29.11.2014 Views

Small Systems Water Treatment Plant Operator Program Manual

Small Systems Water Treatment Plant Operator Program Manual

Small Systems Water Treatment Plant Operator Program Manual

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Community Works Management System<br />

Technical Specifications<br />

Continued Work Method:<br />

M 12. Clean and disinfect floor of lift station, and equipment.<br />

M 13. Confirm availability and condition of safety gear and related equipment. The<br />

minimum safety gear is as follows: Check O&M <strong>Manual</strong> or others sources for full<br />

listing.Fire extinguisher, Eye protection, Disposable overalls, Disposable gloves,<br />

First aid kit, Hard hat, Gas Mask<br />

SA 14. Check for the accumulation of silt, sludge, or other settled solids, and remove<br />

accumulation if it is in excess of 10% of liquid storage capacity and remove if<br />

accumulation.<br />

A 15. Service pumps. (Check O&M <strong>Manual</strong> per proper service procedures)<br />

A 16. Inspect site grading and drainage around the lift station to ensure that all runoff drains<br />

away from the lift station and ponding does not occur around the lift stations.<br />

A 17. Inspect electrical panels for correct labelling, corrosion or other damage and<br />

complete repairs as required. Qualified electrician should complete inspection.<br />

A 18. Inspect vapour seal on electrical panel and repair if seal is not airtight.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!