NORTHERN RAILWAY<br />

TENDER NOTICE NO. I/VEHICULAR USFD/NR/2010<br />

GLOBAL TENDER<br />

CORRIGENDUM NO. 3 Dated : 14.02.2011<br />

Name of work: Ultrasonic flaw detection testing of 30400 Track Km of rails using vehicular<br />

system (i.e. Vehicular USFD) at nominated Group A sections as per “<strong>Indian</strong> <strong>Railway</strong> Standard<br />

specification for ultrasonic testing of Rails/Welds using vehicular system, (Provisional)-2009<br />

(With latest Correction Slips)” over Rajdhani routes of <strong>Railway</strong> (New Delhi-Howrah and New<br />

Delhi–Mumbai) covering sections between New Delhi to Mugalsarai and New Delhi to Ratlam.<br />

Notes:<br />

1. In connection to the above please note the modification in tender conditions<br />

Approx. Cost of Work (Rs.) 95000000/- INSTEAD OF Rs. 137860000/-<br />

Earnest Money Deposit (Rs.) 625000/- INSTEAD OF Rs. 839300/-<br />

Detailed modifications in the tender conditions are available on <strong>Northern</strong> <strong>Railway</strong><br />

website http://www.nr.indianrail.gov.in.<br />

2. The said tender which was due to be opened on 18 th February,2011 ( 18.02.2011 ) will<br />

now be opened on 11 th March,2011 ( 11.03.2011 ).<br />

3. All other terms and conditions except modified above will remain unchanged.<br />

For Chief Track Engineer,<br />

<strong>Northern</strong> <strong>Railway</strong><br />

1


TENDER NOTICE NO. I/VEHICULAR USFD/NR/2010<br />

CORRIGENDUM NO. 3<br />

Name of work: Ultrasonic flaw detection testing of 30400 Track Km of rails using vehicular<br />

system (i.e. Vehicular USFD) at nominated Group A sections as per “<strong>Indian</strong> <strong>Railway</strong> Standard<br />

specification for ultrasonic testing of Rails/Welds using vehicular system, (Provisional)-2009<br />

(With latest Correction Slips)” over Rajdhani routes of <strong>Railway</strong> (New Delhi-Howrah and New<br />

Delhi–Mumbai) covering sections between New Delhi to Mugalsarai and New Delhi to Ratlam.<br />

Notes:<br />

1. In connection to the above please note the modification in tender conditions as detailed in<br />

these 14 pages. These 14 pages should be signed by all the tenderers. These pages must<br />

be attached alongwith the original tender document set of 96 pages (hence total pages<br />

constitute - 01 page tender notice + tender document 96 pages in original published set +<br />

01 page for 1 st corrigendum + 01 page for 2 nd corrigendum +14 pages for 3 rd<br />

corrigendum).<br />

2. Following conventions has been adopted to clearly highlight the changes/modifications<br />

made in the conditions.<br />

(i)<br />

(ii)<br />

The left hand side column is for old tender conditions which exist in the earlier<br />

published tender document of 96 pages. The right hand side column is for modified<br />

tender conditions which are now to be considered while submitting the offer.<br />

Certain words/sentences/paras which existed in the old tender conditions have now been<br />

deleted. All such deleted part is notified in ITALICS in the left hand column.<br />

(iii)<br />

Certain words/sentences/paras have been added or modified in the new conditions. All<br />

such additions/modifications is notified in ITALICS in the respective new conditions in<br />

the Right hand column.<br />

2


S.N<br />

o.<br />

Page/<br />

Para<br />

A Page 3<br />

of 96<br />

Clause/Existing condition specified in the<br />

published <strong>Tender</strong> Document<br />

Approx. Cost of Work (Rs.) = 137860000/-<br />

Earnest Money Deposit (Rs.) = 839300/-<br />

Modified Clause/Condition to be considered while<br />

submitting the offer<br />

Approx. Cost of Work (Rs.) = 95000000/-<br />

Earnest Money Deposit (Rs.) = 625000/-<br />

B Page16<br />

of 96<br />

C Page 30<br />

of 96<br />

1 Page 2<br />

of 96<br />

2. Page 6<br />

of 96<br />

3. Page 21<br />

of 96<br />

Earnest Money Deposit (Rs.) = 839300/- Earnest Money Deposit (Rs.) = 625000/-<br />

Approx. Cost of Work (Rs.) = 137860000/- Approx. Cost of Work (Rs.) = 95000000/-<br />

