30.11.2014 Views

Current transformers and Power Line ... - Allstar Magnetics

Current transformers and Power Line ... - Allstar Magnetics

Current transformers and Power Line ... - Allstar Magnetics

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Combined Core CT<br />

Combined core (2 core parts):<br />

• one high-permeability core part for AC operation<br />

• one non-linear low permeability core part for operation under DC components<br />

Meter with combined core CT behaves very sensitive.<br />

Measurement accuracy: current IEC-test <strong>and</strong> proposal<br />

20.00<br />

test B (combined core)<br />

15.00<br />

error (%)<br />

10.00<br />

5.00<br />

0.00<br />

0 5 10 15 20<br />

25<br />

-5.00<br />

-10.00<br />

-15.00<br />

cos <br />

0.5i<br />

0.8i<br />

0.9i<br />

1<br />

0.9k<br />

-20.00<br />

half-wave current (A)<br />

• IEC-test cos = 1<br />

satisfactory<br />

• proposal cos ≠ 1<br />

Error data between +18 % <strong>and</strong> -7,5 %<br />

Result: <strong>Power</strong> measurement depends strongly on load phase <strong>and</strong> DC components!<br />

<strong>Current</strong> Transformers <strong>and</strong> <strong>Power</strong> <strong>Line</strong> Transformers for Smart Metering<br />

35

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!