15 d<br />

9621.32 168.12<br />

06-AUG-2014<br />

C<br />

FAA 2013-13-09 (G) (2) LANDING GEAR - MODIFICATION AND INSTALLATION INSTALL OUTBOARD BRACKET ASSEMBLIES, ANTI-SKID<br />

SHIELD, FORWARD ELECTRICAL COVER ON THE FORWARD STIFFENER, UPPER AND LOWER INBOARD BRACKET<br />

ASSEMBLIES, AND CLAMPS THAT SUPPORT THE ELECTRICAL WIRE HARNESS; MODIFY THE AFT STIFFENER FOR<br />

THE NEW ELECTRICAL WIRE HARNESS SUPPORT; INSTALL THE AFT ELECTRICAL COVER AND STRAP ON THE AFT<br />

STIFFENER; AND INSTALL A NEW FLAT LANDING LIGHT LAMP<br />

MANDATORY<br />

REF<br />

:<br />

MOS 12<br />

HRS/MSC 600<br />

AFL<br />

(EFF)<br />

06-AUG-2014<br />

15 d<br />

9621.32 168.12<br />

06-AUG-2014<br />

C<br />

FAA 2013-13-09 (G) (3) LANDING GEAR - MODIFICATION AND INSTALLATION INSTALL A NEW WHEEL SPEED DETECT BOX ASSEMBLY,<br />

NUTPLATES, BRACKETS, AND INTERFACE BOX; AND MODIFY THE WIRING FOR THE NEW THRUST REVERSER<br />

INTERFACE BOX<br />

MANDATORY<br />

REF<br />

:<br />

MOS 12<br />

HRS/MSC 600<br />

AFL<br />

(EFF)<br />

06-AUG-2014<br />

15 d<br />

9621.32 168.12<br />

06-AUG-2014<br />

C<br />

05-P&W-790002 NO. 2 ENGINE - PERFORM ENGINE OIL CHANGE<br />

REF<br />

:<br />

See Workcard<br />

MOS 12<br />

HRS/MSC 600<br />

ENC<br />

+50/-50<br />

27-AUG-2013<br />

8870.10<br />

5975<br />

27-AUG-2014<br />

36 d<br />

(9470.10) 9648.40 9520.1<br />

195.2<br />

(+50)<br />

27-AUG-2014<br />

243001B INSPECT NO. 1 STARTER/GENERATOR BRUSHES PER (SAFRAN) STC ST03195CH ICA<br />

P/N: 23091-009<br />

S/N: P1008<br />

REF<br />

:<br />

MOS<br />

HRS/MSC 500<br />

AFL<br />

03-JAN-2014<br />

9194.30<br />

6147<br />

9694.30 241.1<br />

15-DEC-2014<br />

(xEXT) - Extension incorporated in the next <strong>due</strong> (s) - Suppressed Requirement + - FAA manual flag is set (EBT) - Estimated Base Time (EFF) - Effective C/W<br />

* - Estimated Due (applies to New Requirement) C - Task also <strong>due</strong> in calendar <strong>due</strong> list<br />