INDEX<br />

8.HIRING CHARGES OF ENGINE/UTV<br />

Part of - Eligibility Criteria<br />

Only those firms, “companies incorporated under<br />

the Companies Act 1956”, which in their<br />

individual capacity or along with their constituent<br />

units forming legally valid Association / Joint<br />

ventures duly registered with the Registrar of<br />

partnership firms in India (the Association / Joint<br />

ventures should be in existence / formed prior to<br />

submission of tender) satisfying the criteria<br />

detailed at Para (a) & (b) below need to quote<br />

for this tender.<br />

The legally enforced valid associations will be<br />

MOU, Technical collaboration.<br />

For offers supported by collaboration<br />

agreement, the role of all the signatory parties<br />

should be clearly spelt out w.r.t. providing<br />

technical know how, training, including all<br />

aspects of planning and satisfactory execution<br />

of work. The role of each party should be<br />

defined for various activities. The collaboration<br />

agreement should be as per RBI guidelines. In<br />

addition, collaborator should also undertake the<br />

responsibility of the fulfillment of the contract if<br />

awarded by the <strong>Railway</strong>s to the concerned tenderer<br />

jointly or severally. The tenderer will submit a<br />

legal binding in this regard.<br />

The document such as MOU, Collaboration<br />

agreement, Joint venture deed with foreign partner<br />

etc. should be notarized in a country where it is<br />

executed. In case the document is executed outside<br />

INDIA, then besides notarization, the document<br />

would also be required to be authenticated by <strong>Indian</strong><br />

High Commission/<strong>Indian</strong> Embassy/<strong>Indian</strong> High<br />

Commission of that country.<br />

15.0 EMERGENCY TESTING/WORK<br />

In the event of any accident or failure occurring<br />

in or about the work of arising out for or in<br />

connection with the work which in the opinion<br />

of the Engineer require immediate attention, the<br />

3<br />

INDEX<br />

8. HIRING CAHRGES OF ENGINE<br />

Part of - Eligibility Criteria<br />

Only those firms, “companies incorporated under the<br />

Companies Act 1956”, which in their individual<br />

capacity or along with their constituent units forming<br />

legally valid Association / Joint ventures duly<br />

registered with the Registrar of partnership firms in<br />

India (the Association / Joint ventures should be in<br />

existence / formed prior to submission of tender)<br />

satisfying the criteria detailed at Para (a) & (b)<br />

below need to quote for this tender.<br />

The legally enforced valid associations will be<br />

MOU, Technical collaboration.<br />

For offers supported by collaboration agreement,<br />

the role of all the signatory parties should be clearly<br />

spelt out w.r.t. providing technical know how,<br />

training, including all aspects of planning and<br />

satisfactory execution of work. The role of each<br />

party should be defined for various activities The<br />

collaboration agreement should be as per RBI<br />

guidelines. In addition, collaborator should also<br />

undertake the responsibility of the fulfillment of the<br />

contract if awarded by the <strong>Railway</strong>s to the concerned<br />

tenderer jointly or severally. Foreign collaborator<br />

shall be bound to provide technical knowhow/training<br />

and issue competency certificates to<br />

the operators working on the machine.<br />

Undertaking in this regard should be submitted<br />

alongwith the tender document. The tenderer will<br />

submit a legal binding in this regard.<br />

The document such as MOU, Collaboration agreement,<br />

Joint venture deed with foreign partner etc. should be<br />

notarized in a country where it is executed. In case the<br />

document is executed outside INDIA, then besides<br />

notarization, the document would also be required to be<br />

authenticated by <strong>Indian</strong> High Commission/<strong>Indian</strong><br />

