Yazaki Quick Charge Connector - CHAdeMO
Yazaki Quick Charge Connector - CHAdeMO
Yazaki Quick Charge Connector - CHAdeMO
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
5. Supply Chain<br />
5-4. Part Number / Lead-Time<br />
• Lead time to supply the DC <strong>Quick</strong> <strong>Charge</strong>r without a confirmed<br />
forecast: 8 weeks<br />
• To shorten the lead time to 4 weeks we need:<br />
- A confirmed forecast from the customer of a minimum 12-week<br />
period, or a contract to build dedicated safety stock<br />
19