<strong>Falcon</strong> 1 User’s <strong>Guide</strong> ‐ D000973 <strong>Rev</strong>. 7 Page | 42<br />

6. SAFETY<br />

6.1. SAFETY REQUIREMENTS<br />

<strong>Falcon</strong> 1 customers are required to meet AFSPC 91‐710 Range Safety Manual requirements in the design <strong>and</strong><br />

operation of their flight <strong>and</strong> ground systems. These requirements encompass mechanical design, electrical design,<br />

fluid <strong>and</strong> pressurant systems, lifting <strong>and</strong> h<strong>and</strong>ling systems, ordnance <strong>and</strong> RF systems, ground support equipment,<br />

<strong>and</strong> other design <strong>and</strong> operational features. SpaceX can assist the customer in determining which requirements in<br />

particular pertain to the customers systems, <strong>and</strong> can also assist in completing required documentation.<br />

6.2. HAZARDOUS SYSTEMS AND OPERATIONS<br />

Most ranges consider hazardous systems or operations to include ordnance operations, pressurized systems that<br />

operate below a 4 to 1 safety factor, lifting operations, operations or systems that include toxic or hazardous<br />

materials, high power RF systems, laser systems, <strong>and</strong> a variety of other systems <strong>and</strong> operations. The details of the<br />

system design <strong>and</strong> its operation will determine whether the system or its operation are considered hazardous.<br />

Typically, additional precautions are required for operating systems that are considered hazardous – these will be<br />

determined during the safety approval process with SpaceX <strong>and</strong> the launch range. All hazardous operations will<br />

require procedures that are approved by both SpaceX <strong>and</strong> the launch range prior to execution. Ordnance<br />

operations in particular require coordination to provide reduced RF environments, cleared areas, safety support,<br />

<strong>and</strong> other requirements.<br />

6.3. WAIVERS<br />

For systems or operations that are not able to meet safety requirements <strong>and</strong> yet are believed to be acceptable for<br />

ground operations <strong>and</strong> launch, a waiver is typically produced for approval by the launch range safety authority.<br />

Waivers are a last resort solution <strong>and</strong> require considerable coordination <strong>and</strong> should not be considered a st<strong>and</strong>ard<br />

practice. SpaceX will assist the customer in determining whether an issue should be elevated to require a waiver<br />

as the integration process evolves.<br />