Embassy/<strong>Indian</strong> High Commission of that country.<br />

15.0 EMERGENCY TESTING/WORK<br />

In the event of any accident or failure occurring in<br />

or about the work of arising out for or in connection<br />

with the work which in the opinion of the Engineer<br />

require immediate attention, the <strong>Railway</strong> may direct


4.<br />

Page 25<br />

of 96<br />

<strong>Railway</strong> may direct the agency /contractor to<br />

immediately shift machine /resources to the<br />

required site.<br />

MAINTENANCE PERIOD<br />

The work shall be maintained after completion for a<br />

period of NIL months by the contractor however<br />

contractor will be responsible if any rail/weld<br />

fracture occurs in the tested stretch within a period<br />

until next USFD testing has become due as per base<br />

frequency specified in the manual. Such period will<br />

be counted from the date on which last USFD<br />

testing by vehicular USFD method has been done in<br />

the concerned stretch. In such a situation, action will<br />

be taken in accordance with Clause 11 of Special<br />

Conditions of Contract.<br />

the agency /contractor to immediately shift machine<br />

/resources to the required site. Allowance for the<br />

wastage of time in shifting the machine and the time<br />

taken to attend the unscheduled site will be given in the<br />

Date of Completion (D.O.C.) No benefit will be given if<br />

accident/ failure is on part of contractor.<br />

MAINTENANCE PERIOD<br />

The work shall be maintained after completion for a<br />

period of NIL months by the contractor however<br />

contractor will be responsible if any rail/weld fracture<br />

occurs in the tested stretch within a period until next<br />

USFD testing has become due as per base frequency<br />

specified in the manual. Such period will be counted<br />

from the date on which last USFD testing by vehicular<br />

USFD method has been done in the concerned stretch. In<br />

such a situation, action will be taken in accordance with<br />

Clause 10 & 11 of Special Conditions of Contract.<br />

5. Page 39<br />

of 96<br />

6. Page 39<br />

of 96<br />

Para 3 of Special Conditions of Contract<br />

The minimum defect detection level reliability<br />

percentage vis-à-vis size should satisfy clause 6.2<br />

of the Technical specification. The capability of test<br />

system of the successful tenderer shall be verified<br />

by performance benchmarking before actual<br />

/revenue testing begins. Benchmarking of the<br />

performance of the vehicular test system shall be a<br />

pre requisite to use of the system for revenue<br />

t e s t i n g on I R . The successful tenderer will<br />

have to get his vehicular system benchmarked<br />

after the award of contract by RDSO in the presence<br />

of NR officials.<br />

Para 5 of Special Conditions of Contract<br />

For this purpose, contractor will have to get their<br />

vehicle, system, machines and operators approved<br />

by RDSO / LKO for benchmarking and verifying<br />

the test system capability. This may be done<br />

using known rail defect method –<br />

where the test system runs over a test track<br />

containing known defects of various sizes and<br />

types or by defect audit verification method where<br />

number of rails defects detected by contractor<br />

during inspection run is audited by physical<br />

examination.<br />

For this purpose detailed method of benchmarking<br />

is given in the attached specifications. Hand probing<br />

of rail length selected at random and if required<br />

physical examinations b y b r e a k i n g o p e n the<br />

defects which were over reported / under reported /<br />

not reported in any of these testing can be done. In<br />

case it is considered necessary to carry out sizing<br />

of the flaws detected the same can be<br />

accomplished using procedure contained in<br />

4<br />

Para 3 of Special Conditions of Contract<br />

The minimum defect detection level reliability<br />

percentage vis-à-vis size should satisfy clause 6.2 of<br />

the Technical specification. The capability of test system<br />

of the successful tenderer shall be verified by<br />

performance benchmarking before actual /revenue<br />

testing begins. Benchmarking of the performance of the<br />

vehicular test system shall be a pre requisite to use of<br />

the system for revenue t e s t i n g on I R . The<br />

successful tenderer will have to get his vehicular<br />

system benchmarked after the award of contract by<br />

RDSO in the presence of NR officials. RDSO will take<br />

approx. two months for benchmarking of the vehicular<br />

system.<br />

Para 5 of Special Conditions of Contract<br />

For this purpose, contractor will have to get their<br />

vehicle, system, machines and operators approved by<br />

RDSO / LKO for benchmarking and verifying the test<br />

system capability. This may be done using known rail<br />

defect method – where the test system runs over a test<br />

track containing known defects of various sizes and<br />

types or by defect audit verification method where<br />

number of rails defects detected by contractor during<br />

inspection run is audited by physical examination.<br />

For this purpose detailed method of benchmarking is<br />

given in the attached specifications. Hand probing of rail<br />

length selected at random and if required physical<br />

examinations by breaking open the defects which<br />

were over reported / under reported / not reported in any<br />

of these testing can be done. In case it is considered<br />

necessary to carry out sizing of the flaws detected the<br />

same can be accomplished using procedure contained in<br />

specifications. The calibration should be done as per<br />

RDSO specification. The details of calibration of track<br />

containing artificial defects are given at Annexure-3 of


7. Page 40<br />

of 96<br />

specifications. The calibration should be done as<br />

per RDSO specification. The cost of complete<br />

benchmarking activity is to be borne by the tenderer<br />

as detailed in the specification.<br />

Para 5.1.1 of Special Conditions of Contract<br />

For shunting purposes, especially for Rail Bound<br />

Vehicles, the test rail car shall be capable to<br />

operate in both directions. Speed of<br />

operation/running shall be the same from<br />

both the directions. However this will not be<br />

applicable in case of Rail cum Road test car.<br />

The requirement of coupling for RCRV is not<br />

essential but in such a case the tenderer should be in<br />

a position to off track the Rail cum Road test car so<br />

as to clear the block section in case of a break down<br />

and / or derailment.<br />

Failure to offload / re-rail in a period of one hour<br />

shall attract penalties of Rs 3.51 lakhs per hour<br />

or part their off. Track occupation charges for<br />

transporting the vehicle from one location to the<br />

other (non testing run) will be same i.e. Rs. 3.51<br />

lakhs per hour of occupation.<br />

<strong>Indian</strong> <strong>Railway</strong> Standard Specification for Ultrasonic<br />

