29.12.2014 Views

Narrabeen Lagoon Estuary Management Plan - Warringah Council ...

Narrabeen Lagoon Estuary Management Plan - Warringah Council ...

Narrabeen Lagoon Estuary Management Plan - Warringah Council ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

D-2<br />

Pittwater <strong>Council</strong> CAMP<br />

KEY<br />

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

7<br />

8<br />

9<br />

10<br />

11<br />

12<br />

13<br />

14<br />

15<br />

16<br />

17<br />

18<br />

19<br />

20<br />

21<br />

NARRABEEN LAGOON CONSERVATION AND ACCESS MANAGEMENT PLAN<br />

FOR THE PITTWATER COUNCIL LGA<br />

Intertidal Rock Pool<br />

Recreational Swimming<br />

Manage in current configuration<br />

Swimming Club/Change Rooms<br />

Recreational Amenity<br />

Retain existing building envelope, maintain facility<br />

Bluff<br />

Visual amenity/natural feature<br />

Manage vegetation on bluff to regenerate coverage and reduce slip potential<br />

<strong>Lagoon</strong> Entrance<br />

<strong>Management</strong> in accordance with adopted strategy – clearance operations with breakout if necessary<br />

Access to Pools/Beach<br />

Extension of Pelican Path to Entrance<br />

Retain sealed access (pedestrian and emergency vehicles) at base of bluff. Retain sand track on southern side of dune,<br />

immediately behind training wall.<br />

Headland<br />

Conservation area with limited access<br />

Manage in current configuration<br />

Dune<br />

Buffer Zone<br />

Manage in current configuration<br />

Coastal Walkway<br />

Connection between Bicentennial Coastal Walkway and Pelican Path<br />

Stair access from carpark to walkway on headland to be maintained in current configuration.<br />

Carpark/Picnic Area<br />

Manage carpark in current configuration. Upgrade picnic area with increased vegetation cover to reduce windblown sand<br />

ingress to carpark and improved recreational amenity.<br />

Training Wall<br />

Entrance <strong>Management</strong> and foreshore protection on outside of bend<br />

Manage in current configuration<br />

Bridge Abutment<br />

Maintain as per current configuration<br />

Lakeside Caravan Park<br />

Passive Recreation and Foreshore Access<br />

Retain Pelican Path and existing foreshore access to permit passive activities and maintain a “soft” edge treatment for lagoon<br />

foreshore.<br />

Coastal Environment Centre<br />

Environmental Resource Centre providing information about lagoon ecology. Promotes environmental awareness and<br />

conducts environmental training programs.<br />

Lakeside Carpark/Seawall<br />

Carpark managed in current configuration. Fishing wall and boat launching ramp to be maintained in current configuration.<br />

Lakeside Reserve<br />

Passive Recreation Area<br />

Foreshore open space for passive recreation, playground and Pelican Path access around lagoon. Maintain these features in<br />

current configuration. Undertake selective tree plantings. Maintain Phragmites reed beds with one limited break to provide<br />

passive lagoon access.<br />

<strong>Narrabeen</strong> Creek<br />

Riparian Corridor<br />

Continue program of weed eradication, bank restoration and revegetation in conjunction with water quality measures to be<br />

implemented as part of the Warriewood Valley Land Release.<br />

Creekline pathway connecting Warriewood Wetlands to Escarpment via <strong>Narrabeen</strong> Creek<br />

Lakeside Reserve<br />

Sportsground<br />

Landscaping and sportsground development in accordance with adopted <strong>Plan</strong> of <strong>Management</strong>. Limit and control foreshore<br />

access, particularly south of old canteen. Retain and enhance Casuarina glauca stands and Phragmites reed beds.<br />

Mullet Creek<br />

Riparian Corridor<br />

Link to Warriewood Wetlands<br />

Undertake program of weed eradication and revegetation utilising endemic species in co-operation with <strong>Narrabeen</strong> Sports<br />

High School.<br />

Creekline pathway connecting Warriewood Wetlands to Pelican Path.<br />

Warriewood Wetlands<br />

Wetlands Conservation<br />

Undertake restoration in conjunction with the development of appropriate educational and recreational facilities as<br />

programmed in the adopted <strong>Plan</strong> of <strong>Management</strong>.<br />

Pathway through wetlands connecting Mullet Creek path to Irrawong Reserve.<br />

Irrawong Reserve<br />

Riparian Corridor<br />

Manage in current configuration to eradicate weeds and regenerate natural vegetation.<br />

Access pathway connecting Warriewood Wetlands to escarpment to be maintained.<br />

Warriewood Escarpment<br />

Catchment/Escarpment conservation<br />

Continue program of land acquisition to retain undeveloped escarpment and thereby reduce sedimentation and other<br />

environmental impacts in lower catchment and lagoon receiving waters and provide passive recreation opportunities by<br />

connecting pathway to Irrawong Reserve and at head of <strong>Narrabeen</strong> Creek to top of escarpment – <strong>Management</strong> <strong>Plan</strong> to be<br />

developed.<br />

I:\N0433 NARRABEEN LAGOON EPS\DOCS\R.N0433.003.03.EMP.DOC 12/3/02 16:03<br />

OCEANICS AUSTRALIA

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!