09.11.2012 Views

Interbrand Zintzmeyer & Lux, Munich

Interbrand Zintzmeyer & Lux, Munich

Interbrand Zintzmeyer & Lux, Munich

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Project documentation<br />

<strong>Interbrand</strong> <strong>Zintzmeyer</strong> & <strong>Lux</strong>, <strong>Munich</strong><br />

Project description<br />

Modification of the new offices, Sandstraße, <strong>Munich</strong><br />

Client<br />

<strong>Interbrand</strong> <strong>Zintzmeyer</strong> & <strong>Lux</strong>, Zurich<br />

Architect<br />

<strong>Interbrand</strong> <strong>Zintzmeyer</strong> & <strong>Lux</strong>, <strong>Munich</strong><br />

Our service<br />

Construction management of the entire finishing craft<br />

Photos: IBZ+L


Corridor<br />

The offices<br />

Prior to the relocation of the entire <strong>Munich</strong><br />

branch of <strong>Interbrand</strong> <strong>Zintzmeyer</strong> & <strong>Lux</strong> from<br />

Augustenstraße to Sandstraße the complete<br />

clearance of the new office suites came up.<br />

The new offices were designed to provide<br />

34 workstations, a conference room with up<br />

to 16 places and a small conference room<br />

with a maximum of 6 seats. Furthermore<br />

the offices should provide storage spaces,<br />

an IT-Room, a kitchenette with 10 seats, a<br />

backoffice and a waiting area.<br />

The workings include a new cavity floor for<br />

the entire office space, build with teakwood<br />

industry parquetry, modernization of the<br />

restrooms, new system partition, new<br />

acoustical ceiling, paintwork (partly with<br />

magnetic finish) and partly new furnishing.<br />

The entire electricity supply was renewed,<br />

including the network-data cable system.<br />

The whole illumination was altered to<br />

downlight and light scoops, custom-made<br />

for the indirect illumination.<br />

Kitchenette<br />

Excecutive companies<br />

Fa. Bauer, Altötting: Carpenter work, kitchenette<br />

and wardrobes<br />

Fa. Kothig, <strong>Munich</strong>: Carpenter work, tables,<br />

visor, custom-made products<br />

Fa. Marcel Dittrich, <strong>Munich</strong>: Studwork, flase<br />

floor, parquetry<br />

Fa. Max Dietrich, <strong>Munich</strong>: Closing system<br />

Fa. Ammer, Neufahrn: Air conditioning and<br />

installation<br />

Fa. Braunert, Hamburg: Supply and custommade<br />

design of Errex- Racks<br />

Fa. Gebhard, Ravensburg: Sunscreens<br />

Fa. Rebel, <strong>Munich</strong>: Paintwork<br />

Facilities<br />

Conference room tables: Vitra<br />

Conference room chairs: Vitra Alu Chair<br />

Chairs: Vitra<br />

Racks / Tables: USM Haller<br />

System partition: Bene<br />

System racks: Errex<br />

Sanitary facilities: Vola<br />

Floor lamp / Downlights: Zumtobel<br />

Sideboards: Piure<br />

Characteristics<br />

Gross floor area 600 m²<br />

Gross room capacity 1.800 m³<br />

Total cost 0,25 Mio<br />

Construction period<br />

Commencement 02 / 2008<br />

Completion 06 / 2008<br />

Foyer<br />

Our services<br />

• Soliciting bids (LPH 6)<br />

• Site supervision (LPH 8), including auditing<br />

• Organization of the office relocation<br />

Contact<br />

Client:<br />

<strong>Interbrand</strong> <strong>Zintzmeyer</strong> & <strong>Lux</strong><br />

Contact partner: Gerd Burla<br />

Phone: +41 (44) 388 78 80<br />

Kirchenweg 5 · 8008 Zurich<br />

Project address:<br />

<strong>Interbrand</strong> <strong>Zintzmeyer</strong> & <strong>Lux</strong><br />

Sandstrasse 33 · 80335 <strong>Munich</strong><br />

m3<br />

bauprojektmanagement gmbh<br />

managing partners:<br />

dipl. ing. thomas abt, architect<br />

dipl. ing. frank haake<br />

dipl. ing. joachim konetzki, civil engineer<br />

ernsberger str. 5 · 81241 munich / germany<br />

phone: +49 · 89 · 189 08 56 – 0<br />

fax: +49 · 89 · 189 08 56 – 20<br />

e-mail: info@m3-gmbh.de<br />

website: www.m3-gmbh.de

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!