testing of Rail/Welds using Vehicular Systems<br />

(Provisional),2009. The tenderer shall arrange rails<br />

containing artificial defects however the rails required<br />

will be supplied by the <strong>Railway</strong>. The cost of complete<br />

benchmarking activity is to be borne by the tenderer as<br />

detailed in the specification.<br />

Para 5.1.1 of Special Conditions of Contract<br />

For shunting purposes, especially for Rail Bound<br />

Vehicles, the test rail car shall be capable to operate in<br />

both directions. Speed of operation/running<br />

shall be the same from both the directions.<br />

However this will not be applicable in case of Rail cum<br />

Road test car.<br />

The requirement of coupling for RCRV is not essential<br />

but in such a case the tenderer should be in a position to<br />

off track the Rail cum Road test car so as to clear the<br />

block section in case of a break down and / or<br />

derailment.<br />

Failure to offload / re-rail in a period of one hour<br />

shall attract penalties of Rs 3.51 lakhs per hour or<br />

part their off. Track occupation charges for<br />

transporting the vehicle from one location to the<br />

other (non testing run) will be same i.e. Rs. 3.51 lakhs<br />

per hour of occupation.<br />

8.<br />

Page 40<br />

of 96<br />

Para 5.2 of Special Conditions of Contract<br />

5.2 OPERATIONAL SPEEDS<br />

The above penalty shall be levied on all type of USFD<br />

Vehicular system occupying the track in Non-testing<br />

mode, either due to failure to off-load / re-load or<br />

transporting the vehicle from one location to other.<br />

Para 5.2 of Special Conditions of Contract<br />

5.2 OPERATIONAL SPEEDS<br />

9. Page 40<br />

of 96<br />

The vehicular USFD system shall be capable to<br />

carry out testing at the following speeds:<br />

• Minimum testing speed of 40 kmph on <strong>Indian</strong><br />

<strong>Railway</strong> track conditions. However increase in<br />

testing speed shall form an objective of<br />

<strong>Railway</strong>s in order to improve utilization of<br />

track possession.<br />

• Since with each run the familiarization with the<br />

track increases therefore for subsequent runs it<br />

will be possible to test the track with greater<br />

reliability and confidence, therefore higher<br />

testing speeds should be possible. For counting<br />

the number of runs it is specified that<br />

whenever the Vehicular USFD system comes<br />

again in the same section to do ultrasonic<br />

testing, it will be counted as the next run and<br />

accordingly all runs will be counted.<br />

Para 5.4 of Special Conditions of Contract<br />

OTHER OPERATIONAL/TESTING NEEDS.<br />

The self propelled car shall be capable to negotiate<br />

5<br />

The vehicular USFD system shall be capable to<br />

carry out testing at the following speeds:<br />

• Minimum testing speed of 40 kmph on <strong>Indian</strong><br />

<strong>Railway</strong> track conditions. However increase in<br />

testing speed shall form an objective of <strong>Railway</strong>s in<br />

order to improve utilization of track possession.<br />

The records of speed will be maintained through<br />

Speedograph fitted in the vehicle as well as in the<br />

register which will be signed jointly by the <strong>Railway</strong><br />

supervisor and the contractor’s representative.<br />

• Since with each run the familiarization with the track<br />

increases therefore for subsequent runs it will be<br />

possible to test the track with greater reliability and<br />

confidence, therefore higher testing speeds should be<br />

possible. For counting the number of runs it is<br />

specified that whenever the Vehicular USFD system<br />

comes again in the same section to do ultrasonic<br />

testing, it will be counted as the next run and<br />

accordingly all runs will be counted.<br />

Para 5.4 of Special Conditions of Contract<br />

OTHER OPERATIONAL/TESTING NEEDS. The<br />

Vehicular USFD system shall be capable to negotiate


10. Page 41<br />

of 96<br />

11. Page 41<br />

of 96<br />

as well as to start on the steepest gradients present<br />

over the proposed test stretch of Gr. A route.<br />

•The car shall be capable to test the rails having<br />

lateral wear of up to 15mm, as measured 13 to 15<br />

mm below the original top surface of the rail.<br />

• Power Generator sets/Inverters of adequate<br />

capacity to provide power for electronic, electrical<br />

system and for the electrical appliances.<br />

• Adequate Water tank capacity for testing.<br />

Limitations in water quality, if any, be specified.<br />

Optical or any suitable type of encoder shall be<br />

provided to<br />

• Determine the distance travelled<br />

• Determine the speed in KMPH<br />

• Monitor the pulse repetition frequency of each<br />

probe<br />

•Reporting rail defect with exact chainage & Km<br />

post.<br />

Para 5.7 of Special Conditions of Contract<br />

CRS SANCTION AND RIDING QUALITY<br />

TESTS:<br />

The testing car before being permitted to run on<br />

<strong>Indian</strong> <strong>Railway</strong> shall be required to undergo all<br />

