30.11.2014 Views

Engineering & Business District Master Plan Easy Streets II

Engineering & Business District Master Plan Easy Streets II

Engineering & Business District Master Plan Easy Streets II

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Animal<br />

Sciences Bldg.<br />

Tower Dr.<br />

Pedestrian Corridor<br />

(<strong>Easy</strong> <strong>Streets</strong> <strong>II</strong>)<br />

New Bus Hub and<br />

Turnaround with<br />

Covered Shelter<br />

South Stadium Drive<br />

Realignment<br />

(<strong>Easy</strong> <strong>Streets</strong> <strong>II</strong>)<br />

Dining<br />

ELAB<br />

Chemical<br />

Eng. Bldg.<br />

Patrick Taylor Hall<br />

Event<br />

Atrium.<br />

In Context of 2003<br />

Campus <strong>Master</strong> <strong>Plan</strong><br />

<strong>Business</strong><br />

School<br />

Notes:<br />

• Prominent Location along Nicholson Extension<br />

• Maximizes synergy among College of <strong>Engineering</strong> via strong link<br />

between ELAB, Chemical <strong>Engineering</strong>, and Patrick Taylor Hall<br />

• Chemical <strong>Engineering</strong> main corridor aligns with exterior courtyard at Patrick Taylor<br />

Hall, which could be renovated to become and event atrium<br />

• Shared loading dock opportunity at ELAB and Chemical <strong>Engineering</strong><br />

• Easier visitor access to Chemical <strong>Engineering</strong><br />

• Provides bus hub opportunity for Tigertrails system, eliminates traffic congestion<br />

• Green parkway is consistent with <strong>Easy</strong> <strong>Streets</strong> <strong>II</strong> plan, approved March 2010<br />

• Enhanced pedestrian access through district and maximizes access to Tower Drive<br />

Pedestrian Corridor, consistent with <strong>Easy</strong> <strong>Streets</strong> <strong>II</strong> plan<br />

<strong>Engineering</strong> &<br />

<strong>Business</strong><br />

<strong>District</strong><br />

<strong>Master</strong> <strong>Plan</strong><br />

Prepared By:<br />

The LSU Office of<br />

Campus <strong>Plan</strong>ning<br />

July 12, 2010


<strong>Business</strong><br />

School<br />

<strong>Engineering</strong> &<br />

<strong>Business</strong><br />

<strong>District</strong><br />

<strong>Master</strong> <strong>Plan</strong><br />

Chemical <strong>Engineering</strong> –Concept Rendering<br />

Prepared By:<br />

The LSU Office of<br />

Campus <strong>Plan</strong>ning<br />

July 12, 2010


<strong>Plan</strong> requires removal of 4<br />

existing Live Oak trees<br />

<strong>Engineering</strong> &<br />

<strong>Business</strong><br />

<strong>District</strong><br />

<strong>Master</strong> <strong>Plan</strong><br />

Chemical <strong>Engineering</strong> –Architects Site <strong>Plan</strong>, September 2009<br />

Prepared By:<br />

The LSU Office of<br />

Campus <strong>Plan</strong>ning<br />

July 12, 2010


<strong>Engineering</strong> &<br />

<strong>Business</strong><br />

<strong>District</strong><br />

<strong>Master</strong> <strong>Plan</strong><br />

Chemical <strong>Engineering</strong> –1 st Floor <strong>Plan</strong><br />

Prepared By:<br />

The LSU Office of<br />

Campus <strong>Plan</strong>ning<br />

July 12, 2010


<strong>Engineering</strong> &<br />

<strong>Business</strong><br />

<strong>District</strong><br />

<strong>Master</strong> <strong>Plan</strong><br />

Chemical <strong>Engineering</strong> –2nd Floor <strong>Plan</strong><br />

Prepared By:<br />

The LSU Office of<br />

Campus <strong>Plan</strong>ning<br />

July 12, 2010


<strong>Engineering</strong> &<br />

<strong>Business</strong><br />

<strong>District</strong><br />

<strong>Master</strong> <strong>Plan</strong><br />

Chemical <strong>Engineering</strong> –3rd Floor <strong>Plan</strong><br />

Prepared By:<br />

The LSU Office of<br />

Campus <strong>Plan</strong>ning<br />

July 12, 2010


Chemical<br />

Eng. Bldg.<br />

Event<br />

Atrium.<br />

<strong>Engineering</strong> &<br />

<strong>Business</strong><br />

<strong>District</strong><br />

<strong>Master</strong> <strong>Plan</strong><br />

Chemical <strong>Engineering</strong> – Access to Patrick Taylor Hall, Event Atrium (Proposed)<br />

Prepared By:<br />

The LSU Office of<br />

Campus <strong>Plan</strong>ning<br />

July 12, 2010


Tower Drive Pedestrian Corridor –No Vehicles Allowed<br />

Chemical<br />

Eng. Bldg.<br />

Event<br />

Atrium.<br />

<strong>Engineering</strong> &<br />

<strong>Business</strong><br />

<strong>District</strong><br />

<strong>Master</strong> <strong>Plan</strong><br />

<strong>Easy</strong> <strong>Streets</strong> <strong>II</strong> –Creation of Campus “Greenbelt”<br />

South Stadium Drive – “Greenbelt” Corridor<br />

Prepared By:<br />

The LSU Office of<br />

Campus <strong>Plan</strong>ning<br />

July 12, 2010


<strong>Business</strong><br />

School<br />

<strong>Engineering</strong> &<br />

<strong>Business</strong><br />

<strong>District</strong><br />

<strong>Master</strong> <strong>Plan</strong><br />

<strong>Business</strong> School– Concept Rendering<br />

Prepared By:<br />

The LSU Office of<br />

Campus <strong>Plan</strong>ning<br />

July 12, 2010

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!