United Infrastructure Projects Proven Afghanistan Track Record United Infrastructure Projects Successful Afghanistan <strong>Design</strong> & Build Track record United Infrastructure Projects (<strong>UIProjects</strong>), CA, USA has the largest local engineering office in Kabul. <strong>UIProjects</strong> has successfully completed assignments on Afghan projects worth over $25 million. FCEC is the largest local Afghan contractor with proven track record on over $8 million worth of construction and renovation work. Together, we provide top design and build services. FCEC – <strong>UIProjects</strong> JV has over 40 engineers in all fields and 80 construction equipment, including the first concrete transit mixer batch plant (JV with TEPE), and the first concrete pump in Afghanistan. With over 800 technical and construction staff, FCEC – <strong>UIProjects</strong> JV will mobilize the most effective engineering and construction teams equipped with the state of art computerized drafting and project management tools. • ISAF Heli Pad Project $1,100,000 • ISAF Security Road $1,000,000 • IMF Housing & Office Compound $600,000 • National Army Compound in Presidential Palace Improvement Project $300,000 • Renovation of Kabul Military Training College Dining Hall & 6 Buildings $1,250,000 • Poly Charkhi ANA Camp barracks and community center $250,000 • Roshan Equipment Enclosures $200,000 United Infrastructure Projects <strong>UIProjects</strong> Afghanistan AACA Video Conferencing Facility <strong>UIProjects</strong> was extremely innovative in overcoming design, procurement, delivery, and installation obstacles presented by unique systems built for the first time in Afghanistan. The design started in May 2002, and the facility was inaugurated in September 2002. IMF Housing and Office This IMF $600,000 contract of the housing compound, and office quarters in Afghanistan Central Bank building was completed January 2003. Presidential Palace National Army Compound This is a US Corps of Engineers/ Contrack International <strong>Design</strong> & Build $325,000 contract to rehabilitate several buildings, and build new additions. Military Academy Rehabilitation This is over a $1,000,000 US Corps of Engineers/ Contrack International to rehabilitate the dining facility and 6 other buildings in Kabul Military Training Facility. USAID/LBG Kandahar Road Bridges <strong>UIProjects</strong> designed the repair of 36 minor damaged bridges on the Kabul to Kandahar Road. The work involves surveying, soil, structural, and hydraulics investigations & design. Kabul Airport Runway Rehabilitation This AWCC/Scott Wilson <strong>Design</strong> and Supervision $15 million rehabilitation project is underway, with <strong>UIProjects</strong> responsible for surveying, soil testing, asbuilts and drainage design, as well providing local supervision staff. Passengers Building – Kabul Airport This GTZ project involved the rehabilitation of the customs and passenger facilities. The design is focused on the arrival and departure lounges, but involved a master plan for the whole facility. US Embassy Compound Project <strong>UIProjects</strong> completed several consulting assignment under a Master Agreement with Kellogg Brown and Root for the new $110 million US Embassy Compound. National Security Building, Presidential Palace This Crown Agents project involves the architectural/civil design of the rehabilitation of the existing building and the addition of an Annex. ISAF Admin Building This $600,000 GTZ project involved the rehabilitation of 5,000 m 2 of office space, complete with new electromechanical systems. ISAF Security Gate & Logistics Road This $1,100,000 GTZ project involved the design and tender of a new concrete pavement road network inside the ISAF Jallabad Rd Camp. Presidential Palace & 5 Ministries Networks <strong>UIProjects</strong> has successfully completed in August 2002 a World Bank funded broadband telephone and data network in the Presidential Palace and five Ministries. . IMF Data, Voice and Security System This involved installing data, voice and security systems. The network is connected to next door World Bank office VSAT system. US Corps of Engineers Kabul Offices This is a Contrack International project for the installation of electrical wiring and A/C systems, and was completed in record time. WB Compound Security System This involves installing networked security system at 7 dispersed World Bank properties in Wazir Akbar Khan, Kabul, Afghanistan. ISAF Heliport Pad Project This $1,200,000 GTZ project involved the design of a new heliport at Kabul Airport, complete with hanger foundations, apron, and taxiway. AWCC HO, Restaurant and Internet Cafe Preliminary design and budget for this $700,000 project. AWCC Operation Building <strong>Design</strong> and supervision of this new AWCC Yakatoot switching/operation building at Yakatoot, Kabul. Ministry of Education Interior <strong>Design</strong> UNICEF funded space planning and interior design project for the renovated Ministry of Education head quarter in Kabul .
United Infrastructure Projects Buildings Canadian Embassy, Kabul, Afghanistan $850,000 AWCC Operation Building, Kabul, Afghanistan $350,000 IMF Housing and Office Compound, Kabul, Afghanistan $750,000 UNAMA Compound, Kabul, Afghanistan $TBD