procedures and formalities of obtaining CRS<br />

sanction along with specified riding quality<br />

trial/test procedures if needed as per applicable<br />

latest circulars of RDSO/<strong>Railway</strong> Board. No<br />

idling charges or any other waiting charge will be<br />

paid during the period when such sanctions are<br />

being processed by concerned offices.<br />

Para 6 of Special Conditions of Contract<br />

The required kms and their due date of testing of<br />

each section will be scheduled by the <strong>Railway</strong> and<br />

the tenderer shall progress the work accordingly.<br />

There should not be any over due testing of kms.<br />

The base frequency of testing for different sections<br />

will be as per frequency prescribed in Manual of<br />

Ultrasonic testing of Rails/Welds -2006 and is<br />

decided by the traffic load {Measured in Gross<br />

Million Tonnes(GMT) } of that section. It is<br />

highly preferable that agency makes its own<br />

arrangement of motive power (e.g. UT etc) to be<br />

used for non self propelled USFD vehicles.<br />

However if Power for vehicle is hired from the<br />

<strong>Railway</strong>s (UTV/Engine), the applicable charges as<br />

given the attached annexure will be taken from<br />

the contractor. It may be noted that the UTV as<br />

motive power may be provided by railways but<br />

the arrangement for fuel i.e. Diesel will be the<br />

responsibility of the contractor. The cost of<br />

6<br />

as well as to start on the steepest gradients present over<br />

the proposed test stretch of Gr. A route.<br />

•The car shall be capable to test the rails having lateral<br />

wear of up to 15mm, as measured 13 to 15 mm below<br />

the original top surface of the rail.<br />

• Power Generator sets/Inverters of adequate capacity<br />

to provide power for electronic, electrical system and<br />

for the electrical appliances.<br />

• Adequate Water tank capacity for testing. Limitations<br />

in water quality, if any, be specified.<br />

Optical or any suitable type of encoder shall be<br />

provided to<br />

• Determine the distance travelled<br />

• Determine the speed in KMPH<br />

• Monitor the pulse repetition frequency of each probe<br />

•Reporting rail defect with exact chainage & Km post.<br />

Para 5.7 of Special Conditions of Contract<br />

CRS SANCTION AND RIDING QUALITY TESTS:<br />

The testing car before being permitted to run on <strong>Indian</strong><br />

<strong>Railway</strong> shall be required to undergo all procedures<br />

and formalities of obtaining CRS sanction along with<br />

specified riding quality trial/test procedures if needed<br />

as per applicable latest circulars of RDSO/<strong>Railway</strong><br />

Board. No idling charges or any other waiting charge<br />

will be paid during the period when such sanctions are<br />

being processed by concerned offices.<br />

‘<strong>Indian</strong> <strong>Railway</strong>s Schedule of Dimensions 1676mm<br />

