28.11.2014 Views

Electrical Permit Application Form - The Town of Calmar

Electrical Permit Application Form - The Town of Calmar

Electrical Permit Application Form - The Town of Calmar

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Town</strong> <strong>of</strong> <strong>Calmar</strong><br />

PO Box 750<br />

CALMAR AB T0C 0V0<br />

Phone: 780 985 3604<br />

Fax: 780 985 3039<br />

www.calmar.ca<br />

<strong>The</strong> Inspections Group Inc.<br />

12010 – 111 Avenue<br />

EDMONTON AB T5G 0E6<br />

Phone: 780 454 5048 Toll Free: 1 866 554 5048<br />

Fax: 780 454 5222 Toll Free: 1 866 454 5222<br />

www.inspectionsgroup.com<br />

<strong>Electrical</strong> <strong>Permit</strong> <strong>Application</strong> <strong>Form</strong><br />

<strong>Application</strong> Date (Y/M/D): _____________________________________<br />

Estimated Completion Date (Y/M/D): ____________________________<br />

<strong>Permit</strong> Number: ____________________________<br />

Development <strong>Permit</strong> Number: ____________________________<br />

<strong>Permit</strong> Type: Owner Contractor Cost <strong>of</strong> Installation (Labor & Material) $____________________________<br />

<strong>The</strong> <strong>Permit</strong> Holder hereby certifies that this installation will be completed in accordance with the Alberta Safety Codes Act & Regulations and shall commence<br />

within 90 days <strong>of</strong> permit issuance. This permit expires after 90 days without an extension request.<br />

Owner Name: ________________________________________________<br />

Address: _______________________________________________________<br />

City: _______________________________ Prov: ______ Postal Code: _________________ Phone: ____________________ Fax: ____________________<br />

_______________________________________________________ Cell: ______________________ Email: ___________________________________<br />

Owner’s Signature / Declaration for Homeowner <strong>Permit</strong>s<br />

“I hereby declare I am the owner <strong>of</strong> the premises in which the work will be conducted, and reside on the property. I am doing the work myself, and assume responsibility for<br />

compliance with the applicable Act and Regulations”<br />

Contractor Name: _________________________________________<br />

Address: ___________________________________________________________<br />

City: _______________________________ Prov: ______ Postal Code: _________________ Phone: ____________________ Fax: ____________________<br />

Cell: _________________________ Email: __________________________________________________________________________________________<br />

______________________ ____________________________________________ _____________________________________________<br />

Master Electrician Number Master Electrician’s Name Master Electrician’s Signature<br />

Project Location:<br />

Street Address: _______________________________________________________________________________________________________________<br />

Legal Subdivision: Part <strong>of</strong>: _____________ Section: _____________ <strong>Town</strong>ship: _____________ Range: _____________ West <strong>of</strong>: _____________<br />

Subdivision Name: _____________________________________________<br />

Lot: ___________ Block: __________ Plan: __________________________<br />

Directions: ___________________________________________________________________________________________________________________<br />

Project Information:<br />

Building Type: Commercial Residential Multi Family Industrial Institutional Square Feet: ____________________<br />

Type <strong>of</strong> Work: New Work Renovations Connection Temporary Service Other ____________________________________________<br />

Does this Installation Require a Service Connection: Yes No Supply Service: Overhead Underground<br />

Service Information: Amps: ____________ Volts: ____________ Phase: ____________<br />

Description <strong>of</strong> Work: ___________________________________________________________________________________________________________<br />

Type <strong>of</strong> Payment: Cash Cheque Visa MC Other<br />

AUTHORIZATION<br />

<strong>Permit</strong> Fee:<br />

$_______________________<br />

Issuing Officer’s Name: _______________________________________________<br />

+ SCC Levy: $_______________________<br />

$4.50 or 4% <strong>of</strong> the permit fee (whichever is greater) maximum $560.00<br />

Total Cost:<br />

$_______________________<br />

Receipt #: _____________________________<br />

Issuing Officer’s Signature: ____________________________________________<br />

Designation Number: _________________________________________________<br />

Issued Date : ________________________________________________________<br />

PLEASE CONTACT THE INSPECTIONS GROUP INC. FOR INSPECTIONS ALLOWING TWO WORKING DAYS NOTICE.<br />

<strong>The</strong> personal information provided as part <strong>of</strong> this application is collected under Sec. 43 <strong>of</strong> the Safety Codes Act and Sections 303 and 295 <strong>of</strong> the Municipal Government<br />

Act and in accordance with Section 32.c <strong>of</strong> the Freedom <strong>of</strong> Information and Protection <strong>of</strong> Privacy Act.


