The clean up operation collected over<br />
1000 needles, and allowed the surveyors<br />
access to make their inspection prior to the<br />
demolition and rebuilding of the properties.<br />
Over 1000 used syringes were found in the debris<br />
Bio-hazard clean<br />
for United Welsh<br />
Huw Smith, who runs <strong>Rainbow</strong>’s local office in<br />
Cardiff had previously provided some cleaning<br />
work for the Association and when asked if<br />
he had bio-hazard training, Huw’s experience<br />
provided the perfect solution to the problem.<br />
All of Huw’s technicians are accredited to the<br />
Response standard, which is approved by the<br />
Ministry of Defence, and he had 4 of his team<br />
working in the properties for a week to make<br />
them safe for the surveyors’ inspection.<br />
Making the property safe included installing<br />
temporary lighting, placing temporary floorboards,<br />
sweeping the internal and external properties<br />
for needles, removing all rubbish and debris to<br />
approved waste sites.<br />
...and inside the properties was required<br />
Considerable cleaning outside...<br />
United Welsh Housing Association had<br />
a major problem, when a series of their<br />
properties which had been derelict and had<br />
run into a major state of disrepair, were due<br />
for inspection by the surveyors prior to them<br />
being rebuilt.<br />
The row of 5 terrace houses presented a serious<br />
hazard area. All the internal rooms were cluttered<br />
with so much debris that included needles and<br />
broken glass, much of which was hidden in bags and<br />
buried in the overgrown garden areas. Additionally,<br />
the properties had been broken into and had all<br />
the floorboards removed so that the thieves could<br />
remove all the metal and copper beneath.<br />
Barry James, Development Surveyor from United<br />
Welsh Housing was delighted with the work done<br />
by the <strong>Rainbow</strong> team.<br />
He commented:- “We intended to survey the building<br />
however, prior to carrying out the survey we needed<br />
to ensure the building was safe. We asked <strong>Rainbow</strong><br />
to carry out the works as they had previously worked<br />
for us.<br />
I was very satisfied with the work they carried out.<br />
They were very thorough, professional, and completed<br />
the work to time and budget. They found and disposed<br />
of far more needles than anticipated and continually<br />
updated me on the progress of works. The significant<br />
number of needles they found justified using <strong>Rainbow</strong>’s<br />
specialist knowledge. They also provided lighting and<br />
temporary works to enable the survey to be carried out.<br />
I am glad I used <strong>Rainbow</strong> and would recommend them”.<br />