© CAMP SYSTEMS<br />

12 Of 17


Due List<br />

LEARJET 60 S/N 60 050 (N924PS): 9453.2 HRS, 6297 AFL as of 22-Jul-2014<br />

Operator: JET SELECT LLC<br />

Hours Section<br />

Report Date: 22-JUL-2014<br />

TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE<br />

( ENH ) AFH<br />

243002B INSPECT NO. 2 STARTER/GENERATOR BRUSHES PER (SAFRAN) STC ST03195CH ICA<br />

MAX LIMIT DISPOSITION EST. DUE<br />

TIME REMAINING<br />

P/N: 23091-009<br />

S/N: P1007<br />

REF<br />

:<br />

MOS<br />

HRS/MSC 500<br />

AFL<br />

03-JAN-2014<br />

9194.30<br />

6147<br />

9694.30 241.1<br />

15-DEC-2014<br />

C<br />

05-P&W-790002 NO. 1 ENGINE - PERFORM ENGINE OIL CHANGE<br />

REF<br />

:<br />

See Workcard<br />

MOS 12<br />

HRS/MSC 600<br />

ENC<br />

+50/-50<br />

13-NOV-2013<br />

8515.50<br />

5748<br />

13-NOV-2014<br />

114 d<br />

(9115.50) 9702.30 9165.5<br />

249.1<br />

(+50)<br />

13-NOV-2014<br />

05002B PERFORM 24MOS/600HR B-PHASE INSPECTION<br />

REF<br />

:<br />

MOS 24<br />

HRS/MSC 600<br />

AFL<br />

+14d/-14d<br />

+25/-25<br />

18-JAN-2014<br />

9220.20<br />

6159<br />

18-JAN-2016 01-FEB-2016 545 d<br />

9820.20 367<br />

(+14)<br />

02-MAR-2015<br />

783132A INSPECT LEFT OUTBOARD STANG FAIRING ASSEMBLY IAW ST02209AT-D IFCA REV. D ICA<br />

P/N: 6080021-003<br />

S/N: SN-UNKNOWN<br />

REF GENERIC NO REF<br />

:<br />

MOS<br />

HRS/MSC 600<br />

AFL<br />

18-JAN-2014<br />

9220.20<br />

6159<br />

9820.20 367<br />

02-MAR-2015<br />

783136A INSPECT RIGHT OUTBOARD STANG FAIRING ASSEMBLY IAW ST02209AT-D IFCA REV. D ICA<br />

P/N: 6080022-006<br />

S/N: SN-UNKNOWN<br />

REF GENERIC NO REF<br />

:<br />

MOS<br />

HRS/MSC 600<br />

AFL<br />

18-JAN-2014<br />

9220.20<br />

6159<br />

9820.20 367<br />

02-MAR-2015<br />

783142A INSPECT LEFT INBOARD STANG FAIRING ASSEMBLY IAW ST02209AT-D IFCA REV. D ICA<br />

P/N: 6080021-003<br />

S/N: SN-UNKNOWN<br />

REF GENERIC NO REF<br />

:<br />

MOS<br />

HRS/MSC 600<br />

AFL<br />

18-JAN-2014<br />

9220.20<br />

6159<br />

9820.20 367<br />

02-MAR-2015<br />

783146A INSPECT RIGHT INBOARD STANG FAIRING ASSEMBLY IAW ST02209AT-D IFCA REV. D ICA<br />

P/N: 6080022-005<br />

S/N: SN-UNKNOWN<br />

REF GENERIC NO REF<br />

:<br />

MOS<br />

HRS/MSC 600<br />

AFL<br />

18-JAN-2014<br />

9220.20<br />

6159<br />

9820.20 367<br />

02-MAR-2015<br />

(xEXT) - Extension incorporated in the next <strong>due</strong> (s) - Suppressed Requirement + - FAA manual flag is set (EBT) - Estimated Base Time (EFF) - Effective C/W<br />

* - Estimated Due (applies to New Requirement) C - Task also <strong>due</strong> in calendar <strong>due</strong> list<br />