Gauge (BG) Revised, 2004’ with its A&C slips , ‘Policy<br />

Circular no. 06 regarding determining speed potential<br />

of Rolling stock on IR’ and Criteria of determining<br />

speed potential of Rolling Stock may be provided on<br />

payment basis to desirous firms.<br />

Para 6 of Special Conditions of Contract<br />

The required kms and their due date of testing of each<br />

section will be scheduled by the <strong>Railway</strong> and the<br />

tenderer shall progress the work accordingly<br />

(Annexure-1/C to Chapter II - Sections between New<br />

Delhi to Mughalsarai and New Delhi to Ratlam and<br />

their present GMT(revised every year). There should<br />

not be any over due testing of kms. The base<br />

frequency of testing for different sections will be as<br />

per frequency prescribed in Manual of Ultrasonic<br />

testing of Rails/Welds -2006 and is decided by the<br />

traffic load {Measured in Gross Million Tonnes(GMT)<br />

} of that section. It is highly preferable that agency<br />

makes its own arrangement of motive power (e.g. UT<br />

etc) t o be used for non self propelled USFD<br />

vehicles. However if Power for vehicle is hired from<br />

the <strong>Railway</strong>s (Engine), the applicable charges as given<br />

the attached annexure will be taken from the<br />

contractor. Contractor vehicle should be compatible


12. Page 42<br />

of 96<br />

13. Page 43<br />

of 96<br />

14. Page 43<br />

of 96<br />

such fuel provided to <strong>Railway</strong>s will be adjusted<br />

in the hiring charges. Contractor vehicle should<br />

be compatible such that it can be coupled with<br />

railways motive power.<br />

Para 10 of Special Conditions of Contract<br />

Payments of a tested length will be done only after<br />

results of vehicular testing have been found<br />

acceptable after detailed test check of the stretch as<br />

defined in the specifications. Test check on the<br />

length of work d o n e will be done by the <strong>Railway</strong><br />

Engineer-in-Charge as per the detailed procedure<br />

outlined in the attached specifications. Vehicular<br />

USFD Machine will not be allowed to do further<br />

testing unless the test check of previously tested<br />

locations have been completed in all respect. The<br />

decision of the Engineer-in-Charge shall be the<br />

final in this regard. As far as possible test check is<br />

to be carried out within a fortnight. The % of<br />

under-reporting/over-reporting etc will be calculated<br />

as per the results obtained in the detailed test<br />

check for the complete 10 Km stretch of detailed<br />

testing. This 10 Km stretch will not be continuous<br />

but segments of at least 01 Km each , tested on<br />

different dates a t d i f f e r e n t l o c a t i o n s so that<br />

test check is highly representative of general<br />

machine working during that period. In case<br />

under-reporting/over-reporting exceeds the limits<br />

given in the vehicular USFD specifications, a<br />

penalty of Rs 5000 per such underreported/over-reported<br />

flaw will be levied. The<br />

whole length of such track (complete block for<br />

which representative length has been selected &<br />

test check is conducted) where results are doubtful<br />

will have to be tested again by the contractor<br />

without getting any extra payment for the same.<br />

Para 15 of Special Conditions of Contract<br />

Siding facilities for parking the Rail bound<br />

USFD vehicle will be provided in yards free of<br />

charge. However railway will provide such facility<br />

as per its operational needs and any shortage in the<br />

work will not be accepted on this account.<br />

Para 19 of Special Conditions of Contract<br />

The testing shall be carried out as per the track<br />

possession/ block time granted as per the<br />

operations feasibility. It is expected that due to<br />

operational reasons testing in one direction only<br />

(i.e. UP or DN) will be permitted at one time.<br />

However if due to operational reasons or other<br />

factors attributable purely to railways, necessary<br />

path /block for testing is not given and as a result<br />

progress of testing is reduced and the contractor’s<br />

resources (i.e. Machine / Manpower) are idled ,<br />

then <strong>Railway</strong> will reimburse idling charges such<br />

that the contractor is paid an amount as per the<br />

rates offered by agency such that the actual testing<br />

Km plus the idling charges Km are not less than<br />

7<br />

such that it can be coupled with railways motive power.<br />

Para 10 of Special Conditions of Contract<br />

Payments of a tested length will be done only after<br />

results of vehicular testing have been found acceptable<br />

after detailed test check of the stretch as defined in the<br />

specifications. Test check on the length of work d o n e<br />

will be done by the <strong>Railway</strong> Engineer-in-Charge as<br />

per the detailed procedure outlined in the attached<br />

specifications. Vehicular USFD Machine will not be<br />

allowed to do further testing unless the test check of<br />

previously tested locations have been completed in all<br />

respect. The decision of the Engineer-in-Charge shall<br />

be the final in this regard. As far as possible test check<br />

is to be carried out within a fortnight. Efforts will be<br />

made to ensure that the machine does not idle for the<br />

want of test checks. The % of under-reporting/overreporting<br />

etc will be calculated as per the results<br />

obtained in the detailed test check for the complete 10<br />

Km stretch of detailed testing. This 10 Km stretch will<br />

not be continuous but segments of at least 01 Km each<br />

, tested on different dates at different locations<br />

so that test check is highly representative of general<br />

machine working during that period. In case underreporting/over-reporting<br />

exceeds the limits given in the<br />

vehicular USFD specifications, a penalty of Rs 5000<br />

per such under-reported/over-reported flaw will be<br />

levied. The whole length of such track (complete block<br />

for which representative length has been selected &<br />

test check is conducted) where results are doubtful will<br />

have to be tested again by the contractor without getting<br />

any extra payment for the same.<br />

Para 15 of Special Conditions of Contract<br />

Siding facilities for parking the USFD vehicle will be<br />

provided in yards free of charge. However railway will<br />

provide such facility as per its operational needs and any<br />

shortage in the work will not be accepted on this<br />