ELECTRICAL PERMIT FEE<br />

(For “NEW” Single Family Residential)<br />

Square Footage<br />

<strong>Permit</strong> Fee<br />

Up to 1200 square feet $125.00<br />

1201 to 1500 square feet $150.00<br />

1501 to 2000 square feet $175.00<br />

2001 to 2500 square feet $200.00<br />

Over 2500 square feet $250.00<br />

Modular Homes (on foundation or basement) $100.00<br />

Basement Development Wiring – New Home<br />

(if done at time <strong>of</strong> initial construction)<br />

$75.00<br />

Mobile Home Connection $75.00<br />

Attached Garage<br />

Include square footage <strong>of</strong> garage with house<br />

Detached Garage $ .20 a sq. ft. minimum fee $75.00<br />

NOTE:<br />

1. Add Safety Codes Council Fee <strong>of</strong> $4.50 to each permit or 4% <strong>of</strong> permit levy (whichever is<br />

greater) to each permit.<br />

2. This fee schedule applies to “New” Single Family dwellings only. (For residential renovations,<br />

garages, additions, etc., use <strong>Electrical</strong> Installation Cost Fee)<br />

3. When work has commenced without first obtaining the required permit(s); the permit fees<br />

will be doubled.


ELECTRICAL PERMIT FEE<br />

(For “Other Than” New Single Family Residential)<br />

Installation Cost $<br />

<strong>Permit</strong> Fee<br />

Under 1,000 $ 75.00<br />

1,000.01 – 1,500 $ 85.00<br />

1,500.01 – 2,000 $ 95.00<br />

2,000.01 – 2,500 $ 100.00<br />

2,500.01 – 3,000 $ 110.00<br />

3,000.01 – 3,500 $ 120.00<br />

3,500.01 – 4,000 $ 130.00<br />

4,000.01 – 4,500 $140.00<br />

4,500.01 – 5,000 $150.00<br />

5,000.01 – 5,500 $155.00<br />

5,500.01 – 6,000 $160.00<br />

6,000.01 – 6,500 $165.00<br />

6,500.01 – 7,000 $170.00<br />

7,000.01 – 7,500 $175.00<br />

7,500.01 – 8,000 $180.00<br />

8,000.01 – 8,500 $185.00<br />

8,500.01 – 9,000 $190.00<br />

9,000.01 – 9,500 $195.00<br />

9,500.01 – 10,000 $200.00<br />

10,000.01 – 20,000 $220.00<br />

20,000.01 – 30,000 $275.00<br />

30,000.01 – 40,000 $320.00<br />

40,000.01 – 50,000 $400.00<br />

50,000.01 – 60,000 $440.00<br />

60,000.01 – 70,000 $480.00<br />

70,000.01 – 80,000 $520.00<br />

80,000.01 – 90,000 $550.00<br />

90,000.01 – 100,000 $570.00<br />

100,000.01 – 110,000 $600.00<br />

110,000.01 – 120,000 $630.00<br />

120,000.01 – 130,000 $660.00<br />

130,000.01 – 140,000 $690.00<br />

140,000.01 – 150,000 $720.00<br />

150,000.01 – 160,000 $750.00<br />

160,000.01 – 170,000 $780.00<br />

170,000.01 – 180,000 $810.00


180,000.01 – 190,000 $840.00<br />

190,000.01 – 200,000 $870.00<br />

200,000.01 – 210,000 $900.00<br />

210,000.01 – 220,000 $930.00<br />

220,000.01 – 230,000 $960.00<br />

230,000.01 – 240,000 $1,000.00<br />

240,000.01 – 250,000 $1,100.00<br />

250,000.01 – 300,000<br />

$1,200.00<br />

300,000.01 – 350,000<br />

$1,300.00<br />

350,000.01 – 400,000 $1,400.00<br />

400,000.01 – 450,000 $1,500.00<br />

450,000.01 – 500,000 $1,600.00<br />

500,000.01 – 550,000 $1,700.00<br />

550,000.01 – 600,000 $1,800.00<br />

600,000.01 – 650,000 $1,900.00<br />

650,000.01 – 700,000 $2,000.00<br />

700,000.01 – 750,000 $2,100.00<br />

750,000.01 – 800,000 $2,250.00<br />

800,000.01 – 850,000 $2,350.00<br />

850,000.01 – 900,000 $2,450.00<br />

900,000.01 – 950,000 $2,550.00<br />

950,000.01 – 1,000,000<br />

$2,650.00<br />

For each additional $50,000 over $1,000,000<br />

$2,650.00+ $50.00 per unit<br />

For installation costs exceeding $1,000,000.00, contact <strong>The</strong> Inspections Group for the permit fee.<br />

TEMPORARY AND SERVICE CONNECTIONS, CONDUCTORS AND FEEDERS<br />

A flat fee <strong>of</strong> $70.00 (plus Safety Codes Fee $4.50) will be charged for temporary services and above<br />

ground or underground service connections, conductors and feeders<br />

*NOTE:<br />

1. Add Safety Codes Council Fee <strong>of</strong> $4.50 to each permit or 4% <strong>of</strong> permit levy (whichever is<br />

greater) to each permit.<br />

2. When work has commenced without first obtaining the required permit(s); the permit fees<br />

will be doubled.<br />

*INSTALLATION COST:<br />

Total value <strong>of</strong> electrical materials, fixtures and supplies plus labour (in the case <strong>of</strong> a homeowner –<br />

double the value <strong>of</strong> materials, fixtures & supplies to get installation cost)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!