© CAMP SYSTEMS<br />

13 Of 17


Due List<br />

LEARJET 60 S/N 60 050 (N924PS): 9453.2 HRS, 6297 AFL as of 22-Jul-2014<br />

Operator: JET SELECT LLC<br />

Hours Section<br />

Report Date: 22-JUL-2014<br />

TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE<br />

05-10-29-U2130007 PERFORM CABIN LEAK RATE CHECK<br />

NEXT DUE<br />

( ENH ) AFH<br />

MAX LIMIT<br />

DISPOSITION EST. DUE<br />

TIME REMAINING<br />

REF<br />

:<br />

See Workcard<br />

MOS<br />

HRS/MSC 1200<br />

AFL<br />

+25/-25<br />

19-JUL-2012<br />

8620.50<br />

5827<br />

9820.50 9845.5<br />

367.3<br />

(+25)<br />

02-MAR-2015<br />

05003C PERFORM 48MOS/1200HR C-PHASE INSPECTION<br />

REF<br />

:<br />

MOS 48<br />

HRS/MSC 1200<br />

AFL<br />

+14d/-14d<br />

+25/-25<br />

19-JUL-2012<br />

8620.50<br />

5827<br />

19-JUL-2016 02-AUG-2016 728 d<br />

9820.50 367.3<br />

(+14)<br />

02-MAR-2015<br />

05-P&W-710015 NO. 2 ENGINE - PERFORM CHECK AND CLEAN PMA HARNESS CONNECTORS<br />

REF<br />

:<br />

MOS<br />

HRS/MSC 1200<br />

ENC<br />

08-AUG-2012<br />

8446.10<br />

5739<br />

(9646.10) 9824.40 371.2<br />

04-MAR-2015<br />

05-10-29-H2750044 INSPECT FLAP CAM FOLLOWER BEARING - DETAILED<br />

REF<br />

:<br />

See Workcard<br />

MOS<br />

HRS/MSC 1200<br />

AFL<br />

+25/-25<br />

19-JUL-2012<br />

8620.50<br />

5827<br />

9825.90 9850.9<br />

372.7<br />

(+25)<br />

05-MAR-2015<br />

05-11-00-E2750002 REPLACE FLAP NOSE ROLLER BUSHINGS (NAS76A4)<br />

REF<br />

:<br />

See Workcard<br />

MOS<br />

HRS/MSC 1200<br />

AFL<br />

+25/-25<br />

19-JUL-2012<br />

8620.50<br />

5827<br />

9838.80 9863.8<br />

385.6<br />

(+25)<br />

13-MAR-2015<br />

360001 REPLACE LEFT ENGINE PYLON BLEED AIR SEALS<br />

REF<br />

:<br />

See Workcard<br />

MOS<br />

HRS/MSC 1200<br />

AFL<br />

+25/-25<br />

19-JUL-2012<br />

8620.50<br />

5827<br />

9838.80 9863.8<br />

385.6<br />

(+25)<br />

13-MAR-2015<br />

360002 REPLACE RIGHT ENGINE PYLON BLEED AIR SEALS<br />

REF<br />

:<br />

See Workcard<br />

MOS<br />

HRS/MSC 1200<br />

AFL<br />

+25/-25<br />

19-JUL-2012<br />

8620.50<br />

5827<br />

9838.80 9863.8<br />

385.6<br />

(+25)<br />

13-MAR-2015<br />

(xEXT) - Extension incorporated in the next <strong>due</strong> (s) - Suppressed Requirement + - FAA manual flag is set (EBT) - Estimated Base Time (EFF) - Effective C/W<br />

* - Estimated Due (applies to New Requirement) C - Task also <strong>due</strong> in calendar <strong>due</strong> list<br />