account.<br />

Para 19 of Special Conditions of Contract<br />

The testing shall be carried out as per the track<br />

possession/ block time granted as per the operations<br />

feasibility. It is expected that due to operational<br />

reasons testing in one direction only (i.e. UP or DN)<br />

will be permitted at one time. However if due to<br />

operational reasons or other factors attributable<br />

purely to railways, necessary path /block for testing<br />

is not given and as a result progress of testing is<br />

reduced and the contractor’s resources (i.e. Machine<br />

/ Manpower) are idled , then <strong>Railway</strong> will reimburse<br />

idling charges such that the contractor is paid an<br />

amount as per the rates offered by agency such that<br />

the actual testing Km plus the idling charges Km are<br />

not less than 1500 TKM per quarter provided


15.<br />

Page 45<br />

of 96<br />

1500 TKM per quarter provided vehicular<br />

system was available during the complete period<br />

in each shift as detailed in further paras. These<br />

idling charges will be calculated per quarter i.e 03<br />

months period. If the agency fails to offer / provide<br />

the testing system as per the stipulated number of<br />

working days per month then for each failure day or<br />

part thereof a reduction of 30 TKM will be made<br />

from the upper limit of 1500 TKM/per quarter while<br />

deciding the idling charges. However, if the<br />

tenderer is able to achieve a progress of 2500 km<br />

per month than no penalty will be levied on the<br />

tenderer for not making the testing vehicle<br />

available on any day during the quarter.<br />

.<br />

Special Conditions of Contract<br />

1 st para of<br />

vehicular system was available during the complete<br />

period in each shift as detailed in further paras. These<br />

idling charges will be calculated per quarter i.e 03<br />

months period. However the amount of<br />

reimbursement of idling charges during the currency<br />

of contract will not exceed 5% of the total value of<br />

contract. If the agency fails to offer / provide the<br />

testing system as per the stipulated number of working<br />

days per month then for each failure day or part thereof<br />

a reduction of 30 TKM will be made from the upper<br />

limit of 1500 TKM/per quarter while deciding the<br />

idling charges. However, if the tenderer is able to<br />

achieve a progress of 2500 km per month than no<br />

penalty will be levied on the tenderer for not making<br />

the testing vehicle available on any day during the<br />

quarter.<br />

Special Conditions of Contract<br />

1 st para of<br />

TESTING SCHEDULE:<br />

TESTING SCHEDULE:<br />

16. Page 45<br />

of 96<br />

17. Page 46<br />

of 96<br />

For the purpose of this clause, a calendar<br />

year of 12 months shall be divided into four<br />

‘quarters’ of 03 months each. It is expected that<br />

an average USFD vehicle shall have the potential<br />

of testing at least 150 Kms of track length per day<br />

in 10 hour shift. The supplier shall ensure<br />

availability of the testing car for the required no.<br />

of the days so as not to exceed non-working days<br />

by 05 days in every month period including the<br />

scheduled maintenance days.<br />

Special Conditions of Contract<br />

2 nd para of<br />

TESTING SCHEDULE:<br />

A working day shall consist of 10 working<br />

hours i.e. from 08:00 AM to 06:00 PM, which<br />

shall include maximum one hour at the<br />

beginning of the shift for pre testing attention,<br />

calibration etc. and another hour at the end of<br />

the shift for post testing attention. Therefore, in<br />

the working shift of ten hours, the USFD vehicle<br />

shall be available in ready condition for actual<br />

testing for a minimum period of Eight hours. If<br />

the shift needs to be changed by agency due to<br />

any planned work the same needs to be<br />

communicated in writing to authorized<br />

representative of <strong>Railway</strong>s at least 48 hours<br />

in advance so that railway resources i.e.<br />

UTV/Engine, crew/other manpower is deployed<br />

elsewhere.<br />

Required daily schedule of vehicle maintenance<br />

to be done by the agency as per above timings.<br />

Para 31.2.4 of Special Conditions of Contract<br />

In case of self propelled vehicle or where motive<br />

8<br />

For the purpose of this clause, a calendar year of<br />

12 months shall be divided into four ‘quarters’ of 03<br />

months each. It is expected that an average USFD<br />

vehicle shall have the potential of testing at least 150<br />

Kms of track length per day in 10 hour shift. The<br />

supplier shall ensure availability of the testing car for<br />

minimum five days in a week. Schedule maintenance<br />

will be done during non-working days of the week only.<br />

Special Conditions of Contract<br />

2 nd para of<br />

TESTING SCHEDULE:<br />

A working day shall consist of 10 working hours<br />

i.e. from 08:00 AM to 06:00 PM, which shall<br />

include maximum one hour at the beginning of the<br />

shift for pre testing attention, calibration etc. and<br />

another hour at the end of the shift for post testing<br />

attention. Therefore, in the working shift of ten<br />

hours, the USFD vehicle shall be available in ready<br />

condition for actual testing for a minimum period of<br />

Eight hours. If the shift needs to be changed by<br />

agency due to any planned work the same needs to<br />

be communicated in writing to authorized<br />

representative of <strong>Railway</strong>s at least 48 hours in<br />

advance so that railway resources i.e.Engine,<br />

crew/other manpower is deployed elsewhere.<br />

Required daily schedule of vehicle maintenance to be<br />

done by the agency as per above timings.<br />

Para 31.2.4 of Special Conditions of Contract<br />

In case of self propelled vehicle or where motive


18. Page 52<br />

of 96<br />

power is arranged by the contractor himself, the<br />

vehicle shall be driven by t h e crew provided b y<br />

<strong>Indian</strong> <strong>Railway</strong>s who will take care of<br />

provisions of working time-table, <strong>Railway</strong> signals,<br />

safety rules to ensure safe operation of the USFD<br />

vehicle on the highly busy Group A route of<br />

<strong>Indian</strong> <strong>Railway</strong>.<br />

The cost of such pilot driver/crew will be<br />

recovered from the Contractor based upon the<br />

employee’s average cash monthly emoluments<br />

depending upon the number of days he has been<br />

deployed with contractor’s vehicle. For 25 days<br />

