<strong>Reference</strong> <strong>List</strong> – in extracts 2008-2011<br />

<strong>Civil</strong> <strong>engineering</strong>/pipeline <strong>construction</strong><br />

Client: PPS / WINGAS<br />

Building activity: Gas transport pipeline NEL DN 1400 PN 84, lots 1 - 3<br />

Description: 5 x station civil <strong>engineering</strong> underground incl. concrete work and fence <strong>construction</strong><br />

Client: Bonatti S.p.A / WINGAS<br />

Building activity: Gas transport pipeline NEL 86 km DN 1400 PN 84, lots 8 and 9<br />

Description: civil <strong>engineering</strong> works incl. sheet piling work, third-party line survey and<br />

<strong>construction</strong> road<br />

3 x station civil <strong>engineering</strong> underground incl. concrete work and fence <strong>construction</strong><br />

Welding work special route 3.8 km<br />

Client: Bonatti S.p.A / WINGAS<br />

Building activity: Gas transport pipeline OPAL 138 km DN 1400 PN 84, lots 7 to 10<br />

Description: civil <strong>engineering</strong> works incl. sheet piling work, third-party line survey, <strong>construction</strong><br />

road and re<strong>construction</strong> of section<br />

9 x station civil <strong>engineering</strong> underground incl. concrete work and fence <strong>construction</strong><br />

Client: e.wa riss GmbH & Co.KG, Biberach/Riss<br />

Building activity: Ummendorf gas transport pipeline<br />

Description: Installation of natural gas transport pipeline DA160 PE-HD, <strong>construction</strong> length<br />

10,000 m from Ummendorf to Ingoldingen<br />

Additional installation of empty cable conduits for fibre optic cables<br />

Client: ZV Breitbandversorgung Ravensburg<br />

Building activity: Installation of empty cable conduit and placement of a fibre optic cable<br />

Description: 60 km of fibre optic connection lines between the villages of Fronreute, Baienfurt,<br />

Wolfertswende, Baint Schlier Grünkraut, Berg, Königseggwald, Riedhausen,<br />

Unterwaldhausen, Vogt, Waldburg and Bodegg<br />

Client: Breitbandausbau Kressbronn<br />

Building activity: Installation of empty cable conduit and placement of a fibre optic cable<br />

Description: 20 km of fibre optic connection lines between the villages of Kressbronn,<br />

Langenargen and Langenargen<br />

Client: e.wa riss GmbH & Co.KG, Biberach/Riss<br />

Building activity: Ground water catchment in Wolfental<br />

Description: Construction of groundwater seepage galleries, transport pipelines DA250 to DA560,<br />

PE-HD, HDD drill hole, 560 m, DA560<br />

1 Stand 07.09.2011


Client: Liebherr Hausgeräte Ochsenhausen<br />

Building activity: New <strong>construction</strong> of logistics hub<br />

Description: Top soil removal 125,000 m², soil removal 180,000 m³ incl. solidification,<br />

Construction of all slopes, ways and signage, all machines GPS-controlled<br />

Client: Ulm public utility company<br />

Building activity: Installation of natural gas high-pressure pipeline<br />

Description: Length: 4,800 m high-pressure gas pipeline, DN 200<br />

Specific characteristic: <strong>Pipeline</strong> installation in a sensitive habitat, inkl. Rohrbau und sämtlichen Leistungen,<br />

e.g. fence <strong>construction</strong>, re-establishment of ways and drainage lines<br />

Client: Riedlingen regional council<br />

Building activity: Recultivation/relocation of River Danube<br />

Description: Terrain modelliung approx. 40,000 m³, soil removal and subsequent fill-up,<br />

cultivation of the new flood plain of the river<br />

Client: Rown of Senden<br />

Building activity: Water supply for the town of Senden<br />

Description: Water pipeline, length: 2,150 m, cast iron pipe DN 500<br />

incl. preparation and clearing of line section and complete pipeline <strong>construction</strong><br />

Client: Community of Gestratz<br />

Building activity: Water supply for Gestratz (Allgäu)<br />

Description: Landline DA 250, length 17,000 m, 130 private connections, DA 50<br />

Specific characteristic: Crossing of many streets, brooks, fields and meadows in very hilly terrain, incl.<br />

recultivation of the area as well as all fence systems and different compressed pits<br />

Client: Major District Town of Leutkirch<br />

Building activity: Refurbishment and new installation of a water pipeline<br />

Description: Length: 3,800 m, cast iron pipe DN 400<br />

Special characteristic: Installation in a wooded area incl. felling and installation in a steep section, incl.<br />

compressed pits<br />

Client: Community of Boos<br />

Building activity: Water supply Boos - Reichau<br />

Description: Water pipeline, length: 3,240 m, DA 225<br />

Special characteristic: Installation largely in wetlands and moor<br />

Client: Town of Illertissen<br />

Building activity: Waste water plant Town of Illertissen<br />

Description: Length: 3,790 m, pipe diameter DA 280<br />

Client: Überlingen regional council<br />

Building activity: Local bypass Herbertingen<br />

Description: 270,000 m³ exchange of soil, humus removal 156,000 m², incl. renaturation<br />

Client: Krumbach water management office<br />

Building activity: Flood protection river Iller<br />

Description: 12,000 m² groove and tongue incl. wood felling, clearance of section and installation<br />

of 250,000 m³ embankment<br />

2 Stand 07.09.2011


Client: Community of Dettingen/Iller<br />

Building activity: Industrial zone of Dettingen<br />

Description: Underground sewer conduit with approx. 8,000 m²<br />

Special characteristics: Ground water level -0.50 m below top ground surface, therefore complex water<br />

drainage, incl.<strong>construction</strong> of different compressed pits<br />

Client: Community of Altshausen<br />

Building activity: Hochwasserrückhaltebecken<br />

Description: Humus removal and subsequent landfill 40,000 m², soil stripping 30,000 m³<br />

Client: Community of Altusried<br />

Building activity: Water supply for Altusried<br />

Description: Length: 7,250 m, pipe diameter: DA 280, incl. compressed pits, renaturation of the<br />

original terrain and renewal of the drainage system<br />

Client: Community of Memmingerberg (Allgäu-Airport Memmingen)<br />

Building activity: Connection to the water supply for Memmingen airport<br />

Description: Length 4,380 m, pipe diameter DA 315<br />

Special characteristics: Execution of work parallel in several sections in a <strong>construction</strong> period of approx.<br />

3 weeks<br />

Client: Geothermie Allgäu GmbH<br />

Building activity: Construction of drilling site for geothermal drilling in Kaufbeuren<br />

Description: Construction of the entire drilling area incl. re<strong>construction</strong> of roads and lanes, basin,<br />

all pipelines and all outside facilities<br />

Client: AFK Geothermie GmbH<br />

Building activity: Construction of drilling site for geothermal drilling in Munich (Aschheim)<br />

Description: Construction of the entire drilling area incl. re<strong>construction</strong> of roads and lanes, basin,<br />

all pipelines and all outside facilities<br />

The references mentioned here represent only part of the total work performed. Should you wish to request a<br />

specific number of further references, we will be glad to present them to you.<br />

3 Stand 07.09.2011