© CAMP SYSTEMS<br />

14 Of 17


Due List<br />

LEARJET 60 S/N 60 050 (N924PS): 9453.2 HRS, 6297 AFL as of 22-Jul-2014<br />

Operator: JET SELECT LLC<br />

Hours Section<br />

Report Date: 22-JUL-2014<br />

C<br />

TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE<br />

( ENH ) AFH<br />

346081 INSPECT DUAL UNS-1E FMS INSTALLATION (12MONTH / 600HR) ICA<br />

MAX LIMIT DISPOSITION EST. DUE<br />

TIME REMAINING<br />

REF<br />

:<br />

MOS 12<br />

HRS/MSC 600<br />

AFL<br />

20-MAR-2014<br />

9267.60<br />

6187<br />

20-MAR-2015<br />

241 d<br />

9867.60 414.4<br />

20-MAR-2015<br />

05-P&W-710019 NO. 2 ENGINE - REPLACE BLEED OFF VALVE SOLENOID<br />

REF<br />

:<br />

See Workcard<br />

MOS<br />

HRS/MSC 1500<br />

ENC<br />

+300/-300<br />

21-DEC-2011<br />

8212.40<br />

5624<br />

(9712.40) 9890.70 10012.4 437.5<br />

(+300)<br />

14-APR-2015<br />

P&W SB 72-24584 R2 NO. 2 ENGINE - REPLACEMENT OF FUEL/OIL HEAT EXCHANGER (FOHE), SB CATEGORY 5<br />

REF<br />

:<br />

BULLETINS<br />

MOS<br />

HRS/MSC 3300<br />

ENC<br />

(EFF)<br />

(9734.35) 9912.65 459.45<br />

27-APR-2015<br />

FAA 1974-08-09 R3 LAVATORY PAPER OR LINEN WASTE RECEPTACLE FIRE PREVENTION MANDATORY<br />

REF<br />

:<br />

AD<br />

MOS<br />

HRS/MSC 1000<br />

AFL<br />

03-MAY-2013<br />

8933<br />

6005<br />

9933 479.8<br />

09-MAY-2015<br />

WO: N924PS 4-2013 DUE LIST<br />

05-11-00-R2760079 REPLACE SPOILER ACTUATOR ATTACH FITTING AND BOLT LIFE LIMIT<br />

REF<br />

:<br />

See Workcard<br />

MOS<br />

HRS/MSC 10000<br />

AFL<br />

14-DEC-1994<br />

0<br />

0<br />

10000 546.8<br />

19-JUN-2015<br />

276013 * LEFT SPOILER ACTUATOR ASSEMBLY LIFE LIMIT<br />

P/N: 2417015-5<br />

S/N: 1126<br />

REF See Workcard<br />

:<br />

MOS<br />

HRS/MSC<br />

AFL<br />

TSN:0<br />

10000 TSN:0 0<br />

TSN:0 0<br />

10000 546.8<br />

19-JUN-2015<br />

(xEXT) - Extension incorporated in the next <strong>due</strong> (s) - Suppressed Requirement + - FAA manual flag is set (EBT) - Estimated Base Time (EFF) - Effective C/W<br />

* - Estimated Due (applies to New Requirement)<br />

© CAMP SYSTEMS<br />

15 Of 17


Due List<br />

LEARJET 60 S/N 60 050 (N924PS): 9453.2 HRS, 6297 AFL as of 22-Jul-2014<br />

Operator: JET SELECT LLC<br />

Hours Section<br />

Report Date: 22-JUL-2014<br />

TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE<br />

( ENH ) AFH<br />

MAX LIMIT DISPOSITION EST. DUE<br />

TIME REMAINING<br />

SB 60-28-16 TAILCONE FUEL LINE BONDING FOR IMPROVED LIGHTNING STRIKE PROTECTION, SERVICE BULLETIN RECOMMENDED<br />

REF<br />

:<br />

BULLETINS<br />

MOS<br />

HRS/MSC 1200<br />

AFL<br />

(EFF)<br />

10039.05 585.85<br />

13-JUL-2015<br />

(xEXT) - Extension incorporated in the next <strong>due</strong> (s) - Suppressed Requirement + - FAA manual flag is set (EBT) - Estimated Base Time (EFF) - Effective C/W<br />

* - Estimated Due (applies to New Requirement)<br />

© CAMP SYSTEMS<br />

16 Of 17


Due List<br />

LEARJET 60 S/N 60 050 (N924PS): 9453.2 HRS, 6297 AFL as of 22-Jul-2014<br />

Operator: JET SELECT LLC<br />

ACH Section<br />

Report Date: 22-JUL-2014<br />

TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE<br />

05-10-29-L2150053 FUNCTION TEST REFRIGERATION SYSTEM PRESSURE SWITCH<br />

NEXT DUE<br />

( ENH ) AFH<br />

MAX LIMIT<br />

DISPOSITION EST. DUE<br />

TIME REMAINING<br />

MOS<br />

29-JUL-2010<br />

REF See Workcard<br />

HRS/MSC<br />

AFL<br />

+25/-25<br />

: ACH 600 2906 3506 3531<br />

202 (+25)<br />

24-MAR-2015<br />

05-10-29-N2150019 PENETRANT INSPECT AC COMPRESSOR FAN BLADES<br />

MOS<br />

HRS/MSC<br />

AFL<br />

07-DEC-2007<br />

6826.80<br />

4737<br />

REF NDT PART 5 / 21-50-01<br />

+25/-25<br />

: ACH 1200 2357.60 3557.60 3582.6<br />

253.6 (+25)<br />

26-MAY-2015<br />

(xEXT) - Extension incorporated in the next <strong>due</strong> (s) - Suppressed Requirement + - FAA manual flag is set (EBT) - Estimated Base Time (EFF) - Effective C/W<br />

* - Estimated Due (applies to New Requirement)<br />

© CAMP SYSTEMS<br />

17 Of 17