deployment in a month the cost may range<br />

around Rs 40000/- (Rupees Forty thousand) per<br />

month. However this figure is only an indication<br />

to provide a general idea and exact cost will vary<br />

as per the seniority, grade of <strong>Railway</strong> driver<br />

and other related factors. Where <strong>Railway</strong>s is<br />

providing the motive power, the all inclusive cost<br />

of motive power hiring will be charged on per<br />

Engine hour basis as detailed separately and no<br />

additional driver cost will be recovered from<br />

contractor.<br />

The services of the guard, if provided, as per railway<br />

rules shall be recovered from the contractor based on<br />

No. of days, his services are utilized.<br />

Annexure-1/B to Chapter - II<br />

NORTHERN RAILWAY<br />

Sub:Hiring Charges of track machines UTV) to be<br />

used as motive power for vehicular USFD of<br />

track.<br />

Average Hiring charges shall be Rs 5018/- per<br />

Engine Hour /Machine.<br />

Note: Actual Engine hour will be taken as per the<br />

period the engine of UTV will be operative.<br />

This includes:-<br />

1.Time required for entering into block section<br />

after start of engine.<br />

2.Waiting for the path while engine of UTV is in<br />

operation.<br />

3.Shunting required at the station.<br />

4.Actual running time for attachment/ detachment<br />

of test car.<br />

A separate log book shall be maintained clearly<br />

indicating the Engine hours of UTV machines<br />

utilized for the said purpose to work out the hire<br />

charges.<br />

Dy.CE/TMC/Lineeer/TMC /Line<br />

Authority: - Dy CE/TMC/Line’s letter dated<br />

22.04.2010<br />

Note:<br />

(i) All efforts shall be made by the railways to<br />

ensure working of UTV machines. However in<br />

case UTV machine becomes out of order and<br />

9<br />

power is arranged by the contractor himself, the<br />

vehicle shall be driven by t h e crew provided b y<br />

<strong>Indian</strong> <strong>Railway</strong>s who will take care of<br />

provisions of working time-table, <strong>Railway</strong> signals,<br />

safety rules to ensure safe operation of the USFD<br />

vehicle on the highly busy Group A route of <strong>Indian</strong><br />

<strong>Railway</strong>.<br />

The cost of such pilot driver/crew will be recovered<br />

from the Contractor based upon the employee’s<br />

average cash monthly emoluments depending upon<br />

the number of days he has been deployed with<br />

contractor’s vehicle. For deployment of driver, the<br />

cost shall be recovered on actual basis. Where<br />

<strong>Railway</strong>s is providing the motive power, the all<br />

inclusive cost of motive power hiring will be charged<br />

on per Engine hour basis as detailed separately and no<br />

additional driver cost will be recovered from contractor.<br />

The charges for the services of the guard, if provided, as<br />

per railway rules shall be recovered from the contractor<br />

on actual basis.<br />

DELETED


19.<br />

Page<br />

67, 68<br />

& 69 of<br />

96<br />

requires maintenance/replacement by other<br />

UTV machine then <strong>Railway</strong>s liability will be<br />

limited to the extent of giving idling charges as<br />

prescribed in relevant paras of this tender<br />

document.<br />

(ii)Although the above hiring charges include the<br />

cost of the fuel i.e. diesel, but the complete<br />

requirement of the diesel /fuel will be<br />

arranged by the contractor himself as per<br />

the requirement /operation of the Vehicular<br />

USFD machine. The cost of such fuel arranged<br />

by the contractor and used in the operation of<br />

vehicular USFD machine will be deducted /<br />

adjusted while levying the above hiring charges.<br />

Specification Annexure 3 to Chapter III<br />

Drawings on page 67, 68, 69 of 96<br />

Specification Annexure 3 to Chapter III<br />

Revised Drawings on page 67, 68, 69 of 96 have been<br />

enclosed.<br />

20.<br />

Page 77<br />

of 96<br />

5.2.2.3 Scanned Area:<br />

Fig. 2 under above para<br />

5.2.2.4 Scanned Area:<br />

Fig. 2 under above para have been enclosed<br />

Page 77 of 96<br />

5.2.2.3 Scanned Area:<br />

The testing system shall be capable to detect the defects originating within the<br />

cross-sectional area, of the weld shown as hatched in Fig.2 below:<br />

Scanned Area by 0 0 Probe<br />

Scanned Area of head by 70 0 Probe Scanned Area of foot by 70 0 Probe<br />

(Hand Probing)<br />

Fig.2 Cross Sectional Area of the Welds Covered by USFD Testing<br />

10


Page 67, 68, 69 of 96<br />

Specification Annexure 3 to Chapter III<br />

Calibration Track Containing Artificial Defects<br />

11


Annexure-1/C to chapter - II<br />

Sections between New Delhi to Mughalsarai and New Delhi to Ratlam to be covered for<br />

ultrasonic testing of Rails/Welds using vehicular system and their present GMT (GMT is<br />

revised every year).<br />

S.N.<br />

Section<br />

NEW DELHI - RATLAM<br />

NORTHERN RAILWAY<br />

FROM<br />

TO<br />

Lengh<br />

of<br />

Section<br />

in Kms<br />

Lengh<br />

of<br />

Section<br />

in Kms<br />

GMT<br />

DN UP DN UP<br />

1 New Delhi - Tilak Bridge 1537.66 1535.04 2.62 2.62 40.67 42.48<br />

2 Tilak Bridge - H. Nizamuddin 1535.04 1530.41 4.63 4.63 21.17 26.53<br />

3 H. Nizamuddin - Okhla 1530.41 1526.75 3.66 3.66 21.17 26.53<br />

4 Okhla - Tughlakabad 1526.75 1519.90 6.85 6.85 53.83 53.07<br />

5 Tughlakabad - Palwal 1519.90 1480.04 39.86 39.86 62.20 59.00<br />

NORTH CENTRAL RAIWAY<br />

6 Mathura -Palwal 1397.06 1479.40 82.34 82.34 63.12 95.78<br />

WEST CENTRAL RAILWAY<br />

1243.00 1244.20 1.20 1.20<br />

7 Bayana - Mathura 1169.54 1243.00 73.46 73.46 30.12 28.94<br />

8 Gangapur City - Bayana 1092.32 1169.54 77.22 77.22 41.29 32.15<br />

9 Bayana - Kota 920.95 1092.32 171.37 171.37 40.99 30.91<br />

10 Nagda-Kota 698.22 920.95 222.73 222.73 39.79 33.33<br />

WESTERN RAILWAY<br />

11 Ratlam-Nagda 654.62 695.97 41.35 41.35 72.73 77.95<br />

S.N.<br />

Section<br />

NEW DELHI - MUGHALSARAI<br />

NORTHERN RAILWAY<br />

FROM<br />

TO<br />

Lengh<br />

of<br />

Section<br />

in Kms<br />

Lengh<br />

of<br />

Section<br />

in Kms<br />

GMT<br />

DN UP DN UP<br />

1 New Delhi - Tilak Bridge 1537.66 1532.00 5.66 5.66 40.67 42.48<br />

2 Tilak Bridge - Sahibabad 0.00 13.16 13.16 13.16 24.49 24.02<br />

3 Sahibabad - Ghaziabad 13.16 19.88 6.72 6.72 90.56 105.34<br />

NORTH CENTRAL RAIWAY<br />

4 Ghaziabad - Tundla 1428.50 1248.51 179.99 179.99 51.99 73.77<br />

5 Tundla - Kanpur 1248.51 1019.75 228.76 228.76 57.67 76.08<br />

6 Kanpur - Allahabad 1019.75 825.54 194.21 194.21 47.38 72.41<br />